JP2023044926A - Fall preventive measure structure for driver or the like outside of guard fence and fall preventive measure construction method - Google Patents

Fall preventive measure structure for driver or the like outside of guard fence and fall preventive measure construction method Download PDF

Info

Publication number
JP2023044926A
JP2023044926A JP2021153048A JP2021153048A JP2023044926A JP 2023044926 A JP2023044926 A JP 2023044926A JP 2021153048 A JP2021153048 A JP 2021153048A JP 2021153048 A JP2021153048 A JP 2021153048A JP 2023044926 A JP2023044926 A JP 2023044926A
Authority
JP
Japan
Prior art keywords
pile
evacuation
road
inspection passage
fence
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2021153048A
Other languages
Japanese (ja)
Inventor
佳顕 山本
Yoshiaki Yamamoto
悟郎 所司原
Goro Shoshihara
祥剛 竹内
Yoshitake Takeuchi
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
K Con Co Ltd
Original Assignee
K Con Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by K Con Co Ltd filed Critical K Con Co Ltd
Priority to JP2021153048A priority Critical patent/JP2023044926A/en
Publication of JP2023044926A publication Critical patent/JP2023044926A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

To provide a fall preventive measure structure and a fall preventive measure construction method for an evacuation and inspection passage for allowing a driver or the like to temporarily evacuate to the outside of a guard fence when an accident or the like occurs on a highway.SOLUTION: In a fall preventive measure structure for a driver or the like outside of a guard fence and a fall preventive measure construction method, an evacuation and inspection passage is constituted of a frame and a tread to secure a necessary width as the inspection passage, and a fall prevention fence is arranged at a slope tail side end part of the evacuation and inspection passage by securing separation from a guard fence so as not to inhibit a function of the guard fence, the slope tail pile and a slope shoulder pile in a road crossing direction are arranged at a predetermined interval in a road longitudinal direction in a lower part of the evacuation and inspection passage, and the frame is supported by each pile head part of the slope tail pile and the slope shoulder pile, the treads are supported between frames arranged at predetermined intervals in the longitudinal direction of the road to constitute an evacuation and inspection passage, and a pipeline space is provided below the evacuation and inspection passage.SELECTED DRAWING: Figure 2

Description

高速道路で事故や故障が発生し、運転者等が降車する場合、防護柵(ガードレール)外側に避難する。防護柵外側の避難先に用地幅がなく、さらに擁壁やコンクリートブロック積みの直壁に近い構造で地表面からの高さが高い場合、運転者等の転落を防ぐ転落防止柵が必要となる。本発明は高速道路の防護柵外側に設ける避難した運転者等の転落を防止する、転落防止対策構造及び転落防止対策工法に関するものである。 If an accident or breakdown occurs on the expressway and the driver, etc. gets off, evacuate to the outside of the protective fence (guardrail). If the evacuation destination outside the protective fence has no width and the height above the ground surface is high due to a structure close to a retaining wall or a straight wall made of concrete blocks, a fall prevention fence is required to prevent drivers from falling. . BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a fall prevention structure and a fall prevention construction method for preventing an evacuated driver or the like from falling, provided outside a protective fence on a highway.

盛土構造の高速道路で事故や故障が発生し、運転者等が降車を必要とした場合には、高速道路と反対側の防護柵外側に避難することになっている。盛土構造の高速道路の場合、防護柵外側の箇所は点検のための通路(以下、点検通路という)となっており、転落を防止する転落防止柵が知られているが、かならずしも転落防止柵は設けられていない。また、高盛土構造の場合には、防護柵外側は点検通路から直ぐに直壁に近い擁壁やコンクリートブロック積みとなり、地表面からの高さが高く、危険な箇所となっていることがある。一方、幅の狭い通路に転落防止柵が設けられると、清掃や設備交換などの保守点検作業をする際に、転落防止柵の存在が障害となり、作業が困難であったり、十分な作業スペースを確保できなかったりするという問題がある。また、降雪が多い場合には転落防止柵の設置により雪がたまりやすく、また除雪しにくくなるため、点検通路としての機能がそこなわれやすいという問題がある。 If an accident or a breakdown occurs on an embankment-structured expressway and the driver or other person needs to get off, they are supposed to evacuate to the outside of the protective fence on the opposite side of the expressway. In the case of expressways with an embankment structure, the area outside the protective fence is a passage for inspection (hereinafter referred to as an inspection passage), and fall prevention fences are known to prevent falls, but fall prevention fences are not necessarily Not provided. In addition, in the case of a high embankment structure, the outer side of the protective fence is a retaining wall or concrete block pile that is close to a straight wall immediately from the inspection passage, and the height from the ground surface is high and it may be a dangerous place. On the other hand, if a fall prevention fence is installed in a narrow passageway, maintenance and inspection work such as cleaning and equipment replacement will be hindered by the presence of the fall prevention fence, making it difficult to do the work and not enough work space. There is a problem that it cannot be secured. In addition, when there is a lot of snowfall, the installation of the fall prevention fence tends to accumulate snow, and it is difficult to remove the snow, so there is a problem that the function as an inspection passage is likely to be impaired.

転落防止柵の構造は、「防護柵の設置基準・同解説(平成28年12月) 日本道路協会」の「第5編 第1章 1-4歩行者自転車用柵」の「種別P」を準用して設計される。非特許文献1を参照。上記防護柵の設置基準・同解説では、転落防止柵の支柱は法肩側方に余裕を取り、所定の埋込み深さのコンクリート基礎又は支柱の延長である杭で支持することとなっている。 For the structure of the fall prevention fence, refer to "Classification P" in "Section 5, Chapter 1, 1-4 Pedestrian and Bicycle Fences" of "Protection Fence Installation Standards and Commentary (December 2016) Japan Road Association". Designed accordingly. See Non-Patent Document 1. According to the installation standards and explanations for the above protective fences, the posts of the fall prevention fence should be supported by concrete foundations with a specified embedding depth or by piles that are extensions of the posts, with a margin on the side of the slope.

特許文献1の可倒式柵1は、斜面Sのコンクリート支持体Aの上端部に設置されたものであり、さらに上記で記載した転落防止柵の設置により清掃や設備交換などの保守点検作業の障害となることを防止するため、可倒式の柵としたものである。転落防止柵には、運転者等の通路幅を確保し、さらに防護柵の機能を阻害しない所定の離隔距離も必要であり、これらの条件を満足した場合、転落防止柵は盛土法面上に一部張り出した構造となる場合もある。特許文献2は本発明出願人によるものであるが、図1の車道脇ガードレール33の直下の埋設基礎部6から、張出歩道21を車道29の反対側に設置し、張出歩道21の先端部に転落防止柵を設置している。また、特許文献3には、一方側に歩道の役目を備えた歩道用コンクリート版3を地盤上に設置し、該歩道用コンクリート版の一方側端部に転落防止柵に相当するガードパイプ12を立設している The collapsible fence 1 of Patent Document 1 is installed at the upper end of the concrete support A on the slope S, and the installation of the fall prevention fence described above facilitates maintenance and inspection work such as cleaning and equipment replacement. In order to prevent it from becoming an obstacle, it is made into a foldable fence. The anti-fall fence needs to ensure a passage width for drivers, etc., and a predetermined separation distance that does not hinder the function of the protective fence. In some cases, it has a partially overhanging structure. Patent document 2 is by the applicant of the present invention, but the overhang sidewalk 21 is installed on the opposite side of the roadway 29 from the buried foundation 6 immediately below the roadside guardrail 33 in FIG. Fall prevention fences are installed in some areas. Further, in Patent Document 3, a sidewalk concrete slab 3 having a role of a sidewalk on one side is installed on the ground, and a guard pipe 12 corresponding to a fall prevention fence is attached to one side end of the sidewalk concrete slab. erected

転落防止柵の支柱の延長である杭で支持するものとしては、特許文献4には、歩道の安全柵としてのガードパイプ柵支柱5を、軸体1の軸体下端部に螺旋板2を備えた土中建込柱にて支持したことが記載されている。 As for supporting by piles that are extensions of the posts of the fall prevention fence, Patent Document 4 discloses a guard pipe fence post 5 as a sidewalk safety fence, and a spiral plate 2 at the lower end of the shaft 1. It is described that it was supported by pillars erected in the ground.

特開2015-178758号公報JP 2015-178758 A 特開2018-21300号公報Japanese Patent Application Laid-Open No. 2018-21300 特開2014-43755号公報JP 2014-43755 A 特開2000-273833号公報JP-A-2000-273833

防護柵の設置基準・同解説(平成28年12月) 社団法人日本道路協会 第5編 第1章 1-4歩行者自転車用柵 頁5-1-6 Safety fence installation standards and commentary (December 2016) Japan Road Association Vol.

盛土構造の高速道路で事故や故障が発生し、運転者等が降車を必要とした場合には、高速道路と反対側の防護柵外側に避難することになっている。しかしながら、防護柵外側の箇所は点検通路となっているが、かならずしも転落防止柵は設けられておらず、高盛土構造の場合には、防護柵外側の点検通路から直ぐに直壁に近い擁壁やコンクリートブロック積みとなり、地表面からの高さが高く、避難した運転者等の転落を防止する転落防止柵が必要となる。一方、幅の狭い通路に転落防止柵が設けられると、清掃や設備交換などの保守点検作業をする際に、転落防止柵の存在が障害となり、作業が困難であったり、十分な作業スペースを確保できなかったりするという問題があり、さらに降雪が多い場合には転落防止柵の設置により雪がたまりやすく、また除雪しにくくなるため、点検通路としての機能がそこなわれやすいという問題がある。 If an accident or a breakdown occurs on an embankment-structured expressway and the driver or other person needs to get off, they are supposed to evacuate to the outside of the protective fence on the opposite side of the expressway. However, although there is an inspection passage outside the protective fence, there is not necessarily a fall prevention fence. Because of the concrete block construction, the height above the ground surface is high, and a fall prevention fence is required to prevent the evacuated driver from falling. On the other hand, if a fall prevention fence is installed in a narrow passageway, maintenance and inspection work such as cleaning and equipment replacement will be hindered by the presence of the fall prevention fence, making it difficult to do the work and not enough work space. In addition, when there is a lot of snowfall, the installation of fall prevention fences tends to accumulate snow and makes it difficult to remove snow, so there is a problem that the function as an inspection passage is likely to be impaired.

特許文献1では、法面S上の通路Pの転落する危険のある側に柵1を設置し、保守点検作業をする際、柵1が障害となることを避けるため、必要に応じて通路P外側へ倒れる可倒式となっている。そして、可倒式柵1は斜面Sのコンクリート支持体Aの上端部に設置されたものであるが、斜面Sに設置されたコンクリート支持体Aは可倒式柵1を支持するため大規模な基礎構造とする必要がある。特許文献2では、車道脇ガードレール33の直下の埋設基礎部6から、張出歩道21を車道29の反対側に設置し、張出歩道21の先端部に転落防止柵34を設置しているが、張出歩道21を支持する埋設基礎部を大規模な基礎構造とする必要がある。特許文献3では、歩道用コンクリート版3を地盤上に設置し、該歩道用コンクリート版の一方側端部に転落防止柵に相当するガードパイプ12を立設する構造であるが、歩道用コンクリート版3を設置する地盤が必要であり、限られた支持地盤しかない盛土の法肩に、歩道用コンクリート版3を設置する地盤を確保しなければならない問題点がある。特許文献4では、歩道の安全柵としてのガードパイプ柵支柱5を、軸体1の軸体下端部に螺旋板2を備えた土中建込柱にて支持した構造が記載されているが、法肩に点検通路を設けて転落防止柵を設置する構成についての記載はない。 In Patent Document 1, a fence 1 is installed on the side of a passage P on a slope S where there is a danger of falling, and in order to avoid the fence 1 becoming an obstacle during maintenance and inspection work, the passage P is moved as necessary. It is a collapsible type that falls to the outside. The collapsible fence 1 is installed at the upper end of the concrete support A on the slope S. The concrete support A installed on the slope S supports the collapsible fence 1. A basic structure is required. In Patent Document 2, the overhang sidewalk 21 is installed on the opposite side of the roadway 29 from the buried foundation 6 directly below the guardrail 33 on the side of the roadway, and the fall prevention fence 34 is installed at the tip of the overhang sidewalk 21. , the buried foundation supporting the overhang sidewalk 21 must be a large-scale foundation structure. In Patent Document 3, a sidewalk concrete slab 3 is installed on the ground, and a guard pipe 12 equivalent to a fall prevention fence is erected at one end of the sidewalk concrete slab. The ground on which the sidewalk concrete slab 3 is installed is necessary, and there is a problem that the ground on which the sidewalk concrete slab 3 is installed must be secured on the shoulder of the embankment where there is only limited support ground. Patent Document 4 describes a structure in which a guard pipe fence post 5 as a sidewalk safety fence is supported by an underground pillar provided with a spiral plate 2 at the lower end of the shaft 1. There is no description about the configuration of installing an inspection passage on the shoulder of the slope and installing a fall prevention fence.

このような先行技術の問題点等に鑑みて、本発明は、高速道路盛土部での防護柵外側における点検通路を兼ね備えた待避運転者等の転落防止対策として、
(a)「防護柵の設置基準・同解説(平成28年12月) 日本道路協会」の「歩行者自転車用柵」の「種別P」を満足し、かつ防護柵の機能を阻害しないように防護柵からの離隔を1.1m以上確保した、転落防止対策構造及び転落防止対策工法を提供すること、
(b)転落防止柵と防護柵間に設置する点検通路は待避運転者等の移動も考慮し、通路幅0.6m以上を確保し、かつ雪がたまりにくく除雪しやすい通路を備えた、転落防止対策構造及び転落防止対策工法を提供すること、
(c)点検通路部周辺に埋設配置された通信管路を移設収納可能とした、転落防止対策構造及び転落防止対策工法を提供すること、
(d)構造の軽量化を図り、高速道路盛土部の狭小な箇所での設置しやすい構造・工法とした、転落防止対策構造及び転落防止対策工法を提供すること、
(e)転落防止柵の設置工事による法面防災強度の維持を図り、法面掘削の最小化を図った転落防止対策構造及び転落防止対策工法を提供すること、
を目的とするものである。
In view of such problems of the prior art, the present invention has been developed as a fall prevention measure for shunting drivers and the like who also have an inspection passage outside the protective fence in the embankment of the expressway.
(a) "Standards and commentary on the installation of protective fences (December 2016) Satisfy "Type P" of "pedestrian and bicycle fences" of the Japan Road Association and do not impede the function of protective fences. To provide a fall prevention countermeasure structure and a fall prevention countermeasure construction method that secures a distance of 1.1 m or more from a protective fence,
(b) The inspection passage to be installed between the fall prevention fence and the protection fence should be 0.6 m or more in width, considering the movement of evacuated drivers, etc., and equipped with a passage that prevents snow from accumulating and that is easy to remove. To provide a countermeasure structure and fall prevention countermeasure construction method,
(c) To provide a fall prevention countermeasure structure and a fall prevention countermeasure construction method that enable relocation and storage of communication conduits buried around inspection passages;
(d) To provide a fall prevention countermeasure structure and a fall prevention countermeasure construction method that are designed to reduce the weight of the structure and make it a structure and construction method that is easy to install in a narrow section of an embankment of a highway;
(e) To provide a fall prevention structure and a fall prevention construction method that minimizes slope excavation by maintaining the slope disaster prevention strength by installing a fall prevention fence;
It is intended for

前記課題を解決するために、本発明(請求項1)は、「盛土構造の高速道路で事故や故障が発生し、運転者等が降車して防護柵外側に一時避難するための、通常は点検に使用する避難兼用点検通路であって、前記避難兼用点検通路は架台と踏板で構成され、点検通路としての必要幅員を確保し、転落防止柵は、前記防護柵の機能を阻害しないように前記防護柵からの離隔を確保して、前記避難兼用点検通路の法尻側端部に配置され、前記避難兼用点検通路の下部には、道路横断方向の法尻杭及び法肩杭を、道路縦断方向に所定間隔で配置して、前記避難兼用点検通路を支持し、前記避難兼用点検通路の下方には管路スペースを備えたことを特徴とする、防護柵外における運転手等の転落防止対策構造。」を特徴としている。 In order to solve the above-mentioned problems, the present invention (claim 1) provides a system for "when an accident or breakdown occurs on a highway with an embankment structure, the driver or the like gets off and temporarily evacuates to the outside of the protective fence. An evacuation and inspection passage used for inspection, the evacuation and inspection passage is composed of a pedestal and a tread, ensuring the necessary width as an inspection passage, and a fall prevention fence so as not to hinder the function of the protective fence. The distance from the protective fence is secured, and it is arranged at the end of the toe side of the evacuation and inspection passage. Arranged at predetermined intervals in the longitudinal direction to support the evacuation and inspection passageway, and provided with a pipeline space below the evacuation and inspection passageway, preventing a driver from falling outside the protective fence. Countermeasure structure."

転落防護柵を架台と踏板で形成された避難兼用点検通路の法尻側端部に配置することにより、防護柵の機能を阻害しないように防護柵からの離隔を確保し、かつ避難兼用点検通路は点検通路としての必要幅員を確保し、さらに、避難兼用点検通路の法尻側端部及び法面法肩に法尻杭と法肩杭をそれぞれ配置することで、「防護柵の設置基準・同解説(平成28年12月) 日本道路協会」の「歩行者自転車用柵」の設置基準を満足した、防護柵外における運転手等の転落防止対策構造である。また、避難兼用点検通路の下方には管路スペースを備えた、防護柵外における運転手等の転落防止対策構造である。さらに、避難兼用点検通路を架台と踏板で形成し、避難兼用点検通路の支持を法面に打設した法尻杭及び法肩杭で支持固定することで、構造の軽量化を図り、高速道路盛土部の狭小な箇所での法面の掘削・埋戻しのない構造とし、その結果、法面防災強度の維持及び法面改変の最小化が図られた、防護柵外における運転手等の転落防止対策構造である。 By arranging the fall protection fence at the end of the toe side of the evacuation/inspection passage formed by the pedestal and treads, the distance from the protection fence is secured so as not to impede the function of the protection fence, and the evacuation/inspection passage is also used. secures the necessary width as an inspection passage, and furthermore, by arranging trailing piles and slope shoulder piles at the end of the slope side of the inspection passage that also serves as an evacuation and on the slope shoulder, Commentary (December 2016) This is a structure that prevents drivers from falling outside the protective fence, which satisfies the installation standards for "pedestrian and bicycle fences" set by the Japan Road Association. In addition, a pipeline space is provided below the evacuation and inspection passageway, and it is a structure that prevents the driver from falling outside the protective fence. In addition, by forming an evacuation and inspection passage with a pedestal and treads, and supporting and fixing the evacuation and inspection passage with trailing piles and shoulder piles driven into the slope, the weight of the structure can be reduced and the expressway can be constructed. A structure that does not excavate or backfill the slope in a narrow part of the embankment, and as a result, the slope disaster prevention strength is maintained and the slope modification is minimized. It is a preventive measure structure.

本発明(請求項2)は、「前記架台は、T形金具で構成して逆T形状で使用し、道路横断方向の前記法尻杭及び前記法肩杭の各杭頭間に、前記逆T形状で配置して支持固定され、前記踏板は、道路縦断方向に所定の間隔で配置された前記逆T形状の架台間に支持固定されたことを特徴とする、請求項1に記載の防護柵外における運転手等の転落防止対策構造。」を特徴としている。 According to the present invention (claim 2), "the mounting frame is composed of a T-shaped metal fitting and used in an inverted T shape, and between the pile heads of the toe pile and the shoulder pile in the road crossing direction, the reverse The protection according to claim 1, characterized in that the treads are supported and fixed in a T-shape, and the footboards are supported and fixed between the inverted T-shaped pedestals arranged at predetermined intervals in the longitudinal direction of the road. It is characterized by a structure that prevents the driver from falling outside the fence.

本発明に係る「金具」とは、公知の金属からなる部材であり、要求性能に合せて公知の金属から、一例としてステンレス、防食処理された鋼材又は通常の鋼材を使用することができる。架台をT形金具で構成することにより軽量化が図られ、該T形金具を逆T形状で使用し、道路横断方向の法尻杭及び法肩杭の各杭頭間に、逆T形状で配置して支持固定され、道路縦断方向に所定の間隔で配置された逆T形状の架台間に、踏板が固定されることにより、構造の連続・剛性化と軽量化を図り、高速道路盛土部の狭小な箇所での設置容易な構造とした、防護柵外における運転手等の転落防止対策構造である。 The "metal fitting" according to the present invention is a member made of a known metal, and according to the required performance, known metals such as stainless steel, anticorrosion-treated steel, or normal steel can be used. Weight reduction is achieved by configuring the frame with T-shaped metal fittings, and the T-shaped metal fittings are used in an inverted T shape, and between the pile heads of the toe pile and the shoulder pile in the road crossing direction, in an inverted T shape By fixing the treads between the inverted T-shaped pedestals that are arranged and supported and fixed at predetermined intervals in the road longitudinal direction, the structure is made continuous, rigid, and lightweight, and the embankment of the expressway It is a structure that can be easily installed in a narrow space, and is a structure that prevents the driver from falling outside the protective fence.

本発明(請求項3)は、「法面傾斜に従い前記法肩杭は、前記法尻杭より短尺な杭を使用し、前記法尻杭及び前記法肩杭は螺旋杭であることを特徴とする、請求項1乃至請求項2のいずれか1項に記載の防護柵外における運転手等の転落防止対策構造。」を特徴としている。 The present invention (Claim 3) is characterized in that "according to the inclination of the slope, the shoulder pile uses a pile shorter than the toe pile, and the toe pile and the shoulder pile are spiral piles. A structure for preventing a driver or the like from falling outside the protective fence according to any one of claims 1 and 2."

本発明に係る「螺旋杭」とは、杭先端に螺旋状の刃を設け、該杭を回転しながら地盤に打設する、公知の杭である。法面傾斜に従い法肩側に配置された法肩杭は、法尻に配置された法尻杭より短尺な杭を使用し、杭の長さを法面高さにより最小化を図り、さらに法尻杭及び法肩杭を螺旋杭とすることで、支持力の強化と構造の軽量化を図り、高速道路盛土部の狭小な箇所での設置容易な構造とした、防護柵外における運転手等の転落防止対策構造である。 The "spiral pile" according to the present invention is a known pile that has a spiral blade at the tip of the pile and is driven into the ground while rotating. The slope piles placed on the shoulder side of the slope should be shorter than those placed at the toe of the slope. By using spiral piles for the tail piles and slope piles, we have strengthened the bearing capacity and reduced the weight of the structure. It is a fall prevention countermeasure structure.

本発明(請求項4)は、「前記避難兼用点検通路の下方に設けた前記管路スペースは、3面囲いのケーブルラックで構成して前記踏板に組み込まれ、前記ケーブルラックに配管を配置したことを特徴とする、請求項1乃至請求項3のいずれか1項に記載の防護柵外における運転手等の転落防止対策構造。」を特徴としている。 The present invention (Claim 4) is defined as follows: "The pipeline space provided below the evacuation and inspection passage is composed of cable racks that are enclosed on three sides and incorporated into the footboards, and pipes are arranged in the cable racks. A structure for preventing a driver or the like from falling outside the protective fence according to any one of claims 1 to 3, characterized by:

避難兼用点検通路の下方に設けた管路スペースを、3面囲いのケーブルラックで構成し、該ケーブルラックを踏板の下方に設けて管路を配置することで、構造の軽量化を図り、高速道路盛土部の狭小な箇所での設置容易な構造とした、防護柵外における運転手等の転落防止対策構造である。 The pipeline space provided below the evacuation and inspection passage is configured with a three-sided enclosure cable rack. This is a structure that can be easily installed in a narrow section of the road embankment to prevent the driver from falling outside the protective fence.

本発明(請求項5)は、「盛土構造の高速道路で事故や故障が発生し、運転者等が降車して防護柵外側に一時避難するための、通常は点検に使用する避難兼用点検通路であって、盛土法面の道路横断方向の法尻杭及び法肩杭を、道路縦断方向に所定間隔で打設し、架台を、前記道路横断方向の前記法尻杭及び前記法肩杭の各杭頭間に、道路縦断方向に前記所定間隔で架設し、管路スペースを下方に備えた踏板を、前記所定間隔で架設された前記架台間に架設して、避難兼用点検通路を形成し、転落防止柵を、前記防護柵の機能を阻害しないように、前記防護柵からの離隔を取りながら点検通路としての必要幅を確保して前記避難兼用点検通路の法尻側端部に設けたことを特徴とする、防護柵外における運転手等の転落防止対策工法。」を特徴としている。 The present invention (Claim 5) is "an evacuation and inspection passage that is usually used for inspection, in order to temporarily evacuate to the outside of the protective fence when an accident or breakdown occurs on an embankment-structured expressway. The toe piles and the shoulder piles in the road crossing direction of the embankment slope are driven at predetermined intervals in the road longitudinal direction, and the mounting frame is placed on the toe piles and the shoulder piles in the road crossing direction. Between the pile heads, it is constructed at the predetermined intervals in the longitudinal direction of the road, and a tread plate having a pipeline space below is constructed between the pedestals constructed at the predetermined intervals to form an evacuation and inspection passage. A fall prevention fence is provided at the toe side end of the evacuation/inspection passage while securing a necessary width as an inspection passage while maintaining a distance from the protection fence so as not to hinder the function of the protection fence. A construction method for preventing the fall of drivers, etc. outside the protective fence, which is characterized by

転落防護柵を、防護柵の機能を阻害しないように、該防護柵からの離隔を取りながら点検通路としての必要幅を確保して避難兼用点検通路の法尻側端部に設け、さらに、盛土法面の道路横断方向の法尻杭及び法肩杭を、道路縦断方向に所定間隔で打設することで、「防護柵の設置基準・同解説(平成28年12月) 日本道路協会」の「歩行者自転車用柵」の設置基準を満足した、防護柵外における運転手等の転落防止対策工法となっている。また、避難兼用点検通路の下方には管路スペースを備えた、防護柵外における運転手等の転落防止対策工法である。さらに、踏板を所定間隔で架設された架台間に架設して、避難兼用点検通路を形成し、さらに、避難兼用点検通路を法面に打設した法尻杭及び法肩杭で支持することで、高速道路盛土部の狭小な箇所での法面の掘削・埋戻しの必要のない施工容易な工法とし、その結果、法面防災強度の維持及び法面改変の最小化が図られた、防護柵外における運転手等の転落防止対策工法である。 A fall protection fence is provided at the end of the trailing side of the inspection passage that is also used as an evacuation, securing the necessary width as an inspection passage while maintaining a distance from the protection fence so as not to hinder the function of the protection fence, and embankment. By driving the trailing piles and slope piles in the road crossing direction on the slope at predetermined intervals in the road longitudinal direction, it is possible to comply with the "Protective Fence Installation Standards and Commentary (December 2016) Japan Road Association". This method meets the installation standards for "pedestrian and bicycle fences" and prevents drivers from falling outside the protective fence. In addition, a pipeline space is provided below the evacuation and inspection passage, which is a construction method to prevent drivers from falling outside the protective fence. Furthermore, by constructing the treads between the pedestals erected at predetermined intervals to form an inspection passage that also serves as an evacuation, and furthermore, by supporting the passage that also serves as an evacuation and inspection with trailing piles and slope piles driven into the slope. , It is an easy construction method that does not require excavation and backfilling of slopes in narrow areas of expressway embankments. This is a construction method to prevent drivers from falling outside the fence.

本発明(請求項6)は、「前記架台は、T形金具で構成して逆T形状で使用し、道路横断方向の前記法尻杭及び前記法肩杭の各杭頭間に、前記逆T形状で架設して支持固定し、道路縦断方向に所定の間隔で配置された前記逆T形状の架台間に、前記踏板を支持固定させたことを特徴とする、請求項5に記載の防護柵外における運転手等の転落防止対策工法。」を特徴としている。 The present invention (Claim 6) provides that "the pedestal is composed of a T-shaped metal fitting and used in an inverted T shape, and between the pile heads of the toe pile and the shoulder pile in the road crossing direction, the reverse The protection according to claim 5, characterized in that the treads are supported and fixed between the inverted T-shaped pedestals that are erected in a T shape and supported and fixed at predetermined intervals in the longitudinal direction of the road. It is characterized by a construction method to prevent drivers from falling outside the fence.

本発明に係る「金具」とは、公知の金属からなる部材であり、要求性能に合せて公知の金属から、一例としてステンレス、防食処理された鋼材又は通常の鋼材を使用することができる。架台をT形金具で構成することにより軽量化が図られ、該T形金具を逆T形状で使用し、道路横断方向の法尻杭及び法肩杭の各杭頭間に、逆T形状で架設して支持固定され、道路縦断方向に所定の間隔で架設された逆T形状の架台間に、踏板が支持固定されることにより、高速道路盛土部の狭小な箇所での軽量で施工容易な工法とした、防護柵外における運転手等の転落防止対策工法である。 The "metal fitting" according to the present invention is a member made of a known metal, and according to the required performance, known metals such as stainless steel, anticorrosion-treated steel, or normal steel can be used. Weight reduction is achieved by configuring the frame with T-shaped metal fittings, and the T-shaped metal fittings are used in an inverted T shape, and between the pile heads of the toe pile and the shoulder pile in the road crossing direction, in an inverted T shape The treads are supported and fixed between the inverted T-shaped pedestals that are erected and supported and fixed at predetermined intervals in the longitudinal direction of the road. This is a construction method to prevent drivers from falling outside the protective fence.

本発明(請求項7)は、「法面傾斜に従い前記法肩杭は、前記法尻杭より短尺な杭を使用し、前記法尻杭及び法肩杭は螺旋杭であることを特徴とする、請求項5乃至請求項6のいずれか1項に記載の防護柵外における運転手等の転落防止対策工法。」を特徴としている。 The present invention (Claim 7) is characterized in that "according to the inclination of the slope, the shoulder pile uses a pile shorter than the toe pile, and the toe pile and the shoulder pile are spiral piles. , a construction method for preventing a driver or the like from falling outside the protective fence according to any one of claims 5 and 6."

本発明に係る「螺旋杭」とは、杭先端に螺旋状の刃を設け、該杭を回転しながら地盤に打設する、公知の杭である。法面傾斜に従い、法肩側に打設される法肩杭は、法尻に打設される法尻杭より短尺な杭を使用し、杭の長さを法面高さに対応した最小化による軽量化を図り、さらに法尻杭及び法肩杭を螺旋杭とすることで、高速道路盛土部の狭小な箇所での設置容易な工法とした、防護柵外における運転手等の転落防止対策工法である。 The "spiral pile" according to the present invention is a known pile that has a spiral blade at the tip of the pile and is driven into the ground while rotating. According to the slope slope, the piles driven on the shoulder side of the slope use shorter piles than the piles driven on the bottom of the slope, and the length of the piles is minimized according to the height of the slope. In addition, by making the trailing pile and the trailing pile a spiral pile, it is easy to install in a narrow place on the embankment of the expressway. Construction method.

本発明(請求項8)は、「前記避難兼用点検通路の下方に設けた前記管路スペースは、3面囲いのケーブルラックで構成し前記踏板に組み込まれ、前記ケーブルラックに配管を配置したことを特徴とする、請求項5乃至請求項7のいずれか1項に記載の防護柵外における運転手等の転落防止対策工法。」を特徴としている。 The present invention (Claim 8) provides that "the conduit space provided below the evacuation/inspection passage is composed of cable racks that are enclosed on three sides and are incorporated in the footboards, and pipes are arranged in the cable racks. A construction method for preventing a driver or the like from falling outside the protective fence according to any one of claims 5 to 7, characterized by:

避難兼用点検通路から下方には設けた管路スペースを、3面囲いのケーブルラックで構成し、該ケーブルラックを踏板の下方に設けて管路を配置することで、構造の軽量化を図り、高速道路盛土部の狭小な箇所での設置容易な工法とした、防護柵外における運転手等の転落防止対策工法である。 The pipeline space provided below the evacuation and inspection passage is configured with a three-sided enclosure cable rack, and the cable rack is provided below the tread and the pipeline is arranged to reduce the weight of the structure. This is a construction method that can be easily installed in a narrow area of an embankment of an expressway to prevent a driver from falling outside the protective fence.

転落防護柵を、架台と踏板で形成された避難兼用点検通路の法尻側端部に配置することにより、防護柵の機能を阻害しないように防護柵からの離隔を取りながら点検通路としての必要幅を確保し、さらに、避難兼用点検通路の法尻側端部及び法面法肩に法尻杭と法肩杭をそれぞれ配置することで、「防護柵の設置基準・同解説(平成28年12月) 日本道路協会」の「歩行者自転車用柵」の設置基準満足した、防護柵外における運転手等の転落防止対策構造及び工法である。また、避難兼用点検通路の下方には管路スペースを備え、さらに、避難兼用点検通路を架台と踏板による連続・剛性化構造とし、避難兼用点検通路を法面に打設した法尻杭及び法肩杭で支持することで支持力の強化と構造の軽量化を図り、高速道路盛土部の狭小な箇所での法面の掘削・埋戻しの必要のない工法とし、その結果、法面防災強度の維持及び法面改変の最小化が図られた、防護柵外における運転手等の転落防止対策構造及び工法を提供することができる。 By arranging the fall protection fence at the end of the toe side of the inspection passage that also serves as an evacuation, which is formed by a pedestal and treads, it is necessary as an inspection passage while keeping a distance from the protection fence so as not to hinder the function of the protection fence. By securing the width and placing the toe piles and the shoulder piles at the end of the toe side of the evacuation and inspection passage and the shoulder of the slope, (December) This is a structure and construction method that satisfies the installation standards for "pedestrian and bicycle fences" set by the Japan Road Association and prevents drivers, etc. from falling outside the protective fences. In addition, a pipeline space is provided below the evacuation and inspection passage, and the evacuation and inspection passage has a continuous and rigid structure with a pedestal and treads. By supporting with shoulder piles, we aim to strengthen the bearing capacity and reduce the weight of the structure, making it a construction method that does not require excavation and backfilling of slopes in narrow areas of expressway embankments. It is possible to provide a structure and construction method to prevent drivers from falling outside the guard fence, which maintains the safety and minimizes slope modification.

転落防止柵がない防護柵外側の点検通路の側面図Side view of inspection passage outside protective fence without fall prevention fence 防護柵外側に避難兼用点検通路を設け転落防止柵を設置した側面図A side view of an evacuation/inspection passage outside the protective fence and a fall prevention fence installed 防護柵外側に避難兼用点検通路を設け転落防止柵を設置した正面図Front view with an evacuation/inspection passage outside the protective fence and a fall prevention fence installed 避難兼用点検通路下方に設けた管路スペースの側面図Side view of the pipeline space provided below the evacuation and inspection passage 防護柵外側に避難兼用点検通路を設ける施工手順図Construction procedure diagram for installing an evacuation and inspection passage outside the protective fence

以下、図面を参照しながら本発明の好適な実施形態を説明する。なお、盛土構造の高速道路の走行方向に直角な道路横断方向において、防護柵に対して走行車線と反対側を「外側」という。道路横断方向の法面において、法面の法先部を「法尻」、法面の法上端部を「法肩」といい、道路横断方向での位置の表記に使用する。高速道路の走行方向を道路縦断方向といい、位置の表記に使用する。また、避難兼用点検通路の「下部」「下方」とは、避難兼用点検通路の通路面反対側の裏側を「下」といい、位置の表記に使用する。 Preferred embodiments of the present invention will be described below with reference to the drawings. In addition, in the road crossing direction perpendicular to the driving direction of the embankment structure expressway, the side opposite to the driving lane with respect to the guard fence is called "outside". On a slope in the cross-road direction, the toe of the slope is called the "bottom of the slope" and the top of the slope is called the "shoulder", which are used to indicate the position in the cross-road direction. The direction of travel on an expressway is called the longitudinal direction of the road, and it is used to indicate locations. In addition, the "lower" and "lower" sides of the evacuation/inspection passageway are used to indicate the positions, and the back side of the evacuation/inspection passageway opposite to the side of the passageway is referred to as "lower".

図1は、転落防止柵がない防護柵外側の点検通路の側面図である。盛土構造の高速道路で事故や故障が発生し、運転者等が降車を必要とした場合には、高速道路と反対側の防護柵(ガードレール)外側に避難することになっている。盛土構造の高速道路の場合、防護柵外側の箇所は点検のための点検通路となっており、転落を防止する転落防止柵が知られているが、かならずしも転落防止柵は設けられていない。一方、幅の狭い通路に転落防止柵が設けられると、清掃や設備交換などの保守点検作業をする際に、転落防止柵の存在が障害となり、作業が困難であったり、十分な作業スペースを確保できなかったりするという問題がある。また、降雪が多い場合には転落防止柵の設置により雪がたまりやすく、また除雪しにくくなるため、点検通路としての機能がそこなわれやすいという問題がある。 FIG. 1 is a side view of an inspection passage outside a protective fence without a fall prevention fence. In the event of an accident or breakdown on an embankment-structured expressway and the driver, etc., needs to get off, they are supposed to evacuate to the outside of the guardrail on the opposite side of the expressway. In the case of an embankment-structured expressway, the area outside the protective fence serves as an inspection passage for inspection, and fall prevention fences are known to prevent falls, but fall prevention fences are not necessarily provided. On the other hand, if a fall prevention fence is installed in a narrow passageway, maintenance and inspection work such as cleaning and equipment replacement will be hindered by the presence of the fall prevention fence, making it difficult to do the work and not enough work space. There is a problem that it cannot be secured. In addition, when there is a lot of snowfall, the installation of the fall prevention fence tends to accumulate snow, and it is difficult to remove the snow, so there is a problem that the function as an inspection passage is likely to be impaired.

このような先行技術の問題点等に鑑みて、本発明は、高速道路盛土部での防護柵外側における待避運転者等の転落防止対策として
(a)「防護柵の設置基準・同解説(平成28年12月) 日本道路協会」の「歩行者自転車用柵」の「種別P」を満足し、かつ防護柵の機能を阻害しないように防護柵からの離隔を1.1m以上確保し、
(b)転落防止柵と防護柵間に設置する点検通路は待避運転者等の移動も考慮し、通路幅0.6m以上を確保し、かつ雪がたまりにくく除雪しやすい通路とし、
(c)点検通路部周辺に埋設配置された通信管路を移設収納可能とし、
(d)構造の軽量化を図り、高速道路盛土部の狭小な箇所での設置しやすい構造・工法とし、
(e)転落防止柵の設置工事による法面防災強度の維持を図り、法面掘削の最小化を図った、転落防止対策構造及び転落防止対策工法に関するものである。
In view of such problems of the prior art, the present invention provides (a) "Protective fence installation standards and commentary (Heisei era (December 2016) Satisfying the "Type P" of the "pedestrian and bicycle fence" of the Japan Road Association, and ensuring a distance of 1.1 m or more from the protective fence so as not to hinder the function of the protective fence.
(b) The inspection passage installed between the fall prevention fence and the protection fence should be 0.6 m or more in width, considering the movement of evacuated drivers, etc., and it should be easy to remove snow and prevent snow from accumulating.
(c) Make it possible to relocate and store the communication conduits buried around the inspection passage,
(d) To reduce the weight of the structure and adopt a structure and construction method that is easy to install in a narrow section of the embankment of the expressway,
(e) It relates to a fall-prevention structure and a fall-prevention construction method that maintains the slope disaster prevention strength by installing a fall prevention fence and minimizes slope excavation.

このため、本発明の防護柵外における運転手等の転落防止対策構造及び転落防止対策工法では、転落防止柵8を架台91と踏板92で形成された避難兼用点検通路9の法尻側端部に配置することにより、防護柵5の機能を阻害しないように防護柵5からの離隔を確保し、さらに、避難兼用点検通路9の法尻側端部及び法面法肩に杭93をそれぞれ配置することで、「防護柵の設置基準・同解説(平成28年12月) 日本道路協会」の「歩行者自転車用柵」の設置基準満足し、また避難兼用点検通路9の下方には管路スペース100を備え、避難兼用点検通路9を架台91と踏板92で形成し、さらに避難兼用点検通路9を法面に打設した杭93で支持固定することで、構造の軽量化を図り、高速道路盛土部の狭小な箇所での設置しやすい構造及び工法とし、その結果、法面防災強度の維持及び法面掘削の最小化が図られた、防護柵外における運転手等の転落防止対策構造及び工法となっている。 For this reason, in the structure and method for preventing the fall of drivers outside the guard fence of the present invention, the fall prevention fence 8 is formed at the toe side end of the escape/inspection passage 9 formed by the pedestal 91 and the treads 92. By arranging it on the slope, the distance from the protective fence 5 is secured so as not to hinder the function of the protective fence 5, and furthermore, piles 93 are arranged at the toe side end of the evacuation and inspection passage 9 and on the slope shoulder. By doing so, it satisfies the installation standards for "fences for pedestrians and bicycles" of the "Standards and Commentary on Installation of Protective Fences (December 2016) Japan Road Association" A space 100 is provided, an evacuation/inspection passage 9 is formed by a frame 91 and a tread plate 92, and the evacuation/inspection passage 9 is supported and fixed by piles 93 driven into the slope, thereby reducing the weight of the structure and increasing the speed. The structure and construction method are easy to install in a narrow section of the road embankment, and as a result, the slope disaster prevention strength is maintained and the slope excavation is minimized. and construction method.

本発明の実施形態として、初めに防護柵外における運転手等の転落防止対策構造において、軽量で設置取付けを容易にした各部材の構成について説明する。避難兼用点検通路9の主要材は、転落防止柵8、架台91、踏板92、杭93(93A、93B)、管路スペース100、ケーブルラック101、及び管路102から構成されている。図2は、上記各部材により、防護柵外側に避難兼用点検通路9を設け転落防止柵8を設置した側面図を示す。以下に、転落防止対策構造の各主要材の詳細及び組み立て構造を記載する。 As an embodiment of the present invention, the structure of each member that is lightweight and easy to install will be described first in a structure for preventing a driver from falling outside the protective fence. The evacuation/inspection passageway 9 is mainly composed of a fall prevention fence 8 , a pedestal 91 , a tread plate 92 , piles 93 ( 93 A and 93 B), a pipeline space 100 , a cable rack 101 and a pipeline 102 . FIG. 2 shows a side view in which an evacuation/inspection passage 9 is provided outside the protection fence and a fall prevention fence 8 is installed using the above members. The details of each main material of the fall prevention structure and the assembly structure are described below.

転落防止柵8は、防護柵5の機能を阻害しないように該防護柵5からL=1100mmの離隔を確保した避難兼用点検通路9の法尻側端部に配置され、一例として手すり高さH=1100mmのビーム形式である。架台91と踏板92で構成された避難兼用点検通路9の点検通路幅は、待避運転者等の移動も考慮し、通路幅0.6m以上を確保してある。また、避難兼用点検通路9には、雪がたまりにくく除雪しやすいアルミ縞板製踏板92を採用している。 The fall prevention fence 8 is arranged at the toe side end of the escape/inspection passage 9 that secures a distance of L = 1100 mm from the protection fence 5 so as not to hinder the function of the protection fence 5. As an example, the handrail height H = 1100 mm beam format. The inspection passage width of the evacuation/inspection passage 9 composed of the pedestal 91 and the treads 92 is ensured to be 0.6 m or more in consideration of the movement of the shunting driver and the like. In addition, the inspection passage 9 also used as an evacuation adopts a tread plate 92 made of aluminum strip plate which prevents snow from accumulating and which is easy to remove.

避難兼用点検通路9の下部には、道路横断方向の法尻側に法尻杭93Aを配置し、法肩側に法肩杭93Bを配置し、道路縦断方向に一例としてLp=2016mm間隔で配置し、該避難兼用点検通路9を支持固定する。そして、杭93は螺旋杭とすることで、支持力の強化を図った。また、法面傾斜に従い法肩側に配置された法肩杭93Bは、法尻に配置された法尻杭93Aより短尺な杭を使用し、杭93の長さを法面高さにより最小化し軽量化を図った。法尻杭93Aは、一例として杭長L=2500mm、杭外径φ=114mmの鋼管螺旋杭であり、法肩杭93Bは、一例として杭長L=1500mm、杭外径φ=114mmの鋼管螺旋杭である。法尻杭93A及び法肩杭93Bは、杭先端部に螺旋状のスクリュー部を、杭頭部にはボルト接合が可能なフランジ部を、備えた螺旋杭である。図2及び図3を参照。 At the bottom of the evacuation and inspection passage 9, a slope pile 93A is placed on the side of the slope in the road crossing direction, a slope pile 93B is placed on the slope side, and Lp = 2016 mm intervals are arranged in the road longitudinal direction as an example. Then, the evacuation and inspection passage 9 is supported and fixed. The pile 93 is formed as a spiral pile to enhance the bearing capacity. In addition, the slope shoulder pile 93B arranged on the slope side according to the slope slope uses a shorter pile than the slope toe pile 93A arranged on the slope toe, and the length of the pile 93 is minimized by the slope height. We tried to reduce the weight. The bottom pile 93A is, for example, a steel pipe spiral pile having a pile length L of 2500 mm and a pile outer diameter φ of 114 mm. It's a stake. The toe pile 93A and the shoulder pile 93B are helical piles having a helical screw portion at the tip of the pile and a flange portion that can be joined with bolts at the head portion of the pile. See FIGS. 2 and 3.

避難兼用点検通路9を構成する架台91は、一例としてT形鋼(100×100×6×8mm)を採用することにより、軽量化が図られている。該架台91は逆T形状で使用し、法尻杭93A及び法肩杭93Bの各杭頭部のフランジ部に架設して、ボルトにて該杭頭部のフランジ部と連結して支持固定とし、道路縦断方向に所定間隔Lp=2016mm間隔で配置する。杭93と架台91を連結して支持固定する際、必要に応じて、道路横断方向、縦断方向及び高さ方向の調整のため、公知の治具(図示せず)を介在させる。図2及び図3を参照。
なお上記各数値は一例であり、条件により適宜選択して使用する。
The mount 91 that constitutes the evacuation and inspection passageway 9 is lightened by adopting, for example, T-shaped steel (100×100×6×8 mm). The frame 91 is used in an inverted T shape, is installed on the flanges of the pile heads of the toe pile 93A and the shoulder pile 93B, and is connected to the flanges of the pile heads with bolts to support and fix. , are arranged at predetermined intervals Lp=2016 mm in the longitudinal direction of the road. When connecting and supporting the pile 93 and the frame 91, a known jig (not shown) is interposed for adjustment in the road cross direction, longitudinal direction and height direction, if necessary. See FIGS. 2 and 3.
It should be noted that each of the above numerical values is an example, and is appropriately selected and used depending on the conditions.

避難兼用点検通路9を構成する踏板92は、一例としてアルミ縞板製中空箱蓋形状(長さ2000×幅500×高さ100mm)を採用することにより、軽量化が図られている。該踏板92は、道路縦断方向に所定間隔のLp=2016mm間隔で配置された逆T形状の架台91間に、道路横断方向に2本配置して通路幅0.6m以上を確保し、ボルトにて架台91と連結固定させる。架台91は、法尻杭93A及び法肩杭93Bの各杭頭部により道路横断方向に支持固定され、踏板92は、道路縦断方向に所定の間隔で配置された架台91間に支持固定されることにより、道路横断方向及び道路縦断方向の構造の連続・剛性化が図られる。図2及び図3を参照。 The footboard 92 that constitutes the evacuation and inspection passageway 9 is lightened by adopting, for example, a hollow aluminum box lid shape (length 2000×width 500×height 100 mm). Two treads 92 are arranged in the road crossing direction between the inverted T-shaped pedestals 91 arranged at a predetermined interval Lp = 2016 mm in the road longitudinal direction to ensure a passage width of 0.6 m or more, and bolts are connected and fixed to the pedestal 91. The pedestal 91 is supported and fixed in the road crossing direction by the pile heads of the toe pile 93A and the slope shoulder pile 93B, and the tread plate 92 is supported and fixed between the pedestals 91 arranged at predetermined intervals in the road longitudinal direction. As a result, the structure can be made continuous and rigid in both the cross-road direction and the road-longitudinal direction. See FIGS. 2 and 3.

避難兼用点検通路9から下方に設けた管路スペース100は、法尻側に設置される踏板92の下方に、3面囲いのケーブルラック101を設置することで構成し、踏板92を架台91に架設する前に該ケーブルラック101が組み込まれている。そして、踏板92を架台91に架設後に、該ケーブルラック101に管路102が配置される。図4を参照。 The pipeline space 100 provided below the evacuation and inspection passage 9 is configured by installing a three-sided enclosure cable rack 101 below the footboard 92 installed on the side of the slope, and the footboard 92 is attached to the frame 91. The cable rack 101 is installed before installation. After the footboard 92 is installed on the frame 91 , the pipeline 102 is arranged on the cable rack 101 . See FIG.

上記に記載した転落防止対策構造は、盛土構造の高速道路1で事故や故障が発生し、運転者等が降車して防護柵5外側に一時避難するための、通常は点検に使用する避難兼用点検通路9であって、防護柵5の機能を阻害しないように該防護柵5からの離隔を確保した箇所に転落防止柵8を備え、該転落防止柵8は架台91と踏板92で構成された該避難兼用点検通路9の法尻側端部に配置され、避難兼用点検通路9の下部には、道路横断方向の法尻杭93A及び法肩杭93Bを、道路縦断方向に所定間隔で配置して、前記避難兼用点検通路9を支持固定し、避難兼用点検通路9の下方には管路スペース100を備えている、防護柵外における運転手等の転落防止対策構造である。 The fall prevention structure described above is also used for evacuation, which is usually used for inspection, in order to temporarily evacuate to the outside of the protective fence 5 by getting off the driver in the event of an accident or breakdown on the embankment-structured expressway 1. In the inspection passage 9, a fall prevention fence 8 is provided at a location that secures a distance from the protection fence 5 so as not to hinder the function of the protection fence 5, and the fall prevention fence 8 is composed of a stand 91 and a footboard 92. In addition, it is arranged at the end of the toe side of the evacuation and inspection passage 9, and at the lower part of the evacuation and inspection passage 9, the toe pile 93A and the shoulder pile 93B in the road crossing direction are arranged at predetermined intervals in the road longitudinal direction. Then, the evacuation and inspection passage 9 is supported and fixed, and a pipeline space 100 is provided below the evacuation and inspection passage 9, thereby preventing the driver from falling outside the protective fence.

次に、本発明の実施形態として、防護柵外における運転手等の転落防止対策工法において、軽量で設置取付けを容易にした各施工手順について説明する。 Next, as an embodiment of the present invention, in the construction method for preventing a driver from falling outside the protective fence, each construction procedure that is lightweight and easy to install will be described.

避難兼用点検通路9を設ける施工手順は、
(1)盛土法面12に杭93の打設位置93Sを明示する(墨だし)。図5(a)
(2)盛土法面12に法尻杭93A及び法肩杭93Bを打設する。図5(b)
(3)法肩杭93A及び法肩杭93Bの各杭頭間に架台91を架設する。図5(c)
(4)架台91間に踏板92を架設する。図5(d)
(5)管路スペース100へ管路102を配置する。図5(e)
(6)転落防止柵8を避難兼用点検通路9に設置する。図5(e)
手順であり、図5に、防護柵外側に避難兼用点検通路9を設ける施工手順図を示す。以下に、各作業の詳細手順を記載する。
The construction procedure for providing the evacuation and inspection passage 9 is
(1) Clearly mark driving positions 93S of the piles 93 on the embankment slope 12 (marking). Figure 5(a)
(2) Driving the bottom pile 93A and the shoulder pile 93B on the embankment slope 12; Fig. 5(b)
(3) Mounting frame 91 is constructed between each pile head of slope shoulder pile 93A and slope shoulder pile 93B. Fig. 5(c)
(4) Install the treads 92 between the pedestals 91 . Fig. 5(d)
(5) placing the pipeline 102 in the pipeline space 100; Fig. 5(e)
(6) A fall prevention fence 8 is installed in the evacuation and inspection passage 9 . Fig. 5(e)
FIG. 5 shows a construction procedure diagram for providing an evacuation and inspection passageway 9 outside the protective fence. Detailed procedures for each work are described below.

<杭打設位置の明示>
杭93の打設に先行して盛土法面12に、杭93の打設位置93Sを明示する。図5(a)を参照。
<Clarification of pile driving position>
Prior to the driving of the pile 93, the driving position 93S of the pile 93 is clearly indicated on the embankment slope 12. - 特許庁See FIG. 5(a).

<杭の打設>
杭93の打設位置93Sに従い、道路横断方向の法尻杭93A及び法肩杭93Bを、道路縦断方向に一例として所定間隔Lp=2016mm間隔で打設する。杭93の諸元は上記転落防止対策構造の主要材の詳細で記載したとおりである。初めに道路横断方向の法尻杭93Aを打設し、その後法肩杭93Bを打設する。打設は、図5(b)に例示するように、高速道路1の本線路肩3上に一例として杭打設機200である小型バックホウを配置して、該本線路肩3上から法尻杭93A及び法肩杭93Bを回転打設する。該小型バックホウのアーム先端には、杭93を回転打設する装置が装着され、杭93の杭頭部のフランジ部を挟持して回転打設する。そして、道路横断方向の法尻杭93A及び法肩杭93Bの打設が完了後、杭打設機200を道路縦断方向に杭の打設間隔だけ本線路肩3に沿って移動し、道路横断方向の法尻杭93A及び法肩杭93Bの打設を行い、同様の作業を道路縦断方向に所定区間実施する。高速道路盛土部の狭小な箇所で、本線路肩3から基礎工としての杭93の施工が可能で、法面の掘削・埋戻しの必要のない施工容易な工法であり、その結果、法面防災強度の維持及び法面改変の最小化が図られる。
<Pile driving>
According to the driving position 93S of the pile 93, the toe pile 93A and the shoulder pile 93B in the road crossing direction are driven at a predetermined interval Lp=2016 mm in the road longitudinal direction as an example. The specifications of the piles 93 are as described in the details of the main members of the fall prevention structure. First, the toe pile 93A in the road crossing direction is driven, and then the shoulder pile 93B is driven. As shown in FIG. 5B, driving is performed by arranging a small backhoe, which is a pile driving machine 200 as an example, on the main road shoulder 3 of the expressway 1, and driving the trailing pile 93A from the main road shoulder 3. And the shoulder pile 93B is driven by rotation. A device for rotating and driving the pile 93 is attached to the tip of the arm of the small backhoe, and the flange portion of the pile head of the pile 93 is clamped and driven by rotation. Then, after the driving of the toe pile 93A and the shoulder pile 93B in the road crossing direction is completed, the pile driving machine 200 is moved along the main road shoulder 3 by the distance between the piles in the road longitudinal direction. The toe pile 93A and the shoulder pile 93B are driven, and the same work is carried out for a predetermined section in the longitudinal direction of the road. In a narrow part of the embankment of the expressway, it is possible to construct the pile 93 as a foundation work from the main track shoulder 3, and it is an easy construction method that does not require excavation and backfilling of the slope, and as a result, slope disaster prevention. Maintaining strength and minimizing slope alterations.

<架台の架設>
架台91は、一例としてT形鋼(100×100×6×8mm)で構成することにより、軽量化が図られている。該架台91は、逆T形状で使用して道路横断方向の法尻杭93A及び法肩杭93Bの各杭頭部のフランジ部に架設し、必要に応じて、道路横断方向、縦断方向及び高さ方向の調整のため、公知の治具(図示せず)を介在させ、ボルトにて各杭頭部のフランジ部と連結して容易に支持固定することができる。そして、道路縦断方向に所定間隔Lp=2016mm間隔で、同様に架台91を架設していく。図5(c)を参照。
なお上記各数値は一例であり、条件により適宜選択して使用する。
<Installing the frame>
As an example, the frame 91 is made of T-shaped steel (100×100×6×8 mm) to reduce its weight. The mount 91 is used in an inverted T shape and is installed on the flanges of the pile heads of the toe pile 93A and the shoulder pile 93B in the road transverse direction, and if necessary, the road transverse direction, longitudinal direction and height For adjustment in the vertical direction, a known jig (not shown) is interposed, and bolts are used to connect the flanges of the pile heads to facilitate support and fixation. Then, the pedestals 91 are similarly installed at predetermined intervals Lp=2016 mm in the longitudinal direction of the road. See FIG. 5(c).
It should be noted that each of the above numerical values is an example, and is appropriately selected and used depending on the conditions.

<踏板の架設>
道路縦断方向に所定間隔Lp=2016mmで架設された逆T形状の架台91間に、踏板92(一例としてアルミ縞板製中空箱蓋形状:長さ2000×幅500×高さ100mm)を、道路横断方向に2本架設して通路幅0.6m以上が確保される。逆T形状の架台91間に架設された踏板92の両端部は、道路縦断方向にボルトにて容易に架台91に支持固定させる。道路横断方向の法尻側に配置する踏板92には、事前に図4に示すケーブルラック101が組み込まれている。図4及び図5(d)を参照。
なお、踏板92の法尻側端部に転落防止柵8を事前に取り付けておくことも可能である
<Erection of treads>
Between the inverted T-shaped pedestals 91 erected at a predetermined interval Lp = 2016 mm in the longitudinal direction of the road, treads 92 (as an example, a hollow box lid shape made of aluminum strip plate: length 2000 × width 500 × height 100 mm) are installed on the road. A passage width of 0.6 m or more is ensured by installing two in the transverse direction. Both ends of the treads 92 installed between the inverted T-shaped pedestals 91 are easily supported and fixed to the pedestals 91 by bolts in the longitudinal direction of the road. A cable rack 101 shown in FIG. 4 is incorporated in advance in the treads 92 arranged on the toe side of the road in the crossing direction. See FIGS. 4 and 5(d).
In addition, it is also possible to attach the fall prevention fence 8 to the trailing side end of the tread 92 in advance.

<管路スペースへの管路の配管>
踏板92を架台91に架設後に、該ケーブルラック101に管路102を配管する。図4及び図5(e)を参照。
なお、既存ケーブル7は、事前に移設を完了しておく。
<Plumbing of pipelines to the pipeline space>
After installing the footboard 92 on the frame 91 , the pipeline 102 is laid on the cable rack 101 . See FIGS. 4 and 5(e).
It should be noted that the existing cable 7 should be completely relocated in advance.

<転落防止柵の設置>
転落防止柵8を、防護柵5の機能を阻害しないように、該防護柵5からの離隔L=1100mmを確保して、避難兼用点検通路9の法尻側端部に設置する。図5(e)を参照。
なお、上記記載の通り法尻側踏板92に事前に取り付けておくことも可能である。
<Installation of fall prevention fences>
A fall prevention fence 8 is installed at the toe side end of the escape/inspection passage 9 while securing a distance L = 1100 mm from the protection fence 5 so as not to hinder the function of the protection fence 5 . See FIG. 5(e).
In addition, as described above, it is also possible to attach it to the toe side footboard 92 in advance.

上記に記載した防護柵外における運転手等の転落防止対策工法は、盛土法面の道路横断方向の法尻杭93A及び法肩杭93Bを、道路縦断方向に所定間隔で打設し、架台91を、道路横断方向の法尻杭93A及び法肩杭93Bの各杭頭間に、道路縦断方向に所定間隔で架設し、管路スペース100を下方に備えた踏板92を、所定間隔で架設された架台91間に架設して、避難兼用点検通路9を形成し、転落防護柵8を、防護柵5の機能を阻害しないように、防護柵5からの離隔を確保して避難兼用点検通路9の法尻側端部に設けるものである。 In the above-described fall prevention method for drivers and others outside the protective fence, the toe piles 93A and shoulder piles 93B in the road crossing direction of the embankment slope are driven at predetermined intervals in the road longitudinal direction, and the mount 91 are installed at predetermined intervals in the road longitudinal direction between the pile heads of the trailing pile 93A and the slope shoulder pile 93B in the road transverse direction, and the treads 92 having the pipeline space 100 below are installed at predetermined intervals. The evacuation and inspection passage 9 is formed by constructing between the mounting frames 91, and the fall protection fence 8 is secured at a distance from the protection fence 5 so as not to hinder the function of the protection fence 5. It is provided at the toe side end of the.

1 高速道路
11 盛土
12 盛土法面
2 走行車線
3 本線路肩
4 点検通路
5 防護柵(ガードレール)
6 保護路肩
7 既存ケーブル
8 転落防止柵
9 避難兼用点検通路
91 架台
92 踏板
93 杭
93S 杭打設位置
93A 法尻杭
93B 法肩杭
100 管路スペース
101 ケーブルラック
102 管路
200 杭打設械
1 highway 11 embankment 12 embankment slope
2 Driving lane 3 Main track shoulder 4 Inspection passage 5 Protective fence (guard rail)
6 Protective road shoulder 7 Existing cable 8 Fall prevention fence 9 Evacuation combined inspection passage 91 Mount 92 Tread plate 93 Pile 93S Pile driving position 93A Trailing pile 93B Hill shoulder pile 100 Pipeline space 101 Cable rack 102 Pipeline 200 Pile driving machine

Claims (8)

盛土構造の高速道路で事故や故障が発生し、運転者等が降車して防護柵外側に一時避難するための、通常は点検に使用する避難兼用点検通路であって、
前記避難兼用点検通路は架台と踏板で構成され、点検通路としての必要幅員を確保し、転落防止柵は、前記防護柵の機能を阻害しないように前記防護柵からの離隔を確保して、前記避難兼用点検通路の法尻側端部に配置され、
前記避難兼用点検通路の下部には、道路横断方向の法尻杭及び法肩杭を、道路縦断方向に所定間隔で配置して、前記避難兼用点検通路を支持し、
前記避難兼用点検通路の下方には管路スペースを備えたことを特徴とする、防護柵外における運転手等の転落防止対策構造。
In the event of an accident or breakdown on an embankment-structured expressway, the driver, etc. gets off the vehicle and temporarily evacuates outside the protective fence.
The evacuation and inspection passageway is composed of pedestals and treads, ensuring the necessary width as an inspection passageway. It is placed at the end of the trailhead side of the evacuation and inspection passage,
In the lower part of the evacuation and inspection passage, the trailing pile and the slope pile in the road crossing direction are arranged at predetermined intervals in the road longitudinal direction to support the evacuation and inspection passage,
A structure for preventing a driver or the like from falling outside the protective fence, characterized in that a pipeline space is provided below the evacuation and inspection passage.
前記架台は、T形金具で構成して逆T形状で使用し、道路横断方向の前記法尻杭及び前記法肩杭の各杭頭間に、前記逆T形状で配置して支持固定され、
前記踏板は、道路縦断方向に所定の間隔で配置された前記逆T形状の架台間に支持固定されたことを特徴とする、請求項1に記載の防護柵外における運転手等の転落防止対策構造。
The frame is configured with a T-shaped metal fitting and used in an inverted T shape, and is arranged in the inverted T shape and supported and fixed between the pile heads of the toe pile and the shoulder pile in the road crossing direction,
A measure for preventing a driver from falling outside the protective fence according to claim 1, characterized in that said treads are supported and fixed between said inverted T-shaped pedestals arranged at predetermined intervals in the longitudinal direction of the road. structure.
法面傾斜に従い前記法肩杭は、前記法尻杭より短尺な杭を使用し、前記法尻杭及び前記法肩杭は螺旋杭であることを特徴とする、請求項1乃至請求項2のいずれか1項に記載の防護柵外における運転手等の転落防止対策構造。 According to the inclination of the slope, the shoulder pile uses a pile shorter than the toe pile, and the toe pile and the shoulder pile are spiral piles. A fall prevention structure for a driver, etc., outside the protective fence according to any one of the above items. 前記避難兼用点検通路の下方に設けた前記管路スペースは、3面囲いのケーブルラックで構成して前記踏板に組み込まれ、前記ケーブルラックに配管を配置したことを特徴とする、請求項1乃至請求項3のいずれか1項に記載の防護柵外における運転手等の転落防止対策構造。 The pipeline space provided below the evacuation/inspection passage is configured with a three-sided enclosure cable rack and is incorporated in the footboard, and the cable rack is provided with pipes. A structure for preventing a driver or the like from falling outside the protective fence according to any one of claims 3 to 4. 盛土構造の高速道路で事故や故障が発生し、運転者等が降車して防護柵外側に一時避難するための、通常は点検に使用する避難兼用点検通路であって、
盛土法面の道路横断方向の法尻杭及び法肩杭を、道路縦断方向に所定間隔で打設し、
架台を、前記道路横断方向の前記法尻杭及び前記法肩杭の各杭頭間に、道路縦断方向に前記所定間隔で架設し、
管路スペースを下方に備えた踏板を、前記所定間隔で架設された前記架台間に架設して、避難兼用点検通路を形成し、
転落防止柵を、前記防護柵の機能を阻害しないように、前記防護柵からの離隔を取りながら点検通路としての必要幅を確保して前記避難兼用点検通路の法尻側端部に設けたことを特徴とする、防護柵外における運転手等の転落防止対策工法。
In the event of an accident or breakdown on an embankment-structured expressway, the driver, etc. gets off the vehicle and temporarily evacuates outside the protective fence.
The foot piles and shoulder piles of the embankment slope in the road cross direction are driven at predetermined intervals in the road longitudinal direction,
A trestle is erected at the predetermined intervals in the road longitudinal direction between the pile heads of the toe pile and the shoulder pile in the road transverse direction,
A footboard having a pipeline space below is installed between the pedestals installed at the predetermined intervals to form an evacuation and inspection passage,
A fall prevention fence is provided at the toe side end of the evacuation/inspection passage while securing a necessary width as an inspection passage while keeping a distance from the protection fence so as not to hinder the function of the protection fence. A fall prevention method for drivers, etc. outside the protective fence.
前記架台は、T形金具で構成して逆T形状で使用し、道路横断方向の前記法尻杭及び前記法肩杭の各杭頭間に、前記逆T形状で架設して支持固定し、
道路縦断方向に所定の間隔で配置された前記逆T形状の架台間に、前記踏板を支持固定させたことを特徴とする、請求項5に記載の防護柵外における運転手等の転落防止対策工法。
The frame is constructed of a T-shaped metal fitting and used in an inverted T shape, and is supported and fixed in the inverted T shape between the pile heads of the toe pile and the shoulder pile in the road crossing direction,
A measure to prevent a driver from falling outside the protective fence according to claim 5, characterized in that the treads are supported and fixed between the inverted T-shaped pedestals arranged at predetermined intervals in the longitudinal direction of the road. Construction method.
法面傾斜に従い前記法肩杭は、前記法尻杭より短尺な杭を使用し、前記法尻杭及び法肩杭は螺旋杭であることを特徴とする、請求項5乃至請求項6のいずれか1項に記載の防護柵外における運転手等の転落防止対策工法。 7. Any one of claims 5 and 6, characterized in that the shoulder pile uses a pile shorter than the toe pile according to the inclination of the slope, and the toe pile and the shoulder pile are spiral piles. 1. A fall prevention method for drivers outside the protective fence according to 1. 前記避難兼用点検通路の下方に設けた前記管路スペースは、3面囲いのケーブルラックで構成し前記踏板に組み込まれ、前記ケーブルラックに配管を配置したことを特徴とする、請求項5乃至請求項7のいずれか1項に記載の防護柵外における運転手等の転落防止対策工法。 5. The conduit space provided below the evacuation and inspection passageway is composed of a three-sided enclosure cable rack, which is incorporated in the footboard, and the cable rack is provided with pipes. Item 7. Fall prevention method for drivers outside the protective fence according to any one of Item 7.
JP2021153048A 2021-09-21 2021-09-21 Fall preventive measure structure for driver or the like outside of guard fence and fall preventive measure construction method Pending JP2023044926A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021153048A JP2023044926A (en) 2021-09-21 2021-09-21 Fall preventive measure structure for driver or the like outside of guard fence and fall preventive measure construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021153048A JP2023044926A (en) 2021-09-21 2021-09-21 Fall preventive measure structure for driver or the like outside of guard fence and fall preventive measure construction method

Publications (1)

Publication Number Publication Date
JP2023044926A true JP2023044926A (en) 2023-04-03

Family

ID=85776791

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021153048A Pending JP2023044926A (en) 2021-09-21 2021-09-21 Fall preventive measure structure for driver or the like outside of guard fence and fall preventive measure construction method

Country Status (1)

Country Link
JP (1) JP2023044926A (en)

Similar Documents

Publication Publication Date Title
US5533835A (en) Railroad crossing signal foundation and method of producing and erecting the same
KR101401934B1 (en) Method for constructing underground structure of railroad using steel pipe roof of two-side semicircle arch type and apparatus for pressing guidance pipe
CN109629576B (en) Suspension protection system for water supply pipe crossing foundation pit and construction method
KR101040731B1 (en) Movable temporary structure for constructing composite covering arch structure
EP3488051B1 (en) Surface mount security barrier
JP3586864B2 (en) Underground structure construction method and elevated traffic path
US20230349117A1 (en) System, apparatus and method for installation of street furniture
US10435853B2 (en) Construction methods and systems for grade separation structures
JP2023044926A (en) Fall preventive measure structure for driver or the like outside of guard fence and fall preventive measure construction method
JP2007321429A (en) Underground structure construction method
US5325557A (en) Portable, demountable bridge to ford rivers and the like
CN216379170U (en) Construction safety device strides on cast-in-place concrete beam support
KR100790759B1 (en) The one-side opened rock shed tunnel type safety structure
US6795992B2 (en) Bridge construction method
JP2013185357A (en) Partition structure
CN218880667U (en) Central separation guardrail capable of serving as portal structure foundation
KR101054741B1 (en) Bikeway construction method using two point support by lateral support member and slab
CN116608324B (en) Underground pipeline reinforcing structure below river-crossing bridge under tunnel construction
CN113981832B (en) Upper span construction safety device of cast-in-situ concrete beam bracket and construction method thereof
KR102670724B1 (en) Embedded Support Member And Protective Fence For Side Walk Including The Same
KR102272494B1 (en) Slope reinforcement structure using support and tension and Its Construction method
CN221094825U (en) Large cantilever pedestrian overpass and frame pier
CN217758368U (en) Cast-in-situ box girder
CN211006299U (en) Steel structure bridge that full-bridge integration top pushed away
JP2001123421A (en) Attachment for fitting temporary guardrail pole

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20221121