JP2019190021A - Shutter curtain installation device of shutter device and its installation method - Google Patents

Shutter curtain installation device of shutter device and its installation method Download PDF

Info

Publication number
JP2019190021A
JP2019190021A JP2018080297A JP2018080297A JP2019190021A JP 2019190021 A JP2019190021 A JP 2019190021A JP 2018080297 A JP2018080297 A JP 2018080297A JP 2018080297 A JP2018080297 A JP 2018080297A JP 2019190021 A JP2019190021 A JP 2019190021A
Authority
JP
Japan
Prior art keywords
shutter curtain
shutter
winding shaft
lifting
shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2018080297A
Other languages
Japanese (ja)
Other versions
JP7041579B2 (en
Inventor
小林 正典
Masanori Kobayashi
正典 小林
隆行 前田
Takayuki Maeda
隆行 前田
山上 重雄
Shigeo Yamagami
重雄 山上
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bunka Shutter Co Ltd
Original Assignee
Bunka Shutter Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bunka Shutter Co Ltd filed Critical Bunka Shutter Co Ltd
Priority to JP2018080297A priority Critical patent/JP7041579B2/en
Publication of JP2019190021A publication Critical patent/JP2019190021A/en
Priority to JP2021201384A priority patent/JP7262561B2/en
Application granted granted Critical
Publication of JP7041579B2 publication Critical patent/JP7041579B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Operating, Guiding And Securing Of Roll- Type Closing Members (AREA)

Abstract

To provide a shutter curtain installation device of a shutter device and its installation method, which enable speedy and easy formation of the shutter device on an installation site of a shutter curtain with its upper end connected to a winding shaft for wind-up.SOLUTION: In order to perform a work of connecting an upper end of a shutter curtain 1 which opens/closes an opening of a structure to a winding shaft 4 for winding the shutter curtain 1 in a free unwinding state, an attachment bed 40 to be set at a fork 61 of a forklift vehicle is configured as a pull-up device. The pull-up device has a wire 51 serving as a pull-up member which pulls up the upper end of the shutter curtain 1 formed preliminarily in a size to open/close the whole or almost the whole of the opening, to the same or almost the same height as the winding shaft 4 so as to connect the upper end to the winding shaft 4.SELECTED DRAWING: Figure 24

Description

本発明は、シャッター装置のシャッターカーテンの上端を、シャッターカーテンを繰り出し自在に巻き取るための巻取軸に結合するためのシャッターカーテン施工装置及びその施工方法に係り、例えば、出入口用シャッター装置や窓用シャッター装置等の各種用途のシャッター装置に利用できるものである。   The present invention relates to a shutter curtain construction device and a construction method thereof for connecting the upper end of a shutter curtain of a shutter device to a winding shaft for winding the shutter curtain so as to be freely retractable. The present invention can be used for a shutter device for various purposes such as a camera shutter device.

下記の特許文献1に示されているように、構造物に形成されている開口部を開閉するシャッター装置のシャッターカーテンの上端は、このシャッターカーテンを繰り出し自在に巻き取るための巻取軸に結合されており、これにより、巻取軸の正逆回転によってシャッターカーテンが開口部において上下移動して開口部を開閉する。   As shown in Patent Document 1 below, the upper end of a shutter curtain of a shutter device that opens and closes an opening formed in a structure is coupled to a take-up shaft for taking up the shutter curtain freely. Thus, the shutter curtain moves up and down in the opening by the forward and reverse rotation of the winding shaft, thereby opening and closing the opening.

従来において、上端が巻取軸に結合されたシャッターカーテンを形成するために、座板等を除くシャッターカーテンの全部又は略全部が多数のスラットの連設で形成されていて、それぞれのスラットが、これらのスラットの上下両端部に形成されたカール部同士の係合で連結されているスラット式シャッター装置では、シャッター装置の設置現場において、長さ方向の両端部がブラケットで受けられた巻取軸に最上段のスラットを結合した後に、この最上段のスラットに最上段から2番目のスラットを、横方向からのスライド作業によりカール部同士を係合させることで連結し、次いで、最上段から2番目のスラットに最上段から3番目のスラットを、横方向からのスライド作業によりカール部同士を係合させて連結することを行い、これ以後、同様の作業を繰り返している。   Conventionally, in order to form a shutter curtain whose upper end is coupled to a winding shaft, all or substantially all of the shutter curtain except for a seat plate or the like is formed by connecting a plurality of slats, and each slat is In the slat type shutter device that is connected by the engagement between the curl portions formed at the upper and lower ends of these slats, the winding shaft whose both ends in the length direction are received by brackets at the installation site of the shutter device After the uppermost slat is coupled to the uppermost slat, the second slat from the uppermost slat is connected to the uppermost slat by engaging the curled portions with each other by sliding operation from the lateral direction. The third slat from the top is connected to the second slat by engaging the curls with each other by sliding operation from the lateral direction. , And repeat the same work.

特開2015−31021号公報JP2015-31021A

以上の作業によると、上側のスラットに下側のスラットを連結するために、シャッター装置の設置現場において、それぞれのスラットについて横方向からのスライド作業を行わなければならないため、上端が巻取軸に結合されてこの巻取軸に巻き取り可能となっているシャッターカーテンを形成するために多くの手間と時間がかかる。   According to the above work, in order to connect the lower slat to the upper slat, it is necessary to perform a sliding operation from the lateral direction for each slat at the installation site of the shutter device. It takes a lot of labor and time to form a shutter curtain that is coupled and can be wound around the winding shaft.

本発明の目的は、上端が巻取軸に結合されてこの巻取軸に巻き取り可能となっているシャッターカーテンを、シャッター装置の設置現場において短時間で容易に形成することができるようになるシャッター装置のシャッターカーテン施工装置及びその施工方法を提供するところにある。   It is an object of the present invention to form a shutter curtain whose upper end is coupled to a winding shaft and can be wound around the winding shaft in a short time at the installation site of the shutter device. A shutter curtain construction device for a shutter device and a construction method thereof are provided.

本発明に係るシャッター装置のシャッターカーテン施工装置は、構造物に形成されている開口部を開閉するシャッター装置のシャッターカーテンの上端を、このシャッターカーテンを繰り出し自在に巻き取るための巻取軸に結合するために用いるシャッター装置のシャッターカーテン施工装置であって、前記開口部の全部又は略全部を開閉する大きさに形成されている前記シャッターカーテンの前記上端を、前記巻取軸が配置されている高さ位置と同じ又は略同じ高さ位置まで引き上げて、前記上端を前記巻取軸に結合可能とするための引き上げ部材を備えている引き上げ装置を含んで構成されていることを特徴とするものである。   The shutter curtain construction device of the shutter device according to the present invention is configured such that the upper end of the shutter curtain of the shutter device that opens and closes the opening formed in the structure is coupled to a winding shaft for winding the shutter curtain freely. A shutter curtain construction device for a shutter device used to perform the above operation, wherein the winding shaft is arranged on the upper end of the shutter curtain formed to open and close all or almost all of the opening. It is configured to include a lifting device provided with a lifting member for pulling up to a height position that is the same as or substantially the same as the height position and allowing the upper end to be coupled to the winding shaft. It is.

このように本発明に係るシャッター装置のシャッターカーテン施工装置は、開口部の全部又は略全部を開閉する大きさに形成されているシャッターカーテンの上端を、巻取軸が配置されている高さ位置と同じ又は略同じ高さ位置まで引き上げて、シャッターカーテンの上端を巻取軸に結合可能とするための引き上げ部材を備えている引き上げ装置を含んで構成されたものになっているため、シャッターカーテンの上端が巻取軸に結合される以前に、シャッターカーテンは開口部の全部又は略全部を開閉する大きさに予め形成されており、このため、引き上げ装置の引き上げ部材により、シャッターカーテンの上端を、巻取軸が配置されている高さ位置と同じ又は略同じ高さ位置まで引き上げることにより、シャッターカーテンの上端を巻取軸に結合することができ、これにより、上端が巻取軸に結合されてこの巻取軸に巻き取り可能となっているシャッターカーテンを、シャッター装置の設置現場において短時間で容易に形成することができるようになる。   Thus, the shutter curtain construction device of the shutter device according to the present invention is configured such that the upper end of the shutter curtain that is formed in a size that opens and closes all or almost all of the opening is positioned at the height position where the winding shaft is disposed. The shutter curtain is configured to include a lifting device that includes a lifting member that can be pulled up to the same or substantially the same height as that of the shutter curtain so that the upper end of the shutter curtain can be coupled to the winding shaft. Before the upper end of the shutter is coupled to the take-up shaft, the shutter curtain is preliminarily formed in a size that opens or closes all or almost all of the opening, and therefore the upper end of the shutter curtain is moved by the lifting member of the lifting device. The upper end of the shutter curtain is pulled up to the same height as the position where the take-up shaft is located. Thus, a shutter curtain whose upper end is coupled to the winding shaft and can be wound around the winding shaft can be easily formed in a short time at the installation site of the shutter device. It becomes like this.

以上のシャッター装置のシャッターカーテン施工装置において、巻取軸に繰り出し自在に巻き取られるシャッターカーテンは、展開された状態となっているときに上端が巻取軸に結合されてもよいが、引き揚げ装置に、渦巻き状に巻回されているシャッターカーテンを載置するための載置部材を設け、この載置部材に渦巻き状に巻回されて載置されているシャッターカーテンの上端を引き上げ装置の引き上げ部材により、巻取軸が配置されている高さ位置と同じ又は略同じ高さ位置まで引き上げるようにしてもよい。   In the shutter curtain construction apparatus of the shutter device described above, the shutter curtain that is retractably wound around the winding shaft may be coupled to the winding shaft when the shutter curtain is unfolded. A mounting member for mounting the shutter curtain wound in a spiral shape is provided, and the upper end of the shutter curtain wound in a spiral shape on the mounting member is lifted up by the lifting device The member may be pulled up to a height position that is the same as or substantially the same as the height position where the winding shaft is disposed.

これによると、シャッターカーテンの上端を引き上げ装置の引き上げ部材により巻取軸が配置されている高さ位置と同じ又は略同じ高さ位置まで引き上げるための作業を、引き上げ装置に設けられている載置部材にシャッターカーテンが渦巻き状に巻回されて載置されてときに行うことができるため、渦巻き状に巻回されているシャッターカーテンを解きながら、シャッターカーテンの上端を引き上げる作業を行え、これにより、シャッターカーテンの上端の引き上げ作業を円滑に実施することができる。   According to this, the work for raising the upper end of the shutter curtain to a height position that is the same as or substantially the same as the height position at which the take-up shaft is arranged by the lifting member of the lifting device is mounted on the lifting device. Since the shutter curtain is wound around and placed on a member, it can be done when the shutter curtain is wound in a spiral, and the upper end of the shutter curtain can be lifted up. The upper end of the shutter curtain can be smoothly pulled up.

なお、渦巻き状に巻回されているシャッターカーテンを載置するために引き上げ装置に設けられる前記載置部材は、回転しない部材でもよいが、回転自在な回転部材とすることが好ましい。   The mounting member provided in the lifting device for mounting the shutter curtain wound in a spiral shape may be a non-rotating member, but is preferably a rotatable rotating member.

後者のように、渦巻き状に巻回されているシャッターカーテンを載置するために引き上げ装置に設けられる載置部材を回転自在な回転部材とすると、上述のように、渦巻き状に巻回されているシャッターカーテンを解きながら、シャッターカーテンの上端を引き上げる際に、載置部材が回転するため、渦巻き状に巻回されているシャッターカーテンを円滑に解くことができ、これにより、シャッターカーテンの上端の引き上げ作業も一層円滑に実施することができるようになる。   As in the latter case, if the mounting member provided in the pulling device for mounting the shutter curtain wound in a spiral shape is a rotatable rotating member, it is wound in a spiral shape as described above. When the upper end of the shutter curtain is lifted while unfastening the shutter curtain, the mounting member rotates, so that the shutter curtain wound in a spiral shape can be unraveled smoothly. The lifting operation can be performed more smoothly.

以上の本発明に係るシャッター装置のシャッターカーテン施工装置において、シャッターカーテンの上端を巻取軸が配置されている高さ位置と同じ又は略同じ高さ位置まで引き上げるための引き上げ部材は、任意の部材でよく、例えば、シャッターカーテンの上方から吊り下げられたワイヤー等の紐状部材でもよく、シリンダ等の上下移動するロッドによるもの等でもよい。   In the shutter curtain construction apparatus of the shutter device according to the present invention as described above, the lifting member for pulling up the upper end of the shutter curtain to the same or substantially the same height position as the winding shaft is an arbitrary member. For example, it may be a string-like member such as a wire suspended from above the shutter curtain, or may be a rod or the like that moves up and down such as a cylinder.

また、引き上げ部材の下端に、シャッターカーテンの上端を引っ掛けるためのフック部材を設け、このフック部材に引っ掛けられたシャッターカーテンの上端を、引き上げ部材の引き上げ作用により、巻取軸が配置されている高さ位置と同じ又は略同じ高さ位置まで引き上げるようにしてもよい。   In addition, a hook member for hooking the upper end of the shutter curtain is provided at the lower end of the lifting member, and the upper end of the shutter curtain hooked on the hook member is placed at a height where the take-up shaft is arranged by the lifting action of the lifting member. You may make it pull up to the height position which is the same or substantially the same as the height position.

また、このように引き上げ部材の下端に、シャッターカーテンの上端を引っ掛けるためのフック部材を設ける場合であって、シャッターカーテンの上端に、巻取軸にボルトで結合される吊元部材が設けられ、この吊元部材にボルトを挿入するための孔が形成されている場合には、この孔にフック部材を挿入することにより、シャッターカーテンの上端にフック部材を引っ掛けることができるようにしてもよい。   Further, in this way, when the hook member for hooking the upper end of the shutter curtain is provided at the lower end of the lifting member, a suspension member that is coupled to the winding shaft by a bolt is provided at the upper end of the shutter curtain, When a hole for inserting a bolt is formed in the suspension member, the hook member may be hooked on the upper end of the shutter curtain by inserting the hook member into the hole.

これによると、シャッターカーテンの上端に設けられている吊元部材の孔を利用して、引き上げ部材のフック部材をシャッターカーテンの上端に引っ掛けることができる。   According to this, the hook member of the lifting member can be hooked on the upper end of the shutter curtain using the hole of the suspension member provided at the upper end of the shutter curtain.

また、本発明に係るシャッター装置のシャッターカーテン施工装置を、前記引き上げ装置を持ち上げるためのリフト装置を含んで構成されたものとし、このリフト装置により持ち上げられた引き上げ装置の引き上げ部材により、シャッターカーテンの上端が、巻取軸が配置されている高さ位置と同じ又は略同じ高さ位置まで引き上げられるようにしてもよい。   Further, the shutter curtain construction device of the shutter device according to the present invention is configured to include a lift device for lifting the lifting device, and the lifting member of the lifting device lifted by the lifting device can The upper end may be pulled up to the same or substantially the same height position as the winding shaft is disposed.

これによると、引き上げ装置及びシャッターカーテンの全体をリフト装置により巻取軸が配置されている高さ位置に近い位置まで持ち上げた後に、シャッターカーテンの上端を引き上げ装置の引き上げ部材により、巻取軸が配置されている高さ位置と同じ又は略同じ高さ位置まで引き上げる作業を行うことができるため、シャッターカーテンの上端を巻取軸に結合するための作業を、作業効率を向上させて実施することができる。   According to this, after the lifting device and the shutter curtain as a whole are lifted to a position close to the height position where the winding shaft is arranged, the upper end of the shutter curtain is lifted by the lifting member of the lifting device. Since it is possible to perform the work of pulling up to the same or substantially the same height position as the arranged height position, the work for connecting the upper end of the shutter curtain to the take-up shaft is performed with improved work efficiency. Can do.

本発明に係るシャッター装置のシャッターカーテン施工方法は、構造物に形成されている開口部を開閉するシャッター装置のシャッターカーテンの上端を、このシャッターカーテンを繰り出し自在に巻き取るための巻取軸に結合するために実施するシャッター装置のシャッターカーテン施工方法であって、前記シャッターカーテンを、前記開口部の全部又は略全部を開閉可能とする大きさにして形成するための第1作業工程と、前記シャッターカーテンの前記上端を、前記巻取軸が配置されている高さ位置と同じ又は略同じ高さ位置まで引き上げるための第2作業工程と、前記シャッターカーテンの前記上端を前記巻取軸に結合するための第3作業工程と、を含んでいることを特徴とするものである。   The shutter curtain construction method of the shutter device according to the present invention is such that the upper end of the shutter curtain of the shutter device that opens and closes the opening formed in the structure is coupled to a winding shaft for winding the shutter curtain freely. A shutter curtain construction method for a shutter device to be performed, wherein the shutter curtain is formed to have a size that allows all or substantially all of the opening to be opened and closed, and the shutter A second operation step for raising the upper end of the curtain to a height position that is the same as or substantially the same as the height position where the winding shaft is disposed; and coupling the upper end of the shutter curtain to the winding shaft. And a third work process for the purpose.

このシャッター装置のシャッターカーテン施工方法では、第1作業工程において、シャッターカーテンが構造物に形成されている開口部の全部又は略全部を開閉可能とする大きさとなって形成され、第2作業工程において、シャッターカーテンの上端が、巻取軸が配置されている高さ位置と同じ又は略同じ高さ位置まで引き上げられ、第3作業工程において、シャッターカーテンの上端が巻取軸に結合されるため、シャッターカーテンの上端が巻取軸に結合される以前に、シャッターカーテンは開口部の全部又は略全部を開閉する大きさに予め形成されていることになり、このため、シャッターカーテンの上端を、巻取軸が配置されている高さ位置と同じ又は略同じ高さ位置まで引き上げて、この上端を巻取軸に結合することにより、上端が巻取軸に結合されてこの巻取軸に巻き取り可能となっているシャッターカーテンを、シャッター装置の設置現場において短時間で容易に形成することができるようになる。   In the shutter curtain construction method of the shutter device, in the first work process, the shutter curtain is formed to have a size that can open and close all or substantially all of the openings formed in the structure. In the second work process, The upper end of the shutter curtain is pulled up to the same or substantially the same height position where the winding shaft is disposed, and the upper end of the shutter curtain is coupled to the winding shaft in the third work step. Before the upper end of the shutter curtain is coupled to the winding shaft, the shutter curtain is preliminarily formed to have a size that opens or closes all or almost all of the opening. By pulling up to the same or almost the same height position where the take-up shaft is located and connecting this upper end to the take-up shaft, the upper end is Is coupled to shaft shutter curtain has a rollable on the winding shaft, it is possible to easily formed in a short time at the installation site of the shutter device.

なお、このシャッター装置のシャッターカーテン施工方法において、前記第1作業工程と前記第2作業工程との間において、渦巻き状に巻回されているシャッターカーテンを持ち上げるための作業工程を実施してもよい。   In the shutter curtain construction method of the shutter device, a work process for lifting the shutter curtain wound in a spiral shape may be performed between the first work process and the second work process. .

これによると、構造物に形成されている開口部の全部又は略全部を開閉可能とする大きさとなって形成されているシャッターカーテンを渦巻き状に巻回した後に、このシャッターカーテンは、巻取軸が配置されている高さ位置に近い位置まで持ち上げられることになり、次いで、シャッターカーテンの上端が、巻取軸が配置されている高さ位置と同じ又は略同じ高さ位置まで引き上げられて巻取軸に結合されるため、シャッターカーテンの上端を巻取軸に結合するための作業を、作業効率を向上させて実施することができる。   According to this, after the shutter curtain formed in a size that can open and close all or substantially all of the openings formed in the structure is wound in a spiral shape, the shutter curtain The upper end of the shutter curtain is then lifted up to the same or substantially the same height position as the winding shaft. Since it is coupled to the take-up shaft, the work for joining the upper end of the shutter curtain to the take-up shaft can be performed with improved work efficiency.

以上説明した本発明に係るシャッター装置のシャッターカーテン施工装置及びその方法は、任意の部材で形成されたシャッターカーテンに適用することができ、すなわち、シャッターカーテンの全体又は略全体は、スラットで形成されていてもよく、あるいは、パネルで形成されていてもよく、あるいは、左右方向が長さ方向となっていて、リンクで連結されたパイプで形成されていてもよく、あるいは、シートで形成されていてもよく、あるいは、スラットとパネルのように異種の部材の組み合せにより形成されていてもよい。   The shutter curtain construction apparatus and method of the shutter device according to the present invention described above can be applied to a shutter curtain formed of an arbitrary member, that is, the entire shutter curtain or substantially the entire shutter curtain is formed of slats. It may be formed by a panel, or it may be formed by a pipe connected by a link with the left-right direction being the length direction, or formed by a sheet. Alternatively, it may be formed by a combination of different members such as a slat and a panel.

また、本発明に係るシャッター装置のシャッターカーテン施工装置及びその方法は、各種用途で使用されるシャッター装置に適用することができ、すなわち、出入口用シャッター装置にも適用でき、また、窓用シャッター装置にも適用でき、防災用シャッター装置にも適用できる。   In addition, the shutter curtain construction apparatus and method of the shutter device according to the present invention can be applied to a shutter device used in various applications, that is, can be applied to an entrance / exit shutter device, and a window shutter device. It can also be applied to a shutter device for disaster prevention.

本発明によると、上端が巻取軸に結合されてこの巻取軸に巻き取り可能となっているシャッターカーテンを、シャッター装置の設置現場において短時間で容易に形成できるようになるという効果を得られる。   According to the present invention, it is possible to easily form a shutter curtain whose upper end is coupled to a winding shaft and can be wound around the winding shaft at a site where the shutter device is installed. It is done.

図1は、本発明の一実施形態に係る装置及び方法が適用される建材で構成されたシャッター装置の全体を示す正面図である。FIG. 1 is a front view showing the entirety of a shutter device composed of building materials to which an apparatus and method according to an embodiment of the present invention are applied. 図2は、シャッター装置のための建材となっている巻取軸の軸方向の両端部を、シャッター装置が設置される構造物の高所に2個配設されているブラケットにより受けさせたときの状態を示す正面図である。FIG. 2 shows the case where both ends in the axial direction of the winding shaft, which is a building material for the shutter device, are received by two brackets arranged at the height of the structure where the shutter device is installed. It is a front view which shows the state. 図3は、巻取軸等を載置して搬送するための搬送台車の側面図である。FIG. 3 is a side view of a transport carriage for placing and transporting a winding shaft and the like. 図4は、搬送台車の正面図である。FIG. 4 is a front view of the transport carriage. 図5は、搬送台車の平面図である。FIG. 5 is a plan view of the transport carriage. 図6は、フォークリフト車両のフォークにセットされるアタッチメント台の側面図である。FIG. 6 is a side view of the attachment base set on the fork of the forklift vehicle. 図7は、アタッチメント台の正面図である。FIG. 7 is a front view of the attachment table. 図8は、アタッチメント台の平面図である。FIG. 8 is a plan view of the attachment table. 図9は、搬送台車とアタッチメント台とフォークリフト車両をシャッター装置の設置現場に配置したときを示す側面図である。FIG. 9 is a side view showing a state in which the transport carriage, the attachment base, and the forklift vehicle are arranged at the installation site of the shutter device. 図10は、アタッチメント台がフォークリフト車両のフォークにセットされたときを示す側面図である。FIG. 10 is a side view showing when the attachment base is set on the fork of the forklift vehicle. 図11は、図10のときの平面図である。FIG. 11 is a plan view of FIG. 図12は、フォークリフト車両のフォークの前方延出部が内部に挿入されているアタッチメント台の筒部材が、抜け出し阻止手段により前方へ抜け出すことが阻止されていることを示す拡大図であって、(A)は、平面図であり、(B)は、側面図である。FIG. 12 is an enlarged view showing that the cylinder member of the attachment base into which the front extension portion of the fork of the forklift vehicle is inserted is prevented from being pulled out forward by the pull-out preventing means. (A) is a plan view and (B) is a side view. 図13は、巻取軸を搬送台車からアタッチメント台に受け渡すときにおける搬送台車とアタッチメント台の位置関係を示す側面図である。FIG. 13 is a side view showing the positional relationship between the transport carriage and the attachment base when the winding shaft is transferred from the transport carriage to the attachment base. 図14は、図13のS14−S14線断面図である。14 is a cross-sectional view taken along line S14-S14 in FIG. 図15は、フォークリフト車両のフォークの上昇により巻取軸が搬送台車からアタッチメント台に受け渡された後を示す側面図である。FIG. 15 is a side view showing the state after the take-up shaft is transferred from the transport carriage to the attachment base due to the rise of the fork of the forklift vehicle. 図16は、アタッチメント台の巻取軸がフォークリフト車両によりシャッター装置の設置現場に搬送されたときを示す正面図であって、フォークリフト車両を二点鎖線で示した図である。FIG. 16 is a front view showing when the take-up shaft of the attachment base is conveyed to the installation site of the shutter device by the forklift vehicle, and shows the forklift vehicle with a two-dot chain line. 図17は、フォークリフト車両を省略して示す図16のときの側面図である。FIG. 17 is a side view of FIG. 16 with the forklift vehicle omitted. 図18は、フォークリフト車両を省略して示す図16のときの背面図である。18 is a rear view of FIG. 16 with the forklift vehicle omitted. 図19は、アタッチメント台の巻取軸が、この巻取軸の軸方向の両端部を受けるための2個のブラケットが配設されている高さ位置まで持ち上げられときを示す正面図であって、フォークリフト車両を二点鎖線で示した図である。FIG. 19 is a front view showing when the winding shaft of the attachment base is lifted to a height position where two brackets for receiving both ends of the winding shaft in the axial direction are disposed. It is the figure which showed the forklift vehicle with the dashed-two dotted line. 図20は、フォークリフト車両を省略して示す図19のときの側面図である。20 is a side view of FIG. 19 with the forklift vehicle omitted. 図21は、フォークリフト車両を省略して示す図19のときの背面図である。FIG. 21 is a rear view of FIG. 19 with the forklift vehicle omitted. 図22は、渦巻き状に巻回されたシャッターカーテンを搬送台車からアタッチメント台に受け渡すときにおける搬送台車とアタッチメント台の位置関係を示す側面図である。FIG. 22 is a side view showing a positional relationship between the transport carriage and the attachment base when the shutter curtain wound in a spiral shape is transferred from the transport carriage to the attachment base. 図23は、フォークリフト車両のフォークの上昇によりシャッターカーテンが搬送台車からアタッチメント台に受け渡された後を示す側面図である。FIG. 23 is a side view showing the state after the shutter curtain is transferred from the transport carriage to the attachment base by the lift of the fork of the forklift vehicle. 図24は、アタッチメント台のシャッターカーテンの上端を巻取軸が配置されている高さ位置まで引き上げたときを、フォークリフト車両を省略して示した側面図である。FIG. 24 is a side view in which the forklift vehicle is omitted when the upper end of the shutter curtain of the attachment base is pulled up to the height position where the winding shaft is disposed. 図25は、図24のときを、フォークリフト車両を省略して示した背面図である。FIG. 25 is a rear view showing the state of FIG. 24 with the forklift vehicle omitted. 図26は、シャッターカーテンの上端を巻取軸に結合したときを示す図24と同様の図である。FIG. 26 is a view similar to FIG. 24, showing a state where the upper end of the shutter curtain is coupled to the winding shaft. 図27は、巻取軸の回転によりアタッチメント台のシャッターカーテンが巻取軸に巻き取られているときを示す図24と同様の図である。FIG. 27 is a view similar to FIG. 24 illustrating the case where the shutter curtain of the attachment base is wound around the winding shaft by the rotation of the winding shaft. 図28は、アタッチメント台に、巻取軸とシャッターカーテンとの結合体を載置した実施形態を示す図9と同様の図である。FIG. 28 is a view similar to FIG. 9 showing an embodiment in which a combined body of a take-up shaft and a shutter curtain is placed on an attachment base. 図29は、図28の実施形態における図15及び図23と同様の図である。29 is a view similar to FIGS. 15 and 23 in the embodiment of FIG. 図30は、図28の実施形態における図18と同様の図である。30 is a view similar to FIG. 18 in the embodiment of FIG. 図31は、アタッチメント台の巻取軸とシャッターカーテンとの結合体を持ち上げるための別実施形態に係る作業を示す側面図である。FIG. 31 is a side view showing an operation according to another embodiment for lifting a combined body of the winding shaft of the attachment base and the shutter curtain.

以下に本発明を実施するための形態を図面に基づいて説明する。図1には、本発明に係る装置が適用される建材を用いて組み立てられたシャッター装置の全体正面図が示されている。構造物である建物に設置されるこのシャッター装置は、建物に形成された開口部となっている出入口10を上下方向に開閉するシャッターカーテン1と、このシャッターカーテン1の上下移動を案内するために、建物の不動部材となっている柱等の躯体7に取り付けられ、シャッターカーテン1の幅方向の両端部が上下にスライド自在に挿入された左右2個のガイドレール2と、出入口10の上側に建物の不動部材となって設けられている壁等の躯体8に取り付けられた左右2個のブラケット3と、これらのブラケット3により軸方向の両端部が受けられている巻取軸4と、2個のブラケット3に水平に架け渡されている巻取軸4に上端が結合されたシャッターカーテン1を巻取軸4で巻き取り、巻取軸4から繰り出すために、2個のブラケット3のうちの一方に取り付けられ、巻取軸4を正逆回転させるための電動モータとブレーキの組み合せからなる開閉機5と、この開閉機5の駆動力を巻取軸4に伝達するためのスプロケットホイールやチェーンによる駆動力伝達装置6とを含んで構成されており、躯体8には、巻取軸4を内部に収納するシャッターケース9が取り付けられている。   EMBODIMENT OF THE INVENTION Below, the form for implementing this invention is demonstrated based on drawing. FIG. 1 is an overall front view of a shutter device assembled using a building material to which the device according to the present invention is applied. This shutter device installed in a building, which is a structure, includes a shutter curtain 1 that opens and closes an entrance 10 that is an opening formed in the building in the up and down direction, and guides the vertical movement of the shutter curtain 1. The left and right guide rails 2 are attached to a frame 7 such as a pillar, which is a stationary member of the building, and both end portions in the width direction of the shutter curtain 1 are slidably inserted in the vertical direction. Two left and right brackets 3 attached to a housing 8 such as a wall provided as a stationary member of the building, a winding shaft 4 having both axial ends received by these brackets 3, and 2 In order to wind up the shutter curtain 1 whose upper end is coupled to the winding shaft 4 horizontally spanned by the individual brackets 3 with the winding shaft 4 and to feed out the shutter curtain 1, two brackets are used. An opening / closing machine 5 which is attached to one of the belts 3 and is a combination of an electric motor and a brake for rotating the winding shaft 4 forward and backward, and for transmitting the driving force of the opening / closing machine 5 to the winding shaft 4. A sprocket wheel and a driving force transmission device 6 using a chain are included, and a shutter case 9 that houses the winding shaft 4 is attached to the housing 8.

2個のブラケット3で軸方向の両端部が受けられている巻取軸4が開閉機5の駆動力で正逆回転することにより、上端が巻取軸4に結合されているシャッターカーテン1は、出入口10において、ガイドレール2に案内されながら上下に移動して出入口10を開閉し、シャッターカーテン1が全閉となったときには、シャッターカーテン1の下端を形成している座板1Aは床11に達する。また、シャッターカーテン1が全開となったときには、座板1Aは、シャッターカーテン1を上下に挿通させるためのスリットが形成されているシャッターケース9の下面9Aに達し、これにより、シャッターカーテン1は、出入口10の全体又は略全体を開放する。このため、シャッターカーテン1により出入口10の全部又は略全部が開閉される。   The shutter curtain 1 whose upper end is coupled to the winding shaft 4 is obtained by rotating the winding shaft 4 whose both ends in the axial direction are received by the two brackets 3 by forward and reverse rotation by the driving force of the switch 5. The door 10 is moved up and down while being guided by the guide rail 2 at the doorway 10 to open and close the doorway 10 and when the shutter curtain 1 is fully closed, the seat plate 1A forming the lower end of the shutter curtain 1 is the floor 11. To reach. Further, when the shutter curtain 1 is fully opened, the seat plate 1A reaches the lower surface 9A of the shutter case 9 in which a slit for allowing the shutter curtain 1 to be inserted up and down is formed. The whole or substantially the entire entrance / exit 10 is opened. For this reason, all or substantially all of the entrance / exit 10 is opened and closed by the shutter curtain 1.

なお、巻取軸4に結合されているシャッターカーテン1の上端は、図24及び図25で示されている吊元部材1Bにより形成されており、この吊元部材1Bと、シャッターカーテン1の下端を形成している座板1Aとを除くシャッターカーテン1の全部又は大部分は、図1に示されているように、上下に多数連設されたスラット1Cにより形成されており、それぞれのスラット1Cの上下端部に設けられているカール部同士が回動自在に係合していることにより、スラット1C同士が連結されている。   Note that the upper end of the shutter curtain 1 coupled to the winding shaft 4 is formed by a suspension member 1B shown in FIGS. 24 and 25. The suspension member 1B and the lower end of the shutter curtain 1 are formed. As shown in FIG. 1, all or most of the shutter curtain 1 except for the seat plate 1A forming the slats 1C is formed by a plurality of slats 1C arranged in series up and down. The slats 1 </ b> C are connected to each other because the curl portions provided at the upper and lower ends of the slats are rotatably engaged with each other.

このシャッター装置では、シャッターカーテン1や巻取軸4は、建物に設置されるシャッター装置を構成するための部材となっているため、これらのシャッターカーテン1や巻取軸4は、本実施形態に係るシャッター装置のための建材となっている。なお、後述する本発明の一実施形態に係る装置及び方法は、開閉機5によりシャッターカーテン1が開閉移動する自動式シャッター装置のためのシャッターカーテン1と巻取軸4はもちろんのこと、手動操作によりシャッターカーテンが開閉移動する手動式シャッター装置のためのシャッターカーテンと巻取軸にも適用できる。   In this shutter device, since the shutter curtain 1 and the winding shaft 4 are members for constituting the shutter device installed in the building, the shutter curtain 1 and the winding shaft 4 are provided in this embodiment. It is a building material for such a shutter device. The apparatus and method according to an embodiment of the present invention, which will be described later, are not limited to the shutter curtain 1 and the winding shaft 4 for an automatic shutter device in which the shutter curtain 1 is opened and closed by the opening / closing device 5, as well as manual operation. Therefore, the present invention can also be applied to a shutter curtain and a winding shaft for a manual shutter device in which the shutter curtain moves open and close.

図2には、図1で示した巻取軸4を、この巻取軸4の軸方向の間隔をあけて躯体8に取り付けられている2個のブラケット3によって受けさせた作業が終了したときの状態が示されており、そして、図2で示されている状態では、巻取軸4へのシャッターカーテン1の上端の結合作業がまだ行われておらず、また、躯体7へのガイドレール2の取付作業及び躯体8へのシャッターケース9の取付作業等もまだ行われていない。   In FIG. 2, when the work of receiving the take-up shaft 4 shown in FIG. 1 by the two brackets 3 attached to the housing 8 with an interval in the axial direction of the take-up shaft 4 is completed. 2, and in the state shown in FIG. 2, the upper end of the shutter curtain 1 is not yet connected to the winding shaft 4, and the guide rail to the housing 7 is not yet performed. 2 and the mounting operation of the shutter case 9 to the housing 8 have not been performed yet.

なお、図2に示されているように、巻取軸4の軸方向の両端部は細径の首部4Aとなっており、これらの首部4Aが、それぞれのブラケット3に前方に向かって開口形成されている凹部3A(図17等も参照)に挿入されることにより、巻取軸4の軸方向の両端部は2個のブラケット3により受けられることになる。また、それぞれの首部4Aには図2の軸受部材12が回転自在に配置されており、これらの軸受部材12がビス等でブラケット3に結合されることにより、巻取軸4は、ブラケット3に軸受部材12を介して回転自在に支持されることになる。   As shown in FIG. 2, both end portions of the winding shaft 4 in the axial direction are narrow neck portions 4 </ b> A, and these neck portions 4 </ b> A form openings in the respective brackets 3 toward the front. By being inserted into the recessed portion 3A (see also FIG. 17 and the like), both end portions in the axial direction of the winding shaft 4 are received by the two brackets 3. Further, bearing members 12 shown in FIG. 2 are rotatably arranged on the respective neck portions 4A. When these bearing members 12 are coupled to the bracket 3 with screws or the like, the winding shaft 4 is attached to the bracket 3. The bearing member 12 is rotatably supported.

シャッターカーテン1と巻取軸4は予め工場で製造される。図3〜図5には、工場で予め製造されたシャッターカーテン1と巻取軸4とが載置され、これらのシャッターカーテン1と巻取軸4を工場やシャッター装置の設置現場等で搬送するために用いられる搬送台車20が示されており、図3は側面図、図4は正面図、図5は平面図である。なお、この搬送台車20に載置されるときのシャッターカーテン1は渦巻き状に巻回されていて、出入口10の全部又は略全部を開閉できる大きさを有するものとなっている。   The shutter curtain 1 and the winding shaft 4 are manufactured in advance at the factory. 3 to 5, a shutter curtain 1 and a winding shaft 4 manufactured in advance at a factory are placed, and the shutter curtain 1 and the winding shaft 4 are transported at a factory, a site where a shutter device is installed, or the like. FIG. 3 is a side view, FIG. 4 is a front view, and FIG. 5 is a plan view. In addition, the shutter curtain 1 when mounted on the transport carriage 20 is wound in a spiral shape, and has a size capable of opening and closing all or substantially all of the entrance / exit 10.

図4及び図5に示されているように、搬送台車20は、シャッターカーテン1の幅方向である左右方向に配置された2個のベース部材21を備えたものとなっており、図1の出入口10を閉じているときのシャッターカーテン1の厚さ方向となっている前後方向へ長さを有するこれらのベース部材21の前後両端部の下面には、図3のキャスタによる走行輪22がキャスタブラケット22Aにより回転自在に取り付けられている。図3に示されているように、それぞれのベース部材21の下面には、走行輪22同士の間において、下方への寸法を有する中間部材23が結合され、図4に示されているように、これらの中間部材23は、棒状の連結部材24により連結されている。図3及び図5に示されているように、前後方向に2本設けられているこれらの連結部材24は、図3で示されているクランプ25で中間部材23に結合され、それぞれのクランプ25は、一方が中間部材23の下面にビス等で止着された2個の挟着部材26,27と、これらの挟着部材26,27の一方の端部同士を回動自在に連結するピン28と、挟着部材26の他方の端部に軸方向の端部が回動自在に連結されていて、挟着部材27の他方に形成されているU字溝に挿入係合されるボルト軸29と、U字溝から突出したボルト軸29の端部に螺合されているナット30とを有するものとなっている。   As shown in FIGS. 4 and 5, the transport carriage 20 includes two base members 21 arranged in the left-right direction that is the width direction of the shutter curtain 1. 3 on the lower surfaces of both front and rear end portions of the base member 21 having a length in the front-rear direction which is the thickness direction of the shutter curtain 1 when the doorway 10 is closed. The bracket 22A is rotatably attached. As shown in FIG. 3, an intermediate member 23 having a downward dimension is coupled to the lower surface of each base member 21 between the traveling wheels 22, as shown in FIG. These intermediate members 23 are connected by a rod-like connecting member 24. As shown in FIGS. 3 and 5, these two connecting members 24 provided in the front-rear direction are coupled to the intermediate member 23 by the clamps 25 shown in FIG. Are two pinching members 26, 27, one of which is fixed to the lower surface of the intermediate member 23 with screws or the like, and a pin that rotatably connects one end of the pinching members 26, 27. 28 and the other end of the sandwiching member 26, the axial end thereof is rotatably connected, and the bolt shaft is inserted and engaged in a U-shaped groove formed on the other end of the sandwiching member 27. 29 and a nut 30 screwed into the end of the bolt shaft 29 protruding from the U-shaped groove.

このため、ナット30を締め付けることにより、クランプ25は2個の挟着部材26,27により連結部材24を挟着するため、連結部材24は中間部材23を介してベース部材21に結合される。また、ナット30を緩めることにより、クランプ25は連結部材24の挟着を解除することになり、これにより、2個のベース部材21の間隔を、巻取軸4の長さ方向となっていて、連結部材24の長さ方向となっている左右方向に変更、調整することができる。   For this reason, by tightening the nut 30, the clamp 25 clamps the connecting member 24 by the two clamping members 26 and 27, so that the connecting member 24 is coupled to the base member 21 via the intermediate member 23. In addition, by loosening the nut 30, the clamp 25 releases the clamping of the connecting member 24, so that the interval between the two base members 21 is in the length direction of the winding shaft 4. The connecting member 24 can be changed and adjusted in the left-right direction which is the length direction of the connecting member 24.

図3に示されているように、それぞれのベース部材21の上面には、巻取軸4を載置するための一対の第1載置部材31と、前述したように渦巻き状に巻回されているシャッターカーテン1を載置するための一対の第2載置部材32とが、前後方向に離れて配置されている。前後方向に一対をなして離間配置されている第1載置部材31の上面31Aは、互いに近づく方向に下り傾斜した傾斜面となっており、これらの第1載置部材31よりも大きな間隔をもって前後方向に一対をなして離間配置されている第2載置部材32の上面32Aも、互いに近づく方向に下り傾斜した傾斜面となっている。これにより、一対の第1載置部材31に巻取軸4を安定して載置できるとともに、一対の第2載置部材32にもシャッターカーテン1を安定して載置できるようになっている。   As shown in FIG. 3, a pair of first mounting members 31 for mounting the winding shaft 4 and a spiral shape are wound on the upper surface of each base member 21 as described above. A pair of second mounting members 32 for mounting the shutter curtain 1 is disposed away from each other in the front-rear direction. The upper surface 31A of the first mounting member 31 that is spaced apart in a pair in the front-rear direction is an inclined surface that is inclined downward in a direction approaching each other, and has a larger interval than these first mounting members 31. The upper surface 32A of the second mounting member 32 that is spaced apart in a pair in the front-rear direction is also an inclined surface that is inclined downward in a direction approaching each other. Thus, the winding shaft 4 can be stably placed on the pair of first placement members 31 and the shutter curtain 1 can be stably placed on the pair of second placement members 32. .

本実施形態では、図3に示されているように、ベース部材21における上面の前後方向において、一対の第1載置部材31は後側に配置され、一対の第2載置部材32は前側に配置されている。また、図4に示されているように、第2載置部材32に渦巻き状に巻回されて載置されているシャッターカーテン1の下端部1Dは、第1載置部材31に載置されている巻取軸4の下端部4Bよりも下側に達している。   In the present embodiment, as shown in FIG. 3, in the front-rear direction of the upper surface of the base member 21, the pair of first mounting members 31 are disposed on the rear side, and the pair of second mounting members 32 are on the front side. Are arranged. As shown in FIG. 4, the lower end 1 </ b> D of the shutter curtain 1 that is wound around and placed on the second placement member 32 is placed on the first placement member 31. The lower end part 4B of the winding shaft 4 is reached below.

また、第1載置部材31と第2載置部材32は、図5に示されているように、連結部材24の長さ方向である左右方向に2個配置されているベース部材21のそれぞれに設けられているため、一対の第1載置部材31は左右方向に離れて2個設けられているとともに、一対の第2載置部材32も左右方向に離れて2個設けられている。そして、左右方向は、搬送台車20により搬送される建材となっている巻取軸4の軸方向であって、渦巻き状に巻回されているシャッターカーテン1の軸方向でもあり、これらの軸方向は、巻取軸4と、渦巻き状に巻回されているシャッターカーテン1とを搬送台車20で搬送される建材とした場合におけるこれらの建材の長さ方向となるため、第1載置部材31も第2載置部材32も、これらの建材の長さ方向に離れて複数個、より具体的には、2個設けられていることになる。   Further, as shown in FIG. 5, each of the first mounting member 31 and the second mounting member 32 is a base member 21 arranged in two in the left-right direction, which is the length direction of the connecting member 24. Therefore, two pairs of the first mounting members 31 are provided apart in the left-right direction, and two pairs of second mounting members 32 are also provided apart in the left-right direction. And the left-right direction is the axial direction of the winding shaft 4 which is the building material conveyed by the conveyance carriage 20, and is also the axial direction of the shutter curtain 1 wound in a spiral shape. These axial directions Is the length direction of these building materials when the winding shaft 4 and the shutter curtain 1 wound in a spiral shape are used as the building materials conveyed by the conveyance carriage 20, and therefore the first placement member 31. In addition, a plurality of, more specifically, two second placement members 32 are provided apart in the length direction of these building materials.

また、本実施形態では、搬送台車20の構成要素となっているそれぞれのベース部材21は、建材の長さ方向に離れてそれぞれ2個設けられている第1及び第2載置部材31,32ごとに設けられているとともに、これらのベース部材21は、上述したように連結部材24に対するクランプ25の挟着解除により、連結部材24との結合を解除できるものとなっているため、建材の長さ方向における第1及び第2載置部材31,32の間隔を変更、調整することができる。これにより、本実施形態に係る搬送台車20は、建材としての長さ方向の寸法がそれぞれ異なっている各種の巻取軸4とシャッターカーテン1を載置することができて、走行輪22の転動により、巻取軸4とシャッターカーテン1を走行搬送させることができるものになっている。   Moreover, in this embodiment, each base member 21 that is a constituent element of the transport carriage 20 is provided with two first and second placement members 31 and 32 that are provided two apart from each other in the length direction of the building material. These base members 21 can be released from the connection with the connecting member 24 by releasing the clamp 25 from the connecting member 24 as described above. The distance between the first and second placement members 31 and 32 in the vertical direction can be changed and adjusted. As a result, the transport carriage 20 according to the present embodiment can place various winding shafts 4 and shutter curtains 1 having different lengthwise dimensions as building materials. By movement, the take-up shaft 4 and the shutter curtain 1 can be moved and conveyed.

また、本実施形態に係る搬送台車20には、作業者が搬送台車20を走行させるために手を掛けるための図3及び図4の手掛け部材33が設けられている。この手掛け部材33は、搬送台車20の収納等を小型化して容易に行えるようにするために、搬送台車20に対して着脱可能となっており、本実施形態では、長寸法の筒状部材となっている手掛け部材33が、ベース部材21に立設されている細長部材34の外周に上から挿入されることにより、手掛け部材33が搬送台車20に着脱可能に装着される。   In addition, the transport cart 20 according to the present embodiment is provided with a handle member 33 shown in FIGS. 3 and 4 for an operator to put a hand on to run the transport cart 20. The handle member 33 is detachable with respect to the transport carriage 20 so that the transport carriage 20 can be easily stored in a small size. In the present embodiment, The handle member 33 is inserted into the outer periphery of the elongated member 34 erected on the base member 21 from above, so that the handle member 33 is detachably mounted on the transport carriage 20.

図6〜図8には、搬送台車20から巻取軸4とシャッターカーテン1を受け取るための受け取り台となっていて、図9のフォークリフト車両60のフォーク61に着脱可能にセットされるアタッチメント台40が示されており、図6は側面図、図7は正面図、図8は平面図である。アタッチメント台40は、搬送台車20から巻取軸4とシャッターカーテン1を受け取るための受け取り台であるため、搬送台車20は、アタッチメント台40に巻取軸4とシャッターカーテン1を受け渡すための受け渡し台になっている。   6 to 8, a receiving base for receiving the winding shaft 4 and the shutter curtain 1 from the transport carriage 20, and an attachment base 40 that is detachably set on the fork 61 of the forklift vehicle 60 of FIG. 9. 6 is a side view, FIG. 7 is a front view, and FIG. 8 is a plan view. Since the attachment table 40 is a receiving table for receiving the take-up shaft 4 and the shutter curtain 1 from the transfer carriage 20, the transfer carriage 20 transfers the take-up shaft 4 and the shutter curtain 1 to the attachment stand 40. It is a stand.

アタッチメント台40は、図7に示されているように、シャッターカーテン1の幅方向である左右方向が長さ方向となっている1本の基部材41と、この基部材41の上面に左右方向の間隔をあけて立設された複数本、より具体的には、5本の支柱42と、これらの支柱42の上端に、長さ方向が基部材41の長さ方向と同じになって結合され、基部材41と同じ長さ寸法を有しているトップ部材43と、図6及び図7に示されているように、基部材41の下面に長さ方向である前後方向の途中部が結合されていて、左右方向に2本設けられている筒部材44とを含んで構成され、これらの筒部材44は、断面形状が四角形となっている角型筒部材である。5本の支柱42のうち、左右両端部からそれぞれ2本目の支柱42と、それぞれの筒部材44のうち、基部材41から後方へ突出している部分44Aとの間には、補強のための控え部材45が斜めに架設されているとともに、2本の筒部材44の前端上面同士の間にも、補強のための水平部材46が架設されている。   As shown in FIG. 7, the attachment base 40 has one base member 41 whose length direction is the left-right direction, which is the width direction of the shutter curtain 1, and a left-right direction on the upper surface of the base member 41. A plurality of, and more specifically, five columns 42 erected at intervals, are connected to the upper ends of these columns 42 so that the length direction is the same as the length direction of the base member 41. The top member 43 having the same length dimension as the base member 41, and the middle part in the front-rear direction which is the length direction on the lower surface of the base member 41 as shown in FIGS. The cylindrical members 44 are connected to each other and are provided in the left-right direction. These cylindrical members 44 are rectangular cylindrical members having a quadrangular cross-sectional shape. Among the five struts 42, a reinforcing strut is provided between the second struts 42 from the left and right ends and a portion 44A of each cylindrical member 44 protruding rearward from the base member 41. A member 45 is installed obliquely, and a horizontal member 46 for reinforcement is installed between the upper surfaces of the front ends of the two cylindrical members 44.

図6に示されているように、トップ部材43の上側には、2個の滑車47,48が前後方向に離れて配置され、これらの滑車47,48は、図7及び図8に示されているように、左右方向に並設されている2本の保持部材49の間に配置され、図6のピン50で結合されているこれらの保持部材49に架設された軸49A,49Bを中心に回転自在となっている滑車47,48は、2本の保持部材49により保持されている。これらの滑車47,48と2本の保持部材49は、図7及び図8に示されているように、5本の支柱42のうち、控え部材45が設けられていない左右方向両端部と左右方向中央部の3本の支柱42の真上に配置において、3組設けられている。   As shown in FIG. 6, two pulleys 47, 48 are arranged on the upper side of the top member 43 so as to be separated in the front-rear direction, and these pulleys 47, 48 are shown in FIGS. 7 and 8. As shown in FIG. 6, the shafts 49A and 49B are arranged between the two holding members 49 arranged in parallel in the left-right direction and are connected to the holding members 49 connected by the pins 50 in FIG. The pulleys 47 and 48 that are freely rotatable are held by two holding members 49. These pulleys 47 and 48 and the two holding members 49 are, as shown in FIGS. 7 and 8, left and right ends of the five columns 42 where the holding member 45 is not provided and the left and right ends. Three sets are provided in the arrangement just above the three support columns 42 in the central portion in the direction.

それぞれの組における滑車47,48には、図6に示されているように、後述する支持部材となっていて、紐状部材ともなっているワイヤー51が掛けられており、前後2個の滑車47,48のうち、前側の滑車47から下方へ延びているワイヤー51の先端にはフック部材52が取り付けられ、また、後側の滑車48から下方へ延びているワイヤー51の後端は、支柱42にブラケット53により回転自在に保持されている図7の巻取リール54に結合されている。それぞれの巻取リール54には、巻取リール54を正逆回転させて、巻取リール54にワイヤー51の巻き取り、繰り出しを行わせるための電動モータとブレーキからなる駆動装置55が接続されており、これらの駆動装置55は、駆動装置55ごとに設けられた図示外の制御装置により制御されるものとなっている。   As shown in FIG. 6, the pulleys 47 and 48 in each set are hung with a wire 51 serving as a support member, which will be described later, and serving as a string-like member. 48, a hook member 52 is attached to the tip of the wire 51 extending downward from the front pulley 47, and the rear end of the wire 51 extending downward from the rear pulley 48 is connected to the column 42. 7 is coupled to the take-up reel 54 of FIG. Each take-up reel 54 is connected to a drive device 55 composed of an electric motor and a brake for rotating the take-up reel 54 forward and backward so that the take-up reel 54 winds and unwinds the wire 51. These drive devices 55 are controlled by a control device (not shown) provided for each drive device 55.

それぞれの駆動装置55には、作業者が操作する送信器から送信される光又は音による無線信号を受信する受信器56が取り付けられ、これらの受信器56が受信する信号によりそれぞれの制御装置が、駆動装置55を個別に駆動制御することにより、それぞれの巻取リール54は、ワイヤー51を巻き取り、繰り出すための正逆回転を行う。そして、送信器には、それぞれのワイヤー51ごとに設けられている駆動装置55を制御装置により個別に制御して操作するための操作部が設けられているため、この操作部の操作にしたがい、3個の巻取リール54は、それぞれのワイヤー51を個別に巻き取り、繰り出すための正逆回転を行うものとなっている。   Each drive device 55 is attached with a receiver 56 that receives a radio signal by light or sound transmitted from a transmitter operated by an operator, and each control device is controlled by a signal received by these receivers 56. By individually driving and controlling the driving devices 55, each take-up reel 54 performs forward / reverse rotation for winding and feeding the wire 51. And since the transmitter is provided with an operation unit for individually controlling and operating the drive device 55 provided for each wire 51 by the control device, according to the operation of this operation unit, The three take-up reels 54 perform forward and reverse rotations for individually winding and feeding out the respective wires 51.

図6に示されているように、アタッチメント台40の構成部材となっている筒部材44のうち、基部材41から前方へ突出している部分44Bの上面には、巻取軸4を載置するための一対の第3載置部材57と、前述したように渦巻き状に巻回されているシャッターカーテン1を載置するための一対の第4載置部材58が配置され、これらの第3載置部材57と第4載置部材58は、図8に示されているように、2本の筒部材44のそれぞれに設けられているため、第3載置部材57と第4載置部材58のそれぞれは、左右方向に2個設けられていることになる。また、図6に示されているように、第3載置部材57は、筒部材44に固定された保持部材59Aの軸59Bを中心に回転自在となっている回転部材であり、第4載置部材58も、筒部材44に固定された保持部材59Cの軸59Dを中心に回転自在となっている回転部材である。   As shown in FIG. 6, the winding shaft 4 is placed on the upper surface of a portion 44 </ b> B protruding forward from the base member 41 in the cylindrical member 44 that is a constituent member of the attachment base 40. A pair of third mounting members 57 for mounting and a pair of fourth mounting members 58 for mounting the shutter curtain 1 wound in a spiral shape as described above are arranged, and these third mounting members are arranged. As shown in FIG. 8, the placement member 57 and the fourth placement member 58 are provided on each of the two cylindrical members 44, and thus the third placement member 57 and the fourth placement member 58. Each of is provided in the left-right direction. Further, as shown in FIG. 6, the third mounting member 57 is a rotating member that is rotatable about the shaft 59 </ b> B of the holding member 59 </ b> A fixed to the cylindrical member 44. The mounting member 58 is also a rotating member that is rotatable about the shaft 59D of the holding member 59C fixed to the cylindrical member 44.

そして、本実施形態に係るアタッチメント台40では、一対の第3載置部材57に載置されたときの巻取軸4の中心部と、渦巻き状に巻回されて一対の第4載置部材58に載置されたときのシャッターカーテン1との中心部とが、前後方向において、一致又は略一致するように、これらの第3載置部材57と第4載置部材58は、それぞれの筒部材44に配置されている。   And in the attachment stand 40 which concerns on this embodiment, the center part of the winding shaft 4 when it mounts on a pair of 3rd mounting member 57, and a pair of 4th mounting member wound spirally. The third mounting member 57 and the fourth mounting member 58 are arranged in the respective cylinders so that the central portion of the shutter curtain 1 when mounted on 58 is aligned or substantially matched in the front-rear direction. The member 44 is arranged.

また、図7に示されているように、アタッチメント台40に左右2個設けられている筒部材44の前端同士を連結している前述の水平部材46の左右寸法はL1であり、この寸法L1は、図4で示した搬送台車20の左右のベース部材21に設けられている走行輪22のキャスタブラケット22A同士の内幅寸法L2よりも小さい。また、図7で示されているアタッチメント台40において、第3載置部材57の上端と第4載置部材58の上端とのうち、上方への突出量が大きい第4載置部材58の上端と、筒部材44の下面との間の上下寸法はH1であり、この寸法H1は、図4に示されている搬送台車20において、第1載置部材31に載置されている巻取軸4の下端部4Bと、連結部材24の上端との間の上下寸法H2よりも小さい寸法になっている。また、寸法H1は、図4の巻取軸4の下端部4Bよりも下側に達しているシャッターカーテン1の部分であって、搬送台車20の第2載置部材32に載置されているシャッターカーテン1の下端部1Dと、連結部材24の上端との間の上下寸法H3よりも小さい寸法になっている。   Further, as shown in FIG. 7, the horizontal dimension of the horizontal member 46 connecting the front ends of the two cylindrical members 44 provided on the left and right sides of the attachment base 40 is L1, and this dimension L1. Is smaller than the inner width dimension L2 between the caster brackets 22A of the traveling wheels 22 provided on the left and right base members 21 of the transport carriage 20 shown in FIG. In addition, in the attachment base 40 shown in FIG. 7, the upper end of the fourth mounting member 58 having a large upward protrusion amount among the upper end of the third mounting member 57 and the upper end of the fourth mounting member 58. And the vertical dimension between the cylindrical member 44 and the lower surface of the cylindrical member 44 is H1, and this dimension H1 is a winding shaft mounted on the first mounting member 31 in the transport carriage 20 shown in FIG. 4 is smaller than the vertical dimension H <b> 2 between the lower end 4 </ b> B and the upper end of the connecting member 24. The dimension H1 is a portion of the shutter curtain 1 that reaches the lower side of the lower end portion 4B of the winding shaft 4 in FIG. 4 and is placed on the second placement member 32 of the transport carriage 20. The dimension is smaller than the vertical dimension H3 between the lower end 1D of the shutter curtain 1 and the upper end of the connecting member 24.

次に、巻取軸4を、図2で示した2個のブラケット3で受けさせるために実施する作業について説明する。   Next, a description will be given of an operation performed for receiving the winding shaft 4 by the two brackets 3 shown in FIG.

図9には、搬送台車20の第1載置部材31に載置された巻取軸4を2個のブラケット3で受けさせる作業を実施するために、搬送台車20とアタッチメント台40とフォークリフト車両60とを、シャッター装置が設置される建物の床11に並べて配置したときを示しており、搬送台車20の第2載置部材32には渦巻き状に巻回されたシャッターカーテン1が載置されている。フォークリフト車両60のフォーク61は、シリンダやチェーン等の駆動手段によりガイド部材63に沿って昇降する。また、フォーク61は、上下方向に延びる上下延出部61Aと、この上下延出部61Aの下端から連結部61Bを介して前方へ延びる前方延出部61CとからなるL字状又は略L字状となっている。   In FIG. 9, in order to carry out the operation of receiving the winding shaft 4 mounted on the first mounting member 31 of the transport carriage 20 with the two brackets 3, the transport carriage 20, the attachment base 40, and the forklift vehicle are illustrated. 60 is arranged side by side on the floor 11 of the building where the shutter device is installed, and the shutter curtain 1 wound in a spiral shape is placed on the second placement member 32 of the transport carriage 20. ing. The fork 61 of the forklift vehicle 60 moves up and down along the guide member 63 by driving means such as a cylinder or a chain. The fork 61 has an L-shape or a substantially L-shape comprising a vertically extending portion 61A extending in the up-down direction and a forward extending portion 61C extending forward from the lower end of the vertically extending portion 61A via the connecting portion 61B. It has become a shape.

図10には、フォーク61を下降させてフォークリフト車両60を前進させることにより、フォーク61の前方延出部61Cを、床11に置かれているアタッチメント台40の筒部材44の内部に挿入し、これにより、アタッチメント台40をフォーク61にセットしたときの状態が示されており、図11は、このときの平面図である。   In FIG. 10, the fork 61 is lowered to advance the forklift vehicle 60, thereby inserting the front extension 61 </ b> C of the fork 61 into the cylindrical member 44 of the attachment base 40 placed on the floor 11. Thus, the state when the attachment base 40 is set on the fork 61 is shown, and FIG. 11 is a plan view at this time.

また、図12には、このときにおける筒部材44とフォーク61との関係が拡大されて示されており、図12(A)は平面図、図12(B)は側面図である。それぞれの筒部材44の後端上面には、フォーク61の上下延出部61Aを嵌入するための欠部44Cが形成され、また、それぞれの筒部材44の後端には、この後端に形成されている開口部44Dの一部を塞いでいる抜け出し阻止手段64が設けられている。この抜け出し阻止手段64は、軸部65Aが開口部44Dを横断しているボルト65と、筒部材44の外部で軸部65Aの端部に螺合されたナット66とからなるものであり、軸部65Aは、筒部材44の内部において、フォーク61の上下延出部61Aと前方延出部61Cとを湾曲して連結している連結部61Bの後側において、開口部44Dの一部を塞いでいる。   FIG. 12 is an enlarged view showing the relationship between the cylindrical member 44 and the fork 61 at this time. FIG. 12 (A) is a plan view and FIG. 12 (B) is a side view. On the upper surface of the rear end of each cylindrical member 44, a notch 44C for fitting the vertically extending portion 61A of the fork 61 is formed, and at the rear end of each cylindrical member 44, the rear end is formed. An escape prevention means 64 is provided to block a part of the opening 44D. The pull-out prevention means 64 includes a bolt 65 having a shaft portion 65A crossing the opening 44D, and a nut 66 screwed to the end portion of the shaft portion 65A outside the cylindrical member 44. The portion 65A closes a part of the opening 44D on the rear side of the connecting portion 61B that connects the vertically extending portion 61A and the front extending portion 61C of the fork 61 in a curved manner inside the cylindrical member 44. It is out.

このため、フォーク61にアタッチメント台40をセットした後に、ボルト65とナット66からなる抜け出し阻止手段64を筒部材44にセットすると、筒部材44がフォーク61の前方延出部61Cから前方へ抜け出すことは、抜け出し阻止手段64のボルト65の軸部65Aがフォーク61の連結部61Bに当接することで阻止され、このため、アタッチメント台40をフォーク61に脱落を防止して安定した状態でセットすることができる。また、抜け出し阻止手段64は、筒部材44から分離可能となっているボルト65とナット66からなるため、これらのボルト65とナット66を筒部材44から分離することにより、アタッチメント台40をフォーク61から取り外すことも可能である。   For this reason, after the attachment base 40 is set on the fork 61, if the pull-out prevention means 64 including the bolt 65 and the nut 66 is set on the tubular member 44, the tubular member 44 is pulled forward from the front extending portion 61C of the fork 61. Is prevented by the shaft portion 65A of the bolt 65 of the pull-out preventing means 64 coming into contact with the connecting portion 61B of the fork 61. For this reason, the attachment base 40 is set on the fork 61 in a stable state while preventing it from falling off. Can do. Further, the withdrawal prevention means 64 includes a bolt 65 and a nut 66 that are separable from the cylindrical member 44, and therefore, by separating the bolt 65 and the nut 66 from the cylindrical member 44, the attachment base 40 is moved to the fork 61. It is also possible to remove from.

図13には、以上のようにしてアタッチメント台40がセットされたフォークリフト車両60のフォーク61を少し上昇させた後に、フォークリフト車両60を搬送台車20に向けて前進走行させることにより、又は、図3及び図4で示した手掛け部材33を装着した搬送台車20を作業者が手掛け部材33によりアタッチメント台40に向けて前進走行させることにより、アタッチメント台40の左右2個の筒部材44を、搬送台車20の第1載置部材31に載置されている巻取軸4の下側に挿入した状態が示されており、この挿入作業は、巻取軸4を載置するために搬送台車20に設けられている一対の第1載置部材31の位置と、アタッチメント台40に設けられている一対の第3載置部材57の位置とが一致するまで行われる。図14は、図13のS14−S14線断面図である。前述したように、図7の寸法L1は図4の寸法L2よりも小さいため、上述の挿入作業を、図14に示されているように、アタッチメント台40に左右2個設けられている筒部材44を、搬送台車20に左右2個設けられているベース部材21の間に侵入させて行うことができる。   In FIG. 13, after the fork 61 of the forklift vehicle 60 on which the attachment base 40 is set as described above is slightly raised, the forklift vehicle 60 is caused to travel forward toward the transport carriage 20, or FIG. 4, the operator advances the transport cart 20 with the handle member 33 shown in FIG. 4 toward the attachment table 40 by the handle member 33, so that the two left and right cylindrical members 44 of the attachment table 40 are moved to the transport cart. 20 shows a state in which the take-up shaft 4 is placed on the lower side of the take-up shaft 4 placed on the first placement member 31. This is performed until the position of the pair of first mounting members 31 provided matches the position of the pair of third mounting members 57 provided on the attachment base 40. 14 is a cross-sectional view taken along line S14-S14 in FIG. As described above, since the dimension L1 in FIG. 7 is smaller than the dimension L2 in FIG. 4, the above-described insertion operation is performed as two cylindrical members provided on the attachment base 40 as shown in FIG. 44 can be carried out by entering between the two base members 21 provided on the left and right of the transport carriage 20.

また、図7の寸法H1は図4の寸法H2とH3よりも小さいため、図14に示されているように、アタッチメント台40に設けられている第3載置部材57を、搬送台車20に設けられている第1載置部材31に載置された巻取軸4の下端部4Bの下側であって、搬送台車20の2個のベース部材21を連結している連結部材24の上側において、侵入させることにより、上述の挿入作業を行わせることができる。さらに、図14に示されているように、搬送台車20の2個のベース部材21のそれぞれに設けられていて、巻取軸4の軸方向に離れて2個配置されている第1載置部材31の間隔は、アタッチメント台40の2個の筒部材44のそれぞれに設けられていて、巻取軸4の軸方向に離れて2個配置されている第3載置部材57の間隔よりも大きいため、アタッチメント台40の2個の第3載置部材57を搬送台車20の2個の第1載置部材31の間に侵入させることにより、上述の挿入作業を行わせることができる。   7 is smaller than the dimensions H2 and H3 in FIG. 4, the third mounting member 57 provided on the attachment base 40 is attached to the transport carriage 20 as shown in FIG. 14. Below the lower end 4B of the take-up shaft 4 placed on the first placement member 31 provided, above the connecting member 24 that connects the two base members 21 of the transport carriage 20 In this case, the insertion operation described above can be performed. Further, as shown in FIG. 14, the first mounting is provided on each of the two base members 21 of the transport carriage 20, and two are placed apart in the axial direction of the winding shaft 4. The interval between the members 31 is provided on each of the two cylindrical members 44 of the attachment base 40, and is larger than the interval between the third placement members 57 that are disposed two apart in the axial direction of the winding shaft 4. Since it is large, the above-described insertion operation can be performed by allowing the two third placement members 57 of the attachment base 40 to enter between the two first placement members 31 of the transport carriage 20.

図15には、上述の挿入作業を行った後に、フォークリフト車両60のフォーク61を上昇させることにより、このフォーク61でアタッチメント台40を持ち上げたときを示している。この持ち上げ作業により、搬送台車20の第1載置部材31に載置されていた巻取軸4は、アタッチメント台40の第3載置部材57に受け渡されることになる。このため、本実施形態において、搬送台車20は、巻取軸4をアタッチメント台40に受け渡すための受け渡し台となっており、アタッチメント台40は、巻取軸4を搬送台車20から受け取るための受け取り台となっている。   FIG. 15 shows a state where the attachment base 40 is lifted by the fork 61 by raising the fork 61 of the forklift vehicle 60 after performing the above-described insertion operation. By this lifting operation, the take-up shaft 4 placed on the first placement member 31 of the transport carriage 20 is transferred to the third placement member 57 of the attachment base 40. For this reason, in this embodiment, the conveyance cart 20 is a delivery table for delivering the winding shaft 4 to the attachment table 40, and the attachment table 40 is for receiving the winding shaft 4 from the conveyance vehicle 20. It is a receiving stand.

そして、搬送台車20の第1載置部材31に載置されていた巻取軸4をアタッチメント台40の第3載置部材57に受け渡すために、このアタッチメント台40を上昇させるためのフォーク61を備えているフォークリフト車両60は、本実施形態におけるリフト装置となっている。   Then, a fork 61 for raising the attachment base 40 to deliver the winding shaft 4 placed on the first placement member 31 of the transport carriage 20 to the third placement member 57 of the attachment base 40. The forklift vehicle 60 provided with is a lift device in the present embodiment.

以上の作業を行った後に、フォークリフト車両60をシャッター装置の設置現場まで走行させ、図16に示されているように、フォーク61をさらに上昇させることにより、第3載置部材57に載置されることでアタッチメント台40に載せられている巻取軸4を、図2で示した建物の不動部材となっている躯体8に左右2個配置されているブラケット3の高さ位置よりも低い箇所まで持ち上げる。図16では、フォークリフト車両60は二点鎖線で示されている。   After performing the above operations, the forklift vehicle 60 is traveled to the installation site of the shutter device, and the fork 61 is further lifted as shown in FIG. 16 to be placed on the third placement member 57. Thus, the winding shaft 4 placed on the attachment base 40 is lower than the height position of the bracket 3 arranged on the left and right two on the housing 8 which is the stationary member of the building shown in FIG. Lift up. In FIG. 16, the forklift vehicle 60 is indicated by a two-dot chain line.

そして、このようにアタッチメント台40に載せられている巻取軸4を2個のブラケット3の高さ位置よりも低い箇所まで持ち上げるときまでには、フォークリフト車両60を省略して示した図16の側面図となっている図17と、図16の背面図となっている図18に示されているように、アタッチメント台40に左右3本設けられているワイヤー51により、第3載置部材57に載置されている巻取軸4を吊り下げ支持することができるようにしておく。本実施形態では、この吊り下げ支持は、アタッチメント台40に前後2個設けられている滑車47,48のうち、前側の滑車47から下方に延びているそれぞれのワイヤー51の下部を巻取軸4の下側に回し、ワイヤー51の下端に取り付けられているフック部材52を、巻取軸4の上側において、ワイヤー51に係止することにより行っている。このような作業は、図13の状態から、フォークリフト車両60のフォーク61の上昇により、巻取軸4が搬送台車20の第1載置部材31からアタッチメント台40の第3載置部材57に受け渡された直後に、フォーク61の上昇を停止させることによって行うことができ、これにより、作業者は、梯子や脚立等の昇降具を用いることなく低位置でこの作業を行うことができる。   Then, until the take-up shaft 4 placed on the attachment base 40 is lifted to a position lower than the height position of the two brackets 3, the forklift vehicle 60 is omitted in FIG. As shown in FIG. 17 which is a side view and FIG. 18 which is a rear view of FIG. 16, the third mounting member 57 is formed by three wires 51 provided on the left and right sides of the attachment base 40. The take-up shaft 4 placed on is suspended and supported. In the present embodiment, this suspension support is performed by placing the lower part of each wire 51 extending downward from the front pulley 47 out of the two pulleys 47, 48 provided on the front and rear of the attachment base 40. The hook member 52 attached to the lower end of the wire 51 is engaged with the wire 51 on the upper side of the winding shaft 4. Such work is performed from the state shown in FIG. 13 by the lift of the fork 61 of the forklift vehicle 60 so that the winding shaft 4 is received by the third mounting member 57 of the attachment base 40 from the first mounting member 31 of the transport carriage 20. Immediately after being handed over, it can be performed by stopping the fork 61 from rising, so that the worker can perform this work at a low position without using a lifting tool such as a ladder or a stepladder.

次いで、作業者は前述した送信器を操作することにより、それぞれのワイヤー51ごとに設けられている駆動装置55の駆動により、それぞれのワイヤー51ごとに設けられている巻取リール54を正回転させ、これらの巻取リール54でワイヤー51を巻き取ることにより、巻取軸4を第3載置部材57からワイヤー51により持ち上げ支持する。そして、この巻取軸4の持ち上げ支持の高さ位置を、図19〜図21に示されているように、巻取軸4を受けるために建物の不動部材となっている躯体8に2個設けられているブラケット3と同じ高さ位置又は略同じ高さ位置とした後に、送信器の操作によりそれぞれの巻取リール54の正回転を停止させる。この後に、フォークリフト車両60を前進させたり、ワイヤー51で吊り下げ支持されている巻取軸4を作業者が押すなどすることにより、巻取軸4の軸方向の両端部に設けられている前述の首部4Aを、それぞれのブラケット3に形成されている凹部3Aに挿入し、これにより、巻取軸4の軸方向の両端部を、巻取軸4の軸方向の間隔をあけて躯体8に2個配設されているブラケット3により受けさせる。   Next, by operating the transmitter described above, the operator rotates the take-up reel 54 provided for each wire 51 by driving the drive device 55 provided for each wire 51. The winding shaft 4 is lifted and supported by the wire 51 from the third placement member 57 by winding the wire 51 with these winding reels 54. Then, as shown in FIGS. 19 to 21, two height positions of the lifting support of the winding shaft 4 are provided on the housing 8 which is a stationary member of the building for receiving the winding shaft 4. After setting to the same height position as the bracket 3 provided or substantially the same height position, the forward rotation of each take-up reel 54 is stopped by operating the transmitter. Thereafter, the forklift vehicle 60 is moved forward, or the operator pushes the winding shaft 4 supported by being suspended by the wire 51, so that the above-described axial ends of the winding shaft 4 are provided. 4A are inserted into the recesses 3A formed in the respective brackets 3 so that both ends in the axial direction of the winding shaft 4 are spaced apart from each other in the axial direction of the winding shaft 4. It is received by two brackets 3 arranged.

次いで、それぞれの首部4Aに配置されている軸受部材12をそれぞれのブラケット3にビス等で止着する作業を行い、これにより、巻取軸4は2個のブラケット3により回転自在に支持される。   Next, an operation of fixing the bearing members 12 arranged on the respective neck portions 4 </ b> A to the respective brackets 3 with screws or the like is performed, whereby the winding shaft 4 is rotatably supported by the two brackets 3. .

なお、巻取軸4を2個のブラケット3により回転自在に支持させるためには、巻取軸4の軸方向の両端部に2個設けられている首部4Aを、2個のブラケット3の凹部3Aに正確に挿入することが求められ、このため、ワイヤー51による巻取軸4の持ち上げ支持を、それぞれの首部4Aの高さ位置がそれぞれのブラケット3の凹部3Aの高さ位置と一致又は略一致するまで行うことが必要となる。このため、本実施形態では、3本のワイヤー51のうち、左右両側に配置された2本のワイヤー51は、巻取軸4の軸方向に離れた2箇所を持ち上げ支持するものとなっていて、これらのワイヤー51を、作業者が前述した送信器の操作によりそれぞれの巻取リール54を個別に正逆回転させることにより、個別に昇降させることができるようになっており、これにより、巻取軸4の2個の首部4Aを個別に昇降させる作業を行うことにより、巻取軸4が自重等で下方へ湾曲変形していても、巻取軸のそれぞれの首部4Aの高さ位置をそれぞれのブラケット3の凹部3Aの高さ位置と正確に一致又は略一致させることができる。   In order to rotatably support the take-up shaft 4 by the two brackets 3, two neck portions 4 </ b> A provided at both end portions in the axial direction of the take-up shaft 4 are formed in the recesses of the two brackets 3. 3A is required to be accurately inserted. For this reason, the lifting support of the winding shaft 4 by the wire 51 is used so that the height position of each neck 4A coincides with the height position of the recess 3A of each bracket 3 or substantially. It is necessary to do this until they match. For this reason, in the present embodiment, of the three wires 51, the two wires 51 arranged on the left and right sides lift and support two places separated in the axial direction of the winding shaft 4. These wires 51 can be moved up and down individually by rotating the respective winding reels 54 forward and backward individually by the operation of the transmitter described above. By performing the work of raising and lowering the two neck portions 4A of the take-up shaft 4 individually, even if the take-up shaft 4 is bent and deformed downward by its own weight or the like, the height positions of the respective neck portions 4A of the take-up shaft 4 The height positions of the recesses 3A of the respective brackets 3 can be exactly matched or substantially matched.

なお、以上の説明では、巻取軸4の持ち上げ支持を、アタッチメント台40に左右方向に3本設けられているワイヤー51により行ったが、この持ち上げ支持を左右両側の2本のワイヤー51だけで行ってもよい。   In the above description, the winding shaft 4 is lifted and supported by the three wires 51 provided on the attachment base 40 in the left-right direction. However, the lifting support is performed only by the two wires 51 on the left and right sides. You may go.

以上説明した本実施形態では、搬送台車20の第1載置部材31からアタッチメント台40の第3載置部材57に受け渡された巻取軸4を、2個のブラケット3が配置されている建物の高所の箇所まで持ち上げる作業は、フォークリフト車両60のフォーク61の上昇により、アタッチメント台40に載せられている巻取軸4をブラケット3の配置箇所よりも低い箇所まで持ち上げるための第1持ち上げ作業工程と、この後に、アタッチメント台40に配置されているワイヤー51により、巻取軸4をブラケット3の配置箇所まで持ち上げるための第2持ち上げ作業工程とを含んだものとなっている。   In the present embodiment described above, the two brackets 3 are arranged on the take-up shaft 4 delivered from the first placement member 31 of the transport carriage 20 to the third placement member 57 of the attachment base 40. The work of lifting to a high place of the building is a first lifting for lifting the take-up shaft 4 placed on the attachment base 40 to a position lower than the place where the bracket 3 is arranged by raising the fork 61 of the forklift vehicle 60. This includes a work process and a second lifting work process for lifting the take-up shaft 4 to the place where the bracket 3 is disposed by a wire 51 disposed on the attachment base 40.

また、本実施形態では、上述の第1持ち上げ作業工程が、アタッチメント台40がセットされたフォークリフト車両60のフォーク61の上昇により行われるため、このフォーク61は、第1持ち上げ作業工程を実施するための第1持ち上げ手段となっており、また、アタッチメント台40に配置されているワイヤー51は、巻取軸4を2個のブラケット3が配置されている高さの箇所まで吊り下げて持ち上げ支持するものとなっているため、このワイヤー51と、ワイヤー51を巻き取り、繰り出すための巻取リール54と、巻取リール54を正逆回転させるための駆動装置55等により、アタッチメント台40に設けられていて、第2持ち上げ作業工程を実施するための第2持ち上げ手段が構成されている。そして、ワイヤー51は、この第2持ち上げ手段の一部を構成して、巻取軸4を吊り上げて支持するための支持部材となっているとともに、紐状部材ともなっている。   Moreover, in this embodiment, since the above-mentioned 1st lifting work process is performed by the raising of the fork 61 of the forklift vehicle 60 in which the attachment base 40 is set, this fork 61 performs the 1st lifting work process. Further, the wire 51 disposed on the attachment base 40 suspends and supports the winding shaft 4 by suspending the winding shaft 4 to the height where the two brackets 3 are disposed. Therefore, the attachment base 40 is provided with the wire 51, a winding reel 54 for winding and feeding the wire 51, a driving device 55 for rotating the winding reel 54 forward and backward, and the like. The second lifting means for carrying out the second lifting work step is configured. The wire 51 constitutes a part of the second lifting means, and serves as a support member for lifting and supporting the winding shaft 4 and also serves as a string-like member.

以上の本実施形態において、上述の第1持ち上げ作業工程は、フォークリフト車両60のフォーク61を上昇させる作業であるため、ワイヤー51を巻取リール54で巻き取ることにより実施される第2持ち上げ作業工程よりも低精度の作業となっているが、第2持ち上げ作業工程よりも高速で実施することができる作業となっている。また、第2持ち上げ作業工程は、第1持ち上げ作業工程よりも低速で実施される作業であるが、巻取リール54によるワイヤー51の上下移動量の制御により、第1持ち上げ作業工程よりも高精度で実施することができる作業となっている。このため、本実施形態によると、配置箇所が構造物の高所となっている巻取軸4の持ち上げ作業を迅速かつ高精度にして行え、また、この作業の容易化を図ることができる。   In the above embodiment, since the above-mentioned first lifting work process is a work for raising the fork 61 of the forklift vehicle 60, the second lifting work process carried out by winding the wire 51 with the take-up reel 54. However, the work can be performed at a higher speed than the second lifting work process. In addition, the second lifting work process is performed at a lower speed than the first lifting work process, but is more accurate than the first lifting work process by controlling the vertical movement amount of the wire 51 by the take-up reel 54. It is work that can be carried out in. For this reason, according to this embodiment, the operation of lifting the take-up shaft 4 whose place of placement is a high place of the structure can be performed quickly and with high accuracy, and this operation can be facilitated.

また、上述した支持部材や紐状部材となってアタッチメント台40に配置されているワイヤー51は、本実施形態では、巻取軸4の軸方向に離れた少なくとも2箇所を支持するものとなっていて、これらのワイヤー51を個別に昇降させることができるため、これらのワイヤー51により、前述したように、巻取軸4の軸方向に離れた2箇所を個別に昇降させることにより、巻取軸4が自重等で下方へ湾曲変形していても、巻取軸4の軸方向の両端部に設けられている首部4Aの高さ位置を個別に調整することができ、これにより、これらの首部4Aの高さ位置をそれぞれのブラケット3の凹部3Aの高さ位置と一致又は略一致させる作業を、一層正確かつ容易に行うことができる。   In addition, the wire 51 disposed on the attachment base 40 as a support member or a string-like member as described above supports at least two places separated in the axial direction of the winding shaft 4 in this embodiment. Since these wires 51 can be moved up and down individually, the winding shafts can be moved up and down individually at these two locations in the axial direction of the winding shaft 4 as described above. Even if 4 is curved and deformed downward due to its own weight or the like, the height positions of the neck portions 4A provided at both ends in the axial direction of the take-up shaft 4 can be individually adjusted. The operation of making the height position of 4A coincide with or substantially coincide with the height position of the recess 3A of each bracket 3 can be performed more accurately and easily.

次に、以上のようにして2個のブラケット3に受けさせた巻取軸4にシャッターカーテン1の上端を結合するための作業について説明する。   Next, an operation for connecting the upper end of the shutter curtain 1 to the winding shaft 4 received by the two brackets 3 as described above will be described.

図22には、この作業を行うために、シャッターカーテン1を搬送台車20の第2載置部材32からアタッチメント台40の第4載置部材58に受け渡すために行う最初の作業が示されている。この作業は、フォークリフト車両60のフォーク61にセットされたアタッチメント台40の筒部材44を、図13で示した巻取軸4のときと同様にして、搬送台車20の第2載置部材32に渦巻き状に巻回されて載置されたシャッターカーテン1の下側に挿入する作業であり、この挿入作業を、搬送台車20に設けられている一対の第2載置部材32の位置と、アタッチメント台40に設けられている一対の第4載置部材58の位置とが一致するまで行う。   FIG. 22 shows an initial operation for transferring the shutter curtain 1 from the second mounting member 32 of the transport carriage 20 to the fourth mounting member 58 of the attachment base 40 in order to perform this operation. Yes. In this operation, the cylindrical member 44 of the attachment base 40 set on the fork 61 of the forklift vehicle 60 is applied to the second mounting member 32 of the transport carriage 20 in the same manner as the winding shaft 4 shown in FIG. It is an operation of inserting the shutter curtain 1 below the shutter curtain 1 that is wound in a spiral shape, and this insertion operation includes the position of the pair of second mounting members 32 provided on the transport carriage 20 and the attachment. This is performed until the positions of the pair of fourth mounting members 58 provided on the table 40 match.

このとき、前述したように、図7の寸法H1は図4の寸法H3よりも小さいため、搬送台車20の第2載置部材32に載置されているシャッターカーテン1の下端部1Dの下側であって、搬送台車20の2個のベース部材21を連結している連結部材24の上側において、アタッチメント台40の筒部材44を侵入させることにより、上述の挿入作業を行わせることができる。   At this time, since the dimension H1 in FIG. 7 is smaller than the dimension H3 in FIG. 4 as described above, the lower side 1D of the shutter curtain 1 placed on the second placement member 32 of the transport carriage 20 is below. In addition, the above-described insertion operation can be performed by allowing the cylindrical member 44 of the attachment base 40 to enter above the connecting member 24 that connects the two base members 21 of the transport carriage 20.

次いで、図23に示されているように、フォークリフト車両60のフォーク61を上昇させることにより、このフォーク61でアタッチメント台40を持ち上げ、これにより、搬送台車20の第2載置部材32に載置されていたシャッターカーテン1をアタッチメント台40の第4載置部材58に受け渡すための作業を行う。この後に、フォークリフト車両60をシャッター装置の設置現場まで走行させるとともに、フォーク61を上昇させ、これにより、図24から分かるように、アタッチメント台40の第4載置部材58に渦巻き状に巻回されて載置されているシャッターカーテン1の高さ位置が、2個のブラケット3により受けられている巻取軸4の高さ位置よりも低い位置となる箇所までアタッチメント台40を上昇させる。   Next, as shown in FIG. 23, the fork 61 of the forklift vehicle 60 is lifted to lift the attachment base 40 with the fork 61, thereby placing it on the second placement member 32 of the transport carriage 20. An operation for transferring the shutter curtain 1 that has been performed to the fourth placement member 58 of the attachment base 40 is performed. Thereafter, the forklift vehicle 60 is caused to travel to the installation site of the shutter device, and the fork 61 is raised, so that the forklift vehicle 60 is spirally wound around the fourth mounting member 58 of the attachment base 40 as can be seen from FIG. The attachment table 40 is raised to a position where the height position of the shutter curtain 1 placed in this manner is lower than the height position of the winding shaft 4 received by the two brackets 3.

次いで、作業者は、ワイヤー51の先端に設けられている前述のフック部材52をシャッターカーテン1の上端に引っ掛ける作業を行う。この引っ掛け作業は、図25から分かるように、シャッターカーテン1の上端を巻取軸4に結合するためにシャッターカーテン1の上端に設けられている吊元部材1Bの孔68にフック部材52を挿入する作業であり、孔68は、シャッターカーテン1の吊元部材1Bを巻取軸4に結合するためのボルトを挿入するボルト孔である。なお、吊元部材1Bは、渦巻き状に巻回されているシャッターカーテン1の軸方向である左右方向に複数個設けられており、それぞれの吊元部材1Bには、吊元部材1Bでの高さ位置が異なる複数個の孔68が左右方向に離れて形成されている。これにより、巻取軸4でシャッターカーテン1を巻き取ったときに、シャッターカーテン1が横ずれしないで巻取軸4で巻き取ることができる孔68を選択してボルトを挿入して、吊元部材1Bを巻取軸4に結合できるようになっている。   Next, the worker performs an operation of hooking the hook member 52 provided at the tip of the wire 51 on the upper end of the shutter curtain 1. 25, the hook member 52 is inserted into the hole 68 of the suspension member 1B provided at the upper end of the shutter curtain 1 in order to connect the upper end of the shutter curtain 1 to the winding shaft 4. The hole 68 is a bolt hole into which a bolt for coupling the suspension member 1B of the shutter curtain 1 to the winding shaft 4 is inserted. A plurality of suspension members 1B are provided in the left-right direction, which is the axial direction of the shutter curtain 1 wound in a spiral shape, and each suspension member 1B has a height at the suspension member 1B. A plurality of holes 68 having different positions are formed apart in the left-right direction. Thereby, when the shutter curtain 1 is wound up by the winding shaft 4, the hole 68 that can be wound up by the winding shaft 4 without the lateral displacement of the shutter curtain 1 is selected and the bolt is inserted, and the suspension member 1B can be coupled to the winding shaft 4.

本実施形態では、左右方向に複数個設けられている図25の吊元部材1Bのうち、左右方向中央部の吊元部材1Bの孔68に、アタッチメント台40に左右方向に3本設けられているワイヤー51のうち、左右方向中央部のワイヤー51のフック部材52が挿入され、また、このフック部材52は、左右方向中央部の吊元部材1Bに左右方向に複数個形成されている孔68のうち、左右方向中央部の孔68に挿入されている。これにより、後述するように、左右方向中央部の1本のワイヤー51の引き上げにより、シャッターカーテン1の上端を引き上げた際に、この上端全体を均一に引き上げることができるようにする。   In the present embodiment, among the suspension members 1B of FIG. 25 provided in the left-right direction, three are provided in the left and right directions on the attachment base 40 in the holes 68 of the suspension member 1B in the central portion in the left-right direction. Among the wires 51, the hook member 52 of the wire 51 at the center in the left-right direction is inserted, and a plurality of the hook members 52 are formed in the left-right direction in the suspension member 1B at the center in the left-right direction. Of these, it is inserted into the hole 68 at the center in the left-right direction. Thus, as will be described later, when the upper end of the shutter curtain 1 is pulled up by pulling up one wire 51 in the central portion in the left-right direction, the entire upper end can be pulled up uniformly.

以上の作業を行った後に、作業者は前述した送信器を操作することにより、左右方向に3本設けられているワイヤー51のうち、左右方向中央部の1本のワイヤー51だけを、このワイヤー51のためにアタッチメント台40に配置されている巻取リール54を駆動装置55で正回転させることで巻き取り、これにより、図24及び図25で示されているように、前述した支持部材となっているこのワイヤー51によってシャッターカーテン1の上端を引き上げ、この上端の高さ位置を、2個のブラケット3で支持されている巻取軸4の高さ位置と同じ又は略同じ高さ位置とする。次いで、作業者は、フック部材52を孔68から抜き取るとともに、それぞれの吊元部材1Bを、図26に示されているように、上述のボルトにより巻取軸4に結合する。   After performing the above operation, the operator operates the transmitter described above, and among the three wires 51 provided in the left-right direction, only one wire 51 in the central portion in the left-right direction is connected to this wire. 51, the take-up reel 54 disposed on the attachment base 40 is rotated forward by the drive device 55, so that as shown in FIG. 24 and FIG. The upper end of the shutter curtain 1 is pulled up by the wire 51 and the height position of the upper end is the same as or substantially the same as the height position of the winding shaft 4 supported by the two brackets 3. To do. Next, the operator pulls out the hook member 52 from the hole 68, and couples each suspension base member 1B to the take-up shaft 4 with the above-described bolt as shown in FIG.

次いで、作業者は、2個のブラケット3に回転自在に支持されている巻取軸4を正回転させることにより、アタッチメント台40の第4載置部材58に渦巻き状に巻回されているシャッターカーテン1から、このシャッターカーテン1を形成するために吊元部材1Bの下側で連設されているそれぞれのスラット1Cを繰り出させ、これらのスラット1Cを巻取軸4で巻き取る作業を行う。この作業を行っているときの状態が図27に示されている。この際、渦巻き状に巻回されているシャッターカーテン1は第4載置部材58の上で回転するが、第4載置部材58は、前述したように、回転自在の回転部材となっているため、シャッターカーテン1を第4載置部材58の上で円滑に回転させることができ、これにより、それぞれのスラット1Cを巻取軸4で巻き取る作業をより確実に行うことができる。   Next, the operator rotates the winding shaft 4 rotatably supported by the two brackets 3, thereby rotating the shutter wound spirally around the fourth placement member 58 of the attachment base 40. In order to form the shutter curtain 1 from the curtain 1, the respective slats 1 </ b> C connected under the suspension base member 1 </ b> B are fed out, and the slats 1 </ b> C are wound up by the winding shaft 4. The state when performing this operation is shown in FIG. At this time, the shutter curtain 1 wound in a spiral shape rotates on the fourth mounting member 58, but the fourth mounting member 58 is a rotatable rotating member as described above. Therefore, the shutter curtain 1 can be smoothly rotated on the fourth placement member 58, whereby the operation of winding the respective slats 1 </ b> C with the winding shaft 4 can be performed more reliably.

なお、このときまでに、巻取軸4を回転させるための図1で示した開閉機5と駆動力伝達装置6とを2個のブラケット3の一方に取り付ける作業が終了している場合には、シャッターカーテンのそれぞれのスラット1Cを巻取軸4で巻き取るために巻取軸4を正回転させる作業を、これらの開閉機5と駆動力伝達装置6を用いて行ってもよい。   By this time, when the operation of attaching the switch 5 and the driving force transmission device 6 shown in FIG. 1 for rotating the winding shaft 4 to one of the two brackets 3 has been completed. The operation of rotating the take-up shaft 4 in order to take up each slat 1C of the shutter curtain with the take-up shaft 4 may be performed using the opening / closing device 5 and the driving force transmission device 6.

巻取軸4でシャッターカーテン1の全体を巻き取る作業が終了した後に、図1で示した左右のガイドレール2を躯体7に取り付ける作業や、シャッターケース9を躯体8に取り付ける作業等の残余の作業を行う。次いで、巻取軸4を開閉機5や駆動力伝達装置6等により逆回転させ、これにより、巻取軸4から繰り出されたシャッターカーテン1の幅方向の両端部を左右のガイドレール2の内部にスライド自在に挿入して、シャッターカーテン1を下降させる。この作業が終了すると、シャッター装置は、シャッターカーテン1により図1の出入口10を開閉させることができる状態となる。   After the operation of winding the entire shutter curtain 1 with the winding shaft 4 is completed, the remaining work such as the operation of attaching the left and right guide rails 2 shown in FIG. 1 to the housing 7 and the operation of attaching the shutter case 9 to the housing 8 are performed. Do work. Next, the winding shaft 4 is reversely rotated by the opening / closing machine 5, the driving force transmission device 6 and the like, whereby both ends in the width direction of the shutter curtain 1 fed out from the winding shaft 4 are placed inside the left and right guide rails 2. The shutter curtain 1 is lowered. When this operation is completed, the shutter device is in a state where the shutter curtain 1 can open and close the doorway 10 of FIG.

以上の実施形態において、左右方向中央部のワイヤー51は、アタッチメント台40の第4載置部材58に載置されたシャッターカーテン1の上方から吊り下げられた紐状部材となっているとともに、シャッターカーテン1の上端を引き上げるための引き上げ部材ともなっている。そして、このように引き上げ部材となっているワイヤー51が配置されたアタッチメント台40は、本実施形態における引き上げ装置ともなっている。   In the above embodiment, the wire 51 at the center in the left-right direction is a string-like member suspended from above the shutter curtain 1 placed on the fourth placement member 58 of the attachment base 40 and the shutter. It is also a raising member for raising the upper end of the curtain 1. And the attachment stand 40 in which the wire 51 used as a raising member is arrange | positioned in this way is also the raising apparatus in this embodiment.

以上説明した本実施形態によると、2個のブラケット3で回転自在に受けられている巻取軸4に上端が結合されるシャッターカーテン1は、予め工場において、出入口10の全部又は略全部を開閉することができる大きさに形成されているため、シャッター装置の設置現場において、巻取軸4に吊元部材1Bをボルトで結合した後に、このような大きさを有しているシャッターカーテン1を巻取軸4によって巻き取るための作業を実施することができる。   According to the present embodiment described above, the shutter curtain 1 whose upper end is coupled to the winding shaft 4 rotatably received by the two brackets 3 opens and closes all or substantially all of the entrance / exit 10 in advance in the factory. Therefore, after the suspension member 1B is coupled to the winding shaft 4 with a bolt at the installation site of the shutter device, the shutter curtain 1 having such a size is mounted. An operation for winding by the winding shaft 4 can be performed.

これを言い換えると、本実施形態に係るシャッターカーテン1は、予め工場において、出入口10の全部又は略全部を開閉することができる大きさに形成されているため、シャッター装置の設置現場では、シャッターカーテン1の上端部に設けられている吊元部材1Bを巻取軸4にボルトで結合すると、上端が巻取軸4に結合されてこの巻取軸4に巻き取り可能となっているシャッターカーテン1を、シャッター装置の設置現場において短時間で容易に形成することができるようになる。   In other words, the shutter curtain 1 according to the present embodiment is formed in advance in a factory so as to be able to open and close all or substantially all of the entrance / exit 10, so that the shutter curtain is installed at the installation site of the shutter device. When the suspension member 1B provided at the upper end of 1 is coupled to the winding shaft 4 with a bolt, the shutter curtain 1 is coupled to the winding shaft 4 and can be wound around the winding shaft 4. Can be easily formed in a short time at the installation site of the shutter device.

このため、本実施形態によると、大部分が多数のスラット1Cの連設によって形成されているシャッターカーテン1について、シャッター装置の設置現場において、巻取軸4に吊元部材1Bをボルトで結合した後に、それぞれのスラット1C同士を、これらのスラット1Cの上下端部に形成されているカール部同士を回動自在に係合させて連結することによりシャッターカーテン1を形成するために、これらのスラット1Cを横方向から順次スライドさせる作業を省略することができるようになり、このため、巻取軸4に巻き取られるシャッターカーテン1の形成作業をシャッター装置の設置現場において容易に行うことができる。   For this reason, according to the present embodiment, for the shutter curtain 1 which is mostly formed by connecting a large number of slats 1C, the suspension member 1B is coupled to the winding shaft 4 with bolts at the installation site of the shutter device. Later, in order to form the shutter curtain 1 by connecting the respective slats 1C with the curled portions formed at the upper and lower ends of the slats 1C so as to be rotatable, these slats 1C are formed. The operation of sequentially sliding 1C from the lateral direction can be omitted, and therefore, the operation of forming the shutter curtain 1 wound around the winding shaft 4 can be easily performed at the installation site of the shutter device.

また、本実施形態によると、上述の紐状部材及び引き上げ部材となっているワイヤー51の先端には、シャッターカーテン1の上端に設けられている吊元部材1Bの孔68に挿入されることで、シャッターカーテン1の上端を引っ掛けて引き上げるためのフック部材52が設けられているため、シャッターカーテン1の上端を巻取軸4に結合するためにこの上端を引き上げる作業を、巻取軸4にシャッターカーテン1の上端を結合するためにこの上端に設けられている吊元部材1Bを利用して行える。また、フック部材52を引っ掛けるための孔68は、吊元部材1Bを巻取軸4に結合するボルトを挿入するボルト孔であるため、このボルト孔を利用してワイヤー51によるシャッターカーテン1の引き上げ作業を行うことができる。   Further, according to the present embodiment, the wire 51 serving as the string-like member and the lifting member described above is inserted into the hole 68 of the suspension member 1 </ b> B provided at the upper end of the shutter curtain 1. Since the hook member 52 for hooking and lifting the upper end of the shutter curtain 1 is provided, the operation of pulling up the upper end of the shutter curtain 1 to connect the upper end of the shutter curtain 1 to the winding shaft 4 is performed on the winding shaft 4. In order to connect the upper end of the curtain 1, it can carry out using the suspension member 1B provided in this upper end. Moreover, since the hole 68 for hooking the hook member 52 is a bolt hole for inserting a bolt for connecting the lifting member 1B to the take-up shaft 4, the shutter 51 is pulled up by the wire 51 using this bolt hole. Work can be done.

さらに、本実施形態では、ワイヤー51のフック部材52によりシャッターカーテン1の上端を引き上げる作業を行う前に、アタッチメント台40と、このアタッチメント台40の第4載置部材58に載置されているシャッターカーテン1は、前述したリフト装置となっているフォークリフト車両60のフォーク61により、2個のブラケット3で受けられている巻取軸4の高さ位置よりも少し低い位置まで高速で持ち上げられるようになっており、このため、前述した引き上げ装置となっているアタッチメント台40に引き上げ部材となって設けられているワイヤー51により、シャッターカーテン1の上端を巻取軸4の高さ位置と同じ又は略同じ高さ位置まで引き上げるための作業を短時間で行え、これにより、シャッターカーテン1の上端を巻取軸4に結合するまでの全体の作業時間の短縮を図って、作業効率を向上させることができる。   Furthermore, in this embodiment, before performing the operation | work which pulls up the upper end of the shutter curtain 1 with the hook member 52 of the wire 51, the shutter mounted in the attachment base 40 and the 4th mounting member 58 of this attachment base 40. The curtain 1 is lifted at a high speed to a position slightly lower than the height position of the take-up shaft 4 received by the two brackets 3 by the fork 61 of the forklift vehicle 60 serving as the lift device described above. Therefore, the upper end of the shutter curtain 1 is the same as or substantially the same as the height position of the winding shaft 4 by the wire 51 provided as a lifting member on the attachment base 40 serving as the lifting device described above. The work to raise to the same height position can be performed in a short time. To shorten the entire working time to bind the edge the winding shaft 4, thereby improving the working efficiency.

また、本実施形態では、フォークリフト車両60のフォーク61により、アタッチメント台40と、このアタッチメント台40の第4載置部材58に渦巻き状に巻回されて載置されたシャッターカーテン1とが、2個のブラケット3で受けられている巻取軸4の高さ位置よりも少し低い位置まで高速で持ち上げられた後に、吊元部材1Bの孔68にワイヤー51のフック部材52が引っ掛けられてシャッターカーテン1の上端が引き上げられることは、アタッチメント台40に渦巻き状に巻回されて配置されているシャッターカーテン1を解きながら行われるため、シャッターカーテン1の上端の引き上げ作業を円滑に実施することができる。   Further, in the present embodiment, the fork 61 of the forklift vehicle 60 includes the attachment base 40 and the shutter curtain 1 wound and placed on the fourth placement member 58 of the attachment base 40 in a spiral shape. After being lifted at a high speed to a position slightly lower than the height position of the winding shaft 4 received by the single bracket 3, the hook member 52 of the wire 51 is hooked in the hole 68 of the suspension member 1B, and the shutter curtain. The lifting of the upper end of the shutter curtain 1 is performed while unwinding the shutter curtain 1 that is wound around the attachment base 40 in a spiral manner, so that the lifting operation of the upper end of the shutter curtain 1 can be performed smoothly. .

さらに、アタッチメント台40に渦巻き状に巻回されて配置されているシャッターカーテン1は、このアタッチメント台40に回転自在となって設けられている第4載置部材58に載置されているため、ワイヤー51のフック部材52によるシャッターカーテン1の上端の引き上げ作業、及びこの引き上げ作業の後に巻取軸4の正回転で実施される巻取軸4によるシャッターカーテン1の巻き取り作業が行われる際に、第4載置部材58が回転することにより、渦巻き状に巻回されているシャッターカーテン1は円滑に解かれることになり、これにより、ワイヤー51のフック部材52によるシャッターカーテン1の上端の引き上げ作業と、巻取軸4の正回転で実施される巻取軸4によるシャッターカーテン1の巻き取り作業も円滑に行うことができる。   Further, since the shutter curtain 1 arranged in a spiral shape on the attachment base 40 is placed on the fourth placement member 58 provided to be rotatable on the attachment base 40, When the upper end of the shutter curtain 1 is lifted by the hook member 52 of the wire 51, and the winding operation of the shutter curtain 1 by the winding shaft 4 performed by the forward rotation of the winding shaft 4 is performed after the lifting operation. As the fourth mounting member 58 rotates, the spirally wound shutter curtain 1 is smoothly unwound, and thereby the upper end of the shutter curtain 1 is pulled up by the hook member 52 of the wire 51. The winding of the shutter curtain 1 by the winding shaft 4 performed by the forward rotation of the winding shaft 4 can be performed smoothly. Can.

以上説明した実施形態では、アタッチメント台40に左右方向に3本設けられているワイヤー51のうち、左右方向中央部の1本のワイヤー51により、シャッターカーテン1の上端を巻取軸4に結合するためにこの上端を引き上げる作業を行ったが、3本のワイヤー51を用いてシャッターカーテン1の上端を引き上げるための作業を実施してもよい。   In the embodiment described above, the upper end of the shutter curtain 1 is coupled to the take-up shaft 4 by one wire 51 at the center in the left-right direction among the three wires 51 provided in the left-right direction on the attachment base 40. For this purpose, the work for raising the upper end is performed, but the work for raising the upper end of the shutter curtain 1 may be performed using the three wires 51.

また、シャッターカーテン1のうち、シャッターカーテン1の下端を形成している図1の座板1Aは、この座板1Aの左右方向両端部が左右のガイドレール2の内部に挿入されないものとなっているため、予め工場で形成されるシャッターカーテン1を、座板1Aが除外されたものとし、前述したように、巻取軸4の逆回転により、この巻取軸4から繰り出されたシャッターカーテン1の幅方向の両端部を左右のガイドレール2の内部にスライド自在に挿入して、シャッターカーテン1を下降させた後に、シャッターカーテン1の下端部に座板1Aを連結する作業を行ってもよい。   Further, the seat plate 1A in FIG. 1 that forms the lower end of the shutter curtain 1 among the shutter curtains 1 is such that both left and right ends of the seat plate 1A are not inserted into the left and right guide rails 2. Therefore, the shutter curtain 1 formed in advance in the factory is assumed to exclude the seat plate 1A, and as described above, the shutter curtain 1 fed out from the winding shaft 4 by the reverse rotation of the winding shaft 4 is used. After the shutter curtain 1 is lowered and the both ends in the width direction are slidably inserted into the left and right guide rails 2, the seat plate 1 </ b> A may be connected to the lower end of the shutter curtain 1. .

これによると、座板1Aは、スラット1Cと異なり、シャッターカーテン1の厚さ寸法が大きいシャッターカーテン1の構成部材となっているため、搬送台車20の第2載置部材32に載置等するために、シャッターカーテン1を渦巻き状に巻回する際に、この巻回作業を、シャッターカーテン1の直径を小さくして容易に行える。   According to this, unlike the slat 1C, the seat plate 1A is a constituent member of the shutter curtain 1 having a large thickness dimension of the shutter curtain 1, and is thus placed on the second placement member 32 of the transport carriage 20 or the like. Therefore, when the shutter curtain 1 is wound in a spiral shape, this winding operation can be easily performed by reducing the diameter of the shutter curtain 1.

なお、ワイヤー51のフック部材52をシャッターカーテン1の上端に引っ掛けることは、例えば、シャッターカーテン1を形成するために多数連設されているスラット1Cのうち、最上段のスラット1Cに設けた孔や突起等の係止部に引っ掛けることにより行ってもよい。しかし、上述したようにシャッターカーテン1の上端に設けられている吊元部材1Bにボルト孔として形成されている孔68にフック部材52を引っ掛けることにより、上述の作用効果を得られる。   Hooking the hook member 52 of the wire 51 to the upper end of the shutter curtain 1 is, for example, a hole provided in the uppermost slat 1C among the many slats 1C provided in order to form the shutter curtain 1. You may carry out by hooking on latching parts, such as protrusion. However, as described above, the above-described effects can be obtained by hooking the hook member 52 into the hole 68 formed as a bolt hole in the suspension member 1B provided at the upper end of the shutter curtain 1.

また、図26及び図27には、ワイヤー51のフック部材52により引き上げられて巻取軸4に上端が連結されたシャッターカーテン1は、アタッチメント台40の第4載置部材58において、右回転するように示されているが、この回転方向を逆方向にしてもよい。   In FIGS. 26 and 27, the shutter curtain 1 that is pulled up by the hook member 52 of the wire 51 and has the upper end connected to the winding shaft 4 rotates to the right on the fourth mounting member 58 of the attachment base 40. However, this direction of rotation may be reversed.

図28は、搬送台車20の第2載置部材32に載置した建材を、巻取軸4と、この巻取軸4に上端が結合されて巻取軸4に巻き取られているシャッターカーテン1とした実施形態を示し、このため、この実施形態の建材は、巻取軸4とシャッターカーテン1との結合体70である。この実施形態でも、シャッターカーテン1の場合を示した図22の作業と同様の作業を行った後に、フォークリフト車両60のフォーク61を上昇させることにより、図29に示されているように、結合体70を搬送台車20の第2載置部材32からアタッチメント台40の第4載置部材58に受け渡すことができる。   FIG. 28 shows the building material placed on the second placement member 32 of the transport carriage 20, the winding shaft 4, and the shutter curtain that is wound around the winding shaft 4 with the upper end coupled to the winding shaft 4. The construction material of this embodiment is a combined body 70 of the winding shaft 4 and the shutter curtain 1. Also in this embodiment, after performing the same work as the work of FIG. 22 showing the case of the shutter curtain 1, the fork 61 of the forklift vehicle 60 is raised, as shown in FIG. 29. 70 can be transferred from the second mounting member 32 of the transport carriage 20 to the fourth mounting member 58 of the attachment base 40.

図30には、図18及び図21の巻取軸4の場合と同様に、アタッチメント台40に3本設けられているそれぞれのワイヤー51により結合体70を吊り下げ支持した状態が示されている。この実施形態でも、巻取軸4の場合と同様に、巻取軸4の軸方向の両端部に設けられている首部4Aを2個のブラケット3で正確に受けさせる作業を実施しなければならないため、3本のワイヤー51のうち、結合体70における巻取軸4の軸方向に離れた左右両側の2箇所を支持している2本のワイヤー51を、作業者が前述した送信器の操作によってこれらのワイヤー51のための巻取リール54を個別に正逆回転させることにより、個別に昇降させ、これにより、巻取軸4の2個の首部4Aを個別に昇降させる作業を行うことにより、それぞれの首部4Aの高さ位置をそれぞれのブラケット3の凹部3Aの高さ位置と一層正確に一致又は略一致させることができる。   FIG. 30 shows a state in which the combined body 70 is suspended and supported by the respective wires 51 provided on the attachment base 40 in the same manner as the winding shaft 4 of FIGS. 18 and 21. . In this embodiment as well, as in the case of the winding shaft 4, it is necessary to perform an operation for accurately receiving the neck portions 4 </ b> A provided at both ends in the axial direction of the winding shaft 4 with the two brackets 3. Therefore, among the three wires 51, the operator operates the transmitter described above with the two wires 51 supporting the two left and right sides separated in the axial direction of the winding shaft 4 in the combined body 70. By rotating the take-up reels 54 for these wires 51 individually forward and backward, individually raising and lowering them, thereby performing the work of raising and lowering the two neck portions 4A of the take-up shaft 4 individually The height positions of the respective neck portions 4A can be more accurately or substantially matched with the height positions of the concave portions 3A of the respective brackets 3.

なお、この実施形態に係る巻取軸4とシャッターカーテン1との結合体70でも、この結合体70を持ち上げるために、結合体70を吊り下げ支持することを、3本のワイヤー51のうち、左右両側の2本のワイヤー51だけを用いて行ってもよい。   It should be noted that, in the combined body 70 of the winding shaft 4 and the shutter curtain 1 according to this embodiment, in order to lift the combined body 70, the suspension of the combined body 70 is supported among the three wires 51. You may perform using only the two wires 51 of the right-and-left both sides.

図31は、巻取軸4とシャッターカーテン1との結合体70をワイヤー51により持ち上げるために吊り下げ支持することについての別実施形態を示している。この実施形態でも、アタッチメント台40に前後2個設けられている滑車47,48のうち、前側の滑車47から下方へ延びているワイヤー51の下部を、第4載置部材58に載置されている結合体70の下側に回しているが、ワイヤー51の下端に取り付けられているフック部材52を、2個の滑車47,48を回転自在に保持している保持部材49’に、前側の滑車47よりもさらに前方において設けられているピン等による係止部材71に係止させている。   FIG. 31 shows another embodiment in which the combined body 70 of the winding shaft 4 and the shutter curtain 1 is suspended and supported for lifting by the wire 51. Also in this embodiment, the lower portion of the wire 51 extending downward from the front pulley 47 out of the two pulleys 47 and 48 provided on the front and rear of the attachment base 40 is placed on the fourth placement member 58. The hook member 52 attached to the lower end of the wire 51 is turned to the holding member 49 ′ holding the two pulleys 47 and 48 in a rotatable manner. The locking member 71 is locked by a pin or the like provided further forward than the pulley 47.

この実施形態でも、ワイヤー51により結合体70を吊り下げ支持することができるとともに、ワイヤー51を巻き取り、繰り出すための巻取リール54の正回転により、ワイヤー51で結合体70を持ち上げることができ、また、巻取リール54の逆回転により、ワイヤー51で結合体70を支持したままこの結合体を下降させることもできる。   Also in this embodiment, the combined body 70 can be suspended and supported by the wire 51, and the combined body 70 can be lifted by the wire 51 by the forward rotation of the take-up reel 54 for winding and feeding the wire 51. Further, by reverse rotation of the take-up reel 54, the combined body 70 can be lowered while the combined body 70 is supported by the wire 51.

このようなワイヤー51による吊り下げ支持は、結合体70だけではなく、巻取軸4についても実施することができ、渦巻き状に巻回されているシャッターカーテン1についても実施することができる。   Such suspension support by the wire 51 can be implemented not only for the combined body 70 but also for the winding shaft 4 and also for the shutter curtain 1 wound in a spiral shape.

本発明は、シャッター装置のシャッターカーテンの上端を、シャッターカーテンを繰り出し自在に巻き取るための巻取軸に結合する作業に利用することができる。   INDUSTRIAL APPLICATION This invention can be utilized for the operation | work which couple | bonds the upper end of the shutter curtain of a shutter apparatus with the winding shaft for winding up a shutter curtain freely.

1 シャッターカーテン
1B 吊元部材
4 巻取軸
10 開口部である出入口
20 搬送台車
40 引き上げ装置にもなっているアタッチメント台
51 引き上げ部材であって、紐状部材にもなっているワイヤー
52 フック部材
58 アタッチメント台に回転自在に設けられている載置部材
60 フォークリフト車両
61 フォークリフト車両のフォーク
68 吊元部材の孔
DESCRIPTION OF SYMBOLS 1 Shutter curtain 1B Suspension member 4 Winding shaft 10 Entrance / exit which is an opening part 20 Carriage carriage 40 Attachment stand which also serves as a lifting device 51 Wire which is a lifting member and also serves as a string member 52 Hook member 58 Mounting member provided rotatably on attachment base 60 Forklift vehicle 61 Fork of forklift vehicle 68 Hole in suspension member

Claims (9)

構造物に形成されている開口部を開閉するシャッター装置のシャッターカーテンの上端を、このシャッターカーテンを繰り出し自在に巻き取るための巻取軸に結合するために用いるシャッター装置のシャッターカーテン施工装置であって、
前記開口部の全部又は略全部を開閉する大きさに形成されている前記シャッターカーテンの前記上端を、前記巻取軸が配置されている高さ位置と同じ又は略同じ高さ位置まで引き上げて、前記上端を前記巻取軸に結合可能とするための引き上げ部材を備えている引き上げ装置を含んで構成されていることを特徴とするシャッター装置のシャッターカーテン施工装置。
The shutter curtain construction device of the shutter device used for connecting the upper end of the shutter curtain of the shutter device that opens and closes the opening formed in the structure to the winding shaft for winding the shutter curtain freely. And
Pulling up the upper end of the shutter curtain formed to a size that opens and closes all or substantially all of the opening to the same or substantially the same height position where the winding shaft is disposed, A shutter curtain construction device for a shutter device, comprising: a lifting device including a lifting member for allowing the upper end to be coupled to the winding shaft.
請求項1に記載のシャッター装置のシャッターカーテン施工装置において、前記引き揚げ装置は、渦巻き状に巻回されている前記シャッターカーテンを載置するための載置部材を備えていることを特徴とするシャッター装置のシャッターカーテン施工装置。   2. The shutter curtain construction apparatus for a shutter device according to claim 1, wherein the lifting device includes a mounting member for mounting the shutter curtain wound in a spiral shape. Equipment for shutter curtain construction. 請求項2に記載のシャッター装置のシャッターカーテン施工装置において、前記載置部材は回転自在な回転部材となっていることを特徴とするシャッター装置のシャッターカーテン施工装置。   3. The shutter curtain construction device for a shutter device according to claim 2, wherein the mounting member is a rotatable rotating member. 請求項1〜3のいずれかの記載のシャッター装置のシャッターカーテン施工装置において、前記引き上げ部材は、前記シャッターカーテンの上方から吊り下げられた紐状部材となっていることを特徴とするシャッター装置のシャッターカーテン施工装置。   The shutter curtain construction device for a shutter device according to any one of claims 1 to 3, wherein the lifting member is a string-like member suspended from above the shutter curtain. Shutter curtain construction equipment. 請求項3又は4の記載のシャッター装置のシャッターカーテン施工装置において、前記引き上げ部材の下端には、前記シャッターカーテンの前記上端を引っ掛けるためのフック部材が設けられていることを特徴とするシャッター装置のシャッターカーテン施工装置。   5. The shutter curtain construction device for a shutter device according to claim 3, wherein a hook member for hooking the upper end of the shutter curtain is provided at a lower end of the lifting member. Shutter curtain construction equipment. 請求項5に記載のシャッター装置のシャッターカーテン施工装置において、前記シャッターカーテンの前記上端には、前記巻取軸にボルトで結合される吊元部材が設けられ、この吊元部材に前記ボルトを挿入するために形成されている孔に前記フック部材が挿入されることにより、前記シャッターカーテンの前記上端に前記フック部材が引っ掛けられることを特徴とするシャッター装置のシャッターカーテン施工装置。   6. The shutter curtain construction device for a shutter device according to claim 5, wherein a suspension member coupled to the winding shaft by a bolt is provided at the upper end of the shutter curtain, and the bolt is inserted into the suspension member. A shutter curtain construction device for a shutter device, wherein the hook member is hooked on the upper end of the shutter curtain when the hook member is inserted into a hole formed for the purpose. 請求項1〜6のいずれかに記載のシャッター装置のシャッターカーテン施工装置において、前記引き上げ装置を持ち上げるためのリフト装置を含んで構成され、このリフト装置により持ち上げられた前記引き上げ装置の前記引き上げ部材により、前記シャッターカーテンの上端が、前記巻取軸が配置されている高さ位置と同じ又は略同じ高さ位置まで引き上げられることを特徴とするシャッター装置のシャッターカーテン施工装置。   The shutter curtain construction device for a shutter device according to any one of claims 1 to 6, comprising a lift device for lifting the lifting device, and by the lifting member of the lifting device lifted by the lifting device. A shutter curtain construction device for a shutter device, wherein an upper end of the shutter curtain is pulled up to a height position that is the same as or substantially the same as a height position where the winding shaft is disposed. 構造物に形成されている開口部を開閉するシャッター装置のシャッターカーテンの上端を、このシャッターカーテンを繰り出し自在に巻き取るための巻取軸に結合するために実施するシャッター装置のシャッターカーテン施工方法であって、
前記シャッターカーテンを、前記開口部の全部又は略全部を開閉可能とする大きさにして形成するための第1作業工程と、
前記シャッターカーテンの前記上端を、前記巻取軸が配置されている高さ位置と同じ又は略同じ高さ位置まで引き上げるための第2作業工程と、
前記シャッターカーテンの前記上端を前記巻取軸に結合するための第3作業工程と、
を含んでいることを特徴とするシャッター装置のシャッターカーテン施工方法。
In the shutter curtain construction method of the shutter device, the upper end of the shutter curtain of the shutter device that opens and closes the opening formed in the structure is coupled to the winding shaft for winding the shutter curtain freely. There,
A first work step for forming the shutter curtain in such a size that all or substantially all of the opening can be opened and closed;
A second operation step for raising the upper end of the shutter curtain to the same or substantially the same height position as the winding shaft is disposed;
A third operation step for coupling the upper end of the shutter curtain to the winding shaft;
A shutter curtain construction method for a shutter device, comprising:
請求項8に記載のシャッター装置のシャッターカーテン施工方法において、前記第1作業工程と前記第2作業工程との間に、渦巻き状に巻回されている前記シャッターカーテンを持ち上げるための作業工程が実施されることを特徴とするシャッター装置のシャッターカーテン施工方法。   9. The shutter curtain construction method for a shutter device according to claim 8, wherein an operation step for lifting the shutter curtain wound in a spiral shape is performed between the first operation step and the second operation step. A shutter curtain construction method for a shutter device.
JP2018080297A 2018-04-19 2018-04-19 Shutter curtain construction device for shutter device and its construction method Active JP7041579B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2018080297A JP7041579B2 (en) 2018-04-19 2018-04-19 Shutter curtain construction device for shutter device and its construction method
JP2021201384A JP7262561B2 (en) 2018-04-19 2021-12-13 Conveyor trolley for building materials

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018080297A JP7041579B2 (en) 2018-04-19 2018-04-19 Shutter curtain construction device for shutter device and its construction method

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2021201384A Division JP7262561B2 (en) 2018-04-19 2021-12-13 Conveyor trolley for building materials

Publications (2)

Publication Number Publication Date
JP2019190021A true JP2019190021A (en) 2019-10-31
JP7041579B2 JP7041579B2 (en) 2022-03-24

Family

ID=68389377

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018080297A Active JP7041579B2 (en) 2018-04-19 2018-04-19 Shutter curtain construction device for shutter device and its construction method

Country Status (1)

Country Link
JP (1) JP7041579B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11624115B2 (en) 2010-05-12 2023-04-11 Sio2 Medical Products, Inc. Syringe with PECVD lubrication
CN103930595A (en) 2011-11-11 2014-07-16 Sio2医药产品公司 Passivation, ph protective or lubricity coating for pharmaceutical package, coating process and apparatus
US9764093B2 (en) 2012-11-30 2017-09-19 Sio2 Medical Products, Inc. Controlling the uniformity of PECVD deposition
CN110074968B (en) 2013-03-11 2021-12-21 Sio2医药产品公司 Coated packaging material

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0262098U (en) * 1988-10-31 1990-05-09
JPH1061349A (en) * 1996-08-15 1998-03-03 Bunka Shutter Co Ltd Shutter curtain winding device
JP2000160959A (en) * 1998-11-27 2000-06-13 Bunka Shutter Co Ltd Work execution method of opening/closing body of opening /closing device and work execution device therefor
JP2000170463A (en) * 1998-12-04 2000-06-20 Bunka Shutter Co Ltd Opening/closing body installing method for opening/ closing device
JP2001295567A (en) * 2000-04-17 2001-10-26 Bunka Shutter Co Ltd Method and device for supporting winding shaft of shutter device for building
JP2008208532A (en) * 2007-02-23 2008-09-11 Sanwa Shutter Corp Method of mounting shutter device for building
JP2013155517A (en) * 2012-01-30 2013-08-15 Sanwa Shutter Corp Tool and method for holding attitude of shutter device for building

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0262098U (en) * 1988-10-31 1990-05-09
JPH1061349A (en) * 1996-08-15 1998-03-03 Bunka Shutter Co Ltd Shutter curtain winding device
JP2000160959A (en) * 1998-11-27 2000-06-13 Bunka Shutter Co Ltd Work execution method of opening/closing body of opening /closing device and work execution device therefor
JP2000170463A (en) * 1998-12-04 2000-06-20 Bunka Shutter Co Ltd Opening/closing body installing method for opening/ closing device
JP2001295567A (en) * 2000-04-17 2001-10-26 Bunka Shutter Co Ltd Method and device for supporting winding shaft of shutter device for building
JP2008208532A (en) * 2007-02-23 2008-09-11 Sanwa Shutter Corp Method of mounting shutter device for building
JP2013155517A (en) * 2012-01-30 2013-08-15 Sanwa Shutter Corp Tool and method for holding attitude of shutter device for building

Also Published As

Publication number Publication date
JP7041579B2 (en) 2022-03-24

Similar Documents

Publication Publication Date Title
JP2019190021A (en) Shutter curtain installation device of shutter device and its installation method
JP5465526B2 (en) Roping method and apparatus
US2846051A (en) Apparatus for handling conveyor belting for an extensible conveyor
JP5793437B2 (en) Posture holding tool and posture holding method for architectural shutter device
AU2013390707B2 (en) Belt replacement device
JP7063698B2 (en) Building material lifting device and its lifting method
KR101363053B1 (en) Vehicle for carrier of farming machinery with ladder
KR101033695B1 (en) Flag hoisting unit
JP7262561B2 (en) Conveyor trolley for building materials
JP2019189368A (en) Building material delivery device
JP6321938B2 (en) Installation method of construction sheet and equipment used for this method
CN216863542U (en) Goods lift goes up and down
JP7479911B2 (en) Method for hanging shutter curtains in architectural shutter devices
CN112694021A (en) Building material transportation elevating gear
JP5738611B2 (en) Vertical transfer device
JP7446505B1 (en) Parts transport device and part transport method
JP3237367B2 (en) Cylindrical object transfer device using self-propelled body
JP4409400B2 (en) Winding device and horizontal curtain with winding device
JPWO2018230494A1 (en) Tape feeding device and tape feeding method
JP7365969B2 (en) Construction equipment for shutter equipment
JP6937269B2 (en) Lifting device for building materials
JP7365968B2 (en) Construction method of shutter device
CN220351441U (en) Material lifting device for high-rise building
KR20120052055A (en) Apparatus for adjusting position of lift
JP2009107779A (en) Lifting chain changing device and usage thereof

Legal Events

Date Code Title Description
RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20180508

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20201215

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20211006

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20211026

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20211203

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220308

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220311

R150 Certificate of patent or registration of utility model

Ref document number: 7041579

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150