JP2018168601A - Dismantling method of chimney supported with steel tower - Google Patents

Dismantling method of chimney supported with steel tower Download PDF

Info

Publication number
JP2018168601A
JP2018168601A JP2017066939A JP2017066939A JP2018168601A JP 2018168601 A JP2018168601 A JP 2018168601A JP 2017066939 A JP2017066939 A JP 2017066939A JP 2017066939 A JP2017066939 A JP 2017066939A JP 2018168601 A JP2018168601 A JP 2018168601A
Authority
JP
Japan
Prior art keywords
tower
jack
steel tower
block
cylinder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2017066939A
Other languages
Japanese (ja)
Other versions
JP6533550B2 (en
Inventor
昌久 古市
Masahisa Furuichi
昌久 古市
尚貴 須山
Naotaka Suyama
尚貴 須山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taihei Dengyo Kaisha Ltd
Original Assignee
Taihei Dengyo Kaisha Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taihei Dengyo Kaisha Ltd filed Critical Taihei Dengyo Kaisha Ltd
Priority to JP2017066939A priority Critical patent/JP6533550B2/en
Publication of JP2018168601A publication Critical patent/JP2018168601A/en
Application granted granted Critical
Publication of JP6533550B2 publication Critical patent/JP6533550B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

To provide a dismantling method of a chimney supported with a steel tower, in which an elevator is installed, to enable easily, safely and securely dismantling the chimney supported with the steel tower without using a large crane.SOLUTION: A dismantling method comprises: cutting a first section of a steel tower 2 into two steel tower blocks 2a after connecting the first section of the steel tower to a second section of the steel tower 2 with a hinge 8; then, tumbling the steel tower blocks 2a downward with the hinge 8 as a supporting point using a jack 5 for tumbling the steel tower block and a jack 7 for guiding the steel tower block; then, lifting down the steel tower blocks 2a through operating a jack 6 for lifting down the steel tower block, the jack 5 for tumbling the steel tower block, and the jack 7 for guiding the steel tower block, after cutting the hinge 8 off the steel tower 2; then, lifting down a cylindrical body 1 with a jack 4 for lifting the cylindrical body after cutting a lower section of the cylindrical body 1; and repeating the above processes, to enable easily, safely, and securely dismantling a chimney supported with a steel tower without using a large crane.SELECTED DRAWING: Figure 5(a)

Description

この発明は、鉄塔支持型煙突の解体方法、特に、大型クレーンを使用することなく、鉄塔支持型煙突を容易に安全かつ確実に解体することができる、鉄塔支持型煙突の解体方法に関するものである。   The present invention relates to a method for dismantling a tower-supported chimney, and more particularly to a method for dismantling a tower-supported chimney that can be easily and safely disassembled without using a large crane. .

鉄塔支持型煙突の解体方法の一例が特許文献1に開示されている。以下の、この鉄塔支持型煙突の解体方法を従来解体方法といい、図面を参照しながら説明する。   An example of a method for dismantling a steel tower support chimney is disclosed in Patent Document 1. The following method of dismantling the steel tower supported chimney is called a conventional dismantling method and will be described with reference to the drawings.

図9は、従来解体方法を示す説明図であり、(a)は、筒身11Aを撤去した図、(b) は、筒身11Bを撤去した図、(c)は、クローラクレーンにより鉄塔の中間部12Bを撤去した後、筒身11Cと筒身11Dを撤去した図、(d)は、ジャッキによる筒身の吊り位置を変えた図、(e)は、筒身11Eから筒身11Iを撤去した図、(f)は、ジャッキによる筒身の吊り位置を変えた図、(g)は、筒身の頂部を解体する図である。   9A and 9B are explanatory views showing a conventional dismantling method, in which FIG. 9A is a diagram in which the cylindrical body 11A is removed, FIG. 9B is a diagram in which the cylindrical body 11B is removed, and FIG. 9C is a diagram of a steel tower by a crawler crane. The figure which removed the cylinder 11C and the cylinder 11D after removing the intermediate part 12B, (d) is the figure which changed the hanging position of the cylinder with a jack, (e) is the cylinder 11I from the cylinder 11E. The figure which removed, (f) is the figure which changed the hanging position of the cylinder with a jack, (g) is a figure which disassembles the top part of a cylinder.

従来解体方法は、以下の工程からなっている。   The conventional dismantling method includes the following steps.

(第1の筒身部分解体工程)
先ず、図9(a)に示すように、筒身11を部分解体する。すなわち、鉄塔12の第2支持点S2にジャッキ15を取り付け、ジャッキ15により筒身11を支持しつつ筒身11の下端部を切断位置20で所定長さだけ切断し、切断した筒身11Aを搬送台車21に搭載して撤去した後、筒身11をジャッキダウンする。この際、安定に自立している鉄塔12に設けられているガイドローラ16によって筒身11のジャッキダウンを支持案内することによって、ジャッキダウン作業を容易にかつ安全に行うことができる。なお、図中の17、18は、補強材、22は、搬送台車21が走行するためのレールである。そして、上記のような、筒身11の下端部に対する切断撤去とジャッキダウンを行って、図9(b)に示すように、筒身11Bを切断撤去して、筒身11をほぼ第4支持点S4の高さとなるまで解体する。
(First barrel part disassembly process)
First, as shown in FIG. 9A, the cylindrical body 11 is partially disassembled. That is, the jack 15 is attached to the second support point S2 of the tower 12, and the lower end of the cylinder 11 is cut by a predetermined length at the cutting position 20 while the cylinder 11 is supported by the jack 15, and the cut cylinder 11A is cut. After mounting on the transport carriage 21 and removal, the barrel 11 is jacked down. At this time, the jack-down operation can be easily and safely performed by supporting and guiding the jack-down of the cylindrical body 11 by the guide roller 16 provided in the steel tower 12 which is stably standing independently. In addition, 17 and 18 in a figure are a reinforcement material, 22 is a rail for the conveyance trolley | bogie 21 to drive | work. Then, by cutting and removing the lower end portion of the cylinder 11 and jacking down as described above, the cylinder 11B is cut and removed as shown in FIG. Disassemble until point S4 is reached.

(鉄塔の中間部解体工程)
次に、鉄塔12の上部12Aを筒身11に保持させた状態で、図9(b)に示すように、クローラクレーン30を用いて、鉄塔12の中間部12Bを解体撤去する。なお、ここで、鉄塔12の上部12Aは、第3支持点S3と第4支持点S4の間の部分であり、鉄塔12の中間部12Bは、第2支持点S2と第3支持点S3の間の部分である。
(Steel tower middle part dismantling process)
Next, in a state where the upper portion 12A of the steel tower 12 is held by the cylinder 11, the intermediate portion 12B of the steel tower 12 is dismantled and removed using a crawler crane 30 as shown in FIG. Here, the upper portion 12A of the steel tower 12 is a portion between the third support point S3 and the fourth support point S4, and the intermediate portion 12B of the steel tower 12 is between the second support point S2 and the third support point S3. The part between.

(第2の筒身部分解体工程)
次に、上述した筒身部分解体工程と同様にして、筒身11の下端部に対する切断撤去とジャッキダウンとを繰り返して、図9(c)に示すように、筒身11C、11Dを切断撤去して、鉄塔12の上部12Aが鉄塔12の下部12Cに近づく位置になるまで解体撤去する。なお、ここで、鉄塔12の下部12Cは、第2支持点S2から下方の部分である。
(Second barrel part disassembly process)
Next, in the same manner as in the above-described tube body part disassembly process, the tube body 11C and 11D are cut and removed as shown in FIG. Then, the upper part 12A of the steel tower 12 is dismantled and removed until the position approaches the lower part 12C of the steel tower 12. Here, the lower part 12C of the steel tower 12 is a part below the second support point S2.

(鉄塔の上部解体工程)
次に、図9(d)に示すように、ジャッキ15による筒身11の吊り位置を変え、クローラクレーン30を用いて、鉄塔12の上部12Aを解体撤去する。
(Steel tower upper dismantling process)
Next, as shown in FIG. 9D, the suspension position of the cylinder 11 by the jack 15 is changed, and the upper portion 12 </ b> A of the steel tower 12 is dismantled and removed using the crawler crane 30.

(第3の筒身部分解体工程)
次に、上述した筒身部分解体工程及び第2の筒身部分解体工程と同様にして、筒身11の下端部に対する切断撤去とジャッキダウンとを繰り返して、図9(d)、図9(e)、図9(f)に示すように、筒身11Eから11Mを順次切断撤去する。
(Third cylinder body disassembly process)
Next, in the same manner as the above-described cylinder body part disassembling process and second cylinder body part disassembling process, the cutting and removal of the lower end part of the cylinder 11 and the jackdown are repeated, and FIG. 9D and FIG. e) As shown in FIG. 9F, the cylinders 11E to 11M are sequentially cut and removed.

(鉄塔の下部解体工程)
最後に、クローラクレーン30を用いて、鉄塔12の下部12Cと、残った筒身11を解体撤去する。これによって、図9(g)に示すように、鉄塔支持型煙突10の解体が完了する。
(Lower dismantling process of the tower)
Finally, using the crawler crane 30, the lower part 12C of the steel tower 12 and the remaining cylinder 11 are dismantled and removed. This completes the dismantling of the tower-supported chimney 10 as shown in FIG.

特許第4559313号公報Japanese Patent No. 4559313 特許第5563697号公報Japanese Patent No. 5556397 特許第2828430号公報Japanese Patent No. 2828430

上記従来解体方法によれば、煙突の高さ相当の超大型クレーンを使用することなく、鉄塔支持型煙突を安全かつ確実に解体することができるが、高所部分の鉄塔12A、12Bの撤去に大型クレーンを必要とするといった問題があった。   According to the above conventional dismantling method, the tower-supported chimney can be dismantled safely and reliably without using a super large crane corresponding to the height of the chimney, but for removing the towers 12A and 12B at the high places. There was a problem of requiring a large crane.

従って、この発明の目的は、大型クレーンを使用することなく、鉄塔支持型煙突を容易に安全かつ確実に解体することができる、鉄塔支持型煙突の解体方法を提供することにある。   Accordingly, an object of the present invention is to provide a method of dismantling a tower-supported chimney that can easily and safely dismantle the tower-supported chimney without using a large crane.

この発明は、上記目的を達成するためになされたものであって、下記を特徴とするものである。   The present invention has been made to achieve the above object, and is characterized by the following.

請求項1記載の発明は、複数本の筒身の周囲に、前記筒身を支持する鉄塔が構築された鉄塔支持型煙突の解体方法において、下記(a)工程から(h)工程を備え、
(a)前記鉄塔の下部に、前記筒身を吊り上げ可能な筒身吊り上げ用ジャッキを設置し、前記筒身の頂部に、切断された鉄塔ブロックをヒンジを支点として倒す鉄塔ブロック倒し用ジャッキと、前記鉄塔ブロックを吊り下ろす鉄塔ブロック吊り下ろし用ジャッキとを設置し、地上に、前記鉄塔ブロック吊り下ろし用ジャッキにより吊り下ろされる前記鉄塔ブロックをガイドする鉄塔ブロックガイド用ジャッキを設置するジャッキ設置工程、
(b)前記鉄塔の上段の下部と、前記鉄塔の次段の上部とをヒンジにより連結する連結工程、
(c)前記鉄塔の上段を複数個の鉄塔ブロックに切断する鉄塔切断工程、
(d)前記鉄塔ブロック倒し用ジャッキと、前記鉄塔ブロックガイド用ジャッキとを操作して、前記鉄塔ブロックを前記ヒンジを支点として下方に倒す鉄塔ブロック倒し工程、
(e)前記ヒンジを前記鉄塔から切り離すヒンジ切り離し工程、
(f)前記鉄塔ブロック吊り下ろし用ジャッキと、前記鉄塔ブロック倒し用ジャッキと、前記鉄塔ブロックガイド用ジャッキとを操作して、前記鉄塔ブロックを吊り下ろす鉄塔ブロック吊り下ろし工程、
(g)前記(b)工程から前記(f)工程によって、前記鉄塔の上段を解体した後、前記筒身吊り上げ用ジャッキに前記筒身の荷重を預けた状態で、前記筒身の下部を切断し、撤去する筒身切断撤去工程、
(h)前記筒身吊り上げ用ジャッキにより前記筒身を吊り下ろす筒身吊り下ろし工程、
前記(b)工程から前記(h)工程を、前記鉄塔の上段から下段に亘って順次、繰り返し行うことに特徴を有するものである。
The invention according to claim 1 is a dismantling method of a tower-supported chimney in which a steel tower that supports the cylinder is constructed around a plurality of cylinders, and includes the following steps (a) to (h):
(A) At the bottom of the steel tower, a cylinder lifting jack capable of lifting the cylinder is installed, and at the top of the cylinder, a steel tower block tilting jack is used to tilt the cut steel tower block as a fulcrum, A jack installation step of installing a tower block suspension jack for hanging the tower block, and installing a tower block guide jack for guiding the tower block suspended by the tower block suspension jack on the ground,
(B) a connecting step of connecting the lower part of the upper stage of the steel tower and the upper part of the next stage of the steel tower with a hinge;
(C) a steel tower cutting step of cutting the upper stage of the steel tower into a plurality of steel tower blocks;
(D) a tower block tilting step of operating the tower block tilting jack and the tower block guide jack to tilt the tower block downward with the hinge as a fulcrum;
(E) a hinge separating step for separating the hinge from the steel tower;
(F) a tower block hanging step of hanging the tower block by operating the tower block hanging jack, the tower block falling jack, and the tower block guide jack;
(G) After the upper stage of the steel tower is disassembled by the steps (b) to (f), the lower part of the cylinder is cut in a state where the load of the cylinder is left in the cylinder lifting jack. And the barrel cutting and removing process to be removed,
(H) a cylinder hanging process of hanging the cylinder with the cylinder lifting jack;
The step (b) to the step (h) are characterized in that they are repeated in sequence from the upper stage to the lower stage of the tower.

請求項2に記載の発明は、請求項1に記載の発明において、前記筒身は、4本であることに特徴を有するものである。   The invention described in claim 2 is characterized in that, in the invention described in claim 1, the number of the cylinders is four.

請求項3に記載の発明は、請求項1または2に記載の発明において、前記鉄塔は、平面形状が正方形であることに特徴を有するものである。   The invention described in claim 3 is characterized in that, in the invention described in claim 1 or 2, the steel tower has a square planar shape.

請求項4に記載の発明は、請求項1から3の何れか1つに記載の発明において、前記鉄塔ブロックは、平面形状コ字形をなし、2つからなっていることに特徴を有するものである。   The invention according to claim 4 is characterized in that, in the invention according to any one of claims 1 to 3, the steel tower block has a U-shaped planar shape and is composed of two. is there.

この発明によれば、鉄塔の上段の下部と、鉄塔の次段の上部とをヒンジにより連結し、次いで、鉄塔の上段を複数個の鉄塔ブロックに切断し、次いで、鉄塔ブロックをヒンジを支点として下方に倒し、次いで、ヒンジを鉄塔から切り離し、次いで、鉄塔ブロックを吊り下ろし、次いで、筒身の下部を切断した後、筒身を吊り下ろす工程を繰り返し行うことによって、大型クレーンを使用することなく、鉄塔支持型煙突を容易に安全かつ確実に解体することができる。   According to this invention, the lower part of the upper stage of the steel tower and the upper part of the next stage of the steel tower are connected by a hinge, then the upper stage of the steel tower is cut into a plurality of steel tower blocks, and then the steel tower block is hinged on the hinges Without using a large crane by tilting downward, then separating the hinge from the tower, then hanging the tower block, then cutting the bottom of the barrel and then repeatedly hanging the barrel The tower-supported chimney can be easily and safely disassembled.

