JP2022027275A - Shipper notification program, method, and system - Google Patents

Shipper notification program, method, and system Download PDF

Info

Publication number
JP2022027275A
JP2022027275A JP2020131172A JP2020131172A JP2022027275A JP 2022027275 A JP2022027275 A JP 2022027275A JP 2020131172 A JP2020131172 A JP 2020131172A JP 2020131172 A JP2020131172 A JP 2020131172A JP 2022027275 A JP2022027275 A JP 2022027275A
Authority
JP
Japan
Prior art keywords
shipper
arrival
time
travel
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2020131172A
Other languages
Japanese (ja)
Inventor
清英 大宮
Kiyohide Omiya
勇人 吉川
Hayato Yoshikawa
公嗣 磯谷
Masatsugu Isogai
勇樹 村瀬
Yuki Murase
雅之 布志原
Masayuki Fujihara
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujitsu Ltd
Transtron Inc
Original Assignee
Fujitsu Ltd
Transtron Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujitsu Ltd, Transtron Inc filed Critical Fujitsu Ltd
Priority to JP2020131172A priority Critical patent/JP2022027275A/en
Publication of JP2022027275A publication Critical patent/JP2022027275A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Instructional Devices (AREA)
  • Navigation (AREA)
  • Traffic Control Systems (AREA)

Abstract

To provide a shipper notification program capable of solving a problem of an operation manager who makes operation decisions based on regulatory information based on traffic congestion and weather conditions; the guidelines formulated by the Ministry of Land, Infrastructure, Transport and Tourism are merely guidelines, and it is not easy for the operation manager to judge the operation; in addition, the guidelines stipulate that if transportation is carried out without taking appropriate measures, it may be subject to administrative sanctions.SOLUTION: The shipper notification program causes a computer to execute a series of processing: determining whether any abnormal weather is located on a planned travel route at a scheduled travel time based on travel schedule information of a vehicle carrying luggage; When it is determined that the position of occurrence of abnormal weather is on the planned travel route at the scheduled travel time, calculating the estimated time of arrival at the destination based on the travel schedule information and the weather information; and notifying the estimated time of arrival to a second computer used by the shipper of the luggage. With this, the computer can support the operation manager to determine the operation and measures.SELECTED DRAWING: Figure 7

Description

本発明は、荷主通知プログラム、方法、および装置に関する。 The present invention relates to shipper notification programs, methods, and devices.

運送事業用の車両の安全運行を確保する運行管理者は、道路交通情報通信システム(Vehicle Information and Communication System:VICS(登録商標))などから渋滞や気象条件などによる規制情報を得て運行判断を行っている。また、運行判断を行うためのガイドラインが国土交通省によって策定されている。 The operation manager who ensures the safe operation of vehicles for the transportation business obtains regulatory information due to traffic congestion and weather conditions from the Vehicle Information and Communication System (VICS (registered trademark)) and makes an operation decision. Is going. In addition, the Ministry of Land, Infrastructure, Transport and Tourism has formulated guidelines for making operational decisions.

しかしながら、国土交通省のガイドラインはあくまでも目安であり、運行管理者による運行判断は容易でない。また、ガイドラインには、異常気象時などに適切な措置を講じずに運送を行った場合は行政処分の対象になり得ることが規定されている。 However, the guidelines of the Ministry of Land, Infrastructure, Transport and Tourism are just guidelines, and it is not easy for the operation manager to judge the operation. In addition, the guidelines stipulate that transportation may be subject to administrative sanctions if transportation is carried out without taking appropriate measures in the event of abnormal weather.

1つの側面では、運行管理者の運行判断および措置を支援できる荷主通知プログラム、方法、および装置を提供することを目的とする。 One aspect is to provide shipper notification programs, methods, and equipment that can assist operation managers in their operational decisions and measures.

1つの態様において、荷主通知プログラムは、コンピュータに、荷物を運送する車両の走行予定情報および気象情報に基づいて、異常気象の発生位置が走行予定時刻の走行予定経路上にあるかを判定し、発生位置が走行予定時刻の走行予定経路上にあると判定された場合、走行予定情報および気象情報に基づいて、目的地への到着予定時刻を算出し、到着予定時刻を、荷物の荷主の利用する第2のコンピュータに通知する処理を実行させる。 In one embodiment, the shipper notification program determines to the computer whether the location of the abnormal weather is on the estimated travel route at the estimated time of travel, based on the travel schedule information and the weather information of the vehicle carrying the luggage. If it is determined that the location of occurrence is on the scheduled travel route at the scheduled travel time, the estimated arrival time to the destination is calculated based on the scheduled travel information and weather information, and the estimated arrival time is used by the shipper of the luggage. The process of notifying the second computer is executed.

1つの側面では、運行管理者の運行判断および措置を支援できる。 On one side, it can support the operation manager's operation decisions and measures.

図1は、荷主通知システムの構成例を示す図である。FIG. 1 is a diagram showing a configuration example of a shipper notification system. 図2は、荷主通知装置の構成例を示す図である。FIG. 2 is a diagram showing a configuration example of a shipper notification device. 図3は、走行予定情報のデータ構成例を示す図である。FIG. 3 is a diagram showing an example of data configuration of travel schedule information. 図4は、気象情報のデータ構成例を示す図である。FIG. 4 is a diagram showing an example of data configuration of meteorological information. 図5は、荷主情報のデータ構成例を示す図である。FIG. 5 is a diagram showing an example of data configuration of shipper information. 図6は、走行予定経路表示の一例を示す図である。FIG. 6 is a diagram showing an example of a planned travel route display. 図7は、再計算された走行予定経路表示の一例を示す図である。FIG. 7 is a diagram showing an example of the recalculated travel schedule route display. 図8は、荷主通知処理の流れを示すフローチャートである。FIG. 8 is a flowchart showing the flow of the shipper notification process. 図9は、ハードウェア構成例を説明する図である。FIG. 9 is a diagram illustrating a hardware configuration example.

以下に、本発明に係る荷主通知プログラム、方法、および装置の実施例を図面に基づいて詳細に説明する。なお、この実施例により本発明が限定されるものではない。また、各実施例は、矛盾のない範囲内で適宜組み合わせることができる。 Hereinafter, examples of the shipper notification program, method, and apparatus according to the present invention will be described in detail with reference to the drawings. The present invention is not limited to this embodiment. In addition, each embodiment can be appropriately combined within a consistent range.

まず、本発明を実施するための荷主通知システムについて説明する。図1は、荷主通知システムの構成例を示す図である。図1に示すように、荷主通知システム1は、荷主通知装置10と、運行管理者端末100、車両200、および荷主端末300とがネットワークNを介して相互に通信可能に接続されるシステムである。なお、ネットワークNの通信方式は、有線や無線のいずれでもよく、ネットワークNは、インターネットなどの各種通信網でよい。 First, a shipper notification system for carrying out the present invention will be described. FIG. 1 is a diagram showing a configuration example of a shipper notification system. As shown in FIG. 1, the shipper notification system 1 is a system in which a shipper notification device 10, an operation manager terminal 100, a vehicle 200, and a shipper terminal 300 are connected to each other via a network N so as to be communicable with each other. .. The communication method of the network N may be either wired or wireless, and the network N may be various communication networks such as the Internet.

荷主通知装置10は、例えば、運送事業者などによって管理されるサーバコンピュータである。荷主通知装置10は、車両200の走行予定情報および気象情報に基づいて、異常気象の発生位置が走行予定時刻の走行予定経路上にあるかを判定する。また、荷主通知装置10は、車両200の目的地への到着予定時刻を算出し、荷主端末300に通知する。 The shipper notification device 10 is, for example, a server computer managed by a carrier or the like. The shipper notification device 10 determines whether or not the position where abnormal weather occurs is on the planned travel route at the scheduled travel time, based on the travel schedule information and the weather information of the vehicle 200. Further, the shipper notification device 10 calculates the estimated time of arrival of the vehicle 200 at the destination and notifies the shipper terminal 300.

なお、図1では、荷主通知装置10を1台のコンピュータとして示しているが、複数台のコンピュータで構成される分散型コンピューティングシステムであってもよい。また、荷主通知装置10は、クラウドサービスを提供するサービス提供者によって管理されるクラウドサーバ装置であってもよい。 Although the shipper notification device 10 is shown as one computer in FIG. 1, it may be a distributed computing system composed of a plurality of computers. Further, the shipper notification device 10 may be a cloud server device managed by a service provider that provides a cloud service.

運行管理者端末100は、運行管理者が利用する情報処理端末である。運行管理者端末100は、スマートフォンやタブレットPC(Personal Computer)などのモバイル端末であってもよいし、運行管理者の営業拠点などに設置される据え置き端末であってもよい。運行管理者は、運行管理者端末100を介して、荷主通知装置10から提供される各車両の走行予定情報や気象情報などを確認するなどし、道路の安全を確保する。 The operation manager terminal 100 is an information processing terminal used by the operation manager. The operation manager terminal 100 may be a mobile terminal such as a smartphone or a tablet PC (Personal Computer), or may be a stationary terminal installed at a business base of the operation manager. The operation manager secures the safety of the road by confirming the travel schedule information, the weather information, and the like of each vehicle provided from the shipper notification device 10 via the operation manager terminal 100.

車両200は、運行管理者によって管理される運送事業者のトラックなどの自動車である。車両200は、例えば、全地球型航法衛星システム(GNSS:Global Navigation Satellite System)端末(図示せず)などを搭載し、GNSS測位衛星から車両200の位置情報を受信する。GNSS端末は、例えば、車両200の1秒単位の位置情報を受信する。また、車両200は、GNSS端末を介して、荷主通知装置10に位置情報を送信する。なお、GNSS端末は、車両200のドライバーが携帯するモバイル端末などであってもよい。 The vehicle 200 is an automobile such as a truck of a transportation company managed by an operation manager. The vehicle 200 is equipped with, for example, a Global Navigation Satellite System (GNSS) terminal (not shown) and the like, and receives the position information of the vehicle 200 from the GNSS positioning satellite. The GNSS terminal receives, for example, the position information of the vehicle 200 in units of one second. Further, the vehicle 200 transmits the position information to the shipper notification device 10 via the GNSS terminal. The GNSS terminal may be a mobile terminal carried by the driver of the vehicle 200.

荷主端末300は、車両200によって運送される、または運送予定の荷物の荷主が利用する情報処理端末である。ここで、当該荷主とは、運送事業者に荷物の運送を依頼した荷物の送り主である。荷主端末300も、モバイル端末や据え置き端末であってよい。荷主端末300は、荷主通知装置10から、目的地への荷物の到着予定時刻の通知を受信し、表示する。また、荷主端末300の代わりに、または荷主端末300と併せて、荷主の所属する企業などが管理するサーバコンピュータに通知してもよい。これにより、例えば、荷主は、荷主の所属する企業などが管理するシステムを介して、依頼した荷物の到着予定時刻や運送状況を確認できる。 The shipper terminal 300 is an information processing terminal used by the shipper of the cargo transported or scheduled to be transported by the vehicle 200. Here, the shipper is a shipper who has requested a carrier to carry the baggage. The shipper terminal 300 may also be a mobile terminal or a stationary terminal. The shipper terminal 300 receives and displays the notification of the estimated time of arrival of the package to the destination from the shipper notification device 10. Further, instead of the shipper terminal 300 or together with the shipper terminal 300, the server computer managed by the company to which the shipper belongs may be notified. Thereby, for example, the shipper can confirm the estimated time of arrival and the transportation status of the requested package via the system managed by the company to which the shipper belongs.

[荷主通知装置10の機能構成]
次に、図1に示した荷主通知装置10の機能構成について説明する。図2は、荷主通知装置の構成例を示す図である。図2に示すように、荷主通知装置10は、通信部20、記憶部30、および制御部40を有する。
[Functional configuration of shipper notification device 10]
Next, the functional configuration of the shipper notification device 10 shown in FIG. 1 will be described. FIG. 2 is a diagram showing a configuration example of a shipper notification device. As shown in FIG. 2, the shipper notification device 10 includes a communication unit 20, a storage unit 30, and a control unit 40.

通信部20は、運行管理者端末100や、車両200に搭載されたGNSS端末、荷主端末300など、他の装置との間の通信を制御する処理部であり、例えば、通信インタフェースである。 The communication unit 20 is a processing unit that controls communication with other devices such as the operation manager terminal 100, the GNSS terminal mounted on the vehicle 200, and the shipper terminal 300, and is, for example, a communication interface.

記憶部30は、各種データや、制御部40が実行するプログラムを記憶する記憶装置の一例であり、例えば、メモリやハードディスクなどである。記憶部30は、走行予定情報31、気象情報32、および荷主情報33などを記憶する。 The storage unit 30 is an example of a storage device that stores various data and a program executed by the control unit 40, and is, for example, a memory or a hard disk. The storage unit 30 stores travel schedule information 31, weather information 32, shipper information 33, and the like.

走行予定情報31は、車両200の出発位置から到着位置への走行予定に関する情報である。図3は、走行予定情報のデータ構成例を示す図である。図3に示すように、走行予定情報31は、「車両ID、運行ID、走行予定時刻、走行予定位置」などを対応付けて記憶する。 The travel schedule information 31 is information regarding a travel schedule from the departure position to the arrival position of the vehicle 200. FIG. 3 is a diagram showing an example of data configuration of travel schedule information. As shown in FIG. 3, the travel schedule information 31 stores "vehicle ID, operation ID, scheduled travel time, scheduled travel position" and the like in association with each other.

「車両ID」は、車両200を一意に識別するための識別子である。「運行ID」は、出発位置から到着位置への運行を一意に識別するための識別子である。「走行予定時刻」および「走行予定位置」は、「走行予定時刻」によって示される時刻に、「走行予定位置」によって示される位置に、「車両ID」で示される車両200がいる予定であることを示す情報である。すなわち、「車両ID」および「運行ID」ごとに、「走行予定時刻」順に「走行予定位置」を並べ各々を結ぶと、車両200の走行予定経路を作成できる。なお、「走行予定位置」は、例えば、緯度および経度で示される。また、図3の例では、5分ごとの「走行予定時刻」の「走行予定位置」を記憶するように示しているが、より細かい、または粗い刻みで記憶してもよい。 The "vehicle ID" is an identifier for uniquely identifying the vehicle 200. The "operation ID" is an identifier for uniquely identifying the operation from the departure position to the arrival position. The "scheduled travel time" and the "scheduled travel position" indicate that the vehicle 200 indicated by the "vehicle ID" is scheduled to be present at the time indicated by the "scheduled travel time" and at the position indicated by the "scheduled travel position". Information indicating. That is, by arranging the "scheduled travel positions" in the order of "scheduled travel time" for each "vehicle ID" and "operation ID" and connecting each of them, the planned travel route of the vehicle 200 can be created. The "planned travel position" is indicated by, for example, latitude and longitude. Further, in the example of FIG. 3, it is shown that the "scheduled travel position" of the "scheduled travel time" every 5 minutes is memorized, but it may be memorized in finer or coarser increments.

走行予定情報31は、一般的なルート検索機能を用いて、出発位置および到着位置、ならびに出発時刻または到着時刻などを入力し、出力される出発位置から到着位置への経路や距離、および所要時間などから作成される。 The travel schedule information 31 inputs a departure position and an arrival position, a departure time or an arrival time, and the like by using a general route search function, and outputs a route, a distance, and a required time from the departure position to the arrival position. It is created from such as.

気象情報32は、車両200の運行に影響を与え得る異常気象に関する情報である。図4は、気象情報のデータ構成例を示す図である。図4に示すように、気象情報32は、「降雨量、対象期間、対象位置1、対象位置2」などを対応付けて記憶する。 The weather information 32 is information on abnormal weather that may affect the operation of the vehicle 200. FIG. 4 is a diagram showing an example of data configuration of meteorological information. As shown in FIG. 4, the meteorological information 32 stores "rainfall amount, target period, target position 1, target position 2" and the like in association with each other.

「降雨量」は、予測される一定時間あたりの雨量であり、単位は、例えば、mm/h(ミリメートル/時間)である。なお、図4の例では、気象情報32に予測値として降雨量のみを示しているが、他にも、風速、降雪量、濃霧や風雪による視界などの異常気象の予測値を記憶できる。「対象期間」は、対応する異常気象が発生すると予測される期間である。「対象位置1」および「対象位置2」は、対応する異常気象が発生すると予測される位置(範囲)である。例えば、「対象位置1」および「対象位置2」を用いて作成される矩形範囲が異常気象の予測発生範囲となる。 The "rainfall amount" is a predicted amount of rainfall per fixed time, and the unit is, for example, mm / h (millimeter / hour). In the example of FIG. 4, only the amount of rainfall is shown as the predicted value in the weather information 32, but in addition, the predicted value of abnormal weather such as wind speed, amount of snowfall, visibility due to thick fog or wind and snow can be stored. The "target period" is the period in which the corresponding abnormal weather is expected to occur. "Target position 1" and "target position 2" are positions (ranges) where the corresponding abnormal weather is predicted to occur. For example, the rectangular range created by using "target position 1" and "target position 2" is the predicted occurrence range of abnormal weather.

気象情報32は、気象庁などから定期的に取得される、アメダスなどの情報に基づいて作成される。 The meteorological information 32 is created based on information such as AMeDAS, which is periodically acquired from the Japan Meteorological Agency and the like.

荷主情報33は、運送事業者に荷物の運送を依頼する荷物の送り主に関する情報である。図5は、荷主情報のデータ構成例を示す図である。図5に示すように、荷主情報33は、「車両ID、運行ID、注文番号、荷主コード、荷主名、荷主連絡先、連携URL」などを対応付けて記憶する。 The shipper information 33 is information regarding the sender of the cargo for which the carrier is requested to carry the cargo. FIG. 5 is a diagram showing an example of data configuration of shipper information. As shown in FIG. 5, the shipper information 33 stores "vehicle ID, operation ID, order number, shipper code, shipper name, shipper contact information, cooperation URL" and the like in association with each other.

「車両ID」は、荷主の荷物を運送する車両200を一意に識別するための識別子である。「運行ID」は、出発位置から到着位置への運行を一意に識別するための識別子である。「車両ID」および「運行ID」は、走行予定情報31の同名項目とそれぞれ紐づく。「注文番号」は、運送依頼を一意に識別するための識別子を示す。「荷主コード」は、荷主を一意に識別するための識別子を示す。「荷主名」は、荷主の名称を示す。「荷主連絡先」は、荷主に対して通知を行うための連絡先、例えば、メールアドレスを示す。「連携URL」は、荷主に対してデータ連携を行うためのURL(Uniform Resource Locator)を示す。 The "vehicle ID" is an identifier for uniquely identifying the vehicle 200 that carries the shipper's luggage. The "operation ID" is an identifier for uniquely identifying the operation from the departure position to the arrival position. The "vehicle ID" and "operation ID" are associated with the items having the same name in the travel schedule information 31, respectively. The "order number" indicates an identifier for uniquely identifying a transportation request. The "shipper code" indicates an identifier for uniquely identifying the shipper. "Shipper name" indicates the name of the shipper. The "shipper contact" indicates a contact for notifying the shipper, for example, an e-mail address. The "linkage URL" indicates a URL (Uniform Resource Locator) for linking data to the shipper.

なお、記憶部30には、上記情報以外にも様々な情報を記憶できる。 In addition to the above information, various information can be stored in the storage unit 30.

制御部40は、荷主通知装置10全体を司る処理部であり、例えば、プロセッサなどである。制御部40は、判定部41、算出部42、通知部43、および作成部44を備える。なお、各処理部は、プロセッサが有する電子回路の一例やプロセッサが実行するプロセスの一例である。 The control unit 40 is a processing unit that controls the entire shipper notification device 10, and is, for example, a processor. The control unit 40 includes a determination unit 41, a calculation unit 42, a notification unit 43, and a creation unit 44. Each processing unit is an example of an electronic circuit possessed by the processor and an example of a process executed by the processor.

判定部41は、荷物を運送する車両200の走行予定情報31および気象情報32に基づいて、異常気象の発生位置が走行予定時刻の走行予定経路上にあるかを判定する。具体的には、上述したように、走行予定情報31の「車両ID」および「運行ID」ごとに、「走行予定時刻」順に「走行予定位置」を並べ各々を結ぶと、車両200の走行予定経路を作成できる。 The determination unit 41 determines whether or not the position where the abnormal weather occurs is on the travel schedule route at the travel schedule time, based on the travel schedule information 31 and the weather information 32 of the vehicle 200 that carries the cargo. Specifically, as described above, when the "scheduled travel position" is arranged in the order of "scheduled travel time" for each "vehicle ID" and "operation ID" of the travel schedule information 31, the vehicle 200 is scheduled to travel. You can create a route.

そして、作成された走行予定経路の各「走行予定位置」と、各々の位置の「走行予定時刻」とを、気象情報32の「対象位置1」および「対象位置2」を用いて作成される矩形範囲と、「対象期間」とにそれぞれ突き合わせる。すなわち、判定部41は、走行予定の位置およびその時刻が、異常気象発生が予測される位置および時刻に合致するかを判定し、合致する場合は、車両200の走行予定経路上に異常気象の発生位置があると判定する。なお、ここでの位置の合致とは、気象情報32の「対象位置1」および「対象位置2」を用いて作成される矩形範囲に、走行予定情報31の「走行予定位置」が含まれることを意味する。 Then, each "scheduled travel position" of the created planned travel route and the "scheduled travel time" of each position are created by using the "target position 1" and the "target position 2" of the weather information 32. Match the rectangular range with the "target period" respectively. That is, the determination unit 41 determines whether the scheduled travel position and the time match the position and time at which the occurrence of abnormal weather is predicted, and if so, the abnormal weather is found on the planned travel route of the vehicle 200. It is determined that there is an occurrence position. The matching of the positions here means that the "planned running position" of the scheduled running information 31 is included in the rectangular range created by using the "target position 1" and the "target position 2" of the weather information 32. Means.

また、判定部41は、異常気象の発生位置が車両200の走行予定時刻の走行予定経路上にあると判定された場合、とるべき措置を判定する。これは、例えば、気象情報32の「降雨量」などによって示される予測値によって、走行予定情報31の「走行予定位置」の走行の中止、または走行速度の制限を決定することである。 Further, the determination unit 41 determines the measures to be taken when it is determined that the position where the abnormal weather occurs is on the planned travel route at the scheduled travel time of the vehicle 200. This is to determine, for example, the suspension of running at the "planned running position" of the scheduled running information 31 or the limitation of the running speed based on the predicted value indicated by the "rainfall amount" of the weather information 32.

より具体的には、例えば、国土交通省のガイドラインでは、降雨量が30mm/h以上の場合は、走行の中止を検討すべき旨、20~30mm/hの場合は、安全確保のための措置を講じるべき旨が規定されている。そのため、気象情報32の「降雨量」に対して閾値を設け、判定部41は、「降雨量」に基づいて、異常気象の発生位置および当該発生位置に対してとるべき措置を判定する。 More specifically, for example, according to the guidelines of the Ministry of Land, Infrastructure, Transport and Tourism, if the rainfall is 30 mm / h or more, it should be considered to stop driving, and if it is 20 to 30 mm / h, measures for ensuring safety. It is stipulated that the measures should be taken. Therefore, a threshold value is set for the "rainfall amount" of the weather information 32, and the determination unit 41 determines the occurrence position of abnormal weather and the measures to be taken for the occurrence position based on the "rainfall amount".

例えば、「降雨量」が30mm/hを示す第1の閾値より大きい場合、判定部41は、「走行予定位置」の走行の中止、および代替経路の作成を決定する。また、「降雨量」が、第1の閾値以下、かつ20mm/hを示す第2の閾値より大きい場合、判定部41は、「走行予定位置」の走行速度の制限、および制限速度の算出を決定する。 For example, when the "rainfall amount" is larger than the first threshold value indicating 30 mm / h, the determination unit 41 decides to stop the running at the "planned running position" and to create an alternative route. Further, when the "rainfall amount" is equal to or less than the first threshold value and larger than the second threshold value indicating 20 mm / h, the determination unit 41 limits the running speed of the "planned running position" and calculates the speed limit. decide.

なお、上述したように、予測値は降雨量のみに限られない。風速、降雪量、濃霧や風雪による視界などの予測値の場合も、降雨量同様、閾値を設け、とるべき措置が判定される。例えば、濃霧や風雪による視界が20mを示す閾値以下の場合、判定部41は、「走行予定位置」の走行の中止、および代替経路の作成を決定する。 As mentioned above, the predicted value is not limited to the amount of rainfall. In the case of predicted values such as wind speed, amount of snowfall, visibility due to heavy fog and wind and snow, a threshold value is set and the measures to be taken are determined in the same way as the amount of rainfall. For example, when the field of view due to heavy fog or wind and snow is equal to or less than the threshold value indicating 20 m, the determination unit 41 decides to stop the running at the "planned running position" and to create an alternative route.

算出部42は、判定部41によって、異常気象の発生位置が車両200の走行予定時刻の走行予定経路上にあると判定された場合、走行予定情報31および気象情報32に基づいて、目的地への到着予定時刻を算出する。これは、判定部41によって代替経路の作成が決定された場合は、走行予定経路として代替経路を利用して目的地へ向かった場合の到着予定時刻を算出する。 When the determination unit 41 determines that the position where the abnormal weather occurs is on the travel schedule route of the vehicle 200 at the scheduled travel time, the calculation unit 42 returns to the destination based on the travel schedule information 31 and the weather information 32. Calculate the estimated time of arrival of. This calculates the estimated time of arrival when the alternative route is used as the planned travel route and the destination is headed when the determination unit 41 determines the creation of the alternative route.

また、到着予定時刻は、例えば、走行予定経路に含まれる各道路を法定速度で走行した場合の所要時間に基づいて算出されることになる。また、判定部41によって走行速度の制限が決定された道路に対しては、制限速度で走行した場合の所要時間に基づいて算出される。この際、算出部42は、例えば、高速道路は時速50km(キロメートル)、一般道路は時速20kmなどといったように、走行予定経路に含まれる道路ごとに制限速度を算出する。 Further, the estimated time of arrival is calculated based on, for example, the required time when traveling at a legal speed on each road included in the planned travel route. Further, for a road whose traveling speed limit is determined by the determination unit 41, it is calculated based on the required time when traveling at the limiting speed. At this time, the calculation unit 42 calculates the speed limit for each road included in the planned travel route, for example, 50 km / h (kilometers) for expressways and 20 km / h for general roads.

また、厚生労働省によって策定された「自動車運転者の労働時間等の改善のための基準」には、連続運転時間は4時間以内、運転開始後4時間経過直後に30分以上の運転をしない時間が必要であることが規定されている。そのため、到着予定時刻は、例えば、4時間ごとに30分の休憩時間を含めて算出されてもよい。なお、これは、走行予定情報31の作成、すなわち、「走行予定時刻」を算出する際も同様の考え方である。また、休憩時間の間隔は、サービスエリアなどの位置に基づいて決定されてもよい。例えば、厳密に4時間ごととすると、高速道路上で休憩することになるなど、現実的でないケースが発生するため、上記基準を遵守するためにも、休憩終了時から運転時間4時間以内にあるサービスエリアを休憩位置として、休憩時間を算出するなどしてよい。 In addition, according to the "Standards for Improving Working Hours of Automobile Drivers" established by the Ministry of Health, Labor and Welfare, continuous driving time is within 4 hours, and the time for not driving for 30 minutes or more immediately after 4 hours have passed since the start of driving. Is required. Therefore, the estimated time of arrival may be calculated including, for example, a break time of 30 minutes every 4 hours. It should be noted that this is the same idea when creating the travel schedule information 31, that is, when calculating the “scheduled travel time”. Further, the break time interval may be determined based on the position of the service area or the like. For example, if it is strictly every 4 hours, there will be unrealistic cases such as taking a break on the highway, so in order to comply with the above standards, the driving time is within 4 hours from the end of the break. The break time may be calculated with the service area as the break position.

また、算出部42は、代替経路に基づいて、荷物の運送費を算出する。代替経路を利用することにより、走行距離や、有料道路の利用有無など、運送費に関わる事項に変更が生じ、荷主への確認が必要になる場合があるため、運送費を改めて算出する。 Further, the calculation unit 42 calculates the transportation cost of the cargo based on the alternative route. By using the alternative route, items related to transportation costs such as mileage and whether or not toll roads are used may change, and it may be necessary to confirm with the shipper, so the transportation costs will be calculated again.

通知部43は、算出部42によって算出された到着予定時刻を、荷主端末300に通知する。通知方法は、荷主情報33の「荷主連絡先」にメッセージを通知してもよいし、「連携URL」にデータ連携してもよい。「連携URL」へのデータ連携の場合、荷主は、例えば、荷主の所属する企業が管理するシステムを介して、依頼した荷物の到着予定時刻や運送状況を確認できる。また、その他に、荷主通知装置10が提供する専用のWebサイトのURLを「荷主連絡先」に通知するなどし、当該Webサイトを介して到着予定時刻や運送状況を確認させることもできる。なお、代替経路を利用する際の到着予定時刻を通知する場合は、当該到着予定時刻が元の到着予定時刻と異なる場合にのみ、荷主端末300にすることもできる。 The notification unit 43 notifies the shipper terminal 300 of the estimated time of arrival calculated by the calculation unit 42. As the notification method, the message may be notified to the "shipper contact information" of the shipper information 33, or the data may be linked to the "linkage URL". In the case of data linkage to the "linkage URL", the shipper can confirm the estimated arrival time and the transportation status of the requested package, for example, via a system managed by the company to which the shipper belongs. In addition, it is also possible to notify the "shipper contact" of the URL of the dedicated website provided by the shipper notification device 10 so that the estimated arrival time and the transportation status can be confirmed via the website. When notifying the estimated time of arrival when using the alternative route, the shipper terminal 300 may be set only when the estimated time of arrival is different from the original estimated time of arrival.

ここで、通知部43による通知内容の具体例を説明する。図6は、走行予定経路表示の一例を示す図である。図6に示すように、通知部43は、例えば、出発位置から到着位置への走行予定経路とともに、到着予定時刻を通知する。また、走行予定経路付近に異常気象の予測発生範囲がある場合、通知部43は、当該範囲を併せて通知できる。図6の例では、異常気象の予測発生範囲として、降雨量の高い範囲を降雨量の高い順に、ドット、左斜め、右斜めの3つのパターン表示に分けて示している。ここで、図6において、降雨量の高い範囲のうち最も内側のドットパターン表示の範囲の降雨量は30mm/h以上であったとする。そして、図6に示すように、当該範囲は、走行予定経路上にある。この場合、上述したように、判定部41は、当該範囲の走行の中止、および代替経路の作成を決定する。なお、左斜め、右斜めパターン表示の範囲は、異常気象時用の制限速度内で走行してよい範囲とする。 Here, a specific example of the content of the notification by the notification unit 43 will be described. FIG. 6 is a diagram showing an example of a planned travel route display. As shown in FIG. 6, the notification unit 43 notifies, for example, the estimated time of arrival together with the planned travel route from the departure position to the arrival position. Further, when there is a predicted occurrence range of abnormal weather in the vicinity of the planned travel route, the notification unit 43 can also notify the range. In the example of FIG. 6, as the predicted occurrence range of abnormal weather, the range with high rainfall is divided into three pattern displays of dot, diagonal left, and diagonal right in descending order of rainfall. Here, in FIG. 6, it is assumed that the rainfall amount in the innermost dot pattern display range in the high rainfall range is 30 mm / h or more. Then, as shown in FIG. 6, the range is on the planned travel route. In this case, as described above, the determination unit 41 decides to stop traveling in the range and to create an alternative route. The range of the diagonal left and diagonal right patterns is the range in which the vehicle can travel within the speed limit for abnormal weather.

図7は、再計算された走行予定経路表示の一例を示す図である。図7に示される走行予定経路は、図6の走行予定経路上の異常気象の予測発生範囲のうち、走行の中止が決定されたドットパターン表示の範囲を走行しないように作成された代替経路である。また、図7は、算出部42によって算出された、代替経路を利用して目的地へ向かった場合の到着予定時刻を表示している。さらに、通知部43は、図7に示すように、元の到着予定時刻からの遅延時間を通知できる。 FIG. 7 is a diagram showing an example of the recalculated travel schedule route display. The planned travel route shown in FIG. 7 is an alternative route created so as not to travel within the range of the dot pattern display for which it is decided to stop traveling in the predicted occurrence range of abnormal weather on the planned travel route of FIG. be. Further, FIG. 7 displays the estimated time of arrival when heading to the destination using the alternative route calculated by the calculation unit 42. Further, as shown in FIG. 7, the notification unit 43 can notify the delay time from the original estimated time of arrival.

また、通知部43は、運送費を荷主端末300に通知する。代替経路を利用する際の運送費の通知も、元の費用と異なる場合にのみ、荷主端末300にすることもできる。これにより、荷主に対して、変更後の運送費で運送を継続するかなどを確認できる。 Further, the notification unit 43 notifies the shipper terminal 300 of the transportation cost. The notification of the transportation cost when using the alternative route can also be set to the shipper terminal 300 only when it is different from the original cost. This makes it possible to confirm with the shipper whether to continue transportation at the changed transportation cost.

作成部44は、走行予定情報31に基づいて、走行予定経路を作成する。これは、上述したように、走行予定情報31の「走行予定時刻」順に「走行予定位置」を並べ各々を結ぶことにより作成できる。また、作成部44は、作成された走行予定経路および気象情報32に基づいて、代替経路を作成する。これは、例えば、作成された走行予定経路に対して、気象情報32の「対象位置1」および「対象位置2」によって示される異常気象の予測発生範囲を走行せぬよう迂回ルートを検索することにより作成できる。迂回ルートの検索には、一般的なルート検索機能を用いてよい。 The creation unit 44 creates a planned travel route based on the travel schedule information 31. As described above, this can be created by arranging the "scheduled travel positions" in the order of the "scheduled travel time" of the travel schedule information 31 and connecting each of them. Further, the creating unit 44 creates an alternative route based on the created planned travel route and the weather information 32. This is, for example, searching for a detour route so as not to travel within the predicted occurrence range of abnormal weather indicated by "target position 1" and "target position 2" of the weather information 32 for the created planned travel route. Can be created by. A general route search function may be used to search for a detour route.

[処理の流れ]
次に、荷主通知装置10によって実行される荷主通知処理の流れを説明する。図8は、荷主通知処理の流れを示すフローチャートである。図8に示す荷主通知処理は、荷主通知装置10が実行主体であり、運行管理者の運行判断および措置を支援するために、車両200の運行前、および運行中に定期的に車両200ごとに実行される。
[Processing flow]
Next, the flow of the shipper notification process executed by the shipper notification device 10 will be described. FIG. 8 is a flowchart showing the flow of the shipper notification process. The shipper notification device 10 is the execution body of the shipper notification process shown in FIG. 8, and the shipper notification device 10 is periodically executed before and during the operation of the vehicle 200 in order to support the operation judgment and measures of the operation manager. Will be executed.

まず、図8に示すように、荷主通知装置10は、走行予定情報31を登録する(ステップS101)。これは、例えば、運行管理者が、運行管理者端末100を用いて、専用のWebサイトやアプリケーションなどを介して、荷物を運送するための出発位置および到着位置、ならびに出発時刻または到着時刻を入力することにより、荷主通知装置10に登録される。または、荷主が、荷主端末300を用いて、荷物の運送依頼情報として登録する荷物の送り先や、到着希望日時などに基づいて登録されてもよい。 First, as shown in FIG. 8, the shipper notification device 10 registers the travel schedule information 31 (step S101). For example, the operation manager inputs the departure position and the arrival position for transporting the cargo, and the departure time or the arrival time by using the operation manager terminal 100 via a dedicated website or application. By doing so, it is registered in the shipper notification device 10. Alternatively, the shipper may use the shipper terminal 300 to register the cargo based on the destination of the cargo to be registered as the cargo transportation request information, the desired arrival date and time, and the like.

次に、荷主通知装置10は、気象情報32を取得する(ステップS102)。気象情報32は、気象庁などから定期的に取得される、アメダスなどの情報に基づいて作成される。また、気象情報32の取得は、登録された走行予定情報31の走行予定経路に基づいて、ある程度絞り込まれて取得されてよい。 Next, the shipper notification device 10 acquires the weather information 32 (step S102). The meteorological information 32 is created based on information such as AMeDAS, which is periodically acquired from the Japan Meteorological Agency and the like. Further, the acquisition of the weather information 32 may be narrowed down to some extent based on the travel schedule route of the registered travel schedule information 31.

次に、走行予定情報31および気象情報32に基づいて、異常気象の予測発生位置が車両200の走行予定経路上にあるか判定する(ステップS103)。異常気象の予測発生位置が走行予定経路上にない場合(ステップS104:No)、図8に示す荷主通知処理は終了する。 Next, based on the travel schedule information 31 and the weather information 32, it is determined whether or not the predicted occurrence position of the abnormal weather is on the travel schedule route of the vehicle 200 (step S103). When the predicted occurrence position of abnormal weather is not on the planned travel route (step S104: No), the shipper notification process shown in FIG. 8 ends.

一方、異常気象の予測発生位置が走行予定経路上にある場合(ステップS104:Yes)、荷主通知装置10は、異常気象の予測値が第1の閾値以上か判定する(ステップS105)。ここで、異常気象の予測値とは、例えば、気象情報32の「降雨量」であるが、異常気象の種類によって、風速、降雪量、濃霧や風雪による視界などになる。また、第1の閾値は、例えば、国土交通省のガイドラインに走行の中止を検討すべき旨が規定されている目安である。例えば、降雨量の場合は、30mm/h以上である。なお、図8の例では、ステップS105の判定を第1の閾値『以上』としているが、異常気象の種類が濃霧や風雪による視界不良である場合は、第1の閾値『以下』である。例えば、視界が20m以下である。このように、閾値の判定内容は、異常気象の種類やガイドラインの規定により適宜変更される。 On the other hand, when the predicted occurrence position of the abnormal weather is on the planned travel route (step S104: Yes), the shipper notification device 10 determines whether the predicted value of the abnormal weather is equal to or higher than the first threshold value (step S105). Here, the predicted value of abnormal weather is, for example, the "rainfall amount" of the weather information 32, but depending on the type of abnormal weather, the wind speed, the amount of snowfall, the visibility due to thick fog or wind and snow, and the like. In addition, the first threshold value is, for example, a guideline that the guidelines of the Ministry of Land, Infrastructure, Transport and Tourism stipulate that the suspension of driving should be considered. For example, in the case of rainfall, it is 30 mm / h or more. In the example of FIG. 8, the determination in step S105 is set to the first threshold value “or more”, but when the type of abnormal weather is poor visibility due to dense fog or wind and snow, the determination is set to the first threshold value “or less”. For example, the field of view is 20 m or less. In this way, the determination content of the threshold value is appropriately changed depending on the type of abnormal weather and the provisions of the guideline.

異常気象の予測値が第1の閾値以上である場合(ステップS105:Yes)、荷主通知装置10は、新たな走行予定経路として代替経路を作成し(ステップS106)、ステップS108に進む。代替経路は、異常気象の予測値が第1の閾値以上である予測発生位置を回避するように作成される。 When the predicted value of abnormal weather is equal to or higher than the first threshold value (step S105: Yes), the shipper notification device 10 creates an alternative route as a new planned travel route (step S106), and proceeds to step S108. The alternative route is created so as to avoid the predicted occurrence position where the predicted value of the abnormal weather is equal to or higher than the first threshold value.

一方、異常気象の予測値が第1の閾値以上でない場合(ステップS105:No)、荷主通知装置10は、異常気象の予測値が第2の閾値以上か判定する(ステップS107)。ここで、第2の閾値は、例えば、国土交通省のガイドラインに安全確保のための措置を講じるべき旨が規定されている目安である。例えば、降雨量の場合は、20~30mm/hである。異常気象の予測値が第2の閾値以上でない場合(ステップS107:No)、図8に示す荷主通知処理は終了する。 On the other hand, when the predicted value of abnormal weather is not equal to or higher than the first threshold value (step S105: No), the shipper notification device 10 determines whether the predicted value of abnormal weather is equal to or higher than the second threshold value (step S107). Here, the second threshold value is, for example, a guideline that the guidelines of the Ministry of Land, Infrastructure, Transport and Tourism stipulate that measures for ensuring safety should be taken. For example, in the case of rainfall, it is 20 to 30 mm / h. When the predicted value of abnormal weather is not equal to or higher than the second threshold value (step S107: No), the shipper notification process shown in FIG. 8 ends.

一方、ステップS106の実行後、または、異常気象の予測値が第2の閾値以上である場合(ステップS107:Yes)、荷主通知装置10は、走行予定経路に含まれる道路ごとに制限速度を算出する(ステップS108)。ここで算出される制限速度は、予測値が第2の閾値以上の発生位置を含む道路の場合は、例えば、高速道路は時速50km、一般道路は時速20kmなどであり、第2の閾値未満の道路は法定速度である。また、走行予定経路に含まれる道路とは、ステップS106を実行している場合は、代替経路に含まれる道路である。 On the other hand, after the execution of step S106, or when the predicted value of abnormal weather is equal to or higher than the second threshold value (step S107: Yes), the shipper notification device 10 calculates the speed limit for each road included in the planned travel route. (Step S108). The speed limit calculated here is, for example, 50 km / h for a highway and 20 km / h for a general road in the case of a road including a position where the predicted value is equal to or higher than the second threshold value, which is less than the second threshold value. The road is at legal speed. Further, the road included in the planned travel route is a road included in the alternative route when step S106 is executed.

次に、荷主通知装置10は、ステップS108で算出された制限速度に基づいて、到着予定時刻を算出する(ステップS109)。すなわち、走行予定経路に含まれる各道路を制限速度で走行した場合の所要時間を算出し、出発時刻や現在時刻から到着予定時刻を算出する。なお、到着予定時刻は、例えば、4時間ごとに30分など、車両200のドライバーの休憩時間を含めて算出されてよい。 Next, the shipper notification device 10 calculates the estimated time of arrival based on the speed limit calculated in step S108 (step S109). That is, the time required when traveling on each road included in the planned travel route at the speed limit is calculated, and the estimated arrival time is calculated from the departure time and the current time. The estimated time of arrival may be calculated including the break time of the driver of the vehicle 200, for example, 30 minutes every 4 hours.

次に、荷主通知装置10は、ステップS109で算出された到着予定時刻が元の到着予定時刻と異なるか判定する(ステップS110)。ステップS109で算出された到着予定時刻が元の到着予定時刻と異ならない場合(ステップS110:No)、図8に示す荷主通知処理は終了する。 Next, the shipper notification device 10 determines whether the estimated time of arrival calculated in step S109 is different from the original estimated time of arrival (step S110). When the estimated time of arrival calculated in step S109 does not differ from the original estimated time of arrival (step S110: No), the shipper notification process shown in FIG. 8 ends.

一方、ステップS109で算出された到着予定時刻が元の到着予定時刻と異なる場合(ステップS110:Yes)、荷主通知装置10は、ステップS109で算出された到着予定時刻を荷主端末300に通知する(ステップS111)。ステップS111の実行後、図8に示す荷主通知処理は終了するが、さらに、荷主通知装置10は、代替経路を利用する場合の運送費を算出し、算出された運送費が元の運送費と異なる場合に、荷主端末300に通知してもよい。これにより、荷主は、変更後の運送費で運送を継続するかなどを判断できる。 On the other hand, when the estimated time of arrival calculated in step S109 is different from the original estimated time of arrival (step S110: Yes), the shipper notification device 10 notifies the shipper terminal 300 of the estimated time of arrival calculated in step S109 (step S110: Yes). Step S111). After the execution of step S111, the shipper notification process shown in FIG. 8 is completed, but the shipper notification device 10 further calculates the transportation cost when using the alternative route, and the calculated transportation cost is the original transportation cost. If they are different, the shipper terminal 300 may be notified. This allows the shipper to determine whether to continue transportation at the changed transportation cost.

[効果]
上述したように、荷主通知装置10は、荷物を運送する車両200の走行予定情報31および気象情報32に基づいて、異常気象の発生位置が走行予定時刻の走行予定経路上にあるかを判定し、発生位置が走行予定時刻の走行予定経路上にあると判定された場合、走行予定情報31および気象情報32に基づいて、目的地への到着予定時刻を算出し、到着予定時刻を、荷物の荷主の利用する荷主端末300に通知する。
[effect]
As described above, the shipper notification device 10 determines whether or not the position where abnormal weather occurs is on the estimated travel route at the estimated time of travel, based on the travel schedule information 31 and the weather information 32 of the vehicle 200 carrying the cargo. If it is determined that the occurrence position is on the scheduled travel route at the scheduled travel time, the estimated arrival time to the destination is calculated based on the scheduled travel information 31 and the weather information 32, and the estimated arrival time is set as the luggage. Notify the shipper terminal 300 used by the shipper.

これにより、運行管理者は、異常気象時に、担当する各車両に対して適切な措置を講じることができる。また、講じる措置によって到着予定時刻が変わる場合に荷主に通知できる。そのため、荷主通知装置10は、運行管理者の運行判断および措置を支援できる。 As a result, the operation manager can take appropriate measures for each vehicle in charge in the event of abnormal weather. In addition, the shipper can be notified when the estimated time of arrival changes due to the measures taken. Therefore, the shipper notification device 10 can support the operation determination and measures of the operation manager.

また、荷主通知装置10はさらに、発生位置が走行予定時刻の走行予定経路上にあると判定された場合、走行予定情報および気象情報に基づいて、車両の代替経路を作成する。また、荷主通知装置10によって実行される、到着予定時刻を算出する処理は、代替経路に基づいて、到着予定時刻を算出する処理を含む。 Further, when it is determined that the occurrence position is on the travel schedule route at the scheduled travel time, the shipper notification device 10 further creates an alternative route for the vehicle based on the travel schedule information and the weather information. Further, the process of calculating the estimated time of arrival, which is executed by the shipper notification device 10, includes the process of calculating the estimated time of arrival based on the alternative route.

これにより、運行管理者は、国土交通省のガイドラインで走行の中止を検討すべき旨が規定されているような異常気象時に、担当する各車両に対して適切な措置を講じることができる。そのため、荷主通知装置10は、運行管理者の運行判断および措置を支援できる。 As a result, the operation manager can take appropriate measures for each vehicle in charge in the event of abnormal weather, as the guidelines of the Ministry of Land, Infrastructure, Transport and Tourism stipulate that the suspension of driving should be considered. Therefore, the shipper notification device 10 can support the operation determination and measures of the operation manager.

また、荷主通知装置10はさらに、発生位置が走行予定時刻の走行予定経路上にあると判定された場合、道路ごとに制限速度を算出する。また、荷主通知装置10によって実行される、到着予定時刻を算出する処理は、制限速度に基づいて、到着予定時刻を算出する処理を含む。 Further, the shipper notification device 10 further calculates a speed limit for each road when it is determined that the generation position is on the planned travel route at the scheduled travel time. Further, the process of calculating the estimated time of arrival, which is executed by the shipper notification device 10, includes the process of calculating the estimated time of arrival based on the speed limit.

これにより、運行管理者は、国土交通省のガイドラインで安全確保のための措置を講じるべき旨が規定されているような異常気象時に、担当する各車両に対して適切な措置を講じることができる。そのため、荷主通知装置10は、運行管理者の運行判断および措置を支援できる。 As a result, the operation manager can take appropriate measures for each vehicle in charge in the event of abnormal weather, as the guidelines of the Ministry of Land, Infrastructure, Transport and Tourism stipulate that measures for ensuring safety should be taken. .. Therefore, the shipper notification device 10 can support the operation determination and measures of the operation manager.

また、荷主通知装置10はさらに、気象情報に基づいて、降雨量、風速、もしくは降雪量が閾値以上、または濃霧もしくは風雪によって視界が閾値以下のいずれかである位置を発生位置に決定する。 Further, the shipper notification device 10 further determines, based on the meteorological information, a position where the amount of rainfall, wind speed, or amount of snowfall is equal to or higher than the threshold value, or the visibility is equal to or lower than the threshold value due to heavy fog or wind and snow.

これにより、運行管理者は、国土交通省のガイドラインで規定されているような異常気象時に、担当する各車両に対して適切な措置を講じることができる。そのため、荷主通知装置10は、運行管理者の運行判断および措置を支援できる。 As a result, the operation manager can take appropriate measures for each vehicle in charge in the event of abnormal weather as stipulated in the guidelines of the Ministry of Land, Infrastructure, Transport and Tourism. Therefore, the shipper notification device 10 can support the operation determination and measures of the operation manager.

また、荷主通知装置10はさらに、代替経路に基づいて、荷物の運送費を算出し、運送費が元の費用と異なる場合に、運送費を第2のコンピュータに通知する。 Further, the shipper notification device 10 further calculates the transportation cost of the cargo based on the alternative route, and notifies the transportation cost to the second computer when the transportation cost is different from the original cost.

これにより、荷主通知装置10は、異常気象時の措置によって運送費に変更が生じた場合に、荷主に対して、変更後の運送費で運送を継続するかなどを確認できる。 As a result, the shipper notification device 10 can confirm with the shipper whether to continue transportation with the changed transportation cost when the transportation cost is changed due to the measures in the event of abnormal weather.

また、荷主通知装置10によって実行される、到着予定時刻を通知する処理は、到着予定時刻が元の到着予定時刻と異なる場合に、到着予定時刻を第2のコンピュータに通知する処理を含む。 Further, the process of notifying the estimated time of arrival, which is executed by the shipper notification device 10, includes a process of notifying the second computer of the estimated time of arrival when the estimated time of arrival is different from the original estimated time of arrival.

これにより、荷主通知装置10は、到着予定時刻に変更が生じ、荷主に対して通知が必要な場合のみ、荷主端末300に対して通知できる。 As a result, the shipper notification device 10 can notify the shipper terminal 300 only when the estimated time of arrival is changed and the shipper needs to be notified.

また、荷主通知装置10はさらに、車両のドライバーの休憩時間を含んだ走行予定時刻を算出する。 Further, the shipper notification device 10 further calculates a scheduled travel time including a break time of the driver of the vehicle.

これにより、荷主通知装置10は、厚生労働省によって策定された基準を遵守するための情報を提供できる。 Thereby, the shipper notification device 10 can provide information for complying with the standard established by the Ministry of Health, Labor and Welfare.

[システム]
上記文書中や図面中で示した処理手順、制御手順、具体的名称、各種のデータやパラメータを含む情報については、特記する場合を除いて任意に変更できる。また、実施例で説明した具体例、分布、数値などは、あくまで一例であり、任意に変更できる。
[system]
Information including processing procedures, control procedures, specific names, various data and parameters shown in the above documents and drawings can be arbitrarily changed unless otherwise specified. Further, the specific examples, distributions, numerical values, etc. described in the examples are merely examples and can be arbitrarily changed.

また、図示した各装置の各構成要素は機能概念的なものであり、必ずしも物理的に図示の如く構成されていることを要しない。すなわち、各装置の分散や統合の具体的形態は図示のものに限られない。つまり、その全部または一部を、各種の負荷や使用状況などに応じて、任意の単位で機能的または物理的に分散・統合して構成できる。さらに、各装置にて行われる各処理機能は、その全部または任意の一部が、CPUおよび当該CPUにて解析実行されるプログラムにて実現され、あるいは、ワイヤードロジックによるハードウェアとして実現され得る。 Further, each component of each of the illustrated devices is a functional concept, and does not necessarily have to be physically configured as shown in the figure. That is, the specific form of distribution or integration of each device is not limited to the one shown in the figure. That is, all or part of them can be functionally or physically distributed / integrated in any unit according to various loads and usage conditions. Further, each processing function performed by each device may be realized by a CPU and a program analyzed and executed by the CPU, or may be realized as hardware by wired logic.

[ハードウェア]
図9は、ハードウェア構成例を説明する図である。図9に示すように、荷主通知装置10は、通信インタフェース10a、HDD(Hard Disk Drive)10b、メモリ10c、プロセッサ10dを有する。また、図9に示した各部は、バスなどで相互に接続される。
[hardware]
FIG. 9 is a diagram illustrating a hardware configuration example. As shown in FIG. 9, the shipper notification device 10 includes a communication interface 10a, an HDD (Hard Disk Drive) 10b, a memory 10c, and a processor 10d. Further, the parts shown in FIG. 9 are connected to each other by a bus or the like.

通信インタフェース10aは、ネットワークインタフェースカードなどであり、他のサーバとの通信を行う。HDD10bは、図2に示した機能を動作させるプログラムや各種データを記憶する。 The communication interface 10a is a network interface card or the like, and communicates with another server. The HDD 10b stores a program for operating the function shown in FIG. 2 and various data.

プロセッサ10dは、図2に示した各処理部と同様の処理を実行するプログラムをHDD10bなどから読み出してメモリ10cに展開することで、図2などで説明した各機能を実行するプロセスを動作させるハードウェア回路である。すなわち、このプロセスは、荷主通知装置10が有する各処理部と同様の機能を実行する。具体的には、プロセッサ10dは、判定部41、算出部42、通知部43、および作成部44などと同様の機能を有するプログラムをHDD10bなどから読み出す。そして、プロセッサ10dは、判定部41、算出部42、通知部43、および作成部44などと同様の処理を実行するプロセスを実行する。 The processor 10d reads a program that executes the same processing as each processing unit shown in FIG. 2 from the HDD 10b or the like and expands the program into the memory 10c to operate the process that executes each function described in FIG. 2 or the like. It is a wear circuit. That is, this process executes the same function as each processing unit of the shipper notification device 10. Specifically, the processor 10d reads a program having the same functions as the determination unit 41, the calculation unit 42, the notification unit 43, the creation unit 44, and the like from the HDD 10b and the like. Then, the processor 10d executes a process of executing the same processing as the determination unit 41, the calculation unit 42, the notification unit 43, the creation unit 44, and the like.

このように荷主通知装置10は、図2に示した各処理部と同様の処理を実行するプログラムを読み出して実行することで気象情報可視化処理を実行する情報処理装置として動作する。また、荷主通知装置10は、媒体読取装置によって記録媒体からプログラムを読み出し、読み出されたプログラムを実行することで上述した実施例と同様の機能を実現することもできる。なお、この他の実施例でいうプログラムは、荷主通知装置10によって実行されることに限定されるものではない。例えば、他のコンピュータまたはサーバがプログラムを実行する場合や、これらが協働してプログラムを実行するような場合にも、本発明を同様に適用できる。 In this way, the shipper notification device 10 operates as an information processing device that executes weather information visualization processing by reading and executing a program that executes the same processing as each processing unit shown in FIG. 2. Further, the shipper notification device 10 can also realize the same function as the above-described embodiment by reading a program from the recording medium by the medium reading device and executing the read program. The program referred to in the other embodiment is not limited to being executed by the shipper notification device 10. For example, the present invention can be similarly applied when other computers or servers execute programs, or when they execute programs in cooperation with each other.

また、図2に示した各処理部と同様の処理を実行するプログラムは、インターネットなどのネットワークを介して配布できる。また、このプログラムは、ハードディスク、フレキシブルディスク(FD)、CD-ROM、MO(Magneto-Optical disk)、DVD(Digital Versatile Disc)などのコンピュータで読み取り可能な記録媒体に記録され、コンピュータによって記録媒体から読み出されることによって実行できる。 Further, a program that executes the same processing as each processing unit shown in FIG. 2 can be distributed via a network such as the Internet. In addition, this program is recorded on a computer-readable recording medium such as a hard disk, flexible disk (FD), CD-ROM, MO (Magnet-Optical disk), DVD (Digital Versaille Disc), and is recorded from the recording medium by the computer. It can be executed by being read.

以上の実施例を含む実施形態に関し、さらに以下の付記を開示する。 The following additional notes will be further disclosed with respect to the embodiments including the above embodiments.

(付記1)コンピュータに、
荷物を運送する車両の走行予定情報および気象情報に基づいて、異常気象の発生位置が走行予定時刻の走行予定経路上にあるかを判定し、
発生位置が走行予定時刻の走行予定経路上にあると判定された場合、走行予定情報および気象情報に基づいて、目的地への到着予定時刻を算出し、
到着予定時刻を、荷物の荷主の利用する第2のコンピュータに通知する
処理を実行させることを特徴とする荷主通知プログラム。
(Appendix 1) To the computer
Based on the travel schedule information and weather information of the vehicle carrying the luggage, it is determined whether the position where the abnormal weather occurs is on the travel schedule route at the scheduled travel time.
If it is determined that the position of occurrence is on the scheduled travel route at the scheduled travel time, the estimated arrival time to the destination is calculated based on the scheduled travel information and weather information.
A shipper notification program characterized by executing a process of notifying a second computer used by a package shipper of the estimated time of arrival.

(付記2)コンピュータに、
発生位置が走行予定時刻の走行予定経路上にあると判定された場合、走行予定情報および気象情報に基づいて、車両の代替経路を作成する
処理をさらに実行させ、
到着予定時刻を算出する処理は、代替経路に基づいて、到着予定時刻を算出する処理を含むことを特徴とする付記1に記載の荷主通知プログラム。
(Appendix 2) To the computer
If it is determined that the position of occurrence is on the planned travel route at the scheduled travel time, the process of creating an alternative route for the vehicle is further executed based on the travel schedule information and the weather information.
The shipper notification program according to Appendix 1, wherein the process of calculating the estimated time of arrival includes a process of calculating the estimated time of arrival based on an alternative route.

(付記3)コンピュータに、
発生位置が走行予定時刻の走行予定経路上にあると判定された場合、道路ごとに制限速度を算出する
処理をさらに実行させ、
到着予定時刻を算出する処理は、制限速度に基づいて、到着予定時刻を算出する処理を含むことを特徴とする付記1に記載の荷主通知プログラム。
(Appendix 3) To the computer
If it is determined that the position of occurrence is on the planned travel route at the scheduled travel time, the process of calculating the speed limit for each road is further executed.
The shipper notification program according to Appendix 1, wherein the process of calculating the estimated time of arrival includes a process of calculating the estimated time of arrival based on the speed limit.

(付記4)コンピュータに、
気象情報に基づいて、降雨量、風速、もしくは降雪量が閾値以上、または濃霧もしくは風雪によって視界が閾値以下のいずれかである位置を発生位置に決定する
処理をさらに実行させることを特徴とする付記1に記載の荷主通知プログラム。
(Appendix 4) To the computer
Addendum, which further executes a process of determining a position where the amount of rainfall, wind speed, or amount of snowfall is equal to or higher than the threshold value, or the visibility is equal to or lower than the threshold value due to heavy fog or wind and snow, based on the weather information. Shipper notification program according to 1.

(付記5)コンピュータに、
代替経路に基づいて、荷物の運送費を算出し、
運送費が元の費用と異なる場合に、運送費を第2のコンピュータに通知する
処理をさらに実行させることを特徴とする付記2に記載の荷主通知プログラム。
(Appendix 5) To the computer
Calculate the freight cost of the package based on the alternative route,
The shipper notification program according to Appendix 2, wherein the process of notifying the second computer of the freight cost is further executed when the freight cost is different from the original cost.

(付記6)到着予定時刻を通知する処理は、到着予定時刻が元の到着予定時刻と異なる場合に、到着予定時刻を第2のコンピュータに通知する処理を含むことを特徴とする付記1に記載の荷主通知プログラム。 (Appendix 6) The process of notifying the estimated time of arrival is described in Appendix 1, which includes a process of notifying the second computer of the estimated time of arrival when the estimated time of arrival is different from the original estimated time of arrival. Shipper notification program.

(付記7)コンピュータに、
車両のドライバーの休憩時間を含んだ走行予定時刻を算出する
処理をさらに実行させることを特徴とする付記1に記載の荷主通知プログラム。
(Appendix 7) To the computer
The shipper notification program according to Appendix 1, wherein the process of calculating the scheduled travel time including the break time of the driver of the vehicle is further executed.

(付記8)コンピュータが、
荷物を運送する車両の走行予定情報および気象情報に基づいて、異常気象の発生位置が走行予定時刻の走行予定経路上にあるかを判定し、
発生位置が走行予定時刻の走行予定経路上にあると判定された場合、走行予定情報および気象情報に基づいて、目的地への到着予定時刻を算出し、
到着予定時刻を、荷物の荷主の利用する第2のコンピュータに通知する
処理を実行することを特徴とする方法。
(Appendix 8) The computer
Based on the travel schedule information and weather information of the vehicle carrying the luggage, it is determined whether the position where the abnormal weather occurs is on the travel schedule route at the scheduled travel time.
If it is determined that the position of occurrence is on the scheduled travel route at the scheduled travel time, the estimated arrival time to the destination is calculated based on the scheduled travel information and weather information.
A method characterized by executing a process of notifying a second computer used by a package shipper of an estimated time of arrival.

(付記9)コンピュータが、
発生位置が走行予定時刻の走行予定経路上にあると判定された場合、走行予定情報および気象情報に基づいて、車両の代替経路を作成する
処理をさらに実行し、
到着予定時刻を算出する処理は、代替経路に基づいて、到着予定時刻を算出する処理を含むことを特徴とする付記8に記載の方法。
(Appendix 9) The computer
If it is determined that the position of occurrence is on the planned travel route at the scheduled travel time, the process of creating an alternative route for the vehicle based on the scheduled travel information and the weather information is further executed.
The method according to Appendix 8, wherein the process of calculating the estimated time of arrival includes a process of calculating the estimated time of arrival based on an alternative route.

(付記10)コンピュータが、
発生位置が走行予定時刻の走行予定経路上にあると判定された場合、道路ごとに制限速度を算出する
処理をさらに実行し、
到着予定時刻を算出する処理は、制限速度に基づいて、到着予定時刻を算出する処理を含むことを特徴とする付記8に記載の方法。
(Appendix 10) The computer
If it is determined that the position of occurrence is on the planned travel route at the scheduled travel time, the process of calculating the speed limit for each road is further executed.
The method according to Appendix 8, wherein the process of calculating the estimated time of arrival includes a process of calculating the estimated time of arrival based on the speed limit.

(付記11)コンピュータが、
気象情報に基づいて、降雨量、風速、もしくは降雪量が閾値以上、または濃霧もしくは風雪によって視界が閾値以下のいずれかである位置を発生位置に決定する
処理をさらに実行することを特徴とする付記8に記載の方法。
(Appendix 11) The computer
Addendum, which further executes a process of determining a position where the amount of rainfall, wind speed, or amount of snowfall is equal to or higher than the threshold value, or the visibility is equal to or lower than the threshold value due to heavy fog or wind and snow, based on the meteorological information. 8. The method according to 8.

(付記12)コンピュータが、
代替経路に基づいて、荷物の運送費を算出し、
運送費が元の費用と異なる場合に、運送費を第2のコンピュータに通知する
処理をさらに実行することを特徴とする付記8に記載の方法。
(Appendix 12) The computer
Calculate the freight cost of the package based on the alternative route,
The method according to Appendix 8, wherein the process of notifying the second computer of the freight cost is further executed when the freight cost is different from the original cost.

(付記13)到着予定時刻を通知する処理は、到着予定時刻が元の到着予定時刻と異なる場合に、到着予定時刻を第2のコンピュータに通知する処理を含むことを特徴とする付記8に記載の方法。 (Appendix 13) The process of notifying the estimated time of arrival is described in Appendix 8, which includes a process of notifying the second computer of the estimated time of arrival when the estimated time of arrival is different from the original estimated time of arrival. the method of.

(付記14)コンピュータが、
車両のドライバーの休憩時間を含んだ走行予定時刻を算出する
処理をさらに実行することを特徴とする付記8に記載の方法。
(Appendix 14) The computer
The method according to Appendix 8, wherein the process of calculating the scheduled travel time including the break time of the driver of the vehicle is further executed.

(付記15)荷物を運送する車両の走行予定情報および気象情報に基づいて、異常気象の発生位置が走行予定時刻の走行予定経路上にあるかを判定する判定部と、
発生位置が走行予定時刻の走行予定経路上にあると判定された場合、走行予定情報および気象情報に基づいて、目的地への到着予定時刻を算出する算出部と、
到着予定時刻を、荷物の荷主の利用する第2のコンピュータに通知する通知部と
を有することを特徴とする装置。
(Appendix 15) A determination unit that determines whether the position where abnormal weather occurs is on the planned travel route at the scheduled travel time, based on the travel schedule information and weather information of the vehicle that carries the luggage.
When it is determined that the occurrence position is on the scheduled travel route at the scheduled travel time, a calculation unit that calculates the estimated arrival time to the destination based on the scheduled travel information and the weather information,
A device characterized by having a notification unit that notifies a second computer used by the shipper of the package of the estimated time of arrival.

(付記16)発生位置が走行予定時刻の走行予定経路上にあると判定された場合、走行予定情報および気象情報に基づいて、車両の代替経路を作成する作成部
をさらに有し、
到着予定時刻を算出する処理は、代替経路に基づいて、到着予定時刻を算出する処理を含むことを特徴とする付記15に記載の装置。
(Appendix 16) When it is determined that the position of occurrence is on the planned travel route at the scheduled travel time, it further has a creation unit that creates an alternative route for the vehicle based on the travel schedule information and the weather information.
The apparatus according to Appendix 15, wherein the process of calculating the estimated time of arrival includes a process of calculating the estimated time of arrival based on an alternative route.

(付記17)算出部はさらに、発生位置が走行予定時刻の走行予定経路上にあると判定された場合、道路ごとに制限速度を算出し、
到着予定時刻を算出する処理は、制限速度に基づいて、到着予定時刻を算出する処理を含むことを特徴とする付記15に記載の装置。
(Appendix 17) If it is determined that the occurrence position is on the planned travel route at the scheduled travel time, the calculation unit further calculates the speed limit for each road.
The apparatus according to Appendix 15, wherein the process of calculating the estimated time of arrival includes a process of calculating the estimated time of arrival based on the speed limit.

(付記18)判定部はさらに、気象情報に基づいて、降雨量、風速、もしくは降雪量が閾値以上、または濃霧もしくは風雪によって視界が閾値以下のいずれかである位置を発生位置に決定することを特徴とする付記15に記載の装置。 (Appendix 18) The determination unit further determines, based on the meteorological information, a position where the amount of rainfall, wind speed, or amount of snowfall is equal to or higher than the threshold value, or the visibility is equal to or lower than the threshold value due to heavy fog or wind and snow. The apparatus according to Appendix 15, which is characterized.

(付記19)算出部はさらに、代替経路に基づいて、荷物の運送費を算出し、
通知部はさらに、運送費が元の費用と異なる場合に、運送費を第2のコンピュータに通知することを特徴とする付記16に記載の装置。
(Appendix 19) The calculation unit further calculates the freight cost of the cargo based on the alternative route.
The device according to Appendix 16, wherein the notification unit further notifies the second computer of the transportation cost when the transportation cost is different from the original cost.

(付記20)到着予定時刻を通知する処理は、到着予定時刻が元の到着予定時刻と異なる場合に、到着予定時刻を第2のコンピュータに通知する処理を含むことを特徴とする付記15に記載の装置。 (Appendix 20) The process of notifying the estimated time of arrival is described in Appendix 15, which includes a process of notifying the second computer of the estimated time of arrival when the estimated time of arrival is different from the original estimated time of arrival. Equipment.

(付記21)算出部はさらに、車両のドライバーの休憩時間を含んだ走行予定時刻を算出することを特徴とする付記15に記載の装置。 (Supplementary Note 21) The device according to Supplementary Note 15, wherein the calculation unit further calculates a scheduled travel time including a break time of the driver of the vehicle.

(付記22)プロセッサと、
プロセッサに動作可能に接続されたメモリと
を備えた装置であって、プロセッサは、
荷物を運送する車両の走行予定情報および気象情報に基づいて、異常気象の発生位置が走行予定時刻の走行予定経路上にあるかを判定する判定部と、
発生位置が走行予定時刻の走行予定経路上にあると判定された場合、走行予定情報および気象情報に基づいて、目的地への到着予定時刻を算出する算出部と、
到着予定時刻を、荷物の荷主の利用する第2のコンピュータに通知する通知部と
を有することを特徴とする装置。
(Appendix 22) Processor and
A device with memory operably connected to a processor, the processor is
Based on the travel schedule information and weather information of the vehicle that carries the luggage, a determination unit that determines whether the position where abnormal weather occurs is on the travel schedule route at the scheduled travel time, and
When it is determined that the occurrence position is on the scheduled travel route at the scheduled travel time, a calculation unit that calculates the estimated arrival time to the destination based on the scheduled travel information and the weather information,
A device characterized by having a notification unit that notifies a second computer used by the shipper of the package of the estimated time of arrival.

1 荷主通知システム
10 荷主通知装置
20 通信部
30 記憶部
31 走行予定情報
32 気象情報
33 荷主情報
40 制御部
41 判定部
42 算出部
43 通知部
44 作成部
100 運行管理者端末
200 車両
300 荷主端末
1 Shipper notification system 10 Shipper notification device 20 Communication unit 30 Storage unit 31 Travel schedule information 32 Meteorological information 33 Shipper information 40 Control unit 41 Judgment unit 42 Calculation unit 43 Notification unit 44 Creation unit 100 Operation manager terminal 200 Vehicle 300 Shipper terminal

Claims (9)

コンピュータに、
荷物を運送する車両の走行予定情報および気象情報に基づいて、異常気象の発生位置が走行予定時刻の走行予定経路上にあるかを判定し、
前記発生位置が前記走行予定時刻の前記走行予定経路上にあると判定された場合、前記走行予定情報および前記気象情報に基づいて、目的地への到着予定時刻を算出し、
前記到着予定時刻を、前記荷物の荷主の利用する第2のコンピュータに通知する
処理を実行させることを特徴とする荷主通知プログラム。
On the computer
Based on the travel schedule information and weather information of the vehicle carrying the luggage, it is determined whether the position where the abnormal weather occurs is on the travel schedule route at the scheduled travel time.
When it is determined that the occurrence position is on the planned travel route at the scheduled travel time, the estimated arrival time to the destination is calculated based on the travel schedule information and the weather information.
A shipper notification program characterized by executing a process of notifying a second computer used by the shipper of the package of the estimated time of arrival.
前記コンピュータに、
前記発生位置が前記走行予定時刻の前記走行予定経路上にあると判定された場合、前記走行予定情報および前記気象情報に基づいて、前記車両の代替経路を作成する
処理をさらに実行させ、
前記到着予定時刻を算出する処理は、前記代替経路に基づいて、前記到着予定時刻を算出する処理を含むことを特徴とする請求項1に記載の荷主通知プログラム。
To the computer
When it is determined that the occurrence position is on the planned travel route at the scheduled travel time, a process of creating an alternative route for the vehicle is further executed based on the travel schedule information and the weather information.
The shipper notification program according to claim 1, wherein the process of calculating the estimated time of arrival includes a process of calculating the estimated time of arrival based on the alternative route.
前記コンピュータに、
前記発生位置が前記走行予定時刻の前記走行予定経路上にあると判定された場合、道路ごとに制限速度を算出する
処理をさらに実行させ、
前記到着予定時刻を算出する処理は、前記制限速度に基づいて、前記到着予定時刻を算出する処理を含むことを特徴とする請求項1に記載の荷主通知プログラム。
To the computer
When it is determined that the occurrence position is on the planned travel route at the scheduled travel time, the process of calculating the speed limit for each road is further executed.
The shipper notification program according to claim 1, wherein the process of calculating the estimated time of arrival includes a process of calculating the estimated time of arrival based on the speed limit.
前記コンピュータに、
前記気象情報に基づいて、降雨量、風速、もしくは降雪量が閾値以上、または濃霧もしくは風雪によって視界が閾値以下のいずれかである位置を前記発生位置に決定する
処理をさらに実行させることを特徴とする請求項1に記載の荷主通知プログラム。
To the computer
Based on the meteorological information, it is characterized by further executing a process of determining a position where the amount of rainfall, wind speed, or amount of snowfall is equal to or higher than the threshold value, or the visibility is equal to or lower than the threshold value due to heavy fog or wind and snow. The shipper notification program according to claim 1.
前記コンピュータに、
前記代替経路に基づいて、前記荷物の運送費を算出し、
前記運送費が元の費用と異なる場合に、前記運送費を前記第2のコンピュータに通知する
処理をさらに実行させることを特徴とする請求項2に記載の荷主通知プログラム。
To the computer
Based on the alternative route, the freight cost of the baggage is calculated.
The shipper notification program according to claim 2, wherein when the transportation cost is different from the original cost, the process of notifying the second computer of the transportation cost is further executed.
前記到着予定時刻を通知する処理は、前記到着予定時刻が元の到着予定時刻と異なる場合に、前記到着予定時刻を前記第2のコンピュータに通知する処理を含むことを特徴とする請求項1に記載の荷主通知プログラム。 The first aspect of claim 1, wherein the process of notifying the estimated time of arrival includes a process of notifying the second computer of the estimated time of arrival when the estimated time of arrival is different from the original estimated time of arrival. The shipper notification program described. 前記コンピュータに、
前記車両のドライバーの休憩時間を含んだ前記走行予定時刻を算出する
処理をさらに実行させることを特徴とする請求項1に記載の荷主通知プログラム。
To the computer
The shipper notification program according to claim 1, wherein the process of calculating the scheduled travel time including the break time of the driver of the vehicle is further executed.
コンピュータが、
荷物を運送する車両の走行予定情報および気象情報に基づいて、異常気象の発生位置が走行予定時刻の走行予定経路上にあるかを判定し、
前記発生位置が前記走行予定時刻の前記走行予定経路上にあると判定された場合、前記走行予定情報および前記気象情報に基づいて、目的地への到着予定時刻を算出し、
前記到着予定時刻を、前記荷物の荷主の利用する第2のコンピュータに通知する
処理を実行することを特徴とする方法。
The computer
Based on the travel schedule information and weather information of the vehicle carrying the luggage, it is determined whether the position where the abnormal weather occurs is on the travel schedule route at the scheduled travel time.
When it is determined that the occurrence position is on the planned travel route at the scheduled travel time, the estimated arrival time to the destination is calculated based on the travel schedule information and the weather information.
A method comprising executing a process of notifying a second computer used by the shipper of the package of the estimated time of arrival.
荷物を運送する車両の走行予定情報および気象情報に基づいて、異常気象の発生位置が走行予定時刻の走行予定経路上にあるかを判定する判定部と、
前記発生位置が前記走行予定時刻の前記走行予定経路上にあると判定された場合、前記走行予定情報および前記気象情報に基づいて、目的地への到着予定時刻を算出する算出部と、
前記到着予定時刻を、前記荷物の荷主の利用する第2のコンピュータに通知する通知部と
を有することを特徴とする装置。
Based on the travel schedule information and weather information of the vehicle that carries the luggage, a determination unit that determines whether the position where abnormal weather occurs is on the travel schedule route at the scheduled travel time, and
When it is determined that the occurrence position is on the planned travel route at the scheduled travel time, a calculation unit that calculates the estimated time of arrival at the destination based on the travel schedule information and the weather information, and a calculation unit.
A device including a notification unit that notifies a second computer used by the shipper of the package of the estimated time of arrival.
JP2020131172A 2020-07-31 2020-07-31 Shipper notification program, method, and system Pending JP2022027275A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020131172A JP2022027275A (en) 2020-07-31 2020-07-31 Shipper notification program, method, and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020131172A JP2022027275A (en) 2020-07-31 2020-07-31 Shipper notification program, method, and system

Publications (1)

Publication Number Publication Date
JP2022027275A true JP2022027275A (en) 2022-02-10

Family

ID=80264501

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020131172A Pending JP2022027275A (en) 2020-07-31 2020-07-31 Shipper notification program, method, and system

Country Status (1)

Country Link
JP (1) JP2022027275A (en)

Similar Documents

Publication Publication Date Title
US20170178500A1 (en) Management of mobile objects and service platform for mobile objects
EP3165034B1 (en) Automatic geofence determination
EP2973492B1 (en) Traffic causality
JP5013211B2 (en) Driving evaluation system and driving evaluation program
EP3496064A2 (en) Method and apparatus for publishing road event messages
US20140229255A1 (en) Incentive-based traffic management
AU2017213574A1 (en) Public Transportation Navigator
EP1736735A1 (en) Travel time database generating device and method
US10012512B2 (en) Operation support method and operation support device
US20200378780A1 (en) Method and apparatus for providing an intermodal route isoline map
WO2022193995A1 (en) Map updating method, and map-based driving decision-making method and apparatus
Jomrich et al. Dynamic Map Update Protocol for Highly Automated Driving Vehicles.
CN112997226A (en) Information processing method and information processing system
US8972172B2 (en) Wireless sensor network traffic navigation analytics
Iwan et al. Impact of telematics on efficiency of urban freight transport
CN111016909A (en) Road bump information prompting method and device
JP2022027275A (en) Shipper notification program, method, and system
JP6447269B2 (en) Trigger condition determining program, trigger condition determining method, and trigger condition determining apparatus
JP5116728B2 (en) Traffic information processing system
Metz The impact of digital navigation on travel behaviour
JP6847794B2 (en) Message delivery control system and telematics center
JP2020113114A (en) Server, system, method, and computer program
JP2011070302A (en) Vehicle management device
JP2022027239A (en) Route information visualization program, method, and system
Abbasi et al. Integrating Weather and Orography Information in Trip Planning Systems for Heavy Goods Vehicles

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230404

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20231117

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20231121

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240117

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240213

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240325

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20240514