JP2019067066A - Waste disposal plan computing method and waste disposal plan computing device - Google Patents

Waste disposal plan computing method and waste disposal plan computing device Download PDF

Info

Publication number
JP2019067066A
JP2019067066A JP2017190729A JP2017190729A JP2019067066A JP 2019067066 A JP2019067066 A JP 2019067066A JP 2017190729 A JP2017190729 A JP 2017190729A JP 2017190729 A JP2017190729 A JP 2017190729A JP 2019067066 A JP2019067066 A JP 2019067066A
Authority
JP
Japan
Prior art keywords
period
waste
amount
optimization
incinerator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2017190729A
Other languages
Japanese (ja)
Other versions
JP7075194B2 (en
Inventor
瑛大 國政
Akihiro Kunimasa
瑛大 國政
隼太 秋山
Hayata Akiyama
隼太 秋山
橋本 大
Dai Hashimoto
大 橋本
信宏 浅井
Nobuhiro Asai
信宏 浅井
康平 橋本
Kohei Hashimoto
康平 橋本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kawasaki Heavy Industries Ltd
Original Assignee
Kawasaki Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kawasaki Heavy Industries Ltd filed Critical Kawasaki Heavy Industries Ltd
Priority to JP2017190729A priority Critical patent/JP7075194B2/en
Publication of JP2019067066A publication Critical patent/JP2019067066A/en
Application granted granted Critical
Publication of JP7075194B2 publication Critical patent/JP7075194B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B20/00Energy efficient lighting technologies, e.g. halogen lamps or gas discharge lamps
    • Y02B20/40Control techniques providing energy savings, e.g. smart controller or presence detection

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

To provide a waste disposal plan computing method and a waste disposal plan computing device capable of automatically calculating a waste disposal plan to maximize power sale revenue in an incineration plant in a short computing time.SOLUTION: The waste disposal plan computing device is configured to: accept input of a predicted value of a power sale price, a predicted value of a heat generation amount of waste, and a predicted value of a waste introduction amount for every second period shorter than a first period; output a planned amount of waste disposal for every third period shorter than the first period in such a manner that the planned amount of waste disposal satisfies constraints and maximizes power sale revenue of generated power in the first period; accept input of at least a planned amount for every third period and a predicted value of sale price of the generated power for every fourth period shorter than the third period; and output a planned amount of waste for every fourth period in such a manner that the planned amount of waste satisfies the constraints and maximizes the power sale revenue of the generated power in the third period.SELECTED DRAWING: Figure 3

Description

本発明は、焼却プラントにおける廃棄物の処理計画量を演算するための廃棄物処理計画演算方法および廃棄物処理計画演算装置に関する。   The present invention relates to a waste disposal plan computing method and a waste disposal plan computing device for computing a planned amount of waste disposal in an incineration plant.

従来から、廃棄物を焼却する焼却炉を含む焼却プラントが知られている。このような焼却プラントの中には、焼却炉において廃棄物を焼却処理する際に発生する水蒸気を用いて発電を行う発電機が設けられ、発電機で発電した電力を焼却プラントにおいて利用し、余った電力を売電して運用収入を得ることができるものが存在する(例えば特許文献1参照)。   BACKGROUND Conventionally, an incineration plant including an incinerator that incinerates waste is known. In such an incineration plant, a generator is provided that generates electric power using steam generated when incinerating waste in the incinerator, and the electric power generated by the electric generator is used in the incineration plant, There is one that can sell power and obtain an operating income (see, for example, Patent Document 1).

このような焼却プラントの運用に際し、焼却プラントの運用コストを低減するために、売電収入を最大化するように廃棄物の処理計画を策定することが望まれる。   In the operation of such an incineration plant, in order to reduce the operation cost of the incineration plant, it is desirable to formulate a waste treatment plan so as to maximize the power sale income.

しかし、焼却プラントの運用には焼却炉の負荷の制限、廃棄物を貯留する貯留槽の容量の制限、焼却炉または発電機の停止期間、連続稼働期間等、複数の制約条件を考慮する必要がある。しかも、これらの制約条件は互いに影響を与える関係にある。例えば、焼却炉の負荷を低減する(焼却速度を低くする)と貯留槽における廃棄物の容量が増大する等である。このため、経験豊富なプラント運転員の勘等に頼ることなく、制約条件を満たしつつ廃棄物の処理量を、細かく手作業により策定することは困難である。また、1年単位等の長い期間において処理計画を策定するためには時間的な労力が大きい。   However, the operation of the incineration plant needs to consider several constraints, such as limiting the load on the incinerator, limiting the capacity of the storage tank that stores waste, stopping the incinerator or generator, and continuous operation. is there. Moreover, these constraints are in a relation of affecting each other. For example, reducing the load on the incinerator (reducing the incineration rate) may increase the volume of waste in the storage tank. For this reason, it is difficult to formulate the amount of waste to be handled manually manually while satisfying the constraint conditions without relying on the knowledge and experience of an experienced plant operator. In addition, it takes a lot of time to formulate a treatment plan in a long period such as one year.

特開2000−297613号公報JP 2000-297613 A 特開2005−284388号公報JP, 2005-284388, A

したがって、このような廃棄物の処理計画を計算機を用いて演算することが望まれる。与えられた制約条件の下である目的関数を最大または最小にする解を求めることは、最適化問題と称され、当該最適化問題を解くための演算方法は、種々確立されている。しかし、長い期間におけるより詳細な処理計画を策定するためには、決定すべき変数の数が膨大となり(例えば1年間の時間毎の処理量を求める場合、決定すべき変数の数は365×24=8760となるため)、単純に1つの演算方法を適用するだけでは現実的な演算時間で解を得ることができない。   Therefore, it is desirable to calculate such a waste disposal plan using a computer. Finding a solution that maximizes or minimizes an objective function under given constraints is called an optimization problem, and various calculation methods for solving the optimization problem have been established. However, in order to develop a more detailed treatment plan in a long period, the number of variables to be determined becomes enormous (for example, when determining the throughput per hour, the number of variables to be determined is 365 × 24 = 8760), it is impossible to obtain a solution in a realistic operation time simply by applying one operation method.

例えば、上記特許文献2においては、発電プラントの運転スケジュールを最適化するための方法として、予め定められた運転パターンを用いて最適化演算することが開示されている。しかしながら、焼却プラントは、発電だけでなく廃棄物の継続的な処理が必要なため、発電機の運転パターンに基づく最適化演算だけでは、最適な解を得ることはできない。   For example, in Patent Document 2 above, as a method for optimizing the operation schedule of the power generation plant, it is disclosed that the optimization operation is performed using a predetermined operation pattern. However, since the incineration plant needs not only the power generation but also the continuous treatment of wastes, the optimization operation based on the operation pattern of the generator can not obtain an optimal solution.

したがって、現状の焼却プラントにおいては、焼却量を積極的に制御する(焼却速度を可変する)ことは行われていない。   Therefore, in the current incineration plant, actively controlling the amount of incineration (changing the incineration rate) is not performed.

そこで、本発明は、焼却プラントにおいて売電収入を最大化するような廃棄物処理計画を短い演算時間で自動的に算出することができる廃棄物処理計画演算方法および廃棄物処理計画演算装置を提供することを目的とする。   Therefore, the present invention provides a waste disposal plan computing method and waste disposal plan computing device capable of automatically calculating a waste disposal plan that maximizes power sale revenue in an incineration plant in a short computing time. The purpose is to

前記課題を解決するために、本発明の一態様に係る廃棄物処理計画演算方法は、廃棄物を焼却するための焼却炉と、前記焼却炉において廃棄物を焼却処理する際に発生する排熱によって生じた蒸気を用いて発電を行う発電機と、を備えた焼却プラントにおける廃棄物処理計画演算方法であって、第1の期間より短い第2の期間毎の発電電力の売電価格の予測値、廃棄物の発熱量の予測値、および、廃棄物搬入量の予測値、を入力し、前記焼却プラントの運用性能に関する制約条件を満たし、且つ、前記第1の期間における発電電力の売電収入を最大化するように、前記第1の期間より短い第3の期間毎の廃棄物の処理計画量を出力する、第1の最適化演算を行うステップと、前記第3の期間毎の処理計画量、および、前記第3の期間より短い第4の期間毎の発電電力の売電価格の予測値、を少なくとも入力し、前記制約条件を満たし、且つ、前記第3の期間における発電電力の売電収入を最大化するように、前記第4の期間毎の廃棄物の処理計画量を出力する、第2の最適化演算を行うステップと、を含んでいる。   In order to solve the problem, a waste disposal plan calculation method according to an aspect of the present invention includes an incinerator for incinerating waste, and waste heat generated when the waste is incinerated in the incinerator. And calculating a waste disposal plan of the generated power for each of a second period shorter than the first period. Value, the predicted value of the calorific value of waste, and the predicted value of the amount of waste carried in are input, and the constraints on the operation performance of the incineration plant are satisfied, and the sale of power generated in the first period is sold. Performing a first optimization operation to output a planned amount of waste processing for each third period shorter than the first period so as to maximize income; and processing for each third period Planned amount and shorter than the third period The fourth is to input at least the predicted value of the selling price of the generated power for each of the four periods, satisfy the constraint, and maximize the selling income of the generated power in the third period, Performing a second optimization operation, outputting the planned amount of waste treatment for each period of

上記方法によれば、第1の期間がより短い第2の期間に分割され、第1の期間より短い第3の期間単位の最適化演算が行われた上で、第3の期間がさらに短い第4の期間に分割され、第4の期間単位の最適化演算が行われる。このため、各最適化演算において、期間の分割数を少なくすることができ、各最適化演算における変数の数を少なくすることができる。したがって、各最適化演算における演算時間を短縮することができ、結果として第4の期間毎の処理計画量を第1の期間分演算するための演算時間を現実的な時間に抑えることができる。以上より、売電収入を最大化するような廃棄物処理計画を短い演算時間で自動的に算出することができる。また、実際の運用において廃棄物処理量が当初の廃棄物処理計画から乖離した場合であっても、局所的な再計算を容易に行うことができる。   According to the above method, the first period is divided into the shorter second period, and the optimization operation of the third period unit shorter than the first period is performed, and then the third period is further shortened. It is divided into the fourth period, and the optimization operation in the fourth period unit is performed. Therefore, the number of divisions of the period can be reduced in each optimization operation, and the number of variables in each optimization operation can be reduced. Therefore, the calculation time in each optimization calculation can be shortened, and as a result, the calculation time for calculating the processing planned amount for each fourth period for the first period can be suppressed to a realistic time. From the above, it is possible to automatically calculate the waste disposal plan which maximizes the power sale income in a short calculation time. In addition, even if the amount of waste disposal deviates from the original waste disposal plan in actual operation, local recalculation can be easily performed.

前記廃棄物処理計画演算方法は、前記第4の期間毎の処理計画量、および、前記第4の期間より短い第5の期間毎の発電電力の売電価格の予測値、を入力し、前記制約条件を満たし、且つ、前記第4の期間における発電電力の売電収入を最大化するように、前記第5の期間毎の処理計画量を出力する、第3の最適化演算を行うステップを含んでもよい。期間の分割を多段化することにより、各段における演算量を低減することができる。また、期間が細分化されることにより、局所的な再計算を、より好適な期間単位で行うことができる。   The waste treatment plan calculation method inputs the treatment plan amount for each of the fourth period and the predicted value of the selling price of the generated power for each fifth period shorter than the fourth period, and Performing a third optimization calculation step of outputting a planned amount of processing for each of the fifth period so as to satisfy the constraint conditions and maximize the sale income of generated power in the fourth period; May be included. By dividing the period into multiple stages, the amount of computation in each stage can be reduced. Also, by segmenting the period, local recalculation can be performed on a more suitable period basis.

前記第1の期間は、1年以上の期間であり、前記第2の期間および前記第3の期間は、それぞれ1週以上かつ前記第1の期間未満の期間であり、前記第4の期間は、1日以上かつ前記第3の期間未満の期間であり、前記第5の期間は、1時間以上かつ前記第4の期間未満の期間であってもよい。   The first period is a period of 1 year or more, and the second period and the third period are each 1 week or more and less than the first period, and the fourth period is a period of 1 week or more. The period may be one day or more and less than the third period, and the fifth period may be one hour or more and less than the fourth period.

前記第3の最適化演算において、前記制約条件の少なくとも一部を省略して演算を行ってもよい。第1の最適化演算で考慮済みの制約条件について第3の最適化演算では制約条件としないことにより、演算結果の精度を高く維持しつつ演算量をより低減させることができる。   In the third optimization operation, at least a part of the constraint condition may be omitted. Regarding the Constraint Condition Considered in the First Optimization Operation By not setting the constraint condition in the third optimization operation, it is possible to further reduce the amount of operation while maintaining high accuracy of the operation result.

前記第3の期間は、前記第2の期間より長い期間であり、前記第1の最適化演算において、前記制約条件を満たし、且つ、前記第1の期間における発電電力の売電収入を最大化するように、前記第2の期間毎の処理計画量を演算し、演算された前記第2の期間毎の処理計画量に基づいて、前記第3の期間毎の処理計画量を出力してもよい。これにより、中間出力として所望の期間(すなわち、第2の期間とは異なる第3の期間)毎の処理計画量を出力することができるため、長期計画から中期計画および短期計画を1つの演算の流れの中で容易に策定することができる。   The third period is a period longer than the second period, and the constraint condition is satisfied in the first optimization calculation, and power sales revenue of the generated power in the first period is maximized. To calculate the processing plan amount for each second period, and output the processing plan amount for each third period based on the calculated processing plan amount for each second period. Good. As a result, since it is possible to output the processing plan amount for each desired period (that is, the third period different from the second period) as the intermediate output, the long-term plan to the medium-term plan and the short-term plan It can be formulated easily in the flow.

前記制約条件は、前記焼却炉の単位時間あたりの焼却量の上下限値、前記焼却炉に投入される廃棄物を一時貯留するための貯留槽の容量の上下限値、前記焼却炉または前記発電機の停止期間、および、前記焼却炉の連続稼働期間の上限値の少なくとも1つを含んでもよい。   The constraint conditions include upper and lower limit values of incineration amount per unit time of the incinerator, upper and lower limit values of capacity of a storage tank for temporarily storing wastes to be input to the incinerator, the incinerator or the power generation It may include at least one of a machine stop period and an upper limit value of a continuous operation period of the incinerator.

前記焼却プラントは、前記焼却炉を複数有し、前記第1の最適化演算において、前記第3の期間毎の各焼却炉における稼働/停止状況を演算してもよい。これにより、複数の焼却炉の稼働計画に基づく総合的な廃棄物処理計画の算出を行うことができる。   The incineration plant may have a plurality of incinerators, and may calculate an operation / stop state in each incinerator in each of the third periods in the first optimization calculation. In this way, it is possible to calculate a comprehensive waste disposal plan based on the operation plans of a plurality of incinerators.

前記第1の期間は暦に対応した期間であり、前記第2の期間、前記第3の期間、および、前記第4の期間は、前記第1の期間がそれぞれの所定数で分割された複数の期間の一つであり、前記分割された複数の期間のそれぞれが前記第1の期間に対応した暦情報を有していてもよい。季節や時間帯に応じたより細かな予測値に基づいて最適化演算を行うことができる。   The first period is a period corresponding to a calendar, and a plurality of the second period, the third period, and the fourth period are obtained by dividing the first period by a predetermined number of each. The plurality of divided periods may have calendar information corresponding to the first period. The optimization operation can be performed on the basis of finer prediction values in accordance with the season and the time zone.

本発明の他の態様に係る廃棄物処理計画演算装置は、廃棄物を焼却するための焼却炉と、前記焼却炉において廃棄物を焼却処理する際に発生する排熱によって生じた蒸気を用いて発電を行う発電機と、を備えた焼却プラントにおける廃棄物処理計画演算装置であって、第1の期間より短い第2の期間毎の発電電力の売電価格の予測値、廃棄物の発熱量の予測値、および、廃棄物搬入量の予測値、が入力され、前記焼却プラントの運用性能に関する制約条件を満たし、且つ、前記第1の期間における発電電力の売電収入を最大化するように、前記第1の期間より短い第3の期間毎の処理計画量を出力する、第1の最適化演算部と、前記第3の期間毎の処理計画量、および、前記第3の期間より短い第4の期間毎の発電電力の売電価格の予測値、を少なくとも入力し、前記制約条件を満たし、且つ、前記第3の期間における発電電力の売電収入を最大化するように、前記第4の期間毎の処理計画量を出力する、第2の最適化演算部と、を備えている。   A waste disposal plan computing device according to another aspect of the present invention uses an incinerator for incinerating waste, and steam generated by waste heat generated when the waste is incinerated in the incinerator. A waste treatment plan computing device in an incineration plant including the generator for generating power, wherein the predicted value of the selling price of the generated power for each second period shorter than the first period, the calorific value of the waste And the predicted value of the amount of waste carried in are input so as to satisfy the constraints on the operation performance of the incineration plant, and to maximize the sales revenue of the generated power in the first period. A first optimization calculation unit for outputting a processing schedule amount for each third period shorter than the first period, a processing schedule amount for each third period, and a period shorter than the third period Forecast value of selling price of generated power every fourth period, A second optimization that outputs at least the processing planning amount for each fourth period so as to at least input, satisfy the constraint, and maximize sales revenue of generated power in the third period. And an arithmetic unit.

上記構成によれば、第1の期間がより短い第2の期間に分割され、第1の期間より短い第3の期間単位の最適化演算が行われた上で、第3の期間がさらに短い第4の期間に分割され、第4の期間単位の最適化演算が行われる。このため、各最適化演算において、期間の分割数を少なくすることができ、各最適化演算における変数の数を少なくすることができる。したがって、各最適化演算における演算時間を短縮することができ、結果として第4の期間毎の処理計画量を第1の期間分演算するための演算時間を現実的な時間に抑えることができる。以上より、売電収入を最大化するような廃棄物処理計画を短い演算時間で自動的に算出することができる。また、実際の運用において廃棄物処理量が当初の廃棄物処理計画から乖離した場合であっても、局所的な再計算を容易に行うことができる。   According to the above configuration, the first period is divided into the shorter second period, and the optimization operation of the third period unit shorter than the first period is performed, and then the third period is further shortened. It is divided into the fourth period, and the optimization operation in the fourth period unit is performed. Therefore, the number of divisions of the period can be reduced in each optimization operation, and the number of variables in each optimization operation can be reduced. Therefore, the calculation time in each optimization calculation can be shortened, and as a result, the calculation time for calculating the processing planned amount for each fourth period for the first period can be suppressed to a realistic time. From the above, it is possible to automatically calculate the waste disposal plan which maximizes the power sale income in a short calculation time. In addition, even if the amount of waste disposal deviates from the original waste disposal plan in actual operation, local recalculation can be easily performed.

本発明によれば、焼却プラントにおいて売電収入を最大化するような廃棄物処理計画を短い演算時間で自動的に算出することができる廃棄物処理計画演算方法および廃棄物処理計画演算装置を提供することができる。   According to the present invention, it is possible to provide a waste disposal plan computing method and waste disposal plan computing device capable of automatically calculating a waste disposal plan that maximizes power sale revenue in an incineration plant in a short computing time. can do.

本発明の一実施の形態に係る廃棄物処理計画演算方法の対象となる焼却プラントを示す概略構成図である。It is a schematic block diagram which shows the incineration plant used as the object of the waste disposal plan calculation method which concerns on one embodiment of this invention. 図2は、本発明の一実施の形態に係る廃棄物処理計画演算装置の概略構成を示すブロック図である。FIG. 2 is a block diagram showing a schematic configuration of a waste disposal plan computing device according to one embodiment of the present invention. 図3は、本実施の形態における最適化演算処理の流れを示す模式図である。FIG. 3 is a schematic view showing a flow of optimization calculation processing in the present embodiment. 図4は、本実施の形態における第2の最適化演算の結果を概念的に示すグラフである。FIG. 4 is a graph conceptually showing the result of the second optimization operation in the present embodiment. 図5Aは、図4に示す日毎の処理計画量に基づいた第3の最適化演算の結果を概念的に示すグラフである。FIG. 5A is a graph conceptually showing the result of the third optimization calculation based on the daily processing schedule shown in FIG. 図5Bは、図4に示す日毎の処理計画量に基づいた第3の最適化演算の結果を概念的に示すグラフである。FIG. 5B is a graph conceptually showing the result of the third optimization calculation based on the daily processing schedule shown in FIG. 図6は、本実施の形態の変形例における最適化演算処理の流れを示す模式図である。FIG. 6 is a schematic diagram showing a flow of optimization calculation processing in the modification of the present embodiment.

以下、本発明の一実施の形態に係る廃棄物処理計画演算方法について説明する。まず、前提となる焼却プラントの一例について説明する。   Hereinafter, a waste disposal plan calculation method according to an embodiment of the present invention will be described. First, an example of the incineration plant as a premise will be described.

図1は、本発明の一実施の形態に係る廃棄物処理計画演算方法の対象となる焼却プラントを示す概略構成図である。この焼却プラント1は、酸素含有ガスを用いて廃棄物を焼却するための火炉室3を有する焼却炉2と、焼却炉2から排出される焼却炉排ガスから排熱を水蒸気として回収する蒸気回収装置であるボイラ4と、を含む。焼却炉2のボイラ4とは反対側には、ホッパー5および給じん機6が配置されており、ボイラ4からは、排ガスの排気経路7が煙突8まで延びている。排気経路7には、何れも図示しないが、上流側から順に、エコノマイザー、減温塔、集塵機およびブロワが設けられている。   FIG. 1 is a schematic configuration view showing an incineration plant which is a target of the waste disposal plan calculation method according to the embodiment of the present invention. The incineration plant 1 comprises an incinerator 2 having a furnace chamber 3 for incineration of waste using an oxygen-containing gas, and a steam recovery device for recovering waste heat as steam from incinerator exhaust gas discharged from the incinerator 2 And the boiler 4 which is. A hopper 5 and a dust collector 6 are disposed on the side of the incinerator 2 opposite to the boiler 4, and from the boiler 4, an exhaust path 7 of the exhaust gas extends to the chimney 8. Although not shown in the drawings, the exhaust path 7 is provided with an economizer, a temperature reducing tower, a dust collector and a blower in this order from the upstream side.

ホッパー5の火炉室3とは反対側には、焼却炉2に投入される廃棄物を一時貯留するための貯留槽(廃棄物ピット)9が設けられている。貯留槽9の上方にはクレーン10が設けられている。ホッパー5には、貯留槽9に貯められた廃棄物がクレーン10により投入される。給じん機6は、所定のインターバル(例えば、0.5〜3分間隔)で間欠的に作動することにより、ホッパー5に投入された廃棄物を焼却炉2の火炉室3内に送り込む。   On the opposite side to the furnace chamber 3 of the hopper 5, a storage tank (waste pit) 9 for temporarily storing waste to be introduced into the incinerator 2 is provided. A crane 10 is provided above the storage tank 9. The wastes stored in the storage tank 9 are introduced into the hopper 5 by the crane 10. The dust collector 6 feeds the waste introduced into the hopper 5 into the furnace chamber 3 of the incinerator 2 by intermittently operating at predetermined intervals (for example, 0.5 to 3 minutes).

焼却炉2は、火炉室3の下方に設けられたストーカを有している。ストーカは、廃棄物の搬送手段として機能する。ストーカは、給じん機6に近い側から順に乾燥ストーカ11、燃焼ストーカ12および後燃焼ストーカ13を有する。すなわち、これらのストーカ11〜13は、廃棄物の移動方向に配列されている。乾燥、燃焼および後燃焼ストーカ11〜13の下方には、風箱14〜16がそれぞれ設けられている。さらに、焼却炉2は、火炉室3とボイラ4との間に火炉室3と連続する再燃焼室17を有する。なお、燃焼ストーカ12は、図例では1段であるが、2段以上設けられていてもよい。乾燥、燃焼および後燃焼ストーカ11〜13は、例えば、互いに異なるインターバルで間欠的に作動する。   The incinerator 2 has a stoker provided below the furnace chamber 3. The stoker functions as a means for transporting waste. The stoker has a dry stoker 11, a combustion stoker 12 and a post-combustion stoker 13 sequentially from the side close to the dust collector 6. That is, these stokers 11 to 13 are arranged in the moving direction of the waste. Under the drying, combustion and post-combustion stokers 11 to 13, air boxes 14 to 16 are provided, respectively. Furthermore, the incinerator 2 has a recombustion chamber 17 continuous with the furnace chamber 3 between the furnace chamber 3 and the boiler 4. Although the combustion stoker 12 is one stage in the illustrated example, two or more stages may be provided. The drying, combustion and post-combustion stokers 11 to 13 operate intermittently at different intervals, for example.

火炉室3では、廃棄物の熱分解および部分酸化反応により燃焼ガスが生成され、この燃焼ガスが廃棄物と共に燃焼される。再燃焼室17は、火炉室3から流出する燃焼ガスを完全燃焼させるためのものである。廃棄物の燃焼後の灰は、後燃焼ストーカ13に隣接して設けられた排出口18から排出される。   In the furnace chamber 3, combustion gas is generated by the thermal decomposition and partial oxidation reaction of the waste, and the combustion gas is burned together with the waste. The reburning chamber 17 is for completely burning the combustion gas flowing out of the furnace chamber 3. After burning the waste, the ash is discharged from an outlet 18 provided adjacent to the post-combustion stoker 13.

ボイラ4では、焼却炉2から排出される排ガス(排熱)によって蒸気が生成される。より詳しくは、図1に示すように、ボイラ4は、再燃焼室17の上方に配置された放射室19と、放射室19と上部同士が連通する第1煙道20と、第1煙道20と下部同士が連通する第2煙道21と、を含む。ボイラ4で排熱から生成された蒸気は、発電機23と連結されたタービン22に送られて発電に利用される。発電機23で発電した電力は、焼却プラント1において利用される。また、余った電力は、電力会社に売電される。ボイラ4を通過した排ガスの大部分は、排気経路7を流れた後に、煙突8から大気中へ放出される。   In the boiler 4, steam is generated by the exhaust gas (exhaust heat) discharged from the incinerator 2. More specifically, as shown in FIG. 1, the boiler 4 includes a radiation chamber 19 disposed above the reburning chamber 17, a first flue 20 in which the radiation chamber 19 and the upper portion communicate with each other, and a first flue 20 and the 2nd flue 21 which lower parts communicate. Steam generated from waste heat in the boiler 4 is sent to a turbine 22 connected to a generator 23 and used for power generation. The electric power generated by the generator 23 is used in the incineration plant 1. In addition, surplus power is sold to a power company. Most of the exhaust gas that has passed through the boiler 4 is discharged from the chimney 8 to the atmosphere after flowing through the exhaust path 7.

なお、図1においては、焼却プラント1が1つの焼却施設を有する構成として図示されているが、焼却プラント1は、複数の焼却施設(焼却炉2)を備えていてもよい。   In addition, in FIG. 1, although the incineration plant 1 is illustrated as a structure which has one incineration plant, the incineration plant 1 may be equipped with several incineration plant (incinerator 2).

電力会社への売電価格は、季節、時間等により変動する。例えば、売電価格は、夏季(7月〜9月)にそれ以外の期間に比べて高くなる傾向がある。また、廃棄物の単位量あたりの発熱量も、廃棄物の状態が湿度や気温等により変化するため、季節、時間等により変化する。例えば、廃棄物の単位量あたりの発熱量は、夏季において廃棄物に含まれる水分量が多くなるため、小さくなる。また、廃棄物の貯留槽9への搬入量は、その時々で変化する。   The selling price of electricity to a power company fluctuates depending on the season, time, and the like. For example, the selling price tends to be higher in summer (July to September) compared to other periods. In addition, the calorific value per unit amount of waste also changes depending on the season, time, and the like because the state of the waste changes due to humidity, temperature, and the like. For example, the calorific value per unit amount of waste decreases because the amount of water contained in the waste increases in summer. Further, the amount of waste carried into the storage tank 9 changes from time to time.

一方、焼却プラント1における廃棄物の処理には運用上の制約がある。例えば、焼却炉2の単位時間あたりの焼却量の上下限値、貯留槽9の容量の上下限値、焼却炉2または発電機23の停止期間(メンテナンス期間)、および、焼却炉2の連続稼働期間の上限値等がある。これらの制約の少なくとも1つは、後述する廃棄物処理量を最適化演算するための制約条件となり得る。   On the other hand, the disposal of wastes in the incineration plant 1 has operational limitations. For example, upper and lower limit value of incineration amount per unit time of incinerator 2, upper and lower limit value of capacity of storage tank 9, stop period (maintenance period) of incinerator 2 or generator 23, and continuous operation of incinerator 2 There is an upper limit value of the period, etc. At least one of these constraints can be constraints for optimizing the waste processing amount described later.

焼却量の上限値および貯留槽9の容量の上限値は、焼却プラント1の性能上限を示す値として焼却プラント1毎に予め決定されている。焼却量の下限値および貯留槽9の容量の下限値は、焼却炉2が廃棄物の焼却動作を継続的に行うために最低限必要な値として焼却プラント1毎に予め決定されている。焼却炉2の停止期間は、焼却炉2のメンテナンス上の制約として、例えば1年にX回、1回あたりY日停止等のように定められている。発電機23の停止期間についても同様である。焼却炉2の連続稼働期間は、焼却炉2の能力維持のために予め定められている。   The upper limit value of the incineration amount and the upper limit value of the capacity of the storage tank 9 are previously determined for each incineration plant 1 as a value indicating the performance upper limit of the incineration plant 1. The lower limit value of the incineration amount and the lower limit value of the capacity of the storage tank 9 are previously determined for each incineration plant 1 as a minimum value necessary for the incinerator 2 to continuously perform the waste incineration operation. The shutdown period of the incinerator 2 is determined as, for example, X times a year, Y-day shutdown at one time, etc., as constraints on the maintenance of the incinerator 2. The same applies to the stop period of the generator 23. The continuous operation period of the incinerator 2 is predetermined to maintain the capacity of the incinerator 2.

図2は、本発明の一実施の形態に係る廃棄物処理計画演算装置の概略構成を示すブロック図である。図2に示す廃棄物処理計画演算装置(以下、単に演算装置と略することがある)31は、入力部32、記憶部33、演算部34、および出力部35を備えている。各構成31〜35は、バス36により相互にデータ伝達を行う。演算装置31は、焼却システム1における制御装置および制御用コンピュータ(図示せず)によって構成されてもよいし、それとは独立したコンピュータとして構成されてもよい。また、演算装置1が、焼却システム1における制御装置と通信可能なコンピュータにより構成されてもよい。   FIG. 2 is a block diagram showing a schematic configuration of a waste disposal plan computing device according to one embodiment of the present invention. A waste disposal plan computing device (hereinafter sometimes simply referred to as computing device) 31 shown in FIG. 2 includes an input unit 32, a storage unit 33, a computing unit 34, and an output unit 35. The configurations 31 to 35 mutually transmit data via the bus 36. The arithmetic unit 31 may be configured by a control unit and a control computer (not shown) in the incineration system 1 or may be configured as a computer independent of it. The arithmetic device 1 may be configured by a computer that can communicate with the control device in the incineration system 1.

入力部32は、所定期間毎の売電価格の予測値、廃棄物の発熱量の予測値、および廃棄物搬入量の予測値等の情報をユーザが入力可能な入力装置として構成される。記憶部33は、入力部32から入力された情報を記憶する。また、記憶部33には、後述する焼却プラントの運用性能に関する制約条件および最適化演算プログラムが予め記憶されている。なお、制約条件は、入力部32から設定入力または設定変更可能としてもよい。   The input unit 32 is configured as an input device that allows the user to input information such as a predicted value of the sale price for each predetermined period, a predicted value of the calorific value of waste, and a predicted value of the amount of waste carried in. The storage unit 33 stores the information input from the input unit 32. In addition, in the storage unit 33, constraints and an optimization calculation program regarding the operation performance of the incineration plant described later are stored in advance. The constraint conditions may be settable or changeable from the input unit 32.

演算部34は、記憶部33に記憶された各種の情報に基づいて第1の期間(例えば1年)における廃棄物の処理計画量を演算する最適化演算処理を実行する。このために、演算部34は、最適化演算プログラムを実行することにより、入力情報取得部41、第1の最適化演算部42、第2の最適化演算部43および第3の最適化演算部44等の機能を発揮する。   The calculation unit 34 executes optimization calculation processing to calculate the planned amount of waste processing in the first period (for example, one year) based on various types of information stored in the storage unit 33. For this purpose, the operation unit 34 executes the optimization operation program to obtain the input information acquisition unit 41, the first optimization operation unit 42, the second optimization operation unit 43, and the third optimization operation unit. It exerts the function of 44 mag.

入力情報取得部41は、後述する第1〜第3の最適化演算のそれぞれを行うために、必要な入力値を取得する。より具体的には、入力情報取得部41は、所定期間毎の売電価格の予測値、廃棄物の発熱量の予測値、および廃棄物搬入量の予測値等の情報の入力を受け付ける。これらの予測値は過去の実績に基づく値(実績値)であってもよいし、所定の演算(シミュレーション等)による演算値であってもよい。また、売電価格の予測値は、所定の組織(電力会社等)による買電価格の案または決定値であってもよい。   The input information acquisition unit 41 acquires necessary input values to perform each of first to third optimization calculations to be described later. More specifically, the input information acquisition unit 41 receives input of information such as a predicted value of the sale price for each predetermined period, a predicted value of the calorific value of waste, and a predicted value of the amount of carried in waste. These predicted values may be values based on past actual results (actual values) or may be values calculated by a predetermined operation (such as simulation). The predicted value of the sale price may be a proposed or determined value of the purchase price by a predetermined organization (such as a power company).

入力情報取得部41は、入力部32から入力された値をそのまま取得してもよいし、記憶部33に記憶されている情報を読み出すことにより取得してもよい。各最適化演算部42〜44は、入力された情報と、記憶部3に記憶されている制約条件とを用いて、当該制約条件を満たし、且つ、発電電力の売電収入を最大化するように、より短い期間毎の処理計画量を演算する。   The input information acquisition unit 41 may acquire the value input from the input unit 32 as it is, or may acquire the value by reading out the information stored in the storage unit 33. Each optimization calculation unit 42 to 44 satisfies the constraint condition using the input information and the constraint condition stored in the storage unit 3 and maximizes the selling income of generated power. To calculate the processing schedule for each shorter period.

第1の最適化演算部42は、第1の期間より短い第2の期間毎の上記予測値が入力され、上記制約条件を用いて、当該制約条件を満たし、且つ、第1の期間における発電電力の売電収入を最大化するように、第1の期間より短い第3の期間毎の処理計画量を出力する。第2の最適化演算部43は、第1の最適化演算部42により演算された第3の期間毎の処理計画量のそれぞれに対し、第3の期間より短い第4の期間毎の上記予測値が入力され、上記制約条件を用いて、当該制約条件を満たし、且つ、第3の期間における発電電力の売電収入を最大化するように、第4の期間毎の処理計画量を出力する。第3の最適化演算部44は、第2の最適化演算部43により演算された第4の期間毎の処理計画量のそれぞれに対し、第4の期間より短い第5の期間毎の売電価格の予測値が入力され、上記制約条件を用いて、当該制約条件を満たし、且つ、第4の期間における発電電力の売電収入を最大化するように、第5の期間毎の処理計画量を出力する。   The first optimization calculation unit 42 receives the predicted value for each second period shorter than the first period, and satisfies the constraint condition using the constraint condition, and generates power in the first period. In order to maximize the power sales revenue of the power, the planned processing volume per third period shorter than the first period is output. The second optimization calculation unit 43 predicts the above-described prediction for each fourth period, which is shorter than the third period, with respect to each of the processing planning amounts for each third period calculated by the first optimization calculation unit 42. A value is input, and using the above constraint conditions, the planned treatment volume for each fourth period is output so as to satisfy the constraint conditions and maximize the sale income of generated power in the third period. . The third optimization calculation unit 44 sells power for each fifth period, which is shorter than the fourth period, for each of the processing planned amounts for each fourth period calculated by the second optimization calculation unit 43. The forecasted value of the price is input, and the processing schedule quantity for each fifth period is used to satisfy the constraint conditions using the above-mentioned constraint conditions and maximize the sales revenue of the generated power in the fourth period. Output

出力部35は、演算部34における演算結果を出力する。例えば、出力部35は、演算装置1に接続された表示装置(図示せず)に、各期間に応じた処理計画量を表示する。   The output unit 35 outputs the calculation result in the calculation unit 34. For example, the output unit 35 causes the display device (not shown) connected to the arithmetic device 1 to display the planned processing amount according to each period.

以下、最適化演算処理の具体例を説明する。図3は、本実施の形態における最適化演算処理の流れを示す模式図である。図3の例では、1時間毎の処理計画量を1年間分演算する態様を例示している。すなわち、本実施の形態において、第1の期間は1年に設定されている。第1の期間(1年間)は暦に対応した期間である。   Hereinafter, a specific example of the optimization calculation process will be described. FIG. 3 is a schematic view showing a flow of optimization calculation processing in the present embodiment. In the example of FIG. 3, the aspect which calculates the processing plan quantity for every hour for 1 year is illustrated. That is, in the present embodiment, the first period is set to one year. The first period (one year) is a period corresponding to the calendar.

まず、入力情報取得部41は、週毎の売電価格の予測値、週毎の廃棄物発熱量の予測値および週毎の廃棄物搬入量の予測値を取得する。すなわち、本実施の形態において、第2の期間は1週に設定されている。ここで、週毎の各予測値は、1年を52週に分割した場合の週毎の予測値を意味する。すなわち、入力情報取得部41が取得する上記3種類の予測値の数は、それぞれ、第1週の予測値から第52週の予測値までの52個(52×3=156個)である。この結果、例えば第1週の売電価格の予測値と第2週の売電価格の予測値とは、互いに異なり得る。   First, the input information acquisition unit 41 acquires the predicted value of the power sale price for each week, the predicted value of the waste heat generation amount for each week, and the predicted value of the amount of waste carried in each week. That is, in the present embodiment, the second period is set to one week. Here, each weekly forecast value means a weekly forecast value when one year is divided into 52 weeks. That is, the number of the three types of prediction values acquired by the input information acquisition unit 41 is 52 (52 × 3 = 156) from the prediction value of the first week to the prediction value of the 52nd week. As a result, for example, the predicted value of the selling price in the first week and the predicted value of the selling price in the second week may be different from each other.

さらに、入力情報取得部41は、記憶部33から制約条件を読み出す。第1の最適化演算部42は、読み出した制約条件を満たし、第1の期間(1年間)の発電電力の売電収入を最大化するように、第2の期間(1週)より長い第3の期間(1月)毎の処理計画量を演算する第1の最適化演算を行う(ステップS1)。本実施の形態において、第1の最適化演算部42は、まず、読み出した制約条件を満たし、且つ、第1の期間(1年間)の発電電力の売電収入を最大化するように、第2の期間(1週)毎の処理計画量を演算する。   Furthermore, the input information acquisition unit 41 reads the constraint condition from the storage unit 33. The first optimization calculation unit 42 satisfies the read constraint conditions, and the first optimization calculation unit 42 is longer than the second period (one week) so as to maximize selling income of generated power for the first period (one year). A first optimization operation is performed to calculate the processing schedule amount for each of the three periods (January) (step S1). In the present embodiment, the first optimization operation unit 42 first satisfies the read constraint conditions, and maximizes the sale income of generated power during the first period (one year). Calculate the amount of planned processing every 2 periods (one week).

第1の最適化演算は、混合整数非線形計画問題として演算される。第1の最適化演算部42は、この問題の解を効率的に得るために、線形計画法を用いた演算およびメタヒューリスティクスを用いた演算を実行する。   The first optimization operation is calculated as a mixed integer non-linear programming problem. The first optimization operation unit 42 executes an operation using linear programming and an operation using metaheuristics in order to efficiently obtain a solution to this problem.

線形計画法は、目的関数および制約条件を線形式で記述可能な場合の解法である。線形計画法において得られた解は、必ず目的関数を最適化する解となること、計算が高速に行えること等の利点がある。しかし、線形計画法は、全て線形式で表す必要がある、整数を取り扱うことが困難であるという欠点がある。また、線形計画法において、変数の数が増えると指数関数的に演算時間が増大するという欠点もある。   Linear programming is a solution when the objective function and the constraints can be described in linear form. The solution obtained by linear programming has advantages such as being always a solution that optimizes the objective function and performing calculation at high speed. However, linear programming has the disadvantage that it is difficult to handle integers, which must all be expressed in linear form. In addition, in linear programming, there is also a disadvantage that the operation time increases exponentially as the number of variables increases.

メタヒューリスティクスは、発見的解法により、より良い解を現実的な時間で求めることを目的とする解法である。メタヒューリスティクスは、演算時間に拘わらず何らかの解を得ることができるという利点がある。しかし、メタヒューリスティクスは、得られた解が最適解であるかどうかの保証がないこと、ランダムに探索を行うため、より良い解を得るためにはある程度の演算時間が必要であるという欠点がある。   Meta-heuristics is a solution that aims to find better solutions in realistic time by heuristics. Meta-heuristics has the advantage of being able to obtain any solution regardless of the computation time. However, metaheuristics has the disadvantage that there is no guarantee that the obtained solution is the optimal solution, and since random search is performed, some computing time is required to obtain a better solution. is there.

本実施の形態においては、これらの解法を組み合わせて第1の最適化演算を行うことにより、最適解に近い解を短時間で得ることができる。すなわち、第1の最適化演算は、線形計画法を用いた演算を回帰的に行い、その中から最適な結果を選び出すことによって実行される。第1の最適化演算において、月毎の処理計画量を得るための目的関数は、運用収入の計算式となり、線形式で記述可能である。すなわち、第1の最適化演算における目的関数は、以下の式で表される。   In the present embodiment, a solution close to the optimum solution can be obtained in a short time by performing the first optimization operation by combining these solutions. That is, the first optimization operation is performed by recursively performing an operation using linear programming and selecting an optimal result from among them. In the first optimization operation, an objective function for obtaining the monthly processing schedule amount is a formula for calculating operation income and can be described in a linear form. That is, the objective function in the first optimization operation is expressed by the following equation.

Figure 2019067066
Figure 2019067066

ここで、Q1は、年間の売電収入(円)を示し、qは、週毎の売電価格の予測値(円/kWh)を示し、Wは、週毎の売電量(kWh)を示し、Gは、週毎の廃棄物処理量(ton)を示し、α,βは、週毎の廃棄物発熱量および気温等から定められる焼却プラント1の性能指標を示している。α,βは、焼却炉2またはボイラ4の性能、熱利用施設(図示せず)への蒸気供給、焼却プラント1内の消費電力等の影響を考慮して定められてもよい。iは、1年間における各週を示す指標であり、i=1,2,…,52(または53)となる。したがって、第1の最適化演算における決定すべき変数(週毎の廃棄物処理量G)の数は、52(または53)となる。 Here, Q1 represents the annual revenue from electricity sales (yen), q i denotes the predicted value of the electricity sale price of each week (yen / kWh), W i, the amount of power sold of each week (kWh) G i indicates a weekly waste disposal amount (ton), and α i and β i indicate a performance index of the incineration plant 1 determined from the weekly waste heat value and temperature etc. . α i and β i may be determined in consideration of the performance of the incinerator 2 or the boiler 4, the steam supply to a heat utilization facility (not shown), the power consumption in the incineration plant 1, and the like. i is an index indicating each week in one year, i = 1, 2, ..., 52 (or 53). Accordingly, the number of variables to be determined in the first optimizing operation (waste quantity G i weekly) becomes 52 (or 53).

また、制約条件のうち、焼却炉2の単位時間あたりの焼却量の上下限値、貯留槽9の容量の上下限値、および、焼却炉2の連続稼働期間の上限値は、何れも線形式で記述可能である。したがって、第1の最適化演算において、月毎の処理計画量を得るための目的関数、および、制約条件のうちの上記のものは、線形計画法により演算される。   Further, among the constraint conditions, upper and lower limit values of incineration amount per unit time of incinerator 2, upper and lower limit values of capacity of storage tank 9, and upper limit value of continuous operation period of incinerator 2 are all in linear form. Can be described by Therefore, in the first optimization operation, the objective function for obtaining the monthly processing schedule and the above-mentioned one of the constraints are calculated by linear programming.

一方、制約条件のうち、焼却炉2または発電機23の停止期間は、線形式により記述することが難しいため、メタヒューリスティクスによる探索により演算される。   On the other hand, since it is difficult to describe the stop period of the incinerator 2 or the generator 23 in the linear form among the constraint conditions, the stop period is calculated by a search based on metaheuristics.

以上により、第1の最適化演算部42は、年間の売電収入Q1を最大化するような週毎(i毎)の廃棄物処理量Gを出力する。この週毎の廃棄物処理量Gは、1年を暦に沿って週毎に分割した複数の処理計画量となる。 As described above, the first optimization calculation unit 42 outputs the waste processing amount G i every week (every i) that maximizes the annual power sale income Q1. The waste treatment amount G i of each week, a plurality of processing plans amount divided weekly along the one year calendar.

なお、本実施の形態において、複数(例えば2つ)の焼却炉2を備えた焼却プラント1に対する第1の最適化演算を行う場合には、第1の最適化演算部42は、第2の期間(1週)毎の各焼却炉2の稼働/停止状況の計画を演算する。上記制約条件のうち、焼却炉2の停止期間、および、焼却炉2の連続稼働期間の上限値は、焼却炉2毎に個別に設定されている。したがって、第1の最適化演算部42は、これらを考慮しつつ、年間の売電収入Qを最大化するために、各焼却炉2をいつ停止させるか、何台停止させるかを考慮した演算を行う。第1の最適化演算部42は、週毎の各焼却炉2の稼働/停止状況の計画を出力する。これにより、複数の焼却炉2の稼働計画に基づく総合的な廃棄物処理計画の算出を行うことができる。   In the present embodiment, in the case where the first optimization calculation is performed on the incineration plant 1 provided with a plurality of (for example, two) incinerators 2, the first optimization operation unit 42 performs the second optimization operation. The plan of the operation / stop status of each incinerator 2 for each period (one week) is calculated. Among the above constraint conditions, the shutdown period of the incinerator 2 and the upper limit value of the continuous operation period of the incinerator 2 are individually set for each incinerator 2. Therefore, in consideration of these factors, the first optimization operation unit 42 performs operation in consideration of when to stop each incinerator 2 or how many units are to be stopped in order to maximize the annual power sale income Q. I do. The first optimization calculation unit 42 outputs a plan of the operation / stop status of each incinerator 2 on a weekly basis. In this way, it is possible to calculate a comprehensive waste disposal plan based on the operation plan of the plurality of incinerators 2.

また、第1の最適化演算の結果、週毎の貯留槽9の容量(廃棄物の蓄積量)が計算され、出力される。   In addition, as a result of the first optimization calculation, the capacity of the storage tank 9 (the accumulated amount of waste) for each week is calculated and output.

第1の最適化演算部42で演算された週毎の処理計画量(1年間分)と、週毎の各焼却炉2の稼働/停止状況(1年間分)とは、第2の最適化演算において利用される。本実施の形態においては、第2の最適化演算を行う前に、第2の期間(1週)毎の処理計画量を第3の期間(1月)毎の処理計画量に変換する第1の期間変換処理が実行される(ステップS1a)。   The amount of treatment plan for each week (for one year) calculated by the first optimization calculation unit 42 and the operation / stop status of each incinerator 2 for each week (for one year) are the second optimization It is used in the operation. In the present embodiment, before the second optimization calculation is performed, the first planned processing amount for each second period (one week) is converted into the first planned processing amount for each third period (January). The period conversion process is performed (step S1a).

すなわち、第1の最適化演算部42は、第1の期間変換処理において、週毎の処理計画量を月毎に合算して月毎の処理計画量を算出する。例えば、第1の最適化演算部42は、第1週から第5週までの週毎の処理計画量を合算して1月の処理計画量を算出し、第5週から第9週までの週毎の処理計画量を合算して2月の処理計画量を算出する。このようにして算出された月毎の廃棄物処理量は、1年を暦に沿って月毎に分割した複数の処理計画量となる。なお、第1の最適化演算部42は、月が跨る週(第5週)において、週毎の処理計画量を日割りして1月と2月とに振り分ける、または、単純に2分割して1月と2月とに振り分けるような処理を行ってもよい。   That is, in the first period conversion process, the first optimization calculation unit 42 adds up the scheduled processing amounts for each week on a monthly basis to calculate the scheduled processing amounts for each month. For example, the first optimization calculation unit 42 adds up the planned treatment quantities for each week from the first week to the fifth week to calculate the planned treatment quantity for January, and the fifth to ninth weeks Calculate the planned processing volume for February by adding the planned processing volume for each week. The waste disposal amount for each month calculated in this manner is a plurality of planned treatment amounts obtained by dividing a year into a month according to a calendar. The first optimization calculation unit 42 divides the planned processing volume for each week into days and divides them into January and February, or simply divides them into two in a week (fifth week) that spans the months. Processing may be performed to distribute between January and February.

このような第1の期間変換処理を行うことにより、中間出力として所望の期間(すなわち1月)毎の処理計画量を出力することができるため、長期計画から中期計画および短期計画を1つの演算の流れの中で容易に策定することができる。   By performing such first period conversion processing, it is possible to output the processing plan amount for each desired period (that is, January) as an intermediate output, so one operation from the long-term plan to the medium-term plan and the short-term plan is performed. Can easily be formulated in the flow of

また、第1の最適化演算部42は、第1の期間変換処理において、週毎の各焼却炉2の稼働/停止状況を日毎に分割して日毎の各焼却炉2の稼働/停止状況に変換する。   Further, in the first period conversion processing, the first optimization calculation unit 42 divides the operation / stop status of each incinerator 2 every week into the operation / stop status of each incinerator 2 every day. Convert.

第1の最適化演算部42で演算された月毎の処理計画量および日毎の各焼却炉2の稼働/停止状況は、記憶部33に一時記憶される。第2の最適化演算部43は、第1の最適化演算部42で演算された月毎の処理計画量のそれぞれに対して第2の最適化演算を行う。   The monthly processing plan amount calculated by the first optimization calculation unit 42 and the operation / stop status of each incinerator 2 for each day are temporarily stored in the storage unit 33. The second optimization calculation unit 43 performs a second optimization calculation on each of the monthly processing plan amounts calculated by the first optimization calculation unit 42.

第2の最適化演算に際し、入力情報取得部41は、第1の最適化演算部42で演算された月毎の処理計画量および日毎の各焼却炉2の稼働/停止状況を取得するとともに、日毎の売電価格の予測値、日毎の廃棄物発熱量の予測値および日毎の廃棄物搬入量の予測値を取得する。すなわち、本実施の形態において、第4の期間は1日に設定されている。   At the time of the second optimization calculation, the input information acquisition unit 41 acquires the monthly processing plan amount calculated by the first optimization calculation unit 42 and the operation / stop status of each incinerator 2 for each day, and The daily sales price forecast value, the daily waste heating value forecast value, and the daily waste import amount forecast value are acquired. That is, in the present embodiment, the fourth period is set to one day.

ここで、入力情報取得部41は、複数ある月毎の処理計画量の1つを取得した際、取得した1つの処理計画量における月(例えば6月等)に暦が対応する日毎の各予測値を取得する。すなわち、第1の最適化演算で出力される月毎の処理計画量のそれぞれは、1年を月毎に分割した12個の期間の一つであり、対応した暦情報を有している。例えば、入力情報取得部41は、第1の最適化演算により出力された6月の処理計画量を第2の最適化演算のために取得した場合、これに合わせて6月1日から6月30日までの日毎の各予測値(3種類の予測値を30日分で計90個の予測値)を取得する。最適化演算を行う期間(第3の期間)に応じた入力値とすることにより、季節や時間帯に応じたより細かな予測値に基づいて最適化演算を行うことができる。   Here, when the input information acquisition unit 41 acquires one of a plurality of monthly processing plan amounts, each forecast for each day for which the calendar corresponds to the month (for example, June) in the acquired one processing plan amount Get the value. That is, each of the processing plan amounts for each month output in the first optimization calculation is one of 12 periods obtained by dividing one year into each month, and has corresponding calendar information. For example, when the input information acquisition unit 41 acquires the processing plan amount for June output by the first optimization calculation for the second optimization calculation, the input information acquisition unit 41 combines the processing amount from June 1 to June. Each predicted value for each day up to 30 days (three predicted values for a total of 90 predicted values for 30 days) are acquired. By setting the input value according to the period (third period) in which the optimization operation is performed, the optimization operation can be performed based on a finer predicted value according to the season or the time zone.

さらに、入力情報取得部41は、記憶部33から制約条件を読み出す。第2の最適化演算部43は、読み出した制約条件を満たし、且つ、第3の期間(1月)より短い第4の期間(1日)の発電電力の売電収入を最大化するように、第4の期間(1日)毎の処理計画量を演算する第2の最適化演算を行う(ステップS2)。   Furthermore, the input information acquisition unit 41 reads the constraint condition from the storage unit 33. The second optimization calculation unit 43 satisfies the read constraint conditions, and maximizes selling income of generated power in the fourth period (one day) shorter than the third period (January). A second optimization calculation is performed to calculate a processing schedule amount for each fourth period (one day) (step S2).

なお、第2の最適化演算部43は、第2の最適化演算において、上記制約条件の少なくとも一部を省略して演算を行ってもよい。より具体的には、第2の最適化演算部43は、上記制約条件のうち、焼却炉2または発電機の停止期間、および焼却炉2の連続稼働期間の上限値について省略してもよい。第1の最適化演算で考慮済みの制約条件について第2の最適化演算では制約条件としなくても第2の最適化演算における解の厳密性に与える影響は小さい。したがって、このような制約条件を省略することにより、演算結果の精度を高く維持しつつ演算量をより低減させることができる。   In the second optimization calculation, the second optimization calculation unit 43 may perform calculation by omitting at least a part of the constraint conditions. More specifically, the second optimization calculation unit 43 may omit the stop period of the incinerator 2 or the generator and the upper limit value of the continuous operation period of the incinerator 2 among the constraint conditions. Regarding Constraint Conditions Considered in the First Optimization Operation In the second optimization operation, the influence on the stringency of the solution in the second optimization operation is small even if the constraint condition is not used. Therefore, by omitting such constraint conditions, it is possible to further reduce the amount of computation while maintaining high accuracy of the computation result.

第2の最適化演算も、第1の最適化演算と同様に、混合整数非線形計画問題として演算される。第2の最適化演算部43は、第1の最適化演算部42と同様に、線形計画法を用いた演算およびメタヒューリスティクスを用いた演算を実行する。すなわち、第2の最適化演算部43は、第1の最適化演算における年(第1の期間)を月(第3の期間)に、週(第2の期間)を日(第4の期間)に、変える以外は同様の演算を行う。例えば、第2の最適化演算における目的関数は、以下の式で表される。   Similar to the first optimization operation, the second optimization operation is also computed as a mixed integer non-linear programming problem. Similar to the first optimization operation unit 42, the second optimization operation unit 43 executes an operation using linear programming and an operation using metaheuristics. That is, the second optimization operation unit 43 sets the year (first period) in the first optimization operation to month (third period) and week (second period) to day (fourth period). The same operation is performed except changing to. For example, the objective function in the second optimization operation is expressed by the following equation.

Figure 2019067066
Figure 2019067066

ここで、Q2は、月間の売電収入(円)を示し、qは、日毎の売電価格の予測値(円/kWh)を示し、Wは、日毎の売電量(kWh)を示し、Gは、日毎の廃棄物処理量(ton)を示し、α,βは、日毎の廃棄物発熱量および気温等から定められる発電機23の性能指標を示している。jは、入力された月における各日を示す指標であり、j=1,2,…,J(Jはその月の最終日)となる。したがって、第2の最適化演算における決定すべき変数(日毎の廃棄物処理量G)の数は、J(28〜31の何れか)となる。 Here, Q2 indicates monthly power sale income (yen), q j indicates daily sale price forecast value (yen / kWh), and W j indicates daily power sale amount (kWh) , G j indicate the daily waste processing amount (ton), and α j and β j indicate the performance index of the generator 23 determined from the daily heat generation amount of the waste and the temperature and the like. j is an index indicating each day of the input month, and j = 1, 2,..., J (J is the last day of the month). Therefore, the number of variables to be determined (the daily waste processing amount G j ) in the second optimization calculation is J (any of 28 to 31).

以上により、第2の最適化演算部43は、月間の売電収入Q2を最大化するような日毎(j毎)の廃棄物処理量Gを出力する。このようにして得られる日毎の廃棄物処理量Gは、それぞれ、元の1年間の暦情報に対応した暦情報とともに出力される。また、第2の最適化演算部43は、第4の期間(1日)毎の各焼却炉2における稼働/停止状況の計画を出力する。なお、日毎の各焼却炉2における稼働/停止状況は、第1の期間変換処理により演算されているので、第2の最適化演算部43は、改めてこれを演算しなくてもよい。さらに、第2の最適化演算の結果、日毎の貯留槽9の容量(廃棄物の蓄積量)が計算され、出力される。第2の最適化演算部43は、第2の最適化演算を月毎に12ヶ月分(12回)行うことで、1年間における日毎の廃棄物処理量G、各焼却炉2の稼働/停止状況の計画、および日毎の貯留層9の容量を算出する。 As described above, the second optimization calculation unit 43 outputs the daily (every j) waste processing amount G j that maximizes the power sale income Q 2 of the month. The daily waste disposal amount G j obtained in this manner is output together with calendar information corresponding to the original one-year calendar information. Further, the second optimization calculation unit 43 outputs a plan of the operation / stop status in each incinerator 2 for each fourth period (one day). In addition, since the operation / stop condition in each incinerator 2 on a daily basis is calculated by the first period conversion process, the second optimization calculation unit 43 may not calculate this again. Furthermore, as a result of the second optimization operation, the daily capacity (the amount of accumulated waste) of the storage tank 9 is calculated and output. The second optimization calculation unit 43 performs the second optimization calculation every month for 12 months (12 times), so that the daily waste processing amount G j in one year, the operation of each incinerator 2 / The planning of the shutdown situation and the daily capacity of the reservoir 9 are calculated.

このように、第1の最適化演算における演算結果を第2の最適化演算部43への入力とすることにより、第2の最適化演算において、他の月を気にすることなく日毎の処理計画量を演算することができる。   As described above, by using the calculation result in the first optimization calculation as an input to the second optimization calculation unit 43, daily processing without worrying about other months in the second optimization calculation The planned amount can be calculated.

第2の最適化演算部43で演算された日毎の処理計画量および日毎の各焼却炉2の稼働/停止状況は、記憶部33に一時記憶される。第3の最適化演算部43は、第2の最適化演算部43で演算された日毎の処理計画量のそれぞれに対して第3の最適化演算を行う。   The daily processing plan amount calculated by the second optimization calculation unit 43 and the operation / stop status of each incinerator 2 for each day are temporarily stored in the storage unit 33. The third optimization calculation unit 43 performs the third optimization calculation on each of the daily processing plan amounts calculated by the second optimization calculation unit 43.

第3の最適化演算に際し、入力情報取得部41は、第2の最適化演算部43で演算された日毎の処理計画量および記憶部33に記憶されている日毎の各焼却炉2の稼働/停止状況を取得するとともに、時間毎の売電価格の予測値を取得する。すなわち、本実施の形態において、第5の期間は1時間に設定されている。ここで、入力情報取得部41は、複数ある日毎の処理計画量の1つを取得した際、取得した1つの処理計画量における日(例えば6月1日等)に暦が対応する時間毎の売電価格の予測値を取得する。すなわち、第2の最適化演算で出力される日毎の処理計画量のそれぞれは、1年を日毎に分割した365個の期間の一つであり、対応した暦情報を有している。例えば、入力情報取得部41は、第2の最適化演算により出力された6月1日の処理計画量を第3の最適化演算のために取得した場合、これに合わせて6月1日の0時から24時までの時間毎の売電価格の予測値(24時間分、すなわち24個の予測値)を取得する。   At the time of the third optimization calculation, the input information acquisition unit 41 operates the daily treatment plan amount calculated by the second optimization calculation unit 43 and the operation of each incinerator 2 stored in the storage unit 33 for each day In addition to acquiring the stop status, the forecast value of the selling price for each hour is acquired. That is, in the present embodiment, the fifth period is set to one hour. Here, when the input information acquisition unit 41 acquires one of a plurality of planned processing amounts for each of a plurality of days, the input information acquisition unit 41 for each time when the calendar corresponds to a day (for example, June 1) in the acquired one planned processing amount. Get forecast value of selling price. That is, each of the daily processing plan amounts output in the second optimization calculation is one of 365 periods obtained by dividing a year into days, and has corresponding calendar information. For example, when the input information acquisition unit 41 acquires the processing plan amount for June 1 output by the second optimization calculation for the third optimization calculation, the input information acquisition unit 41 The forecast value (24 hours, ie, 24 forecast values) of the selling price every hour from 0 o'clock to 24 o'clock is acquired.

さらに、入力情報取得部41は、記憶部33から制約条件を読み出す。第3の最適化演算部44は、読み出した制約条件を満たし、且つ、第4の期間(1日)より短い第5の期間(1時間)の発電電力の売電収入を最大化するように、第5の期間(1時間)毎の処理計画量を演算する第3の最適化演算を行う(ステップS3)。   Furthermore, the input information acquisition unit 41 reads the constraint condition from the storage unit 33. The third optimization operation unit 44 satisfies the read constraint conditions and maximizes selling income of generated power in the fifth period (one hour) shorter than the fourth period (one day). A third optimization calculation is performed to calculate a processing schedule amount for each fifth period (one hour) (step S3).

第3の最適化演算も、第1の最適化演算および第2の最適化演算と同様に演算される。ただし、第3の最適化演算部44は、第3の最適化演算において、上記制約条件の少なくとも一部を省略して演算を行う。より具体的には、第3の最適化演算部44は、上記制約条件のうち、焼却炉2の単位時間あたりの焼却量の上下限値を第3の最適化演算における制約条件として演算を行う。第1の最適化演算および第2の最適化演算で考慮済みの制約条件について第3の最適化演算では制約条件としなくても第3の最適化演算における解の厳密性に与える影響は小さい。したがって、このような制約条件を省略することにより、演算結果の精度を高く維持しつつ演算量をより低減させることができる。   The third optimization operation is also calculated in the same manner as the first optimization operation and the second optimization operation. However, in the third optimization operation, the third optimization operation unit 44 performs the operation while omitting at least a part of the constraint conditions. More specifically, the third optimization operation unit 44 performs an operation using the upper and lower limit values of the incineration amount per unit time of the incinerator 2 among the above-described constraint conditions as the constraint condition in the third optimization operation. . Regarding Constraint Conditions Considered in the First Optimization Operation and the Second Optimization Operation In the third optimization operation, the influence on the stringency of the solution in the third optimization operation is small even if the constraint condition is not set. Therefore, by omitting such constraint conditions, it is possible to further reduce the amount of computation while maintaining high accuracy of the computation result.

なお、上記のような制約条件を省略する代わりに、焼却炉2の運用手順に関する制約条件を第3の最適化演算における制約条件として追加してもよい。例えば、焼却炉2の立ち上げ(負荷上げ)または立ち下げ(負荷下げ)には最低2時間必要であること、負荷上げ後は最低3時間その状態を維持すること等を第3の最適化演算における制約条件として追加してもよい。   Note that instead of omitting the above-described constraint conditions, constraint conditions on the operation procedure of the incinerator 2 may be added as constraint conditions in the third optimization calculation. For example, the third optimization operation requires at least 2 hours to start up (load up) or down (load down) the incinerator 2, and maintain the state for at least 3 hours after the load up, etc. You may add as a constraint condition in.

この結果、第3の最適化演算は、線形計画法を用いた演算のみを実行する。第3の最適化演算における目的関数は、以下の式で表される。   As a result, the third optimization operation executes only the operation using linear programming. The objective function in the third optimization operation is expressed by the following equation.

Figure 2019067066
Figure 2019067066

ここで、Q3は、日間の売電収入(円)を示し、qは、時間毎の売電価格の予測値(円/kWh)を示し、Wは、時間毎の売電量(kWh)を示し、Gは、時間毎の廃棄物処理量(ton)を示し、α,βは、時間毎の廃棄物発熱量および気温等から定められる焼却プラント1の性能指標を示している。kは、入力された日における各時間を示す指標であり、k=1,2,…,24となる。したがって、第3の最適化演算における決定すべき変数(時間毎の廃棄物処理量G)の数は、24となる。 Here, Q3 indicates the power sale income (yen) of the day, q k indicates the forecast value of the power sale price per hour (yen / kWh), and W k indicates the power sale amount per hour (kWh) G k indicates the waste disposal amount (ton) per hour, and α k and β k indicate the performance index of the incineration plant 1 determined from the waste calorific value per hour and the air temperature etc. . k is an index indicating each time on the input day, and k = 1, 2,. Therefore, the number of variables to be determined in the third optimization operation (waste disposal amount G k per hour) is 24.

以上により、第3の最適化演算部44は、日間の売電収入Q3を最大化するような時間毎(k毎)の廃棄物処理量Gを出力する。第3の最適化演算部44は、第3の最適化演算を日毎に12月分(J×12回)行い、1年間における時間毎の廃棄物処理量Gを算出する。このようにして得られる時間毎の廃棄物処理量Gは、それぞれ、元の1年間の暦情報に対応した暦情報とともに出力される。 As described above, the third optimization calculation unit 44 outputs the waste processing amount G k for each time (every k) that maximizes the power sale income Q3 of the day. The third optimization calculation unit 44 performs the third optimization calculation for each day in December (J × 12 times), and calculates the hourly waste disposal amount G k in one year. The waste disposal amount G k for each time obtained in this manner is output together with calendar information corresponding to the original one-year calendar information.

このように、第2の最適化演算における演算結果を第3の最適化演算部44への入力とすることにより、第3の最適化演算において、他の日を気にすることなく時間毎の処理計画量を演算することができる。   As described above, by using the calculation result in the second optimization calculation as an input to the third optimization calculation unit 44, it is possible to set the third optimization calculation every time without worrying about other days. The amount of processing plan can be calculated.

図4は、本実施の形態における第2の最適化演算の結果を概念的に示すグラフである。なお、本グラフ(後述する図5Aおよび図5Bのグラフを含む)は、最適化演算の傾向を表すための概念的なグラフであり、実際の演算結果を示すグラフではない。図4は、6月の処理計画量を示すグラフを例示している。図4のグラフは、横軸を日(6月1日から6月30日)に取り、日毎の売電価格の予測値を二点鎖線の折れ線グラフで表し、日毎の廃棄物発熱量を実線の折れ線グラフで表し、第2の最適化演算結果である日毎の処理計画量を棒グラフで表している。   FIG. 4 is a graph conceptually showing the result of the second optimization operation in the present embodiment. Note that this graph (including the graphs of FIG. 5A and FIG. 5B described later) is a conceptual graph for showing the tendency of the optimization calculation, and is not a graph showing an actual calculation result. FIG. 4 exemplifies a graph showing the amount of planned treatment in June. In the graph of FIG. 4, the horizontal axis is taken on a day (June 1 to June 30), and the forecast value of the selling price for each day is represented by a line graph of a two-dot chain line, And a daily processing plan amount, which is the second optimization calculation result, is represented by a bar graph.

図4に示すように、第2の最適化演算の結果として得られる日毎の処理計画量は、日毎の売電価格の予測値および/または日毎の廃棄物発熱量の予測値が低くなるほど少なくなり、これらの予測値が高くなるほど多くなるような傾向を有する。   As shown in FIG. 4, the planned daily treatment volume obtained as a result of the second optimization operation decreases as the predicted daily selling price and / or the daily estimated waste heat generation value decreases. There is a tendency that as the predicted values become higher, they increase.

図5Aおよび図5Bは、図4に示す日毎の処理計画量に基づいた第3の最適化演算の結果を概念的に示すグラフである。図5Aのグラフは、図4に示す6月8日の処理計画量に基づいた第3の最適化演算の結果を示し、図5Bのグラフは、図4に示す6月13日の処理計画量に基づいた第3の最適化演算の結果を示す。   FIGS. 5A and 5B are graphs conceptually showing the results of the third optimization calculation based on the daily processing schedule shown in FIG. The graph of FIG. 5A shows the result of the third optimization calculation based on the processing schedule amount of June 8 shown in FIG. 4, and the graph of FIG. 5B shows the processing schedule amount of June 13 shown in FIG. 8 shows the result of the third optimization operation based on

図5Aおよび図5Bのグラフは、横軸を時間(0時から24時)に取り、時間毎の売電価格の予測値を二点鎖線の折れ線グラフで表し、第3の最適化演算結果である時間毎の処理計画量を実線のグラフで表している。図5Aおよび図5Bに示すように、第3の最適化演算の結果として得られる時間毎の処理計画量も、図4のグラフと同様に、時間毎の売電価格の予測値が低くなるほど少なくなり、この予測値が高くなるほど多くなるような傾向を有する。   In the graphs of FIGS. 5A and 5B, the horizontal axis represents time (from 0 o'clock to 24 o'clock), the predicted value of the sale price for each hour is represented by a line graph of a two-dot chain line, The amount of planned processing for each time is represented by a solid line graph. As shown in FIGS. 5A and 5B, the planned processing volume per hour obtained as a result of the third optimization operation is also smaller as the predicted value of the selling price per hour is lower, as in the graph of FIG. There is a tendency that the higher the predicted value, the more it becomes.

ただし、図5Aのグラフ(6月8日のグラフ)と図5Bのグラフ(6月13日のグラフ)とは、その日の処理計画量の総量(すなわち、図4における棒グラフの長さ)が異なる。したがって、日毎の処理計画量がより多い図5Bのグラフにおいて、時間毎の処理計画量は、図5Aのグラフと比較して全体的に上方にシフトしたグラフとなる。このように、本実施の形態における最適化演算では、第3の最適化演算において各日における時間毎の処理計画量を求める際に、第2の最適化演算の演算結果である日毎の処理計画量の各値が用いられる。このため、第3の最適化演算において演算対象の日以外の日における処理計画量を考慮する必要がなくなる。このことは、第1の最適化演算と第2の最適化演算との間の関係においても成り立つ。   However, the graph of FIG. 5A (graph of June 8) and the graph of FIG. 5B (graph of June 13) differ in the total amount of planned treatment for the day (that is, the length of the bar graph in FIG. 4). . Therefore, in the graph of FIG. 5B in which the amount of planned processing for each day is larger, the amount of planned processing for each time is a graph shifted upward as a whole compared with the graph of FIG. 5A. Thus, in the optimization calculation according to the present embodiment, when obtaining the amount of planned processing for each hour in each day in the third optimization calculation, the daily processing plan which is the calculation result of the second optimization calculation. Each value of quantity is used. For this reason, it is not necessary to consider the amount of planned processing on a day other than the day to be calculated in the third optimization calculation. This is also true for the relationship between the first optimization operation and the second optimization operation.

以上のように、上記態様によれば、第1の期間(1年)がより短い第2の期間(週毎)に分割され、第1の期間より短い第3の期間(1月)単位の最適化演算が行われた上で、第3の期間がさらに短い第4の期間(日毎)に分割され、第4の期間がさらに短い第5の期間(1時間)単位の最適化演算が行われる。このため、各最適化演算において、期間の分割数を少なくすることができ、1回の最適化演算において決定すべき変数の数を少なくすることができる。したがって、各最適化演算における演算時間を短縮することができ、結果として第5の期間毎の処理計画量を第1の期間分演算するための演算時間を現実的な時間に抑えることができる。   As described above, according to the above aspect, the first period (one year) is divided into shorter second periods (every week), and the third period (January) unit shorter than the first period is used. After the optimization operation is performed, the third period is further divided into shorter fourth periods (every day), and the optimization operation is performed in units of the fifth period (one hour) in which the fourth period is further shorter. It will be. Therefore, the number of divisions of the period can be reduced in each optimization operation, and the number of variables to be determined in one optimization operation can be reduced. Therefore, the calculation time in each optimization calculation can be shortened, and as a result, the calculation time for calculating the processing schedule amount for each fifth period for the first period can be suppressed to a realistic time.

以上より、運転員の経験または勘によらず、売電収入を最大化するような廃棄物処理計画を短い演算時間で自動的に算出することができる。また、第1〜第3の最適化演算を行うことにより、期間の分割を多段化することにより、各段における演算量を低減することができる。   From the above, it is possible to automatically calculate a waste disposal plan that maximizes the power sale income in a short calculation time, regardless of the experience or intuition of the operator. Further, by performing the first to third optimization operations, the amount of operations in each stage can be reduced by dividing the period into multiple stages.

また、処理計画量が各期間単位毎(月毎、日毎、時間毎)に独立して出力されるため、実際の運用において廃棄物処理量が当初の廃棄物処理計画から乖離した場合であっても、局所的な再計算を容易に行うことができる。例えば、1月から事前に演算した年間の廃棄物処理計画に基づいて焼却プラント1を運用していたものの、3月の時点で処理計画量と実際の処理量との間に所定量以上の差が生じた場合、4月の廃棄物処理計画(第2の最適化演算および第3の最適化演算)を、当該差をなくすまたは小さくするように演算し直すことができる。このように長期計画の中の部分的な期間の計画(中期計画、短期計画)が簡単に再計算(修正)可能であるため、部分的な修正で当初の処理計画に戻すことができる。さらに、本実施の形態において各最適化演算により出力される処理計画量の期間が、月(週)、日、時間と細分化されることにより、局所的な再計算を、より好適な期間単位で行うことができる。   In addition, since the planned treatment volume is output independently for each period unit (every month, every day, every hour), the waste disposal amount deviates from the initial waste disposal plan in actual operation. Also, local recalculation can be easily performed. For example, although the incineration plant 1 was operated based on the yearly waste treatment plan calculated in advance from January, the difference between the planned treatment amount and the actual treatment amount at the time of March is a predetermined amount or more In the event of a failure, the April waste treatment plan (the second optimization operation and the third optimization operation) can be recalculated to eliminate or reduce the difference. In this way, partial plans (medium-term plans, short-term plans) in the long-term plans can be easily recalculated (corrected), so partial corrections can be made to return to the initial treatment plan. Furthermore, the period of the processing schedule amount output by each optimization operation in the present embodiment is subdivided into month (week), day, and time, so that local recalculation can be performed in a more preferable period unit. Can be done with

なお、上記実施の形態において、各最適化演算部42〜44に入力される、各期間単位毎の予測値は、それぞれ独立した予測値を用いてもよい。これに代えて、短い期間単位毎の予測値を用いてより長い期間単位毎の予測値を演算する第2および第3の期間変換処理を実行し、当該演算した期間単位毎の予測値を対応する最適化演算部42〜43に入力してもよい。   In the above embodiment, the prediction values for each period unit input to the optimization calculation units 42 to 44 may use independent prediction values. Instead of this, second and third period conversion processing is performed to calculate the predicted value for each longer period unit using the predicted value for each shorter period unit, and the calculated predicted value for each calculated period unit is supported. May be input to the optimization calculation units 42 to 43.

例えば、図3に示すように、第2の最適化演算部43は、第3の最適化演算部44に入力される第5の期間(1時間)毎の売電価格の予測値を第4の期間(1日)毎の売電価格の予測値に変換する第2の期間変換処理を実行する(ステップS2a)。この場合、第2の最適化演算部43は、時間毎の売電価格の予測値を1日分合算し、平均を取ることにより、日毎の売電価格の予測値を算出する。   For example, as shown in FIG. 3, the second optimization calculation unit 43 may use the fourth forecast value of the sale price every fifth period (one hour) input to the third optimization calculation unit 44. A second period conversion process is performed to convert into a predicted value of the sale price every period (one day) of (step S2a). In this case, the second optimization calculation unit 43 calculates the forecast value of the power sale price for each day by adding up the forecast values of the power sale price for each hour for one day and taking the average.

また、第1の最適化演算部42は、第2の最適化演算部43に入力される第4の期間(1日)毎の売電価格の予測値、廃棄物発熱量の予測値および廃棄物搬入量の予測値を第2の期間(1週)毎の各予測値に変換する第3の期間変換処理を実行する(ステップS1b)。この場合、第1の最適化演算部42は、日毎の売電価格の予測値および廃棄物発熱量の予測値を1週間分合算し、平均を取ることにより、週毎の売電価格の予測値および廃棄物発熱量の予測値を算出する。さらに、第1の最適化演算部42は、日毎の廃棄物搬入量の予測値を1週間分合算し、週毎の廃棄物搬入量の予測値を算出する。   In addition, the first optimization calculation unit 42 predicts the sale price for each fourth period (one day) input to the second optimization calculation unit 43, the predicted value of the heat generation amount of the waste, and discards it. A third period conversion process of converting the predicted value of the carried-in amount into each predicted value for each second period (one week) is executed (step S1b). In this case, the first optimization calculation unit 42 sums up the forecast value of the selling price every day and the forecasting value of the waste heat value for one week, and takes the average to forecast the selling price every week. Calculate the value and the predicted value of waste heat value. Further, the first optimization calculation unit 42 adds up the predicted value of the daily amount of waste carried in for one week, and calculates the predicted value of the weekly amount of waste carried in.

このように各最適化演算部42〜44に入力される入力値の一部をより短い期間の入力値から演算により求めることで、入力データ量を低減させることができる。   Thus, the amount of input data can be reduced by calculating part of the input values input to the optimization calculation units 42 to 44 from the input values in a shorter period by calculation.

以上、本発明の実施の形態について説明したが、本発明は上記実施の形態に限定されるものではなく、その趣旨を逸脱しない範囲内で種々の改良、変更、修正が可能である。   As mentioned above, although embodiment of this invention was described, this invention is not limited to the said embodiment, A various improvement, change, and correction are possible within the range which does not deviate from the meaning.

例えば、上記実施の形態においては、廃棄物処理計画演算の対象として、ストーカ式の焼却炉2を有する焼却プラント1を例示したが、焼却炉において廃棄物を焼却処理する際に発生する水蒸気を用いて発電を行う発電機を備えた焼却プラントであれば、これに限られない。例えば、本発明の廃棄物処理計画演算方法を、流動層式の焼却炉を有する焼却プラント等に適用することも可能である。   For example, in the above embodiment, the incineration plant 1 having the stoker-type incinerator 2 is illustrated as a target of the waste treatment plan calculation, but the steam generated when the waste is incinerated in the incinerator is used If it is the incineration plant provided with the generator which performs electric power generation, it will not be restricted to this. For example, it is also possible to apply the waste disposal plan calculation method of the present invention to an incineration plant having a fluidized bed incinerator.

また、上記実施の形態における目的関数、制約条件は例示であり、上記に限定されない。目的関数の変更、パラメータの追加等を適宜行ってもよい。例えば、目的関数を売電収入から焼却プラント1のランニングコストを差し引いた利益としてもよい。ランニングコストには、例えば、飛灰処理薬剤、消石灰、活性炭等の施設ユーティリティの消費コスト、焼却炉2の起動または停止にかかるコスト等が含まれる。例えば、売電収入が同じでも焼却炉2の起動または停止回数が異なると得られる利益に差が生じる。このため、売電収入だけでなくランニングコストを同時に考慮した最適化演算を行うことにより、得られる利益がより高くなるような演算とすることができる。   Moreover, the objective function in the said embodiment and a constraint condition are illustrations, and are not limited above. The objective function may be changed, or parameters may be added as appropriate. For example, the objective function may be a profit obtained by subtracting the running cost of the incineration plant 1 from the power sale income. The running cost includes, for example, the consumption cost of the facility utility such as fly ash processing chemical, slaked lime, activated carbon, and the cost for starting or stopping the incinerator 2. For example, if the number of start-up or shut-down times of the incinerator 2 is different even if the power sale income is the same, a difference occurs in the profit obtained. For this reason, it is possible to make the obtained profit higher by performing the optimization calculation in which not only the selling income but also the running cost are simultaneously considered.

また、制約条件は、上記制約条件のうちの一部を制約条件としてもよいし、上記以外の制約条件を追加してもよい。   Further, as the constraint conditions, part of the above-described constraint conditions may be used as the constraint condition, or constraint conditions other than the above may be added.

また、上記実施の形態において、第1〜第3の最適化演算部42〜44に入力される各予測値は、演算対象となる処理計画量の暦に応じた値を用いたが、これに限られない。例えば、各予測値における平均値等、対応期間によらず一定の値を入力する予測値としてもよい。   Further, in the above embodiment, as each predicted value input to the first to third optimization calculation units 42 to 44, a value corresponding to the calendar of the planned processing amount to be calculated is used. It is not limited. For example, it is good also as a predicted value which inputs a fixed value irrespective of corresponding period, such as an average value in each predicted value.

また、上記実施の形態においては、第1の期間を1年、第2の期間を1週、第3の期間を1月、第4の期間を1日、第5の期間を1時間としたが、これに限られず、各期間は種々設定可能である。例えば、第1の期間を、1年以上の期間に設定し、第2の期間および第3の期間を、それぞれ1週以上かつ第1の期間未満の期間に設定し、第4の期間を、1日以上かつ第3の期間未満の期間に設定し、第5の期間を、1時間以上かつ第4の期間未満の期間に設定してもよい。   In the above embodiment, the first period is one year, the second period is one week, the third period is January, the fourth period is one day, and the fifth period is one hour. However, the present invention is not limited to this, and each period can be set variously. For example, the first period is set to a period of 1 year or more, the second period and the third period are set to a period of 1 week or more and less than the first period, and the fourth period is A period of one day or more and less than the third period may be set, and the fifth period may be set to a period of one hour or more and less than the fourth period.

また、上記実施の形態においては、第1の最適化演算により演算された第2の期間(1週)毎の処理計画量を第3の期間(1月)毎の処理計画量に変更する第1の期間変換処理を行い、当該第2の期間毎の処理計画量を第2の最適化演算の入力にする態様を例示したが、これに限られない。例えば、第1の最適化演算により演算された第2の期間毎の処理計画量をそのまま第2の最適化演算の入力としてもよい。すなわち、第3の期間を第2の期間と同じ期間としてもよい。   Further, in the above embodiment, the process planning amount for each second period (one week) calculated by the first optimization calculation is changed to the process planning amount for each third period (January) Although the period conversion process of 1 is performed and the aspect which makes the processing plan amount for every said 2nd period the input of 2nd optimization calculation was illustrated, it is not restricted to this. For example, the planned processing volume for each second period calculated by the first optimization calculation may be used as the input of the second optimization calculation as it is. That is, the third period may be the same as the second period.

また、上記実施の形態においては、第1〜第3の最適化演算(3段階の最適化演算)を行う態様について例示したが、2段階の最適化演算(第1の最適化演算および第2の最適化演算)または4段階以上の最適化演算(第4以降の最適化演算)を行う態様としてもよい。   In the above embodiment, the first to third optimization calculations (three-stage optimization calculations) are illustrated. However, two-step optimization calculations (first optimization calculation and second calculation) are described. The optimization operation of 4) or the optimization operation of four or more stages (the fourth and subsequent optimization operations) may be performed.

例えば、図6は、本実施の形態の変形例における最適化演算処理の流れを示す模式図である。本変形例が上記実施の形態(図3の例)と異なる点は、2段階の最適化演算を行うことで1年間における1時間毎の処理計画量を演算することである。すなわち、第1の最適化演算部42は、日毎の売電価格の予測値と、日毎の廃棄物の発熱量の予測値と、日毎の廃棄物搬入量の予測値と、が入力され、上記制約条件を用いて、当該制約条件を満たし、且つ、1年における発電電力の売電収入を最大化するように、日毎の処理計画量を出力する第1の最適化演算を行う。すなわち、本変形例において、第1の期間は1年であり、第2の期間および第3の期間は1日である。   For example, FIG. 6 is a schematic view showing a flow of optimization calculation processing in a modification of the present embodiment. The present modified example is different from the above-described embodiment (example in FIG. 3) in that it calculates a process planning amount for each hour in a year by performing a two-stage optimization operation. That is, the first optimization calculation unit 42 receives the predicted value of the power sale price on a daily basis, the predicted value of the calorific value of waste on a daily basis, and the predicted value of the amount of waste carried in on a daily basis. A first optimization operation is performed to output a daily planned amount of processing so as to satisfy the constraint conditions and maximize the power sales revenue of the generated power in one year using the constraint conditions. That is, in the present variation, the first period is one year, and the second and third periods are one day.

また、第2の最適化演算部43は、日毎の処理計画量のそれぞれに対し、時間毎の売電価格の予測値を入力し、上記制約条件を用いて、当該制約条件を満たし、且つ、1日における発電電力の売電収入を最大化するように、時間毎の処理計画量を出力する第2の最適化演算を行う。すなわち、本変形例において、第4の期間は、1時間である。   Further, the second optimization calculation unit 43 inputs the predicted value of the sale price per hour for each of the planned processing amounts for each day, and satisfies the constraint conditions using the above constraint conditions, and A second optimization operation is performed to output a planned amount of processing per hour so as to maximize the sale of power generation on a daily basis. That is, in the present modification, the fourth period is one hour.

本変形例においても、各最適化演算において決定すべき変数の数を少なくすることができる。したがって、各最適化演算における演算時間を短縮することができ、結果として1時間毎の処理計画量を1年間分演算する時間を現実的な時間に抑えることができる。   Also in this modification, the number of variables to be determined in each optimization operation can be reduced. Therefore, the calculation time in each optimization calculation can be shortened, and as a result, it is possible to suppress the time to calculate the processing schedule amount for one hour for one year to a realistic time.

なお、本変形例において、第2の最適化演算を行う際の制約条件は、上記実施の形態と同様に、その一部を省略可能である。本変形例において、第2の最適化演算を行う際の制約条件は、焼却炉の単位時間あたりの焼却量の上下限値のみである。これにより、上記実施の形態における第3の最適化演算と同様に、本変形例の第2の最適化演算において演算量および演算時間をより低減することができる。   In the present modification, as in the above embodiment, a part of the constraint conditions when performing the second optimization operation can be omitted. In the present modification, the constraint condition for performing the second optimization calculation is only the upper and lower limit values of the incineration amount per unit time of the incinerator. Thus, as in the third optimization calculation in the above-described embodiment, it is possible to further reduce the calculation amount and calculation time in the second optimization calculation of this modification.

本発明は、焼却プラントにおいて売電収入を最大化するような廃棄物処理計画を短い演算時間で自動的に算出することができる廃棄物処理計画演算方法および廃棄物処理計画演算装置を提供するために有用である。   The present invention provides a waste disposal plan computing method and waste disposal plan computing device capable of automatically calculating a waste disposal plan that maximizes power sale revenue in an incineration plant in a short computing time. Useful for

1 焼却プラント
2 焼却炉
9 貯留槽
23 発電機
31 廃棄物処理計画演算装置
42 第1の最適化演算部
43 第2の最適化演算部
44 第3の最適化演算部
DESCRIPTION OF SYMBOLS 1 incineration plant 2 incinerator 9 storage tank 23 generator 31 waste disposal plan calculation apparatus 42 1st optimization calculating part 43 2nd optimization calculating part 44 3rd optimization calculating part

Claims (9)

廃棄物を焼却するための焼却炉と、前記焼却炉において廃棄物を焼却処理する際に発生する排熱によって生じた蒸気を用いて発電を行う発電機と、を備えた焼却プラントにおける廃棄物処理計画演算方法であって、
第1の期間より短い第2の期間毎の発電電力の売電価格の予測値、廃棄物の発熱量の予測値、および、廃棄物搬入量の予測値、を入力し、前記焼却プラントの運用性能に関する制約条件を満たし、且つ、前記第1の期間における発電電力の売電収入を最大化するように、前記第1の期間より短い第3の期間毎の廃棄物の処理計画量を出力する、第1の最適化演算を行うステップと、
前記第3の期間毎の処理計画量、および、前記第3の期間より短い第4の期間毎の発電電力の売電価格の予測値、を少なくとも入力し、前記制約条件を満たし、且つ、前記第3の期間における発電電力の売電収入を最大化するように、前記第4の期間毎の廃棄物の処理計画量を出力する、第2の最適化演算を行うステップと、を含む、廃棄物処理計画演算方法。
Waste treatment in an incineration plant equipped with an incinerator for incinerating waste, and a generator for generating electricity using steam generated by exhaust heat generated when incineration treatment of waste in the incinerator It is a plan calculation method, and
Forecast value of selling price of generated power for every second period shorter than the first period, predicted value of calorific value of waste, and predicted value of the amount of waste carried in, and operation of the incineration plant Output a planned amount of waste processing for each third period shorter than the first period so as to satisfy performance constraints and maximize sales revenue of generated power in the first period. Performing a first optimization operation,
At least input of the planned processing amount for each of the third period and the predicted value of the selling price of the generated power for each of the fourth period shorter than the third period, and satisfying the constraint, and Performing a second optimization operation to output a planned amount of waste processing for each of the fourth periods so as to maximize the sale of power generation power in the third period. Object processing plan calculation method.
前記第4の期間毎の処理計画量、および、前記第4の期間より短い第5の期間毎の発電電力の売電価格の予測値、を入力し、前記制約条件を満たし、且つ、前記第4の期間における発電電力の売電収入を最大化するように、前記第5の期間毎の処理計画量を出力する、第3の最適化演算を行うステップを含む、請求項1に記載の廃棄物処理計画演算方法。   The planned processing amount for each fourth period and the predicted value of the selling price of the generated power for each fifth period shorter than the fourth period are input, and the constraint condition is satisfied, and The discard according to claim 1, further comprising the step of: performing a third optimization operation to output a planned amount of processing for each of the fifth periods so as to maximize the sale of power generation power in the four periods. Object processing plan calculation method. 前記第1の期間は、1年以上の期間であり、
前記第2の期間および前記第3の期間は、それぞれ1週以上かつ前記第1の期間未満の期間であり、
前記第4の期間は、1日以上かつ前記第3の期間未満の期間であり、
前記第5の期間は、1時間以上かつ前記第4の期間未満の期間である、請求項2に記載の廃棄物処理計画演算方法。
The first period is a period of one year or more,
The second period and the third period are periods of one week or more and less than the first period, respectively.
The fourth period is a period of one day or more and less than the third period,
The waste disposal plan computing method according to claim 2, wherein the fifth period is a period of one hour or more and less than the fourth period.
前記第3の最適化演算において、前記制約条件の少なくとも一部を省略して演算を行う、請求項2または3に記載の廃棄物処理計画演算方法。   The waste disposal plan operation method according to claim 2 or 3, wherein at least a part of the constraint condition is omitted in the third optimization operation. 前記第3の期間は、前記第2の期間より長い期間であり、
前記第1の最適化演算において、
前記制約条件を満たし、且つ、前記第1の期間における発電電力の売電収入を最大化するように、前記第2の期間毎の処理計画量を演算し、
演算された前記第2の期間毎の処理計画量に基づいて、前記第3の期間毎の処理計画量を出力する、請求項1から4の何れかに記載の廃棄物処理計画演算方法。
The third period is a period longer than the second period,
In the first optimization operation,
Calculating a planned amount of processing for each of the second periods so as to satisfy the constraint conditions and maximize the sale of power generation power in the first period;
The waste treatment plan computing method according to any one of claims 1 to 4, wherein the planned treatment quantity for each third period is output based on the calculated treatment plan amount for each second period.
前記制約条件は、前記焼却炉の単位時間あたりの焼却量の上下限値、前記焼却炉に投入される廃棄物を一時貯留するための貯留槽の容量の上下限値、前記焼却炉または前記発電機の停止期間、および、前記焼却炉の連続稼働期間の上限値の少なくとも1つを含む、請求項1から5の何れかに記載の廃棄物処理計画演算方法。   The constraint conditions include upper and lower limit values of incineration amount per unit time of the incinerator, upper and lower limit values of capacity of a storage tank for temporarily storing wastes to be input to the incinerator, the incinerator or the power generation The waste disposal plan operation method according to any one of claims 1 to 5, including at least one of an outage period of a machine and an upper limit value of a continuous operation period of the incinerator. 前記焼却プラントは、前記焼却炉を複数有し、
前記第1の最適化演算において、前記第3の期間毎の各焼却炉における稼働/停止状況を演算する、請求項1から6の何れかに記載の廃棄物処理計画演算方法。
The incineration plant has a plurality of incinerators,
The waste disposal plan operation method according to any one of claims 1 to 6, wherein in the first optimization operation, an operation / stop status in each incinerator for each of the third periods is calculated.
前記第1の期間は暦に対応した期間であり、
前記第2の期間、前記第3の期間、および、前記第4の期間は、前記第1の期間がそれぞれの所定数で分割された複数の期間の一つであり、
前記分割された複数の期間のそれぞれが前記第1の期間に対応した暦情報を有している、請求項1から7の何れかに記載の廃棄物処理計画演算方法。
The first period corresponds to a calendar, and
The second period, the third period, and the fourth period are one of a plurality of periods in which the first period is divided by a predetermined number of each.
The waste disposal plan operation method according to any one of claims 1 to 7, wherein each of the plurality of divided periods has calendar information corresponding to the first period.
廃棄物を焼却するための焼却炉と、前記焼却炉において廃棄物を焼却処理する際に発生する排熱によって生じた蒸気を用いて発電を行う発電機と、を備えた焼却プラントにおける廃棄物処理計画演算装置であって、
第1の期間より短い第2の期間毎の発電電力の売電価格の予測値、廃棄物の発熱量の予測値、および、廃棄物搬入量の予測値、が入力され、前記焼却プラントの運用性能に関する制約条件を満たし、且つ、前記第1の期間における発電電力の売電収入を最大化するように、前記第1の期間より短い第3の期間毎の処理計画量を出力する、第1の最適化演算部と、
前記第3の期間毎の処理計画量、および、前記第3の期間より短い第4の期間毎の発電電力の売電価格の予測値、を少なくとも入力し、前記制約条件を満たし、且つ、前記第3の期間における発電電力の売電収入を最大化するように、前記第4の期間毎の処理計画量を出力する、第2の最適化演算部と、を備えた、廃棄物処理計画演算装置。
Waste treatment in an incineration plant equipped with an incinerator for incinerating waste, and a generator for generating electricity using steam generated by exhaust heat generated when incineration treatment of waste in the incinerator A plan computing device,
The predicted value of the selling price of the generated power for each second period shorter than the first period, the predicted value of the calorific value of waste, and the predicted value of the amount of waste carried in are input, and the operation of the incineration plant is performed Outputting a processing planning quantity for each third period shorter than the first period so as to satisfy performance constraints and maximize sales revenue of generated power in the first period; Optimization operation unit of
At least input of the planned processing amount for each of the third period and the predicted value of the selling price of the generated power for each of the fourth period shorter than the third period, and satisfying the constraint, and Waste treatment plan calculation, comprising: a second optimization calculation unit that outputs a planned treatment quantity for each of the fourth periods so as to maximize sales of power generation power in the third period; apparatus.
JP2017190729A 2017-09-29 2017-09-29 Waste treatment plan calculation method and waste treatment plan calculation device Active JP7075194B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017190729A JP7075194B2 (en) 2017-09-29 2017-09-29 Waste treatment plan calculation method and waste treatment plan calculation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017190729A JP7075194B2 (en) 2017-09-29 2017-09-29 Waste treatment plan calculation method and waste treatment plan calculation device

Publications (2)

Publication Number Publication Date
JP2019067066A true JP2019067066A (en) 2019-04-25
JP7075194B2 JP7075194B2 (en) 2022-05-25

Family

ID=66340631

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017190729A Active JP7075194B2 (en) 2017-09-29 2017-09-29 Waste treatment plan calculation method and waste treatment plan calculation device

Country Status (1)

Country Link
JP (1) JP7075194B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020197854A (en) * 2019-05-31 2020-12-10 日新電機株式会社 Arithmetic device and arithmetic method
CN112361348A (en) * 2020-11-19 2021-02-12 上海电气集团股份有限公司 Production scheduling method, system, equipment and medium for hazardous waste cement kiln incineration disposal

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09179604A (en) * 1995-09-13 1997-07-11 Toshiba Corp System and method for controlling operation of plant
JPH10281435A (en) * 1997-04-04 1998-10-23 Kubota Corp Combustion control device
JP2004171548A (en) * 2002-11-06 2004-06-17 Fuji Electric Holdings Co Ltd Optimal operating method, optimal design method, optimal running planning method, and optimizing apparatus for plant
JP2007058760A (en) * 2005-08-26 2007-03-08 Mitsubishi Electric Corp Energy transaction support system and energy transaction support program
JP2009075876A (en) * 2007-09-20 2009-04-09 Toshiba Corp Energy facility operation planning system and energy facility operation planning method
US20160349780A1 (en) * 2014-01-16 2016-12-01 Kabushiki Kaisha Toshiba Operation plan generation device, control device, operation plan generation method, and program
JP2017084346A (en) * 2015-10-30 2017-05-18 株式会社東芝 Generator operation plan creation device, generator operation plan creation method, program, data, and generator control device
JP2017134556A (en) * 2016-01-27 2017-08-03 三菱電機株式会社 Energy supply-demand planning device and energy supply-demand planning program

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09179604A (en) * 1995-09-13 1997-07-11 Toshiba Corp System and method for controlling operation of plant
JPH10281435A (en) * 1997-04-04 1998-10-23 Kubota Corp Combustion control device
JP2004171548A (en) * 2002-11-06 2004-06-17 Fuji Electric Holdings Co Ltd Optimal operating method, optimal design method, optimal running planning method, and optimizing apparatus for plant
JP2007058760A (en) * 2005-08-26 2007-03-08 Mitsubishi Electric Corp Energy transaction support system and energy transaction support program
JP2009075876A (en) * 2007-09-20 2009-04-09 Toshiba Corp Energy facility operation planning system and energy facility operation planning method
US20160349780A1 (en) * 2014-01-16 2016-12-01 Kabushiki Kaisha Toshiba Operation plan generation device, control device, operation plan generation method, and program
JP2017084346A (en) * 2015-10-30 2017-05-18 株式会社東芝 Generator operation plan creation device, generator operation plan creation method, program, data, and generator control device
JP2017134556A (en) * 2016-01-27 2017-08-03 三菱電機株式会社 Energy supply-demand planning device and energy supply-demand planning program

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
鈴木 昌和、淵 昌彦: ""多段階遺伝的アルゴリズムによる大規模最適化問題の解法"", 計測自動制御学会論文集, vol. 第35巻、第11号, JPN6021034968, 1999, pages 1385 - 1393, ISSN: 0004671259 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020197854A (en) * 2019-05-31 2020-12-10 日新電機株式会社 Arithmetic device and arithmetic method
JP7279525B2 (en) 2019-05-31 2023-05-23 日新電機株式会社 Arithmetic device and method
CN112361348A (en) * 2020-11-19 2021-02-12 上海电气集团股份有限公司 Production scheduling method, system, equipment and medium for hazardous waste cement kiln incineration disposal

Also Published As

Publication number Publication date
JP7075194B2 (en) 2022-05-25

Similar Documents

Publication Publication Date Title
JP5860612B2 (en) System and method for improving power generation equipment
Benalcazar Optimal sizing of thermal energy storage systems for CHP plants considering specific investment costs: A case study
JP6676445B2 (en) Maintenance planning support system for power generation units
CN112465614B (en) One-day operation accounting system and method for coal-fired power generation enterprises
JP2009075876A (en) Energy facility operation planning system and energy facility operation planning method
Luo et al. Operational planning optimization of steam power plants considering equipment failure in petrochemical complex
JP7075194B2 (en) Waste treatment plan calculation method and waste treatment plan calculation device
JP3299531B2 (en) Power plant
US7065414B2 (en) Methods and apparatus for operating production facilities
JP5060313B2 (en) Operation method of waste treatment facility with power generation equipment
JP6661501B2 (en) Generator operation plan creation device, generator operation plan creation method, program, data, and generator control device
Chiang et al. Solid waste management for the eco-efficiency assessment of energy recovery from waste in incinerators
JP2006277456A (en) Power generation fuel selection support system and power generation fuel selection method
Butemann et al. Long-term electricity production planning of a flexible biogas plant considering wear and tear
Milovanović et al. Efficiency of condensing thermal power plant as a complex system—An algorithm for assessing and improving energy efficiency and reliability during operation and maintenance
Karimi-Zare et al. Aggregate production planning and energy supply management in steel industry with an onsite energy generation system: A multi-objective robust optimization model
JP2023180730A (en) Waste disposal plan calculation apparatus and waste disposal plan calculation method
Janošťák et al. Energy Dispatch Model for Integrated Waste-to-Energy Plant.
JP2011198169A5 (en)
EP4354022A1 (en) Control device for co2 recovery device, control method for co2 recovery device, and program
Putna et al. Short-time Fluctuations and Their Impact on Waste-to-Energy Conceptual Design Optimized by Multi-Stage Stochastic Model
Chakravorty et al. Can Nuclear Power solve the Global Warming Problem?
Breitschopf et al. Simulation-based Optimization of Flexible Energy Systems in Manufacturing with Local Energy Production and Storage Components
Caselles-Moncho et al. Dynamic simulation model of a coal thermoelectric plant with a flue gas desulphurisation system
JP2002162014A (en) Method and device of controlling operation for incinerating wastes

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200923

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210721

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210907

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20211104

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20211228

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20220222

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220418

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220510

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220513

R150 Certificate of patent or registration of utility model

Ref document number: 7075194

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150