JP2022161779A - Business method obtained by combining cost burden in periodical maintenance inspection and load test of emergency generator with cost reduction in switching to new power source - Google Patents

Business method obtained by combining cost burden in periodical maintenance inspection and load test of emergency generator with cost reduction in switching to new power source Download PDF

Info

Publication number
JP2022161779A
JP2022161779A JP2021089622A JP2021089622A JP2022161779A JP 2022161779 A JP2022161779 A JP 2022161779A JP 2021089622 A JP2021089622 A JP 2021089622A JP 2021089622 A JP2021089622 A JP 2021089622A JP 2022161779 A JP2022161779 A JP 2022161779A
Authority
JP
Japan
Prior art keywords
maintenance
company
emergency generator
business
emergency
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2021089622A
Other languages
Japanese (ja)
Inventor
俊之 村松
Toshiyuki Muramatsu
祐樹 竹内
Yuki Takeuchi
晃道 冨永
Akimichi Tominaga
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2021089622A priority Critical patent/JP2022161779A/en
Publication of JP2022161779A publication Critical patent/JP2022161779A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

To provide a method for increasing an execution rate of a maintenance inspection load test of an emergency generator.SOLUTION: A method is used for switching electricity prices of an emergency generator owner to a new power source of a low price to secure a maintenance inspection load test charge with a difference between their amounts. Three business companies share respective data and efficiently use computers, and thereby use a method for guiding and proceeding work procedures.SELECTED DRAWING: Figure 1

Description

本発明は災害時や非常事態発生により停電現象が生じた場合において、即座に作動させて停電現象による緊急事態の発生を最小限に食い止めるため、非常用発電機の保守点検の確実な履行がなされるように、できる限り多くの設置業者が非常用発電機の点検を行いうるようにしようとするものである。 In the event of a power outage due to a disaster or emergency, the present invention operates immediately to minimize the occurrence of an emergency due to the power outage. As such, the aim is to allow as many installers as possible to inspect emergency generators.

従来の非常用発電機には毎年1回の保守点検や、負荷試験が義務ずけられていた。 Conventional emergency power generators were required to undergo annual maintenance inspections and load tests.

しかしこの点検は多くの非常用発電機設置の事業体ではなされていないかもしくは、形ばかりの方法でやり安全で確実な点検装置を用いてはなされていなかった。ゆえにいざというときに作動不良を起こし作動しない場合がしばしば起こっていた。また作動しても使用通りの電力を発電しない場合がみられた。 However, this inspection is not done in many emergency generator installations, or is done in a token manner and without safe and reliable inspection equipment. Therefore, in an emergency, malfunction often occurred and it did not work. In addition, there were cases in which the power was not generated as required even if it operated.

従来これらの点検が十分に施工されなかったり、全く点検が行われなかったという問題の最大の原因は、毎年の点検作業を行うにおいてその非常用発電機の発電量に応じてそれなりの点検コストがかかるが、所有業者はその必要性の認識はあったとしても、費用の面においてそのコストを抑えようとして点検を先送りするか又はやらない業者が多かった。これによっていざというときに不具合があり、十分に発電の機能を発揮しない場合があった。 In the past, the biggest cause of the problem that these inspections were not carried out sufficiently or not at all was that the annual inspection work required a certain amount of inspection cost according to the amount of power generated by the emergency generator. However, even if the owners recognized the need for such inspections, many of them postponed or did not carry out inspections in an attempt to keep costs down. As a result, there was a problem in an emergency, and there was a case where the power generation function was not fully exhibited.

本発明はこの問題を解決すべく従来の電気料金の出費の範囲において、その問題を解決し非常用発電機の保守点検が確実に行われるようにすることを目的としてもビジネスを提供しようとするものである。 In order to solve this problem, the present invention attempts to provide a business for the purpose of solving the problem and ensuring that the maintenance and inspection of the emergency power generator are performed within the range of the conventional electricity bill expense. It is a thing.

この問題を解決するためには、従来の電気料金の出費の範囲の中でこの保守点検を行いうるようにすれば、あまり抵抗なく保守点検作業を実施する事業体が多くなると思われる。そのために以下の手段を用いる。 In order to solve this problem, if maintenance and inspection can be performed within the range of conventional electricity charges, it is believed that more businesses will be able to carry out maintenance and inspection work without much resistance. For this purpose, the following means are used.

その方法は近年地球温暖化防止のため、石化燃料に頼らずCO2削減のために自然エネルギーを用いたり、またカーボンニュートラルのバイオマス発電などを用いた新電源が推奨され電力自体も自由化されてきている。その中において従来の既存の電力会社以外に約360社が新電力の供給を始めていている。これらの会社では従来の電気料金よりも安価に電力を供給している電力会社がある。
これらの会社の一つと、保守点検を執り行おうとする会社と、これらの事業を取りまとめる会社の3社が共同で事業体を形成し、非常用発電機を設置している会社に電力の安価な提供先を紹介して、従来支払っていた電気料金を安価にし、その差額分で非常用発電機の保守点検費用を捻出するという方法である。
In recent years, in order to prevent global warming, new power sources such as carbon-neutral biomass power generation have been recommended, and electricity itself has been liberalized. there is Among them, about 360 companies other than the conventional existing power companies have started supplying new power. Among these companies, there are electric power companies that supply electric power at lower prices than the conventional electric rates.
One of these companies, a company that conducts maintenance and inspections, and a company that organizes these businesses jointly form a business entity. It is a method of introducing a provider, reducing the electricity bill that has been paid in the past, and using the difference to pay for the maintenance and inspection of the emergency generator.

さらに詳細に説明すれば、非常用発電機の設置会社に安価な新電力への切り替えと、保守点検作業を執り行うにおける業務内容の説明や見積もりを行う会社と、新電源を供給する会社と、保守点検の作業を執り行う会社との3社が協力しでそれぞれの役割をはたすように取り進めれば実現されうる。 To explain in more detail, a company that provides explanations and estimates of work content in switching to inexpensive new electric power to the company that installs the emergency generator and performing maintenance and inspection work, a company that supplies the new power supply, and a maintenance company It can be realized if the three companies, including the company that carries out the inspection work, work together to fulfill their respective roles.

本ビジネスの取り進め方により、従来必要な非常発電機の保守点検の施工が費用の問題でその施工率が低かったものが、この手段をもち得ることによってその非常用発電機の保守点検依頼件数が増加すると考えられ、その結果非常用発電機の即時運転可能となる発電機の運転可能の発電機が限りなく100パーセントに近づき、非常用発電機の不動作による弊害をより確実に未然に防ぐことができる。したがって社会生活における不安をより解消することができる。この事業は各担当組織の分野においてコンピューターを駆使しソフトプログラミングをしっかり活用することによってのみ、効率的に本事業を推進するビジネスとして実現できる。 Due to the way this business is being carried out, the number of requests for maintenance and inspection of emergency generators has increased, although the construction rate for maintenance and inspection of emergency generators, which is necessary in the past, was a problem due to cost issues. As a result, the number of operable generators that can be operated immediately approaches 100%, and the adverse effects caused by the non-operation of the emergency generator are more reliably prevented. can be done. Therefore, anxiety in social life can be eliminated more. This project can be realized as a business that efficiently promotes this project only by making full use of computers and firmly utilizing software programming in the field of each responsible organization.

本ビジネス特許を実施するにおける関係各社の相関関係と各社が行う業務内容の概要を示すものである。 It shows the relationship between the companies involved in implementing this business patent and the outline of the work performed by each company. 本ビジネスを遂行するにおいての一実施例で、各社が行う業務の内容とその関係を示す相関関係と業務内容詳細を示す説明図である。 FIG. 2 is an explanatory diagram showing the details of the business content and the content of the business performed by each company, the correlation showing the relationship therebetween, and the details of the business content, in one embodiment of the execution of this business.

本ビシネスにおいては非常用発電機所有者1とその非常用発電機所有者1に対してその費用削減提案を行い、その削減金でもって非常用発電機の保守点検や負荷試験費用を捻出するといった提案を行う事業主体会社2と、事業主体会社より委託を受けて保守点検や負荷試験などを行う保守サービスセンター会社3との間において、それぞれの情報をコンプーターに入力し、オンラインによってしかるべき作業を円滑に取り進める方法をとる。各々各社はオンラインのコンピューターに接続して情報を共有しつつ、的確な作業日程や指示を行えるようにしたものである。本ビシネスの営業にあたり事業主体会社2は非常用発電機所有者1より的確な仕様情報を入手して、関係各社に情報提供する。たとえはAの顧客の非常用発電機は何年何月何日に導入されたものであるか、製造メー会はどこか、その型式は何か、発電容量はいくらか、ボルト数やアンペア数、サイクルはいくらかなどや、支払っている電気料金はいくらか、その変動幅はどうかなどの情報を共有する。 In this business, we propose to the emergency generator owner 1 and its emergency generator owner 1 to reduce the cost, and use the reduction money to pay for the maintenance inspection and load test costs of the emergency generator. Between the operating company 2, which makes the proposal, and the maintenance service center company 3, which carries out maintenance inspections, load tests, etc., on consignment from the operating company, each information is entered into a computer, and the appropriate work is performed online. Find a way to proceed smoothly. Each company is connected to an online computer and shares information, allowing them to give accurate work schedules and instructions. For the operation of this business, the operating company 2 obtains accurate specification information from the emergency generator owner 1 and provides the information to related companies. For example, what year, month, and day was customer A's emergency generator installed? Where is the manufacturer? What is the model? Share information such as how much is the cycle, how much electricity you are paying and how much it fluctuates.

しかして前記した3社によって情報を共有し、電気料金削減量や見積もりの作成また、保守点検や負荷試験の実施契約を取り交わし、また実施契約の後は保守点検や負荷試験の工事日程を取り決める作業等に入る。これらの作業はコンピュターにデーターを入力することによってすべての指示がなされるように、コンピュータープログラミングにソフトとして組み入れる。 Information is then shared by the three companies mentioned above, electricity bill reductions and estimates are created, maintenance inspections and load testing implementation contracts are exchanged, and after the implementation contract, maintenance inspections and load testing work schedules are determined. etc. These tasks are incorporated into computer programming as software so that all instructions are performed by entering data into the computer.

以下に本ビシネスを取り進めるための実施例を例示する。関係3社とそれに付随してかかわる事業体の作業内容を図1を用いてその概要を説明し、その後具体的なビシネス内容を図2に従って詳細に説明する。 The following are illustrative examples for pursuing this business. The outline of the work of the three related companies and the associated business entities will be explained with reference to FIG. 1, and then the specific business contents will be explained in detail with reference to FIG.

図1は非常用発電機所有者1でありこの会社は非常用発電機製造会社6より購入し設置している。また2は事業主体会社であり電気料金の削減や保守点検の基本契約の営業や保守サービスセンター会社3への指示や依頼をする。また保守サービスセンター3は保守点検作業会社に作業実務の依頼をする。
一方新電源会社5は事業主体会社2の情報をもとに非常用発電機所有者1と新電力への切り替え契約7を取り結ぶ。また新電力会社5は非常用発電機所有者1との間での契約についての金額を含む内容を事業主体会社2に提供する。
FIG. 1 shows the emergency generator owner 1, who purchased and installed it from an emergency generator manufacturing company 6. FIG. Further, 2 is a main business company, which sells basic contracts for reduction of electricity charges and maintenance inspections, and gives instructions and requests to the maintenance service center company 3 . Further, the maintenance service center 3 requests the maintenance and inspection work company to perform the actual work.
On the other hand, the new power supply company 5 concludes a contract 7 for switching to the new electric power with the emergency power generator owner 1 based on the information of the operating company 2 . In addition, the new electric power company 5 provides the operating company 2 with the content including the amount of money for the contract with the emergency power generator owner 1 .

