JP2019031902A - Unloading auxiliary tool, brake auxiliary tool and unloading method - Google Patents

Unloading auxiliary tool, brake auxiliary tool and unloading method Download PDF

Info

Publication number
JP2019031902A
JP2019031902A JP2018192429A JP2018192429A JP2019031902A JP 2019031902 A JP2019031902 A JP 2019031902A JP 2018192429 A JP2018192429 A JP 2018192429A JP 2018192429 A JP2018192429 A JP 2018192429A JP 2019031902 A JP2019031902 A JP 2019031902A
Authority
JP
Japan
Prior art keywords
unloading
rope
pulley
unloading rope
hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2018192429A
Other languages
Japanese (ja)
Inventor
古屋 謙
Ken Furuya
謙 古屋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Furuya Kosan Co Ltd
Original Assignee
Furuya Kosan Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Furuya Kosan Co Ltd filed Critical Furuya Kosan Co Ltd
Priority to JP2018192429A priority Critical patent/JP2019031902A/en
Publication of JP2019031902A publication Critical patent/JP2019031902A/en
Pending legal-status Critical Current

Links

Images

Abstract

To provide a method for reducing frequent replacements of gloves and possibility of getting a hand burnt and improving workability.SOLUTION: A base column of an unloading auxiliary tool 40 is fastened by clamping to the upper end of a front side vertical frame 8 of a building frame member 2 erected on the uppermost stage in a Beatty temporary scaffold 1, and a hook fastened to the upper end of the base column is fitted to a horizontal frame. A pulley 90 is suspended from a pulley attachment part 46 mounted in the forward end of an arm part 45 extended obliquely upward and forward from the upper end of the base column, and an unloading rope 3 wound around the pulley 90 is wound by about 3/4 circumference around a body part of a brake part 49 installed on the front side of the base column. A building frame 6 is hung on the unloading rope 3 suspended from the pulley 90 and is thrown on the ground. At first the rise movement of the unloading rope 3 suspended from the brake part 49 is not restrained, and the rise movement is restrained by hands with leather gloves at a point where the building frame is approaching the ground, and brake is applied by bringing the unloading rope 3 into contact with the body part.SELECTED DRAWING: Figure 2

Description

本発明は荷降ろし補助具、ブレーキ用補助具、荷降ろし方法に係り、とくにマンション、ビル等の建築物の新築・改修工事現場等の仮設足場に設置して足場部材、建築用工事資材、建築物の解体部材等の荷降ろしをするのに好適な荷降ろし補助具、ブレーキ用補助具、荷降ろし方法に関する。   The present invention relates to an unloading assisting tool, a brake assisting tool, and an unloading method. In particular, it is installed on a temporary scaffold such as a new construction / renovation construction site of a building such as a condominium or a building, and is used as a scaffold member, an architectural work material, an architecture. The present invention relates to an unloading assisting tool, a brake assisting tool, and an unloading method suitable for unloading an object dismantling member or the like.

マンション、ビル等の新築・改修工事現場等で工事後の仮設足場は、最上段から順次、足場部材を外して地上に降ろして解体することで撤去される。ビティ式仮設足場の場合、図1に示す如く、ビティ式仮設足場1の最上部のステージに建枠部材2を1つ立脚した状態で、作業員Aが荷降ろしロープ3を建枠部材2の上部の横枠4に二つ折りにして掛ける。荷降ろしロープ3の一端の輪部5に荷降ろし対象の建枠部材6を掛け、横枠4に掛かった荷降ろしロープ3の両側の下降側ロープ3aと上昇側ロープ3bを皮手袋をした両手で支持しながら建枠部材6を投下する。縦枠部材6が地上に近づいた所で、下降側ロープ3aと上昇側ロープ3bを両手でまとめて強く握り、摩擦ブレーキを掛けてスピードを落とし、ゆっくり地上に降ろす。地上の作業員Bは荷降ろしロープ3から建枠部材6を外し、空きスペースに積み上げる。作業員Aは荷降ろしロープ3の上昇側ロープ3bを引き下げて元に戻し、同様の作業を繰り返して他の建枠部材や足場ステージを解体していく。クサビ緊結式足場など、他の種類の仮設足場も同様の作業で解体するようにしている。   Temporary scaffolds after construction at new construction / renovation construction sites, etc. of condominiums, buildings, etc. are removed by dismantling them by removing the scaffold members in sequence from the top. In the case of the bitty temporary scaffold, as shown in FIG. 1, the worker A unloads the unloading rope 3 of the building frame member 2 with one building frame member 2 standing on the uppermost stage of the bitty temporary scaffold 1. Fold it in half on the top horizontal frame 4. Hands with leather gloves on the lower rope 3a and the upper rope 3b on both sides of the unloading rope 3 hung on the horizontal frame 4 on the ring 5 at one end of the unloading rope 3 The building frame member 6 is dropped while supporting. When the vertical frame member 6 approaches the ground, the lowering rope 3a and the rising rope 3b are gripped firmly with both hands, the friction brake is applied, the speed is lowered, and the lowering rope 3a is slowly lowered to the ground. The worker B on the ground removes the building frame member 6 from the unloading rope 3 and piles it up in an empty space. The worker A pulls down the ascending rope 3b of the unloading rope 3 and returns it to the original state, and repeats the same work to dismantle other building frame members and the scaffold stage. Other types of temporary scaffolds such as wedge-tight scaffolds are dismantled in the same way.

ところで、一回に荷降ろしする足場部材は、複数個の建枠部材や、複数個の足場ステージなどで40kg程度の重量があり、作業員Aがブレーキを掛ける際、下降側ロープ3aと上昇側ロープ3bを両手でかなり強く握り締める必要があり、摩擦熱で火傷する恐れがあるため、作業者の身体的な負担が大きく作業の円滑な進行の妨げとなっていた。   By the way, the scaffold member to be unloaded at a time has a weight of about 40 kg with a plurality of building frame members, a plurality of scaffold stages, etc., and when the worker A applies a brake, the descending rope 3a and the ascending side The rope 3b needs to be squeezed fairly strongly with both hands, and there is a risk of burns due to frictional heat, so the physical burden on the worker is great and hinders the smooth progress of the work.

本発明は上記した従来技術の問題に鑑みなされたもので、作業者の身体的な負担を減らし、作業性を向上することのできる荷降ろし補助具、ブレーキ用補助具、荷降ろし方法を提供することを、その目的とする。   The present invention has been made in view of the above-described problems of the prior art, and provides an unloading assisting tool, a brake assisting tool, and an unloading method capable of reducing the physical burden on an operator and improving workability. That is the purpose.

請求項1記載の発明では、
荷降ろしを行なう足場の構造物に着脱自在に装着可能なブラケットと、
ブラケットの前部に設けられて、荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられる滑車を懸吊する滑車取り付け部、または荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられるシーブと、
ブラケットの基部寄りに固着して装着されるかまたは着脱自在に装着されたブレーキ部と、
を備え、
ブレーキ部は、滑車取り付け部に懸吊した滑車またはシーブに巻き掛けられる荷降ろしロープの内、荷降ろし対象部材が吊るされる下降側とは反対の上昇側が巻き掛けられる摩擦発生用の固定の胴部と、
胴部の端部に設けられて荷降ろしロープが胴部から外れるのを阻止するストッパを含み、
胴部は、荷降ろしロープを巻き掛ける外面が外部に露出していること、
を特徴としている。
請求項2記載の発明では、
荷降ろしを行なう足場の構造物の最上部に着脱自在に立設可能で前方へ延設されたブラケットと、
ブラケットの前部に設けられて、荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられる滑車を懸吊する滑車取り付け部、または荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられるシーブと、
ブラケットの基部寄りに固着して装着されるかまたは着脱自在に装着されたブレーキ部と、
を備え、
ブレーキ部は、滑車取り付け部に懸吊した滑車またはシーブに巻き掛けられる荷降ろしロープの内、荷降ろし対象部材が吊るされる下降側とは反対の上昇側が巻き掛けられる摩擦発生用の固定の胴部と、
胴部の端部に設けられて荷降ろしロープが胴部から外れるのを阻止するストッパを含み、
胴部は、荷降ろしロープを巻き掛ける外面が外部に露出していること、
を特徴としている。
請求項3記載の発明では、
荷降ろしを行なう足場の構造物に着脱自在に装着可能な基部部材と、
基部部材から前方に延設されたアーム部と、
アーム部の前部に設けられて、荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられる滑車を懸吊する滑車取り付け部、または荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられるシーブと、
基部部材またはアーム部の基部部材近くに固着して装着されるかまたは着脱自在に装着されたブレーキ部と、
を備え、
ブレーキ部は、滑車取り付け部に懸吊した滑車またはシーブに巻き掛けられる荷降ろしロープの内、荷降ろし対象部材が吊るされる下降側とは反対の上昇側が巻き掛けられる摩擦発生用の固定の胴部と、
胴部の端部に設けられて荷降ろしロープが胴部から外れるのを阻止するストッパを含み、
胴部は、荷降ろしロープを巻き掛ける外面が外部に露出していること、
を特徴としている。
請求項4記載の発明では、
仮設足場の最上段の建枠部材の内、前側縦枠の上端に嵌合した連結ピンに上方から嵌脱自在に嵌着可能な基部部材と、
基部部材の上部から前方に延設されたアーム部と、
アーム部の前部に設けられて、荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられる滑車を懸吊する滑車取り付け部、または荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられるシーブと、
基部部材の上部から後方に延設されて仮設足場の最上段の建枠部材の横枠または後側縦枠に着脱自在に装着可能な後方延設部と、
基部部材またはアーム部の基部部材近くに固着して装着されるかまたは着脱自在に装着されたブレーキ部と、
を備え、
ブレーキ部は、滑車取り付け部に懸吊した滑車またはシーブに巻き掛けられる荷降ろしロープの内、荷降ろし対象部材が吊るされる下降側とは反対の上昇側が巻き掛けられる摩擦発生用の固定の胴部と、
胴部の端部に設けられて荷降ろしロープが胴部から外れるのを阻止するストッパを含み、
胴部は、荷降ろしロープを巻き掛ける外面が外部に露出していること、
を特徴としている。
請求項5記載の発明では、
荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられる滑車を懸吊する滑車取り付け部、または荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられるシーブが前部に設けられて荷降ろしを行なう足場の構造物に着脱自在に装着可能なブラケットに対して、
ブラケットの基部寄りに着脱自在に装着可能なブレーキ用補助具であって、
このブレーキ用補助具は、滑車取り付け部に懸吊した滑車またはシーブに巻き掛けられる荷降ろしロープの内、荷降ろし対象部材が吊るされる下降側とは反対の上昇側が巻き掛けられる摩擦発生用の胴部を含み、
胴部は、荷降ろしロープを巻き掛ける外面が外部に露出するとともに、荷降ろしロープから回転力を受けても回転不能としたこと、
を特徴としている。
請求項6記載の発明では、
荷降ろしを行なう足場の構造物に、前部に荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられる滑車を懸吊する滑車取り付け部、または荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられるシーブを備えるとともに、基部寄りに荷降ろしロープが巻き掛けられる摩擦発生用の固定の胴部を含む巻き掛け式のブレーキ部が装着されたブラケットを設置し、
荷降ろしロープを滑車取り付け部に懸吊した滑車またはシーブと胴部に巻き掛け、滑車またはシーブから垂れ下がった荷降ろしロープに荷降ろし対象部材を吊るして地上に向けて落下させ、
荷降ろし対象部材を地上に向け落下させたあとの初めの内は上昇側の荷降ろしロープの移動を手で拘束しないようにして、荷降ろし対象部材の降下速度が上がると胴部に巻き掛けられた荷降ろしロープが遠心力で胴部の外側に膨らむようにし、
荷降ろし対象部材が降下している途中で、胴部から垂れ下がった荷降ろしロープの移動を手で拘束したときの荷降ろしロープと胴部との接触で発生する摩擦により荷降ろしロープにブレーキを掛けながら荷降ろしすること、
を特徴としている。
請求項7記載の発明では、
荷降ろしを行なう足場の構造物の最上部に、前部に荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられる滑車を懸吊する滑車取り付け部、または荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられるシーブを備えるとともに、基部寄りに荷降ろしロープが巻き掛けられる摩擦発生用の固定の胴部を含む巻き掛け式のブレーキ部が装着されたブラケットを立設し、このブラケットが荷降ろしを行なう足場の構造物の前方へ延設するようにし、
荷降ろしロープを滑車取り付け部に懸吊した滑車またはシーブと胴部に巻き掛け、滑車またはシーブから垂れ下がった荷降ろしロープに荷降ろし対象部材を吊るして地上に向けて落下させ、
荷降ろし対象部材を地上に向け落下させたあとの初めの内は上昇側の荷降ろしロープの移動を手で拘束しないようにして、荷降ろし対象部材の降下速度が上がると胴部に巻き掛けられた荷降ろしロープが遠心力で胴部の外側に膨らむようにし、
荷降ろし対象部材が降下している途中で、胴部から垂れ下がった荷降ろしロープの移動を手で拘束したときの荷降ろしロープと胴部との接触で発生する摩擦により荷降ろしロープにブレーキを掛けながら荷降ろしすること、
を特徴としている。
請求項8記載の発明では、
荷降ろしを行なう足場の構造物に、前部に荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられる滑車を懸吊する滑車取り付け部、または荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられるシーブを備えるとともに、基部寄りに荷降ろしロープが巻き掛けられる摩擦発生用の固定の胴部を含む巻き掛け式のブレーキ部が装着されたブラケットを設置し、
荷降ろしロープを滑車取り付け部に懸吊した滑車またはシーブと胴部に巻き掛け、滑車またはシーブから垂れ下がった荷降ろしロープに荷降ろし対象部材を吊るして地上に向けて落下させ、
荷降ろし対象部材を地上に向け落下させたあとの初めの内は上昇側の荷降ろしロープの移動を手で拘束しないようにして、荷降ろし対象部材の降下速度が上がると胴部に巻き掛けられた荷降ろしロープが遠心力で胴部の外側に膨らむようにし、
降下した荷降ろし対象部材が地上に近づいたところで、胴部から垂れ下がった荷降ろしロープの移動を手で拘束したときの荷降ろしロープと胴部との接触で発生する摩擦により
荷降ろしロープにブレーキを掛けながら荷降ろしすること、
を特徴としている。
請求項9記載の発明では、
荷降ろしを行なう足場の構造物の最上部に、前部に荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられる滑車を懸吊する滑車取り付け部、または荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられるシーブを備えるとともに、基部寄りに荷降ろしロープが巻き掛けられる摩擦発生用の固定の胴部を含む巻き掛け式のブレーキ部が装着されたブラケットを立設し、このブラケットが荷降ろしを行なう足場の構造物の前方へ延設するようにし、
荷降ろしロープを滑車取り付け部に懸吊した滑車またはシーブと胴部に巻き掛け、滑車またはシーブから垂れ下がった荷降ろしロープに荷降ろし対象部材を吊るして地上に向けて落下させ、
荷降ろし対象部材を地上に向け落下させたあとの初めの内は上昇側の荷降ろしロープの移動を手で拘束しないようにして、荷降ろし対象部材の降下速度が上がると胴部に巻き掛けられた荷降ろしロープが遠心力で胴部の外側に膨らむようにし、
降下した荷降ろし対象部材が地上に近づいたところで、胴部から垂れ下がった荷降ろしロープの移動を手で拘束したときの荷降ろしロープと胴部との接触で発生する摩擦により荷降ろしロープにブレーキを掛けながら荷降ろしすること、
を特徴としている。
請求項1、5、6、8において、ブラケットは荷降ろしを行う足場の構造物の前面に着脱自在に装着可能としても良い。
請求項3において、基部部材は荷降ろしを行う足場の構造物の前面に着脱自在に装着可能としても良い。
請求項1乃至4において、胴部の内、ストッパ寄りの一部の表面に摩擦用ロープなどの摩擦部材を付設するとともに、ストッパに、胴部に巻き掛けた荷降ろしロープの下側をストッパの外側に引き出して荷降ろしロープを摩擦部材に接触可能とする切除部を形成しても良い。
請求項5において、胴部の端部に荷降ろしロープが胴部から外れるのを阻止するストッパを設けても良く、更に、胴部の内、ストッパ寄りの一部の表面に摩擦用ロープなどの摩擦部材を付設するとともに、ストッパに、胴部に巻き掛けた荷降ろしロープの下側をストッパの外側に引き出して荷降ろしロープを摩擦部材に接触可能とする切除部を形成しても良い。
請求項6乃至9において、ブレーキを掛ける際、上昇側ロープを手で拘束する力を加減してブレーキの効きを加減するようにしても良い。
In invention of Claim 1,
A bracket that can be detachably attached to a scaffold structure for unloading;
A sheave provided on the front portion of the bracket, on which a pulley for hanging an unloading rope for hanging an unloading target member is suspended, or a sheave on which a unloading rope for hanging an unloading target member is wound;
A brake part fixedly attached to the base of the bracket or detachably attached;
With
The brake part is a fixed body part for generating friction in which an ascending side opposite to a descending side on which a member to be unloaded is suspended is wound out of an unloading rope suspended on a pulley or sheave suspended from a pulley mounting part. When,
Including a stopper provided at the end of the trunk to prevent the unloading rope from coming off the trunk;
The torso has an external surface that is used to unload the unloading rope.
It is characterized by.
In invention of Claim 2,
A bracket that can be detachably installed at the top of the scaffold structure for unloading and that extends forward;
A sheave provided on the front portion of the bracket, on which a pulley for hanging an unloading rope for hanging an unloading target member is suspended, or a sheave on which a unloading rope for hanging an unloading target member is wound;
A brake part fixedly attached to the base of the bracket or detachably attached;
With
The brake part is a fixed body part for generating friction in which an ascending side opposite to a descending side on which a member to be unloaded is suspended is wound out of an unloading rope suspended on a pulley or sheave suspended from a pulley mounting part. When,
Including a stopper provided at the end of the trunk to prevent the unloading rope from coming off the trunk;
The torso has an external surface that is used to unload the unloading rope.
It is characterized by.
In invention of Claim 3,
A base member detachably attachable to a scaffold structure for unloading;
An arm portion extending forward from the base member;
A sheave provided on a front portion of the arm portion, on which a pulley for hanging an unloading rope for hanging an unloading target member is wound, or a sheave on which a unloading rope for hanging an unloading target member is wound,
A brake part fixedly mounted near the base member or the base member of the arm part or detachably mounted;
With
The brake part is a fixed body part for generating friction in which an ascending side opposite to a descending side on which a member to be unloaded is suspended is wound out of an unloading rope suspended on a pulley or sheave suspended from a pulley mounting part. When,
Including a stopper provided at the end of the trunk to prevent the unloading rope from coming off the trunk;
The torso has an external surface that is used to unload the unloading rope.
It is characterized by.
In invention of Claim 4,
Of the uppermost building frame member of the temporary scaffold, a base member that can be detachably fitted from above to a connecting pin fitted to the upper end of the front vertical frame;
An arm portion extending forward from the upper portion of the base member;
A sheave provided on a front portion of the arm portion, on which a pulley for hanging an unloading rope for hanging an unloading target member is wound, or a sheave on which a unloading rope for hanging an unloading target member is wound,
A rear extending portion that extends rearward from the upper part of the base member and can be detachably attached to the horizontal frame or the rear vertical frame of the uppermost building frame member of the temporary scaffold,
A brake part fixedly mounted near the base member or the base member of the arm part or detachably mounted;
With
The brake part is a fixed body part for generating friction in which an ascending side opposite to a descending side on which a member to be unloaded is suspended is wound out of an unloading rope suspended on a pulley or sheave suspended from a pulley mounting part. When,
Including a stopper provided at the end of the trunk to prevent the unloading rope from coming off the trunk;
The torso has an external surface that is used to unload the unloading rope.
It is characterized by.
In invention of Claim 5,
A scaffolding unit that unloads a pulley that hangs a pulley on which a unloading rope that suspends an unloading target member is suspended, or a sheave on which a sheave on which an unloading rope that suspends an unloading target member is wound is provided at the front. For brackets that can be detachably attached to structures,
A brake aid that can be detachably attached to the base of the bracket,
This brake auxiliary tool is a friction generating cylinder in which an unloading rope suspended around a pulley or sheave suspended from a pulley mounting portion is wound on an ascending side opposite to a descending side on which a member to be unloaded is suspended. Part
The body part is exposed to the outside, and the outer surface around which the unloading rope is wound is unrotatable even if it receives rotational force from the unloading rope.
It is characterized by.
In invention of Claim 6,
A sheave attachment section for hanging a pulley on which a load unloading rope for hanging an unloading target member is suspended on the structure of a scaffold for unloading or a sheave on which a unloading rope for hanging an unloading target member is wound And a bracket on which a wrapping type brake part including a fixed body part for generating friction on which an unloading rope is wound near the base is installed,
Wrap the unloading rope around the pulley or sheave suspended from the pulley mounting section and the trunk, hang the target member from the unloading rope hanging from the pulley or sheave, and drop it toward the ground.
The first part after the unloading target member is dropped to the ground is not restrained by hand by the movement of the unloading rope on the rising side, and when the lowering speed of the unloading target member increases, it is wound around the trunk. So that the unloading rope swells to the outside of the trunk by centrifugal force,
The unloading rope is braked by the friction generated by the contact between the unloading rope and the body when the unloading rope hanging from the body is restrained by hand while the member to be unloaded is descending. Unloading while
It is characterized by.
In invention of Claim 7,
The unloading rope that suspends the pulley that suspends the pulley to be unloaded or the pulley mounting portion that suspends the pulley that suspends the pulley that hangs the unloading rope that suspends the unloading rope that suspends the unloading target member around the top of the scaffold structure that performs unloading. A bracket is provided with a sheave to be hung, and a bracket with a winding-type brake part including a fixed body for friction generation around which an unloading rope is wound near the base, and this bracket performs unloading. Extend to the front of the scaffold structure,
Wrap the unloading rope around the pulley or sheave suspended from the pulley mounting section and the trunk, hang the target member from the unloading rope hanging from the pulley or sheave, and drop it toward the ground.
The first part after the unloading target member is dropped to the ground is not restrained by hand by the movement of the unloading rope on the rising side, and when the lowering speed of the unloading target member increases, it is wound around the trunk. So that the unloading rope swells to the outside of the trunk by centrifugal force,
The unloading rope is braked by the friction generated by the contact between the unloading rope and the body when the unloading rope hanging from the body is restrained by hand while the member to be unloaded is descending. Unloading while
It is characterized by.
In invention of Claim 8,
A sheave attachment section for hanging a pulley on which a load unloading rope for hanging an unloading target member is suspended on the structure of a scaffold for unloading or a sheave on which a unloading rope for hanging an unloading target member is wound And a bracket on which a wrapping type brake part including a fixed body part for generating friction on which an unloading rope is wound near the base is installed,
Wrap the unloading rope around the pulley or sheave suspended from the pulley mounting section and the trunk, hang the target member from the unloading rope hanging from the pulley or sheave, and drop it toward the ground.
The first part after the unloading target member is dropped to the ground is not restrained by hand by the movement of the unloading rope on the rising side, and when the lowering speed of the unloading target member increases, it is wound around the trunk. So that the unloading rope swells to the outside of the trunk by centrifugal force,
When the lowered unloading target member approaches the ground, the unloading rope is braked by the friction generated by the contact between the unloading rope and the trunk when the unloading rope hanging from the trunk is restrained by hand. Unloading while hanging,
It is characterized by.
In invention of Claim 9,
The unloading rope that suspends the pulley to be unloaded or the unloading rope that suspends the pulley to be unloaded or the unloading rope to suspend the pulley that suspends the pulley that hangs the unloading rope that suspends the unloading rope that suspends the unloading target member on the front part A bracket is provided with a sheave to be hung, and a bracket with a winding-type brake part including a fixed body for friction generation around which an unloading rope is wound near the base, and this bracket performs unloading. Extend to the front of the scaffold structure,
Wrap the unloading rope around the pulley or sheave suspended from the pulley mounting section and the trunk, hang the target member from the unloading rope hanging from the pulley or sheave, and drop it toward the ground.
The first part after the unloading target member is dropped to the ground is not restrained by hand by the movement of the unloading rope on the rising side, and when the lowering speed of the unloading target member increases, it is wound around the trunk. So that the unloading rope swells to the outside of the trunk by centrifugal force,
When the lowered unloading target member approaches the ground, the unloading rope is braked by the friction generated by the contact between the unloading rope and the trunk when the unloading rope hanging from the trunk is restrained by hand. Unloading while hanging,
It is characterized by.
In Claims 1, 5, 6, and 8, the bracket may be detachably attachable to the front surface of the scaffold structure for unloading.
According to a third aspect of the present invention, the base member may be detachably attachable to the front surface of the scaffold structure for unloading.
The friction member such as a friction rope is attached to a part of the body portion near the stopper, and the lower side of the unloading rope wound around the body portion is connected to the stopper. A cut-out portion that allows the unloading rope to be brought out of contact with the friction member may be formed.
In Claim 5, you may provide the stopper which prevents that an unloading rope remove | deviates from a trunk | drum at the edge part of a trunk | drum, Furthermore, a friction rope etc. are provided in the surface of a part of the trunk | drum near a stopper. While attaching the friction member, the stopper may be formed with a cut-out portion that allows the lower side of the unloading rope wound around the body portion to be pulled out to the outside of the stopper so that the unloading rope can contact the friction member.
In the sixth to ninth aspects, when the brake is applied, the effectiveness of the brake may be adjusted by adjusting the force of restraining the ascending rope by hand.

本発明によれば、荷降ろしロープをブラケット(またはアーム部)前部の滑車(またはシーブ)とブレーキ部の胴部に巻き掛け、滑車(またはシーブ)から垂れ下がった荷降ろしロープに荷降ろし対象部材を吊るして地上に向け落下させたあと、荷降ろし対象部材の降下速度が上がると、遠心力で荷降ろしロープが胴部の外側に膨らんで胴部から離れるか、軽く接触するだけであり、円滑に落下する。荷降ろし対象部材が地上に近づいたときなど、荷降ろし対象部材の降下途中で、胴部から垂れ下がった荷降ろしロープの上昇移動を皮手袋をした手で拘束すると荷降ろしロープが胴部の表面に対し大きな押圧力で接触して大きな摩擦力が生じブレーキが掛かる。これにより、上昇側ロープを強く握らなくても荷降ろし対象部材をゆっくり地上に降ろすことができる。従って、皮手袋をした手と上昇側ロープとの間の摩擦熱は小さく、火傷する恐れがなくなり、作業者の身体的な負担が軽減する。また、胴部の両端にストッパを設けたので、胴部に巻き掛けた荷降ろしロープが外れないようにすることができる。   According to the present invention, the unloading rope is wound around the pulley (or sheave) in front of the bracket (or arm portion) and the trunk portion of the brake portion, and the member to be unloaded onto the unloading rope hanging from the pulley (or sheave). After hanging down and dropping to the ground, when the descending speed of the unloading target member increases, the unloading rope swells out of the trunk due to centrifugal force, or just comes out of the trunk or touches it gently. Fall into. When the unloading target member approaches the ground, when the unloading rope hanging from the torso is restrained by the hand with leather gloves while the unloading target member is descending, the unloading rope is placed on the surface of the torso. On the other hand, a large friction force is generated by contact with a large pressing force, and the brake is applied. Thereby, even if it does not hold | grip an ascending side rope strongly, unloading object member can be slowly lowered to the ground. Therefore, the frictional heat between the hand wearing leather gloves and the rising rope is small, there is no risk of burns, and the physical burden on the operator is reduced. Moreover, since the stopper was provided in the both ends of the trunk | drum, it can prevent that the unloading rope wound around the trunk | drum does not remove | deviate.

従来のビティ式仮設足場の解体方法を示す説明図である。It is explanatory drawing which shows the dismantling method of the conventional bitty type temporary scaffold. 本発明の第1実施例に係る荷降ろし補助具の使用方法を示す斜視図である(実施例1)。It is a perspective view which shows the usage method of the unloading auxiliary tool which concerns on 1st Example of this invention (Example 1). 図2中の荷降ろし補助具の外観斜視図である。It is an external appearance perspective view of the unloading auxiliary tool in FIG. 図3中の抜け止め金具と抜け止め金具取り付け部の関係を示す組み立て図である。FIG. 4 is an assembly diagram illustrating the relationship between the retaining bracket and the retaining bracket mounting portion in FIG. 3. 図5は建枠部材の上下連結方法の説明図である。FIG. 5 is an explanatory view of a method for vertically connecting building frame members. 図6は荷降ろし補助具が建枠部材に及ぼすモーメントの説明図である。FIG. 6 is an explanatory diagram of the moment that the unloading assisting tool exerts on the building frame member. 図7は図2中の抜け止め金具の使用状態を示す斜視図である。FIG. 7 is a perspective view showing a usage state of the retaining metal fitting in FIG. 図2の荷降ろし補助具の使用方法の説明図である。It is explanatory drawing of the usage method of the unloading auxiliary tool of FIG. 図2の荷降ろし補助具の付け替え方法の説明図である。It is explanatory drawing of the replacement method of the unloading auxiliary tool of FIG. 図2の荷降ろし補助具の付け替え方法の説明図である。It is explanatory drawing of the replacement method of the unloading auxiliary tool of FIG. 図2の第1実施例の変形例に係る荷降ろし補助具の使用方法を示す斜視図である。It is a perspective view which shows the usage method of the unloading auxiliary tool which concerns on the modification of 1st Example of FIG. 図11の荷降ろし補助具の一部省略した拡大斜視図である。FIG. 12 is an enlarged perspective view in which a part of the unloading assisting tool in FIG. 11 is omitted. 図2の第1実施例の他の変形例に係る荷降ろし補助具の一部省略した斜視図である。It is the perspective view which abbreviate | omitted one part of the unloading assistance tool which concerns on the other modification of 1st Example of FIG. 図13の荷降ろし補助具のブレーキ部に巻く摩擦用ロープの例を示す一部省略した斜視図である。It is the perspective view which abbreviate | omitted partially which shows the example of the friction rope wound around the brake part of the unloading auxiliary tool of FIG. 図13の荷降ろし補助具の変形例を示す一部省略した斜視図である。It is the perspective view which abbreviate | omitted partially which shows the modification of the unloading auxiliary tool of FIG. 本発明の第2実施例に係る荷降ろし補助具の使用方法を示す斜視図である(実施例2)。It is a perspective view which shows the usage method of the unloading auxiliary tool which concerns on 2nd Example of this invention (Example 2). 図16中の荷降ろし補助具の外観斜視図である。It is an external appearance perspective view of the unloading auxiliary tool in FIG. 図16の荷降ろし補助具の使用方法の説明図である。It is explanatory drawing of the usage method of the unloading auxiliary tool of FIG. 図16の荷降ろし補助具の使用方法の説明図である。It is explanatory drawing of the usage method of the unloading auxiliary tool of FIG. 図16の荷降ろし補助具の使用方法の説明図である。It is explanatory drawing of the usage method of the unloading auxiliary tool of FIG. 図16の荷降ろし補助具の付け替え方法の説明図である。It is explanatory drawing of the replacement method of the unloading auxiliary tool of FIG. 図16の荷降ろし補助具の付け替え方法の説明図である。It is explanatory drawing of the replacement method of the unloading auxiliary tool of FIG. 図16の第1実施例の変形例に係る荷降ろし補助具の使用方法を示す斜視図である。It is a perspective view which shows the usage method of the unloading auxiliary tool which concerns on the modification of 1st Example of FIG. 図23の荷降ろし補助具の一部省略した拡大斜視図である。It is the expansion perspective view which a part of the unloading assistance tool of FIG. 23 abbreviate | omitted. 図17中のブレーキ部の変形例を示す一部省略した斜視図である。It is the perspective view which abbreviate | omitted a part which shows the modification of the brake part in FIG. 図17中のブレーキ部の他の変形例を示す一部省略した斜視図である。FIG. 18 is a partially omitted perspective view showing another modification of the brake portion in FIG. 17. 図26のブレーキ部の使用方法の説明図である。It is explanatory drawing of the usage method of the brake part of FIG. 図26のブレーキ部の変形例を示す一部省略した斜視図である。FIG. 27 is a perspective view in which a modification of the brake unit in FIG. 26 is partially omitted. 図16の荷降ろし補助具の他の変形例を示す斜視図である。It is a perspective view which shows the other modification of the unloading assistance tool of FIG. 図29の荷降ろし補助具の使用方法の説明図である。It is explanatory drawing of the usage method of the unloading auxiliary tool of FIG. 図16の荷降ろし補助具の他の変形例を示す斜視図である。It is a perspective view which shows the other modification of the unloading assistance tool of FIG. 図16の荷降ろし補助具の他の変形例を示す斜視図である。It is a perspective view which shows the other modification of the unloading assistance tool of FIG. 図16の荷降ろし補助具の他の変形例を示す斜視図である。It is a perspective view which shows the other modification of the unloading assistance tool of FIG. 図16の荷降ろし補助具の他の変形例を示す斜視図である。It is a perspective view which shows the other modification of the unloading assistance tool of FIG. 図16の荷降ろし補助具の他の変形例を示す斜視図である。It is a perspective view which shows the other modification of the unloading assistance tool of FIG. 図35の荷降ろし補助具の他の変形例を示す斜視図である。It is a perspective view which shows the other modification of the unloading assistance tool of FIG. 図16の荷降ろし補助具の他の変形例を示す斜視図である。It is a perspective view which shows the other modification of the unloading assistance tool of FIG. 本発明の第3実施例に係る荷降ろし補助具の使用方法を示す斜視図である(実施例3)。It is a perspective view which shows the usage method of the unloading auxiliary tool which concerns on 3rd Example of this invention (Example 3). 図38中の荷降ろし補助具の外観斜視図である。It is an external appearance perspective view of the unloading auxiliary tool in FIG. 図38の荷降ろし補助具の使用方法の説明図である。It is explanatory drawing of the usage method of the unloading auxiliary tool of FIG. 図38の荷降ろし補助具の使用方法の説明図である。It is explanatory drawing of the usage method of the unloading auxiliary tool of FIG. 図38の荷降ろし補助具の使用方法の説明図である。It is explanatory drawing of the usage method of the unloading auxiliary tool of FIG. 図38の荷降ろし補助具の付け替え方法の説明図である。It is explanatory drawing of the replacement method of the unloading auxiliary tool of FIG. 図38の荷降ろし補助具の付け替え方法の説明図である。It is explanatory drawing of the replacement method of the unloading auxiliary tool of FIG. 図38の荷降ろし補助具の付け替え方法の説明図である。It is explanatory drawing of the replacement method of the unloading auxiliary tool of FIG. 図38の荷降ろし補助具の付け替え方法の説明図である。It is explanatory drawing of the replacement method of the unloading auxiliary tool of FIG. 図38の荷降ろし補助具の付け替え方法の説明図である。It is explanatory drawing of the replacement method of the unloading auxiliary tool of FIG. 図38の荷降ろし補助具の付け替え方法の説明図である。It is explanatory drawing of the replacement method of the unloading auxiliary tool of FIG. 図38の第3実施例の変形例に係る荷降ろし補助具を示す外観斜視図である。It is an external appearance perspective view which shows the unloading assistance tool which concerns on the modification of 3rd Example of FIG. 本発明の他の変形例に係る荷降ろし補助具の説明図である。It is explanatory drawing of the unloading assistance tool which concerns on the other modification of this invention.

以下、本発明の最良の形態を実施例に基づき説明する。   Hereinafter, the best mode of the present invention will be described based on examples.

図2乃至図7を参照して本発明の第1実施例を説明する。図2は本発明に係る荷降ろし方法を具現した荷降ろし補助具の使用状態を示す斜視図、図3は図2中の荷降ろし補助具の外観斜視図、図4は図3中の抜け止め金具と抜け止め金具取り付け部の関係を示す組み立て図、図5は建枠部材の上下連結方法の説明図、図6は荷降ろし補助具が建枠部材に及ぼすモーメントの説明図、図7は図2中の抜け止め金具の使用状態を示す斜視図である。これらの図において、図1と同一の構成部分には同一の符号が付してある。
図2において、1は解体途中のビティ式仮設足場であり、最上部のステージに建枠部材2が一脚立設されており、この建枠部材2の前側の縦枠8の上部に全体が鋼製の荷降ろし補助具40が着脱自在に装着されている。最上部のステージに載った作業員Aは荷降ろし補助具40に懸吊した滑車(この実施例では、フック首廻し式の滑車とする)90に荷降ろしロープ3を掛け、荷降ろし対象の建枠部材6を地上に荷降ろしする。荷降ろしロープ3は、麻ロープ、綿ロープなどの天然繊維系ロープ、ポリプロピレンロープ、ビニロンロープ(クレモナロープ)、ビニロンとポリエチレン、ビニロンとエステルなどの混撚ロープなどである。
A first embodiment of the present invention will be described with reference to FIGS. 2 is a perspective view showing a use state of the unloading assisting tool embodying the unloading method according to the present invention, FIG. 3 is an external perspective view of the unloading assisting tool in FIG. 2, and FIG. 4 is a retainer in FIG. FIG. 5 is an explanatory diagram of a method for vertically connecting building frame members, FIG. 6 is an explanatory diagram of the moment exerted by the unloading aid on the building frame member, and FIG. 7 is a diagram. It is a perspective view which shows the use condition of the retaining metal fitting in 2. FIG. In these drawings, the same components as those in FIG. 1 are denoted by the same reference numerals.
In FIG. 2, reference numeral 1 denotes a bite-type temporary scaffold in the middle of dismantling. A building frame member 2 is erected on the uppermost stage, and the entire steel frame is placed on the front vertical frame 8 of the building frame member 2. A product unloading assisting tool 40 is detachably mounted. The worker A on the uppermost stage hangs the unloading rope 3 on a pulley (in this embodiment, a hook-and-roller pulley) 90 suspended on the unloading assisting tool 40, and the building to be unloaded is built. The frame member 6 is unloaded onto the ground. The unloading rope 3 is a natural fiber rope such as a hemp rope or cotton rope, a polypropylene rope, a vinylon rope (Cremona rope), a blended rope such as vinylon and polyethylene, or vinylon and ester.

荷降ろし補助具40は、図3(1)、(2)の外観斜視図に示す如く、縦方向に延びた角パイプからなる基部支柱41を有し、基部支柱41の背面側の上部及び下部に装着されたクランプ42及び左右一対の係合爪43、44により、建枠部材2の前側の縦枠8に着脱自在に装着可能となっている。なお、係合爪43と44は上下に段差が有り、基部支柱41を斜めに傾けて係合爪43、44の間に縦枠8を挿入後、基部支柱41を上下真っ直ぐに立てることで縦枠8にワンタッチで係合可能となっている。基部支柱41の上端に固着された角パイプからなるアーム部45が前方斜め上方向きに延設されており(図6参照)、このアーム部45の前端部にU字状の滑車取り付け部46が装着されている。滑車取り付け部46には滑車90を着脱自在に懸吊可能になっている。アーム部45の途中と基部支柱41の下端部の前面側との間には補強部材47が斜め方向に固着されている。補強部材47の上には荷降ろしロープ3の端の輪部5または7を掛けるフック48が固着されている。   The unloading assisting tool 40 has a base column 41 made of a square pipe extending in the vertical direction, as shown in the external perspective views of FIGS. 3 (1) and 3 (2). By the clamp 42 and the pair of left and right engaging claws 43 and 44 that are attached to the front frame member 2, it can be detachably attached to the front vertical frame 8 of the building frame member 2. The engaging claws 43 and 44 are stepped up and down. After the base column 41 is inclined and the vertical frame 8 is inserted between the engaging claws 43 and 44, the base column 41 is set up and down vertically. The frame 8 can be engaged with one touch. An arm portion 45 made of a square pipe fixed to the upper end of the base column 41 extends obliquely upward and forward (see FIG. 6), and a U-shaped pulley mounting portion 46 is provided at the front end portion of the arm portion 45. It is installed. A pulley 90 can be detachably suspended from the pulley mounting portion 46. A reinforcing member 47 is fixed in an oblique direction between the middle of the arm portion 45 and the front side of the lower end portion of the base column 41. A hook 48 is secured on the reinforcing member 47 to hang the ring portion 5 or 7 at the end of the unloading rope 3.

基部支柱41の上端部の前側(クランプ42とは反対側)には、巻き掛け式のブレーキ部49が装着されている。このブレーキ部49は荷降ろしロープ3を約3/4周または7/4周だけ巻きかけて摩擦によるブレーキを掛けるためのものである。ブレーキ部49の内、50はブレーキドラムとしての鋼製で円筒状の胴部であり、一端に荷降ろし対象部材を吊持して滑車90に巻き掛けられる荷降ろしロープ3の内、荷降ろし対象部材とは反対の上昇側が巻き掛けられる。51と52は胴部50の両端に装着された円環状のストッパであり、荷降ろしロープ3が胴部50から外れないようにする。53と54は胴部50の軸方向の中央を基部支柱41に固着する固着プレートである。胴部50は軸が左右水平に配設されている。   On the front side of the upper end portion of the base column 41 (on the side opposite to the clamp 42), a winding type brake unit 49 is mounted. The brake portion 49 is used to apply a brake by friction by winding the unloading rope 3 by about 3/4 or 7/4. Of the brake portion 49, 50 is a steel cylindrical body as a brake drum, and is an object to be unloaded from the unloading rope 3 that is suspended on one end of the unloading rope 3 suspended from a member to be unloaded. The rising side opposite to the member is wound. Reference numerals 51 and 52 denote annular stoppers attached to both ends of the trunk portion 50 so that the unloading rope 3 does not come off the trunk portion 50. Reference numerals 53 and 54 denote fixing plates for fixing the axial center of the body 50 to the base column 41. The shaft of the trunk portion 50 is horizontally arranged.

胴部50は背面側の中央部分が固着プレート53、54に支持されることにより、荷降ろしロープ3を巻き掛ける左右の外周面が外部に露出しており、胴部50の外側からの胴部50への荷降ろしロープ3の巻き掛け、取り外しを自在に行えるようになっている。また、胴部50は固着プレート53、54により回転不能に固定されているので、胴部50の外周面に荷降ろしロープ3を接触させると摩擦力が発生し、移動中の荷降ろしロープ3にブレーキが掛かる。なお、荷降ろしロープ3が胴部50に接触する接触長さが長くなったり、胴部50に接触した荷降ろしロープ3が胴部50を押圧する力が大きくなると摩擦力が大きくなり、接触長さが短くなったり、押圧力が小さくなると摩擦力が小さくなる。
基部支柱41の上端部には後方に向けて旋回阻止部としてのフック55が固着されている。フック55は後端部が下向きU字状に湾曲されており、建枠部材2の上部の横枠4に嵌合させることで荷降ろし補助具40が左右に旋回しようとしても、フック55が横枠4に当接して旋回を阻止する。
The body part 50 is supported by the fixing plates 53 and 54 at the center part on the back side, so that the left and right outer peripheral surfaces around which the unloading rope 3 is wound are exposed to the outside, and the body part from the outside of the body part 50 is exposed. The unloading rope 3 to 50 can be freely wound and removed. Further, since the trunk portion 50 is fixed by the fixing plates 53 and 54 so as not to rotate, when the unloading rope 3 is brought into contact with the outer peripheral surface of the trunk portion 50, a frictional force is generated, and the unloading rope 3 is moved. The brake is applied. In addition, when the contact length with which the unloading rope 3 comes into contact with the trunk portion 50 is increased, or when the force with which the unloading rope 3 in contact with the trunk portion 50 presses the trunk portion 50 is increased, the frictional force is increased, and the contact length is increased. The frictional force decreases as the length decreases or the pressing force decreases.
A hook 55 as a turning prevention portion is fixed to the upper end portion of the base column 41 toward the rear. The hook 55 has a rear end curved downward in a U-shape, and even when the unloading assisting tool 40 tries to turn left and right by fitting with the horizontal frame 4 at the top of the building frame member 2, the hook 55 is horizontal. Abutting on the frame 4 prevents the turning.

アーム部45の上面には、円筒状の抜け止め金具取り付け部56が固着プレート57、58によりアーム部45の上面との間に口を空けて装着されており、この抜け止め金具取り付け部56に抜け止め金具59が着脱自在に取り付けられている。抜け止め金具59はフック60とフック60の基端側に装着されたクランプ61からなり、クランプ61により抜け止め金具取り付け部56に着脱自在に取り付けられている(図4参照)。抜け止め金具59は、荷降ろし補助具40を設置した建枠部材2の後ろ側の縦枠9が荷降ろし中に荷重モーメントにより上方に抜けるのを防止するためのものである。すなわち、図5に示す如く、建枠部材2は縦枠8、9の下端部を下側の建枠部材10の縦枠11、12の上端部に着脱自在に嵌合した一対の連結ピン13、14に着脱自在に嵌合することで立設させるようになっている。連結ピン13、14の内部の上下にはバネにより側方へ突出するように付勢された係合突起15と16、17と18が備えられており、縦枠8と11、9と12に穿設された係合孔19と20、21と22に係合突起15と16、17と18が嵌ることで抜け止めされるようになっている。   On the upper surface of the arm portion 45, a cylindrical retaining bracket mounting portion 56 is mounted with a fixing plate 57, 58 with an opening between the upper surface of the arm portion 45 and attached to the retaining bracket mounting portion 56. A retaining bracket 59 is detachably attached. The retaining bracket 59 includes a hook 60 and a clamp 61 attached to the proximal end side of the hook 60, and is detachably attached to the retaining bracket mounting portion 56 by the clamp 61 (see FIG. 4). The retaining bracket 59 is for preventing the vertical frame 9 on the rear side of the building frame member 2 on which the unloading assisting tool 40 is installed from being pulled upward due to a load moment during unloading. That is, as shown in FIG. 5, the building frame member 2 has a pair of connecting pins 13 in which the lower ends of the vertical frames 8 and 9 are detachably fitted to the upper ends of the vertical frames 11 and 12 of the lower building frame member 10. , 14 is detachably fitted so as to be erected. Engagement projections 15 and 16, 17 and 18 are provided on the upper and lower sides of the connecting pins 13 and 14 so as to protrude laterally by springs. The engagement projections 15, 16, 17, and 18 are fitted into the drilled engagement holes 19, 20, 21, and 22, and are prevented from coming off.

けれども、永年の使用で係合突起15乃至18が折損したり無くなっている場合があり、図6に示すように、荷降ろし補助具40の前端部に下向きに掛かる荷重Fで建枠部材2の前側の縦枠8の下端を支点にして、縦枠9の下端に反時計方向のモーメントMが掛かると、連結ピン14から縦枠9が抜けてしまう恐れがある。この対策として、図7に示す如く抜け止め金具59を抜け止め金具取り付け部56から外し、フック60を建枠部材10の横枠23の後端部に係合し、クランプ61により建枠部材2の後側の縦枠9の下部に着脱自在に締結することにより、上下の縦枠9、12を固定する。   However, the engagement protrusions 15 to 18 may be broken or lost due to long-term use, and as shown in FIG. 6, the load F applied to the front end portion of the unloading assisting tool 40 is lowered by the load F applied to the building frame member 2. If a counterclockwise moment M is applied to the lower end of the vertical frame 9 with the lower end of the front vertical frame 8 as a fulcrum, the vertical frame 9 may come off from the connecting pin 14. As a countermeasure against this, as shown in FIG. 7, the retaining bracket 59 is removed from the retaining bracket mounting portion 56, the hook 60 is engaged with the rear end portion of the horizontal frame 23 of the building frame member 10, and the building frame member 2 is clamped 61. The upper and lower vertical frames 9 and 12 are fixed by detachably fastening to the lower part of the rear vertical frame 9.

図2と図8は上記した荷降ろし補助具40による荷降ろし方法の説明図、図9と図10は荷降ろし補助具40の付け替え方法の説明図であり、以下、これらの図を参照して上記した実施例の作用を説明する。
図2に示す如く、予めビティ式仮設足場1の最上部のステージに1つ立脚された建枠部材2の前側の縦枠8の上端近くに荷降ろし補助具40が装着済みであるとする。具体的には、基部支柱41の背面下側の係合爪43、44を縦枠8に係合し、フック55を横枠4に嵌合したのち基部支柱41の背面上側に装着されたクランプ42により、縦枠8に着脱自在に締結してある。滑車取り付け部46には荷降ろし用の滑車90が懸吊してある。荷降ろし補助具40の抜け止め金具取り付け部56から抜け止め金具59が外されて、建枠部材2の後側で、一段下の建枠部材10の横枠23にフック60を嵌合するとともに、フック60の基端部に装着されたクランプ61により、建枠部材2の後側の縦枠9の下部に着脱自在に締結しある(図7参照)。
FIGS. 2 and 8 are explanatory views of the unloading method by the unloading assisting tool 40 described above, and FIGS. 9 and 10 are explanatory views of a method of replacing the unloading assisting tool 40. Hereinafter, referring to these drawings, FIG. The operation of the above embodiment will be described.
As shown in FIG. 2, it is assumed that an unloading assisting tool 40 has been mounted in the vicinity of the upper end of the vertical frame 8 on the front side of the building frame member 2, one of which is erected on the uppermost stage of the bite-type temporary scaffold 1 in advance. Specifically, the engaging claws 43 and 44 on the lower back side of the base column 41 are engaged with the vertical frame 8, the hook 55 is fitted to the horizontal frame 4, and then the clamp mounted on the upper side of the base column 41. 42 is detachably fastened to the vertical frame 8. A pulley 90 for unloading is suspended from the pulley mounting portion 46. The retaining bracket 59 is removed from the retaining bracket mounting portion 56 of the unloading assisting tool 40, and the hook 60 is fitted to the horizontal frame 23 of the lower building frame member 10 on the rear side of the building frame member 2. The clamp 61 attached to the base end of the hook 60 is detachably fastened to the lower part of the vertical frame 9 on the rear side of the building frame member 2 (see FIG. 7).

最上部のステージに配置した作業員Aは、荷降ろしロープ3を滑車90に掛けるとともに、荷降ろしロープ3の手元側(滑車90に巻き掛けられる荷降ろしロープ3の内、荷降ろし対象部材とは反対の上昇側)をブレーキ部49の胴部50に約3/4周程度巻き掛けておく(図8参照)。そして、滑車90から垂れ下がった下降側ロープ3aの下端の輪部5に荷降ろし対象の建枠部材6を掛ける。この際、アーム部45が斜め上方に向いており、滑車90の位置が高くなっているので、輪部5に掛けた建枠部材6の下端が作業員Aの配置した足場ステージ24、25にぶつかり難くなり、建枠部材6の取り扱いが容易となる。   The worker A arranged on the uppermost stage hangs the unloading rope 3 on the pulley 90 and the hand side of the unloading rope 3 (the unloading rope 3 wound around the pulley 90 is a member to be unloaded. The opposite side is wound around the trunk portion 50 of the brake portion 49 by about 3/4 round (see FIG. 8). Then, the building frame member 6 to be unloaded is hung on the ring portion 5 at the lower end of the descending rope 3 a that hangs down from the pulley 90. At this time, since the arm portion 45 is directed obliquely upward and the position of the pulley 90 is high, the lower end of the building frame member 6 hung on the wheel portion 5 is placed on the scaffold stages 24 and 25 arranged by the worker A. It becomes difficult to collide, and handling of the building frame member 6 becomes easy.

ブレーキ部49から垂れ下がった上昇側ロープ3bを上昇移動を拘束しないように皮手袋をした手で支持しながら建枠部材6を地上に投下する。建枠部材6の降下速度が上がると、胴部50に巻き掛けられた荷降ろしロープ3は遠心力で胴部50の半径方向外側に膨らんだ大きな円弧(または円)を描き、拡径しながら移動するので胴部50の表面に殆ど接触しないか、胴部50の表面に対し比較的小さな押圧力で軽く接触するだけであり、摩擦力が殆ど生じないか小さな摩擦力が発生するだけで、円滑に建枠部材6は落下する。
滑車90がビティ仮設足場1の前面より前方に離れているので、荷降ろし中の建枠部材6とビティ式仮設足場1の前面との間に距離があき、建枠部材6に上昇側ロープ3bの下端の輪部7が引っ掛かる恐れが少なくなる。また、作業員Aは荷降ろし中の建枠部材6がビティ式仮設足場1の前面に衝突しないように下降側ロープ3aを前方に押す必要がなく、上昇側ロープ3bを手で制御して下端の輪部7が荷降ろし中の建枠部材6に引っ掛からないように注意するだけでよく、作業性が良好となる。
The building frame member 6 is dropped to the ground while supporting the ascending rope 3b hanging from the brake portion 49 with a hand wearing leather gloves so as not to restrain the ascending movement. When the descent speed of the building frame member 6 increases, the unloading rope 3 wound around the trunk portion 50 draws a large arc (or circle) that swells radially outward of the trunk portion 50 by centrifugal force, while expanding the diameter. Since it moves, it hardly touches the surface of the body part 50, or only makes a light contact with the surface of the body part 50 with a relatively small pressing force, and little or no frictional force is generated. The building frame member 6 falls smoothly.
Since the pulley 90 is farther forward than the front surface of the bitty temporary scaffold 1, there is a distance between the building frame member 6 being unloaded and the front surface of the bitty temporary scaffold 1, and the building frame member 6 has a rising rope 3 b. There is less possibility that the lower ring portion 7 will be caught. In addition, the worker A does not need to push the lowering rope 3a forward so that the building frame member 6 being unloaded does not collide with the front surface of the temporary temporary scaffold 1, and the lower end of the lower end is controlled by hand. It is only necessary to take care that the ring portion 7 is not caught by the building frame member 6 being unloaded, and workability is improved.

建枠部材6が地上に近づいたところで、胴部50の下側の上昇側ロープ3bを皮手袋をした両手または片手で掴み、上方移動を少し拘束すると、ブレーキ部49の固定の胴部50に巻き掛けられた荷降ろしロープ3が締まって縮径し、胴部50の表面に大きな押圧力で接触して大きな摩擦力が生じ、荷降ろしロープ3の移動にブレーキが掛かる。これにより、上昇側ロープ3bを強く握らなくても建枠部材6をゆっくり地上に降ろすことができる。
なお、ブレーキを掛ける際、荷降ろしロープ3の上昇移動を手で拘束する力を加減することで、胴部50に接触した荷降ろしロープ3が胴部50の表面を押圧する力を加減することができ、胴部50と荷降ろしロープ3の接触による摩擦力を加減してブレーキの効きを制御できる。
地上の作業員Bは荷降ろしロープ3から建枠部材6を外し、空きスペースに積み上げる。作業員Aは荷降ろしロープ3の上昇側ロープ3bをブレーキ部49から外し、滑車90をフック首を軸にして180度回転し、荷降ろしロープ3の上昇側と下降側を入れ替えたのち、同様の作業を繰り返して他の足場部材(建枠部材、足場ステージなど)を荷降ろしする。
When the building frame member 6 approaches the ground, the lower side rope 3b on the lower side of the body part 50 is grasped with both hands or one hand wearing leather gloves, and when the upward movement is restricted a little, the fixed body part 50 of the brake part 49 is fixed. The wound unloading rope 3 is tightened and reduced in diameter, and a large frictional force is generated by contacting the surface of the body portion 50 with a large pressing force, and a brake is applied to the movement of the unloading rope 3. Thereby, the building frame member 6 can be slowly lowered to the ground without strongly grasping the ascending rope 3b.
In addition, when applying a brake, the force which restrains the lifting movement of the unloading rope 3 by hand is moderated, and the force by which the unloading rope 3 contacting the trunk portion 50 presses the surface of the trunk portion 50 is moderated. It is possible to control the effectiveness of the brake by adjusting the frictional force caused by the contact between the body 50 and the unloading rope 3.
The worker B on the ground removes the building frame member 6 from the unloading rope 3 and piles it up in an empty space. The worker A removes the ascending rope 3b of the unloading rope 3 from the brake part 49, rotates the pulley 90 180 degrees around the hook neck, and then swaps the ascending side and the descending side of the unloading rope 3. The above work is repeated to unload other scaffold members (building frame members, scaffold stages, etc.).

作業員Aが荷降ろし補助具40の設置場所をビティ式仮設足場1の一段下に付け替えたい場合、図9に示すように、荷降ろしロープ3の一端側の輪部7をフック48に掛けて落ちないようにしておき、クランプ42を建枠部材2の縦枠8から外すとともに基部支柱41を少し上方へ移動してフック55を横枠4から外し、更に基部支柱41を斜めに傾けて前方へ動かしながら一対の係止爪43、44を縦枠8から外すことで、荷降ろし補助具40を建枠部材2から取り外す。そして、図10に示すように、一段下の縦枠部材10に対し、基部支柱41の係止爪43、44を前側の縦枠11に係合し、フック55を建枠部材10の横枠23(図7参照)に嵌合したのち基部支柱41に装着されたクランプ42により縦枠11に締結して付け替えれば良い。抜け止め金具59はクランプ61を建枠部材2の縦枠9から外すとともに下方へ少し移動してフック60を建枠部材10の横枠23(図7参照)から外し、一段下の図示しない建枠部材の横枠にフック60を嵌合するとともに、クランプ61により、建枠部材10の縦枠12の下部に締結して付け替えれば良い。
あとは建枠部材10を残して、建枠部材2と作業員Aが前回配置したステージの足場ステージ24、25や他の建枠部材を外し、前回荷降ろししたステージの一段下のステージに置き、前述と同様にして、今回外した足場部材を地上に降ろす。
When the worker A wants to change the installation location of the unloading assisting tool 40 to one level below the bite-type temporary scaffold 1, as shown in FIG. 9, the ring portion 7 on one end side of the unloading rope 3 is hung on the hook 48. The clamp 42 is removed from the vertical frame 8 of the building frame member 2 and the base column 41 is moved slightly upward to remove the hook 55 from the horizontal frame 4. Further, the base column 41 is inclined obliquely forward. The unloading assisting tool 40 is removed from the building frame member 2 by removing the pair of locking claws 43 and 44 from the vertical frame 8 while moving to the right. As shown in FIG. 10, the engaging claws 43 and 44 of the base column 41 are engaged with the front vertical frame 11 with respect to the vertical frame member 10 one step below, and the hook 55 is connected to the horizontal frame of the building frame member 10. 23 (see FIG. 7), and then fastened to the vertical frame 11 by a clamp 42 attached to the base column 41 and then replaced. The retaining bracket 59 removes the clamp 61 from the vertical frame 9 of the building frame member 2 and moves it slightly downward to remove the hook 60 from the horizontal frame 23 (see FIG. 7) of the building frame member 10, so The hook 60 may be fitted to the horizontal frame of the frame member, and the clamp 61 may be fastened to the lower portion of the vertical frame 12 of the building frame member 10 and replaced.
After that, leaving the building frame member 10, remove the scaffolding stages 24, 25 and other building frame members of the stage previously placed by the building frame member 2 and the worker A and place them on the stage one stage below the stage where the last unloading was performed. In the same manner as described above, the scaffold member removed this time is lowered to the ground.

この実施例によれば、ビティ式仮設足場1の最上部のステージに立脚した建枠部材2の内、前側の縦枠8の上端部に着脱自在に設置した荷降ろし補助具40を用いて足場部材を荷降ろしできる。具体的には、ビティ式仮設足場1の最上部のステージに配置した作業員Aは、荷降ろし補助具40の前端の滑車取り付け部46に懸吊した滑車90に荷降ろしロープ3を掛けるとともに、ブレーキ部49の胴部50にも約3/4周程度巻き掛ける。そして、滑車90から垂れ下がった下降側ロープ3aの一端側の輪部5に荷降ろし対象の建枠部材6を掛ける。この際、アーム部45が斜め上方に向いており、滑車90の位置が高くなっているので、建枠部材6を容易に輪部5に掛けることができる。
次に、ブレーキ部49の胴部50から垂れ下がった上昇側ロープ3bを上昇移動を拘束しないように皮手袋をした手で支持しながら建枠部材6を地上に投下する。建枠部材6の降下速度が上がると、胴部50に巻き掛けられた荷降ろしロープ3は遠心力で半径方向外側に膨らんだ大きな円弧(または円)を描きながら移動するので胴部50の表面に殆ど接触しないか、胴部50の表面に対し比較的小さな押圧力で軽く接触するだけであり、摩擦力が殆ど生じないか小さな摩擦力が発生するだけで、円滑に建枠部材6は落下する。滑車90がビティ式仮設足場1の前面より前方に離れているので、荷降ろし中の建枠部材6とビティ式仮設足場1の前面との間に距離があき、建枠部材6に上昇側ロープ3bの下端の輪部7が引っ掛かる恐れが少なくなる。また、作業員Aは荷降ろし中の建枠部材6がビティ式仮設足場1の前面に衝突しないように下降側ロープ3aを前方に押す必要がなく、上昇側ロープ3bを手で制御して下端の輪部7が荷降ろし中の建枠部材6に引っ掛からないように注意するだけでよく、作業性が良好となる。
According to this embodiment, of the building frame member 2 standing on the uppermost stage of the bite-type temporary scaffold 1, the scaffold is used by using the unloading assisting tool 40 detachably installed at the upper end of the front vertical frame 8. The member can be unloaded. Specifically, the worker A arranged on the uppermost stage of the bitty-type temporary scaffold 1 hangs the unloading rope 3 on the pulley 90 suspended from the pulley mounting portion 46 at the front end of the unloading assisting tool 40, The body 50 of the brake unit 49 is also wound about 3/4 round. Then, the building frame member 6 to be unloaded is hung on the ring portion 5 on one end side of the descending rope 3a hanging from the pulley 90. At this time, since the arm portion 45 is directed obliquely upward and the position of the pulley 90 is high, the building frame member 6 can be easily hung on the ring portion 5.
Next, the building frame member 6 is dropped on the ground while supporting the ascending rope 3b hanging from the trunk portion 50 of the brake portion 49 with a hand wearing leather gloves so as not to restrain the ascending movement. When the descent speed of the building frame member 6 increases, the unloading rope 3 wound around the trunk portion 50 moves while drawing a large arc (or circle) swelled radially outward by centrifugal force, so the surface of the trunk portion 50 The building frame member 6 can be smoothly dropped with little frictional force or little frictional force. To do. Since the pulley 90 is farther forward than the front surface of the bitty temporary scaffold 1, there is a distance between the building frame member 6 being unloaded and the front surface of the bitty temporary scaffold 1, and the building frame member 6 has a rising side rope. The possibility that the ring portion 7 at the lower end of 3b is caught is reduced. In addition, the worker A does not need to push the lowering rope 3a forward so that the building frame member 6 being unloaded does not collide with the front surface of the temporary temporary scaffold 1, and the lower end of the lower end is controlled by hand. It is only necessary to take care that the ring portion 7 is not caught by the building frame member 6 being unloaded, and workability is improved.

建枠部材6が地上に近づいたところで、胴部50の下側の上昇側ロープ3bを皮手袋をした両手または片手で掴み、上方移動を少し拘束する。すると、ブレーキ部49の固定の胴部50に巻き掛けられた荷降ろしロープ3が締まって縮径し、胴部50の表面に大きな押圧力で接触して大きな摩擦力が生じ、ブレーキが掛かる。これにより、上昇側ロープ3bを強く握らなくても建枠部材6をゆっくり地上に降ろすことができる。
従って、作業者Aの身体的負担が軽減し、また皮手袋と上昇側ロープ3aとの間の摩擦熱は小さく、火傷する恐れがなくなり、作業の中断や遅延が生じ難く作業性が改善する。また皮手袋の損傷も少なく経済的となる。また、手に皮手袋だけ嵌めればよいので、厚くならず、これによっても作業性が改善する。また、ブレーキを掛けるときに下降側ロープ3aと上昇側ロープ3bの両方をまとめて握らなくて良いので、荷降ろし対象の建枠部材6に上昇側ロープ3bが引っ掛かる恐れが少なくなる。
なお、ブレーキを掛ける際、荷降ろしロープ3の上昇移動を手で拘束する力を加減することで、胴部50に接触した荷降ろしロープ3が胴部50の表面を押圧する力を加減することができ、胴部50と荷降ろしロープ3の接触による摩擦力を加減してブレーキの効きを制御できる。
また、胴部50は背面側の中央部分が固着プレート53、54に支持されることにより、荷降ろしロープ3を巻き掛ける左右の外周面が外部に露出しており、胴部50の外側からの胴部50への荷降ろしロープ3の巻き掛け、取り外しを自在に行える。
また、荷降ろし補助具40の建枠部材2への設置は、基部支柱41の係合爪43、44を前側の縦枠8に係合し、フック55を横枠4に嵌合したのち基部支柱41に装着されたクランプ42により縦枠8に締結するだけでよく、簡単な作業で済む。
また、基部支柱41の上端部に固着したフック55を横枠4に嵌合させることで、荷降ろし補助具40が左右に旋回しようとしても、フック55が横枠4に当接して旋回を阻止することができ、荷降ろし補助具40が不用意に旋回しないように、向きを簡単な構造で固定することができる。
また、抜け止め金具59により、建枠部材2の後ろ側の縦枠9の下部と、一段下の建枠部材10の横枠23の後端部との間を固定可能としたことにより、アーム部45の前端部に下向きの荷重が掛かっても、縦枠9が建枠部材10の縦枠12から抜ける恐れがなくなる。
When the building frame member 6 comes close to the ground, the lower side rope 3b on the lower side of the trunk portion 50 is grasped with both hands or one hand wearing leather gloves, and the upward movement is restrained a little. Then, the unloading rope 3 wound around the fixed barrel portion 50 of the brake portion 49 is tightened and reduced in diameter, and a large frictional force is generated by contacting the surface of the barrel portion 50 with a large pressing force, and the brake is applied. Thereby, the building frame member 6 can be slowly lowered to the ground without strongly grasping the ascending rope 3b.
Accordingly, the physical burden on the worker A is reduced, the frictional heat between the leather gloves and the ascending rope 3a is small, there is no risk of burns, and work interruptions and delays are unlikely to occur and workability is improved. Moreover, the leather gloves are less damaged and economical. Moreover, since only a leather glove should just fit in a hand, it does not become thick but this also improves workability | operativity. Further, since it is not necessary to hold both the descending rope 3a and the ascending rope 3b together when the brake is applied, the risk of the ascending rope 3b being caught by the building frame member 6 to be unloaded is reduced.
In addition, when applying a brake, the force which restrains the lifting movement of the unloading rope 3 by hand is moderated, and the force by which the unloading rope 3 contacting the trunk portion 50 presses the surface of the trunk portion 50 is moderated. It is possible to control the effectiveness of the brake by adjusting the frictional force caused by the contact between the body 50 and the unloading rope 3.
In addition, the trunk portion 50 is supported by the fixing plate 53, 54 at the central portion on the back side, so that the left and right outer peripheral surfaces around which the unloading rope 3 is wound are exposed to the outside. The unloading rope 3 can be freely wound around and removed from the trunk portion 50.
Also, the unloading assisting tool 40 is installed on the building frame member 2 by engaging the engaging claws 43 and 44 of the base column 41 with the front vertical frame 8 and fitting the hook 55 with the horizontal frame 4. It is only necessary to fasten to the vertical frame 8 by the clamp 42 attached to the support column 41, and a simple operation is sufficient.
Further, by fitting the hook 55 fixed to the upper end of the base column 41 to the horizontal frame 4, even if the unloading assisting tool 40 tries to turn left and right, the hook 55 abuts against the horizontal frame 4 to prevent the turning. The direction can be fixed with a simple structure so that the unloading aid 40 does not turn carelessly.
Further, the retaining bracket 59 can fix the lower portion of the vertical frame 9 on the rear side of the building frame member 2 and the rear end portion of the horizontal frame 23 of the next lower building frame member 10, Even if a downward load is applied to the front end portion of the portion 45, there is no possibility that the vertical frame 9 comes off from the vertical frame 12 of the building frame member 10.

なお、上記した実施例では、アーム部は前方斜め上向きに延設した例を示したが、本発明は何らこれに限定されず、アーム部を前方へ水平に延設するようにしても良い。
また、上記した実施例では、基部支柱の背面側の下部に段差の有る一対の係合爪を固着した例を挙げたが、一対の係合爪を背面側の上部と同じクランプに置き換えても良い。
また、上記した実施例では、荷降ろし補助具をビティ式仮設足場の建枠部材に設置するタイプとした場合を説明したが、クサビ緊結式仮設足場の建地支柱に設置するタイプとしても良い。具体的には、図11、図12に示す荷降ろし補助具40Aの如く、図3に示した第1実施例の荷降ろし補助具40の内、基部支柱41の背面上側のクランプ42に代えてクサビ部62を固着し、フック55と抜け止め金具取り付け部56及び抜け止め金具59を省略した構成とする。使用時は図11に示す如く、クサビ緊結式仮設足場の最上部に立脚した建地支柱26に対し、基部支柱41の係合爪43、44を建地支柱26に係合したのち基部支柱41に固着されたクサビ部62を建地支柱26のポケット27にハンマで打ち込み、緊結するだけで旋回不能かつ着脱自在に装着でき、簡単な取り付け作業で済む。
In the above-described embodiment, an example is shown in which the arm portion extends obliquely upward in the forward direction. However, the present invention is not limited to this, and the arm portion may be extended horizontally in the forward direction.
Further, in the above-described embodiment, an example in which a pair of engaging claws having a step is fixed to the lower part on the back side of the base support column, but the pair of engaging claws may be replaced with the same clamp as the upper part on the back side. good.
Moreover, although the above-mentioned Example demonstrated the case where it was set as the type which installs an unloading auxiliary tool in the building frame member of a bitty type temporary scaffold, it is good also as a type installed in the building strut of a wedge-tight temporary scaffold. Specifically, like the unloading assisting tool 40A shown in FIGS. 11 and 12, the unloading assisting tool 40 of the first embodiment shown in FIG. The wedge portion 62 is fixed, and the hook 55, the retaining bracket attaching portion 56, and the retaining bracket 59 are omitted. At the time of use, as shown in FIG. 11, after engaging the engaging claws 43, 44 of the base column 41 with the building column 26, which is standing on the top of the wedge-tight temporary scaffold, the base column 41 is engaged. The wedge portion 62 fixed to the housing is hammered into the pocket 27 of the building strut 26 with a hammer, and can be attached in a non-turnable and detachable manner simply by tightening, so that a simple mounting operation is sufficient.

また、上記した実施例では、ブレーキ部の鋼製の胴部の表面と荷降ろしロープとの接触で生じる摩擦力でブレーキが掛かるようにしたが、胴部の表面の全部または一部に摩擦部材を設け、鋼製の胴部表面と比較してより大きな摩擦力が生じるようにしても良い。
具体的には、図13(1)に示す荷降ろし補助具40Bの如く、ブレーキ部49Bの胴部50の両側に固着された円環状のストッパ51、52にロープ通し孔63、64を穿設するとともに、胴部50の内、ストッパ51と固着プレート53の中間、固着プレート54とストッパ52の中間にロープ通し孔65、66を穿設しておく。そして、図13(2)に示す如く荷降ろしロープ3と同じ材質の摩擦部材としての摩擦用ロープ67を胴部50の表面全体に一重巻きし、両端をロープ通し孔63、64に通しストッパ51、52の外側で結び目68、69を作って解けないようにする。ブレーキを掛ける際、荷降ろしロープ3と摩擦用ロープ67との接触で大きな摩擦力を発生させることができる。
或いは、図13(3)に示す如く、摩擦用ロープ70を胴部50のロープ通し孔65に通し、先端を胴部50の穴71から引き出して結び目(図示せず)を作り、ロープ通し孔65から外に出た部分を引っ張って結び目をロープ通し孔65の裏側に当て、胴部50の表面にストッパ51まで巻いてロープ通し孔63に通し、ストッパ51の外側に結び目72を作って解けないようにする。同様に、摩擦用ロープ73を胴部50のロープ通し孔66に通し、先端を胴部50の穴71から引き出して結び目(図示せず)を作り、ロープ通し孔66から外に出た部分を引っ張って結び目をロープ通し孔66の裏側に当て、胴部50の表面にストッパ52まで巻いてロープ通し孔64に通し、ストッパ52の外側に結び目74を作って解けないようにする。荷降ろし補助具40Bの準備作業で、荷降ろしロープ3をブレーキ部49Bに巻き掛ける際は、胴部50の表面の内、摩擦用ロープ70、73の巻かれてない部分を用いることで大きな摩擦抵抗を受けることなく、円滑に荷降ろしロープ3を配設することができる(図14(1)参照)。一方、荷降ろし中にブレーキを掛ける際は、上昇側ロープ3bを手でずらして摩擦用ロープ70または73の巻かれた部分に当てることにより、大きな摩擦力を発生させることができる(図14(2)参照)。
Further, in the above-described embodiment, the brake is applied by the friction force generated by the contact between the surface of the steel body portion of the brake portion and the unloading rope, but the friction member is applied to all or part of the surface of the body portion. And a larger frictional force than that of the steel body surface may be generated.
Specifically, as in the unloading assisting tool 40B shown in FIG. 13 (1), the rope through holes 63 and 64 are drilled in the annular stoppers 51 and 52 fixed to both sides of the body part 50 of the brake part 49B. At the same time, rope through-holes 65 and 66 are formed in the middle portion 50 between the stopper 51 and the fixing plate 53 and between the fixing plate 54 and the stopper 52. 13 (2), a friction rope 67 as a friction member made of the same material as that of the unloading rope 3 is wound around the entire surface of the trunk portion 50, and both ends are passed through the rope through holes 63 and 64 and the stopper 51 , 52, make knots 68 and 69 so that they cannot be unwound. When the brake is applied, a large frictional force can be generated by the contact between the unloading rope 3 and the friction rope 67.
Alternatively, as shown in FIG. 13 (3), the friction rope 70 is passed through the rope passage hole 65 of the trunk portion 50, and the tip is pulled out from the hole 71 of the trunk portion 50 to form a knot (not shown). Pull the part that goes out from 65 to hit the knot against the back side of the rope through hole 65, wind up to the stopper 51 around the surface of the trunk 50, pass through the rope through hole 63, and make the knot 72 outside the stopper 51 Do not. Similarly, the friction rope 73 is passed through the rope passage hole 66 of the trunk portion 50, and the tip is pulled out from the hole 71 of the trunk portion 50 to form a knot (not shown). The knot is pulled and applied to the back side of the rope passage hole 66, wound up to the stopper 52 around the surface of the trunk portion 50, passed through the rope passage hole 64, and a knot 74 is formed outside the stopper 52 so as not to be unwound. When the unloading rope 3 is wound around the brake part 49B in the preparation work of the unloading assisting tool 40B, a large friction is obtained by using a portion of the surface of the body part 50 where the friction ropes 70 and 73 are not wound. The unloading rope 3 can be arranged smoothly without receiving resistance (see FIG. 14 (1)). On the other hand, when the brake is applied during unloading, a large frictional force can be generated by shifting the ascending rope 3b by hand and applying it to the portion around which the friction rope 70 or 73 is wound (FIG. 14 ( 2)).

なお、図13(3)の場合、図15(1)に示す荷降ろし補助具40Cの如く、ストッパ51C、52Cの内、前方から下方に掛けて切除部75、76を形成するとともに、切除部75、76以外のストッパ51C、52Cと胴部50の周表面との間に、摩擦用ロープ70の上下を覆うようにして傾斜ガイド77と78、摩擦用ロープ73の上下を覆うようにして傾斜ガイド79と80を装着したブレーキ部49Cとしても良い(図15(2)参照)。傾斜ガイド77と78、79と80は、荷降ろしロープ3が仮に摩擦用ロープ70または73の上に巻かれようとしても、胴部50の中央寄りの表面に案内させるためのものである。荷降ろし補助具40Cの準備作業で、荷降ろしロープ3をブレーキ部49Cに巻き掛ける際、傾斜ガイド77と78、または79と80に案内されて胴部50の表面の内、摩擦用ロープ70、73の巻かれてない部分に容易に配設できる(図15(2)参照)。一方、荷降ろし中にブレーキを掛ける際は、ブレーキ部49Cの下側の上昇側ロープ3bを手で切除部75または76から外側へ斜めにずらすことにより、確実に摩擦用ロープ70または73の巻かれた部分に当てることができる(図15(3)参照)。   In the case of FIG. 13 (3), as in the unloading assisting tool 40C shown in FIG. 15 (1), the cut portions 75 and 76 are formed by hanging from the front to the bottom of the stoppers 51C and 52C, and the cut portions Between the stoppers 51C and 52C other than 75 and 76 and the peripheral surface of the body portion 50, the inclined guides 77 and 78 are inclined so as to cover the upper and lower sides of the friction rope 70, and the upper and lower sides of the friction rope 73 are inclined. A brake portion 49C fitted with guides 79 and 80 may be used (see FIG. 15 (2)). The inclined guides 77 and 78 and 79 and 80 are used to guide the unloading rope 3 to the surface near the center of the trunk 50 even if the unloading rope 3 is to be wound on the friction rope 70 or 73. When the unloading rope 3 is wound around the brake portion 49C in the preparation work of the unloading assisting tool 40C, the friction rope 70, of the surface of the trunk portion 50 is guided by the inclined guides 77 and 78, or 79 and 80. 73 can be easily disposed on the unrolled portion (see FIG. 15 (2)). On the other hand, when the brake is applied during unloading, the lower rope 3b on the lower side of the brake part 49C is obliquely shifted outward from the cut part 75 or 76 by hand, thereby reliably winding the friction rope 70 or 73. It can be applied to the portion (see FIG. 15 (3)).

次に、図16、図17を参照して本発明の第2実施例を説明する。図16は本発明に係る荷降ろし方法を具現した荷降ろし補助具の使用状態を示す斜視図、図17は図16中の荷降ろし補助具の外観斜視図である。これらの図において、図2と同一の構成部分には同一の符号が付してある。
図16において、1は解体途中のビティ式仮設足場であり、最上部のステージに建枠部材2が一脚立設されており、この建枠部材2の前側の縦枠8の上部に全体が鋼製の荷降ろし補助具140が着脱自在に装着されている。最上部のステージに載った作業員Aは荷降ろし補助具140に懸吊した滑車(この実施例では、フック首廻し式の滑車とする)90に荷降ろしロープ3を掛け、荷降ろし対象の建枠部材6を地上に荷降ろしする。荷降ろしロープ3は、麻ロープ、綿ロープなどの天然繊維系ロープ、ポリプロピレンロープ、ビニロンロープ(クレモナロープ)、ビニロンとポリエチレン、ビニロンとエステルなどの混撚ロープなどである。
Next, a second embodiment of the present invention will be described with reference to FIGS. 16 is a perspective view showing a usage state of the unloading assisting tool embodying the unloading method according to the present invention, and FIG. 17 is an external perspective view of the unloading assisting tool in FIG. In these drawings, the same components as those in FIG. 2 are denoted by the same reference numerals.
In FIG. 16, reference numeral 1 denotes a bite-type temporary scaffold in the middle of dismantling, and a building frame member 2 is erected on the uppermost stage, and the entire steel frame is placed above the vertical frame 8 on the front side of the building frame member 2. A product unloading assisting tool 140 is detachably mounted. The worker A on the uppermost stage hangs the unloading rope 3 on a pulley (in this embodiment, a hook-and-neck pulley) 90 suspended on the unloading assisting tool 140, and the building to be unloaded is built. The frame member 6 is unloaded onto the ground. The unloading rope 3 is a natural fiber rope such as a hemp rope or cotton rope, a polypropylene rope, a vinylon rope (Cremona rope), a blended rope such as vinylon and polyethylene, or vinylon and ester.

荷降ろし補助具140は、図17(1)、(2)の外観斜視図に示す如く、縦方向に延びた鋼製の角パイプからなる基部支柱41を有し、基部支柱41の背面側の上部及び下部に装着されたクランプ42及び係合爪143により、建枠部材2の前側の縦枠8に着脱自在に装着可能となっている。基部支柱41の上端に固着された鋼製の角パイプからなるアーム部45が前方斜め上方向きに延設されており(図18参照)、このアーム部45の前端部にU字状の滑車取り付け部46が装着されている。滑車取り付け部46には滑車90を着脱自在に懸吊可能になっている。アーム部45の下面の途中と基部支柱41の下端部の前面側との間には鋼製の補強部材47が斜め方向に固着されている。基部支柱41、クランプ42、係合爪143、アーム部45、補強部材47によりブラケットが形成されている。基部支柱41はブラケットの基部を成し、アーム部45の前端がブラケットの前端となる。   The unloading assisting tool 140 has a base column 41 made of a steel square pipe extending in the vertical direction, as shown in the external perspective views of FIGS. 17 (1) and (2). The clamp 42 and the engaging claw 143 attached to the upper part and the lower part can be detachably attached to the front vertical frame 8 of the building frame member 2. An arm portion 45 made of a steel square pipe fixed to the upper end of the base column 41 extends obliquely upward and forward (see FIG. 18), and a U-shaped pulley is attached to the front end portion of the arm portion 45. Part 46 is mounted. A pulley 90 can be detachably suspended from the pulley mounting portion 46. A steel reinforcing member 47 is fixed obliquely between the middle of the lower surface of the arm portion 45 and the front side of the lower end portion of the base column 41. A bracket is formed by the base column 41, the clamp 42, the engaging claw 143, the arm portion 45, and the reinforcing member 47. The base column 41 forms the base of the bracket, and the front end of the arm portion 45 is the front end of the bracket.

基部支柱41の上端部の前側(クランプ42とは反対側)には、鋼製の巻き掛け式のブレーキ部49が装着されている。このブレーキ部49は荷降ろしロープ3を巻き掛けて摩擦によるブレーキを掛けるためのものである。ブレーキ部49の内、50は荷降ろしロープ3が巻き掛けられるブレーキドラムとしての円筒状の胴部であり、中心軸が左右方向に水平に配設されている。51と52は胴部50の両端に装着された円環状のストッパであり、胴部50の外周表面に巻き掛けられた荷降ろしロープ3が胴部50から外れないようにする。53と54は胴部50の軸方向の中央を基部支柱41の前面側の上端近くに固着する固着プレートである。胴部50は基部支柱41の背面側から見て左右両側に延設されており、作業員は胴部50の左側部分または右側部分に荷降ろしロープ3を巻き掛けることができる。   On the front side of the upper end portion of the base column 41 (on the side opposite to the clamp 42), a steel-wound brake portion 49 is mounted. The brake portion 49 is used to wrap the unloading rope 3 and apply a brake by friction. Among the brake parts 49, 50 is a cylindrical body part as a brake drum around which the unloading rope 3 is wound, and the central axis is disposed horizontally in the left-right direction. Reference numerals 51 and 52 denote annular stoppers attached to both ends of the trunk portion 50 so that the unloading rope 3 wound around the outer peripheral surface of the trunk portion 50 does not come off from the trunk portion 50. Reference numerals 53 and 54 denote fixing plates for fixing the axial center of the body portion 50 near the upper end on the front side of the base column 41. The trunk portion 50 is extended on both the left and right sides when viewed from the back side of the base column 41, and the operator can unload the unloading rope 3 around the left side portion or the right side portion of the trunk portion 50.

基部支柱41の上端部には後方に向けて旋回阻止部としてのフック55が固着されている。フック55は後端部が下向きU字状に湾曲されており、建枠部材2の上部の横枠4に嵌合させることで荷降ろし補助具140を構成するブラケットが左右に旋回しようとしても、フック55が横枠4に当接して旋回を阻止する。   A hook 55 as a turning prevention portion is fixed to the upper end portion of the base column 41 toward the rear. The hook 55 has a rear end curved downward in a U-shape, and even if the bracket constituting the unloading assisting tool 140 is swung left and right by fitting it into the horizontal frame 4 at the top of the building frame member 2, The hook 55 comes into contact with the horizontal frame 4 to prevent the turning.

基部支柱41の下部の左右両側面には、上下一対の上向き及び下向きのL字状のロープ掛け部(ロープ掛けフック)156と157、158と159が固着されている。上下一対のロープ掛け部156と157、または158と159は荷降ろしロープ3を8の字状などに巻き掛けて掛け止めることで、荷降ろしロープ3の移動を一時的に拘束するロープ掛け止め部としての機能を有する。ロープ掛け部156と157、または158と159へ荷降ろしロープ3を掛け止めることで、荷降ろしロープ3から両手を離しても荷降ろしロープ3が移動せず、荷降ろしの準備をする際、両手を使って荷降ろし対象の建枠部材6を荷降ろしロープ3の輪部5または輪部7へ掛けたり、輪部5または輪部7に掛けた荷降ろし対象の建枠部材6を足場ステージから前方へ投下したりする作業を行なえる。   A pair of upper and lower L-shaped rope hooks (rope hooks) 156 and 157, 158 and 159 are fixed to the left and right side surfaces of the lower portion of the base column 41. A pair of upper and lower rope hooks 156 and 157 or 158 and 159 is a rope hook that temporarily restrains the movement of the unloading rope 3 by hanging the unloading rope 3 around a figure 8 or the like. As a function. By holding the unloading rope 3 on the rope hanging portions 156 and 157 or 158 and 159, the unloading rope 3 does not move even if both hands are released from the unloading rope 3, and both hands are used when preparing for unloading. The unloading target building frame member 6 is hung on the ring part 5 or the ring part 7 of the unloading rope 3, or the unloading target building frame member 6 hung on the ring part 5 or the ring part 7 from the scaffolding stage. You can drop it forward.

図16、図18乃至図20は上記した荷降ろし補助具140による荷降ろし方法の説明図、図21と図22は荷降ろし補助具40の付け替え方法の説明図であり、以下、これらの図を参照して上記した実施例の作用を説明する。
図16、図18に示す如く、予めビティ式仮設足場1の最上部のステージに1つ立脚された建枠部材2の前側の縦枠8の上端近くに荷降ろし補助具140が装着済みであるとする。具体的には、基部支柱41の背面下側の係合爪143を縦枠8に係合し、フック55を横枠4に嵌合したのち基部支柱41の背面上側に装着されたクランプ42により、縦枠8に着脱自在に締結してある。滑車取り付け部46には荷降ろし用の滑車90が懸吊してある。
FIGS. 16 and 18 to 20 are explanatory diagrams of the unloading method by the unloading assisting tool 140 described above, and FIGS. 21 and 22 are explanatory diagrams of the replacement method of the unloading assisting tool 40, which will be described below. The operation of the above embodiment will be described with reference to FIG.
As shown in FIGS. 16 and 18, the unloading assisting tool 140 has been mounted in the vicinity of the upper end of the vertical frame 8 on the front side of the building frame member 2 that is preliminarily placed on the uppermost stage of the bitty temporary scaffold 1. And Specifically, the engaging claw 143 on the lower back side of the base column 41 is engaged with the vertical frame 8, and the hook 55 is fitted to the horizontal frame 4, and then the clamp 42 mounted on the upper back side of the base column 41. It is fastened to the vertical frame 8 so as to be detachable. A pulley 90 for unloading is suspended from the pulley mounting portion 46.

最上部のステージに配置した作業員Aは両手に皮手袋を嵌めた状態で、荷降ろしロープ3を滑車90に掛けるとともに、荷降ろしロープ3の手元側をブレーキ部49の胴部50の外周表面に約1/4周乃至数周だけ巻き掛ける(胴部50への巻き掛け量は、吊り荷の重量、地上から滑車90までの距離などにより調節する)。更に、胴部50の下側の上昇側ロープ3bをロープ掛け部156と157(またはロープ掛け部158と159)に8の字状に巻き掛けて掛け止め、上昇移動を一時的に拘束しておく(図19参照)。そして、最上部のステージにおいて、作業員Aは両手を使って滑車90から垂れ下がった下降側ロープ3aの下端の輪部5に荷降ろし対象の建枠部材6を掛ける。そして、輪部5に掛けた荷降ろし対象の建枠部材6を足場ステージから前方へ投下する。この際、アーム部45が斜め上方に向いており、滑車90の位置が高くなっているので、輪部5に掛けた建枠部材6の下端が作業員Aの配置した足場ステージ24、25にぶつかり難くなり、建枠部材6の取り扱いが容易となる。荷降ろしロープ3の移動が拘束されているため投下された建枠部材6は荷降ろしロープ3を介して滑車90に吊支されてまだ降下はしない。   The worker A placed on the uppermost stage hangs the unloading rope 3 on the pulley 90 with leather gloves fitted on both hands, and the hand side of the unloading rope 3 is the outer peripheral surface of the trunk portion 50 of the brake portion 49. (The amount of wrapping around the body 50 is adjusted by the weight of the suspended load, the distance from the ground to the pulley 90, etc.). Further, the ascending rope 3b on the lower side of the trunk 50 is wrapped around the rope hooks 156 and 157 (or the rope hooks 158 and 159) in the shape of figure 8 to temporarily restrain the rising movement. (See FIG. 19). Then, on the uppermost stage, the worker A uses both hands to hang the building frame member 6 to be unloaded on the ring portion 5 at the lower end of the descending rope 3a hanging from the pulley 90. Then, the unloading target building frame member 6 hung on the ring portion 5 is dropped forward from the scaffold stage. At this time, since the arm portion 45 is directed obliquely upward and the position of the pulley 90 is high, the lower end of the building frame member 6 hung on the wheel portion 5 is placed on the scaffold stages 24 and 25 arranged by the worker A. It becomes difficult to collide, and handling of the building frame member 6 becomes easy. Since the movement of the unloading rope 3 is restricted, the dropped building frame member 6 is suspended by the pulley 90 via the unloading rope 3 and has not yet been lowered.

次に、上昇側ロープ3bをロープ掛け部156と157(またはロープ掛け部158と159)から外し(図20参照)、ブレーキ部49から垂れ下がった上昇側ロープ3bの上昇移動を拘束しないように皮手袋をした手で支持しながら建枠部材6を地上に落下させる。建枠部材6の降下速度が上がると、胴部50に巻き掛けられた荷降ろしロープ3は遠心力で胴部50の半径方向外側に膨らんだ大きな円弧(または円)を描き、拡径しながら移動するので胴部50の表面に殆ど接触しないか、胴部50の表面に対し比較的小さな押圧力で軽く接触するだけであり、摩擦力が殆ど生じないか小さな摩擦力が発生するだけで、円滑に建枠部材6は落下する。
滑車90がビティ式仮設足場1の前面より前方に離れているので、荷降ろし中の建枠部材6とビティ式仮設足場1の前面との間に距離があき、建枠部材6に上昇側ロープ3bの下端の輪部7が引っ掛かる恐れが少なくなる。また、作業員Aは荷降ろし中の建枠部材6がビティ式仮設足場1の前面に衝突しないように下降側ロープ3aを前方に押す必要がなく、上昇側ロープ3bを手で制御して下端の輪部7が荷降ろし中の建枠部材6に引っ掛からないように注意するだけでよく、作業性が良好となる(図16参照)。
Next, the ascending rope 3b is removed from the rope hooks 156 and 157 (or the rope hooks 158 and 159) (see FIG. 20), and the ascending rope 3b hanging from the brake 49 is not restrained from being lifted. The building frame member 6 is dropped to the ground while being supported by a gloved hand. When the descent speed of the building frame member 6 increases, the unloading rope 3 wound around the trunk portion 50 draws a large arc (or circle) that swells radially outward of the trunk portion 50 by centrifugal force, while expanding the diameter. Since it moves, it hardly touches the surface of the body part 50, or only makes a light contact with the surface of the body part 50 with a relatively small pressing force, and little or no frictional force is generated. The building frame member 6 falls smoothly.
Since the pulley 90 is farther forward than the front surface of the bitty temporary scaffold 1, there is a distance between the building frame member 6 being unloaded and the front surface of the bitty temporary scaffold 1, and the building frame member 6 has a rising side rope. The possibility that the ring portion 7 at the lower end of 3b is caught is reduced. In addition, the worker A does not need to push the lowering rope 3a forward so that the building frame member 6 being unloaded does not collide with the front surface of the temporary temporary scaffold 1, and the lower end of the lower end is controlled by hand. It is only necessary to be careful that the ring portion 7 is not caught by the building frame member 6 being unloaded, and workability is improved (see FIG. 16).

建枠部材6が地上に近づいたところで、作業員Aが上昇側ロープ3bを皮手袋をした両手または片手で掴み、上方移動を少し拘束すると、ブレーキ部49の固定の胴部50に巻き掛けられた荷降ろしロープ3が締まって縮径し、胴部50の表面に大きな押圧力で接触して大きな摩擦力が生じ、ブレーキが掛かる。これにより、上昇側ロープ3bを強く握らなくても建枠部材6をゆっくり地上に降ろすことができる。地上の作業員Bは荷降ろしロープ3から建枠部材6を外し、空きスペースに積み上げれば良い。
一回分の荷降ろし後、作業員Aは荷降ろしロープ3の上昇側ロープ3bをブレーキ部49から外し、滑車90をフック首を軸にして180度回転し、荷降ろしロープ3の上昇側と下降側を入れ替えたのち、同様の作業を繰り返して他の足場部材(建枠部材、足場ステージなど)を荷降ろしする。
When the building frame member 6 approaches the ground, when the worker A grasps the ascending rope 3b with both hands or one hand wearing leather gloves and restrains the upward movement a little, the worker A is wound around the fixed body portion 50 of the brake portion 49. The unloading rope 3 is tightened to reduce the diameter, and is brought into contact with the surface of the body portion 50 with a large pressing force, so that a large frictional force is generated and a brake is applied. Thereby, the building frame member 6 can be slowly lowered to the ground without strongly grasping the ascending rope 3b. The worker B on the ground may remove the building frame member 6 from the unloading rope 3 and stack it in an empty space.
After one unloading, the worker A removes the ascending rope 3b of the unloading rope 3 from the brake portion 49, rotates the pulley 90 180 degrees around the hook neck, and descends with the ascending side of the unloading rope 3. After replacing the sides, the same work is repeated to unload other scaffold members (building frame members, scaffold stages, etc.).

作業員Aが荷降ろし補助具140の設置場所をビティ式仮設足場1の一段下に付け替えたい場合、図21に示すように、荷降ろしロープ3の一端側の輪部7(または輪部5)をロープ掛け部159に掛けて落ちないようにしておき、クランプ42を建枠部材2の縦枠8から外すとともに基部支柱41を少し上方へ移動してフック55を横枠4から外すことで、荷降ろし補助具140を建枠部材2から取り外す。そして、図22に示すように、一段下の建枠部材10に対し、基部支柱41の係合爪143を前側の縦枠11に係合し、フック55を建枠部材10の横枠23に嵌合したのち基部支柱41に装着されたクランプ42により縦枠11に締結して付け替えれば良い。
あとは建枠部材10を残して、建枠部材2と作業員Aが前回配置したステージの足場ステージ24、25や他の建枠部材を外し、前回荷降ろししたステージの一段下のステージに置き、前述と同様にして、今回外した足場部材を地上に降ろす。
When the worker A wants to change the installation location of the unloading assisting tool 140 to one level below the temporary temporary scaffold 1, as shown in FIG. 21, the ring portion 7 (or the ring portion 5) on one end side of the unloading rope 3. Is hung on the rope hook 159 so that it does not fall off, the clamp 42 is removed from the vertical frame 8 of the building frame member 2 and the base column 41 is moved slightly upward to remove the hook 55 from the horizontal frame 4, The unloading assisting tool 140 is removed from the building frame member 2. Then, as shown in FIG. 22, the engaging claw 143 of the base column 41 is engaged with the front vertical frame 11 and the hook 55 is attached to the horizontal frame 23 of the building frame member 10. After fitting, the clamp 42 attached to the base column 41 may be fastened to the vertical frame 11 and replaced.
After that, leaving the building frame member 10, remove the scaffolding stages 24, 25 and other building frame members of the stage previously placed by the building frame member 2 and the worker A and place them on the stage one stage below the stage where the last unloading was performed. In the same manner as described above, the scaffold member removed this time is lowered to the ground.

この第2実施例によれば、ビティ式仮設足場1の最上部のステージに立脚した建枠部材2の内、前側の縦枠8の上端部に着脱自在に設置した荷降ろし補助具140を用いて足場部材を荷降ろしできる。具体的には、ビティ式仮設足場1の最上部のステージに配置した作業員Aは両手に皮手袋を嵌め、荷降ろし補助具140の前端の滑車取り付け部46に懸吊した滑車90に荷降ろしロープ3を掛け、ブレーキ部49の胴部50にも約1/4周乃至数周だけ巻き掛ける。更に、胴部50の下側の荷降ろしロープ3をロープ掛け部156、157(または158、159)に巻き掛けて移動を一時的に拘束する。そして、両手を荷降ろしロープ3から離し、最上部のステージ上において、滑車90から垂れ下がった下降側ロープ3aの一端側の輪部5に荷降ろし対象の建枠部材6を掛け、輪部5に掛けた荷降ろし対象の建枠部材6を前方へ投下する。この際、アーム部45が斜め上方に向いており、滑車90の位置が高くなっているので、輪部5に掛けた建枠部材6の下端が作業員Aの配置した足場ステージ24、25にぶつかり難くなり、建枠部材6の取り扱いが容易となる。
次に、上昇側ロープ3bをロープ掛け部156と157(またはロープ掛け部158と159)から外し(図20参照)、ブレーキ部49から垂れ下がった上昇側ロープ3bの上昇移動を拘束しないように皮手袋をした手で支持しながら建枠部材6を地上に落下させる。建枠部材6の降下速度が上がると、胴部50に巻き掛けられた荷降ろしロープ3は遠心力で半径方向外側に膨らんだ大きな円弧(または円)を描き、拡径しながら移動するので胴部50の表面に殆ど接触しないか、胴部50の表面に対し比較的小さな押圧力で軽く接触するだけであり、摩擦力が殆ど生じないか小さな摩擦力が発生するだけで、円滑に建枠部材6は落下する。
滑車90がビティ式仮設足場1の前面より前方に離れているので、荷降ろし中の建枠部材6とビティ式仮設足場1の前面との間に距離があき、建枠部材6に上昇側ロープ3bの下端の輪部7が引っ掛かる恐れが少なくなる。また、作業員Aは荷降ろし中の建枠部材6がビティ仮設足場1の前面に衝突しないように下降側ロープ3aを前方に押す必要がなく、上昇側ロープ3bを手で制御して下端の輪部7が荷降ろし中の建枠部材6に引っ掛からないように注意するだけでよく、作業性が良好となる。
According to the second embodiment, the unloading assisting tool 140 detachably installed at the upper end of the front vertical frame 8 out of the building frame member 2 standing on the uppermost stage of the bitty temporary scaffold 1 is used. Can unload the scaffolding member. Specifically, the worker A placed on the uppermost stage of the temporary temporary scaffold 1 unloads the pulley 90 suspended on the pulley mounting portion 46 at the front end of the unloading assisting tool 140 with leather gloves on both hands. The rope 3 is hung, and the trunk portion 50 of the brake portion 49 is also wound about a quarter or several times. Further, the unloading rope 3 below the trunk portion 50 is wound around the rope hooking portions 156 and 157 (or 158 and 159) to temporarily restrain the movement. Then, both hands are separated from the unloading rope 3, and the building frame member 6 to be unloaded is hung on the ring part 5 on one end side of the descending rope 3 a hanging down from the pulley 90 on the uppermost stage. The building frame member 6 to be unloaded is dropped forward. At this time, since the arm portion 45 is directed obliquely upward and the position of the pulley 90 is high, the lower end of the building frame member 6 hung on the wheel portion 5 is placed on the scaffold stages 24 and 25 arranged by the worker A. It becomes difficult to collide, and handling of the building frame member 6 becomes easy.
Next, the ascending rope 3b is removed from the rope hooks 156 and 157 (or the rope hooks 158 and 159) (see FIG. 20), and the ascending rope 3b hanging from the brake 49 is not restrained from being lifted. The building frame member 6 is dropped to the ground while being supported by a gloved hand. When the descent speed of the building frame member 6 increases, the unloading rope 3 wound around the trunk portion 50 draws a large arc (or circle) swelled radially outward by centrifugal force, and moves while expanding in diameter. The frame 50 is hardly in contact with the surface of the portion 50 or only lightly contacts the surface of the body portion 50 with a relatively small pressing force. The member 6 falls.
Since the pulley 90 is farther forward than the front surface of the bitty temporary scaffold 1, there is a distance between the building frame member 6 being unloaded and the front surface of the bitty temporary scaffold 1, and the building frame member 6 has a rising side rope. The possibility that the ring portion 7 at the lower end of 3b is caught is reduced. Further, the worker A does not need to push the lowering rope 3a forward so that the building frame member 6 being unloaded does not collide with the front of the temporary temporary scaffolding 1, and controls the ascending rope 3b by hand. It is only necessary to be careful not to catch the ring portion 7 on the building frame member 6 being unloaded, and workability is improved.

建枠部材6が地上に近づいたところで、上昇側ロープ3bを皮手袋をした両手または片手で掴み、上方移動を少し拘束する。すると、ブレーキ部49に巻き掛けられた荷降ろしロープ3が締まって縮径し、胴部50の表面に大きな押圧力で接触して大きな摩擦力が生じ、ブレーキが掛かる。これにより、上昇側ロープ3bを強く握らなくても建枠部材6をゆっくり地上に降ろすことができる。
従って、作業者Aの身体的負担が軽減し、また皮手袋と上昇側ロープ3aとの間の摩擦熱は小さく、火傷する恐れがなくなり、作業の中断や遅延が生じ難く作業性が改善する。また皮手袋の損傷も少なく経済的となる。また、手に皮手袋だけ嵌めればよいので、厚くならず、これによっても作業性が改善する。また、ブレーキを掛けるときに下降側ロープ3aと上昇側ロープ3bの両方をまとめて握らなくて良いので、荷降ろし対象の建枠部材6に上昇側ロープ3bが引っ掛かる恐れが少なくなる。
また、荷降ろし補助具140の建枠部材2への設置は、基部支柱41の係合爪143を前側の縦枠8に係合し、フック55を横枠4に嵌合したのち基部支柱41に装着されたクランプ42により縦枠8に締結するだけでよく、簡単な作業で済む。
また、基部支柱41の上端部に固着したフック55を横枠4に嵌合させることで、荷降ろし補助具140が左右に旋回しようとしても、フック55が横枠4に当接して旋回を阻止することができ、荷降ろし補助具140が不用意に旋回しないように、向きを簡単な構造で固定することができる。
When the building frame member 6 approaches the ground, the ascending rope 3b is grasped with both hands or one hand wearing leather gloves, and the upward movement is restrained a little. Then, the unloading rope 3 wound around the brake part 49 is tightened to reduce the diameter, and a large frictional force is generated by contacting the surface of the body part 50 with a large pressing force, and the brake is applied. Thereby, the building frame member 6 can be slowly lowered to the ground without strongly grasping the ascending rope 3b.
Accordingly, the physical burden on the worker A is reduced, the frictional heat between the leather gloves and the ascending rope 3a is small, there is no risk of burns, and work interruptions and delays are unlikely to occur and workability is improved. Moreover, the leather gloves are less damaged and economical. Moreover, since only a leather glove should just fit in a hand, it does not become thick but this also improves workability | operativity. Further, since it is not necessary to hold both the descending rope 3a and the ascending rope 3b together when the brake is applied, the risk of the ascending rope 3b being caught by the building frame member 6 to be unloaded is reduced.
Further, the unloading assisting tool 140 is installed on the building frame member 2 by engaging the engaging claw 143 of the base column 41 with the front vertical frame 8 and fitting the hook 55 with the horizontal frame 4. It is only necessary to fasten it to the vertical frame 8 by the clamp 42 attached to the, so that a simple operation is sufficient.
Further, by fitting the hook 55 fixed to the upper end of the base column 41 to the horizontal frame 4, even if the unloading assisting tool 140 tries to turn left and right, the hook 55 abuts against the horizontal frame 4 to prevent the turning. The direction can be fixed with a simple structure so that the unloading assisting tool 140 does not turn carelessly.

なお、上記した第2実施例では、アーム部は前方斜め上向きに延設した例を示したが、本発明は何らこれに限定されず、アーム部を前方へ水平に延設するようにしても良い。
また、基部支柱の背面側の下部に係合爪を固着した例を挙げたが、係合爪を基部支柱背面側の上部と同じクランプに置き換えても良い。
また、一対のロープ掛け部を基部支柱の左右両側に設ける代わりに、補強部材の左右両側に設けるようにしても良い。
また、上側のロープ掛け部(図17の符号156、158)を省略し、下側のロープ掛け部(図17の符号157、159)だけ残し、胴部に巻き掛けた荷降ろしロープの内、胴部下側の上昇側ロープを下側のロープ掛け部に巻き掛けたあと、再度胴部に巻き掛けることで、一時的に上昇移動を拘束するようにしても良い。
また、旋回防止用のフックを省略するようにしても良い。
In the above-described second embodiment, an example is shown in which the arm portion extends obliquely upward in the forward direction. However, the present invention is not limited to this, and the arm portion may be extended horizontally in the forward direction. good.
Moreover, although the example which fixed the engaging claw to the lower part of the back side of a base support | pillar was given, you may replace an engaging claw with the same clamp as the upper part of a base support | pillar back side.
Moreover, you may make it provide a pair of rope hook part in the right-and-left both sides of a reinforcement member instead of providing in the right-and-left both sides of a base support | pillar.
Also, the upper rope hanging portion (reference numerals 156 and 158 in FIG. 17) is omitted, and only the lower rope hanging portion (reference numerals 157 and 159 in FIG. 17) is left, and among the unloading ropes wound around the trunk portion, The ascending movement may be temporarily constrained by winding the ascending rope on the lower side of the trunk part around the lower rope hook part and then winding it again on the trunk part.
Further, the hook for preventing turning may be omitted.

また、上記した第2実施例では、荷降ろし補助具をビティ式仮設足場の建枠部材に設置するタイプとした場合を説明したが、クサビ緊結式仮設足場の建地支柱に設置するタイプとしても良い。具体的には、図23、図24に示す荷降ろし補助具140Aの如く、図16、図17に示した第2実施例の荷降ろし補助具140の内、基部支柱41の背面上側のクランプ42に代えてクサビ部62を固着した構成とする。クサビ部62はクサビ緊結式仮設足場の建地支柱26のポケット27に挿脱自在に嵌合可能である。使用時は図23に示す如く、クサビ緊結式仮設足場の最上部に立脚した建地支柱26に対して、基部支柱41の係合爪143を建地支柱26に係合し、基部支柱41に固着されたクサビ部62を建地支柱26のポケット27に嵌合するだけで旋回不能かつ着脱自在に装着でき、簡単な取り付け作業で済む。なお、図23、図24の荷降ろし補助具140Aにおいて、基部支柱41の背面側のクサビ部62と係合爪143の間に、建地支柱26と着脱自在なクランプを装備しても良い。   Further, in the second embodiment described above, the case where the unloading assisting tool is set to the type installed on the building frame member of the bite-type temporary scaffold has been described, but the type to be installed on the building strut of the wedge-type temporary scaffold can also be used. good. Specifically, like the unloading aid 140A shown in FIGS. 23 and 24, the clamp 42 on the upper back side of the base column 41 in the unloading aid 140 of the second embodiment shown in FIGS. 16 and 17. Instead of this, the wedge part 62 is fixed. The wedge part 62 can be removably fitted into the pocket 27 of the building strut 26 of the wedge-tight temporary scaffold. In use, as shown in FIG. 23, the engaging claw 143 of the base column 41 is engaged with the building column 26 with respect to the building column 26 standing on the top of the wedge-tightened temporary scaffold, By simply fitting the fixed wedge portion 62 into the pocket 27 of the building strut 26, the wedge portion 62 can be mounted in a non-turnable and detachable manner. In addition, in the unloading assisting tool 140 </ b> A of FIGS. 23 and 24, the building strut 26 and a detachable clamp may be provided between the wedge portion 62 on the back side of the base strut 41 and the engaging claw 143.

また、上記した第2実施例では、巻き掛け式のブレーキ部を基部支柱の前面側の上端部に装備した例を示したが、基部支柱の前面側の下端部に装備しても良い。或いは、アーム部の内、基部支柱寄りの箇所に装備するようにしたり、アーム部と基部支柱の間に固着された補強部材の内、基部支柱寄りの箇所に装備するようにしても良い。具体的には図25(1)に示す荷降ろし補助具140Bの如く、アーム部45の内、基部支柱41に近い箇所に交差するようにして、左右に延設された円筒状の胴部150Bを固着し、胴部150Bの両端に円環状のストッパ51、52を固着して巻き掛け式のブレーキ部149Bを構成しても良い。または、図25(2)に示す荷降ろし補助具140Cの如く、補強部材47の内、基部支柱41に近い箇所に交差するようにして、左右に延設された円筒状の胴部150Cを固着し、胴部150Cの両端に円環状のストッパ51、52を固着して巻き掛け式のブレーキ部149Cを構成しても良い。   Further, in the second embodiment described above, the example in which the winding type brake portion is provided on the upper end portion on the front side of the base column is shown, but it may be provided on the lower end portion on the front side of the base column. Or you may make it equip | install in the location near a base support | pillar among arm parts, or equip in the location near a base support | pillar among the reinforcement members fixed between the arm part and the base support | pillar. Specifically, like the unloading assisting tool 140B shown in FIG. 25 (1), a cylindrical trunk portion 150B extending left and right so as to intersect a portion of the arm portion 45 close to the base column 41. May be fixed, and annular stoppers 51 and 52 may be fixed to both ends of the body portion 150B to form a wrapping brake portion 149B. Alternatively, as in the unloading assisting tool 140C shown in FIG. 25 (2), the cylindrical body portion 150C extending to the left and right is fixed so as to intersect a portion of the reinforcing member 47 close to the base column 41. Alternatively, the annular stoppers 51 and 52 may be fixed to both ends of the body portion 150C to constitute the winding type brake portion 149C.

また、上記した第2実施例では、ブレーキ部の鋼製の胴部の外周表面と荷降ろしロープとの接触で生じる摩擦力でブレーキが掛かるようにしたが、胴部の外周表面の全部または一部を覆うようにして、ロープ、皮シート、ゴムシート、布シート等の摩擦部材を胴部50の表面に装着し、鋼製の胴部表面と比較してより大きな摩擦力が生じるようにしても良い。
具体的には、例えば図26(1)に示す荷降ろし補助具140Dの如く、ブレーキ部149Dの胴部150Dの両側に固着された円環状のストッパ51、52にロープ通し孔63、64を穿設するとともに、胴部150Dの内、ストッパ51と固着プレート53の中間、固着プレート54とストッパ52の中間にロープ通し孔65、66を穿設しておく。そして、図26(2)に示す如く摩擦部材の一例としての摩擦用ロープ67を胴部150Dの外周表面全体に一重巻きし、両端をロープ通し孔63、64に通しストッパ51、52の外側で結び目68、69を作って解けないようにすることで、胴部150Dの表面全体に覆着する。摩擦用ロープ67には、荷降ろしロープと同様の麻ロープ、綿ロープなどの天然繊維系ロープ、ポリプロピレンロープ、ビニロンロープ(クレモナロープ)、ビニロンとポリエチレン、ビニロンとエステルなどの混撚ロープなどを用いることができる。ブレーキを掛ける際、荷降ろしロープ3と摩擦用ロープ67との接触で大きな摩擦力を発生させることができる。
Further, in the second embodiment described above, the brake is applied by the frictional force generated by the contact between the outer peripheral surface of the steel barrel portion of the brake portion and the unloading rope. A friction member such as a rope, a leather sheet, a rubber sheet, or a cloth sheet is attached to the surface of the body part 50 so as to cover the part so that a larger frictional force is generated as compared with the steel body surface. Also good.
Specifically, for example, as in the unloading assisting tool 140D shown in FIG. 26 (1), the rope through holes 63 and 64 are drilled in the annular stoppers 51 and 52 fixed to both sides of the trunk portion 150D of the brake portion 149D. In addition, rope through holes 65 and 66 are formed in the middle of the barrel portion 150D between the stopper 51 and the fixing plate 53 and between the fixing plate 54 and the stopper 52. Then, as shown in FIG. 26 (2), a friction rope 67 as an example of a friction member is wound once around the entire outer peripheral surface of the trunk portion 150D, and both ends are passed through the rope through holes 63 and 64 and outside the stoppers 51 and 52. By making the knots 68 and 69 so as not to be broken, the entire surface of the trunk portion 150D is covered. For the friction rope 67, the same hemp rope as the unloading rope, natural fiber rope such as cotton rope, polypropylene rope, vinylon rope (Cremona rope), vinylon and polyethylene, mixed twisted rope such as vinylon and ester, etc. Can do. When the brake is applied, a large frictional force can be generated by the contact between the unloading rope 3 and the friction rope 67.

或いは、図26(3)に示す如く、摩擦用ロープ70を胴部150Dのロープ通し孔65に通し、先端を胴部150Dの穴71から引き出して結び目(図示せず)を作り、ロープ通し孔65から外に出た部分を引っ張って結び目をロープ通し孔65の裏側に当て、胴部150Dの外周表面にストッパ51まで巻いてロープ通し孔63に通し、ストッパ51の外側に結び目72を作って解けないようにすることで、胴部150Dの外周表面の一端部に覆着する。同様に、摩擦用ロープ73を胴部150Dのロープ通し孔66に通し、先端を胴部150Dの穴71から引き出して結び目(図示せず)を作り、ロープ通し孔66から外に出た部分を引っ張って結び目をロープ通し孔66の裏側に当て、胴部150Dの外周表面にストッパ52まで巻いてロープ通し孔64に通し、ストッパ52の外側に結び目74を作って解けないようにすることで、胴部150Dの外周表面の他端部に覆着する。
荷降ろし補助具140Dの準備作業で、荷降ろしロープ3をブレーキ部149Dに巻き掛ける際は、胴部150Dの外周表面の内、摩擦用ロープ70、73の巻かれてない部分を用いることで大きな摩擦抵抗を受けることなく、円滑に荷降ろしロープ3を配設することができる(図27(1)参照)。一方、荷降ろし中にブレーキを掛ける際は、上昇側ロープ3bを手でずらして摩擦用ロープ70、73の巻かれた部分に当てることにより、大きな摩擦力を発生させることができる(図27(2)参照)。
Alternatively, as shown in FIG. 26 (3), the friction rope 70 is passed through the rope passage hole 65 of the trunk portion 150D, and the tip is pulled out from the hole 71 of the trunk portion 150D to form a knot (not shown). Pull the portion that has come out of 65 to hit the knot against the back side of the rope passage hole 65, wind up to the stopper 51 around the outer peripheral surface of the trunk portion 150 </ b> D, pass it through the rope passage hole 63, and make a knot 72 outside the stopper 51. By making it not unraveled, it covers one end portion of the outer peripheral surface of the body portion 150D. Similarly, the friction rope 73 is passed through the rope passage hole 66 of the trunk portion 150D, and the tip is pulled out from the hole 71 of the trunk portion 150D to form a knot (not shown). By pulling and applying the knot to the back side of the rope passage hole 66, winding the stopper 52 around the outer peripheral surface of the trunk portion 150 </ b> D through the rope passage hole 64, and making a knot 74 on the outside of the stopper 52 so that it cannot be unwound. Cover the other end of the outer peripheral surface of the body 150D.
When the unloading rope 3 is wound around the brake part 149D in the preparation work of the unloading assisting tool 140D, it is large by using a part of the outer peripheral surface of the body part 150D where the friction ropes 70 and 73 are not wound. The unloading rope 3 can be arranged smoothly without receiving frictional resistance (see FIG. 27 (1)). On the other hand, when the brake is applied during unloading, a large frictional force can be generated by shifting the ascending rope 3b by hand and applying it to the portion around which the friction ropes 70 and 73 are wound (FIG. 27 ( 2)).

なお、図26(3)の場合、図28(1)に示す荷降ろし補助具140Eの如く、胴部150Dの両側に固着されたストッパ51E、52Eの内、前方から下方に掛けてと下方から後方にかけて、各々切除部175、176を形成するとともに、ストッパ51E、52Eと胴部150Dの外周表面との間に、摩擦用ロープ70の上下と前後を覆うようにして4つの傾斜ガイドバー177、摩擦用ロープ73の上下と前後を覆うようにして4つの傾斜ガイドバー178を装着したブレーキ部149Eとしても良い(図28(2)参照)。傾斜ガイドバー177、178は、荷降ろしロープ3が仮に摩擦用ロープ70または73の上に重ねて巻かれようとしても、胴部150Dの中央寄りの表面に案内させるためのものである。荷降ろし補助具140Eの準備作業で、荷降ろしロープ3をブレーキ部149Eに巻き掛ける際、傾斜ガイドバー177、または178に案内されて胴部150Dの外周表面の内、摩擦用ロープ70、73の巻かれていない部分に容易に配設できる(図28(2)参照)。一方、荷降ろし中にブレーキを掛ける際は、ブレーキ部149Eの下側の上昇側ロープ3bを手で切除部175または176から外側へ斜めにずらすことにより、確実に摩擦用ロープ70または73の巻かれた部分に上昇側ロープ3bを当てることができる(図28(3)参照)。   In the case of FIG. 26 (3), like the unloading assisting tool 140E shown in FIG. 28 (1), the stoppers 51E and 52E fixed to both sides of the body portion 150D are hung from the front to the bottom and from below. In the rear, cut portions 175 and 176 are formed, and four inclined guide bars 177 are formed between the stoppers 51E and 52E and the outer peripheral surface of the trunk portion 150D so as to cover the top and bottom and the front and rear of the friction rope 70. A brake portion 149E may be used in which four inclined guide bars 178 are mounted so as to cover the top and bottom and front and rear of the friction rope 73 (see FIG. 28 (2)). The inclined guide bars 177 and 178 are for guiding the unloading rope 3 to the surface near the center of the trunk portion 150D even if the unloading rope 3 is to be wound on the friction rope 70 or 73. When the unloading rope 3 is wound around the brake part 149E in the preparation work of the unloading assisting tool 140E, it is guided by the inclined guide bar 177 or 178, and the friction ropes 70 and 73 of the outer peripheral surface of the trunk part 150D. It can be easily disposed in a portion that is not wound (see FIG. 28 (2)). On the other hand, when the brake is applied during unloading, the lower rope 3b on the lower side of the brake part 149E is obliquely shifted outward from the cut part 175 or 176 by the hand, thereby reliably winding the friction rope 70 or 73. The ascending rope 3b can be applied to the portion (see FIG. 28 (3)).

また、上記した第2実施例では、アーム部の前端部に装着した滑車取り付け部に滑車を懸吊し、荷降ろしロープを滑車に巻き掛けたのち、ブレーキ部の胴部に巻き掛けるようにしたが、アーム部の前端部に滑車取り付け部に代えて、荷降ろしロープを巻き掛けるシーブを装着しても良い。
また、アームの前端部に滑車取り付け部に代えて荷降ろしロープを摺動自在に掛けるロープ掛け部を設け、荷降ろしロープをロープ掛け部に巻き掛けたのち、ブレーキ部の胴部に巻き掛けるようにしても良い。
具体的には、例えば図29に示す荷降ろし補助具140Fの如く構成する。荷降ろし補助具140Fは全体が鋼製であり、丸パイプから成る基部支柱41Fの背面側の上下にクランプ42、係合爪143が固着されており、基部支柱41Fの上端から前方斜め上向きに延設した丸パイプから成るアーム部45Fが装着されている。アーム部45Fの下面側の途中と基部支柱41Fの前面側下端部の間には丸パイプから成る補強部材47Fが固着されている。また、基部支柱41Fの上端部には後方に延設されたフック55が装着されている。アーム部45Fの内、基部支柱41F寄りの部分に交差するようにして、左右方向にブレーキ部149Fが装着されている。アーム部45Fの前端近くの上面には丸パイプから成るロープ掛け部材180が上方に立設されており、アーム部45Fの前端とロープ掛け部材180の上端には荷降ろしロープが外れないようにするストッパ181、182が装着されている。アーム部45Fの内、ロープ掛け部材180から前側の部分とロープ掛け部材180、ストッパ181、182により荷降ろしロープを摺動自在に懸吊するロープ掛け部が構成されている。
使用時は図30(1)に示す如く、荷降ろしロープ3をロープ掛け部材180の前側でアーム部45Fの上側に掛け、更にロープ掛け部材180に巻き掛けたのちブレーキ部149Fに巻き掛けるか、或いは、図30(2)に示す如く、荷降ろしロープ3をアーム部45Fの内、ロープ掛け部材180より前側に掛け、アーム部45Fの下側を通してブレーキ部149Fに巻き掛けるようにすれば、下降側ロープ3aをアーム部45Fの前端部に懸吊させることができる。アーム部45F、ロープ掛け部材180が丸パイプ製なので、荷降ろし中に荷降ろしロープ3はアーム部45Fの前端部やロープ掛け部材180に対し円滑に摺動移動可能である。
In the second embodiment described above, the pulley is suspended from the pulley mounting portion attached to the front end portion of the arm portion, and the unloading rope is wound around the pulley and then wound around the trunk portion of the brake portion. However, instead of the pulley mounting portion, a sheave around which the unloading rope is wound may be attached to the front end portion of the arm portion.
In addition, instead of the pulley mounting part at the front end of the arm, a rope hanging part for slidably hanging the unloading rope is provided, and after the unloading rope is wrapped around the rope hanging part, it is wound around the body of the brake part. Anyway.
Specifically, for example, it is configured as an unloading assisting tool 140F shown in FIG. The unloading assisting tool 140F is entirely made of steel, and a clamp 42 and an engaging claw 143 are fixed to the upper and lower sides of the back side of the base column 41F made of a round pipe, and extends obliquely upward and forward from the upper end of the base column 41F. An arm portion 45F made of a round pipe is provided. A reinforcing member 47F made of a round pipe is fixed between the middle of the lower surface side of the arm portion 45F and the lower end portion on the front surface side of the base column 41F. A hook 55 extending rearward is attached to the upper end of the base column 41F. A brake part 149F is mounted in the left-right direction so as to intersect a part of the arm part 45F near the base column 41F. A rope hooking member 180 made of a round pipe is erected upward on the upper surface near the front end of the arm portion 45F so that the unloading rope does not come off at the front end of the arm portion 45F and the upper end of the rope hooking member 180. Stoppers 181 and 182 are attached. Of the arm portion 45F, a rope hanging portion for slidably suspending the unloading rope is configured by the portion on the front side from the rope hanging member 180, the rope hanging member 180, and the stoppers 181 and 182.
During use, as shown in FIG. 30 (1), the unloading rope 3 is hung on the upper side of the arm portion 45F on the front side of the rope hooking member 180, and further wound around the rope hooking member 180 and then wound around the brake portion 149F. Alternatively, as shown in FIG. 30 (2), when the unloading rope 3 is hung on the front side of the rope hooking member 180 in the arm portion 45F and is wound around the brake portion 149F through the lower side of the arm portion 45F, the lowering is performed. The side rope 3a can be suspended from the front end portion of the arm portion 45F. Since the arm portion 45F and the rope hanging member 180 are made of a round pipe, the unloading rope 3 can smoothly slide and move with respect to the front end portion of the arm portion 45F and the rope hanging member 180 during unloading.

なお、図29に示す変形例ではアーム部の内、基部支柱寄りにブレーキ部を装備したが、図17と同様にして基部支柱の前側の上端部に装備したり、基部支柱の前側の下端部に装備したり、図25(2)と同様にして補強部材の内、基部支柱寄りに装備したりしても良い。或いは、図31に示す荷降ろし補助具140Gの如く、アーム部45Fの内、基部支柱41F寄りの上側に鋼製で円筒状の胴部150Gを軸を鉛直方向に向け固着して立設し、胴部150Gの上端に円盤状のストッパ151Gを固着して荷降ろしロープ3を巻き掛けるブレーキ部149Gを構成しても良い。図2、図3に示す第1実施例のブレーキ部についても、図31の如く変更し、アーム部の内、基部支柱寄りの上面に立設することもできる。   In the modification shown in FIG. 29, the brake portion is provided near the base column in the arm portion. However, as in FIG. 17, the brake unit is provided at the upper end on the front side of the base column, or the lower end on the front side of the base column. Or may be installed near the base column among the reinforcing members in the same manner as in FIG. Alternatively, like the unloading assisting tool 140G shown in FIG. 31, the steel body cylindrical body 150G is fixed on the upper side of the arm portion 45F near the base support column 41F with the axis thereof fixed vertically, You may comprise the brake part 149G which adheres the disk-shaped stopper 151G to the upper end of the trunk | drum 150G, and winds the unloading rope 3 around it. The brake portion of the first embodiment shown in FIGS. 2 and 3 can also be changed as shown in FIG. 31 and can be erected on the upper surface of the arm portion near the base column.

また、図29に示す変形例ではアーム部の先端近くの上側にロープ掛け部材を立設し、アーム部の前端部とロープ掛け部材により構成したロープ掛け部に荷降ろしロープの下降側を摺動移動自在に巻き掛けるようにしたが、図32に示す荷降ろし補助具140Hの如く、アーム部45Fの先端に左右方向に延設した丸鋼管製のロープ掛け部材183を固着し、ロープ掛け部材183の両端に荷降ろしロープ3が外れないようにする円環状のストッパ184、185を固着することで、荷降ろしロープ3の下降側部分を摺動移動自在に巻き掛けるためのロープ掛け部を構成することもできる。
また、図29、図31、図32の基部支柱41Fまたは補強部材47Fに、図17の符号156乃至159と同様のロープ掛け部を付設しても良い。
In the modification shown in FIG. 29, a rope hooking member is erected on the upper side near the tip of the arm portion, and the unloading rope slides on the rope hanging portion constituted by the front end portion of the arm portion and the rope hooking member. 32. The rope hanging member 183 made of a round steel pipe extending in the left-right direction is fixed to the tip of the arm portion 45F like the unloading assisting tool 140H shown in FIG. By attaching annular stoppers 184 and 185 to prevent the unloading rope 3 from coming off at both ends, a rope hooking portion for slidably winding the descending portion of the unloading rope 3 is configured. You can also.
In addition, rope base portions similar to reference numerals 156 to 159 in FIG. 17 may be attached to the base column post 41F or the reinforcing member 47F in FIGS. 29, 31 and 32.

また、図29に示す変形例はビティ式仮設足場用であるが、クサビ緊結式仮設足場用は例えば図33の如く構成すれば良い。図33の荷降ろし補助具140Iは全体が鋼製であり、斜め上方に向けて延設されたアーム部45Fの基端にクサビ緊結式仮設足場の建地部材のポケット(図23の符号26、27参照)に挿脱自在に嵌合可能なクサビ部62Iが固着されている。アーム部45Fの下面の途中からクサビ部62Iの真下に向けて斜材186が固着されており、斜材186の後端に断面がハ字状の係合部187が装着されている。アーム部45Fの内、基部寄り(クサビ部寄り)に設けられたブレーキ部149Fの下面と斜材186の間に鉛直方向に延設された補強部材188が固着されている。アーム部45Fの前端近くにはロープ掛け部材180が立設されている。アーム部45F、クサビ部62I、斜材186、係合部187、補強部材188により、ブラケットが構成されている。使用時は、クサビ緊結式仮設足場の建地部材に係合部187を係合し、クサビ部62Iを建地部材のポケットに嵌合すれば良く、容易に設置可能である。
なお、図33ではアーム部45Fの内、基部寄りにブレーキ部149Fを設けた例を示したが、図34(1)に示す荷降ろし補助具140Jの如く、補強部材188の途中にブレーキ部149Jを設けたり、図34(2)に示す荷降ろし補助具140Kの如く斜材186の内、係合部187寄りにブレーキ部149Kを設けるようにしても良い。或いは、アーム部の内、基部寄りの上側に、図31と同様に構成されたブレーキ部を立設するようにしても良い。
また、図33、図34の斜材186に、図17の符号156乃至159と同様のロープ掛け部を付設しても良い。
In addition, the modification shown in FIG. 29 is for the bite-type temporary scaffold, but the wedge-tight temporary scaffold may be configured as shown in FIG. 33, for example. 33. The unloading assisting tool 140I of FIG. 33 is entirely made of steel, and has a pocket of a building member of a wedge-tightened temporary scaffold (reference numeral 26 in FIG. 23) at the base end of an arm portion 45F extending obliquely upward. 27), a wedge portion 62I that can be removably fitted is fixed. An oblique member 186 is fixed from the middle of the lower surface of the arm portion 45F directly below the wedge portion 62I, and an engaging portion 187 having a cross-section is attached to the rear end of the oblique member 186. A reinforcing member 188 extending in the vertical direction is fixed between the lower surface of the brake part 149F provided near the base part (close to the wedge part) and the diagonal member 186 in the arm part 45F. A rope hooking member 180 is erected near the front end of the arm portion 45F. The arm portion 45F, the wedge portion 62I, the diagonal member 186, the engaging portion 187, and the reinforcing member 188 constitute a bracket. At the time of use, it is only necessary to engage the engaging portion 187 with the building member of the wedge-tight temporary scaffold, and to fit the wedge portion 62I into the pocket of the building member, so that it can be easily installed.
FIG. 33 shows an example in which the brake portion 149F is provided near the base portion of the arm portion 45F. However, like the unloading assisting tool 140J shown in FIG. 34 (1), the brake portion 149J is provided in the middle of the reinforcing member 188. Alternatively, a brake part 149K may be provided near the engaging part 187 in the diagonal member 186 as in the unloading assisting tool 140K shown in FIG. Or you may make it erect the brake part comprised similarly to FIG. 31 on the upper side close | similar to a base part among arm parts.
33 and FIG. 34 may be provided with a rope hook similar to the reference numerals 156 to 159 in FIG.

また、上記した第1、第2実施例では、ビティ式仮設足場の最上部の建枠部材の内、前面側の縦枠の上端部に荷降ろし補助具を装着する場合を例に挙げたが、ビティ仮設足場の最上部の建枠部材の前側の縦枠と横枠の上に着脱自在に立設するようにしたり、前側の縦枠と後ろ側の縦枠の上に着脱自在に立設するようにしても良い。
例えば図35(1)の荷降ろし補助具140Lは最上部の建枠部材の前側の縦枠と横枠の上に着脱自在に立設する例を示し、下端部がビティ式仮設足場1の最上部の建枠部材2の前側の縦枠8の上端部に差し込まれた連結ピン13に嵌脱自在で上下方向に延設された丸パイプから成る基部支柱141L、基部支柱141Lの上端部に固着されたへの字状に曲がった丸パイプからなるアーム部材145L、アーム部材145Lの内、基部支柱141Lの上端からビティ仮設足場1の前方へ、への字状に延設されたアーム部145aの前端に固着された滑車取り付け部146、アーム部材145Lの内、基部支柱141Lの上端から斜め下後方へ延設された後方延設部145bの下端に装着されて建枠部材2の横枠4に着脱自在に締結可能なクランプ142、基部支柱141Lの下部に設けられたブレーキ部149L、基部支柱141Lの内、ブレーキ部149Lの上側とアーム部145a、後方延設部145bの途中に配設された補強部材147a、147bとから成る。アーム部145aは前側の2/3以上が斜め下向きに延設されている。基部支柱141L、アーム部材145L、補強部材147a、147bによりブラケットが構成されている。
荷降ろし補助具140Lをビティ式仮設足場1の最上部に設置する際、基部支柱141Lの下端部をビティ仮設足場1の最上部の建枠部材2の前側の縦枠8の上端部に差し込まれた連結ピン13に上方から嵌合し、後方延設部145bの下端のクランプ142を建枠部材2の横枠4に締結すれば良い(図35(2)参照)。
In the first and second embodiments described above, the case where the unloading assisting tool is attached to the upper end of the front vertical frame among the uppermost building frame members of the bite-type temporary scaffold is taken as an example. , Stand up detachably on the front vertical frame and horizontal frame of the uppermost building frame member of the Bitty temporary scaffold, or detachably stand on the front vertical frame and the rear vertical frame You may make it do.
For example, the unloading assisting tool 140L shown in FIG. A base column 141L made of a round pipe that is detachable from a connecting pin 13 inserted in the upper end of the vertical frame 8 on the front side of the upper building frame member 2 and extends vertically, and is fixed to the upper end of the base column 141L. Of the arm member 145L made of a round pipe bent into a bent shape, the arm member 145L of the arm member 145a extending from the upper end of the base column 141L to the front of the bite temporary scaffold 1 Of the pulley attachment portion 146 and the arm member 145L fixed to the front end, it is attached to the lower end of the rear extension portion 145b extending obliquely downward and rearward from the upper end of the base column 141L and attached to the horizontal frame 4 of the building frame member 2 Clutch that can be detachably fastened 142, the brake member 149L provided at the lower part of the base post 141L, and the reinforcing member 147a, 147b disposed in the middle of the upper part of the brake part 149L, the arm part 145a, and the rear extension part 145b, of the base post 141L Consists of. The arm part 145a is extended in an obliquely downward direction at 2/3 or more of the front side. A bracket is constituted by the base column 141L, the arm member 145L, and the reinforcing members 147a and 147b.
When the unloading assisting tool 140L is installed on the uppermost part of the bitty temporary scaffolding 1, the lower end of the base column 141L is inserted into the upper end of the vertical frame 8 on the front side of the building frame member 2 on the uppermost part of the temporary temporary scaffolding 1. The connecting pin 13 may be fitted from above and the clamp 142 at the lower end of the rearward extending portion 145b may be fastened to the horizontal frame 4 of the building frame member 2 (see FIG. 35 (2)).

図36は図35のクランプをカンヌキ構造に変更した荷降ろし補助具140Mを示し、後方延設部145bの下端部の左右両側にカンヌキ穴120の穿設された一対の固定板121が固着されている。横枠4を固定板121で挟み込み、横枠4の下面側で左右の固定板121のカンヌキ穴120にカンヌキ122を通すことで後方延設部145bの下端を横枠4に着脱自在に装着可能となっている。カンヌキ122はワイヤ123で固定板121に取着されている。固定板121はアーム部145aの旋回阻止部としての機能を有し、アーム部145aが左右方向へ旋回しようとしても固定板121が横枠4に当接して阻止される。   FIG. 36 shows an unloading assisting tool 140M in which the clamp of FIG. 35 is changed to a cannula structure, and a pair of fixing plates 121 having a cannula hole 120 are fixed to the left and right sides of the lower end part of the rear extension part 145b. Yes. The lower frame 145b can be detachably attached to the horizontal frame 4 by sandwiching the horizontal frame 4 with the fixing plate 121 and passing the cannula 122 through the cannula holes 120 of the left and right fixing plates 121 on the lower surface side of the horizontal frame 4. It has become. The cannula 122 is attached to the fixed plate 121 with a wire 123. The fixing plate 121 has a function as a turning prevention portion of the arm portion 145a, and even if the arm portion 145a tries to turn in the left-right direction, the fixing plate 121 abuts against the horizontal frame 4 and is prevented.

また、図37(1)の荷降ろし補助具140Nは最上部の建枠部材2の前側の縦枠8と後側の縦枠9の上に着脱自在に立設する例を示し、下端部がビティ式仮設足場1の最上部の建枠部材2の前側の縦枠8の上端部に差し込まれた連結ピン13に嵌脱自在で上下方向に延設された丸パイプから成る基部支柱141N、基部支柱141Nの上端部に固着された丸パイプからなるL字状のアーム部材145N、アーム部材145Nの内、基部支柱141Nの上端からビティ仮設足場1の前方へ延設されたアーム部145cの前端に固着された滑車取り付け部146、基部支柱141Nの下部に設けられたブレーキ部149N、基部支柱141Nの内、ブレーキ部149Nの上側とアーム部145c、アーム部材145Nの後方延設部145dの途中に配設された補強部材147c、147dとから成る。基部支柱141N、アーム部材145N、補強部材147c、147dによりブラケットが構成されている。アーム部材145Nの内、後方へ延設されたL字状の後方延設部145dの端部が鉛直方向に配設されて、建枠部材2の後側の縦枠9の上端部に差し込まれた連結ピン14に嵌脱自在に装着可能となっている。
荷降ろし補助具140Nをビティ式仮設足場1の最上部に設置する際、基部支柱141Nの下端部をビティ式仮設足場1の最上部の建枠部材2の前側の縦枠8の上端部に差し込まれた連結ピン13に上方から嵌合し、後方延設部145dの端部を建枠部材2の後側の縦枠9の上端部に差し込まれた連結ピン14に上方から嵌合すれば良い(図37(2)参照)。
37 (1) shows an example in which the unloading assisting tool 140N is detachably erected on the front vertical frame 8 and the rear vertical frame 9 of the uppermost building frame member 2, and the lower end portion is Base column 141N composed of a round pipe that is detachable from a connecting pin 13 inserted into the upper end of the vertical frame 8 on the front side of the uppermost building frame member 2 of the bite-type temporary scaffold 1 and that extends vertically. Of the L-shaped arm member 145N and arm member 145N made of a round pipe fixed to the upper end portion of the support post 141N, the front end of the arm portion 145c extending from the upper end of the base support post 141N to the front of the bite temporary scaffold 1 is provided. Among the fixed pulley mounting portion 146, the brake portion 149N provided at the lower portion of the base column 141N, and the base column 141N, the upper side of the brake portion 149N, the arm portion 145c, and the way of the rear extending portion 145d of the arm member 145N. Disposed in the reinforcing member 147c, consisting of 147d. A bracket is constituted by the base column 141N, the arm member 145N, and the reinforcing members 147c and 147d. Of the arm member 145N, an end portion of an L-shaped rearward extending portion 145d extending rearward is disposed in the vertical direction and is inserted into the upper end portion of the vertical frame 9 on the rear side of the building frame member 2. The connecting pin 14 can be detachably mounted.
When the unloading assisting tool 140N is installed on the uppermost part of the bitty temporary scaffold 1, the lower end of the base column 141N is inserted into the upper end of the vertical frame 8 on the front side of the building frame member 2 at the uppermost part of the bitty temporary scaffold 1 The connecting pin 13 is fitted from above, and the end of the rear extension 145d is fitted from above to the connecting pin 14 inserted into the upper end of the vertical frame 9 on the rear side of the building frame member 2. (See FIG. 37 (2)).

次に、図38、図39を参照して本発明の第3実施例を説明する。図38は本発明に係る荷降ろし方法を具現した荷降ろし補助具の使用状態を示す斜視図、図39は図38中の荷降ろし補助具の外観斜視図である。これらの図において、図2と同一の構成部分には同一の符号が付してある。
図38において、200はビル、マンションなどの建物、201は建物の前面側に設置された解体途中のビティ式仮設足場であり、地上から偶数段目の建枠部材の後側(建物側)の縦枠がアンカーボルト202により建物200の前面に仮固定されている。ビティ式仮設足場201の最上部のステージに建枠部材2が一脚立設されており、この建枠部材2の前側の縦枠8の上部に全体が鋼製の荷降ろし補助具240が着脱自在に装着されている。最上部のステージに載った作業員Aは荷降ろし補助具240に懸吊した滑車(この実施例では、フック首廻し式の滑車とする)90に荷降ろしロープ3を掛け、荷降ろし対象の建枠部材6を地上に荷降ろしする。荷降ろしロープ3は、麻ロープ、綿ロープなどの天然繊維系ロープ、ポリプロピレンロープ、ビニロンロープ(クレモナロープ)、ビニロンとポリエチレン、ビニロンとエステルなどの混撚ロープなどである。
Next, a third embodiment of the present invention will be described with reference to FIGS. 38 is a perspective view showing a use state of the unloading assisting tool embodying the unloading method according to the present invention, and FIG. 39 is an external perspective view of the unloading assisting tool in FIG. In these drawings, the same components as those in FIG. 2 are denoted by the same reference numerals.
In FIG. 38, reference numeral 200 denotes a building such as a building or a condominium, 201 denotes a temporary temporary scaffolding in the middle of dismantling installed on the front side of the building. A vertical frame is temporarily fixed to the front surface of the building 200 by anchor bolts 202. A building frame member 2 is erected on the uppermost stage of the temporary temporary scaffold 201, and a whole steel unloading auxiliary tool 240 is detachably attached to the upper part of the vertical frame 8 on the front side of the building frame member 2. It is attached to. The worker A on the uppermost stage hangs the unloading rope 3 on a pulley (in this embodiment, a hook-and-neck pulley) 90 suspended on an unloading assisting tool 240, and the building to be unloaded is built. The frame member 6 is unloaded onto the ground. The unloading rope 3 is a natural fiber rope such as a hemp rope or cotton rope, a polypropylene rope, a vinylon rope (Cremona rope), a blended rope such as vinylon and polyethylene, or vinylon and ester.

荷降ろし補助具240は、図39(1)、(2)の外観斜視図に示す如く、縦方向に延びた鋼製の角パイプからなる基部支柱41を有し、基部支柱41の背面側の上部及び下部に装着されたクランプ42及び係合爪143により、建枠部材2の前側の縦枠8に着脱自在に装着可能となっている。基部支柱41の上端に固着された鋼製の角パイプからなるアーム部245が前方斜め上方向きに延設されており(図41参照)、このアーム部245の前端近くと前端にU字状の滑車取り付け部46とガイドロープ取り付け部210が装着されている。滑車取り付け部46には滑車90を着脱自在に懸吊可能になっている。ガイドロープ取り付け部210にはガイドロープ211の一端側が取り付けられたフック212が着脱自在に懸吊されている。ガイドロープ211は荷降ろし中の建枠部材等がビティ式仮設足場1の前面に衝突しないようにするためのものである。アーム部245の上面で滑車取り付け部46の近くに半円環状の吊持ロープ止め部213、アーム部245の上面の基部寄りに前後一対の前向き及び後ろ向きのL字状の吊持ロープ掛け部(吊持ロープ掛けフック)214、215が固着されている。建物200の屋上に一端側を固定した吊持ロープ216の途中を吊持ロープ止め部213に嵌装したカラビナ217に挿通して掛装したのち、吊持ロープ掛け部214、215に8の字状などに巻き掛けて掛け止めることで、荷降ろし補助具240の装着された建枠部材2が荷降ろし部材の重量で前方へ傾斜するのを防止する。吊持ロープ止め部213、吊持ロープ掛け部214、215は吊持ロープ装着部の一例を成す。
アーム部245の下面の途中と基部支柱41の下端部の前面側との間には鋼製の補強部材47が斜め方向に固着されている。基部支柱41、クランプ42、係合爪143、アーム部245、補強部材47によりブラケットが形成されている。基部支柱41はブラケットの基部を成し、アーム部245の前端がブラケットの前端となる。
The unloading assisting tool 240 has a base column 41 made of a steel square pipe extending in the vertical direction as shown in the external perspective views of FIGS. 39 (1) and (2). The clamp 42 and the engaging claw 143 attached to the upper part and the lower part can be detachably attached to the front vertical frame 8 of the building frame member 2. An arm portion 245 made of a steel square pipe fixed to the upper end of the base column 41 extends obliquely upward and forward (see FIG. 41), and has a U-shape near the front end of the arm portion 245 and at the front end. A pulley attachment portion 46 and a guide rope attachment portion 210 are attached. A pulley 90 can be detachably suspended from the pulley mounting portion 46. A hook 212 to which one end side of the guide rope 211 is attached is detachably suspended from the guide rope attaching portion 210. The guide rope 211 is used to prevent a building frame member or the like being unloaded from colliding with the front surface of the bite-type temporary scaffold 1. A semi-circular suspension rope stopper 213 near the pulley mounting portion 46 on the upper surface of the arm portion 245, and a pair of front and rear L-shaped suspension rope hooks (near the base of the upper surface of the arm portion 245) Suspension rope hooks 214, 215 are fixed. After the suspension rope 216 having one end fixed on the roof of the building 200 is inserted into the carabiner 217 fitted to the suspension rope stopper 213 and is hooked, the suspension rope hooks 214 and 215 are shaped like eight characters. The building frame member 2 to which the unloading assisting tool 240 is attached is prevented from being inclined forward by the weight of the unloading member by being wrapped around the shape or the like. The suspension rope stopper 213 and the suspension rope hooks 214 and 215 form an example of a suspension rope mounting portion.
A steel reinforcing member 47 is fixed obliquely between the middle of the lower surface of the arm portion 245 and the front side of the lower end portion of the base column 41. A bracket is formed by the base column 41, the clamp 42, the engaging claw 143, the arm portion 245, and the reinforcing member 47. The base column 41 forms the base of the bracket, and the front end of the arm portion 245 is the front end of the bracket.

基部支柱41の上端部の前側(クランプ42とは反対側)には、鋼製の巻き掛け式のブレーキ部49が装着されている。このブレーキ部49は荷降ろしロープ3を巻き掛けて摩擦によるブレーキを掛けるためのものである。ブレーキ部49の内、50は荷降ろしロープ3が巻き掛けられるブレーキドラムとしての円筒状の胴部であり、中心軸が左右方向に水平に配設されている。51と52は胴部50の両端に装着された円環状のストッパであり、胴部50の外周表面に巻き掛けられた荷降ろしロープ3が胴部50から外れないようにする。53と54は胴部50の軸方向の中央を基部支柱41の前面側の上端近くに固着する固着プレートである。胴部50は基部支柱41の背面側から見て左右両側に延設されており、作業員は胴部50の左側部分または右側部分に荷降ろしロープ3を巻く掛ことができる。   On the front side of the upper end portion of the base column 41 (on the side opposite to the clamp 42), a steel-wound brake portion 49 is mounted. The brake portion 49 is used to wrap the unloading rope 3 and apply a brake by friction. Among the brake parts 49, 50 is a cylindrical body part as a brake drum around which the unloading rope 3 is wound, and the central axis is disposed horizontally in the left-right direction. Reference numerals 51 and 52 denote annular stoppers attached to both ends of the trunk portion 50 so that the unloading rope 3 wound around the outer peripheral surface of the trunk portion 50 does not come off from the trunk portion 50. Reference numerals 53 and 54 denote fixing plates for fixing the axial center of the body portion 50 near the upper end on the front side of the base column 41. The trunk portion 50 is extended on both the left and right sides when viewed from the back side of the base column 41, and an operator can hang the unloading rope 3 on the left side portion or the right side portion of the trunk portion 50.

基部支柱41の上端部には後方に向けて旋回阻止部としてのフック55が固着されている。フック55は後端部が下向きU字状に湾曲されており、建枠部材2の上部の横枠4に嵌合させることで荷降ろし補助具240を構成するブラケットが左右に旋回しようとしても、フック55が横枠4に当接して旋回を阻止する。   A hook 55 as a turning prevention portion is fixed to the upper end portion of the base column 41 toward the rear. The hook 55 has a rear end curved downward in a U-shape, and even when the bracket constituting the unloading assisting tool 240 is turned to the left and right by fitting into the horizontal frame 4 at the top of the building frame member 2, The hook 55 comes into contact with the horizontal frame 4 to prevent the turning.

基部支柱41の下部の左右両側面には、上下一対の上向き及び下向きのL字状のロープ掛け部(ロープ掛けフック)156と157、158と159が固着されている。ロープ掛け部156と157、または158と159は荷降ろしロープ3を8の字状などに巻き掛けて掛け止めることで、荷降ろしロープ3の移動を一時的に拘束するロープ掛け止め部としての機能を有する。ロープ掛け部156と157、または158と159へ荷降ろしロープ3を掛け止めることで、荷降ろしロープ3から両手を離しても荷降ろしロープ3が移動せず、荷降ろしの準備をする際、両手を使って荷降ろし対象の建枠部材6を荷降ろしロープ3の輪部5または輪部7へ掛けたり、輪部5または輪部7に掛けた荷降ろし対象の建枠部材6を足場ステージから前方へ投下したりする作業を行なえる。   A pair of upper and lower L-shaped rope hooks (rope hooks) 156 and 157, 158 and 159 are fixed to the left and right side surfaces of the lower portion of the base column 41. The rope hanging portions 156 and 157 or 158 and 159 function as a rope hanging portion that temporarily restrains the movement of the unloading rope 3 by hanging the unloading rope 3 around the shape of figure 8, etc. Have By holding the unloading rope 3 on the rope hanging portions 156 and 157 or 158 and 159, the unloading rope 3 does not move even if both hands are released from the unloading rope 3, and both hands are used when preparing for unloading. The unloading target building frame member 6 is hung on the ring part 5 or the ring part 7 of the unloading rope 3, or the unloading target building frame member 6 hung on the ring part 5 or the ring part 7 from the scaffolding stage. You can drop it forward.

図38、図40乃至図43は上記した荷降ろし補助具240による荷降ろし方法の説明図、図44乃至図48は荷降ろし補助具240の付け替え方法の説明図であり、以下、これらの図を参照して上記した実施例の作用を説明する。
図40に示す如く、予めビティ式仮設足場201の最上部のステージに1つ立脚された建枠部材2の前側の縦枠8の上端近くに荷降ろし補助具240が装着済みであるとする。具体的には、基部支柱41の背面下側の係合爪143を縦枠8に係合し、フック55を横枠4に嵌合したのち基部支柱41の背面上側に装着されたクランプ42により、縦枠8に着脱自在に締結してある。滑車取り付け部46には荷降ろし用の滑車90が懸吊してある。また、半円環状の吊持ロープ止め部213の穴に嵌着したカラビナ217に建物200の屋上に一端が固定された吊持ロープ216を通し、この吊持ロープ216を張った状態で吊持ロープ掛け部214、215に巻き掛けて仮固定することにより、荷降ろし補助具240のアーム部245が吊持してある。吊持ロープ216の他端側は建枠部材2の後側(建物側)の縦枠9の上端に掛けたのち下方へ垂らしてある。ビティ式仮設足場201を解体する場合、未解体部分の最上部のステージに近いアンカーボルト(図40の符号202A)を作業員Cが先行して取り外し、ボルト穴の穴埋め作業を済ませておく。このため、荷降ろし補助具240に荷降ろし対象部材の荷重が掛かったとき、建枠部材2が前方に傾斜し易くなるが、荷降ろし補助具240のアーム部245が吊持ロープ216に吊持されることで、前傾が抑制される。また、ガイドロープ取り付け部210にはフック212が懸吊してあり、このフック212に上端が取り付けられたガイドロープ211の下側が地上まで垂らされて、地上の作業員Bにより斜め前下方向に張った状態で地上に設置した重量物218に固定されている。重量物218はガイドロープ取り付け部210の直下より少し前方に置かれている。
FIGS. 38 and 40 to 43 are explanatory diagrams of the unloading method by the unloading assisting tool 240 described above, and FIGS. 44 to 48 are explanatory diagrams of the replacement method of the unloading assisting tool 240, which will be described below. The operation of the above embodiment will be described with reference to FIG.
As shown in FIG. 40, it is assumed that the unloading assisting tool 240 has been mounted in the vicinity of the upper end of the vertical frame 8 on the front side of the building frame member 2 that is preliminarily placed on the uppermost stage of the bitty-type temporary scaffold 201. Specifically, the engaging claw 143 on the lower back side of the base column 41 is engaged with the vertical frame 8, and the hook 55 is fitted to the horizontal frame 4, and then the clamp 42 mounted on the upper back side of the base column 41. It is fastened to the vertical frame 8 so as to be detachable. A pulley 90 for unloading is suspended from the pulley mounting portion 46. Further, a suspension rope 216 having one end fixed to the roof of the building 200 is passed through a carabiner 217 fitted in a hole of the semi-circular suspension rope stopper 213, and the suspension rope 216 is suspended in a stretched state. The arm portion 245 of the unloading assisting tool 240 is suspended by being wound around the rope hanging portions 214 and 215 and temporarily fixed. The other end side of the suspension rope 216 is hung down after being hung on the upper end of the vertical frame 9 on the rear side (building side) of the building frame member 2. When disassembling the bite-type temporary scaffold 201, the worker C first removes the anchor bolt (reference numeral 202A in FIG. 40) near the uppermost stage of the undisassembled portion, and completes the bolt hole filling work. For this reason, when a load of the unloading target member is applied to the unloading assisting tool 240, the building frame member 2 is easily inclined forward, but the arm portion 245 of the unloading assisting tool 240 is suspended by the suspension rope 216. By doing so, forward tilt is suppressed. A hook 212 is suspended from the guide rope attaching portion 210, and the lower side of the guide rope 211 having the upper end attached to the hook 212 is hung down to the ground. It is fixed to a heavy object 218 installed on the ground in a stretched state. The heavy object 218 is placed slightly forward from directly below the guide rope attachment part 210.

最上部のステージに配置した作業員Aは両手に皮手袋を嵌めた状態で、荷降ろしロープ3を滑車90に掛けるとともに、荷降ろしロープ3の手元側をブレーキ部49の胴部50の外周表面に約1/4周乃至数周だけ巻き掛ける(胴部50への巻き掛け量は、吊り荷の重量、地上から滑車90までの距離などにより調節する)。更に、胴部50の下側の上昇側ロープ3bをロープ掛け部158と159(またはロープ掛け部156と157)に8の字状に巻き掛けて掛け止め、上昇移動を一時的に拘束しておく。次に、滑車90から垂れ下がった下降側ロープ3aの下端の荷側端部としての輪部5に嵌装された2つのカラビナ219、220の内の一方のカラビナ220に玉掛けロープ221を介して荷降ろし対象の建枠部材6を吊持させる。そして、両手で荷降ろし対象の建枠部材6を足場ステージから前方へ投下する。この際、アーム部245が斜め上方に向いており、滑車90の位置が高くなっているので、輪部5に吊した建枠部材6の下端が作業員Aの配置した足場ステージ24、25にぶつかり難くなり、建枠部材6の取り扱いが容易となる。荷降ろしロープ3の移動が拘束されているため投下された建枠部材6は荷降ろしロープ3を介して滑車90に吊支されてまだ降下はしない。次に、下降側ロープ3aの輪部5に嵌装された他方のカラビナ219にガイドロープ211を挿通して懸装させる(図41参照)。   The worker A placed on the uppermost stage hangs the unloading rope 3 on the pulley 90 with leather gloves fitted on both hands, and the hand side of the unloading rope 3 is the outer peripheral surface of the trunk portion 50 of the brake portion 49. (The amount of wrapping around the body 50 is adjusted by the weight of the suspended load, the distance from the ground to the pulley 90, etc.). Further, the lower side rope 3b on the lower side of the body part 50 is wrapped around the rope hooks 158 and 159 (or the rope hooks 156 and 157) in the shape of figure 8 to temporarily restrain the upward movement. deep. Next, the load is applied to one of the two carabiners 219 and 220 fitted to the ring portion 5 as the load side end portion of the lower end rope 3a hanging from the pulley 90 via the sling rope 221. The building frame member 6 to be lowered is suspended. Then, the building frame member 6 to be unloaded with both hands is dropped forward from the scaffold stage. At this time, since the arm portion 245 is directed obliquely upward and the position of the pulley 90 is high, the lower end of the building frame member 6 suspended from the wheel portion 5 is placed on the scaffold stages 24 and 25 arranged by the worker A. It becomes difficult to collide, and handling of the building frame member 6 becomes easy. Since the movement of the unloading rope 3 is restricted, the dropped building frame member 6 is suspended by the pulley 90 via the unloading rope 3 and has not yet been lowered. Next, the guide rope 211 is inserted and suspended in the other carabiner 219 fitted to the ring portion 5 of the descending rope 3a (see FIG. 41).

次に、上昇側ロープ3bをロープ掛け部158と159(またはロープ掛け部156と157)から外し、ブレーキ部49から垂れ下がった上昇側ロープ3bの上昇移動を拘束しないように皮手袋をした手で支持しながら建枠部材6を地上に落下させる。建枠部材6の降下速度が上がると、胴部50に巻き掛けられた荷降ろしロープ3は遠心力で胴部50の半径方向外側に膨らんだ大きな円弧(または円)を描き、拡径しながら移動するので胴部50の表面に殆ど接触しないか、胴部50の表面に対し比較的小さな押圧力で軽く接触するだけであり、摩擦力が殆ど生じないか小さな摩擦力が発生するだけで、円滑に建枠部材6は落下する。滑車90がビティ式仮設足場201の前面より前方に離れており、また、下降側ロープ3aの輪部5がカラビナ219を介してガイドロープ211により前方へ引っ張られるので、荷降ろし中の建枠部材6とビティ式仮設足場201の前面との間に大きな距離があき、建枠部材6がビティ仮設足場201の前面に衝突する恐れがなくなり、上昇側ロープ3bの輪部7に引っ掛かる恐れも一層少なくなる。従って、作業員Aは荷降ろし中の建枠部材6がビティ仮設足場201の前面に衝突しないように下降側ロープ3aを前方に押す必要がなく、上昇側ロープ3bを手で制御して下端の輪部7が荷降ろし中の建枠部材6に引っ掛からないように注意するだけでよく、作業性が極めて良好となる(図42参照)。   Next, remove the ascending rope 3b from the rope hooks 158 and 159 (or the rope hooks 156 and 157) and put on leather gloves so as not to restrain the ascending movement of the ascending rope 3b hanging from the brake part 49. The building frame member 6 is dropped to the ground while being supported. When the descent speed of the building frame member 6 increases, the unloading rope 3 wound around the trunk portion 50 draws a large arc (or circle) that swells radially outward of the trunk portion 50 by centrifugal force, while expanding the diameter. Since it moves, it hardly touches the surface of the body part 50, or only makes a light contact with the surface of the body part 50 with a relatively small pressing force, and little or no frictional force is generated. The building frame member 6 falls smoothly. Since the pulley 90 is farther forward than the front surface of the bitty temporary scaffold 201 and the ring portion 5 of the descending rope 3a is pulled forward by the guide rope 211 via the carabiner 219, the building frame member being unloaded 6 and the front surface of the bite-type temporary scaffold 201, there is no risk of the building frame member 6 colliding with the front surface of the bity temporary scaffold 201, and there is less risk of being caught by the ring portion 7 of the ascending rope 3b. Become. Therefore, the worker A does not need to push the lowering rope 3a forward so that the building frame member 6 being unloaded does not collide with the front surface of the temporary temporary scaffold 201. It is only necessary to be careful not to catch the ring portion 7 on the building frame member 6 being unloaded, and workability is extremely good (see FIG. 42).

建枠部材6が地上に近づいたところで、作業員Aが上昇側ロープ3bを皮手袋をした両手または片手で掴み、上方移動を少し拘束すると、ブレーキ部49の固定の胴部50に巻き掛けられた荷降ろしロープ3が締まって縮径し、胴部50の表面に大きな押圧力で接触して大きな摩擦力が生じ、ブレーキが掛かる。これにより、上昇側ロープ3bを強く握らなくても建枠部材6をゆっくり地上に降ろすことができる。
地上の作業員Bは荷降ろしロープ3の輪部5に嵌装したカラビナ219からガイドロープ211を外し、更にカラビナ220から玉掛けロープ221を外して建枠部材6を荷降ろしロープ3から外し、空きスペースに積み上げればよい(図43参照)。
一回分の荷降ろし後、作業員Aは荷降ろしロープ3の上昇側ロープ3bをブレーキ部49から外し、滑車90をフック首を軸にして180度回転し、荷降ろしロープ3の上昇側と下降側を入れ替えたのち(輪部7にもカラビナ223、224が嵌装されており、カラビナ224には玉掛けワイヤ225が吊持されている。)、同様の作業を繰り返して他の足場部材(建枠部材、足場ステージなど)を荷降ろしする。
When the building frame member 6 approaches the ground, when the worker A grasps the ascending rope 3b with both hands or one hand wearing leather gloves and restrains the upward movement a little, the worker A is wound around the fixed body portion 50 of the brake portion 49. The unloading rope 3 is tightened to reduce the diameter, and is brought into contact with the surface of the body portion 50 with a large pressing force, so that a large frictional force is generated and a brake is applied. Thereby, the building frame member 6 can be slowly lowered to the ground without strongly grasping the ascending rope 3b.
The worker B on the ground removes the guide rope 211 from the carabiner 219 fitted to the ring portion 5 of the unloading rope 3, further removes the sling rope 221 from the carabiner 220, unloads the building frame member 6 from the unloading rope 3, and is free. What is necessary is just to pile up in a space (refer FIG. 43).
After one unloading, the worker A removes the ascending rope 3b of the unloading rope 3 from the brake portion 49, rotates the pulley 90 180 degrees around the hook neck, and descends with the ascending side of the unloading rope 3. After the sides are replaced (carabiners 223 and 224 are also fitted to the ring portion 7 and the slinging wire 225 is suspended on the carabiner 224), the same operation is repeated and another scaffold member (building) Unload frame members, scaffolding stage, etc.

荷降ろし補助具240の設置場所をビティ式仮設足場201の一段下に付け替えたい場合、地上の作業員Bは重量物218とガイドロープ211の固定を外す。ビティ式仮設足場201の最上部のステージの作業員Aは荷降ろしロープ3の一端側の輪部5(または輪部7)をロープ掛け部159(または157)に掛けて落ちないようにし、吊持ロープ216を吊持ロープ掛け部214、215から外す(図44参照)。そして、クランプ42を建枠部材2の縦枠8から外すとともに基部支柱41を少し上方へ移動してフック55を横枠4から外すことで、荷降ろし補助具240を建枠部材2から取り外す(図45参照)。そして、図46に示すように、一段下の建枠部材10に対し、基部支柱41の係合爪143を前側の縦枠11に係合し、フック55を建枠部材10の横枠23に嵌合したのち基部支柱41に装着されたクランプ42により縦枠11に締結して付け替えれば良い。
あとは建枠部材10を残して、建枠部材2と作業員Aが前回配置したステージの足場ステージ24、25や他の建枠部材を外し、前回荷降ろししたステージの一段下のステージに置く(図47参照)。次に、カラビナ217に通された吊持ロープ216を張った状態で吊持ロープ掛け部214、215に巻き掛けて仮固定することにより荷降ろし補助具240を吊持し(図48参照)、前述と同様にして、今回外した足場部材を地上に降ろす。
When it is desired to change the installation location of the unloading assisting tool 240 to one level below the bitty-type temporary scaffold 201, the worker B on the ground removes the fixing of the heavy object 218 and the guide rope 211. The worker A on the uppermost stage of the bite-type temporary scaffold 201 hangs the ring part 5 (or ring part 7) on one end side of the unloading rope 3 on the rope hook part 159 (or 157) so as not to fall. The holding rope 216 is removed from the hanging rope hooks 214 and 215 (see FIG. 44). Then, the unloading aid 240 is removed from the building frame member 2 by removing the clamp 42 from the vertical frame 8 of the building frame member 2 and moving the base column 41 slightly upward to remove the hook 55 from the horizontal frame 4 ( (See FIG. 45). 46, the engaging claw 143 of the base column 41 is engaged with the front vertical frame 11 and the hook 55 is attached to the horizontal frame 23 of the building frame member 10 with respect to the building frame member 10 one step below. After fitting, the clamp 42 attached to the base column 41 may be fastened to the vertical frame 11 and replaced.
After that, leaving the building frame member 10, remove the scaffolding stages 24, 25 and other building frame members of the stage previously placed by the building frame member 2 and the worker A, and place them on the stage one stage below the stage unloaded last time. (See FIG. 47). Next, the unloading auxiliary tool 240 is suspended by suspending the suspension rope 216 passed through the carabiner 217 and temporarily fixing the suspension rope hooks 214 and 215 by winding them (see FIG. 48). In the same manner as described above, the scaffold member removed this time is lowered to the ground.

この第3実施例によれば、ビティ式仮設足場201の最上部のステージに立脚した建枠部材2の内、前側の縦枠8の上端部に着脱自在に設置した荷降ろし補助具240を用いて足場部材をビティ式仮設足場201の前面に衝突させることなく円滑に荷降ろしできる。具体的には、荷降ろし補助具240の前端から地上近くまで垂らしたガイドロープ211を地上の作業員Bが斜め前下方向へ引っ張って重量物218に固定しておく。ビティ式仮設足場201の最上部のステージに配置した作業員Aは両手に皮手袋を嵌めて、荷降ろし補助具240の前端近くの滑車取り付け部46に懸吊した滑車90に荷降ろしロープ3を巻き掛け、ブレーキ部49の胴部50にも約1/4周乃至数周だけ巻き掛ける。更に、胴部50の下側の荷降ろしロープ3をロープ掛け部158、159(または156、157)に巻き掛けて移動を一時的に拘束する。そして、両手を荷降ろしロープ3から離し、最上部のステージ上において、滑車90から垂れ下がった下降側ロープ3aの一端側の輪部5に嵌装したカラビナ220に玉掛けワイヤ221を介して荷降ろし対象の建枠部材6を吊持させ、輪部5に吊持させた荷降ろし対象の建枠部材6を前方へ投下する。この際、アーム部245が斜め上方に向いており、滑車90の位置が高くなっているので、輪部5に吊持した建枠部材6の下端が作業員Aの配置した足場ステージ24、25にぶつかり難くなり、建枠部材6の取り扱いが容易となる。荷降ろしロープ3の移動が拘束されているため投下された建枠部材6は荷降ろしロープ3を介して滑車90に吊支されてまだ降下はしない。次に、下降側ロープ3aの輪部5に嵌装された他方のカラビナ219にガイドロープ211を挿通して懸装させる。
次に、上昇側ロープ3bをロープ掛け部158と159(または156と157)から外し、ブレーキ部49から垂れ下がった上昇側ロープ3bの上昇移動を拘束しないように皮手袋をした手で支持しながら建枠部材6を地上に落下させる。建枠部材6の降下速度が上がると、胴部50に巻き掛けられた荷降ろしロープ3は遠心力で半径方向外側に膨らんだ大きな円弧(または円)を描き、拡径しながら移動するので胴部50の表面に殆ど接触しないか、胴部50の表面に対し比較的小さな押圧力で軽く接触するだけであり、摩擦力が殆ど生じないか小さな摩擦力が発生するだけで、円滑に建枠部材6は落下する。滑車90がビティ式仮設足場201の前面より前方に離れており、また、建枠部材6が懸吊される下降側ロープ3aの輪部5がガイドロープ211により前方に引っ張られるので、荷降ろし中の建枠部材6とビティ式仮設足場201の前面との間に大きな距離があき、建枠部材6がビティ式仮設足場201の前面に衝突する恐れがなくなり、輪部7に引っ掛かる恐れも一層少なくなる。従って、作業員Aは荷降ろし中の建枠部材6がビティ式仮設足場201の前面に衝突しないように下降側ロープ3aを前方に押す必要がなく、上昇側ロープ3bを手で制御して下端の輪部7が荷降ろし中の建枠部材6に引っ掛からないように注意するだけでよく、作業性が極めて良好となる。
According to the third embodiment, the unloading assisting tool 240 detachably installed at the upper end of the front vertical frame 8 out of the building frame member 2 standing on the uppermost stage of the bite-type temporary scaffold 201 is used. Thus, the scaffold member can be unloaded smoothly without colliding with the front surface of the bitty temporary scaffold 201. Specifically, the operator B on the ground pulls the guide rope 211 hung from the front end of the unloading assisting tool 240 to near the ground, and fixes it to the heavy object 218 in a diagonally forward and downward direction. The worker A placed on the uppermost stage of the bitty temporary scaffold 201 puts unloading rope 3 on the pulley 90 suspended on the pulley mounting portion 46 near the front end of the unloading assisting tool 240 by putting leather gloves on both hands. Wind around the trunk portion 50 of the brake portion 49 for about ¼ to several turns. Further, the unloading rope 3 below the trunk portion 50 is wound around the rope hooks 158 and 159 (or 156 and 157) to temporarily restrain the movement. Then, both hands are separated from the unloading rope 3 and are unloaded via the sling wires 221 on the carabiner 220 fitted to the ring portion 5 on one end side of the descending rope 3a hanging from the pulley 90 on the uppermost stage. The building frame member 6 is suspended, and the building frame member 6 to be unloaded, which is suspended by the ring portion 5, is dropped forward. At this time, since the arm portion 245 is directed obliquely upward and the position of the pulley 90 is high, the scaffold stages 24 and 25 in which the lower end of the building frame member 6 suspended on the wheel portion 5 is arranged by the worker A are disposed. It becomes difficult to hit, and handling of the building frame member 6 becomes easy. Since the movement of the unloading rope 3 is restricted, the dropped building frame member 6 is suspended by the pulley 90 via the unloading rope 3 and has not yet been lowered. Next, the guide rope 211 is inserted and suspended in the other carabiner 219 fitted to the ring portion 5 of the descending rope 3a.
Next, remove the ascending rope 3b from the rope hooks 158 and 159 (or 156 and 157) and support it with hands wearing leather gloves so as not to restrain the ascending movement of the ascending rope 3b hanging from the brake part 49. The building frame member 6 is dropped on the ground. When the descent speed of the building frame member 6 increases, the unloading rope 3 wound around the trunk portion 50 draws a large arc (or circle) swelled radially outward by centrifugal force, and moves while expanding in diameter. The frame 50 is hardly in contact with the surface of the portion 50 or only lightly contacts the surface of the body portion 50 with a relatively small pressing force. The member 6 falls. Since the pulley 90 is separated forward from the front surface of the bite-type temporary scaffold 201 and the ring portion 5 of the descending rope 3a on which the building frame member 6 is suspended is pulled forward by the guide rope 211, the unloading is being performed. There is a large distance between the building frame member 6 and the front surface of the bite-type temporary scaffold 201, so that the building frame member 6 does not collide with the front surface of the bity-type temporary scaffold 201 and is less likely to be caught by the ring portion 7. Become. Therefore, the worker A does not need to push the lowering rope 3a forward so that the building frame member 6 being unloaded does not collide with the front surface of the bitty temporary scaffold 201, and the lower end of the lower end is controlled by hand. It is only necessary to take care that the ring portion 7 is not caught by the building frame member 6 being unloaded, and workability is extremely good.

建枠部材6が地上に近づいたところで、胴部50の下側の上昇側ロープ3bを皮手袋をした両手または片手で掴み、上方移動を少し拘束する。すると、ブレーキ部49に巻き掛けられた荷降ろしロープ3が締まって縮径し、胴部50の表面に大きな押圧力で接触して大きな摩擦力が生じ、ブレーキが掛かる。これにより、上昇側ロープ3bを強く握らなくても建枠部材6をゆっくり地上に降ろすことができる。
従って、作業者Aの身体的負担が軽減し、また皮手袋と上昇側ロープ3aとの間の摩擦熱は小さく、火傷する恐れがなくなり、作業の中断や遅延が生じ難く作業性が改善する。また皮手袋の損傷も少なく経済的となる。また、手に皮手袋だけ嵌めればよいので、厚くならず、これによっても作業性が改善する。また、ブレーキを掛けるときに下降側ロープ3aと上昇側ロープ3bの両方をまとめて握らなくて良いので、荷降ろし対象の建枠部材6に上昇側ロープ3bが引っ掛かる恐れが少なくなる。
また、荷降ろし補助具240の建枠部材2への設置は、基部支柱41の係合爪143を前側の縦枠8に係合し、フック55を横枠4に嵌合したのち基部支柱41に装着されたクランプ42により縦枠8に締結するだけでよく、簡単な作業で済む。
また、基部支柱41の上端部に固着したフック55を横枠4に嵌合させることで、荷降ろし補助具240が左右に旋回しようとしても、フック55が横枠4に当接して旋回を阻止することができ、荷降ろし補助具240が不用意に旋回しないように、向きを簡単な構造で固定することができる。
また、荷降ろし補助具240に荷降ろし対象部材の荷重が掛かったとき、建枠部材2が前方に傾斜し易くなるが、荷降ろし補助具240のアーム部245が吊持ロープ216に吊持されているので、建枠部材2の前傾やビティ式仮設足場201からの離脱が抑制される。
When the building frame member 6 comes close to the ground, the lower side rope 3b on the lower side of the trunk portion 50 is grasped with both hands or one hand wearing leather gloves, and the upward movement is restrained a little. Then, the unloading rope 3 wound around the brake part 49 is tightened to reduce the diameter, and a large frictional force is generated by contacting the surface of the body part 50 with a large pressing force, and the brake is applied. Thereby, the building frame member 6 can be slowly lowered to the ground without strongly grasping the ascending rope 3b.
Accordingly, the physical burden on the worker A is reduced, the frictional heat between the leather gloves and the ascending rope 3a is small, there is no risk of burns, and work interruptions and delays are unlikely to occur and workability is improved. Moreover, the leather gloves are less damaged and economical. Moreover, since only a leather glove should just fit in a hand, it does not become thick but this also improves workability | operativity. Further, since it is not necessary to hold both the descending rope 3a and the ascending rope 3b together when the brake is applied, the risk of the ascending rope 3b being caught by the building frame member 6 to be unloaded is reduced.
The unloading assisting tool 240 is installed on the building frame member 2 by engaging the engaging claws 143 of the base column 41 with the front vertical frame 8 and fitting the hook 55 with the horizontal frame 4. It is only necessary to fasten it to the vertical frame 8 by the clamp 42 attached to the, so that a simple operation is sufficient.
Further, by fitting the hook 55 fixed to the upper end of the base column 41 to the horizontal frame 4, even if the unloading assisting tool 240 tries to turn left and right, the hook 55 abuts against the horizontal frame 4 to prevent the turning. The direction can be fixed with a simple structure so that the unloading aid 240 does not turn carelessly.
Further, when a load of the unloading target member is applied to the unloading assisting tool 240, the building frame member 2 is easily inclined forward, but the arm portion 245 of the unloading assisting tool 240 is suspended by the suspension rope 216. Therefore, the building frame member 2 is prevented from being tilted forward and detached from the bite-type temporary scaffold 201.

なお、上記した第3実施例では、アーム部は前方斜め上向きに延設した例を示したが、本発明は何らこれに限定されず、アーム部を前方へ水平に延設するようにしても良い。
また、基部支柱の背面側の下部に係合爪を固着した例を挙げたが、係合爪を基部支柱背面側の上部と同じクランプに置き換えても良い。
また、一対のロープ掛け部を基部支柱の左右両側に設ける代わりに、補強部材の左右両側に設けるようにしても良い。
また、上側のロープ掛け部(図39の符号156、158)を省略し、下側のロープ掛け部(図39の符号157、159)だけ残し、胴部に巻き掛けた荷降ろしロープの内、胴部下側の上昇側ロープを下側のロープ掛け部に巻き掛けたあと、再度胴部に巻き掛けることで、一時的に上昇移動を拘束するようにしても良い。
また、旋回防止用のフックを省略するようにしても良い。
In the third embodiment described above, an example is shown in which the arm portion extends obliquely upward in the forward direction. However, the present invention is not limited to this, and the arm portion may be extended horizontally in the forward direction. good.
Moreover, although the example which fixed the engaging claw to the lower part of the back side of a base support | pillar was given, you may replace an engaging claw with the same clamp as the upper part of a base support | pillar back side.
Moreover, you may make it provide a pair of rope hook part in the right-and-left both sides of a reinforcement member instead of providing in the right-and-left both sides of a base support | pillar.
Also, the upper rope hanging portion (reference numerals 156 and 158 in FIG. 39) is omitted, and only the lower rope hanging portion (reference numerals 157 and 159 in FIG. 39) is left, and among the unloading ropes wound around the trunk portion, The ascending movement may be temporarily constrained by winding the ascending rope on the lower side of the trunk part around the lower rope hook part and then winding it again on the trunk part.
Further, the hook for preventing turning may be omitted.

また、上記した第3実施例では、荷降ろし補助具をビティ式仮設足場の建枠部材に設置するタイプとした場合を説明したが、図39の第3実施例の荷降ろし補助具240の内、基部支柱41の背面上側のクランプ42に代えてクサビ部を固着した構成とし、クサビ緊結式仮設足場の建地支柱に設置するタイプとしても良い(図23、図24参照)。この場合、基部支柱の背面側のクサビ部と係合爪の間に、建地支柱と着脱自在なクランプを装備しても良い。   Further, in the third embodiment described above, the case where the unloading assisting device is of a type installed on the building frame member of the bitty temporary scaffold has been described. However, the unloading assisting device 240 of the third embodiment of FIG. Instead of the upper clamp 42 on the back side of the base column 41, a wedge portion may be fixed and installed on the building column of the wedge-tight temporary scaffold (see FIGS. 23 and 24). In this case, the building strut and the detachable clamp may be provided between the wedge portion on the back side of the base strut and the engaging claw.

また、上記した第3実施例では、巻き掛け式のブレーキ部を基部支柱の前面側の上端部に装備した例を示したが、基部支柱の前面側の下端部に装備しても良い。或いは、アーム部の内、基部支柱寄りの箇所に装備するようにしたり、アーム部と基部支柱の間に固着された補強部材の内、基部支柱寄りの箇所に装備するようにしても良い(図25参照)。   Further, in the third embodiment described above, the example in which the winding type brake portion is provided on the upper end portion on the front side of the base column is shown, but it may be provided on the lower end portion on the front side of the base column. Alternatively, the arm portion may be equipped near the base column, or the reinforcing member fixed between the arm portion and the base column may be equipped near the base column. 25).

また、上記した第3実施例では、ブレーキ部の鋼製の胴部の外周表面と荷降ろしロープの接触で生じる摩擦力でブレーキが掛かるようにしたが、図13乃至図15または図26乃至図28と同様にして、胴部の外周表面の全部または一部を覆うようにして、ロープ、皮シート、ゴムシート、布シート等の摩擦部材を胴部の表面に装着し、鋼製の胴部表面と比較してより大きな摩擦力が生じるようにしても良い。   Further, in the third embodiment described above, the brake is applied by the frictional force generated by the contact between the outer peripheral surface of the steel body portion of the brake portion and the unloading rope, but FIG. 13 to FIG. 15 or FIG. 26 to FIG. 28, a friction member such as a rope, a leather sheet, a rubber sheet, or a cloth sheet is attached to the surface of the body so as to cover all or a part of the outer peripheral surface of the body, and the steel body A larger frictional force than the surface may be generated.

また、上記した第3実施例では、アーム部の前部(前端近く)に装着した滑車取り付け部に滑車を懸吊し、荷降ろしロープを滑車に巻き掛けたのち、ブレーキ部の胴部に巻き掛けるようにしたが、アーム部の前部(前端近く)に滑車取り付け部に代えて、荷降ろしロープを巻き掛けるシーブを装着しても良い。
また、アーム部の前部(前端近く)に装着した滑車取り付け部に代えて、図29または図32の如く、荷降ろしロープを摺動移動自在に掛けて懸吊するロープ掛け部を設け、このロープ掛け部に荷降ろしロープを巻き掛けて懸吊したのち、ブレーキ部の胴部に巻き掛けるようにしても良い(この場合、ガイドロープ取り付け部は、図29または図32乃至図34のアーム部45Fをストッパ181またはロープ掛け部材183から前方へ延設した前端に設けるようにすれば良い)。
In the third embodiment described above, the pulley is suspended from the pulley mounting portion attached to the front portion (near the front end) of the arm portion, the unloading rope is wound around the pulley, and then wound around the trunk portion of the brake portion. However, instead of the pulley mounting portion, a sheave for winding an unloading rope may be attached to the front portion (near the front end) of the arm portion.
Further, instead of the pulley mounting portion mounted on the front portion (near the front end) of the arm portion, a rope hanging portion for suspending and hanging the unloading rope slidably as shown in FIG. 29 or 32 is provided. After the unloading rope is wrapped around the rope hook and suspended, it may be wound around the trunk of the brake section (in this case, the guide rope mounting section is the arm section shown in FIG. 29 or FIGS. 32 to 34). 45F may be provided at the front end extending forward from the stopper 181 or the rope hooking member 183).

また、上記した第3実施例では、ビティ式仮設足場の最上部の建枠部材の内、前側の縦枠の上端部に荷降ろし補助具を装着する場合を例に挙げたが、図36乃至図38の如く変形し、ビティ式仮設足場の最上部の建枠部材の前側の縦枠と横枠の上に着脱自在に立設するようにしたり、前側の縦枠と後ろ側の縦枠の上に着脱自在に立設するようにし、アーム部を前方に延設した前端と前端近くにガイドロープ取り付け部と滑車取り付け部を装着するようにしたり、アーム部の内、滑車取り付け部の近くに、図39の符号213乃至215の如き吊持ロープ取り付け部を設けて吊持ロープにより吊持するようにしても良い。   In the third embodiment described above, the case where the unloading assisting tool is attached to the upper end portion of the front vertical frame among the uppermost building frame members of the bite-type temporary scaffold is described as an example. It is modified as shown in FIG. 38 so that it can be detachably installed on the front vertical frame and horizontal frame of the uppermost building frame member of the bite-type temporary scaffold, or the front vertical frame and the rear vertical frame The guide rope attachment part and pulley attachment part are installed near the front end and the front end with the arm part extending forward, or within the arm part and near the pulley attachment part. 39 may be provided with suspension rope attachment portions as indicated by reference numerals 213 to 215 in FIG. 39 and suspended by the suspension rope.

また、第3実施例ではアーム部の前端にカイドロープ取り付け部を設けたが、図49に示す荷降ろし補助具240Aに示す如く、前端のガイドロープ取り付け部を省略し、第2実施例と同様のアーム部45としても良い。荷降ろし補助具240Aのブレーキ部249では、胴部50の両端に設けられた円環状のストッパ51、52に、半径方向外側に放射状に突出した複数の舌部251a、252aが設けられて、胴部50に巻き掛けた荷降ろしロープがストッパ51、52の外側に外れにくくしてある。第1実施例と第2実施例及びそれらの変形例に係る胴部においても、図49の舌部251a、252aの如く舌部を付設するようにしても良いのは勿論である。   Further, in the third embodiment, a guide rope attaching portion is provided at the front end of the arm portion, but as shown in the unloading assisting tool 240A shown in FIG. 49, the guide rope attaching portion at the front end is omitted and the same as in the second embodiment. The arm portion 45 may be used. In the brake part 249 of the unloading assisting tool 240A, a plurality of tongue parts 251a and 252a projecting radially outward in the radial direction are provided on the annular stoppers 51 and 52 provided at both ends of the body part 50, respectively. The unloading rope wound around the portion 50 is difficult to come off the outside of the stoppers 51 and 52. Of course, the body portions according to the first and second embodiments and their modifications may also be provided with tongue portions such as the tongue portions 251a and 252a of FIG.

また、上記した各実施例及びその変形例ではブレーキドラムとしての胴部を円筒状としたが、円柱状、楕円柱状、角を丸めた四角柱や六角柱などの多角柱状、中央が太く両側が細い太鼓状、中央が細く両側が太い糸巻き状などの形状としても良い。胴部は、巻き掛けられた荷降ろしロープとの接触で摩擦を生じる胴形の摩擦発生手段として機能するものである。   Further, in each of the above-described embodiments and modifications thereof, the body portion as a brake drum is cylindrical, but a columnar shape, an elliptical column shape, a polygonal column shape such as a quadrangular column or a hexagonal column with rounded corners, a thick center, and both sides are thick. A thin drum shape, a pincushion shape with a thin center and thick sides may be used. The body portion functions as a body-shaped friction generating means that generates friction upon contact with the wound unloading rope.

また、上記した各実施例及びその変形例の内、ブラケットに巻き掛け式のブレーキ部を装備したタイプでは、ブレーキ部を固着プレート等により基部支柱等に固着して装備する場合を例に挙げて説明したが、本発明は何らこれに限定されるものでなく、ボルトやクランプ等の締結部品等を用いて、着脱自在に装着可能としても良い。
例えば、図50に示す巻き掛け式のブレーキ部80a’を装備した荷降ろし補助具10Gでは、ブレーキ用補助具の一例としてのブレーキ部80a’は全体が鋼製であり、円筒状に形成された胴部81a’の両端に円環状のストッパ82a’、83a’が固着されて成る。基部支柱11’の上端近くに前後方向に貫通して穿設されたクランプボルト通し孔120の両側の基部支柱11’の前面に、2つの支持プレート84a’、85a’が固着されており、支持プレート84a’、85a’の前端には水平に配設された胴部81a’の周面の一部が嵌合する円弧状の当て部86、87が形成されている。一方、胴部81aの軸方向中央に前後方向に貫通したクランプボルト通し孔88が穿設されている。クランプ12とブレーキ部80a’を基部支柱11’に装着する場合、クランプ12と基部支柱11’のクランプボルト通し孔120にクランプボルト121を通し、更に胴部81a’の軸方向中央の背面側を支持プレート84a’、85a’の当て部86、87に当てながら、クランプボルト通し孔88にクランプボルト121を通し、ナット122を螺合して着脱自在に締結する。
この図50の例によれば、ブレーキ部80a’の胴部81a’が荷降ろしロープ3との摩擦で磨り減ったときに、容易に交換することができる。
図2、図11、図13、図15、図16、図23、図25、図26、図28、図29乃至図38、図49などのブレーキ部も基部支柱、アーム部、補強部材等に着脱自在に装着可能としても良いのは勿論である。
Also, among the above-described embodiments and modifications thereof, the type in which the bracket is provided with a wrapping type brake portion is exemplified by the case where the brake portion is fixedly mounted on the base column with a fixing plate or the like. Although described, the present invention is not limited to this, and may be detachably mounted using fastening parts such as bolts and clamps.
For example, in the unloading assisting tool 10G equipped with the winding-type brake part 80a ′ shown in FIG. 50, the entire brake part 80a ′ as an example of the brake assisting tool is made of steel and formed in a cylindrical shape. Annular stoppers 82a ′ and 83a ′ are fixed to both ends of the body 81a ′. Two support plates 84 a ′ and 85 a ′ are fixed to the front surface of the base column 11 ′ on both sides of the clamp bolt through hole 120 penetrating in the front-rear direction near the upper end of the base column 11 ′. At the front ends of the plates 84a ′ and 85a ′, arcuate abutting portions 86 and 87 into which a part of the circumferential surface of the body 81a ′ disposed horizontally is fitted are formed. On the other hand, a clamp bolt through-hole 88 penetrating in the front-rear direction is formed in the axial center of the body 81a. When the clamp 12 and the brake part 80a ′ are mounted on the base column 11 ′, the clamp bolt 121 is passed through the clamp bolt through hole 120 of the clamp 12 and base column 11 ′, and the back side at the center in the axial direction of the body 81a ′ is further passed. The clamp bolt 121 is passed through the clamp bolt through hole 88 while being applied to the contact portions 86 and 87 of the support plates 84a ′ and 85a ′, and the nut 122 is screwed to be detachably fastened.
According to the example of FIG. 50, when the trunk portion 81a ′ of the brake portion 80a ′ is worn away by friction with the unloading rope 3, it can be easily replaced.
2, 11, 13, 15, 15, 16, 23, 25, 26, 28, 29 to 38, 49, etc., can also be used as base struts, arms, reinforcing members, etc. Of course, it may be detachable.

また、上記した各実施例及びその変形例では、足場部材を荷降ろしする場合を例に挙げて説明したが、建築物の工事用資材、建築物の解体部材等を対象とすることもできる。   Further, in each of the above-described embodiments and the modifications thereof, the case where the scaffold member is unloaded has been described as an example. However, it is also possible to target building construction materials, building demolition members, and the like.

本発明は、マンション、ビル等の建築物の新築・改修工事現場等に設置される仮設足場の解体部材、建築物の工事用資材、建築物の解体部材等を仮設足場を通じて荷降ろしする際に適用できる。   The present invention is used when unloading temporary scaffolding demolition members, building construction materials, building demolition members, etc. that are installed at construction / renovation construction sites for buildings such as condominiums and buildings through temporary scaffolding. Applicable.

1 ビティ式仮設足場
2、6、10、28 建枠部材
3 荷降ろしロープ
3a 下降側ロープ
3b 上昇側ロープ
4 横枠
8、9 縦枠
24、25 足場ステージ
40 荷降ろし補助具
41 基部支柱
45 アーム部
46 滑車取り付け部
55 フック
49 ブレーキ部
50 胴部
51、52 ストッパ
67、70、73 摩擦用ロープ
75、76 切除部
90 滑車
DESCRIPTION OF SYMBOLS 1 Bitty type temporary scaffold 2, 6, 10, 28 Building frame member 3 Unloading rope 3a Lowering rope 3b Ascending rope 4 Horizontal frame 8, 9 Vertical frame 24, 25 Scaffolding stage 40 Unloading assisting tool 41 Base column 45 Arm Part 46 pulley attachment part 55 hook 49 brake part 50 trunk part 51, 52 stopper 67, 70, 73 friction rope 75, 76 cutting part 90 pulley

Claims (9)

荷降ろしを行なう足場の構造物に着脱自在に装着可能なブラケットと、
ブラケットの前部に設けられて、荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられる滑車を懸吊する滑車取り付け部、または荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられるシーブと、
ブラケットの基部寄りに固着して装着されるかまたは着脱自在に装着されたブレーキ部と、
を備え、
ブレーキ部は、滑車取り付け部に懸吊した滑車またはシーブに巻き掛けられる荷降ろしロープの内、荷降ろし対象部材が吊るされる下降側とは反対の上昇側が巻き掛けられる摩擦発生用の固定の胴部と、
胴部の端部に設けられて荷降ろしロープが胴部から外れるのを阻止するストッパを含み、
胴部は、荷降ろしロープを巻き掛ける外面が外部に露出していること、
を特徴とする荷降ろし補助具。
A bracket that can be detachably attached to a scaffold structure for unloading;
A sheave provided on the front portion of the bracket, on which a pulley for hanging an unloading rope for hanging an unloading target member is suspended, or a sheave on which a unloading rope for hanging an unloading target member is wound;
A brake part fixedly attached to the base of the bracket or detachably attached;
With
The brake part is a fixed body part for generating friction in which an ascending side opposite to a descending side on which a member to be unloaded is suspended is wound out of an unloading rope suspended on a pulley or sheave suspended from a pulley mounting part. When,
Including a stopper provided at the end of the trunk to prevent the unloading rope from coming off the trunk;
The torso has an external surface that is used to unload the unloading rope.
Unloading aid characterized by.
荷降ろしを行なう足場の構造物の最上部に着脱自在に立設可能で前方へ延設されたブラケットと、
ブラケットの前部に設けられて、荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられる滑車を懸吊する滑車取り付け部、または荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられるシーブと、
ブラケットの基部寄りに固着して装着されるかまたは着脱自在に装着されたブレーキ部と、
を備え、
ブレーキ部は、滑車取り付け部に懸吊した滑車またはシーブに巻き掛けられる荷降ろしロープの内、荷降ろし対象部材が吊るされる下降側とは反対の上昇側が巻き掛けられる摩擦発生用の固定の胴部と、
胴部の端部に設けられて荷降ろしロープが胴部から外れるのを阻止するストッパを含み、
胴部は、荷降ろしロープを巻き掛ける外面が外部に露出していること、
を特徴とする荷降ろし補助具。
A bracket that can be detachably installed at the top of the scaffold structure for unloading and that extends forward;
A sheave provided on the front portion of the bracket, on which a pulley for hanging an unloading rope for hanging an unloading target member is suspended, or a sheave on which a unloading rope for hanging an unloading target member is wound;
A brake part fixedly attached to the base of the bracket or detachably attached;
With
The brake part is a fixed body part for generating friction in which an ascending side opposite to a descending side on which a member to be unloaded is suspended is wound out of an unloading rope suspended on a pulley or sheave suspended from a pulley mounting part. When,
Including a stopper provided at the end of the trunk to prevent the unloading rope from coming off the trunk;
The torso has an external surface that is used to unload the unloading rope.
Unloading aid characterized by.
荷降ろしを行なう足場の構造物に着脱自在に装着可能な基部部材と、
基部部材から前方に延設されたアーム部と、
アーム部の前部に設けられて、荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられる滑車を懸吊する滑車取り付け部、または荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられるシーブと、
基部部材またはアーム部の基部部材近くに固着して装着されるかまたは着脱自在に装着されたブレーキ部と、
を備え、
ブレーキ部は、滑車取り付け部に懸吊した滑車またはシーブに巻き掛けられる荷降ろしロープの内、荷降ろし対象部材が吊るされる下降側とは反対の上昇側が巻き掛けられる摩擦発生用の固定の胴部と、
胴部の端部に設けられて荷降ろしロープが胴部から外れるのを阻止するストッパを含み、
胴部は、荷降ろしロープを巻き掛ける外面が外部に露出していること、
を特徴とする荷降ろし補助具。
A base member detachably attachable to a scaffold structure for unloading;
An arm portion extending forward from the base member;
A sheave provided on a front portion of the arm portion, on which a pulley for hanging an unloading rope for hanging an unloading target member is wound, or a sheave on which a unloading rope for hanging an unloading target member is wound,
A brake part fixedly mounted near the base member or the base member of the arm part or detachably mounted;
With
The brake part is a fixed body part for generating friction in which an ascending side opposite to a descending side on which a member to be unloaded is suspended is wound out of an unloading rope suspended on a pulley or sheave suspended from a pulley mounting part. When,
Including a stopper provided at the end of the trunk to prevent the unloading rope from coming off the trunk;
The torso has an external surface that is used to unload the unloading rope.
Unloading aid characterized by.
仮設足場の最上段の建枠部材の内、前側縦枠の上端に嵌合した連結ピンに上方から嵌脱自在に嵌着可能な基部部材と、
基部部材の上部から前方に延設されたアーム部と、
アーム部の前部に設けられて、荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられる滑車を懸吊する滑車取り付け部、または荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられるシーブと、
基部部材の上部から後方に延設されて仮設足場の最上段の建枠部材の横枠または後側縦枠に着脱自在に装着可能な後方延設部と、
基部部材またはアーム部の基部部材近くに固着して装着されるかまたは着脱自在に装着されたブレーキ部と、
を備え、
ブレーキ部は、滑車取り付け部に懸吊した滑車またはシーブに巻き掛けられる荷降ろしロープの内、荷降ろし対象部材が吊るされる下降側とは反対の上昇側が巻き掛けられる摩擦発生用の固定の胴部と、
胴部の端部に設けられて荷降ろしロープが胴部から外れるのを阻止するストッパを含み、
胴部は、荷降ろしロープを巻き掛ける外面が外部に露出していること、
を特徴とする荷降ろし補助具。
Of the uppermost building frame member of the temporary scaffold, a base member that can be detachably fitted from above to a connecting pin fitted to the upper end of the front vertical frame;
An arm portion extending forward from the upper portion of the base member;
A sheave provided on a front portion of the arm portion, on which a pulley for hanging an unloading rope for hanging an unloading target member is wound, or a sheave on which a unloading rope for hanging an unloading target member is wound,
A rear extending portion that extends rearward from the upper part of the base member and can be detachably attached to the horizontal frame or the rear vertical frame of the uppermost building frame member of the temporary scaffold,
A brake part fixedly mounted near the base member or the base member of the arm part or detachably mounted;
With
The brake part is a fixed body part for generating friction in which an ascending side opposite to a descending side on which a member to be unloaded is suspended is wound out of an unloading rope suspended on a pulley or sheave suspended from a pulley mounting part. When,
Including a stopper provided at the end of the trunk to prevent the unloading rope from coming off the trunk;
The torso has an external surface that is used to unload the unloading rope.
Unloading aid characterized by.
荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられる滑車を懸吊する滑車取り付け部、または荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられるシーブが前部に設けられて荷降ろしを行なう足場の構造物に着脱自在に装着可能なブラケットに対して、
ブラケットの基部寄りに着脱自在に装着可能なブレーキ用補助具であって、
このブレーキ用補助具は、滑車取り付け部に懸吊した滑車またはシーブに巻き掛けられる荷降ろしロープの内、荷降ろし対象部材が吊るされる下降側とは反対の上昇側が巻き掛けられる摩擦発生用の胴部を含み、
胴部は、荷降ろしロープを巻き掛ける外面が外部に露出するとともに、荷降ろしロープから回転力を受けても回転不能としたこと、
を特徴とするブレーキ用補助具。
A scaffolding unit that unloads a pulley that hangs a pulley on which a unloading rope that suspends an unloading target member is suspended, or a sheave on which a sheave on which an unloading rope that suspends an unloading target member is wound is provided at the front. For brackets that can be detachably attached to structures,
A brake aid that can be detachably attached to the base of the bracket,
This brake auxiliary tool is a friction generating cylinder in which an unloading rope suspended around a pulley or sheave suspended from a pulley mounting portion is wound on an ascending side opposite to a descending side on which a member to be unloaded is suspended. Part
The body part is exposed to the outside, and the outer surface around which the unloading rope is wound is unrotatable even if it receives rotational force from the unloading rope.
A brake aid characterized by
荷降ろしを行なう足場の構造物に、前部に荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられる滑車を懸吊する滑車取り付け部、または荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられるシーブを備えるとともに、基部寄りに荷降ろしロープが巻き掛けられる摩擦発生用の固定の胴部を含む巻き掛け式のブレーキ部が装着されたブラケットを設置し、
荷降ろしロープを滑車取り付け部に懸吊した滑車またはシーブと胴部に巻き掛け、滑車またはシーブから垂れ下がった荷降ろしロープに荷降ろし対象部材を吊るして地上に向けて落下させ、
荷降ろし対象部材を地上に向け落下させたあとの初めの内は上昇側の荷降ろしロープの移動を手で拘束しないようにして、荷降ろし対象部材の降下速度が上がると胴部に巻き掛けられた荷降ろしロープが遠心力で胴部の外側に膨らむようにし、
荷降ろし対象部材が降下している途中で、胴部から垂れ下がった荷降ろしロープの移動を手で拘束したときの荷降ろしロープと胴部との接触で発生する摩擦により荷降ろしロープにブレーキを掛けながら荷降ろしすること、
を特徴とする荷降ろし方法。
A sheave attachment section for hanging a pulley on which a load unloading rope for hanging an unloading target member is suspended on a front structure, or a sheave on which a unloading rope for hanging an unloading target member is wound on a scaffold structure for unloading. And a bracket on which a wrapping type brake part including a fixed body part for generating friction on which an unloading rope is wound near the base is installed,
Wrap the unloading rope around the pulley or sheave suspended from the pulley mounting section and the trunk, hang the target member from the unloading rope hanging from the pulley or sheave, and drop it toward the ground.
The first part after the unloading target member is dropped to the ground is not restrained by hand by the movement of the unloading rope on the rising side, and when the lowering speed of the unloading target member increases, it is wound around the trunk. So that the unloading rope swells to the outside of the trunk by centrifugal force,
The unloading rope is braked by the friction generated by the contact between the unloading rope and the body when the unloading rope hanging from the body is restrained by hand while the member to be unloaded is descending. Unloading while
Unloading method characterized by.
荷降ろしを行なう足場の構造物の最上部に、前部に荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられる滑車を懸吊する滑車取り付け部、または荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられるシーブを備えるとともに、基部寄りに荷降ろしロープが巻き掛けられる摩擦発生用の固定の胴部を含む巻き掛け式のブレーキ部が装着されたブラケットを立設し、このブラケットが荷降ろしを行なう足場の構造物の前方へ延設するようにし、
荷降ろしロープを滑車取り付け部に懸吊した滑車またはシーブと胴部に巻き掛け、滑車またはシーブから垂れ下がった荷降ろしロープに荷降ろし対象部材を吊るして地上に向けて落下させ、
荷降ろし対象部材を地上に向け落下させたあとの初めの内は上昇側の荷降ろしロープの移動を手で拘束しないようにして、荷降ろし対象部材の降下速度が上がると胴部に巻き掛けられた荷降ろしロープが遠心力で胴部の外側に膨らむようにし、
荷降ろし対象部材が降下している途中で、胴部から垂れ下がった荷降ろしロープの移動を手で拘束したときの荷降ろしロープと胴部との接触で発生する摩擦により荷降ろしロープにブレーキを掛けながら荷降ろしすること、
を特徴とする荷降ろし方法。
The unloading rope that suspends the pulley to be unloaded or the unloading rope that suspends the pulley to be unloaded or the unloading rope to suspend the pulley that suspends the pulley that hangs the unloading rope that suspends the unloading rope that suspends the unloading target member on the front part A bracket is provided with a sheave to be hung, and a bracket with a winding-type brake part including a fixed body for friction generation around which an unloading rope is wound near the base, and this bracket performs unloading. Extend to the front of the scaffold structure,
Wrap the unloading rope around the pulley or sheave suspended from the pulley mounting section and the trunk, hang the target member from the unloading rope hanging from the pulley or sheave, and drop it toward the ground.
The first part after the unloading target member is dropped to the ground is not restrained by hand by the movement of the unloading rope on the rising side, and when the lowering speed of the unloading target member increases, it is wound around the trunk. So that the unloading rope swells to the outside of the trunk by centrifugal force,
The unloading rope is braked by the friction generated by the contact between the unloading rope and the body when the unloading rope hanging from the body is restrained by hand while the member to be unloaded is descending. Unloading while
Unloading method characterized by.
荷降ろしを行なう足場の構造物に、前部に荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられる滑車を懸吊する滑車取り付け部、または荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられるシーブを備えるとともに、基部寄りに荷降ろしロープが巻き掛けられる摩擦発生用の固定の胴部を含む巻き掛け式のブレーキ部が装着されたブラケットを設置し、
荷降ろしロープを滑車取り付け部に懸吊した滑車またはシーブと胴部に巻き掛け、滑車またはシーブから垂れ下がった荷降ろしロープに荷降ろし対象部材を吊るして地上に向けて落下させ、
荷降ろし対象部材を地上に向け落下させたあとの初めの内は上昇側の荷降ろしロープの移動を手で拘束しないようにして、荷降ろし対象部材の降下速度が上がると胴部に巻き掛けられた荷降ろしロープが遠心力で胴部の外側に膨らむようにし、
降下した荷降ろし対象部材が地上に近づいたところで、胴部から垂れ下がった荷降ろしロープの移動を手で拘束したときの荷降ろしロープと胴部との接触で発生する摩擦により
荷降ろしロープにブレーキを掛けながら荷降ろしすること、
を特徴とする荷降ろし方法。
A sheave attachment section for hanging a pulley on which a load unloading rope for hanging an unloading target member is suspended on the structure of a scaffold for unloading or a sheave on which a unloading rope for hanging an unloading target member is wound And a bracket on which a wrapping type brake part including a fixed body part for generating friction on which an unloading rope is wound near the base is installed,
Wrap the unloading rope around the pulley or sheave suspended from the pulley mounting section and the trunk, hang the target member from the unloading rope hanging from the pulley or sheave, and drop it toward the ground.
The first part after the unloading target member is dropped to the ground is not restrained by hand by the movement of the unloading rope on the rising side, and when the lowering speed of the unloading target member increases, it is wound around the trunk. So that the unloading rope swells to the outside of the trunk by centrifugal force,
When the lowered unloading target member approaches the ground, the unloading rope is braked by the friction generated by the contact between the unloading rope and the trunk when the unloading rope hanging from the trunk is restrained by hand. Unloading while hanging,
Unloading method characterized by.
荷降ろしを行なう足場の構造物の最上部に、前部に荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられる滑車を懸吊する滑車取り付け部、または荷降ろし対象部材を吊るす荷降ろしロープが巻き掛けられるシーブを備えるとともに、基部寄りに荷降ろしロープが巻き掛けられる摩擦発生用の固定の胴部を含む巻き掛け式のブレーキ部が装着されたブラケットを立設し、このブラケットが荷降ろしを行なう足場の構造物の前方へ延設するようにし、
荷降ろしロープを滑車取り付け部に懸吊した滑車またはシーブと胴部に巻き掛け、滑車またはシーブから垂れ下がった荷降ろしロープに荷降ろし対象部材を吊るして地上に向けて落下させ、
荷降ろし対象部材を地上に向け落下させたあとの初めの内は上昇側の荷降ろしロープの移動を手で拘束しないようにして、荷降ろし対象部材の降下速度が上がると胴部に巻き掛けられた荷降ろしロープが遠心力で胴部の外側に膨らむようにし、
降下した荷降ろし対象部材が地上に近づいたところで、胴部から垂れ下がった荷降ろしロープの移動を手で拘束したときの荷降ろしロープと胴部との接触で発生する摩擦により荷降ろしロープにブレーキを掛けながら荷降ろしすること、
を特徴とする荷降ろし方法。
The unloading rope that suspends the pulley to be unloaded or the unloading rope that suspends the pulley to be unloaded or the unloading rope to suspend the pulley that suspends the pulley that hangs the unloading rope that suspends the unloading rope that suspends the unloading target member on the front part A bracket is provided with a sheave to be hung, and a bracket with a winding-type brake part including a fixed body for friction generation around which an unloading rope is wound near the base, and this bracket performs unloading. Extend to the front of the scaffold structure,
Wrap the unloading rope around the pulley or sheave suspended from the pulley mounting section and the trunk, hang the target member from the unloading rope hanging from the pulley or sheave, and drop it toward the ground.
The first part after the unloading target member is dropped to the ground is not restrained by hand by the movement of the unloading rope on the rising side, and when the lowering speed of the unloading target member increases, it is wound around the trunk. So that the unloading rope swells to the outside of the trunk by centrifugal force,
When the lowered unloading target member approaches the ground, the unloading rope is braked by the friction generated by the contact between the unloading rope and the trunk when the unloading rope hanging from the trunk is restrained by hand. Unloading while hanging,
Unloading method characterized by.
JP2018192429A 2018-10-11 2018-10-11 Unloading auxiliary tool, brake auxiliary tool and unloading method Pending JP2019031902A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018192429A JP2019031902A (en) 2018-10-11 2018-10-11 Unloading auxiliary tool, brake auxiliary tool and unloading method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018192429A JP2019031902A (en) 2018-10-11 2018-10-11 Unloading auxiliary tool, brake auxiliary tool and unloading method

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP2017154788A Division JP6452007B1 (en) 2017-08-09 2017-08-09 Unloading aid, brake aid

Publications (1)

Publication Number Publication Date
JP2019031902A true JP2019031902A (en) 2019-02-28

Family

ID=65523106

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018192429A Pending JP2019031902A (en) 2018-10-11 2018-10-11 Unloading auxiliary tool, brake auxiliary tool and unloading method

Country Status (1)

Country Link
JP (1) JP2019031902A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111021707A (en) * 2019-12-12 2020-04-17 中建八局第四建设有限公司 Scaffold construction method, scaffold connecting structure and wall connecting piece

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111021707A (en) * 2019-12-12 2020-04-17 中建八局第四建设有限公司 Scaffold construction method, scaffold connecting structure and wall connecting piece

Similar Documents

Publication Publication Date Title
US10760338B2 (en) Ladder securing apparatuses, ladders incorporating same and related methods
JP6452007B1 (en) Unloading aid, brake aid
JP2019031902A (en) Unloading auxiliary tool, brake auxiliary tool and unloading method
JP6312223B2 (en) Unloading aid
JP6452008B1 (en) Unloading aid for simple crane, unloading device, simple crane
JP2019031903A (en) Unloading auxiliary tool for simple cane, unloader, simple crane and unloading method
JP2022086067A (en) Suspension tool for scaffold
KR20160030137A (en) Safety system for bottom cage fix and disassemble of gang form
JP2011109780A (en) Device and method for fixing overhead wire ladder
JP5948542B1 (en) Simple crane
JPH0769585A (en) Crane boom assembly
JP6127303B1 (en) Lifting aid
JP6260844B1 (en) Auxiliary mat for gripping unloading rope
JP6917048B2 (en) Kaishakunin arm, and a crane arm with a kaishakunin arm
JP6379420B1 (en) Hand fitting tool for rope gripping
JP2010235265A (en) Derrick for assembling/disassembling iron tower
JP5429569B2 (en) Safety block mounting jig for movable ladder
JP6103461B1 (en) Simple crane, suspension load suspension method with simple crane
JP3811136B2 (en) Parent rope supporter
CN218931539U (en) Balance type movable suspension arm
JP2019031889A (en) Unloading method
CN109944541B (en) Vertical ladder for wall construction
KR200452488Y1 (en) Wheel for Working
JP2539247Y2 (en) Suspension tools such as safety nets
CN114906715A (en) Wheel hub hoisting tool, wheel hub hoisting equipment and wheel hub hoisting method