JP2019037017A - 電力系統の力率推定装置および方法、並びに太陽光発電量推定装置および方法 - Google Patents
電力系統の力率推定装置および方法、並びに太陽光発電量推定装置および方法 Download PDFInfo
- Publication number
- JP2019037017A JP2019037017A JP2017155149A JP2017155149A JP2019037017A JP 2019037017 A JP2019037017 A JP 2019037017A JP 2017155149 A JP2017155149 A JP 2017155149A JP 2017155149 A JP2017155149 A JP 2017155149A JP 2019037017 A JP2019037017 A JP 2019037017A
- Authority
- JP
- Japan
- Prior art keywords
- power
- load
- value
- power generation
- slope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
- Y02E10/56—Power conversion systems, e.g. maximum power point trackers
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
複数の負荷特性の傾きを仮設定する仮定値保持手段と、電力系統の潮流を入力する潮流計測情報取得手段と、有効電力と無効電力を軸とする平面上で入力した潮流の位置と仮設定された負荷特性の傾きとから、有効電力軸と無効電力軸の一方軸に投射した射影値を求める計測値射影手段と、日照期間内の所定時間帯における複数の潮流から求めた複数の射影値についてのヒストグラムを日照期間について求める射影値のヒストグラム作成手段と、所定時間帯における複数の前記ヒストグラムを2次元の配列とみなし,日射量の余弦則に従った経路で配列の要素を選択し,選択した要素の合計値を求め、かつ仮設定された負荷特性の傾きごとに求めた複数の合計値から晴天時の太陽光発電量の時間推移との合致の度合いを算出し、合致が最も高いときの負荷特性の傾きを負荷の力率とする余弦特性合致度判定手段を備えることを特徴とする電力系統の力率推定装置」としたものである。
複数の負荷特性の傾きを仮設定する仮定値保持手段と、電力系統の潮流を入力する潮流計測情報取得手段と、有効電力と無効電力を軸とする平面上で入力した潮流の位置と仮設定された負荷特性の傾きとから、有効電力軸と無効電力軸の一方軸に投射した射影値を求める計測値射影手段と、日照期間内の所定時間帯における複数の潮流から求めた複数の射影値についてのヒストグラムを日照期間について求める射影値のヒストグラム作成手段と、所定時間帯における複数の前記ヒストグラムを2次元の配列とみなし,日射量の余弦則に従った経路で配列の要素を選択し,選択した要素の合計値を求め、かつ仮設定された負荷特性の傾きごとに求めた複数の合計値から晴天時の太陽光発電量の時間推移との合致の度合いを算出し、合致が最も高いときの負荷特性の傾きを負荷の力率とする余弦特性合致度判定手段と、電力系統で計測した潮流と合致が最も高いときの負荷特性の傾きとから太陽光発電量を推定する太陽光発電量推定手段を備えることを特徴とする電力系統の太陽光発電量推定装置」としたものである。
複数の負荷特性の傾きを仮設定し、電力系統の潮流を入力し、有効電力と無効電力を軸とする平面上で入力した潮流の位置と仮設定された負荷特性の傾きとから、有効電力軸と無効電力軸の一方軸に投射した射影値を求め、日照期間内の所定時間帯における複数の潮流から求めた複数の射影値についてのヒストグラムを日照期間について求め、所定時間帯における複数の前記ヒストグラムを2次元の配列とみなし,日射量の余弦則に従った経路で配列の要素を選択し,選択した要素の合計値を求め、かつ仮設定された負荷特性の傾きごとに求めた複数の合計値から晴天時の太陽光発電量の時間推移との合致の度合いを算出し、合致が最も高いときの負荷特性の傾きを負荷の力率とすることを特徴とする電力系統の力率推定方法」としたものである。
複数の負荷特性の傾きを仮設定し、電力系統の潮流を入力し、有効電力と無効電力を軸とする平面上で入力した潮流の位置と仮設定された負荷特性の傾きとから、有効電力軸と無効電力軸の一方軸に投射した射影値を求め、日照期間内の所定時間帯における複数の潮流から求めた複数の射影値についてのヒストグラムを日照期間について求め、所定時間帯における複数の前記ヒストグラムを2次元の配列とみなし,日射量の余弦則に従った経路で配列の要素を選択し,選択した要素の合計値を求め、かつ仮設定された負荷特性の傾きごとに求めた複数の合計値から晴天時の太陽光発電量の時間推移との合致の度合いを算出し、合致が最も高いときの負荷特性の傾きを負荷の力率とし、電力系統で計測した潮流と合致が最も高いときの負荷特性の傾きとから太陽光発電量を推定することを特徴とする電力系統の太陽光発電量推定方法」としたものである。
SS:変電所
103:計測点
PL:送電線
DL:配電線
Hh:大口需要家
Hl:小口需要家
PV:太陽光発電設備
200:太陽光発電量推定部
201:諸定数決定部
221:計測情報取得手段
222:太陽光発電量推定手段
231:計測値データベース
232:計測値射影手段
233:負荷特性の傾きの仮定値保持手段
234:射影値のヒストグラム作成手段
235:PV出力の余弦特性合致度判定手段
236:統括制御手段
505:負荷特性の傾きの仮定が正しい場合のプロット
506:負荷特性の傾きの仮定が正しくない場合のプロット
511:負荷特性の無効電力Q軸切片の求め方の例1
512:仮定した負荷特性の傾きの妥当性判定の別指標1
513:仮定した負荷特性の傾きの妥当性判定の別指標2
L:負荷特性
656:負荷特性の無効電力Q軸切片
657:潮流計測値
665:需要家の負荷のΔP−ΔQ平面上での変動方向、負荷の力率
666:太陽光発電量の推定値
667:太陽光発電量のΔP−ΔQ平面上での変動方向、太陽光発電設備の力率
672:負荷特性上の交点
681:計測値の無効電力Q軸への射影値
L1:負荷特性Lと平行な射影用の直線
683:無効電力Q軸上の射影値のヒストグラム
684:ヒストグラムの有効電力P軸上への変換
685:無効電力Q軸に沿った負荷特性からの隔たり
α:斜面日射量係数
Claims (7)
- 太陽光発電設備を備える電力系統の負荷の力率を推定する電力系統の力率推定装置であって、
複数の負荷特性の傾きを仮設定する仮定値保持手段と、電力系統の潮流を入力する潮流計測情報取得手段と、有効電力と無効電力を軸とする平面上で前記入力した潮流の位置と仮設定された前記負荷特性の傾きとから、有効電力軸と無効電力軸の一方軸に投射した射影値を求める計測値射影手段と、日照期間内の所定時間帯における複数の潮流から求めた複数の射影値についてのヒストグラムを前記日照期間について求める射影値のヒストグラム作成手段と、前記所定時間帯における複数の前記ヒストグラムを2次元の配列とみなし,日射量の余弦則に従った経路で配列の要素を選択し,選択した要素の合計値を求め、かつ仮設定された前記負荷特性の傾きごとに求めた複数の前記合計値から晴天時の太陽光発電量の時間推移との合致の度合いを算出し、合致が最も高いときの前記負荷特性の傾きを負荷の力率とする余弦特性合致度判定手段を備えることを特徴とする電力系統の力率推定装置。 - 請求項1に記載の電力系統の力率推定装置であって、
前記ヒストグラムについて最も高い頻度を示すピーク値を結ぶ特性の時間推移と、晴天時の太陽光発電量の時間推移との合致の度合いの算出のために、前記所定時間帯毎のヒストグラムを時系列で並べた2次元のデータの集合とし、同2次元のデータにおいて、太陽光発電量の時間推移の経路に相当する経路で、階級値を線積分することを特徴とする電力系統の力率推定装置。 - 請求項2に記載の電力系統の力率推定装置であって、
前記太陽光発電量の時間推移の経路に相当する経路に対し、前記投射した軸方向に偏差量を加えて評価することで、太陽光発電の連系が無い場合の負荷の変動特性が、前記投射した軸と交わる切片を求めることを特徴とする電力系統の力率推定装置。 - 請求項1から請求項3のいずれか1項に記載の電力系統の力率推定装置であって、
前記投射した軸上の射影点を太陽光発電量の力率と負荷の力率の仮定値を含む変換式を用いて、投射しなかった側の軸上の射影点に変換し、投射しなかった側の軸上でヒストグラムを算出し、該ヒストグラムの最大電力もしくはある時間帯の電力値と、太陽光発電量の定格と斜面日射量より求めた同じ時間帯における太陽光発電量との比較を行い、両者が合致する場合に用いた負荷の力率の仮定値を、負荷の力率とすることを特徴とする電力系統の力率推定装置。 - 電力系統における太陽光発電量を推定するための電力系統の太陽光発電量推定装置であって、
複数の負荷特性の傾きを仮設定する仮定値保持手段と、電力系統の潮流を入力する潮流計測情報取得手段と、有効電力と無効電力を軸とする平面上で前記入力した潮流の位置と仮設定された前記負荷特性の傾きとから、有効電力軸と無効電力軸の一方軸に投射した射影値を求める計測値射影手段と、日照期間内の所定時間帯における複数の潮流から求めた複数の射影値についてのヒストグラムを前記日照期間について求める射影値のヒストグラム作成手段と、前記所定時間帯における複数の前記ヒストグラムを2次元の配列とみなし,日射量の余弦則に従った経路で配列の要素を選択し,選択した要素の合計値を求め、かつ仮設定された前記負荷特性の傾きごとに求めた複数の前記合計値から晴天時の太陽光発電量の時間推移との合致の度合いを算出し、合致が最も高いときの前記負荷特性の傾きを負荷の力率とする余弦特性合致度判定手段と、電力系統で計測した潮流と合致が最も高いときの前記負荷特性の傾きとから太陽光発電量を推定する太陽光発電量推定手段を備えることを特徴とする電力系統の太陽光発電量推定装置。 - 太陽光発電設備を備える電力系統の負荷の力率を推定する電力系統の力率推定方法であって、
複数の負荷特性の傾きを仮設定し、電力系統の潮流を入力し、有効電力と無効電力を軸とする平面上で前記入力した潮流の位置と仮設定された前記負荷特性の傾きとから、有効電力軸と無効電力軸の一方軸に投射した射影値を求め、日照期間内の所定時間帯における複数の潮流から求めた複数の射影値についてのヒストグラムを前記日照期間について求め、前記所定時間帯における複数の前記ヒストグラムを2次元の配列とみなし,日射量の余弦則に従った経路で配列の要素を選択し,選択した要素の合計値を求め、かつ仮設定された前記負荷特性の傾きごとに求めた複数の前記合計値から晴天時の太陽光発電量の時間推移との合致の度合いを算出し、合致が最も高いときの前記負荷特性の傾きを負荷の力率とすることを特徴とする電力系統の力率推定方法。 - 電力系統における太陽光発電量を推定するための電力系統の太陽光発電量推定方法であって、
複数の負荷特性の傾きを仮設定し、電力系統の潮流を入力し、有効電力と無効電力を軸とする平面上で前記入力した潮流の位置と仮設定された前記負荷特性の傾きとから、有効電力軸と無効電力軸の一方軸に投射した射影値を求め、日照期間内の所定時間帯における複数の潮流から求めた複数の射影値についてのヒストグラムを前記日照期間について求め、前記所定時間帯における複数の前記ヒストグラムを2次元の配列とみなし,日射量の余弦則に従った経路で配列の要素を選択し,選択した要素の合計値を求め、かつ仮設定された前記負荷特性の傾きごとに求めた複数の前記合計値から晴天時の太陽光発電量の時間推移との合致の度合いを算出し、合致が最も高いときの前記負荷特性の傾きを負荷の力率とし、電力系統で計測した潮流と合致が最も高いときの前記負荷特性の傾きとから太陽光発電量を推定することを特徴とする電力系統の太陽光発電量推定方法。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2017155149A JP6899732B2 (ja) | 2017-08-10 | 2017-08-10 | 電力系統の力率推定装置および方法、並びに太陽光発電量推定装置および方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2017155149A JP6899732B2 (ja) | 2017-08-10 | 2017-08-10 | 電力系統の力率推定装置および方法、並びに太陽光発電量推定装置および方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2019037017A true JP2019037017A (ja) | 2019-03-07 |
JP6899732B2 JP6899732B2 (ja) | 2021-07-07 |
Family
ID=65637772
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2017155149A Active JP6899732B2 (ja) | 2017-08-10 | 2017-08-10 | 電力系統の力率推定装置および方法、並びに太陽光発電量推定装置および方法 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6899732B2 (ja) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP7377118B2 (ja) | 2020-02-03 | 2023-11-09 | 株式会社日立製作所 | 電力系統の実負荷算出装置、実負荷算出方法並びに物理量算出方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000039457A (ja) * | 1998-07-23 | 2000-02-08 | Nissin Electric Co Ltd | 電力系統のp−q相関カーブグループ化方法 |
JP2012191777A (ja) * | 2011-03-11 | 2012-10-04 | Nissin Electric Co Ltd | 太陽光発電システムの発電量推定方法 |
JP2016049012A (ja) * | 2014-08-25 | 2016-04-07 | 株式会社明電舎 | 太陽光発電システムを有した配電系統における負荷量推定装置および負荷量推定方法 |
JP2016158371A (ja) * | 2015-02-24 | 2016-09-01 | 一般財団法人電力中央研究所 | 発電出力の推定方法、推定装置、及び推定プログラム |
JP2017055566A (ja) * | 2015-09-10 | 2017-03-16 | 株式会社日立製作所 | 分散電源発電量推定装置および方法 |
JP2017099187A (ja) * | 2015-11-26 | 2017-06-01 | 株式会社日立製作所 | 分散型電源の発電量推定装置及び方法 |
US20170271877A1 (en) * | 2016-03-21 | 2017-09-21 | The Regents Of The University Of California | Real-time disaggregation of renewable energy generation on an electricity distribution system |
JP2018088761A (ja) * | 2016-11-29 | 2018-06-07 | 株式会社日立製作所 | 電力系統の力率推定装置および方法 |
-
2017
- 2017-08-10 JP JP2017155149A patent/JP6899732B2/ja active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000039457A (ja) * | 1998-07-23 | 2000-02-08 | Nissin Electric Co Ltd | 電力系統のp−q相関カーブグループ化方法 |
JP2012191777A (ja) * | 2011-03-11 | 2012-10-04 | Nissin Electric Co Ltd | 太陽光発電システムの発電量推定方法 |
JP2016049012A (ja) * | 2014-08-25 | 2016-04-07 | 株式会社明電舎 | 太陽光発電システムを有した配電系統における負荷量推定装置および負荷量推定方法 |
JP2016158371A (ja) * | 2015-02-24 | 2016-09-01 | 一般財団法人電力中央研究所 | 発電出力の推定方法、推定装置、及び推定プログラム |
JP2017055566A (ja) * | 2015-09-10 | 2017-03-16 | 株式会社日立製作所 | 分散電源発電量推定装置および方法 |
US20180252753A1 (en) * | 2015-09-10 | 2018-09-06 | Hitachi, Ltd. | Distributed-Generator Power-Generation-Amount Estimation Apparatus and Method |
JP2017099187A (ja) * | 2015-11-26 | 2017-06-01 | 株式会社日立製作所 | 分散型電源の発電量推定装置及び方法 |
US20170271877A1 (en) * | 2016-03-21 | 2017-09-21 | The Regents Of The University Of California | Real-time disaggregation of renewable energy generation on an electricity distribution system |
JP2018088761A (ja) * | 2016-11-29 | 2018-06-07 | 株式会社日立製作所 | 電力系統の力率推定装置および方法 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP7377118B2 (ja) | 2020-02-03 | 2023-11-09 | 株式会社日立製作所 | 電力系統の実負荷算出装置、実負荷算出方法並びに物理量算出方法 |
Also Published As
Publication number | Publication date |
---|---|
JP6899732B2 (ja) | 2021-07-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20110282514A1 (en) | Systems and methods for forecasting solar power | |
Zhang et al. | Baseline and target values for regional and point PV power forecasts: Toward improved solar forecasting | |
Wu et al. | Integrating solar PV (photovoltaics) in utility system operations: Analytical framework and Arizona case study | |
Dolara et al. | Performance analysis of a single-axis tracking PV system | |
Chatterjee et al. | Neural network estimation of microgrid maximum solar power | |
US9535135B2 (en) | Method for calculating solar radiation amount and method for determining power to be supplied | |
EP3248267A1 (en) | Photovoltaic energy system with solar intensity prediction | |
Bakhshi et al. | A comprehensive economic analysis method for selecting the PV array structure in grid–connected photovoltaic systems | |
KR101597993B1 (ko) | 에너지 저장 장치 | |
JP2010193594A (ja) | 太陽光発電システムの最大発電量推定方法、配電系統の制御方法、及び配電系統制御装置 | |
Lonij et al. | Forecasts of PV power output using power measurements of 80 residential PV installs | |
JP6287306B2 (ja) | 電力推定装置、電力推定方法、および、プログラム | |
Baumgartner | Photovoltaic (PV) balance of system components: Basics, performance | |
Khemliche et al. | Bond graph modeling and optimization of photovoltaic pumping system: Simulation and experimental results | |
CN104598743A (zh) | 一种无量测地区太阳辐射数据的生成方法 | |
JP6899732B2 (ja) | 電力系統の力率推定装置および方法、並びに太陽光発電量推定装置および方法 | |
Gotseff et al. | Accurate power prediction of spatially distributed PV systems using localized irradiance measurements | |
Eddine et al. | Estimation model for global solar radiation in Lebanon | |
Jeong et al. | Design of short-term forecasting model of distributed generation power for solar power generation | |
Estebsari et al. | Real-time control of power exchange at primary substations: An opf-based solution | |
Vu | A stochastic methodology to determine reinforcement cost of power distribution grid for integrating increasing share of renewable energies and electric vehicles | |
Lorenz et al. | PVSAT-2: intelligent performance check of PV system operation based on satellite data | |
CN106372805A (zh) | 水冷却光伏‑光热一体化发电系统发电量计算方法及系统 | |
Morelli et al. | Web tools concerning performance analysis and planning support for solar energy plants starting from remotely sensed optical images | |
JP6247955B2 (ja) | 日射量推定装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20200604 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20210416 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20210518 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20210615 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6899732 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |