JP2018131877A - Installation method of precast member, temporary presser - Google Patents

Installation method of precast member, temporary presser Download PDF

Info

Publication number
JP2018131877A
JP2018131877A JP2017028298A JP2017028298A JP2018131877A JP 2018131877 A JP2018131877 A JP 2018131877A JP 2017028298 A JP2017028298 A JP 2017028298A JP 2017028298 A JP2017028298 A JP 2017028298A JP 2018131877 A JP2018131877 A JP 2018131877A
Authority
JP
Japan
Prior art keywords
precast member
temporary
hole
precast
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2017028298A
Other languages
Japanese (ja)
Other versions
JP6814656B2 (en
Inventor
佳大 中村
Yoshihiro Nakamura
佳大 中村
宏延 林
Kying-Jeong Yim
宏延 林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2017028298A priority Critical patent/JP6814656B2/en
Publication of JP2018131877A publication Critical patent/JP2018131877A/en
Application granted granted Critical
Publication of JP6814656B2 publication Critical patent/JP6814656B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide an installation method of a precast member or the like, capable of easily installing the precast member.SOLUTION: An anchor bolt 3 which is fixed to a ground covering part 2 of a floor slab of a highway bridge and the like is passed through a hole 111 on an undersurface of a recess 11 of a precast member 10, and the precast member 10 is arranged on the ground covering part 2 via a frame body 4 with elasticity. Then, a temporary presser 20 is arranged on the undersurface of the recess 11 of the precast member 10 through the anchor bolt 3 into its opening 211. Then, on the top surface of the temporary presser 20, a nut 24 is fastened through a washer 23 to the anchor bolt 3. Then, a solidification material is injected into the hole 111 of the precast member 10 to fill the space between the precast member 10 and the ground covering part 2 with the solidification material. A space 30 opened to the lateral side is formed between the hole 111 of the precast member 10 and the top surface of the temporary presser 20.SELECTED DRAWING: Figure 5

Description

本発明は、プレキャスト部材の設置方法およびこれに用いる仮押さえ具に関する。   The present invention relates to a method for installing a precast member and a temporary presser used therefor.

道路橋や鉄道橋等の床版の両側には、人、物の墜落防止や目隠し、防音等のために高欄が設けられる。この高欄は、FRP(繊維強化プラスチック)等によるプレキャスト部材を設置して構築されることがあり、工期短縮等を実現できる(特許文献1参照)。   On both sides of floor slabs such as road bridges and railway bridges, rails are provided to prevent people and objects from falling, blindfolding, and soundproofing. This handrail is sometimes constructed by installing a precast member made of FRP (fiber reinforced plastic) or the like, and can shorten the work period or the like (see Patent Document 1).

例えば、プレキャスト部材を床版の両側に設けた地覆部の上に弾性部材を介して配置し、この時プレキャスト部材の孔に地覆部から突出したアンカーボルトを差込む。このアンカーボルトの上端に座金を通しナットを締込んで、ナットの締付によりプレキャスト部材の高さや建ち(姿勢)の調整と仮固定を行う。   For example, the precast member is disposed on the ground cover portion provided on both sides of the floor slab via the elastic member, and at this time, the anchor bolt protruding from the ground cover portion is inserted into the hole of the precast member. A washer is passed through the upper end of the anchor bolt, and a nut is tightened. By tightening the nut, the height and construction (posture) of the precast member are adjusted and temporarily fixed.

その後、プレキャスト部材と地覆部の間に無収縮モルタル等の固化材を充填する手順となり、固化材の固化によってプレキャスト部材が固定される。   Then, it becomes the procedure of filling solidifying materials, such as a non-shrink mortar, between a precast member and a ground cover part, and a precast member is fixed by solidification of a solidifying material.

特開2009-074304号公報JP 2009-074304

充填性等を考慮すると、上記の固化材はプレキャスト部材の孔から注入するのが好ましいが、そのためには座金やナットを一旦取外して仮固定を解除する必要があり、この時プレキャスト部材の高さ等が狂う恐れがある。その場合にはプレキャスト部材の高さ等を再調整する必要が生じ、プレキャスト部材の設置に手間が掛かる。   In consideration of filling properties and the like, it is preferable to inject the solidified material from the hole of the precast member. For this purpose, it is necessary to remove the washer and the nut once to release the temporary fixing. There is a risk of madness. In that case, it becomes necessary to readjust the height of the precast member, and it takes time to install the precast member.

本発明は上記の問題に鑑みてなされたものであり、プレキャスト部材を容易に設置できるプレキャスト部材の設置方法等を提供することを目的とする。   This invention is made | formed in view of said problem, and it aims at providing the installation method of the precast member etc. which can install a precast member easily.

前述した課題を解決するための第1の発明は、プレキャスト部材を対象面上に設置する設置方法であって、前記プレキャスト部材の孔に前記対象面に固定されたボルトを通し、前記プレキャスト部材を前記対象面上に弾性部材を介して配置する工程と、仮押さえ具の挿通部に前記ボルトを通し、前記仮押さえ具を前記プレキャスト部材の前記孔が設けられた面の上に配置する工程と、前記仮押さえ具の上面において、前記ボルトに仮締結具を締込む工程と、前記プレキャスト部材の前記孔に固化材を注入して前記プレキャスト部材と前記対象面の間に前記固化材を充填する工程と、を有し、前記プレキャスト部材の前記孔と前記仮押さえ具の上面との間に、側方に開いた空間が形成され、前記空間から前記固化材の注入が行われることを特徴とするプレキャスト部材の設置方法である。   1st invention for solving the subject mentioned above is an installation method which installs a precast member on an object surface, a bolt fixed to the object surface is passed through a hole of the precast member, and the precast member is installed. A step of placing the elastic member on the target surface, a step of passing the bolt through the insertion portion of the temporary pressing tool, and a step of arranging the temporary pressing tool on the surface of the precast member provided with the hole; A step of tightening a temporary fastener to the bolt on the upper surface of the temporary pressing tool, and a solidifying material is injected into the hole of the precast member to fill the solidified material between the precast member and the target surface. A space opened laterally is formed between the hole of the precast member and the upper surface of the temporary presser, and the solidifying material is injected from the space. A method of installing precast members.

