JP2021058056A - Cable tie attachment device - Google Patents

Cable tie attachment device Download PDF

Info

Publication number
JP2021058056A
JP2021058056A JP2019181780A JP2019181780A JP2021058056A JP 2021058056 A JP2021058056 A JP 2021058056A JP 2019181780 A JP2019181780 A JP 2019181780A JP 2019181780 A JP2019181780 A JP 2019181780A JP 2021058056 A JP2021058056 A JP 2021058056A
Authority
JP
Japan
Prior art keywords
binding band
attachment device
holding
cable
rod member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2019181780A
Other languages
Japanese (ja)
Inventor
海人 上野
Kaito Ueno
海人 上野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Building Solutions Corp
Original Assignee
Mitsubishi Electric Building Techno Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Building Techno Service Co Ltd filed Critical Mitsubishi Electric Building Techno Service Co Ltd
Priority to JP2019181780A priority Critical patent/JP2021058056A/en
Publication of JP2021058056A publication Critical patent/JP2021058056A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

To provide a cable tie attachment device capable of bundling parts of multiple cables, extending in a height direction and separated from each other in a lateral direction, at height out of the reach of a worker.SOLUTION: The cable tie attachment device includes: a holding member 7 that holds a ring-shaped binding band 6 and bundles multiple wiring cables 4 inserted inside the binding band 6 by reducing the inner area of binding band 6; and a gripping member 8 that extends downward from holding member 7 and is gripped by the operator. The holding member 7 reduces the inner region of the binding band 6 by manipulating the gripping member 8.SELECTED DRAWING: Figure 2

Description

この発明は、結束バンドの取付装置に関する。 The present invention relates to a cable tie attachment device.

従来、結束バンドを結束対象物の外周に巻いて、結束バンドの先端部を結束バンドの孔に挿入する巻部と、操作されることによって、巻部を動作させる操作部とを備えた結束バンドの取付装置が知られている(例えば、特許文献1参照)。 Conventionally, a binding band including a winding portion in which a binding band is wound around the outer circumference of an object to be bound and the tip end portion of the binding band is inserted into a hole of the binding band, and an operation portion that operates the winding portion by being operated. Is known (see, for example, Patent Document 1).

特開2000−85718号公報Japanese Unexamined Patent Publication No. 2000-85718

しかしながら、高さ方向に延び横方向に互いに離れた複数のケーブルであって、作業者の手が届かない高さ位置にある部分を束ねることができないという問題点があった。 However, there is a problem that a plurality of cables extending in the height direction and separated from each other in the lateral direction cannot be bundled at a height position beyond the reach of an operator.

この発明は、上述のような課題を解決するためになされたものであり、その目的は、高さ方向に延び横方向に互いに離れた複数のケーブルであって、作業者の手が届かない高さ位置にある部分を束ねることができる結束バンドの取付装置を提供するものである。 The present invention has been made to solve the above-mentioned problems, and an object thereof is a plurality of cables extending in the height direction and separated from each other in the lateral direction, and the height is out of reach of an operator. It provides an attachment device for a cable tie that can bundle the parts in the position.

この発明に係る結束バンドの取付装置は、環状の結束バンドを保持し、結束バンドの内側領域を小さくすることによって、結束バンドの内側に挿入された複数のケーブルが束ねられる保持部材と、保持部材から下方に延び、作業者に把持される把持部材とを備え、保持部材は、把持部材が操作されることによって、結束バンドの内側領域を小さくする。 The binding band attachment device according to the present invention holds an annular binding band, and by reducing the inner region of the binding band, a holding member for bundling a plurality of cables inserted inside the binding band and a holding member. It comprises a gripping member that extends downward from the cable tie and is gripped by the operator, the holding member reducing the inner region of the cable tie by manipulating the gripping member.

この発明に係る結束バンドの取付装置によれば、高さ方向に延び横方向に互いに離れた複数のケーブルであって、作業者の手が届かない高さ位置にある部分を束ねることができる。 According to the binding band attachment device according to the present invention, it is possible to bundle a plurality of cables extending in the height direction and separated from each other in the lateral direction at a height position beyond the reach of an operator.

この発明の実施の形態1に係る結束バンドの取付装置が用いられるエレベーター装置を示す正面図である。It is a front view which shows the elevator device which uses the cable tie attachment device which concerns on Embodiment 1 of this invention. この発明の実施の形態1に係る結束バンドの取付装置を示す正面図である。It is a front view which shows the attachment device of the binding band which concerns on Embodiment 1 of this invention. 図2の結束バンドの取付装置を示す平面図である。It is a top view which shows the attachment device of the binding band of FIG.

実施の形態1.
図1は、この発明の実施の形態1に係る結束バンドの取付装置が用いられるエレベーター装置を示す正面図である。エレベーター装置は、昇降路を昇降するかご1と、かご1の上部に設けられたかご上装置2、かご1の内部に設けられたかご内操作盤3と、かご上装置2とかご内操作盤3とに接続された配線ケーブル4とを備えている。配線ケーブル4は、かご1の上部からかご1の側面を通って、かご1の下部において内部に挿入されている。図1では、1本の配線ケーブル4が示されているが、エレベーター装置は、複数の配線ケーブル4を備えている。配線ケーブル4は、高さ方向に延び横方向に互いに離れて配置されている。
Embodiment 1.
FIG. 1 is a front view showing an elevator device in which the binding band attachment device according to the first embodiment of the present invention is used. The elevator device includes a car 1 for raising and lowering a hoistway, a car upper device 2 provided on the upper part of the car 1, an in-car operation panel 3 provided inside the car 1, a car upper device 2 and an in-car operation panel. It is provided with a wiring cable 4 connected to 3. The wiring cable 4 is inserted inside the lower part of the car 1 from the upper part of the car 1 through the side surface of the car 1. Although one wiring cable 4 is shown in FIG. 1, the elevator device includes a plurality of wiring cables 4. The wiring cables 4 extend in the height direction and are arranged apart from each other in the lateral direction.

次に、複数の配線ケーブル4を束ねる結束バンドの取付装置について説明する。なお、結束バンドの取付装置は、配線ケーブル4に限らず、例えば、かご1の下部に接続された複数の制御ケーブル5を束ねてもよい。 Next, a binding band attachment device for bundling a plurality of wiring cables 4 will be described. The binding band attachment device is not limited to the wiring cable 4, and for example, a plurality of control cables 5 connected to the lower part of the car 1 may be bundled.

図2は、この発明の実施の形態1に係る結束バンドの取付装置を示す正面図である。図3は、図2の結束バンドの取付装置を示す平面図である。結束バンドの取付装置は、結束バンド6を保持する保持部材7と、保持部材7から下方に延び、作業者に把持される把持部材8とを備えている。 FIG. 2 is a front view showing a cable tie attachment device according to the first embodiment of the present invention. FIG. 3 is a plan view showing a cable tie attachment device of FIG. The binding band attachment device includes a holding member 7 that holds the binding band 6, and a grip member 8 that extends downward from the holding member 7 and is gripped by an operator.

保持部材7は、基部71と、基部71の上部に設けられた一対のケーブル保持部72とを有している。一対のケーブル保持部72のそれぞれは、環状の結束バンド6を保持する。一対のケーブル保持部72のうちの一方を第1ケーブル保持部72Aとし、他方を第2ケーブル保持部72Bとする。 The holding member 7 has a base portion 71 and a pair of cable holding portions 72 provided on the upper portion of the base portion 71. Each of the pair of cable holding portions 72 holds an annular binding band 6. One of the pair of cable holding portions 72 is referred to as a first cable holding portion 72A, and the other is referred to as a second cable holding portion 72B.

