JP2020128668A - Marker block - Google Patents

Marker block Download PDF

Info

Publication number
JP2020128668A
JP2020128668A JP2019022227A JP2019022227A JP2020128668A JP 2020128668 A JP2020128668 A JP 2020128668A JP 2019022227 A JP2019022227 A JP 2019022227A JP 2019022227 A JP2019022227 A JP 2019022227A JP 2020128668 A JP2020128668 A JP 2020128668A
Authority
JP
Japan
Prior art keywords
block
marker
recess
boundary
marker block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2019022227A
Other languages
Japanese (ja)
Inventor
忠夫 池田
Tadao Ikeda
忠夫 池田
雅行 内野
Masayuki Uchino
雅行 内野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chiba Ceramic Industry Inc
Original Assignee
Chiba Ceramic Industry Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chiba Ceramic Industry Inc filed Critical Chiba Ceramic Industry Inc
Priority to JP2019022227A priority Critical patent/JP2020128668A/en
Publication of JP2020128668A publication Critical patent/JP2020128668A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

To provide a marker block for preventing a buried boundary block from being damaged by enabling the border of pavement to be confirmed when repairing a road.SOLUTION: A recessed part 18 is formed on the tip outer edge of the side wall 16 of a side ditch block 13, and a marker block 23 is detachably installed in the recessed part 18. The marker blocks 23 are attached to the respective recesses part 18 of the respective side ditch block 13 by means of bonding or screwing.SELECTED DRAWING: Figure 1

Description

本発明は、道路の境界に埋設される境界ブロックについて使用されるマーカーブロックに関する。 The present invention relates to a marker block used for a boundary block buried at the boundary of a road.

道路の境界(例えば車道と歩道との境界・車道と中央分離帯との境界・道路脇の側溝など)には、縁石ブロックや側溝ブロックなどが境界ブロックとして埋設されている。 A curb block or a gutter block is buried as a boundary block at a road boundary (for example, a boundary between a roadway and a sidewalk, a boundary between a roadway and a median strip, and a gutter beside the road).

この境界ブロックの一例としては特許文献1が提案されている。図12に基づき概略を説明すれば、道路脇の側溝には複数の側溝ブロック1が列状に埋設されている。この側溝ブロック1は縦断面U字状に形成され、上端開口部が蓋ブロック2により閉塞されている。 Patent document 1 is proposed as an example of this boundary block. The outline will be described with reference to FIG. 12. A plurality of gutter blocks 1 are embedded in rows in a gutter beside the road. The gutter block 1 is formed in a U-shape in vertical section, and the upper end opening is closed by a lid block 2.

具体的には側溝ブロック1は、底壁5の両側端部に立設された側壁6を備え、側壁6は段差縮径状に形成され、路盤3内に埋設されている。ここでは路盤3側の側壁6の先端外縁には縦断面略V字状の凹部8が形成され、該凹部8内まで舗装材が打設されている。この凹部8は、底部12から側壁6の先端面9まで略垂直に立ちあがった垂直面10と、底部12から側壁6の外面までの傾斜面11とを備えている。 Specifically, the gutter block 1 includes side walls 6 provided upright on both side ends of the bottom wall 5, the side walls 6 are formed in a step-reduced diameter and embedded in the roadbed 3. Here, a concave portion 8 having a substantially V-shaped vertical cross section is formed at the outer edge of the front end of the side wall 6 on the side of the roadbed 3, and a paving material is cast into the concave portion 8. The recess 8 includes a vertical surface 10 that rises substantially vertically from the bottom 12 to the tip surface 9 of the side wall 6, and an inclined surface 11 from the bottom 12 to the outer surface of the side wall 6.

特開2010−163863JP, 2010-163863, A

しかしながら、施工後の垂直面10および傾斜面11は舗装材に覆われるため、補修工事や修繕工事などで舗装4を掘削する際に前記両面10,11の正確な位置を正確に把握することができない。そのため、誤って舗装4を深く掘りすぎて前記両面10,11を削り、側溝ブロック1に損傷を与えるおそれがある。 However, since the vertical surface 10 and the inclined surface 11 after the construction are covered with the pavement material, it is possible to accurately grasp the exact positions of the both surfaces 10 and 11 when excavating the pavement 4 for repair work or repair work. Can not. Therefore, there is a risk that the pavement 4 is digged too deeply to scrape the both surfaces 10 and 11 and damage the gutter block 1.

本発明は、このような従来の問題を解決するためになされ、道路の補修工事や修繕工事などの際に舗装の境目を確認可能にし、埋設された境界ブロック損傷防止を図ることを解決課題としている。 The present invention has been made to solve such a conventional problem, and makes it possible to confirm the boundary of the pavement during repair work or repair work on the road, and to prevent damage to the buried boundary block. There is.

(1)本発明は、道路に舗装材を打設する際に道路の境界に埋設される境界ブロックについて使用されるマーカーブロックであって、
前記境界ブロックの道路側に形成された凹部内に取外し可能に設置され、
前記設置後に前記舗装材が打設されて前記凹部内に埋設される
ことを特徴としている。
(1) The present invention is a marker block used for a boundary block embedded at a boundary of a road when a pavement material is cast on the road,
Removably installed in the recess formed on the road side of the boundary block,
After the installation, the paving material is driven and embedded in the recess.

(2)本発明の一態様では、
前記道路に沿って複数の前記境界ブロックが列状に埋設され、
前記境界ブロック群の前記凹部列に所定間隔をおいて設置される
ことを特徴としている。
(2) In one aspect of the present invention,
A plurality of the boundary blocks are buried in rows along the road,
It is characterized in that it is installed at a predetermined interval in the row of recesses of the boundary block group.

(3)本発明の他の態様では、
前記道路に沿って複数個の前記境界ブロックが列状に埋設され、
前記各境界ブロックの前記凹部内に設置されることを特徴としている。
(3) In another aspect of the present invention,
A plurality of the boundary blocks are buried in rows along the road,
It is characterized in that it is installed in the concave portion of each of the boundary blocks.

(4)本発明のさらに他の態様では、前記凹部内に接着又はねじ止めで設置されることを特徴としている。 (4) Yet another aspect of the present invention is characterized in that the recess is installed in the recess by adhesion or screwing.

(5)本発明のさらに他の態様において、
前記境界ブロックは、車道と歩道との境界または車道と中央分離帯との境界に埋設される縁石ブロックであり、
前記縁石ブロックの前記凹部内に取外し可能に設置されることを特徴としている。
(5) In still another aspect of the present invention,
The boundary block is a curb block buried at the boundary between the roadway and the sidewalk or at the boundary between the roadway and the median strip,
It is characterized in that it is removably installed in the recess of the curb block.

(6)本発明のさらに他の態様において、
前記境界ブロックは、道路脇に埋設される側溝ブロックであって、
前記側溝ブロックの前記凹部内に取外し可能に設置されることを特徴としている。
(6) In still another aspect of the present invention,
The boundary block is a gutter block buried on the side of the road,
It is characterized in that it is removably installed in the recess of the gutter block.

本発明によれば、道路の補修工事や修繕工事などの際に舗装の境目を確認可能なため、埋設された境界ブロックの損傷を防止することができる。 According to the present invention, the boundary of the pavement can be confirmed at the time of repairing or repairing the road, so that the buried boundary block can be prevented from being damaged.

実施例1のマーカーブロックの設置状態を示す道路際の縦断面図。FIG. 3 is a vertical cross-sectional view at the roadside showing the installation state of the marker block of the first embodiment. (a)は実施例1のマーカーブロックの斜視図、(b)は実施例2のマーカーブロックの斜視図、(c)は実施例3のマーカーブロックの斜視図。(A) is a perspective view of the marker block of Example 1, (b) is a perspective view of the marker block of Example 2, (c) is a perspective view of the marker block of Example 3. (a)は実施例1のマーカーブロックを接着により設置した状態の縦断面図、(b)実施例2のマーカーブロックを接着により設置した状態の縦断面図。(A) is a vertical cross-sectional view of a state where the marker block of Example 1 is installed by adhesion, and (b) a vertical cross-sectional view of a state that the marker block of Example 2 is installed by adhesion. (a)は実施例1のマーカーブロックをボルトで設置した状態の縦断面図、(b)は実施例2のマーカーブロックをボルトで設置した状態の縦断面図。(A) is a vertical cross-sectional view of the marker block of Example 1 installed with bolts, and (b) is a vertical cross-sectional view of the marker block of Example 2 installed with bolts. (a)は実施例1のマーカーブロックをインサートにボルトを締結して設置した状態を示す縦断面図、(b)は実施例2のマーカーブロックをインサートにボルトを締結して設置した状態を示す縦断面図。(A) is a longitudinal sectional view showing a state where the marker block of the first embodiment is fastened to the insert by bolting, and (b) shows a state where the marker block of the second embodiment is fastened to the insert by bolting. Vertical sectional view. 実施例2のマーカーブロックの設置を示す道路際の縦断面図。FIG. 6 is a vertical cross-sectional view at the roadside showing the installation of the marker block according to the second embodiment. 実施例3のマーカーブロックの設置状態を示す道路際の縦断面図。FIG. 7 is a vertical cross-sectional view on the road showing the installation state of the marker block according to the third embodiment. 実施例4のマーカーブロックの設置状態を示す道路際の縦断面図。FIG. 8 is a vertical cross-sectional view at the roadside showing the installation state of the marker block according to the fourth embodiment. 実施例5のマーカーブロックの設置状態を示す道路際の縦断面図。FIG. 11 is a vertical cross-sectional view at the roadside showing the installation state of the marker block according to the fifth embodiment. 実施例6のマーカーブロックの設置状態を示す道路際の縦断面図。FIG. 10 is a vertical cross-sectional view at the roadside showing the installation state of the marker block according to the sixth embodiment. 実施例7のマーカーブロックの設置状態を示す道路際の縦断面図。FIG. 10 is a vertical cross-sectional view at the roadside showing the installation state of the marker block according to the seventh embodiment. 従来例の縦断面図。FIG.

以下、本発明の実施形態に係るマーカーブロックを説明する。このマーカーブロックは、道路の境界(例えば車道と歩道との境界・車道と中央分離帯との境界・道路脇の側溝など)を仕切る境界ブロックに使用されている。この境界ブロックの一例としては、前述の側溝ブロックや縁石ブロックなどが挙げられる。 Hereinafter, the marker block according to the embodiment of the present invention will be described. This marker block is used as a boundary block that divides road boundaries (for example, a boundary between a roadway and a sidewalk, a boundary between a roadway and a median strip, and a gutter beside the road). Examples of this boundary block include the above-mentioned gutter block and curb block.

また、境界ブロックは道路の長手方向に沿って複数個が列状に埋設され、該境界ブロックの外垂直面側にコンクリートやアスファルトなどの舗装材が打設され、道路の舗装が構築されている。 Further, a plurality of boundary blocks are buried in rows along the longitudinal direction of the road, and pavement materials such as concrete and asphalt are placed on the outer vertical surface side of the boundary blocks to construct the road pavement. ..

このとき前記マーカーブロックは、構築された舗装の修繕工事や補修工事などの際に境界ブロックと舗装との境目を確認するための目印として用いられている。以下、前記マーカーブロックの詳細を実施例1〜7に基づき説明する。 At this time, the marker block is used as a mark for confirming the boundary between the boundary block and the pavement when repairing or repairing the constructed pavement. Hereinafter, details of the marker block will be described based on Examples 1 to 7.

≪実施例1≫
図1に基づき実施例1を説明する。この実施例1は、本実施形態に係るマーカーブロックの側溝ブロックへの適用例を示している。ここで図1中の13は、道路脇の側溝を構成し、列状に埋設される側溝ブロックを示している。
<<Example 1>>
Example 1 will be described with reference to FIG. Example 1 shows an application example of the marker block according to the present embodiment to a gutter block. Here, reference numeral 13 in FIG. 1 denotes a gutter block which constitutes a roadside gutter and is buried in a row.

この側溝ブロック13は、縦断面U字状に形成され、蓋ブロック2により上端開口部が閉塞され、底壁15の両側端部に立設された側壁16を備えている。この側壁16は段差縮径状に形成され、路盤3内に埋設されている。ここでは舗装4側の側壁16の先端外縁に縦断面略L字状の凹部18が形成されている。 The gutter block 13 is formed in a U-shape in a vertical section, has an upper end opening closed by the lid block 2, and includes side walls 16 provided upright on both side ends of the bottom wall 15. The side wall 16 is formed in a step-reduced diameter and is embedded in the roadbed 3. Here, a recess 18 having a substantially L-shaped vertical cross section is formed on the outer edge of the tip of the side wall 16 on the pavement 4 side.

この凹部18は、底部22から側壁16の先端面19までの垂直面20と、底部22から側壁16の外面までの水平面21と備えている。この両面20,21は凹部18の内面として底部22で直交しており、垂直面20の高さが水平面21の長さの約2倍を呈している。 The recess 18 includes a vertical surface 20 from the bottom 22 to the tip surface 19 of the side wall 16 and a horizontal surface 21 from the bottom 22 to the outer surface of the side wall 16. The two surfaces 20 and 21 are orthogonal to each other at the bottom 22 as the inner surface of the recess 18, and the height of the vertical surface 20 is about twice the length of the horizontal surface 21.

この凹部18内にはマーカーブロック23が設置されている。ここでは各側溝ブロック13の凹部18内にそれぞれマーカーブロック23を設置してもよく、あるいは側溝ブロック13群の凹部18列にマーカーブロックを数メートルおきに設置してもよい。このときマーカーブロック23の設置間隔は、側溝ブロック13の長手方向の長さなどを勘案してメーカー側で適切な間隔に定められる。具体的にはマーカーブロック23は、コンクリート製だけでなく、例えば金属製(鉄製・アルミ製・ステンレス製など)・樹脂製・木製・セメント製・モルタル製などでもよい。 A marker block 23 is installed in the recess 18. Here, the marker blocks 23 may be installed in the recesses 18 of each of the gutter blocks 13, or the marker blocks may be installed every few meters in the recess 18 rows of the group of gutter blocks 13. At this time, the installation interval of the marker blocks 23 is set to an appropriate interval on the manufacturer side in consideration of the length of the gutter block 13 in the longitudinal direction. Specifically, the marker block 23 is not limited to concrete, but may be made of metal (iron, aluminum, stainless steel, etc.), resin, wood, cement, mortar, or the like.

また、マーカーブロック23は、図2(a)に示すように、凹部18内に設置可能な略直方体に形成され、「高さL1=平面20の高さR1」かつ「奥行L2=水平面21の幅方向の長さR2」となっている。さらにマーカーブロック23は、次の手段(1)〜(3)により凹部18内に着脱自在に設置されている。 Further, as shown in FIG. 2A, the marker block 23 is formed into a substantially rectangular parallelepiped that can be installed in the recess 18, and “height L1=height R1 of plane 20” and “depth L2=horizontal plane 21”. The length in the width direction is R2". Further, the marker block 23 is detachably installed in the recess 18 by the following means (1) to (3).

(1)まず、図3(a)に基づきマーカーブロック23を凹部18内に接着により設置する場合を説明する。この場合にはマーカーブロック23の背面23aおよび底面23bに樹脂系接着剤30を塗布する。 (1) First, the case where the marker block 23 is installed in the recess 18 by bonding will be described with reference to FIG. In this case, the resin adhesive 30 is applied to the back surface 23a and the bottom surface 23b of the marker block 23.

その後、マーカーブロック23の背面23aを凹部18の垂直面20に密着させるとともに、底面23b水平面21に密着させる。これによりマーカーブロック23の両面23a,23bがそれぞれ垂直面20・水平面21に接着され、マーカーブロック23が凹部18内に取り付けられる。この場合にはマーカーブロック23を上方に引き抜けば取り外すことができる。 Then, the back surface 23a of the marker block 23 is brought into close contact with the vertical surface 20 of the recess 18 and the bottom surface 23b is also brought into close contact with the horizontal surface 21. As a result, both surfaces 23a and 23b of the marker block 23 are adhered to the vertical surface 20 and the horizontal surface 21, respectively, and the marker block 23 is mounted in the recess 18. In this case, the marker block 23 can be removed by pulling it upward.

(2)つぎに図4(a)に基づきマーカーブロック23を凹部18内にボルト24を用いて設置する場合を説明する。すなわち、マーカーブロック23を凹部18内の所定位置に置いた状態のままボルト24を一方向に回転させ、ボルト24の軸部をマーカーブロック23および垂直面20内の側壁16に捻じ込んでねじ止めする。この場合にはボルト24を他方向に回転させて前記軸部を抜脱すれば、マーカーブロック23を取り外すことができる。 (2) Next, the case where the marker block 23 is installed in the recess 18 with the bolt 24 will be described with reference to FIG. That is, the bolt 24 is rotated in one direction while the marker block 23 is placed at a predetermined position in the recess 18, and the shaft portion of the bolt 24 is screwed into the marker block 23 and the side wall 16 in the vertical surface 20 and screwed. To do. In this case, the marker block 23 can be removed by rotating the bolt 24 in the other direction and pulling out the shaft portion.

(3)最後に図5(a)に基づきマーカーブロック23を凹部18内にボルト25とインサート26とを用いて設置する場合を説明する。この場合にはマーカーブロック23は、正面23c側に凹溝27が形成され、該凹溝27の中心から貫通孔28が形成されている。 (3) Finally, the case where the marker block 23 is installed in the recess 18 using the bolt 25 and the insert 26 will be described with reference to FIG. In this case, the marker block 23 has a groove 27 formed on the front surface 23c side, and a through hole 28 is formed from the center of the groove 27.

ここでは側溝ブロック13には側壁16の先端部17内にインサート26が埋設され、インサート26の雌ねじ孔が貫通孔28に連通している。したがって、ボルト25の軸部を貫通孔28に挿通後にインサート26の雌ねじ孔に締結すれば、マーカーブロック23を凹部18内にねじ止めすることができる。一方、前記締結を解除すれば、マーカーブロック23を凹部18内から取り外すことができる。 Here, in the side groove block 13, an insert 26 is embedded in the tip portion 17 of the side wall 16, and the female screw hole of the insert 26 communicates with the through hole 28. Therefore, if the shaft portion of the bolt 25 is inserted into the through hole 28 and then fastened to the female screw hole of the insert 26, the marker block 23 can be screwed into the recess 18. On the other hand, when the fastening is released, the marker block 23 can be removed from the recess 18.

このような手段によりマーカーブロック23を側溝ブロック13に設置した後に舗装材を凹部18内まで流し込んで打設する。この舗装材の乾燥・硬化後に舗装4が構築され、マーカーブロック23が凹部18内に埋設される。 After the marker block 23 is installed in the gutter block 13 by such a means, the pavement material is poured into the recess 18 and then placed. After the pavement material is dried and cured, the pavement 4 is constructed, and the marker block 23 is embedded in the recess 18.

ここで経年などにより舗装4が劣化した場合には、前述のように補修工事や修繕工事などが施される。この場合にマーカーブロック23に沿って舗装4を切断して凹部18から該マーカーブロック23を取り外すことで垂直面20および水平面21が露出する。 Here, when the pavement 4 deteriorates due to aging or the like, repair work or repair work is performed as described above. In this case, the vertical surface 20 and the horizontal surface 21 are exposed by cutting the pavement 4 along the marker block 23 and removing the marker block 23 from the recess 18.

これによりマーカーブロック23の位置を目印にして、側溝ブロック13と舗装4との境目を確認することができ、補修工事などの際に舗装4をどこまで掘削してよいのかを把握することが可能となる。 This makes it possible to confirm the boundary between the gutter block 13 and the pavement 4 by using the position of the marker block 23 as a mark, and to know to what extent the pavement 4 may be excavated during repair work or the like. Become.

その結果、誤って垂直面20や水平面21を削ることが防止され、側溝ブロック13の損傷が抑制される。なお、前述したマーカーブロック23の取外し後には、その交換が可能となり、マーカーブロック23自体の劣化にも対処できる。 As a result, it is possible to prevent the vertical surface 20 and the horizontal surface 21 from being mistakenly cut, and damage to the gutter block 13 is suppressed. Note that after the marker block 23 is removed, it can be replaced, and deterioration of the marker block 23 itself can be dealt with.

≪実施例2≫
図6に基づき実施例2を説明する。この実施例2は、本実施形態に係るマーカーブロックの側溝ブロック1へ適用例を示している。この側溝ブロック1は、背景技術と同じなため説明を省略する。
<<Example 2>>
A second embodiment will be described with reference to FIG. Example 2 shows an application example of the marker block according to the present embodiment to the gutter block 1. Since this gutter block 1 is the same as the background art, its description is omitted.

ここでは側溝ブロック1の凹部8には、マーカーブロック33が着脱自在に設置されている。具体的にはマーカーブロック33は、凹部8内に設置可能な縦断面略矩形状に形成されている。 Here, the marker block 33 is detachably installed in the recess 8 of the side groove block 1. Specifically, the marker block 33 is formed in a generally rectangular vertical cross section that can be installed in the recess 8.

このマーカーブロック33の底面33bの傾斜角度θ(図2(b)参照)は、凹部8の傾斜面11の傾斜角度α(図12参照)と同じ角度(約70度)に形成されている。また、マーカーブロック33は、「背面33aの高さL3=垂直面10の高さR3」、かつ「底面33bの傾斜方向の長さL4=傾斜面11の傾斜方向の長さR4」となっている。 The inclination angle θ (see FIG. 2B) of the bottom surface 33b of the marker block 33 is formed at the same angle (about 70 degrees) as the inclination angle α (see FIG. 12) of the inclined surface 11 of the recess 8. Further, the marker block 33 has “the height L3 of the rear surface 33a=the height R3 of the vertical surface 10” and “the length L4 of the bottom surface 33b in the inclined direction=the length R4 of the inclined surface 11 in the inclined direction”. There is.

このときマーカーブロック33は、図3(b)〜図5(b)に示すように、マーカーブロック23と同じ手段で凹部8内に着脱自在に設置される。この設置後に舗装材が打設され、舗装材の乾燥・硬化後に道路の舗装4が構築され、マーカーブロック33が凹部8内に埋設される。 At this time, the marker block 33 is detachably installed in the recess 8 by the same means as the marker block 23, as shown in FIGS. 3B to 5B. After this installation, the pavement material is cast, the road pavement 4 is constructed after the pavement material is dried and cured, and the marker block 33 is embedded in the recess 8.

このマーカーブロック33は実施例1と同じく、舗装4の補修工事や修繕工事の際に凹部8内から取り外すことができる。これにより凹部8の内面(垂直面10および傾斜面11)が露出し、この点で実施例1と同様な効果が得られる。なお、マーカーブロック33の設置間隔などは実施例1と同じとする。 Like the first embodiment, the marker block 33 can be removed from the inside of the recess 8 at the time of repairing or repairing the pavement 4. As a result, the inner surface (vertical surface 10 and inclined surface 11) of the recess 8 is exposed, and in this respect, the same effect as that of the first embodiment can be obtained. The intervals between the marker blocks 33 are the same as in the first embodiment.

≪実施例3≫
図7に基づき実施例3を説明する。この実施例3は、本実施形態に係るマーカーブロックの側溝ブロック41への適用例を示している。この側溝ブロック41は、実施例2の側溝ブロック1と異なり、凹部48の傾斜面50の傾斜角βは約110度に設定されている。
<<Example 3>>
A third embodiment will be described with reference to FIG. Example 3 shows an application example of the marker block according to the present embodiment to the gutter block 41. The side groove block 41 is different from the side groove block 1 of the second embodiment in that the inclination angle β of the inclined surface 50 of the recess 48 is set to about 110 degrees.

具体的にはマーカーブロック43は、図2(c)に示すように、凹部48内に設置可能な縦断面略矩形状に形成されている。ここでは底面43bの傾斜角度θ´は、傾斜角βと同じく約110度に設定されている。なお、「背面43aの高さL5=垂直面49の高さR5」、「底面43bの傾斜方向の長さL6=傾斜面50の傾斜方向の長さR6」に設定されている。 Specifically, as shown in FIG. 2C, the marker block 43 is formed in a substantially rectangular vertical cross section that can be installed in the recess 48. Here, the inclination angle θ′ of the bottom surface 43b is set to about 110 degrees like the inclination angle β. The height L5 of the back surface 43a=the height R5 of the vertical surface 49 and the length L6 of the bottom surface 43b in the tilt direction=the length R6 of the tilt surface 50 in the tilt direction are set.

このマーカーブロック43も、マーカーブロック23と同様な手段により凹部48内に着脱自在に設置される。この設置後に舗装材が打設され、舗装材の乾燥・硬化後に道路の舗装4が構築され、マーカーブロック43が凹部48内に埋設される。 The marker block 43 is also detachably installed in the recess 48 by the same means as the marker block 23. After this installation, the pavement material is cast, the road pavement 4 is constructed after the pavement material is dried and hardened, and the marker block 43 is embedded in the recess 48.

このときマーカーブロック43は、実施例1と同じく舗装4の補修工事や修繕工事の際に凹部48内から取り外すことができる。これにより凹部8の内面(垂直面49および傾斜面50)が露出し、この点で実施例1と同様な効果が得られる。なお、マーカーブロック43の設置間隔などは実施例1と同じとする。 At this time, the marker block 43 can be removed from the inside of the recess 48 at the time of repairing or repairing the pavement 4 as in the first embodiment. As a result, the inner surface (vertical surface 49 and inclined surface 50) of the recess 8 is exposed, and in this respect, the same effect as that of the first embodiment can be obtained. The intervals between the marker blocks 43 are the same as those in the first embodiment.

≪実施例4〜6≫
実施例4〜6は、本実施形態に係るマーカーブロックの縁石ブロック51,61,71への適用例を示している。この縁石ブロック51,61,71は、道路の車道と歩道との境界・車道と中央分離帯との境界などに複数個が列状に埋設される。
<<Examples 4 to 6>>
Examples 4 to 6 show examples of application of the marker block according to the present embodiment to the curb blocks 51, 61, 71. A plurality of the curb blocks 51, 61, 71 are embedded in a row at the boundary between the roadway and the sidewalk, the boundary between the roadway and the median strip, and the like.

(1)実施例4
図8に基づき実施例4を説明する。実施例4は、縁石ブロック51への適用例を示している。この縁石ブロック51は、縁石本体52と、該縁石本体52の一方の側端部53に形成された縦断面略V字状の凹部54とを備えている。
(1) Example 4
A fourth embodiment will be described with reference to FIG. Example 4 shows an example of application to the curb block 51. The curb block 51 includes a curb main body 52 and a recess 54 formed in one side end 53 of the curb main body 52 and having a substantially V-shaped vertical cross section.

この凹部54は、縁石本体52の外面55と、底部57から側端部53の外面までの傾斜面56とを備えている。この凹部54内にはマーカーブロック58が着脱自在に設置されている。 The concave portion 54 includes an outer surface 55 of the curb body 52 and an inclined surface 56 from the bottom portion 57 to the outer surface of the side end portion 53. A marker block 58 is detachably installed in the recess 54.

すなわち、マーカーブロック58は、凹部54内に設置可能な縦断面略矩形状に形成され、凹部54内に実施例1と同じ手段で設置することができる。この設置後に舗装材が打設され、舗装材の乾燥・硬化後に道路の舗装4が構築され、マーカーブロック58が凹部54内に埋設される。 That is, the marker block 58 is formed in a substantially rectangular vertical cross section that can be installed in the recess 54, and can be installed in the recess 54 by the same means as in the first embodiment. After this installation, the pavement material is cast, the road pavement 4 is constructed after the pavement material is dried and cured, and the marker block 58 is embedded in the recess 54.

このときマーカーブロック58は、実施例1と同じく舗装4の補修工事や修繕工事の際に凹部54内から取り外すことができる。これにより凹部54の内面55,56が露出し、この点でマーカーブロック58の位置を目印に縁石ブロック51と舗装4との境目を確認することが可能となり、実施例1と同様な効果が得られる。なお、マーカーブロック58の設置間隔などは実施例1と同じとする。 At this time, the marker block 58 can be removed from the recess 54 at the time of repairing or repairing the pavement 4 as in the first embodiment. As a result, the inner surfaces 55, 56 of the recess 54 are exposed, and at this point it is possible to confirm the boundary between the curb block 51 and the pavement 4 using the position of the marker block 58 as a mark, and the same effect as in Example 1 can be obtained. To be The intervals between the marker blocks 58 are the same as those in the first embodiment.

(2)実施例5
図9に基づき実施例5を説明する。実施例5は、縁石ブロック61への適用例を示している。この縁石ブロック61は、縁石本体62と、該縁石本体62の両側端部63に形成された縦断面略V字状の凹部64とを備えている。この両凹部64内にはマーカーブロック68が着脱自在に設置されている。
(2) Example 5
A fifth embodiment will be described with reference to FIG. The fifth embodiment shows an application example to the curb block 61. The curb block 61 includes a curb main body 62 and recesses 64 formed in both end portions 63 of the curb main body 62 and having a substantially V-shaped vertical cross section. A marker block 68 is detachably installed in the both concave portions 64.

すなわち、各マーカーブロック68は、実施例4と同様に凹部64内に設置可能な縦断面略矩形状に形成されている。この各マーカーブロック68は、それぞれ実施例1と同じ手段で凹部64内に設置することができる。 That is, each marker block 68 is formed in a substantially rectangular shape in vertical cross section that can be installed in the recess 64 as in the fourth embodiment. Each of the marker blocks 68 can be installed in the recess 64 by the same means as in the first embodiment.

この設置後に舗装材が各凹部64内まで打設され、舗装材の乾燥・硬化後に縁石本体62の両サイドに舗装4が構築され、各マーカーブロック68が各凹部64内に埋設される。 After this installation, the pavement material is cast into each recess 64, and after the pavement material is dried and hardened, the pavement 4 is constructed on both sides of the curb body 62, and each marker block 68 is embedded in each recess 64.

このとき各マーカーブロック68は、実施例1と同じく舗装4の補修工事や修繕工事の際に凹部64内から取り外すことができる。これにより凹部64の内面65,66が露出し、この点で縁石本体62の両サイドで舗装4との境目を確認でき、実施例1と同様な効果が得られる。なお、各マーカーブロック68の設置間隔などは実施例1と同じとする。 At this time, each marker block 68 can be removed from the inside of the recess 64 at the time of repairing or repairing the pavement 4 as in the first embodiment. As a result, the inner surfaces 65 and 66 of the recess 64 are exposed, and at this point, the boundary between the curb body 62 and the pavement 4 can be confirmed, and the same effect as that of the first embodiment can be obtained. In addition, the installation interval of each marker block 68 is the same as that in the first embodiment.

(3)実施例6
図10に基づき実施例6を説明する。この実施例6は、縁石ブロック71への適用例を示している。この縁石ブロック71は、実施例4の縁石ブロック61に延長部73を設けて形成されている。
(3) Example 6
A sixth embodiment will be described with reference to FIG. The sixth embodiment shows an application example to the curb block 71. The curb block 71 is formed by providing the curb block 61 of the fourth embodiment with an extension 73.

すなわち、縁石ブロック71は、縁石本体72と、該縁石本体72の一方の側端部に形成された延長部73と、該延長部73に形成された縦断面略V字状の凹部74とを備えている。 That is, the curb block 71 includes a curb main body 72, an extension 73 formed at one side end of the curb main body 72, and a recess 74 having a substantially V-shaped vertical section formed in the extension 73. I have it.

この凹部74内にはマーカーブロック78が着脱自在に設置されている。このマーカーブロック78は、実施例4と同様に凹部74内に設置可能な縦断面略矩形状に形成され、また凹部74内に実施例1と同じ手段で設置することができる。この設置後に舗装材が打設され、舗装材の乾燥・硬化後に舗装4が構築され、マーカーブロック78が凹部74内に埋設される。 A marker block 78 is detachably installed in the recess 74. The marker block 78 is formed in a substantially rectangular shape in vertical section that can be installed in the recess 74 as in the fourth embodiment, and can be installed in the recess 74 by the same means as in the first embodiment. After this installation, the pavement material is cast, the pavement 4 is constructed after the pavement material is dried and cured, and the marker block 78 is embedded in the recess 74.

このときマーカーブロック78は、実施例1と同じく舗装4の補修工事や修繕工事の際に凹部74内から取り外すことができる。これにより凹部74の内面75,76が露出し、この点で実施例1と同様な効果が得られる。なお、マーカーブロック78の設置間隔などは実施例1と同じとする。 At this time, the marker block 78 can be removed from the inside of the recess 74 during the repair work or repair work of the pavement 4 as in the first embodiment. As a result, the inner surfaces 75 and 76 of the recess 74 are exposed, and in this respect, the same effect as that of the first embodiment can be obtained. The intervals between the marker blocks 78 are the same as those in the first embodiment.

≪実施例7≫
図11に基づき実施例7を説明する。この実施例7では、図8の縁石ブロック51と暗渠型の側溝ブロック81との組み合わせに対して本実施形態のマーカーブロックが適用されている。ここでは両者51,81の組合せが、道路の車道と歩道との境界・車道と中央分離帯との境界などに列状に埋設されている。
<<Example 7>>
A seventh embodiment will be described with reference to FIG. In Example 7, the marker block of the present embodiment is applied to the combination of the curb block 51 and the underdrain type gutter block 81 of FIG. 8. Here, a combination of the two 51, 81 is buried in rows at the boundary between the roadway and the sidewalk, the boundary between the roadway and the median strip, and the like.

この側溝ブロック81は、底壁83と、底壁83の両端部に立設された側壁82と、両側壁82の上端開口部を閉塞する上壁85とを備えている。この上壁85のP側に凸部86が形成され、同Q側に縁石ブロック51が載置されている。 The gutter block 81 includes a bottom wall 83, side walls 82 provided upright at both ends of the bottom wall 83, and an upper wall 85 that closes upper end openings of the side walls 82. A convex portion 86 is formed on the P side of the upper wall 85, and the curb block 51 is placed on the Q side thereof.

また、縁石ブロック51の凹部54はQ側に配置されている一方、凸部86のP側には縦断面略V字状の凹部84が形成されている。この両凹部54,84には、それぞれマーカーブロック58,88が実施例1と同じ手段により設置されている。 Further, the concave portion 54 of the curb block 51 is arranged on the Q side, while the concave portion 84 having a substantially V-shaped vertical cross section is formed on the P side of the convex portion 86. Marker blocks 58 and 88 are installed in the recesses 54 and 84, respectively, by the same means as in the first embodiment.

ここでは側溝ブロック81のP側と縁石ブロック51のQ側とに舗装材が打設され、縁石本体52の両サイドに道路の舗装4が構築され、マーカーブロック58,88が凹部54,84内に埋設される。 Here, pavement material is placed on the P side of the gutter block 81 and the Q side of the curb block 51, the pavement 4 for the road is constructed on both sides of the curb body 52, and the marker blocks 58 and 88 are formed in the recesses 54 and 84. Buried in.

このとき各マーカーブロック58,88は、実施例1と同じく舗装4の補修工事などの際、それぞれ凹部54,84内から取り外すことができる。これにより凹部54,84の内面53,55,85,86が露出し、この点で縁石本体52の両サイドで舗装4との境目を確認でき、実施例1と同様な効果が得られる。このマーカーブロック58,88の設置間隔などは実施例1と同じとする。 At this time, the marker blocks 58 and 88 can be removed from the recesses 54 and 84, respectively, when the pavement 4 is repaired as in the first embodiment. As a result, the inner surfaces 53, 55, 85, 86 of the recesses 54, 84 are exposed, and at this point the boundaries with the pavement 4 can be confirmed on both sides of the curb body 52, and the same effect as in Example 1 can be obtained. The installation intervals of the marker blocks 58 and 88 are the same as those in the first embodiment.

≪その他・他例≫
本発明は、上記実施形態に限定されるものではなく、各請求項に記載された範囲内で変形して実施することができる。
≪Others and other examples≫
The present invention is not limited to the above-mentioned embodiments, but can be modified and implemented within the scope described in each claim.

(1)例えば図8〜図11では、マーカーブロック23,33,43,58,68,78,88の平面が露呈しているが、これを舗装4内に完全に埋設してもよい。 (1) For example, in FIGS. 8 to 11, the planes of the marker blocks 23, 33, 43, 58, 68, 78, 88 are exposed, but they may be completely embedded in the pavement 4.

この場合には修繕工事や補修工事などの際に埋設位置を掘削することでマーカーブロック23,33,43,58,68,78,88が現れる。その後に凹部8,18,48,54,64,74,84内から取り外せば、舗装4との境界を確認することが可能となる。なお、前記埋設位置は図面などに記述しておくことが好ましい。 In this case, the marker blocks 23, 33, 43, 58, 68, 78, 88 appear by excavating the buried position during repair work or repair work. Then, if it is removed from the inside of the recesses 8, 18, 48, 54, 64, 74, 84, the boundary with the pavement 4 can be confirmed. The buried position is preferably described in the drawing or the like.

(2)また、マーカーブロック23,33,43,58,68,78,88は、必ずしも凹部8,18,48,54,64,74,84内に隙間なく設置可能な形状に形成する必要はない。 (2) Further, the marker blocks 23, 33, 43, 58, 68, 78, 88 do not necessarily have to be formed in the recesses 8, 18, 48, 54, 64, 74, 84 in such a shape that they can be installed without a gap. Absent.

例えばマーカーブロック23を側溝ブロック1,41,81の凹部8,48,84に設置してもよい。また、マーカーブロック23を縁石ブロック51,61,71の凹部54,64,74に設置してもよい。 For example, the marker block 23 may be installed in the recesses 8, 48, 84 of the gutter blocks 1, 41, 81. Further, the marker block 23 may be installed in the recesses 54, 64, 74 of the curb blocks 51, 61, 71.

この場合にはマーカーブロック23の底面23b側に隙間が生じるものの、背面23aの接着により設置が可能である。同様にボルト25の捻じ込みやボルト25とインサート26との締結により設置が可能である。 In this case, although there is a gap on the bottom surface 23b side of the marker block 23, it can be installed by adhering the back surface 23a. Similarly, it can be installed by screwing the bolt 25 or fastening the bolt 25 and the insert 26.

1,13,41…側溝ブロック
2…蓋ブロック
51,61,71…縁石ブロック
81…暗渠型の側溝ブロック
4…舗装
5,15,42…底壁
6、16,44…側壁
8,18,48,54,64,74,84…凹部
23,33,43,58,68,78,88…マーカーブロック
30…樹脂系接着剤
24,25…ボルト
26…インサート
52,62,72…縁石本体
53,63,72…側端部
1, 13, 41... Gutter block 2... Lid block 51, 61, 71... Curb block 81... Underdrain type gutter block 4... Pavement 5, 15, 42... Bottom wall 6, 16, 44... Side wall 8, 18, 48 , 54, 64, 74, 84... Recess 23, 33, 43, 58, 68, 78, 88... Marker block 30... Resin adhesive 24, 25... Bolt 26... Insert 52, 62, 72... Curb body 53, 63, 72... Side end

Claims (6)

道路に舗装材を打設する際に道路の境界に埋設される境界ブロックについて使用されるマーカーブロックであって、
前記境界ブロックの道路側に形成された凹部内に取外し可能に設置され、
前記設置後に前記舗装材が打設されて前記凹部内に埋設される
ことを特徴とするマーカーブロック。
A marker block used for a boundary block that is buried at the boundary of a road when placing a pavement material on the road,
Removably installed in the recess formed on the road side of the boundary block,
The marker block, wherein the paving material is cast after the installation and embedded in the recess.
前記道路に沿って複数の前記境界ブロックが列状に埋設され、
前記境界ブロック群の前記凹部列に所定間隔をおいて設置される
ことを特徴とする請求項1記載のマーカーブロック。
A plurality of the boundary blocks are buried in rows along the road,
The marker block according to claim 1, wherein the marker block is installed at a predetermined interval in the recess row of the boundary block group.
前記道路に沿って複数個の前記境界ブロックが列状に埋設され、
前記各境界ブロックの前記凹部内に設置される
ことを特徴とする請求項1記載のマーカーブロック。
A plurality of the boundary blocks are buried in rows along the road,
The marker block according to claim 1, wherein the marker block is installed in the recess of each of the boundary blocks.
前記凹部内に接着又はねじ止めで設置されることを特徴とする請求項1〜3のいずれかに記載のマーカーブロック。 The marker block according to any one of claims 1 to 3, wherein the marker block is installed in the recess by adhesion or screwing. 前記境界ブロックは、車道と歩道との境界または車道と中央分離帯との境界に埋設される縁石ブロックであり、
前記縁石ブロックの前記凹部内に取外し可能に設置されることを特徴とする請求項1〜4のいずれかに記載のマーカーブロック。
The boundary block is a curb block buried at the boundary between the roadway and the sidewalk or at the boundary between the roadway and the median strip,
The marker block according to claim 1, wherein the marker block is detachably installed in the recess of the curb block.
前記境界ブロックは、道路脇に埋設される側溝ブロックであって、
前記側溝ブロックの前記凹部内に取外し可能に設置されることを特徴とする請求項1〜4のいずれかに記載のマーカーブロック。
The boundary block is a gutter block buried on the side of the road,
The marker block according to any one of claims 1 to 4, wherein the marker block is detachably installed in the recess of the gutter block.
JP2019022227A 2019-02-12 2019-02-12 Marker block Pending JP2020128668A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019022227A JP2020128668A (en) 2019-02-12 2019-02-12 Marker block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019022227A JP2020128668A (en) 2019-02-12 2019-02-12 Marker block

Publications (1)

Publication Number Publication Date
JP2020128668A true JP2020128668A (en) 2020-08-27

Family

ID=72175307

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019022227A Pending JP2020128668A (en) 2019-02-12 2019-02-12 Marker block

Country Status (1)

Country Link
JP (1) JP2020128668A (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09221815A (en) * 1996-02-20 1997-08-26 Ibigawa Concrete Kogyo Kk Block for side ditch
JP2005042500A (en) * 2003-07-25 2005-02-17 Hidemitsu Kakudo Concrete mold and asphalt paving method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09221815A (en) * 1996-02-20 1997-08-26 Ibigawa Concrete Kogyo Kk Block for side ditch
JP2005042500A (en) * 2003-07-25 2005-02-17 Hidemitsu Kakudo Concrete mold and asphalt paving method

Similar Documents

Publication Publication Date Title
US4863307A (en) Restraint edge for paving members
US20020170259A1 (en) Interlocking sidewalk block system
USRE33550E (en) Restraint edge for paving members
JP2020128668A (en) Marker block
US20040062605A1 (en) Expansion joint structure for concrete slabs
KR100785311B1 (en) A load safety boundary stone and construction method thereof
CN211113161U (en) Connecting mechanism of telescopic device
JP2021008764A (en) Side ditch member with weed-proof structure, side ditch plate, foundation block, boundary structure, and concrete block set
JP2005023776A (en) Side ditch structure for water permeability paved road, side ditch lid for water permeability paved road, its side ditch work execution method, and water permeability paved road
US1916631A (en) Paving tile
CN211113160U (en) Beam end or bridge head concrete structure of embedded part special for expansion joint
JP2004169375A (en) Drain gutter structure
JP5517057B2 (en) Gutter repair member and gutter repair method using gutter repair member
CN110725197A (en) Beam end or bridge head concrete structure with embedded part embedded specially for expansion joint and its application
US1358042A (en) Roadway reinforcement
JP6941761B1 (en) Grating receiving frame and its installation method
CN110725198A (en) Connecting mechanism of telescopic device
JP2005256281A (en) Structure of expansion joint and expansion joint construction method
JP6875624B2 (en) Base member for forming gutter lids, gutter lid construction method and gutter structure repair method
KR20040052885A (en) L type roadside drain having boundary stone and construction method thereof
GB2446861A (en) Apparatus and method for protecting a kerb from damage
JP6609609B2 (en) Circular waterway renovation method and refurbished circular waterway
CA1267554A (en) Restraint edge for paving members
JP2006083665A (en) Rising method of side ditch and rising device
JP5505979B2 (en) How to repair gutter

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20211224

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20220921

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20221011

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20221206

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230322

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20230919