本発明によれば、上記のように仮押さえ具を用いることで、前記したプレキャスト部材の高さ等の調整および仮固定を、プレキャスト部材の孔から固化材を注入可能な状態で行える。そのため、固化材の注入時にプレキャスト部材の仮固定を解除する必要が無く、高さ等を再調整する手間も掛からない。結果、作業手順が減り工程が簡素化されるためプレキャスト部材の設置時間を大幅に短縮可能であり、作業員の安全性も向上する。   According to the present invention, by using the temporary pressing tool as described above, the adjustment of the height and the like of the above-mentioned precast member and temporary fixing can be performed in a state where the solidification material can be injected from the hole of the precast member. Therefore, it is not necessary to release the temporary fixing of the precast member at the time of injecting the solidifying material, and it is not necessary to readjust the height or the like. As a result, the work procedure is reduced and the process is simplified, so that the installation time of the precast member can be greatly shortened, and the safety of the worker is improved.

前記固化材が固化した後、前記仮締結具を取外して前記仮押さえ具を撤去し、締結具を前記ボルトに締込むことが望ましい。
固化材の固化によりプレキャスト部材の固定が行われるので、仮締結具を取外して仮押さえ具を撤去することが可能になり、これらの仮締結具と仮押さえ具を転用することが可能になる。
After the solidified material is solidified, it is desirable to remove the temporary fastener, remove the temporary retainer, and tighten the fastener to the bolt.
Since the precast member is fixed by solidifying the solidifying material, the temporary fastener can be removed and the temporary retainer can be removed, and the temporary fastener and the temporary retainer can be diverted.

前記プレキャスト部材の平面において前記仮押さえ具が複数配置され、各仮押さえ具の前記挿通部に前記ボルトが通され、各ボルトに前記仮締結具が締込まれることが望ましい。
これら複数の仮押さえ具の挿通部に通したボルトのそれぞれにおいて、仮締結具の締付を調整することで、プレキャスト部材の姿勢を調整することが可能になる。
It is desirable that a plurality of the temporary pressers are arranged on the plane of the precast member, the bolts are passed through the insertion portions of the temporary pressers, and the temporary fasteners are fastened to the bolts.
It is possible to adjust the posture of the precast member by adjusting the tightening of the temporary fastener in each of the bolts passed through the insertion portions of the plurality of temporary pressers.

前記仮押さえ具は平面において複数の前記挿通部を有し、各挿通部に前記ボルトが通され、各ボルトに前記仮締結具が締込まれることが望ましい。
仮押さえ具の複数の挿通部に通したボルトのそれぞれにおいて、仮締結具の締付を調整することでも、プレキャスト部材の姿勢の調整が可能になる。
It is desirable that the temporary pressing tool has a plurality of insertion portions in a plane, the bolts are passed through the insertion portions, and the temporary fasteners are tightened into the bolts.
It is possible to adjust the posture of the precast member by adjusting the tightening of the temporary fastener in each of the bolts passed through the plurality of insertion portions of the temporary presser.

前記プレキャスト部材の側面に凹部が設けられ、前記プレキャスト部材の前記孔は前記凹部の下面に設けられ、前記仮押さえ具は前記凹部の下面の上に配置されることが望ましい。
これにより、プレキャスト部材の設置に係る一連の作業をプレキャスト部材の側方から容易に行うことができる。
It is desirable that a concave portion is provided on a side surface of the precast member, the hole of the precast member is provided on a lower surface of the concave portion, and the temporary pressing tool is disposed on a lower surface of the concave portion.
Thereby, a series of work concerning installation of a precast member can be easily performed from the side of a precast member.

前記仮押さえ具は、天板と、前記天板の両側に設けられた側板と、を有し、前記天板に前記挿通部である開口が形成されることが望ましい。
これにより、仮押さえ具が簡易な構成となり、鋼板等の加工により簡単に製作することができて低コストになる。
The temporary pressing tool preferably includes a top plate and side plates provided on both sides of the top plate, and an opening which is the insertion portion is formed in the top plate.
Thereby, a temporary pressing tool becomes a simple structure, and it can manufacture easily by processing a steel plate etc., and becomes low-cost.

前記プレキャスト部材は高欄を構成するものであることが望ましい。
これにより、プレキャスト部材の設置により道路橋や鉄道橋等の高欄を容易に構築できるようになる。
The precast member preferably constitutes a balustrade.
Thereby, it becomes possible to easily construct rails such as road bridges and railway bridges by installing precast members.

第2の発明は、対象面上に弾性部材を介して配置されたプレキャスト部材の仮押さえを行うための仮押さえ具であって、前記対象面に固定され前記プレキャスト部材の孔に通されたボルトを通すための挿通部を有し、前記挿通部に前記ボルトを通して前記仮押さえ具を前記プレキャスト部材の前記孔が設けられた面の上に配置した際に、前記プレキャスト部材の前記孔と前記仮押さえ具の上面との間に、側方に開いた空間が形成されることを特徴とする仮押さえ具である。   A second invention is a temporary pressing tool for temporarily pressing a precast member disposed on an object surface via an elastic member, and is a bolt fixed to the object surface and passed through a hole of the precast member. When the temporary pressing tool is disposed on the surface of the precast member on the surface provided with the hole, the temporary hole and the temporary hole are inserted into the insertion portion. The temporary pressing tool is characterized in that a space opened laterally is formed between the upper surface of the pressing tool.

本発明により、プレキャスト部材を容易に設置できるプレキャスト部材の設置方法等を提供することができる。   According to the present invention, it is possible to provide a method for installing a precast member and the like that can easily install the precast member.

プレキャスト部材10による高欄100を示す図。The figure which shows the handrail 100 by the precast member 10. FIG. プレキャスト部材10の設置方法について説明する図。The figure explaining the installation method of the precast member. プレキャスト部材10の設置方法について説明する図。The figure explaining the installation method of the precast member. 仮押さえ具20を示す図。The figure which shows the temporary pressing tool 20. FIG. プレキャスト部材10の設置方法について説明する図。The figure explaining the installation method of the precast member. プレキャスト部材10の設置方法について説明する図。The figure explaining the installation method of the precast member. 仮押さえ具20a、20b、20cを示す図。The figure which shows temporary pressing tool 20a, 20b, 20c. 仮押さえ具20dを示す図。The figure which shows the temporary pressing tool 20d. 空間30aについて示す図。The figure shown about the space 30a.

以下、図面に基づいて本発明の好適な実施形態について詳細に説明する。   Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the drawings.

(1.高欄100)
図1(a)はプレキャスト部材10によって構成された高欄100を示す図であり、図1(b)はプレキャスト部材10の凹部11の鉛直方向の断面を示す図である。以降の図2、3においても同様である。
(1. Handrail 100)
FIG. 1A is a view showing a rail 100 constituted by the precast member 10, and FIG. 1B is a view showing a vertical section of the concave portion 11 of the precast member 10. The same applies to FIGS.

高欄100は、道路橋や鉄道橋等において、床版1の両側の地覆部2(対象面)の上に複数のプレキャスト部材10を並べて設置することで構築される。プレキャスト部材10はFRP等を用いた樹脂製の中空部材であり、軽量且つ高強度で人力により設置できるものとなっている。ただし、プレキャスト部材10を中実の部材としてもよいし、コンクリート製の部材とすること等も可能である。   The handrail 100 is constructed by arranging a plurality of precast members 10 side by side on the ground covering portions 2 (target surfaces) on both sides of the floor slab 1 in a road bridge, a railway bridge, or the like. The precast member 10 is a resin hollow member using FRP or the like, and is light and high in strength and can be installed by human power. However, the precast member 10 may be a solid member, a concrete member, or the like.

プレキャスト部材10は、弾性部材による枠体4を介して地覆部2上に配置される。枠体4には例えば発泡ポチエチレンフォーム等の樹脂を用いることができる。しかしながら、適度な弾性を有するものであればこれに限ることはない。   The precast member 10 is arrange | positioned on the ground cover part 2 via the frame 4 by an elastic member. For the frame 4, for example, a resin such as foamed polyethylene foam can be used. However, it is not limited to this as long as it has moderate elasticity.

枠体4は、プレキャスト部材10の厚さ方向の両端部において、プレキャスト部材10の幅方向に連続するように配置される。プレキャスト部材10の厚さ方向は図1(b)の左右方向に対応する。プレキャスト部材10の幅方向は、プレキャスト部材10の厚さ方向と平面において直交する方向である。   The frame body 4 is disposed at both ends in the thickness direction of the precast member 10 so as to be continuous in the width direction of the precast member 10. The thickness direction of the precast member 10 corresponds to the left-right direction in FIG. The width direction of the precast member 10 is a direction orthogonal to the thickness direction of the precast member 10 in a plane.

プレキャスト部材10の底面と地覆部2の上面の間には固化材5が充填される。固化材5は枠体4の内側に充填される。固化材5には無収縮モルタル等を用いることができるが、これに限ることはない。   A solidified material 5 is filled between the bottom surface of the precast member 10 and the top surface of the ground covering portion 2. The solidifying material 5 is filled inside the frame body 4. Non-shrink mortar or the like can be used for the solidifying material 5, but is not limited thereto.

プレキャスト部材10の側面の下部には凹部11が設けられる。本実施形態では、平面において、プレキャスト部材10の幅方向に複数の凹部11が設けられる。   A recess 11 is provided in the lower part of the side surface of the precast member 10. In the present embodiment, a plurality of recesses 11 are provided in the width direction of the precast member 10 in the plane.

各凹部11の下面には、プレキャスト部材10の厚さ方向に複数の孔111が設けられる。これらの孔111は、プレキャスト部材10の凹部11の下面とプレキャスト部材10の底面の間を貫通している。   A plurality of holes 111 are provided in the thickness direction of the precast member 10 on the lower surface of each recess 11. These holes 111 penetrate between the lower surface of the recess 11 of the precast member 10 and the bottom surface of the precast member 10.

図1の例では、1つのプレキャスト部材10に2箇所の凹部11が設けられ、各凹部11に孔111が2つ配置される。従って、プレキャスト部材10に計4つの孔111が設けられ、これらの孔111のそれぞれに、床版1の地覆部2に固定されたアンカーボルト3(ボルト)が通される。各アンカーボルト3の下部は地覆部2やその下の床版1のコンクリートに埋設されている。   In the example of FIG. 1, two recesses 11 are provided in one precast member 10, and two holes 111 are arranged in each recess 11. Accordingly, a total of four holes 111 are provided in the precast member 10, and anchor bolts 3 (bolts) fixed to the ground covering portion 2 of the floor slab 1 are passed through these holes 111. The lower part of each anchor bolt 3 is embed | buried in the concrete of the ground covering part 2 and the floor slab 1 under it.

プレキャスト部材10の凹部11の下面の上には、開口121を有する座金プレート12(以下、プレートという)が配置される。アンカーボルト3はプレキャスト部材10の孔111とプレート12の開口121を貫通して上方に突出している。アンカーボルト3の突出部分に角座金等の座金13を通してナット14(締結具)を締込むことで、プレキャスト部材10が床版1の地覆部2に確実に固定される。ナット14には緩み防止のためダブルナット等が用いられるが、これに限ることはない。   A washer plate 12 (hereinafter referred to as a plate) having an opening 121 is disposed on the lower surface of the recess 11 of the precast member 10. The anchor bolt 3 protrudes upward through the hole 111 of the precast member 10 and the opening 121 of the plate 12. By tightening a nut 14 (fastener) through a washer 13 such as a square washer to the protruding portion of the anchor bolt 3, the precast member 10 is securely fixed to the ground covering portion 2 of the floor slab 1. A double nut or the like is used for the nut 14 to prevent loosening, but is not limited thereto.

(2.プレキャスト部材10の設置方法)
次に、本発明の実施形態に係るプレキャスト部材10の設置方法について説明する。
(2. Installation method of the precast member 10)
Next, the installation method of the precast member 10 which concerns on embodiment of this invention is demonstrated.

本実施形態では、まず図2に示すように、プレキャスト部材10を地覆部2の上に枠体4を介して配置する。この際、地覆部2から突出したアンカーボルト3の突出部分が、プレキャスト部材10の凹部11の下面に設けた孔111に通される。   In the present embodiment, first, as shown in FIG. 2, the precast member 10 is arranged on the ground covering portion 2 via the frame body 4. At this time, the protruding portion of the anchor bolt 3 protruding from the ground covering portion 2 is passed through the hole 111 provided on the lower surface of the concave portion 11 of the precast member 10.

その後、図3に示すように仮押さえ具20をプレキャスト部材10の凹部11の下面の上に配置する。本実施形態では、プレキャスト部材10の複数(図の例では2つ)の凹部11のそれぞれに仮押さえ具20が配置される。すなわち、プレキャスト部材10の平面において複数の仮押さえ具20が配置される。   Thereafter, as shown in FIG. 3, the temporary presser 20 is disposed on the lower surface of the recess 11 of the precast member 10. In the present embodiment, the temporary presser 20 is disposed in each of the plurality of (two in the illustrated example) recesses 11 of the precast member 10. That is, a plurality of temporary pressers 20 are arranged on the plane of the precast member 10.

図4は仮押さえ具20を示す図である。仮押さえ具20は鋼板等の金属部材を加工して製作され、略矩形状の天板21と側板22を有する。   FIG. 4 is a view showing the temporary holding tool 20. The temporary presser 20 is manufactured by processing a metal member such as a steel plate, and includes a substantially rectangular top plate 21 and side plates 22.

天板21には、平面において複数(図の例では2つ)の開口211が設けられる。これらの開口211は前記したアンカーボルト3を通すための挿通部であり、図3(b)に示すように、天板21の各開口211に前記の孔111から突出したアンカーボルト3の突出部分が通される。   The top plate 21 is provided with a plurality of (two in the illustrated example) openings 211 in a plane. These openings 211 are insertion portions through which the anchor bolts 3 are passed, and as shown in FIG. 3B, the protruding portions of the anchor bolts 3 protruding from the holes 111 into the openings 211 of the top plate 21. Is passed.

側板22は天板21の両側に設けられる。側板22の下端は外側へとかぎ状に折り曲げられており、この折り曲げ部分をプレキャスト部材10の凹部11の下面に載せて配置する。   The side plates 22 are provided on both sides of the top plate 21. The lower end of the side plate 22 is bent outwardly in a hook shape, and this bent portion is placed on the lower surface of the recess 11 of the precast member 10.

こうして仮押さえ具20を配置した後、必要に応じてプレキャスト部材10の平面位置を調整し、図5(a)に示すように、仮押さえ具20の上面において、前記の開口211から突出したアンカーボルト3の突出部分に座金23を通し、ナット24(仮締結具)を締込む。これにより、仮押さえ具20を介してプレキャスト部材10が下方に押付けられる。   After arranging the temporary presser 20 in this way, the planar position of the precast member 10 is adjusted as necessary, and the anchor protruding from the opening 211 on the upper surface of the temporary presser 20 as shown in FIG. A washer 23 is passed through the protruding portion of the bolt 3 and a nut 24 (temporary fastener) is tightened. Thereby, the precast member 10 is pressed downward via the temporary pressing tool 20.

枠体4はプレキャスト部材10の押付けに伴って縮み、ナット24の締付の調整によりプレキャスト部材10の高さが調整される。ナット24からの押付力は、仮押さえ具20の側板22の折り曲げ部分からプレキャスト部材10に面で伝達され、プレキャスト部材10に局所的に力が加わるといったことはない。   The frame 4 contracts as the precast member 10 is pressed, and the height of the precast member 10 is adjusted by adjusting the tightening of the nut 24. The pressing force from the nut 24 is transmitted from the bent portion of the side plate 22 of the temporary pressing tool 20 to the precast member 10 by a surface, and no force is locally applied to the precast member 10.

プレキャスト部材10の幅方向の2箇所の凹部11(図3等参照)で上記のようにアンカーボルト3に対するナット24の締付の調整を行うことで、プレキャスト部材10の幅方向の姿勢(傾斜)を調整できる。また、各凹部11において、プレキャスト部材10の厚さ方向の2つのアンカーボルト3に対するナット24の締付の調整を行うことで、プレキャスト部材10の厚さ方向の姿勢(傾斜)を調整できる。   By adjusting the tightening of the nut 24 to the anchor bolt 3 as described above at the two concave portions 11 (see FIG. 3 and the like) in the width direction of the precast member 10, the posture (inclination) of the precast member 10 in the width direction is adjusted. Can be adjusted. Moreover, in each recessed part 11, the attitude | position (inclination) of the thickness direction of the precast member 10 can be adjusted by adjusting tightening of the nut 24 with respect to the two anchor bolts 3 of the thickness direction of the precast member 10. FIG.

このように、ナット24の締付の調整により、プレキャスト部材10の高さだけでなくプレキャスト部材10の建ち(姿勢)も調整できる。プレキャスト部材10は、ナット24からの押付力と、プレキャスト部材10の押付けに伴って縮んだ枠体4の反発力によって仮固定される。   Thus, by adjusting the tightening of the nut 24, not only the height of the precast member 10 but also the erection (posture) of the precast member 10 can be adjusted. The precast member 10 is temporarily fixed by the pressing force from the nut 24 and the repulsive force of the frame body 4 contracted with the pressing of the precast member 10.

また本実施形態では、仮押さえ具20をプレキャスト部材10の凹部11の下面の上に配置した際、図5(b)に示すように、プレキャスト部材10の孔111と仮押さえ具20の上面との間に空間30が形成される。この空間30は矢印に示すように側方に開いており、プレキャスト部材10の孔111はこの空間30を介して仮押さえ具20の外部と連通するようになっている。   In the present embodiment, when the temporary presser 20 is disposed on the lower surface of the recess 11 of the precast member 10, as shown in FIG. 5B, the hole 111 of the precast member 10 and the upper surface of the temporary presser 20 A space 30 is formed between the two. This space 30 is open to the side as shown by the arrow, and the hole 111 of the precast member 10 communicates with the outside of the temporary presser 20 through this space 30.

じょうろ等を用いて上記の空間30から図6(a)に示すように固化材5をプレキャスト部材10の孔111に注入し、プレキャスト部材10と地覆部2の間に固化材5を充填することができる。固化材5は孔111の上端に達するまで充填される。孔111の上端まで固化材5が充填されたことの確認は、外部からの視認によって行うことができる。本実施形態では固化材5が順打ちにより充填されるので、固化材5の充填性も良好である。   Using a watering can or the like, the solidified material 5 is injected into the hole 111 of the precast member 10 from the space 30 as shown in FIG. 6A, and the solidified material 5 is filled between the precast member 10 and the ground cover portion 2. be able to. The solidified material 5 is filled until reaching the upper end of the hole 111. Confirmation that the solidifying material 5 is filled up to the upper end of the hole 111 can be performed by visual recognition from the outside. In this embodiment, since the solidifying material 5 is filled in order, the filling property of the solidifying material 5 is good.

固化材5が固化するとプレキャスト部材10が固定されるので、座金23とナット24を取外し、図6(b)に示すように仮押さえ具20を撤去する。   Since the precast member 10 is fixed when the solidified material 5 is solidified, the washer 23 and the nut 24 are removed, and the temporary presser 20 is removed as shown in FIG.

そして、図6(c)に示すように、プレート12を、その開口121にアンカーボルト3を通して凹部11の下面の上に配置し、開口121から突出したアンカーボルト3の突出部分に座金13を通して本設のナット14を締込む。これにより、プレキャスト部材10が床版1の地覆部2に確実に固定される。   Then, as shown in FIG. 6C, the plate 12 is placed on the opening 121 through the anchor bolt 3 on the lower surface of the recess 11, and the washer 13 is passed through the washer 13 to the protruding portion of the anchor bolt 3 protruding from the opening 121. The nut 14 is tightened. Thereby, the precast member 10 is reliably fixed to the ground covering portion 2 of the floor slab 1.

以上説明したように、本実施形態によれば、上記のように仮押さえ具20を用いることで、プレキャスト部材10の高さや建ち等の調整および仮固定を、孔111から固化材5を注入可能な状態で行える。そのため、固化材5の注入時にプレキャスト部材10の仮固定を解除する必要が無く、高さや建ち等を再調整する手間も掛からない。   As described above, according to the present embodiment, by using the temporary holding tool 20 as described above, the solidified material 5 can be injected from the hole 111 for adjusting and temporarily fixing the height and the building of the precast member 10. It can be done in a state. Therefore, it is not necessary to release the temporary fixing of the precast member 10 at the time of injecting the solidifying material 5, and it is not necessary to readjust the height and the building.

結果、作業手順が減り工程が簡素化されるためプレキャスト部材10の設置時間を大幅に短縮可能であり、作業員の安全性も向上する。加えて、固化材5の充填確認を外部からの視認により容易に行える利点もある。   As a result, since the work procedure is reduced and the process is simplified, the installation time of the precast member 10 can be greatly shortened, and the safety of the worker is improved. In addition, there is an advantage that confirmation of filling of the solidifying material 5 can be easily performed by visual recognition from the outside.

また、本実施形態では固化材5の固化によりプレキャスト部材10の固定が行われるので、固化材5の固化後、座金23やナット24を取外して仮押さえ具20を撤去することが可能になり、座金23やナット24、仮押さえ具20を転用することが可能になる。   Further, in the present embodiment, the precast member 10 is fixed by solidifying the solidifying material 5, so that after the solidifying material 5 is solidified, it is possible to remove the washer 23 and the nut 24 and remove the temporary presser 20. The washer 23, the nut 24, and the temporary pressing tool 20 can be diverted.

また、本実施形態では前記のようにプレキャスト部材10の平面において複数の仮押さえ具20を配置し、これらの仮押さえ具20の開口211に通されたアンカーボルト3に対してナット24の締付の調整を行うことで、プレキャスト部材10の幅方向の姿勢を調整することが可能になる。   Further, in the present embodiment, as described above, a plurality of temporary pressers 20 are arranged on the plane of the precast member 10, and the nuts 24 are fastened to the anchor bolts 3 passed through the openings 211 of these temporary pressers 20. It is possible to adjust the posture in the width direction of the precast member 10 by performing the adjustment.

また各仮押さえ具20には複数の開口211が形成されており、これら複数の開口211のそれぞれに通されたアンカーボルト3に対してナット24の締付の調整を行うことで、プレキャスト部材10の厚さ方向の姿勢を調整することも可能である。   Each temporary holding tool 20 is formed with a plurality of openings 211, and by adjusting the tightening of the nut 24 with respect to the anchor bolt 3 passed through each of the plurality of openings 211, the precast member 10. It is also possible to adjust the posture in the thickness direction.

また本実施形態では、プレキャスト部材10の側面の凹部11において、仮押さえ具20の設置、プレキャスト部材10の高さ等の調整および仮固定などといったプレキャスト部材10の設置に係る一連の作業をプレキャスト部材10の側方から容易に行うことができる。   Moreover, in this embodiment, in the recessed part 11 of the side surface of the precast member 10, a series of operation | work which concerns on installation of the precast member 10, such as installation of the temporary pressing tool 20, adjustment of the height etc. of the precast member 10, temporary fixation, etc. is performed. It can be easily performed from the side of 10.

また、仮押さえ具20は、前記のように天板21と側板22によって構成された簡易な構成となっているので、鋼板等の加工によって簡単に製作することができ低コストになる。   Moreover, since the temporary pressing tool 20 has a simple structure constituted by the top plate 21 and the side plate 22 as described above, it can be easily manufactured by processing a steel plate or the like and is low in cost.

また、本実施形態では、プレキャスト部材10が床版1の高欄100を構成するものとなっており、プレキャスト部材10の設置により高欄100が容易に構築できるようになる。   In the present embodiment, the precast member 10 constitutes the handrail 100 of the floor slab 1, and the handrail 100 can be easily constructed by installing the precast member 10.

しかしながら、本発明はこれに限ることはない。例えば、プレキャスト部材10の形状は上記したものに限らず、アンカーボルト3を通すための孔111を設けた面の上に仮押さえ具20を配置可能なものであればよい。   However, the present invention is not limited to this. For example, the shape of the precast member 10 is not limited to that described above, and any shape can be used as long as the temporary presser 20 can be disposed on the surface on which the hole 111 for passing the anchor bolt 3 is provided.

また、本実施形態ではプレキャスト部材10により高欄100を構築する例を説明したが、本発明はこれに限ることはなく、各種の構造物をプレキャスト部材10によって構築する際に適用することが可能である。   Moreover, although the example which constructs the handrail 100 by the precast member 10 was demonstrated in this embodiment, this invention is not restricted to this, It is possible to apply when constructing various structures by the precast member 10. is there.

また本実施形態では、床版1の地覆部2に埋設したアンカーボルト3をプレキャスト部材10の高さ等の調整に用いたが、高さ等の調整に用いるボルトはこれに限ることはなく、地覆部2に固定されるものであればよい。   In the present embodiment, the anchor bolt 3 embedded in the ground cover 2 of the floor slab 1 is used for adjusting the height of the precast member 10, but the bolt used for adjusting the height is not limited to this. Anything can be used as long as it is fixed to the ground covering portion 2.

また仮押さえ具も前記したものに限らない。図7〜9はその他の仮押さえ具の例について説明する図である。例えば図7(a)の仮押さえ具20aは、側板22aの下端を内側にかぎ状に折り曲げた点で前記した仮押さえ具20と異なっている。この仮押さえ具20aは、角筒状の鋼管の一部をスリット状に切断するだけで容易に製作できる利点がある。   Also, the temporary presser is not limited to the above. 7-9 is a figure explaining the example of another temporary pressing tool. For example, the temporary presser 20a in FIG. 7A is different from the temporary presser 20 described above in that the lower end of the side plate 22a is bent inwardly in a hook shape. This temporary presser 20a has an advantage that it can be easily manufactured by simply cutting a part of a rectangular tubular steel pipe into a slit shape.

図7(b)の仮押さえ具20bは、側板22bが下方に行くにつれ外側に向かうように傾斜している点で前記した仮押さえ具20と異なる。この仮押さえ具20bを用いる場合、前記した空間30の幅が広くなり、固化材5の注入作業が容易になる利点がある。   The temporary pressing tool 20b shown in FIG. 7B is different from the temporary pressing tool 20 described above in that the side plate 22b is inclined so as to go outward as it goes downward. When this temporary pressing tool 20b is used, there is an advantage that the width of the space 30 described above is widened and the operation of injecting the solidifying material 5 is facilitated.

図7(c)の仮押さえ具20cでは、天板21aとその両側の側板22とで囲まれた端面に端板25が設けられるとともに、天板21aの中間部にスリット状の開口212が設けられる。この仮押さえ具20cは全体として丈夫なものとなり、ナット24の締付時の変形等を防ぐことができる。また固化材5の注入作業も、開口212にじょうろ等を差込んで前記の空間30から行うことができる。   7C, the end plate 25 is provided on the end surface surrounded by the top plate 21a and the side plates 22 on both sides thereof, and the slit-shaped opening 212 is provided in the middle portion of the top plate 21a. It is done. The temporary pressing tool 20c is strong as a whole, and can prevent deformation or the like when the nut 24 is tightened. Also, the solidifying material 5 can be poured from the space 30 by inserting a watering can into the opening 212.

一方、図8(a)の仮押さえ具20dは、所定厚の鋼板を用いた本体に、当該本体を上下に貫通する貫通部26(アンカーボルト3の挿通部)を設けたものである。この例では、図8(b)に示すように、仮押さえ具20dをその貫通部26にアンカーボルト3を通してプレキャスト部材10の凹部11の下面の上に配置し、図9(a)に示すように、本体の上面においてアンカーボルト3に座金23を通しナット24を締め込む。   On the other hand, the temporary pressing tool 20d shown in FIG. 8A has a main body using a steel plate having a predetermined thickness provided with a penetrating portion 26 (an insertion portion for the anchor bolt 3) that vertically penetrates the main body. In this example, as shown in FIG. 8B, the temporary pressing tool 20d is disposed on the lower surface of the concave portion 11 of the precast member 10 through the anchor bolt 3 through the penetration portion 26, as shown in FIG. 9A. Then, the nut 24 is tightened through the washer 23 through the anchor bolt 3 on the upper surface of the main body.

この例でも、仮押さえ具20dをプレキャスト部材10の凹部11の下面の上に配置した際に、図9(b)に示すように、プレキャスト部材10の孔111と仮押さえ具20dの上面との間に空間30aが形成される。この空間30aも矢印に示すように側方に開いており、プレキャスト部材10の孔111が空間30aを介して外部と連通する。固化材5の注入作業は、この空間30aから前記と同様に行うことができる。   Also in this example, when the temporary presser 20d is arranged on the lower surface of the recess 11 of the precast member 10, as shown in FIG. 9B, the hole 111 of the precast member 10 and the upper surface of the temporary presser 20d A space 30a is formed between them. This space 30a is also open to the side as shown by the arrow, and the hole 111 of the precast member 10 communicates with the outside through the space 30a. The operation of injecting the solidifying material 5 can be performed from the space 30a in the same manner as described above.

以上、添付図面を参照して、本発明の好適な実施形態について説明したが、本発明は係る例に限定されない。当業者であれば、本願で開示した技術的思想の範疇内において、各種の変更例または修正例に想到し得ることは明らかであり、それらについても当然に本発明の技術的範囲に属するものと了解される。   The preferred embodiments of the present invention have been described above with reference to the accompanying drawings, but the present invention is not limited to such examples. It will be apparent to those skilled in the art that various changes or modifications can be conceived within the scope of the technical idea disclosed in the present application, and these are naturally within the technical scope of the present invention. Understood.