第1ケーブル保持部72Aは、基部71に固定されている。第2ケーブル保持部72Bは、基部71に対して幅方向Aにスライド可能となっている。第2ケーブル保持部72Bが第1ケーブル保持部72Aに近づくように、第2ケーブル保持部72Bが基部71に対してスライドすることによって、結束バンド6の内側領域が小さくなる。結束バンド6の内側領域が小さくなることによって、結束バンド6の内側に挿入された複数の配線ケーブル4が束ねられる。束ねられる複数の配線ケーブル4は、基部71の側面に沿うように配置される。これにより、結束バンド6を用いて、複数の配線ケーブル4を強く束ねることができる。 The first cable holding portion 72A is fixed to the base portion 71. The second cable holding portion 72B is slidable in the width direction A with respect to the base portion 71. As the second cable holding portion 72B slides with respect to the base portion 71 so that the second cable holding portion 72B approaches the first cable holding portion 72A, the inner region of the binding band 6 becomes smaller. By reducing the inner region of the binding band 6, a plurality of wiring cables 4 inserted inside the binding band 6 are bundled. The plurality of wiring cables 4 to be bundled are arranged along the side surface of the base 71. As a result, the plurality of wiring cables 4 can be strongly bundled by using the binding band 6.

また、結束バンドの取付装置は、結束バンド6が複数の配線ケーブル4を束ねた場合に、結束バンド6における余剰部分61を切断する図示しない切断部材を備えている。切断部材としては、カッター、はさみなどが挙げられる。また、結束バンドの取付装置は、切断された余剰部分61を受ける図示しない受け皿を備えている。 Further, the binding band attachment device includes a cutting member (not shown) that cuts the excess portion 61 of the binding band 6 when the binding band 6 bundles a plurality of wiring cables 4. Examples of the cutting member include a cutter and scissors. In addition, the binding band attachment device includes a saucer (not shown) that receives the cut surplus portion 61.

把持部材8は、第1棒部材81と、第1棒部材に隣り合うように設けられた第2棒部材82とを有している。第1棒部材81は、基部71に固定されている。第2棒部材82は、作業者によって第2棒部材82が操作されることによって、基部71に対してスライド可能となっている。第2棒部材82が基部71に対してスライドすることによって、第2ケーブル保持部72Bが基部71に対してスライドする。したがって、保持部材7は、把持部材8が操作されることによって、結束バンドの内側領域を小さくする。 The gripping member 8 has a first rod member 81 and a second rod member 82 provided adjacent to the first rod member. The first rod member 81 is fixed to the base 71. The second rod member 82 can be slidable with respect to the base 71 by operating the second rod member 82 by an operator. As the second rod member 82 slides with respect to the base 71, the second cable holding portion 72B slides with respect to the base 71. Therefore, the holding member 7 reduces the inner region of the binding band by operating the gripping member 8.

また、把持部材8は、第1棒部材81に設けられた切断操作部83を備えている。切断操作部83が操作されることによって、切断部材が余剰部分61を切断する。作業者の手が切断操作部83と第1棒部材81とを握ることによって、切断操作部83が操作される。 Further, the gripping member 8 includes a cutting operation unit 83 provided on the first rod member 81. By operating the cutting operation unit 83, the cutting member cuts the surplus portion 61. The cutting operation unit 83 is operated by the operator's hand grasping the cutting operation unit 83 and the first rod member 81.

把持部材8は、長手方向について伸縮可能となっている。把持部材8が長手方向に伸縮することによって、保持部材7の高さ位置が変化する。 The grip member 8 can be expanded and contracted in the longitudinal direction. As the gripping member 8 expands and contracts in the longitudinal direction, the height position of the holding member 7 changes.

また、把持部材8は、図示しない保持解除操作部を備えている。保持解除操作部は、第1棒部材81または第2棒部材82に設けられている。作業者が保持解除操作部を操作することによって、一対のケーブル保持部72による結束バンド6の保持が解除される。これにより、結束バンドが結束バンドの取付装置から取り外される。 Further, the gripping member 8 includes a holding / releasing operation unit (not shown). The holding release operation unit is provided on the first rod member 81 or the second rod member 82. When the operator operates the holding / releasing operation unit, the holding of the binding band 6 by the pair of cable holding parts 72 is released. As a result, the cable tie is removed from the cable tie attachment device.

次に、結束バンドの取付装置を用いて、複数の配線ケーブル4を束ねる手順について説明する。複数の配線ケーブル4における束ねられる部分は、設定された高さ位置の部分であり、また、作業者の手が届かない高さ位置にある部分である。まず、作業者は、複数の配線ケーブル4における作業者の手が届く高さ位置の部分を束ねて、束ねられた配線ケーブル4の周囲を囲むように環状の結束バンド6を配置する。また、結束バンド6を保持部材7に取り付ける。この時、結束バンド6は、配線ケーブル4に対して高さ方向に移動可能である。言い換えれば、結束バンド6は、配線ケーブル4に対して仮止めされた状態である。 Next, a procedure for bundling a plurality of wiring cables 4 using a binding band attachment device will be described. The bundled portion of the plurality of wiring cables 4 is a portion at a set height position and a portion at a height position that is out of the reach of the operator. First, the operator bundles the portions of the plurality of wiring cables 4 at height positions that the operator can reach, and arranges the annular binding band 6 so as to surround the bundled wiring cables 4. Further, the binding band 6 is attached to the holding member 7. At this time, the binding band 6 can move in the height direction with respect to the wiring cable 4. In other words, the binding band 6 is temporarily fixed to the wiring cable 4.

その後、作業者は、把持部材8を上方に移動させる。これにより、結束バンド6が配線ケーブル4を滑りながら上方に移動する。これにより、複数の配線ケーブル4における束ねられた部分が上方に移動する。結束バンド6が設定された高さ位置に到達した後、作業者は、把持部材8を操作する。具体的には、作業者は、第2棒部材82が第1棒部材81に近づく方向に第2棒部材82を移動させる。作業者は、第2棒部材82の移動を複数回繰り返してもよい。 After that, the operator moves the gripping member 8 upward. As a result, the binding band 6 moves upward while sliding on the wiring cable 4. As a result, the bundled portions of the plurality of wiring cables 4 move upward. After the binding band 6 reaches the set height position, the operator operates the gripping member 8. Specifically, the operator moves the second rod member 82 in the direction in which the second rod member 82 approaches the first rod member 81. The operator may repeat the movement of the second rod member 82 a plurality of times.

第2棒部材82が第1棒部材81に近づく方向に第2棒部材82が移動することによって、第2ケーブル保持部72Bが第1ケーブル保持部72Aに近づく方向に第2ケーブル保持部72Bが移動する。これにより、結束バンド6の内側領域が小さくなる。その結果、結束バンド6が複数の配線ケーブル4を強く束ねる。これにより、結束バンド6が配線ケーブル4に固定される。 As the second rod member 82 moves in the direction in which the second rod member 82 approaches the first rod member 81, the second cable holding portion 72B moves in the direction in which the second cable holding portion 72B approaches the first cable holding portion 72A. Moving. As a result, the inner region of the cable tie 6 becomes smaller. As a result, the binding band 6 strongly bundles the plurality of wiring cables 4. As a result, the binding band 6 is fixed to the wiring cable 4.

その後、作業者は、切断操作部83を操作する。切断操作部が操作されることによって、図示しない切断部材が結束バンド6の余剰部分61を切断する。 After that, the operator operates the cutting operation unit 83. By operating the cutting operation unit, a cutting member (not shown) cuts the excess portion 61 of the binding band 6.

その後、作業者は、保持解除操作部を操作する。保持解除操作部が操作されることによって、第1ケーブル保持部72Aおよび第2ケーブル保持部72Bによる配線ケーブル4の保持が解除される。以上により、結束バンドの取付装置を用いて、複数の配線ケーブル4を束ねる手順が終了する。 After that, the operator operates the holding / releasing operation unit. By operating the holding / releasing operation unit, the holding of the wiring cable 4 by the first cable holding unit 72A and the second cable holding unit 72B is released. This completes the procedure for bundling a plurality of wiring cables 4 using the binding band attachment device.

以上説明したように、この発明の実施の形態1に係る結束バンドの取付装置によれば、環状の結束バンド6を保持する保持部材7と、保持部材7から下方に延び、作業者に把持される把持部材8とを備えている。保持部材7は、把持部材8が操作されることによって、結束バンド6の内側領域を小さくする。これにより、高さ方向に延び横方向に互いに離れた複数の配線ケーブル4であって、作業者の手が届かない高さ位置にある部分を束ねることができる。 As described above, according to the binding band attachment device according to the first embodiment of the present invention, the holding member 7 that holds the annular binding band 6 and the holding member 7 that extends downward from the holding member 7 and is gripped by the operator. The grip member 8 is provided. The holding member 7 reduces the inner region of the binding band 6 by operating the gripping member 8. As a result, it is possible to bundle a plurality of wiring cables 4 that extend in the height direction and are separated from each other in the lateral direction at a height position that is out of the reach of the operator.

また、結束バンドの取付装置は、結束バンド6が複数の配線ケーブル4を束ねた場合に、結束バンド6における余剰部分61を切断する切断部材を備えている。切断部材は、把持部材8が操作されることによって、余剰部分61を切断する。これにより、余剰部分61が結束バンド6に付いたままとなることを防止することができる。 Further, the binding band attachment device includes a cutting member that cuts the excess portion 61 of the binding band 6 when the binding band 6 bundles a plurality of wiring cables 4. The cutting member cuts the surplus portion 61 by operating the gripping member 8. As a result, it is possible to prevent the surplus portion 61 from remaining attached to the binding band 6.

また、把持部材8は、長手方向について伸縮可能となっている。これにより、作業者は、脚立を用いることなく、設定された高さ位置に結束バンド6を容易に配置することができる。 Further, the gripping member 8 can be expanded and contracted in the longitudinal direction. As a result, the operator can easily arrange the cable tie 6 at the set height position without using a stepladder.

また、把持部材8は、第1棒部材81と、第1棒部材81に隣り合うように設けられた第2棒部材82とを有している。第2棒部材82が第1棒部材81に近づくことによって、保持部材7が結束バンド6の内側領域を小さくする。これにより、作業者は、把持部材8を簡単に操作することができる。 Further, the gripping member 8 has a first rod member 81 and a second rod member 82 provided adjacent to the first rod member 81. As the second rod member 82 approaches the first rod member 81, the holding member 7 reduces the inner region of the binding band 6. As a result, the operator can easily operate the grip member 8.

なお、上記実施の形態1では、かご1に隣り合う高さ位置に結束バンド6を配置する結束バンドの取付装置について説明した。しかしながら、これに限らず、昇降路の頂部の高さ位置に結束バンド6を配置する結束バンドの取付装置であってもよい。 In the first embodiment, the binding band attachment device for arranging the binding band 6 at a height position adjacent to the car 1 has been described. However, the present invention is not limited to this, and a binding band attachment device may be used in which the binding band 6 is arranged at a height position at the top of the hoistway.

1 かご、2 かご上装置、3 かご内操作盤、4 配線ケーブル、5 制御ケーブル、6 結束バンド、7 保持部材、8 把持部材、71 基部、72 ケーブル保持部、72A 第1ケーブル保持部、72B 第2ケーブル保持部、81 第1棒部材、82 第2棒部材、83 切断操作部。 1 car, 2 car upper device, 3 in-car operation panel, 4 wiring cable, 5 control cable, 6 binding band, 7 holding member, 8 gripping member, 71 base, 72 cable holding part, 72A 1st cable holding part, 72B 2nd cable holding part, 81 1st rod member, 82 2nd rod member, 83 Cutting operation part.

Claims (4)

環状の結束バンドを保持し、前記結束バンドの内側領域を小さくすることによって、前記結束バンドの内側に挿入された複数のケーブルが束ねられる保持部材と、
前記保持部材から下方に延び、作業者に把持される把持部材と
を備え、
前記保持部材は、前記把持部材が操作されることによって、前記結束バンドの内側領域を小さくする結束バンドの取付装置。
A holding member that holds an annular binding band and reduces the inner region of the binding band to bundle a plurality of cables inserted inside the binding band.
A gripping member extending downward from the holding member and gripped by an operator is provided.
The holding member is a binding band attachment device that reduces the inner region of the binding band by operating the gripping member.
前記結束バンドが前記複数のケーブルを束ねた場合に、前記結束バンドにおける余剰部分を切断する切断部材をさらに備え、
前記切断部材は、前記把持部材が操作されることによって、前記余剰部分を切断する請求項1に記載の結束バンドの取付装置。
Further provided with a cutting member for cutting the excess portion of the binding band when the binding band bundles the plurality of cables.
The binding band attachment device according to claim 1, wherein the cutting member cuts the excess portion by operating the gripping member.
前記把持部材は、長手方向について伸縮可能となっている請求項1または請求項2に記載の結束バンドの取付装置。 The binding band attachment device according to claim 1 or 2, wherein the gripping member is expandable and contractible in the longitudinal direction. 前記把持部材は、
第1棒部材と、
前記第1棒部材に隣り合うように設けられた第2棒部材と
を有し、
前記第2棒部材が前記第1棒部材に近づくことによって、前記保持部材が前記結束バンドの内側領域を小さくする請求項1から請求項3までの何れか一項に記載の結束バンドの取付装置。
The gripping member
1st rod member and
It has a second rod member provided adjacent to the first rod member, and has a second rod member.
The binding band attachment device according to any one of claims 1 to 3, wherein the holding member reduces the inner region of the binding band when the second rod member approaches the first rod member. ..
JP2019181780A 2019-10-02 2019-10-02 Cable tie attachment device Pending JP2021058056A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019181780A JP2021058056A (en) 2019-10-02 2019-10-02 Cable tie attachment device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019181780A JP2021058056A (en) 2019-10-02 2019-10-02 Cable tie attachment device

Publications (1)

Publication Number Publication Date
JP2021058056A true JP2021058056A (en) 2021-04-08

Family

ID=75271374

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019181780A Pending JP2021058056A (en) 2019-10-02 2019-10-02 Cable tie attachment device

Country Status (1)

Country Link
JP (1) JP2021058056A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107068279A (en) * 2017-05-03 2017-08-18 上海贝恩科电缆有限公司 Cable reinforces bridging bar

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107068279A (en) * 2017-05-03 2017-08-18 上海贝恩科电缆有限公司 Cable reinforces bridging bar
CN107068279B (en) * 2017-05-03 2023-08-11 上海贝恩科电缆有限公司 Cable reinforcement cross-connecting rod

Similar Documents

Publication Publication Date Title
JP2021058056A (en) Cable tie attachment device
US20150151954A1 (en) Telescopic arm for operating machines
US20200094999A1 (en) Connector and connector assembly including the same
JP6266996B2 (en) Bird harm prevention tool and its mounting method
JP2018073735A (en) Manufacturing device of wire harness
US11267681B2 (en) Crane
JP5939547B2 (en) Special felling rope work auxiliary tool
EP3760567A1 (en) Crane
JP5870180B2 (en) Transmission line transfer method and transfer device
EP1275610A1 (en) Hoisting mechanism
JP6567734B1 (en) Elevator rope connection method
JP6292618B2 (en) Electric wire arrangement device and electric wire arrangement method
JP2003192271A (en) Storing method of tower attachment of mobile crane and device thereof
JP2019041674A (en) Rope attachment tool and method
CN213697089U (en) Fish mouth type wire hooking forceps for joint minimally invasive surgery
JP2018068064A (en) Slide type protective tube
JP6112024B2 (en) Rope fastening device
JP2017206337A (en) Rope removal jig for elevator
JP6180386B2 (en) Roping method for building tower crane or jib crane
JP7287201B2 (en) work vehicle
JP2018152940A (en) Electric wire cutting tool
SE464631B (en) Process and device for gripping, displacing and releasing bundled elongated elements
IT201800010215A1 (en) Apparatus and procedure for putting insulating sheaths on the ends of the windings of electrical machines.
JP7326043B2 (en) construction machinery
US10561076B1 (en) Grapple mounted rope controller and rope anchor rigging device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20220630

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20230222

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230404

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20230829

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20231129

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20231208

A912 Re-examination (zenchi) completed and case transferred to appeal board

Free format text: JAPANESE INTERMEDIATE CODE: A912

Effective date: 20240301