Prior art keywords
steel pipe
jig
drilling
main body
punching
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2018216129A
Other languages
Japanese (ja)
Other versions
JP7062575B2 (en
Inventor
仁 沼
Hitoshi Numa
仁 沼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MO TEC KK
Original Assignee
MO TEC KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MO TEC KK filed Critical MO TEC KK
Priority to JP2018216129A priority Critical patent/JP7062575B2/en
Publication of JP2020082229A publication Critical patent/JP2020082229A/en
Application granted granted Critical
Publication of JP7062575B2 publication Critical patent/JP7062575B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

To provide a hole drilling jig and a hole drilling method for a steel pipe, which enable a bolt hole to be drilled in a side surface of the cylindrical cross-section steel pipe with a high degree of accuracy.SOLUTION: A hole drilling jig 20 for a steel pipe, which is used to drill a bolt hole 30A in a side surface of the cylindrical steel pipe 30, includes a body 21 that is arranged on the side surface of the steel pipe 30 and that has one or more openings 21A provided in positions to face a surface of the steel pipe 30, and fixing structures 22-25 for fixing the body 21 to the side surface of the steel pipe 30.SELECTED DRAWING: Figure 2

Description

本発明は、鋼管の孔開け用治具及び孔開け方法に関し、さらに詳しくは、例えば、円筒状の鋼管の側面にボルトで部材を締着するためのボルト孔を正しく穿設することができる鋼管の孔開け用治具及び孔開け方法に関する。 TECHNICAL FIELD The present invention relates to a jig for punching a steel pipe and a method for punching the steel pipe. More specifically, for example, a steel pipe capable of correctly forming a bolt hole for fastening a member with a bolt on a side surface of a cylindrical steel pipe. The present invention relates to a hole making jig and a hole making method.

建築現場などで資材運搬用のトラックの乗り入れや各種の建築資材を吊下げ搬送を行うためにタワークレーンが使用される。タワークレーンのマストの台座は、例えばH形鋼などの桁材(「覆工受桁」や「横継材」等)で構成されており、当該桁材は地中に貫入された回転圧入鋼管杭などの支持杭へ支持固定される(特許文献1等を参照)。 Tower cranes are used at construction sites to drive in trucks for material transportation and to suspend and transport various building materials. The pedestal of the mast of the tower crane is composed of girder materials such as H-section steel (“lining girders” and “horizontal joint materials”), and the girder materials are rotary press-fit steel pipes that have penetrated into the ground. It is supported and fixed to a support pile such as a pile (see Patent Document 1 and the like).

例えば図10に示される回転圧入鋼管杭100は、断面が円形状の鋼管101の先端側(下端側)に羽根102を取り付けた鋼管杭であり、狭い場所での使用が可能であること、地中に静かに捻じ込むことが可能であること、先端の羽根によって硬い地盤へ確実に打設することが可能であること、残土が発生しないこと等の利点がある。このような回転圧入鋼管杭としては例えば「NSエコパイル」(新日鉄住金エンジニアリング株式会社の登録商標)などがある。 For example, the rotary press-fit steel pipe pile 100 shown in FIG. 10 is a steel pipe pile in which blades 102 are attached to the tip side (lower end side) of a steel pipe 101 having a circular cross section, and can be used in a narrow place. It has the advantages that it can be gently screwed in, that it can be reliably driven into hard ground by the blade at the tip, and that no residual soil will be generated. Examples of such a rotary press-fitted steel pipe pile include "NS Ecopile" (registered trademark of Nippon Steel & Sumikin Engineering Co., Ltd.).

このような断面円形状の回転圧入鋼管杭を支持杭として利用したものとして例えば特許文献1がある。すなわち、台座を構成する桁材(H形鋼)に接続金具を用いて回転圧入鋼管杭へ固定するというものである。そして、当該桁材と回転圧入鋼管杭とを確実に固定するために、図11に示されるとおり、回転圧入鋼管杭100の上端側の側面に接続金具を構成する保持部材32,32の凹型ウェブを当接させて固定ボルト2a〜2cによって固定する必要がある。そして、回転圧入鋼管杭100に対するボルト孔穿設に係る作業としては、地中に埋設された状態の回転圧入鋼管杭の側面にボルト孔を形成すべき目標位置を墨出ししてから、当該目標位置へ向けて電動ドリル(穿設装置)の切削刃を正面から押し当て断面円形である鋼管杭の中心に向かってボルト孔が穿設されるまで電動ドリルの姿勢を維持し続けるというものであった。 There is, for example, Patent Document 1 as an application of such a rotary press-fitted steel pipe pile having a circular cross section as a support pile. That is, the girder material (H-shaped steel) forming the pedestal is fixed to the rotary press-fitted steel pipe pile by using a connecting fitting. Then, in order to securely fix the girder material and the rotary press-fitted steel pipe pile, as shown in FIG. 11, the concave webs of the holding members 32, 32 constituting the connection fittings on the side surface on the upper end side of the rotary press-fitted steel pipe pile 100. Must be brought into contact with each other and fixed by the fixing bolts 2a to 2c. Then, as the work relating to the bolt hole drilling for the rotary press-fitted steel pipe pile 100, the target position where the bolt hole is to be formed on the side surface of the rotary press-fitted steel pipe pile buried in the ground is marked out, and then the target Push the cutting blade of the electric drill (drilling device) from the front toward the position and keep the posture of the electric drill until the bolt hole is drilled toward the center of the steel pipe pile with a circular cross section. It was

特許第6355057号公報Patent No. 6355057 特許第4077777号公報Japanese Patent No. 4077777

しかしながら、従来、作業員は中腰の状態でボルト孔の穿設作業を行わなければならなかったことから電動ドリルの姿勢は不安定にならざるを得ないという問題があった。電動ドリルの姿勢が不安定であると断面円形である鋼管杭の中心に向かって正しくボルト孔を穿設することができず、ボルト孔が正しく穿設されていなければ保持部材も正しく取り付けることができない。 However, conventionally, there is a problem that the posture of the electric drill has to be unstable because the worker has had to perform a bolt hole drilling work in a middle waist state. If the posture of the electric drill is unstable, the bolt holes cannot be correctly drilled toward the center of the steel pipe pile that has a circular cross section.If the bolt holes are not drilled correctly, the holding member can also be installed correctly. Can not.

一方、電動ドリルとしては、例えば、特許文献2に示すような電磁石で構成された付着ベース付きの電動ドリル装置が提供されている。当該電動ドリルを用いることで作業者の負担は改善されると考えられるが、電動ドリルの姿勢を安定させた状態で穿設作業を行うためには付着ベースを平坦な面に磁着させる必要がある。しかし、回転圧入鋼管杭の側面は曲面であるため当該電動ドリルを安定して固定することができないという問題があった。 On the other hand, as an electric drill, for example, an electric drill device with an attachment base composed of an electromagnet as shown in Patent Document 2 is provided. Although it is thought that the burden on the operator is reduced by using the electric drill, it is necessary to magnetically attach the attachment base to a flat surface in order to perform the drilling work while the posture of the electric drill is stable. is there. However, since the side surface of the rotary press-fitted steel pipe pile is a curved surface, there is a problem that the electric drill cannot be stably fixed.

そこで、本発明者はこのような従来の問題の解決を図るべく鋭意検討を行った結果、新たな鋼管の孔開け用治具及び孔開け方法に係る本発明を完成するに至った。すなわち、本発明の目的とするところは、断面円筒状の鋼管の側面に対するボルト孔の穿設を高精度に行うことができる鋼管の孔開け用治具及び孔開け方法を提供することにある。 Therefore, as a result of intensive studies aimed at solving such a conventional problem, the present inventor has completed the present invention relating to a new jig and method for boring a steel pipe. That is, an object of the present invention is to provide a jig for punching a steel pipe and a method for punching a steel pipe, which are capable of highly accurately drilling bolt holes on the side surface of a steel pipe having a cylindrical cross section.

上記課題を解決するために請求項1に記載の本発明は、円筒状の鋼管の側面にボルト孔を穿設するための鋼管の孔開け用治具において、前記鋼管の側面に配置される本体であって、当該鋼管の表面と正対する位置に一又は複数の開口部が設けられている本体と、前記本体を前記鋼管の側面へ固定するための固定構造と、を備えていることを特徴とする。 In order to solve the above-mentioned problems, the present invention according to claim 1 is a jig for drilling a steel pipe for forming a bolt hole in a side face of a cylindrical steel pipe, the main body being arranged on the side face of the steel pipe. And a main body having one or a plurality of openings provided at a position directly facing the surface of the steel pipe, and a fixing structure for fixing the main body to a side surface of the steel pipe. And

上記課題を解決するために請求項2に記載の本発明は、請求項1に記載の鋼管の孔開け治具において、前記本体は平板状であり、平板状の前記本体の左右に立設された一対の側板を前記固定構造の少なくとも一部として備えていることを特徴とする。 In order to solve the above-mentioned problems, the present invention according to claim 2 is the jig for drilling a steel pipe according to claim 1, wherein the main body has a flat plate shape and is erected on the left and right sides of the flat plate-like main body. It is characterized in that a pair of side plates are provided as at least a part of the fixing structure.

上記課題を解決するために請求項3に記載の本発明は、請求項2に記載の鋼管の孔開け治具において、左右の前記側板の外側に形成された一対の鍔部を前記固定構造の少なくとも一部として備え、一対の前記鍔部には固定ボルトを取り付けるための固定用ボルト孔がそれぞれ設けられていることを特徴とする。 In order to solve the above-mentioned problems, the present invention according to claim 3 is the jig for drilling a steel pipe according to claim 2, wherein a pair of collar portions formed outside the left and right side plates is provided in the fixing structure. At least a part of the flange portions is provided with fixing bolt holes for attaching the fixing bolts, respectively.

上記課題を解決するために請求項4に記載の本発明は、請求項3に記載の鋼管の孔開け治具において、一対の前記鍔部は複数設けられていることを特徴とすることを特徴とする。 In order to solve the above-mentioned problems, the present invention according to claim 4 is characterized in that, in the jig for punching a steel pipe according to claim 3, a plurality of the pair of flange portions are provided. And

上記課題を解決するために請求項5に記載の本発明は、請求項1から4のいずれか一項に記載の鋼管の孔開け治具を利用した孔開け方法において、ボルト孔を穿設すべき前記鋼管の側面の所定位置を墨出しするステップと、第一の前記鋼管の孔開け治具と第二の前記鋼管の孔開け治具とを前記鋼管を挟んでそれぞれ対向する位置に配置するステップと、第一の前記鋼管の孔開け治具と第二の前記鋼管の孔開け治具の一方又は両方の前記本体の前記開口部が墨出しされた所定位置と正対するように位置合わせするステップと、第一の前記鋼管の孔開け治具と第二の前記鋼管の孔開け治具とを互いの前記固定構造により固定するステップと、墨出しされた所定位置に対して前記本体の前記開口部を介して穿設装置によってボルト孔を穿設するステップと、を含み構成されていることを特徴とする。 In order to solve the above problems, the present invention according to claim 5 provides a bolt hole in the method for drilling using a jig for drilling a steel pipe according to any one of claims 1 to 4. The step of marking out a predetermined position on the side surface of the steel pipe to be disposed, and the first jig for punching the steel pipe and the second jig for punching the steel pipe are arranged at positions facing each other with the steel pipe sandwiched therebetween. And a step of aligning one or both of the first steel pipe hole forming jig and the second steel pipe hole forming jig so that the opening portion of the main body faces the predetermined position marked out. A step of fixing the first jig for punching the steel pipe and the second jig for punching the steel pipe by the fixing structure of each other; and Drilling a bolt hole with a drilling device through the opening.

上記課題を解決するために請求項6に記載の本発明は、請求項5に記載の鋼管の孔開け治具を利用した孔開け方法において、前記穿設装置を磁力によって前記本体に固定した状態でボルト孔を穿設することを特徴とする。 In order to solve the above-mentioned problems, the present invention according to claim 6 relates to a hole forming method using the jig for forming a steel pipe according to claim 5, wherein the punching device is fixed to the main body by magnetic force. It is characterized in that a bolt hole is bored by.

上記課題を解決するために請求項7に記載の本発明は、請求項1から4のいずれか一項に記載の鋼管の孔開け治具を利用した孔開け方法において、ボルト孔を穿設すべき前記鋼管の側面の所定位置を墨出しするステップと、前記鋼管の孔開け治具の前記本体の前記開口部が墨出しされた所定位置と正対するように位置合わせするステップと、前記鋼管の孔開け治具の一方側と他方側を前記固定構造により固定するステップと、墨出しされた所定位置に対して前記本体の前記開口部を介して穿設装置によってボルト孔を穿設するステップと、を含み構成されていることを特徴とする。 In order to solve the above-mentioned problems, the present invention according to claim 7 provides a bolt hole in the method for drilling using a jig for drilling a steel pipe according to any one of claims 1 to 4. Indicating a predetermined position on the side surface of the steel pipe to be positioned, aligning the opening of the main body of the hole forming jig of the steel pipe so as to directly face the predetermined position that is marked out, and Fixing one side and the other side of the drilling jig by the fixing structure, and drilling a bolt hole by a drilling device through the opening of the main body with respect to the marked predetermined position. It is characterized by including and.

上記課題を解決するために請求項8に記載の本発明は、請求項5から7のいずれか1項に記載の孔開け方法において、前記鋼管が鋼管杭であることを特徴とする。 In order to solve the above problems, the present invention according to claim 8 is the drilling method according to any one of claims 5 to 7, characterized in that the steel pipe is a steel pipe pile.

本発明に係る鋼管の孔開け用治具によれば、当該孔開け用治具の全体を鋼管へ固定構造により固定することが容易である。そして少なくとも1つの開口部を介して穿設装置で前記鋼管の側面にボルト孔を穿設する際には、当該開口部を目印とすることができるので、ボルト孔の穿設位置の精度を高めることが容易である。しかも当該鋼管の側面と穿設装置との間には本体が介在し、かつ当該本体は当該鋼管に固定されているので、穿設中に本体を支えとして穿設装置の姿勢を維持することで、ボルト孔の中心線を側面の法線に一致させることも容易である。したがって、本発明に係る鋼管の孔開け用治具によれば、断面円筒状の鋼管の側面に対するボルト孔の穿設を高精度に行うことができるという効果がある。 According to the jig for punching a steel pipe according to the present invention, it is easy to fix the entire jig for punching a hole to the steel pipe by the fixing structure. When the bolt hole is formed on the side surface of the steel pipe by the drilling device through at least one opening, the opening can be used as a mark, and thus the accuracy of the drilling position of the bolt hole is improved. It's easy to do. Moreover, since the main body is interposed between the side surface of the steel pipe and the drilling device, and the main body is fixed to the steel pipe, it is possible to maintain the posture of the drilling device by supporting the main body during drilling. It is also easy to match the center line of the bolt hole with the normal line of the side surface. Therefore, the jig for drilling a steel pipe according to the present invention has an effect that it is possible to perform the drilling of the bolt hole with high accuracy on the side surface of the steel pipe having a cylindrical cross section.

本発明に係る鋼管の孔開け治具を利用した孔開け方法によれば、第一の孔開け用治具と第二の孔開け用治具とで鋼管を両側から挟み込むようにして固定構造により鋼管へ固定することが可能である。そして、少なくとも1つの開口部を介して穿設装置で前記鋼管の所定位置にボルト孔を穿設する際には、当該開口部を目印とすることができるので、ボルト孔の穿設位置の精度を高めることが容易である。しかも、当該鋼管の所定位置と穿設装置との間には本体が介在し、かつ当該本体は当該鋼管に固定されているので、穿設中に本体を支えとして磁着可能な穿設装置を確実に固定することができ、ボルト孔の中心線を側面の法線に正確に一致させることも容易となる。したがって、本発明に係る鋼管の孔開け治具を利用した孔開け方法によれば、断面円筒状の鋼管の側面に対するボルト孔の穿設を高精度に行うことができるという効果がある。しかも、本発明に係る鋼管の孔開け治具を利用した孔開け方法によれば、互いに同じ構成の第一の孔開け用治具と第二の孔開け用治具とで鋼管を両側から挟み込むので、鋼管の中心線に関して対称な位置にそれぞれボルト孔を穿設する際の位置合わせが容易という利点もある。 According to the hole forming method using the hole forming jig for the steel pipe according to the present invention, the steel pipe is sandwiched from both sides by the first hole forming jig and the second hole forming jig, and the fixing structure is provided. It can be fixed to a steel pipe. When a bolt hole is drilled at a predetermined position of the steel pipe with the drilling device through at least one opening, the opening can be used as a mark, so that the accuracy of the drilled position of the bolt hole is high. Is easy to increase. Moreover, since the main body is interposed between the predetermined position of the steel pipe and the drilling device, and the main body is fixed to the steel pipe, a drilling device that can be magnetically attached by using the main body as a support during drilling is provided. It can be securely fixed, and the center line of the bolt hole can be easily matched with the normal line of the side surface. Therefore, according to the hole forming method using the jig for forming a steel pipe according to the present invention, there is an effect that the bolt hole can be formed with high accuracy on the side surface of the steel pipe having a cylindrical cross section. Moreover, according to the hole forming method using the hole forming jig for the steel pipe according to the present invention, the steel pipe is sandwiched from both sides by the first hole forming jig and the second hole forming jig having the same configuration. Therefore, there is also an advantage that it is easy to align the bolt holes at the positions symmetrical with respect to the center line of the steel pipe.

本発明に係る鋼管の孔開け治具を利用した孔開け方法によれば、孔開け用治具の本体で鋼管を側方から保持するようにしてその全体を固定構造で鋼管へ固定することが可能である。そして少なくとも1つの開口部を介して穿設装置で前記鋼管の所定位置にボルト孔を穿設する際には、当該開口部を目印とすることができるので、ボルト孔の穿設位置の精度を高めることが容易である。しかも、当該鋼管の所定位置と穿設装置との間には本体が介在し、かつ当該本体は当該鋼管に固定されているので、穿設中に本体を支えとして磁着可能な穿設装置を固定することで、ボルト孔の中心線を側面の法線に一致させることも容易となる。したがって、本発明に係る鋼管の孔開け用治具を利用した孔開け方法によれば、断面円筒状の鋼管の側面に対するボルト孔の穿設を高精度に行うことができるという効果がある。 According to the punching method using the jig for punching a steel pipe according to the present invention, it is possible to fix the entire steel pipe to the steel pipe with the fixing structure such that the steel pipe is laterally held by the main body of the jig for punching. It is possible. Then, when a bolt hole is drilled at a predetermined position of the steel pipe with the drilling device through at least one opening, the opening can be used as a mark, so that the accuracy of the drilling position of the bolt hole can be improved. Easy to increase. Moreover, since the main body is interposed between the predetermined position of the steel pipe and the drilling device, and the main body is fixed to the steel pipe, a drilling device that can be magnetically attached by using the main body as a support during drilling is provided. By fixing, it becomes easy to make the center line of the bolt hole coincide with the normal line of the side surface. Therefore, according to the drilling method using the jig for drilling a steel pipe according to the present invention, there is an effect that the bolt hole can be drilled with high accuracy on the side surface of the steel pipe having a cylindrical cross section.

本実施形態に係る孔開け用治具を示す斜視図である。It is a perspective view showing a jig for punching according to the present embodiment. 図2(A)は鋼管に装着された一対の孔開け用治具を示す斜視図、図2(B)はボルト孔の穿設後における鋼管を示す斜視図である。FIG. 2(A) is a perspective view showing a pair of hole drilling jigs attached to the steel pipe, and FIG. 2(B) is a perspective view showing the steel pipe after the bolt holes are drilled. 図2(A)における孔開け用治具の正面図である。FIG. 3 is a front view of the jig for punching in FIG. 2(A). 図2(A)における孔開け用治具の平面図である。FIG. 3 is a plan view of the jig for punching in FIG. 2(A). 図2(A)における孔開け用治具の側面図である。FIG. 3 is a side view of the hole forming jig in FIG. 電動ドリル(穿設装置)の概要を示す斜視図である。It is a perspective view showing the outline of an electric drill (drilling device). 電動ドリル(穿設装置)による孔開け作業を説明する説明図である。It is explanatory drawing explaining the drilling work by an electric drill (drilling device). 本実施形態に係る孔開け方法の手順を示すフローチャートである。It is a flow chart which shows the procedure of the punching method concerning this embodiment. 孔開け方法の変形例を説明する図である。It is a figure explaining the modification of the punching method. 回転圧入鋼管杭の主要部の構成を示す斜視図である。It is a perspective view which shows the structure of the principal part of a rotary press-fitting steel pipe pile. 回転圧入鋼管杭と保持部材との取り付け状態を示す平面図である。It is a top view which shows the attachment state of a rotation press fit steel pipe pile and a holding member.

初めに、本発明に係る孔開け用治具の好ましい一実施形態について図面を参照しつつ説明する。 First, a preferred embodiment of a hole making jig according to the present invention will be described with reference to the drawings.

[孔開け用治具の構成]
先ず、本実施形態に係る孔開け用治具の構成について説明する。図1は本実施形態に係る孔開け用治具を示す斜視図、図2(A)は鋼管に装着された一対の孔開け用治具を示す斜視図、図2(B)はボルト孔の穿設後における鋼管を示す斜視図である。図3は図2(A)における孔開け用治具の正面図、図4は図2(A)における孔開け用治具の平面図、図5は図2(A)における孔開け用治具の側面図である。本実施形態における孔開け用治具20は、地中に貫入された回転圧入鋼管杭などの円筒状の鋼管30の側面にボルト孔30A,30Aを穿設するために使用される鋼管の孔開け用治具である。なお、図2(A)では、2つの孔開け用治具20,20が互いに対向するようにして鋼管30に取り付けられており、一方の孔開け用治具20と他方の孔開け用治具20の構成は共通となっている。
[Structure of jig for punching]
First, the structure of the jig for punching according to the present embodiment will be described. FIG. 1 is a perspective view showing a hole making jig according to this embodiment, FIG. 2(A) is a perspective view showing a pair of hole making jigs mounted on a steel pipe, and FIG. It is a perspective view showing a steel pipe after perforation. 3 is a front view of the hole making jig shown in FIG. 2(A), FIG. 4 is a plan view of the hole making jig shown in FIG. 2(A), and FIG. 5 is a hole making jig shown in FIG. 2(A). FIG. The jig 20 for drilling in the present embodiment is a drilling tool for a steel pipe used for drilling bolt holes 30A, 30A on the side surface of a cylindrical steel pipe 30 such as a rotary press-fit steel pipe pile that is penetrated into the ground. It is a jig. In FIG. 2(A), the two jigs 20 for drilling are attached to the steel pipe 30 so as to face each other, and one jig 20 for punching and another jig for punching are drilled. The configuration of 20 is common.

図示された孔開け用治具20は、鋼管30の側面に配置される本体21と、本体21を鋼管30の側面へ固定するための固定構造22〜25とを備えている。本体21は、鋼板(鉄板など)で構成された平板状の部材であり、固定構造22〜25は、本体21の左右(両端縁)から同一方向に屈曲するようにして立設された側板22,23と、左右の側板22,23の外側にそれぞれ形成された一対の鍔部24,25とを備えている。本体21は、後述する電動ドリル(穿設装置)50が磁着固定可能な、例えば、鋼、鉄などで形成することが好ましい。また、側板22,23及び鍔部24,25の材質も本体21と同様の材質(鋼、鉄など)で形成されている。 The illustrated jig 20 for punching includes a main body 21 arranged on the side surface of the steel pipe 30, and fixing structures 22 to 25 for fixing the main body 21 to the side surface of the steel pipe 30. The main body 21 is a flat plate-shaped member made of a steel plate (iron plate or the like), and the fixing structures 22 to 25 are side plates 22 erected from the left and right (both edges) of the main body 21 so as to be bent in the same direction. , 23 and a pair of collar portions 24, 25 formed outside the left and right side plates 22, 23, respectively. The main body 21 is preferably formed of, for example, steel or iron to which an electric drill (drilling device) 50 described later can be magnetically fixed. Further, the side plates 22 and 23 and the collar portions 24 and 25 are made of the same material (steel, iron, etc.) as that of the main body 21.

また、本体21の左右に位置する側板22,23は、本体21を構成する鋼板の両端を同一方向に屈曲させるか、あるいは平板状の側板22,23を本体21の端縁部に溶接することにより、本体21と一体として形成したものである。この場合、側板22,23を含む本体21の断面形状は概略コの字状となる。また、鍔部24,25の各々も断面略コの字状の部材であり、一枚の鋼板の両端を同一方向に屈曲させるか、あるいは平板状の板材を断面略コの字状に組み合わせて溶接することにより形成したものである。 The side plates 22 and 23 located on the left and right sides of the main body 21 may be formed by bending both ends of the steel plate forming the main body 21 in the same direction or by welding the flat side plates 22 and 23 to the edge portions of the main body 21. Therefore, it is integrally formed with the main body 21. In this case, the main body 21 including the side plates 22 and 23 has a substantially U-shaped cross section. Each of the collar portions 24 and 25 is also a member having a substantially U-shaped cross section, and both ends of a single steel plate are bent in the same direction, or flat plate members are combined into a substantially U-shaped cross section. It is formed by welding.

また、本体21には、左右の側板22,23を鋼管30の側面にそれぞれ当接させた状態(図2(A)に示す状態)において、鋼管30の表面と正対する位置に、一又は複数の開口部21Aが設けられている。本実施形態では本体21の中央に3つの開口部21A,21A,21Aが高さ方向に沿って等ピッチで配列されている。これらの開口部21A,21A,21Aは、鋼管30の側面に形成すべきボルト孔30A(図2(B)参照)を完全にカバーできるようなサイズの例えば円形孔である。本実施形態において穿設すべきボルト孔は、図2(B)において実線で示されたボルト孔30Aであり、図2(A)では破線で示されている。開口部21A,21A,21Aの数や大きさ形状は特に限定されるものではなく、後述する電動ドリル(穿設装置)50の切削刃が挿入可能であり、鋼管30に付した墨出しが確認可能であればよい。なお、図2(A),(B)に示したボルト孔30A,30A,30Aは説明のために示したものであり、実際には各ボルト孔30Aは適宜の位置に穿設される。 Further, in the main body 21, one or a plurality of side plates 22 and 23 are provided at positions facing the surface of the steel pipe 30 in a state where the left and right side plates 22 and 23 are in contact with the side surfaces of the steel pipe 30 (the state shown in FIG. 2A). 21A is provided. In this embodiment, three openings 21A, 21A, 21A are arranged in the center of the main body 21 at equal pitches along the height direction. These openings 21A, 21A, 21A are, for example, circular holes having a size capable of completely covering the bolt hole 30A (see FIG. 2B) to be formed on the side surface of the steel pipe 30. The bolt hole to be bored in this embodiment is the bolt hole 30A shown by the solid line in FIG. 2B, and is shown by the broken line in FIG. 2A. The number and size of the openings 21A, 21A, 21A are not particularly limited, and a cutting blade of an electric drill (drilling device) 50, which will be described later, can be inserted, and the marking attached to the steel pipe 30 can be confirmed. It should be possible. The bolt holes 30A, 30A, 30A shown in FIGS. 2(A) and 2(B) are shown for the sake of explanation, and each bolt hole 30A is actually formed at an appropriate position.

また、図1及び図3に示すとおり、一対の鍔部24,25には、固定ボルト60を取り付ける(締着する)ための固定用ボルト孔24A,25Aがそれぞれ設けられると共に、一対の鍔部24,25に設けられた固定用ボルト孔24A,25Aの中心同士の間隔W1は、固定用ボルト孔24A,25Aにそれぞれ固定用ボルト60,60を挿通した際に平行鋼管30の側面によって阻害されることなく延伸できるように鋼管30の直径(外径)W2よりも僅かに長く形成されている。 Further, as shown in FIGS. 1 and 3, the pair of flange portions 24 and 25 are provided with fixing bolt holes 24A and 25A for attaching (tightening) the fixing bolt 60, respectively, and the pair of collar portions is formed. The spacing W1 between the centers of the fixing bolt holes 24A, 25A provided in 24, 25 is obstructed by the side surface of the parallel steel pipe 30 when the fixing bolts 60, 60 are inserted into the fixing bolt holes 24A, 25A, respectively. It is formed to be slightly longer than the diameter (outer diameter) W2 of the steel pipe 30 so that it can be stretched without being stretched.

ここで、本実施形態の孔開け用治具20においては、一対の鍔部24,25は複数設けられている。例えば、一対の鍔部24,25は、本体21の高さ方向にかけて2段に亘って設けられている。この場合、一対の孔開け用治具20は合計4本の固定ボルト60,60によって鋼管30へ強く固定される。 Here, in the hole making jig 20 of the present embodiment, a plurality of pairs of flange portions 24 and 25 are provided. For example, the pair of collar portions 24 and 25 are provided in two steps in the height direction of the main body 21. In this case, the pair of jigs 20 for drilling are strongly fixed to the steel pipe 30 by a total of four fixing bolts 60, 60.

[孔開け用治具等の寸法]
次に、孔開け用治具20の寸法の一例について説明する。ここで想定するのは、鋼管30の外径(外径)が406.4mmである場合に好適な孔開け用治具20である。
本体21の高さh:660mm
本体21の上端から固定用ボルト孔24A,25Aの中心までの距離a:250mm
鍔部24,25の厚さc:40mm
側板22,23の長さd:70mm
固定用ボルト孔24A,25Aの中心間隔W1:426mm
固定用ボルト孔24A,25Aの各々の径:20mm
固定用ボルト孔24A,24Aの高さの差b:160mm
固定用ボルト孔25A,25Aの高さの差b:160mm
開口部21Aの径:60mm
最上段の開口部21Aと最下段の開口部21Aとの中心間隔e:160mm
固定ボルト60の長さ:500mm
固定ボルト60の径:20mm
[Dimensions of drilling jigs, etc.]
Next, an example of dimensions of the hole making jig 20 will be described. It is assumed here that the jig 20 for punching is suitable when the outer diameter (outer diameter) of the steel pipe 30 is 406.4 mm.
Height of main body 21 h: 660 mm
Distance a from the upper end of the main body 21 to the centers of the fixing bolt holes 24A, 25A: 250 mm
Thickness c of collars 24 and 25: 40 mm
Length d of the side plates 22 and 23: 70 mm
Center distance between fixing bolt holes 24A, 25A W1: 426 mm
Diameter of each fixing bolt hole 24A, 25A: 20 mm
Height difference b between fixing bolt holes 24A, 24A: 160 mm
Height difference b between fixing bolt holes 25A, 25A: 160 mm
Diameter of opening 21A: 60 mm
Center distance e between the uppermost opening 21A and the lowermost opening 21A e: 160 mm
Length of fixing bolt 60: 500 mm
Diameter of fixing bolt 60: 20 mm

[電動ドリルの構成]
次に、本実施形態の孔開け方法に使用される電動ドリル(穿設装置)50について説明する。図6は、電動ドリル(穿設装置)50の概要を示す斜視図、図7は電動ドリル(穿設装置)による孔開け作業を説明する説明図である。
[Structure of electric drill]
Next, the electric drill (drilling device) 50 used in the drilling method of the present embodiment will be described. FIG. 6 is a perspective view showing the outline of the electric drill (drilling device) 50, and FIG. 7 is an explanatory view for explaining the drilling work by the electric drill (drilling device).

図示されるとおり、電動ドリル(穿設装置)50は、ドリルモータ52を備えた本体54、ドリルモータ52によって駆動される回転軸アセンブリ58、回転軸アセンブリ58の先端に装着される切削刃t、ドリルモータ52を制御するための操作レバー39、電磁石を内蔵した電磁ベース41、電動ドリル(穿設装置)50を保持するためのハンドル42などを備える。このような電動ドリル50としては、例えば、日東工器株式会社のアトラエースLO−3000A、LO−3550Aなどを用いることができる。 As shown in the figure, the electric drill (drilling device) 50 includes a main body 54 having a drill motor 52, a rotary shaft assembly 58 driven by the drill motor 52, a cutting blade t attached to the tip of the rotary shaft assembly 58, An operation lever 39 for controlling the drill motor 52, an electromagnetic base 41 containing an electromagnet, a handle 42 for holding an electric drill (drilling device) 50, and the like are provided. As such an electric drill 50, for example, ATRAACE LO-3000A, LO-3550A manufactured by Nitto Kohki Co., Ltd. can be used.

作業者が電動ドリル(穿設装置)50の電源スイッチ(不図示)をオンすると、電磁ベース41内の電磁石が通電し、電磁ベース41に磁力が発生するので、電磁ベース41の底面は平坦な強磁性体へ吸着させることが可能となる。本実施形態では前述した孔開け用治具20の本体21が平坦な強磁性体(鋼板)で構成されているので、図7に示されるとおり、本体21の表面へ電磁ベース41の底面を吸着させることが可能となる。また、本体54に対する電磁ベース41の相対位置は調整可能とされている。これにより、電磁ベース41の底面を孔開け治具20の本体21に固定した後に、本体54の位置を微調整することにより、切削刃tの芯出しを行うことが可能となる。 When an operator turns on a power switch (not shown) of the electric drill (drilling device) 50, the electromagnet in the electromagnetic base 41 is energized and a magnetic force is generated in the electromagnetic base 41, so that the bottom surface of the electromagnetic base 41 is flat. It becomes possible to adsorb to a ferromagnetic material. In the present embodiment, since the main body 21 of the above-described hole making jig 20 is made of a flat ferromagnetic material (steel plate), the bottom surface of the electromagnetic base 41 is attracted to the surface of the main body 21 as shown in FIG. It becomes possible. Further, the relative position of the electromagnetic base 41 with respect to the main body 54 can be adjusted. This makes it possible to center the cutting blade t by fixing the bottom surface of the electromagnetic base 41 to the main body 21 of the hole making jig 20 and then finely adjusting the position of the main body 54.

[孔開け方法の手順]
次に、本実施形態に係る孔開け方法の手順について説明する。図8は、本実施形態に係る孔開け方法の手順を示すフローチャートである。本実施形態の孔開け方法は、2つの孔開け治具20,20を一対として利用する。そして、ここでは一対の孔開け治具20の一方を「第一の鋼管の孔開け治具20」と称し、他方を「第二の鋼管の孔開け治具20」と称する。また、鋼管30の中心線に関して対称な一対のボルト孔30Aを、本体21における3つの開口部21A,21A,21Aと同じ配列パターンで3段に亘って穿設すること(合計6つのボルト孔30Aを穿設すること)を想定する。
[Procedure for punching]
Next, the procedure of the punching method according to the present embodiment will be described. FIG. 8 is a flow chart showing the procedure of the punching method according to the present embodiment. The hole forming method of the present embodiment uses two hole forming jigs 20, 20 as a pair. Further, here, one of the pair of drilling jigs 20 is referred to as "first steel pipe drilling jig 20", and the other is referred to as "second steel pipe drilling jig 20". Further, a pair of bolt holes 30A symmetrical with respect to the center line of the steel pipe 30 should be bored in three steps in the same arrangement pattern as the three openings 21A, 21A, 21A in the main body 21 (six bolt holes 30A in total). ) Is assumed.

先ず、作業者は、ボルト孔30Aを穿設すべき鋼管30の側面の所定位置に対して墨出しを行う(ステップS1)。この墨出しは、公知のいずれかの方法で行われ、ボルト孔30Aの穿設先となる6つの所定位置にそれぞれマークとして、例えば、十字線(図示せず)を付す。 First, an operator marks out a predetermined position on the side surface of the steel pipe 30 where the bolt hole 30A is to be formed (step S1). This marking is performed by any known method, and cross marks (not shown), for example, are provided as marks at the six predetermined positions where the bolt holes 30A are to be drilled.

次に、作業者は、第一の鋼管の孔開け治具20と第二の鋼管の孔開け治具20とを、図2(A)に示すとおり、鋼管30を挟んでそれぞれ対向する位置に配置する(ステップS2)。このとき第一の鋼管の孔開け治具20の鍔部24は第二の鋼管の孔開け治具20の鍔部25と対向し、第一の鋼管の孔開け治具20の鍔部25は第二の鋼管の孔開け治具20の鍔部24と対向する。また、このとき第一の鋼管の孔開け治具20の3つの開口部21A,21A,21Aは鋼管30を挟んで第二の鋼管の孔開け治具20の3つの開口部21A,21A,21Aと対向する。 Next, the worker places the first steel pipe hole-making jig 20 and the second steel pipe hole-making jig 20 at positions facing each other with the steel pipe 30 interposed therebetween, as shown in FIG. 2(A). It is arranged (step S2). At this time, the flange portion 24 of the first steel pipe hole forming jig 20 faces the flange portion 25 of the second steel pipe hole forming jig 20, and the flange portion 25 of the first steel pipe hole forming jig 20 is It faces the collar portion 24 of the jig 20 for punching the second steel pipe. Further, at this time, the three openings 21A, 21A, 21A of the first steel pipe hole forming jig 20 sandwich the steel pipe 30 and the three openings 21A, 21A, 21A of the second steel pipe hole forming jig 20. To face.

次いで、作業者は、第一の鋼管の孔開け治具20と第二の鋼管の孔開け治具20の両方の本体21の開口部21A,21A,21Aの中心線が墨出しされた6つの所定位置(十字線)と正対(交差)するように位置合わせする(ステップS3)。 Next, the operator uses the six center lines of the openings 21A, 21A, 21A of the main body 21 of both the first steel pipe hole forming jig 20 and the second steel pipe hole forming jig 20 Positioning is performed so as to directly face (cross) the predetermined position (cross line) (step S3).

上述した位置合わせと並行して、作業者は、第一の鋼管の孔開け治具20の一方側の鍔部24に設けられた固定用ボルト孔24Aと第二の鋼管の孔開け治具20の一方側の鍔部25に設けられた固定用ボルト孔25Aとを固定用ボルト60で連結固定すると共に、第一の鋼管の孔開け治具20の他方側の鍔部25に設けられた固定用ボルト孔25Aと第二の前記鋼管の孔開け治具20の他方側の鍔部24に設けられた固定用ボルト孔24Aとを他の固定用ボルト60で連結固定する(ステップS4)。 In parallel with the above-described alignment, the worker is required to fix the fixing bolt hole 24A provided in the collar portion 24 on one side of the first steel pipe hole forming jig 20 and the second steel pipe hole forming jig 20. The fixing bolt hole 25A provided on the flange portion 25 on one side is connected and fixed by the fixing bolt 60, and the fixing portion provided on the flange portion 25 on the other side of the jig 20 for drilling the first steel pipe. The bolt hole 25A for fixing and the fixing bolt hole 24A provided in the flange portion 24 on the other side of the second jig 20 for drilling the steel pipe are connected and fixed by another fixing bolt 60 (step S4).

ここで、一対の鍔部24,25は、本体21の高さ方向に2段に亘って設けられているので、第一の鋼管の孔開け治具20及び第二の鋼管の孔開け治具20は、2段に亘って合計4本の固定用ボルト60,60で鋼管30に固定される。これによって第一の鋼管の孔開け治具20及び第二の鋼管の孔開け治具20が鋼管30に対して強固に固定され、位置ずれの可能性が抑えられる。なお、ステップS4において各ボルト孔24A,25Aと固定用ボルト60との連結部は、それぞれナットSによって締着される。 Here, since the pair of flange portions 24 and 25 are provided in two steps in the height direction of the main body 21, the first steel pipe hole forming jig 20 and the second steel pipe hole forming jig. 20 is fixed to the steel pipe 30 with a total of four fixing bolts 60, 60 in two stages. As a result, the first steel pipe hole forming jig 20 and the second steel pipe hole forming jig 20 are firmly fixed to the steel pipe 30, and the possibility of positional displacement is suppressed. In addition, in step S4, the connecting portions of the bolt holes 24A and 25A and the fixing bolt 60 are fastened by the nuts S, respectively.

次に、作業者は、図7に示されるとおり、墨出しされた6つの所定位置(十字線)の各々に対して本体21の開口部21A,21A,21Aを介して電動ドリル(穿設装置)50によってボルト孔30Aを穿設する(ステップS5)。この穿設の際、作業者は、電動ドリル(穿設装置)50を磁力によって本体21に固定した状態とする。 Next, as shown in FIG. 7, the worker inserts an electric drill (piercing device) into each of the six predetermined positions (crosshairs) marked out through the openings 21A, 21A, 21A of the main body 21. )50 to form the bolt hole 30A (step S5). At the time of this drilling, the operator sets the electric drill (piercing device) 50 to the main body 21 by magnetic force.

[穿設処理の詳細]
ここで、開口部21Aからボルト孔30Aを穿設する処理について詳しく説明する。先ず、作業者は、鋼管の孔開け治具20の本体21に電磁ベース41の底部を密着させ、切削刃tが開口部21Aのおおむね中央に位置している状態で、電動ドリル50のスイッチをオンすることにより、鋼管の孔開け治具20の本体21に電動ドリル50を磁力によって固定する。そして、作業者は、切削刃tの芯だしのために電動ドリル50の本体54の位置を微調整して切削刃tの回転軸を鋼管30の側面の所定位置(十字線)に一致させる。その後、作業者は、電動ドリル50の操作レバー39をゆっくりと倒すことにより、切削刃tの先端で所定位置(十字線)にボルト孔30Aを穿設する。そして穿設が完了すると作業者は電動ドリル50の電源をオフにして磁力を解消し、次の穿設作業に移る。以上が1つのボルト孔30Aを穿設する処理である。他のボルト孔30も同様に穿設される。
[Details of drilling process]
Here, the process of forming the bolt hole 30A from the opening 21A will be described in detail. First, the operator brings the bottom of the electromagnetic base 41 into close contact with the main body 21 of the steel pipe drilling jig 20 and turns on the switch of the electric drill 50 while the cutting blade t is positioned approximately in the center of the opening 21A. When turned on, the electric drill 50 is magnetically fixed to the main body 21 of the steel pipe drilling jig 20. Then, the operator finely adjusts the position of the main body 54 of the electric drill 50 for centering the cutting blade t so that the rotation axis of the cutting blade t coincides with a predetermined position (cross line) on the side surface of the steel pipe 30. Then, the operator slowly tilts the operation lever 39 of the electric drill 50 to form the bolt hole 30A at a predetermined position (cross line) at the tip of the cutting blade t. Then, when the drilling is completed, the operator turns off the power of the electric drill 50 to eliminate the magnetic force, and proceeds to the next drilling work. The above is the process of forming one bolt hole 30A. Other bolt holes 30 are similarly drilled.

[実施形態の効果]
以上説明したとおり、本実施形態に係る鋼管の孔開け用治具20によれば、孔開け用治具20の本体21及び左右の側板22,23で鋼管30を側方から囲うようにして保持することができ、両方の鍔部24,25に形成された固定用ボルト孔24A,25Aを固定用ボルト60,60で連結することにより当該孔開け用治具20の全体を鋼管30へ固定することが可能である。
[Effect of Embodiment]
As described above, according to the jig 20 for drilling a steel pipe according to the present embodiment, the steel pipe 30 is held by the body 21 of the drilling jig 20 and the left and right side plates 22 and 23 so as to surround the steel pipe 30 from the side. By fixing the fixing bolt holes 24A, 25A formed in both the collar portions 24, 25 with the fixing bolts 60, 60, the whole jig 20 for fixing holes is fixed to the steel pipe 30. It is possible.

特に、本実施形態に係る鋼管の孔開け方法によれば、第一の孔開け用治具20と第二の孔開け用治具20とで鋼管30を両側から挟み込むようにして保持し、双方の固定用ボルト孔24A,25Aを固定用ボルト60,60で連結固定することで第一の孔開け用治具20と第二の孔開け用治具20とを鋼管30へ固定することが可能である。そして開口部21Aを介して電動ドリル(穿設装置)50で鋼管30の所定位置にボルト孔30Aを穿設する際には、当該開口部21Aを目印とすることができるので、ボルト孔30Aの穿設位置の精度を高めることが容易である。しかも当該鋼管30の所定位置と電動ドリル(穿設装置)50との間には平板状の本体21が介在し、かつ当該本体21は当該鋼管30に固定されているので、穿設中に本体21を支えとして電動ドリル(穿設装置)50の姿勢を維持することで、ボルト孔30Aの中心線を側面の法線に一致させることも容易である。したがって、本実施形態に係る孔開け方法によれば、断面円筒状の鋼管30の側面に対するボルト孔30Aの穿設を高精度に行うことができる。しかも、本実施形態に係る孔開け方法によれば、互いに同じ構成の第一の孔開け用治具20と第二の孔開け用治具20とで鋼管30を両側から挟み込むので、鋼管30の中心線に関して対称な位置にそれぞれボルト孔30A,30Aを穿設する際の位置合わせが容易という利点もある。さらに、作業員も楽な姿勢で作業を進めることが可能となる。 In particular, according to the method for punching a steel pipe according to the present embodiment, the steel pipe 30 is held so as to be sandwiched between the first jig 20 for drilling and the jig 20 for second drilling, It is possible to fix the first hole forming jig 20 and the second hole forming jig 20 to the steel pipe 30 by connecting and fixing the fixing bolt holes 24A and 25A of the above with the fixing bolts 60 and 60. Is. When the bolt hole 30A is drilled at a predetermined position of the steel pipe 30 with the electric drill (piercing device) 50 through the opening 21A, the opening 21A can be used as a mark. It is easy to improve the accuracy of the drilling position. Moreover, since the flat plate-shaped main body 21 is interposed between the predetermined position of the steel pipe 30 and the electric drill (drilling device) 50, and the main body 21 is fixed to the steel pipe 30, the main body during drilling. By maintaining the posture of the electric drill (drilling device) 50 with 21 as a support, it is easy to match the center line of the bolt hole 30A with the normal line of the side surface. Therefore, according to the drilling method of the present embodiment, the bolt holes 30A can be accurately drilled in the side surface of the steel pipe 30 having a cylindrical cross section. Moreover, according to the hole forming method according to the present embodiment, the steel pipe 30 is sandwiched from both sides by the first hole forming jig 20 and the second hole forming jig 20 having the same configuration as each other. There is also an advantage that the positioning can be easily performed when the bolt holes 30A and 30A are formed at positions symmetrical with respect to the center line. Further, the worker can also proceed with the work in a comfortable posture.

[実施形態の補足]
なお、上述した実施形態では、開口部21Aを3つずつ備えた2つの鋼管の孔開け治具20,20を利用して、鋼管30の側面に6つのボルト孔30Aを穿設したが、これら6つの開口部21Aの全てを利用することは必須ではなく、6つの開口部21Aの一部(少なくとも1つ)を利用して5個以下の個数のボルト孔30Aを穿設してもよいことは言うまでもない。
[Supplement to Embodiment]
In addition, in the above-described embodiment, the six bolt holes 30A are formed on the side surface of the steel pipe 30 by using the two steel pipe hole forming jigs 20 and 20 provided with three openings 21A. It is not essential to use all of the six openings 21A, and a part (at least one) of the six openings 21A may be used to form the bolt holes 30A of 5 or less in number. Needless to say.

[変形例]
次に、本実施形態の孔開け方法の変形例について説明する。図9は、孔開け方法の変形例を説明する図である。上述した実施形態の孔開け方法は2つの孔開け用治具20,20を棒状の固定ボルト60で鋼管30へ固定するものであったが、本変形例は、1つの孔開け用治具20をU字状の固定ボルト(U字ボルト60’)で鋼管30へ固定するというものである。そして、本変形例の孔開け方法は、上述した実施形態の孔開け方法(図8)においてステップS2を省略したものに相当する。なお、本変形例では、本体21における開口部21A,21A,21Aと同じ配列パターンで鋼管30の側面に3つのボルト孔30Aを穿設すること(合計3つのボルト孔30Aを穿設すること)を想定する。
[Modification]
Next, a modified example of the punching method of the present embodiment will be described. FIG. 9 is a diagram illustrating a modified example of the punching method. In the hole drilling method of the above-described embodiment, the two hole drilling jigs 20 and 20 are fixed to the steel pipe 30 with the rod-shaped fixing bolts 60. However, in this modification, one hole drilling jig 20 is used. Is fixed to the steel pipe 30 with a U-shaped fixing bolt (U-shaped bolt 60′). The drilling method of this modification corresponds to the drilling method of the above-described embodiment (FIG. 8) with step S2 omitted. In this modification, three bolt holes 30A are formed on the side surface of the steel pipe 30 in the same arrangement pattern as the openings 21A, 21A, 21A in the main body 21 (a total of three bolt holes 30A are formed). Assume

先ず、作業者は、ボルト孔30Aを穿設すべき鋼管30の側面の所定位置を墨出しする(ステップS1)。この墨出しは、公知のいずれかの方法で行われ、例えば、ボルト孔30Aの穿設先となる3つの所定位置にマーク(十字線)を付すことにより行われる。 First, the operator marks out a predetermined position on the side surface of the steel pipe 30 where the bolt hole 30A is to be formed (step S1). This marking is performed by any known method, for example, by marking marks (crosshairs) at three predetermined positions where the bolt holes 30A are to be drilled.

次に、作業者は、鋼管の孔開け治具20の本体21の開口部21A,21A,21Aの中心を墨出しされた3つの所定位置(十字線)と正対するように位置合わせする(ステップS3)。 Next, the operator aligns the centers of the openings 21A, 21A, 21A of the main body 21 of the steel pipe boring jig 20 so as to directly face the three predetermined positions (crosshairs) marked out (step). S3).

上述した位置合わせと並行して、作業者は、図9に示されるとおり、鋼管の孔開け治具20の一方側の鍔部24に設けられた固定用ボルト孔24Aと他方側の鍔部25に設けられた固定用ボルト孔25AとをU字ボルト60’で連結固定する(ステップS4)。このときU字ボルト60’は鋼管30の周囲を囲うようにして配置される。 In parallel with the above-described alignment, the worker, as shown in FIG. 9, the fixing bolt hole 24A provided on the collar portion 24 on one side of the hole forming jig 20 for the steel pipe and the collar portion 25 on the other side. The fixing bolt hole 25A provided in the above is connected and fixed by a U-shaped bolt 60' (step S4). At this time, the U-shaped bolt 60 ′ is arranged so as to surround the steel pipe 30.

ここで一対の鍔部24,25は、本体21の高さ方向にかけて2段に亘って設けられているので、鋼管の孔開け治具20は2段に亘って合計2本のU字ボルト60’,60’で鋼管30に固定される。これによって鋼管の孔開け治具20が鋼管30に対して強固に固定され、位置ずれの可能性が抑えられる。なお、ステップS4において各ボルト孔24A,25AとU字ボルト60’との連結部は、それぞれナットSによって締着される。 Since the pair of flanges 24 and 25 are provided in two steps in the height direction of the main body 21, the steel pipe drilling jig 20 has two U-shaped bolts 60 in total in two steps. It is fixed to the steel pipe 30 with “, 60”. As a result, the steel pipe punching jig 20 is firmly fixed to the steel pipe 30, and the possibility of positional displacement is suppressed. In step S4, the connecting portions of the bolt holes 24A, 25A and the U-shaped bolt 60' are tightened by the nuts S, respectively.

次に、作業者は、墨出しされた3つの所定位置(十字線)の各々に対して本体21の開口部21A,21A,21Aを介して電動ドリル(穿設装置)50によってボルト孔30Aを穿設する(ステップS5)。この穿設作業の際には、作業者は、電動ドリル(穿設装置)50を磁力によって本体21に固定した状態とする。その固定のさせ方については前述した実施形態と同様である。 Next, the worker drills the bolt holes 30A with the electric drill (drilling device) 50 through the openings 21A, 21A, 21A of the main body 21 at each of the three predetermined positions (crosshairs) marked out. Drill (step S5). At the time of this drilling work, the operator fixes the electric drill (drilling device) 50 to the main body 21 by magnetic force. The fixing method is the same as in the above-described embodiment.

[変形例の効果]
以上説明したとおり、本変形例に係る孔開け方法によれば、孔開け用治具20の本体21及び左右の側板22,23で鋼管30を側方から囲うようにして保持することができ、両方の鍔部24,25に形成された固定用ボルト孔24A,25AをU字ボルト60’で連結することにより当該孔開け用治具20の全体を鋼管30へ固定することが可能である。そして開口部21Aを介して電動ドリル(穿設装置)50で鋼管30の所定位置にボルト孔30Aを穿設する際には、当該開口部21Aを目印とすることができるので、ボルト孔30Aの穿設位置の精度を高めることが容易である。しかも鋼管30の所定位置と電動ドリル(穿設装置)50との間には平板状の本体21が介在し、かつ当該本体21は当該鋼管30に固定されているので、穿設中に本体21を支えとして電動ドリル(穿設装置)50の姿勢を維持することで、ボルト孔30Aの中心線を側面の法線に一致させることも容易である。したがって、本変形例に係る孔開け方法によれば、断面円筒状の鋼管30の側面に対するボルト孔30Aの穿設を高精度に行うことができる。さらに、作業員も楽な姿勢で作業を進めることが可能となる。
[Effect of modification]
As described above, according to the drilling method of the present modification, the main body 21 of the drilling jig 20 and the left and right side plates 22 and 23 can hold the steel pipe 30 so as to surround the steel pipe 30 from the side, By connecting the fixing bolt holes 24A, 25A formed in both the flange portions 24, 25 with the U-shaped bolt 60', the entire hole making jig 20 can be fixed to the steel pipe 30. When the bolt hole 30A is drilled at a predetermined position of the steel pipe 30 with the electric drill (piercing device) 50 through the opening 21A, the opening 21A can be used as a mark, so that the bolt hole 30A It is easy to improve the accuracy of the drilling position. Moreover, the flat plate-shaped main body 21 is interposed between the predetermined position of the steel pipe 30 and the electric drill (drilling device) 50, and the main body 21 is fixed to the steel pipe 30. By maintaining the posture of the electric drill (drilling device) 50 using the support as a support, it is easy to match the center line of the bolt hole 30A with the normal line of the side surface. Therefore, according to the drilling method of the present modification, the bolt hole 30A can be drilled with high accuracy on the side surface of the steel pipe 30 having a cylindrical cross section. Further, the worker can also proceed with the work in a comfortable posture.

以上のように、本発明の好ましい実施形態について詳述したが、本発明は係る特定の実施形態に限定されるものではなく、特許請求の範囲に記載された本発明の要旨の範囲内において、種々の変形・変更が可能であることはいうまでもない。 As described above, the preferred embodiments of the present invention have been described in detail, but the present invention is not limited to the specific embodiments, and within the scope of the gist of the present invention described in the claims, It goes without saying that various modifications and changes are possible.

例えば、上述した実施形態又は変形例では特定サイズ(外径)の鋼管30に適した孔開け治具20を説明したが、様々なサイズ(外径)鋼管30に使用できるよう、前述した固定用ボルト孔24A,25Bを丸孔ではなく左右方向(一対の鍔部24,25の配列方向)に長い長孔としてもよい。 For example, in the above-described embodiment or modification, the drilling jig 20 suitable for the steel pipe 30 having a specific size (outer diameter) has been described, but the fixing jig described above can be used for various sizes (outer diameter) steel pipes 30. The bolt holes 24A, 25B may be long holes that are long in the left-right direction (the arrangement direction of the pair of collar portions 24, 25) instead of being round holes.

20 孔開け用治具
21 本体
21A 開口部
22 側板
23 側板
30 鋼管
24 鍔部
24A 固定用ボルト孔
25A 固定用ボルト孔
25 鍔部
30A ボルト孔
32 保持部材
32c 凹型ウェブ
2a 固定ボルト
2b 固定ボルト
2c 固定ボルト
41 電磁ベース
42 ハンドル
50 電動ドリル(穿設装置)
52 ドリルモータ
54 本体
58 回転軸アセンブリ
60 固定ボルト
S ナット
t 切削刃

20 Hole Jig 21 Main Body 21A Opening 22 Side Plate 23 Side Plate 30 Steel Pipe 24 Collar 24A Fixing Bolt Hole 25A Fixing Bolt Hole 25 Collar 30A Bolt Hole 32 Holding Member 32c Recessing Bolt 2b Fixing Bolt 2c Fixing Bolt 41 Electromagnetic base 42 Handle 50 Electric drill (drilling device)
52 drill motor 54 main body 58 rotating shaft assembly 60 fixing bolt S nut t cutting blade

Claims (8)

円筒状の鋼管の側面にボルト孔を穿設するための鋼管の孔開け用治具において、
前記鋼管の側面に配置される本体であって、当該鋼管の表面と正対する位置に一又は複数の開口部が設けられている本体と、
前記本体を前記鋼管の側面へ固定するための固定構造と、
を備えていることを特徴とする鋼管の孔開け治具。
In a jig for drilling a steel pipe for forming a bolt hole on the side surface of a cylindrical steel pipe,
A main body arranged on a side surface of the steel pipe, wherein the main body is provided with one or a plurality of openings at positions facing the surface of the steel pipe,
A fixing structure for fixing the main body to the side surface of the steel pipe,
A jig for punching a steel pipe, characterized by being provided with.
請求項1に記載の鋼管の孔開け治具において、
前記本体は平板状であり、
平板状の前記本体の左右に立設された一対の側板を前記固定構造の少なくとも一部として備えていることを特徴とする鋼管の孔開け治具。
The jig for punching a steel pipe according to claim 1,
The main body has a flat plate shape,
A jig for punching a steel pipe, comprising a pair of side plates standing upright on the left and right of the flat plate-shaped main body as at least a part of the fixing structure.
請求項2に記載の鋼管の孔開け治具において、
左右の前記側板の外側に形成された一対の鍔部を前記固定構造の少なくとも一部として備え、
一対の前記鍔部には固定ボルトを取り付けるための固定用ボルト孔がそれぞれ設けられていることを特徴とする鋼管の孔開け治具。
The jig for punching a steel pipe according to claim 2,
A pair of flanges formed on the outside of the left and right side plates is provided as at least a part of the fixing structure,
A jig for punching a steel pipe, wherein each of the pair of collars is provided with a fixing bolt hole for attaching a fixing bolt.
請求項3に記載の鋼管の孔開け治具において、
一対の前記鍔部は複数設けられていることを特徴とする鋼管の孔開け治具。
The jig for punching a steel pipe according to claim 3,
A jig for punching a steel pipe, wherein a plurality of the pair of flanges are provided.
請求項1から4のいずれか一項に記載の鋼管の孔開け治具を利用した孔開け方法において、
ボルト孔を穿設すべき前記鋼管の側面の所定位置を墨出しするステップと、
第一の前記鋼管の孔開け治具と第二の前記鋼管の孔開け治具とを前記鋼管を挟んでそれぞれ対向する位置に配置するステップと、
第一の前記鋼管の孔開け治具と第二の前記鋼管の孔開け治具の一方又は両方の前記本体の前記開口部が墨出しされた所定位置と正対するように位置合わせするステップと、
第一の前記鋼管の孔開け治具と第二の前記鋼管の孔開け治具とを互いの前記固定構造により固定するステップと、
墨出しされた所定位置に対して前記本体の前記開口部を介して穿設装置によってボルト孔を穿設するステップと、
を含み構成されていることを特徴とする孔開け方法。
A drilling method using the drilling jig for a steel pipe according to any one of claims 1 to 4,
Marking out a predetermined position on the side surface of the steel pipe in which a bolt hole is to be bored,
Arranging a first jig for punching the steel pipe and a second jig for punching the steel pipe at positions facing each other with the steel pipe sandwiched therebetween;
A step of aligning so that the opening of one or both of the first steel pipe hole forming jig and the second steel pipe hole forming jig directly faces the predetermined position where the opening is marked out,
Fixing the first jig for punching the steel pipe and the jig for punching the second steel pipe with each other by the fixing structure;
A step of drilling a bolt hole by a drilling device through the opening of the main body with respect to a predetermined position that has been marked out;
A method for forming a hole, which comprises:
請求項5に記載の鋼管の孔開け治具を利用した孔開け方法において、
前記穿設装置を磁力によって前記本体に固定した状態でボルト孔を穿設することを特徴とする孔開け方法。
A drilling method using the jig for drilling a steel pipe according to claim 5,
A method of drilling a hole, wherein a bolt hole is drilled while the drilling device is fixed to the main body by magnetic force.
請求項1から4のいずれか一項に記載の鋼管の孔開け治具を利用した孔開け方法において、
ボルト孔を穿設すべき前記鋼管の側面の所定位置を墨出しするステップと、
前記鋼管の孔開け治具の前記本体の前記開口部が墨出しされた所定位置と正対するように位置合わせするステップと、
前記鋼管の孔開け治具の一方側と他方側を前記固定構造により固定するステップと、
墨出しされた所定位置に対して前記本体の前記開口部を介して穿設装置によってボルト孔を穿設するステップと、
を含み構成されていることを特徴とする孔開け方法。
A drilling method using the drilling jig for a steel pipe according to any one of claims 1 to 4,
Marking out a predetermined position on the side surface of the steel pipe in which a bolt hole is to be bored,
Aligning the opening of the main body of the jig for punching the steel pipe so as to face the predetermined position marked out;
Fixing one side and the other side of the hole forming jig of the steel pipe by the fixing structure,
A step of drilling a bolt hole by a drilling device through the opening of the main body with respect to a predetermined position that has been marked out;
A method for forming a hole, which comprises:
請求項5から7のいずれか1項に記載の孔開け方法において、
前記鋼管が鋼管杭であることを特徴とする孔開け方法。
The punching method according to any one of claims 5 to 7,
A drilling method, wherein the steel pipe is a steel pipe pile.
JP2018216129A 2018-11-19 2018-11-19 Jig for drilling holes in steel pipes and drilling methods Active JP7062575B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018216129A JP7062575B2 (en) 2018-11-19 2018-11-19 Jig for drilling holes in steel pipes and drilling methods

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018216129A JP7062575B2 (en) 2018-11-19 2018-11-19 Jig for drilling holes in steel pipes and drilling methods

Publications (2)

Publication Number Publication Date
JP2020082229A true JP2020082229A (en) 2020-06-04
JP7062575B2 JP7062575B2 (en) 2022-05-06

Family

ID=70905508

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018216129A Active JP7062575B2 (en) 2018-11-19 2018-11-19 Jig for drilling holes in steel pipes and drilling methods

Country Status (1)

Country Link
JP (1) JP7062575B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115077762A (en) * 2022-05-20 2022-09-20 国家石油天然气管网集团有限公司 Stress measuring equipment for long-distance pipeline

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5125893A (en) * 1974-08-29 1976-03-03 Taihei Dengyo Kaisha NENRYOHAIKANNOANZENSETSUSAKUKOHO
JPS59105309U (en) * 1983-01-05 1984-07-16 三菱重工業株式会社 hole gauge
JPH055317U (en) * 1991-07-10 1993-01-26 動力炉・核燃料開発事業団 Hole processing equipment
JPH0661407U (en) * 1993-01-27 1994-08-30 日本鋼管株式会社 Drill misalignment prevention tool
JP2004261922A (en) * 2003-03-03 2004-09-24 Kubota Corp Bolt hole perforating apparatus for connecting foundation pile
JP4077777B2 (en) * 2003-08-29 2008-04-23 日東工器株式会社 Low length electric drill
US20100243072A1 (en) * 2009-03-31 2010-09-30 Mcgraw Harry Method and apparatus of hot tapping multiple coaxial or nested strings of underwater piping and/or tubing for overturned wells or platforms
JP2011177818A (en) * 2010-02-26 2011-09-15 Hitachi Koki Co Ltd Magnetic drilling machine
JP2011251370A (en) * 2010-06-02 2011-12-15 Kiso Kogyo:Kk Magnet drill
JP2015212488A (en) * 2014-05-02 2015-11-26 株式会社三誠 Bolt holder of connection bolt of steel pipe pile and connecting method of steel pipe pile
US20160067793A1 (en) * 2014-09-05 2016-03-10 Thomas Andrew Baum Jigs and methods for consistent manual configuration of cylindrical material into standardized building components and products derived thereof
JP2017077619A (en) * 2015-10-21 2017-04-27 有限会社 飯島製作所 Boring tool
JP2017120750A (en) * 2015-12-29 2017-07-06 株式会社三栄電機工業 Steel pipe with fall prevention structure for lateral face lid

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5125893A (en) * 1974-08-29 1976-03-03 Taihei Dengyo Kaisha NENRYOHAIKANNOANZENSETSUSAKUKOHO
JPS59105309U (en) * 1983-01-05 1984-07-16 三菱重工業株式会社 hole gauge
JPH055317U (en) * 1991-07-10 1993-01-26 動力炉・核燃料開発事業団 Hole processing equipment
JPH0661407U (en) * 1993-01-27 1994-08-30 日本鋼管株式会社 Drill misalignment prevention tool
JP2004261922A (en) * 2003-03-03 2004-09-24 Kubota Corp Bolt hole perforating apparatus for connecting foundation pile
JP4077777B2 (en) * 2003-08-29 2008-04-23 日東工器株式会社 Low length electric drill
US20100243072A1 (en) * 2009-03-31 2010-09-30 Mcgraw Harry Method and apparatus of hot tapping multiple coaxial or nested strings of underwater piping and/or tubing for overturned wells or platforms
JP2011177818A (en) * 2010-02-26 2011-09-15 Hitachi Koki Co Ltd Magnetic drilling machine
JP2011251370A (en) * 2010-06-02 2011-12-15 Kiso Kogyo:Kk Magnet drill
JP2015212488A (en) * 2014-05-02 2015-11-26 株式会社三誠 Bolt holder of connection bolt of steel pipe pile and connecting method of steel pipe pile
US20160067793A1 (en) * 2014-09-05 2016-03-10 Thomas Andrew Baum Jigs and methods for consistent manual configuration of cylindrical material into standardized building components and products derived thereof
JP2017077619A (en) * 2015-10-21 2017-04-27 有限会社 飯島製作所 Boring tool
JP2017120750A (en) * 2015-12-29 2017-07-06 株式会社三栄電機工業 Steel pipe with fall prevention structure for lateral face lid

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115077762A (en) * 2022-05-20 2022-09-20 国家石油天然气管网集团有限公司 Stress measuring equipment for long-distance pipeline

Also Published As

Publication number Publication date
JP7062575B2 (en) 2022-05-06

Similar Documents

Publication Publication Date Title
JP5966025B2 (en) Joint structure and attachment of pile and building frame
US7703215B1 (en) Flange alignment tool
US6990782B2 (en) Method for assembling building with thin and lightweight shaped-steel members
JP2020082229A (en) Hole drilling jig and hole drilling method for steel pipe
JPWO2017170671A1 (en) Pile foundation structure
JP4750414B2 (en) Fixing jig for tack welding
JP6250745B1 (en) Pipe drilling device
JP5321549B2 (en) Oblique pile joint jig, oblique pile joint method using the jig and structure manufacturing method
JP2007182731A (en) Joint method of steel pipe pole and joint jig
JP4185009B2 (en) Method for forming screw member penetration hole and jig for cutting screw member penetration hole
JP2001336291A (en) Gusset welding jig
JP2006289424A (en) Welding equipment and tool in relation to joint core of steel pole
JPH1150556A (en) Joint structure of base with column
JP4057943B2 (en) Joint structure of large beam and small beam with alignment function
JP4189418B2 (en) Steel joint structure
JP4774319B2 (en) Column and foundation joining device
JP2000192550A (en) Joining metal fitting and joining part structure of framework member
JP7090787B1 (en) How to align steel pipes with jigs and steel pipes
CN214184766U (en) Flat steel pipe clamp manufacturing tool
JP2007039930A (en) Joining structure of structure
JP2009138363A (en) Joint for joining columnar members together
JP3024468U (en) Rigid joint structure of beam in weak axis direction of H-shaped steel column
JP2006226046A (en) Joining body for joining column with beam, and joint structure
JP2007077695A (en) Pile fastening structure and fastener used therefor
JPH0531878U (en) Nailing jig

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20201208

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210924

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20211005

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20211126

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220419

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220420

R150 Certificate of patent or registration of utility model

Ref document number: 7062575

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150