JP2022076229A - Inner window - Google Patents

Inner window Download PDF

Info

Publication number
JP2022076229A
JP2022076229A JP2020186552A JP2020186552A JP2022076229A JP 2022076229 A JP2022076229 A JP 2022076229A JP 2020186552 A JP2020186552 A JP 2020186552A JP 2020186552 A JP2020186552 A JP 2020186552A JP 2022076229 A JP2022076229 A JP 2022076229A
Authority
JP
Japan
Prior art keywords
shoji
frame
rail
window
downward
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2020186552A
Other languages
Japanese (ja)
Inventor
正謙 山田
Masakane Yamada
みく 杉本
Miku Sugimoto
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lixil Corp
Original Assignee
Lixil Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lixil Corp filed Critical Lixil Corp
Priority to JP2020186552A priority Critical patent/JP2022076229A/en
Publication of JP2022076229A publication Critical patent/JP2022076229A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Hinge Accessories (AREA)
  • Closing And Opening Devices For Wings, And Checks For Wings (AREA)

Abstract

To provide an inner window capable of preventing a sash from falling off.SOLUTION: An inner window 1 is disposed at an indoor side of an outer window and has a frame body 2 having a headsill 21, and sashes 3, 4 that are disposed inside the frame body 2 and can slide in a lateral direction. The headsill 21 has downward protruding rails 212, 213 that protrude downward. The sashes 3, 4 have rail storing guide portions 312, 412 that open upward and store at least a portion of the downward protruding rails 212, 213 and guide sliding movement in the lateral direction of the sashes 3, 4, and an oscillation stop member 6 that is disposed at a top edge of an end in a moving direction of sliding movement of the sashes 3, 4, opens upward and suppresses oscillation of the sashes 3, 4 by storing at least a portion of the downward protruding rails 212, 213. The inner window has a sash fall stop member 7 that is configured to be mountable to the oscillation stop member 6 and has an upper component member 72 located above upper ends of the sashes 3, 4.SELECTED DRAWING: Figure 5

Description

本開示は、内窓に関する。詳しくは、二重窓における外窓の屋内側に配置される内窓に関する。 This disclosure relates to an inner window. More specifically, the present invention relates to an inner window arranged on the indoor side of the outer window in a double-glazed window.

従来、建物の開口部に、内窓と外窓とが二重に設けられて構成される二重窓が知られている(例えば、特許文献1参照)。二重窓は、窓を二重にすることで、断熱性能を高めることができると共に、防音性を高くすることができる。二重窓は、新築時に外窓と内窓とを同時に設けることや、既設の窓の屋内側に、リフォームにより内窓を追加することで設けることもできる。 Conventionally, there is known a double-glazed window in which an inner window and an outer window are doubly provided at an opening of a building (see, for example, Patent Document 1). The double-glazed window can improve the heat insulating performance and the soundproofing property by making the window double. Double-glazed windows can be installed at the same time as an outer window and an inner window at the time of new construction, or by adding an inner window by remodeling to the indoor side of the existing window.

屋内側に配置される内窓は、上枠を有する枠体と、枠体内に配置される障子と、を有する。上枠には、下方に突出する下方突出レールが形成されている。障子の上端部には、上枠の下方突出レールを収容するレール収容ガイドが形成されている。上枠の下方突出レールが、障子のレール収容ガイドに収容されてガイドされることで、障子は、枠体内を見付方向の左右方向にスライド移動可能である。 The inner window arranged on the indoor side has a frame body having an upper frame and a shoji screen arranged in the frame body. The upper frame is formed with a downward projecting rail that projects downward. At the upper end of the shoji, a rail accommodating guide for accommodating the downward protruding rail of the upper frame is formed. The downward protruding rail of the upper frame is accommodated and guided by the rail accommodating guide of the shoji, so that the shoji can slide and move in the left-right direction in the finding direction inside the frame.

特開2019-152002号公報Japanese Unexamined Patent Publication No. 2019-152002

内窓は、リフォームにより、既存の窓の内側に追加で取り付ける場合がある。この場合、施工時の調整不足・経年劣化による取付面の変形等により、上枠の下方突出レールと障子のレール収容ガイドとの掛かりが少なくなり、障子が脱落し、内窓の障子が倒れてしまう可能性がある。そのため、内窓の障子の脱落に対する対策が望まれている。 The inner window may be additionally installed inside the existing window by remodeling. In this case, due to insufficient adjustment during construction, deformation of the mounting surface due to deterioration over time, etc., the hook between the lower protruding rail of the upper frame and the rail accommodation guide of the shoji is reduced, the shoji falls off, and the shoji of the inner window collapses. There is a possibility that it will end up. Therefore, it is desired to take measures against the falling off of the shoji screen of the inner window.

本開示は、障子の脱落を防止できる内窓を提供することを目的とする。 The present disclosure is intended to provide an inner window capable of preventing the shoji from falling off.

本開示は、外窓の屋内側に配置される内窓であって、上枠を有する枠体と、前記枠体内に配置され、横方向にスライド移動可能な障子と、を備え、前記上枠は、下方に突出する下方突出レールを有し、前記障子は、上方に向けて開放すると共に前記下方突出レールの少なくとも一部を収容して該障子の横方向へのスライド移動をガイドするレール収容ガイド部と、該障子におけるスライド移動の移動方向の端部の上端に設けられ上方に向けて開放すると共に前記下方突出レールの少なくとも一部を収容して該障子の振れを抑制する振れ止め部材と、を有し、前記振れ止め部材に取り付け可能に構成され、前記障子の上端部よりも上方側に位置する上部構成部材を有する障子外れ止め部材を備える、内窓に関する。 The present disclosure is an inner window arranged on the indoor side of an outer window, comprising a frame having an upper frame and a shoji screen arranged inside the frame and slidable in the lateral direction, and the upper frame. Has a downward projecting rail that projects downward, and the shoji is a rail accommodating that opens upward and accommodates at least a part of the downward projecting rail to guide the lateral sliding movement of the shoji. A guide portion and a steady rest member provided at the upper end of the end portion of the sliding movement of the shoji in the moving direction and opened upward and accommodating at least a part of the downward protruding rail to suppress the runout of the shoji. The present invention relates to an inner window comprising a shoji retaining member having the above-mentioned

実施形態に係る内窓を屋内側から見た正面図である。It is a front view which looked at the inner window which concerns on embodiment from the indoor side. 図1のA-A線断面図である。FIG. 3 is a cross-sectional view taken along the line AA of FIG. 内障子及び外障子を上方側から見た斜視図である。It is a perspective view which looked at the inside and outside shoji from the upper side. 障子外れ止め部材を取り外した状態を示す斜視図である。It is a perspective view which shows the state which the shoji detachment prevention member was removed. 図3のB-B線断面図である。FIG. 3 is a cross-sectional view taken along the line BB of FIG. 障子外れ止め部材及び振れ止め部材の分解斜視図である。It is an exploded perspective view of the shoji retaining member and the steady rest member. 図3のC-C線断面図である。FIG. 3 is a cross-sectional view taken along the line CC of FIG. 障子外れ止め部材をクリップで取り付ける状態を示す縦断面図である。It is a vertical sectional view which shows the state which attaches the shoji detachment prevention member with a clip.

