JP2021051649A - 作業人員割当システムおよび作業人員割当装置 - Google Patents
作業人員割当システムおよび作業人員割当装置 Download PDFInfo
- Publication number
- JP2021051649A JP2021051649A JP2019175262A JP2019175262A JP2021051649A JP 2021051649 A JP2021051649 A JP 2021051649A JP 2019175262 A JP2019175262 A JP 2019175262A JP 2019175262 A JP2019175262 A JP 2019175262A JP 2021051649 A JP2021051649 A JP 2021051649A
- Authority
- JP
- Japan
- Prior art keywords
- personnel
- work
- organization
- abilities
- unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/28—Databases characterised by their database models, e.g. relational or object models
- G06F16/284—Relational databases
- G06F16/285—Clustering or classification
Abstract
Description
図1において、100は全体として第1の実施の形態による作業人員割当システムを示す。
なお、上述の実施の形態においては、本発明を作業人員割当システムに適用するようにした場合について述べたが、本発明はこれに限らず、この他種々のシステム、装置、方法、プログラムに広く適用することができる。
Claims (7)
- 所定の組織が担う作業に前記組織の人員を割り当てる作業人員割当システムであって、
前記組織が担った作業に要した能力の数と前記組織の人員の能力の数とを示す情報を含む第1のデータから、将来の所定の時間において、前記組織に不足する能力の数である不足能力数を算出する算出部と、
前記組織が担う作業で必要となる能力と前記組織の人員の能力との関係を示す情報を含む第2のデータをもとに、前記算出部で算出された最大の不足能力数の能力を習得するのに適した作業と人員とを特定する特定部と、
前記特定部により特定された作業に前記特定部により特定された人員を割り当てた後、前記組織が担う残りの作業に前記組織の残りの人員を割り当てる割当部と、
前記割当部により割り当てられた結果を出力する出力部と、
を備える作業人員割当システム。 - 前記特定部は、前記最大の不足能力数の能力を習得するのに適した作業が複数ある場合、前記割当部により割り当てられた作業と人員とが適していない度合いであるペナルティを示す情報を含む第3のデータをもとに、前記複数の作業の中からペナルティが最も高い作業を特定する、
請求項1に記載の作業人員割当システム。 - 前記特定部は、前記最大の不足能力数の能力を習得するのに適した人員が複数いる場合、作業と能力とが適していない度合いであるペナルティを示す情報を含む第4のデータをもとに、前記複数の人員の中から前記最大の不足能力数の能力以外の能力のペナルティが最も低い人員を特定する、
請求項1に記載の作業人員割当システム。 - 前記第1のデータには、前記組織が担う作業において必要とされた時間毎の能力の数を示す第5のデータと、前記組織の人員が保有する時間毎の能力の数を示す第6のデータとが含まれ、
前記算出部は、前記第5のデータと前記第6のデータとから、前記所定の時間において、前記組織に必要となる能力の数を示す必要能力数と前記組織の人員が保有する能力の数を示す保有能力数とを算出し、算出した必要能力数と保有能力数とから前記不足能力数を算出する、
請求項1に記載の作業人員割当システム。 - 前記組織の人員の能力には、レベルが設定され、
前記第2のデータは、前記組織が担う作業で必要となる能力のレベルと前記組織の人員の能力のレベルとの関係を示す情報を含み、
所定の能力のレベルに達したと判定するための条件が作業の分類毎に規定された第7のデータをもとに、前記組織の人員の能力のレベルを決定する決定部を備え、
前記特定部は、前記第2のデータをもとに、前記最大の不足能力数の能力のレベルを習得するのに適した作業と人員とを特定する、
請求項1に記載の作業人員割当システム。 - 前記特定部は、前記第2のデータをもとに、前記最大の不足能力数の能力のレベルを習得するのに適した作業が属する作業の分類を特定し、特定した作業の分類に属する作業を特定する、
請求項5に記載の作業人員割当システム。 - 所定の組織が担う作業に前記組織の人員を割り当てる作業人員割当装置であって、
前記組織が担った作業に要した能力の数と前記組織の人員の能力の数とを示す情報を含む第1のデータから、将来の所定の時間において、前記組織に不足する能力の数である不足能力数を算出する算出部と、
前記組織が担う作業で必要となる能力と前記組織の人員の能力との関係を示す情報を含む第2のデータをもとに、前記算出部で算出された最大の不足能力数の能力を習得するのに適した作業と人員とを特定する特定部と、
前記特定部により特定された作業に前記特定部により特定された人員を割り当てた後、前記組織が担う残りの作業に前記組織の残りの人員を割り当てる割当部と、
前記割当部により割り当てられた結果を出力する出力部と、
を備える作業人員割当装置。
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2019175262A JP7177759B2 (ja) | 2019-09-26 | 2019-09-26 | 作業人員割当システムおよび作業人員割当装置 |
US16/812,407 US20210097459A1 (en) | 2019-09-26 | 2020-03-09 | Worker assignment system and worker assignment device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2019175262A JP7177759B2 (ja) | 2019-09-26 | 2019-09-26 | 作業人員割当システムおよび作業人員割当装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2021051649A true JP2021051649A (ja) | 2021-04-01 |
JP7177759B2 JP7177759B2 (ja) | 2022-11-24 |
Family
ID=75158019
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2019175262A Active JP7177759B2 (ja) | 2019-09-26 | 2019-09-26 | 作業人員割当システムおよび作業人員割当装置 |
Country Status (2)
Country | Link |
---|---|
US (1) | US20210097459A1 (ja) |
JP (1) | JP7177759B2 (ja) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP7106873B2 (ja) * | 2018-01-23 | 2022-07-27 | 富士フイルムビジネスイノベーション株式会社 | 情報処理装置及び情報処理プログラム |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002007646A (ja) * | 2000-06-20 | 2002-01-11 | Omron Corp | 人材の成長方向の設定方法、補充能力の選択方法、補充人材の選択方法、人材評価方法、人材育成プラン作成システム、人材補充システム、業務実績査定システム、ならびに情報伝達用媒体 |
JP2002279132A (ja) * | 2001-03-19 | 2002-09-27 | Daiichi Tekko Kk | 要員配置システムおよび要員配置プログラム |
US20040162748A1 (en) * | 2003-02-14 | 2004-08-19 | Vogel Eric S. | Generating a resource allocation action plan |
JP2007115037A (ja) * | 2005-10-20 | 2007-05-10 | Chugoku Electric Power Co Inc:The | 要員管理支援装置、要員管理支援装置の制御方法及びプログラム |
US20070198317A1 (en) * | 2005-12-02 | 2007-08-23 | George Harthcryde | Systems, program product, and methods for organization realignment |
JP2012174098A (ja) * | 2011-02-23 | 2012-09-10 | Hitachi Ltd | 作業計画作成装置及び作業計画作成方法 |
-
2019
- 2019-09-26 JP JP2019175262A patent/JP7177759B2/ja active Active
-
2020
- 2020-03-09 US US16/812,407 patent/US20210097459A1/en not_active Abandoned
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002007646A (ja) * | 2000-06-20 | 2002-01-11 | Omron Corp | 人材の成長方向の設定方法、補充能力の選択方法、補充人材の選択方法、人材評価方法、人材育成プラン作成システム、人材補充システム、業務実績査定システム、ならびに情報伝達用媒体 |
JP2002279132A (ja) * | 2001-03-19 | 2002-09-27 | Daiichi Tekko Kk | 要員配置システムおよび要員配置プログラム |
US20040162748A1 (en) * | 2003-02-14 | 2004-08-19 | Vogel Eric S. | Generating a resource allocation action plan |
JP2007115037A (ja) * | 2005-10-20 | 2007-05-10 | Chugoku Electric Power Co Inc:The | 要員管理支援装置、要員管理支援装置の制御方法及びプログラム |
US20070198317A1 (en) * | 2005-12-02 | 2007-08-23 | George Harthcryde | Systems, program product, and methods for organization realignment |
JP2012174098A (ja) * | 2011-02-23 | 2012-09-10 | Hitachi Ltd | 作業計画作成装置及び作業計画作成方法 |
Also Published As
Publication number | Publication date |
---|---|
US20210097459A1 (en) | 2021-04-01 |
JP7177759B2 (ja) | 2022-11-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Braekers et al. | A bi-objective home care scheduling problem: Analyzing the trade-off between costs and client inconvenience | |
Goren et al. | Robustness and stability measures for scheduling: single-machine environment | |
US20110077994A1 (en) | Optimization of workforce scheduling and capacity planning | |
Buddas | A bottleneck analysis in the IFRC supply chain | |
Lin et al. | Crew rostering with multiple goals: An empirical study | |
Pillac et al. | A fast reoptimization approach for the dynamic technician routing and scheduling problem | |
Henao et al. | Multiskilled personnel assignment problem under uncertain demand: A benchmarking analysis | |
Vergara et al. | Impact of labor productivity and multiskilling on staff management: A retail industry case | |
Zaki et al. | Using AHP and TOPSIS techniques for assessment of multi-skilled workforce in manufacturing industry | |
Beauchemin et al. | Dynamic allocation of human resources: case study in the metal 4.0 manufacturing industry | |
JP6161810B2 (ja) | 人員計画システム及び人員計画方法 | |
JP2021144756A (ja) | プロジェクト計画策定システム | |
JP2021051649A (ja) | 作業人員割当システムおよび作業人員割当装置 | |
Santos et al. | HP enterprise services uses optimization for resource planning | |
Petrov et al. | Competence-based method of human community forming in expert network for joint task solving | |
Nowak et al. | An application of the multiple criteria decision tree in project planning | |
Madanhire et al. | Aggregate production planning framework in a multi-product factory | |
Bairi et al. | Capacity and availability management by quantitative project management in the IT service industry | |
JP2006244470A (ja) | 納期回答システム、納期回答方法、及び納期回答プログラム | |
Hlaoittinun et al. | Managing the competencies of team members in design projects through multi-period task assignment | |
Kjersem et al. | Improving planning process for ETO-projects: A case study | |
Bagherpour | Risky Time Driven Activity Based Costing in a Medical Center: A Development, Implementation and Simulation based Optimization Approach. | |
Couch | Performance Robust Project Scheduling Polices for Naval Ship Maintenance | |
Vermina et al. | Bi-Objective Job-Shop Scheduling Considering Human Fatigue in Cobotic Order Picking Systems: A Case of an Online Grocer | |
Al-Dossari | Optimization Models for Multiple Resource Planning |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20211125 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20221004 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20221005 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20221102 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20221108 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20221111 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 7177759 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |