CN214184766U - Flat steel pipe clamp manufacturing tool - Google Patents

Flat steel pipe clamp manufacturing tool Download PDF

Info

Publication number
CN214184766U
CN214184766U CN202022409954.1U CN202022409954U CN214184766U CN 214184766 U CN214184766 U CN 214184766U CN 202022409954 U CN202022409954 U CN 202022409954U CN 214184766 U CN214184766 U CN 214184766U
Authority
CN
China
Prior art keywords
sleeve
positioning
steel pipe
operating handle
pipe clamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022409954.1U
Other languages
Chinese (zh)
Inventor
祝波
任仲艺
纪鹏凯
原艺
岳兆杰
宋文韬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Installation & Construction Co ltd
Original Assignee
Qingdao Installation & Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Installation & Construction Co ltd filed Critical Qingdao Installation & Construction Co ltd
Priority to CN202022409954.1U priority Critical patent/CN214184766U/en
Application granted granted Critical
Publication of CN214184766U publication Critical patent/CN214184766U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a flat steel pipe clamp manufacturing tool, which comprises an operating platform, a positioning plate, a sleeve and an operating handle; operation platform up end symmetry is equipped with four rectangle fixed slots, the locating plate is four, four the locating plate is placed respectively in four fixed slot tops, swing joint between locating plate and the fixed slot, locating plate one end is equipped with the fixed axle perpendicularly, still is equipped with the location axle on one of them locating plate, four fixed axles are cup jointed to the sleeve, operating handle one end is equipped with the locating lever perpendicularly, sleeve top fixed connection operating handle. The utility model discloses simple structure, convenient operation, the dismouting of being convenient for can transport the job site and carry out the interim processing preparation of band steel pipe strap, and the cost of manufacture is low, efficient, can make the band steel pipe strap of any crookedness according to the installation condition to realize the firm installation of pipeline.

Description

Flat steel pipe clamp manufacturing tool
Technical Field
The utility model relates to a construction technical field, concretely relates to band steel pipe strap preparation frock.
Background
The pipe clamp is a clamp for fixing a tubular object, and the pipe clamp on the market generally belongs to standard parts and commonly used types are an elevator and a U-shaped clamp. The bending degree of the elevator is 360 degrees, the elevator consists of a semicircular upper pipe clamp and a semicircular lower pipe clamp, and the upper pipe clamp and the lower pipe clamp are fixedly connected through bolts and nuts; the degree of curvature of the U-shaped clamp is 270 degrees, the general U-shaped clamp is made of round steel, the degree of adhesion of the U-shaped clamp and the pipeline is not high, the constraint force of the pipeline with vibration amplitude is not strong particularly during operation, and the pipeline installation quality is not ideal. When some pipelines need the pipe clamps of non-standard parts, temporary processing and manufacturing are generally needed, but the manufacturing cost of the pipe clamps of the non-standard parts is high, the efficiency is low, and the construction period is influenced.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome the shortcoming that prior art exists, provide a band steel pipe strap preparation frock.
In order to realize the purpose, the technical scheme of the utility model is that: the utility model provides a band steel pipe strap preparation frock which characterized in that: comprises an operating platform, a positioning plate, a sleeve and an operating handle;
four rectangular fixing grooves are symmetrically formed in the upper end face of the operating platform, the number of the positioning plates is four, the four positioning plates are respectively placed above the four fixing grooves, the positioning plates are movably connected with the fixing grooves, a fixing shaft is vertically arranged at one end of each positioning plate, a positioning shaft is further arranged on one positioning plate, the sleeve is sleeved with the four fixing shafts, and the positioning shafts are located on the outer side of the sleeve and are adjacent to the sleeve; the sleeve is characterized in that one end of the operating handle is vertically provided with a positioning rod, the top of the sleeve is fixedly connected with the operating handle, and the positioning rod is located on the outer side of the sleeve and is adjacent to the sleeve.
Further, the method comprises the following steps of; the included angle between two adjacent fixing grooves is 90 degrees.
Further, the method comprises the following steps of; the positioning plate is inserted into the fixing groove through a bolt, a rectangular positioning groove hole is formed in the positioning plate, and the bolt penetrates through the positioning groove hole and then is inserted into the fixing groove.
Further, the method comprises the following steps of; four corners of operation platform lower extreme all are equipped with the landing leg, the landing leg lower extreme is equipped with the lower margin.
The utility model has the advantages that:
1) the utility model discloses simple structure, convenient operation, the dismouting of being convenient for can transport the job site and carry out the interim processing preparation of band steel pipe strap, and the cost of manufacture is low, efficient, can make the band steel pipe strap of any crookedness according to the installation condition to realize the firm installation of pipeline.
2) The positioning plates and the fixing grooves are connected through bolts in an inserted mode, therefore, the distance between the two relative positioning plates can be adjusted according to the size of the sleeve, the bolts are pulled out during adjustment, and the positioning plates are moved to proper positions and then are inserted into the bolts again for fixing.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the split structure of the present invention;
fig. 3 is a top view of the present invention.
In the figure: 1. an operating handle; 2. positioning a plate; 3. a fixed shaft; 4. an operating platform; 5. positioning a rod; 6. positioning the shaft; 7. a support leg; 8. ground feet; 9. a sleeve; 10. a bolt; 11. fixing grooves; 12. and positioning the slotted hole.
Detailed Description
Example (b):
as shown in fig. 1 to 3, a tooling for manufacturing a flat steel pipe clamp comprises an operation platform 4, a positioning plate 2, a sleeve 9 and an operation handle 1.
Four rectangular fixing grooves 11 are symmetrically arranged on the upper end face of the operating platform 4, an included angle between every two adjacent fixing grooves 11 is 90 degrees, four positioning plates 2 are arranged, the four positioning plates 2 are respectively placed above the four fixing grooves 11, the positioning plates 2 are spliced with the fixing grooves 11 through bolts 10, rectangular positioning groove holes 12 are formed in the positioning plates 2, the bolts 10 penetrate through the positioning groove holes 12 and then are inserted into the fixing grooves 11, fixing shafts 3 are vertically arranged at one ends of the positioning plates 2, a positioning shaft 6 is further arranged on one positioning plate 2, the four fixing shafts 3 are sleeved with the sleeve 9, and the positioning shaft 6 is located on the outer side of the sleeve 9 and is adjacent to the sleeve 9; one end of the operating handle 1 is vertically provided with a positioning rod 5, the top of the sleeve 9 is fixedly connected with the operating handle 1, and the positioning rod 5 is positioned outside the sleeve 9 and is adjacent to the sleeve 9.
Four corners of 4 lower extremes of operation platform all are equipped with landing leg 7, landing leg 7 lower extreme is equipped with lower margin 8.
A manufacturing process of a flat steel pipe clamp comprises the following steps:
1) the initial end of the flat steel penetrates through a gap between the positioning rod 5 and the sleeve 9 and is bent into a radian of 90 degrees;
2) holding the operating handle 1 by hand to rotate the sleeve 9 clockwise to enable the positioning rod 5 to be adjacent to the positioning shaft 6, penetrating the flat steel through a gap between the positioning rod 5 and the sleeve 9 and a gap between the positioning shaft 6 and the sleeve 9, then holding the operating handle 1 by hand to rotate the sleeve 9 anticlockwise, and bending the flat steel according to the bending requirement;
3) the tail end of the flat steel penetrates through a gap between the positioning rod 5 and the sleeve 9 and is bent to be parallel to the initial end;
4) and finally cutting off the bent flat steel from the base metal, drilling bolt holes at two ends, and finishing the manufacture of the pipe clamp.
The above-described embodiments are merely preferred and are not intended to limit the present invention in any way, and other variations and modifications may be made without departing from the spirit and scope of the invention as defined in the appended claims.
In the description of the present invention, it is to be understood that the terms indicating orientation or positional relationship are based on the orientation or positional relationship shown in the drawings, and are only for convenience of description and simplification of description, and do not indicate or imply that the equipment or elements referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention.

Claims (4)

1. The utility model provides a band steel pipe strap preparation frock which characterized in that: comprises an operating platform, a positioning plate, a sleeve and an operating handle;
four rectangular fixing grooves are symmetrically formed in the upper end face of the operating platform, the number of the positioning plates is four, the four positioning plates are respectively placed above the four fixing grooves, the positioning plates are movably connected with the fixing grooves, a fixing shaft is vertically arranged at one end of each positioning plate, a positioning shaft is further arranged on one positioning plate, the sleeve is sleeved with the four fixing shafts, and the positioning shafts are located on the outer side of the sleeve and are adjacent to the sleeve; the sleeve is characterized in that one end of the operating handle is vertically provided with a positioning rod, the top of the sleeve is fixedly connected with the operating handle, and the positioning rod is located on the outer side of the sleeve and is adjacent to the sleeve.
2. The tooling for manufacturing the flat steel pipe clamp according to claim 1, is characterized in that: the included angle between two adjacent fixing grooves is 90 degrees.
3. The tooling for manufacturing the flat steel pipe clamp according to claim 1, is characterized in that: the positioning plate is inserted into the fixing groove through a bolt, a rectangular positioning groove hole is formed in the positioning plate, and the bolt penetrates through the positioning groove hole and then is inserted into the fixing groove.
4. The tooling for manufacturing the flat steel pipe clamp according to claim 1, is characterized in that: four corners of operation platform lower extreme all are equipped with the landing leg, the landing leg lower extreme is equipped with the lower margin.
CN202022409954.1U 2020-10-27 2020-10-27 Flat steel pipe clamp manufacturing tool Active CN214184766U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022409954.1U CN214184766U (en) 2020-10-27 2020-10-27 Flat steel pipe clamp manufacturing tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022409954.1U CN214184766U (en) 2020-10-27 2020-10-27 Flat steel pipe clamp manufacturing tool

Publications (1)

Publication Number Publication Date
CN214184766U true CN214184766U (en) 2021-09-14

Family

ID=77643207

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022409954.1U Active CN214184766U (en) 2020-10-27 2020-10-27 Flat steel pipe clamp manufacturing tool

Country Status (1)

Country Link
CN (1) CN214184766U (en)

Similar Documents

Publication Publication Date Title
CN111589904B (en) Large-diameter steel pipe correction butt joint method
CN214184766U (en) Flat steel pipe clamp manufacturing tool
CN210435609U (en) Welding positioning tool
CN207171356U (en) Crane beam stiffener assembles locator
CN112355100A (en) Flat steel pipe clamp manufacturing tool and manufacturing process
CN210067488U (en) Outdoor curtain wall unwrapping wire appurtenance
CN108161527A (en) A kind of metal winding pipe divided edge molding system and metal winding pipe clamping device
CN214518585U (en) Pipeline welding aligning centralizer
CN206071075U (en) A kind of Steel Structure Installation line-up clamp
CN211544493U (en) Multifunctional pipeline supporting and recovering device
CN212019906U (en) Auxiliary connecting tool for butt joint of large-diameter steel pipes
CN110977332B (en) Manufacturing tool and manufacturing method for top structural part of crane
CN214291493U (en) Fixing device for butt-joint and butt-joint assembly connection of pipelines
CN104477275B (en) Automobile auxiliary frame positioning method
CN215967153U (en) Welding tool for guide wheel assembly
CN220600735U (en) Pipeline flange butt-joint assembly
CN216546279U (en) Workpiece transfer device for machining main shaft and auxiliary shaft
CN215880584U (en) Welding station frame suitable for all-position welding of pipes and plates
JP2020082229A (en) Hole drilling jig and hole drilling method for steel pipe
US10240336B2 (en) Truss assembly with alignment guides
CN214921918U (en) Tool for omnibearing adjustment of position of welding workpiece
CN218964566U (en) Adjustable pipeline group misalignment correction tool
CN212443982U (en) External aligning device
CN215469448U (en) Alignment installation device for phase angle of balance pin on clutch flywheel
CN216882496U (en) Flexible tool for welding tower crane support

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant