JP2019105984A - Apparatus control device - Google Patents

Apparatus control device Download PDF

Info

Publication number
JP2019105984A
JP2019105984A JP2017237779A JP2017237779A JP2019105984A JP 2019105984 A JP2019105984 A JP 2019105984A JP 2017237779 A JP2017237779 A JP 2017237779A JP 2017237779 A JP2017237779 A JP 2017237779A JP 2019105984 A JP2019105984 A JP 2019105984A
Authority
JP
Japan
Prior art keywords
unit
setting condition
incentive
control
user
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2017237779A
Other languages
Japanese (ja)
Inventor
乙允 大杉
Takamasa Osugi
乙允 大杉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Denso Corp
Original Assignee
Denso Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Denso Corp filed Critical Denso Corp
Priority to JP2017237779A priority Critical patent/JP2019105984A/en
Publication of JP2019105984A publication Critical patent/JP2019105984A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances
    • Y04S20/244Home appliances the home appliances being or involving heating ventilating and air conditioning [HVAC] units

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

To enable a user to make a change to a setting condition of desired equipment even during control.SOLUTION: An apparatus control device determines whether change of a setting condition of an air conditioner 3 is required during demand response control (S108). When determining that the change of the setting condition of the air conditioner 3 is required, the apparatus control device notifies a user that the change of the setting condition of the air conditioner 3 is required, and also presents one or more setting conditions of the air conditioner 3 to the user (S120). Then, the apparatus control device resets the setting condition of the air conditioner 3 to a setting condition selected by the user among the one or more presented setting conditions of equipment to perform demand response control of the equipment.SELECTED DRAWING: Figure 6

Description

本発明は、設備機器を制御する機器制御装置に関するものである。   The present invention relates to a device control apparatus that controls equipment.

近年、電気料金の設定またはインセンティブの支払いに応じてユーザ(需要家)が電力の使用を抑制するように電力消費パターンを変化させるデマンドレスポンスに関する開発が進められている。DRは、電気料金型デマンドレスポンスとインセンティブ型デマンドレスポンスに分けられる。電気料金型デマンドレスポンスは、電力需要のピーク時に電気料金を値上げするなど多様な電気料金を設定することで、ユーザに電力消費の抑制を促す仕組みである。インセンティブ型デマンドレスポンスは、電力会社とユーザとの間で予め電力需要のピーク時などに節電する契約を結んだ上で、電力会社からの依頼に応じてユーザが節電した場合に電力会社がインセンティブ(対価)を支払うことで、ユーザに電力消費の抑制を促す仕組みである。   In recent years, development has been advanced on demand response that changes the power consumption pattern so that the user (consumer) suppresses the use of power according to the setting of the electricity rate or the payment of the incentive. DR can be divided into electricity bill type demand response and incentive type demand response. The electricity bill type demand response is a mechanism that urges the user to suppress the power consumption by setting various electricity bills such as raising the electricity bill at the peak of the power demand. Incentive type demand response, when a contract is made between the power company and the user in advance to save power at peak demand of power, etc., and the power company gives an incentive when the user saves power in response to a request from the power company. It is a mechanism that urges the user to suppress power consumption by paying the consideration).

インセンティブ型デマンドレスポンスに対応する装置として、特許文献1に記載されたものがある。この装置は、インセンティブ単価等のインセンティブの導出要素に変動が生じた場合でも、使用者が期待するインセンティブを得られるように、設備機器の制御条件を変更し、この制御条件で設備機器を制御するようにしている。   As an apparatus corresponding to an incentive type demand response, there is a thing described in patent documents 1. As shown in FIG. This device changes the control conditions of the equipment and controls the equipment under this control condition so that the incentive expected by the user can be obtained even if the derivation factor of the incentive such as the incentive unit price changes. It is like that.

特開2016−207034号公報JP, 2016-207034, A

このような装置では、インセンティブを得るための制御が行われている途中で、快適性を得るために設備機器の制御条件を変更したくなる場合がある。   In such an apparatus, while control for obtaining an incentive is being performed, it may be desirable to change the control conditions of the equipment to obtain comfort.

例えば、インセンティブを得るために設備機器として空調機の制御が行われている途中でも、急な来客等によって、夏場に空調機の設定温度を下げて快適性を確保したい場合や、冬場に空調機の設定温度を上げて快適性を確保したい場合がある。   For example, even when the control of the air conditioner as equipment is performed to obtain an incentive, a steep visitor or the like may want to lower the set temperature of the air conditioner in the summer to ensure comfort, or the air conditioner in the winter There are cases where it is desirable to increase the set temperature of to ensure comfort.

しかしながら、上記特許文献1に記載された装置は、インセンティブを得るための制御を実施する前に設備機器の制御条件を設定した後、この制御条件を維持した状態でインセンティブを得るための制御を実施するようになっている。   However, the apparatus described in Patent Document 1 sets control conditions of equipment before implementing control for obtaining an incentive, and then performs control for obtaining an incentive while maintaining the control conditions. It is supposed to

すなわち、上記特許文献1に記載された装置は、インセンティブを得るための制御が行われている途中で、設備機器の制御条件をユーザが希望する条件に変更することまで考慮されていない。このため、ユーザに快適なサービスを提供することができないという問題があった。   That is, the device described in Patent Document 1 does not consider changing the control condition of the equipment to a condition desired by the user while control for obtaining an incentive is being performed. For this reason, there has been a problem that the user can not be provided with a comfortable service.

本発明は上記問題に鑑みたもので、制御の途中であっても、ユーザが希望する設備機器の設定条件に変更できるようにすることを目的とする。   SUMMARY OF THE INVENTION The present invention has been made in consideration of the above problems, and has an object of enabling a user to change to setting conditions of equipment desired by the user even during control.

上記目的を達成するため、請求項1に記載の発明は、電力削減要求の受信に応答して設備機器(3)が所定期間内に所定の目標電力削減量を削減したときに得られるインセンティブを獲得できるよう設備機器を制御する機器制御装置であって、電力削減要求を受信した場合、所定期間内に所定の目標電力削減量分の電力削減を達成するための設備機器の設定条件を特定する設定条件特定部(S102、S129、S133)と、設定条件特定部により特定された設定条件にしたがって所定期間内に所定の目標電力削減量分の電力削減を達成するよう設備機器をデマンドレスポンス制御する機器制御部(S106)と、機器制御部によるデマンドレスポンス制御の途中で設備機器の設定条件を変更する必要が生じたか否かを判定する設定条件判定部(S108)と、設定条件判定部により設備機器の設定条件を変更する必要が生じたと判定された場合、設備機器の設定条件を変更する必要が生じた旨をユーザに報知するとともに、1または複数の設備機器の設定条件をユーザに提示する設定条件提示部(S120)と、を備え、機器制御部は、設備機器の設定条件を、設定条件提示部により提示された1または複数の設備機器の設定条件の中からユーザによって選択された設定条件に再設定して設備機器をデマンドレスポンス制御する。   In order to achieve the above object, the invention according to claim 1 provides an incentive to be obtained when the facility device (3) reduces a predetermined target power reduction amount within a predetermined period in response to the reception of the power reduction request. A device control apparatus that controls facility equipment to be able to obtain, and when a power reduction request is received, specifies setting conditions of the facility equipment to achieve power reduction by a predetermined target power reduction amount within a predetermined period. Demand response control is performed on facility equipment to achieve power reduction by a predetermined target power reduction amount within a predetermined period according to the setting condition specifying unit (S102, S129, S133) and the setting condition specified by the setting condition specifying unit Setting condition check to determine whether it is necessary to change the setting condition of the equipment during the demand response control by the device control unit (S106) and the device control unit When it is determined that the setting condition of the facility device needs to be changed by the unit (S108) and the setting condition determining unit, the user is informed that the setting condition of the facility device needs to be changed, and 1 or A setting condition presentation unit (S120) for presenting the setting conditions of the plurality of facility devices to the user, and the device control unit displays the setting conditions of the facility device by one or more facility devices presented by the setting condition presentation unit The demand response control of the facility device is performed by resetting to the setting condition selected by the user from among the setting conditions of.

このような構成によれば、設定条件提示部は、設定条件判定部により設備機器の設定条件を変更する必要が生じたと判定された場合、設備機器の設定条件を変更する必要が生じた旨をユーザに報知するとともに、1または複数の設備機器の設定条件をユーザに提示し、機器制御部は、設備機器の設定条件を、設定条件提示部により提示された1または複数の設備機器の設定条件の中からユーザによって選択された設定条件に再設定して設備機器をデマンドレスポンス制御するので、制御の途中であっても、ユーザが希望する設備機器の設定条件に変更することができる。   According to such a configuration, when the setting condition determining unit determines that the setting condition of the facility device needs to be changed, the setting condition presenting unit indicates that the setting condition of the facility device needs to be changed. While notifying the user, the setting conditions of one or more equipment are presented to the user, and the equipment control unit sets the setting conditions of the equipment, the setting conditions of the one or more equipments presented by the setting condition presentation unit Since the demand response control of the equipment is performed by resetting the setting conditions selected by the user from among the above, the setting conditions of the equipment desired by the user can be changed even during the control.

なお、この欄および特許請求の範囲で記載した各手段の括弧内の符号は、後述する実施形態に記載の具体的手段との対応関係を示すものである。   In addition, the code | symbol in the parenthesis of each means described by this column and the claim shows correspondence with the specific means as described in embodiment mentioned later.

第1実施形態の機器制御装置を用いた屋内空調システムの全体構成図である。It is a whole block diagram of the indoor air-conditioning system using the apparatus control apparatus of 1st Embodiment. 機器制御装置のブロック図である。It is a block diagram of an apparatus control device. 冷房時におけるデマンドレスポンス制御のスケジュールの一例を示した図である。It is a figure showing an example of a schedule of demand response control at the time of air conditioning. 暖房時におけるデマンドレスポンス制御のスケジュールの一例を示した図である。It is a figure showing an example of a schedule of demand response control at the time of heating. 冷房時におけるデマンドレスポンス制御のスケジュールの一例を示した図である。It is a figure showing an example of a schedule of demand response control at the time of air conditioning. 第1実施形態の機器制御装置の制御部のフローチャートである。It is a flowchart of the control part of the apparatus control apparatus of 1st Embodiment. 表示画面の表示例を表した図である。It is a figure showing the example of a display of a display screen. 第2実施形態の機器制御装置の制御部のフローチャートである。It is a flowchart of the control part of the apparatus control apparatus of 2nd Embodiment.

以下、本発明の実施形態について図に基づいて説明する。なお、以下の各実施形態相互において、互いに同一もしくは均等である部分には、図中、同一符号を付してある。   Hereinafter, an embodiment of the present invention will be described based on the drawings. In the following embodiments, parts identical or equivalent to each other are denoted by the same reference numerals in the drawings.

(第1実施形態)
第1実施形態に係る機器制御装置1の全体構成について図1を用いて説明する。機器制御装置1は、建物の全体の空調を行う全館空調装置3の制御を行うものである。図1は、機器制御装置1および空調装置3が2階建ての戸建て住宅に設置された様子を表している。
First Embodiment
The entire configuration of the device control apparatus 1 according to the first embodiment will be described with reference to FIG. The device control device 1 controls the entire building air conditioner 3 that performs air conditioning of the entire building. FIG. 1 shows the device control device 1 and the air conditioner 3 installed in a two-story detached house.

空調装置3は、室内に設置される室内機31および室外に設置される室外機32を備えている。室内機31と室外機32の間は、冷媒が流れる冷媒配管33を介して接続されている。室内機31は、冷媒と空気との熱交換により温度調整された空気をダクト34を介してリビング、和室、寝室、子供部屋等の各部屋に送風する。   The air conditioner 3 includes an indoor unit 31 installed indoors and an outdoor unit 32 installed outdoor. The indoor unit 31 and the outdoor unit 32 are connected via a refrigerant pipe 33 through which a refrigerant flows. The indoor unit 31 blows the air whose temperature has been adjusted by heat exchange between the refrigerant and the air to each room such as a living room, a Japanese room, a bedroom, and a child room through the duct 34.

室内機31は、冷媒と室内空気とを熱交換させて、室内の空気の温度を変化させる室内熱交換器と、この室内熱交換器を通過する気流を発生させるとともに内熱交換器にて温度調整された空調風をダクト34を介して各部屋に送風する室内送風機(いずれも図示せず)と、を有している。   The indoor unit 31 exchanges heat between the refrigerant and the indoor air to generate an indoor heat exchanger that changes the temperature of the indoor air, generates an air flow passing through the indoor heat exchanger, and generates an internal heat exchanger with the temperature. The indoor air blower (all are not shown) which ventilate the adjusted air-conditioning air to each room via the duct 34.

室外機32は、冷媒を圧縮して吐出する圧縮機と、圧縮機から吐出された高温の冷媒と室外の空気とを熱交換させる室外熱交換器と、空調用減圧機器(いずれも図示せず)と、を備えている。空調用減圧機器は、室内熱交換器および室外熱交換器のうち、一方の熱交換器から流出した冷媒を所定の圧力まで減圧して他方の熱交換器に流出させる。   The outdoor unit 32 includes a compressor that compresses and discharges a refrigerant, an outdoor heat exchanger that exchanges heat between the high temperature refrigerant discharged from the compressor and the outdoor air, and a decompression device for air conditioning (all not shown) ) And. The decompression device for air conditioning decompresses the refrigerant flowing out of one of the indoor heat exchangers and the outdoor heat exchanger to a predetermined pressure and causes the refrigerant to flow out to the other heat exchanger.

本実施形態の機器制御装置1および空調装置3が設置されている建物は、電力会社等の電力供給会社との間で、電力供給会社からの電力削減要求に応じて節電した際に、ユーザ(需要家)が電力供給会社からインセンティブを得られるインセンティブ型デマンドレスポンス(DR)契約がなされている。なお、電力削減要求には、時間帯と目標電力削減量が含まれる。ユーザは、電力削減要求に含まれる所定の時間帯に目標電力削減量の電力を削減すると、電力供給会社からインセンティブとして所定の対価を得ることができるようになっている。   The building in which the device control device 1 and the air conditioner 3 of the present embodiment are installed is a user (when power saving is made in response to a power reduction request from a power supply company with a power supply company such as a power company). An incentive type demand response (DR) contract has been made in which customers can obtain an incentive from a power supply company. The power reduction request includes a time zone and a target power reduction amount. When the user reduces the power of the target power reduction amount in a predetermined time zone included in the power reduction request, the user can receive predetermined compensation as an incentive from the power supply company.

次に、機器制御装置1の構成について説明する。図2に示すように、機器制御装置1は、制御装置20およびリモコン10を備えている。制御装置20とリモコン10は、離れた場所に配置されている。制御装置20は、リモコン10との間で通信することが可能となっている。   Next, the configuration of the device control device 1 will be described. As shown in FIG. 2, the device control device 1 includes a control device 20 and a remote control 10. The control device 20 and the remote control 10 are disposed at remote places. The control device 20 can communicate with the remote control 10.

制御装置20は、ネットワーク網を介して外部機器と通信するための通信部21、各種演算を行う演算部22および各種データを記憶する記憶部23を有している。   The control device 20 has a communication unit 21 for communicating with an external device via a network, an operation unit 22 for performing various calculations, and a storage unit 23 for storing various data.

制御装置20は、通信部21を介してネットワーク網に接続することで、電力会社等の電力供給会社のサーバ等と通信を行うことが可能となっている。演算部22は、CPUにより構成されており、記憶部23に記憶されたプログラムに従って各種演算処理を実行する。記憶部23は、ROM、RAM、フラッシュメモリ等により構成されている。   The control device 20 can communicate with a server or the like of a power supply company such as a power company by connecting to the network via the communication unit 21. The arithmetic unit 22 is constituted by a CPU, and executes various arithmetic processing in accordance with a program stored in the storage unit 23. The storage unit 23 is configured of a ROM, a RAM, a flash memory, and the like.

リモコン10は、操作部11および報知部12を有している。操作部11は、各種メカニカルスイッチ、タッチスイッチ等のスイッチにより構成され、ユーザのスイッチに対する操作に応じた信号を出力する。報知部12は、液晶ディスプレイ等の表示部と、音声信号に応じた音を出力するスピーカと、を有している。   The remote controller 10 has an operation unit 11 and a notification unit 12. The operation unit 11 is configured by switches such as various mechanical switches and touch switches, and outputs a signal according to an operation on the switch by the user. The notification unit 12 includes a display unit such as a liquid crystal display, and a speaker that outputs a sound corresponding to the audio signal.

機器制御装置1の制御装置20は、電力会社等の電力供給会社から電力削減要求を受信すると、設備機器としての空調装置3が所定期間内に所定の目標電力削減量を削減したときに得られるインセンティブを獲得できるよう空調装置3を制御する。   When the control device 20 of the device control device 1 receives a power reduction request from a power supply company such as a power company, it is obtained when the air conditioner 3 as a facility device reduces a predetermined target power reduction amount within a predetermined period. The air conditioner 3 is controlled to obtain an incentive.

具体的には、制御装置20は、電力削減要求を受信した場合、所定期間内に所定の目標電力削減量分の電力削減を達成するための空調装置3の制御スケジュールを作成し、この制御スケジュールに従って空調装置3をデマンドレスポンス制御する。なお、空調装置3は、機器制御装置1の制御装置20からの制御信号に応じて設定温度、設定湿度、送風風量等を変更することが可能となっている。   Specifically, when the power reduction request is received, the control device 20 creates a control schedule of the air conditioner 3 for achieving the power reduction by a predetermined target power reduction amount within a predetermined period, and this control schedule The demand response control of the air conditioner 3 is performed according to. The air conditioner 3 can change the set temperature, the set humidity, the amount of air blowing, and the like according to a control signal from the control device 20 of the device control device 1.

ここでは、空調装置3の設定湿度および送風風量を一定とし、設定温度を変更することにより空調装置3の消費電力を調整する例を示すが、空調装置3の設定湿度や送風風量を制御して空調装置3の消費電力を調整することもできる。   Here, an example is shown in which the power consumption of the air conditioner 3 is adjusted by setting the set humidity and the air volume of the air conditioner 3 constant and changing the set temperature, but by controlling the set humidity and the air volume of the air conditioner 3 The power consumption of the air conditioner 3 can also be adjusted.

図3は、冷房運転時に、13時00分〜16時00分までの時間帯で、3キロワット時(kWh)の電力削減要求を受信した際のデマンドレスポンス制御のスケジュールの一例を示した図である。左軸は、図中実線で示されている空調装置3の設定温度である。右軸は、図中一点鎖線で示されている目標削減量と点線で示されている予測削減量となっている。   FIG. 3 is a diagram showing an example of a schedule of demand response control at the time of receiving a power reduction request of 3 kilowatt hours (kWh) in the time zone from 13:00 to 16:00 during cooling operation. . The left axis is the set temperature of the air conditioner 3 indicated by a solid line in the figure. The right axis corresponds to the target reduction amount indicated by an alternate long and short dash line in the drawing and the predicted reduction amount indicated by a dotted line.

デマンドレスポンス制御前の空調装置3の設定温度は26℃となっている。図3は、13時00分〜16時00分までの時間帯で、空調装置3の設定温度を28℃に変更することによりどの程度の電力削減効果が得られるかを予測した結果を表している。ここでは、13時00分〜16時00分までの時間帯で、3キロワット時(kWh)の電力が削減されることが示されている。   The set temperature of the air conditioner 3 before the demand response control is 26 ° C. FIG. 3 shows the result of predicting how much the power reduction effect can be obtained by changing the set temperature of the air conditioner 3 to 28 ° C. in the time zone from 13:00 to 16:00. There is. Here, it is shown that power of 3 kilowatt-hours (kWh) is reduced in the time zone from 13:00 to 16:00.

図4は、暖房運転時に、6時00分〜8時00分までの時間帯と、17時00分〜19時00分までの時間帯で、合計4キロワット時(kWh)の電力削減要求を受信した際のデマンドレスポンス制御のスケジュールの一例を示した図である。   Fig. 4 shows a total of 4 kilowatt-hour (kWh) power reduction requests received during the heating operation from 6:00 to 8:00 and from 17:00 to 19:00. It is the figure which showed an example of the schedule of demand response control at the time of having carried out.

デマンドレスポンス制御期間外の空調装置3の設定温度は24℃となっている。6時00分〜8時00分までの時間帯で、空調装置3の設定温度を21℃に変更するとともに、17時00分〜19時00分までの時間帯で、空調装置3の設定温度を20℃に変更することにより、どの程度の電力削減効果が得られるかを予測した結果を表している。   The set temperature of the air conditioner 3 outside the demand response control period is 24 ° C. The set temperature of the air conditioner 3 is changed to 21 ° C. in the time zone from 6:00 to 8:00, and the set temperature of the air conditioner 3 in the time zone from 17:00 to 19:00 The figure shows the result of predicting how much the power reduction effect can be obtained by changing the temperature to 20 ° C.

6時00分〜8時00分までの時間帯で、空調装置3の設定温度を21℃に変更することにより、2キロワット時(kWh)の電力が削減されることが示されている。さらに、17時00分〜19時00分までの時間帯で、空調装置3の設定温度を20℃に変更することにより2キロワット時(kWh)の電力が削減されることが示されている。   It is shown that the power of 2 kilowatt hours (kWh) is reduced by changing the set temperature of the air conditioner 3 to 21 ° C. in the time zone from 6:00 to 8:00. Furthermore, it is shown that the power of 2 kilowatt hours (kWh) is reduced by changing the set temperature of the air conditioner 3 to 20 ° C. in the time zone from 17:00 to 19:00.

すなわち、6時00分〜8時00分までの時間帯と、17時00分〜19時00分までの時間帯で、合計4キロワット時(kWh)の電力が削減されることが示されている。   That is, it is shown that a total of 4 kilowatt hours (kWh) of power is reduced in the time zone from 6:00 to 8:00 and the time zone from 17:00 to 19:00. .

図5は、冷房運転時に、13時00分〜16時00分までの時間帯で、3キロワット時(kWh)の電力削減要求を受信した際のデマンドレスポンス制御のスケジュールの一例を示した図である。   FIG. 5 is a diagram showing an example of a schedule of demand response control at the time of receiving a power reduction request of 3 kilowatt hours (kWh) in the time zone from 13:00 to 16:00 during cooling operation. .

デマンドレスポンス制御前の空調装置3の設定温度は26℃となっている。13時00分〜14時00分までの時間帯で、空調装置3の設定温度を28℃に変更したことにより、どの程度の電力削減効果が得られるかを予測した結果を表している。   The set temperature of the air conditioner 3 before the demand response control is 26 ° C. By changing the preset temperature of the air conditioner 3 to 28 ° C. in the time zone from 13:00 to 14:00, it is shown the result of predicting how much power reduction effect can be obtained.

ここで、空調装置3の電力削減量を再計算した結果、目標電力削減量を達成するために空調装置3の設定温度を29℃にする必要が生じ、14時00分〜15時00分までの時間帯で、空調装置3の設定温度を29℃に変更することによりどの程度の電力削減効果が得られるかを予測した結果を表している。   Here, as a result of recalculating the power reduction amount of the air conditioner 3, it is necessary to set the set temperature of the air conditioner 3 to 29 ° C. in order to achieve the target power reduction amount, from 14:00 to 15:00 In the time zone, the result of predicting how much the power reduction effect can be obtained by changing the set temperature of the air conditioner 3 to 29 ° C. is shown.

さらに、空調装置3の電力削減量を再計算した結果、目標電力削減量を達成するために空調装置3の設定温度を30℃にする必要が生じ、15時00分〜16時00分までの時間帯で、空調装置3の設定温度を30℃に変更することによりどの程度の電力削減効果が得られるかを予測した結果を表している。   Furthermore, as a result of recalculating the power reduction amount of the air conditioner 3, it becomes necessary to set the set temperature of the air conditioner 3 to 30 ° C. in order to achieve the target power reduction amount, from 15:00 to 16:00 It represents the result of predicting how much the power reduction effect can be obtained by changing the set temperature of the air conditioner 3 to 30 ° C. in the time zone.

デマンドレスポンス制御期間外の空調装置3の設定温度は26℃となっている。13時00分〜14時00分までの時間帯で、空調装置3の設定温度を28℃に変更することにより1キロワット時(kWh)の電力が削減されることが示されている。   The set temperature of the air conditioner 3 outside the demand response control period is 26 ° C. It is shown that power of 1 kilowatt hour (kWh) is reduced by changing the set temperature of the air conditioner 3 to 28 ° C. in the time zone from 13:00 to 14:00.

また、14時00分〜15時00分までの時間帯で、空調装置3の設定温度を29℃に変更することにより1キロワット時(kWh)の電力が削減されることが示されている。   It is also shown that by changing the set temperature of the air conditioner 3 to 29 ° C. in the time zone from 14:00 to 15:00, power of 1 kilowatt hour (kWh) is reduced.

また、15時00分〜16時00分までの時間帯で、空調装置3の設定温度を30℃に変更することにより1キロワット時(kWh)の電力が削減されることが示されている。   It is also shown that by changing the set temperature of the air conditioner 3 to 30 ° C., power of 1 kilowatt hour (kWh) can be reduced in the time zone from 15:00 to 16.00.

したがって、13時00分〜16時00分までの時間帯で、3キロワット時(kWh)の電力を削減することが可能であることが分かる。   Therefore, it is understood that it is possible to reduce the power of 3 kilowatt-hours (kWh) in the time zone from 13:00 to 16:00.

図6は、制御装置20のフローチャートである。次に、制御装置20の処理について図6を参照して説明する。ここでは、空調装置3が冷房運転を実施しているものとして説明する。制御装置20は、周期的に図6に示す処理を実施する。   FIG. 6 is a flowchart of the control device 20. Next, processing of the control device 20 will be described with reference to FIG. Here, the air conditioner 3 will be described as performing a cooling operation. Control device 20 periodically carries out the processing shown in FIG.

まず、制御装置20は、S100にて電力供給会社等から送信される電力削減要求を受信したか否かを判定する。なお、電力削減要求には、デマンドレスポンス制御する時間帯と目標電力削減量が含まれる。   First, the control device 20 determines whether or not the power reduction request transmitted from the power supply company or the like has been received in S100. The power reduction request includes the time period for performing demand response control and the target power reduction amount.

ここで、電力削減要求を受信した場合、制御装置20は、S102にて目標電力削減量分の電力削減を達成するための空調装置3の設定条件を特定する。ここでは、目標電力削減量分の電力削減を達成するための空調装置3の設定温度のスケジュールを作成する。なお、電力削減量は、例えば、過去の空調装置3の設定温度と消費電力の関係に基づいて特定することができる。   Here, when the power reduction request is received, the control device 20 specifies the setting condition of the air conditioner 3 for achieving the power reduction for the target power reduction amount in S102. Here, a schedule of the set temperature of the air conditioner 3 for achieving the power reduction by the target power reduction amount is created. The amount of power reduction can be specified based on, for example, the relationship between the set temperature of the air conditioner 3 and the power consumption in the past.

次に、制御装置20は、S104において、S102にて特定された空調装置3の設定条件とスケジュールをユーザに報知する。例えば、制御装置20は、図3に示したような空調装置3の設定温度のスケジュールとともにインセンティブを獲得可能である旨をリモコン10の表示部に表示させるとともにリモコン10のスピーカから報知音を発出させる。   Next, in S104, the control device 20 notifies the user of the setting condition and the schedule of the air conditioner 3 identified in S102. For example, the control device 20 causes the display unit of the remote controller 10 to display an indication that the incentive can be acquired along with the schedule of the set temperature of the air conditioner 3 as shown in FIG. .

次に、制御装置20は、デマンドレスポンス制御する時間帯になると、S106にて、デマンドレスポンス制御を実施する。具体的には、S102にて作成したスケジュールに従った空調装置3の設定温度の制御を開始する。   Next, when it is time to perform demand response control, the control device 20 performs demand response control in S106. Specifically, control of the set temperature of the air conditioner 3 according to the schedule created in S102 is started.

次に、制御装置20は、S108にて、設定条件を変更する必要があるか否かを判定する。ここで、例えば、空調空間への外気の流入など、何らかの外乱により、インセンティブを獲得できない可能性が大きくなった場合には、設定条件を変更する必要があると判定する。また、急な来客等によって、ユーザが空調装置3の設定温度を変更しようと操作部11を操作した場合にも、空調装置3の設定条件を変更する必要があると判定する。   Next, the control device 20 determines in S108 whether or not the setting condition needs to be changed. Here, for example, when the possibility that the incentive can not be acquired becomes large due to some disturbance such as the inflow of the outside air into the air conditioned space, it is determined that the setting condition needs to be changed. Also, when the user operates the operation unit 11 to change the set temperature of the air conditioner 3 by a sudden visitor or the like, it is determined that the set conditions of the air conditioner 3 need to be changed.

ここで、制御装置20は、空調装置3の設定条件を変更する必要がないと判定した場合、S110にて、デマンドレスポンス制御した場合に獲得できるインセンティブを推定する。具体的には、電力供給会社等との間で結んだ契約の内容に従って、インセンティブを推定する。例えば、電力削減要求を満たした場合に、一定料金のインセンティブが支払われる契約となっている場合には、電力削減要求を満たした場合のインセンティブを一定料金として推定し、電力削減要求を満たさない場合のインセンティブを0円として推定する。また、削減した電力量と単位電力量当たりのインセンティブ単価との積によりインセンティブを算出する契約となっている場合には、削減した電力量に単位電力量当たりの単価を乗算してインセンティブを推定する。   Here, when it is determined that the setting condition of the air conditioner 3 does not need to be changed, the control device 20 estimates an incentive that can be acquired when the demand response control is performed in S110. Specifically, the incentive is estimated according to the contents of the contract concluded with the power supply company or the like. For example, if the contract to pay a certain fee incentive is satisfied when the power reduction request is satisfied, the incentive when the power reduction request is satisfied is estimated as a certain fee, and the power reduction request is not satisfied. Incentive of is estimated as 0 yen. In addition, when the contract is to calculate the incentive by the product of the reduced power and the incentive unit price per unit power, the reduced power is multiplied by the unit price per unit power to estimate the incentive. .

次に、制御装置20は、S112にて、インセンティブに変更があったか否かを判定する。具体的には、以前に推定したインセンティブと現在、推定したインセンティブを比較してインセンティブに変更があったか否かを判定する。ここでは、初めてインセンティブを推定しているので、インセンティブに変更がないものとする。   Next, the control device 20 determines in S112 whether or not the incentive has been changed. Specifically, it is determined whether the incentive has been changed by comparing the previously estimated incentive with the currently estimated incentive. Here, since the incentive is estimated for the first time, there is no change in the incentive.

この場合、制御装置20は、S113にて、インセンティブをユーザに報知する。具体的には、S110にて推定したインセンティブをリモコン10の表示部に表示させるとともにリモコン10のスピーカから報知音を発出させる。   In this case, the control device 20 notifies the user of the incentive at S113. Specifically, the incentive estimated in S110 is displayed on the display unit of the remote controller 10, and the notification sound is emitted from the speaker of the remote controller 10.

次に、制御装置20は、S114にて、現在時刻がデマンドレスポンス制御の終了時刻になったか否かを判定する。ここで、現在時刻がデマンドレスポンス制御の終了時刻になっていない場合、制御装置20は、S116にて、一定時間が経過したか否かを判定する。   Next, in S114, the control device 20 determines whether the current time has reached the end time of the demand response control. Here, if the current time has not reached the end time of the demand response control, the control device 20 determines in S116 whether or not a certain time has elapsed.

ここで、一定時間が経過してない場合、制御装置20は、S116の判定を繰り返し実施する。また、一定時間が経過すると、制御装置20は、S102の処理を実施する。   Here, when the predetermined time has not elapsed, the control device 20 repeatedly performs the determination of S116. In addition, when a predetermined time has elapsed, the control device 20 performs the process of S102.

また、制御装置20は、S108にて、設定条件を変更する必要があると判定すると、S118にて、空調装置3の設定条件を変更できないようにロックするロック機能が有効であるか否かを判定する。ロック機能の有効または無効の設定は、ユーザがリモコン10の操作部11を操作することにより行われる。なお、ロック機能の有効または無効の設定は、記憶部23に記憶されている。   Further, when the control device 20 determines that the setting condition needs to be changed in S108, it is determined in S118 whether or not the lock function for locking the setting condition of the air conditioner 3 so as not to be changed is effective. judge. The setting of enabling or disabling of the lock function is performed by the user operating the operation unit 11 of the remote control 10. Note that the setting for enabling or disabling the lock function is stored in the storage unit 23.

ここで、ロック機能が有効になっている場合、制御装置20は、S136にて、空調装置3の設定条件の変更を禁止するとともに空調装置3の設定条件を変更できない旨をユーザに報知し、S114へ進む。   Here, when the lock function is enabled, the control device 20 prohibits the change of the setting condition of the air conditioner 3 and informs the user that the setting condition of the air conditioner 3 can not be changed in S136. It progresses to S114.

また、ロック機能が無効になっている場合、制御装置20は、S120にて、空調装置3の設定条件を変更する必要が生じた旨をユーザに報知するとともに、1または複数の空調装置3の設定条件をユーザに提示する。   In addition, when the lock function is disabled, the control device 20 notifies the user that the setting condition of the air conditioner 3 needs to be changed in S120, and at least one of the one or more air conditioners 3 Present setting conditions to the user.

図7は、設定条件を提示している画面の表示例である。この画面には、日付、時刻、室温:29℃、湿度:50%、現在の設定温度:29℃、ユーザ設定値:27℃、「スケジュールアイコン」、「今日の目標削減電力量:3kWh」、「現在の削減電力量:1.5kWh」、「目標削減量達成のため設定温度を30℃に変更しますか?」といったメッセージとともに「はい」、「いいえ」を表すアイコンが表示されている。なお、ユーザがリモコン10の操作部11を操作してスケジュールアイコンを選択すると、デマンドレスポンス制御のスケジュールが表示される。   FIG. 7 is a display example of a screen presenting setting conditions. On this screen, date, time, room temperature: 29 ° C, humidity: 50%, current setting temperature: 29 ° C, user setting value: 27 ° C, "schedule icon", "target power reduction amount today: 3kWh", An icon representing "Yes" or "No" is displayed together with a message such as "Current energy consumption: 1.5 kWh" or "Do you change the set temperature to 30 ° C. to achieve the target reduction?". When the user operates the operation unit 11 of the remote control 10 to select a schedule icon, a schedule of demand response control is displayed.

この画面では、空調装置3の設定温度を30℃に上げるか、あるいは29℃の設定温度を維持するかを提示している。   On this screen, it is indicated whether the set temperature of the air conditioner 3 is raised to 30 ° C. or the set temperature of 29 ° C. is maintained.

次に、制御装置20は、S122にて、空調装置3の設定条件の入力を受け付け、S124にて、空調装置3の設定条件が空調装置3のの能力過多側に変更となったか否かを判定する。   Next, in S122, the control device 20 receives the input of the setting condition of the air conditioner 3, and in S124, whether or not the setting condition of the air conditioner 3 has been changed to the excess capacity side of the air conditioner 3. judge.

例えば、ユーザがリモコン10の操作部11を操作して「はい」を表すアイコンを選択すると、S122にてNOと判定され、制御装置20は、S130にてインセンティブを推定する。具体的には、現在時刻までの電力削減量に、変更後の空調装置3の設定温度で残りの時間帯にデマンドレスポンス制御を実施することにより削減される電力削減量を加算して全体の電力削減量を算出し、この全体の電力削減量に対するインセンティブを推定する。   For example, when the user operates the operation unit 11 of the remote control 10 to select an icon representing "Yes", it is determined as NO in S122, and the control device 20 estimates an incentive in S130. Specifically, the total power consumption is added to the power reduction amount up to the current time, the power reduction amount reduced by performing demand response control in the remaining time zone with the set temperature of the air conditioner 3 after the change Calculate the amount of reduction and estimate the incentive for this total amount of power reduction.

次に、制御装置20は、S132にて、空調装置3の設定条件とインセンティブを報知する。具体的には、変更する予定の空調装置3の設定温度と、S130にて推定したインセンティブと、をリモコン10の表示部に表示させるとともにリモコン10のスピーカから報知音を発出させる。   Next, in S132, the control device 20 notifies the setting condition and the incentive of the air conditioner 3. Specifically, the set temperature of the air conditioner 3 scheduled to be changed and the incentive estimated in S130 are displayed on the display unit of the remote control 10 and the notification sound is emitted from the speaker of the remote control 10.

次に、制御装置20は、S133にて、空調装置3の設定条件を再設定(変更)し、S114へ進む。   Next, the control device 20 resets (changes) the setting conditions of the air conditioner 3 in S133, and proceeds to S114.

また、例えば、図7に示した表示に従ってユーザがリモコン10の操作部11を操作して「いいえ」を表すアイコンを選択すると、S124にてNOと判定され、制御装置20は、S126にてインセンティブを推定する。また、例えば、急な来客により、ユーザがリモコン10の操作部11を操作して空調装置3の設定温度を24℃に変更した場合にも、S124にてNOと判定され、制御装置20は、S126にてインセンティブを推定する。具体的には、現在時刻までの電力削減量に、変更後の空調装置3の設定温度で残りの時間帯にデマンドレスポンス制御を実施することにより削減される電力削減量を加算して全体の電力削減量を算出し、この全体の電力削減量に対するインセンティブを推定する。   Further, for example, when the user operates the operation unit 11 of the remote control 10 to select the icon representing "No" according to the display shown in FIG. 7, it is determined as NO in S124, and the control device 20 determines the incentive in S126. Estimate In addition, for example, even when the sudden visitor changes the set temperature of the air conditioner 3 to 24 ° C. by operating the operation unit 11 of the remote control 10, the determination in S124 is NO, and the control device 20 An incentive is estimated in S126. Specifically, the total power consumption is added to the power reduction amount up to the current time, the power reduction amount reduced by performing demand response control in the remaining time zone with the set temperature of the air conditioner 3 after the change Calculate the amount of reduction and estimate the incentive for this total amount of power reduction.

次に、制御装置20は、S128にて、空調装置3の設定条件とインセンティブを報知する。具体的には、変更する予定の空調装置3の設定温度と、S130にて推定したインセンティブと、をリモコン10の表示部に表示させるとともにリモコン10のスピーカから報知音を発出させる。なお、全体の電力削減量が電力削減要求に含まれる目標電力削減量未満となった場合には、目標達成が付加となる可能性がある旨についても報知する。   Next, in S128, the control device 20 notifies the setting condition and the incentive of the air conditioner 3. Specifically, the set temperature of the air conditioner 3 scheduled to be changed and the incentive estimated in S130 are displayed on the display unit of the remote control 10 and the notification sound is emitted from the speaker of the remote control 10. When the total power reduction amount is less than the target power reduction amount included in the power reduction request, notification is also given that the target achievement may be added.

次に、制御装置20は、S129にて、空調装置3の設定条件を再設定(変更)し、S114へ進む。   Next, in S129, the control device 20 resets (changes) the setting conditions of the air conditioner 3 and proceeds to S114.

また、制御装置20は、S114の判定にて、現在時刻がデマンドレスポンス制御の終了時刻になると、S114YESとなり、制御装置20は、S138にて、デマンドレスポンス制御により削減した空調装置3の電力削減量とインセンティブをリモコン10の表示部に表示させるとともにリモコン10のスピーカから報知音を発出させ、本処理を終了する。   When the current time reaches the end time of the demand response control in the determination of S114, the control device 20 determines YES in S114, and the control device 20 reduces the power reduction amount of the air conditioner 3 reduced by the demand response control in S138. And the incentive are displayed on the display unit of the remote controller 10 and the notification sound is emitted from the speaker of the remote controller 10, and the process is ended.

以上、説明したように、機器制御装置1は、電力削減要求の受信に応答して設備機器3が所定期間内に所定の目標電力削減量を削減したときに得られるインセンティブを獲得できるよう設備機器を制御する。また、電力削減要求を受信した場合、所定期間内に所定の目標電力削減量分の電力削減を達成するための設備機器の設定条件を特定する。また、特定した設定条件にしたがって所定期間内に所定の目標電力削減量分の電力削減を達成するよう設備機器をデマンドレスポンス制御する。また、デマンドレスポンス制御の途中で設備機器の設定条件を変更する必要が生じたか否かを判定し、設備機器の設定条件を変更する必要が生じたと判定された場合、設備機器の設定条件を変更する必要が生じた旨をユーザに報知する。また、1または複数の設備機器の設定条件をユーザに提示する。そして、設備機器の設定条件を、設定条件提示部により提示された1または複数の設備機器の設定条件の中からユーザによって選択された設定条件に再設定して設備機器をデマンドレスポンス制御する。   As described above, the equipment control device 1 can acquire the incentive obtained when the equipment device 3 reduces the predetermined target power reduction amount within the predetermined period in response to the reception of the power reduction request. Control. Further, when the power reduction request is received, the setting condition of the facility device for achieving the power reduction for the predetermined target power reduction amount within the predetermined period is specified. Further, demand response control of the facility device is performed so as to achieve power reduction by a predetermined target power reduction amount within a predetermined period according to the specified setting condition. In addition, it is determined whether it is necessary to change the setting condition of the equipment during the demand response control, and if it is determined that the setting condition of the equipment has changed, the setting condition of the equipment is changed Inform the user that it has become necessary to In addition, the setting conditions of one or more equipments are presented to the user. Then, the demand response control of the facility device is performed by resetting the setting condition of the facility device to the setting condition selected by the user from among the setting conditions of one or more of the facility devices presented by the setting condition presentation unit.

このような構成によれば、設定条件提示部は、設定条件判定部により設備機器の設定条件を変更する必要が生じたと判定された場合、1または複数の設備機器の設定条件をユーザに提示する。そして、機器制御部は、設備機器の設定条件を、設定条件提示部により提示された1または複数の設備機器の設定条件の中からユーザによって選択された設定条件に再設定して設備機器をデマンドレスポンス制御する。したがって、制御の途中であっても、ユーザが希望する設備機器の設定条件に変更することができる。   According to such a configuration, the setting condition presentation unit presents the user with the setting conditions of one or more of the facility devices when the setting condition determination unit determines that the setting conditions of the facility device need to be changed. . Then, the device control unit resets the setting condition of the facility device to the setting condition selected by the user from among the setting conditions of one or more of the facility devices presented by the setting condition presentation unit, and demands the facility device. Control the response. Therefore, even during the control, it is possible to change to the setting condition of the facility device desired by the user.

また、機器制御装置1は、設備機器の設定条件を選択するための操作部11と、設備機器の設定条件をユーザに報知する報知部12を、を備えている。   The device control apparatus 1 further includes an operation unit 11 for selecting a setting condition of the installation device, and a notification unit 12 for notifying the user of the setting condition of the installation device.

したがって、ユーザは操作部を操作して設備機器の設定条件の変更を行うことができるとともに報知部により設備機器の設定条件を認識することができる。   Therefore, the user can operate the operation unit to change the setting condition of the facility device, and can recognize the setting condition of the facility device by the notification unit.

また、機器制御装置1は、設備機器の消費電力が減少する側に設備機器の設定条件が変更された場合、変更された設定条件で設備機器をデマンドレスポンス制御した場合に獲得できるインセンティブを推定する。さらに、設備機器の設定条件がユーザによって選択された設定条件に再設定される前に、インセンティブ推定部により推定されたインセンティブをユーザに報知する。   In addition, when the setting condition of the equipment is changed to the side where the power consumption of the equipment decreases, the equipment control device 1 estimates an incentive that can be acquired when the demand response control of the equipment is performed under the changed setting condition. . Furthermore, before the setting condition of the equipment is reset to the setting condition selected by the user, the user is notified of the incentive estimated by the incentive estimating unit.

したがって、設備機器の消費電力が減少する側に設備機器の設定条件が変更された場合、設備機器の設定条件がユーザによって選択された設定条件に再設定される前に、ユーザはインセンティブ推定部により推定されたインセンティブを認識することができる。   Therefore, when the setting condition of the equipment is changed to the side where the power consumption of the equipment decreases, the user is determined by the incentive estimation unit before the setting condition of the equipment is reset to the setting selected by the user. The estimated incentive can be recognized.

また、機器制御装置1は、設備機器の消費電力が増加する側に設備機器の設定条件が変更された場合、変更された設定条件で設備機器をデマンドレスポンス制御した場合に獲得できるインセンティブを推定する。また、機器制御部により、設備機器の設定条件がユーザによって選択された設定条件に再設定される前に、第2インセンティブ推定部により推定されたインセンティブをユーザに報知する。   Further, when the setting condition of the equipment is changed to the side where the power consumption of the equipment increases, the equipment control device 1 estimates an incentive that can be acquired when demand response control of the equipment is performed under the changed setting condition. . Further, before the setting condition of the installation device is reset to the setting condition selected by the user by the device control unit, the user is notified of the incentive estimated by the second incentive estimation unit.

したがって、設備機器の消費電力が増加する側に設備機器の設定条件が変更された場合、設備機器の設定条件がユーザによって選択された設定条件に再設定される前に、ユーザはインセンティブ推定部により推定されたインセンティブを認識することができる。   Therefore, when the setting condition of the equipment is changed to the side where the power consumption of the equipment increases, the user is determined by the incentive estimation unit before the setting condition of the equipment is reset to the setting selected by the user. The estimated incentive can be recognized.

また、機器制御装置1は、設定条件特定部により特定された設備機器の設定条件を変更できないようにロックするロック機能が有効であるか否かを判定する。また、ロック有効判定部によりロック機能が有効であると判定された場合、設備機器の設定条件の変更を禁止するとともに設備機器の設定条件を変更できない旨をユーザに報知する。   In addition, the device control device 1 determines whether or not a lock function that locks so as not to change the setting condition of the facility device specified by the setting condition specifying unit is valid. Further, when it is determined by the lock validity determination unit that the lock function is valid, the change of the setting condition of the facility device is prohibited and the user is notified that the setting condition of the facility device can not be changed.

したがって、ロック機能を有効設定にすることで、設備機器の設定条件の変更を禁止することができ、さらに、ユーザはロック機能により設備機器の設定条件を変更できない旨を認識することができる。   Therefore, by setting the lock function to an effective setting, the change of the setting condition of the equipment can be prohibited, and the user can recognize that the setting condition of the equipment can not be changed by the lock function.

また、機器制御装置1は、機器制御部によるデマンドレスポンス制御が終了した場合、デマンドレスポンス制御により削減した設備機器の電力削減量および獲得されたインセンティブの少なくとも一方をユーザに報知する。   Further, when the demand response control by the device control unit ends, the device control device 1 notifies the user of at least one of the power reduction amount of the facility device reduced by the demand response control and the acquired incentive.

したがって、機器制御部によるデマンドレスポンス制御が終了した場合、ユーザは、デマンドレスポンス制御により削減した設備機器の電力削減量および獲得されたインセンティブの少なくとも一方を認識することができる。   Therefore, when the demand response control by the device control unit ends, the user can recognize at least one of the power reduction amount of the facility device reduced by the demand response control and the acquired incentive.

また、機器制御装置1は、機器制御部によるデマンドレスポンス制御の途中で、獲得できるインセンティブに変更が生じたか否かを判定する。また、機器制御部によるデマンドレスポンス制御の途中で、獲得できるインセンティブに変更が生じたと判定された場合、獲得できるインセンティブに変更が生じた旨を報知する。   Further, the device control device 1 determines whether or not a change has occurred in the obtainable incentive in the middle of the demand response control by the device control unit. In addition, when it is determined that a change has occurred in the obtainable incentive during the demand response control by the device control unit, notification that the change in the obtainable incentive has occurred is notified.

したがって、機器制御部によるデマンドレスポンス制御の途中で、獲得できるインセンティブに変更が生じた場合、ユーザは、獲得できるインセンティブに変更が生じた旨を認識することができる。   Therefore, when a change occurs in the obtainable incentive during the demand response control by the device control unit, the user can recognize that the change in the obtainable incentive has occurred.

また、設定条件提示部は、変更判定部により機器制御部によるデマンドレスポンス制御の途中で、獲得できるインセンティブに変更が生じたと判定された場合、1または複数の設備機器の設定条件をユーザに提示する。   In addition, the setting condition presentation unit presents the user with the setting condition of one or more equipment when it is determined by the change determination unit that the incentive that can be acquired is changed during the demand response control by the device control unit. .

したがって、機器制御部によるデマンドレスポンス制御の途中で、獲得できるインセンティブに変更が生じた場合、ユーザは1または複数の設備機器の設定条件の中から希望する設定条件を選択することができる。   Therefore, when the incentive that can be acquired is changed in the middle of the demand response control by the device control unit, the user can select a desired setting condition from among the setting conditions of one or more equipment devices.

また、機器制御部は、変更判定部により機器制御部によるデマンドレスポンス制御の途中で、獲得できるインセンティブに変更が生じたと判定された場合、空調装置の設定条件を、設定条件提示部により提示された1または複数の空調装置の設定条件の中からユーザによって選択された設定条件に再設定して空調装置をデマンドレスポンス制御する。   In addition, when the device control unit determines that the change in the obtainable incentive has occurred during the demand response control by the device control unit by the change determination unit, the setting condition presentation unit presents the setting condition of the air conditioner Demand response control of the air conditioner is performed by resetting the setting condition selected by the user from among the setting conditions of one or more air conditioners.

したがって、機器制御部によるデマンドレスポンス制御の途中で、獲得できるインセンティブに変更が生じた場合、空調装置の設定条件を、設定条件提示部により提示された1または複数の空調装置の設定条件の中からユーザによって選択された設定条件に再設定して空調装置をデマンドレスポンス制御することができる。   Therefore, when the incentive that can be acquired is changed in the middle of the demand response control by the device control unit, the setting condition of the air conditioner is selected from among the setting conditions of one or more air conditioners presented by the setting condition presenting unit. Demand response control of the air conditioner can be performed by resetting the setting condition selected by the user.

(第2実施形態)
第2実施形態に係る機器制御装置1の構成は、上記第1実施形態と同じである。本実施形態の機器制御装置1は、ユーザの快適性の許容範囲である快適空調条件範囲が予め記憶部23に記憶されている。なお、この快適空調条件範囲は、ユーザ操作に応じて変更することが可能となっている。また、本実施形態の機器制御装置1は、上記第1実施形態と比較してフローチャートのS103〜S105の処理が異なる。
Second Embodiment
The configuration of the device control apparatus 1 according to the second embodiment is the same as that of the first embodiment. In the device control apparatus 1 according to the present embodiment, the comfortable air conditioning condition range, which is the allowable range of the user's comfort, is stored in advance in the storage unit 23. The comfortable air conditioning condition range can be changed according to the user operation. Moreover, the device control apparatus 1 of this embodiment differs in the process of S103 to S105 of the flowchart compared with the said 1st embodiment.

本実施形態の制御装置20は、S102にて、目標電力削減量分の電力削減を達成するための空調装置3の設定温度のスケジュールを作成した後、S103において、S102にて特定された設定条件が記憶部23に記憶された快適空調条件範囲内であるか否かを判定する。   After creating the schedule of the set temperature of the air conditioner 3 for achieving the power reduction by the target power reduction amount in S102, the control device 20 of the present embodiment sets the conditions specified in S102 in S103. It is determined whether or not is within the comfortable air conditioning condition range stored in the storage unit 23.

ここで、S102にて特定された設定条件が記憶部23に記憶された快適空調条件範囲内である場合には、S104にて、図3に示したような空調装置3の設定温度のスケジュールと、インセンティブを獲得可能である旨とともにS103の判定結果をユーザに報知する。また、設定条件が快適空調条件範囲内に設定されている旨をリモコン10の表示部に表示させるとともにリモコン10のスピーカから報知音を発出させる。   Here, if the setting condition specified in S102 is within the comfortable air conditioning condition range stored in the storage unit 23, in S104, the schedule of the setting temperature of the air conditioner 3 as shown in FIG. 3 and The user is notified of the determination result of S103 together with the fact that an incentive can be obtained. In addition, a message that the setting condition is set within the comfortable air conditioning condition range is displayed on the display unit of the remote controller 10, and an alarm sound is emitted from the speaker of the remote controller 10.

また、S102にて特定された設定条件が記憶部23に記憶された快適空調条件範囲外である場合には、S105にて、図3に示したような空調装置3の設定温度のスケジュールと、インセンティブを獲得可能である旨とともにS103の判定結果をユーザに報知する。また、設定条件が快適空調条件範囲外に設定されている旨をリモコン10の表示部に表示させるとともにリモコン10のスピーカから報知音を発出させる。   In addition, when the setting condition specified in S102 is out of the comfortable air conditioning condition range stored in the storage unit 23, in S105, a schedule of the setting temperature of the air conditioner 3 as shown in FIG. The determination result of S103 is notified to the user along with the purport that an incentive can be acquired. Further, the display unit of the remote controller 10 displays that the setting condition is set out of the comfortable air conditioning condition range and causes the speaker of the remote controller 10 to emit an alarm sound.

本実施形態では、上記第1実施形態と共通の構成から奏される同様の効果を上記第1実施形態と同様に得ることができる。   In the present embodiment, the same effects obtained from the configuration common to the first embodiment can be obtained in the same manner as the first embodiment.

また、本実施形態の機器制御装置は、ユーザの快適性の許容範囲である快適空調条件範囲を記憶する記憶部23を備えている。また、設定条件特定部により特定された設定条件が記憶部に記憶された快適空調条件範囲内であるか否かを判定し、その判定結果をユーザに報知する。   Further, the device control apparatus of the present embodiment includes the storage unit 23 that stores the comfortable air conditioning condition range, which is the allowable range of the user's comfort. Further, it is determined whether the setting condition specified by the setting condition specifying unit is within the comfortable air conditioning condition range stored in the storage unit, and the determination result is notified to the user.

したがって、ユーザは、特定された設定条件が快適空調条件範囲内であるか否かを容易に認識することができる。   Therefore, the user can easily recognize whether the specified setting condition is within the comfortable air conditioning condition range.

(他の実施形態)
(1)上記各実施形態では、削減した電力量が目標電力削減量に達した場合、予め定められた所定の対価を得ることができるようにした。これに対し、例えば、削減した電力量が目標電力削減量を上回った場合には、所定対価に上乗せした額を受け取ることができるようにしてもよい。
(Other embodiments)
(1) In each of the above embodiments, when the reduced amount of power reaches the target amount of power reduction, it is possible to obtain a predetermined predetermined compensation. On the other hand, for example, when the reduced power amount exceeds the target power reduction amount, an amount added to the predetermined consideration may be received.

(2)上記各実施形態では、制御装置20とリモコン10が離れた場所に配置されるよう構成したが、制御装置20とリモコン10を一体出構成することもできる。   (2) In the above-described embodiments, the control device 20 and the remote control 10 are disposed at remote locations. However, the control device 20 and the remote control 10 can be integrally provided.

(3)上記各実施形態では、図6にて、空調装置3が冷房運転を実施している場合のデマンドレスポンス制御を示したが、空調装置3が暖房運転、除湿運転等、冷房運転以外の運転を実施している場合に適用することもできる。   (3) In the above embodiments, the demand response control is shown in FIG. 6 when the air conditioner 3 is performing the cooling operation, but the air conditioning device 3 performs the heating operation, the dehumidifying operation, etc. other than the cooling operation. It can also be applied when running.

(4)上記各実施形態では、図6にて、電力削減要求の受信に応じて1回分のデマンドレスポンス制御を実施する制御を示したが、図4に示したように、1または複数の電力削減要求の受信に応じて複数回分のデマンドレスポンス制御を実施する制御を実施することもできる。   (4) In each of the above embodiments, FIG. 6 shows control for implementing one time of demand response control in response to the reception of the power reduction request. However, as shown in FIG. A control that implements demand response control for multiple times may be implemented according to the reception of the reduction request.

(5)上記各実施形態では、機器制御装置が、設備機器として空調装置3の制御を実施する例を示したが、空調装置3以外の機器、例えば、照明器具の明るさ、テレビのオンオフ等を調整することにより、デマンドレスポンス制御を実施することもできる。この場合、照明器具、テレビ等の設備機器毎に、設備機器の設定条件を設定する表示を表示部に表意させ、設備機器毎に設備機器の設定の変更を受け付けるよう構成することができる。   (5) In each of the above-described embodiments, the apparatus control apparatus performs the control of the air conditioner 3 as the installation apparatus. However, the apparatus other than the air conditioner 3 such as the brightness of the lighting fixture, the on / off of the television, etc. Demand response control can also be implemented by adjusting. In this case, a display for setting the setting condition of the equipment can be represented on the display unit for each of the equipment such as the lighting apparatus and the television, and the setting change of the equipment can be received for each equipment.

(6)上記各実施形態では、設備機器の設定条件として空調装置3の設定温度を変更する例を示したが、人の存在の有無を検出し、人の存在が検出された空間の空調制御を実施して、人の存在が検出されない空間の空調制御を停止するようにするようにデマンドレスポンス制御を実施することもできる。   (6) In the above embodiments, the setting temperature of the air conditioner 3 is changed as the setting condition of the equipment, but the air conditioning control of the space where the presence of a person is detected and the presence of a person is detected. The demand response control may be implemented to stop the air conditioning control of the space where the presence of a person is not detected.

また、デマンドレスポンス制御を実施する際に、室外機32の動作を停止させるが室内機31の送風ファンは動作させるといったこともできる。また、これらのデマンドレスポンス制御の組み合わせを異ならせて段階的にデマンドレスポンス制御を実施することもできる。   In addition, when the demand response control is performed, the operation of the outdoor unit 32 may be stopped but the blower fan of the indoor unit 31 may be operated. In addition, it is possible to implement demand response control in stages by changing combinations of these demand response controls.

(7)上記各実施形態では、本発明を、室内機31と室外機32の間が冷媒配管33を介して接続されており、室内機31からリビング、和室、寝室、子供部屋等の各部屋に温度調整された空気を搬送する所謂全館空調システムに適用した例を示した。これに対し、本発明を、1つの部屋に設けられた室内機31からこの部屋に温度調整された空気を送風する空調システムに適用することもできる。   (7) In the above embodiments, the indoor unit 31 and the outdoor unit 32 are connected via the refrigerant pipe 33 according to the present invention, and the indoor unit 31 is connected to each room such as a living room, a Japanese room, a bedroom, and a children's room The example applied to the so-called whole building air conditioning system which conveys temperature-controlled air was shown. On the other hand, the present invention can also be applied to an air conditioning system that blows temperature-controlled air from an indoor unit 31 provided in one room to this room.

(8)上記各実施形態では、S120にて、空調装置3の設定温度を30℃に設定するか、あるいは29℃に設定するかを提示したが、1つの設定条件を提示するようにしてもよく、2つ以上の設定条件を提示するようにしてもよい。   (8) In each of the above embodiments, it has been presented in S 120 whether the set temperature of the air conditioner 3 is set to 30 ° C. or 29 ° C. However, even if one set condition is presented Well, two or more setting conditions may be presented.

(9)上記第2実施形態では、S102にて、目標電力削減量分の電力削減を達成するための空調装置3の設定条件を特定するようにした。これに対し、空調装置の設定条件が記憶部23に記憶された快適空調条件範囲内となるように、目標電力削減量分の電力削減を達成するための空調装置3の設定条件を特定するようにしてもよい。   (9) In the second embodiment, the setting condition of the air conditioner 3 for achieving the power reduction by the target power reduction amount is specified in S102. On the other hand, the setting condition of the air conditioner 3 for achieving the power reduction by the target power reduction amount is specified so that the setting condition of the air conditioner falls within the comfortable air conditioning condition range stored in the storage unit 23 You may

(10)上記第2実施形態では、S103において、S102にて特定された設定条件が記憶部23に記憶された快適空調条件範囲内であるか否かを判定した。さらに、S104、S105において、図3に示したような空調装置3の設定温度のスケジュール、インセンティブを獲得可能である旨とともにS103の判定結果をユーザに報知するようにした。   (10) In the second embodiment, in S103, it is determined whether the setting condition specified in S102 is within the comfortable air conditioning condition range stored in the storage unit 23. Further, in S104 and S105, the schedule of the set temperature of the air conditioner 3 as shown in FIG. 3 and the effect that the incentive can be acquired is notified to the user of the determination result of S103.

これに対し、S103において、S102にて特定された設定条件が記憶部23に記憶された快適空調条件範囲外であると判定された場合に、S102にて特定された設定条件で設備機器の制御を行うか、あるいは設備機器の設定条件を変更するかをユーザに確認し、ユーザの応答に従って設備機器の制御を行うようにしてもよい。   On the other hand, when it is determined in S103 that the setting condition specified in S102 is out of the comfortable air conditioning condition range stored in the storage unit 23, control of the facility equipment with the setting condition specified in S102 It is also possible to confirm with the user whether or not to change the setting conditions of the equipment and to control the equipment according to the user's response.

(11)上記各実施形態では、S102にて特定した設定条件に従って設備機器をデマンドレスポンス制御するようにした。これに対し、ユーザがより省エネ指向でる場合を考慮して、デマンドレスポンス制御の途中のタイミングで「より省エネにしますか?」といった表示を行ってユーザの意志を確認し、ユーザ操作に応じて設備機器の設定条件を変更するようにしてもよい。これにより、目標電力削減量を上回る電力量を削減することが可能となり、より多くのインセンティブを獲得することも可能となる。   (11) In the above embodiments, demand response control of the facility device is performed in accordance with the setting condition specified in S102. On the other hand, in consideration of the case where the user is more energy-saving oriented, a message such as “Do you want to save more energy?” Is displayed in the middle of the demand response control to confirm the user's intention, and the equipment according to the user operation The setting conditions of the device may be changed. As a result, it is possible to reduce the amount of power exceeding the target power reduction amount, and it is also possible to obtain more incentives.

(12)上記各実施形態では、S102にて空調装置3の消費電力が低減するよう空調装置3の設定温度を変更するようデマンドレスポンス制御のスケジュールを作成し、このスケジュールに従ってデマンドレスポンス制御を実施するようにした。これに対し、デマンドレスポンス制御の開始時に、空調装置3の動作を停止させ、目標電力削減量を上回る電力量が削減された後に、空調装置3の動作を再開させるようにしてもよい。この場合、例えば、目標電力削減量を上回る電力量が削減され、かつ、空調装置3を所定の設定条件で制御しても目標電力削減量の削減が可能となると判定されたタイミングで、「目標電力削減量の削減が可能となったため、空調装置3の動作を開始しますか?」といった報知をユーザに行うことができる。また、この場合、空調装置3の動作を再開させた後に空調装置3で消費される電力量が、目標電力削減量を上回らないようユーザに周期的に報知するのが好ましい。   (12) In the above embodiments, a schedule for demand response control is created to change the set temperature of the air conditioner 3 so that the power consumption of the air conditioner 3 is reduced in S102, and demand response control is performed according to this schedule. I did it. On the other hand, when the demand response control is started, the operation of the air conditioner 3 may be stopped, and the operation of the air conditioner 3 may be resumed after the amount of power exceeding the target power reduction amount is reduced. In this case, for example, at the timing when it is determined that the amount of power exceeding the target amount of power reduction is reduced, and the target amount of power reduction can be reduced even if the air conditioner 3 is controlled under a predetermined setting condition, Since the reduction of the amount of power reduction has become possible, the user can be notified of “Does the operation of the air conditioner 3 start?”. In this case, it is preferable to periodically notify the user that the amount of power consumed by the air conditioner 3 after restarting the operation of the air conditioner 3 does not exceed the target power reduction amount.

なお、本発明は上記した実施形態に限定されるものではなく、特許請求の範囲に記載した範囲内において適宜変更が可能である。また、上記各実施形態は、互いに無関係なものではなく、組み合わせが明らかに不可な場合を除き、適宜組み合わせが可能である。また、上記各実施形態において、実施形態を構成する要素は、特に必須であると明示した場合および原理的に明らかに必須であると考えられる場合等を除き、必ずしも必須のものではないことは言うまでもない。また、上記各実施形態において、実施形態の構成要素の個数、数値、量、範囲等の数値が言及されている場合、特に必須であると明示した場合および原理的に明らかに特定の数に限定される場合等を除き、その特定の数に限定されるものではない。また、上記各実施形態において、構成要素等の材質、形状、位置関係等に言及するときは、特に明示した場合および原理的に特定の材質、形状、位置関係等に限定される場合等を除き、その材質、形状、位置関係等に限定されるものではない。   In addition, this invention is not limited to above-described embodiment, In the range described in the claim, it can change suitably. Moreover, said each embodiment is not mutually irrelevant and can be combined suitably, unless the combination is clearly impossible. Further, in each of the above-described embodiments, it is needless to say that the elements constituting the embodiment are not necessarily essential except when clearly indicated as being essential and when it is considered to be obviously essential in principle. Yes. Further, in the above embodiments, when numerical values such as the number, numerical value, amount, range, etc. of constituent elements of the embodiment are mentioned, it is clearly indicated that they are particularly essential and clearly limited to a specific number in principle. It is not limited to the specific number except when it is done. Further, in the above embodiments, when referring to materials, shapes, positional relationships, etc. of constituent elements etc., unless specifically stated otherwise or in principle when limited to a specific material, shape, positional relationship, etc., etc. It is not limited to the material, the shape, the positional relationship, etc.

(まとめ)
上記各実施形態の一部または全部で示された第1の観点によれば、機器制御装置1は、電力削減要求の受信に応答して設備機器が所定期間内に所定の目標電力削減量を削減したときに得られるインセンティブを獲得できるよう設備機器を制御する。また、電力削減要求を受信した場合、所定期間内に所定の目標電力削減量分の電力削減を達成するための設備機器の設定条件を特定する設定条件特定部を備えている。また、設定条件特定部により特定された設定条件にしたがって所定期間内に所定の目標電力削減量分の電力削減を達成するよう設備機器をデマンドレスポンス制御する機器制御部を備えている。また、機器制御部によるデマンドレスポンス制御の途中で設備機器の設定条件を変更する必要が生じたか否かを判定する設定条件判定部を備えている。また、設定条件判定部により設備機器の設定条件を変更する必要が生じたと判定された場合、設備機器の設定条件を変更する必要が生じた旨をユーザに報知するとともに、1または複数の設備機器の設定条件をユーザに提示する設定条件提示部を備えている。そして、機器制御部は、設備機器の設定条件を、設定条件提示部により提示された1または複数の設備機器の設定条件の中からユーザによって選択された設定条件に再設定して設備機器をデマンドレスポンス制御する。
(Summary)
According to the first aspect shown in part or all of each of the above-described embodiments, the device control apparatus 1 responds to the reception of the power reduction request that the facility device performs the predetermined target power reduction amount within a predetermined period. Control equipment so that you can get the incentive you get when you cut back. In addition, when the power reduction request is received, the setting condition specifying unit is configured to specify the setting condition of the facility device for achieving the power reduction by the predetermined target power reduction amount within the predetermined period. The apparatus control unit further includes a device control unit that performs demand response control on the facility device to achieve power reduction by a predetermined target power reduction amount within a predetermined period according to the setting condition specified by the setting condition specifying unit. The apparatus further includes a setting condition determination unit that determines whether it is necessary to change the setting condition of the facility device during the demand response control by the device control unit. In addition, when it is determined that the setting condition determination unit needs to change the setting condition of the facility device, the user is notified that the setting condition of the facility device needs to be changed, and the one or more facility devices And a setting condition presenting unit for presenting the setting conditions of Then, the device control unit resets the setting condition of the facility device to the setting condition selected by the user from among the setting conditions of one or more of the facility devices presented by the setting condition presentation unit, and demands the facility device. Control the response.

また、第2の観点によれば、機器制御装置1は、設備機器の設定条件を選択するための操作部と、設備機器の設定条件をユーザに報知する報知部を、を備えている。したがって、ユーザは操作部を操作して設備機器の設定条件の変更を行うことができるとともに報知部により設備機器の設定条件を認識することができる。   Further, according to the second aspect, the device control apparatus 1 includes an operation unit for selecting the setting condition of the installation device, and a notification unit for notifying the user of the setting condition of the installation device. Therefore, the user can operate the operation unit to change the setting condition of the facility device, and can recognize the setting condition of the facility device by the notification unit.

また、第3の観点によれば、機器制御装置1は、設備機器の消費電力が減少する側に設備機器の設定条件が変更された場合、変更された設備機器の設定条件で設備機器をデマンドレスポンス制御した場合に獲得できるインセンティブを推定するインセンティブ推定部を備えている。さらに、機器制御部により、設備機器の設定条件がユーザによって選択された設定条件に再設定される前に、インセンティブ推定部により推定されたインセンティブをユーザに報知する第1インセンティブ報知部を備えている。   Further, according to the third aspect, when the setting condition of the equipment is changed to the side where the power consumption of the equipment decreases, the equipment control device 1 requests the equipment with the changed setting condition of the equipment. The system includes an incentive estimation unit that estimates an incentive that can be acquired when response control is performed. Furthermore, the apparatus control unit includes a first incentive notification unit that notifies the user of the incentive estimated by the incentive estimation unit before the setting condition of the equipment is reset to the setting condition selected by the user. .

したがって、設備機器の消費電力が減少する側に設備機器の設定条件が変更された場合、設備機器の設定条件がユーザによって選択された設定条件に再設定される前に、ユーザはインセンティブ推定部により推定されたインセンティブを認識することができる。   Therefore, when the setting condition of the equipment is changed to the side where the power consumption of the equipment decreases, the user is determined by the incentive estimation unit before the setting condition of the equipment is reset to the setting selected by the user. The estimated incentive can be recognized.

また、第4の観点によれば、機器制御装置1は、設備機器の消費電力が増加する側に設備機器の設定条件が変更された場合、変更された設備機器の設定条件で設備機器をデマンドレスポンス制御した場合に獲得できるインセンティブを推定する第2インセンティブ推定部を備えている。また、機器制御部により、設備機器の設定条件がユーザによって選択された設定条件に再設定される前に、第2インセンティブ推定部により推定されたインセンティブをユーザに報知する第2インセンティブ報知部を備えている。   Further, according to the fourth aspect, when the setting condition of the equipment is changed to the side where the power consumption of the equipment increases, the equipment control device 1 demands the equipment with the changed setting condition of the equipment. A second incentive estimation unit is provided to estimate an incentive that can be obtained when response control is performed. The apparatus further includes a second incentive notification unit that notifies the user of the incentive estimated by the second incentive estimation unit before the equipment control unit resets the setting conditions of the equipment to the setting conditions selected by the user. ing.

したがって、設備機器の消費電力が増加する側に設備機器の設定条件が変更された場合、設備機器の設定条件がユーザによって選択された設定条件に再設定される前に、ユーザはインセンティブ推定部により推定されたインセンティブを認識することができる。   Therefore, when the setting condition of the equipment is changed to the side where the power consumption of the equipment increases, the user is determined by the incentive estimation unit before the setting condition of the equipment is reset to the setting selected by the user. The estimated incentive can be recognized.

また、第5の観点によれば、機器制御装置1は、設定条件特定部により特定された設備機器の設定条件を変更できないようにロックするロック機能が有効であるか否かを判定するロック有効判定部を備えている。また、ロック有効判定部によりロック機能が有効であると判定された場合、設備機器の設定条件の変更を禁止するとともに設備機器の設定条件を変更できない旨をユーザに報知する変更不可報知部を備えている。   Further, according to the fifth aspect, the device control apparatus 1 determines whether the lock function for locking the setting condition of the facility device specified by the setting condition specifying unit is not effective. A determination unit is provided. Also, when the lock validity determination unit determines that the lock function is valid, the system is provided with a change impossible notification unit that prohibits the change of the setting condition of the equipment and informs the user that the setting condition of the equipment can not be changed. ing.

したがって、ロック機能を有効設定にすることで、設備機器の設定条件の変更を禁止することができ、さらに、ユーザはロック機能により設備機器の設定条件を変更できない旨を認識することができる。   Therefore, by setting the lock function to an effective setting, the change of the setting condition of the equipment can be prohibited, and the user can recognize that the setting condition of the equipment can not be changed by the lock function.

また、第6の観点によれば、機器制御装置1は、機器制御部によるデマンドレスポンス制御が終了した場合、デマンドレスポンス制御により削減した設備機器の電力削減量および獲得されたインセンティブの少なくとも一方をユーザに報知する結果報知部を備えている。   Further, according to the sixth aspect, when the demand response control by the equipment control unit ends, the equipment control device 1 uses the user of at least one of the power reduction amount of the equipment reduced by the demand response control and the acquired incentive. And a notification unit for notifying to

したがって、機器制御部によるデマンドレスポンス制御が終了した場合、ユーザは、デマンドレスポンス制御により削減した設備機器の電力削減量および獲得されたインセンティブの少なくとも一方を認識することができる。   Therefore, when the demand response control by the device control unit ends, the user can recognize at least one of the power reduction amount of the facility device reduced by the demand response control and the acquired incentive.

また、第7の観点によれば、機器制御装置1は、機器制御部によるデマンドレスポンス制御の途中で、獲得できるインセンティブに変更が生じたか否かを判定する変更判定部を備えている。また、変更判定部により機器制御部によるデマンドレスポンス制御の途中で、獲得できるインセンティブに変更が生じたと判定された場合、獲得できるインセンティブに変更が生じた旨を報知する変更報知部と、を備えている。   Further, according to the seventh aspect, the device control apparatus 1 includes the change determination unit that determines whether a change has occurred in the obtainable incentive during the demand response control by the device control unit. And a change notification unit for notifying that a change has occurred in the obtainable incentive if the change determination unit determines that a change has occurred in the obtainable incentive during the demand response control by the device control unit. There is.

したがって、機器制御部によるデマンドレスポンス制御の途中で、獲得できるインセンティブに変更が生じた場合、ユーザは、獲得できるインセンティブに変更が生じた旨を認識することができる。   Therefore, when a change occurs in the obtainable incentive during the demand response control by the device control unit, the user can recognize that the change in the obtainable incentive has occurred.

また、第8の観点によれば、設定条件提示部は、変更判定部により機器制御部によるデマンドレスポンス制御の途中で、獲得できるインセンティブに変更が生じたと判定された場合、1または複数の設備機器の設定条件をユーザに提示する。   Further, according to the eighth aspect, when the change determination unit determines that the change in the obtainable incentive has occurred during the demand response control by the device control unit, the setting condition presentation unit determines one or more of the equipment devices The setting conditions of are presented to the user.

したがって、機器制御部によるデマンドレスポンス制御の途中で、獲得できるインセンティブに変更が生じた場合、ユーザは1または複数の設備機器の設定条件の中から希望する設定条件を選択することができる。   Therefore, when the incentive that can be acquired is changed in the middle of the demand response control by the device control unit, the user can select a desired setting condition from among the setting conditions of one or more equipment devices.

また、第9の観点によれば、機器制御部は、変更判定部により機器制御部によるデマンドレスポンス制御の途中で、獲得できるインセンティブに変更が生じたと判定された場合、設備機器の設定条件を、設定条件提示部により提示された1または複数の設備機器の設定条件の中からユーザによって選択された設定条件に再設定して設備機器をデマンドレスポンス制御する。   Further, according to the ninth aspect, when it is determined by the change determination unit that the incentive that can be acquired has been changed in the middle of the demand response control by the change control unit, the equipment control unit sets the setting conditions of the equipment Demand response control of the facility device is performed by resetting the setting condition selected by the user from among the setting conditions of the one or more facility devices presented by the setting condition presentation unit.

したがって、機器制御部によるデマンドレスポンス制御の途中で、獲得できるインセンティブに変更が生じた場合、空調装置の設定条件を、設定条件提示部により提示された1または複数の空調装置の設定条件の中からユーザによって選択された設定条件に再設定して空調装置をデマンドレスポンス制御することができる。   Therefore, when the incentive that can be acquired is changed in the middle of the demand response control by the device control unit, the setting condition of the air conditioner is selected from among the setting conditions of one or more air conditioners presented by the setting condition presenting unit. Demand response control of the air conditioner can be performed by resetting the setting condition selected by the user.

また、第10の観点によれば、設備機器は、設定された空調条件となるよう温度調整された空気を送風する空調装置である。また、ユーザの快適性の許容範囲である快適空調条件範囲を記憶する記憶部を備えている。さらに、設定条件特定部により特定された設定条件が前記記憶部に記憶された前記快適空調条件範囲内であるか否かを判定する快適判定部と、前記快適判定部の判定結果をユーザに報知する快適報知部を備えている。   Further, according to the tenth aspect, the facility device is an air conditioner that blows the air whose temperature has been adjusted to be the set air conditioning condition. Moreover, the memory | storage part which memorize | stores the comfortable air-conditioning condition range which is the tolerance | permissible_range of a user's comfort is provided. Furthermore, the comfort determination unit determines whether the setting condition specified by the setting condition specifying unit is within the comfort air conditioning condition range stored in the storage unit, and notifies the user of the determination result of the comfort determination unit Provided with a comfortable notification unit.

したがって、ユーザは、特定された設定条件が快適空調条件範囲内であるか否かを容易に認識することができる。   Therefore, the user can easily recognize whether the specified setting condition is within the comfortable air conditioning condition range.

なお、上記実施形態における構成と特許請求の範囲の構成との対応関係について説明すると、S102、S129、S133の処理が設定条件特定部に相当し、S106の処理が機器制御部に相当し、S108の処理が設定条件判定部に相当する。また、S120の処理が設定条件提示部に相当し、S130の処理がインセンティブ推定部に相当し、S132に処理が第1インセンティブ報知部に相当し、S126の処理が第2インセンティブ推定部に相当する。また、S118の処理がロック有効判定部に相当し、S136の処理が変更不可報知部に相当し、S138の処理が結果報知部に相当し、S112の処理が変更判定部に相当し、S134の処理が変更報知部に相当し、S103が快適判定部に相当し、S104が快適報知部に相当する。   In addition, to describe the correspondence between the configuration in the above embodiment and the configuration in the claims, the processing in S102, S129, and S133 corresponds to the setting condition identification unit, the processing in S106 corresponds to the device control unit, and S108. The process of corresponds to the setting condition determination unit. Further, the processing of S120 corresponds to the setting condition presentation unit, the processing of S130 corresponds to the incentive estimation unit, the processing to S132 corresponds to the first incentive notification unit, and the processing of S126 corresponds to the second incentive estimation unit. . Further, the process of S118 corresponds to the lock validity determination unit, the process of S136 corresponds to the unchangeable notification unit, the process of S138 corresponds to the result notification unit, and the process of S112 corresponds to the change determination unit, and The process corresponds to the change notification unit, S103 corresponds to the comfort determination unit, and S104 corresponds to the comfort notification unit.

1 機器制御装置
3 空調装置
10 リモコン
11 操作部
12 報知部
20 制御装置
31 室外機
32 室内機
DESCRIPTION OF SYMBOLS 1 apparatus control apparatus 3 air conditioner 10 remote control 11 operation part 12 alerting | reporting part 20 control apparatus 31 outdoor unit 32 indoor unit

Claims (10)

電力削減要求の受信に応答して設備機器(3)が所定期間内に所定の目標電力削減量を削減したときに得られるインセンティブを獲得できるよう前記設備機器を制御する機器制御装置であって、
前記電力削減要求を受信した場合、前記所定期間内に前記所定の目標電力削減量分の電力削減を達成するための前記設備機器の設定条件を特定する設定条件特定部(S102、S129、S133)と、
前記設定条件特定部により特定された設定条件にしたがって前記所定期間内に前記所定の目標電力削減量分の電力削減を達成するよう前記設備機器をデマンドレスポンス制御する機器制御部(S106)と、
前記機器制御部による前記デマンドレスポンス制御の途中で前記設備機器の設定条件を変更する必要が生じたか否かを判定する設定条件判定部(S108)と、
前記設定条件判定部により前記設備機器の設定条件を変更する必要が生じたと判定された場合、前記設備機器の設定条件を変更する必要が生じた旨をユーザに報知するとともに、1または複数の前記設備機器の設定条件をユーザに提示する設定条件提示部(S120)と、を備え、
前記機器制御部は、前記設備機器の設定条件を、前記設定条件提示部により提示された前記1または複数の前記設備機器の設定条件の中からユーザによって選択された設定条件に再設定して前記設備機器を前記デマンドレスポンス制御する機器制御装置。
The apparatus control apparatus controls the facility device to obtain an incentive obtained when the facility device (3) reduces a predetermined target power reduction amount within a predetermined period in response to the reception of the power reduction request,
A setting condition specifying unit (S102, S129, S133) for specifying the setting condition of the facility device for achieving the power reduction by the predetermined target power reduction amount within the predetermined period when the power reduction request is received When,
A device control unit (S106) that performs demand response control on the facility device to achieve power reduction by the predetermined target power reduction amount within the predetermined period according to the setting condition specified by the setting condition specifying unit;
A setting condition determination unit (S108) that determines whether it is necessary to change the setting condition of the facility device during the demand response control by the device control unit;
When it is determined by the setting condition determination unit that the setting condition of the facility device needs to be changed, the user is notified that the setting condition of the facility device needs to be changed, and one or more of the above A setting condition presentation unit (S120) for presenting the setting conditions of the installation device to the user;
The device control unit resets the setting condition of the facility device to the setting condition selected by the user from among the setting conditions of the one or more of the facility devices presented by the setting condition presentation unit, The apparatus control apparatus which carries out the said demand response control of equipment apparatus.
前記設備機器の設定条件を選択するための操作部(11)と、前記設備機器の設定条件をユーザに報知する報知部(12)を、を備えた請求項1に記載の機器制御装置。   The apparatus control device according to claim 1, further comprising: an operation unit (11) for selecting a setting condition of the facility device; and a notification unit (12) for notifying a user of the setting condition of the facility device. 前記設備機器の消費電力が減少する側に前記設備機器の設定条件が変更された場合、変更された前記設備機器の設定条件で前記設備機器を前記デマンドレスポンス制御した場合に獲得できる前記インセンティブを推定するインセンティブ推定部(S130)と、
前記機器制御部により、前記設備機器の設定条件がユーザによって選択された設定条件に再設定される前に、前記インセンティブ推定部により推定された前記インセンティブをユーザに報知するインセンティブ報知部(S132)と、を備えた請求項1または2に記載の機器制御装置。
When the setting condition of the equipment is changed to the side where the power consumption of the equipment decreases, the incentive that can be acquired when the demand response control of the equipment is performed under the changed setting of the equipment is estimated An incentive estimation unit (S130) to
An incentive notification unit (S132) for notifying the user of the incentive estimated by the incentive estimation unit before the setting condition of the facility device is reset to the setting condition selected by the user by the device control unit; The device control apparatus according to claim 1, further comprising:
前記インセンティブ推定部は、第1インセンティブ推定部であり、前記インセンティブ報知部は、第1インセンティブ報知部であり、
前記設備機器の消費電力が増加する側に前記設備機器の設定条件が変更された場合、変更された前記設備機器の設定条件で前記設備機器を前記デマンドレスポンス制御した場合に獲得できる前記インセンティブを推定する第2インセンティブ推定部(S126)と、
前記機器制御部により、前記設備機器の設定条件がユーザによって選択された設定条件に再設定される前に、前記第2インセンティブ推定部により推定された前記インセンティブをユーザに報知する第2インセンティブ報知部(S128)と、を備えた請求項3に記載の機器制御装置。
The incentive estimation unit is a first incentive estimation unit, and the incentive notification unit is a first incentive notification unit.
When the setting condition of the equipment is changed to the side where the power consumption of the equipment increases, the incentive that can be acquired when the demand response control of the equipment is performed under the changed setting of the equipment is estimated A second incentive estimation unit (S126)
A second incentive notification unit that notifies the user of the incentive estimated by the second incentive estimation unit before the setting condition of the facility device is reset to the setting condition selected by the user by the device control unit. The device control apparatus according to claim 3, further comprising: (S128).
前記設定条件特定部により特定された前記設備機器の設定条件を変更できないようにロックするロック機能が有効であるか否かを判定するロック有効判定部(S118)と、
前記ロック有効判定部によりロック機能が有効であると判定された場合、前記設備機器の設定条件の変更を禁止するとともに前記設備機器の設定条件を変更できない旨をユーザに報知する変更不可報知部(S136)と、を備えた請求項1ないし4のいずれか1つに記載の機器制御装置。
A lock validity determination unit (S118) that determines whether a lock function that locks so as not to change the setting conditions of the equipment identified by the setting condition identification unit is valid;
If the lock validity determination unit determines that the lock function is valid, the change disabling notification unit prohibits the user from changing the setting condition of the facility device and informs the user that the setting condition of the facility device can not be changed. The device control device according to any one of claims 1 to 4, comprising: S136).
前記機器制御部による前記デマンドレスポンス制御が終了した場合、前記デマンドレスポンス制御により削減した前記設備機器の電力削減量および獲得された前記インセンティブの少なくとも一方をユーザに報知する結果報知部(S138)を備えた請求項1ないし5のいずれか1つに記載の機器制御装置。   When the demand response control by the device control unit ends, the apparatus further includes a result notification unit (S138) for notifying the user of at least one of the power reduction amount of the facility device reduced by the demand response control and the acquired incentive. The device control apparatus according to any one of claims 1 to 5. 前記機器制御部による前記デマンドレスポンス制御の途中で、獲得できる前記インセンティブに変更が生じたか否かを判定する変更判定部(S112)と、
前記変更判定部により前記機器制御部による前記デマンドレスポンス制御の途中で、獲得できる前記インセンティブに変更が生じたと判定された場合、獲得できる前記インセンティブに変更が生じた旨を報知する変更報知部(S134)と、を備えた請求項1ないし6のいずれか1つに記載の機器制御装置。
A change determination unit (S112) that determines whether the incentive that can be acquired has been changed during the demand response control by the device control unit;
If the change determination unit determines that the incentive that can be acquired has been changed during the demand response control by the device control unit, the change notification unit that notifies that the incentive that can be acquired has changed (S134 The device control device according to any one of claims 1 to 6, further comprising
前記設定条件提示部は、前記変更判定部により前記機器制御部による前記デマンドレスポンス制御の途中で、獲得できる前記インセンティブに変更が生じたと判定された場合、1または複数の前記設備機器の設定条件をユーザに提示する請求項7に記載の機器制御装置。   The setting condition presentation unit, when it is determined by the change determination unit that the incentive that can be acquired has been changed during the demand response control by the device control unit, the setting condition of one or more of the facility devices The apparatus control device according to claim 7 presented to a user. 前記機器制御部は、前記変更判定部により前記機器制御部による前記デマンドレスポンス制御の途中で、獲得できる前記インセンティブに変更が生じたと判定された場合、前記設備機器の設定条件を、前記設定条件提示部により提示された前記1または複数の前記設備機器の設定条件の中からユーザによって選択された設定条件に再設定して前記設備機器を前記デマンドレスポンス制御する請求項8に記載の機器制御装置。   The device control unit is configured to present the setting condition of the facility device when the change determination unit determines that the incentive that can be acquired has been changed during the demand response control by the device control unit. The device control apparatus according to claim 8, wherein the demand response control is performed on the facility device by resetting the setting condition selected by the user from among the setting conditions of the one or more facility devices presented by the unit. 前記設備機器は、設定された空調条件となるよう温度調整された空気を送風する空調装置であり、
ユーザの快適性の許容範囲である快適空調条件範囲を記憶する記憶部(23)と、
前記設定条件特定部により特定された設定条件が前記記憶部に記憶された前記快適空調条件範囲内であるか否かを判定する快適判定部(S103)と、
前記快適判定部の判定結果をユーザに報知する快適報知部(S104)と、を備えた請求項1ないし9のいずれか1つに記載の機器制御装置。
The equipment is an air conditioner that blows air whose temperature has been adjusted to set a set air conditioning condition,
A storage unit (23) for storing a comfortable air conditioning condition range which is an allowable range of the user's comfort;
A comfort determining unit (S103) that determines whether the setting condition specified by the setting condition specifying unit is within the comfort air conditioning condition range stored in the storage unit;
The apparatus control device according to any one of claims 1 to 9, further comprising: a comfort notification unit (S104) for notifying the user of the determination result of the comfort determination unit.
JP2017237779A 2017-12-12 2017-12-12 Apparatus control device Pending JP2019105984A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017237779A JP2019105984A (en) 2017-12-12 2017-12-12 Apparatus control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017237779A JP2019105984A (en) 2017-12-12 2017-12-12 Apparatus control device

Publications (1)

Publication Number Publication Date
JP2019105984A true JP2019105984A (en) 2019-06-27

Family

ID=67062463

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017237779A Pending JP2019105984A (en) 2017-12-12 2017-12-12 Apparatus control device

Country Status (1)

Country Link
JP (1) JP2019105984A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021136851A (en) * 2020-02-28 2021-09-13 パナソニックIpマネジメント株式会社 Load control system, load control method, and program
JP2021197788A (en) * 2020-06-11 2021-12-27 東北電力株式会社 Power management device, power management system, power management method, and program

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021136851A (en) * 2020-02-28 2021-09-13 パナソニックIpマネジメント株式会社 Load control system, load control method, and program
JP7519618B2 (en) 2020-02-28 2024-07-22 パナソニックIpマネジメント株式会社 LOAD CONTROL SYSTEM, LOAD CONTROL METHOD, AND PROGRAM
JP2021197788A (en) * 2020-06-11 2021-12-27 東北電力株式会社 Power management device, power management system, power management method, and program

Similar Documents

Publication Publication Date Title
CN108700323B (en) Air conditioning system
JP5316335B2 (en) Energy saving support device
US9671123B2 (en) Air conditioner
US8514540B2 (en) Smart plug with internal condition-based demand response capability
JP2007195392A (en) Demand supervisory equipment
KR102140069B1 (en) Air-conditioner and method
JP2014236605A (en) Management system of air-conditioner
JP2017531876A (en) Method and apparatus for managing air conditioners
JP2005009853A (en) Central control system for air conditioner and its operating method
JP2014185832A (en) Air conditioning system, air conditioning control device, and air conditioning system control method
JP2009115392A (en) Energy-saving control system
JP2019105984A (en) Apparatus control device
JP5136403B2 (en) Equipment control system
WO2014196199A1 (en) Power management method and power management device
WO2018033983A1 (en) Electric device, power consumption reduction system, communication adapter, and power consumption reduction method
WO2013062018A1 (en) Energy-saving device, energy-saving system, and program
CN116529539A (en) Fluid heating system
JP2011106698A (en) Equipment item control device
JP6443947B2 (en) Demand control system
JP2004118366A (en) Energy saving control system, energy saving control method and presentation acceptance device
JP2015004444A (en) Power control device for air-conditioning equipment
CN101231020A (en) Demand control system and method for multi-type air conditioner
WO2017009912A1 (en) Energy management device, energy management method, and program
JP5131185B2 (en) Equipment control system
JP2014072911A (en) Controller