JP2017221966A - Continuous casting apparatus and continuous casting method - Google Patents

Continuous casting apparatus and continuous casting method Download PDF

Info

Publication number
JP2017221966A
JP2017221966A JP2016120661A JP2016120661A JP2017221966A JP 2017221966 A JP2017221966 A JP 2017221966A JP 2016120661 A JP2016120661 A JP 2016120661A JP 2016120661 A JP2016120661 A JP 2016120661A JP 2017221966 A JP2017221966 A JP 2017221966A
Authority
JP
Japan
Prior art keywords
slab
conveyance
sensor
transport
pinch roll
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2016120661A
Other languages
Japanese (ja)
Other versions
JP6202145B1 (en
Inventor
中嶋 健一
Kenichi Nakajima
健一 中嶋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yaskawa Electric Corp
Original Assignee
Yaskawa Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yaskawa Electric Corp filed Critical Yaskawa Electric Corp
Priority to JP2016120661A priority Critical patent/JP6202145B1/en
Application granted granted Critical
Publication of JP6202145B1 publication Critical patent/JP6202145B1/en
Publication of JP2017221966A publication Critical patent/JP2017221966A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Continuous Casting (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a continuous casting apparatus and a continuous casting method by which a position can be tracked more reliably.SOLUTION: A continuous casting apparatus 1 comprises: plural pinch rolls 4 which are arranged along a transportation route R1 of a slab 21 and transport the slab 21; plural sensors 5 which respectively output information concerning at least rotational speeds of the plural pinch rolls 4; and a control unit 100 which is so configured as to execute such an operation that a position of a transportation object T including the slab 21 is derived by use of any one of the plural sensors 5 and such an operation that the sensor, which is used for derivation of the position, among the plural sensors 5 is changed from an upstream side to a downstream side of the transportation route R1 according to movement of the transportation object T.SELECTED DRAWING: Figure 1

Description

本開示は、連続鋳造装置及び連続鋳造方法に関する。   The present disclosure relates to a continuous casting apparatus and a continuous casting method.

特許文献1には、検尺ロールと、ピンチロールとを備える連続鋳造装置が開示されている。検尺ロールは、鋳片と接触すると回転し始める。上記連続鋳造装置は、検尺ロールの回転数と、既知情報である検尺ロールの位置とに基づいて鋳片の位置を計測し、計測した位置情報に基づいてピンチロールを駆動することで鋳片を搬送する。   Patent Document 1 discloses a continuous casting apparatus including a measuring roll and a pinch roll. The measuring roll starts to rotate when it comes into contact with the slab. The continuous casting apparatus measures the position of the cast piece based on the rotation speed of the measuring roll and the position of the measuring roll that is known information, and drives the pinch roll based on the measured position information. Transport the piece.

特公平6−77791号公報Japanese Patent Publication No. 6-77791

本開示は、より確実に鋳片の位置をトラッキングできる連続鋳造装置及び連続鋳造方法を提供することを目的とする。   An object of this indication is to provide the continuous casting apparatus and continuous casting method which can track the position of slab more reliably.

本開示の一側面に係る連続鋳造装置は、鋳片の搬送経路に沿って並び、鋳片を搬送する複数のピンチロールと、複数のピンチロールの少なくとも回転速度に関する情報をそれぞれ出力する複数の第一センサと、複数の第一センサのうちいずれかを用いて鋳片を含む搬送対象物の位置を導出することと、複数の第一センサのうち位置の導出に用いるセンサを搬送対象物の移動に応じて搬送経路の上流側から下流側に切り替えることと、を実行するように構成された制御装置と、を備える。   A continuous casting apparatus according to one aspect of the present disclosure includes a plurality of pinch rolls arranged along a slab conveying path, each of which outputs a plurality of pinch rolls that convey the slab and at least rotational speed information of the plurality of pinch rolls. Deriving the position of a conveyance object including a slab using one sensor and a plurality of first sensors, and moving the conveyance object to be used for deriving the position among the plurality of first sensors And a control device configured to execute switching from the upstream side to the downstream side of the transport path according to

本開示の一側面に係る連続鋳造装置は、鋳片の搬送経路に沿って並び、鋳片を搬送する複数のピンチロールと、複数のピンチロールの少なくとも回転速度に関する情報をそれぞれ出力する複数の第一センサと少なくとも第一鋳片を含む第一搬送対象物と、第一搬送対象物に後続し、少なくとも第二鋳片を含む第二搬送対象物とを同時に搬送し、第一搬送対象物と第二搬送対象物との間隔が、搬送経路に沿って隣り合うピンチロール同士の間隔の最小値に対して5倍以下となるように複数のピンチロールを制御する制御装置と、を備える。   A continuous casting apparatus according to one aspect of the present disclosure includes a plurality of pinch rolls arranged along a slab conveying path, each of which outputs a plurality of pinch rolls that convey the slab and at least rotational speed information of the plurality of pinch rolls. A first conveyance object including at least one sensor and at least a first slab, and a second conveyance object following the first conveyance object and including at least a second slab at the same time, And a control device that controls the plurality of pinch rolls so that the distance from the second transport object is 5 times or less the minimum value of the distance between adjacent pinch rolls along the transport path.

本開示の一側面に係る連続鋳造方法は、鋳片の搬送経路に沿って並び、鋳片を搬送する複数のピンチロールの少なくとも回転速度に関する情報をそれぞれ出力する複数の第一センサのうちいずれかを用いて鋳片を含む搬送対象物の位置を導出することと、複数の第一センサのうち位置の導出に用いるセンサを搬送対象物の搬送に応じて搬送経路の上流側から下流側に切り替えることと、を含む。   The continuous casting method according to one aspect of the present disclosure is any one of a plurality of first sensors that are arranged along a slab conveying path and each output information on at least rotational speeds of a plurality of pinch rolls that convey the slab. And deriving the position of the conveyance object including the slab from among the plurality of first sensors from the upstream side to the downstream side of the conveyance path according to the conveyance of the conveyance object Including.

本開示によれば、より確実に鋳片の位置をトラッキングできる。   According to the present disclosure, the position of the slab can be more reliably tracked.

連続鋳造装置の構成を示す模式図である。It is a schematic diagram which shows the structure of a continuous casting apparatus. 制御装置のハードウェア構成を例示するブロック図である。It is a block diagram which illustrates the hardware constitutions of a control apparatus. 鋳造制御の実行手順を示すフローチャートである。It is a flowchart which shows the execution procedure of casting control. 一鋳片に対する鋳造制御手順を示すフローチャートである。It is a flowchart which shows the casting control procedure with respect to one slab. 一鋳片に対する鋳造制御手順を示すフローチャートである。It is a flowchart which shows the casting control procedure with respect to one slab. ダミーバの挿入手順を示すフローチャートである。It is a flowchart which shows the insertion procedure of a dummy bar. ロールの駆動制御手順を示すフローチャートである。It is a flowchart which shows the drive control procedure of a roll. ロールの駆動制御手順を示すフローチャートである。It is a flowchart which shows the drive control procedure of a roll. ロールの駆動制御手順を示すフローチャートである。It is a flowchart which shows the drive control procedure of a roll. ロールの駆動制御手順を示すフローチャートである。It is a flowchart which shows the drive control procedure of a roll. ダミーバの分離・搬送手順を示すフローチャートである。It is a flowchart which shows the separation / conveyance procedure of a dummy bar. 移動速度の調節手順を示すフローチャートである。It is a flowchart which shows the adjustment procedure of a moving speed. 鋳型にダミーバを挿入している状態を示す模式図である。It is a schematic diagram which shows the state which has inserted the dummy bar into the casting_mold | template. 挿入モードにおけるロール駆動制御を実行している状態を示す模式図である。It is a schematic diagram which shows the state which is performing the roll drive control in insertion mode. 鋳造モードにおけるロール駆動制御を実行している状態を示す模式図である。It is a schematic diagram which shows the state which is performing the roll drive control in casting mode. 引抜モードにおけるロール駆動制御を実行している状態を示す模式図である。It is a schematic diagram which shows the state which is performing roll drive control in drawing mode. 測長ロールをアクティブに切り替える状態を示す模式図である。It is a schematic diagram which shows the state which switches a length measurement roll to active. 第一鋳造制御及び第二鋳造制御を同時に実行している状態を示す模式図である。It is a schematic diagram which shows the state which is performing simultaneously 1st casting control and 2nd casting control.

以下、実施形態について、図面を参照しつつ詳細に説明する。説明において、同一要素又は同一機能を有する要素には同一の符号を付し、重複する説明を省略する。   Hereinafter, embodiments will be described in detail with reference to the drawings. In the description, the same elements or elements having the same functions are denoted by the same reference numerals, and redundant description is omitted.

1.連続鋳造装置
1.1 全体構成
連続鋳造装置1は、溶融金属(例えば溶鋼)を鋳型から引き出すことで、帯状又は線状の鋳片を形成する装置である。図1に示すように、連続鋳造装置1は、少なくとも複数のピンチロール4と、複数のセンサ5(第一センサ)と、制御装置100とを備える。複数のピンチロール4は、鋳片の搬送経路R1に沿って並び、鋳片を搬送する。複数のセンサ5は、複数のピンチロール4の少なくとも回転速度に関する情報をそれぞれ出力する。なお、図1は連続鋳造装置1を模式的に示すものであり、ピンチロール4の数及び配置等は図示のものに限られない。以下、連続鋳造装置1の具体的な構成を例示する。
1. Continuous casting apparatus 1.1 Overall configuration The continuous casting apparatus 1 is an apparatus that forms a strip-shaped or linear cast piece by drawing molten metal (for example, molten steel) from a mold. As shown in FIG. 1, the continuous casting apparatus 1 includes at least a plurality of pinch rolls 4, a plurality of sensors 5 (first sensors), and a control device 100. The plurality of pinch rolls 4 are arranged along the slab transport path R1 and transport the slab. The plurality of sensors 5 respectively output information related to at least the rotational speed of the plurality of pinch rolls 4. FIG. 1 schematically shows the continuous casting apparatus 1, and the number and arrangement of the pinch rolls 4 are not limited to those shown in the drawing. Hereinafter, the specific structure of the continuous casting apparatus 1 is illustrated.

図1に示すように、連続鋳造装置1は、溶鋼供給部2と、鋳型3と、複数の搬送ユニットU1とを備える。溶鋼供給部2は、鋳造用の溶鋼を鋳型3に供給する。溶鋼供給部2は、例えばレードル及びタンディッシュ等により構成される。鋳型3は、溶鋼供給部2により供給された溶鋼を所定の形状に成形して送出する。複数の搬送ユニットU1は、搬送経路R1に沿って並び、搬送対象物Tを搬送する。   As shown in FIG. 1, the continuous casting apparatus 1 includes a molten steel supply unit 2, a mold 3, and a plurality of conveyance units U <b> 1. The molten steel supply unit 2 supplies molten steel for casting to the mold 3. The molten steel supply part 2 is comprised by a ladle, a tundish, etc., for example. The mold 3 forms the molten steel supplied by the molten steel supply unit 2 into a predetermined shape and sends it out. The plurality of transport units U1 are arranged along the transport path R1 and transport the transport target T.

後述のように、鋳片の形成開始前における搬送対象物Tはダミーバ22を含み、鋳片の形成開始時点における搬送対象物Tは互いに連なったダミーバ22と鋳片21とを含み、ダミーバ22の切り離し後における搬送対象物Tはダミーバ22から分離した鋳片21を含む。搬送経路R1は、例えば鋳型3から下方に延び、途中で湾曲して更に水平方向に延びている。以下の説明において、「上流」とは、搬送経路R1における鋳型3側を意味し、「下流」とは、搬送経路R1における鋳型3の逆側を意味する。   As will be described later, the conveyance object T before the start of slab formation includes the dummy bar 22, and the conveyance object T at the time of starting the slab formation includes the dummy bar 22 and the slab 21 that are connected to each other. The object T to be transported after the separation includes the slab 21 separated from the dummy bar 22. The conveyance path R1 extends, for example, downward from the mold 3, is curved in the middle, and further extends in the horizontal direction. In the following description, “upstream” means the mold 3 side in the transport path R1, and “downstream” means the opposite side of the mold 3 in the transport path R1.

搬送ユニットU1は、二つのピンチロール4と、二つのセンサ5と、切替駆動部6と、回転駆動部7とを有する。二つのピンチロール4は、搬送経路R1に交差(例えば直交)する方向において搬送経路R1を挟むように配置されている。   The transport unit U1 includes two pinch rolls 4, two sensors 5, a switching drive unit 6, and a rotation drive unit 7. The two pinch rolls 4 are disposed so as to sandwich the transport path R1 in a direction intersecting (for example, orthogonal to) the transport path R1.

二つのセンサ5は、二つのピンチロール4の少なくとも回転速度に関する情報をそれぞれ出力する。例えばセンサ5はパルスジェネレータであり、ピンチロール4の回転速度に相関する(例えば比例する)周波数にてパルス状の電気信号を出力する。   The two sensors 5 each output information on at least the rotational speed of the two pinch rolls 4. For example, the sensor 5 is a pulse generator, and outputs a pulsed electric signal at a frequency correlated (for example, proportional to) the rotational speed of the pinch roll 4.

切替駆動部6は、例えば油圧シリンダ等を動力源として搬送対象物Tの片側(例えば、搬送経路R1の下流側において上方に面する側)のピンチロール4を移動させ、当該ピンチロール4が搬送対象物Tに押し当たった状態(以下、「アクティブ状態」という。)と、当該ピンチロール4が搬送対象物Tから離れた状態(以下、「非アクティブ状態」という。)とを切り替える。   The switching drive unit 6 moves the pinch roll 4 on one side (for example, the side facing upward on the downstream side of the conveyance path R1) of the conveyance target T using, for example, a hydraulic cylinder as a power source, and the pinch roll 4 is conveyed. A state in which the object is pressed against the object T (hereinafter referred to as “active state”) and a state in which the pinch roll 4 is separated from the conveyance object T (hereinafter referred to as “inactive state”) are switched.

回転駆動部7は、例えば電動モータ等を動力源としてピンチロール4を回転させる。回転駆動部7は、両方のピンチロール4を回転させるように構成されていてもよいし、いずれか一方のピンチロール4のみを回転させるように構成されていてもよい。   The rotation drive unit 7 rotates the pinch roll 4 using, for example, an electric motor as a power source. The rotation drive unit 7 may be configured to rotate both the pinch rolls 4, or may be configured to rotate only one of the pinch rolls 4.

搬送対象物Tは、上記アクティブ状態のピンチロール4(以下、「アクティブなピンチロール4」という。)により搬送される。すなわち、アクティブなピンチロール4が、搬送対象物Tを搬送中のピンチロール4に相当する。   The conveyance target T is conveyed by the pinch roll 4 in the active state (hereinafter referred to as “active pinch roll 4”). That is, the active pinch roll 4 corresponds to the pinch roll 4 that is transporting the transport target T.

連続鋳造装置1は、測長ロール8とセンサ9(第二センサ)とを更に備えてもよく、切替駆動部10を更に備えてもよい。測長ロール8は、搬送対象物Tの片側(例えば上側)に設けられ、搬送対象物Tに接しているときに、当該搬送対象物Tの移動に応じて回転する。搬送対象物Tに接した測長ロール8は、搬送対象物Tとの間の摩擦力により、周速が搬送対象物Tの移動速度に一致するように回転する。ここでの「一致」は実質的な一致を意味し、誤差レベルの差異が存在する状態を含む。以下においても同様である。   The continuous casting apparatus 1 may further include a length measuring roll 8 and a sensor 9 (second sensor), and may further include a switching drive unit 10. The length measuring roll 8 is provided on one side (for example, the upper side) of the conveyance target T, and rotates in accordance with the movement of the conveyance target T when in contact with the conveyance target T. The length measuring roll 8 in contact with the transport target T rotates so that the peripheral speed matches the moving speed of the transport target T due to the frictional force with the transport target T. Here, “match” means a substantial match, and includes a state where a difference in error level exists. The same applies to the following.

測長ロール8は、搬送経路R1に沿う方向において、少なくとも二つの搬送ユニットU1よりも下流側に配置されている。一例として、測長ロール8は、全ての搬送ユニットU1のうち最も下流側に位置する搬送ユニットU1よりも更に下流側に配置されている。   The length measuring roll 8 is disposed downstream of at least two transport units U1 in the direction along the transport path R1. As an example, the length measuring roll 8 is disposed further downstream than the transport unit U1 located on the most downstream side among all the transport units U1.

センサ9は、測長ロール8の少なくとも回転速度に関する情報を出力する。例えばセンサ9はパルスジェネレータであり、測長ロール8の回転速度に相関する(例えば比例する)周波数にてパルス状の電気信号を出力する。   The sensor 9 outputs information on at least the rotational speed of the length measuring roll 8. For example, the sensor 9 is a pulse generator, and outputs a pulsed electric signal at a frequency correlated (for example, proportional) to the rotation speed of the length measuring roll 8.

切替駆動部10は、例えば油圧シリンダ等を動力源として測長ロール8を移動させ、測長ロール8が搬送対象物Tに押し当たった状態(以下、「アクティブ状態」という。)と、測長ロール8が搬送対象物Tから離れた状態(以下、「非アクティブ状態」という。)とを切り替える。   The switching drive unit 10 moves the length measuring roll 8 using, for example, a hydraulic cylinder or the like as a power source, the state in which the length measuring roll 8 is pressed against the conveyance target T (hereinafter referred to as “active state”), and length measurement. The state in which the roll 8 is separated from the conveyance target T (hereinafter referred to as “inactive state”) is switched.

連続鋳造装置1は、ダミーバ搬送装置11を更に備えてもよい。ダミーバ搬送装置11は、所定の切り離し位置に到達したダミーバ22を鋳片21から切り離し、鋳型3への挿入位置まで搬送し、鋳型3内に挿入する。例えばダミーバ搬送装置11は、ウィンチ12と、ダミーバカー13と、コンベヤ14とを有する。   The continuous casting apparatus 1 may further include a dummy bar transport device 11. The dummy bar conveyance device 11 separates the dummy bar 22 that has reached a predetermined separation position from the cast piece 21, conveys the dummy bar 22 to the insertion position into the mold 3, and inserts it into the mold 3. For example, the dummy bar transport device 11 includes a winch 12, a dummy bager 13, and a conveyor 14.

ウィンチ12は、所定の切り離し位置に到達したダミーバ22を引き上げて鋳片21から切り離す。上記切り離し位置は、全ての搬送ユニットU1のうち最も下流側に位置する搬送ユニットU1よりも更に下流側に設定されている。連続鋳造装置1が測長ロール8を備える場合、上記切り離し位置は、最も下流側の搬送ユニットU1と測長ロール8との間に設定されていてもよい。   The winch 12 pulls up the dummy bar 22 that has reached a predetermined separation position and separates it from the cast piece 21. The separation position is set further downstream than the transport unit U1 located on the most downstream side of all the transport units U1. When the continuous casting apparatus 1 includes the length measuring roll 8, the separation position may be set between the transport unit U 1 and the length measuring roll 8 on the most downstream side.

ダミーバカー13は、ウィンチ12からダミーバ22を受け取るための位置と、ダミーバ22を鋳型3に挿入するための位置との間で移動する。ダミーバ22を鋳型3に挿入するための位置は、例えば鋳型3の上方である。   The dummy backer 13 moves between a position for receiving the dummy bar 22 from the winch 12 and a position for inserting the dummy bar 22 into the mold 3. The position for inserting the dummy bar 22 into the mold 3 is, for example, above the mold 3.

コンベヤ14は、ダミーバカー13上に設けられており、ダミーバカー13上へのダミーバ22の引き上げと、鋳型3へのダミーバ22の送出とを行う。コンベヤ14はセンサ15(第三センサ)を有してもよい。センサ15は、コンベヤ14からダミーバ22を送出する際に、その送出速度に関する情報を出力する。例えばセンサ15はパルスジェネレータであり、ダミーバ22の送出速度に相関する(例えば比例する)周波数にてパルス状の電気信号を出力する。   The conveyor 14 is provided on the dummy bunker 13, and pulls up the dummy bar 22 onto the dummy baker 13 and sends the dummy bar 22 to the mold 3. The conveyor 14 may have a sensor 15 (third sensor). When the sensor 15 sends the dummy bar 22 from the conveyor 14, the sensor 15 outputs information related to the sending speed. For example, the sensor 15 is a pulse generator, and outputs a pulsed electric signal at a frequency correlated (for example, proportional) to the transmission speed of the dummy bar 22.