以下、本開示の一実施形態について、図面を参照しながら詳しく説明する。なお、本明細書において、「見付方向」とは、建物の壁に形成された開口部に納められた内窓1におけるガラスの面方向を意味し、「見込方向」とは、上記ガラスの厚さ方向(即ち、奥行き方向)を意味する。図面において、屋外側を「OUTSIDE」と記載し、屋内側を「INSIDE」と記載する。 Hereinafter, one embodiment of the present disclosure will be described in detail with reference to the drawings. In the present specification, the "finding direction" means the surface direction of the glass in the inner window 1 housed in the opening formed in the wall of the building, and the "expected direction" means the plane direction of the glass. It means the thickness direction (that is, the depth direction). In the drawings, the outdoor side is described as "OUTSIDE" and the indoor side is described as "INSIDE".

本実施形態の内窓1は、二重窓のうちの屋内側の窓を構成する。二重窓は、建物の壁に形成された開口部に納められる。二重窓は、建物の開口部に設けられた枠部に外窓(図示せず)を設置し、外窓の屋内側に内窓1を設置することで、二重の窓となる。 The inner window 1 of the present embodiment constitutes a window on the indoor side of the double-glazed windows. Double-glazed windows are housed in openings formed in the walls of the building. The double-glazed window becomes a double-glazed window by installing an outer window (not shown) in the frame portion provided at the opening of the building and installing the inner window 1 on the indoor side of the outer window.

外窓(図示せず)は、二重窓のうちの屋外側の窓を構成する。外窓は、内窓1よりも屋外側に配置される。外窓は、いわゆる引き違い窓であり、図示を省略するが、方形状に枠組みされた窓枠内に、内障子と外障子とを開閉可能に嵌め込んで構成される。 The outer window (not shown) constitutes the window on the outdoor side of the double-glazed windows. The outer window is arranged on the outdoor side of the inner window 1. The outer window is a so-called sliding window, and although not shown, the outer window is configured by fitting the inner shoji and the outer shoji into a window frame framed in a rectangular shape so as to be openable and closable.

内窓1は、外窓の屋内側に配置される。本実施形態においては、例えば、内窓1は、外窓が取り付けられた後において、リフォームにより、外窓の屋内側に設置される。なお、二重窓は、リフォームにより内窓を外窓の屋内側に追加して設ける場合に限られず、新築時に外窓と内窓とを同時に設けてもよい。 The inner window 1 is arranged on the indoor side of the outer window. In the present embodiment, for example, the inner window 1 is installed on the indoor side of the outer window by reforming after the outer window is attached. The double-glazed window is not limited to the case where the inner window is additionally provided on the indoor side of the outer window by remodeling, and the outer window and the inner window may be provided at the same time at the time of new construction.

内窓1は、いわゆる引き違い窓であり、図1及び図2に示すように、窓枠2(枠体)と、窓枠2内に開閉可能に配置された内障子3(障子)及び外障子4(障子)と、を備える。 The inner window 1 is a so-called sliding window, and as shown in FIGS. 1 and 2, the window frame 2 (frame body), the inner shoji 3 (shoji) arranged to be openable and closable in the window frame 2, and the outer window 1 It is equipped with shoji 4 (shoji).

窓枠2の内側には、内障子3及び外障子4が組み付けられる。窓枠2は、いずれも長尺状の上枠21、下枠22および左右の縦枠23,24により矩形に枠組みされている。窓枠2は、例えば、塩化ビニル樹脂等の合成樹脂の押出し成形品により形成された樹脂製の樹脂枠で構成される。上枠21、下枠22および左右の縦枠23,24は、例えば額縁部材(図示省略)の内周面にそれぞれ固定される。 Inside the window frame 2, the internal sash 3 and the external sash 4 are assembled. The window frame 2 is rectangularly framed by a long upper frame 21, a lower frame 22, and left and right vertical frames 23, 24. The window frame 2 is composed of a resin frame made of a resin formed of an extruded product of a synthetic resin such as vinyl chloride resin, for example. The upper frame 21, the lower frame 22, and the left and right vertical frames 23, 24 are fixed to, for example, the inner peripheral surface of a frame member (not shown), respectively.

上枠21は、図1に示すように、窓枠2の上部において、見付方向の左右方向(横方向)に延びる。上枠21は、図2に示すように、上枠上面板部211と、内障子用上枠下方突出レール212(下方突出レール)と、外障子用上枠下方突出レール213(下方突出レール)と、上枠屋内側下方延出壁部214(下方延出板)と、を有する。 As shown in FIG. 1, the upper frame 21 extends in the left-right direction (horizontal direction) in the finding direction at the upper part of the window frame 2. As shown in FIG. 2, the upper frame 21 includes an upper frame upper surface plate portion 211, an upper frame downward protruding rail 212 for internal shoji (downward protruding rail), and an outer shoji upper frame downward protruding rail 213 (downward protruding rail). And the lower extension wall portion 214 (lower extension plate) on the indoor side of the upper frame.

上枠上面板部211は、上枠21の上部に配置され、見込方向に延びる板状に形成される。 The upper frame upper surface plate portion 211 is arranged on the upper portion of the upper frame 21, and is formed in a plate shape extending in the prospective direction.

内障子用上枠下方突出レール212は、上枠上面板部211の屋内側の下面から下方に突出する。外障子用上枠下方突出レール213は、上枠上面板部211の外窓側(屋外側)の下面から下方に突出する。内障子用上枠下方突出レール212及び外障子用上枠下方突出レール213は、断面形状が縦長の長方形状に形成される。内障子用上枠下方突出レール212及び外障子用上枠下方突出レール213は、見付方向の左右方向(横方向)に延びて形成され、上枠21の長手方向の全域に亘って形成される。 The upper frame downward projecting rail 212 for internal shoji projects downward from the lower surface of the upper frame upper plate portion 211 on the indoor side. The lower protruding rail 213 of the upper frame for the shoji projectes downward from the lower surface of the upper frame upper plate portion 211 on the outer window side (outdoor side). The upper frame downward projecting rail 212 for internal shoji and the upper frame downward projecting rail 213 for external shoji are formed in a vertically long rectangular cross section. The upper frame downward protruding rail 212 for internal shoji and the upper frame downward protruding rail 213 for outer shoji are formed so as to extend in the left-right direction (lateral direction) in the finding direction, and are formed over the entire longitudinal direction of the upper frame 21. Rail.

内障子3は、内障子用上枠下方突出レール212が、内障子3の上端部に形成された上部レールガイド312(レール収容ガイド部)(後述)にガイドされて移動することで、窓枠2内を見付方向の左右方向にスライド移動可能である。外障子4は、外障子用上枠下方突出レール213が、外障子4の上端部に形成された上部レールガイド412(レール収容ガイド部)(後述)にガイドされて移動することで、窓枠2内を見付方向の左右方向にスライド移動可能である。 The inner sash 3 has a window frame in which the lower protruding rail 212 for the upper sash for the inner sash is guided by the upper rail guide 312 (rail accommodating guide portion) (described later) formed at the upper end of the inner sash 3 to move. 2 The inside can be slid to the left and right in the finding direction. The outer sash 4 has a window frame in which the lower protruding rail 213 of the upper frame for the outer sash is guided by the upper rail guide 412 (rail accommodating guide portion) (described later) formed at the upper end of the outer sash 4 to move. 2 The inside can be slid to the left and right in the finding direction.

上枠屋内側下方延出壁部214は、内障子3の屋内側に配置され、上枠上面板部211における屋内側の見込方向の端部から、下方に所定長さ延出する。本実施形態においては、上枠屋内側下方延出壁部214の下端部214aは、内障子用上枠下方突出レール212の下端部212a及び外障子用上枠下方突出レール213の下端部213aよりも上方側に位置する。 The lower extending wall portion 214 on the indoor side of the upper frame is arranged on the indoor side of the shoji screen 3, and extends downward by a predetermined length from the end portion of the upper frame upper plate portion 211 on the indoor side in the prospective direction. In the present embodiment, the lower end portion 214a of the upper frame indoor side downward extending wall portion 214 is from the lower end portion 212a of the upper frame lower protruding rail 212 for internal shoji and the lower end portion 213a of the upper frame lower protruding rail 213 for outer shoji. Is also located on the upper side.

下枠22は、図1に示すように、窓枠2の下部において、見付方向の左右方向(横方向)に延びる。下枠22は、図2に示すように、内障子用下部レール221と、外障子用下部レール222と、を有する。 As shown in FIG. 1, the lower frame 22 extends in the left-right direction (horizontal direction) in the finding direction at the lower part of the window frame 2. As shown in FIG. 2, the lower frame 22 has a lower rail 221 for internal shoji and a lower rail 222 for external shoji.

内障子用下部レール221は、下枠22の屋内側の上面において、上方に立設される。内障子用下部レール221には、内障子3の下框32の下端部に配置された戸車321が係合する。これにより、内障子3が窓枠2内を見付方向の左右方向にスライド移動可能となっている。 The lower rail 221 for the internal shoji is erected upward on the upper surface of the lower frame 22 on the indoor side. A door roller 321 arranged at the lower end of the lower frame 32 of the inner sash 3 engages with the lower rail 221 for the inner sash. As a result, the shoji 3 can slide and move in the window frame 2 in the left-right direction in the finding direction.

外障子用下部レール222は、下枠22の外窓側(屋外側)の上面において、上方に立設される。外障子用下部レール222には、外障子4の下框42の下端部に配置された戸車421が係合する。これにより、外障子4が窓枠2内を見付方向の左右方向にスライド移動可能となっている。 The lower rail 222 for the shoji is erected upward on the upper surface of the lower frame 22 on the outer window side (outdoor side). The door roller 421 arranged at the lower end of the lower stile 42 of the shoji 4 engages with the lower rail 222 for the shoji. As a result, the external shoji 4 can slide and move in the window frame 2 in the left-right direction in the finding direction.

左右の縦枠23,24は、図1に示すように、上枠21及び下枠22の見付方向の左右方向の両端部において上下方向に延びる。左右の縦枠23,24は、窓枠2の側部を構成する。 As shown in FIG. 1, the left and right vertical frames 23 and 24 extend in the vertical direction at both ends of the upper frame 21 and the lower frame 22 in the left-right direction in the finding direction. The left and right vertical frames 23 and 24 form a side portion of the window frame 2.

内障子3及び外障子4は、いずれも引き戸であり、これらを見付方向の左右方向(横方向)にスライド移動可能に構成されることで、窓枠2の開口部が閉鎖又は開放される、いわゆる引き違い窓を構成する。 Both the inner sash 3 and the outer sash 4 are sliding doors, and by being configured to be slidable in the left-right direction (lateral direction) in the finding direction, the opening of the window frame 2 is closed or opened. , So-called sliding windows are constructed.

内障子3は、図1に示すように、いずれも長尺状の上框31、下框32および左右の縦框である召内框33,戸先框34により矩形に枠組みされた框体35と、框体35内に嵌め込まれて固定されたガラス36と、を含んで構成される。外障子4は、いずれも長尺状の上框41、下框42および左右の縦框である召外框43,戸先框44により矩形に枠組みされた框体45と、框体45内に嵌め込まれて固定されたガラス46と、を含んで構成される。 As shown in FIG. 1, the internal shoji 3 has a rectangular frame 35 formed by a long upper stile 31, a lower stile 32, and left and right vertical stiles such as a sumi stile 33 and a door tip stile 34. And the glass 36 fitted and fixed in the frame 35, and the like. The shoji sash 4 is formed in a stile 45 which is rectangularly framed by a long upper stile 41, a lower stile 42, an outer stile 43 which is a left and right vertical stile, and a door tip stile 44, and inside the stile 45. It is configured to include a glass 46 that is fitted and fixed.

框体35,45は、例えば、塩化ビニル樹脂等の合成樹脂の押出し成形品により形成された樹脂製の樹脂框体で構成される。ガラス36,46は、本実施形態においては、例えば、2層ガラスで構成される。内障子3の召内框33の見込面には、戸締り用のクレセント錠331が設けられている。 The frames 35 and 45 are made of a resin resin frame made of an extruded product of a synthetic resin such as vinyl chloride resin. In the present embodiment, the glasses 36 and 46 are composed of, for example, two-layer glass. A crescent lock 331 for locking the door is provided on the prospective surface of the inner stile 33 of the shoji shoji 3.

下框32,42の内部の下部には、図2に示すように、戸車321,421が設けられる。戸車321,421の見付方向の左右方向への移動は、内障子用下部レール221,外障子用下部レール222によりガイドされる。 As shown in FIG. 2, door rollers 321 and 421 are provided at the lower part of the inside of the lower stiles 32 and 42. The movement of the door rollers 321 and 421 in the left-right direction in the finding direction is guided by the lower rail 222 for the inner shoji and the lower rail 222 for the outer shoji.

上框31,41は、図2に示すように、下部に形成される下部ガラス溝311,411と、上部に形成される上部レールガイド312,412(レール収容ガイド部)と、を有する。下部ガラス溝311,411は、下方に開放する溝状に形成される。下部ガラス溝311,411には、ガラス36,46の上端部が配置される。 As shown in FIG. 2, the upper stiles 31 and 41 have lower glass grooves 311, 411 formed in the lower portion and upper rail guides 312 and 412 (rail accommodating guide portions) formed in the upper portion. The lower glass grooves 311, 411 are formed in a groove shape that opens downward. The upper ends of the glasses 36 and 46 are arranged in the lower glass grooves 311,411.

上部レールガイド312,412は、上方に向けて開放する。上部レールガイド312,412には、内障子用上枠下方突出レール212の下部側及び外障子用上枠下方突出レール213の下部側が収容(配置)される。上部レールガイド312,412は、内障子用上枠下方突出レール212及び外障子用上枠下方突出レール213の少なくとも一部を収容して、内障子3,外障子4の左右方向(横方向)へのスライド移動をガイドする。 The upper rail guides 312 and 412 open upward. The upper rail guides 312 and 412 accommodate (arrange) the lower side of the upper frame lower protruding rail 212 for internal shoji and the lower side of the upper frame lower protruding rail 213 for outer shoji. The upper rail guides 312 and 412 accommodate at least a part of the upper frame downward projecting rail 212 for the internal sash and the external sash upper frame downward projecting rail 213, and accommodate the internal sash 3 and the external sash 4 in the left-right direction (lateral direction). Guide the slide movement to.

上部レールガイド312,412の上端の開口縁には、見込方向に離間して配置される一対の気密材51が設けられている。気密材51は、上枠21の内障子用上枠下方突出レール212又は外障子用上枠下方突出レール213の側面に当接する。 A pair of airtight materials 51 arranged apart from each other in the prospective direction are provided on the opening edge of the upper end of the upper rail guides 312 and 412. The airtight material 51 abuts on the side surface of the upper frame lower protruding rail 212 for the inner shoji or the upper frame lower protruding rail 213 for the outer shoji of the upper frame 21.

図1及び図3に示すように、内障子3の召内框33の上部、内障子3の戸先框34の上部、外障子4の召外框43及び戸先框44の上部には、それぞれ、振れ止め部材6が配置される。内障子3の召内框33に配置される振れ止め部材6には、図4及び図5に示すように、障子外れ止め部材7が取り付けられている。 As shown in FIGS. 1 and 3, the upper part of the inner stile 33 of the inner shoji 3, the upper part of the door tip stile 34 of the inner sash 3, and the upper part of the outer stile 43 and the upper part of the door stile 44 of the outer sash 4 A steady rest member 6 is arranged in each. As shown in FIGS. 4 and 5, a shoji retaining member 7 is attached to the steady rest member 6 arranged on the inner stile 33 of the shoji.

振れ止め部材6及び障子外れ止め部材7について説明する。以下の説明においては、内障子3の召内框33の上部に配置される振れ止め部材6の詳細について説明する。内障子3の戸先框34の上部に配置される振れ止め部材6の構成は、内障子3の召内框33の上部に配置される振れ止め部材6を左右の向きを反対にした構成と同様であるため、その説明を省略する。外障子4の戸先框44の上部及び召外框43の上部に配置される振れ止め部材6の構成は、内障子3の戸先框34の上部及び召内框33の上部に配置される振れ止め部材6の構成と同様であるため、その説明を省略する。 The steady rest member 6 and the shoji retaining member 7 will be described. In the following description, the details of the steady rest member 6 arranged on the upper part of the inner stile 33 of the shoji 3 will be described. The configuration of the steady rest member 6 arranged on the upper part of the door end stile 34 of the internal sash 3 is the configuration in which the steady rest member 6 arranged on the upper part of the inner stile 33 of the internal sash 3 is oriented in the opposite direction. Since they are the same, the description thereof will be omitted. The configuration of the steady rest member 6 arranged on the upper part of the door tip stile 44 of the shoji 4 and the upper part of the outer stile 43 is arranged on the upper part of the door tip stile 34 and the upper part of the inner stile 33 of the inner sash 3. Since the configuration is the same as that of the steady rest member 6, the description thereof will be omitted.

図6及び図7に示すように、内障子3の召内框33の上部に配置される振れ止め部材6は、内障子3の召内框33の上部に形成される上方に向けて開放する開口37に配置される。振れ止め部材6は、内障子3のスライド移動の移動方向の端部の上端に設けられる。振れ止め部材6は、上方に向けて開放すると共に内障子用上枠下方突出レール212の少なくとも一部を収容して内障子3の振れを抑制する。 As shown in FIGS. 6 and 7, the steady rest member 6 arranged on the upper part of the inner stile 33 of the inner sash 3 opens upward formed on the upper part of the inner stile 33 of the inner sash 3. Arranged in the opening 37. The steady rest member 6 is provided at the upper end of the end portion of the sliding door 3 in the moving direction. The steady rest member 6 opens upward and accommodates at least a part of the lower protruding rail 212 for the upper frame for the internal sash to suppress the sway of the internal sash 3.

図6及び図7に示すように、振れ止め部材6は、上方が開放して形成される断面視U字状の振れ止め部材本体61と、板状の係合パッキン板63(図6参照)と、を有する。振れ止め部材本体61と係合パッキン板63とは、一体で形成される。 As shown in FIGS. 6 and 7, the steady rest member 6 has a U-shaped steady rest member main body 61 formed with an open upper portion and a plate-shaped engaging packing plate 63 (see FIG. 6). And have. The steady rest member main body 61 and the engaging packing plate 63 are integrally formed.

振れ止め部材本体61は、召内框33の開口37内に配置される。振れ止め部材本体61は、上方が開放するU字部材621と、一対の上部板622,622と、取付部623と、端部板状部624と、を有する。 The steady rest member main body 61 is arranged in the opening 37 of the inner stile 33. The steady rest member main body 61 has a U-shaped member 621 that opens upward, a pair of upper plates 622,622, a mounting portion 623, and an end plate-shaped portion 624.

U字部材621は、見込方向に沿って切断した場合の断面形状が、上方に向けて開放する断面視U字状に形成される。U字部材621は、召内框33の上端部において、内障子3の見付方向に沿って配置される。U字部材621は、U字状に窪んだ部分が召内框33の見付方向に沿って延びて形成される。 The U-shaped member 621 is formed in a cross-sectional view U-shape that opens upward in the cross-sectional shape when cut along the prospective direction. The U-shaped member 621 is arranged at the upper end of the inner stile 33 along the finding direction of the internal sash 3. The U-shaped member 621 is formed by extending a U-shaped recessed portion along the finding direction of the inner stile 33.

一対の上部板622,622は、それぞれ、U字部材621における内障子3の見込方向の両側の上端から見込方向の外側に延びる。一対の上部板622,622は、それぞれ、召内框33の上端の上面に配置される。 Each of the pair of upper plates 622 and 622 extends outward in the prospective direction from the upper ends on both sides of the inner sash 3 in the U-shaped member 621 in the prospective direction. The pair of upper plates 622,622 are respectively arranged on the upper surface of the upper end of the inner stile 33.

取付部623は、U字部材621の見付方向の奥側においてU字部材621の下方に突出する。振れ止め部材本体61は、召内框33の上端に配置された状態で、取付部623が、ネジ64により、内障子3の上框31に固定される。 The mounting portion 623 projects below the U-shaped member 621 on the inner side of the U-shaped member 621 in the finding direction. The steady rest member main body 61 is arranged at the upper end of the inner stile 33, and the mounting portion 623 is fixed to the upper stile 31 of the inner sash 3 by the screw 64.

端部板状部624は、U字部材621の見付方向の手前側においてU字部材621の端面に配置される。端部板状部624は、U字部材621の見付方向の手前側の端面において下方に延出する延出板624aを有する。端部板状部624は、板状凸部624bを有する。板状凸部624bは、召内框33の見付方向の外側の見込面において上端に形成される凹部332に引っ掛かるように厚みを有する。板状凸部624bの厚み部分は、召内框33の凹部332の厚み部分に引っ掛かる。 The end plate-shaped portion 624 is arranged on the end surface of the U-shaped member 621 on the front side in the finding direction of the U-shaped member 621. The end plate-shaped portion 624 has an extension plate 624a that extends downward on the front end surface of the U-shaped member 621 in the finding direction. The end plate-shaped portion 624 has a plate-shaped convex portion 624b. The plate-shaped convex portion 624b has a thickness so as to be hooked on the concave portion 332 formed at the upper end of the prospective surface on the outer side in the finding direction of the inner stile 33. The thick portion of the plate-shaped convex portion 624b is caught by the thick portion of the concave portion 332 of the inner stile 33.

端部板状部624の延出板624aには、内障子3の見付方向に貫通する振れ止め部材貫通穴624cが形成される。 The extension plate 624a of the end plate-shaped portion 624 is formed with a steady rest member through hole 624c that penetrates in the finding direction of the internal sash 3.

振れ止め部材貫通穴624cは、振れ止め部材6を内障子3の召内框33の上端に配置した状態で、振れ止め部材6を内障子3の上框31に固定する場合に、ネジ64が貫通して通される。振れ止め部材貫通穴624cは、障子外れ止め部材7を振れ止め部材6に取り付ける場合に、クリップ部材73により、障子外れ止め部材7の外れ止め部材貫通穴711a(後述)に固定される。 The steady rest member through hole 624c has a screw 64 when the steady rest member 6 is fixed to the upper stile 31 of the internal sash 3 in a state where the steady rest member 6 is arranged at the upper end of the inner stile 33 of the internal sash 3. It is passed through. When the shoji retaining member 7 is attached to the steady rest member 6, the steady rest member through hole 624c is fixed to the retaining member through hole 711a (described later) of the shoji retaining member 7 by the clip member 73.

振れ止め部材本体61は、図6及び図7に示すように、底面部611と、U字状の下部において見込方向の間隔が同じ間隔で上方に延びる一対の垂直面部612と、U字状の上部において下方側から上方側に向かうに従って見込方向の中央に向かって見込方向の間隔が狭くなるように傾斜する一対の傾斜面部613と、を有する。 As shown in FIGS. 6 and 7, the steady rest member main body 61 has a bottom surface portion 611, a pair of vertical surface portions 612 having a U-shaped lower portion extending upward at the same spacing in the prospective direction, and a U-shaped portion. The upper portion has a pair of inclined surface portions 613 that are inclined so that the distance in the prospective direction becomes narrower toward the center of the prospective direction from the lower side to the upper side.

係合パッキン板63は、板状に形成され、内障子3の見付方向の左右方向の外側の端部に配置される。係合パッキン板63は、振れ止め部材本体61の見付方向の左右方向の外側の端部の端面に取り付けられている。係合パッキン板63は、例えば、樹脂材料で形成される。係合パッキン板63は、上部において下方に窪む凹部631が形成される。凹部631には、内障子用上枠下方突出レール212の下部が配置される。 The engaging packing plate 63 is formed in a plate shape and is arranged at the outer end portion of the internal sash 3 in the left-right direction in the finding direction. The engaging packing plate 63 is attached to the end surface of the outer end portion of the steady rest member main body 61 in the left-right direction in the finding direction. The engaging packing plate 63 is made of, for example, a resin material. The engaging packing plate 63 is formed with a recess 631 that is recessed downward at the upper part. In the recess 631, the lower portion of the upper frame downward projecting rail 212 for internal shoji is arranged.

係合パッキン板63には、凹部631におけるU字状の縁において、内障子用上枠下方突出レール212が接触する。これにより、内障子3が見付方向の左右方向に移動する際に、内障子用上枠下方突出レール212が係合パッキン板63に接触しながら移動することで、係合パッキン板63は、気密部材として機能する。 The engaging packing plate 63 is in contact with the lower protruding rail 212 for the upper frame for internal shoji at the U-shaped edge of the recess 631. As a result, when the internal sash 3 moves in the left-right direction in the finding direction, the internal sash upper frame downward protruding rail 212 moves while in contact with the engaging packing plate 63, so that the engaging packing plate 63 can be moved. Functions as an airtight member.

振れ止め部材6には、振れ止め部材本体61の一対の垂直面部612又は一対の傾斜面部613の間に内障子用上枠下方突出レール212が配置されることで、内障子用上枠下方突出レール212が配置される。これにより、内障子3が窓枠2内を見付け方向にスライド移動する際において、内障子3の屋内外方向の移動が規制され、内障子3と窓枠2とのガタつきが抑制される。 The steady rest member 6 is provided with the inner shoji upper frame downward projecting rail 212 between the pair of vertical surface portions 612 or the pair of inclined surface portions 613 of the steady rest member main body 61, so that the inner shoji upper frame downward protrusion Rail 212 is arranged. As a result, when the sash 3 slides in the window frame 2 in the finding direction, the movement of the sash 3 in the indoor / outdoor direction is restricted, and the rattling between the sash 3 and the window frame 2 is suppressed.

障子外れ止め部材7は、図4~図6に示すように、内障子3の召内框33に配置された振れ止め部材6に取り付け可能である。障子外れ止め部材7は、内障子3を窓枠2に組み付けた後に、振れ止め部材6に取り付けられる。障子外れ止め部材7は、L字状に形成され、端部取付板71(見込面取付部)と、上部横方向延出部72(上部構成部材)と、を有する。 As shown in FIGS. 4 to 6, the shoji shoji retaining member 7 can be attached to the steady rest member 6 arranged on the inner stile 33 of the shoji shoji 3. The shoji sash retaining member 7 is attached to the steady rest member 6 after the internal sash 3 is assembled to the window frame 2. The shoji shoji retaining member 7 is formed in an L shape and has an end mounting plate 71 (expected surface mounting portion) and an upper lateral extending portion 72 (upper component member).