1:床版
2:地覆部
3:アンカーボルト
4:枠体
5:固化材
10:プレキャスト部材
11:凹部
12:座金プレート
13、23:座金
14、24:ナット
20、20a、20b、20c、20d:仮押さえ具
21、21a:天板
22、22a、22b:側板
25:端板
26:貫通部
30、30a:空間
100:高欄
111:孔
121、211、212:開口
1: floor slab 2: ground cover 3: anchor bolt 4: frame 5: solidified material 10: precast member 11: recess 12: washer plate 13, 23: washer 14, 24: nuts 20, 20a, 20b, 20c, 20d: Temporary presser 21, 21a: Top plate 22, 22a, 22b: Side plate 25: End plate 26: Through part 30, 30a: Space 100: High column 111: Holes 121, 211, 212: Opening

Claims (8)

プレキャスト部材を対象面上に設置する設置方法であって、
前記プレキャスト部材の孔に前記対象面に固定されたボルトを通し、前記プレキャスト部材を前記対象面上に弾性部材を介して配置する工程と、
仮押さえ具の挿通部に前記ボルトを通し、前記仮押さえ具を前記プレキャスト部材の前記孔が設けられた面の上に配置する工程と、
前記仮押さえ具の上面において、前記ボルトに仮締結具を締込む工程と、
前記プレキャスト部材の前記孔に固化材を注入して前記プレキャスト部材と前記対象面の間に前記固化材を充填する工程と、
を有し、
前記プレキャスト部材の前記孔と前記仮押さえ具の上面との間に、側方に開いた空間が形成され、前記空間から前記固化材の注入が行われることを特徴とするプレキャスト部材の設置方法。
An installation method for installing a precast member on a target surface,
Passing a bolt fixed to the target surface through the hole of the precast member, and disposing the precast member on the target surface via an elastic member;
Passing the bolt through the insertion part of the temporary pressing tool, and placing the temporary pressing tool on the surface of the precast member provided with the hole;
Tightening a temporary fastener on the bolt on the upper surface of the temporary presser;
Injecting a solidifying material into the hole of the precast member to fill the solidifying material between the precast member and the target surface;
Have
An installation method of a precast member, wherein a space opened laterally is formed between the hole of the precast member and the upper surface of the temporary pressing tool, and the solidifying material is injected from the space.
前記固化材が固化した後、前記仮締結具を取外して前記仮押さえ具を撤去し、締結具を前記ボルトに締込むことを特徴とする請求項1記載のプレキャスト部材の設置方法。   The precast member installation method according to claim 1, wherein after the solidifying material is solidified, the temporary fastener is removed, the temporary retainer is removed, and the fastener is fastened to the bolt. 前記プレキャスト部材の平面において前記仮押さえ具が複数配置され、
各仮押さえ具の前記挿通部に前記ボルトが通され、
各ボルトに前記仮締結具が締込まれることを特徴とする請求項1または請求項2に記載のプレキャスト部材の設置方法。
A plurality of the temporary pressing tools are arranged in the plane of the precast member,
The bolt is passed through the insertion part of each temporary presser,
The precast member installation method according to claim 1, wherein the temporary fastener is fastened to each bolt.
前記仮押さえ具は平面において複数の前記挿通部を有し、
各挿通部に前記ボルトが通され、
各ボルトに前記仮締結具が締込まれることを特徴とする請求項1から請求項3のいずれかに記載のプレキャスト部材の設置方法。
The temporary pressing tool has a plurality of insertion portions in a plane,
The bolt is passed through each insertion part,
The precast member installation method according to any one of claims 1 to 3, wherein the temporary fastener is fastened to each bolt.
前記プレキャスト部材の側面に凹部が設けられ、
前記プレキャスト部材の前記孔は前記凹部の下面に設けられ、
前記仮押さえ具は前記凹部の下面の上に配置されることを特徴とする請求項1から請求項4のいずれかに記載のプレキャスト部材の設置方法。
A concave portion is provided on a side surface of the precast member,
The hole of the precast member is provided on the lower surface of the recess,
The said temporary pressing tool is arrange | positioned on the lower surface of the said recessed part, The installation method of the precast member in any one of Claims 1-4 characterized by the above-mentioned.
前記仮押さえ具は、
天板と、
前記天板の両側に設けられた側板と、
を有し、
前記天板に前記挿通部である開口が形成されたことを特徴とする請求項1から請求項5のいずれかに記載のプレキャスト部材の設置方法。
The temporary presser is
With the top plate,
Side plates provided on both sides of the top plate;
Have
The opening method which is the said insertion part in the said top plate was formed, The installation method of the precast member in any one of Claims 1-5 characterized by the above-mentioned.
前記プレキャスト部材は高欄を構成するものであることを特徴とする請求項1から請求項6のいずれかに記載のプレキャスト部材の設置方法。   The said precast member comprises a handrail, The installation method of the precast member in any one of Claims 1-6 characterized by the above-mentioned. 対象面上に弾性部材を介して配置されたプレキャスト部材の仮押さえを行うための仮押さえ具であって、
前記対象面に固定され前記プレキャスト部材の孔に通されたボルトを通すための挿通部を有し、
前記挿通部に前記ボルトを通して前記仮押さえ具を前記プレキャスト部材の前記孔が設けられた面の上に配置した際に、前記プレキャスト部材の前記孔と前記仮押さえ具の上面との間に、側方に開いた空間が形成されることを特徴とする仮押さえ具。
A temporary pressing tool for temporarily pressing a precast member arranged on an object surface via an elastic member,
An insertion portion for passing a bolt fixed to the target surface and passed through a hole of the precast member;
When the temporary pressing tool is disposed on the surface of the precast member through the bolt through the insertion portion, the side between the hole of the precast member and the upper surface of the temporary pressing tool is provided. A temporary presser characterized in that an open space is formed.
JP2017028298A 2017-02-17 2017-02-17 Installation method of precast members, temporary retainer Expired - Fee Related JP6814656B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017028298A JP6814656B2 (en) 2017-02-17 2017-02-17 Installation method of precast members, temporary retainer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017028298A JP6814656B2 (en) 2017-02-17 2017-02-17 Installation method of precast members, temporary retainer

Publications (2)

Publication Number Publication Date
JP2018131877A true JP2018131877A (en) 2018-08-23
JP6814656B2 JP6814656B2 (en) 2021-01-20

Family

ID=63249471

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017028298A Expired - Fee Related JP6814656B2 (en) 2017-02-17 2017-02-17 Installation method of precast members, temporary retainer

Country Status (1)

Country Link
JP (1) JP6814656B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109056520A (en) * 2018-09-07 2018-12-21 上海建工材料工程有限公司 A kind of bolt connection of prefabricated overhead guardrail board
KR102641328B1 (en) * 2023-07-25 2024-02-27 주식회사 브리콘 Apparatus for temporarily fixing precast concrete slab panels

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08269911A (en) * 1995-03-30 1996-10-15 Sumitomo Constr Co Ltd Structure of attaching part of concrete wall transom
JPH09296414A (en) * 1996-04-30 1997-11-18 Nippon Samikon Kk Balustrade for concrete wall and road side wall
JPH1018226A (en) * 1996-07-02 1998-01-20 Nippon Doro Kodan Concrete pier and concrete pier reinforcing method and tendon anchoring method
WO2000008259A1 (en) * 1998-08-05 2000-02-17 Autostrade Concessioni E Costruzioni Devices for calibrating the deceleration of colliding vehicles
JP2000220206A (en) * 1999-02-03 2000-08-08 Ando Corp Joint structure of vertical precast concrete member
JP2003129473A (en) * 2001-10-24 2003-05-08 Kowa Sangyo Kk Anchoring method
JP2009074304A (en) * 2007-09-21 2009-04-09 Toray Ind Inc Mounting structure of sound insulating frp wall
JP2013240914A (en) * 2012-05-21 2013-12-05 Sumitomo Mitsui Construction Co Ltd Method for forming through-hole

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08269911A (en) * 1995-03-30 1996-10-15 Sumitomo Constr Co Ltd Structure of attaching part of concrete wall transom
JPH09296414A (en) * 1996-04-30 1997-11-18 Nippon Samikon Kk Balustrade for concrete wall and road side wall
JPH1018226A (en) * 1996-07-02 1998-01-20 Nippon Doro Kodan Concrete pier and concrete pier reinforcing method and tendon anchoring method
WO2000008259A1 (en) * 1998-08-05 2000-02-17 Autostrade Concessioni E Costruzioni Devices for calibrating the deceleration of colliding vehicles
JP2000220206A (en) * 1999-02-03 2000-08-08 Ando Corp Joint structure of vertical precast concrete member
JP2003129473A (en) * 2001-10-24 2003-05-08 Kowa Sangyo Kk Anchoring method
JP2009074304A (en) * 2007-09-21 2009-04-09 Toray Ind Inc Mounting structure of sound insulating frp wall
JP2013240914A (en) * 2012-05-21 2013-12-05 Sumitomo Mitsui Construction Co Ltd Method for forming through-hole

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109056520A (en) * 2018-09-07 2018-12-21 上海建工材料工程有限公司 A kind of bolt connection of prefabricated overhead guardrail board
KR102641328B1 (en) * 2023-07-25 2024-02-27 주식회사 브리콘 Apparatus for temporarily fixing precast concrete slab panels

Also Published As

Publication number Publication date
JP6814656B2 (en) 2021-01-20

Similar Documents

Publication Publication Date Title
KR100748629B1 (en) Device for connecting a precast deck slab with a beam on a bridge and method for connecting the slab with the beam using the device
CZ295073B6 (en) Reinforced panel, its use in the manufacture of pre-assembled plate structure and process for producing structure from such panels
KR101611468B1 (en) Structure and method of fixing main legs of steel tower structure
KR101845717B1 (en) Aseismatic Reinforcement Steel Frame with Hinge Type Friction Slip Brace and Aseismatic Reinforcement Method using thereof
KR101908356B1 (en) Aseismatic Reinforcement Double Steel Frame and Aseismatic Reinforcement Method using thereof
KR102099207B1 (en) Seismic Reinforcement Method of Reinforced Concrete Structures
JP2018131877A (en) Installation method of precast member, temporary presser
KR20180137268A (en) Aseismatic Reinforcement Steel Frame with Friction Slip Brace and Aseismatic Reinforcement Method using thereof
JP4192255B2 (en) Widened embankment structure
JP2005016106A (en) Method for preventing settlement of viaduct
KR101639592B1 (en) Prefabricated lightweight girder and the bridge construction method using the same
JP4398876B2 (en) Structure pier structure
JP6423899B2 (en) Track for maintenance work
JP5028323B2 (en) Ground anchor method
JPH1181737A (en) Vibration control construction for reinforced concrete building and constructing method therefor
JP2006283317A (en) Prestressed concrete floor slab formed of precast concrete plates, and method of constructing the same
JP5982143B2 (en) Reinforcing structure and reinforcing method for existing structure
KR101208087B1 (en) prestressing bridge using the rifling beam and methode for installation thereof
KR101189041B1 (en) Soundproofing walls using piles for constructing foundation and supporting posts and construction method the same
KR102000619B1 (en) Support structure for footbridge and construction method thereof
JP2017137627A (en) Composite structure of steel girder and precast floor slab, precast floor slab, floor slab replacement method
KR101223268B1 (en) a bridge repair and reinforcement method
KR101208088B1 (en) rifling beam for prestressing bridge and device for manufacturing thereof
JP7290940B2 (en) Seismic isolation device installation member, seismic isolation device stand structure, and construction method for seismic isolation device stand
JP3829458B2 (en) Attaching the vibration control device to the building

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190927

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20200717

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20200728

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200909

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20201215

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20201221

R150 Certificate of patent or registration of utility model

Ref document number: 6814656

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees