JP2018073329A5 - - Google Patents

Download PDF

Info

Publication number
JP2018073329A5
JP2018073329A5 JP2016216018A JP2016216018A JP2018073329A5 JP 2018073329 A5 JP2018073329 A5 JP 2018073329A5 JP 2016216018 A JP2016216018 A JP 2016216018A JP 2016216018 A JP2016216018 A JP 2016216018A JP 2018073329 A5 JP2018073329 A5 JP 2018073329A5
Authority
JP
Japan
Prior art keywords
information
product
mold
production
jig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2016216018A
Other languages
Japanese (ja)
Other versions
JP2018073329A (en
JP6944097B2 (en
Filing date
Publication date
Application filed filed Critical
Priority to JP2016216018A priority Critical patent/JP6944097B2/en
Priority claimed from JP2016216018A external-priority patent/JP6944097B2/en
Priority to PCT/JP2017/039542 priority patent/WO2018084180A1/en
Priority to CN201780066537.XA priority patent/CN110168457A/en
Publication of JP2018073329A publication Critical patent/JP2018073329A/en
Publication of JP2018073329A5 publication Critical patent/JP2018073329A5/ja
Application granted granted Critical
Publication of JP6944097B2 publication Critical patent/JP6944097B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Claims (5)

製品を成形する金型又は製品を加工する治工具に関する第1の情報と、前記金型又は治工具を用いて製品を生産する生産設備に関する第2の情報と、前記金型又は治工具及び前記生産設備を用いて生産された製品の少なくとも製品測定値を含む品質に関する第3の情報とを通信ネットワークを使ってリアルタイムに収集する情報収集部と、
前記収集した第1〜第3の情報を前記金型又は前記治工具ごとに統合し、前記統合した第1〜第3の情報に、前記製品の少なくとも製品精度を含む品質に関する管理指標を前記金型又は前記治工具ごとに結び付け、前記結び付けた第1〜第3の情報及び管理指標を、前記製品測定値と製品精度とを関係付けながら、前記マッピングデータとして表示可能に出力する情報生成部と
を具備する生産管理システム。
First information about a mold for molding a product or a jig and a tool for processing the product, second information about a production facility for producing a product using the mold and the jig, and the mold or the jig and the tool. An information collection unit for collecting, in real time, third information on quality including at least a product measurement value of a product produced using the production equipment using a communication network;
The collected first to third information is integrated for each mold or jig and the integrated first to third information includes a management index relating to quality including at least product accuracy of the product in the mold. An information generating unit that outputs the display data as the mapping data while associating the first to third information and management indices with each other with respect to each mold or the jig and tool, while associating the product measurement value and the product accuracy with each other ; A production management system.
請求項1に記載の生産管理システムであって、
前記第1の情報は、前記金型のメンテナンス情報、前記金型の累積ショット数情報及び前記金型のメンテナンスを行った作業者の作業者情報のうち少なくとも1つが含まれ、
前記第2の情報は、前記生産設備が前記金型を用いて製品を成形したときの成形サイクル、生産数、成形条件、前記金型の温度情報及び前記生産設備が配置された環境に関する環境情報のうち少なくとも1つが含まれ、
前記第3の情報は、前記生産された製品の測定情報及び前記製品の測定を行った作業者の作業者情報のうち少なくとも1つが含まれた
生産管理システム。
The production management system according to claim 1, wherein
The first information includes at least one of the mold maintenance information, the cumulative shot number information of the mold, and worker information of a worker who has performed the mold maintenance,
The second information includes a molding cycle when the production equipment molds a product using the mold, a production number, molding conditions, temperature information of the mold, and environmental information on an environment where the production equipment is arranged. At least one of
The production management system, wherein the third information includes at least one of measurement information of the produced product and worker information of a worker who measured the product.
請求項1又は2に記載の生産管理システムであって、
前記管理指標は、損益限界ライン及び生産条件の限界ラインのうち少なくとも1つである
生産管理システム。
The production management system according to claim 1 or 2,
The management index is at least one of a profit / loss limit line and a production condition limit line.
請求項1から3のうちいずれか1項に記載の生産管理システムであって、
前記情報生成部は、前記マッピングデータを閲覧する人の属性に応じた所定の第1〜第3の情報に所定の管理指標を結び付ける
生産管理システム。
The production management system according to any one of claims 1 to 3, wherein
The production management system, wherein the information generation unit associates a predetermined management index with predetermined first to third information corresponding to an attribute of a person who views the mapping data.
製品を成形する金型又は製品を加工する治工具に関する第1の情報と、前記金型又は治工具を用いて前記製品を生産する生産設備に関する第2の情報と、前記金型又は治工具及び生産設備を用いて生産された製品の少なくとも製品測定値を含む品質に関する第3の情報とを通信ネットワークを使ってリアルタイムに収集し、
前記収集した第1〜第3の情報を前記金型又は前記治工具ごとに統合し、
前記統合した第1〜第3の情報に、前記製品の少なくとも製品精度を含む品質に関する管理指標を前記金型又は前記治工具ごとに結び付け、
前記結び付けた第1〜第3の情報及び管理指標を、前記製品測定値と製品精度とを関係付けながら、マッピングデータとして表示する
生産管理方法。
First information on a mold for molding a product or a jig or tool for processing the product, second information on a production facility for producing the product using the mold or the jig, and the mold or the jig and the tool. Collecting in real time, using a communication network, third information on quality , including at least product measurements , of products produced using the production equipment;
Integrating the collected first to third information for each mold or jig ,
To the integrated first to third information, a management index relating to quality including at least product accuracy of the product is associated with each of the molds or the jigs and tools ,
A production management method for displaying the linked first to third information and management indexes as mapping data while associating the product measurement values with the product accuracy .
JP2016216018A 2016-11-04 2016-11-04 Production control system and production control method Active JP6944097B2 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP2016216018A JP6944097B2 (en) 2016-11-04 2016-11-04 Production control system and production control method
PCT/JP2017/039542 WO2018084180A1 (en) 2016-11-04 2017-11-01 Production management system and production management method
CN201780066537.XA CN110168457A (en) 2016-11-04 2017-11-01 Production management system and production management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016216018A JP6944097B2 (en) 2016-11-04 2016-11-04 Production control system and production control method

Publications (3)

Publication Number Publication Date
JP2018073329A JP2018073329A (en) 2018-05-10
JP2018073329A5 true JP2018073329A5 (en) 2019-12-19
JP6944097B2 JP6944097B2 (en) 2021-10-06

Family

ID=62076854

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016216018A Active JP6944097B2 (en) 2016-11-04 2016-11-04 Production control system and production control method

Country Status (3)

Country Link
JP (1) JP6944097B2 (en)
CN (1) CN110168457A (en)
WO (1) WO2018084180A1 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019053699A (en) * 2017-09-19 2019-04-04 トーヨーエイテック株式会社 Quality control system
JP7060535B2 (en) 2019-02-27 2022-04-26 ファナック株式会社 Machine tool machining defect occurrence prediction system
JP7333576B2 (en) * 2019-03-12 2023-08-25 京都機械工具株式会社 Measurement data management device, measurement data management system, and program for measurement data management device
JP7230316B2 (en) * 2019-03-14 2023-03-01 株式会社ニフコ Construction support device and construction support program
JP2022077204A (en) * 2020-11-11 2022-05-23 セイコーエプソン株式会社 Injection molding machine management system
KR102466148B1 (en) 2022-03-28 2022-11-14 에이치디솔루션즈 주식회사 Injection molding analysis system
CN115496426A (en) * 2022-11-16 2022-12-20 承德石油高等专科学校 Industrial big data intelligent analysis decision-making method and system
CN116205543B (en) * 2023-05-04 2023-10-31 张家港广大特材股份有限公司 Method and system for detecting quality of metallurgical steel by combining feedback

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3976640B2 (en) * 2002-08-09 2007-09-19 新日鉄ソリューションズ株式会社 Information processing apparatus, information processing method, and program
JP4128996B2 (en) * 2004-11-11 2008-07-30 オムロン株式会社 Information processing apparatus, operation status management apparatus, information processing method, program, and computer-readable recording medium recording the program
CN2807665Y (en) * 2005-07-15 2006-08-16 上海欣泰通信技术有限公司 Power equipment environment and image centralization monitoring apparatus
JP2006260605A (en) * 2006-05-25 2006-09-28 Nippon Canpack:Kk Decision support system for entrusted package production
TWI590929B (en) * 2008-05-20 2017-07-11 Max Co Ltd Tool
US20120041744A1 (en) * 2010-07-28 2012-02-16 Kantzes Christopher P Handheld field maintenance tool with field device simulation capability
JP2013012100A (en) * 2011-06-30 2013-01-17 Olympus Corp Production management method and production control system
CN104766147B (en) * 2014-01-07 2019-02-05 青岛海尔机器人有限公司 Intelligent device management method and management system
EP2916189B1 (en) * 2014-03-06 2019-05-08 Hexagon Technology Center GmbH Quality assured manufacturing
JP6425198B2 (en) * 2014-03-19 2018-11-21 株式会社Kmc Mold control method using mold electronic medical record system
CN105549557A (en) * 2015-12-16 2016-05-04 天津市奥朗新能源科技有限公司 Real-time dynamic 3D water balance monitoring system of power plant and working method of system
CN105759759A (en) * 2016-03-10 2016-07-13 浙江工贸职业技术学院 Line production equipment and operation intelligent networking management system

Similar Documents

Publication Publication Date Title
JP2018073329A5 (en)
JP6817426B2 (en) Yield prediction system and method for machine learning-based semiconductor manufacturing
CN105034366B (en) A kind of detection method of 3D printer and its printing reduction degree
CN103984287A (en) Numerically-controlled machine tool thermal error compensation grey neural network modeling method
US20150026107A1 (en) System and apparatus that identifies, captures, classifies and deploys tribal knowledge unique to each operator in a semi-automated manufacturing set-up to execute automatic technical superintending operations to improve manufacturing system performance and the methods therefor
CN105397560B (en) One kind is dry to cut chain digital control gear hobbing machine bed and workpiece method for thermal deformation error compensation
CN105739462B (en) intelligent real-time dynamic factory automation management system
JP2018073329A (en) Production management system and production management method
CN110440950B (en) Large-volume concrete temperature monitoring visualization system and method based on optical fiber temperature measurement
TWI598841B (en) Cloud based injection molding system and method thereof
CN103591912B (en) The measuring method of the special-shaped feature locations degree of a kind of ring-shaped work pieces
CN109948746A (en) A kind of sensor-based steel billet information tracing method
JP5831310B2 (en) Method and program for predicting appearance defects of products manufactured with molds
CN107679630A (en) Maintenance operation time estimation method based on proportional maintenance model
CN111368416A (en) Large-scale steel casting mold filling sensing correction method and system
CN108646669A (en) A kind of simplified approach of Machining of Curved Surface piece surface profile errors
CN204278435U (en) A kind of supervising device
CN102706232A (en) Method for designing bumper injection molding piece checking fixture
CN116737665B (en) Cloud storage-based additive manufacturing data management method and system
CN206557032U (en) Mixing plant enterprise production quality checking system based on computer management
JP2016118956A5 (en)
CN104476745B (en) Monitoring device, monitoring method and operation method of data statistics module
RU2013132608A (en) METHOD FOR SCENARIOUS DYNAMIC MODELING OF TECHNICAL AND ECONOMIC INDICATORS OF A LIFE CYCLE OF A POWER OBJECT AND A SOFTWARE AND HARDWARE COMPLEX FOR ITS IMPLEMENTATION
US20150356208A1 (en) Method for generating an enhanced digital mockup
CN105180864B (en) A kind of method for examining composite die deviation