また事業主体会社2は新電力会社5の情報や自身の得た情報をもとに保守サービスセンター会社3に保守点検内容及びその金額等を提供10し、保守サービスセンター3は、保守点検作業会社4に作業指示11を行う。保守点検作業会社4は作業完了後顧客の非常用発電機所有者1に完了報告12を行う。 In addition, the main business company 2 provides 10 the contents of maintenance and inspection, the amount of money, etc. to the maintenance service center company 3 based on the information of the new electric power company 5 and the information obtained by itself, and the maintenance service center 3 is a maintenance and inspection work company. Work instruction 11 is given to 4. The maintenance and inspection work company 4 makes a completion report 12 to the emergency generator owner 1 of the customer after the work is completed.

この一連の流れの中で各々の会社は情報に従いパーソナルコンピューターのソフトを用いて適宜情報を入力しつつ的確な処理を執り行う。 In this series of flows, each company follows the information and uses the software of the personal computer to appropriately input the information and carry out accurate processing.

以下に図2に従って本ビジネスの取り組み詳細を説明する。 The details of this business initiative are described below with reference to Figure 2.

先ず事業主体会社2が営業管理領域の取りまとめ、即ち電気契約明細書を入手してスキャンニングしそれに基ずき電気料金減額シュミレーションを行い減額料金を算出する。これはあらかじめ組み込んだアプリケーションにより算出する。同時に顧客の非常用発電機の情報、すなわちメーカー名型式発電容量、納入年月日等を入手する。そこで電力データーや非常用発電機のデーターをアプリケーションに入力する。事業主体会社2は非常用発電機所有者1間において契約を結ぶ9とともに新電力供給会社5と非常用発電機所有者1との間で電力供給契約7をむすぶ。 First, the main business company 2 compiles the sales management area, that is, obtains and scans the electricity contract specifications, and based on this, conducts an electricity charge reduction simulation to calculate the reduced charge. This is calculated by an application installed in advance. At the same time, information on the customer's emergency power generator, that is, the manufacturer's name, model, power generation capacity, delivery date, etc., is obtained. Therefore, the power data and the data of the emergency generator are input to the application. The operating company 2 concludes a contract 9 with the emergency power generator owner 1 and concludes a power supply contract 7 between the new power supply company 5 and the emergency power generator owner 1 .

次いで事業主体会社2は現場管理領域15を統括する保守サービスセンター会社3との間において作業に関する諸契約を取り結ぶ。その作業内容は、非常用発電機保守計画、すなわちいつの時点でいかなる点検や負荷試験を行うかスケジュールを加味したものを取り決める。これは非常用発電機所有者1のもろもろのデーターを作業計画や、各顧客の非常用発電機の諸元を組み込んだコンピューターソフトに組み入れる。同時に保守点検作業にかかわる交換部品等も含めた見積もりを作成する。 Next, the main business company 2 concludes various contracts regarding work with the maintenance service center company 3 that controls the field management area 15 . The content of the work is the emergency generator maintenance plan, that is, when and what kind of inspections and load tests are to be carried out, and the schedule is determined. This incorporates various data of the emergency generator owner 1 into the work plan and computer software that incorporates the specifications of each customer's emergency generator. At the same time, an estimate including replacement parts related to maintenance and inspection work is prepared.

しかる後その時点におけるすべての非常用発電機所有者1の情報を一括入力し、時系列的に何月何日はどこの場所のどのような仕様の非常用発電機の保守点検、あるいは負荷試験が必要となるかをコンピューター上の画面に、時系列的に表示出来るようにする。 After that, the information of all the emergency generator owners 1 at that time is collectively input, and the maintenance inspection or load test of the emergency generator of what specification in what place in chronological order will be displayed on a computer screen in chronological order.

一方保守サービスセンター会社3は実作業を執り行う部隊、現場作業領域16の保守点検担当部署に作業指示11を行う。そこでは法定点検、保守メンテナンス、場合によっては新しく設置する非常用発電機を発電機メーカー6より導入しこの設置工事等行う。もろもろの作業、工事等の完了後は報告書を作成し保守サービスセンター会社3に報告するとともに、非常用発電機所有者1に作業完了報告書13を提出する。 On the other hand, the maintenance service center company 3 issues work instructions 11 to the units that carry out the actual work, the units in charge of maintenance and inspection in the field work area 16 . There, statutory inspections, maintenance, and in some cases, a newly installed emergency power generator are introduced from the power generator manufacturer 6 and installation work is performed. After completion of various work, construction, etc., a report is prepared and reported to the maintenance service center company 3, and a work completion report 13 is submitted to the emergency power generator owner 1.

以上の一連の仕事の流れの中ではまず非常用発電機所有者1に保守点検の重要性を説明し、次いでそれにかかる費用の捻出方法を説明し、価格の安い新電源の会社5と契約を結ばせ従来の支払っていた電気料金相当額を非常用発電機所有者1より新電力会社5に支払っていただき、新電力会社5は新電力相当価格の手数料を差し引いた差額相当を本事業の事業主体会社2に支払い、事業主体会社2は保守サービスセンター会社3に保守点検費用を支払うこととする。 In the above series of work flow, first explain the importance of maintenance and inspection to the emergency generator owner 1, then explain how to raise the cost, and conclude a contract with the new power supply company 5 at a low price. The emergency generator owner 1 paid the new electric power company 5 the amount equivalent to the electricity bill that had been paid in the past, and the new electric power company 5 paid the difference after deducting the fee equivalent to the new electric power price to the business of this project. The main company 2 is paid, and the business main company 2 pays the maintenance and inspection cost to the maintenance service center company 3 .

一方保守サービスセンター会社3は現場へのもろもろの費用を現場作業領域の担当部署に支払う。 On the other hand, the maintenance service center company 3 pays various costs to the site to the department in charge of the field work area.

これら一連の作業の流れや指示は全てコンピューターソフトのプログラムを作成し、すべてこのソフトに基ずき実行される。すなわちいつの日にどこの顧客のいかなる仕様の非常用発電機の保守、または点検、あるいは負荷試験を行う必要があるか、またその費用はいくらかといったことや、毎日向こう一カ月の各々顧客の非常用発電機の保守点検、負荷試験の作業計画などが一目瞭然にわかるようにコンピューターのプログラミングソフトを組み、効率よく本事業を執り行いうる。 All of these series of work flows and instructions create a computer software program, and all are executed based on this software. In other words, when it is necessary to perform maintenance, inspection, or load test of the emergency generator of what specifications for which customer on what day, how much it costs, and each customer's emergency use for the next month every day The computer programming software is designed so that the maintenance and inspection of the generator and work plans for the load test can be understood at a glance, and this project can be carried out efficiently.

附合の説明Description of attachment

1 非常用発電機所有者
2 事業主体会社
3 保守サービスセンター会社
4 保守点検作業会社
5 新電力会社
6 非常用発電機製造会社
7 新電力切り替え契約締結関係ライン
8 非常用発電機保守点検契約ライン
9 非常用発電機保守点検契約及び電力料金削減提案ライン
10 保守点検契約は中ライン
11 保守点検指示ライン
12 保守点検報告書提出ライン
13 非常用発電機納入契約ライン
14 営業管理領域
15 現場管理領域
16 現場作業領域
1 Emergency generator owner 2 Operating company 3 Maintenance service center company 4 Maintenance and inspection work company 5 New electric power company 6 Emergency generator manufacturing company 7 New power switching contract conclusion line 8 Emergency generator maintenance and inspection contract line 9 Emergency generator maintenance and inspection contract and electricity rate reduction proposal line 10 Maintenance and inspection contract is the middle line 11 Maintenance and inspection instruction line 12 Maintenance and inspection report submission line 13 Emergency generator delivery contract line 14 Sales management area 15 Site management area 16 Site work area

Claims (1)

非常用発電機設置業者1の保守点検負荷試験の実施率を高めるため、非常用発電機設置業者1が支払う通常の電気料金を、新電源の減額制度システムを用いて、その減額額を算出し本制度を用いて、その減額された費用を保守点検負荷試験の実施料金に充てることを事業主体とする会社と、新電源供給会社と、非常用発電機の保守点検負荷試験実施会社との3社で構成する事業において、その3社の事業の取り進め方に対して各々入手する情報を、コンピューターにプログラム入力し、最適条件で効率よく保守点検負荷試験が執り行えるようプログラミングされたコンピューターを用いて執り行うことによって、効率よく保守点検負荷試験を取り進める方法の事業実施方法。 In order to increase the implementation rate of the maintenance inspection load test by the emergency generator installer 1, the normal electricity charge paid by the emergency generator installer 1 is calculated using the reduction system system of the new power supply. Using this system, there are three companies: a company whose main business is to apply the reduced costs to the implementation fee for maintenance and inspection load tests, a new power supply company, and a company that conducts maintenance and inspection load tests for emergency power generators. In the business consisting of three companies, the information obtained for each of the three companies' business procedures is entered into a computer program, and the computer is programmed so that maintenance and inspection load tests can be carried out efficiently under optimal conditions. A business implementation method of a method of efficiently proceeding with a maintenance inspection load test by enforcing it.
JP2021089622A 2021-04-08 2021-04-08 Business method obtained by combining cost burden in periodical maintenance inspection and load test of emergency generator with cost reduction in switching to new power source Pending JP2022161779A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021089622A JP2022161779A (en) 2021-04-08 2021-04-08 Business method obtained by combining cost burden in periodical maintenance inspection and load test of emergency generator with cost reduction in switching to new power source

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021089622A JP2022161779A (en) 2021-04-08 2021-04-08 Business method obtained by combining cost burden in periodical maintenance inspection and load test of emergency generator with cost reduction in switching to new power source

Publications (1)

Publication Number Publication Date
JP2022161779A true JP2022161779A (en) 2022-10-21

Family

ID=83658569

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021089622A Pending JP2022161779A (en) 2021-04-08 2021-04-08 Business method obtained by combining cost burden in periodical maintenance inspection and load test of emergency generator with cost reduction in switching to new power source

Country Status (1)

Country Link
JP (1) JP2022161779A (en)

Similar Documents

Publication Publication Date Title
Manual Energy & ancillary services market operations
Ericson et al. A comparison of fuel choice for backup generators
US20130268311A1 (en) System and Method for Identifying and Upgrading a Transmission Grid
Gómez Electricity distribution
JP2015158750A (en) Power supply utilization planning apparatus, power supply utilization planning method, and power supply utilization planning program
Alvarez et al. Alternative ratemaking in the US: A prerequisite for grid modernization or an unwarranted shift of risk to customers?
Chang et al. The benefits of electric transmission: identifying and analyzing the value of investments
JP2022161779A (en) Business method obtained by combining cost burden in periodical maintenance inspection and load test of emergency generator with cost reduction in switching to new power source
JP5322868B2 (en) Power supply facility introduction support device
Authority Regulatory Framework for Mini-Grids
JP4003693B2 (en) Distribution system planning support service providing method and system
Susan et al. Demand response participation in organized electricity markets: A PJM case study
Soden et al. A Guide to Inform Institutions about Participation in PJM’s Demand Response Programs
Namir et al. Restructuring in the Power Systems for Promotion of Renewable Energy: An updated Review
JP2013012133A (en) Calculation support system for repair cost of generator and transformer and calculation support method for the same
Woolf et al. A Framework for Evaluating the Cost-Effectiveness of Demand
Interconnection et al. FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426 OFFICE OF ENERGY MARKET REGULATION
Manual Generation and Transmission Interconnection Planning
Bose NERC Standards Report, Status and Timetable for Addressing Regulatory Directives, Docket No. RR09-6-003
Bose Re: California Independent System Operator Corporation Docket No. ER11-2139-000 Errata to Filing of ISO Service Agreement No. 1718, Non-Conforming Large Generator Interconnection Agreement
Ihrig Congestion in the ISO-NE electricity markets
Bose Re: California Independent System Operator Corporation Docket No. ER11-_-000 ISO Service Agreement No. 1718, Non-Conforming Large Generator Interconnection Agreement
Unit Empowering Rural India: Expanding Electricity Access by Mobilizing Local Resources
Bose Re: California Independent System Operator Corporation Docket No. ER10-_-000 ISO Service Agreement No. 1562, Non-Conforming Large Generator Interconnection Agreement
Date et al. EDI 2007 Interim Distribution Tariff