JP2020166794A - Balance prediction device, balance prediction program, and balance prediction method - Google Patents

Balance prediction device, balance prediction program, and balance prediction method Download PDF

Info

Publication number
JP2020166794A
JP2020166794A JP2019069513A JP2019069513A JP2020166794A JP 2020166794 A JP2020166794 A JP 2020166794A JP 2019069513 A JP2019069513 A JP 2019069513A JP 2019069513 A JP2019069513 A JP 2019069513A JP 2020166794 A JP2020166794 A JP 2020166794A
Authority
JP
Japan
Prior art keywords
value
specific
year
predicted value
general plan
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2019069513A
Other languages
Japanese (ja)
Other versions
JP7112368B2 (en
Inventor
武 稲村
Takeshi Inamura
武 稲村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Utsunomiya City
Original Assignee
Utsunomiya City
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Utsunomiya City filed Critical Utsunomiya City
Priority to JP2019069513A priority Critical patent/JP7112368B2/en
Publication of JP2020166794A publication Critical patent/JP2020166794A/en
Application granted granted Critical
Publication of JP7112368B2 publication Critical patent/JP7112368B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

To provide a balance prediction device that performs more accurate financial risk management in long-term asset management.SOLUTION: A balance prediction device 1 is a balance prediction device that predicts, assuming that a reference year when prediction is started is N year (N is an integer), up to after M years including N year (M is an integer, for example, 50). The balance prediction device makes a predication by using a settlement value for a period from N year to K years ago (K is an integer, for example, 5), a general planned value of a period until L years later including N year (L is an integer less than M, for example, 10) and a particular prediction value that requires particular processing for a period until M years later including N year.SELECTED DRAWING: Figure 6

Description

本発明は、収支予測装置、収支予測プログラム及び収支予測方法に関する。 The present invention relates to a balance forecasting device, a balance forecasting program, and a balance forecasting method.

1990年代以降、公共事業への投資が減少し、上下水道設備への投資額も減少傾向にあったが、近年、老朽化した上下水道設備の更新需要を背景に投資額は下げ止まりを見せている。 Since the 1990s, investment in public works projects has decreased, and the amount of investment in water and sewage facilities has also been on a downward trend, but in recent years, the amount of investment has stopped declining due to the demand for renewal of aging water and sewage facilities. ..

水道事業・下水道事業は、現在、地方自治体が担っている。地方自治体は厳しい財政状況が続いており、設備の更新・維持の財源を確保するべく、計画的に資金調達を行い、事業資金の枯渇を防ぐことが求められている。そこで、以下の技術が開示されている。 Local governments are currently in charge of water supply and sewerage projects. Local governments continue to face difficult financial conditions, and are required to systematically raise funds to prevent the depletion of business funds in order to secure financial resources for the renewal and maintenance of facilities. Therefore, the following techniques are disclosed.

例えば、第1の技術として、施設の損傷又は劣化を将来にわたり把握することにより、最も費用対効果の高い管理および更新を行う技術が開示されている(例えば、特許文献1)。第1の技術では、部品補修および部品交換のタイミングを、予測健全度、部品の耐用年数および資産の耐用年数の少なくともいずれかとの関係によって定めた複数種類のシナリオと、部品ごとに定められた健全度低下関数と、部品ごとに定められた部品補修又は部品交換が行われた場合の健全度回復量とにしたがって、現在健全度を基準にして将来の年度ごとの予測健全度が、複数のシナリオについて算出される。 For example, as a first technique, a technique for performing the most cost-effective management and renewal by grasping the damage or deterioration of a facility in the future is disclosed (for example, Patent Document 1). In the first technique, there are multiple types of scenarios in which the timing of part repair and part replacement is determined in relation to at least one of the predicted soundness, the useful life of the part, and the useful life of the asset, and the soundness determined for each part. Multiple scenarios of predicted health for each future year based on current health, according to the degree reduction function and the amount of health recovery when parts are repaired or replaced, which is determined for each part. Is calculated for.

算出された年度ごとの予測健全度に基づいて、複数のシナリオのそれぞれについて部品補修又は部品交換の実施年度が計画される。複数のシナリオのそれぞれについて将来の所定期間に発生する費用が算出され、最も期間費用が少ないシナリオが最適シナリオと決定される。 Based on the calculated forecasted soundness for each year, the implementation year of parts repair or replacement is planned for each of the multiple scenarios. The cost to be incurred in a predetermined period in the future is calculated for each of the plurality of scenarios, and the scenario with the lowest period cost is determined as the optimum scenario.

また、例えば、第2の技術として、現有資産の状態、価値を定量化し、設備更新需要および財政収支情報から、中長期的観点で上下水道施設の適切な維持管理と更新計画の立案を支援するシステムが開示されている(例えば、特許文献2)。第2の技術では、設備維持管理業務支援システムは、上下水道施設からデータ毎に決められている監視周期又は任意に入力されてくる各種設備情報、点検・保守データ、モニタリングデータ、プラントデータを計算機システムへ取り込み、データベースに格納する。 In addition, for example, as a second technology, the state and value of existing assets are quantified, and from the equipment renewal demand and financial balance information, appropriate maintenance and renewal plans for water and sewage facilities are supported from a medium- to long-term perspective. The system is disclosed (eg, Patent Document 2). In the second technology, the facility maintenance work support system calculates the monitoring cycle determined for each data from the water and sewage facilities or various facility information, inspection / maintenance data, monitoring data, and plant data that are arbitrarily input. Import to the system and store in the database.

当該格納した、設備に関する点検・保守、モニタリングデータから、定量的健全度の評価と、劣化診断予測による統計的耐用年数を算出し、設備毎に設定されたリスクレベルに応じて、予算制約を遵守した設備更新需要コストの平準化と、適宜に更新するための需要計画立案の支援を行っている。 Quantitative soundness evaluation and statistical useful life based on deterioration diagnosis prediction are calculated from the stored inspection / maintenance and monitoring data of equipment, and budget constraints are observed according to the risk level set for each equipment. We support the leveling of equipment renewal demand costs and the formulation of demand plans for appropriate renewal.

特開2009−169737号公報Japanese Unexamined Patent Publication No. 2009-169737 特開2014−016691号公報Japanese Unexamined Patent Publication No. 2014-016691

これまでは、経営の健全性につき、市民への説明責任(アカウンタビリティ)を全うするため、個々の収入・支出の見込みの積み上げ方式により、今後10年間の計画を立て、これを精緻化することに重点を置いてきた。 Until now, in order to fulfill accountability to the citizens regarding the soundness of management, we decided to make a plan for the next 10 years and refine it by accumulating the prospects of individual income and expenditure. I've been focusing on it.

しかしながら、設備(水道管、下水道管等)の設置が一通り終了し、今後、これらの維持更新の時代を迎えるにあたり、水道管・下水道管の更新期間(40〜50年間)に合わせて、そのような長期期間中、資金調達を適切に行い、資金枯渇を防ぐことが重要となっている。 However, the installation of equipment (water pipes, sewer pipes, etc.) has been completed, and in the future, as we enter the era of maintenance and renewal, we will adjust to the renewal period (40 to 50 years) of water pipes and sewer pipes. During such a long period of time, it is important to raise funds appropriately and prevent the depletion of funds.

そこで、経営の持続性に反する財政面のリスクのマネジメント、すなわちアセットマネジメントにおける財政マネジメントが要求される。ここで、そのリスクのうち最大のものは、資金の枯渇である。公営企業の経営は、長期的な運転資金の借り入れにより、社会資本を整備し、その資本から利益を生み出して、保有する資金高を増加させ、借入金の元金と利益を返済するというサイクルで行われている。 Therefore, management of financial risks contrary to the sustainability of management, that is, financial management in asset management is required. Here, the biggest risk is the depletion of funds. The management of public enterprises is carried out in a cycle of improving social capital by borrowing long-term working capital, generating profits from the capital, increasing the amount of funds held, and repayment of the principal and profits of the borrowed money. It has been.

つまり、将来的に人口減少による収益の減少と、施設の更新費用の増大が見込まれる中、資金の枯渇というリスクを適切にマネジメントできない限り、持続的な経営は心もとないと考えられる。 In other words, while profits are expected to decline due to population decline and facility renewal costs are expected to increase in the future, sustainable management will not be possible unless the risk of fund depletion is properly managed.

本発明は、上記課題に鑑みて、長期的なアセットマネジメントにおいて、より正確に財政リスクのマネジメントを行う収支予測装置、収支予測プログラム及び収支予測方法を提供することを目的とする。 In view of the above problems, an object of the present invention is to provide a balance forecasting device, a balance forecasting program, and a balance forecasting method for more accurate management of financial risk in long-term asset management.

上記課題を解決するために、本発明の収支予測装置は、予測開始の基準年をN年とし、収支に関する複数の項目について前記N年を含むM年後までの予測を行う収支予測装置であって、前記N年からK年前までの期間の決算値と、前記N年を含むL年(L<M)までの期間の一般的な計画値である一般計画値と、前記N年を含む前記M年後までの期間について特定処理を要する特定予測値とを用いて予測を行うものであり、前記決算値を入力可能な決算値入力部と、前記一般計画値を入力可能な一般計画値入力部と、前記特定予測値を予測するための特定入力値を入力可能な特定入力値入力部と、入力された前記特定入力値に対して特定処理を行って特定予測値を算出する特定予測値算出部と、前記決算値、前記一般計画値又は前記特定予測値(ただし、前記一般計画値と前記特定予測値の双方が存在する場合には前記一般計画値)を基礎として回帰直線に基づいて予測された直線予測値を算出する直線予測値算出部と、前記N年から前記M年後までの各年について、前記複数の項目毎に、前記一般計画値又は前記特定予測値が存在する場合には、前記N年から前記L年後までの期間は前記一般計画値又は前記特定予測値(ただし、前記一般計画値と前記特定予測値の双方が存在する場合には前記一般計画値)を選択すると共に、前記L年後から前記M年後までの期間は前記決算値、前記一般計画値又は前記特定予測値(ただし、前記一般計画値と前記特定予測値の双方が存在する場合には前記一般計画値)から回帰直線に基づいて前記直線予測値算出部により算出された(ただし、前記決算値のみに基づく場合を除く。)第1直線予測値を選択し、前記一般計画値又は前記特定予測値が存在しない場合、前記N年から前記M年後までの期間は、前記決算値に基づいて前記直線予測値算出部により算出された第2直線予測値を選択し、前記特定予測値が存在する場合には、前記L年後から前記M年後までの期間は、前記特定予測値算出部により処理された特定予測値を選択する選択部と、前記選択部により選択された予測値を予測結果として出力する出力部とを備えていることを特徴とする。 In order to solve the above problems, the balance forecasting device of the present invention is a balance forecasting device in which the base year for starting forecasting is N years and a plurality of items related to the balance are predicted up to M years including the N years. The settlement value for the period from N years to K years ago, the general plan value which is the general plan value for the period from L years (L <M) including the N years, and the N years are included. Forecasting is performed using a specific forecast value that requires specific processing for the period up to M years later, and a settlement value input unit in which the settlement value can be input and a general plan value in which the general plan value can be input. An input unit, a specific input value input unit capable of inputting a specific input value for predicting the specific predicted value, and a specific prediction that performs specific processing on the input specific input value to calculate a specific predicted value. Based on the regression line based on the value calculation unit and the settlement value, the general plan value, or the specific predicted value (however, if both the general plan value and the specific predicted value exist, the general plan value). The general plan value or the specific predicted value exists for each of the plurality of items for each year from the N year to the M year later, and the linear predicted value calculation unit for calculating the predicted linear predicted value. In the case, the period from the N years to the L years later is the general plan value or the specific predicted value (however, if both the general plan value and the specific predicted value exist, the general plan value). In addition to selecting, the period from the L year to the M year is the settlement value, the general plan value or the specific predicted value (provided that both the general plan value and the specific predicted value exist. Is calculated from the general plan value) by the straight line predicted value calculation unit based on the regression line (however, except when it is based only on the settlement value), the first straight line predicted value is selected, and the general plan value or If the specific predicted value does not exist, the second linear predicted value calculated by the linear predicted value calculation unit is selected based on the settlement value for the period from N years to M years later, and the specific predicted value is selected. If there is a value, the period from L years to M years later is a selection unit that selects the specific prediction value processed by the specific prediction value calculation unit, and a prediction selected by the selection unit. It is characterized by having an output unit that outputs a value as a prediction result.

当該構成によれば、選択部によって、収支予測としての予測値を、一般計画値、特定予測値、及び直線予測値から選択して予測結果とすることができる。また、このうち、一般計画値は、既に計画された内容であるので信憑性が高い。また、特定予測値は、予測を行う項目における特定の処理により予測が行われるので、一般計画値と同様に信憑性が高い。よって、本発明の収支予測装置では、選択部が信憑性の高い予測値を選択するため、より正確な予測値を得ることができる。 According to this configuration, the selection unit can select the forecast value as the income and expenditure forecast from the general plan value, the specific forecast value, and the linear forecast value to obtain the forecast result. Of these, the general plan value is highly credible because it is already planned. In addition, since the specific predicted value is predicted by a specific process in the item to be predicted, it is as credible as the general plan value. Therefore, in the income and expenditure prediction device of the present invention, the selection unit selects a highly credible prediction value, so that a more accurate prediction value can be obtained.

また、本発明の収支予測装置において、前記特定予測値算出部は、前記特定予測値を前記L年後から前記M年後までの期間に反映させるか否かを選択可能な反映選択部を備え、前記選択部は、前記反映選択部において反映する旨の選択がされた場合、前記特定予測値算出部により処理された特定予測値を選択し、前記反映選択部において反映しない旨の選択がされた場合、前記L年後から前記M年後までの期間は、前記第2直線予測値を選択するようにしてもよい。 Further, in the income and expenditure prediction device of the present invention, the specific predicted value calculation unit includes a reflection selection unit that can select whether or not to reflect the specific predicted value in the period from the L year to the M year. When the reflection selection unit selects to reflect, the selection unit selects the specific prediction value processed by the specific prediction value calculation unit and selects not to reflect it in the reflection selection unit. In this case, the second linear predicted value may be selected for the period from the L year to the M year.

当該構成によれば、特定予測値を予測結果に反映する場合としない場合で予測結果を比較することができる。従って、特定項目の収支への影響を容易に確認することができる。 According to this configuration, it is possible to compare the prediction results with and without reflecting the specific prediction value in the prediction result. Therefore, the influence of a specific item on the income and expenditure can be easily confirmed.

また、本発明の収支予測装置において、前記特定項目値入力部を前記計画値入力部とは別個の入力画面に設けるようにしてもよい。当該構成によれば、特定項目入力部での特定項目値の入力を、他の入力を行う画面ではなく、専用の画面で入力することができるので、入力が容易であり、特定項目値の入力においてミスが生じにくい。 Further, in the income and expenditure prediction device of the present invention, the specific item value input unit may be provided on an input screen separate from the planned value input unit. According to this configuration, the input of the specific item value in the specific item input unit can be input on the dedicated screen instead of the screen for other input, so that the input is easy and the input of the specific item value is performed. It is difficult for mistakes to occur.

また、本発明の収支予測装置において、前記選択部が前記第1直線予測値と、前記第2直線予測値とのいずれかを強制的に選択可能な直線値選択部を設けるようにしてもよい。当該構成によれば、ユーザは前記N年を含む前記L年後までの期間の、前記一般計画値又は前記特定予測値を算出するための前記特定入力値の入力をすべきか否かを判断しやすくなるので、前記一般計画値又は前記特定入力値の入力においてミスが生じにくい。 Further, in the income and expenditure prediction device of the present invention, the selection unit may be provided with a linear value selection unit capable of forcibly selecting either the first straight line prediction value or the second straight line prediction value. .. According to the configuration, the user determines whether or not to input the specific input value for calculating the general plan value or the specific predicted value in the period up to the L year including the N year. Since it becomes easy, mistakes are less likely to occur in the input of the general plan value or the specific input value.

また、本発明の収支予測装置において、前記出力部は、年度別予測結果の一覧表と年度別現金保有額のグラフを出力するものであり、前記グラフは、各前記項目毎に表示の要否を選択可能とすることができる。当該構成によれば、予測を行う者は、項目毎のグラフの出力を確認できるので、収支に関する情報を一目で確認することができる。 Further, in the income and expenditure forecasting apparatus of the present invention, the output unit outputs a list of forecast results by year and a graph of cash holdings by year, and the graph needs to be displayed for each of the above items. Can be made selectable. According to this configuration, the person who makes the forecast can confirm the output of the graph for each item, so that the information on the balance can be confirmed at a glance.

また、本発明の収支予測プログラムは、コンピュータを、予測開始の基準年をN年とし、収支に関する複数の項目について前記N年を含むM年後までの予測を行う収支予測装置として機能させる収支予測プログラムであって、
前記コンピュータは、前記N年からK年前までの期間の決算値と、前記N年を含むL年後(L<M)までの期間の一般的な計画値である一般計画値と、前記N年を含む前記M年後までの期間について特定処理を要する特定予測値とを用いて予測を行うものであり、前記コンピュータを、前記決算値を入力可能な決算値入力部と、前記一般計画値を入力可能な一般計画値入力部と、前記特定予測値を予測するための特定入力値を入力可能な特定入力値入力部と、入力された前記特定入力値に対して特定処理を行って特定予測値を算出する特定予測値算出部と、前記決算値、前記一般計画値又は前記特定予測値(ただし、前記一般計画値と前記特定予測値の双方が存在する場合には前記一般計画値)を基礎として回帰直線に基づいて予測された直線予測値を算出する直線予測値算出部と、前記N年から前記M年後までの各年について、前記複数の項目毎に、前記N年から前記M年後までの各年について、前記複数の項目毎に、前記一般計画値又は前記特定予測値が存在する場合には、前記N年から前記L年後までの期間は前記一般計画値又は前記特定予測値(ただし、前記一般計画値と前記特定予測値の双方が存在する場合には前記一般計画値)を選択すると共に、前記L年後から前記M年後までの期間は前記決算値、前記一般計画値又は前記特定予測値(ただし、前記一般計画値と前記特定予測値の双方が存在する場合には前記一般計画値)から回帰直線に基づいて前記直線予測値算出部により算出された(ただし、前記決算値のみに基づく場合を除く。)第1直線予測値を選択し、前記一般計画値又は前記特定予測値が存在しない場合、前記N年から前記M年後までの期間は、前記決算値に基づいて前記直線予測値算出部により算出された第2直線予測値を選択し、前記特定予測値が存在する場合には、前記L年後から前記M年後までの期間は、前記特定予測値算出部により処理された特定予測値を選択する選択部と、前記選択部により選択された予測値を予測結果として出力する出力部として機能させることを特徴とする。
Further, the income and expenditure forecasting program of the present invention makes the computer function as an income and expenditure forecasting device in which the base year for starting the forecast is N years and a plurality of items related to the income and expenditure are predicted up to M years including the N years. It ’s a program
The computer has a settlement value for the period from N years to K years ago, a general plan value which is a general plan value for a period after L years (L <M) including the N years, and the N. Forecasting is performed using a specific predicted value that requires specific processing for the period up to M years including the year, and the computer is used with a settlement value input unit capable of inputting the settlement value and the general plan value. A general plan value input unit that can input a specific input value, a specific input value input unit that can input a specific input value for predicting the specific predicted value, and a specific input value input that is specified by performing specific processing. A specific predicted value calculation unit that calculates a predicted value, and the settlement value, the general plan value, or the specific predicted value (however, if both the general plan value and the specific predicted value exist, the general plan value). The linear prediction value calculation unit that calculates the linear prediction value predicted based on the regression line based on the above, and for each year from the N year to the M year later, for each of the plurality of items, from the N year to the said For each year up to M years later, if the general plan value or the specific predicted value exists for each of the plurality of items, the period from N years to L years later is the general plan value or the above. A specific predicted value (however, the general planned value when both the general planned value and the specific predicted value exist) is selected, and the period from the L year to the M year is the settlement value. It was calculated by the linear prediction value calculation unit based on the regression line from the general plan value or the specific predicted value (however, if both the general plan value and the specific predicted value exist, the general plan value). (However, this does not apply when it is based only on the settlement value.) If the first linear forecast value is selected and the general plan value or the specific forecast value does not exist, the period from N years to M years later is The second linear predicted value calculated by the linear predicted value calculation unit is selected based on the settlement value, and when the specific predicted value exists, the period from the L year to the M year is It is characterized in that it functions as a selection unit that selects a specific prediction value processed by the specific prediction value calculation unit and an output unit that outputs the prediction value selected by the selection unit as a prediction result.

同様に、本発明の収支予測方法は、コンピュータによって、予測開始の基準年をN年とし、収支に関する複数の項目について前記N年を含むM年後までの予測を行う収支予測方法であって、前記コンピュータは、前記N年からK年前までの期間の決算値と、前記N年を含むL年後(L<M)までの期間の一般的な計画値である一般計画値と、前記N年を含む前記M年後までの期間について特定処理を要する特定予測値とを用いて予測を行うものであり、前記決算値を入力可能な決算値入力部と、前記一般計画値を入力可能な一般計画値入力部と、前記特定予測値を予測するための特定入力値を入力可能な特定入力値入力部と、入力された前記特定入力値に対して特定処理を行って特定予測値を算出する特定予測値算出部と、前記決算値、前記一般計画値又は前記特定予測値(ただし、前記一般計画値と前記特定予測値の双方が存在する場合には前記一般計画値)を基礎として回帰直線に基づいて予測された直線予測値を算出する直線予測値算出部とを有しており、前記コンピュータによって、前記N年から前記M年後までの各年について、前記複数の項目毎に、前記一般計画値又は前記特定予測値が存在する場合には、前記N年から前記L年後までの期間は前記一般計画値又は前記特定予測値(ただし、前記一般計画値と前記特定予測値の双方が存在する場合には前記一般計画値)を選択すると共に、前記L年後から前記M年後までの期間は前記決算値、前記一般計画値又は前記特定予測値(ただし、前記一般計画値と前記特定予測値の双方が存在する場合には前記一般計画値)から回帰直線に基づいて前記直線予測値算出部により算出された(ただし、前記決算値のみに基づく場合を除く。)第1直線予測値を選択し、前記一般計画値又は前記特定予測値が存在しない場合、前記N年から前記M年後までの期間は、前記決算値に基づいて前記直線予測値算出部により算出された第2直線予測値を選択し、前記特定予測値が存在する場合には、前記L年後から前記M年後までの期間は、前記特定予測値算出部により処理された特定予測値を選択し、
前記選択された予測値を予測結果として出力することを特徴とする。
Similarly, the balance forecasting method of the present invention is a balance forecasting method in which the base year for starting forecasting is set to N years, and a plurality of items related to balance are forecasted up to M years including the N years. The computer has a settlement value for the period from N years to K years ago, a general plan value which is a general plan value for a period after L years (L <M) including the N years, and the N. Forecasting is performed using a specific forecast value that requires specific processing for the period up to M years including the year, and the settlement value input unit capable of inputting the settlement value and the general plan value can be input. A general plan value input unit, a specific input value input unit capable of inputting a specific input value for predicting the specific predicted value, and a specific processing performed on the input specific input value to calculate a specific predicted value. Return based on the specific predicted value calculation unit and the settlement value, the general plan value, or the specific predicted value (however, if both the general plan value and the specific predicted value exist, the general plan value). It has a linear prediction value calculation unit that calculates a linear prediction value predicted based on a straight line, and uses the computer to perform each of the plurality of items for each year from the N year to the M year later. When the general plan value or the specific predicted value exists, the period from the N year to the L year later is the general plan value or the specific predicted value (however, the general plan value and the specific predicted value). If both are present, the general plan value is selected, and the period from L year to M year is the settlement value, the general plan value, or the specific predicted value (however, the general plan value). When both the specific predicted value and the specific predicted value exist, the straight line predicted value calculation unit calculates the value from the general plan value) based on the regression line (excluding the case where only the settlement value is used). When a linear forecast value is selected and the general plan value or the specific forecast value does not exist, the period from the N year to the M year later is calculated by the linear forecast value calculation unit based on the settlement value. The second linear predicted value is selected, and if the specific predicted value exists, the specific predicted value processed by the specific predicted value calculation unit is selected during the period from the L year to the M year. ,
It is characterized in that the selected predicted value is output as a prediction result.

本発明の実施形態における収支予測装置の概要を示す説明図。The explanatory view which shows the outline of the income and expenditure prediction apparatus in embodiment of this invention. (A)及び(B)は本実施形態の収支予測装置における入力と出力の関係を示す模式図。(A) and (B) are schematic views showing the relationship between the input and the output in the income and expenditure prediction device of this embodiment. 本実施形態の収支予測装置における入力部の基本データ入力画面を示す説明図。The explanatory view which shows the basic data input screen of the input part in the income and expenditure prediction apparatus of this embodiment. 本実施形態の収支予測装置における収支に関する複数の項目を示す説明図。The explanatory view which shows a plurality of items about the balance in the balance prediction apparatus of this embodiment. 本実施形態の収支予測装置の特定予測値のデータ入力画面を示す説明図。The explanatory view which shows the data input screen of the specific prediction value of the income and expenditure prediction apparatus of this embodiment. 本実施形態の収支予測装置の処理の概要を示す説明図。The explanatory view which shows the outline of the processing of the income and expenditure prediction apparatus of this embodiment. 本実施形態の収支予測装置における直線予測値算出部による直線予測結果を示す説明図。The explanatory view which shows the linear prediction result by the linear prediction value calculation part in the balance prediction apparatus of this embodiment. 本実施形態の収支予測装置1の収支予測方法を示すフローチャート。The flowchart which shows the balance prediction method of the balance prediction apparatus 1 of this embodiment. (A)〜(C)は、本実施形態の収支予測装置における予測結果の例を示す説明図。(A) to (C) are explanatory views showing an example of a prediction result in the income and expenditure prediction device of this embodiment. 図9(B)の予測結果のうち、経費だけを表示させた例を示す説明図。An explanatory diagram showing an example in which only expenses are displayed among the prediction results of FIG. 9B.

次に、図1〜図10を参照して、本発明の実施形態の一例である収支予測装置1、収支予測プログラム及び方法について説明する。図1は、本発明の実施形態における収支予測装置の機能的構成を示す説明図である。収支予測装置1は、決算値入力部2、一般計画値入力部3、特定入力値入力部4、直線予測値算出部5、特定予測値算出部6、選択部7、及び出力部8を備えている。本実施形態においては、事業として上下水道事業を例に挙げ、上下水道事業において将来の収益を予測する装置について説明する。 Next, the balance prediction device 1, the balance prediction program, and the method, which are examples of the embodiments of the present invention, will be described with reference to FIGS. 1 to 10. FIG. 1 is an explanatory diagram showing a functional configuration of a balance forecasting device according to an embodiment of the present invention. The income and expenditure prediction device 1 includes a settlement value input unit 2, a general plan value input unit 3, a specific input value input unit 4, a linear prediction value calculation unit 5, a specific prediction value calculation unit 6, a selection unit 7, and an output unit 8. ing. In the present embodiment, a water and sewage business is taken as an example as a business, and a device for predicting future profits in the water and sewage business will be described.

本実施形態の収支予測装置1は、ユーザの所有するコンピュータ上で作動するプログラムにより構成され、当該プログラムはサーバ(図示省略)からダウンロードすることが可能である。当該プログラムは、実行形式のプログラムとしてもよく、一般的な表計算ソフト上で作動するスプレッドシートのような形態としてもよい。また、当該プログラムは、CDロム等の記録媒体によって配布されるものであってもよい。また、クラウドサーバにおいて、運営者側が管理するプログラムとして、ユーザの所有するコンピュータ上で作動するようにしてもよい。 The income and expenditure prediction device 1 of the present embodiment is composed of a program that operates on a computer owned by the user, and the program can be downloaded from a server (not shown). The program may be an executable program or a spreadsheet-like program that operates on general spreadsheet software. In addition, the program may be distributed by a recording medium such as a CD ROM. Further, in the cloud server, the program may be operated on the computer owned by the user as a program managed by the operator.

図2を参照して、本実施形態の収支予測装置1は、予測を開始する基準年をN年(Nは整数)とすると、N年を含むM年後(Mは整数、例えば50)までの予測を行う収支予測装置であって、N年からK年前(Kは整数、例えば5)までの期間の決算値と、N年を含むL年後(LはM未満の整数、例えば10)までの期間の一般計画値と、N年を含むM年後までの期間について特定処理を要する特定予測値とを用いて予測を行う。 With reference to FIG. 2, when the base year for starting forecasting is N years (N is an integer), the balance forecasting device 1 of the present embodiment is up to M years after including N years (M is an integer, for example, 50). It is a balance forecasting device that predicts the settlement value of the period from N years to K years ago (K is an integer, for example 5) and L years after including N years (L is an integer less than M, for example 10). ), And a specific forecast value that requires specific processing for the period up to M years including N years.

図2(A)は、今後50年までの上下水道事業の収支の予測を行うために入力すべき項目の概要を示している。図2(A)及び(B)において、N−5からN+49で表されている表は、基準年であるN年度の5年前から49年後までの後述する年度別入力画面30を示している。 FIG. 2A shows an outline of the items to be entered in order to forecast the income and expenditure of the water and sewage business up to the next 50 years. In FIGS. 2A and 2B, the table represented by N-5 to N + 49 shows the year-specific input screen 30 described later from 5 years before to 49 years after the base year N. There is.

図2において、一般項目とは、例えば、営業経費のように収支における一般的な項目を示しており、特定の処理の必要のない項目である。特定項目とは、例えば、上下水道事業の料金収入等のように、今後の人口の推移等を考慮するために特定の処理が必要となる項目である。 In FIG. 2, the general item indicates a general item in the income and expenditure, such as operating expenses, and is an item that does not require specific processing. The specific item is an item that requires specific processing in order to consider future population changes, such as toll income of water and sewage business.

本実施形態においては、予測開始の基準年をN年度としている。ユーザが入力すべき項目としては、図2(A)の決算値入力領域10(決算値入力部2)における決算値がある。決算値入力領域10は、基準年であるN年度の5年前まで、即ち、N−1年度からN−5年度までの決算値を入力する。基準年であるN年度は、通常は来年度であることから、今年度となるN−1年度は、通常は決算予測値を入力することになる。 In this embodiment, the base year for starting the forecast is the N year. As an item to be input by the user, there is a settlement value in the settlement value input area 10 (settlement value input unit 2) of FIG. 2A. The settlement value input area 10 inputs the settlement values up to 5 years before the base year N, that is, from N-1 to N-5. Since the base year N is usually the next year, the forecast value for financial results is usually entered in the N-1 year, which is the current year.

また、ユーザは、図2(A)における一般計画値入力領域11に、各自治体で行われているように、N年度を含めて今後10年間の計画値を入力する。この一般計画値入力領域11においては、特定の処理の必要がない計画値を入力する。 Further, the user inputs the planned value for the next 10 years including the N fiscal year into the general planned value input area 11 in FIG. 2 (A), as is performed in each local government. In the general plan value input area 11, a plan value that does not require specific processing is input.

また、ユーザは、特定項目における予測値として、特定項目入力領域12に、予測に関して特定の処理が必要な特定入力値を入力する。この特定項目入力領域12は、特定入力値入力部4で入力した特定入力値を基礎として、N年度を含めて今後50年間の特定予測値の入力が行われる。 Further, the user inputs a specific input value that requires specific processing for prediction in the specific item input area 12 as a predicted value in the specific item. In the specific item input area 12, based on the specific input value input by the specific input value input unit 4, the specific predicted value for the next 50 years including the N year is input.

図2(A)においては、一般項目及び特定項目について、決算値入力領域10に決算値が入力されている。ここで、決算値入力領域10においては、特定項目であっても、既に決算において処理がなされ、数値として決算報告等に記載されているため、ユーザとしては、一般項目と同様に特定項目も入力することができる。 In FIG. 2A, settlement values are input to the settlement value input area 10 for general items and specific items. Here, in the settlement value input area 10, even if it is a specific item, it has already been processed in the settlement and is described as a numerical value in the settlement report or the like, so that the user inputs the specific item as well as the general item. can do.

また、図2(A)の一般項目の1行目においては、N年度からN+9年度の領域に、自治体等で計画がなされている計画値が入力されている。一方で、同行のN+10年度からN+49年度までの領域には、計画等がないため、ユーザは入力を行わない。 Further, in the first line of the general item in FIG. 2 (A), the planned value planned by the local government or the like is input in the area from N year to N + 9 year. On the other hand, since there is no plan or the like in the area from N + 10 to N + 49 of the bank, the user does not input.

また、図2(A)の一般項目の2行目においては、N年度からN+9年度の領域に、計画値は記入されていない。これは、当該一般項目について、その自治体における計画が策定されていない場合にこのような事態が生じうる。なお、同行のN+10年度からN+49年度までの領域には、1行目と同様に計画等がないため、ユーザは入力を行わない。 Further, in the second line of the general item in FIG. 2 (A), the planned value is not entered in the area from N year to N + 9 year. This can happen if the municipality does not have a plan for the general item. As in the first line, there is no plan or the like in the area from N + 10 to N + 49 of the bank, so the user does not input.

また、図2(A)の特定項目の1行目においては、N年度からN+49年度の領域に、特定入力値入力部4において入力された特定入力値を元にして特定予測値算出部6が算出した予測値が特定項目入力領域12に入力されている。 Further, in the first line of the specific item in FIG. 2A, the specific predicted value calculation unit 6 is based on the specific input value input in the specific input value input unit 4 in the area from N year to N + 49 year. The calculated predicted value is input to the specific item input area 12.

また、図2(A)の特定項目の2行目においては、ユーザが特定入力値を入力していないか、又はユーザが特定入力値入力部4において、後述する反映選択部41(直線値選択部)で特定予測値を予測値として反映させない旨の選択を行っているため、特定項目入力領域12には、予測値は反映されていない。 Further, in the second line of the specific item in FIG. 2A, either the user has not input the specific input value, or the user has entered the specific input value input unit 4 and the reflection selection unit 41 (straight line value selection) described later. Part) selects not to reflect the specific predicted value as the predicted value, so that the predicted value is not reflected in the specific item input area 12.

図2(B)は、上記入力が行われた際に出力される値のイメージを示す模式図である。本実施形態の収支予測装置1によれば、上記入力が行われると、選択部7によって、一般項目の1行目のN年度からN+9年度には、図2(A)の一般項目の1行目に入力された計画値がそのまま予測値として採用される。 FIG. 2B is a schematic diagram showing an image of a value output when the above input is performed. According to the income and expenditure forecasting device 1 of the present embodiment, when the above input is made, the selection unit 7 selects one line of the general item in FIG. 2 (A) from the first line of the general item in the N to N + 9 years. The planned value entered in the eyes is adopted as the predicted value as it is.

また、同行のN+10年度からN+49年度までは、直線予測値算出部5によって算出された第1直線予測値が選択部7によって選択され、予測値として採用される。この第1直線予測値は、直線予測値算出部5によって、N−1年度からN−5年度までの決算値と、N年度からN+9年度まで入力された一般計画値とを基礎として、回帰直線に基づいて予測された直線予測値である。 In addition, from N + 10 to N + 49 of the bank, the first linear prediction value calculated by the linear prediction value calculation unit 5 is selected by the selection unit 7 and adopted as the prediction value. This first straight line predicted value is a regression line based on the settlement value from N-1 to N-5 and the general plan value input from N to N + 9 by the straight line predicted value calculation unit 5. It is a linear predicted value predicted based on.

