JP2020522063A5 - - Google Patents
Download PDFInfo
- Publication number
- JP2020522063A5 JP2020522063A5 JP2019565280A JP2019565280A JP2020522063A5 JP 2020522063 A5 JP2020522063 A5 JP 2020522063A5 JP 2019565280 A JP2019565280 A JP 2019565280A JP 2019565280 A JP2019565280 A JP 2019565280A JP 2020522063 A5 JP2020522063 A5 JP 2020522063A5
- Authority
- JP
- Japan
- Prior art keywords
- task
- resource
- candidate
- schedule
- dependency
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 claims 13
- 230000001172 regenerating effect Effects 0.000 claims 2
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US15/606,084 US11132631B2 (en) | 2017-05-26 | 2017-05-26 | Computerized system and method for resolving cross-vehicle dependencies for vehicle scheduling |
| US15/606,084 | 2017-05-26 | ||
| PCT/US2018/034338 WO2018217992A1 (en) | 2017-05-26 | 2018-05-24 | Computerized system and method for resolving cross-vehicle dependencies for vehicle scheduling |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| JP2020522063A JP2020522063A (ja) | 2020-07-27 |
| JP2020522063A5 true JP2020522063A5 (enExample) | 2021-02-25 |
| JP7319196B2 JP7319196B2 (ja) | 2023-08-01 |
Family
ID=62705681
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2019565280A Active JP7319196B2 (ja) | 2017-05-26 | 2018-05-24 | 車両スケジューリングのために車両相互依存性を解決するためのコンピュータ化されたシステムおよび方法 |
Country Status (4)
| Country | Link |
|---|---|
| US (1) | US11132631B2 (enExample) |
| JP (1) | JP7319196B2 (enExample) |
| CN (1) | CN110663051B (enExample) |
| WO (1) | WO2018217992A1 (enExample) |
Families Citing this family (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| LU101480B1 (en) * | 2019-11-18 | 2021-05-18 | Luxembourg Inst Science & Tech List | Data preprocessing for a supervised machine learning process |
| CN111340413A (zh) * | 2020-02-10 | 2020-06-26 | 拉扎斯网络科技(上海)有限公司 | 配送任务的分配方法、装置、服务器和存储介质 |
| US12163795B2 (en) | 2021-07-07 | 2024-12-10 | Oracle International Corporation | Vehicle routing with dynamic selection of turns across opposing traffic |
| US20230342687A1 (en) * | 2022-04-20 | 2023-10-26 | Verizon Patent And Licensing Inc. | Systems and methods for utilizing vehicle data to identify events associated with scheduled jobs |
| US20250355449A1 (en) * | 2024-05-16 | 2025-11-20 | Wing Aviation Llc | Efficient allocation of resources in a fleet management system |
Family Cites Families (26)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3501385B2 (ja) * | 1995-04-13 | 2004-03-02 | 株式会社日立製作所 | ジョブ実行順序決定方法 |
| US7660904B2 (en) * | 2004-05-11 | 2010-02-09 | Microsoft Corporation | Providing keys to share data within an instant messaging session |
| WO2006023820A2 (en) * | 2004-08-19 | 2006-03-02 | United States Postal Service | Delivery operations information system with route adjstment feature and methods of use |
| GB0513045D0 (en) * | 2005-06-27 | 2005-08-03 | Vidus Ltd | Resource scheduling method and system |
| US9710508B2 (en) * | 2006-03-09 | 2017-07-18 | Quickbase, Inc. | Method and system for managing data in a workflow process |
| US20080215409A1 (en) * | 2007-01-03 | 2008-09-04 | Victorware, Llc | Iterative resource scheduling |
| US20080215406A1 (en) * | 2007-03-01 | 2008-09-04 | Julian Pachon | Scheduling Resources for Airline Flights |
| US20090025004A1 (en) * | 2007-07-16 | 2009-01-22 | Microsoft Corporation | Scheduling by Growing and Shrinking Resource Allocation |
| JP5382844B2 (ja) * | 2008-02-21 | 2014-01-08 | 株式会社日立ソリューションズ | 輸送スケジュール作成システム |
| US8607246B2 (en) * | 2008-07-02 | 2013-12-10 | Nxp, B.V. | Multiprocessor circuit using run-time task scheduling |
| US8881158B2 (en) * | 2008-11-14 | 2014-11-04 | Nec Corporation | Schedule decision device, parallel execution device, schedule decision method, and program |
| US8875143B2 (en) | 2009-12-31 | 2014-10-28 | Bmc Software, Inc. | Utility-optimized scheduling of time-sensitive tasks in a resource-constrained environment |
| JP5743169B2 (ja) * | 2011-07-07 | 2015-07-01 | 村田機械株式会社 | 搬送車システムと搬送車の走行スケジュールの生成方法 |
| US8751497B2 (en) * | 2011-10-07 | 2014-06-10 | Clear Channel Management Services, Inc. | Multi-shot scheduling system |
| US8543438B1 (en) | 2012-02-03 | 2013-09-24 | Joel E. Fleiss | Labor resource utilization method and apparatus |
| US9268604B1 (en) * | 2012-12-11 | 2016-02-23 | The Boeing Company | Automated allocation of vehicle systems for different specified vehicle testing tasks |
| CN104346220B (zh) * | 2013-07-31 | 2017-11-03 | 中国科学院计算技术研究所 | 一种任务调度方法与系统 |
| US10241654B2 (en) * | 2013-12-20 | 2019-03-26 | Dassault Systemes Americas Corp. | Computer method and apparatus for automated scheduling |
| US20160026935A1 (en) | 2014-07-24 | 2016-01-28 | International Business Machines Corporation | Multiple individual travel scheduling |
| US9933177B2 (en) * | 2014-11-04 | 2018-04-03 | Google Llc | Enhanced automated environmental control system scheduling using a preference function |
| US9697045B2 (en) * | 2015-03-24 | 2017-07-04 | International Business Machines Corporation | Selecting resource allocation policies and resolving resource conflicts |
| US10726366B2 (en) | 2015-04-14 | 2020-07-28 | International Business Machines Corporation | Scheduling and simulation system |
| US10977092B2 (en) * | 2015-10-16 | 2021-04-13 | Qualcomm Incorporated | Method for efficient task scheduling in the presence of conflicts |
| US10796285B2 (en) * | 2016-04-14 | 2020-10-06 | Microsoft Technology Licensing, Llc | Rescheduling events to defragment a calendar data structure |
| CN106503836B (zh) * | 2016-10-09 | 2020-06-16 | 电子科技大学 | 一种多目标优化的纯电动汽车物流配送优化调度方法 |
| GB201621627D0 (en) * | 2016-12-19 | 2017-02-01 | Palantir Technologies Inc | Task allocation |
-
2017
- 2017-05-26 US US15/606,084 patent/US11132631B2/en active Active
-
2018
- 2018-05-24 JP JP2019565280A patent/JP7319196B2/ja active Active
- 2018-05-24 CN CN201880034634.5A patent/CN110663051B/zh active Active
- 2018-05-24 WO PCT/US2018/034338 patent/WO2018217992A1/en not_active Ceased
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US12326796B2 (en) | Cloud infrastructure optimization | |
| EP3754496B1 (en) | Data processing method and related products | |
| JP2020522063A5 (enExample) | ||
| Chen et al. | Workflowsim: A toolkit for simulating scientific workflows in distributed environments | |
| JP5845809B2 (ja) | 知的且つ動的なロードバランシングによる、分散コンピューティング環境におけるソフトウェアの解析の効率的な並列化の手法 | |
| JP6447120B2 (ja) | ジョブスケジューリング方法、データアナライザ、データ解析装置、コンピュータシステム及びコンピュータ可読媒体 | |
| JP7629257B2 (ja) | アプリケーション・ベースのプロファイリングを用いた機械学習ワークロードの弾力的な実行 | |
| CN102880546B (zh) | 一种基于xml数据库的软件集成测试方法及系统 | |
| CN107590075B (zh) | 一种软件测试方法及装置 | |
| JP5845812B2 (ja) | 分散コンピューティング環境におけるソフトウェアの解析の効率的な並列化のためのポリシーのスケジューリング | |
| CN104461856A (zh) | 基于云计算平台的性能测试方法、装置及系统 | |
| CN108205469B (zh) | 一种基于MapReduce的资源分配方法及服务器 | |
| JP5845813B2 (ja) | 分散コンピューティング環境におけるソフトウェアの解析の効率的な並列化のためのノードの計算の初期化手法 | |
| Ouyang et al. | Straggler detection in parallel computing systems through dynamic threshold calculation | |
| CN103092751A (zh) | 一种云环境下基于用户行为模型的web应用性能测试系统 | |
| CN111861012B (zh) | 一种测试任务执行时间预测方法及最优执行节点选择方法 | |
| US7747986B2 (en) | Generating static performance modeling factors in a deployed system | |
| JP2012099109A (ja) | 分散コンピューティング環境におけるソフトウェアの解析の効率的な並列化のための動的且つ知的な部分的計算管理 | |
| CN109634714B (zh) | 一种智能调度的方法及装置 | |
| JP5845810B2 (ja) | 分散コンピューティング環境におけるソフトウェアの解析の並列化のための効率的な部分計算 | |
| CN104298589A (zh) | 一种性能测试方法和设备 | |
| KR20120051933A (ko) | 시뮬레이터 기반의 로봇 소프트웨어 컴포넌트 성능평가시스템 및 성능평가방법 | |
| US20250036498A1 (en) | Automated performance testing in a containerized environment | |
| CN113806034B (zh) | 任务执行方法及装置、计算机可读存储介质和电子设备 | |
| KR102153811B1 (ko) | 웹 어플리케이션 테스트를 위한 웹 브라우저 환경의 우선순위 결정 방법 및 장치 |