JP2019219156A - Storage water heater - Google Patents

Storage water heater Download PDF

Info

Publication number
JP2019219156A
JP2019219156A JP2018119282A JP2018119282A JP2019219156A JP 2019219156 A JP2019219156 A JP 2019219156A JP 2018119282 A JP2018119282 A JP 2018119282A JP 2018119282 A JP2018119282 A JP 2018119282A JP 2019219156 A JP2019219156 A JP 2019219156A
Authority
JP
Japan
Prior art keywords
hot water
water supply
temperature
bypass
storage tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2018119282A
Other languages
Japanese (ja)
Other versions
JP6958492B2 (en
Inventor
洋真 黒柳
Hiromasa Kuroyanagi
洋真 黒柳
一樹 池田
Kazuki Ikeda
一樹 池田
真行 須藤
Masayuki Sudo
真行 須藤
宗平 高橋
Sohei Takahashi
宗平 高橋
康史 本庄
Yasushi Honjo
康史 本庄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2018119282A priority Critical patent/JP6958492B2/en
Publication of JP2019219156A publication Critical patent/JP2019219156A/en
Priority to JP2021131665A priority patent/JP7151838B2/en
Application granted granted Critical
Publication of JP6958492B2 publication Critical patent/JP6958492B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Heat-Pump Type And Storage Water Heaters (AREA)
  • Domestic Hot-Water Supply Systems And Details Of Heating Systems (AREA)

Abstract

To provide a storage water heater advantageous for preventing an increase in a difference between a hot water supply temperature and a target value.SOLUTION: A storage water heater includes: a hot water delivery selector valve 26 for switching a boiling-up circuit and a bypass circuit; a general hot water supply side electric mixing valve 7 for controlling a hot water supply temperature; and a control section 24 for controlling a boiling-up operation for causing hot water heated by a heat pump unit 2 to flow into an upper part of a hot water storage tank 1 by the boiling-up circuit and a bypass operation for circulating water in the bypass circuit prior to the boiling-up operation. The control section 24 can execute bypass operation time change control for executing the bypass operation only for a first bypass operation time when the boiling-up operation is started while a hot water supply operation from the general hot water supply side electric mixing valve 7 to a hot water supply destination is being executed and for executing the bypass operation only for a second bypass operation time longer than the first bypass operation time when the boiling-up operation is started while the hot water supply operation is not being executed.SELECTED DRAWING: Figure 1

Description

本発明は、貯湯式給湯装置に関する。   The present invention relates to a hot water supply type hot water supply apparatus.

貯湯タンクに貯えた湯を用いて給湯を行う貯湯式給湯装置が広く用いられている。貯湯式給湯装置は、例えば、リモコンにて使用者が設定した温度で、蛇口、シャワー、浴槽等へ給湯する機能を有する。   Hot water storage type hot water supply devices that supply hot water using hot water stored in a hot water storage tank are widely used. The hot water storage device has a function of supplying hot water to a faucet, a shower, a bathtub, or the like at a temperature set by a user using a remote controller, for example.

特許文献1に開示された貯湯式給湯装置は、ヒートポンプユニットの水冷媒熱交換器で加熱された高温水を貯湯タンクの上部に戻すヒーポン戻り管と、ヒーポン往き管とを直接あるいは、貯湯タンクを介してバイパスするバイパス管を設け、沸上運転を開始するときには、水冷媒熱交換器の出口温水温度を検知する出口温度センサが所定温度を検知すると、バイパス管側への流通からヒーポン戻り管側への流通へと流路切替手段を制御するようにしている。   The hot water storage type hot water supply apparatus disclosed in Patent Literature 1 directly or directly connects the heapon return pipe and the heapon return pipe that return high-temperature water heated by the water-refrigerant heat exchanger of the heat pump unit to the top of the hot water storage tank. A bypass pipe is provided for bypassing, and when the boiling operation is started, when the outlet temperature sensor for detecting the outlet hot water temperature of the water-refrigerant heat exchanger detects a predetermined temperature, the flow from the bypass pipe side to the heapon return pipe side The flow path switching means is controlled so as to flow to the flow path.

特開2009−264617号公報JP 2009-264617 A

沸上運転のときに、ヒートポンプユニットのような加熱手段から流出する湯水の温度が、貯湯タンク内の上部にある湯の温度よりも低い場合あるいは高い場合には、次回の給湯動作が行われたときに、給湯温度と目標値との差が大きくなる可能性がある。   If the temperature of the hot water flowing out of the heating means such as the heat pump unit during the boiling operation is lower or higher than the temperature of the hot water in the upper part of the hot water storage tank, the next hot water supply operation was performed. Sometimes, the difference between the hot water supply temperature and the target value may increase.

本発明は、上述のような課題を解決するためになされたもので、給湯温度と目標値との差が大きくなることを防止することに有利な貯湯式給湯装置を提供することを目的とする。   The present invention has been made in order to solve the above-described problems, and has an object to provide a hot water storage type hot water supply apparatus that is advantageous in preventing a difference between a hot water supply temperature and a target value from increasing. .

本発明に係る貯湯式給湯装置は、貯湯タンクと、水を加熱する加熱手段と、貯湯タンクの下部から取り出した水を、加熱手段を経由して貯湯タンクの上部に流入させる沸上回路と、貯湯タンクの下部から取り出した水を、加熱手段を経由して貯湯タンクの下部に流入させるバイパス回路と、沸上回路とバイパス回路とを切り替える切替弁と、貯湯タンクの上部から供給される第一温水と、第一温水よりも温度の低い第二温水とを混合することにより給湯温度を調整する混合弁と、加熱手段により加熱された湯を沸上回路により貯湯タンクの上部に流入させる沸上運転と、沸上運転の前にバイパス回路に水を循環させるバイパス運転とを制御する制御部と、を備え、制御部は、混合弁から給湯先への給湯動作が実行中であるときに沸上運転を開始する場合には、第一のバイパス運転時間だけバイパス運転を実行し、給湯動作が実行中でないときに沸上運転を開始する場合には、第一のバイパス運転時間よりも長い第二のバイパス運転時間だけバイパス運転を実行するバイパス運転時間変更制御を実施可能であるものである。
また、本発明に係る貯湯式給湯装置は、貯湯タンクと、水を加熱する加熱手段と、貯湯タンクの下部から取り出した水を、加熱手段を経由して貯湯タンクの上部に流入させる沸上回路と、貯湯タンクの上部から供給される第一温水と、第一温水よりも温度の低い第二温水とを混合することにより給湯温度を調整する混合弁と、加熱手段により加熱された湯を沸上回路により貯湯タンクの上部に流入させる沸上運転と、混合弁から給湯先への給湯が実行中でないときの混合弁の開度である待機開度とを制御する制御部と、貯湯タンクの上部にある湯の温度であるタンク上部温度を検出するタンク上部温度検出手段と、加熱手段から流出する湯の温度である出湯温度を検出する出湯温度検出手段と、第二温水の温度を検出する第二温水温度検出手段と、を備え、制御部は、沸上運転が実行中かつ出湯温度がタンク上部温度よりも低い場合にはタンク上部温度と第二温水の温度とに基づいて待機開度を調整し、沸上運転が実行中かつ出湯温度がタンク上部温度以上である場合には出湯温度と第二温水の温度とに基づいて待機開度を調整する混合弁開度変更制御を実施可能であるものである。
Hot water storage type hot water supply device according to the present invention, a hot water storage tank, heating means for heating water, water taken out from the lower part of the hot water storage tank, a boiling circuit for flowing into the upper part of the hot water storage tank via the heating means, A bypass circuit for allowing water taken out from the lower part of the hot water storage tank to flow into the lower part of the hot water storage tank via the heating means, a switching valve for switching between a boiling circuit and a bypass circuit, and a first valve supplied from the upper part of the hot water storage tank A mixing valve for adjusting the hot water supply temperature by mixing hot water and second hot water having a lower temperature than the first hot water, and boiling for flowing hot water heated by the heating means into an upper portion of the hot water storage tank by a boiling circuit. A control unit that controls the operation and a bypass operation that circulates water to the bypass circuit before the boiling operation.The control unit is configured to perform the boiling operation when the hot water supply operation from the mixing valve to the hot water supply destination is being performed. Open up operation When performing the bypass operation only for the first bypass operation time, and when starting the boiling operation when the hot water supply operation is not being performed, the second bypass operation longer than the first bypass operation time The bypass operation time change control that executes the bypass operation only for the time can be performed.
Further, the hot water storage type hot water supply apparatus according to the present invention includes a hot water storage tank, a heating means for heating water, and a boiling circuit for flowing water taken out from a lower part of the hot water storage tank into an upper part of the hot water storage tank via the heating means. A mixing valve for adjusting the hot water supply temperature by mixing the first hot water supplied from the upper portion of the hot water storage tank with the second hot water having a lower temperature than the first hot water, and boiling the hot water heated by the heating means. A control unit that controls a boiling operation in which the upper circuit flows into the upper part of the hot water storage tank and a standby opening degree that is an opening degree of the mixing valve when hot water is not being supplied from the mixing valve to the hot water supply destination; Tank upper temperature detecting means for detecting a tank upper temperature which is a temperature of hot water at an upper part, tapping temperature detecting means for detecting a tapping temperature which is a temperature of hot water flowing out of the heating means, and detecting a temperature of the second hot water Second hot water temperature detection hand The control unit adjusts the standby opening degree based on the tank upper temperature and the temperature of the second hot water when the boiling operation is being performed and the tapping temperature is lower than the tank upper temperature, and When the operation is being performed and the tapping temperature is equal to or higher than the tank upper temperature, the mixing valve opening change control for adjusting the standby opening based on the tapping temperature and the temperature of the second hot water can be performed.

本発明によれば、給湯温度と目標値との差が大きくなることを防止することに有利な貯湯式給湯装置を提供することが可能となる。   Advantageous Effects of Invention According to the present invention, it is possible to provide a hot water supply type hot water supply apparatus that is advantageous in preventing a difference between a hot water supply temperature and a target value from increasing.

実施の形態1による貯湯式給湯装置を示す図である。It is a figure which shows the hot-water storage type hot-water supply apparatus by Embodiment 1. 実施の形態1による貯湯式給湯装置のバイパス運転時間変更制御の制御動作を示すフローチャートである。It is a flowchart which shows the control operation of the bypass operation time change control of the hot water storage type hot water supply apparatus according to Embodiment 1. 実施の形態1による貯湯式給湯装置の混合弁開度変更制御の制御動作を示すフローチャートである。It is a flowchart which shows the control operation | movement of the mixing valve opening degree change control of the hot-water storage type hot water supply apparatus by Embodiment 1.

以下、図面を参照して実施の形態について説明する。各図において共通または対応する要素には、同一の符号を付して、重複する説明を簡略化または省略する。本開示は、以下の各実施の形態で説明する構成のうち、組み合わせ可能な構成のあらゆる組み合わせを含み得る。   Hereinafter, embodiments will be described with reference to the drawings. In the drawings, common or corresponding elements are denoted by the same reference numerals, and redundant description will be simplified or omitted. The present disclosure may include any combination of configurations that can be combined among the configurations described in the following embodiments.

実施の形態1.
図1は、実施の形態1による貯湯式給湯装置を示す図である。図1に示すように、本実施の形態の貯湯式給湯装置は、水を加熱する加熱手段であるヒートポンプユニット2と、貯湯タンク1を有する貯湯ユニット40とを備える。ヒートポンプユニット2と、貯湯ユニット40との間は、HP往き配管48と、HP戻り配管49と、電気配線(図示省略)とを介して接続されている。ヒートポンプユニット2内には、圧縮機、給湯用熱交換器、膨張弁、空気熱交換器を順次冷媒配管で接続したヒートポンプ回路が備えられている。
Embodiment 1 FIG.
FIG. 1 is a diagram showing a hot water supply type hot water supply apparatus according to Embodiment 1. As shown in FIG. 1, the hot water supply type hot water supply apparatus of the present embodiment includes a heat pump unit 2 which is a heating unit for heating water, and a hot water storage unit 40 having a hot water storage tank 1. The heat pump unit 2 and the hot water storage unit 40 are connected via an HP going pipe 48, an HP returning pipe 49, and electric wiring (not shown). The heat pump unit 2 includes a heat pump circuit in which a compressor, a hot water supply heat exchanger, an expansion valve, and an air heat exchanger are sequentially connected by refrigerant piping.

貯湯タンク1は、湯水を貯留する。貯湯タンク1の内部では、温度による水の密度の差によって、上側が高温で下側が低温になる温度成層を形成することができる。説明の便宜上、貯湯タンク1について、上部、中間部、及び下部を定める。貯湯タンク1の中間部は、貯湯タンク1の上部と、貯湯タンク1の下部との間の高さの部分である。貯湯タンク1の容量の1/3ずつに相当する部分をそれぞれ上部、中間部、下部とみなしてもよいし、それとは異なる位置を境に上部、中間部、及び下部を定めてもよい。貯湯タンク1において上側から順に上部、中間部、下部の順になっていればよい。なお、貯湯タンク1が、管を介して直列に接続された複数のタンクを備える場合には、最上位のタンクから最下位のタンクまでの複数のタンク全体の階層において、上部、中間部、及び下部を定めればよい。   Hot water storage tank 1 stores hot water. Inside the hot water storage tank 1, a temperature stratification in which the upper side has a high temperature and the lower side has a low temperature can be formed due to the difference in water density depending on the temperature. For convenience of description, the upper, middle, and lower portions of the hot water storage tank 1 are defined. The intermediate portion of hot water storage tank 1 is a portion having a height between an upper portion of hot water storage tank 1 and a lower portion of hot water storage tank 1. Portions corresponding to 1 / of the capacity of the hot water storage tank 1 may be regarded as upper, middle, and lower portions, respectively, or upper, middle, and lower portions may be defined at different positions. It is sufficient that the hot water storage tank 1 has an upper part, an intermediate part, and a lower part in order from the upper side. In the case where the hot water storage tank 1 includes a plurality of tanks connected in series via pipes, the upper part, the middle part, and the lower part of the entire tank from the highest tank to the lowest tank The lower part may be determined.

貯湯タンク1の外面には、貯湯タンク1の最上部からの容積が、例えば0L、50L、100L、150L、170L、220Lの各位置に、第1の温度センサ5a、第2の温度センサ5b、第3の温度センサ5c、第4の温度センサ5d、第5の温度センサ5e、第6の温度センサ5fがそれぞれ設けられており、各位置で水温を検出する。第1の温度センサ5a、第2の温度センサ5b、第3の温度センサ5c、第4の温度センサ5d、第5の温度センサ5e、及び第6の温度センサ5fは、貯湯タンク1内の残湯熱量を検出する残湯熱量検出手段として機能する。HP往き配管48には、ヒートポンプユニット2への入水温度を検出する第7の温度センサ5gが設けられている。   On the outer surface of the hot water storage tank 1, the volume from the top of the hot water storage tank 1 is, for example, at each of 0L, 50L, 100L, 150L, 170L, and 220L, the first temperature sensor 5a, the second temperature sensor 5b, A third temperature sensor 5c, a fourth temperature sensor 5d, a fifth temperature sensor 5e, and a sixth temperature sensor 5f are provided, and each position detects a water temperature. The first temperature sensor 5a, the second temperature sensor 5b, the third temperature sensor 5c, the fourth temperature sensor 5d, the fifth temperature sensor 5e, and the sixth temperature sensor 5f It functions as a remaining hot-water calorie detecting means for detecting the amount of hot-water. The HP going pipe 48 is provided with a seventh temperature sensor 5g for detecting the temperature of water entering the heat pump unit 2.

貯湯ユニット40内には、循環ポンプ4、一般給湯側電動混合弁7、高温配管8、給水管9、風呂給湯側電動混合弁11、風呂用電磁弁13、風呂循環ポンプ14、入水切替弁17、給湯用流量センサ19、給湯用温度センサ20、風呂用流量センサ21、風呂用温度センサ22、給水温度センサ23、出湯切替弁26、中温戻し切替弁27、中温取出切替弁28、中温配管30などがさらに備えられている。   In the hot water storage unit 40, a circulation pump 4, a general hot water supply side electric mixing valve 7, a high temperature pipe 8, a water supply pipe 9, a bath hot water supply side electric mixing valve 11, a solenoid valve for bath 13, a bath circulation pump 14, a water inlet switching valve 17. , Hot water supply flow sensor 19, hot water supply temperature sensor 20, bath flow sensor 21, bath temperature sensor 22, water supply temperature sensor 23, hot water switching valve 26, medium temperature return switching valve 27, medium temperature extraction switching valve 28, medium temperature pipe 30 And so on.

給水管9の上流は、例えば水道管のような水源に接続されている。給水管9の下流側は、給水管9a及び給水管9bに分岐している。給水管9aは、貯湯タンク1の下部に接続されている。水源から供給される低温水が給水管9aから貯湯タンク1の下部に流入することで、貯湯タンク1内は満水状態に維持される。   The upstream of the water supply pipe 9 is connected to a water source such as a water pipe. The downstream side of the water supply pipe 9 is branched into a water supply pipe 9a and a water supply pipe 9b. The water supply pipe 9 a is connected to a lower part of the hot water storage tank 1. When the low-temperature water supplied from the water source flows into the lower part of the hot water storage tank 1 from the water supply pipe 9a, the inside of the hot water storage tank 1 is maintained in a full state.

中温取出切替弁28は、中温入口28a、低温入口28b、及び水出口28cを有する。低温入口28bに給水管9bが接続されている。中温入口28aに中温配管30の一端が接続されている。高温配管8の上流部は、貯湯タンク1の上部にある第一位置1aにて貯湯タンク1内に連通する。中温配管30の他端は、第一位置1aよりも低位にある第二位置1bにて貯湯タンク1内に連通する。第二位置1bは、給水管9aが接続された貯湯タンク1の下部よりも上位にある。すなわち、第二位置1bは、貯湯タンク1の上部と下部との間の中間部にある。   The medium temperature extraction switching valve 28 has a medium temperature inlet 28a, a low temperature inlet 28b, and a water outlet 28c. The water supply pipe 9b is connected to the low-temperature inlet 28b. One end of a medium temperature pipe 30 is connected to the medium temperature inlet 28a. The upstream portion of the high-temperature pipe 8 communicates with the hot water storage tank 1 at a first position 1 a above the hot water storage tank 1. The other end of the intermediate temperature pipe 30 communicates with the inside of the hot water storage tank 1 at a second position 1b lower than the first position 1a. The second position 1b is higher than the lower part of the hot water storage tank 1 to which the water supply pipe 9a is connected. That is, the second position 1b is located at an intermediate portion between the upper and lower portions of the hot water storage tank 1.

貯湯タンク1から中温配管30を通って供給される中温水が中温入口28aに流入する。当該中温水よりも温度の低い低温水が低温入口28bに流入する。本実施の形態では、水源から給水管9bを通って供給される低温水が低温入口28bに流入する。中温取出切替弁28は、「中温位置」と「低温位置」とに流路を切り替え可能である。「中温位置」では、中温入口28aが水出口28cへ連通し、低温入口28bが遮断される。「中温位置」のときには、中温配管30からの中温水が水出口28cへ流れる。「低温位置」では、低温入口28bが水出口28cへ連通し、中温入口28aが遮断される。「低温位置」のときには、給水管9bからの低温水が水出口28cへ流れる。   Medium-temperature water supplied from the hot-water storage tank 1 through the medium-temperature pipe 30 flows into the medium-temperature inlet 28a. Low-temperature water having a lower temperature than the medium-temperature water flows into the low-temperature inlet 28b. In the present embodiment, low-temperature water supplied from the water source through the water supply pipe 9b flows into the low-temperature inlet 28b. The medium temperature extraction switching valve 28 can switch the flow path between a “medium temperature position” and a “low temperature position”. At the "medium temperature position", the medium temperature inlet 28a communicates with the water outlet 28c, and the low temperature inlet 28b is shut off. At the “medium temperature position”, the medium temperature water from the medium temperature pipe 30 flows to the water outlet 28c. In the "low temperature position", the low temperature inlet 28b communicates with the water outlet 28c, and the medium temperature inlet 28a is shut off. At the "low temperature position", the low temperature water from the water supply pipe 9b flows to the water outlet 28c.

一般給湯側電動混合弁7は、湯側入口7a、水側入口7b、及び湯出口7cを備える。風呂給湯側電動混合弁11は、湯側入口11a、水側入口11b、及び湯出口11cを備える。高温配管8の下流部は、湯側入口7a及び湯側入口11aのそれぞれに連通している。中温取出切替弁28の水出口28cは、水側入口7b及び水側入口11bのそれぞれに連通している。   The general hot water supply side electric mixing valve 7 includes a hot water side inlet 7a, a water side inlet 7b, and a hot water outlet 7c. The bath water supply side electric mixing valve 11 includes a hot water side inlet 11a, a water side inlet 11b, and a hot water outlet 11c. The downstream portion of the high-temperature pipe 8 communicates with each of the hot-water inlet 7a and the hot-water inlet 11a. The water outlet 28c of the intermediate temperature extraction switching valve 28 communicates with each of the water-side inlet 7b and the water-side inlet 11b.

第一給湯管10の一端は、湯出口7cに接続されている。一般給湯側電動混合弁7は、貯湯タンク1から高温配管8を通って供給される第一温水と、中温取出切替弁28の水出口28cからの第二温水とを混合する。第二温水は、第一温水よりも温度が低い。このため、一般給湯側電動混合弁7が第一温水と第二温水との混合比を調整することにより、給湯温度を調整できる。一般給湯側電動混合弁7にて温度調節された湯は、第一給湯管10に流入する。第一給湯管10を通る湯は、例えば蛇口、シャワーのような給湯先へ供給される。   One end of the first hot water supply pipe 10 is connected to the hot water outlet 7c. The general hot water supply side electric mixing valve 7 mixes the first hot water supplied from the hot water storage tank 1 through the high temperature pipe 8 and the second hot water from the water outlet 28 c of the medium temperature extraction switching valve 28. The second hot water has a lower temperature than the first hot water. Therefore, the hot water supply temperature can be adjusted by the general hot water supply side electric mixing valve 7 adjusting the mixing ratio of the first hot water and the second hot water. The hot water whose temperature has been adjusted by the general hot water supply side electric mixing valve 7 flows into the first hot water supply pipe 10. Hot water passing through the first hot water supply pipe 10 is supplied to a hot water supply destination such as a faucet or a shower.

第二給湯管18の一端は、湯出口11cに接続されている。風呂給湯側電動混合弁11は、貯湯タンク1から高温配管8を通って供給される第一温水と、中温取出切替弁28の水出口28cからの第二温水とを混合し、温度調節する。その温度調節された湯は、第二給湯管18に流入する。   One end of the second hot water supply pipe 18 is connected to the hot water outlet 11c. The bath hot water supply side electric mixing valve 11 mixes the first hot water supplied from the hot water storage tank 1 through the high temperature pipe 8 with the second hot water from the water outlet 28c of the medium temperature extraction switching valve 28 to adjust the temperature. The hot water whose temperature has been adjusted flows into the second hot water supply pipe 18.

給水管9には、給水温度センサ23が設けられている。給水温度センサ23は、給水管9を流れる水の温度である給水温度を検出する。第一給湯管10には、給湯用流量センサ19及び給湯用温度センサ20が設けられている。給湯用流量センサ19は、第一給湯管10を流れる湯水の流量を検出する。給湯用温度センサ20は、第一給湯管10を流れる湯水の温度を検出する。第二給湯管18には、風呂用電磁弁13、風呂用流量センサ21、及び風呂用温度センサ22が設けられている。風呂用電磁弁13は、第二給湯管18を開閉する開閉弁に相当する。風呂用流量センサ21は、第二給湯管18を流れる湯水の流量を検出する。風呂用温度センサ22は、第二給湯管18を流れる湯水の温度を検出する。   The water supply pipe 9 is provided with a water supply temperature sensor 23. The feedwater temperature sensor 23 detects a feedwater temperature that is the temperature of the water flowing through the feedwater pipe 9. The first hot water supply pipe 10 is provided with a hot water supply flow rate sensor 19 and a hot water supply temperature sensor 20. Hot water supply flow sensor 19 detects the flow rate of hot water flowing through first hot water supply pipe 10. Hot water supply temperature sensor 20 detects the temperature of hot water flowing through first hot water supply pipe 10. The second hot water supply pipe 18 is provided with a bath solenoid valve 13, a bath flow sensor 21, and a bath temperature sensor 22. The bath solenoid valve 13 corresponds to an on-off valve that opens and closes the second hot water supply pipe 18. Bath flow sensor 21 detects the flow rate of hot water flowing through second hot water supply pipe 18. Bath temperature sensor 22 detects the temperature of hot water flowing through second hot water supply pipe 18.

第二給湯管18は、風呂側循環回路12に接続されている。貯湯ユニット40内には熱交換器15が配置されている。風呂側循環回路12は、貯湯式給湯装置の外部の浴室にある浴槽(図示省略)から浴水を引き込み、熱交換器15を経由した浴水を浴槽内に戻すことのできる経路である。風呂側循環回路12の途中に接続された風呂循環ポンプ14を運転すると、浴槽から浴水が風呂側循環回路12を通過して浴槽に戻るように循環する。熱交換器15は、浴水と、熱媒体との間で熱を交換する。熱媒体は、例えば、貯湯タンク1から供給される湯水である。   The second hot water supply pipe 18 is connected to the bath-side circulation circuit 12. The heat exchanger 15 is arranged in the hot water storage unit 40. The bath-side circulation circuit 12 is a path through which bath water can be drawn from a bath tub (not shown) in a bathroom outside the hot water supply type hot water supply device, and the bath water passed through the heat exchanger 15 can be returned into the bath tub. When the bath circulation pump 14 connected in the middle of the bath-side circulation circuit 12 is operated, bath water is circulated from the bathtub so as to pass through the bath-side circulation circuit 12 and return to the bathtub. The heat exchanger 15 exchanges heat between the bath water and the heat medium. The heat medium is, for example, hot water supplied from the hot water storage tank 1.

貯湯ユニット40から浴槽に湯を注入する湯張り動作を行うときには、以下のようになる。風呂用電磁弁13が開かれる。風呂給湯側電動混合弁11で温度調節された湯は、第二給湯管18及び風呂側循環回路12を通って、浴槽に流入する。風呂用電磁弁13が閉じると、湯張り動作が終了する。   When performing the filling operation of pouring hot water from the hot water storage unit 40 into the bathtub, the following is performed. The bath solenoid valve 13 is opened. The hot water whose temperature has been adjusted by the bath water supply side electric mixing valve 11 flows into the bathtub through the second hot water supply pipe 18 and the bath side circulation circuit 12. When the bath solenoid valve 13 closes, the filling operation ends.

入水切替弁17は、入口となるaポート及びbポートと、出口となるcポートとを有する流路切替手段である。入水切替弁17は、a−c、b−cの2つの経路の間で流路切替可能に構成されている。   The water input switching valve 17 is a flow path switching unit having an a port and a b port serving as inlets and a c port serving as an outlet. The water inlet switching valve 17 is configured to be able to switch between two paths, ac and bc.

出湯切替弁26は、入口となるaポート及びbポートと、出口となるcポート及びdポートとを有する流路切替手段である。出湯切替弁26は、a−c、a−d、b−c、b−dの4つの経路の間で流路切替可能に構成されている。   The hot water switching valve 26 is a flow path switching unit having an a port and a b port serving as inlets and a c port and a d port serving as outlets. The hot water switching valve 26 is configured to be capable of switching flow paths among four paths of ac, ad, bc, and bd.

中温戻し切替弁27は、入口となるaポートと、出口となるbポート、cポート、及びdポートとを有する流路切替手段である。中温戻し切替弁27は、a−b、a−c、a−dの3つの経路の間で流路切替可能に構成されている。   The intermediate temperature return switching valve 27 is a flow path switching unit having an a port serving as an inlet, and b, c, and d ports serving as outlets. The intermediate temperature return switching valve 27 is configured to be capable of switching a flow path among three paths of ab, ac, and ad.

貯湯ユニット40は、バイパス配管32、配管41、配管42、配管43、配管45、配管46、及び配管47をさらに備えている。バイパス配管32は、出湯切替弁26のcポートと、貯湯タンク1の下部との間を接続する。配管41は、貯湯タンク1の下部と、入水切替弁17のaポートとの間を接続する。配管42は、入水切替弁17のcポートと、循環ポンプ4の入口との間を接続する。HP往き配管48は、循環ポンプ4の出口と、ヒートポンプユニット2の入口との間を接続する。HP戻り配管49は、ヒートポンプユニット2の出口と、出湯切替弁26のbポートとの間を接続する。配管43は、出湯切替弁26のdポートと、中温戻し切替弁27のaポートとの間を接続する。配管45は、中温戻し切替弁27のbポートと、貯湯タンク1の上部の温水導入出口1cとの間を接続する。配管46は、中温戻し切替弁27のdポートと、高温配管8の途中の位置との間を接続する。配管47は、中温戻し切替弁27のcポートと、貯湯タンク1の中間部に設けられた温水導入口1dとの間を接続する。   Hot water storage unit 40 further includes bypass pipe 32, pipe 41, pipe 42, pipe 43, pipe 45, pipe 46, and pipe 47. The bypass pipe 32 connects between the port c of the hot water switching valve 26 and the lower part of the hot water storage tank 1. The pipe 41 connects between the lower part of the hot water storage tank 1 and the port a of the water input switching valve 17. The pipe 42 connects between the port c of the water inlet switching valve 17 and the inlet of the circulation pump 4. The HP going pipe 48 connects between the outlet of the circulation pump 4 and the inlet of the heat pump unit 2. The HP return pipe 49 connects between the outlet of the heat pump unit 2 and the b port of the hot water switching valve 26. The pipe 43 connects between the d port of the hot water switching valve 26 and the a port of the intermediate temperature return switching valve 27. The pipe 45 connects between the b port of the intermediate temperature return switching valve 27 and the hot water inlet / outlet 1 c at the upper part of the hot water storage tank 1. The pipe 46 connects between the d port of the intermediate temperature return switching valve 27 and a position in the middle of the high temperature pipe 8. The pipe 47 connects between the port c of the intermediate temperature return switching valve 27 and a hot water inlet 1 d provided in an intermediate portion of the hot water storage tank 1.

以下の説明では、ヒートポンプユニット2から流出する湯の温度を「出湯温度」と称する。温水導入出口1cの近くに出湯温度センサ6が設けられている。出湯温度センサ6は、出湯温度を検出する出湯温度検出手段に相当する。本実施の形態における出湯温度センサ6は、ヒートポンプユニット2によって加熱されて貯湯タンク1の上部に戻される湯の温度を検出する。図示の構成に変えて、出湯温度センサ6は、例えば配管43、配管45、またはHP戻り配管49に配置されていてもよい。   In the following description, the temperature of the hot water flowing out of the heat pump unit 2 will be referred to as “hot water temperature”. A tap water temperature sensor 6 is provided near the hot water inlet / outlet 1c. Hot water temperature sensor 6 corresponds to hot water temperature detecting means for detecting hot water temperature. Hot water temperature sensor 6 in the present embodiment detects the temperature of hot water heated by heat pump unit 2 and returned to the upper portion of hot water storage tank 1. Instead of the illustrated configuration, the tapping temperature sensor 6 may be arranged in, for example, the pipe 43, the pipe 45, or the HP return pipe 49.

第一タンク循環配管16は、配管45の途中の位置と、熱交換器15の熱媒体の入口との間を接続する。第二タンク循環配管50は、熱交換器15の熱媒体の出口と、入水切替弁17のbポートとの間を接続する。配管51は、HP往き配管48における循環ポンプ4とヒートポンプユニット2の入口との間から分岐し、出湯切替弁26のaポートに接続される。風呂熱回収配管31は、第二タンク循環配管50の途中の位置から分岐して、中温配管30の途中の位置に接続されている。   The first tank circulation pipe 16 connects between a position in the middle of the pipe 45 and the inlet of the heat medium of the heat exchanger 15. The second tank circulation pipe 50 connects between the outlet of the heat medium of the heat exchanger 15 and the b port of the water input switching valve 17. The pipe 51 branches from the HP pumping pipe 48 between the circulation pump 4 and the inlet of the heat pump unit 2 and is connected to the port a of the hot water switching valve 26. The bath heat recovery pipe 31 branches off from a position in the middle of the second tank circulation pipe 50 and is connected to a position in the middle temperature pipe 30.

本実施の形態の貯湯式給湯装置は、制御手段としての制御部24を備える。制御部24は、上述した各アクチュエータ及び各センサと電気的に接続されている。後述する沸上運転及びバイパス運転を含む貯湯式給湯装置の各種の運転は、制御部24により制御される。制御部24は、例えば、少なくとも1つのプロセッサと少なくとも1つのメモリとを有する処理回路を備えたものでもよい。   The hot water supply type hot water supply apparatus of the present embodiment includes a control unit 24 as control means. The control unit 24 is electrically connected to each actuator and each sensor described above. Various operations of the hot water supply type hot water supply apparatus including a boiling operation and a bypass operation described later are controlled by the control unit 24. The control unit 24 may include, for example, a processing circuit having at least one processor and at least one memory.

制御部24と、リモコン25との間は、有線通信または無線通信により、双方向に通信可能である。制御部24と、リモコン25とが、ネットワークを介して通信可能でもよい。リモコン25は、ユーザーインターフェースの例である。リモコン25は、ユーザーが操作する操作部と、情報を表示する表示部25aとを有する。リモコン25は、操作部及び表示部25aの両方の機能を有するタッチスクリーンを備えてもよい。ユーザーは、リモコン25を操作することで、貯湯式給湯装置を遠隔操作し、各種の設定などを行うことが可能である。リモコン25の表示部25aは、ユーザーに情報を報知する報知手段としての機能を有する。本実施の形態におけるリモコン25は、表示部25aを報知手段として備えるが、変形例として、例えば音声案内装置のような他の報知手段を備えてもよい。   Communication between the control unit 24 and the remote controller 25 can be performed bidirectionally by wired communication or wireless communication. The control unit 24 and the remote controller 25 may be able to communicate via a network. The remote controller 25 is an example of a user interface. The remote controller 25 has an operation unit operated by a user and a display unit 25a for displaying information. The remote controller 25 may include a touch screen having both functions of the operation unit and the display unit 25a. By operating the remote controller 25, the user can remotely control the hot water supply type hot water supply apparatus and perform various settings. The display unit 25a of the remote controller 25 has a function as a notification unit that notifies the user of information. The remote controller 25 in the present embodiment includes the display unit 25a as a notification unit, but may include another notification unit such as a voice guidance device as a modification.

本実施の形態において、リモコン25は、例えば台所、リビング、浴室などの壁に設置されたものでもよい。または、例えばスマートフォンのような携帯情報端末がリモコン25のようなユーザーインターフェースとしての機能を有するように構成してもよい。複数のリモコン25が制御部24に対して通信可能でもよい。   In the present embodiment, the remote controller 25 may be installed on a wall such as a kitchen, a living room, or a bathroom. Alternatively, for example, a portable information terminal such as a smartphone may be configured to have a function as a user interface such as the remote controller 25. A plurality of remote controllers 25 may be able to communicate with the control unit 24.

ユーザーは、リモコン25を操作することで、一般給湯側電動混合弁7についての設定温度及び風呂給湯側電動混合弁11についての設定温度をそれぞれ変更できる。以下の説明では、一般給湯側電動混合弁7についての設定温度を「給湯設定温度」と呼び、風呂給湯側電動混合弁11についての設定温度を「湯張り設定温度」と呼ぶ。   By operating the remote controller 25, the user can change the set temperature of the general hot water supply side electric mixing valve 7 and the set temperature of the bath hot water supply side electric mixing valve 11, respectively. In the following description, the set temperature of the general hot water supply side electric mixing valve 7 is referred to as “hot water supply set temperature”, and the set temperature of the bath hot water supply side electric mixing valve 11 is referred to as “hot water setting temperature”.

本実施の形態の貯湯式給湯装置は、ヒートポンプユニット2で加熱された湯を貯湯タンク1の上部に流入させる沸上運転を実行できる。沸上運転では、以下のようになる。ヒートポンプユニット2及び循環ポンプ4が運転される。貯湯タンク1の下部から取り出された水が、配管41、入水切替弁17、配管42、循環ポンプ4、及びHP往き配管48を通ってヒートポンプユニット2内に導かれる。ヒートポンプユニット2内で加熱された湯は、HP戻り配管49、出湯切替弁26、配管43、中温戻し切替弁27、及び配管45を通って、温水導入出口1cから貯湯タンク1に流入する。このように水が循環する回路は、貯湯タンク1の下部から取り出した水を、ヒートポンプユニット2を経由して貯湯タンク1の上部に流入させる沸上回路に相当する。沸上運転は、典型的には、深夜電力時間帯を中心に実施され、翌日に使用される分の湯を貯湯タンク1に貯える。   The hot water storage type hot water supply apparatus of the present embodiment can perform a boiling operation in which hot water heated by heat pump unit 2 flows into an upper portion of hot water storage tank 1. In the boiling operation, it becomes as follows. The heat pump unit 2 and the circulation pump 4 are operated. The water taken out from the lower part of the hot water storage tank 1 is guided into the heat pump unit 2 through the pipe 41, the water input switching valve 17, the pipe 42, the circulation pump 4, and the HP going pipe 48. The hot water heated in the heat pump unit 2 flows into the hot water storage tank 1 from the hot water inlet / outlet 1c through the HP return pipe 49, the hot water switching valve 26, the pipe 43, the medium temperature return switching valve 27, and the pipe 45. The circuit in which water circulates in this way corresponds to a boiling circuit in which water taken out from the lower part of the hot water storage tank 1 flows into the upper part of the hot water storage tank 1 via the heat pump unit 2. The boiling operation is typically performed around the midnight power hours, and hot water used for the next day is stored in the hot water storage tank 1.

本実施の形態の貯湯式給湯装置は、沸上運転の前にバイパス運転を実行する。バイパス運転では、以下のようになる。ヒートポンプユニット2及び循環ポンプ4が運転される。貯湯タンク1の下部から取り出された水が、配管41、入水切替弁17、配管42、循環ポンプ4、及びHP往き配管48を通ってヒートポンプユニット2内に導かれる。ヒートポンプユニット2内で加熱された湯は、HP戻り配管49、出湯切替弁26、及びバイパス配管32を通って、貯湯タンク1の下部に流入する。このように水が循環する回路は、貯湯タンク1の下部から取り出した水を、ヒートポンプユニット2を経由して貯湯タンク1の下部に流入させるバイパス回路に相当する。本実施の形態では、出湯切替弁26により、沸上回路とバイパス回路とを切り替えることができる。   The hot water supply type hot water supply apparatus of the present embodiment executes the bypass operation before the boiling operation. In the bypass operation, the following is performed. The heat pump unit 2 and the circulation pump 4 are operated. The water taken out from the lower part of the hot water storage tank 1 is guided into the heat pump unit 2 through the pipe 41, the water input switching valve 17, the pipe 42, the circulation pump 4, and the HP going pipe 48. The hot water heated in the heat pump unit 2 flows into the lower part of the hot water storage tank 1 through the HP return pipe 49, the hot water switching valve 26, and the bypass pipe 32. The circuit in which the water circulates in this way corresponds to a bypass circuit that causes the water taken out from the lower part of the hot water storage tank 1 to flow into the lower part of the hot water storage tank 1 via the heat pump unit 2. In the present embodiment, the hot water switching valve 26 can switch between the boiling circuit and the bypass circuit.

ヒートポンプユニット2が起動されてからしばらくの間は、ヒートポンプユニット2が水を十分に加熱することができないので、十分な温度に達していない湯水がヒートポンプユニット2から流出する。沸上運転の前にバイパス運転を実行することにより、そのような加熱不十分の湯水が貯湯タンク1の上部に流入することを防止できるので、貯湯タンク1の上部に貯留されている高温水の温度が低下してしまうことを防止できる。   Since the heat pump unit 2 cannot sufficiently heat water for a while after the heat pump unit 2 is started, hot water not reaching a sufficient temperature flows out of the heat pump unit 2. By performing the bypass operation before the boiling operation, it is possible to prevent such insufficiently heated hot water from flowing into the upper portion of the hot water storage tank 1, so that the high-temperature water stored in the upper portion of the hot water storage tank 1 can be prevented. It is possible to prevent the temperature from lowering.

以下の説明では、一般給湯側電動混合弁7から給湯先へ給湯する動作を単に「給湯動作」と称する。制御部24は、給湯用流量センサ19によって、給湯動作の開始及び停止を検出することができる。給湯動作の実行中、制御部24は、給湯用温度センサ20で検出される給湯温度が、目標値である給湯設定温度に等しくなるように、一般給湯側電動混合弁7での混合比を調整することができる。すなわち、給湯動作の実行中、制御部24は、給湯温度をフィードバック制御することができる。   In the following description, the operation of supplying hot water from the general hot water supply side electric mixing valve 7 to the hot water supply destination is simply referred to as “hot water supply operation”. The control unit 24 can detect the start and stop of the hot water supply operation by the hot water supply flow rate sensor 19. During the execution of the hot water supply operation, the control unit 24 adjusts the mixing ratio of the general hot water supply side electric mixing valve 7 so that the hot water supply temperature detected by the hot water supply temperature sensor 20 becomes equal to the target hot water supply set temperature. can do. That is, during execution of the hot water supply operation, control unit 24 can perform feedback control of the hot water supply temperature.

一般給湯側電動混合弁7は、例えば、ステッピングモータにより回転する弁体を備え、当該弁体の回転によって湯側入口7aの開口面積と水側入口7bの開口面積との比を変えることで、湯側入口7aから流入する第一温水と、水側入口7bから流入する第二温水との混合比を調整できる。この混合比は、「一般給湯側電動混合弁7の開度」に応じて変化する。「一般給湯側電動混合弁7の開度」とは、例えば、上記ステッピングモータの回転位置に対応した数値で表される。制御部24は、一般給湯側電動混合弁7の開度の情報を保持することができる。第一温水と第二温水との混合比は、一般給湯側電動混合弁7の開度に応じて変化するので、制御部24は、当該混合比の情報を保持することができる。なお、風呂給湯側電動混合弁11の構成は、上述した一般給湯側電動混合弁7の構成と同様である。   The general hot water supply side electric mixing valve 7 includes, for example, a valve body that is rotated by a stepping motor, and changes the ratio between the opening area of the hot water side inlet 7a and the opening area of the water side inlet 7b by rotation of the valve body. The mixing ratio of the first warm water flowing from the hot water inlet 7a and the second warm water flowing from the hot water inlet 7b can be adjusted. This mixing ratio changes according to “the opening degree of the general hot water supply side electric mixing valve 7”. The “opening degree of the general hot water supply side electric mixing valve 7” is represented, for example, by a numerical value corresponding to the rotation position of the stepping motor. The control unit 24 can hold information on the opening degree of the general hot water supply side electric mixing valve 7. Since the mixing ratio of the first hot water and the second hot water changes according to the opening of the general hot water supply side electric mixing valve 7, the control unit 24 can hold information on the mixing ratio. The configuration of the bath water supply side electric mixing valve 11 is the same as the configuration of the general hot water supply side electric mixing valve 7 described above.

以下の説明では、給湯動作が実行中でないときの一般給湯側電動混合弁7の開度を「混合弁待機開度」と称する。本実施の形態における制御部24は、混合弁待機開度を制御する機能を有する。   In the following description, the opening of the general hot water supply side electric mixing valve 7 when the hot water supply operation is not being executed is referred to as “mixing valve standby opening”. The control unit 24 in the present embodiment has a function of controlling the mixing valve standby opening.

制御部24は、給湯動作の実行中に、給湯用温度センサ20で検出される給湯温度が目標値に等しくなったときの一般給湯側電動混合弁7の開度を「給湯時安定開度」として記憶可能である。制御部24は、混合弁待機開度が、前回の給湯動作のときの給湯時安定開度に等しくなるように、混合弁待機開度を制御可能である。次回の給湯動作において、一般給湯側電動混合弁7に供給される第一温水及び第二温水の温度、並びに給湯設定温度が前回の給湯動作のときと同じであれば、混合弁待機開度を給湯時安定開度に等しくしておくことで、給湯動作の開始後に速やかに給湯温度を目標値に等しくすることができる。   The control unit 24 sets the opening of the general hot water supply side electric mixing valve 7 when the hot water supply temperature detected by the hot water supply temperature sensor 20 becomes equal to the target value during the execution of the hot water supply operation to “a stable opening at hot water supply”. Can be stored as The control unit 24 can control the mixing valve standby opening such that the mixing valve standby opening is equal to the hot water supply stable opening during the previous hot water supply operation. In the next hot water supply operation, if the temperatures of the first hot water and the second hot water supplied to the general hot water supply side electric mixing valve 7 and the hot water supply set temperature are the same as those in the previous hot water supply operation, the mixing valve standby opening degree is changed. By making the opening degree equal to the hot water supply stable opening degree, the hot water supply temperature can be made equal to the target value immediately after the start of the hot water supply operation.

本実施の形態における第1の温度センサ5aは、貯湯タンク1の上部にある湯の温度であるタンク上部温度を検出するタンク上部温度検出手段に相当する。貯湯タンク1内の温度成層が安定しているときには、第1の温度センサ5aにより検出されるタンク上部温度は、貯湯タンク1の上部から高温配管8を通って一般給湯側電動混合弁7に供給される第一温水の温度に等しいと考えることができる。   The first temperature sensor 5a in the present embodiment corresponds to a tank upper temperature detecting unit that detects a tank upper temperature that is the temperature of hot water in the upper part of the hot water storage tank 1. When the temperature stratification in the hot water storage tank 1 is stable, the tank upper temperature detected by the first temperature sensor 5a is supplied to the general hot water supply side electric mixing valve 7 from the upper part of the hot water storage tank 1 through the high temperature pipe 8. Can be considered to be equal to the temperature of the first hot water.

中温取出切替弁28が低温位置にあるときには、給水管9からの低温水が第二温水として一般給湯側電動混合弁7に流入し、貯湯タンク1の上部からの第一温水と混合されて、給湯先へ供給される。この場合には、給水温度センサ23により第二温水の温度を検出できる。すなわち、給水温度センサ23は、第二温水の温度を検出する第二温水温度検出手段に相当する。   When the middle temperature extraction switching valve 28 is at the low temperature position, low temperature water from the water supply pipe 9 flows into the general hot water supply side electric mixing valve 7 as second hot water, and is mixed with the first hot water from the upper part of the hot water storage tank 1, It is supplied to the hot water supply destination. In this case, the temperature of the second hot water can be detected by the feedwater temperature sensor 23. That is, the feed water temperature sensor 23 corresponds to a second hot water temperature detecting unit that detects the temperature of the second hot water.

本実施の形態における第4の温度センサ5dは、第二位置1bと同じ高さ、またはほぼ同じ高さの位置にある。このため、第4の温度センサ5dで検出される温度は、貯湯タンク1から中温配管30へ供給される中温水の温度に等しいとみなすことができる。中温取出切替弁28が中温位置にあるときには、貯湯タンク1から中温配管30へ流出した中温水が第二温水として一般給湯側電動混合弁7に流入し、貯湯タンク1の上部からの第一温水と混合されて、給湯先へ供給される。この場合には、第4の温度センサ5dにより第二温水の温度を検出できる。すなわち、第4の温度センサ5dは、第二温水の温度を検出する第二温水温度検出手段に相当する。   The fourth temperature sensor 5d in the present embodiment is located at the same height or almost the same height as the second position 1b. For this reason, the temperature detected by the fourth temperature sensor 5d can be considered to be equal to the temperature of the medium-temperature water supplied from the hot-water storage tank 1 to the medium-temperature pipe 30. When the intermediate-temperature extraction switching valve 28 is at the intermediate-temperature position, the intermediate-temperature water flowing out of the hot-water storage tank 1 to the intermediate-temperature pipe 30 flows into the general hot-water-supply-side electric mixing valve 7 as second hot water, and the first hot water And supplied to the hot water supply destination. In this case, the temperature of the second hot water can be detected by the fourth temperature sensor 5d. That is, the fourth temperature sensor 5d corresponds to a second hot water temperature detecting unit that detects the temperature of the second hot water.

一般に、バイパス運転時間が長いほど、バイパス運転から沸上運転に移行したときの出湯温度が高くなりやすい。このため、低温の湯水が貯湯タンク1の上部に流入することを防止する観点からは、バイパス運転時間が長いことが好ましい。その一方で、バイパス運転時間が長いほど、バイパス運転中に貯湯タンク1の下部に流入する湯水の量が多くなるので、バイパス運転中にヒートポンプユニット2が生成した熱量の損失が多くなる。このため、省エネルギーの観点からは、バイパス運転時間が短いことが好ましい。   In general, the longer the bypass operation time, the higher the tapping temperature when shifting from the bypass operation to the boiling operation. For this reason, from the viewpoint of preventing low-temperature hot water from flowing into the upper portion of the hot water storage tank 1, it is preferable that the bypass operation time is long. On the other hand, the longer the bypass operation time, the larger the amount of hot water flowing into the lower part of the hot water storage tank 1 during the bypass operation, and thus the greater the loss of heat generated by the heat pump unit 2 during the bypass operation. Therefore, from the viewpoint of energy saving, it is preferable that the bypass operation time is short.

給湯動作と沸上運転との両方が実行されているときに、貯湯タンク1の上部にある湯よりも温度の低い湯水(以下、「低温流入水」と称する)が温水導入出口1cから貯湯タンク1の上部に流入した場合を考える。この場合には、貯湯タンク1の上部内の湯に低温流入水が徐々に混ざるとともに、貯湯タンク1の上部内の湯が第一位置1aから高温配管8へ流出していく。このため、貯湯タンク1の上部から高温配管8を通って一般給湯側電動混合弁7へ供給される第一温水の温度は、比較的低下しにくい。その結果、給湯温度は低下しにくいので、給湯温度と目標値との差は大きくなりにくい。   When both the hot water supply operation and the boiling operation are performed, hot water having a lower temperature than the hot water in the upper part of the hot water storage tank 1 (hereinafter, referred to as “low-temperature inflow water”) flows from the hot water introduction outlet 1c to the hot water storage tank 1c. Consider the case of flowing into the upper part of 1. In this case, the low-temperature inflow water gradually mixes with the hot water in the upper part of the hot water storage tank 1, and the hot water in the upper part of the hot water storage tank 1 flows out of the first position 1 a to the high-temperature pipe 8. For this reason, the temperature of the first hot water supplied from the upper part of the hot water storage tank 1 to the general hot water supply side electric mixing valve 7 through the high temperature pipe 8 is relatively unlikely to decrease. As a result, the hot water supply temperature is hardly reduced, and the difference between the hot water supply temperature and the target value is hardly large.

一方、給湯動作が実行中でないときに、沸上運転により低温流入水が温水導入出口1cから貯湯タンク1の上部に流入した場合には、以下のようになる。この場合には、貯湯タンク1の上部内の湯が高温配管8へ流出しないので、貯湯タンク1の上部内に低温流入水が溜まっていき、貯湯タンク1の上部内の温度が大きく低下しやすい。貯湯タンク1の上部内の温度が大きく低下したタイミングで給湯動作が開始されると、前回の給湯動作のときよりも低い温度の第一温水が貯湯タンク1の上部から一般給湯側電動混合弁7へ供給される。その結果、給湯温度が低下しやすいので、給湯温度と目標値との差が大きくなりやすい。   On the other hand, when the low-temperature inflowing water flows into the upper part of the hot-water storage tank 1 from the hot-water inlet / outlet 1c by the boiling operation when the hot-water supply operation is not being performed, the following occurs. In this case, since the hot water in the upper part of the hot water storage tank 1 does not flow out to the high-temperature pipe 8, low-temperature inflow water accumulates in the upper part of the hot water storage tank 1, and the temperature in the upper part of the hot water storage tank 1 is liable to decrease significantly. . When the hot water supply operation is started at a timing when the temperature in the upper part of the hot water storage tank 1 is greatly reduced, the first hot water having a lower temperature than that of the previous hot water supply operation is supplied from the upper part of the hot water storage tank 1 to the general hot water supply side electric mixing valve 7. Supplied to As a result, the hot water supply temperature tends to decrease, and the difference between the hot water supply temperature and the target value tends to increase.

本実施の形態における制御部24は、バイパス運転時間変更制御を実施するバイパス運転時間変更手段24aと、混合弁開度変更制御を実施する混合弁開度変更手段24bとを備える。本開示の貯湯式給湯装置は、バイパス運転時間変更制御と、混合弁開度変更制御とのいずれか一方のみを実施可能なものでもよい。すなわち、制御部24は、バイパス運転時間変更手段24aと混合弁開度変更手段24bとのいずれか一方のみを備えるものでもよい。   The control unit 24 in the present embodiment includes bypass operation time changing means 24a for performing bypass operation time change control, and mixing valve opening degree changing means 24b for executing mixing valve opening degree change control. The hot water storage type hot water supply device of the present disclosure may be capable of performing only one of the bypass operation time change control and the mixing valve opening degree change control. That is, the control unit 24 may include only one of the bypass operation time changing unit 24a and the mixing valve opening changing unit 24b.

本実施の形態のバイパス運転時間変更制御において、制御部24は、給湯動作が実行中であるときに沸上運転を開始する場合には、第一のバイパス運転時間だけバイパス運転を実行した後に沸上運転に移行する。また、バイパス運転時間変更制御において、制御部24は、給湯動作が実行中でないときに沸上運転を開始する場合には、第一のバイパス運転時間よりも長い第二のバイパス運転時間だけバイパス運転を実行した後に沸上運転に移行する。このようなバイパス運転時間変更制御によれば、以下の効果が得られる。給湯動作が実行中のときには、前述したように、低温流入水が貯湯タンク1の上部に流入した場合であっても、給湯温度は低下しにくく、給湯温度と目標値との差は大きくなりにくい。このため、給湯動作が実行中のときには、バイパス運転時間を長くする必要性は少ないので、比較的短い第一のバイパス運転時間だけバイパス運転を実行する。これにより、省エネルギーが図れる。これに対し、給湯動作が実行中でないときには、低温流入水が貯湯タンク1の上部に流入すると、その後に給湯動作が開始された場合に、給湯温度が低下しやすく、給湯温度と目標値との差が大きくなりやすい。そのような事態を予防するために、給湯動作が実行中でないときには、比較的長い第二のバイパス運転時間だけバイパス運転を実行する。これにより、低温流入水が貯湯タンク1の上部に流入することを確実に抑制できるので、その後に給湯動作が開始された場合にも、給湯温度の低下を確実に抑制できる。   In the bypass operation time change control according to the present embodiment, when starting the boiling operation while the hot water supply operation is being performed, the control unit 24 performs the boiling operation after performing the bypass operation for the first bypass operation time. Shift to upper operation. Further, in the bypass operation time change control, when starting the boiling operation when the hot water supply operation is not being performed, the control unit 24 performs the bypass operation for the second bypass operation time longer than the first bypass operation time. Then, the operation shifts to the boiling operation. According to such bypass operation time change control, the following effects can be obtained. When the hot water supply operation is being performed, as described above, even when the low-temperature inflow water flows into the upper part of the hot water storage tank 1, the hot water supply temperature does not easily decrease, and the difference between the hot water supply temperature and the target value does not easily increase. . For this reason, when the hot water supply operation is being performed, there is little need to lengthen the bypass operation time, so that the bypass operation is performed only for the relatively short first bypass operation time. Thereby, energy saving can be achieved. On the other hand, if the low-temperature inflow water flows into the upper portion of the hot water storage tank 1 when the hot water supply operation is not being performed, the hot water supply temperature tends to decrease when the hot water supply operation is started thereafter, and the difference between the hot water supply temperature and the target value is determined. The difference tends to be large. In order to prevent such a situation, when the hot water supply operation is not being performed, the bypass operation is performed for the relatively long second bypass operation time. Thereby, since the low-temperature inflow water can be reliably prevented from flowing into the upper portion of the hot water storage tank 1, even when the hot water supply operation is started thereafter, a decrease in the hot water supply temperature can be reliably suppressed.

給湯動作が停止中であって沸上運転が実行中のときに、貯湯タンク1の上部内にある湯よりも温度の高い湯(以下、「高温流入水」と称する)が温水導入出口1cから貯湯タンク1の上部に流入した場合を考える。この場合に、給湯動作が開始されると、沸上運転の前に貯湯タンク1の上部内にあった湯よりも高い温度の湯が高温配管8を通って一般給湯側電動混合弁7へ供給される可能性があるので、給湯温度が目標値よりも高くなる可能性がある。   When the hot water supply operation is stopped and the boiling operation is being performed, hot water having a higher temperature than the hot water in the upper part of the hot water storage tank 1 (hereinafter, referred to as “high-temperature inflow water”) is supplied from the hot water inlet 1c. Consider a case where the water flows into the upper part of the hot water storage tank 1. In this case, when the hot water supply operation is started, hot water having a higher temperature than the hot water in the upper part of the hot water storage tank 1 before the boiling operation is supplied to the general hot water supply side electric mixing valve 7 through the high temperature pipe 8. Therefore, the hot water supply temperature may be higher than the target value.

本実施の形態の混合弁開度変更制御において、制御部24は、沸上運転が実行中で、出湯温度センサ6により検出される出湯温度が第1の温度センサ5aにより検出されるタンク上部温度よりも低い場合には、タンク上部温度と、給水温度センサ23または第4の温度センサ5dにより検出される第二温水の温度とに基づいて混合弁待機開度を調整する。すなわち、制御部24は、タンク上部温度に等しい温度の第一温水と、第二温水とが混合されたと仮定した場合に給湯温度が目標値に等しくなる混合比となるように、混合弁待機開度を調整する。そのようにして調整された混合弁待機開度を以下「第一待機開度」と称する。   In the mixing valve opening degree change control of the present embodiment, the control unit 24 determines that the tapping temperature detected by the tapping temperature sensor 6 is detected by the first temperature sensor 5a while the boiling operation is being performed. If the temperature is lower than the temperature, the mixing valve standby opening is adjusted based on the tank upper temperature and the temperature of the second hot water detected by the feedwater temperature sensor 23 or the fourth temperature sensor 5d. That is, the control unit 24 opens and stops the mixing valve so that the hot water supply temperature becomes equal to the target value when it is assumed that the first hot water having the temperature equal to the tank upper temperature and the second hot water are mixed. Adjust the degree. The mixing valve standby opening thus adjusted is hereinafter referred to as “first standby opening”.

また、混合弁開度変更制御において、制御部24は、沸上運転が実行中で、出湯温度センサ6により検出される出湯温度が第1の温度センサ5aにより検出されるタンク上部温度以上である場合には、出湯温度と、給水温度センサ23または第4の温度センサ5dにより検出される第二温水の温度とに基づいて混合弁待機開度を調整する。すなわち、制御部24は、出湯温度に等しい温度の第一温水と、第二温水とが混合されたと仮定した場合に給湯温度が目標値に等しくなる混合比となるように、混合弁待機開度を調整する。そのようにして調整された混合弁待機開度を以下「第二待機開度」と称する。   In addition, in the mixing valve opening degree change control, the control unit 24 is performing the boiling operation, and the tapping temperature detected by the tapping temperature sensor 6 is equal to or higher than the tank upper temperature detected by the first temperature sensor 5a. In this case, the mixing valve standby opening is adjusted based on the tap water temperature and the temperature of the second hot water detected by the feed water temperature sensor 23 or the fourth temperature sensor 5d. That is, the control unit 24 sets the mixing valve standby opening degree so that the hot water supply temperature becomes equal to the target value when the first hot water having the temperature equal to the tap water temperature and the second hot water are mixed. To adjust. The mixing valve standby opening thus adjusted is hereinafter referred to as “second standby opening”.

沸上運転の実行中に高温流入水が貯湯タンク1の上部に流入しているときに給湯動作が開始された場合を考える。このときの混合弁待機開度が第一待機開度であったと仮定すると、第1の温度センサ5aにより検出されるタンク上部温度よりも高い温度の湯が高温配管8を通って一般給湯側電動混合弁7へ供給される可能性があるので、給湯温度が目標値よりも高くなる可能性がある。これに対し、上述した混合弁開度変更制御によれば、沸上運転の実行中に高温流入水が貯湯タンク1の上部に流入した場合には、混合弁待機開度が第二待機開度に調整される。混合弁待機開度が第二待機開度に調整された状態で給湯動作が開始されると、高温流入水に等しい温度の湯が高温配管8を通って一般給湯側電動混合弁7へ供給されたとしても、給湯温度は目標値を超えることはない。このため、給湯温度が目標値よりも高くなることを確実に抑制できる。   Consider a case where the hot water supply operation is started while the high-temperature inflow water is flowing into the upper portion of hot water storage tank 1 during the execution of the boiling operation. Assuming that the mixing valve standby opening at this time is the first standby opening, hot water having a temperature higher than the tank upper temperature detected by the first temperature sensor 5a passes through the high-temperature pipe 8 and is supplied to the general hot water supply side motor. Since there is a possibility that the hot water is supplied to the mixing valve 7, the hot water supply temperature may be higher than the target value. On the other hand, according to the above-described mixing valve opening change control, when the high-temperature inflow water flows into the upper part of the hot water storage tank 1 during the boiling operation, the mixing valve standby opening becomes the second standby opening. It is adjusted to. When the hot water supply operation is started in a state where the mixing valve standby opening is adjusted to the second standby opening, hot water having a temperature equal to the high temperature inflow water is supplied to the general hot water supply side electric mixing valve 7 through the high temperature pipe 8. Even so, the hot water supply temperature does not exceed the target value. For this reason, it can be surely suppressed that the hot water supply temperature becomes higher than the target value.

図2は、実施の形態1による貯湯式給湯装置のバイパス運転時間変更制御の制御動作を示すフローチャートである。制御部24は、沸上運転を実施する必要が生じた場合に、本フローチャートの処理を開始する。図2のステップS1で、バイパス運転時間変更手段24aは、給湯動作が実行中であるかどうかを判断する。給湯動作が実行中である場合には、ステップS3へ進み、バイパス運転時間変更手段24aは、バイパス運転を継続する予定時間を第一のバイパス運転時間に設定し、バイパス運転を実施する。   FIG. 2 is a flowchart showing a control operation of the bypass operation time change control of the hot water supply type hot water supply apparatus according to Embodiment 1. The control unit 24 starts the process of this flowchart when it is necessary to perform the boiling operation. In step S1 of FIG. 2, the bypass operation time changing unit 24a determines whether the hot water supply operation is being performed. When the hot water supply operation is being performed, the process proceeds to step S3, and the bypass operation time changing unit 24a sets the scheduled time for continuing the bypass operation to the first bypass operation time, and performs the bypass operation.

一方、ステップS1で給湯動作が実行中でない場合には、ステップS2へ進み、前回の給湯動作の終了時から所定時間が経過しているかどうかを判断する。前回の給湯動作の終了時からまだ所定時間が経過していない場合には、ステップS4へ進み、バイパス運転時間変更手段24aは、バイパス運転を継続する予定時間を第二のバイパス運転時間に設定し、バイパス運転を実施する。これに対し、前回の給湯動作の終了時から既に所定時間が経過している場合には、ステップS3へ進み、バイパス運転時間変更手段24aは、バイパス運転を継続する予定時間を第一のバイパス運転時間に設定し、バイパス運転を実施する。   On the other hand, if the hot water supply operation is not being performed in step S1, the process proceeds to step S2, and it is determined whether a predetermined time has elapsed since the end of the previous hot water supply operation. If the predetermined time has not yet elapsed since the end of the previous hot water supply operation, the process proceeds to step S4, where the bypass operation time changing means 24a sets the scheduled time for continuing the bypass operation to the second bypass operation time. , Carry out bypass operation. On the other hand, if the predetermined time has already elapsed from the end of the previous hot water supply operation, the process proceeds to step S3, and the bypass operation time changing unit 24a sets the scheduled time for continuing the bypass operation to the first bypass operation. Set the time and perform the bypass operation.

上述したステップS2の「所定時間」は、例えば、給湯動作の停止中に第一給湯管10内に滞留している湯が冷めてしまうまでの基準時間に相当している。本実施の形態において、バイパス運転時間変更手段24aは、給湯動作が実行中でないときに沸上運転を開始する場合であって、前回の給湯動作の終了時から経過した時間が上記基準時間に達している場合には、ステップS2及びステップS3の処理により、第一のバイパス運転時間だけバイパス運転を実行した後、沸上運転に移行する。これにより、以下の効果が得られる。前回の給湯動作の終了時から既に所定時間が経過している場合には、仮に第二のバイパス運転時間だけバイパス運転を実行したとしても、給湯動作が開始すると第一給湯管10内の冷めた低温水がまず給湯先へ送られてしまうので、給湯先での給湯温度が低下することは避けられない。よって、バイパス運転を長い時間実行することによって得られる利益は比較的少ないと言える。そこで、この場合には、比較的短い第一のバイパス運転時間だけバイパス運転を実行することにより、省エネルギーを図ることができる。   The “predetermined time” in step S2 described above corresponds to, for example, a reference time until the hot water staying in the first hot water supply pipe 10 cools down while the hot water supply operation is stopped. In the present embodiment, the bypass operation time changing means 24a starts the boiling operation when the hot water supply operation is not being performed, and the time elapsed from the end of the previous hot water supply operation has reached the reference time. If so, the process in steps S2 and S3 executes the bypass operation for the first bypass operation time, and then shifts to the boiling operation. Thereby, the following effects can be obtained. If the predetermined time has already elapsed from the end of the previous hot water supply operation, even if the bypass operation is executed only for the second bypass operation time, when the hot water supply operation starts, the inside of the first hot water supply pipe 10 is cooled. Since the low-temperature water is first sent to the hot water supply destination, it is inevitable that the hot water supply temperature at the hot water supply destination decreases. Therefore, it can be said that the benefit obtained by performing the bypass operation for a long time is relatively small. Therefore, in this case, energy can be saved by executing the bypass operation only for the relatively short first bypass operation time.

上記のような制御に限らず、バイパス運転時間変更手段24aは、給湯動作が実行中でないときには、前回の給湯動作の終了時からの経過時間にかかわらず、第二のバイパス運転時間だけバイパス運転を実行してもよい。そのようにすることで、給湯動作が開始したときに給湯温度が目標値に等しくなるまでに要する時間を短縮する上で有利になる。   Not limited to the above control, the bypass operation time changing means 24a performs the bypass operation for the second bypass operation time when the hot water supply operation is not being performed, regardless of the elapsed time from the end of the previous hot water supply operation. May be performed. This is advantageous in reducing the time required for the hot water supply temperature to become equal to the target value when the hot water supply operation is started.

第一のバイパス運転時間は、少なくとも、ヒートポンプユニット2、HP戻り配管49、及び出湯切替弁26の内部に滞留していた水をバイパス配管32を通して貯湯タンク1の下部に流入させるのに必要な時間であることが好ましい。第一のバイパス運転時間は、例えば90秒でもよい。   The first bypass operation time is at least a time required for the water remaining inside the heat pump unit 2, the HP return pipe 49, and the hot water switching valve 26 to flow into the lower part of the hot water storage tank 1 through the bypass pipe 32. It is preferable that The first bypass operation time may be, for example, 90 seconds.

第二のバイパス運転時間は、例えば、ヒートポンプユニット2、HP戻り配管49、及び出湯切替弁26の内部に滞留していた水をバイパス配管32を通して貯湯タンク1の下部に流入させるのに必要な時間に、ヒートポンプユニット2から流出する湯の温度が所定温度まで上昇するのに必要な時間を加算した時間であることが好ましい。第二のバイパス運転時間は、例えば400秒でもよい。   The second bypass operation time is, for example, a time required for flowing water retained inside the heat pump unit 2, the HP return pipe 49, and the hot water switching valve 26 into the lower part of the hot water storage tank 1 through the bypass pipe 32. Preferably, the time is a time obtained by adding a time required for the temperature of the hot water flowing out of the heat pump unit 2 to rise to a predetermined temperature. The second bypass operation time may be, for example, 400 seconds.

処理はステップS3またはステップS4からステップS5へ進む。ステップS5で、バイパス運転時間変更手段24aは、バイパス運転の開始からの経過時間が、ステップS3で設定された第一のバイパス運転時間またはステップS4で設定された第二のバイパス運転時間に達したかどうかを判断する。バイパス運転の開始からの経過時間が、設定されたバイパス運転時間にまだ達していない場合には、ステップS7に進み、バイパス運転時間変更手段24aは、出湯切替弁26をバイパス側すなわちb−cポート間を連通させる状態に維持することにより、バイパス運転を継続する。これに対し、バイパス運転の開始からの経過時間が、設定されたバイパス運転時間に達した場合には、ステップS6に進み、バイパス運転時間変更手段24aは、出湯切替弁26をタンク上部側すなわちb−dポート間を連通させる状態へ切り替える。これにより、バイパス運転から沸上運転へ移行する。   The process proceeds from step S3 or step S4 to step S5. In step S5, the bypass operation time changing unit 24a determines that the elapsed time from the start of the bypass operation has reached the first bypass operation time set in step S3 or the second bypass operation time set in step S4. Determine whether or not. When the elapsed time from the start of the bypass operation has not yet reached the set bypass operation time, the process proceeds to step S7, and the bypass operation time changing unit 24a sets the hot water switching valve 26 to the bypass side, that is, the bc port. The bypass operation is continued by maintaining the state in which the communication is established. On the other hand, when the elapsed time from the start of the bypass operation has reached the set bypass operation time, the process proceeds to step S6, and the bypass operation time changing means 24a sets the hot water switching valve 26 to the tank upper side, that is, b -Switch to a state that allows communication between d ports. This causes a transition from the bypass operation to the boiling operation.

処理はステップS6またはステップS7からステップS8へ進む。ステップS8で、バイパス運転時間変更手段24aは、バイパス運転の開始からの経過時間が給湯停止監視時間に達したかどうかを判断する。給湯停止監視時間は、例えば、第二のバイパス運転時間に等しい値である。バイパス運転の開始からの経過時間が給湯停止監視時間に達している場合には、バイパス運転時間変更手段24aは、本フローチャートの処理を終了する。   The process proceeds from step S6 or step S7 to step S8. In step S8, the bypass operation time changing unit 24a determines whether the elapsed time from the start of the bypass operation has reached the hot water supply stop monitoring time. The hot water supply stop monitoring time is, for example, a value equal to the second bypass operation time. If the elapsed time from the start of the bypass operation has reached the hot water supply stop monitoring time, the bypass operation time changing unit 24a ends the processing of this flowchart.

これに対し、バイパス運転の開始からの経過時間が給湯停止監視時間にまだ達していない場合には、ステップS9へ進み、バイパス運転時間変更手段24aは、給湯動作が停止したことが検知されたかどうかを判断する。給湯動作が停止したことが検知されていない場合には、ステップS5に戻る。一方、ステップS9で給湯動作が停止したことが検知された場合には、ステップS10へ進み、バイパス運転時間変更手段24aは、バイパス運転を継続する時間を第三のバイパス運転時間に設定する。第三のバイパス運転時間は、バイパス運転の開始時からステップS9で検知された給湯動作停止までの時間を第二のバイパス運転時間から引いた時間として設定される。ステップS10からステップS11へ進み、バイパス運転時間変更手段24aは、出湯切替弁26がバイパス側すなわちb−cポート間を連通させる状態になるようにし、バイパス運転を実行する。ステップS11の処理によれば、バイパス運転の実行中であった場合にはバイパス運転が継続されることになり、沸上運転の実行中であった場合には沸上運転を中断してバイパス運転が再開されることになる。ステップS11からステップS5に戻る。   On the other hand, if the elapsed time from the start of the bypass operation has not yet reached the hot water supply stop monitoring time, the process proceeds to step S9, and the bypass operation time changing unit 24a determines whether the stop of the hot water supply operation is detected. Judge. If it is not detected that the hot water supply operation has stopped, the process returns to step S5. On the other hand, when it is detected in step S9 that the hot water supply operation has stopped, the process proceeds to step S10, and the bypass operation time changing unit 24a sets the time for continuing the bypass operation to the third bypass operation time. The third bypass operation time is set as a time obtained by subtracting the time from the start of the bypass operation to the stop of the hot water supply operation detected in step S9 from the second bypass operation time. Proceeding from step S10 to step S11, the bypass operation time changing means 24a performs the bypass operation by setting the hot water switching valve 26 to a state in which the bypass side, that is, the bc port is communicated with. According to the processing in step S11, if the bypass operation is being performed, the bypass operation is continued. If the boiling operation is being performed, the boiling operation is interrupted and the bypass operation is performed. Will be resumed. The process returns from step S11 to step S5.

なお、ステップS10で第三のバイパス運転時間が設定された場合には、ステップS5に戻ったとき、バイパス運転時間変更手段24aは、ステップS9で検知された給湯動作停止からの経過時間が第三のバイパス運転時間に達したかどうかを判断するものとする。   If the third bypass operation time is set in step S10, and when returning to step S5, the bypass operation time changing means 24a sets the third elapsed time from the stop of the hot water supply operation detected in step S9. It is determined whether the bypass operation time has been reached.

給湯動作が実行中であるときに開始されたバイパス運転の最中に給湯動作が停止した場合において、第一のバイパス運転時間が経過したときにバイパス運転から沸上運転に移行したと仮定すると、低温流入水が貯湯タンク1の上部に溜まる可能性がある。このため、その後に給湯動作が再開されると、給湯温度が低下しやすくなり、給湯温度と目標値との差が大きくなる可能性がある。これに対し、本実施の形態であれば、給湯動作が実行中であるときに開始されたバイパス運転の最中に給湯動作が停止した場合には、ステップS9からステップS11の処理によって第三のバイパス運転時間が設定されることで、第二のバイパス運転時間に等しい時間だけバイパス運転が実行される。これにより、低温流入水が貯湯タンク1の上部に流入することを確実に抑制できるので、その後に給湯動作が再開されたときに、給湯温度が低下しにくくなり、給湯温度と目標値との差が大きくなることを確実に防止できる。   In the case where the hot water supply operation is stopped during the bypass operation started while the hot water supply operation is being performed, assuming that the operation has shifted from the bypass operation to the boiling operation when the first bypass operation time has elapsed, Low-temperature inflow water may accumulate in the upper part of the hot water storage tank 1. For this reason, when the hot water supply operation is restarted thereafter, the hot water supply temperature tends to decrease, and the difference between the hot water supply temperature and the target value may increase. On the other hand, according to the present embodiment, when the hot water supply operation is stopped during the bypass operation started while the hot water supply operation is being performed, the third processing is performed by the processing of steps S9 to S11. By setting the bypass operation time, the bypass operation is performed for a time equal to the second bypass operation time. As a result, the low-temperature inflow water can be reliably prevented from flowing into the upper part of the hot water storage tank 1, so that when the hot water supply operation is restarted thereafter, the hot water supply temperature is less likely to decrease, and the difference between the hot water supply temperature and the target value is reduced. Can be reliably prevented from increasing.

また、バイパス運転が第一のバイパス運転時間だけ実行された後の沸上運転の最中であって、当該バイパス運転の開始から経過した時間が第二のバイパス運転時間に達する前に給湯動作が停止したと仮定すると、低温流入水が貯湯タンク1の上部に溜まる可能性がある。このため、その後に給湯動作が再開されると、給湯温度が低下しやすくなり、給湯温度と目標値との差が大きくなる可能性がある。これに対し、本実施の形態であれば、給湯動作が実行中であるときに開始されたバイパス運転の後の沸上運転の最中であって、当該バイパス運転の開始から経過した時間が給湯停止監視時間(=第二のバイパス運転時間)に達する前に給湯動作が停止した場合には、ステップS8からステップS11の処理によってバイパス運転が再開される。これにより、低温流入水が貯湯タンク1の上部に流入することを確実に抑制できるので、その後に給湯動作が再開されたときに、給湯温度が低下しにくくなり、給湯温度と目標値との差が大きくなることを確実に防止できる。   In addition, during the boiling operation after the bypass operation is performed for the first bypass operation time, and before the time elapsed from the start of the bypass operation reaches the second bypass operation time, the hot water supply operation is performed. Assuming that it has stopped, low-temperature inflow water may accumulate in the upper part of the hot water storage tank 1. For this reason, when the hot water supply operation is restarted thereafter, the hot water supply temperature tends to decrease, and the difference between the hot water supply temperature and the target value may increase. On the other hand, according to the present embodiment, during the boiling operation after the bypass operation started when the hot water supply operation is being executed, and the time elapsed since the start of the bypass operation, If the hot water supply operation is stopped before reaching the stop monitoring time (= second bypass operation time), the bypass operation is restarted by the processing from step S8 to step S11. As a result, the low-temperature inflow water can be reliably prevented from flowing into the upper part of the hot water storage tank 1, so that when the hot water supply operation is restarted thereafter, the hot water supply temperature is less likely to decrease, and the difference between the hot water supply temperature and the target value Can be reliably prevented from increasing.

制御部24は、貯湯式給湯装置の機種構成を判断する手段を備えていてもよい。その場合、次のようにしてもよい。例えば、ヒートポンプユニット2からの出湯水を貯湯タンク1の上部に流入させる流入口と、給湯利用のために貯湯タンク1の上部から湯を取り出す取出し口が切り離されており、お互いの配管に流れる湯水が干渉しない機種構成のように、バイパス運転時間変更手段24aによるバイパス運転時間変更制御が不要の機種構成と判断した場合には、制御部24は、給湯動作が実行中であるか否かにかかわらず、バイパス運転の時間を第一のバイパス運転時間に設定し、バイパス運転を実施してもよい。   The control unit 24 may include means for determining the model configuration of the hot water supply type hot water supply device. In that case, the following may be performed. For example, an inflow port for flowing hot water from the heat pump unit 2 into the upper portion of the hot water storage tank 1 and an outlet for taking out hot water from the upper portion of the hot water storage tank 1 for hot water supply are separated from each other. If it is determined that the bypass operation time change control by the bypass operation time changing means 24a is not necessary as in the model configuration in which the hot water supply operation is not being performed, the control unit 24 determines whether or not the hot water supply operation is being performed. Instead, the bypass operation time may be set to the first bypass operation time and the bypass operation may be performed.

制御部24は、貯湯式給湯装置の運転モードを、第一の運転モードと、第一の運転モードよりも省エネルギーを優先する第二の運転モードとに切り替え可能であってもよい。例えば使用者がリモコン25を操作することにより、第一の運転モードを設定するか第二の運転モードを設定するかを切り替え可能でもよい。第二の運転モードを以下「省エネモード」と称する。省エネモードが設定されている場合には、制御部24は、バイパス運転時間変更制御を実施せず、給湯動作が実行中であるか否かにかかわらず、バイパス運転の時間を第一のバイパス運転時間に設定し、バイパス運転を実施してもよい。そのようにすることで、給湯温度の変動が発生する可能性はあるが、バイパス運転の時間が長くなることを確実に防止できるので、省エネルギーが図れる。   The control unit 24 may be capable of switching the operation mode of the hot water supply type hot water supply device between a first operation mode and a second operation mode in which energy saving is prioritized over the first operation mode. For example, by operating the remote controller 25, the user may be able to switch between setting the first operation mode and setting the second operation mode. The second operation mode is hereinafter referred to as “energy saving mode”. When the energy saving mode is set, the control unit 24 does not perform the bypass operation time change control, and sets the bypass operation time to the first bypass operation regardless of whether the hot water supply operation is being performed. The time may be set and the bypass operation may be performed. By doing so, there is a possibility that the temperature of the hot water supply may fluctuate, but it is possible to reliably prevent the time of the bypass operation from being prolonged, thereby achieving energy saving.

本実施の形態の貯湯式給湯装置は、バイパス運転時間変更制御を実施するか実施しないかを使用者が選択可能とする選択手段を備えてもよい。例えば、リモコン25を使用者が操作することで、バイパス運転時間変更制御を実施するか実施しないかを使用者が設定可能となるように構成してもよい。これにより、使用者は、給湯温度の変動を抑制することよりも省エネルギーを優先したい場合には、バイパス運転時間変更制御を実施しないように設定することができる。   The hot water supply type hot water supply apparatus of the present embodiment may include a selection unit that allows a user to select whether or not to execute bypass operation time change control. For example, a configuration may be adopted in which the user can set whether or not to execute the bypass operation time change control by operating the remote controller 25. Thereby, the user can set so as not to execute the bypass operation time change control when the user wants to give priority to energy saving rather than suppressing the fluctuation of the hot water supply temperature.

図3は、実施の形態1による貯湯式給湯装置の混合弁開度変更制御の制御動作を示すフローチャートである。制御部24は、給湯動作が停止しているときに、本フローチャートの処理を実施する。図3のステップS12で、混合弁開度変更手段24bは、沸上運転が非実行中であるかどうかを判断する。沸上運転が非実行中である場合には、ステップS15へ進み、混合弁開度変更手段24bは、前回の給湯動作のときの給湯時安定開度の情報がメモリに記憶されているかどうかを判断する。給湯時安定開度の情報がメモリに記憶されている場合には、ステップS16へ進み、混合弁開度変更手段24bは、混合弁待機開度が給湯時安定開度に等しくなるように一般給湯側電動混合弁7に対して指令を出す。ステップS16の後、本フローチャートの処理を終了する。   FIG. 3 is a flowchart showing a control operation of the mixing valve opening degree change control of the hot water storage type hot water supply apparatus according to Embodiment 1. Control unit 24 performs the processing of this flowchart when the hot water supply operation is stopped. In step S12 in FIG. 3, the mixing valve opening degree changing unit 24b determines whether the boiling operation is not being performed. If the boiling operation is not being performed, the process proceeds to step S15, and the mixing valve opening degree changing unit 24b determines whether the information of the hot water supply stable opening degree in the previous hot water supply operation is stored in the memory. to decide. If the information of the hot water supply stable opening is stored in the memory, the process proceeds to step S16, and the mixing valve opening changing means 24b determines whether the mixing valve standby opening is equal to the hot water supply stable opening. A command is issued to the side electric mixing valve 7. After step S16, the processing of this flowchart ends.

これに対し、ステップS15で給湯時安定開度の情報がメモリに記憶されていない場合には、ステップS17へ進み、混合弁開度変更手段24bは、混合弁待機開度が、次式(1)により演算される第一待機開度に等しくなるように一般給湯側電動混合弁7に対して指令を出す。ステップS17の後、本フローチャートの処理を終了する。
第一待機開度={850/(TH−Twm)}×{|要求湯温−Twm|} …式(1)
On the other hand, when the information of the hot water supply stable opening is not stored in the memory in step S15, the process proceeds to step S17, and the mixing valve opening changing means 24b determines that the mixing valve standby opening is calculated by the following equation (1). ) Is issued to the general hot water supply side electric mixing valve 7 so as to be equal to the first standby opening calculated by the above (1). After step S17, the processing of this flowchart ends.
First standby opening = {850 / (TH−Twm)} × {| required hot water temperature−Twm |} Equation (1)

ここで、THは、第1の温度センサ5aにより検出されるタンク上部温度である。Twmは、水側入口7bに流入する水の温度、すなわち給水温度センサ23または第4の温度センサ5dにより検出される第二温水の温度である。「要求湯温」は、リモコン25にて設定された給湯設定温度に、放熱を考慮したマージンを加えた温度であり、給湯温度の目標値に相当する。   Here, TH is the tank upper temperature detected by the first temperature sensor 5a. Twm is the temperature of the water flowing into the water-side inlet 7b, that is, the temperature of the second hot water detected by the feedwater temperature sensor 23 or the fourth temperature sensor 5d. The “required hot water temperature” is a temperature obtained by adding a margin considering heat radiation to the hot water supply set temperature set by the remote controller 25, and corresponds to a target value of the hot water supply temperature.

一方、ステップS12で沸上運転が非実行中でない場合には、混合弁開度変更手段24bは、ステップS13に進み、出湯切替弁26がバイパス側すなわちb−cポート間を連通させる状態であるかどうかを判断する。出湯切替弁26がバイパス側である場合には、ステップS15へ進む。ステップS15以降の処理は前述したとおりである。   On the other hand, when the boiling operation is not being executed in step S12, the mixing valve opening degree changing unit 24b proceeds to step S13, and the hot water switching valve 26 is in a state of connecting the bypass side, that is, the bc port. Determine whether or not. When the hot water switching valve 26 is on the bypass side, the process proceeds to step S15. The processing after step S15 is as described above.

ステップS13で出湯切替弁26がバイパス側でない場合、すなわち出湯切替弁26がタンク上部側すなわちb−dポート間を連通させる状態である場合は、沸上運転が実行中の場合に相当する。この場合には、ステップS14へ進み、混合弁開度変更手段24bは、出湯温度センサ6により検出される出湯温度Twoをタンク上部温度THと比較する。出湯温度Twoがタンク上部温度TH未満である場合には、ステップS15へ進む。ステップS15以降の処理は前述したとおりである。これに対し、出湯温度Twoがタンク上部温度TH以上である場合には、ステップS18へ進み、混合弁開度変更手段24bは、混合弁待機開度が、次式(2)により演算される第二待機開度に等しくなるように一般給湯側電動混合弁7に対して指令を出す。   If the hot water switching valve 26 is not on the bypass side in step S13, that is, if the hot water switching valve 26 is in the state of communicating with the tank upper side, that is, between the b and d ports, this corresponds to the case where the boiling operation is being executed. In this case, the process proceeds to step S14, and the mixing valve opening degree changing means 24b compares the tapping temperature Two detected by the tapping temperature sensor 6 with the tank upper temperature TH. When tapping temperature Two is lower than tank upper part temperature TH, the process proceeds to step S15. The processing after step S15 is as described above. On the other hand, when the tapping temperature Two is equal to or higher than the tank upper temperature TH, the process proceeds to Step S18, and the mixing valve opening changing unit 24b calculates the mixing valve standby opening using the following equation (2). A command is issued to the general hot water supply side electric mixing valve 7 so as to be equal to the second standby opening.

第二待機開度={850/(Two−ΔTb−Twm)}×{|要求湯温−Twm|} …式(2)   Second standby opening = {850 / (Two−ΔTb−Twm)} × {| required hot water temperature−Twm |} Expression (2)

ここで、ΔTbは、ヒートポンプユニット2からの出湯水が貯湯タンク1の上部に流入するまでに配管放熱等により温度低下することを見込んで設定された配管放熱マージンである。ΔTbは、例えば5℃と設定してもよい。   Here, ΔTb is a pipe heat dissipation margin set in consideration of the fact that the temperature of the hot water from the heat pump unit 2 will decrease due to the heat dissipation of the pipe before flowing into the upper part of the hot water storage tank 1. ΔTb may be set to, for example, 5 ° C.

ステップS18からステップS19へ進み、混合弁開度変更手段24bは、給湯時安定開度の情報がメモリに記憶されている場合には、給湯時安定開度の情報をメモリから消去する。ステップS19の後、本フローチャートの処理を終了する。   Proceeding from step S18 to step S19, the mixing valve opening changing means 24b deletes the information on the hot water supply stable opening from the memory when the information on the hot water supply stable opening is stored in the memory. After step S19, the processing of this flowchart ends.

上述した図3のフローチャートの処理によれば、沸上運転中にタンク上部温度THよりも温度の高い高温流入水が貯湯タンク1の上部に流入した場合には、ステップS18の処理により、混合弁待機開度が第二待機開度に調整される。その結果、給湯動作が開始された場合に、給湯温度が目標値よりも高くなることを確実に抑制できる。   According to the process of the flowchart of FIG. 3 described above, when high-temperature inflow water having a temperature higher than the tank upper temperature TH flows into the upper portion of the hot water storage tank 1 during the boiling operation, the mixing valve is processed by the process of step S18. The standby opening is adjusted to the second standby opening. As a result, when the hot water supply operation is started, it is possible to reliably prevent the hot water supply temperature from becoming higher than the target value.

また、本実施の形態では、ステップS18で、出湯温度センサ6により検出される出湯温度Twoと、給水温度センサ23または第4の温度センサ5dにより検出される第二温水の温度Twmとに基づいて混合弁待機開度を調整した場合、すなわち混合弁待機開度を第二待機開度に調整した場合には、ステップS19で、混合弁開度変更手段24bは、前回の給湯動作のときの給湯時安定開度の情報をメモリから消去する。これにより、以下の効果が得られる。沸上運転中にタンク上部温度THよりも温度の高い高温流入水が貯湯タンク1の上部に流入したことにより、貯湯タンク1の上部内の湯温は、前回の給湯動作のときよりも高くなっている可能性がある。このため、仮に混合弁待機開度が給湯時安定開度に等しい状態で給湯動作が開始されると、給湯温度が目標値よりも高くなる可能性がある。これに対し、本実施の形態であれば、上記のような場合には前回の給湯動作のときの給湯時安定開度の情報が消去されるので、混合弁待機開度が給湯時安定開度に等しい状態で給湯動作が開始されることを確実に防止できる。その結果、給湯温度が目標値よりも高くなることを確実に防止できる。   Further, in the present embodiment, in step S18, based on tap water temperature Two detected by tap water temperature sensor 6 and temperature Twm of the second hot water detected by feed water temperature sensor 23 or fourth temperature sensor 5d. If the mixing valve standby opening has been adjusted, that is, if the mixing valve standby opening has been adjusted to the second standby opening, in step S19, the mixing valve opening changing means 24b determines whether the hot water supply in the previous hot water supply operation was performed. The time stable opening information is erased from the memory. Thereby, the following effects can be obtained. During the boiling operation, the high-temperature inflow water having a higher temperature than the tank upper temperature TH flows into the upper portion of the hot water storage tank 1, so that the temperature of the hot water in the upper portion of the hot water storage tank 1 becomes higher than in the previous hot water supply operation. Could be. Therefore, if the hot water supply operation is started in a state where the mixing valve standby opening is equal to the hot water supply stable opening, the hot water supply temperature may become higher than the target value. On the other hand, according to the present embodiment, in the above case, since the information of the hot water supply stable opening at the time of the previous hot water supply operation is deleted, the mixing valve standby opening becomes the hot water supply stable opening. Can be reliably prevented from being started in a state equal to. As a result, it is possible to reliably prevent the hot water supply temperature from becoming higher than the target value.

貯湯式給湯装置の機種構成を判断する手段を制御部24が備えている場合には、次のようにしてもよい。例えば、ヒートポンプユニット2からの出湯水が、出湯切替弁26及び中温戻し切替弁27等を経由せずに、直接貯湯タンク1の上部に流入するような回路を有する機種構成のように、混合弁開度変更手段24bによる混合弁開度変更制御が不要の機種構成と判断した場合には、制御部24は、出湯温度Twoにかかわらず、混合弁待機開度が、式(1)で演算される第一待機開度、もしくは給湯動作中に記憶する給湯時安定開度に等しくなるように、一般給湯側電動混合弁7を制御してもよい。   When the control unit 24 includes means for determining the model configuration of the hot water supply type hot water supply device, the following may be performed. For example, as in a model configuration having a circuit having a circuit in which tap water from the heat pump unit 2 flows directly into the upper portion of the hot water storage tank 1 without passing through the tap switch valve 26 and the intermediate temperature return switch valve 27 and the like. If it is determined that the model configuration does not require the mixing valve opening change control by the opening changing means 24b, the control unit 24 calculates the mixing valve standby opening by equation (1) regardless of the tapping temperature Two. The general hot water supply side electric mixing valve 7 may be controlled so as to be equal to the first standby opening degree or the hot water supply stable opening degree stored during the hot water supply operation.

また、省エネモードが設定されている場合には、制御部24は、混合弁開度変更制御を実施することなく、出湯温度Twoにかかわらず、混合弁待機開度が、式(1)で演算される第一待機開度、もしくは給湯動作中に記憶する給湯時安定開度に等しくなるように、一般給湯側電動混合弁7を制御してもよい。そのようにすることで、一般給湯側電動混合弁7の動作頻度を低減できるので、一般給湯側電動混合弁7の電力消費を抑制でき、省エネルギーが図れる。   When the energy saving mode is set, the control unit 24 calculates the mixing valve standby opening by the equation (1) regardless of the tapping temperature Two without executing the mixing valve opening change control. The general hot water supply side electric mixing valve 7 may be controlled so as to be equal to the first standby opening degree or the hot water supply stable opening degree stored during the hot water supply operation. By doing so, the operation frequency of the general hot water supply side electric mixing valve 7 can be reduced, so that the power consumption of the general hot water supply side electric mixing valve 7 can be suppressed, and energy saving can be achieved.

本実施の形態の貯湯式給湯装置は、混合弁開度変更制御を実施するか実施しないかを使用者が選択可能とする選択手段を備えてもよい。例えば、リモコン25を使用者が操作することで、混合弁開度変更制御を実施するか実施しないかを使用者が設定可能となるように構成してもよい。これにより、使用者は、給湯温度の変動を抑制することよりも省エネルギーを優先したい場合には、混合弁開度変更制御を実施しないように設定することができる。   The hot water supply type hot water supply apparatus of the present embodiment may include a selection unit that allows a user to select whether to execute the mixing valve opening degree change control or not. For example, the user may operate the remote controller 25 so that the user can set whether to execute the mixing valve opening degree change control or not. Thereby, the user can set so as not to execute the mixing valve opening change control when the user wants to give priority to energy saving rather than suppressing fluctuation of the hot water supply temperature.

1 貯湯タンク、 1a 第一位置、 1b 第二位置、 1c 温水導入出口、 1d 温水導入口、 2 ヒートポンプユニット、 4 循環ポンプ、 5a 第1の温度センサ、 5b 第2の温度センサ、 5c 第3の温度センサ、 5d 第4の温度センサ、 5e 第5の温度センサ、 5f 第6の温度センサ、 5g 第7の温度センサ、 6 出湯温度センサ、 7 一般給湯側電動混合弁、 7a 湯側入口、 7b 水側入口、 7c 湯出口、 8 高温配管、 9 給水管、 9a 給水管、 9b 給水管、 10 第一給湯管、 11 風呂給湯側電動混合弁、 11a 湯側入口、 11b 水側入口、 11c 湯出口、 12 風呂側循環回路、 13 風呂用電磁弁、 14 風呂循環ポンプ、 15 熱交換器、 16 第一タンク循環配管、 17 入水切替弁、 18 第二給湯管、 19 給湯用流量センサ、 20 給湯用温度センサ、 21 風呂用流量センサ、 22 風呂用温度センサ、 23 給水温度センサ、 24 制御部、 24a バイパス運転時間変更手段、 24b 混合弁開度変更手段、 25 リモコン、 25a 表示部、 26 出湯切替弁、 27 中温戻し切替弁、 28 中温取出切替弁、 28a 中温入口、 28b 低温入口、 28c 水出口、 30 中温配管、 31 風呂熱回収配管、 32 バイパス配管、 40 貯湯ユニット、 41 配管、 42 配管、 43 配管、 45 配管、 46 配管、 47 配管、 48 HP往き配管、 49 HP戻り配管、 50 第二タンク循環配管、 51 配管 Reference Signs List 1 hot water storage tank, 1a first position, 1b second position, 1c hot water inlet / outlet, 1d hot water inlet, 2 heat pump unit, 4 circulation pump, 5a first temperature sensor, 5b second temperature sensor, 5c third Temperature sensor, 5d fourth temperature sensor, 5e fifth temperature sensor, 5f sixth temperature sensor, 5g seventh temperature sensor, 6 tapping temperature sensor, 7 general hot water supply side electric mixing valve, 7a hot water side inlet, 7b Water side inlet, 7c hot water outlet, 8 high temperature pipe, 9 water supply pipe, 9a water supply pipe, 9b water supply pipe, 10 first hot water supply pipe, 11 bath hot water supply side electric mixing valve, 11a hot water side inlet, 11b water side inlet, 11c hot water Outlet, 12 bath side circulation circuit, 13 bath solenoid valve, 14 bath circulation pump, 15 heat exchanger, 16 first tank circulation piping, 17 water supply switching valve, 18 second hot water supply pipe, 19 hot water supply flow sensor, 20 hot water supply temperature sensor, 21 bath flow sensor, 22 bath temperature sensor, 23 water supply temperature sensor, 24 control unit, 24a bypass operation time changing means , 24b mixing valve opening changing means, 25 remote controller, 25a display unit, 26 hot water switching valve, 27 medium temperature return switching valve, 28 medium temperature extraction switching valve, 28a medium temperature inlet, 28b low temperature inlet, 28c water outlet, 30 medium temperature pipe, 31 Bath heat recovery piping, 32 bypass piping, 40 hot water storage units, 41 piping, 42 piping, 43 piping, 45 piping, 46 piping, 47 piping, 48 HP going piping, 49 HP returning piping, 50 second tank circulation piping, 51 piping

Claims (10)

貯湯タンクと、
水を加熱する加熱手段と、
前記貯湯タンクの下部から取り出した水を、前記加熱手段を経由して前記貯湯タンクの上部に流入させる沸上回路と、
前記貯湯タンクの下部から取り出した水を、前記加熱手段を経由して前記貯湯タンクの下部に流入させるバイパス回路と、
前記沸上回路と前記バイパス回路とを切り替える切替弁と、
前記貯湯タンクの上部から供給される第一温水と、前記第一温水よりも温度の低い第二温水とを混合することにより給湯温度を調整する混合弁と、
前記加熱手段により加熱された湯を前記沸上回路により前記貯湯タンクの上部に流入させる沸上運転と、前記沸上運転の前に前記バイパス回路に水を循環させるバイパス運転とを制御する制御部と、
を備え、
前記制御部は、前記混合弁から給湯先への給湯動作が実行中であるときに前記沸上運転を開始する場合には、第一のバイパス運転時間だけ前記バイパス運転を実行し、前記給湯動作が実行中でないときに前記沸上運転を開始する場合には、前記第一のバイパス運転時間よりも長い第二のバイパス運転時間だけ前記バイパス運転を実行するバイパス運転時間変更制御を実施可能である貯湯式給湯装置。
Hot water storage tank,
Heating means for heating water;
A boiling circuit for flowing water taken out from the lower part of the hot water storage tank into the upper part of the hot water storage tank via the heating means,
A bypass circuit for flowing water taken out from the lower part of the hot water storage tank into the lower part of the hot water storage tank via the heating means;
A switching valve for switching between the boiling circuit and the bypass circuit,
A mixing valve for adjusting the hot water supply temperature by mixing first hot water supplied from the upper portion of the hot water storage tank and second hot water having a lower temperature than the first hot water,
A control unit that controls a boiling operation in which hot water heated by the heating means flows into an upper portion of the hot water storage tank by the boiling circuit, and a bypass operation in which water is circulated to the bypass circuit before the boiling operation. When,
With
When starting the boiling operation while the hot water supply operation from the mixing valve to the hot water supply destination is being performed, the control unit performs the bypass operation for a first bypass operation time, and performs the hot water supply operation. When the boiling operation is started when is not being executed, bypass operation time change control for executing the bypass operation for a second bypass operation time longer than the first bypass operation time can be performed. Hot water storage device.
貯湯タンクと、
水を加熱する加熱手段と、
前記貯湯タンクの下部から取り出した水を、前記加熱手段を経由して前記貯湯タンクの上部に流入させる沸上回路と、
前記貯湯タンクの上部から供給される第一温水と、前記第一温水よりも温度の低い第二温水とを混合することにより給湯温度を調整する混合弁と、
前記加熱手段により加熱された湯を前記沸上回路により前記貯湯タンクの上部に流入させる沸上運転と、前記混合弁から給湯先への給湯が実行中でないときの前記混合弁の開度である待機開度とを制御する制御部と、
前記貯湯タンクの上部にある湯の温度であるタンク上部温度を検出するタンク上部温度検出手段と、
前記加熱手段から流出する湯の温度である出湯温度を検出する出湯温度検出手段と、
前記第二温水の温度を検出する第二温水温度検出手段と、
を備え、
前記制御部は、前記沸上運転が実行中かつ前記出湯温度が前記タンク上部温度よりも低い場合には前記タンク上部温度と前記第二温水の温度とに基づいて前記待機開度を調整し、前記沸上運転が実行中かつ前記出湯温度が前記タンク上部温度以上である場合には前記出湯温度と前記第二温水の温度とに基づいて前記待機開度を調整する混合弁開度変更制御を実施可能である貯湯式給湯装置。
Hot water storage tank,
Heating means for heating water;
A boiling circuit for flowing water taken out from the lower part of the hot water storage tank into the upper part of the hot water storage tank via the heating means,
A mixing valve for adjusting the hot water supply temperature by mixing first hot water supplied from the upper portion of the hot water storage tank and second hot water having a lower temperature than the first hot water,
A boiling operation in which hot water heated by the heating means flows into the upper portion of the hot water storage tank by the boiling circuit, and an opening degree of the mixing valve when hot water is not being supplied from the mixing valve to a hot water supply destination. A control unit for controlling the standby opening degree;
Tank upper temperature detecting means for detecting a tank upper temperature that is a temperature of hot water at an upper portion of the hot water storage tank,
Tap water temperature detection means for detecting a tap water temperature that is the temperature of the hot water flowing out of the heating means,
Second hot water temperature detecting means for detecting the temperature of the second hot water,
With
The controller is configured to adjust the standby opening degree based on the tank upper temperature and the second hot water temperature when the boiling operation is being performed and the tapping temperature is lower than the tank upper temperature, Mixing valve opening change control for adjusting the standby opening based on the tapping temperature and the temperature of the second hot water when the boiling operation is being performed and the tapping temperature is equal to or higher than the tank upper temperature. Hot water storage type hot water supply device that can be implemented.
前記制御部は、前記給湯動作が実行中でないときに前記沸上運転を開始する場合であって、前回の前記給湯動作の終了時から経過した時間が基準に達している場合には、前記第一のバイパス運転時間だけ前記バイパス運転を実行する請求項1に記載の貯湯式給湯装置。   The control unit is configured to start the boiling operation when the hot water supply operation is not being performed, and when the time elapsed from the end of the previous hot water supply operation has reached a reference, The hot-water storage type hot water supply device according to claim 1, wherein the bypass operation is performed for one bypass operation time. 前記制御部は、前記給湯動作が実行中であるときに開始された前記バイパス運転の最中に前記給湯動作が停止した場合には、前記第二のバイパス運転時間だけ前記バイパス運転を実行する請求項1または請求項3に記載の貯湯式給湯装置。   The control unit, when the hot water supply operation is stopped during the bypass operation started when the hot water supply operation is being performed, executes the bypass operation for the second bypass operation time. The hot-water storage type hot-water supply device according to claim 1 or 3. 前記制御部は、前記給湯動作が実行中であるときに開始された前記バイパス運転の後の前記沸上運転の最中であって、当該バイパス運転の開始から経過した時間が前記第二のバイパス運転時間に達する前に前記給湯動作が停止した場合には、前記バイパス運転を再開する請求項1、請求項3及び請求項4のいずれか一項に記載の貯湯式給湯装置。   The control unit is in the middle of the boiling operation after the bypass operation started when the hot water supply operation is being performed, and the time elapsed from the start of the bypass operation is the second bypass operation. 5. The hot water supply apparatus according to claim 1, wherein the bypass operation is restarted when the hot water supply operation is stopped before the operation time is reached. 6. 前記制御部は、前記混合弁から給湯先への給湯動作の実行中に前記給湯温度が目標値に等しくなったときの前記混合弁の開度を給湯時安定開度として記憶可能であり、
前記制御部は、前記出湯温度と前記第二温水の温度とに基づいて前記待機開度を調整した場合には、記憶された前記給湯時安定開度の情報を消去する請求項2に記載の貯湯式給湯装置。
The controller can store the opening degree of the mixing valve when the hot water temperature becomes equal to a target value during execution of the hot water supply operation from the mixing valve to the hot water supply destination as a hot water supply stable opening degree,
3. The control unit according to claim 2, wherein when the standby opening is adjusted based on the tapping temperature and the temperature of the second hot water, the control unit deletes the stored information on the hot water supply stable opening. Hot water storage device.
前記バイパス運転時間変更制御を実施するか実施しないかを使用者が選択可能とする選択手段を備える請求項1、請求項3、請求項4、及び請求項5のいずれか一項に記載の貯湯式給湯装置。   The hot water storage according to any one of claims 1, 3, 3, and 4, further comprising a selection unit that allows a user to select whether to perform the bypass operation time change control. Water heater. 前記混合弁開度変更制御を実施するか実施しないかを使用者が選択可能とする選択手段を備える請求項2または請求項6に記載の貯湯式給湯装置。   The hot water supply type hot water supply apparatus according to claim 2 or 6, further comprising a selection unit configured to allow a user to select whether to perform the mixing valve opening degree change control. 第一の運転モードと、前記第一の運転モードよりも省エネルギーを優先する第二の運転モードとに切り替え可能であり、
前記第二の運転モードが設定されている場合には、前記制御部は、前記バイパス運転時間変更制御を実施しない請求項1、請求項3、請求項4、請求項5、及び請求項7のいずれか一項に記載の貯湯式給湯装置。
It is possible to switch between a first operation mode and a second operation mode that prioritizes energy saving over the first operation mode,
When the second operation mode is set, the control unit does not perform the bypass operation time change control, and the control unit does not perform the bypass operation time change control according to any one of claims 1, 3, 4, 5, and 7. The hot-water storage type hot-water supply device according to any one of the preceding claims.
第一の運転モードと、前記第一の運転モードよりも省エネルギーを優先する第二の運転モードとに切り替え可能であり、
前記第二の運転モードが設定されている場合には、前記制御部は、前記混合弁開度変更制御を実施しない請求項2、請求項6、及び請求項8のいずれか一項に記載の貯湯式給湯装置。
It is possible to switch between a first operation mode and a second operation mode that prioritizes energy saving over the first operation mode,
The said control part does not perform the said mixing valve opening degree change control, when the said 2nd operation mode is set, The Claims any one of Claim 2, Claim 6, and Claim 8 characterized by the above-mentioned. Hot water storage device.
JP2018119282A 2018-06-22 2018-06-22 Hot water storage type hot water supply device Active JP6958492B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2018119282A JP6958492B2 (en) 2018-06-22 2018-06-22 Hot water storage type hot water supply device
JP2021131665A JP7151838B2 (en) 2018-06-22 2021-08-12 Storage hot water heater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018119282A JP6958492B2 (en) 2018-06-22 2018-06-22 Hot water storage type hot water supply device

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2021131665A Division JP7151838B2 (en) 2018-06-22 2021-08-12 Storage hot water heater

Publications (2)

Publication Number Publication Date
JP2019219156A true JP2019219156A (en) 2019-12-26
JP6958492B2 JP6958492B2 (en) 2021-11-02

Family

ID=69096272

Family Applications (2)

Application Number Title Priority Date Filing Date
JP2018119282A Active JP6958492B2 (en) 2018-06-22 2018-06-22 Hot water storage type hot water supply device
JP2021131665A Active JP7151838B2 (en) 2018-06-22 2021-08-12 Storage hot water heater

Family Applications After (1)

Application Number Title Priority Date Filing Date
JP2021131665A Active JP7151838B2 (en) 2018-06-22 2021-08-12 Storage hot water heater

Country Status (1)

Country Link
JP (2) JP6958492B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20220096599A (en) * 2020-12-31 2022-07-07 엘지전자 주식회사 An apparatus and method for controlling temperature of a heating device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009264617A (en) * 2008-04-23 2009-11-12 Corona Corp Heat pump water heater
JP2012225522A (en) * 2011-04-15 2012-11-15 Daikin Industries Ltd Hot water supply system
JP2012255587A (en) * 2011-06-08 2012-12-27 Mitsubishi Electric Corp Hot water storage type water heater
JP2013002765A (en) * 2011-06-20 2013-01-07 Mitsubishi Electric Corp Storage type water heater
JP2013002750A (en) * 2011-06-17 2013-01-07 Mitsubishi Electric Corp Hot water storage type water heater
JP2013245852A (en) * 2012-05-24 2013-12-09 Mitsubishi Electric Corp Storage water heater
JP2015155781A (en) * 2014-02-21 2015-08-27 パナソニックIpマネジメント株式会社 heat pump water heater
JP2016217545A (en) * 2015-05-14 2016-12-22 三菱電機株式会社 Hot water storage type heat pump water heater

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006266596A (en) 2005-03-24 2006-10-05 Matsushita Electric Ind Co Ltd Hot water storage type water heater
JP4678518B2 (en) 2006-01-24 2011-04-27 株式会社デンソー Hot water storage water heater
JP2016065685A (en) * 2014-09-25 2016-04-28 三菱電機株式会社 Hybrid hot water supply system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009264617A (en) * 2008-04-23 2009-11-12 Corona Corp Heat pump water heater
JP2012225522A (en) * 2011-04-15 2012-11-15 Daikin Industries Ltd Hot water supply system
JP2012255587A (en) * 2011-06-08 2012-12-27 Mitsubishi Electric Corp Hot water storage type water heater
JP2013002750A (en) * 2011-06-17 2013-01-07 Mitsubishi Electric Corp Hot water storage type water heater
JP2013002765A (en) * 2011-06-20 2013-01-07 Mitsubishi Electric Corp Storage type water heater
JP2013245852A (en) * 2012-05-24 2013-12-09 Mitsubishi Electric Corp Storage water heater
JP2015155781A (en) * 2014-02-21 2015-08-27 パナソニックIpマネジメント株式会社 heat pump water heater
JP2016217545A (en) * 2015-05-14 2016-12-22 三菱電機株式会社 Hot water storage type heat pump water heater

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20220096599A (en) * 2020-12-31 2022-07-07 엘지전자 주식회사 An apparatus and method for controlling temperature of a heating device
KR102614891B1 (en) * 2020-12-31 2023-12-15 엘지전자 주식회사 An apparatus and method for controlling temperature of a heating device

Also Published As

Publication number Publication date
JP6958492B2 (en) 2021-11-02
JP7151838B2 (en) 2022-10-12
JP2021175943A (en) 2021-11-04

Similar Documents

Publication Publication Date Title
JP2017190884A (en) Hot water storage type water heater system
JP6036563B2 (en) Hot water storage water heater
JP2009257618A (en) Heat pump type water heating system
JP6760250B2 (en) Hot water storage type hot water supply device
JP7151838B2 (en) Storage hot water heater
JP6683171B2 (en) Hot water storage system
JP7272303B2 (en) Storage hot water heater
JP6498133B2 (en) Hot water storage type water heater and hot water supply method with hot water storage type water heater
JP2013217575A (en) Heat pump water heater
JP6962140B2 (en) Hot water storage type hot water supply device
JP6286312B2 (en) Hot water storage system
JP7494752B2 (en) Hot water system
JP2019215158A (en) Heat pump type hot water supply device
JP2020125878A (en) Hot water storage type water heater
JP2019152353A (en) Water heater
JP5884645B2 (en) Hot water storage water heater
JP2015059668A (en) Hot water supply
JP7400662B2 (en) Hot water storage type water heater
JP7342643B2 (en) Hot water storage type water heater
JP2019113212A (en) Water heater
JP6939629B2 (en) Hot water storage type hot water supply device
JP2018017417A (en) Storage water heater
JP6616927B2 (en) Heat pump type water heater
JP2023127255A (en) Storage-type water heater
JP2023078464A (en) Storage type water heater

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200731

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210615

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210616

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210812

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20210907

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20210920

R150 Certificate of patent or registration of utility model

Ref document number: 6958492

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250