図2(B)の一般項目の2行目においては、図2(A)で計画値が入力されていないことから、N年度からN+49年度までの領域において、直線予測値算出部5によって算出された第2直線予測値が選択部7によって選択される。この第2直線予測値は、直線予測値算出部5によって、N−1年度からN−5年度までの決算値のみに基づいて、回帰直線に基づいて予測された直線予測値である。 In the second line of the general item of FIG. 2 (B), since the planned value is not input in FIG. 2 (A), it is calculated by the linear prediction value calculation unit 5 in the region from N year to N + 49 year. The second linear predicted value is selected by the selection unit 7. This second straight line predicted value is a straight line predicted value predicted by the straight line predicted value calculation unit 5 based only on the settlement value from N-1 to N-5 based on the regression line.

図2(B)の特定項目の第1行目においては、図2(A)で特定項目入力領域12に予測値が入力されているので、N年度からN+49年度までの領域において、特定予測値算出部6によって処理された特定予測値が選択部7により選択される。 In the first line of the specific item in FIG. 2 (B), since the predicted value is input to the specific item input area 12 in FIG. 2 (A), the specific predicted value is input in the area from N year to N + 49 year. The specific predicted value processed by the calculation unit 6 is selected by the selection unit 7.

図2(B)の特定項目の第2行目においては、図2(A)において、ユーザが特定入力値を入力していないか、後述する反映選択部41で特定予測値を予測値として反映させない旨の選択を行っているため、選択部7は、特定項目入力領域12には、予測値を反映させない。 In the second line of the specific item in FIG. 2 (B), whether the user has not input the specific input value in FIG. 2 (A) or the specific predicted value is reflected as the predicted value by the reflection selection unit 41 described later. Since the selection is made to prevent the selection, the selection unit 7 does not reflect the predicted value in the specific item input area 12.

このとき、N年度からN+49年度までの領域において、直線予測値算出部5によって算出された第2直線予測値が選択部7によって選択される。この第2直線予測値は、直線予測値算出部5によって、N−1年度からN−5年度までの決算値のみに基づいて、回帰直線に基づいて予測された直線予測値である。 At this time, in the region from N year to N + 49 year, the second straight line predicted value calculated by the straight line predicted value calculation unit 5 is selected by the selection unit 7. This second straight line predicted value is a straight line predicted value predicted by the straight line predicted value calculation unit 5 based only on the settlement value from N-1 to N-5 based on the regression line.

次に、本実施形態の収支予測装置1における画面の構成について説明する。収支予測装置1においては、ユーザの使用するコンピュータの表示画面に、図3に示す基本データ入力画面20と、図4に示す年度別入力画面30と、図5(A)に示す特定入力値入力部である企業債情報入力画面40と、図5(B)に示す同じく特定入力値入力部である水道料金入力画面50と、図5(C)に示す同じく特定入力値入力部である建設費入力画面60を備えている。 Next, the configuration of the screen in the income and expenditure prediction device 1 of the present embodiment will be described. In the balance prediction device 1, the basic data input screen 20 shown in FIG. 3, the yearly input screen 30 shown in FIG. 4, and the specific input value input shown in FIG. 5 (A) are displayed on the display screen of the computer used by the user. The corporate bond information input screen 40, which is a unit, the water charge input screen 50, which is also a specific input value input unit shown in FIG. 5 (B), and the construction cost, which is also a specific input value input unit shown in FIG. 5 (C). It has an input screen 60.

基本データ入力画面20は、図3に示すように、収支を予測したい最初の年度N(通常は来年度)を入力する基準年度入力部21と、直線関数予測の基礎データとなる年度を入力する基礎データ入力部22と、基準年度Nから5年度前の当初現金保有額を入力する当初現金保有額入力部23が設けられている。 As shown in FIG. 3, the basic data input screen 20 includes a base year input unit 21 for inputting the first year N (usually the next year) for which the balance is to be predicted, and a basis for inputting the year to be the basic data for linear function prediction. A data input unit 22 and an initial cash holding amount input unit 23 for inputting the initial cash holding amount five years before the base year N are provided.

また、基本データ入力画面20には、消費税計算のための各種パラメータの設定が可能な消費税率設定部24が設けられている。パラメータの設定は、消費税率設定部24の下方に図示された仕入税額等の税金関係図25を参照して数値を入力する。 Further, the basic data input screen 20 is provided with a consumption tax rate setting unit 24 capable of setting various parameters for consumption tax calculation. For the parameter setting, a numerical value is input with reference to the tax-related diagram 25 such as the purchase tax amount shown below the consumption tax rate setting unit 24.

また、基本データ入力画面20には、基準年度Nを含み、N−5年度からN+49年度までの消費税率を入力する消費税率入力部26が設けられている。ここでは、例えば何年度から消費税率が変更されることが明らかになっていれば、当該年度から変更される消費税率を入力する。 Further, the basic data input screen 20 is provided with a consumption tax rate input unit 26 for inputting a consumption tax rate from N-5 to N + 49, including the base year N. Here, for example, if it is clear from what year the consumption tax rate will be changed, the consumption tax rate to be changed from that year is input.

図4は、本実施形態の収支予測装置1における収支に関する複数の項目が設けられた年度別入力画面30を示す説明図である。年度別入力画面30には、年度が表示された年度表示31と、その年度の消費税を示す消費税表示32と、決算情報を入力或いは表示させるための決算値入力部2が設けられている。決算値入力部2には、収益事業である上下水道事業の営業収益等の決算情報を入力する。 FIG. 4 is an explanatory diagram showing an annual input screen 30 provided with a plurality of items related to the income and expenditure in the income and expenditure prediction device 1 of the present embodiment. The year-specific input screen 30 is provided with a year display 31 in which the year is displayed, a consumption tax display 32 in which the consumption tax for that year is displayed, and a settlement value input unit 2 for inputting or displaying settlement information. .. In the settlement value input unit 2, the settlement information such as the operating revenue of the water and sewage business, which is a profitable business, is input.

年度別入力画面30には、その他に、直線予測値表示34、特定予測値表示35、計画値表示36、これらの予測値から最終的に採用された値を示す採用数値表示37、及びどの予測値が採用されたかを表示する採用数値の種類38の各表示が表示される。これらの表示の内、計画値表示36は、年度によって入力が可能な領域となっており、直線予測値表示34、特定予測値表示35、採用数値表示37、及び採用数値の種類38は、表示のみで入力が不可となっている。 In addition to the yearly input screen 30, the linear predicted value display 34, the specific predicted value display 35, the planned value display 36, the adopted numerical value display 37 showing the value finally adopted from these predicted values, and which prediction Each display of the type 38 of the adopted numerical value indicating whether the value has been adopted is displayed. Of these displays, the planned value display 36 is an area that can be input depending on the year, and the linear predicted value display 34, the specific predicted value display 35, the adopted numerical value display 37, and the adopted numerical value type 38 are displayed. It is not possible to input only.

年度別入力画面30は、収支を予測したい最初の年度である基準年度のN年度を含み、N−5年度からN+49年度までの合計55枚が準備されている。ここで、年度別入力画面30においては、各年度の範囲毎に入力できる項目が異なるように設定されている。 The year-specific input screen 30 includes the N year of the base year, which is the first year for which the income and expenditure is to be predicted, and a total of 55 sheets from the N-5 year to the N + 49 year are prepared. Here, on the year-specific input screen 30, the items that can be input are set to be different for each range of each year.

図2(A)を参照すると、N−5年度からN−1年度までは、決算値の入力のみを行うものであるため、このN−5年度からN−1年度においては、年度別入力画面30において、決算値入力部2のみが入力可能となっており、他の直線予測値表示34、及び計画値表示36の各表示部においては、入力ができないように設定されている。 With reference to FIG. 2 (A), since only the settlement value is input from N-5 to N-1 year, the input screen for each year is entered from N-5 to N-1. In 30, only the settlement value input unit 2 can be input, and the other display units of the linear predicted value display 34 and the planned value display 36 are set so that they cannot be input.

次に、N年度からN+9年度においては、年度別入力画面30において、決算値入力部2及び直線予測表示34の各表示部は入力ができないようになっている。一方で、計画値表示36の表示部においては、ユーザが値を入力可能となるように設定されている。 Next, from the N fiscal year to the N + 9 fiscal year, on the annual input screen 30, each display unit of the settlement value input unit 2 and the linear forecast display 34 cannot be input. On the other hand, the display unit of the planned value display 36 is set so that the user can input a value.

次に、図5(A)〜(C)を参照して、本実施形態の収支予測装置1における特定入力値入力部4について説明する。図5(A)は、企業債に関する企業債関係情報を入力する企業債情報入力画面40の一例を示している。図5(B)は、収益事業としての水道事業によって得られる水道料金を算出するための水道料金入力画面50の一例を示している。図5(C)は、新規設備の建築や、既存設備のメンテナンスのための費用である建設費に関する情報を入力する建設費入力画面60の一例を示している。 Next, the specific input value input unit 4 in the income and expenditure prediction device 1 of the present embodiment will be described with reference to FIGS. 5A to 5C. FIG. 5A shows an example of the corporate bond information input screen 40 for inputting corporate bond-related information regarding corporate bonds. FIG. 5B shows an example of a water charge input screen 50 for calculating a water charge obtained by a water supply business as a profitable business. FIG. 5C shows an example of the construction cost input screen 60 for inputting information on the construction cost, which is the cost for the construction of new equipment and the maintenance of existing equipment.

企業債情報入力画面40では、図5(A)に示すように、反映選択部41が設けられており、「利息返済額を各年度の入力表に反映させるか否か」「元金返済額を各年度の入力表に反映させるか否か」及び「借入金額を各年度の入力表に反映させるか否か」を選択することができる。 As shown in FIG. 5A, the corporate bond information input screen 40 is provided with a reflection selection unit 41, which is "whether or not the interest repayment amount is reflected in the input table for each fiscal year" and "principal repayment amount". Can be selected from "whether or not to reflect in the input table for each year" and "whether or not to reflect the borrowed amount in the input table for each year".

反映選択部41では、これらの項目を反映させる旨の指定をした場合、選択部7が特定予測値算出部6により処理された特定予測値を選択する。一方で、これらの項目を反映させない旨の指定をした場合、選択部7が特定予測値算出部6により処理された特定予測値を選択せず、第2直線予測値を選択する。 When the reflection selection unit 41 specifies that these items should be reflected, the selection unit 7 selects the specific prediction value processed by the specific prediction value calculation unit 6. On the other hand, when it is specified that these items are not reflected, the selection unit 7 does not select the specific prediction value processed by the specific prediction value calculation unit 6, but selects the second linear prediction value.

また、企業債情報入力画面40では、図5(A)に示すように、基準年度表示部42、直線関数予測の基礎データを取得する年度の表示43が設けられている。また、その下方には、企業債情報入力部44が設けられている。この企業債情報入力部44においては、複利等の複雑な条件を考慮する必要がないように、借入年月日、借入額、償還開始日、据置回数、償還回数、利率という明確な情報を入力すれば予測を行うことが可能となっている。 Further, as shown in FIG. 5A, the corporate bond information input screen 40 is provided with a base year display unit 42 and a display 43 for the year in which basic data for linear function prediction is acquired. A corporate bond information input unit 44 is provided below the corporate bond information input unit 44. In the corporate bond information input unit 44, clear information such as the borrowing date, the borrowing amount, the redemption start date, the number of deferments, the number of redemptions, and the interest rate is input so that it is not necessary to consider complicated conditions such as compound interest. Then it is possible to make a prediction.

企業債情報入力画面40において、必要な情報を入力したときは、「元金返済額」及び「利息返済額」が、償還回数や複利等の条件を勘案した計算式によって計算され、企業債情報表示部45に表示される。また、この「元金返済額」及び「利息返済額」は、反映選択部41において反映させる旨の指定をしたときは、年度別入力画面30の所定の年度のデータとして反映される。 When necessary information is entered on the corporate bond information input screen 40, the "principal repayment amount" and "interest repayment amount" are calculated by a calculation formula that takes into account conditions such as the number of redemptions and compound interest, and the corporate bond information. It is displayed on the display unit 45. Further, when the reflection selection unit 41 specifies that the "principal repayment amount" and the "interest repayment amount" are to be reflected, they are reflected as the data of the predetermined year on the year-specific input screen 30.

次に、図5(B)を参照して、水道料金入力画面50について説明する。この水道料金入力画面50においても、反映選択部51として、「各年度の入力表に反映させるか否か」を選択することができるようになっている。また、水道料金入力画面50では、基準年度表示部52が設けられ、その下方に、人口見込み、水道料金総額見込み、料金改定計数の各項目の入力が可能な水道関係入力部53となっている。また、その下の水道料金総額54の欄には、上記条件下における水道料金の総額が計算されて表示されるようになっている。 Next, the water charge input screen 50 will be described with reference to FIG. 5 (B). Also on the water charge input screen 50, the reflection selection unit 51 can select "whether or not to reflect in the input table of each year". Further, on the water charge input screen 50, a base year display unit 52 is provided, and below that, there is a water supply-related input unit 53 capable of inputting each item of population forecast, total water charge forecast, and charge revision count. .. Further, in the column of total water charge 54 below that, the total amount of water charge under the above conditions is calculated and displayed.

次に、図5(C)を参照して、建設費入力画面60について説明する。この建設費入力画面60においても、反映選択部61が設けられている。また、基準年度表示部62が設けられ、直線関数予測の基礎データを取得する年度の表示63が設けられている。その下方には、新規に建設を行う建設費の負担分である新設費入力部64が設けられている。また、その下方には、建築物の更新費に関する入力を行う更新費入力部65が設けられている。 Next, the construction cost input screen 60 will be described with reference to FIG. 5 (C). The reflection selection unit 61 is also provided on the construction cost input screen 60. In addition, a base year display unit 62 is provided, and a year display 63 for acquiring basic data for linear function prediction is provided. Below that, a new construction cost input unit 64, which is a share of the construction cost for newly constructing, is provided. Further, below that, a renewal cost input unit 65 for inputting the renewal cost of the building is provided.

更新費入力部65では、ケース1からケース3までの3パターンで、今後発生する更新費を入力することができる。これにより、更新費に関して想定される複数のケースの金額を入力しておき、状況に応じてケースを切り替えるというような運用が可能となる。 In the renewal cost input unit 65, the renewal cost to be generated in the future can be input in three patterns from case 1 to case 3. As a result, it is possible to input the amounts of a plurality of cases assumed for the renewal cost and switch the cases according to the situation.

一般計画値入力部3は、本実施形態においては、図2(A)のN年度からN+9年度における年度別入力画面30の計画値表示36が該当する(図3参照)。この計画値表示36には、各自治体が計画している10年計画等の計画値を直接入力することができる。 In the present embodiment, the general plan value input unit 3 corresponds to the plan value display 36 of the year-specific input screen 30 from the N year to the N + 9 year in FIG. 2 (A) (see FIG. 3). A planned value such as a 10-year plan planned by each local government can be directly input to the planned value display 36.

特定予測値算出部6は、図3に示す年度別入力画面30に入力される複数の項目の内、特定の処理を要する特定処理項目について、今後50年間の特定予測値を算出する。具体的には、ユーザは、図5(A)に示す企業債情報入力画面40、図5(B)に示す水道料金入力画面50、及び図5(C)に示す建設費入力画面60の他、図示しない入力画面において、長期前受金・減価償却費関係情報、及び人件費に関する人件費関係情報の入力を行う。 The specific predicted value calculation unit 6 calculates the specific predicted value for the next 50 years for the specific processing item that requires specific processing among the plurality of items input to the yearly input screen 30 shown in FIG. Specifically, the user can use the corporate bond information input screen 40 shown in FIG. 5 (A), the water charge input screen 50 shown in FIG. 5 (B), and the construction cost input screen 60 shown in FIG. 5 (C). , Input long-term advance payment / depreciation related information and personnel cost related information related to labor costs on an input screen (not shown).

特定処理項目とは、本実施形態では、企業債に関係する企業債関係情報、収益事業料金に関係する収益事業料金関係情報、建設費に関係する建設費関係情報、長期前受金・減価償却費に関する長期前受金・減価償却費関係情報、及び人件費に関する人件費関係情報をいう。 In this embodiment, the specific processing items are related to corporate bond-related information related to corporate bonds, profitable business charge-related information related to profitable business charges, construction cost-related information related to construction costs, and long-term advance payment / depreciation costs. Long-term advance payment / depreciation related information and personnel cost related information related to personnel costs.

直線予測値算出部5は、年度別入力画面30に入力される決算情報等から、回帰直線に基づいて今後50年間の直線予測値を算出する。具体的には、複数年における決算情報を取得し、過去の収支の傾向から回帰直線を求め、今後の収支を予測する第1直線予測値と、決算情報のみから今後の収支を予測する第2直線予測値の2つの予測値の計算を行う。 The straight line predicted value calculation unit 5 calculates the straight line predicted value for the next 50 years based on the regression line from the settlement information and the like input to the year-specific input screen 30. Specifically, the first straight line forecast value that acquires the settlement information for multiple years, obtains the regression line from the tendency of the past balance, and predicts the future balance, and the second that predicts the future balance only from the settlement information. Two predicted values of linear predicted values are calculated.

選択部7は、年度別入力画面30に入力される複数の項目毎に、計画値の有無、及び特定予測値の有無を確認し、予測結果として出力する。図2(B)に示す一般項目において、N年度からN+9年度においては、計画値が存在する場合には計画値を選択し、計画値が存在せず特定予測値が存在する場合には特定予測値を選択する。また、計画値及び特定予測値のいずれも存在しない場合は、直線予測値算出部5により算出された第2直線予測値を選択する。 The selection unit 7 confirms the presence / absence of the planned value and the presence / absence of the specific predicted value for each of the plurality of items input to the year-specific input screen 30, and outputs the predicted result. In the general items shown in FIG. 2B, from the N year to the N + 9 year, the planned value is selected when the planned value exists, and the specific predicted value exists when the planned value does not exist and the specific predicted value exists. Select a value. If neither the planned value nor the specific predicted value exists, the second straight line predicted value calculated by the straight line predicted value calculation unit 5 is selected.

また、選択部7は、図2(B)に示す一般項目のN+10年度からN+49年度において、N年度からN+9年度に計画値が存在する場合には、直線予測値算出部5により算出された第1直線予測値を選択する。同様の領域において、N年度からN+9年度に計画値が存在しない場合は、直線予測値算出部5により算出された第2直線予測値を選択する。 Further, the selection unit 7 is calculated by the linear prediction value calculation unit 5 when the planned value exists in the general items N + 10 to N + 49 shown in FIG. 2B and from N to N + 9. 1 Select a linear prediction value. In the same area, if the planned value does not exist from the N year to the N + 9 year, the second straight line predicted value calculated by the straight line predicted value calculation unit 5 is selected.

また、選択部7は、図2(B)に示す特定項目のN年度からN+49年度において、特定予測値算出部6が算出した予測値が特定項目入力領域12に入力されているときは、当該予測値を選択する。一方で、ユーザが特定入力値を入力していないか、反映選択部41で特定予測値を予測値として反映させない旨の選択を行っている場合は、選択部は、直線予測値算出部5により算出された第2直線予測値を選択する。 Further, when the predicted value calculated by the specific predicted value calculation unit 6 is input to the specific item input area 12 from the N year to the N + 49 year of the specific item shown in FIG. Select a predicted value. On the other hand, if the user has not input a specific input value or the reflection selection unit 41 has selected not to reflect the specific prediction value as a prediction value, the selection unit uses the linear prediction value calculation unit 5. Select the calculated second linear predicted value.

出力部8は、選択部7により選択された一の予測値を予測結果として、将来の年度別入力画面30、及び図9(A)〜(C)に示すグラフに出力するものである。また、出力部8は、基準年度であるN年度からN+49年度までの各予測値をまとめた結果一覧(図6の符号71)に出力する。 The output unit 8 outputs one predicted value selected by the selection unit 7 as a prediction result to the future year-specific input screen 30 and the graphs shown in FIGS. 9A to 9C. Further, the output unit 8 outputs to a result list (reference numeral 71 in FIG. 6) summarizing each predicted value from the base year N to N + 49.

次に、図6を参照して、本実施形態の収支予測装置1の処理の概要を説明する。まず、ユーザは、N−5年度からN−1年度の年度別入力画面30に決算情報を入力する。その際、N−1年度の決算が確定していない場合は、決算の見込み値を入力する。 Next, with reference to FIG. 6, an outline of the processing of the income and expenditure prediction device 1 of the present embodiment will be described. First, the user inputs the settlement information on the yearly input screen 30 from the N-5 year to the N-1 year. At that time, if the settlement of accounts for the N-1 fiscal year is not finalized, enter the estimated value of the settlement of accounts.

また、今後10年間の計画値が存在する場合、N年度からN+9年度の年度別入力画面30において、ユーザが計画値を計画値表示36の欄に入力する。 If there is a planned value for the next 10 years, the user inputs the planned value in the field of the planned value display 36 on the yearly input screen 30 from the N year to the N + 9 year.

一方で、N−5年度からN−1年度の決算情報が入力されると、直線予測値算出部5が当該決算情報から回帰直線に基づいてN+49年度の直線予測値を算出して該当欄に記入する。このとき、直線予測値算出部5は、N年度からN+9年度の年度別入力画面30に計画値又は特定予測値が入力されていないときは、決算情報のみから第2直線予測値を算出する。N年度からN+9年度の年度別入力画面30に計画値又は特定予測値が入力されているときは、決算情報に加えて、計画値又は特定予測値をパラメータとして用いて第1直線予測値を算出する。 On the other hand, when the settlement information for N-5 to N-1 is input, the linear forecast value calculation unit 5 calculates the linear forecast value for N + 49 based on the regression line from the settlement information and fills in the corresponding column. Fill out. At this time, when the planned value or the specific predicted value is not input to the yearly input screen 30 from the N year to the N + 9 year, the straight line predicted value calculation unit 5 calculates the second straight line predicted value only from the settlement information. When the planned value or the specific predicted value is input to the yearly input screen 30 from the N year to the N + 9 year, the first straight line predicted value is calculated using the planned value or the specific predicted value as a parameter in addition to the settlement information. To do.

この直線予測値算出部5による直線予測値は、図7に示すようなイメージとなる。図7の縦軸は各項目の金額であり、横軸はN−5年度からN+49年度の各年度を示している。図7の円で囲まれた部分は、N−5年度からN−1年度の決算情報の値と、N年度からN+9年度の計画値の値であり、各年度毎に金額にばらつきがある。直線予測値算出部5においては、これらの年度の金額から、N+10年度からN+49年度の直線予測値を算出してグラフ化を行う。 The linear predicted value by the linear predicted value calculation unit 5 has an image as shown in FIG. 7. The vertical axis of FIG. 7 is the amount of each item, and the horizontal axis shows each year from N-5 to N + 49. The part surrounded by a circle in FIG. 7 is the value of the settlement information from the N-5 year to the N-1 year and the value of the planned value from the N year to the N + 9 year, and the amount varies from year to year. The linear prediction value calculation unit 5 calculates the linear prediction values from N + 10 to N + 49 from the amounts of these years and graphs them.

直線予測値算出部5においては、上記のような処理を行っているため、演算結果によっては、N+10年度からN+49年度の各年度の上昇率(グラフの傾き)が異なることとなり、傾きがプラス(右肩上がり)の場合だけでなく、マイナス(右肩下がり)になることもある。 Since the linear prediction value calculation unit 5 performs the above processing, the rate of increase (slope of the graph) in each year from N + 10 to N + 49 differs depending on the calculation result, and the slope is positive (slope of the graph). Not only in the case of rising to the right, but also in the case of minus (falling to the right).

このように、計画値表示36と、特定予測値表示35と、直線予測値表示34が算出されると、図6に示すように、各値がN年度からN+49年度の年度別入力画面30に反映される。ここで、図6のN年度の年度別入力画面30においては、項目としてA、B、及びCが例示されている。 When the planned value display 36, the specific predicted value display 35, and the linear predicted value display 34 are calculated in this way, as shown in FIG. 6, each value is displayed on the yearly input screen 30 from the N year to the N + 49 year. It will be reflected. Here, A, B, and C are exemplified as items in the year-specific input screen 30 of the Nth year of FIG.

項目Aでは、計画値表示36及び直線予測値表示34が記録されている。項目Bでは、特定予測値表示35及び直線予測値表示34が記録されている。項目Cでは、直線予測値表示34のみが記録されている。このような状況の場合、図1に示す選択部7により、各項目の採用数値表示37として、項目Aが計画値となり、項目Bが特定予測値となり、項目Cが直線予測値となるように選択が行われる。 In item A, the planned value display 36 and the linear predicted value display 34 are recorded. In item B, the specific predicted value display 35 and the linear predicted value display 34 are recorded. In item C, only the linear predicted value display 34 is recorded. In such a situation, the selection unit 7 shown in FIG. 1 sets the item A as the planned value, the item B as the specific predicted value, and the item C as the linear predicted value as the adopted numerical display 37 of each item. A selection is made.

以上のような処理がN年度のみならず、N+1からN+49の年度別入力画面30に反映され、各項目において記録されている予測値に応じて、選択部7により予測値の選択が行われる。 The above processing is reflected not only in the N year but also in the yearly input screens 30 from N + 1 to N + 49, and the selection unit 7 selects the predicted value according to the predicted value recorded in each item.

以上の処理が行われると、図1に示す出力部8は、図6に示すように、演算された予測値を年度別予測結果の一覧表71に出力する。また、出力部8は、年度別予測結果の予測値と、基本データ入力画面20において入力された当初現金保有額入力部23の金額を用いて、図6に示す年度別現金保有額のグラフ72を作成する。 When the above processing is performed, the output unit 8 shown in FIG. 1 outputs the calculated predicted value to the list 71 of the forecast results for each year as shown in FIG. Further, the output unit 8 uses the predicted value of the annual forecast result and the amount of the initial cash holding amount input unit 23 input on the basic data input screen 20, and the graph 72 of the annual cash holding amount shown in FIG. To create.

次に、図8〜図10を参照して、本実施形態の収支予測装置1による収支予測方法について説明する。図8は本実施形態の収支予測装置1の収支予測方法を示すフローチャートである。図9(A)〜(C)は、本実施形態の収支予測装置1における予測結果の例を示す説明図である。図10は図9(B)の予測結果のうち、経費だけを表示させた例を示す説明図である。 Next, the balance prediction method by the balance prediction device 1 of the present embodiment will be described with reference to FIGS. 8 to 10. FIG. 8 is a flowchart showing a balance prediction method of the balance prediction device 1 of the present embodiment. 9 (A) to 9 (C) are explanatory views showing an example of a prediction result in the income and expenditure prediction device 1 of the present embodiment. FIG. 10 is an explanatory diagram showing an example in which only the expenses are displayed among the prediction results of FIG. 9B.

上下水道事業において今後50年間の収支予測を行う場合、ユーザは、コンピュータ上で本実施形態の収支予測装置1を形成するプログラムを立ち上げ、必要な準備を行う。準備作業としては、図3に示す基本データ入力画面20をコンピュータ上に表示させ、予測を開始する基準年度Nを基準年度入力部21に入力し、直線関数予測の基礎データとなる期間の始期と終期の年度を基礎データ入力部22に入力する。また、当初現金保有額入力部23に、基準年度Nから5年度前の当初現金保有額を入力する。さらに、消費税率設定部24の各年度に消費税率のデータを入力する。 When forecasting the income and expenditure for the next 50 years in the water and sewage business, the user launches a program for forming the income and expenditure forecasting device 1 of the present embodiment on a computer and makes necessary preparations. As the preparatory work, the basic data input screen 20 shown in FIG. 3 is displayed on the computer, the base year N for starting the prediction is input to the base year input unit 21, and the start of the period that becomes the basic data for the linear function prediction is set. The final year is input to the basic data input unit 22. In addition, the initial cash holding amount 5 years before the base year N is input to the initial cash holding amount input unit 23. Further, the consumption tax rate data is input in each year of the consumption tax rate setting unit 24.

上記準備が終了した後、ユーザは、図4に示す年度別入力画面30を呼び出してコンピュータ上に表示させる。決算情報は、予測を行うN年度よりも5年前の情報から入力を行う。具体的には、入力を行う年度の年度別入力画面30の画面を表示させ、収益的収支等の必要な情報の入力を行う。この入力作業を、N−5年度からN−1年度(本年度)になるまで行う。収支予測装置1のプログラムは、このユーザからの決算情報の入力を、決算値入力部2によって受け付ける(S1)。 After the above preparation is completed, the user calls the yearly input screen 30 shown in FIG. 4 and displays it on the computer. The settlement information is input from the information 5 years before the forecasted fiscal year N. Specifically, the screen of the year-specific input screen 30 of the year to be input is displayed, and necessary information such as the profit balance is input. This input work is performed from N-5 year to N-1 year (this year). The program of the income and expenditure forecasting device 1 receives the input of the settlement information from this user by the settlement value input unit 2 (S1).

次に、ユーザは、今後10年間の計画情報の入力を行い、収支予測装置1のプログラムは、このユーザからの計画情報の入力を、一般計画値入力部3によって受け付ける(S2)。この計画情報は、予測を行うN年度からN+9年度になるまで行う。具体的には、ユーザの所属する各自治体において計画された計画情報を図4に示す年度別入力画面30に入力していく。年度別入力画面30においては、計画値表示36の入力欄に、計画のある項目について、金額の入力を行う。 Next, the user inputs the plan information for the next 10 years, and the program of the balance forecasting device 1 receives the input of the plan information from this user by the general plan value input unit 3 (S2). This plan information will be provided from the forecasting year N to the year N + 9. Specifically, the plan information planned in each local government to which the user belongs is input to the yearly input screen 30 shown in FIG. On the yearly input screen 30, the amount of money is input for the item with the plan in the input field of the planned value display 36.

次に、ユーザは、特定予測用入力画面である図5(A)〜(C)の各入力画面を使用して、特定予測値を算出するための情報の入力を行う。収支予測装置1のプログラムは、このユーザからの特定処理項目の入力を、特定入力値入力部4によって受け付ける(S3)。 Next, the user inputs information for calculating the specific prediction value using each of the input screens of FIGS. 5A to 5C, which are input screens for specific prediction. The program of the income and expenditure prediction device 1 receives the input of the specific processing item from this user by the specific input value input unit 4 (S3).

例えば、企業債に関する項目は、考慮すべき項目が多いので、通常は、入力作業は熟練した担当者が行う必要があるが、本実施形態の収支予測装置1においては、図5(A)に示す企業債情報入力画面40において、借入年月日、借入額、償還開始日、据置回数、償還回数、利率という明確な情報を入力すれば予測を行うことができるようになっている。 For example, since there are many items related to corporate bonds to be considered, the input work usually needs to be performed by a skilled person in charge, but in the balance forecasting device 1 of the present embodiment, FIG. 5 (A) shows. On the corporate bond information input screen 40 shown, prediction can be made by inputting clear information such as the borrowing date, the borrowing amount, the redemption start date, the number of deferments, the number of redemptions, and the interest rate.

同様に、ユーザは、図5(B)に示す水道料金入力画面50において、人口見込み、水道料金総額見込み、料金改定計数の水道関係入力部53を入力することにより、水道料金の各年度における予測を行うことができる。その他、建設費入力画面60において、建設費の金額や、更新費のケースの選択等を行って建設費についての情報の入力を行う。また、その他の長期前受金・減価償却費関係情報、長期前受金戻入、人件費等についても同様の入力を行う。 Similarly, on the water charge input screen 50 shown in FIG. 5 (B), the user inputs the population forecast, the total water charge forecast, and the water-related input unit 53 of the charge revision count to forecast the water charge in each year. It can be performed. In addition, on the construction cost input screen 60, the amount of the construction cost, the case of the renewal cost, and the like are selected, and the information about the construction cost is input. In addition, the same input is made for other long-term advance payment / depreciation expense related information, long-term advance payment reversal, personnel expenses, etc.

次に、本実施形態の収支予測装置1のプログラムにおいて、特定予測値算出部6が、今後50年間の特定予測値の算出を行う(S4)。特定予測値の算出は、収支予測装置1に組み込まれた演算式によって行われるので、ユーザは、各項目における自明な事項についての入力を行うだけで、複雑な特定予測値の算出を行うことができる。 Next, in the program of the income and expenditure prediction device 1 of the present embodiment, the specific prediction value calculation unit 6 calculates the specific prediction value for the next 50 years (S4). Since the calculation of the specific predicted value is performed by the calculation formula incorporated in the income and expenditure prediction device 1, the user can calculate the complicated specific predicted value simply by inputting the obvious matters in each item. it can.

次に、直線予測値算出部5は、各項目について、少なくとも入力された決算値によって直線予測値(第2直線予測値)を算出する(S5)。また、各項目において、決算値のみならず一般計画値又は特定予測値が入力されている場合は、決算値に加えて一般計画値又は特定予測値もパラメータとして直線予測値(第1直線予測値)を算出する。 Next, the straight line predicted value calculation unit 5 calculates a straight line predicted value (second straight line predicted value) for each item at least based on the input settlement value (S5). In addition, when not only the settlement value but also the general plan value or the specific forecast value is input in each item, the general plan value or the specific forecast value is also used as a parameter in addition to the settlement value as the linear forecast value (first linear forecast value). ) Is calculated.

次に、選択部7は、予測値の選択を行う際の回数を示す変数iを1で初期化する(S6)。選択部7は、N=iの年度別入力画面30において、計画値が存在するか否かを判定する(S7)。計画値が存在すると判定された場合(S7においてYES)、選択部7は、その計画値を選択し(S8)、S12へ進む。 Next, the selection unit 7 initializes the variable i indicating the number of times when the predicted value is selected with 1. (S6). The selection unit 7 determines whether or not the planned value exists on the yearly input screen 30 of N = i (S7). If it is determined that the planned value exists (YES in S7), the selection unit 7 selects the planned value (S8) and proceeds to S12.

S7において計画値が存在しないと判定された場合(S7においてNO)、選択部7は、N=iの年度別入力画面30において、特定予測値が存在するか否かを判定する(S9)。特定予測値が存在すると判定された場合(S9においてYES)、選択部7は、その特定予測値を選択し(S10)、S12へ進む。 When it is determined in S7 that the planned value does not exist (NO in S7), the selection unit 7 determines whether or not the specific predicted value exists on the yearly input screen 30 of N = i (S9). When it is determined that the specific predicted value exists (YES in S9), the selection unit 7 selects the specific predicted value (S10) and proceeds to S12.

S9において特定予測値が存在しないと判定された場合(S9においてNO)、選択部7は、N=iの年度別個表において直線予測値を選択する(S11)。 When it is determined in S9 that the specific predicted value does not exist (NO in S9), the selection unit 7 selects the linear predicted value in the year-specific table of N = i (S11).

回数を示す変数iが50以下の場合(S12においてNO)、選択部7は、変数iにカウント1を追加して(S13)、S7の処理へ戻る。変数iが50以下の間、S7〜S13の処理を繰り返す。 When the variable i indicating the number of times is 50 or less (NO in S12), the selection unit 7 adds the count 1 to the variable i (S13), and returns to the process of S7. While the variable i is 50 or less, the processes of S7 to S13 are repeated.

S11において選択する回数を示す変数iが50を超えたと判定された場合、出力部8は、選択した予測値に基づいて年度別予測結果(年度別予測結果の一覧表71、年度別現金保有額のグラフ72等)を表示する(S14)。 When it is determined in S11 that the variable i indicating the number of times of selection exceeds 50, the output unit 8 outputs the forecast result by year (list of forecast results by year 71, cash holding amount by year) based on the selected forecast value. Graph 72, etc.) is displayed (S14).

以上の処理で算出された結果を、図9(A)〜(C)、及び図10に示す。図9(A)は、N年度からN+49年度における年度末の現金保有額を示すグラフである。このグラフは、図2に示す基本データ入力画面20において入力された当初現金保有額と、各年度で算出された収支から、各年度毎の現金保有額を算出している。 The results calculated by the above processing are shown in FIGS. 9A to 9C and FIG. FIG. 9A is a graph showing the amount of cash held at the end of the fiscal year from N to N + 49. In this graph, the cash holding amount for each year is calculated from the initial cash holding amount input on the basic data input screen 20 shown in FIG. 2 and the income and expenditure calculated for each year.

図9(B)は、水道事業における収益的収支を示すグラフである。グラフの右側に各項目が記載されており、グラフは、各年度における各項目の金額を加算したものとなっている。このような収益収支を示すグラフをN年度からN+49年度分表示させることにより、全体としての50年間の収支を一目で把握することができる。また、金額の増減についえては、各項目について着目することにより、収支を改善するための問題点の洗い出しも行うことができる。 FIG. 9B is a graph showing the profit balance in the water supply business. Each item is described on the right side of the graph, and the graph is the sum of the amounts of each item in each year. By displaying such a graph showing the income and expenditure for the years N to N + 49, the income and expenditure for 50 years as a whole can be grasped at a glance. In addition, regarding the increase or decrease in the amount of money, by paying attention to each item, it is possible to identify problems for improving the income and expenditure.

ここで、図10は、収益的収支について、図9(B)の予測結果のうち、経費だけを表示させている。このように、収益的収支を示すグラフにおいて、必要な項目を選択して表示させることにより、各項目に応じた金額の推移を確認することができるため、収支の問題点の洗い出し等を行うことができる。 Here, FIG. 10 displays only the expenses among the forecast results of FIG. 9 (B) for the profit balance. In this way, by selecting and displaying the necessary items in the graph showing the profit balance, it is possible to check the transition of the amount of money according to each item, so it is necessary to identify the problems of the balance. Can be done.

図9(C)は、水道事業における資本的収支を示すグラフである。この資本的収支においては、建設費等の項目について、各年度毎の金額と、50年間を通した金額の推移を確認することができる。 FIG. 9C is a graph showing the capital balance in the water supply business. In this capital balance, it is possible to check the amount of money for each year and the transition of the amount of money for 50 years for items such as construction costs.

以上のように、本発明の収支予測装置、収支予測プログラム、及び収支予測方法によって、長期的なアセットマネジメントにおいて、より正確に財政リスクのマネジメントを行うことができる。 As described above, the balance forecasting device, the balance forecasting program, and the balance forecasting method of the present invention enable more accurate management of financial risk in long-term asset management.

なお、上記実施形態においては、期間について、決算情報を5年間、計画情報を10年間及び予測値を50年間としているが、これらの期間については必要に応じて変更することが可能である。 In the above embodiment, the settlement information is set to 5 years, the plan information is set to 10 years, and the predicted value is set to 50 years, but these periods can be changed as necessary.

1…収支予測装置、…決算値入力部、3…一般計画値入力部、4…特定入力値入力部、5…直線予測値算出部、5…特定予測用入力画面図、6…特定処理部、7…特定予測値算出部、8…選択部、9…出力部、10…決算値入力領域、11…一般計画値入力領域、12…特定項目入力領域、21…基準年度入力部、34…直線予測値表示、35…特定予測値表示、36…計画値表示、37…採用項目、40…企業債情報入力画面、41…反映選択部(直線値選択部)、50…水道料金入力画面、60…建設費入力画面。

1 ... Balance forecasting device, ... Settlement value input unit, 3 ... General plan value input unit, 4 ... Specific input value input unit, 5 ... Linear prediction value calculation unit, 5 ... Specific prediction input screen diagram, 6 ... Specific processing unit , 7 ... Specific predicted value calculation unit, 8 ... Selection unit, 9 ... Output unit, 10 ... Settlement value input area, 11 ... General plan value input area, 12 ... Specific item input area, 21 ... Base year input unit, 34 ... Straight line predicted value display, 35 ... Specific predicted value display, 36 ... Planned value display, 37 ... Employment item, 40 ... Corporate bond information input screen, 41 ... Reflection selection unit (straight value selection part), 50 ... Water charge input screen, 60 ... Construction cost input screen.

Claims (7)

予測開始の基準年をN年とし、収支に関する複数の項目について前記N年を含むM年後までの予測を行う収支予測装置であって、
前記N年からK年前までの期間の決算値と、前記N年を含むL年(L<M)までの期間の一般的な計画値である一般計画値と、前記N年を含む前記M年後までの期間について特定処理を要する特定予測値とを用いて予測を行うものであり、
前記決算値を入力可能な決算値入力部と、
前記一般計画値を入力可能な一般計画値入力部と、
前記特定予測値を予測するための特定入力値を入力可能な特定入力値入力部と、
入力された前記特定入力値に対して特定処理を行って特定予測値を算出する特定予測値算出部と、
前記決算値、前記一般計画値又は前記特定予測値(ただし、前記一般計画値と前記特定予測値の双方が存在する場合には前記一般計画値)を基礎として回帰直線に基づいて予測された直線予測値を算出する直線予測値算出部と、
前記N年から前記M年後までの各年について、前記複数の項目毎に、
前記一般計画値又は前記特定予測値が存在する場合には、前記N年から前記L年後までの期間は前記一般計画値又は前記特定予測値(ただし、前記一般計画値と前記特定予測値の双方が存在する場合には前記一般計画値)を選択すると共に、
前記L年後から前記M年後までの期間は前記決算値、前記一般計画値又は前記特定予測値(ただし、前記一般計画値と前記特定予測値の双方が存在する場合には前記一般計画値)から回帰直線に基づいて前記直線予測値算出部により算出された(ただし、前記決算値のみに基づく場合を除く。)第1直線予測値を選択し、
前記一般計画値又は前記特定予測値が存在しない場合、前記N年から前記M年後までの期間は、前記決算値に基づいて前記直線予測値算出部により算出された第2直線予測値を選択し、
前記特定予測値が存在する場合には、前記L年後から前記M年後までの期間は、前記特定予測値算出部により処理された特定予測値を選択する選択部と、
前記選択部により選択された予測値を予測結果として出力する出力部とを備えていることを特徴とする収支予測装置。
It is a balance forecasting device that forecasts a plurality of items related to the balance up to M years including the N years, with the base year of the forecast start as N years.
The settlement value for the period from N years to K years ago, the general plan value which is the general plan value for the period up to L years (L <M) including the N years, and the M including the N years. Forecasts are made using specific forecast values that require specific processing for the period up to a year later.
A settlement value input unit that allows you to enter the settlement value,
A general plan value input unit capable of inputting the general plan value and
A specific input value input unit capable of inputting a specific input value for predicting the specific predicted value,
A specific predicted value calculation unit that calculates a specific predicted value by performing specific processing on the input specific input value,
A straight line predicted based on a regression line based on the settlement value, the general plan value or the specific predicted value (however, if both the general plan value and the specific predicted value exist, the general plan value). A linear predicted value calculation unit that calculates the predicted value, and
For each year from the N year to the M year later, for each of the plurality of items,
When the general plan value or the specific predicted value exists, the period from the N year to the L year later is the general plan value or the specific predicted value (however, the general plan value and the specific predicted value). If both exist, select the above general plan value) and select
The period from the L year to the M year is the settlement value, the general plan value, or the specific predicted value (however, if both the general plan value and the specific predicted value exist, the general plan value). ) To the first straight line predicted value calculated by the straight line predicted value calculation unit based on the regression line (except when based only on the settlement value).
If the general plan value or the specific predicted value does not exist, the second straight line predicted value calculated by the straight line predicted value calculation unit is selected based on the settlement value for the period from N years to M years later. And
When the specific predicted value exists, the period from the L year to the M year later includes a selection unit that selects the specific predicted value processed by the specific predicted value calculation unit and a selection unit.
A balance forecasting device including an output unit that outputs a predicted value selected by the selection unit as a prediction result.
請求項1に記載の収支予測装置であって、
前記特定予測値算出部は、前記特定予測値を前記L年後から前記M年後までの期間に反映させるか否かを選択可能な反映選択部を備え、
前記選択部は、前記反映選択部において反映する旨の選択がされた場合、前記特定予測値算出部により処理された特定予測値を選択し、
前記反映選択部において反映しない旨の選択がされた場合、前記L年後から前記M年後までの期間は、前記第2直線予測値を選択することを特徴とする収支予測装置。
The income and expenditure forecasting device according to claim 1.
The specific predicted value calculation unit includes a reflection selection unit that can select whether or not to reflect the specific predicted value in the period from the L year to the M year.
When the reflection selection unit selects to reflect, the selection unit selects the specific prediction value processed by the specific prediction value calculation unit.
An income and expenditure prediction device, characterized in that, when the reflection selection unit selects not to reflect, the second linear prediction value is selected for the period from the L year to the M year.
請求項1又は2に記載の収支予測装置であって、
前記特定入力値入力部を前記一般計画値入力部とは別個の入力画面に設けられていることを特徴とする収支予測装置。
The income and expenditure forecasting device according to claim 1 or 2.
An income and expenditure forecasting device characterized in that the specific input value input unit is provided on an input screen separate from the general plan value input unit.
請求項1〜3のいずれか一項に記載の収支予測装置であって、
前記選択部が前記第1直線予測値と、前記第2直線予測値とのいずれかを強制的に選択可能な直線値選択部が設けられていることを特徴とする収支予測装置。
The income and expenditure forecasting device according to any one of claims 1 to 3.
An income and expenditure prediction device characterized in that the selection unit is provided with a linear value selection unit capable of forcibly selecting either the first straight line prediction value or the second straight line prediction value.
請求項1〜4のいずれか一項に記載の収支予測装置であって、
前記出力部は、年度別の前記予測結果の一覧表とグラフを出力するものであり、
前記グラフは、各前記項目毎に表示の要否を選択可能であることを特徴とする収支予測装置。
The income and expenditure forecasting device according to any one of claims 1 to 4.
The output unit outputs a list and graphs of the forecast results for each year.
The graph is a balance forecasting device characterized in that the necessity of display can be selected for each of the items.
コンピュータを、予測開始の基準年をN年とし、収支に関する複数の項目について前記N年を含むM年後までの予測を行う収支予測装置として機能させる収支予測プログラムであって、
前記コンピュータは、前記N年からK年前までの期間の決算値と、前記N年を含むL年後(L<M)までの期間の一般的な計画値である一般計画値と、前記N年を含む前記M年後までの期間について特定処理を要する特定予測値とを用いて予測を行うものであり、
前記コンピュータを、
前記決算値を入力可能な決算値入力部と、
前記一般計画値を入力可能な一般計画値入力部と、
前記特定予測値を予測するための特定入力値を入力可能な特定入力値入力部と、
入力された前記特定入力値に対して特定処理を行って特定予測値を算出する特定予測値算出部と、
前記決算値、前記一般計画値又は前記特定予測値(ただし、前記一般計画値と前記特定予測値の双方が存在する場合には前記一般計画値)を基礎として回帰直線に基づいて予測された直線予測値を算出する直線予測値算出部と、
前記N年から前記M年後までの各年について、前記複数の項目毎に、
前記N年から前記M年後までの各年について、前記複数の項目毎に、
前記一般計画値又は前記特定予測値が存在する場合には、前記N年から前記L年後までの期間は前記一般計画値又は前記特定予測値(ただし、前記一般計画値と前記特定予測値の双方が存在する場合には前記一般計画値)を選択すると共に、
前記L年後から前記M年後までの期間は前記決算値、前記一般計画値又は前記特定予測値(ただし、前記一般計画値と前記特定予測値の双方が存在する場合には前記一般計画値)から回帰直線に基づいて前記直線予測値算出部により算出された(ただし、前記決算値のみに基づく場合を除く。)第1直線予測値を選択し、
前記一般計画値又は前記特定予測値が存在しない場合、前記N年から前記M年後までの期間は、前記決算値に基づいて前記直線予測値算出部により算出された第2直線予測値を選択し、
前記特定予測値が存在する場合には、前記L年後から前記M年後までの期間は、前記特定予測値算出部により処理された特定予測値を選択する選択部と、
前記選択部により選択された予測値を予測結果として出力する出力部として機能させることを特徴とする収支予測プログラム。
A balance forecasting program that allows a computer to function as a balance forecaster that forecasts a plurality of items related to balance up to M years including the N years, with the base year of forecast start as N years.
The computer has a settlement value for the period from N years to K years ago, a general plan value which is a general plan value for a period after L years (L <M) including the N years, and the N. Forecasts are made using specific predicted values that require specific processing for the period up to M years after the year including the year.
The computer
A settlement value input unit that allows you to enter the settlement value,
A general plan value input unit capable of inputting the general plan value and
A specific input value input unit capable of inputting a specific input value for predicting the specific predicted value,
A specific predicted value calculation unit that calculates a specific predicted value by performing specific processing on the input specific input value,
A straight line predicted based on a regression line based on the settlement value, the general plan value or the specific predicted value (however, if both the general plan value and the specific predicted value exist, the general plan value). A linear predicted value calculation unit that calculates the predicted value, and
For each year from the N year to the M year later, for each of the plurality of items,
For each year from the N year to the M year later, for each of the plurality of items,
When the general plan value or the specific predicted value exists, the period from the N year to the L year later is the general plan value or the specific predicted value (however, the general plan value and the specific predicted value). If both exist, select the above general plan value) and select
The period from the L year to the M year is the settlement value, the general plan value, or the specific predicted value (however, if both the general plan value and the specific predicted value exist, the general plan value). ) To the first straight line predicted value calculated by the straight line predicted value calculation unit based on the regression line (except when based only on the settlement value).
If the general plan value or the specific predicted value does not exist, the second straight line predicted value calculated by the straight line predicted value calculation unit is selected based on the settlement value for the period from N years to M years later. And
When the specific predicted value exists, the period from the L year to the M year later includes a selection unit that selects the specific predicted value processed by the specific predicted value calculation unit and a selection unit.
A balance prediction program characterized in that it functions as an output unit that outputs a prediction value selected by the selection unit as a prediction result.
コンピュータによって、予測開始の基準年をN年とし、収支に関する複数の項目について前記N年を含むM年後までの予測を行う収支予測方法であって、
前記コンピュータは、前記N年からK年前までの期間の決算値と、前記N年を含むL年後(L<M)までの期間の一般的な計画値である一般計画値と、前記N年を含む前記M年後までの期間について特定処理を要する特定予測値とを用いて予測を行うものであり、前記決算値を入力可能な決算値入力部と、前記一般計画値を入力可能な一般計画値入力部と、前記特定予測値を予測するための特定入力値を入力可能な特定入力値入力部と、入力された前記特定入力値に対して特定処理を行って特定予測値を算出する特定予測値算出部と、前記決算値、前記一般計画値又は前記特定予測値(ただし、前記一般計画値と前記特定予測値の双方が存在する場合には前記一般計画値)を基礎として回帰直線に基づいて予測された直線予測値を算出する直線予測値算出部とを有しており、
前記コンピュータによって、
前記N年から前記M年後までの各年について、前記複数の項目毎に、
前記一般計画値又は前記特定予測値が存在する場合には、前記N年から前記L年後までの期間は前記一般計画値又は前記特定予測値(ただし、前記一般計画値と前記特定予測値の双方が存在する場合には前記一般計画値)を選択すると共に、
前記L年後から前記M年後までの期間は前記決算値、前記一般計画値又は前記特定予測値(ただし、前記一般計画値と前記特定予測値の双方が存在する場合には前記一般計画値)から回帰直線に基づいて前記直線予測値算出部により算出された(ただし、前記決算値のみに基づく場合を除く。)第1直線予測値を選択し、
前記一般計画値又は前記特定予測値が存在しない場合、前記N年から前記M年後までの期間は、前記決算値に基づいて前記直線予測値算出部により算出された第2直線予測値を選択し、
前記特定予測値が存在する場合には、前記L年後から前記M年後までの期間は、前記特定予測値算出部により処理された特定予測値を選択し、
前記選択された予測値を予測結果として出力することを特徴とする収支予測方法。



It is a balance forecasting method that uses a computer to set the base year for forecasting to N years and forecasts a plurality of items related to the balance up to M years including the N years.
The computer has a settlement value for the period from N years to K years ago, a general plan value which is a general plan value for a period after L years (L <M) including the N years, and the N. Forecasting is performed using a specific forecast value that requires specific processing for the period up to M years including the year, and the settlement value input unit capable of inputting the settlement value and the general plan value can be input. A general plan value input unit, a specific input value input unit capable of inputting a specific input value for predicting the specific predicted value, and a specific processing performed on the input specific input value to calculate a specific predicted value. Return based on the specific predicted value calculation unit and the settlement value, the general plan value, or the specific predicted value (however, if both the general plan value and the specific predicted value exist, the general plan value). It has a linear prediction value calculation unit that calculates the linear prediction value predicted based on the straight line.
By the computer
For each year from the N year to the M year later, for each of the plurality of items,
When the general plan value or the specific predicted value exists, the period from the N year to the L year later is the general plan value or the specific predicted value (however, the general plan value and the specific predicted value). If both exist, select the above general plan value) and select
The period from the L year to the M year is the settlement value, the general plan value, or the specific predicted value (however, if both the general plan value and the specific predicted value exist, the general plan value). ) To the first straight line predicted value calculated by the straight line predicted value calculation unit based on the regression line (except when based only on the settlement value).
If the general plan value or the specific predicted value does not exist, the second straight line predicted value calculated by the straight line predicted value calculation unit is selected based on the settlement value for the period from N years to M years later. And
When the specific predicted value exists, the specific predicted value processed by the specific predicted value calculation unit is selected for the period from the L year to the M year later.
A balance forecasting method characterized by outputting the selected forecast value as a forecast result.



JP2019069513A 2019-03-30 2019-03-30 Balance prediction device, balance prediction program and balance prediction method Active JP7112368B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019069513A JP7112368B2 (en) 2019-03-30 2019-03-30 Balance prediction device, balance prediction program and balance prediction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019069513A JP7112368B2 (en) 2019-03-30 2019-03-30 Balance prediction device, balance prediction program and balance prediction method

Publications (2)

Publication Number Publication Date
JP2020166794A true JP2020166794A (en) 2020-10-08
JP7112368B2 JP7112368B2 (en) 2022-08-03

Family

ID=72717522

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019069513A Active JP7112368B2 (en) 2019-03-30 2019-03-30 Balance prediction device, balance prediction program and balance prediction method

Country Status (1)

Country Link
JP (1) JP7112368B2 (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002279059A (en) * 2000-12-22 2002-09-27 Cns Consulting Group:Kk Management analysis system
JP2014164604A (en) * 2013-02-26 2014-09-08 Yukitaka Ochiai Financial document creation program and financial document creation method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003288474A (en) 2002-03-27 2003-10-10 Toshiba Corp Asset management device, asset management method and consignment contract method for asset management

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002279059A (en) * 2000-12-22 2002-09-27 Cns Consulting Group:Kk Management analysis system
JP2014164604A (en) * 2013-02-26 2014-09-08 Yukitaka Ochiai Financial document creation program and financial document creation method

Also Published As

Publication number Publication date
JP7112368B2 (en) 2022-08-03

Similar Documents

Publication Publication Date Title
US8725541B2 (en) Systems and methods for rating and pricing insurance policies
Goetschalckx et al. Strategic network planning
JP2004274956A (en) Method, device and program for making generation plan and power selling and buying plan
Carlin Victoria's accrual output based budgeting system-delivering as promised? Some empirical evidence
JP2018049400A (en) Financial information analysis system, and program
Chun et al. Varying heterogeneity among US firms: facts and implications
KR101793619B1 (en) Business plan management method for monthly based short-term supporting enterprise business plan management
JP6489704B2 (en) Real estate information provision system
Zhan et al. Formulating systemic construction productivity enhancement strategies
KR100712050B1 (en) Management method for risk in construction using analysis of cash flow and apparatus threrof, and management method for risk in construction using analysis of portfolio and apparatus threrof using that
Abeysekara et al. Improving the capital deployment efficiency: An infrastructure investment planning process in transportation project
JP2008021170A (en) Power plant value evaluation system and its program
US20040103052A1 (en) System and method for valuing investment opportunities using real options, creating heuristics to approximately represent value, and maximizing a portfolio of investment opportunities within specified objectives and constraints
TWI471818B (en) Small enterprise financing risk assessment method
US20160092892A1 (en) Computer-Aided System for Improving Return on Assets
JP7112368B2 (en) Balance prediction device, balance prediction program and balance prediction method
JP2004185551A (en) Management quality control system, management quality control method, management quality control program and medium
Moorhouse Asset management of irrigation infrastructure–the approach of Goulburn-Murray Water, Australia
Holmes et al. Modes of failure of South African local government in the water services sector
Grabovy et al. Information systems for life cycle management of capital construction facilities
JP6363740B2 (en) Management simulation program
JP2020161101A (en) Management support device, management support system, and management support method
JP6842627B2 (en) Management support device, management support system, and management support method
US20210209527A1 (en) Manufacturing system and method based on an asset-hour basis
Corea et al. Challenges in business performance measurement: The case of a corporate it function

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190330

A80 Written request to apply exceptions to lack of novelty of invention

Free format text: JAPANESE INTERMEDIATE CODE: A80

Effective date: 20190429

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20200623

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20200821

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20201223

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210323

C60 Trial request (containing other claim documents, opposition documents)

Free format text: JAPANESE INTERMEDIATE CODE: C60

Effective date: 20210323

C11 Written invitation by the commissioner to file amendments

Free format text: JAPANESE INTERMEDIATE CODE: C11

Effective date: 20210414

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20210514

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20210628

C21 Notice of transfer of a case for reconsideration by examiners before appeal proceedings

Free format text: JAPANESE INTERMEDIATE CODE: C21

Effective date: 20210630

A912 Re-examination (zenchi) completed and case transferred to appeal board

Free format text: JAPANESE INTERMEDIATE CODE: A912

Effective date: 20210730

C211 Notice of termination of reconsideration by examiners before appeal proceedings

Free format text: JAPANESE INTERMEDIATE CODE: C211

Effective date: 20210811

C22 Notice of designation (change) of administrative judge

Free format text: JAPANESE INTERMEDIATE CODE: C22

Effective date: 20210910

C22 Notice of designation (change) of administrative judge

Free format text: JAPANESE INTERMEDIATE CODE: C22

Effective date: 20220413

C23 Notice of termination of proceedings

Free format text: JAPANESE INTERMEDIATE CODE: C23

Effective date: 20220525

C03 Trial/appeal decision taken

Free format text: JAPANESE INTERMEDIATE CODE: C03

Effective date: 20220622

C30A Notification sent

Free format text: JAPANESE INTERMEDIATE CODE: C3012

Effective date: 20220622

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220722

R150 Certificate of patent or registration of utility model

Ref document number: 7112368

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150