JP2020094325A - Slope construction method using sheet - Google Patents

Slope construction method using sheet Download PDF

Info

Publication number
JP2020094325A
JP2020094325A JP2018230489A JP2018230489A JP2020094325A JP 2020094325 A JP2020094325 A JP 2020094325A JP 2018230489 A JP2018230489 A JP 2018230489A JP 2018230489 A JP2018230489 A JP 2018230489A JP 2020094325 A JP2020094325 A JP 2020094325A
Authority
JP
Japan
Prior art keywords
sheet
stage
slope
water
nth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2018230489A
Other languages
Japanese (ja)
Other versions
JP7053036B2 (en
Inventor
廣義 中村
Hiroyoshi Nakamura
廣義 中村
考宏 中村
Naruhiro Nakamura
考宏 中村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Clear System Co Ltd
Original Assignee
Clear System Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Clear System Co Ltd filed Critical Clear System Co Ltd
Priority to JP2018230489A priority Critical patent/JP7053036B2/en
Publication of JP2020094325A publication Critical patent/JP2020094325A/en
Application granted granted Critical
Publication of JP7053036B2 publication Critical patent/JP7053036B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

To provide a slope construction method using a sheet, which is implemented as an emergency measure when a slope formed as a natural or artificial article collapses.SOLUTION: This slope construction method using a sheet includes: laying a first-stage protective sheet on a first-stage water-conveyance sheet 21; implanting, into the ground, a first-stage draining tool 31 in a prescribed place near the upper side of the first-stage protective sheet; laying a second-stage protective sheet so as to be superposed on the upper side of the first-stage protective sheet with a prescribed width; implanting, into the ground, a second-stage draining tool in a prescribed place near the upper side of the second-stage protective sheet; and then fixing these components to a slope by fasteners, and repeating these steps of laying, implanting, fixing, etc. upwardly, until an n-th stage.SELECTED DRAWING: Figure 9

Description

本発明は、自然または人工物により形成されている斜面が崩壊した場合の応急処置として行われるシートを用いた斜面施工方法に関する。 The present invention relates to a slope construction method using a sheet, which is performed as an emergency measure when a slope formed of a natural or artificial object collapses.

近年の異常気象による台風やゲリラ豪雨の多発による山間部の斜面崩落や、道路盛土体、鉄道盛土体や河川堤防の決壊氾濫等、社会インフラの豪雨被災が相次いでいる。社会資本は一国の活力基盤であり、活発な経済活動や豊かで安全な生活がそのうえに築かれるものであるから、その充実と安全・維持管理は極めて重要である。豪雨被災ではブルーシート等のシートでの法面表層保護の保護を行う応急処置(応急工事)が行われ、重宝されている。しかしながら、あくまで、応急処置としての復旧であり、長く保護できるものではなかった。 In recent years, heavy rains on social infrastructure have been occurring one after another, such as landslides in mountainous areas caused by frequent typhoons and heavy guerrilla rains due to abnormal weather, and road and bank embankments and river banks. Since social capital is the vital foundation of a country, and active economic activities and abundant and safe lives are built on it, its enhancement, safety and maintenance are extremely important. In the event of a heavy rain, blue sheets and other sheets are used as emergency measures (first-aid construction) to protect the slope surface protection, which is useful. However, it was only a recovery as an emergency measure and could not be protected for a long time.

山の斜面(人工的な斜面の場合は法面とも呼ばれる。)、造成地の斜面、道路の斜面、河川堤防の斜面、護岸の斜面等の土砂崩れや、地滑り等の斜面の崩壊に対する応急処置は、いかに早く安く有効に応急処置や仮復旧するかにあった。その後、本格的なコンクリート護岸工事をする本復旧予算を申請し、事業が決定すると恒久処置(恒久工事)として斜面の恒久的な補強工事を行うのが一般的であった。 First-aid measures for landslides such as mountain slopes (also called slopes in the case of artificial slopes), land slopes, road slopes, river embankment slopes, revetment slopes, and landslides , How quickly and cheaply and effectively the first aid and the temporary restoration were done. After that, it was common to apply for this restoration budget for full-scale concrete revetment work, and when the project was decided, permanent reinforcement work on the slope was performed as a permanent measure (permanent construction).

また、応急処置から恒久処置まで必要な期間も、広範囲な地域で発生する場合や、同じまたは近傍の地域で連続して発生する場合もあり、作業者や資材の手配が難しいので簡単に対応できない場合や、恒久処置を行う費用がすぐには用意できない場合もあり、応急処置といっても、できるだけ長い期間、斜面を保護できる工法が必要となっていた。 Also, the period from first aid to permanent treatment may occur in a wide area or continuously in the same or nearby areas, and it is difficult to arrange workers and materials, so it is not easy to handle. In some cases, it may not be possible to immediately prepare for the cost of performing permanent treatment, and even for emergency treatment, a construction method that can protect the slope for as long as possible was needed.

実開昭61−023344号公報Japanese Utility Model Publication No. 61-023344 特開2018−066159号公報JP, 2008-066159, A

しかしながら、これらの背景技術においても、特許文献1の考案の名称「築堤の法面防護構造」や、特許文献2の発明の名称「法面の施工方法とそれに用いるシート」については、応急処置としては、多くの作業の時間や、多くの資材が必要になる内容であるため、応急処置には適さない内容が提案されていた。 However, even in these background arts, the name of the invention of “Patent Document 1 “Slope protection structure of embankment” and the name of the invention of Patent Document 2 “Construction method of slope and sheet used therefor” are used as an emergency measure. Since it requires a lot of work time and a lot of materials, a content not suitable for first aid has been proposed.

また、特許文献1の考案や特許文献2の発明では、斜面が崩壊する原因ともなっている斜面に含まれている地表面の下にある水(土壌水と呼ばれている。以下「土壌水」と呼ぶ。)、を排水できないという問題があった。 In addition, in the device of Patent Document 1 and the invention of Patent Document 2, water under the ground surface included in the slope that causes the slope to collapse (referred to as soil water. Hereinafter, “soil water”. There is a problem that the water cannot be drained.

上記の課題を解決するため、本発明では、次の技術的手段を講じている。 In order to solve the above problems, the present invention takes the following technical means.

第1発明のシートを用いた斜面施工方法は、1段目導水シートを斜面に敷設し、前記1段目導水シートの上に1段目保護シート敷設し、前記1段目導水シートと前記1段目保護シートの上側近傍の所定の箇所に1段目排水具を土中に打ち込み、前記1段目保護シートの上辺に所定の幅で重ね合せて2段目導水シートを前記1段目保護シートの上方に敷設し、その後前記2段目導水シートの上に2段目保護シート敷設し、前記2段目導水シートと前記2段目保護シートの上側近傍の所定の箇所に2段目排水具を土中に打ち込み、その後少なくとも前記2段目保護シート、前記2段目導水シート、前記1段目保護シート及び前記1段目導水シートの重なり部分と、前記1段目保護シート及び前記1段目導水シートの下辺近傍を留め具で斜面に固定し、前記敷設、打ち込みや固定等の手順を上方に向かってn段目まで繰り返すことからなっている。
第2発明のシートを用いた斜面施工方法は、請求項1記載の発明において、前記1〜n段目保護シートの裏面側に予め対応する前記第1〜n段目導水シートが接着または溶着されている。
第3発明のシートを用いた斜面施工方法は、請求項1または請求項2記載の発明において、前記留め具で、下側にある前記1〜n段目保護シート及び前記第1〜n段目導水シートを仮止めしている。
第4発明のシートを用いた斜面施工方法は、請求項1乃至請求項3記載の発明において、
前記1〜n段目保護シートは、内部空間を有しており、前記空間に鉱物を粉砕または鉱物を焼成・粉砕した原材料料を主成分とする粉粒材を充填させている。
第5発明のシートを用いた斜面施工方法は、請求項1乃至請求項4記載の発明において、
前記1〜n段目保護シートの表面で受け止められた雨水は、前記1〜n段目保護シートの表面を流下し、斜面上流側からの土壌水は、略水平方向に連続して又は所定の間隔で土中に打ち込まれた1〜n段目排水具で、対応する前記1〜n段目保護シート表面に誘導排水されている。
The slope construction method using the sheet of the first aspect of the invention is to lay a first-stage water guide sheet on a slope, lay a first-stage protection sheet on the first-stage water guide sheet, and then install the first-stage water guide sheet and the first sheet. The first-stage drainage tool is driven into the soil at a predetermined location near the upper side of the first-stage protection sheet, and the second-stage water conveyance sheet is protected by the first-stage protection sheet by overlapping the upper side of the first-stage protection sheet with a predetermined width. Laying above the sheet, then laying the second-stage protection sheet on the second-stage water guiding sheet, and draining the second-stage drainage sheet to the predetermined location near the upper side of the second-stage water guiding sheet and the second-stage water guiding sheet. The tool is driven into the soil, and then at least the second-stage protection sheet, the second-stage water guide sheet, the first-stage protection sheet and the overlapping portion of the first-stage water conveyance sheet, the first-stage protection sheet and the first stage. The vicinity of the lower side of the stage water guide sheet is fixed to the slope with a fastener, and the procedures such as the laying, driving and fixing are repeated up to the n-th stage.
The slope construction method using the sheet of the second invention is the invention according to claim 1, wherein the first to nth water guiding sheets corresponding to the back surface side of the first to nth protective sheets are adhered or welded in advance. ing.
A slope construction method using a sheet according to a third aspect of the present invention is the invention according to claim 1 or 2, wherein, in the fastener, the 1st to nth stage protective sheet and the 1st to nth stage underneath. The water guide sheet is temporarily fixed.
A slope construction method using the sheet according to the fourth aspect of the present invention is the method according to any one of the first to third aspects,
The 1st-nth stage protection sheet has an internal space, and the space is filled with a powdered or granular material whose main component is a raw material material obtained by pulverizing minerals or firing and pulverizing minerals.
A slope construction method using a sheet according to the fifth aspect of the present invention is the method according to any one of the first to fourth aspects,
The rainwater received on the surface of the 1st to nth protective sheet flows down the surface of the 1st to nth protective sheet, and the soil water from the slope upstream side is continuously or substantially in the horizontal direction. With the 1st to nth stage drainage tools driven into the soil at intervals, the corresponding 1st to nth stage protective sheet surfaces are guided and drained.

以上のような、技術的手段を有することにより、以下の効果を有する。 By having the above technical means, the following effects can be obtained.

応急処置と変わらない工事であっても、比較的長い期間保護することができる。さらに、斜面の崩壊に関わる土壌水を排出することができる。 Even if the work is the same as the first aid, it can be protected for a relatively long period of time. In addition, soil water associated with slope failure can be discharged.

本発明に係る第1の実施形態の施工完了後の説明図である。It is explanatory drawing after the completion of construction of the 1st Embodiment which concerns on this invention. 本発明に係る第1の実施形態の排水具の外観図である。It is an external view of the drainage tool of the 1st Embodiment which concerns on this invention. 本発明に係る第1の実施形態の第1段階と第2段階の施工方法の説明図である。It is explanatory drawing of the construction method of the 1st step and 2nd step of 1st Embodiment which concerns on this invention. 本発明に係る第1の実施形態の第3段階の施工方法の説明図である。It is explanatory drawing of the construction method of the 3rd step of 1st Embodiment which concerns on this invention. 本発明に係る第1の実施形態の第3段階の施工方法の説明図である。It is explanatory drawing of the construction method of the 3rd step of 1st Embodiment which concerns on this invention. 本発明に係る第1の実施形態の第4段階の施工方法の説明図である。It is explanatory drawing of the construction method of the 4th step of 1st Embodiment which concerns on this invention. 本発明に係る第1の実施形態の第5段階の施工方法の説明図である。It is explanatory drawing of the construction method of the 5th step of 1st Embodiment which concerns on this invention. 本発明に係る第1の実施形態の第5段階の施工方法の説明図である。It is explanatory drawing of the construction method of the 5th step of 1st Embodiment which concerns on this invention. 本発明に係る第1の実施形態の断面図である。It is sectional drawing of the 1st Embodiment which concerns on this invention. 本発明に係る第1の実施形態の第6段階の施工方法の説明図である。It is explanatory drawing of the construction method of the 6th step of 1st Embodiment which concerns on this invention. 本発明に係る第1の実施形態の第7段階の施工方法の説明図である。It is explanatory drawing of the construction method of the 7th step of 1st Embodiment which concerns on this invention. 本発明に係る第1の実施形態の第7段階の施工方法の説明図である。It is explanatory drawing of the construction method of the 7th step of 1st Embodiment which concerns on this invention. 本発明に係る第1の実施形態の第8段階以降の施工方法の説明図である。It is explanatory drawing of the construction method after the 8th step of 1st Embodiment which concerns on this invention. 本発明に係る第2の実施形態の斜面の説明図である。It is explanatory drawing of the slope of 2nd Embodiment which concerns on this invention. 本発明に係る第2の実施形態の施工完了後の説明図である。It is explanatory drawing after the completion of construction of the 2nd Embodiment which concerns on this invention. 本発明に係る第3の実施形態の排水具の外観図である。It is an external view of the drainage tool of the 3rd Embodiment which concerns on this invention. 本発明に係る第4の実施形態の排水具の外観図である。It is an external view of the drainage tool of the 4th Embodiment which concerns on this invention.

本発明に係るシートを用いた斜面施工方法の実施の形態について図1乃至図17に基づき説明する。なお、この実施の形態によりこの発明が限定されるものではない。 An embodiment of a slope construction method using a sheet according to the present invention will be described with reference to FIGS. 1 to 17. The present invention is not limited to this embodiment.

(第1の実施形態)
第1の実施形態について、図1乃至13図に基づき説明する。まず、図1の説明図を用いて本発明のシートを用いた斜面施工方法が行われた斜面についての概要を説明する。
(First embodiment)
The first embodiment will be described with reference to FIGS. First, an outline of a slope on which a slope construction method using a sheet of the present invention is performed will be described with reference to the explanatory view of FIG.

図1は、斜面1に本願発明のシートを用いた斜面施工方法を実施した形態の一例を図示している。斜面1は、施工方法の説明を容易にするために、角度約45度で、斜面の面が整地されているものとして図示しているが、この様な斜面に限定されるものではない。また、斜面1の状態を分かり易くするために、水平面5も図示している。 FIG. 1 illustrates an example of an embodiment in which a slope construction method using a sheet of the present invention is applied to a slope 1. In order to facilitate the description of the construction method, the slope 1 is illustrated as having an angle of about 45 degrees and the slope surface is leveled, but the slope 1 is not limited to such a slope. A horizontal plane 5 is also shown in order to make the state of the slope 1 easy to understand.

図1において、斜面1には、1段目保護シート11、2段目保護シート12、3段目保護シート13及び4段目保護シート14の4枚の保護シートが、複数の留め具41で固定されている。また、図1においては、1段目保護シート11、2段目保護シート12、3段目保護シート13及び4段目保護シート14で隠れているため、図1には図示されてないが、1段目保護シート11、2段目保護シート12、3段目保護シート13及び4段目保護シート14と斜面1の間には、1段目導水シート21、2段目導水シート22、3段目導水シート23及び4段目導水シート24や、1段目排水具31、2段目排水具32及び3段目排水具33が設けられている。なお、詳細については図2乃至図13で説明する。 In FIG. 1, on the slope 1, four protective sheets including a first-stage protective sheet 11, a second-stage protective sheet 12, a third-stage protective sheet 13 and a fourth-stage protective sheet 14 are provided with a plurality of fasteners 41. It is fixed. In addition, in FIG. 1, since it is hidden by the first-step protective sheet 11, the second-step protective sheet 12, the third-step protective sheet 13, and the fourth-step protective sheet 14, it is not shown in FIG. Between the first-step protective sheet 11, the second-step protective sheet 12, the third-step protective sheet 13 and the fourth-step protective sheet 14 and the slope 1, the first-step water guide sheet 21, the second-step water guide sheet 22, 3, A second-stage water guiding sheet 23 and a fourth-stage water guiding sheet 24, a first-stage drainage tool 31, a second-stage drainage tool 32 and a third-stage drainage tool 33 are provided. The details will be described with reference to FIGS. 2 to 13.

ここで、施工方法の段階を説明する便宜上、1段目〜4段目の保護シート、導水シート及び排水具は、夫々別の名称及び符号を附して説明している。そのため、保護シート、導水シート及び排水具は同一形態のものを使用しても実施可能である。また、1段目〜4段目の保護シートを総称して、1〜n段目保護シート10と呼び、1段目〜4段目の導水シートを総称して、1〜n段目導水シート20と呼び、1段目〜3段目の排水具を総称して、1〜n段目排水具30と呼び、説明する。 Here, for convenience of explaining the steps of the construction method, the first to fourth protection sheets, the water guide sheet, and the drainage tool are described by giving different names and symbols, respectively. Therefore, the protection sheet, the water guide sheet, and the drainage tool can be used even if they have the same form. Further, the first to fourth stage protective sheets are collectively referred to as the first to nth stage protective sheets 10, and the first to fourth stage water guide sheets are collectively referred to as the first to nth stage water guide sheets. The first to third-stage drainage tools are collectively referred to as "20", and the first to nth-stage drainage tools 30 are collectively described.

1〜n段目保護シート10は、厚みが0.2〜10mmの適度な強度及び耐久性を有すると同時に、柔軟性を有したシートである。なお、この1〜n段目保護シート10の厚みや材質については、施工主から提示される恒久処置が開始されるまでの期間を考慮して、適切な厚みや材質選択する。 The 1st to n-th stage protective sheet 10 is a sheet having a thickness of 0.2 to 10 mm, having appropriate strength and durability, and at the same time having flexibility. Regarding the thickness and material of the 1st to n-th protection sheet 10, an appropriate thickness and material are selected in consideration of the period until the permanent treatment presented by the construction owner is started.

1〜n段目保護シート10の具体的な材質としては、ポリプロピレン(PP)、ポリエチレン(PE)、ポリエステル(PEs)、塩化ビニル(PVC)等をシート状に加工したものや、アルミフィルム等の軟性金属をシート状に加工した不通水性(遮水性)を有したシートである。よって、雨水については、斜面1の内部に浸み込むことはない。なお、本出願書類において「シート」として呼ぶものは、英語の「sheet」のことであり、フィルムよりは厚いが、柔軟性を備えている平板の材料のことである。 Specific materials for the 1st to n-th protective sheet 10 include polypropylene (PP), polyethylene (PE), polyester (PEs), vinyl chloride (PVC) processed into a sheet shape, an aluminum film, and the like. It is a sheet having imperviousness (water impermeability) obtained by processing a soft metal into a sheet shape. Therefore, rainwater does not penetrate into the inside of the slope 1. In addition, what is referred to as a “sheet” in the present application documents is an English “sheet”, and is a flat plate material that is thicker than a film but has flexibility.

また1〜n段目保護シート10の広さについては、幅が0.5m〜10m(好ましくは1〜2m)で、長さについては斜面に合わせて適宜な長さを選択している。本実施形態においては、幅2メートル長さ5メートルとしている。なお、原材料の供給や製造が可能であれば、これより広いものとしても良く、また施工場所に合わせて適当の大きさに分割して施工しても良い。1〜n段目保護シート10を設けることにより、豪雨時も土壌水の浸透による斜面1の土壌の含水率を多くすることなく脱水乾燥硬化を促進することができる。 The width of the 1st to n-th stage protective sheet 10 is 0.5 m to 10 m (preferably 1 to 2 m), and the length is appropriately selected depending on the slope. In this embodiment, the width is 2 meters and the length is 5 meters. If the raw materials can be supplied or manufactured, the raw material may be wider than the raw material, or the raw material may be divided into suitable sizes according to the construction site. By providing the 1st to n-th stage protection sheets 10, it is possible to promote dehydration and dry hardening without increasing the water content of the soil on the slope 1 due to the infiltration of soil water even during heavy rain.

1〜n段目保護シート10については、本願の出願人の出願した出願番号「特願2018−204814号」で説明している発明「複合シート」を用いても良い。複合シートの場合は、その性質状厚みが、2〜20mm程度になり、全体として不通水性を有している。 The invention “composite sheet” described in the application number “Japanese Patent Application No. 2018-204814” filed by the applicant of the present application may be used for the first to n-th stage protective sheets 10. In the case of a composite sheet, its characteristic thickness is about 2 to 20 mm, and it has impermeable properties as a whole.

なお、複合シートとは、内包させる材料に対する遮蔽性及び柔軟性を備えた第2シートと、平面状の網を加工して前記平面状の網から分割された複数の点・線・面の集合体からなる所定の間隔を保持できる二つの面が形成されている所定の目開きの変形させた網と、前記第2シートに、前記変形させた網に形成された一方の面を接合させて前記第2シートの一面に前記変形させた網で所定の空間を形成し、前記空間に鉱物を粉砕または鉱物を焼成・粉砕した原材料料を主成分とする粉粒材を充填させた後に、前記変形させた網に形成された他方の面に、内包させる材料に対する遮蔽性及び柔軟性を備えた第1シートを接合させ、変形させた網の側面を塞ぎ、前記粉粒材を内包させているシートのことである。 The composite sheet is a set of a plurality of dots, lines, and surfaces obtained by processing a second sheet having a shielding property and flexibility against a material to be included and a planar net and dividing the planar net. By joining a deformed mesh having a predetermined mesh formed on the body and having two surfaces capable of holding a predetermined gap, one surface formed on the deformed mesh is joined to the second sheet. A predetermined space is formed on one surface of the second sheet by the deformed net, and the space is filled with a powdered or granular material containing a raw material material obtained by crushing minerals or firing/crushing minerals as a main component. The first sheet having the shielding property and the flexibility for the material to be included is joined to the other surface formed on the deformed mesh, the side surface of the deformed mesh is closed, and the powdery material is included. It is a sheet.

1〜n段目導水シート20については、水分を吸収すると同時に、重力によって水分を通水又は導水することができる。そのため、1〜n段目導水シート20の大きさについては、斜面を覆うことができる様に1〜n段目保護シート10と同様の広さではあり、厚みについては、1〜n段目保護シート10よりも厚く、5〜20mm程度になる。 The first to n-th water guide sheets 20 can absorb water and at the same time allow water to pass through or conduct water by gravity. Therefore, the size of the 1st-nth stage water guide sheet 20 is the same as that of the 1st-nth stage protection sheet 10 so that the slope can be covered, and about the thickness, 1st-nth stage protection sheet is provided. It is thicker than the sheet 10 and has a thickness of about 5 to 20 mm.

1〜n段目導水シート20の例としては、繊維や繊維状のもの等の糸状絡まりあって、ひとまとまりの状態になっているもので、言い換えるならば綿状の塊となっているものや、繊維や繊維状の塊でない場合にはスポンジの様な多孔質のものである。1〜n段目導水シート20を設けて斜面1にフィツトすることにより、斜面1の水分を吸収すると共に、水は通すが土の微粒子は通さないフィルターとしての機能で、斜面1が浸食され空洞化されるのを防ぐ。 Examples of the 1st to n-th water-conducting sheets 20 include fibers and fibrous filaments that are entangled with each other in a filamentous state, in other words, a cotton-like lump. If it is not a fiber or fibrous mass, it is a sponge-like porous material. By providing the first to n-th water guiding sheet 20 and fitting the slope 1 to the slope 1, the slope 1 is eroded and cavities by absorbing water on the slope 1 and functioning as a filter that allows water to pass but does not pass fine particles of soil. Prevent being converted.

さらに、前記1〜n段目導水シートの材質の例としては、合成樹脂の場合は、ポリエステル、ナイロン、アクリル、ポリ塩化ビニル、ポリウレタン、レーヨン、キュプラ、ポリノジック、アセテート、トリアセテート、プロミックス、などの繊維や、スポンジ状に加工したものである。また、天然の繊維や繊維状の材質としては、ヤシの実繊維、麻(ジュート・ケナフ)、綿、や動物繊維等であり、無機物の場合は、グラスファイバーやロックウール等でも良い。 Further, as an example of the material of the first to n-th water-conducting sheets, in the case of synthetic resin, polyester, nylon, acrylic, polyvinyl chloride, polyurethane, rayon, cupra, polynosic, acetate, triacetate, promix, etc. It is processed into fibers or sponge. The natural fibers and fibrous materials include coconut fiber, hemp (jute/kenaf), cotton, animal fiber and the like, and in the case of an inorganic substance, glass fiber, rock wool and the like may be used.

図2において、1〜n段目排水具30の詳細について説明する。1〜n段目排水具30は、金属、合成樹脂等を適切な形状に加工したものである。1〜n段目排水具30の大きさの幅については、5〜20cm程度であり、土壌水の状況により適切に選定する。また、1〜n段目排水具30の厚みや長さについては、打ち込まれる斜面1の硬質や軟質等の土壌の状態により適切に選定する。 In FIG. 2, details of the first to n-th stage drainage tools 30 will be described. The first to n-th stage drainage tools 30 are formed by processing metal, synthetic resin, or the like into an appropriate shape. The width of the size of the first to n-th stage drainage tool 30 is about 5 to 20 cm, and is appropriately selected depending on the situation of soil water. Further, the thickness and length of the first to n-th stage drainage tools 30 are appropriately selected depending on the soil condition such as the hardness or softness of the slope 1 to be driven.

1〜n段目排水具30は平板の先端30aを土中に打ち込み易い様に、尖らせている。また、末端30bは、1〜n段目排水具30を土中に打ち込む場合に、ハンマーで叩きやすくするためと、1〜n段目保護シート10a、図3や図4の場合は1段目保護シート11aの上辺を押さえて仮止めが可能な、下向きに折り曲げられた折り返しが設けられている。 The first to n-th stage drainage tools 30 are sharpened so that the tip end 30a of the flat plate can be easily driven into the soil. Further, the terminal end 30b is for facilitating hitting with a hammer when the first to nth stage drainage tool 30 is driven into the soil, and for the first to nth stage protective sheet 10a, the first stage in the case of FIGS. 3 and 4. A downwardly bent fold back is provided, which can be temporarily fixed by pressing the upper side of the protective sheet 11a.

留め具41は、金属、合成樹脂等の土木用鋲や土木用釘である。留め具41の長さや太さについては、打ち込まれる斜面1の硬質や軟質等の土壌の状態により適切に選定する。1〜n段目保護シート20や1〜n段目導水シート10の外周や要所に貫通して、斜面の土や岩等に打ち込まれることによって1〜n段目保護シート20や1〜n段目導水シート10を斜面に固定する。なお、留め具41の1〜n段目保護シート20や1〜n段目導水シート10に対する押さえる効果を増すために、留め具41の頭部(ハンマーなどで叩く部分で、他の部分に比較して大きくしている部分。)、を大きくしても良いが、本実施形態においては、合成樹脂や金属等の円板を押さえ板として組み合わせたものとしている。 The fastener 41 is a tack for civil engineering or a nail for civil engineering such as metal or synthetic resin. The length and thickness of the fastener 41 are appropriately selected depending on the soil condition such as the hardness or softness of the slope 1 to be driven. The 1st-nth stage protection sheet 20 and the 1st-nth stage protection sheet 20 and the 1st-nth stage protection sheet 20 and 1-nth stage are penetrated into the outer periphery of the 1st-nth stage water conveyance sheet 10 and a key point, and are driven into the soil or the rock of a slope. The stage water guide sheet 10 is fixed to the slope. In addition, in order to increase the effect of holding the fastener 41 against the 1st-nth stage protection sheet 20 and the 1st-nth stage water guiding sheet 10, the head of the fastener 41 (a portion hit with a hammer or the like, compared to other portions). However, in the present embodiment, a disc made of synthetic resin, metal or the like is combined as a pressing plate.

図3乃至図13を用いて、図1の実施形態になるまでの施工方法について説明する。 A construction method up to the embodiment of FIG. 1 will be described with reference to FIGS. 3 to 13.

シートを用いた斜面施工方法の第1段階(第1ステップ)は、図3で図示する様にまず1段目導水シート21を斜面1敷設する。斜面1における1段目導水シート21の敷設する箇所は、斜面1が崩壊することを防ぎたい箇所の斜面1の最下部(平面5が斜面1に変化する箇所)に、1段目導水シート21の下側の辺を合わせて敷設する。なお、1〜n段目導水シート20については、図中において、交線を附して図示している。また、用語としての敷設は、鉄道や水道等を設置する場合に一般的に用いられているが、シート状のものを敷いて設置するという意味を説明する用語として用いている。 In the first step (first step) of the slope construction method using the sheet, first, the first water guiding sheet 21 is laid on the slope 1 as shown in FIG. The place where the first-stage water guiding sheet 21 is laid on the slope 1 is located at the bottom of the slope 1 (where the plane 5 changes to the slope 1) where it is desired to prevent the slope 1 from collapsing. Lay the lower sides of the two together. In addition, about the 1st-nth stage water-conducting sheet 20, it attaches and shows an intersection line in the figure. Further, the term "laying" is generally used when installing a railway, a water supply, etc., but is used as a term for explaining the meaning of laying and installing a sheet-shaped object.

第2段階は、1段目導水シート21を敷設した後に、1段目導水シート21とほぼ同じ広さの1段目保護シート11を1段目導水シート21に重ね合せて敷設する。 In the second stage, after the first-stage water guiding sheet 21 is laid, the first-stage protection sheet 11 having the same size as the first-stage water guiding sheet 21 is laid on the first-stage water guiding sheet 21.

斜面1に1段目導水シート21に合わせて1段目保護シート11を敷設した状態が図4である。図中において、1〜n段目導水シート20に1〜n段目保護シート10が重ね合されているかどうかを明確にできる様にするために、1〜n段目導水シート20に重ね合された状態の1〜n段目保護シート10を、1〜n段目保護シート10a、図4の場合は、1段目保護シート11aとし、符号を変えて図示して説明する。 FIG. 4 shows a state in which the first-stage protection sheet 11 is laid on the slope 1 so as to match the first-stage water guide sheet 21. In the figure, in order to make it clear whether or not the 1st-nth stage water-conducting sheet 20 is superposed on the 1st-nth stage water-conducting sheet 20, it is superposed on the 1st-nth stage water-conducting sheet 20. The 1st-nth stage protection sheet 10 in this state is referred to as the 1st-nth stage protection sheet 10a, and in the case of FIG. 4, it is the 1st stage protection sheet 11a.

第3段階は、図4に示している様に、1段目導水シート21が重ね合された1段目保護シート11aの上側の辺の近傍の3箇所に、3個の1段目排水具31を斜面1の土中に打ち込む。ここで、1段目排水具31を斜面1に打ち込む角度は、平面5に対して、上向きになる様にする。詳しくは、図8の断面図である図9に図示している。また、本実施形態においては、1段目排水具31を3個として、均等に配置しているが、1段目保護シート11aの大きさや、斜面1の土壌水の条件により、1〜n段目排水具30の数を1段目保護シート11aの幅に合わせて連続して打ち込んでも、減らしても良い。また。1段目排水具31の打ち込む間隔については、土壌水の状況で不均等に打ち込んでも良い。 In the third stage, as shown in FIG. 4, three first-stage drainage tools are provided at three locations in the vicinity of the upper side of the first-stage protection sheet 11a on which the first-stage water guiding sheet 21 is overlapped. Drive 31 into the soil on slope 1. Here, the angle at which the first-stage drainage tool 31 is driven into the slope 1 is set to be upward with respect to the plane 5. Details are shown in FIG. 9, which is a cross-sectional view of FIG. In addition, in the present embodiment, the first-stage drainage tools 31 are three and are evenly arranged. However, depending on the size of the first-stage protection sheet 11a and the condition of the soil water on the slope 1, 1-n stages. The number of eye drainage tools 30 may be continuously driven or reduced according to the width of the first-stage protection sheet 11a. Also. The first-stage drainage tool 31 may be driven at uneven intervals depending on the condition of soil water.

後述する図9で説明するが、1〜n段目排水具30が設けられていることにより、斜面が崩壊する原因ともなっている斜面1に含まれている地表面の下にある土壌水を十分に誘導排水することができる。 As will be described later with reference to FIG. 9, since the first to nth stage drainage tools 30 are provided, the soil water under the ground surface included in the slope 1 that causes the slope to collapse is sufficiently removed. Can be drained to induction.

図5は、1段目保護シート11aの上側の辺の近傍の3箇所に、3個の1段目排水具31を斜面1の土中に打ち込まれ、1段目保護シート11aの上側で3個の1段目排水具31により、斜面1に仮止めされた状態となっている。 FIG. 5 shows that three first-stage drainage tools 31 are driven into the soil of the slope 1 at three locations near the upper side of the first-stage protection sheet 11a, and three first-stage drainage tools 31 are placed on the upper side of the first-stage protection sheet 11a. It is in a state of being temporarily fixed to the slope 1 by the individual first-stage drainage tools 31.

第4段階は、図6で図示する様に1段目導水シート21が重ね合された1段目保護シート11aの上側で、1段目保護シート11aと所定の重ね代(図6において、1段目保護シート11aの上辺と2点鎖線で示す箇所までの間)を設けて、2段目導水シート22を斜面1敷設する。所定の重ね代としては、5〜20cm程度である。 In the fourth stage, as shown in FIG. 6, the upper side of the first-stage protection sheet 11a in which the first-stage water guide sheet 21 is superposed is provided and a predetermined overlapping margin (in FIG. The upper side of the stage protection sheet 11a and the part up to the position indicated by the chain double-dashed line are provided, and the second stage water guide sheet 22 is laid on the slope 1. The predetermined overlap margin is about 5 to 20 cm.

なお、本実施形態において重ね代は、10cmとしている。重ね代の部分で留め具41を1段目保護シート11aと2段目保護シート12aを貫通させて斜面1に打ち込むため、1段目保護シート11aと2段目保護シート12aが破れない様に、余裕を持たせるためである。 In addition, in this embodiment, the overlap margin is 10 cm. Since the fastener 41 penetrates the first-stage protection sheet 11a and the second-stage protection sheet 12a and is driven into the slope 1 at the overlap portion, the first-stage protection sheet 11a and the second-stage protection sheet 12a are not broken. , To allow a margin.

第5段階は、図7に図示する様に、2段目導水シート22を敷設した後に、2段目導水シート22とほぼ同じ広さの2段目保護シート12を2段目導水シート22に重ね合せて敷設する。2段目導水シート22に重ね合された、2段目保護シート12aが敷設された後の状態を図8に示す。図8におけるA−A断面図を図9に図示する。 In the fifth step, as shown in FIG. 7, after the second-stage water guide sheet 22 is laid, the second-stage water guide sheet 22 is replaced with the second-stage protection sheet 12 having the same size as the second-stage water guide sheet 22. Lay on top of each other. FIG. 8 shows a state after the second-stage protection sheet 12a is laid on the second-stage water guide sheet 22. A sectional view taken along the line AA in FIG. 8 is shown in FIG.

図9において、斜面1の断面を多数の点で、1段目導水シート21と2段目導水シート22の断面を交線で、1段目保護シート11と2段目保護シート12を左上がりの斜線で、1段目排水具31を右上がりの斜線で、図示している。図9において、1段目排水具31は1段目保護シート11aの上部を押さえている。1段目排水具31は斜面1に対して、水平面5の角度よりも上向き(左上がり)に埋め込まれている。 In FIG. 9, the cross section of the slope 1 is divided into a number of points, and the cross sections of the first-stage water guide sheet 21 and the second-stage water guide sheet 22 are intersected with each other, and the first-stage protection sheet 11 and the second-stage protection sheet 12 are moved to the left. The first-stage drainage tool 31 is illustrated by a diagonal line rising to the right. In FIG. 9, the first-stage drainage tool 31 holds the upper part of the first-stage protection sheet 11a. The first-stage drainage tool 31 is embedded in the slope 1 upward (to the left) above the angle of the horizontal plane 5.

このため、土壌水が斜面1の内部で流れたとしても、1段目排水具31により斜面1の外部、さらには1段目保護シート11aの表面側に誘導排水することができる。この場合に1段目排水具31の表側は、2段目導水シート22で覆われているので、2段目導水シート22のフィルター機能により、水は通すが土の微粒子を通さないことになり、斜面1の崩壊を防ぐことができる。 Therefore, even if the soil water flows inside the slope 1, the first-stage drainage tool 31 can guide and drain the water to the outside of the slope 1 and further to the surface side of the first-stage protection sheet 11a. In this case, since the front side of the first-stage drainage tool 31 is covered with the second-stage water guide sheet 22, the filter function of the second-stage water guide sheet 22 allows water to pass but does not allow fine particles of soil to pass. It is possible to prevent the slope 1 from collapsing.

また、1段目排水具31は、2段目導水シート22の下側にあるので、2段目導水シート22を伝わって落下する水についても、1段目保護シート11aの表面側に誘導排水することができる。 Further, since the first-stage drainage tool 31 is located below the second-stage water guide sheet 22, even water that has fallen along the second-stage water guide sheet 22 is guided and drained to the surface side of the first-stage protection sheet 11a. can do.

第6段階は、図10に示している様に、2段目導水シート22が重ね合された2段目保護シート12aの上側の辺の近傍の3箇所に、3個の2段目排水具32を斜面1の土中に打ち込む。ここで、2段目排水具32を斜面1に打ち込む角度は、前述の1段目排水具31と同様の角度に打ち込む。また、2段目排水具32の数や打ち込む位置についても1段目排水具31と同様にしても良いし、変更しても良い。打ち込まれた状態が図11となる。これにより2段目保護シート12aは2段目排水具32によって、仮止めされている。 In the sixth step, as shown in FIG. 10, three second-stage drainage tools are provided at three locations in the vicinity of the upper side of the second-stage protection sheet 12a in which the second-stage water guiding sheet 22 is superposed. Drive 32 into the soil of slope 1. Here, the angle of driving the second-stage drainage tool 32 into the slope 1 is the same as that of the first-stage drainage tool 31 described above. Further, the number and driving positions of the second-stage drainage tools 32 may be the same as those of the first-stage drainage tool 31 or may be changed. The driven state is shown in FIG. As a result, the second-stage protection sheet 12a is temporarily fixed by the second-stage drainage tool 32.

第7段階は、図11に示している様に、2段目排水具32を斜面1に打ち込んだ後に、留め具41を1段目保護シート11aの下辺近傍と、1段目保護シート11aと2段目保護シート12aとの重ね代に均等間隔で打ち込む。本実施形態においては、1段目保護シート11aについて、上下4本ずつ留め具41を打ち込む状態を図示しているが、斜面1の状態や、1段目保護シート11aの大きさにより、増減しても良い。また、1段目保護シート11aの左右辺の近傍に留め具41を打ち込んでも良い。そして留め具41が打ち込まれた状態が図12となる。 In the seventh step, as shown in FIG. 11, after the second-stage drainage tool 32 is driven into the slope 1, the fasteners 41 are provided near the lower side of the first-step protection sheet 11a and the first-step protection sheet 11a. The second protective sheet 12a and the second protective sheet 12a are piled up at even intervals. In the present embodiment, the upper and lower four fasteners 41 are driven into the first-stage protective sheet 11a, but the number of the fasteners 41 may be increased or decreased depending on the state of the slope 1 or the size of the first-stage protective sheet 11a. May be. Further, the fasteners 41 may be driven near the left and right sides of the first-stage protection sheet 11a. The state where the fastener 41 is driven in is shown in FIG.

第8段階以降については、4段階から7段階までの繰り返しを実施することになる。詳細は繰り返しであるので省略するが、4段階から7段階の、1段目導水シート21、1段目保護シート11、11a、1段目排水具31を、2段目導水シート22、2段目保護シート12、12a、2段目排水具32と読み替え、2段目導水シート22、2段目保護シート12、12a、2段目排水具32を3段目導水シート23、3段目保護シート13、13a、3段目排水具33と読み替えることにより実施できる。なお、4段階から7段階を、前記の読み替えを行って実施した図が、図13となる。 After the 8th stage, the repetition from the 4th stage to the 7th stage will be carried out. The details are omitted because they are repeated, but the first-stage water guide sheet 21, the first-stage protection sheets 11, 11a, the first-stage drainage tool 31, the second-stage water guide sheet 22, and the second stage in four to seven stages are omitted. The eye protection sheets 12, 12a are replaced with the second-stage drainage tool 32, the second-stage water guiding sheet 22, the second-stage protection sheet 12, 12a, the second-stage drainage tool 32 are replaced by the third-stage water guiding sheet 23, the third-stage protection. It can be carried out by reading the sheets 13, 13a and the third-stage drainage tool 33. Note that FIG. 13 is a diagram obtained by carrying out the above-described replacement of steps 4 to 7.

さらに、本実施形態の図1で示した、1段目保護シート11a〜4段目保護シート14aを敷設した場合について説明する。この場合については、4段階から7段階の、1段目導水シート21、1段目保護シート11、11a、1段目排水具31を、3段目導水シート23、3段目保護シート13、13a、3段目排水具33と読み替え、2段目導水シート22、2段目保護シート12、12a、2段目排水具32を、4段目導水シート24、4段目保護シート14、14a、4段目排水具34と読み替えることにより実施できる。 Further, a case where the first-stage protection sheet 11a to the fourth-stage protection sheet 14a shown in FIG. 1 of the present embodiment are laid will be described. In this case, the first-stage water guide sheet 21, the first-stage protection sheets 11, 11a, the first-stage drainage tool 31, the third-stage water guide sheet 23, the third-stage protection sheet 13, which are in four to seven stages, 13a is replaced with the third-stage drainage tool 33, the second-stage water guide sheet 22, the second-stage protection sheets 12, 12a, the second-stage drainage tool 32, the fourth-stage water guide sheet 24, the fourth-stage protection sheets 14, 14a. It can be carried out by replacing it with the fourth-stage drainage tool 34.

ただし、4段目排水具34については、斜面1の上部にあり土壌水が発生するおそれがないことや、4段目排水具34の上面に密着する5段目導水シート25は設けられないことにより、1〜n段目導水シート20によるフィルター機能がないことから、本実施形態においては設けられてない。そして、4段目保護シート14aよりも上にシートの敷設は行わないことから、4段目保護シート14aの上辺近傍に、留め具41を4本打ち込んでいる。以上の読み替え等を行って実施した図が、図1となる。 However, regarding the fourth-stage drainage device 34, there is no possibility that soil water will be generated at the upper part of the slope 1 and that the fifth-stage water guiding sheet 25 that adheres to the upper surface of the fourth-stage drainage device 34 will not be provided. Therefore, the first to n-th water guiding sheets 20 do not have a filter function, and thus are not provided in the present embodiment. Since no sheet is laid above the fourth-level protection sheet 14a, four fasteners 41 are driven near the upper side of the fourth-level protection sheet 14a. FIG. 1 is a diagram obtained by performing the above replacements and the like.

1〜n段目保護シート10、1〜n段目導水シート20、1〜n段目排水具30を増やして実施する場合には、前記の敷設を繰り返すことによって実施できる。また、本実施形態においては、1〜n段目保護シート10と1〜n段目導水シート20を分離して施工する方法として説明しているが、最初から1〜n段目導水シート20に1〜n段目保護シート10を重ねあわせて接着や溶着して製造されたものを用いて施工しても良い。その場合には、前記の施工の段階において、1〜n段目導水シート20を敷設する工程は省略され、1〜n段目導水シート20が接着または溶着された1〜n段目保護シート10aを敷設することになる。 In the case of increasing the number of the 1st-nth stage protection sheet 10, the 1st-nth stage water guiding sheet 20, and the 1st-nth stage drainage tool 30, the above-mentioned laying can be repeated. Moreover, in this embodiment, although it explains as a method of separating and constructing the 1st-nth stage protection sheet 10 and the 1st-nth stage water conveyance sheet 20, from the beginning to the 1st-nth stage water conveyance sheet 20. You may construct using the thing manufactured by laminating|stacking the 1st-nth stage protection sheet 10 and adhering or welding. In that case, the step of laying the 1st-nth stage water guide sheet 20 is omitted in the above-mentioned construction stage, and the 1st-nth stage protection sheet 10a to which the 1st-nth stage water guide sheet 20 is adhered or welded Will be laid.

本出願書類において接合する方法として、「接着、溶着」と説明するものは、素材を変性劣化がし難い、熱溶着、超音波溶着、接着剤、溶射、ホットメルトや、接着シートを用いる方法等のことである。 As a method of joining in the present application documents, what is described as "adhesion, welding" means that the material is not easily deteriorated by modification, heat welding, ultrasonic welding, adhesive, thermal spraying, hot melt, a method of using an adhesive sheet, etc. That is.

(第2の実施形態)
第2の実施形態について、図14と図15を用いて説明する。図14は第1の実施形態の斜面1の中央部が崩壊して中央部に窪み6が生じた斜面2である。この斜面2に本発明のシートを用いた斜面施工方法が行われた場合を図15に示す。
(Second embodiment)
The second embodiment will be described with reference to FIGS. 14 and 15. FIG. 14 shows the slope 2 in which the central portion of the slope 1 of the first embodiment collapses and a recess 6 is formed in the central portion. FIG. 15 shows a case where the slope construction method using the sheet of the present invention is performed on the slope 2.

図15において、崩壊が生じた中央部の窪み6については、第1の実施形態と同様に、1段目導水シート21が重ね合された1段目保護シート11aと、2段目導水シート22が重ね合された2段目保護シート12aと、3段目導水シート23が重ね合された3段目保護シート13aと、4段目導水シート24が重ね合された4段目保護シート14aが敷設されている。 In FIG. 15, for the depression 6 in the central portion where collapse has occurred, as in the first embodiment, the first-stage protection sheet 11a in which the first-stage water guiding sheet 21 is overlaid and the second-stage water guiding sheet 22. The second-stage protection sheet 12a in which the 4th-stage protection sheet 12a is stacked, the third-stage protection sheet 13a in which the third-stage water guiding sheet 23 is stacked, and the fourth-stage protection sheet 14a in which the fourth-stage water guiding sheet 24 is stacked It has been laid.

また、1段目保護シート11aの上側の辺の近傍に、3個の1段目排水具31が、2段目保護シート12aの上側の辺の近傍に、3個の2段目排水具32が、3段目保護シート13aの上側の辺の近傍に、3個の3段目排水具33が、斜面2の土中に打ち込まれている。 Further, three first-stage drainage tools 31 are provided near the upper side of the first-stage protection sheet 11a, and three second-stage drainage tools 32 are provided near the upper side of the second-stage protection sheet 12a. However, three third-stage drainage tools 33 are driven into the soil of the slope 2 in the vicinity of the upper side of the third-stage protection sheet 13a.

次に、1段目保護シート11a、2段目保護シート12a、3段目保護シート13a、4段目保護シート14aの右側には、5段目導水シート25が重ね合された5段目保護シート15aと、6段目導水シート26が重ね合された6段目保護シート16aが敷設されている。 Next, on the right side of the first-step protection sheet 11a, the second-step protection sheet 12a, the third-step protection sheet 13a, and the fourth-step protection sheet 14a, the fifth-step water guiding sheet 25 is superposed on the fifth-step protection sheet. A sixth stage protection sheet 16a, in which the sheet 15a and the sixth stage water guide sheet 26 are laminated, is laid.

5段目保護シート15aと6段目保護シート16aについては、横長に敷設するのではなく、縦長に敷設されている。また、5段目保護シート15aと6段目保護シート16aが敷設されている斜面2の部分には、1〜n段目排水具30は設けられてない。 The fifth-level protection sheet 15a and the sixth-level protection sheet 16a are laid vertically rather than horizontally. In addition, the first to n-th stage drainage tools 30 are not provided in the portion of the slope 2 on which the fifth-step protection sheet 15a and the sixth-step protection sheet 16a are laid.

これは、斜面2では、中央部が崩壊して窪みができていることから、窪みのある中央部付近に土壌水が集中していると考えて、1段目保護シート11a、2段目保護シート12a、3段目保護シート13a、4段目保護シート14aが敷設した斜面2だけ、排水具を設け、5段目保護シート15aと6段目保護シート16aを敷設した斜面2には、排水具が必要ないと判断して実施したからである。また、土壌水を外部に誘導排水する必要がないことから、シートを敷設し易い縦長にして、5段目保護シート15aと6段目保護シート16aを敷設している。 This is because in the slope 2, the central part collapses to form a depression, so it is considered that soil water is concentrated in the vicinity of the central part where the depression is present, and the first-stage protection sheet 11a and the second-stage protection sheet are protected. A drainage tool is provided only on the slope 2 on which the sheet 12a, the third protection sheet 13a, and the fourth protection sheet 14a are laid, and drainage is provided on the slope 2 on which the fifth protection sheet 15a and the sixth protection sheet 16a are laid. This is because it was decided that the equipment was not needed. Further, since it is not necessary to guide and drain the soil water to the outside, the sheet is made vertically long so that the sheet can be easily laid, and the fifth stage protection sheet 15a and the sixth stage protection sheet 16a are laid.

なお、5段目保護シート15aと6段目保護シート16aを横長に敷設して、斜面2に排水具を打ち込んでも良い。また、図15においては省略しているが、必要な場合には、1段目保護シート11a、2段目保護シート12a、3段目保護シート13a、4段目保護シート14aの左側に、7段目保護シート17aと8段目保護シート18aを敷設しても良い。 Note that the fifth-stage protection sheet 15a and the sixth-stage protection sheet 16a may be laid horizontally and the drainage tool may be driven into the slope 2. Although omitted in FIG. 15, if necessary, 7-th layer is provided on the left side of the first-stage protection sheet 11a, the second-stage protection sheet 12a, the third-stage protection sheet 13a, and the fourth-stage protection sheet 14a. The step protection sheet 17a and the eighth step protection sheet 18a may be laid.

1〜n段目導水シート20、1〜n段目保護シート10、1〜n段目排水具30の材質や形状等については、第1の実施形態と同様であるので説明を省略する。また、斜面2に対する施工方法については、1段目保護シート11a、2段目保護シート12a、3段目保護シート13a、4段目保護シート14aについては、第1の実施形態と同様であるので説明を省略する。そして、4段目保護シート14aを敷設した後に、5段目保護シート15a、6段目保護シート16aの順で敷設する。 The materials, shapes, etc. of the 1st-nth stage water guide sheet 20, the 1st-nth stage protection sheet 10, and the 1st-nth stage drainage tools 30 are the same as those in the first embodiment, and therefore their explanations are omitted. The construction method for the slope 2 is the same as that of the first embodiment for the first-stage protection sheet 11a, the second-stage protection sheet 12a, the third-stage protection sheet 13a, and the fourth-stage protection sheet 14a. The description is omitted. Then, after the fourth-level protection sheet 14a is laid, the fifth-level protection sheet 15a and the sixth-level protection sheet 16a are laid in this order.

(第3の実施形態)
第3の実施形態について、図16を用いて説明する。図16は第3の実施形態に用いる排水具51の斜視図であり、排水具51が変更されているだけであるので、1〜n段目導水シート20、1〜n段目保護シート10、留め具41の材質や形状等については、第1の実施形態と同様として説明を省略する。また、斜面1や斜面2に対する施工方法については、第1の実施形態や第2の実施形態と同様であるので説明を省略する。
(Third Embodiment)
The third embodiment will be described with reference to FIG. FIG. 16 is a perspective view of the drainage tool 51 used in the third embodiment. Since the drainage tool 51 is only changed, the 1-nth stage water guiding sheet 20, the 1st-nth stage protection sheet 10, The material, shape, etc. of the fastener 41 are the same as those in the first embodiment, and a description thereof will be omitted. The construction method for the slope 1 and the slope 2 is the same as that in the first and second embodiments, and thus the description thereof is omitted.

排水具51は、金属、合成樹脂等を適切な形状に加工したものである。排水具51の先端51aは、1〜n段目排水具30の先端30aと同様に、土中に打ち込み易い様に、尖らせている。また、末端51bは、排水具51を土中に打ち込む場合に、ハンマーで叩きやすくするためと、1〜n段目保護シート10aの上辺を押さえて仮止めが可能な、下向きに折り曲げられた折り返しが設けられている。そして、折り返した部分については、1〜n段目保護シート10aを押さえつけ易くするために、複数の四角形の切欠きが設けている。なお、切り欠きについては、1〜n段目保護シート10aの厚みや材質により個数を増減させることや、形状を三角形や半円形等にしても良い。 The drainage tool 51 is made by processing metal, synthetic resin, or the like into an appropriate shape. The tip 51a of the drainage tool 51 is sharpened so as to be easily driven into the soil like the tip 30a of the drainage tool 30 of the 1st to n-th stages. In addition, the terminal end 51b is a folded-down folded portion that facilitates tapping with a hammer when the drainage tool 51 is driven into the soil, and that can be temporarily fixed by pressing the upper side of the 1st to n-th protective sheet 10a. Is provided. The folded-back portion is provided with a plurality of rectangular cutouts so that the first to n-th protective sheets 10a can be easily pressed. The number of notches may be increased or decreased depending on the thickness and material of the 1st to n-th protective sheet 10a, and the shape may be triangular or semicircular.

(第4の実施形態)
第4の実施形態について、図17を用いて説明する。図17は第4の実施形態に用いる排水具52の斜視図であり、排水具52が変更されているだけであるので、1〜n段目導水シート20、1〜n段目保護シート10、留め具41の材質や形状等については、第1の実施形態と同様として説明を省略する。また、斜面1や斜面2に対する施工方法については、第1の実施形態や第2の実施形態と同様であるので説明を省略する。
(Fourth Embodiment)
The fourth embodiment will be described with reference to FIG. FIG. 17 is a perspective view of the drainage tool 52 used in the fourth embodiment, and since the drainage tool 52 is only changed, the 1-nth stage water guide sheet 20, the 1-nth stage protection sheet 10, The material, shape, etc. of the fastener 41 are the same as those in the first embodiment, and a description thereof will be omitted. The construction method for the slope 1 and the slope 2 is the same as that in the first and second embodiments, and thus the description thereof is omitted.

排水具52は、金属、合成樹脂等を適切な形状に加工したものである。排水具52の末端52bについては、1〜n段目排水具30の先端30bと同様に、土中に打ち込む場合に、ハンマーで叩きやすくするためと、1〜n段目保護シート10aの上辺を押さえて仮止めが可能な、下向きに折り曲げられた折り返しが設けられている。また、先端52aについては、中央部に窪みを設けて、断面「逆への字」状に加工されている。土壌水を受け易くするためである。なお、排水具52が1〜n段目導水シート20で覆われる部分については平面になっているので、1〜n段目導水シート20のフィルター機能を損なわない。 The drainage tool 52 is made by processing metal, synthetic resin, or the like into an appropriate shape. Regarding the terminal end 52b of the drainage tool 52, like the tip 30b of the 1st to nth stage drainage tool 30, in order to make it easier to hit with a hammer when driving into the soil, the upper side of the 1st to nth stage protection sheet 10a is set. A downwardly folded fold is provided that can be pressed and temporarily fixed. The tip 52a is provided with a recess in the center and is processed to have a "reverse shape" in cross section. This is to make it easier to receive soil water. In addition, since the portion of the drainage tool 52 covered with the first to n-th water guiding sheets 20 is flat, the filter function of the first to n-th water guiding sheets 20 is not impaired.

以上、本発明について、第1〜第4の実施形態に基づき説明してきたが、本発明は何らこれらの実施形態の構成に限定するものではない。例えば、第1〜第4の実施形態の組み合わせについては適宜組合せを変えて実施可能である。 Although the present invention has been described above based on the first to fourth embodiments, the present invention is not limited to the configurations of these embodiments. For example, the combination of the first to fourth embodiments can be implemented by appropriately changing the combination.

さらには、この発明は、これらに限定されるものではなく、特許請求の範囲に記載された発明とその均等の範囲を含むものである。
以下に、本件出願の特許請求の範囲に記載された発明を付記する。
(付記)
[1]付記1は、1段目導水シートを斜面に敷設し、
前記1段目導水シートの上に1段目保護シート敷設し、
前記1段目導水シートと前記1段目保護シートの上側近傍の所定の箇所に1段目排水具を土中に打ち込み、
前記1段目保護シートの上辺に所定の幅で重ね合せて2段目導水シートを前記1段目保護シートの上方に敷設し、
その後前記2段目導水シートの上に2段目保護シート敷設し、
前記2段目導水シートと前記2段目保護シートの上側近傍の所定の箇所に2段目排水具を土中に打ち込み、
その後少なくとも前記2段目保護シート、前記2段目導水シート、前記1段目保護シート及び前記1段目導水シートの重なり部分と、前記1段目保護シート及び前記1段目導水シートの下辺近傍を留め具で斜面に固定し、
前記敷設、打ち込みや固定等の手順を上方に向かってn段目まで繰り返すことからなるシートを用いた斜面施工方法である。
[2]付記2は、前記1〜n段目保護シートの裏面側に予め対応する前記第1〜n段目導水シートが接着または溶着されている、請求項1記載のシートを用いた斜面施工方法である。
[3]付記3は、前記留め具で、下側にある前記1〜n段目保護シート及び前記第1〜n段目導水シートを仮止めする、請求項1または請求項2記載のシートを用いた斜面施工方法である。
[4]付記4は、前記1〜n段目保護シートは、内部空間を有しており、前記空間に鉱物を粉砕または鉱物を焼成・粉砕した原材料料を主成分とする粉粒材を充填させている請求項1乃至請求項3記載のシートを用いた斜面施工方法である。
[5]付記5は、前記1〜n段目保護シートの表面で受け止められた雨水は、前記1〜n段目保護シートの表面を流下し、斜面上流側からの土壌水は、略水平方向に連続して又は所定の間隔で土中に打ち込まれた1〜n段目排水具で、対応する前記1〜n段目保護シート表面に誘導排水される請求項1乃至請求項4記載のシートを用いた斜面施工方法である。
Further, the present invention is not limited to these, and includes the inventions described in the claims and their equivalents.
The inventions described in the claims of the present application will be additionally described below.
(Appendix)
[1] Appendix 1 lays the first-stage water guiding sheet on the slope,
Laying the first protection sheet on the first water-conducting sheet,
Driving the first-stage drainage tool into the soil at a predetermined location near the upper side of the first-stage water guide sheet and the first-stage protection sheet,
Laying a second level water-conducting sheet on the upper side of the first level protection sheet with a predetermined width, and laying it above the first level protection sheet,
Then, lay a second protective sheet on the second water guide sheet,
Driving the second-stage drainage tool into the soil at a predetermined location near the upper side of the second-stage water guide sheet and the second-stage protection sheet,
After that, at least the second protection sheet, the second water guiding sheet, the first protection sheet and the overlapping portion of the first water guiding sheet and the lower side of the first protection sheet and the first water guiding sheet Secure it to the slope with fasteners,
It is a slope construction method using a sheet, which comprises repeating the above-mentioned steps of laying, driving, and fixing up to the n-th step.
[2] Appendix 2 is a sloped construction using a sheet according to claim 1, wherein the corresponding first to nth water guiding sheets are adhered or welded to the back surface side of the first to nth protective sheets in advance. Is the way.
[3] The supplementary note 3 is the fastener according to claim 1 or 2, wherein the first to n-th protection sheets and the first to n-th water guide sheets on the lower side are temporarily fixed. This is the slope construction method used.
[4] Note 4, the 1st to n-th protective sheet has an internal space, and the space is filled with a powder or granular material containing a raw material material obtained by crushing minerals or firing/crushing minerals as a main component. It is a slope construction method using the sheet according to any one of claims 1 to 3.
[5] Note 5 is that the rainwater received on the surface of the 1st to nth protective sheet flows down the surface of the 1st to nth protective sheet, and the soil water from the upstream side of the slope is in a substantially horizontal direction. The sheet according to any one of claims 1 to 4, which is guided and drained to the surface of the corresponding 1st to nth stage protective sheet by a 1st to nth stage drainage tool which is continuously driven into the soil or is driven into the soil at a predetermined interval. It is a slope construction method using.

重要な社会インフラである山の斜面、造成地の斜面、道路の斜面、河川堤防の斜面、護岸の斜面等の土砂崩れや、地滑り等の斜面の崩壊に対する応急処置を行う場合に、恒久処置までの期間が延長する場合についても対応できる。 When performing emergency measures for landslides such as mountain slopes, landslide slopes, road slopes, river embankment slopes, revetment slopes, etc. We can also handle cases where the period is extended.

1、2:斜面
5:水平面
6:窪み
10、10a:1〜n段目保護シート
11、11a:1段目保護シート
12、12a:2段目保護シート
13、13a:3段目保護シート
14、14a:4段目保護シート
15a:5段目保護シート
16a:6段目保護シート
20:1〜n段目導水シート
21:1段目導水シート
22:2段目導水シート
23:3段目導水シート
24:4段目導水シート
30:1〜n段目排水具
30a、51a、52a:先端
30b、51b、52b:末端
31:1段目排水具
32:2段目排水具
33:3段目排水具
41:留め具
51、52:排水具
1, 2: slope 5: horizontal surface 6: dent 10, 10a: 1-nth stage protective sheet 11, 11a: 1st stage protective sheet 12, 12a: 2nd stage protective sheet 13, 13a: 3rd stage protective sheet 14 , 14a: 4th stage protective sheet 15a: 5th stage protective sheet 16a: 6th stage protective sheet 20:1 to nth stage water guide sheet 21: 1st stage water guide sheet 22: 2nd stage water guide sheet 23: 3rd stage Water guide sheet 24: Fourth-stage water guide sheet 30:1 to n-th stage drainers 30a, 51a, 52a: Tip 30b, 51b, 52b: Terminal 31: 1st stage drainer 32: Second stage drainer 33: 3rd stage Eye drainage device 41: Fasteners 51, 52: Drainage device

Claims (5)

1段目導水シートを斜面に敷設し、
前記1段目導水シートの上に1段目保護シート敷設し、
前記1段目導水シートと前記1段目保護シートの上側近傍の所定の箇所に1段目排水具を土中に打ち込み、
前記1段目保護シートの上辺に所定の幅で重ね合せて2段目導水シートを前記1段目保護シートの上方に敷設し、
その後前記2段目導水シートの上に2段目保護シート敷設し、
前記2段目導水シートと前記2段目保護シートの上側近傍の所定の箇所に2段目排水具を土中に打ち込み、
その後少なくとも前記2段目保護シート、前記2段目導水シート、前記1段目保護シート及び前記1段目導水シートの重なり部分と、前記1段目保護シート及び前記1段目導水シートの下辺近傍を留め具で斜面に固定し、
前記敷設、打ち込みや固定等の手順を上方に向かってn段目まで繰り返すことからなるシートを用いた斜面施工方法。
Laying the first stage water guide sheet on the slope,
Laying the first protection sheet on the first water-conducting sheet,
Driving the first-stage drainage tool into the soil at a predetermined location near the upper side of the first-stage water guide sheet and the first-stage protection sheet,
Laying a second level water-conducting sheet on the upper side of the first level protection sheet with a predetermined width, and laying it above the first level protection sheet,
Then, lay a second protective sheet on the second water guide sheet,
Driving the second-stage drainage tool into the soil at a predetermined location near the upper side of the second-stage water guide sheet and the second-stage protection sheet,
After that, at least the second protection sheet, the second water guiding sheet, the first protection sheet and the overlapping portion of the first water guiding sheet and the lower side of the first protection sheet and the first water guiding sheet Secure it to the slope with fasteners,
A slope construction method using a sheet, which comprises repeating the above-mentioned steps of laying, driving, and fixing up to the n-th step.
前記1〜n段目保護シートの裏面側に予め対応する前記第1〜n段目導水シートが接着または溶着されている、請求項1記載のシートを用いた斜面施工方法。 The slope construction method using a sheet according to claim 1, wherein the corresponding first to nth water-conducting sheets are adhered or welded to the back surface side of the first to nth protective sheets in advance. 前記留め具で、下側にある前記1〜n段目保護シート及び前記第1〜n段目導水シートを仮止めする、請求項1または請求項2記載のシートを用いた斜面施工方法。 The slope construction method using the sheet according to claim 1 or 2, wherein the fasteners temporarily fix the 1st to nth stage protection sheets and the 1st to nth stage water guide sheets on the lower side. 前記1〜n段目保護シートは、内部空間を有しており、前記空間に鉱物を粉砕または鉱物を焼成・粉砕した原材料料を主成分とする粉粒材を充填させている請求項1乃至請求項3記載のシートを用いた斜面施工方法。 The 1st to n-th protective sheet has an internal space, and the space is filled with a powdered or granular material containing a raw material material obtained by pulverizing minerals or firing and pulverizing minerals as a main component. A slope construction method using the sheet according to claim 3. 前記1〜n段目保護シートの表面で受け止められた雨水は、前記1〜n段目保護シートの表面を流下し、斜面上流側からの土壌水は、略水平方向に連続して又は所定の間隔で土中に打ち込まれた1〜n段目排水具で、対応する前記1〜n段目保護シート表面に誘導排水される請求項1乃至請求項4記載のシートを用いた斜面施工方法。 The rainwater received on the surface of the 1st to nth protective sheet flows down the surface of the 1st to nth protective sheet, and the soil water from the slope upstream side is continuously or substantially in the horizontal direction. The slope construction method using a sheet according to any one of claims 1 to 4, wherein guided drainage is performed on the surface of the corresponding 1st to nth stage protective sheets with the 1st to nth stage drainage tools driven into the soil at intervals.
JP2018230489A 2018-12-10 2018-12-10 Slope construction method using a sheet Active JP7053036B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018230489A JP7053036B2 (en) 2018-12-10 2018-12-10 Slope construction method using a sheet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018230489A JP7053036B2 (en) 2018-12-10 2018-12-10 Slope construction method using a sheet

Publications (2)

Publication Number Publication Date
JP2020094325A true JP2020094325A (en) 2020-06-18
JP7053036B2 JP7053036B2 (en) 2022-04-12

Family

ID=71084598

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018230489A Active JP7053036B2 (en) 2018-12-10 2018-12-10 Slope construction method using a sheet

Country Status (1)

Country Link
JP (1) JP7053036B2 (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5022907U (en) * 1973-06-23 1975-03-14
JPS6123344U (en) * 1984-07-11 1986-02-12 財団法人鉄道総合技術研究所 Embankment slope protection structure
JPS6229610A (en) * 1985-07-31 1987-02-07 Ohbayashigumi Ltd Water-proof construction for soil ground surface
JPH10317352A (en) * 1997-03-14 1998-12-02 Pub Works Res Inst Ministry Of Constr Greenable erosion preventing sheet mat
JP2001254330A (en) * 2000-03-10 2001-09-21 Public Works Research Institute Ministry Of Land Infrastructure & Transport Erosion prevention mat and its laying method
JP2003313865A (en) * 2002-04-18 2003-11-06 Diatex Co Ltd Synthetic resin pile body for civil engineering
JP2004131967A (en) * 2002-10-08 2004-04-30 Hirose & Co Ltd Structure of reinforcement slant face
JP2008208604A (en) * 2007-02-26 2008-09-11 Yoshihara Kako:Kk Slope protection mat
JP2011084905A (en) * 2009-10-14 2011-04-28 Yoshio Murahashi Clogging prevention device of water collection pipe in underground water drainage mechanism
JP2018066159A (en) * 2016-10-18 2018-04-26 有限会社エコプロ Method of constructing slope face and sheet body used therefor

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5022907U (en) * 1973-06-23 1975-03-14
JPS6123344U (en) * 1984-07-11 1986-02-12 財団法人鉄道総合技術研究所 Embankment slope protection structure
JPS6229610A (en) * 1985-07-31 1987-02-07 Ohbayashigumi Ltd Water-proof construction for soil ground surface
JPH10317352A (en) * 1997-03-14 1998-12-02 Pub Works Res Inst Ministry Of Constr Greenable erosion preventing sheet mat
JP2001254330A (en) * 2000-03-10 2001-09-21 Public Works Research Institute Ministry Of Land Infrastructure & Transport Erosion prevention mat and its laying method
JP2003313865A (en) * 2002-04-18 2003-11-06 Diatex Co Ltd Synthetic resin pile body for civil engineering
JP2004131967A (en) * 2002-10-08 2004-04-30 Hirose & Co Ltd Structure of reinforcement slant face
JP2008208604A (en) * 2007-02-26 2008-09-11 Yoshihara Kako:Kk Slope protection mat
JP2011084905A (en) * 2009-10-14 2011-04-28 Yoshio Murahashi Clogging prevention device of water collection pipe in underground water drainage mechanism
JP2018066159A (en) * 2016-10-18 2018-04-26 有限会社エコプロ Method of constructing slope face and sheet body used therefor

Also Published As

Publication number Publication date
JP7053036B2 (en) 2022-04-12

Similar Documents

Publication Publication Date Title
CN104164851B (en) The construction method of the ecological flexible mud-rock flow blocking dam of gabion arch
CN107119522A (en) The structure and construction method of new-old concrete bond linking
CN105887938A (en) Building trough vibration isolator
CN210194547U (en) River course ecological revetment
CN106759397A (en) Ecological lattice guest method to set up
CN105442499B (en) 300m grades of rock self-bearing type panel construction systems and installation method
CN101906785B (en) Method of anti-leak treatment on petroleum drilling place by adopting composite geo-membrane
JP2020094325A (en) Slope construction method using sheet
CN204163049U (en) A kind of gabion net for river course slope protection regulation
CN107806080A (en) A kind of Novel geogrid
JP6533907B1 (en) Composite sheet and bag made of the composite sheet
CN207512762U (en) A kind of friction pile repairs structure with the breakage mountain body that TGXG is combined
JP5261121B2 (en) Reinforced structure of paved road
CN107761700A (en) The ballast method of soft soil foundation
CN213773384U (en) Deep basal pit side slope protection reinforcing bar net fixing device
CN210887227U (en) Foundation ditch drainage type sprays concrete structure
JP2017206826A (en) Embankment reinforcement method
JP6676463B2 (en) Embankment reinforcement method
CN210862412U (en) Protection device suitable for high steep side slope goes out hole blasting
CN207228130U (en) A kind of city integrated piping lane foundation pit backfill processing combined system
CN106917388A (en) The check dam and construction method of a kind of use Fill Reinforced With Geogrids modified cement soil clad
CN202809565U (en) Self-filter impervious system of concrete dam
CN201991015U (en) Foundation underpinning structure
Gouw et al. High hybrid reinforced soil slope as runway support–Tana Toraja airport case study
CN110318405A (en) Side slope modular guard system construction method based on lattice guest gabion and TGXG

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20211026

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20211026

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20211216

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220210

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220318

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220324

R150 Certificate of patent or registration of utility model

Ref document number: 7053036

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150