端部取付板71は、振れ止め部材6の係合パッキン板63に沿うように、振れ止め部材6の見付方向の端部の見込面に取り付けられる。端部取付板71は、振れ止め部材6の見込面に沿って配置される。端部取付板71は、下部固定部711と、上方延出部712と、を有する。下部固定部711には、見付方向に貫通する外れ止め部材貫通穴711aが形成される。 The end mounting plate 71 is mounted on the prospective surface of the end of the steady rest member 6 in the finding direction so as to be along the engagement packing plate 63 of the steady rest member 6. The end mounting plate 71 is arranged along the prospective surface of the steady rest member 6. The end mounting plate 71 has a lower fixing portion 711 and an upward extending portion 712. The lower fixing portion 711 is formed with a retaining member through hole 711a that penetrates in the finding direction.

外れ止め部材貫通穴711aは、図8に示すように、振れ止め部材6を内障子3の上框31に固定する場合に、ネジ64が貫通して通される。外れ止め部材貫通穴711aは、障子外れ止め部材7を振れ止め部材6に取り付ける場合に、クリップ部材73により、振れ止め部材6の振れ止め部材貫通穴624cに固定される。 As shown in FIG. 8, the retaining member through hole 711a is passed through the screw 64 when the steady rest member 6 is fixed to the upper stile 31 of the inner sash 3. The retaining member through hole 711a is fixed to the steady rest member through hole 624c of the steady rest member 6 by the clip member 73 when the shoji retaining member 7 is attached to the steady rest member 6.

上部横方向延出部72は、振れ止め部材6の上部に配置される。上部横方向延出部72は、端部取付板71の上端に接続され、端部取付板71の上端から、内障子3の見付方向の内側に延びる。図5及び図7に示すように、上部横方向延出部72の上端部721の位置は、窓枠2の内障子用上枠下方突出レール212の下端部212a及び上枠屋内側下方延出壁部214の下端部214aの位置よりも所定高さ上部側に位置する。 The upper lateral extending portion 72 is arranged on the upper part of the steady rest member 6. The upper lateral extending portion 72 is connected to the upper end of the end mounting plate 71, and extends from the upper end of the end mounting plate 71 inward in the finding direction of the internal shoji 3. As shown in FIGS. 5 and 7, the position of the upper end portion 721 of the upper lateral extension portion 72 is such that the lower end portion 212a of the upper frame downward projecting rail 212 for the internal shoji of the window frame 2 and the upper frame indoor side downward extension. It is located on the upper side of a predetermined height from the position of the lower end portion 214a of the wall portion 214.

上部横方向延出部72の上端部721の位置は、経年劣化などで、窓枠2の内障子用上枠下方突出レール212と内障子3との掛かりが少なくなったとしても、上部横方向延出部72の上端部721が窓枠2の内障子用上枠下方突出レール212の下端部212a又は上枠屋内側下方延出壁部214の下端部214aに引っ掛かって、内障子3が窓枠2から外れることを防止できる位置が設定される。 The position of the upper end portion 721 of the upper lateral extending portion 72 is in the upper lateral direction even if the engagement between the upper frame downward protruding rail 212 for the inner shoji of the window frame 2 and the inner shoji 3 is reduced due to deterioration over time. The upper end portion 721 of the extending portion 72 is caught by the lower end portion 212a of the upper frame downward projecting rail 212 for the inner shoji of the window frame 2 or the lower end portion 214a of the lower extending wall portion 214 on the indoor side of the upper frame, and the inner shoji 3 is a window. A position that can prevent the frame 2 from coming off is set.

そのため、経年劣化などで、内障子3の掛かりが少なくなったとしても、上部横方向延出部72は、上枠21の上枠屋内側下方延出壁部214や内障子用上枠下方突出レール212に引っ掛かりやすく、内障子3が窓枠2から外れることを防止できる。 Therefore, even if the hanging of the internal sash 3 is reduced due to deterioration over time, the upper lateral extension portion 72 still protrudes downward from the upper frame 21 upper frame indoor side downward extension wall portion 214 and the inner sash. It is easy to get caught on the rail 212 and can prevent the shoji 3 from coming off the window frame 2.

上部横方向延出部72は、振れ止め部材6の上部に配置され、内障子3の見込方向において、内障子3の内障子用上枠下方突出レール212と窓枠2の上枠屋内側下方延出壁部214との間に配置される。 The upper lateral extending portion 72 is arranged on the upper part of the steady rest member 6, and in the prospective direction of the internal sash 3, the upper frame downward protruding rail 212 for the internal sash of the internal sash 3 and the upper frame indoor side lower of the window frame 2 It is arranged between the extending wall portion 214 and the extending wall portion 214.

次に、内窓1の施工手順について説明する。内窓1の施工時において、内障子3及び外障子4を窓枠2に組み込む場合について説明する。内障子3及び外障子4を、窓枠2内に、いわゆるケンドン式にて組み込んで建て込む。 Next, the construction procedure of the inner window 1 will be described. A case where the inner sash 3 and the outer sash 4 are incorporated into the window frame 2 at the time of construction of the inner window 1 will be described. The internal shoji 3 and the external shoji 4 are built in the window frame 2 by incorporating them in a so-called Kendon style.

外障子4をケンドン式で窓枠2に組み込む場合には、外障子4の上部を内窓1の窓枠2の内部側に傾けて、外障子4を徐々に立てながら、上方側に持ち上げて、外障子4の上部レールガイド412を上枠21の外障子用上枠下方突出レール213に挿入して、上方側に更に持ち上げた後に、下方側に下ろすことで、外障子4の戸車321を下枠22の外障子用下部レール222に挿入する。内障子3をケンドン式で窓枠2に組み込む場合には、内障子3の上部を内窓1の窓枠2の内部側に傾けて、内障子3を徐々に立てながら、上方側に持ち上げて、内障子3の上部レールガイド312を上枠21の内障子用上枠下方突出レール212に挿入して、上方側に更に持ち上げた後に、下方側に下ろすことで、内障子3の戸車321を下枠22の内障子用下部レール221に挿入する。 When the shoji 4 is incorporated into the window frame 2 by the Kendon method, the upper part of the shoji 4 is tilted toward the inside of the window frame 2 of the inner window 1, and the shoji 4 is gradually raised and lifted upward. , The upper rail guide 412 of the outer sash 4 is inserted into the upper frame downward protruding rail 213 for the outer sash of the upper frame 21, lifted further upward, and then lowered to the lower side to lower the door roller 321 of the outer sash 4. It is inserted into the lower rail 222 for the shoji of the lower frame 22. When incorporating the shoji 3 into the window frame 2 in a Kendon style, the upper part of the shoji 3 is tilted toward the inside of the window frame 2 of the inner window 1, and the shoji 3 is gradually raised and lifted upward. , The upper rail guide 312 of the inner sash 3 is inserted into the upper frame downward protruding rail 212 for the inner sash of the upper frame 21, and after being further lifted upward, it is lowered to the lower side to lower the door roller 321 of the inner sash 3. It is inserted into the lower rail 221 for the inner shoji of the lower frame 22.

その後、内障子3の上端の左右方向の端部において、振れ止め部材6を、内障子3と上枠21の内障子用上枠下方突出レール212との掛かりが適正になるよう調整を行う。外障子4の上端の左右方向の端部において、振れ止め部材6を、外障子4と上枠21の外障子用上枠下方突出レール213との掛かりが適正になるよう調整を行う。 After that, at the left-right end of the upper end of the inner sash 3, the steady rest member 6 is adjusted so that the inner sash 3 and the upper frame downward projecting rail 212 for the inner sash of the upper frame 21 are properly engaged. At the left-right end of the upper end of the outer sash 4, the steady rest member 6 is adjusted so that the outer sash 4 and the upper frame 21 upper frame downward projecting rail 213 are properly engaged.

続けて、障子外れ止め部材7を、図4~図6に示すように、内障子3の召内框33に配置された振れ止め部材6に取り付ける。これにより、経年劣化などにより、内障子3の掛かりが少なくなったとしても、上部横方向延出部72は、上枠21の上枠屋内側下方延出壁部214や内障子用上枠下方突出レール212に引っ掛かりやすく、内障子3が窓枠2から外れることを防止できる。 Subsequently, as shown in FIGS. 4 to 6, the shoji shoji retaining member 7 is attached to the steady rest member 6 arranged in the sash 33 of the shoji. As a result, even if the hanging of the internal sash 3 is reduced due to deterioration over time, the upper lateral extension portion 72 is the upper frame 21 upper frame indoor side lower extension wall portion 214 and the lower part of the upper frame for the internal sash. It is easy to get caught on the protruding rail 212, and it is possible to prevent the shoji 3 from coming off the window frame 2.

本実施形態によれば、以下の効果が奏される。本実施形態の内窓1は、窓枠2内に配置され横方向にスライド移動可能な障子(内障子3,外障子4)と、を備え、上枠21は、下方に突出する下方突出レール(内障子用上枠下方突出レール212,外障子用上枠下方突出レール213)を有し、障子(内障子3,外障子4)は、上方に向けて開放すると共に下方突出レール(内障子用上枠下方突出レール212,外障子用上枠下方突出レール213)の少なくとも一部を収容して障子(内障子3,外障子4)の横方向へのスライド移動をガイドする上部レールガイド312,412と、障子(内障子3,外障子4)におけるスライド移動の移動方向の端部の上端に設けられ上方に向けて開放すると共に下方突出レール(内障子用上枠下方突出レール212,外障子用上枠下方突出レール213)の少なくとも一部を収容して障子(内障子3,外障子4)の振れを抑制する振れ止め部材7と、を有し、振れ止め部材7に取り付け可能に構成され、障子(内障子3,外障子4)の上端部よりも上方側に位置する上部横方向延出部72を有する障子外れ止め部材7を備える。 According to this embodiment, the following effects are achieved. The inner window 1 of the present embodiment includes a shoji (inner shoji 3, outer shoji 4) arranged in the window frame 2 and slidable in the lateral direction, and the upper frame 21 is a downward protruding rail protruding downward. It has (upper frame downward projecting rail 212 for internal shoji, upper frame downward projecting rail 213 for external shoji), and the shoji (internal shoji 3, external shoji 4) is opened upward and downward projecting rail (internal shoji). Upper rail guide 312 that accommodates at least a part of the upper frame downward projecting rail 212 and the external shoji upper frame downward projecting rail 213) and guides the lateral slide movement of the shoji (inner shoji 3, outer shoji 4). , 412, and a downward protruding rail (upper frame downward protruding rail 212 for internal obstacles, outside) that is provided at the upper end of the end of the sliding movement in the shoji (internal obstacle 3, external obstacle 4) and opens upward. It has a steady rest member 7 that accommodates at least a part of the upper frame downward protruding rail 213) for shoji and suppresses the runout of the shoji (inner shoji 3, outer shoji 4), and can be attached to the steady rest member 7. The shoji retaining member 7 is configured and has an upper lateral extending portion 72 located above the upper end portion of the shoji (inner shoji 3, outer shoji 4).

これにより、経年劣化などで、窓枠2と障子(内障子3、外障子4)との掛かりが少なくなったとしても、少なくとも内障子3の召内框33に配置された振れ止め部材6に障子外れ止め部材7が取り付けたため、障子外れ止め部材7が邪魔になって、障子(内障子3、外障子4)が窓枠2から外れることを防止できる。 As a result, even if the engagement between the window frame 2 and the shoji (inner shoji 3 and outer shoji 4) is reduced due to deterioration over time, at least the steady rest member 6 arranged on the inner stile 33 of the inner shoji 3 Since the shoji retaining member 7 is attached, it is possible to prevent the shoji (inner shoji 3 and outer shoji 4) from coming off the window frame 2 due to the obstruction of the shoji retaining member 7.

本実施形態においては、上部横方向延出部72は、振れ止め部材7の上部に配置され内障子3の見込方向において内障子用上枠下方突出レール212と上枠屋内側下方延出壁部214との間に配置される。これにより、上部横方向延出部72が内障子用上枠下方突出レール212と上枠屋内側下方延出壁部214との間に配置されることで、内障子3が屋内側へ外れることを一層防止できる。 In the present embodiment, the upper lateral extending portion 72 is arranged on the upper part of the steady rest member 7, and the upper frame downward projecting rail 212 for the internal shoji and the upper frame indoor side downward extending wall portion are arranged in the prospective direction of the internal shoji 3. It is placed between 214 and 214. As a result, the upper lateral extension portion 72 is arranged between the upper frame downward projecting rail 212 for the internal sash and the upper frame indoor side downward extension wall portion 214, so that the internal sash 3 is disengaged to the indoor side. Can be further prevented.

本実施形態においては、障子外れ止め部材7は、L字状に形成され、振れ止め部材6の見込面に沿って配置される端部取付板71と、端部取付板71の上端に接続され振れ止め部材6の上部において障子(内障子3,外障子4)の見付方向に延びる上部横方向延出部72と、を有する。これにより、端部取付板71を振れ止め部材6の見込面に取り付けるだけで、障子外れ止め部材7を振れ止め部材6に容易に取り付けることができる。 In the present embodiment, the shoji retaining member 7 is formed in an L shape and is connected to an end mounting plate 71 arranged along the prospective surface of the steady rest member 6 and the upper end of the end mounting plate 71. The upper part of the steady rest member 6 has an upper lateral extending portion 72 extending in the finding direction of the shoji (inner shoji 3, outer shoji 4). As a result, the shoji slip prevention member 7 can be easily attached to the steady rest member 6 simply by attaching the end mounting plate 71 to the prospective surface of the steady rest member 6.

なお、本開示は上記実施形態に限定されるものではなく、本開示の目的を達成できる範囲での変形、改良等は本開示に含まれる。 The present disclosure is not limited to the above embodiment, and modifications, improvements, etc. to the extent that the object of the present disclosure can be achieved are included in the present disclosure.

例えば、前記実施形態においては、障子外れ止め部材7を内障子3の召内框33に配置される振れ止め部材6に設けたが、これに限定されない。障子外れ止め部材7を、内障子3の戸先框34に配置される振れ止め部材6に設けてもよい。障子外れ止め部材7を、外障子4の召外框43に配置される振れ止め部材6に設けてもよく、外障子4の戸先框44に配置される振れ止め部材6に設けてもよい。 For example, in the above-described embodiment, the shoji shoji retaining member 7 is provided on the steady rest member 6 arranged on the inner stile 33 of the shoji shoji 3, but the present invention is not limited to this. The shoji sash retaining member 7 may be provided on the steady rest member 6 arranged on the door end stile 34 of the internal sash 3. The shoji sash retaining member 7 may be provided on the steady rest member 6 arranged on the outer stile 43 of the sash 4 or on the steady rest member 6 arranged on the door end stile 44 of the sash 4. ..

前記実施形態においては、内窓1の窓枠2を樹脂製の枠で構成したが、これに限定されない。内窓1の窓枠を、例えば、金属製の枠で構成してもよい。 In the above embodiment, the window frame 2 of the inner window 1 is made of a resin frame, but the present invention is not limited to this. The window frame of the inner window 1 may be made of, for example, a metal frame.

1 内窓、2 窓枠(枠体)、3 内障子(障子)、4 外障子(障子)、6 振れ止め部材、7 障子外れ止め部材 21 上枠、71 端部取付板(見込面取付部)、72 上部横方向延出部(上部構成部材)、212 内障子用上枠下方突出レール(下方突出レール)、213 外障子用上枠下方突出レール(下方突出レール)、214 上枠屋内側下方延出壁部(下方延出板)、312,412 上部レールガイド(レール収容ガイド部) 1 Inner window, 2 Window frame (frame body), 3 Internal shoji (shoji), 4 External shoji (shoji), 6 Anti-sway member, 7 Anti-shoji member 21 Upper frame, 71 End mounting plate (expected surface mounting part) ), 72 Upper lateral extension (upper component), 212 Upper frame downward protruding rail for internal shoji (downward protruding rail), 213 Upper frame downward protruding rail for external shoji (downward protruding rail), 214 Upper frame indoor side Downward extension wall part (downward extension plate), 312,412 Upper rail guide (rail accommodation guide part)

Claims (3)

外窓の屋内側に配置される内窓であって、
上枠を有する枠体と、
前記枠体内に配置され、横方向にスライド移動可能な障子と、を備え、
前記上枠は、下方に突出する下方突出レールを有し、
前記障子は、上方に向けて開放すると共に前記下方突出レールの少なくとも一部を収容して該障子の横方向へのスライド移動をガイドするレール収容ガイド部と、該障子におけるスライド移動の移動方向の端部の上端に設けられ上方に向けて開放すると共に前記下方突出レールの少なくとも一部を収容して該障子の振れを抑制する振れ止め部材と、を有し、
前記振れ止め部材に取り付け可能に構成され、前記障子の上端部よりも上方側に位置する上部構成部材を有する障子外れ止め部材を備える、内窓。
It is an inner window placed on the indoor side of the outer window.
A frame body with an upper frame and
It is equipped with a shoji that is placed inside the frame and can be slid laterally.
The upper frame has a downward projecting rail that projects downward, and the upper frame has a downward projecting rail.
The shoji is a rail accommodating guide portion that opens upward and accommodates at least a part of the downward projecting rail to guide the lateral slide movement of the shoji, and a rail accommodating guide portion in the moving direction of the slide movement in the shoji. It has a steady rest member provided at the upper end of the end portion, which opens upward and accommodates at least a part of the downward protruding rail to suppress the runout of the shoji.
An inner window comprising a shoji retaining member that is configured to be attachable to the steady rest member and has an upper component located above the upper end of the shoji.
前記上枠は、屋内側において下方に延出する下方延出板を有し、
前記上部構成部材は、前記振れ止め部材の上部に配置され前記障子の見込方向において前記下方突出レールと前記下方延出板との間に配置される、請求項1に記載の内窓。
The upper frame has a downward extending plate extending downward on the indoor side.
The inner window according to claim 1, wherein the upper component is arranged above the steady rest member and is arranged between the downward projecting rail and the downward extension plate in the prospective direction of the shoji.
前記障子外れ止め部材は、L字状に形成され、前記振れ止め部材の見込面に沿って配置される見込面取付部と、前記見込面取付部の上端に接続され前記振れ止め部材の上部において前記障子の見付方向に延びる前記上部構成部材と、を有する、請求項1又は2に記載の内窓。 The shoji retaining member is formed in an L shape, and is connected to a prospective surface mounting portion arranged along the prospective surface of the steady rest member and the upper end of the prospective surface mounting portion, and is connected to the upper portion of the steady rest member. The inner window according to claim 1 or 2, comprising the upper component member extending in the finding direction of the shoji.
JP2020186552A 2020-11-09 2020-11-09 Inner window Pending JP2022076229A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020186552A JP2022076229A (en) 2020-11-09 2020-11-09 Inner window

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020186552A JP2022076229A (en) 2020-11-09 2020-11-09 Inner window

Publications (1)

Publication Number Publication Date
JP2022076229A true JP2022076229A (en) 2022-05-19

Family

ID=81606531

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020186552A Pending JP2022076229A (en) 2020-11-09 2020-11-09 Inner window

Country Status (1)

Country Link
JP (1) JP2022076229A (en)

Similar Documents

Publication Publication Date Title
KR102329603B1 (en) sliding window
JP2022076229A (en) Inner window
JP2022076228A (en) Inner window
JP2022074662A (en) Inner window
JP2022072005A (en) Inner window
JP2022074663A (en) Inner window
KR101958891B1 (en) Rail stopper for sliding window adjustable its length
JP7514729B2 (en) Inner window
JP2022072733A (en) Inner window
KR100985753B1 (en) Explosion-proof window of window system with anti-separation structure
JP2003176667A (en) Vertically movable window
JP2022074664A (en) Inner window
JP6890429B2 (en) Joinery
JP3245318B2 (en) Up / down windows and doors with up / down windows
JP2021055316A (en) Opening limit stopper
JP7361173B2 (en) fittings
JP6851912B2 (en) Joinery
JP2004238931A (en) Sliding door frame of building
US4245436A (en) Metal window with offset sash and balance mechanisms
EP1365099B1 (en) Draught excluding device for doors
GB2493591A (en) Extendable and retractable bead member
US20230332462A1 (en) Child safe tension corded shade
JP3251226B2 (en) Bathroom folding door retaining structure
JP2006070579A (en) Sash
JP3203503B2 (en) Airtight and watertight structure under the sliding door

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20210127

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230905

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240522

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240528