この発明の、鉄塔支持型煙突の解体方法によって、筒身吊り上げ用ジャッキと、鉄塔ブロック倒し用ジャッキと、鉄塔ブロック吊り下ろし用ジャッキと、鉄塔ブロックガイド用ジャッキとを設置した鉄塔支持型煙突を示す平面図である。The tower-supported chimney in which the tube-lifting jack, the tower block-lowering jack, the tower block-suspending jack, and the tower-block guide jack are installed by the dismantling method of the tower-supporting chimney of the present invention is shown. It is a top view. 鉄塔ブロック倒し用ジャッキと、鉄塔ブロック吊り下ろし用ジャッキと、鉄塔ブロックガイド用ジャッキとの設置部分の拡大図である。It is an enlarged view of the installation part of the steel tower block fall jack, the steel tower block hanging jack, and the steel tower block guide jack. 筒身吊り上げ用ジャッキの設置部分の拡大図である。It is an enlarged view of the installation part of the cylinder lifting jack. 煙突を示す平面図である。It is a top view which shows a chimney. この発明の、鉄塔支持型煙突の解体方法によって、鉄塔の1段目(最上段)の鉄塔ブロックを吊り下ろす工程を示す正面図である。It is a front view which shows the process of suspending the steel tower block of the 1st step | level (uppermost stage) of a steel tower by the dismantling method of the steel tower support type chimney of this invention. この発明の、鉄塔支持型煙突の解体方法によって、鉄塔の1段目を解体した後、筒身の下部を切断し、撤去し、この後、筒身を吊り下ろす工程を示す正面図である。It is a front view which shows the process of cut | disconnecting and removing the lower part of a cylindrical body after this dismantling the 1st step | paragraph of a steel tower by the dismantling method of the steel tower support type chimney of this invention, and then suspending a cylindrical body. この発明の、鉄塔支持型煙突の解体方法によって、筒身吊り上げ用ジャッキを据え替える工程を示す正面図である。It is a front view which shows the process of replacing the cylinder lifting jack by the dismantling method of the steel tower support type chimney of this invention. この発明の、鉄塔支持型煙突の解体方法によって、鉄塔の2段目の鉄塔ブロックを吊り下ろす工程を示す正面図である。It is a front view which shows the process of suspending the 2nd steel tower block of a steel tower by the dismantling method of the steel tower support type chimney of this invention. この発明の、鉄塔支持型煙突の解体方法によって、鉄塔の2段目を解体した後、筒身の下部を切断し、撤去し、この後、筒身を吊り下ろす工程を示す正面図である。It is a front view which shows the process of cut | disconnecting the lower part of a cylindrical body after removing the 2nd step | paragraph of a steel tower by the dismantling method of the steel tower support type chimney of this invention, removing it, and suspending a cylindrical body after that. この発明の、鉄塔支持型煙突の解体方法によって、筒身吊り上げ用ジャッキを据え替える工程を示す正面図である。It is a front view which shows the process of replacing the cylinder lifting jack by the dismantling method of the steel tower support type chimney of this invention. この発明の、鉄塔支持型煙突の解体方法によって、鉄塔の3段目の鉄塔ブロックを吊り下ろす工程を示す正面図である。It is a front view which shows the process of hanging the 3rd-stage steel tower block of a steel tower by the dismantling method of the steel tower support type chimney of this invention. この発明の、鉄塔支持型煙突の解体方法によって、鉄塔の3段目を解体した後、筒身の下部を切断し、撤去し、この後、筒身を吊り下ろす工程を示す正面図である。It is a front view which shows the process of cut | disconnecting and removing the lower part of a cylindrical body after this disassembling the 3rd stage of a steel tower by the dismantling method of the steel tower support type chimney of this invention, and then suspending a cylindrical body. この発明の、鉄塔支持型煙突の解体方法によって、筒身吊り上げ用ジャッキを据え替える工程を示す正面図である。It is a front view which shows the process of replacing the cylinder lifting jack by the dismantling method of the steel tower support type chimney of this invention. この発明の、鉄塔支持型煙突の解体方法によって、鉄塔の4段目の鉄塔ブロックを吊り下ろす工程を示す正面図である。It is a front view which shows the process of hanging the 4th-stage steel tower block of a steel tower by the dismantling method of the steel tower support type chimney of this invention. この発明の、鉄塔支持型煙突の解体方法によって、鉄塔の4段目を解体した後、筒身の下部を切断し、撤去し、この後、筒身を吊り下ろす工程を示す正面図である。It is a front view which shows the process of cut | disconnecting the lower part of a cylinder after removing the 4th step | paragraph of a steel tower by the dismantling method of the steel tower support type chimney of this invention, and then removing, and then hanging down a cylinder. この発明の、鉄塔支持型煙突の解体方法によって、筒身吊り上げ用ジャッキを据え替える工程を示す正面図である。It is a front view which shows the process of replacing the cylinder lifting jack by the dismantling method of the steel tower support type chimney of this invention. この発明の、鉄塔支持型煙突の解体方法によって、クレーンにより、鉄塔ブロック倒し用ジャッキと、鉄塔ブロック吊り下ろし用ジャッキと、鉄塔ブロックガイド用ジャッキとを吊り下ろす工程を示す正面図である。It is a front view which shows the process of hanging the tower block fall jack, the tower block suspension jack, and the tower block guide jack with a crane by the dismantling method of the tower support type chimney of this invention. この発明の、鉄塔支持型煙突の解体方法によって、筒身の下部を切断した後、撤去し、この後、筒身を吊り下ろす工程を示す正面図である。It is a front view which shows the process of removing after removing the lower part of a cylinder by the dismantling method of the steel tower support type chimney of this invention, and removing it after this. この発明の、鉄塔支持型煙突の解体方法によって、筒身吊り上げ用ジャッキを据え替える工程を示す正面図である。It is a front view which shows the process of replacing the cylinder lifting jack by the dismantling method of the steel tower support type chimney of this invention. この発明の、鉄塔支持型煙突の解体方法によって、筒身の下部を切断した後、撤去し、この後、筒身を吊り下ろす工程を示す正面図である。It is a front view which shows the process of removing after removing the lower part of a cylinder by the dismantling method of the steel tower support type chimney of this invention, and removing it after this. この発明の、鉄塔支持型煙突の解体方法によって、筒身頂部を撤去する工程を示す正面図である。It is a front view which shows the process of removing a cylinder top part by the dismantling method of the steel tower support type chimney of this invention. この発明の、鉄塔支持型煙突の解体方法によって、クレーンにより、筒身吊り上げ用ジャッキを撤去する工程を示す正面図である。It is a front view which shows the process of removing the cylinder lifting jack with a crane by the dismantling method of the steel tower support type chimney of this invention. この発明の、鉄塔支持型煙突の解体方法によって、鉄塔の最下段(5段目)を解体する工程を示す正面図である。It is a front view which shows the process of demolishing the lowest stage (5th stage) of a steel tower by the method of demolishing a steel tower support type chimney of this invention. ヒンジ部分を示す正面図である。It is a front view which shows a hinge part. ヒンジ部分を示す側面図である。It is a side view which shows a hinge part. 鉄塔ブロックをヒンジを支点として下方に倒した状態を示す正面図である。It is a front view which shows the state which fell down the steel tower block by using a hinge as a fulcrum. 従来解体方法により筒身11Aを撤去した図である。It is the figure which removed 11 A of cylinders by the conventional dismantling method. 従来解体方法により筒身11Bを撤去した図である。It is the figure which removed the cylinder 11B with the conventional dismantling method. 従来解体方法によりクローラクレーンにより鉄塔の中間部12Bを撤去した後、筒身11Cと筒身11Dを撤去した図である。It is the figure which removed the cylinder 11C and the cylinder 11D after removing the intermediate part 12B of the steel tower with the crawler crane by the conventional dismantling method. 従来解体方法によりジャッキによる筒身の吊り位置を変えた図である。It is the figure which changed the hanging position of the cylinder with a jack by the conventional dismantling method. 従来解体方法により筒身11Eから筒身11Iを撤去した図である。It is the figure which removed the cylinder 11I from the cylinder 11E by the conventional dismantling method. 従来解体方法によりジャッキによる筒身の吊り位置を変えた図である。It is the figure which changed the hanging position of the cylinder with a jack by the conventional dismantling method. 従来解体方法により筒身の頂部を解体する図である。It is a figure which disassembles the top part of a cylinder body by the conventional dismantling method.

この発明の、鉄塔支持型煙突の解体方法の一実施態様を、図面を参照しながら説明する。   An embodiment of a method for dismantling a steel tower supported chimney according to the present invention will be described with reference to the drawings.

図1は、この発明の、鉄塔支持型煙突の解体方法によって、筒身吊り上げ用ジャッキと、鉄塔ブロック倒し用ジャッキと、鉄塔ブロック吊り下ろし用ジャッキと、鉄塔ブロックガイド用ジャッキとを設置した鉄塔支持型煙突を示す平面図、図2は、鉄塔ブロック倒し用ジャッキと、鉄塔ブロック吊り下ろし用ジャッキと、鉄塔ブロックガイド用ジャッキとの設置部分の拡大図、図3は、筒身吊り上げ用ジャッキの設置部分の拡大図、図4は、煙突を示す平面図である。   FIG. 1 shows a tower support in which a barrel lifting jack, a tower block falling jack, a tower block hanging jack, and a tower block guide jack are installed according to the dismantling method of the tower-supported chimney of the present invention. FIG. 2 is an enlarged view of an installation portion of a tower block tilting jack, a tower block suspension jack, and a tower block guide jack, and FIG. 3 is an installation of a cylinder lifting jack. FIG. 4 is a plan view showing a chimney.

図1から図4において、1は、複数本(この例では、4本)の筒身、2は、4本の筒身1の外側に構築された、筒身1を支持する鉄塔である。この例では、図1に示すように、鉄塔2を、5段階、すなわち、1段目(最上段)、2段目、3段目、4段目、5段目(最下段)に分割して解体、撤去する。鉄塔2は、図4に示すように、平面形状正方形をなしている。   In FIG. 1 to FIG. 4, reference numeral 1 denotes a plurality of (in this example, four) cylinders, and 2 denotes a steel tower that is constructed outside the four cylinders 1 and supports the cylinders 1. In this example, as shown in FIG. 1, the tower 2 is divided into five stages, that is, the first stage (uppermost stage), the second stage, the third stage, the fourth stage, and the fifth stage (lowermost stage). Dismantle and remove. As shown in FIG. 4, the steel tower 2 has a square shape in plan view.

3は、4本の筒身1の中央部に設置されたエレベータ用シャフト(図4参照)であり、エレベータは、例えば、足場の構築時等において使用する。   Reference numeral 3 denotes an elevator shaft (see FIG. 4) installed at the center of the four cylinders 1, and the elevator is used, for example, when building a scaffold.

4は、鉄塔2の下部に設置された、筒身1を吊り上げ可能な筒身吊り上げ用ジャッキである。筒身吊り上げ用ジャッキ4としては、例えば、特許文献2に開示された大形ジャッキを使用する。   Reference numeral 4 denotes a barrel lifting jack that is installed in the lower part of the steel tower 2 and can lift the barrel 1. As the cylinder lifting jack 4, for example, a large jack disclosed in Patent Document 2 is used.

5は、筒身1の頂部に設置された鉄塔ブロック倒し用ジャッキであり、後述する切断された平面形状コ字形をなす鉄塔ブロック2aを、後述するヒンジ8を支点として倒す際に使用するジャッキである。   Reference numeral 5 denotes a tower block tilting jack installed at the top of the barrel 1 and used when a tower block 2a having a cut U-shape that has been cut, which will be described later, is tilted with a hinge 8 described later as a fulcrum. is there.

6は、筒身1の頂部に設置された鉄塔ブロック吊り下ろし用ジャッキであり、鉄塔ブロック2aを吊り下ろす際に使用するジャッキである。   6 is a tower block hanging jack installed at the top of the barrel 1 and is used when hanging the tower block 2a.

7は、地上に設置された鉄塔ブロックガイド用ジャッキであり、鉄塔ブロック吊り下ろし用ジャッキ6により吊り下ろされる鉄塔ブロック2aをガイドする際に使用するジャッキである。   7 is a tower block guide jack installed on the ground, which is used to guide the tower block 2a suspended by the tower block suspension jack 6.

鉄塔ブロック倒し用ジャッキ5、鉄塔ブロック吊り下ろし用ジャッキ6、鉄塔ブロックガイド用ジャッキ7としては、例えば、特許文献3に開示された小型ジャッキを使用する。   As the steel tower block tilting jack 5, the steel tower block hanging jack 6, and the steel tower block guide jack 7, for example, a small jack disclosed in Patent Document 3 is used.

8は、鉄塔ブロック2aの下部と、未切断の鉄塔2の上部とを連結するヒンジである。   8 is a hinge which connects the lower part of the steel tower block 2a and the upper part of the uncut steel tower 2;

次に、この発明の、鉄塔支持型煙突の解体方法による煙突の解体方法について説明する。   Next, a method for disassembling a chimney according to a method for disassembling a steel tower supported chimney according to the present invention will be described.

(a)工程(ジャッキ設置工程)
先ず、図5(a)、図2、図3に示すように、鉄塔2の下部に、筒身1を吊り上げ可能な筒身吊り上げ用ジャッキ4を設置し、筒身1の頂部に、切断された鉄塔ブロック2aをヒンジ8を支点として倒す鉄塔ブロック倒し用ジャッキ5と、鉄塔ブロック2aを吊り下ろす鉄塔ブロック吊り下ろし用ジャッキ6とを設置し、地上に、鉄塔ブロック吊り下ろし用ジャッキ6により吊り下ろされる鉄塔ブロック2aをガイドする鉄塔ブロックガイド用ジャッキ7を設置する。
(A) Process (jack installation process)
First, as shown in FIGS. 5 (a), 2, and 3, a barrel lifting jack 4 capable of lifting the barrel 1 is installed at the lower portion of the tower 2, and is cut at the top of the barrel 1. The tower block tilting jack 5 for tilting the tower block 2a with the hinge 8 as a fulcrum and the tower block hanging jack 6 for hanging the tower block 2a are installed and suspended on the ground by the tower block hanging jack 6. A steel tower block guide jack 7 is installed to guide the steel tower block 2a.

(b)工程(連結工程)
次に、図5(a)、図2に示すように、鉄塔2の1段目、すなわち、鉄塔2の最上段の下部と、鉄塔2の2段目、すなわち、次段の上部とをヒンジ8により連結する。
(B) Process (linking process)
Next, as shown in FIGS. 5A and 2, the first stage of the tower 2, that is, the lowermost part of the upper part of the tower 2, and the second stage of the tower 2, that is, the upper part of the next stage are hinged. 8 is connected.

(c)工程(鉄塔切断工程)
次に、鉄塔2の1段目を2つの平面形状コ字形の鉄塔ブロック2aに切断する。すなわち、図2、図5(a)中、切断線(A−A)で示すように、鉄塔2の1段目をその高さ方向に切断し、図6中、切断線を(B−B)で示すように、ヒンジ8部分の鉄塔を水平方向に切断する。
(C) Process (steel tower cutting process)
Next, the first stage of the steel tower 2 is cut into two planar U-shaped steel tower blocks 2a. That is, as shown by the cutting line (AA) in FIG. 2 and FIG. 5A, the first stage of the steel tower 2 is cut in the height direction, and the cutting line in FIG. ), The steel tower at the hinge 8 portion is cut in the horizontal direction.

(d)(鉄塔ブロック倒し工程)
次に、図5(a)に示すように、鉄塔ブロック倒し用ジャッキ5と、鉄塔ブロックガイド用ジャッキ7とを操作して、1段目の鉄塔ブロック2aをヒンジ8を支点として下方に倒す。
(D) (Steel block defeating process)
Next, as shown in FIG. 5A, the steel tower block tilting jack 5 and the steel tower block guide jack 7 are operated to tilt the first steel tower block 2a downward with the hinge 8 as a fulcrum.

(e)(ヒンジ切り離し工程)
次に、ヒンジ8を鉄塔2から切り離す。このときの切断線を、図8中、(C−C)で示す。
(E) (Hinge separation process)
Next, the hinge 8 is separated from the steel tower 2. The cutting line at this time is indicated by (CC) in FIG.

(f)(鉄塔ブロック吊り下ろし工程)
次に、図5(a)に示すように、鉄塔ブロック吊り下ろし用ジャッキ6と、鉄塔ブロック倒し用ジャッキ5と、鉄塔ブロックガイド用ジャッキ7とを操作して、1段目の鉄塔ブロック2aを地上に吊り下ろす。すなわち、鉄塔ブロック吊り下ろし用ジャッキ6と、鉄塔ブロック倒し用ジャッキ5とを調整しながら鉄塔ブロック1aを吊り下ろしていき、地上近くで鉄塔ブロックガイド用ジャッキ7を張って、徐々に鉄塔ブロック1aを水平状態に戻して、地上に着座させる。
(F) (Steel block hanging process)
Next, as shown in FIG. 5 (a), the tower block hanging jack 6, the tower block tilting jack 5, and the tower block guide jack 7 are operated to remove the first tower block 2a. Hanging on the ground. That is, the steel tower block 1a is suspended while adjusting the steel tower block hanging jack 6 and the steel tower block tilting jack 5, and the steel tower block guide jack 7 is stretched near the ground to gradually remove the steel tower block 1a. Return to level and sit on the ground.

(g)(筒身切断撤去工程)
次に、前記(b)工程から前記(f)工程によって、鉄塔2の1段目を解体した後、筒身吊り上げ用ジャッキ4に筒身1の荷重を預けた状態で、筒身1の下部を切断し、撤去する。このときの切断線を、図5(b)中、(D−D)で示す(後述する工程においても同様)。
(G) (Cylinder cutting and removal process)
Next, after the first stage of the steel tower 2 is disassembled by the steps (b) to (f), the lower portion of the barrel 1 is placed in a state where the load of the barrel 1 is left in the barrel lifting jack 4. Cut and remove. The cutting line at this time is indicated by (DD) in FIG. 5B (the same applies to the steps described later).

(h)筒身吊り下ろし工程
次に、図5(b)に示すように、筒身吊り上げ用ジャッキ4により筒身1を、その切断撤去毎に地上に吊り下ろす。なお、エレベータシャフト3は、筒身1の切断時に切断して、撤去する。以下の工程においても同様である。
(H) Cylinder suspension process Next, as shown in FIG.5 (b), the cylinder 1 is suspended on the ground for every cutting and removal with the cylinder lifting jack 4. FIG. The elevator shaft 3 is cut and removed when the cylinder 1 is cut. The same applies to the following steps.

このようにして、鉄塔2の1段目の解体が終了したら、前記(b)工程から前記(h)工程を、鉄塔2の2段目から4段目に亘って順次、繰り返し行う。   When the first stage dismantling of the tower 2 is completed in this way, the process (b) to the process (h) are repeated sequentially from the second stage to the fourth stage of the tower 2.

すなわち、鉄塔2の1段目の解体が終了したら、図5(c)に示すように、筒身吊り上げ用ジャッキ4を据え替えた後、図5(d)に示すように、鉄塔2の2段目の下部と、鉄塔2の3段目の上部とをヒンジ8により連結する。   That is, after the disassembly of the first stage of the tower 2 is completed, as shown in FIG. 5 (c), after the tube lifting jack 4 is replaced, as shown in FIG. The lower part of the stage and the upper part of the third stage of the steel tower 2 are connected by a hinge 8.

次に、鉄塔2の2段目を2つの平面形状コ字形の鉄塔ブロック2aに切断する。   Next, the second stage of the tower 2 is cut into two planar U-shaped tower blocks 2a.

次に、図5(d)に示すように、鉄塔ブロック倒し用ジャッキ5と、鉄塔ブロックガイド用ジャッキ7とを操作して、2段目の鉄塔ブロック2aをヒンジ8を支点として下方に倒す。   Next, as shown in FIG. 5 (d), the steel tower block tilting jack 5 and the steel tower block guide jack 7 are operated to tilt the second steel tower block 2 a downward with the hinge 8 as a fulcrum.

次に、ヒンジ8を鉄塔2から切り離す。   Next, the hinge 8 is separated from the steel tower 2.

次に、鉄塔ブロック吊り下ろし用ジャッキ6と、鉄塔ブロック倒し用ジャッキ5と、鉄塔ブロックガイド用ジャッキ7とを操作して、2段目の鉄塔ブロック2aを地上に吊り下ろす。   Next, the steel tower block hanging jack 6, the steel tower block falling jack 5, and the steel tower block guide jack 7 are operated to suspend the second steel tower block 2a on the ground.

次に、上記工程によって、鉄塔2の2段目を解体した後、筒身吊り上げ用ジャッキ4に筒身1の荷重を預けた状態で、筒身1の下部を切断し、撤去する。   Next, after the second stage of the steel tower 2 is disassembled by the above process, the lower part of the cylinder 1 is cut and removed in a state where the load of the cylinder 1 is left in the cylinder lifting jack 4.

次に、図5(e)に示すように、筒身吊り上げ用ジャッキ4により筒身1を、その切断撤去毎に地上に吊り下ろす。   Next, as shown in FIG. 5 (e), the barrel 1 is suspended from the ground by the barrel lifting jack 4 every time the barrel 1 is cut and removed.

次に、図5(f)に示すように、筒身吊り上げ用ジャッキ4を据え替えた後、図5(g)から図5(j)に示すように、鉄塔2の3段目から4段目についても同様な工程を繰り返し行って、3段目から4段目の鉄塔2を解体する。   Next, as shown in FIG. 5 (f), after the cylinder lifting jack 4 is replaced, as shown in FIGS. 5 (g) to 5 (j), the third to fourth steps of the steel tower 2. The same process is repeated for the eyes to dismantle the steel tower 2 in the third to fourth stages.

このようにして、鉄塔2の1段目から4段目の解体が終了したら、図5(k)に示すように、筒身吊り上げ用ジャッキ4により筒身1を、その切断撤去毎に地上に吊り下ろす。   When the disassembly of the first to fourth stages of the steel tower 2 is completed in this way, as shown in FIG. 5 (k), the barrel 1 is put on the ground every time it is cut and removed by the barrel lifting jack 4. Hanging down.

次に、図5(l)に示すように、筒身吊り上げ用ジャッキ4を据え替える。   Next, as shown in FIG. 5 (l), the barrel lifting jack 4 is replaced.

次に、図5(m)に示すように、クレーン9により、鉄塔ブロック倒し用ジャッキ5と、鉄塔ブロック吊り下ろし用ジャッキ6とを地上に吊り下ろす。   Next, as shown in FIG. 5 (m), the crane block 9 and the steel tower block hanging jack 6 are suspended on the ground by the crane 9.

次に、図5(n)に示すように、筒身1の下部を切断した後、撤去し、この後、筒身吊り上げ用ジャッキ4により筒身1を吊り下ろす。   Next, as shown in FIG. 5 (n), the lower portion of the barrel 1 is cut and then removed, and then the barrel 1 is suspended by the barrel lifting jack 4.

次に、図5(o)に示すように、筒身吊り上げ用ジャッキ4を据え替える。   Next, as shown in FIG. 5 (o), the barrel lifting jack 4 is replaced.

次に、図5(p)に示すように、筒身1の下部を切断した後、撤去し、この後、筒身吊り上げ用ジャッキ4により筒身1を吊り下ろす工程を繰り返し行う。   Next, as shown in FIG. 5 (p), the lower portion of the barrel 1 is cut and then removed, and thereafter, the step of hanging the barrel 1 with the barrel lifting jack 4 is repeated.

次に、図5(q)に示すように、筒身頂部1aを撤去する。   Next, as shown in FIG. 5 (q), the cylinder top 1a is removed.

次に、図5(r)に示すように、クレーン9により、筒身吊り上げ用ジャッキ1bを撤去する。   Next, as shown in FIG. 5 (r), the barrel lifting jack 1b is removed by the crane 9.

次に、図5(s)に示すように、鉄塔2の5段目を解体する。   Next, as shown in FIG. 5 (s), the fifth stage of the steel tower 2 is disassembled.

以上のようにして、この発明により鉄塔支持型煙突を解体することができる。   As described above, the tower-supported chimney can be disassembled according to the present invention.

この発明によれば、鉄塔2の1段目と、鉄塔の2段目とをヒンジ8により連結した後、鉄塔2の1段目を2つの鉄塔ブロック2aに切断し、次いで、鉄塔ブロック2aをヒンジ8を支点として鉄塔ブロック倒し用ジャッキ5と鉄塔ブロックガイド用ジャッキ7とにより下方に倒し、次いで、ヒンジ8を鉄塔2から切り離した後、鉄塔ブロック2aを鉄塔ブロック吊り下ろし用ジャッキ6と、鉄塔ブロック倒し用ジャッキ5と、鉄塔ブロックガイド用ジャッキ7とを操作して吊り下ろし、次いで、筒身1の下部を切断した後、筒身1を筒身吊り上げ用ジャッキ4により吊り下ろす工程を繰り返し行うことによって、大型クレーンを使用することなく、鉄塔支持型煙突を容易に安全かつ確実に解体することができる。   According to this invention, after connecting the first stage of the tower 2 and the second stage of the tower by the hinge 8, the first stage of the tower 2 is cut into two tower blocks 2a, and then the tower block 2a is The hinge 8 is used as a fulcrum and the tower block tilting jack 5 and the tower block guide jack 7 are tilted downward. Next, after the hinge 8 is separated from the tower 2, the tower block 2a is suspended from the tower block jack 6, and the tower The block tilting jack 5 and the tower block guide jack 7 are operated and suspended, and then the lower portion of the barrel 1 is cut, and then the barrel 1 is suspended by the barrel lifting jack 4. Thus, the tower-supported chimney can be easily and securely disassembled without using a large crane.

1:筒身
1a:筒身頂部
2:鉄塔
2a:鉄塔ブロック
3:エレベータシャフト
4:筒身吊り上げ用ジャッキ
5:鉄塔ブロック倒し用ジャッキ
6:鉄塔ブロック吊り下ろし用ジャッキ
7:鉄塔ブロックガイド用ジャッキ
8:ヒンジ
9:クレーン
11:筒身
12:鉄塔
15:ジャッキ
16:ガイドローラ
17:補強材
18:補強材
20:切断位置
21:搬送台車
22:レール
30:クローラクレーン
1: Tube 1a: Tube top 2: Steel tower 2a: Steel tower block 3: Elevator shaft 4: Jack for lifting steel pipe 5: Jack for lifting steel tower block 6: Jack for hanging steel tower block 7: Jack for steel tower block guide 8 : Hinge 9: Crane 11: Tube 12: Steel tower 15: Jack 16: Guide roller 17: Reinforcement material 18: Reinforcement material 20: Cutting position 21: Carriage truck 22: Rail 30: Crawler crane

Claims (4)

複数本の筒身の周囲に、前記筒身を支持する鉄塔が構築された鉄塔支持型煙突の解体方法において、下記(a)工程から(h)工程を備え、
(a)前記鉄塔の下部に、前記筒身を吊り上げ可能な筒身吊り上げ用ジャッキを設置し、前記筒身の頂部に、切断された鉄塔ブロックをヒンジを支点として倒す鉄塔ブロック倒し用ジャッキと、前記鉄塔ブロックを吊り下ろす鉄塔ブロック吊り下ろし用ジャッキとを設置し、地上に、前記鉄塔ブロック吊り下ろし用ジャッキにより吊り下ろされる前記鉄塔ブロックをガイドする鉄塔ブロックガイド用ジャッキを設置するジャッキ設置工程、
(b)前記鉄塔の上段の下部と、前記鉄塔の次段の上部とをヒンジにより連結する連結工程、
(c)前記鉄塔の上段を複数個の鉄塔ブロックに切断する鉄塔切断工程、
(d)前記鉄塔ブロック倒し用ジャッキと、前記鉄塔ブロックガイド用ジャッキとを操作して、前記鉄塔ブロックを前記ヒンジを支点として下方に倒す鉄塔ブロック倒し工程、
(e)前記ヒンジを前記鉄塔から切り離すヒンジ切り離し工程、
(f)前記鉄塔ブロック吊り下ろし用ジャッキと、前記鉄塔ブロック倒し用ジャッキと、前記鉄塔ブロックガイド用ジャッキとを操作して、前記鉄塔ブロックを吊り下ろす鉄塔ブロック吊り下ろし工程、
(g)前記(b)工程から前記(f)工程によって、前記鉄塔の上段を解体した後、前記筒身吊り上げ用ジャッキに前記筒身の荷重を預けた状態で、前記筒身の下部を切断し、撤去する筒身切断撤去工程、
(h)前記筒身吊り上げ用ジャッキにより前記筒身を吊り下ろす筒身吊り下ろし工程、
前記(b)工程から前記(h)工程を、前記鉄塔の上段から下段に亘って順次、繰り返し行うことを特徴とする、鉄塔支持型煙突の解体方法。
In a dismantling method of a tower-supported chimney in which a steel tower that supports the cylinder is constructed around a plurality of cylinders, the following steps (a) to (h) are provided,
(A) At the bottom of the steel tower, a cylinder lifting jack capable of lifting the cylinder is installed, and at the top of the cylinder, a steel tower block tilting jack is used to tilt the cut steel tower block as a fulcrum, A jack installation step of installing a tower block suspension jack for hanging the tower block, and installing a tower block guide jack for guiding the tower block suspended by the tower block suspension jack on the ground,
(B) a connecting step of connecting the lower part of the upper stage of the steel tower and the upper part of the next stage of the steel tower with a hinge;
(C) a steel tower cutting step of cutting the upper stage of the steel tower into a plurality of steel tower blocks;
(D) a tower block tilting step of operating the tower block tilting jack and the tower block guide jack to tilt the tower block downward with the hinge as a fulcrum;
(E) a hinge separating step for separating the hinge from the steel tower;
(F) a tower block hanging step of hanging the tower block by operating the tower block hanging jack, the tower block falling jack, and the tower block guide jack;
(G) After the upper stage of the steel tower is disassembled by the steps (b) to (f), the lower part of the cylinder is cut in a state where the load of the cylinder is left in the cylinder lifting jack. And the barrel cutting and removing process to be removed,
(H) a cylinder hanging process of hanging the cylinder with the cylinder lifting jack;
A method of dismantling a tower-supported chimney, wherein the steps (b) to (h) are repeated sequentially from the upper stage to the lower stage of the tower.
前記筒身は、4本であることを特徴とする、請求項1に記載の、鉄塔支持型煙突の解体方法。   The method of disassembling a tower-supported chimney according to claim 1, wherein the number of the cylinders is four. 請求項1または2に記載の発明において、前記鉄塔は、平面形状が正方形であることを特徴とする、請求項1または2に記載の、鉄塔支持型煙突の解体方法。   3. The method of disassembling a tower-supported chimney according to claim 1 or 2, wherein the tower has a square shape in plan view. 前記鉄塔ブロックは、平面形状コ字形をなし、2つからなっていることを特徴とする、請求項1から3の何れか1つに記載の、鉄塔支持型煙突の解体方法。   The method of disassembling a tower-supported chimney according to any one of claims 1 to 3, wherein the tower block has a U-shaped planar shape and is composed of two.
JP2017066939A 2017-03-30 2017-03-30 Method of dismantling tower supported chimney Active JP6533550B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017066939A JP6533550B2 (en) 2017-03-30 2017-03-30 Method of dismantling tower supported chimney

