Prior art keywords
power supply
power
time
storage battery
cutoff
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2021139051A
Other languages
Japanese (ja)
Inventor
亨 海老澤
Kyo Ebisawa
正光 和田
Masamitsu Wada
諭 大坪
Satoshi Okubo
知哉 小郷
Tomoya Kosato
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shintec Co Ltd
Original Assignee
Shintec Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shintec Co Ltd filed Critical Shintec Co Ltd
Priority to JP2021139051A priority Critical patent/JP2023032750A/en
Publication of JP2023032750A publication Critical patent/JP2023032750A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

To provide technical means capable of preventing the stagnation of supplying power to a premises of a collective power receiving adopted apartment building in the event of a disaster or power outage.SOLUTION: A processing device 8 of a power supply support system 1 acquires disaster information on earthquakes, fires, floods, volcanic eruptions, and other disasters via a network 90 from a collection server 91 that collects the disaster information, predicts the occurrence of a power failure within a predetermined time in the future on the basis of the acquired disaster information, determines a schedule for recharging and discharging a storage battery equipment 4 on the basis of the prediction, and controls the recharging and discharging of the storage battery equipment 4 according to the determined schedule.SELECTED DRAWING: Figure 1

Description

本発明は、一括受電採用共同住宅における電力供給を制御する技術に関する。 TECHNICAL FIELD The present invention relates to technology for controlling power supply in collective housing.

共同住宅の一括受電は、共同住宅の各戸が個別に電力契約を締結するのではなく、共同住宅の全戸が一体として電力契約を締結し、電力事業者から電力の供給を受ける仕組みである。マンションなどの一括受電設備の中には、蓄電池設備を活用することにより、系統電力からマンション内への電力供給量のピークを抑え、各戸の電力量単価をより一層低くするものがある。例えば、図6に示すように、マンション全体の電力消費量が基準値Refより小さいときは、系統電力から供給される電力の一部を蓄電池に充電し、マンション全体の電力消費量が基準値Refより大きいときは、蓄電池から放電する、といった充放電を繰り返すことにより、系統電力からの電力供給量のピークを抑えられる。 Collective power supply for condominiums is a system in which all units in a condominium conclude a power contract as a unit and receive power from a power company, rather than each unit in the condominium individually concluding a power contract. Some collective power receiving facilities such as condominiums use storage battery equipment to suppress peaks in the amount of power supplied from the grid power to the condominium, thereby further lowering the unit price of electric energy for each house. For example, as shown in FIG. 6, when the power consumption of the entire condominium is less than the reference value Ref, a part of the power supplied from the grid power is charged in the storage battery, and the power consumption of the entire condominium is reduced to the reference value Ref When it is larger, the peak of the power supply amount from the grid power can be suppressed by repeating charging and discharging such as discharging from the storage battery.

共同住宅の一括受電に関わる技術を開示した文献として、特許文献1がある。特許文献1に記載された集合住宅節電システムは、高圧一括受電した電力情報を基に一定時間毎に使用電力量情報を算出して電力供給事業者に通知する電力情報送信装置と、アグリゲータからの電力削減要求を受けて、個々の住戸に対して節電指示を出すと共に、実施された電力削減量情報をアグリゲータに送信する親コントローラと、各住戸に設置されて親コントローラの指示を受けて節電指示を実施し、住戸内での電力削減量を計測して親コントローラに送信する宅内コントローラとを備えるものである。 Japanese Patent Laid-Open No. 2002-200012 discloses a technique related to collective power reception in an apartment house. The collective housing power saving system described in Patent Document 1 includes a power information transmitting device that calculates power usage information at regular intervals based on the power information received in bulk at high voltage and notifies it to the power supplier, and a power information transmitting device that In response to a power reduction request, a parent controller that issues power saving instructions to each dwelling unit and transmits information on the amount of power reduction that has been implemented to the aggregator, and a power saving instruction that is installed in each dwelling unit and receives instructions from the parent controller. and an in-home controller that measures the power reduction amount in the house and transmits it to the parent controller.

特開2016-25681号公報JP 2016-25681 A

しかしながら、従来のこの種の技術は、災害やそれによる停電の発生があったときに、共同住宅内への電力の供給が滞る恐れがあった。 However, with this type of conventional technology, there is a risk that the power supply to the condominium will be disrupted in the event of a disaster or a power outage caused by the disaster.

本発明は、このような背景の下に案出されたものであり、災害や停電の発生時における一括受電採用共同住宅の構内への電力供給の停滞を防ぐことができる技術的手段を提供することを目的とする。 The present invention has been devised under such a background, and provides a technical means capable of preventing stagnation of the power supply to the premises of collective housing employing collective power reception in the event of a disaster or power outage. for the purpose.

上記課題を解決するため、本発明の好適な態様である電力供給支援システムは、一括受電採用共同住宅における電力供給支援システムであって、蓄電池設備と、系統電力及び前記蓄電池設備と繋がった一括受電盤と、前記一括受電盤から住居部の住居に至る給電路上に配置された第1の電力供給遮断/復旧切替手段と、前記一括受電盤から共用部の共用設備に至る給電路上に配置された第2の電力供給遮断/復旧切替手段と、前記蓄電池設備、前記第1の電力供給遮断/復旧切替手段、及び前記第2の電力供給遮断/復旧切替手段と接続されると共に、ネットワークと接続された処理装置とを具備し、前記処理装置は、地震、火災、洪水、火山噴火、その他の災害に関わる災害情報を収集する収集サーバから、前記ネットワークを介して、災害情報を取得し、取得した災害情報に基づいて、将来の所定時間以内における停電の発生を予測し、この予測の結果に基づいて、前記蓄電池設備における充電及び放電のスケジュールを決定し、決定したスケジュールに従って、前記蓄電池設備の充電及び放電を制御することを特徴とする。 In order to solve the above problems, a power supply support system, which is a preferred embodiment of the present invention, is a power supply support system in a collective housing employing collective power reception, comprising a storage battery facility, a system power supply, and a batch power reception system connected to the storage battery facility. a first power supply cut-off/restoration switching means arranged on a power supply line from the collective power receiving board to the residence of the residential section; connected to a second power supply cutoff/restoration switching means, the storage battery equipment, the first power supply cutoff/restoration switching means, and the second power supply cutoff/restoration switching means, and connected to a network; The processing device acquires and acquires disaster information from a collection server that collects disaster information related to earthquakes, fires, floods, volcanic eruptions, and other disasters through the network. Predicting the occurrence of a power outage within a predetermined time in the future based on disaster information, determining a schedule for charging and discharging the storage battery equipment based on the result of this prediction, and charging the storage battery equipment according to the determined schedule. and discharge control.

この態様において、前記第1の電力供給遮断/復旧切替手段は、スマートメータ又はスイッチであり、前記第2の電力供給遮断/復旧切替手段は、スマートメータ又はスイッチであってもよい。 In this aspect, the first power supply cutoff/restoration switching means may be a smart meter or a switch, and the second power supply cutoff/restoration switching means may be a smart meter or a switch.

また、前記処理装置は、前記蓄電池設備の電池残量、停電予想時間、及び当該共同住宅内における時期と時間帯とに応じた電力需要予測量を含む複数種類の項目の値の組み合わせと、前記住居及び前記共用設備への電力の供給量のレベルとを対応付けたテーブルを有し、前記処理装置は、前記所定時間以内に停電が発生すると予測した場合に、前記蓄電池設備の電池残量を示す情報、停電予想時間を示す情報、及び日付と時刻とに基づいて求めた電力需要予測量を示す情報を取得し、取得した情報を基に、前記テーブルを参照して、電力の供給量のレベルを決定し、このレベルを示す制御信号を前記第1の電力供給遮断/復旧切替手段及び前記第2の電力供給遮断/復旧切替手段に送信してもよい。 Further, the processing device combines the values of a plurality of types of items including the remaining battery capacity of the storage battery equipment, the expected power outage time, and the predicted amount of power demand according to the time and time zone in the condominium; The processing device has a table that associates residences with power supply levels to the shared equipment, and the processing device calculates the remaining battery level of the storage battery equipment when predicting that a power failure will occur within the predetermined time. information indicating the estimated power outage time, and information indicating the predicted amount of power demand obtained based on the date and time; A level may be determined, and a control signal indicating this level may be transmitted to the first power supply cutoff/restoration switching means and the second power supply cutoff/restoration switching means.

また、前記処理装置は、前記災害情報に基づいて、地震が発生すると予測した場合、前記テーブルの如何に関わらず、前記住居への電力の供給の遮断を指示する制御信号を前記第1の電力供給遮断/復旧切替手段に送信してもよい。 Further, when predicting that an earthquake will occur based on the disaster information, the processing device outputs a control signal instructing cutoff of power supply to the residence regardless of the table. It may be transmitted to the supply interruption/restoration switching means.

また、前記一括受電盤は、不足電圧継電器を有し、前記処理装置は、前記不足電圧継電器によって、突然の停電の発生が検出された場合、予め定められた長さの時間を、突然の停電の発生の時点における仮の停電予想時間とし、当該停電の発生の時点における前記蓄電池設備の電池残量を示す情報、及び日付と時刻とに基づいて求めた電力需要予測量を示す情報を基に、前記仮の停電予想時間の間の前記住居及び前記共用設備の電力需要を満たすのに必要な電力の供給量のレベルを決定し、このレベルを示す制御信号を前記第1の電力供給遮断/復旧切替手段及び前記第2の電力供給遮断/復旧切替手段に送信してもよい。 In addition, the collective power receiving board has an undervoltage relay, and when the occurrence of a sudden power failure is detected by the undervoltage relay, the processing device detects the occurrence of the sudden power failure for a predetermined length of time. Based on information indicating the remaining battery capacity of the storage battery equipment at the time of the occurrence of the power outage, and information indicating the predicted amount of power demand obtained based on the date and time , determining the level of power supply required to meet the power demand of the residence and the common facilities during the tentative power outage forecast time, and sending a control signal indicative of this level to the first power outage/ It may be transmitted to the restoration switching means and the second power supply interruption/restoration switching means.

また、前記第1の電力供給遮断/復旧切替手段は、電力供給の遮断を解除する解除手段を具備し、前記解除手段によって、電力供給の遮断が解除された場合、電力供給の遮断が解除されたことを示す解除通知信号を前記処理装置に送信し、前記処理装置は、解除通知信号を受信した場合、その発信元の住居と関連付けられたアドレスに宛てて、安否通知メッセージを送信してもよい。 Further, the first power supply cutoff/restoration switching means includes a canceling means for canceling the cutoff of the power supply. When receiving the cancellation notice signal, the processing device may send the safety notice message to the address associated with the sender's residence. good.

また、前記解除手段は、手動により電力供給の遮断を解除するスイッチを有していてもよい。 Further, the canceling means may have a switch for manually canceling the cutoff of the power supply.

また、前記解除手段は、電力供給の遮断の解除を指示するメッセージを受信する通信手段を有していてもよい。 Further, the canceling means may have communication means for receiving a message instructing cancellation of cutoff of power supply.

本発明である電力供給支援システムは、一括受電採用共同住宅における電力供給支援システムであって、蓄電池設備と、系統電力及び前記蓄電池設備と繋がった一括受電盤と、前記一括受電盤から住居部の住居に至る給電路上に配置された第1の電力供給遮断/復旧切替手段と、前記一括受電盤から共用部の共用設備に至る給電路上に配置された第2の電力供給遮断/復旧切替手段と、前記蓄電池設備、前記第1の電力供給遮断/復旧切替手段、及び前記第2の電力供給遮断/復旧切替手段と接続されると共に、ネットワークと接続された処理装置とを具備し、前記処理装置は、地震、火災、洪水、火山噴火、その他の災害に関わる災害情報を収集する収集サーバから、前記ネットワークを介して、災害情報を取得し、取得した災害情報に基づいて、将来の所定時間以内における停電の発生を予測し、この予測の結果に基づいて、前記蓄電池設備における充電及び放電のスケジュールを決定し、決定したスケジュールに従って、前記蓄電池設備の充電及び放電を制御する。よって、災害や停電の発生時における一括受電採用共同住宅の構内への電力供給の停滞を防ぐことができる技術的手段を提供することができる。 A power supply support system according to the present invention is a power supply support system in a collective housing that employs collective power reception, and comprises a storage battery facility, a collective power receiving panel connected to system power and the storage battery facility, and a residential section from the collective power receiving panel. A first power supply cutoff/restoration switching means arranged on the power supply line leading to the residence, and a second power supply cutoff/restoration switching means arranged on the power supply line from the collective power receiving board to the shared equipment of the common area. , a processing device connected to the storage battery equipment, the first power supply cutoff/restoration switching means, and the second power supply cutoff/restoration switching means, and connected to a network; acquires disaster information via the network from a collection server that collects disaster information related to earthquakes, fires, floods, volcanic eruptions, and other disasters, and based on the acquired disaster information, within a predetermined time in the future predicts the occurrence of a power outage in the storage battery equipment, determines a schedule for charging and discharging the storage battery equipment based on the result of this prediction, and controls the charging and discharging of the storage battery equipment according to the determined schedule. Therefore, it is possible to provide a technical means capable of preventing the stagnation of the power supply to the premises of the condominium that employs collective power reception in the event of a disaster or power outage.

本発明の第1実施形態である電力供給支援システム1の構成を示す図である。BRIEF DESCRIPTION OF THE DRAWINGS It is a figure which shows the structure of the electric power supply assistance system 1 which is 1st Embodiment of this invention. 図1の電力供給支援システム1の火災用電力供給レベル設定テーブルTBLaを示す図である。2 is a diagram showing a fire power supply level setting table TBLa of the power supply support system 1 of FIG. 1; FIG. 図1の電力供給支援システム1の動作を示すフローチャートである。2 is a flow chart showing the operation of the power supply support system 1 of FIG. 1; 図1の電力供給支援システム1の動作を示すフローチャートである。2 is a flow chart showing the operation of the power supply support system 1 of FIG. 1; 本発明の第2実施形態である電力供給支援システム1Aの構成を示す図である。It is a figure which shows the structure of 1 A of power supply assistance systems which are 2nd Embodiment of this invention. 従来の一括受電採用共同住宅における蓄電池設備4の通常運転制御を示す図である。FIG. 10 is a diagram showing normal operation control of the storage battery equipment 4 in the conventional collective housing.

<第1実施形態>
以下、図面を参照しつつ、本発明の第1実施形態である電力供給支援システム1を説明する。図1は、電力供給支援システム1の構成を示す図である。電力供給支援システム1は、電力供給業者との間に一括受電契約を締結している共同住宅における、住宅構内への電力供給を支援するものである。電力供給支援システム1は、蓄電池設備4と、非常用発電設備5と、一括受電盤10と、住居部11と、第1共用部12と、第2共用部13と、消防用設備14と、第1スマートメータ21と、第2スマートメータ22と、第3スマートメータ23と、第4スマートメータ24と、ゲートウェイ6と、処理・指令サーバ7と、を有する。これら各部のうち、ゲートウェイ6と処理・指令サーバ7は、当該電力供給支援システム1の処理装置8を構成する。
<First embodiment>
A power supply support system 1 according to a first embodiment of the present invention will be described below with reference to the drawings. FIG. 1 is a diagram showing the configuration of a power supply support system 1. As shown in FIG. The power supply support system 1 supports power supply to the premises of a condominium that has entered into a collective power receiving contract with a power supplier. The power supply support system 1 includes a storage battery facility 4, an emergency power generation facility 5, a collective power receiving board 10, a dwelling section 11, a first common section 12, a second common section 13, firefighting equipment 14, It has a first smart meter 21 , a second smart meter 22 , a third smart meter 23 , a fourth smart meter 24 , a gateway 6 , and a processing/command server 7 . Among these units, the gateway 6 and the processing/command server 7 constitute the processing device 8 of the power supply support system 1 .

蓄電池設備4は、蓄電池を有する。蓄電池設備4は、ゲートウェイ6による制御の下、蓄電池の充電と放電を行う。非常用発電設備5は、ゲートウェイ6による制御の下、非常用電力の発電を行い、ゲートウェイ6や、スマートメータ21、22、23、24などに電力を供給する。 The storage battery equipment 4 has a storage battery. The storage battery facility 4 charges and discharges storage batteries under the control of the gateway 6 . The emergency power generation equipment 5 generates emergency power under the control of the gateway 6, and supplies power to the gateway 6, the smart meters 21, 22, 23, 24, and the like.

一括受電盤10は、系統電力95から供給される高圧電力を、低圧電力に変換し、蓄電池設備4、住居部11、第1共用部12、第2共用部13、消防用設備14、及びゲートウェイ6に供給する。一括受電盤10には、不足電圧継電器9が設けられている。不足電圧継電器9は、停電の発生を検出すると、そのことを示す通知信号をゲートウェイ6に出力する。 The collective power receiving board 10 converts the high-voltage power supplied from the grid power 95 into low-voltage power, and stores the storage battery equipment 4, the residential section 11, the first shared section 12, the second shared section 13, the firefighting equipment 14, and the gateway. 6. The collective power receiving board 10 is provided with an undervoltage relay 9 . When the undervoltage relay 9 detects the occurrence of a power failure, it outputs a notification signal to the gateway 6 indicating the fact.

住居部11は、共同住宅の専有部の各住居を含む。第1共用部12は、エレベータ、共用照明、管理室といった、停電の発生時の電力供給の優先度が比較的高い共用施設を含む。第2共用部13は、停電の発生時の電力供給の優先度が比較的低い他の共用施設を含む。 The residential section 11 includes each dwelling in the exclusive section of the apartment complex. The first common area 12 includes common facilities, such as elevators, common lighting, and a control room, which have a relatively high priority for power supply in the event of a power failure. The second common area 13 includes other common facilities with relatively low priority for power supply in the event of a power failure.

第1スマートメータ21は、一括受電盤10から住居部11の各住居に至る給電路上に配置されている。第2スマートメータ22は、一括受電盤10から第1共用部12の各共用設備に至る給電路上に配置されている。第3スマートメータ23は、一括受電盤10から第2共用部13の各共用設備に至る給電路上に配置されている。第4スマートメータ24は、一括受電盤10から消防用設備14に至る給電路上に配置されている。第1スマートメータ21、第2スマートメータ22、第3スマートメータ23、及び第4スマートメータ24は、各々が設置された住居や設備における電力量の計電や電力供給の遮断、復旧に関わる制御を行う、電力供給遮断/復旧切替手段としての役割を果たすものである。住居部11の第1スマートメータ21には、CPU、RAM、ROMのほか、電力供給の遮断を解除する復旧スイッチ20が設けられている。 The first smart meter 21 is arranged on a power supply line from the collective power receiving board 10 to each residence in the residence section 11 . The second smart meter 22 is arranged on a power supply line from the collective power receiving board 10 to each shared facility of the first shared section 12 . The third smart meter 23 is arranged on the power supply line from the collective power receiving board 10 to each shared facility of the second shared section 13 . The fourth smart meter 24 is arranged on the power supply line from the collective power receiving board 10 to the fire fighting equipment 14 . The first smart meter 21, the second smart meter 22, the third smart meter 23, and the fourth smart meter 24 measure the amount of power in the house or facility in which they are installed, and control power supply interruption and restoration. It serves as power supply interruption/restoration switching means. The first smart meter 21 of the dwelling unit 11 is provided with a CPU, a RAM, and a ROM, as well as a recovery switch 20 for canceling cutoff of power supply.

ゲートウェイ6は、CPU61、RAM62、ROM63、通信インターフェース64を有する。ゲートウェイ6は、蓄電池設備4、非常用発電設備5、一括受電盤10、第1スマートメータ21、第2スマートメータ22、第3スマートメータ23、及び第4スマートメータ24、及び処理・指令サーバ7と、PLC(Power Line Communications)により接続される。処理・指令サーバ7は、ネットワーク90上の装置と、TCP/IP(Transmission Control Protocol / Internet Protocol)により接続される。 The gateway 6 has a CPU 61 , a RAM 62 , a ROM 63 and a communication interface 64 . The gateway 6 includes a storage battery facility 4, an emergency power generation facility 5, a collective power receiving panel 10, a first smart meter 21, a second smart meter 22, a third smart meter 23, and a fourth smart meter 24, and a processing/command server 7. and PLC (Power Line Communications). The processing/command server 7 is connected to devices on the network 90 by TCP/IP (Transmission Control Protocol/Internet Protocol).

ゲートウェイ6は、処理・指令サーバ7から特別運転に関わるメッセージが送信されていない間は、通常運転制御を行い、処理・指令サーバ7から特別運転に関わるメッセージが送信されると、特別運転制御を行う。ゲートウェイ6は、通常運転制御では、図6に示すように、共同住宅全体の電力消費量が基準値Refより小さいときは、系統電力95から供給される電力を蓄電池に充電し、共同住宅全体の電力消費量が基準値Refより大きいときは、蓄電池から放電する。ゲートウェイ6は、特別運転制御では、処理・指令サーバ7から送信されるメッセージに従って、蓄電池の充電と放電を制御し、スマートメータ21、22、23、及び24に、電力供給のレベルや、電力供給の遮断、復旧を指示する制御信号を送信する。 The gateway 6 performs normal operation control while the processing/command server 7 does not send a message related to special operation, and when the processing/command server 7 transmits a message related to special operation, the gateway 6 performs special operation control. conduct. In the normal operation control, as shown in FIG. 6, when the power consumption of the entire apartment building is smaller than the reference value Ref, the gateway 6 charges the storage battery with the power supplied from the grid power 95, and When the power consumption is greater than the reference value Ref, the storage battery is discharged. In the special operation control, the gateway 6 controls charging and discharging of the storage battery according to messages sent from the processing/command server 7, and the smart meters 21, 22, 23, and 24 are informed of the level of power supply, Sends a control signal instructing the disconnection and restoration of the

処理・指令サーバ7は、CPU71、RAM72、ROM73、通信インターフェース74、ハードディスク75を有する。ハードディスク75には、制御プログラム、火災用電力供給レベル設定テーブルTBLa、洪水用電力供給レベル設定テーブルTBLb、その他の災害用電力供給レベル設定テーブルTBLc、及び系統停電用電力供給レベル設定テーブルTBLdが記憶される。 The processing/command server 7 has a CPU 71 , a RAM 72 , a ROM 73 , a communication interface 74 and a hard disk 75 . The hard disk 75 stores a control program, a fire power supply level setting table TBLa, a flood power supply level setting table TBLb, another disaster power supply level setting table TBLc, and a system blackout power supply level setting table TBLd. be.

制御プログラムは、次の3つの機能を有する。
a1.蓄電池制御機能
これは、収集サーバ91から、ネットワーク90を介して、災害情報を取得し、取得した災害情報に基づいて、将来の所定時間以内における停電の発生を予測し、この予測の結果に基づいて、蓄電池設備4における充電及び放電のスケジュールを決定し、決定したスケジュールに従って、蓄電池設備4の充電及び放電を制御する機能である。
The control program has the following three functions.
a1. Storage battery control function This acquires disaster information from the collection server 91 via the network 90, predicts the occurrence of a power outage within a predetermined time based on the acquired disaster information, and based on the result of this prediction It is a function of determining the schedule of charging and discharging in the storage battery equipment 4 and controlling the charging and discharging of the storage battery equipment 4 according to the determined schedule.

b1.停電予測時給電レベル制御機能
これは、所定時間以内に停電が発生すると予測した場合に、当該予測の時点における蓄電池設備4の電池残量Cを示す情報、停電予想時間Tを示す情報、及び、電力需要予測量Dを示す情報を基に、停電予想時間Tの間の、住居部11、第1共用部12、第2共用部13、消防用設備14の電力需要を満たすのに必要な電力の供給量のレベルを決定し、このレベルを示す制御信号を、スマートメータ21、22、23、及び24に送信する機能である。
b1. Power Supply Level Control Function at Power Failure Prediction When it is predicted that a power failure will occur within a predetermined time, information indicating the remaining battery capacity C of the storage battery equipment 4 at the time of the prediction, information indicating the expected power failure time T, and Based on the information indicating the predicted power demand amount D, the power required to meet the power demand of the residential section 11, the first shared section 12, the second shared section 13, and the firefighting equipment 14 during the predicted power outage time T. It is a function of determining the level of the amount of supply of electricity and transmitting a control signal indicating this level to the smart meters 21 , 22 , 23 , and 24 .

c1.突発停電発生時給電レベル制御機能
これは、所定時間以内に停電が発生するとの予測がされていない状態において、不足電圧継電器9によって、突然の停電の発生が検出された場合、予め定められた長さの時間(例えば2時間)を、停電の発生の時点における仮の停電予想時間T’とし、当該停電の発生の時点における蓄電池設備4の電池残量Cを示す情報、及び、電力需要予測量Dを示す情報を基に、停電予想時間T’の間の、住居部11、第1共用部12、第2共用部13、消防用設備14の電力需要を満たすのに必要な電力の供給量のレベルを決定し、このレベルを示す制御信号を、スマートメータ21、22、23、及び24に送信する機能である。
c1. Sudden power failure occurrence power supply level control function This is a state in which a power failure is not predicted to occur within a predetermined time, and if the undervoltage relay 9 detects a sudden power failure, the power supply level is controlled for a predetermined length of time. The time (for example, 2 hours) is assumed to be a provisional power failure forecast time T' at the time of the power failure, information indicating the remaining battery capacity C of the storage battery equipment 4 at the time of the power failure, and the predicted amount of power demand Based on the information indicating D, the amount of power supply necessary to meet the power demand of the residential section 11, the first shared section 12, the second shared section 13, and the firefighting equipment 14 during the expected power failure time T' , and transmits a control signal indicating this level to the smart meters 21 , 22 , 23 , and 24 .

図2は、火災用電力供給レベル設定テーブルTBLaの構成を示す図である。火災用電力供給レベル設定テーブルTBLaは、蓄電池設備4の電池残量、停電予想時間、及び共同住宅内における時期と時間帯とに応じた電力需要予測量の各値の組み合わせと、住居及び共用設備への電力の供給量のレベルを対応付けたものである。 FIG. 2 is a diagram showing the configuration of the fire power supply level setting table TBLa. The fire power supply level setting table TBLa includes a combination of values of the remaining battery capacity of the storage battery equipment 4, the expected power outage time, and the predicted power demand amount corresponding to the time and period in the condominium, as well as the residence and shared facilities. is associated with the level of the amount of power supplied to

火災用電力供給レベル設定テーブルTBLaを構成する各レコードは、「電池残量」、「停電予想時間」、「電力需要予測量」、及び「レベル」のフィールドを有する。「電池残量」のフィールドは、満充電を100%とした場合における蓄電池設備4の電池残量の値を示す。「停電予想時間」のフィールドは、停電予想時間の値を示す。「レベル」のフィールドは、電力供給レベルの値を示す。電力供給レベルは、電力供給量の最も多い「レベルA」から電力供給量の最も少ない「レベルE」までの5段階になっている。 Each record constituting the fire power supply level setting table TBLa has fields of "remaining battery level", "estimated power outage time", "estimated amount of power demand", and "level". The "remaining battery level" field indicates the value of the remaining battery level of the storage battery equipment 4 when full charge is assumed to be 100%. The "estimated power outage time" field indicates the value of the estimated power outage time. The "level" field indicates the power supply level value. There are five power supply levels, from "level A" with the highest amount of power supply to "level E" with the lowest amount of power supply.

