JP2019199706A - Manufacturing method of bag body for civil engineering, and manufacturing device of bag body for civil engineering - Google Patents

Manufacturing method of bag body for civil engineering, and manufacturing device of bag body for civil engineering Download PDF

Info

Publication number
JP2019199706A
JP2019199706A JP2018093421A JP2018093421A JP2019199706A JP 2019199706 A JP2019199706 A JP 2019199706A JP 2018093421 A JP2018093421 A JP 2018093421A JP 2018093421 A JP2018093421 A JP 2018093421A JP 2019199706 A JP2019199706 A JP 2019199706A
Authority
JP
Japan
Prior art keywords
civil engineering
engineering bag
filling material
suspension frame
bag body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2018093421A
Other languages
Japanese (ja)
Other versions
JP7086384B2 (en
Inventor
川 祐 介 石
Yusuke Ishikawa
川 祐 介 石
谷 勇 太 関
Yuta Sekiya
谷 勇 太 関
藤 正 規 佐
Masaki Sato
藤 正 規 佐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nakada Industrial Co Ltd
Original Assignee
Nakada Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nakada Industrial Co Ltd filed Critical Nakada Industrial Co Ltd
Priority to JP2018093421A priority Critical patent/JP7086384B2/en
Publication of JP2019199706A publication Critical patent/JP2019199706A/en
Application granted granted Critical
Publication of JP7086384B2 publication Critical patent/JP7086384B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

To provide a manufacturing method of a bag body for civil engineering and a manufacturing device of a bag body for civil engineering capable of simply and quickly manufacturing a bag body for civil engineering.SOLUTION: A manufacturing device T of a bag body for civil engineering comprises: a hanging frame 2 to which a bag body 1 for civil engineering is detachably attached; a cradle 3 on which the hanging frame 2 is mounted and supported in a state where the bag body 1 for civil engineering is attached; and a hopper 4 for feeding a filling material mounted on and supported on the hanging frame 2 and guiding a filling material 5. A feeding outlet 4A of the hopper 4 for feeding a filling material faces an opening 1A of the bag body 1 for civil engineering attached to the hanging frame 2. The hanging frame 2 and the hopper 4 for feeding a filling material are mounted respectively on the cradle 3 and the hanging frame 2 in a separable manner.SELECTED DRAWING: Figure 3

Description

本発明は、土木用袋体の製造方法及び土木用袋体の製造装置に係り、特に、土木用袋体を簡易且つ迅速に製造することができる土木用袋体の製造方法及び土木用袋体の製造装置に関する。     The present invention relates to a civil engineering bag manufacturing method and a civil engineering bag manufacturing apparatus, and more particularly to a civil engineering bag manufacturing method and civil engineering bag capable of easily and quickly manufacturing a civil engineering bag. It relates to a manufacturing apparatus.

本件出願人は、先に、砂地等の河川や海岸に付設させる堤体などの構造物の下方から砂等が吸い出されて該構造物が崩壊するのを防止する土木用包装体を出願した(例えば、特許文献1参照)。
これは、特許文献1の図2に示すように、立設した枠体(W)の中に土木用袋体袋体(1)を差し入れて固定し、各小部屋(3)内に充填材(4)を投入して、土木用袋体を製造していた。
土木用袋体が小さい場合は、それ程支障を生じない。
The present applicant has previously filed a civil engineering packaging body that prevents sand and other structures from being sucked out from the bottom of structures such as sandy rivers and dams attached to the coast. (For example, refer to Patent Document 1).
As shown in FIG. 2 of Patent Document 1, the civil engineering bag body (1) is inserted and fixed in a standing frame (W), and a filler is placed in each small chamber (3). (4) was introduced to manufacture civil engineering bags.
If the civil engineering bag is small, it will not cause much trouble.

特許第5035781号公報Japanese Patent No. 5035781

ところが、土木用袋体が大きくなると、土木用袋体袋体(1)を枠体(W)へ取り付けが困難な上、充填材(4)を充填した土木用袋体袋体(1)を枠体(W)からの離脱が難しいという問題点が生じた。     However, when the civil engineering bag becomes large, it is difficult to attach the civil engineering bag (1) to the frame (W), and the civil engineering bag (1) filled with the filler (4). There was a problem that it was difficult to leave the frame (W).

本発明は、上記問題点を考慮してなされた土木用袋体の製造方法及び土木用袋体の製造装置を提供することを目的とする。     An object of the present invention is to provide a method for manufacturing a civil engineering bag body and an apparatus for manufacturing a civil engineering bag body in consideration of the above problems.

請求項1記載の土木用袋体の製造方法は、土木用袋体の開口部が開いた状態で吊り枠に取り付け、前記土木用袋体を取り付けた状態で前記吊り枠を吊り上げて、前記吊り枠を架台に載置して支持し、支持後、前記開口部を介して中詰め材を前記土木用袋体内に投入するものである。     The civil engineering bag manufacturing method according to claim 1, wherein the civil engineering bag is attached to a suspension frame with the opening of the civil engineering bag open, the suspension frame is lifted with the civil engineering bag attached, and the suspension The frame is placed on and supported by the gantry, and after the support, the filling material is put into the civil engineering bag through the opening.

また、請求項2記載の土木用袋体の製造方法は、吊り枠を架台に載置して支持し、支持後、土木用袋体の開口部が開いた状態で前記吊り枠に取り付け、前記開口部を介して中詰め材を前記土木用袋体内に投入するものである。     Moreover, the manufacturing method of the civil engineering bag body of Claim 2 is mounted to the said hanging frame in the state which the opening part of the civil engineering bag body opened after supporting the suspension frame mounted on a mount frame, The filling material is thrown into the civil engineering bag through the opening.

また、請求項3記載の土木用袋体の製造方法は、請求項1又は請求項2記載の土木用袋体の製造方法において、中詰め材をガイドする中詰め材投入用ホッパーの出口が土木用袋体の開口部に臨むように中詰め材投入用ホッパーを架台に載置して支持し、前記中詰め材投入用ホッパーを介して前記中詰め材を前記土木用袋体内に投入し、投入後、前記中詰め材投入用ホッパーを前記架台から分離し、分離後、前記開口部を閉じ、その後、前記中詰め材が投入された前記土木用袋体を取り付けた前記吊り枠を前記架台から分離するものである。     The civil engineering bag manufacturing method according to claim 3 is the civil engineering bag manufacturing method according to claim 1 or 2, wherein the outlet of the filling material charging hopper for guiding the filling material is the civil engineering bag. A hopper for filling the filling material is placed on and supported by a stand so as to face the opening of the bag for filling, and the filling material is put into the civil engineering bag through the hopper for filling the filling material, After charging, the stuffing material charging hopper is separated from the gantry, and after the separation, the opening is closed, and then the suspension frame to which the civil engineering bag body into which the stuffing material is charged is attached is mounted on the gantry. Is to be separated from

また、請求項4記載の土木用袋体の製造装置は、土木用袋体を着脱自在に取り付ける吊り枠と、前記土木用袋体を取り付けた状態で前記吊り枠を載置して支持する架台と、前記吊り枠に載置して支持されると共に、中詰め材をガイドする中詰め材投入用ホッパーとを備え、前記吊り枠に取り付けられた前記土木用袋体の開口部に前記中詰め材投入用ホッパーの投入出口が臨み、前記架台に前記吊り枠が、前記吊り枠に前記中詰め材投入用ホッパーが、それぞれ分離可能に載置されているものである。     The civil engineering bag manufacturing apparatus according to claim 4 is a suspension frame to which the civil engineering bag is detachably attached, and a gantry on which the suspension frame is placed and supported with the civil engineering bag attached. And a stuffing material charging hopper that guides the stuffing material and is placed on and supported by the suspending frame, and the stuffing in the opening of the civil engineering bag attached to the suspending frame The material charging hopper faces the charging outlet, and the suspension frame is detachably mounted on the frame and the filling material charging hopper is detachably mounted on the suspension frame.

請求項1記載の土木用袋体の製造方法によれば、土木用袋体の開口部が開いた状態で吊り枠に取り付け、前記土木用袋体を取り付けた状態で前記吊り枠を吊り上げて、前記吊り枠を架台に載置して支持したため、土木用袋体を架台に簡易且つ迅速に支持し、開口部を介して中詰め材を土木用袋体内に投入して簡易且つ迅速に土木用袋体を製造することができる。     According to the method for manufacturing a civil engineering bag according to claim 1, the civil engineering bag is attached to a hanging frame with the opening of the civil engineering bag open, and the hanging frame is lifted with the civil engineering bag attached thereto, Since the suspension frame is placed on and supported by the gantry, the civil engineering bag body is simply and quickly supported by the gantry, and the filling material is put into the civil engineering bag body through the opening to easily and quickly A bag can be manufactured.

また、請求項2記載の土木用袋体の製造方法によれば、土木用袋体の開口部が開いた状態で吊り枠に取り付け、前記土木用袋体を取り付けた状態で前記吊り枠を吊り上げて、前記吊り枠を架台に載置して支持したため、土木用袋体を架台に支持した吊り枠に簡易且つ迅速に支持し、開口部を介して中詰め材を土木用袋体内に投入して簡易且つ迅速に土木用袋体を製造することができる。     According to the method for manufacturing a civil engineering bag according to claim 2, the civil engineering bag is attached to the suspension frame with the opening of the civil engineering bag open, and the suspension frame is lifted with the civil engineering bag attached. Since the suspension frame is placed on and supported by the gantry, the civil engineering bag is easily and quickly supported by the suspension frame supported by the gantry, and the filling material is put into the civil engineering bag through the opening. The civil engineering bag can be manufactured easily and quickly.

また、請求項3記載の土木用袋体の製造方法によれば、上述した請求項1又は請求項2記載の発明の効果に加え、中詰め材投入用ホッパーを用いた分、中詰め材を土木用袋体に効率良く導くことができ、しかも、中詰め材が投入された土木用袋体を架台から容易に分離して簡易且つ迅速に土木用袋体を製造することができる。     Moreover, according to the method for manufacturing a civil engineering bag according to claim 3, in addition to the effect of the invention according to claim 1 or claim 2 described above, the amount of the intermediate filling material is increased by using the filling material input hopper. The civil engineering bag body can be efficiently guided to the civil engineering bag body, and the civil engineering bag body into which the filling material is put can be easily separated from the mount and the civil engineering bag body can be manufactured easily and quickly.

また、請求項4記載の土木用袋体の製造装置によれば、架台に吊り枠が、吊り枠に中詰め材投入用ホッパーが、それぞれ分離可能に載置されているため、土木用袋体を取り付けた状態で前記吊り枠を吊り上げて、前記吊り枠を架台に載置し、載置後、中詰め材投入用ホッパーを介して中詰め材を前記土木用袋体内に投入できると共に、投入後、中詰め材が投入された土木用袋体を架台から容易に分離して簡易且つ迅速に土木用袋体を製造することができる。     According to the civil engineering bag manufacturing apparatus of claim 4, the suspension frame is placed on the gantry and the filling material input hopper is detachably mounted on the suspension frame. The suspension frame is lifted up with the attachment attached, and the suspension frame is placed on a gantry, and after placement, the filling material can be put into the civil engineering bag through the filling material filling hopper, and Then, the civil engineering bag body into which the filling material is put can be easily separated from the mount, and the civil engineering bag body can be manufactured easily and quickly.

図1は、本発明の一実施例の土木用袋体の製造装置の概略的構成図である。FIG. 1 is a schematic configuration diagram of a civil engineering bag manufacturing apparatus according to an embodiment of the present invention. 図2は、図1の土木用袋体に中詰め材が投入される状態を示す概略的図である。FIG. 2 is a schematic view showing a state in which the filling material is put into the civil engineering bag body of FIG. 1. 図3は、図2の概略的側断面図である。3 is a schematic cross-sectional side view of FIG. 図4(a)は、土木用袋体が吊り枠に取り付けられる前の状態の概略的図であり、図4(b)は、図4(a)の概略的正面図である。Fig.4 (a) is a schematic diagram of the state before the civil engineering bag body is attached to a hanging frame, and FIG.4 (b) is a schematic front view of Fig.4 (a). 図5(a)は、吊り枠に取り付けられた土木用袋体が架台に載置される前の状態の概略的図であり、図5(b)は、図5(a)の概略的正面図である。Fig.5 (a) is a schematic diagram of the state before the civil engineering bag body attached to the suspension frame is mounted in a mount frame, FIG.5 (b) is a schematic front view of Fig.5 (a). FIG. 図6(a)は、吊り枠に取り付けられた土木用袋体が架台に載置された状態の概略的図であり、図6(b)は、図6(a)の概略的正面図である。FIG. 6A is a schematic view of a state in which the civil engineering bag attached to the suspension frame is placed on the gantry, and FIG. 6B is a schematic front view of FIG. 6A. is there. 図7(a)は、中詰め材投入用ホッパーが吊り枠に載置された状態の概略的図であり、図7(b)は、図7(a)の概略的正面図である。Fig.7 (a) is a schematic diagram of the state in which the stuffing material injection | throwing-in hopper was mounted in the suspension frame, FIG.7 (b) is a schematic front view of Fig.7 (a). 図8(a)は、中詰め材が土木用袋体に投入される状態の概略的図であり、図8(b)は、図8(a)の概略的正面図である。Fig.8 (a) is a schematic diagram of the state in which the filling material is thrown into the civil engineering bag body, and FIG.8 (b) is a schematic front view of Fig.8 (a). 図9は、土木用袋体の開口部が閉じられた状態の概略的斜視図である。FIG. 9 is a schematic perspective view showing a state in which the opening of the civil engineering bag is closed. 図10は、吊り枠が架台から分離し、中詰め材充填入りの土木用袋体が取り付けられた吊り枠の移動中の概略的図である。FIG. 10 is a schematic view during movement of the suspension frame to which the suspension frame is separated from the gantry and the civil engineering bag filled with filling material is attached. 図11は、図10の中詰め材充填入りの土木用袋体が吊り枠から分離し、載置場所へ載置された状態の写真である。FIG. 11 is a photograph of a state in which the civil engineering bag body filled with the filling material in FIG. 10 is separated from the suspension frame and placed on the placement place. 図12は、土木用袋体の製造装置の概略的平面図である。FIG. 12 is a schematic plan view of a civil engineering bag manufacturing apparatus. 図13は、吊り枠に取り付けられた土木用袋体が架台に載置される前の状態の概略的図である。FIG. 13 is a schematic diagram of a state before the civil engineering bag attached to the suspension frame is placed on the gantry. 図14は、図13の吊り枠が架台に載置されると共に、中詰め材投入用ホッパーが吊り枠に載置された状態の概略的図である。FIG. 14 is a schematic view of the state in which the suspension frame of FIG. 13 is placed on the gantry and the filling material charging hopper is placed on the suspension frame. 図15は、図14の土木用袋体に中詰め材が投入される状態の概略的図である。FIG. 15 is a schematic view showing a state in which the filling material is put into the civil engineering bag body of FIG. 14. 図16は、図15の吊り枠が架台から分離し、中詰め材充填入りの土木用袋体が取り付けられた吊り枠の移動中の概略的図である。FIG. 16 is a schematic view of the suspension frame of FIG. 15 separated from the gantry and the suspension frame to which the civil engineering bag filled with filling material is attached is being moved. 図17は、土木用袋体が吊り枠に取り付けられた状態の写真である。FIG. 17 is a photograph of a state in which the civil engineering bag is attached to the suspension frame. 図18は、図17の土木用袋体の上方から撮った写真である。FIG. 18 is a photograph taken from above the civil engineering bag of FIG. 図19は、図17の土木用袋体が取り付けられた吊り枠が架台に載置される前の写真である。FIG. 19 is a photograph before the suspension frame attached with the civil engineering bag of FIG. 17 is placed on the gantry. 図20は、図19の土木用袋体が取り付けられた吊り枠が架台に載置された状態の写真である。FIG. 20 is a photograph of a state in which the suspension frame to which the civil engineering bag of FIG. 19 is attached is placed on the gantry. 図21は、図20の吊り枠に中詰め材投入用ホッパーが載置された状態の写真である。FIG. 21 is a photograph of the state in which the filling material feeding hopper is placed on the hanging frame of FIG. 20. 図22は、図21の中詰め材投入用ホッパーを介して中詰め材を土木用袋体に投入する状態の写真である。FIG. 22 is a photograph showing a state in which the filling material is put into the civil engineering bag through the filling material feeding hopper in FIG. 21. 図23は、図21を別の角度から撮った写真である。FIG. 23 is a photograph of FIG. 21 taken from a different angle. 図24は、土木用袋体の開口部を閉じた状態の写真である。FIG. 24 is a photograph showing a state in which the opening of the civil engineering bag is closed. 図25は、図21の吊り枠が架台から分離し、中詰め材充填入りの土木用袋体が取り付けられた吊り枠の移動中を撮った写真である。FIG. 25 is a photograph taken while the suspension frame shown in FIG. 21 is separated from the gantry and the suspension frame to which the civil engineering bag filled with filling material is attached is being moved. 図26は、吊り枠を斜め上方から撮った写真である。FIG. 26 is a photograph of the hanging frame taken from obliquely above.

本発明の一実施例の土木用袋体の製造方法及び土木用袋体の製造装置を図面(図1乃至図26)を参照して説明する。
図1に示すTは土木用袋体の製造装置で、土木用袋体の製造装置Tは、土木用袋体1を着脱自在に取り付ける吊り枠2と、土木用袋体1を取り付けた状態で吊り枠2を載置して支持する架台3と、吊り枠2に載置して支持されると共に、中詰め材5をガイドする中詰め材投入用ホッパー4とを備え、吊り枠2に取り付けられた土木用袋体1の開口部1A(図5参照)に中詰め材投入用ホッパー4の投入出口4A(図7参照)が臨み、架台3に吊り枠2が、吊り枠2に中詰め材投入用ホッパー4が、それぞれ分離可能に載置されている。
A civil engineering bag manufacturing method and a civil engineering bag manufacturing apparatus according to an embodiment of the present invention will be described with reference to the drawings (FIGS. 1 to 26).
T shown in FIG. 1 is a civil engineering bag manufacturing apparatus, and the civil engineering bag manufacturing apparatus T has a suspension frame 2 to which the civil engineering bag 1 is detachably attached and a civil engineering bag 1 attached. A gantry 3 for placing and supporting the hanging frame 2, and a stuffing material charging hopper 4 for guiding and filling the filling material 5 while being placed and supported by the hanging frame 2, are attached to the hanging frame 2. The opening 4A (see FIG. 7) of the stuffing material charging hopper 4 faces the opening 1A (see FIG. 5) of the civil engineering bag 1 so that the suspension frame 2 is placed on the gantry 3 and the suspension frame 2 is packed in the middle. The material charging hoppers 4 are detachably mounted.

吊り枠2は、土木用袋体1を取り付けるもので、例えば、図5及び図26に示すように、長方形状の枠体21が、側部にロープ取付部22が、枠体21の内方に形成された空間部23が、枠体21の下方に架台載置部24が、それぞれ設けられている。     The suspension frame 2 is for attaching the civil engineering bag 1. For example, as shown in FIGS. 5 and 26, a rectangular frame 21, a rope attachment part 22 on the side, and an inner side of the frame 21. The space 23 formed in the frame body 21 is provided with a gantry mounting portion 24 below the frame body 21.

架台3は、吊り枠2に取り付けられた土木用袋体1を受け入れるもので、例えば、図1に示すように、直方形の枠体の二つの脚体31、32を連結体33で連結し、中央部に土木用袋体1を受け入れる空間部34が形成されている。     The gantry 3 receives the civil engineering bag 1 attached to the suspension frame 2. For example, as shown in FIG. 1, two legs 31 and 32 of a rectangular frame are connected by a connecting body 33. A space 34 for receiving the civil engineering bag 1 is formed at the center.

中詰め材投入用ホッパー4は、投入された中詰め材5を土木用袋体1に案内するもので、例えば、図1に示すように、ホッパー本体41に取り付けられ、下方に中詰め材5を案内する下り勾配の第1のガイド部42、第1のガイド部42に接続され、中詰め材5を垂下する方向に案内する第2のガイド部43、第1のガイド部42と第2のガイド部43の接続部位の外側の屈曲する部位に設けられた載置部44が設けられている。     The stuffing material charging hopper 4 guides the inserted stuffing material 5 to the civil engineering bag 1, and is attached to the hopper body 41, for example, as shown in FIG. The first guide part 42 of the downward slope that guides the first guide part 42, the second guide part 43 that is connected to the first guide part 42 and guides the filling material 5 in the direction of hanging down, the first guide part 42 and the second guide part 42 A mounting portion 44 provided at a bending portion outside the connection portion of the guide portion 43 is provided.

中詰め材5を充填して製造された土木用袋体1は、例えば、人工リーフの下部、突堤・離岸堤の下部、護岸の根固め工等に使用されるものである。
また、中詰め材5は、例えば、砂利石、石材、玉石、割栗石、砕石、栗石、コンクリートガラ等である。
土木用袋体1の大きさは、例えば、縦 約2.0m、横 約10.0m、高さ 約0.25mの略直方体形状である。
土木用袋体1の材料は、例えば、ポリエステル繊維等である。
The civil engineering bag body 1 manufactured by filling the filling material 5 is used for, for example, a lower part of an artificial reef, a lower part of a jetty and a breakwater, a revetment rooting work, and the like.
Further, the filling material 5 is, for example, gravel stone, stone material, cobblestone, cracked stone, crushed stone, chestnut stone, concrete glass or the like.
The size of the civil engineering bag 1 is, for example, a substantially rectangular parallelepiped shape having a length of about 2.0 m, a width of about 10.0 m, and a height of about 0.25 m.
The material of the civil engineering bag 1 is, for example, polyester fiber.

このように、架台3に吊り枠2が、吊り枠2に中詰め材投入用ホッパー4が、それぞれ分離可能に載置されているため、土木用袋体1を取り付けた状態で吊り枠2を吊り上げて、吊り枠2を架台3に載置し、載置後、中詰め材投入用ホッパー4を介して中詰め材5を土木用袋体1内に投入できると共に、投入後、中詰め材5が投入された土木用袋体1を架台3から容易に分離して簡易且つ迅速に土木用袋体1を製造することができる。なお、中詰め材投入用ホッパー4は、必ずしも、必要ではない。     Thus, since the suspension frame 2 is mounted on the gantry 3 and the filling material input hopper 4 is mounted on the suspension frame 2 in a separable manner, the suspension frame 2 is mounted with the civil engineering bag 1 attached. It is lifted, the suspension frame 2 is placed on the gantry 3, and after placing, the filling material 5 can be put into the civil engineering bag 1 through the filling material feeding hopper 4, and after filling, the filling material is filled The civil engineering bag body 1 in which 5 is put can be easily separated from the gantry 3 and the civil engineering bag body 1 can be manufactured easily and quickly. The filling material charging hopper 4 is not always necessary.

次に、土木用袋体の製造方法について、説明する。
先ず、土木用袋体1の上部に設けられた開口部1Aが開いた状態で吊り枠2に取り付ける。取り付けは、例えば、土木用袋体1に取り付けたロープ11をロープ取付部22に取り付ける(図4、図5、図17及び図18)。ロープ11をロープ取付部22に取り付け、土木用袋体1が垂下した状態においては、開口部1Aは、開放している(図5参照)。
Next, the manufacturing method of the civil engineering bag will be described.
First, it attaches to the suspension frame 2 in the state which the opening part 1A provided in the upper part of the bag 1 for civil engineering opened. For example, the rope 11 attached to the civil engineering bag 1 is attached to the rope attaching portion 22 (FIGS. 4, 5, 17, and 18). In the state where the rope 11 is attached to the rope attachment portion 22 and the civil engineering bag 1 is suspended, the opening 1A is open (see FIG. 5).

土木用袋体1を取り付けた状態で吊り枠2を吊り上げる(図5、図13及び図19)。吊り上げは、例えば、クレーン6により行う。
吊り上げられた吊り枠2は、架台3に載置して支持される(図2、図6及び図20)。支持後、開口部1Aを介して中詰め材5を土木用袋体1内に投入する。投入は、例えば、バックホウ7により行う。
投入後、土木用袋体1内の中詰め材5が所定量に達すると、開口部1Aを閉じる。
開口部1Aの閉じは、例えば、土木用袋体1に取り付けられた口縛りロープ12(図24)により行う。この実施例においては、中詰め材投入用ホッパー4を用いないが、後述するが、望ましくは、中詰め材5を土木用袋体1内に投入する際、中詰め材投入用ホッパー4を用いるのが良い。
The suspension frame 2 is lifted with the civil engineering bag 1 attached (FIGS. 5, 13, and 19). The lifting is performed by, for example, the crane 6.
The suspended suspension frame 2 is placed on and supported by the gantry 3 (FIGS. 2, 6, and 20). After the support, the filling material 5 is put into the civil engineering bag 1 through the opening 1A. The charging is performed by, for example, the backhoe 7.
When the filling material 5 in the civil engineering bag body 1 reaches a predetermined amount after the introduction, the opening 1A is closed.
The opening 1A is closed by, for example, a tying rope 12 (FIG. 24) attached to the civil engineering bag 1. In this embodiment, the filling material charging hopper 4 is not used, but as will be described later, it is desirable to use the filling material charging hopper 4 when charging the filling material 5 into the civil engineering bag body 1. Is good.

従って、上述した土木用袋体の製造方法によれば、土木用袋体1の開口部1Aが開いた状態で吊り枠2に取り付け(図18)、土木用袋体1を取り付けた状態で吊り枠2を吊り上げて、吊り枠2を架台3に載置して支持したため、土木用袋体1を架台3に簡易且つ迅速に載置して支持し、開口部1Aを介して中詰め材5を土木用袋体1内に投入して簡易且つ迅速に土木用袋体1を製造することができる。     Therefore, according to the civil engineering bag manufacturing method described above, the civil engineering bag 1 is attached to the suspension frame 2 with the opening 1A open (FIG. 18), and the civil engineering bag 1 is suspended. Since the frame 2 is lifted and the suspension frame 2 is placed on and supported by the gantry 3, the civil engineering bag body 1 is simply and quickly placed and supported on the gantry 3, and the filling material 5 is provided through the opening 1 </ b> A. The civil engineering bag 1 can be manufactured simply and quickly by putting the above into the civil engineering bag 1.

次に、中詰め材投入用ホッパー4を用いて、中詰め材5を土木用袋体1内に投入する場合について、説明する。
土木用袋体1を取り付けた状態で吊り枠2を吊り上げて、吊り枠2を架台3に載置して支持するまでは、上述した実施例と同様であるため、説明を省略する。
吊り枠2を架台3に載置した後、中詰め材5をガイドする中詰め材投入用ホッパー4の投入出口4Aが土木用袋体1の開口部1Aに臨むように中詰め材投入用ホッパー4を架台3に載置して支持する(図7及び図21)。中詰め材投入用ホッパー4の架台3への載置は、例えば、クレーン6により行う。
Next, a case where the filling material 5 is put into the civil engineering bag body 1 using the filling material charging hopper 4 will be described.
Since it is the same as that of the Example mentioned above until it lifts the suspension frame 2 in the state which attached the bag 1 for civil engineering, and mounts and supports the suspension frame 2 on the mount frame 3, description is abbreviate | omitted.
After placing the suspension frame 2 on the gantry 3, the filling material charging hopper is arranged so that the charging outlet 4 </ b> A of the filling material charging hopper 4 that guides the filling material 5 faces the opening 1 </ b> A of the civil engineering bag body 1. 4 is placed on and supported by the gantry 3 (FIGS. 7 and 21). For example, the crane 6 is used to place the filling material charging hopper 4 on the gantry 3.

中詰め材投入用ホッパー4を架台3への載置後、中詰め材投入用ホッパー4を介して中詰め材5を土木用袋体1内に投入する(図2、図3、図8、図15及び図22)。
投入後、土木用袋体1内の中詰め材5が所定量に達すると、中詰め材投入用ホッパー4を架台3から分離する(図10、図16)。分離は、例えば、クレーン6により行う。
分離後、開口部1Aを閉じる(図9及び図24)。開口部1Aの閉じは、上述の実施例と同様、例えば、土木用袋体1に取り付けられた口縛りロープ12により行う。
After the stuffing material charging hopper 4 is placed on the gantry 3, the stuffing material 5 is loaded into the civil engineering bag 1 through the stuffing material charging hopper 4 (FIGS. 2, 3, and 8). 15 and 22).
When the filling material 5 in the civil engineering bag 1 reaches a predetermined amount after the charging, the filling material charging hopper 4 is separated from the gantry 3 (FIGS. 10 and 16). Separation is performed by, for example, the crane 6.
After the separation, the opening 1A is closed (FIGS. 9 and 24). The opening 1A is closed by, for example, a tying rope 12 attached to the civil engineering bag 1 in the same manner as in the above-described embodiment.

開口部1Aを閉じた後、中詰め材5が投入された土木用袋体1を取り付けた吊り枠2を載置場所8(例えば、図8参照)に移動し、移動後、吊り枠2から土木用袋体1を分離する。なお、載置場所8は、施工場所、施工場所に設置する前の仮置き場等である。     After closing the opening 1A, the suspension frame 2 to which the civil engineering bag body 1 filled with the filling material 5 is attached is moved to the placement place 8 (for example, see FIG. 8). The civil engineering bag 1 is separated. The placement place 8 is a construction place, a temporary place before installation at the construction place, or the like.

従って、上述した土木用袋体の製造方法によれば、中詰め材投入用ホッパー4を用いた分、中詰め材5を土木用袋体1に効率良く導くことができ、しかも、中詰め材5が投入された土木用袋体1を架台3から容易に分離して簡易且つ迅速に土木用袋体1を製造することができる。     Therefore, according to the above-described method for manufacturing a civil engineering bag body, the intermediate packing material 5 can be efficiently guided to the civil engineering bag body 1 by the amount using the filling material input hopper 4, and the intermediate packing material The civil engineering bag body 1 in which 5 is put can be easily separated from the gantry 3 and the civil engineering bag body 1 can be manufactured easily and quickly.

上述した実施例の土木用袋体の製造方法においては、土木用袋体1の開口部1Aが開いた状態で吊り枠2に取り付け、土木用袋体1を取り付けた状態で吊り枠2を吊り上げて、吊り枠2を架台3に載置して支持し、支持後、開口部1Aを介して中詰め材5を土木用袋体1内に投入するようにしたが、本願発明は、これに限らず、土木用袋体の製造方法においては、吊り枠2を架台3に載置して支持し、支持後、土木用袋体1の開口部1Aが開いた状態で吊り枠2に取り付け、開口部1Aを介して中詰め材5を土木用袋体1内に投入するようにしても良い。
この土木用袋体の製造方法によれば、土木用袋体1を架台3に支持した吊り枠2に簡易且つ迅速に支持し、開口部1Aを介して中詰め材5を土木用袋体1内に投入して簡易且つ迅速に土木用袋体1を製造することができる。
In the civil engineering bag manufacturing method of the embodiment described above, the civil engineering bag 1 is attached to the suspension frame 2 with the opening 1A opened, and the suspension frame 2 is lifted with the civil engineering bag 1 attached. The suspension frame 2 is placed on and supported by the gantry 3 and, after the support, the filling material 5 is introduced into the civil engineering bag body 1 through the opening 1A. Not limited to this, in the civil engineering bag manufacturing method, the suspension frame 2 is placed and supported on the gantry 3, and after the support, the suspension frame 2 is attached to the suspension frame 2 with the opening 1A of the civil engineering bag 1 open. The filling material 5 may be put into the civil engineering bag 1 through the opening 1A.
According to this civil engineering bag manufacturing method, the civil engineering bag 1 is simply and quickly supported by the suspension frame 2 supported by the gantry 3, and the filling material 5 is placed through the opening 1A. It is possible to manufacture the civil engineering bag 1 simply and quickly by putting it inside.

T 土木用袋体の製造装置
1 土木用袋体
1A 開口部
2 吊り枠
3 架台
4 中詰め材投入用ホッパー
4A 投入出口
5 中詰め材
T Production Equipment for Civil Engineering Bags 1 Civil Engineering Bags 1A Openings 2 Hanging Frames 3 Bases 4 Filling Hopper 4A Filling Exit 5 Filling Materials

本件出願人は、先に、砂地等の河川や海岸に付設させる堤体などの構造物の下方から砂等が吸い出されて該構造物が崩壊するのを防止する土木用包装体を出願した(例えば、特許文献1参照)。
これは、特許文献1の図2に示すように、立設した枠体(W)の中に土木用袋(1)を差し入れて固定し、各小部屋(3)内に充填材(4)を投入して、土木用袋体を製造していた。
土木用袋体が小さい場合は、それ程支障を生じない。
The present applicant has previously filed a civil engineering packaging body that prevents sand and other structures from being sucked out from the bottom of structures such as sandy rivers and dams attached to the coast. (For example, refer to Patent Document 1).
This is because, as shown in FIG. 2 of Patent Document 1, and fixed pledged civil engineering bag (1) in the upright and the frame (W), each cubicle (3) filler in the (4 ) To manufacture civil engineering bags.
If the civil engineering bag is small, it will not cause much trouble.

ところが、土木用袋体が大きくなると、土木用袋(1)を枠体(W)へ取り付けが困難な上、充填材(4)を充填した土木用袋(1)を枠体(W)からの離脱が難しいという問題点が生じた。
However, when the civil engineering bag increases, civil engineering bag (1) on the mounting is difficult to frame (W), civil engineering bag filled filler (4) (1) frame (W ) Was difficult to leave.

Claims (4)

土木用袋体の開口部が開いた状態で吊り枠に取り付け、
前記土木用袋体を取り付けた状態で前記吊り枠を吊り上げて、前記吊り枠を架台に載置して支持し、支持後、前記開口部を介して中詰め材を前記土木用袋体内に投入する
ことを特徴とする土木用袋体の製造方法。
Attach to the hanging frame with the opening of the civil engineering bag open,
The suspension frame is lifted with the civil engineering bag attached, and the suspension frame is placed on and supported by a gantry. After the support, the filling material is put into the civil engineering bag through the opening. A method for producing a civil engineering pouch.
吊り枠を架台に載置して支持し、支持後、土木用袋体の開口部が開いた状態で前記吊り枠に取り付け、前記開口部を介して中詰め材を前記土木用袋体内に投入する
ことを特徴とする土木用袋体の製造方法。
The suspension frame is placed on and supported by the gantry, and after the support, it is attached to the suspension frame with the opening of the civil engineering bag open, and the filling material is put into the civil engineering bag through the opening. A method for producing a civil engineering pouch.
中詰め材をガイドする中詰め材投入用ホッパーの出口が土木用袋体の開口部に臨むように中詰め材投入用ホッパーを架台に載置して支持し、前記中詰め材投入用ホッパーを介して前記中詰め材を前記土木用袋体内に投入し、投入後、前記中詰め材投入用ホッパーを前記架台から分離し、分離後、前記開口部を閉じ、その後、前記中詰め材が投入された前記土木用袋体を取り付けた前記吊り枠を前記架台から分離する
ことを特徴とする請求項1又は請求項2記載の土木用袋体の製造方法。
The stuffing material charging hopper is placed on and supported by the gantry so that the outlet of the stuffing material charging hopper for guiding the filling material faces the opening of the civil engineering bag body. Through which the filling material is put into the civil engineering bag body, and after filling, the filling material feeding hopper is separated from the mount, and after the separation, the opening is closed, and then the filling material is charged. The method for manufacturing a civil engineering bag according to claim 1 or 2, wherein the suspension frame to which the civil engineering bag is attached is separated from the frame.
土木用袋体を着脱自在に取り付ける吊り枠と、
前記土木用袋体を取り付けた状態で前記吊り枠を載置して支持する架台と、
前記吊り枠に載置して支持されると共に、中詰め材をガイドする中詰め材投入用ホッパーとを備え、
前記吊り枠に取り付けられた前記土木用袋体の開口部に前記中詰め材投入用ホッパーの投入出口が臨み、
前記架台に前記吊り枠が、前記吊り枠に前記中詰め材投入用ホッパーが、それぞれ分離可能に載置されている
ことを特徴とする土木用袋体の製造装置。
A suspension frame for detachably attaching a civil engineering bag,
A stand for mounting and supporting the suspension frame with the civil engineering bag attached thereto;
A hopper for filling the filling material that guides the filling material and is supported by being mounted on the hanging frame,
The opening of the stuffing material charging hopper faces the opening of the civil engineering bag attached to the hanging frame,
The civil engineering bag manufacturing apparatus, wherein the suspension frame is detachably mounted on the gantry and the filling material charging hopper is detachably mounted on the suspension frame.
JP2018093421A 2018-05-15 2018-05-15 How to manufacture a bag for civil engineering Active JP7086384B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018093421A JP7086384B2 (en) 2018-05-15 2018-05-15 How to manufacture a bag for civil engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018093421A JP7086384B2 (en) 2018-05-15 2018-05-15 How to manufacture a bag for civil engineering

Publications (2)

Publication Number Publication Date
JP2019199706A true JP2019199706A (en) 2019-11-21
JP7086384B2 JP7086384B2 (en) 2022-06-20

Family

ID=68611879

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018093421A Active JP7086384B2 (en) 2018-05-15 2018-05-15 How to manufacture a bag for civil engineering

Country Status (1)

Country Link
JP (1) JP7086384B2 (en)

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09151434A (en) * 1995-11-24 1997-06-10 Tootetsu:Kk Deformation preventing frame for square gabion and installation method for the gabion
JPH1018262A (en) * 1996-06-27 1998-01-20 Tsunehiro Yasui Manufacturing device of sandbag
JPH10252035A (en) * 1997-03-13 1998-09-22 Yasukuni Yasui Bagged quantity adjusting device for bagged machine
JP2000192437A (en) * 1998-12-24 2000-07-11 Nippon Gyabion Kk Stone-filling work for hexagonal net gabion, and conveying method
JP2000318701A (en) * 1999-05-11 2000-11-21 Nisshoku Corp And apparatus for manufacturing flexible revetment material
JP2001348011A (en) * 2000-06-07 2001-12-18 Kake Kiko:Kk Granule packing device, and sandbag installing method
JP2003074061A (en) * 2001-09-06 2003-03-12 Kinuzo Fujishima Earth retaining sandbag and retaining wall construction method by this sandbag
JP2003342931A (en) * 2002-05-29 2003-12-03 Tokyu Constr Co Ltd Sandbag production device
JP2006315722A (en) * 2005-05-12 2006-11-24 Toshiro Matsumura Filler introduction apparatus
JP2007315142A (en) * 2006-05-29 2007-12-06 Setouchi Wire Netting Industry Co Ltd Suspension device for stone-filled basket
JP2008274698A (en) * 2007-05-02 2008-11-13 Kyowa Co Ltd Bag body manufacturing frame and bag body manufacturing method
US20120230766A1 (en) * 2011-02-01 2012-09-13 Schnaars Sr Daniel R Flood wall protection system
JP2014088186A (en) * 2012-10-29 2014-05-15 Yoshinori Okitsu Stand device for bagging work of material bag
EP2783992A1 (en) * 2013-03-28 2014-10-01 Tideway B.V. Device and method for filling a flexible bag with material, and device and method for depositing the filled bag on the bottom of a water mass
JP3195164U (en) * 2014-10-10 2015-01-08 日本植生株式会社 Green sandbag
JP2015232265A (en) * 2014-05-12 2015-12-24 日本植生株式会社 Greening bag for sandbag, forming method of greening sandbag using the same, and method for earth retaining and greening

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09151434A (en) * 1995-11-24 1997-06-10 Tootetsu:Kk Deformation preventing frame for square gabion and installation method for the gabion
JPH1018262A (en) * 1996-06-27 1998-01-20 Tsunehiro Yasui Manufacturing device of sandbag
JPH10252035A (en) * 1997-03-13 1998-09-22 Yasukuni Yasui Bagged quantity adjusting device for bagged machine
JP2000192437A (en) * 1998-12-24 2000-07-11 Nippon Gyabion Kk Stone-filling work for hexagonal net gabion, and conveying method
JP2000318701A (en) * 1999-05-11 2000-11-21 Nisshoku Corp And apparatus for manufacturing flexible revetment material
JP2001348011A (en) * 2000-06-07 2001-12-18 Kake Kiko:Kk Granule packing device, and sandbag installing method
JP2003074061A (en) * 2001-09-06 2003-03-12 Kinuzo Fujishima Earth retaining sandbag and retaining wall construction method by this sandbag
JP2003342931A (en) * 2002-05-29 2003-12-03 Tokyu Constr Co Ltd Sandbag production device
JP2006315722A (en) * 2005-05-12 2006-11-24 Toshiro Matsumura Filler introduction apparatus
JP2007315142A (en) * 2006-05-29 2007-12-06 Setouchi Wire Netting Industry Co Ltd Suspension device for stone-filled basket
JP2008274698A (en) * 2007-05-02 2008-11-13 Kyowa Co Ltd Bag body manufacturing frame and bag body manufacturing method
US20120230766A1 (en) * 2011-02-01 2012-09-13 Schnaars Sr Daniel R Flood wall protection system
JP2014088186A (en) * 2012-10-29 2014-05-15 Yoshinori Okitsu Stand device for bagging work of material bag
EP2783992A1 (en) * 2013-03-28 2014-10-01 Tideway B.V. Device and method for filling a flexible bag with material, and device and method for depositing the filled bag on the bottom of a water mass
JP2015232265A (en) * 2014-05-12 2015-12-24 日本植生株式会社 Greening bag for sandbag, forming method of greening sandbag using the same, and method for earth retaining and greening
JP3195164U (en) * 2014-10-10 2015-01-08 日本植生株式会社 Green sandbag

Also Published As

Publication number Publication date
JP7086384B2 (en) 2022-06-20

Similar Documents

Publication Publication Date Title
JP2019199706A (en) Manufacturing method of bag body for civil engineering, and manufacturing device of bag body for civil engineering
JP2689002B2 (en) Method for compacting and leveling mound of seabed by sand pile construction ship
JP6074535B1 (en) Large sandbag for waterworks
CN112644746A (en) Mechanized sand bag automatic filling machine equipment
JP2006315722A (en) Filler introduction apparatus
JP4989266B2 (en) Embankment construction apparatus and embankment construction method
CN209907952U (en) Concrete blanking funnel device
JPH07109718A (en) Installation method of gabion filled with stone
JP2005120754A (en) Sandbag and method for filling it with fill material
KR102203188B1 (en) Frame apparatus for making soil back
JP5259686B2 (en) Cylindrical formwork for bag bodies for bagging cobblestones
JP4148737B2 (en) Installation method to the bottom of the bag body filled with earth and sand or a mixture of earth and sand and solidification material
JPS5934604Y2 (en) Sand supply device to net bag for sand pile
ITTO20090282A1 (en) FEEDING DEVICE FOR INERT MATERIALS IN SOIL VIBRATION COMPACTION SYSTEMS.
JP3122664U (en) Sandbag making equipment
JP2003074061A (en) Earth retaining sandbag and retaining wall construction method by this sandbag
JP2014181979A (en) Suspension/storage tool for radioactive contaminant solidified body
JPH04222772A (en) Placing device of steel pipe concrete column and placing method thereof
CN219884140U (en) Temporary cofferdam geotechnical bagged sand dustproof device
JP2016125218A (en) Long-sandbag manufacturing equipment, manufacturing method and long sandbag
EP3816066B1 (en) Bag material and crushed stone placement method using bag material
CN109035998A (en) A kind of apparatus for demonstrating of effective stress varying effect
JP2891663B2 (en) Ground improvement equipment
CN217174592U (en) Special bent for construction of net-mould pebble rows
CN209508991U (en) A kind of magazine attachment for underwater embedding rock steel sheet-pile cofferdam closed concrete

Legal Events

Date Code Title Description
A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180524

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210325

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20220128

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220222

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220411

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220517

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220601

R150 Certificate of patent or registration of utility model

Ref document number: 7086384

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150