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017066939A JP6533550B2 (en) 2017-03-30 2017-03-30 Method of dismantling tower supported chimney

Publications (2)

Publication Number Publication Date
JP2018168601A true JP2018168601A (en) 2018-11-01
JP6533550B2 JP6533550B2 (en) 2019-06-19

Family

ID=64019326

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017066939A Active JP6533550B2 (en) 2017-03-30 2017-03-30 Method of dismantling tower supported chimney

Country Status (1)

Country Link
JP (1) JP6533550B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108571183A (en) * 2018-06-11 2018-09-25 威海市华塔建筑机械有限公司 A kind of chimney class structures remove device and method for dismounting
CN112144905A (en) * 2020-09-22 2020-12-29 九州职业技术学院 Waste coal storage bin reinforcing method
CN112502472A (en) * 2020-11-27 2021-03-16 上海建工五建集团有限公司 Support bearing capacity conversion device and construction method thereof
CN115354882A (en) * 2022-07-15 2022-11-18 安徽送变电工程有限公司 Method for dismantling ultra-large spanning old electric tower
CN117166816A (en) * 2023-11-03 2023-12-05 北京市第三建筑工程有限公司 Method for dismantling overhanging arc-shaped beam of high-rise building

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010242429A (en) * 2009-04-08 2010-10-28 Takenaka Komuten Co Ltd Demolition method for steel tower
JP2012225006A (en) * 2011-04-18 2012-11-15 Furukawa C&B Co Ltd Demolition method
JP2015055090A (en) * 2013-09-11 2015-03-23 太平電業株式会社 Demolition method for steel tower supported stack

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010242429A (en) * 2009-04-08 2010-10-28 Takenaka Komuten Co Ltd Demolition method for steel tower
JP2012225006A (en) * 2011-04-18 2012-11-15 Furukawa C&B Co Ltd Demolition method
JP2015055090A (en) * 2013-09-11 2015-03-23 太平電業株式会社 Demolition method for steel tower supported stack

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108571183A (en) * 2018-06-11 2018-09-25 威海市华塔建筑机械有限公司 A kind of chimney class structures remove device and method for dismounting
CN108571183B (en) * 2018-06-11 2023-12-19 威海市华塔建筑机械有限公司 Chimney structure dismantling device and method
CN112144905A (en) * 2020-09-22 2020-12-29 九州职业技术学院 Waste coal storage bin reinforcing method
CN112502472A (en) * 2020-11-27 2021-03-16 上海建工五建集团有限公司 Support bearing capacity conversion device and construction method thereof
CN112502472B (en) * 2020-11-27 2022-07-19 上海建工五建集团有限公司 Support bearing capacity conversion device and construction method thereof
CN115354882A (en) * 2022-07-15 2022-11-18 安徽送变电工程有限公司 Method for dismantling ultra-large spanning old electric tower
CN115354882B (en) * 2022-07-15 2023-08-22 安徽送变电工程有限公司 Method for dismantling ultra-large spanning old electric tower
CN117166816A (en) * 2023-11-03 2023-12-05 北京市第三建筑工程有限公司 Method for dismantling overhanging arc-shaped beam of high-rise building
CN117166816B (en) * 2023-11-03 2024-04-12 北京市第三建筑工程有限公司 Method for dismantling overhanging arc-shaped beam of high-rise building

Also Published As

Publication number Publication date
JP6533550B2 (en) 2019-06-19

Similar Documents

Publication Publication Date Title
JP2018168601A (en) Dismantling method of chimney supported with steel tower
CN104863362B (en) The arch barrel lattice shell construction technology that the sliding of arch steel lattice moulding bed is installed is set
CN107879257A (en) For lifting heavy duty equipment
JP5977216B2 (en) Demolition method of tower-supported chimney
JP6839681B2 (en) How to dismantle a tower-supported chimney
JP4559313B2 (en) Demolition method of steel tower supported chimney
JP2012052306A (en) Stack dismantlement method
JP5123120B2 (en) Dismantling method of large storage tank
JP6543654B2 (en) Demolition method of collective chimney
JP5977224B2 (en) Dismantling method for large tower structure
JP4984493B2 (en) Blast furnace demolition method and blast furnace construction method
JP2019206817A (en) Demolition method for steel tower- supported chimney and demolishing device for steel tower-supported chimney
JP6185001B2 (en) Dismantling method of multi-legged steel chimney
JP4001332B2 (en) Chimney demolition scaffold device and chimney demolition method using the device
JP2011149163A (en) Overhaul facility for steel tower support structure and method for overhauling the same
JP5750362B2 (en) Demolition method for tower structure
JP6185007B2 (en) Dismantling method of polar crane in reactor containment vessel
JP2010149961A (en) Crane replacing apparatus and method for replacing crane using the same
JP6159197B2 (en) Steel tower dismantling method and dismantling apparatus
JP5953404B1 (en) Dismantling method of multi-legged steel chimney
JP2004076256A6 (en) Chimney demolition scaffold device and chimney demolition method using the device
TW201508145A (en) Method for constructing cylindrical tank
JP6285386B2 (en) Dismantling method of multi-legged steel chimney
JP7044393B2 (en) Tower-shaped structure dismantling method and tower-shaped structure dismantling device
JP5941696B2 (en) Storage tank dismantling method and construction method, and dismantling or construction equipment

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190418

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190507

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190524

R150 Certificate of patent or registration of utility model

Ref document number: 6533550

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250