洪水用電力供給レベル設定テーブルTBLb、その他の災害用電力供給レベル設定テーブルTBLc、及び系統停電用電力供給レベル設定テーブルTBLdを構成するレコードも、「電池残量」、「停電予想時間」、「電力需要予測量」、及び「レベル」のフィールドを有する。ただし、洪水用電力供給レベル設定テーブルTBLb、その他の災害用電力供給レベル設定テーブルTBLc、及び系統停電用電力供給レベル設定テーブルTBLdでは、蓄電池設備4の電池残量、停電予想時間、及び電力需要予測量の各値と電力供給量のレベルの組み合わせが、火災用電力供給レベル設定テーブルTBLaのそれと異なっている。 The records constituting the flood power supply level setting table TBLb, the other disaster power supply level setting table TBLc, and the system blackout power supply level setting table TBLd also include "remaining battery level", "expected power outage time", and "power supply level setting table TBLd". It has fields of demand forecast amount” and “level”. However, in the flood power supply level setting table TBLb, the other disaster power supply level setting table TBLc, and the system blackout power supply level setting table TBLd, the remaining battery capacity of the storage battery equipment 4, the expected power outage time, and the power demand forecast The combination of each quantity value and power supply level is different from that of the fire power supply level setting table TBLa.

次に、本実施形態の動作を説明する。図3及び図4は、本実施形態の動作を示すフローチャートである。処理・指令サーバ7のCPU71は、所定時間毎に、図3及び図4に示す一連の処理を実行する。 Next, the operation of this embodiment will be described. 3 and 4 are flow charts showing the operation of this embodiment. The CPU 71 of the processing/command server 7 executes a series of processes shown in FIGS. 3 and 4 at predetermined time intervals.

処理・指令サーバ7のCPU71は、収集サーバ91に、情報のリクエストを送信し、収集サーバ91から、気象予報に関わる気象予報情報、系統電力95の電力需給に関わる電力需給情報、地震の発生に関わる災害情報、火災の発生に関わる災害情報、洪水の発生に関わる災害情報、火山噴火に関わる災害情報などを取得し、取得した情報をRAM72に記憶する(S110)。 The CPU 71 of the processing/command server 7 transmits a request for information to the collection server 91, and from the collection server 91, the weather forecast information related to the weather forecast, the power supply and demand information related to the power supply and demand of the grid power 95, and the occurrence of an earthquake. Related disaster information, fire disaster information, flood disaster information, volcanic eruption disaster information, etc. are acquired, and the acquired information is stored in the RAM 72 (S110).

ステップS120において、CPU71は、RAM72内の災害情報に基づいて、地震が発生するか否かを判定する。RAM72内に、地震の発生を示す災害情報がある場合、このステップの判定結果は、「Yes」になり、地震の発生を示す災害情報がない場合、このステップの判定結果は、「No」になる。地震が発生する場合(S120:Yes)、ステップS130に進む。地震が発生しない場合(S120:No)、ステップS150に進む。 In step S<b>120 , the CPU 71 determines whether or not an earthquake will occur based on the disaster information in the RAM 72 . If there is disaster information indicating the occurrence of an earthquake in the RAM 72, the determination result of this step will be "Yes", and if there is no disaster information indicating the occurrence of an earthquake, the determination result of this step will be "No". Become. If an earthquake occurs (S120: Yes), proceed to step S130. If no earthquake occurs (S120: No), the process proceeds to step S150.

ステップS130において、CPU71は、RAM72に地震発生フラグをセットする。地震発生フラグは、地震の発生を示すフラグである。ステップS140において、CPU71は、住居部11の各住居への電力の供給の遮断を指示する給電ロックメッセージをゲートウェイ6に送信する。ステップS140の実行の後は、ステップS210に進む。 In step S<b>130 , the CPU 71 sets an earthquake occurrence flag in the RAM 72 . The earthquake occurrence flag is a flag indicating the occurrence of an earthquake. In step S<b>140 , the CPU 71 transmits to the gateway 6 a power supply lock message instructing to cut off the power supply to each residence of the residence section 11 . After execution of step S140, the process proceeds to step S210.

ゲートウェイ6は、給電ロックメッセージを受信すると、住居部11の各住居の第1スマートメータ21に、電力の遮断を指示する制御信号を送信する。第1スマートメータ21は、電力の供給の遮断を指示する制御信号を受信すると、住居内の負荷への電力供給を遮断する。電源供給の遮断の後、住居の中に居住者が居り、その居住者が第1スマートメータ21の復旧スイッチ20を押す操作を行うと、第1スマートメータ21は、電力供給の遮断を解除し、電力供給の遮断の解除を通知する解除通知信号をゲートウェイ6に送信する。ゲートウェイ6は、住居部11の住居の第1スマートメータ21から、解除通知信号を受信すると、その住居の識別情報を含むロック解除メッセージを処理・指令サーバ7に送信する。 Upon receiving the power supply lock message, the gateway 6 transmits a control signal to the first smart meter 21 of each residence in the residence section 11 to instruct the power to be cut off. When the first smart meter 21 receives the control signal instructing to cut off the power supply, the first smart meter 21 cuts off the power supply to the load in the house. After the power supply is cut off, when a resident is in the house and the resident presses the recovery switch 20 of the first smart meter 21, the first smart meter 21 cancels the power supply cutoff. , transmits to the gateway 6 a cancellation notification signal for notifying the cancellation of the interruption of power supply. Upon receiving the release notification signal from the first smart meter 21 of the dwelling unit 11 , the gateway 6 transmits a lock release message including the identification information of the dwelling to the processing/command server 7 .

ステップS150において、CPU71は、RAM72に充電/放電スケジュール設定済みフラグがセットされているか否かを判定する。充電/放電スケジュール設定済みフラグは、将来の所定時間内に停電が発生すると予測される場合に、後述するステップS190において、セットされる。RAM72に充電/放電スケジュール設定済みフラグがセットされていない場合(S150:No)、ステップS160に進む。RAM72に充電/放電スケジュール設定済みフラグがセットされている場合(S150:Yes)、ステップS210に進む。 In step S<b>150 , the CPU 71 determines whether or not the charge/discharge schedule set flag is set in the RAM 72 . The charging/discharging schedule set flag is set in step S190, which will be described later, when it is predicted that a power failure will occur within a predetermined time in the future. If the charging/discharging schedule setting completed flag is not set in the RAM 72 (S150: No), the process proceeds to step S160. If the charging/discharging schedule setting completion flag is set in the RAM 72 (S150: Yes), the process proceeds to step S210.

ステップS160において、CPU71は、停電予測処理を実行する。停電予測処理は、RAM72に記憶されている最新の情報を基に、将来の所定時間以内に停電が発生するか否か、及び、停電の発生日時を予測する処理である。停電予測処理では、CPU71は、RAM72内の電力需給情報が、停電の発生に関わる情報を含む場合は、将来の所定時間内に停電が発生すると判定する。また、CPU71は、RAM72内の災害情報が、火災、洪水、火山噴火、その他の災害の発生を示すものであり、災害情報が示す災害の発生時刻や地域が、所定のパターンにマッチする場合も、将来の所定時間内に停電が発生すると判定する。また、電力需給情報や災害情報に、停電の発生の見通しに関わる情報が含まれている場合、その見通しが示す時刻を、停電の発生日時とする。 In step S160, the CPU 71 executes power failure prediction processing. The power failure prediction process is a process of predicting whether or not a power failure will occur within a predetermined time in the future and the date and time of occurrence of the power failure, based on the latest information stored in the RAM 72 . In the power failure prediction process, when the power supply and demand information in the RAM 72 includes information related to the occurrence of power failure, the CPU 71 determines that the power failure will occur within a predetermined time in the future. Moreover, the CPU 71 may also determine that the disaster information in the RAM 72 indicates the occurrence of a fire, flood, volcanic eruption, or other disaster, and that the time and area of occurrence of the disaster indicated by the disaster information match a predetermined pattern. , it is determined that a power failure will occur within a predetermined time in the future. If the power supply and demand information or the disaster information includes information related to the forecast of the occurrence of power failure, the time indicated by the forecast is used as the date and time of occurrence of the power failure.

ステップS170において、CPU71は、停電予測処理において、停電が発生する、との予測結果が得られたか否かを判定する。停電が発生するとの予測結果であった場合(S170:Yes)、ステップS180に進む。停電が発生するとの予測結果でなかった場合(S170:No)、ステップS210に進む。 In step S<b>170 , the CPU 71 determines whether or not a prediction result that a power failure will occur is obtained in the power failure prediction process. If the prediction result indicates that a power failure will occur (S170: Yes), the process proceeds to step S180. If the prediction result does not indicate that a power failure will occur (S170: No), the process proceeds to step S210.

CPU71は、充電/放電スケジュールデータを生成する。充電/放電スケジュールデータは、特別運転における蓄電池設備4の充電から放電への切替予定時刻と、放電への切替以降における、住居部11、第1共用部12、第2共用部13、及び消防用設備14への電力供給量のレベルとを示すデータである。 The CPU 71 generates charge/discharge schedule data. The charging/discharging schedule data includes the scheduled switching time from charging to discharging of the storage battery equipment 4 in the special operation, and the residential section 11, the first common section 12, the second common section 13, and the fire station after switching to discharging. This data indicates the level of power supply to the equipment 14 .

充電/放電スケジュールデータの生成の手順は次の通りである。CPU71は、停電予測処理において求めた停電の発生日時を、充電から放電への切替予定時刻とする。CPU71は、当該処理・指令サーバ7のリアルタイムクロックまたはネットワーク90上の装置から、当該ステップの実行時点の日時を示す情報を取得する。 The procedure for generating charge/discharge schedule data is as follows. The CPU 71 sets the date and time of occurrence of the power failure obtained in the power failure prediction process as the scheduled switching time from charging to discharging. The CPU 71 acquires information indicating the date and time of execution of the step from the real-time clock of the processing/command server 7 or from a device on the network 90 .

CPU71は、ゲートウェイ6にリクエストを送信し、蓄電池設備4の電池残量Cを示す第1情報を取得し、この第1情報をRAM72に記憶する。CPU71は、停電予想時間Tを示す第2情報を取得し、この第2情報をRAM72に記憶する。ここで、停電予想時間Tは、処理・指令サーバ7から電力需給情報の一部として受信してもよいし、処理・指令サーバ7から受信した災害情報に基づく所定の計算によって求めてもよい。CPU71は、当該ステップの実行の時点の日付と時刻とに基づいて求めた電力需要予測量Dを示す第3情報を取得し、この第3情報をRAM72に記憶する。電力需要予測量Dは、日付及び時間帯と過去の電力需要量の統計値とを対応付けたテーブルを参照することよって求めるとよい。 The CPU 71 transmits a request to the gateway 6 , acquires first information indicating the remaining battery capacity C of the storage battery equipment 4 , and stores this first information in the RAM 72 . The CPU 71 acquires second information indicating the expected power failure time T and stores this second information in the RAM 72 . Here, the estimated power outage time T may be received from the processing/command server 7 as part of the power supply and demand information, or may be obtained by a predetermined calculation based on the disaster information received from the processing/command server 7 . The CPU 71 acquires the third information indicating the predicted power demand amount D obtained based on the date and time of execution of the step, and stores this third information in the RAM 72 . The predicted power demand D may be obtained by referring to a table that associates the date and time period with past power demand statistical values.

次に、CPU71は、火災用電力供給レベル設定テーブルTBLa、洪水用電力供給レベル設定テーブルTBLb、その他の災害用電力供給レベル設定テーブルTBLc、及び系統停電用電力供給レベル設定テーブルTBLdのうち、RAM72内の情報と対応するものを、参照先テーブルとする。具体的には、RAM72内に火災の発生を示す災害情報がある場合は、火災用電力供給レベル設定テーブルTBLaを参照先とし、洪水の発生を示す災害情報がある場合は、洪水用電力供給レベル設定テーブルTBLbを参照先とし、その他の災害を示す災害情報がある場合は、その他の災害用電力供給レベル設定テーブルTBLcを参照先とする。また、RAM72内に災害情報がなく、停電の発生を示す電力需給情報がある場合は、系統停電用電力供給レベル設定テーブルTBLdを参照先とする。 Next, the CPU 71 selects from the fire power supply level setting table TBLa, the flood power supply level setting table TBLb, the other disaster power supply level setting table TBLc, and the system blackout power supply level setting table TBLd. A table corresponding to the information of is referred to. Specifically, if there is disaster information indicating the occurrence of fire in the RAM 72, the fire power supply level setting table TBLa is referred to, and if there is disaster information indicating the occurrence of flooding, the flood power supply level The setting table TBLb is referred to, and if there is disaster information indicating other disasters, the other disaster power supply level setting table TBLc is referred to. If there is no disaster information in the RAM 72 and there is power supply and demand information indicating the occurrence of a power failure, the power supply level setting table TBLd for system power failure is referred to.

CPU71は、第1情報、第2情報、及び第3情報を基に、参照先の電力供給レベル設定テーブルを参照することにより、該当の電力供給レベルを示すデータを特定する。CPU71は、充電から放電への切替予定時刻を示すデータと、テーブルから読み出した電力供給レベルを示すデータのセットを充電/放電スケジュールデータとし、このスケジュールデータをRAM72に記憶する。 Based on the first information, the second information, and the third information, the CPU 71 refers to the power supply level setting table, which is the reference destination, to specify data indicating the corresponding power supply level. The CPU 71 sets a set of data indicating the scheduled switching time from charging to discharging and data indicating the power supply level read from the table as charge/discharge schedule data, and stores this schedule data in the RAM 72 .

ステップS190において、CPU71は、RAM72に充電/放電スケジュール設定済みフラグをセットする。 In step S<b>190 , the CPU 71 sets a charge/discharge schedule set flag in the RAM 72 .

ステップS200において、CPU71は、蓄電池設備4の充電を指示する充電開始メッセージをゲートウェイ6に送信する。ゲートウェイ6が充電開始メッセージを受信すると、運転制御が通常運転から特別運転に切り替わり、蓄電池設備4は、その時点の充電池の充填量と基準値Refとの大小関係に関わらず、充電を開始する。 In step S<b>200 , the CPU 71 transmits to the gateway 6 a charging start message instructing charging of the storage battery equipment 4 . When the gateway 6 receives the charge start message, the operation control is switched from normal operation to special operation, and the storage battery equipment 4 starts charging regardless of the size relationship between the charging amount of the rechargeable battery at that time and the reference value Ref. .

ステップS210において、CPU71は、ゲートウェイ6から、不足電圧継電器9によって停電の発生が検出されたことを示す停電発生メッセージを受信したか否かを判定する。停電発生メッセージを受信した場合(S210:Yes)、ステップS220に進む。停電発生メッセージを受信していない場合(S210:No)、ステップS250に進む。 In step S<b>210 , the CPU 71 determines whether or not a power failure occurrence message indicating that a power failure has been detected by the undervoltage relay 9 has been received from the gateway 6 . If the power failure occurrence message is received (S210: Yes), the process proceeds to step S220. If the power failure occurrence message has not been received (S210: No), the process proceeds to step S250.

ステップS220において、CPU71は、RAM72に地震発生フラグがセットされているか否かを判定する。地震発生フラグがセットされていない場合(S220:No)、ステップS230に進む。地震発生フラグがセットされている場合(S220:Yes)、ステップS250に進む。 In step S<b>220 , the CPU 71 determines whether or not an earthquake flag is set in the RAM 72 . If the earthquake occurrence flag is not set (S220: No), the process proceeds to step S230. If the earthquake occurrence flag is set (S220: Yes), the process proceeds to step S250.

ステップS230において、CPU71は、電力供給レベル決定処理を行う。電力供給レベル決定処理は、停電の発生以降における電力供給のレベルを決定する処理である。CPU71は、RAM72に充電/放電スケジュールデータが記憶されている場合、その充電/放電スケジュールデータが示すレベルを、停電の発生以降における電力供給レベルとする。CPU71は、RAM72に充電/放電スケジュールデータが記憶されていない場合、当該ステップの実行の時点を停電の発生時とし、予め定められた長さの時間(例えば2時間)を、仮の停電予想時間T’とし、当該停電の発生の時点における蓄電池設備4の電池残量Cを示す第1情報、及び当停電の発生の時点の日付と時刻とに基づいて求めた電力需要予測量Dを示す第3情報を基に、停電予想時間T’の間の住居及び共用設備の電力需要を満たすのに必要な電力の供給量のレベルを求め、このレベルを停電の発生以降における電力供給レベルとする。 In step S230, the CPU 71 performs power supply level determination processing. The power supply level determination process is a process of determining the level of power supply after the occurrence of a power failure. When charging/discharging schedule data is stored in the RAM 72, the CPU 71 sets the level indicated by the charging/discharging schedule data as the power supply level after the occurrence of the power failure. When the charge/discharge schedule data is not stored in the RAM 72, the CPU 71 sets the time of execution of the step to the occurrence of power failure, and sets a predetermined length of time (for example, 2 hours) as the estimated power failure time. T′, the first information indicating the remaining battery capacity C of the storage battery equipment 4 at the time of the occurrence of the power failure, and the predicted power demand D obtained based on the date and time at the time of the occurrence of the power failure. 3 Based on the information, the level of power supply required to meet the power demand of the residence and common facilities during the expected power failure time T' is obtained, and this level is set as the power supply level after the occurrence of the power failure.

ステップS240において、CPU71は、電力供給レベル決定処理において決定した電力供給レベルのデータを含む電力供給レベル通知メッセージをゲートウェイ6に送信する。ゲートウェイ6は、電力供給レベル通知メッセージを受信すると、そのメッセージに応じて、住居部11、第1共用部12、第2共用部13、及び消防用設備14に固有の電力供給量の上限値を決定し、電力供給量の制御信号を、スマートメータ21、22、23、及び24に送信する。ここで、CPU71は、住居部11については、電力供給量を、最も高い20Aと最も低い0Aの間の5段階で制御し、第1共用部12、第2共用部13、及び消防用設備14については、電力供給量を、電力供給あり(電力供給量の制限なし)と電力供給なし(電力供給を遮断)の2段階で制御する。 In step S240, the CPU 71 transmits to the gateway 6 a power supply level notification message including data of the power supply level determined in the power supply level determination process. When the gateway 6 receives the power supply level notification message, the gateway 6 sets the upper limit value of the power supply specific to the residential section 11, the first common section 12, the second common section 13, and the firefighting equipment 14 according to the message. , and transmits control signals for power supply to the smart meters 21 , 22 , 23 , and 24 . Here, the CPU 71 controls the amount of power supply to the residential section 11 in five stages between the highest 20 A and the lowest 0 A, and , the amount of power supply is controlled in two stages: with power supply (no limit on the amount of power supply) and without power supply (cutoff of power supply).

より詳細に説明すると、CPU71は、住居部11については、電力供給レベル通知メッセージによって指定された電力供給レベルがレベルAならば、電力供給量を20Aにし、レベルBならば、電力供給量を10Aにし、レベルCならば、電力供給量を5Aにし、レベルDならば、電力供給量を0Aにし、レベルEならば、電力供給を遮断する。 More specifically, if the power supply level designated by the power supply level notification message is level A, the CPU 71 sets the power supply amount to 20 A, and if the power supply level is level B, sets the power supply amount to 10 A. If it is level C, the amount of power supply is set to 5 A. If it is level D, the amount of power supply is set to 0 A. If it is level E, the power supply is cut off.

また、CPU71は、第1共用部12については、電力供給レベル通知メッセージによって指定された電力供給レベルがレベルA、B、C、D、及びEの何れであっても、電力供給ありとする。 Further, the CPU 71 determines that power is supplied to the first shared unit 12 regardless of whether the power supply level specified by the power supply level notification message is any of levels A, B, C, D, and E.

また、CPU71は、第2共用部13については、電力供給レベル通知メッセージによって指定された電力供給レベルがレベルA又はBならば、電力供給ありとし、レベルC、D、又はEならば、電力供給なしとする。 In addition, the CPU 71 determines that power is supplied to the second shared unit 13 if the power supply level specified by the power supply level notification message is level A or B, and if level C, D, or E is specified, power is supplied. None.

また、CPU71は、消防用設備14については、電力供給レベル通知メッセージによって指定された電力供給レベルがレベルA、B、C、D、及びEの何れであっても、電力供給ありとする。 Further, the CPU 71 determines that power is supplied to the firefighting equipment 14 regardless of whether the power supply level specified by the power supply level notification message is any of levels A, B, C, D, and E.

ステップS250において、CPU71は、ゲートウェイ6から、ロック解除メッセージを受信したか否かを判定する。住居部11の住居の中に居住者が居り、住居の第1スマートメータ21の復旧スイッチ20を押す操作が行われた場合、このステップS250の判定結果は「Yes」になり、復旧スイッチ20を押す操作が行われていない場合、このステップの判定結果は「No」になる。ロック解除メッセージを受信した場合(S250:Yes)、ステップS260に進む。ロック解除メッセージを受信していない場合(S250:No)、今回の処理を終了する。 In step S<b>250 , the CPU 71 determines whether or not an unlock message has been received from the gateway 6 . If there is a resident in the dwelling unit 11 and the operation of pressing the recovery switch 20 of the first smart meter 21 of the dwelling is performed, the determination result in step S250 becomes "Yes", and the recovery switch 20 is turned off. If no pressing operation has been performed, the determination result of this step is "No". If the unlock message has been received (S250: Yes), the process proceeds to step S260. If the unlock message has not been received (S250: No), the current process is terminated.

ステップS260において、CPU71は、安否確認情報の電子メールを送信する。より具体的には、CPU71は、ロック解除メッセージを基に、住居部11のどの住居の第1スマートメータ21から解除通知信号が発信されたかを特定する。CPU71は、各住居の識別情報と居住者の関係者の電子メールアドレスとを対応付けたテーブルから、解除通知信号の発信元の住居の識別情報と対応する電子メールアドレスを検索する。CPU71は、テーブルから探索した電子メールアドレスに宛てて、住居内に居る者が無事であることを記した電子メールメッセージを発信する。 In step S260, the CPU 71 sends an e-mail of safety confirmation information. More specifically, based on the lock release message, the CPU 71 identifies which first smart meter 21 of the dwelling unit 11 transmitted the release notification signal. The CPU 71 retrieves the identification information of the residence from which the cancellation notification signal is transmitted and the corresponding e-mail address from the table that associates the identification information of each residence with the e-mail addresses of the persons related to the residents. The CPU 71 sends an e-mail message to the e-mail address searched from the table, stating that the person in the residence is safe.

以上が、本実施形態の詳細である。本実施形態によると、次の効果が得られる。
第1に、本実施形態に係る電力供給支援システム1は、蓄電池設備4と、系統電力95及び蓄電池設備4と繋がった一括受電盤10と、一括受電盤10から住居部11の住居に至る給電路上に配置された第1スマートメータ21と、一括受電盤10から第1共用部12の共用設備に至る給電路上に配置された第2スマートメータ22と、一括受電盤10から第2共用部13の共用設備に至る給電路上に配置された第3スマートメータ23と、一括受電盤10から消防法設備に至る給電路上に配置された第4スマートメータ24と、蓄電池設備4、第1スマートメータ21、第2スマートメータ22、第3スマートメータ23、及び第4スマートメータ24と接続されると共に、ネットワーク90と接続された処理装置8である処理・指令サーバ7及びゲートウェイ6とを具備し、処理装置8は、地震、火災、洪水、火山噴火、その他の災害に関わる災害情報を収集する収集サーバ91から、ネットワーク90を介して、災害情報を取得し、取得した災害情報に基づいて、将来の所定時間以内における停電の発生を予測し、この予測の結果に基づいて、蓄電池設備4における充電及び放電のスケジュールを決定し、決定したスケジュールに従って、蓄電池設備4の充電及び放電を制御する。よって、災害や停電の発生時における一括受電採用共同住宅の構内への電力供給の停滞を防ぐことができる技術的手段を提供することができる。
The above is the details of the present embodiment. According to this embodiment, the following effects are obtained.
First, the power supply support system 1 according to the present embodiment includes a storage battery facility 4, a collective power receiving board 10 connected to the grid power 95 and the storage battery facility 4, and power supply from the collective power receiving board 10 to the residence of the dwelling section 11. A first smart meter 21 placed on the road, a second smart meter 22 placed on a power supply line from the collective power receiving board 10 to the shared equipment of the first common area 12, and from the collective power receiving board 10 to the second common area 13. A third smart meter 23 placed on the power supply line leading to the shared equipment, a fourth smart meter 24 placed on the power supply line from the collective power receiving board 10 to the Fire Service Act equipment, the storage battery equipment 4, and the first smart meter 21 , the second smart meter 22, the third smart meter 23, and the fourth smart meter 24, and the processing/command server 7 and the gateway 6, which are processing devices 8 connected to the network 90, The device 8 acquires disaster information via a network 90 from a collection server 91 that collects disaster information related to earthquakes, fires, floods, volcanic eruptions, and other disasters. It predicts the occurrence of a power outage within a predetermined time, determines the charging and discharging schedule for the storage battery equipment 4 based on the results of this prediction, and controls the charging and discharging of the storage battery equipment 4 according to the determined schedule. Therefore, it is possible to provide a technical means capable of preventing the stagnation of the power supply to the premises of the condominium that employs collective power reception in the event of a disaster or power outage.

第2に、本実施形態では、処理・指令サーバ7は、災害情報に基づいて、地震が発生すると予測した場合(S120:Yes)、火災用電力供給レベル設定テーブルTBLa、洪水用電力供給レベル設定テーブルTBLb、及びその他の災害用電力供給レベル設定テーブルTBLc、及び系統停電用電力供給レベル設定テーブルTBLdの如何に関わらず、ゲートウェイ6に、給電ロックメッセージを送信し(S140)、ゲートウェイ6は、給電ロックメッセージを受信すると、住居への電力の供給を遮断する制御信号を第1スマートメータ21に送信する。よって、地震が発生したときに、住居への電力の供給を直ちに停めて、火災などの二次災害の発生を確実に防ぐことができる。 Secondly, in this embodiment, when the processing/command server 7 predicts that an earthquake will occur based on the disaster information (S120: Yes), the fire power supply level setting table TBLa and the flood power supply level setting table TBLa Regardless of the table TBLb, other disaster power supply level setting table TBLc, and system blackout power supply level setting table TBLd, a power supply lock message is transmitted to the gateway 6 (S140). Upon receiving the lock message, it sends a control signal to the first smart meter 21 to cut off the power supply to the residence. Therefore, when an earthquake occurs, the power supply to the residence can be immediately stopped to reliably prevent the occurrence of a secondary disaster such as a fire.

第3に、本実施形態では、住居部11の第1スマートメータ21は、電力供給の遮断を解除する解除手段である復旧スイッチ20を具備し、復旧スイッチ20によって、電力供給の遮断が解除された場合、第1スマートメータ21は、電力供給の遮断が解除されたことを示す解除通知信号をゲートウェイ6に送信し、ゲートウェイ6は、解除通知信号を受信すると、処理・指令サーバ7に、ロック解除メッセージを送信する。そして、処理・指令サーバ7は、ロック解除メッセージを受信すると(S250:Yes)、解除通知信号の発信元の住居と関連付けられたアドレスに宛てて、安否通知メッセージを送信する(S260)。よって、地震の発生時に住居の中に居る者の安否を、外に居る関係者に確実に知らせることができる。 Thirdly, in the present embodiment, the first smart meter 21 of the dwelling unit 11 includes a recovery switch 20 that is a release means for releasing the cutoff of the power supply. In this case, the first smart meter 21 transmits to the gateway 6 a release notification signal indicating that the cutoff of the power supply has been released. Upon receiving the release notification signal, the gateway 6 instructs the processing/command server 7 to Send a release message. Then, when the processing/command server 7 receives the lock release message (S250: Yes), it transmits a safety notification message to the address associated with the residence of the sender of the release notification signal (S260). Therefore, when an earthquake occurs, the safety of people in the house can be reliably notified to the people outside.

<第2実施形態>
次に、本発明の第2実施形態を説明する。図5は、本発明の第2実施形態である電力供給支援システム1Aの構成を示す図である。電力供給支援システム1Aは、第1実施形態の電力供給支援システム1のスマートメータ21、22、23、24を、スイッチ21A、22A、23A、24Aに置き換えたものである。スイッチ21A、22A、23A、24Aは、電磁接触器等により構成されるスイッチにするとよい。本実施形態によっても、上記第1実施形態と同様の効果が得られる。
<Second embodiment>
Next, a second embodiment of the invention will be described. FIG. 5 is a diagram showing the configuration of a power supply support system 1A that is a second embodiment of the present invention. The power supply support system 1A replaces the smart meters 21, 22, 23 and 24 of the power supply support system 1 of the first embodiment with switches 21A, 22A, 23A and 24A. The switches 21A, 22A, 23A, and 24A are preferably switches configured by electromagnetic contactors or the like. This embodiment also provides the same effects as the first embodiment.

以上、本発明の第1及び第2実施形態について説明したが、この実施形態に以下の変形を加えてもよい。
(1)上記第1及び第2実施形態では、火災用電力供給レベル設定テーブルTBLa、洪水用電力供給レベル設定テーブルTBLb、及びその他の災害用電力供給レベル設定テーブルTBLc、及び系統停電用電力供給レベル設定テーブルTBLdの4種類のテーブルがあった。しかし、テーブルの種類を5種類以上にしてもよい。
Although the first and second embodiments of the present invention have been described above, the following modifications may be added to these embodiments.
(1) In the first and second embodiments, the fire power supply level setting table TBLa, the flood power supply level setting table TBLb, the other disaster power supply level setting table TBLc, and the power supply level for system blackout There were four types of tables, the setting table TBLd. However, the number of types of tables may be five or more.

(2)上記第1及び第2実施形態では、火災用電力供給レベル設定テーブルTBLa、洪水用電力供給レベル設定テーブルTBLb、及びその他の災害用電力供給レベル設定テーブルTBLc、及び系統停電用電力供給レベル設定テーブルTBLdは、「電池残量」、「停電予想時間」、「電力需要予測量」、及び「レベル」のフィールドを有していた。しかし、これらのほかのフィールドを有してもよい。テーブルは、蓄電池設備4の電池残量C、停電予想時間T、及び当該共同住宅内における時期と時間帯とに応じた電力需要予測量Dを含む複数種類の項目の値の組み合わせと、電力供給レベルとを対応付けるものでありさえすればよい。例えば、「地震発生」、「電池残量」、「停電予想時間」、「電力需要予測量」、及び「レベル」のフィールドを有し、「地震発生」のフィールドは、「地震発生あり」と、「地震発生なし」のいずれかの値を示すとよい。この場合の処理・指令サーバ7の動作では、ステップS120:Yes→ステップS130→ステップS140の処理を無くし、参照先のテーブルにおいて、「地震発生」のフィールドが「地震発生あり」となっているレコードの「レベル」を、最も低いレベルEとしておくことにより、地震の発生の際は、直ちに電力供給が遮断されるようにするとよい。 (2) In the above first and second embodiments, the fire power supply level setting table TBLa, the flood power supply level setting table TBLb, the other disaster power supply level setting table TBLc, and the power supply level for system blackout The setting table TBLd has fields of "remaining battery level", "estimated power outage time", "estimated amount of power demand", and "level". However, it may have other fields than these. The table includes a combination of values of a plurality of types of items including the remaining battery capacity C of the storage battery equipment 4, the expected power outage time T, and the predicted power demand amount D corresponding to the season and time zone in the condominium, and the power supply It is only necessary to associate the level with the level. For example, it has fields of "earthquake occurrence", "battery level", "estimated power outage time", "power demand forecast amount", and "level". , or "no earthquake occurrence". In the operation of the processing/command server 7 in this case, the processing of step S120: Yes→step S130→step S140 is eliminated, and in the referenced table, records whose "earthquake occurrence" field is "earthquake occurrence" is set to the lowest level E so that the power supply can be cut off immediately in the event of an earthquake.

(3)上記第1及び第2実施形態では、処理装置8が、共同住宅の中のゲートウェイ6と、共同住宅の外の処理・指令サーバ7とに分かれていた。しかし、ゲートウェイ6と処理・指令サーバ7を一体のものとしてもよい。 (3) In the first and second embodiments, the processing device 8 is divided into the gateway 6 inside the condominium and the processing/command server 7 outside the condominium. However, the gateway 6 and the processing/command server 7 may be integrated.

(4)上記第1及び第2実施形態では、処理・指令サーバ7は、充電/放電スケジュールデータを生成した後、充電開始メッセージをゲートウェイ6に送信して蓄電池設備4の充電を開始させ、ゲートウェイ6から停電発生メッセージを受信したときに、放電開始メッセージをゲートウェイ6に送信して充電から放電への切り替えを行った。しかし、処理・指令サーバ7は、充電/放電スケジュールデータを生成した後に、その充電/放電スケジュールデータをゲートウェイ6に送信し、以降は、ゲートウェイ6が、この充電/放電スケジュールデータに従った充電と放電を行うようにしてもよい。 (4) In the first and second embodiments, the processing/command server 7 generates the charging/discharging schedule data, then transmits a charging start message to the gateway 6 to start charging the storage battery equipment 4, and the gateway When a power failure occurrence message is received from 6, a discharge start message is transmitted to the gateway 6 to switch from charging to discharging. However, after the processing/command server 7 generates the charging/discharging schedule data, it transmits the charging/discharging schedule data to the gateway 6, and thereafter the gateway 6 performs charging and discharging according to this charging/discharging schedule data. You may make it discharge.

(5)上記第1及び第2実施系形態では、第1スマートメータ21は、手動により電力供給の遮断を解除する復旧手段である復旧スイッチ20を有していた。しかし、第1スマートメータ21は、スマートフォンなどの外部の端末から、電力供給の遮断の解除を指示するメッセージを受信する通信手段を有し、このメッセージを受信したときに、電力供給の遮断を解除するようにしてもよい。 (5) In the above-described first and second embodiments, the first smart meter 21 has the recovery switch 20 that is recovery means for manually canceling cutoff of power supply. However, the first smart meter 21 has communication means for receiving a message from an external terminal such as a smart phone, which instructs to cancel the cutoff of the power supply. You may make it

1 1A 電力供給支援システム
2 アグリゲータ
6 ゲートウェイ
7 処理・指令サーバ
8 処理装置
9 不足電圧継電器
10 一括受電盤
11 住居部
12 第1共用部
13 第2共用部
20 復旧スイッチ
21 第1スマートメータ
22 第2スマートメータ
23 第3スマートメータ
24 第4スマートメータ
21A 第1スイッチ
22A 第2スイッチ
23A 第3スイッチ
24A 第4スイッチ
61 CPU、
62 RAM、
63 ROM、
64 通信インターフェース
71 CPU、
72 RAM、
73 ROM、
74 通信インターフェース
75 ハードディスク
90 ネットワーク
91 収集サーバ
95 系統電力
REFERENCE SIGNS LIST 1 1A power supply support system 2 aggregator 6 gateway 7 processing/command server 8 processing device 9 undervoltage relay 10 collective power receiving panel 11 residential section 12 first common section 13 second common section 20 recovery switch 21 first smart meter 22 second smart meter 23 third smart meter 24 fourth smart meter 21A first switch 22A second switch 23A third switch 24A fourth switch 61 CPU,
62 RAM,
63 ROMs,
64 communication interface 71 CPU,
72 RAM,
73 ROMs,
74 communication interface 75 hard disk 90 network 91 collection server 95 grid power

Claims (8)

一括受電採用共同住宅における電力供給支援システムであって、
蓄電池設備と、
系統電力及び前記蓄電池設備と繋がった一括受電盤と、
前記一括受電盤から住居部の住居に至る給電路上に配置された第1の電力供給遮断/復旧切替手段と、
前記一括受電盤から共用部の共用設備に至る給電路上に配置された第2の電力供給遮断/復旧切替手段と、
前記蓄電池設備、前記第1の電力供給遮断/復旧切替手段、及び前記第2の電力供給遮断/復旧切替手段と接続されると共に、ネットワークと接続された処理装置と
を具備し、
前記処理装置は、
地震、火災、洪水、火山噴火、その他の災害に関わる災害情報を収集する収集サーバから、前記ネットワークを介して、災害情報を取得し、取得した災害情報に基づいて、将来の所定時間以内における停電の発生を予測し、この予測の結果に基づいて、前記蓄電池設備における充電及び放電のスケジュールを決定し、決定したスケジュールに従って、前記蓄電池設備の充電及び放電を制御する
ことを特徴とする電力供給支援システム。
A power supply support system in a collective housing adopting collective power reception,
storage battery equipment;
a collective power receiving board connected to the system power and the storage battery equipment;
a first power supply cut-off/restoration switching means arranged on a power supply line from the collective power receiving board to the residence of the residence;
a second power supply cut-off/restoration switching means arranged on a power supply line from the collective power receiving panel to shared equipment in a common area;
a processing device connected to the storage battery equipment, the first power supply interruption/restoration switching means, and the second power supply interruption/restoration switching means, and connected to a network;
The processing device is
Acquire disaster information via the network from a collection server that collects disaster information related to earthquakes, fires, floods, volcanic eruptions, and other disasters, and based on the acquired disaster information, a power outage within a predetermined time in the future is predicted, based on the result of the prediction, a schedule for charging and discharging the storage battery equipment is determined, and the charging and discharging of the storage battery equipment is controlled according to the determined schedule. system.
前記第1の電力供給遮断/復旧切替手段は、スマートメータ又はスイッチであり、
前記第2の電力供給遮断/復旧切替手段は、スマートメータ又はスイッチである
ことを特徴とする請求項1に記載の電力供給支援システム。
the first power supply interruption/restoration switching means is a smart meter or a switch;
The power supply support system according to claim 1, wherein the second power supply cutoff/restoration switching means is a smart meter or a switch.
前記処理装置は、
前記蓄電池設備の電池残量、停電予想時間、及び当該共同住宅内における時期と時間帯とに応じた電力需要予測量を含む複数種類の項目の値の組み合わせと、前記住居及び前記共用設備への電力の供給量のレベルとを対応付けたテーブルを有し、
前記処理装置は、
前記所定時間以内に停電が発生すると予測した場合に、前記蓄電池設備の電池残量を示す情報、停電予想時間を示す情報、及び日付と時刻とに基づいて求めた電力需要予測量を示す情報を取得し、取得した情報を基に、前記テーブルを参照して、電力の供給量のレベルを決定し、このレベルを示す制御信号を前記第1の電力供給遮断/復旧切替手段及び前記第2の電力供給遮断/復旧切替手段に送信する
ことを特徴とする請求項1又は2に記載の電力供給支援システム。
The processing device is
A combination of values of a plurality of types of items including the remaining battery capacity of the storage battery equipment, the expected power outage time, and the predicted amount of power demand according to the time and time zone in the apartment, and the amount of electricity to the residence and the shared equipment. having a table in which levels of power supply amount are associated with each other;
The processing device is
When it is predicted that a power failure will occur within the predetermined time, information indicating the remaining battery capacity of the storage battery equipment, information indicating the expected power failure time, and information indicating the predicted amount of power demand obtained based on the date and time. Based on the acquired information, the table is referred to determine the power supply level, and a control signal indicating this level is sent to the first power supply cutoff/restoration switching means and the second power supply cutoff/restoration switching means. 3. The power supply support system according to claim 1, wherein the information is transmitted to power supply cutoff/restoration switching means.
前記処理装置は、
前記災害情報に基づいて、地震が発生すると予測した場合、前記テーブルの如何に関わらず、前記住居への電力の供給の遮断を指示する制御信号を前記第1の電力供給遮断/復旧切替手段に送信する
ことを特徴とする請求項3に記載の電力供給支援システム。
The processing device is
When it is predicted that an earthquake will occur based on the disaster information, regardless of the table, a control signal instructing to cut off the power supply to the residence is sent to the first power supply cutoff/restoration switching means. The power supply support system according to claim 3, characterized by transmitting.
前記一括受電盤は、不足電圧継電器を有し、
前記処理装置は、前記不足電圧継電器によって、突然の停電の発生が検出された場合、予め定められた長さの時間を、突然の停電の発生の時点における仮の停電予想時間とし、当該停電の発生の時点における前記蓄電池設備の電池残量を示す情報、及び日付と時刻とに基づいて求めた電力需要予測量を示す情報を基に、前記仮の停電予想時間の間の前記住居及び前記共用設備の電力需要を満たすのに必要な電力の供給量のレベルを決定し、このレベルを示す制御信号を前記第1の電力供給遮断/復旧切替手段及び前記第2の電力供給遮断/復旧切替手段に送信する
ことを特徴とする請求項1~4のいずれか1項に記載の電力供給支援システム。
The collective power receiving board has an undervoltage relay,
When the occurrence of a sudden power failure is detected by the undervoltage relay, the processing device sets a predetermined length of time as a temporary power failure prediction time at the time of the sudden power failure occurrence, and Based on the information indicating the remaining battery level of the storage battery equipment at the time of occurrence and the information indicating the predicted amount of power demand obtained based on the date and time, the residence and the common use during the temporary power outage predicted time determining the level of power supply required to meet the power demand of the facility, and transmitting a control signal indicating this level to the first power supply cutoff/restoration switching means and the second power supply cutoff/restoration switching means; 5. The power supply support system according to any one of claims 1 to 4, characterized by transmitting to.
前記第1の電力供給遮断/復旧切替手段は、
電力供給の遮断を解除する解除手段を具備し、前記解除手段によって、電力供給の遮断が解除された場合、電力供給の遮断が解除されたことを示す解除通知信号を前記処理装置に送信し、
前記処理装置は、
解除通知信号を受信した場合、その発信元の住居と関連付けられたアドレスに宛てて、安否通知メッセージを送信する
ことを特徴とする請求項5に記載の電力供給支援システム。
The first power supply cutoff/restoration switching means includes:
a canceling means for canceling the cutoff of power supply, wherein when the cutoff of the power supply is canceled by the canceling means, a cancellation notification signal indicating that the cutoff of the power supply has been canceled is transmitted to the processing device;
The processing device is
6. The power supply support system according to claim 5, wherein when a cancellation notification signal is received, a safety notification message is sent to an address associated with the residence of the sender.
前記解除手段は、手動により電力供給の遮断を解除するスイッチを有している
ことを特徴とする請求項6に記載の電力供給支援システム。
7. The power supply support system according to claim 6, wherein said canceling means has a switch for manually canceling cutoff of power supply.
前記解除手段は、電力供給の遮断の解除を指示するメッセージを受信する通信手段を有している
ことを特徴とする請求項7に記載の電力供給支援システム。
8. The power supply support system according to claim 7, wherein the canceling means has communication means for receiving a message instructing cancellation of cutoff of power supply.
JP2021139051A 2021-08-27 2021-08-27 Power supply support system Pending JP2023032750A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021139051A JP2023032750A (en) 2021-08-27 2021-08-27 Power supply support system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021139051A JP2023032750A (en) 2021-08-27 2021-08-27 Power supply support system

Publications (1)

Publication Number Publication Date
JP2023032750A true JP2023032750A (en) 2023-03-09

Family

ID=85416190

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021139051A Pending JP2023032750A (en) 2021-08-27 2021-08-27 Power supply support system

Country Status (1)

Country Link
JP (1) JP2023032750A (en)

Similar Documents

Publication Publication Date Title
JP5044382B2 (en) Power supply system
JP5658955B2 (en) Information communication apparatus and information communication method
JP6418239B2 (en) Power supply apparatus and power supply method
JP2009159730A (en) Dc power distribution system
US9444288B2 (en) Power monitor and control apparatus and control apparatus of distributed powering system
JP2009153336A (en) Distribution system
JP3901025B2 (en) Power storage system
JP5989436B2 (en) Energy management system, energy management apparatus, control method, and program
WO2018078975A1 (en) Power supply device and power storage device
JP6356517B2 (en) System monitoring and control device
JP2016073003A (en) Power control system, method, and breaking controller
JP6758207B2 (en) Power control device and power control method
WO2017204011A1 (en) Management system, management method, power conversion device, and management device
JP6582091B2 (en) Power conversion device, power management device, and power management method
JP5952069B2 (en) Consumption monitoring system
JP2023032750A (en) Power supply support system
JP2009247045A (en) Information processing system for suppressing power consumption rate when auxiliary power supply unit is in operation, information processing apparatus and method for suppressing power consumption rate
JP6971196B2 (en) Power system and switching device
CN107465267A (en) A kind of community electric power protection monitoring system
JP3171633U (en) Solar system that can sell electricity with electricity storage
JP2016171713A (en) Supervision control device
WO2023095911A1 (en) Power system and control method
CN107909158A (en) Power grid maintenance supervisory systems based on current limiting system
JP7346099B2 (en) power supply system
JP2017038502A (en) Energy management device, energy management method, and program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20240722