連続鋳造装置1は、搬送テーブル16とカッター17とを更に備えてもよい。搬送テーブル16は、全ての搬送ユニットU1のうち最も下流側に位置する搬送ユニットU1から鋳片21を取得して更に搬送し、切断用の位置に配置する。カッター17は、搬送テーブル16により位置決めされた鋳片21を切断する。カッター17の具体例としては、溶断式のトーチカッター等が挙げられる。   The continuous casting apparatus 1 may further include a conveyance table 16 and a cutter 17. The conveyance table 16 acquires the slab 21 from the conveyance unit U1 located on the most downstream side among all the conveyance units U1, further conveys it, and arranges it at a cutting position. The cutter 17 cuts the slab 21 positioned by the transport table 16. Specific examples of the cutter 17 include a fusing torch cutter.

1.2 制御装置(コントローラ)
続いて、制御装置100の構成について詳述する。制御装置100は、複数のセンサ5のうちいずれかを用いて鋳片21を含む搬送対象物Tの位置を導出することと、複数のセンサ5のうち位置の導出に用いるセンサを搬送対象物Tの移動に応じて搬送経路R1の上流側から下流側に切り替えることと、を実行するように構成されている。
1.2 Controller (controller)
Next, the configuration of the control device 100 will be described in detail. The control device 100 derives the position of the conveyance target T including the slab 21 using any one of the plurality of sensors 5 and uses the sensor used for derivation of the position among the plurality of sensors 5 as the conveyance target T. And switching from the upstream side to the downstream side of the transport path R1 in accordance with the movement of.

制御装置100は、導出した搬送対象物Tの位置に基づいてピンチロール4を制御するように構成されていてもよい。より具体的に、制御装置100は、導出した搬送対象物Tの位置に基づいてピンチロール4をアクティブ状態又は非アクティブ状態に切り替えるように構成されていてもよい。更に制御装置100は、アクティブなピンチロール4の回転速度をセンサ5の出力に基づいて制御するように構成されていてもよい。   The control device 100 may be configured to control the pinch roll 4 based on the derived position of the transport target T. More specifically, the control device 100 may be configured to switch the pinch roll 4 to an active state or an inactive state based on the derived position of the transport target T. Further, the control device 100 may be configured to control the rotational speed of the active pinch roll 4 based on the output of the sensor 5.

例えば制御装置100は、機能的な構成(以下、「機能モジュール」という。)として、制御指令生成部111と、ダミーバ搬送制御部112と、溶鋼供給制御部113と、トラッキング制御部114と、ピンチロール制御部115と、切断制御部116とを有する。   For example, the control device 100 includes a control command generation unit 111, a dummy bar conveyance control unit 112, a molten steel supply control unit 113, a tracking control unit 114, a pinch as a functional configuration (hereinafter referred to as “functional module”). A roll control unit 115 and a cutting control unit 116 are included.

制御指令生成部111は、外部からの指令入力を取得し、当該指令入力に応じた処理を実行するように、ダミーバ搬送制御部112、溶鋼供給制御部113、ピンチロール制御部115及び切断制御部116に対する制御指令を生成する。外部からの指令入力は、オペレータにより操作盤に入力されるものであってもよいし、上位の制御装置から入力されるものであってもよい。   The control command generation unit 111 acquires a command input from the outside, and executes a process according to the command input, the dummy bar conveyance control unit 112, the molten steel supply control unit 113, the pinch roll control unit 115, and the cutting control unit. A control command for 116 is generated. The command input from the outside may be input to the operation panel by an operator, or may be input from a host control device.

ダミーバ搬送制御部112は、制御指令生成部111からの制御指令に基づいて、ダミーバ搬送装置11を制御する。溶鋼供給制御部113は、制御指令生成部111からの制御指令に基づいて、溶鋼供給部2を制御する。   The dummy bar transport control unit 112 controls the dummy bar transport device 11 based on a control command from the control command generation unit 111. The molten steel supply control unit 113 controls the molten steel supply unit 2 based on the control command from the control command generation unit 111.

トラッキング制御部114は、複数のセンサ5のうちいずれかを用いて搬送対象物Tの位置を導出することと、複数のセンサ5のうち位置の導出に用いるセンサを搬送対象物Tの移動に応じて搬送経路R1の上流側から下流側に切り替えることと、を実行する。トラッキング制御部114は、センサ9を用いて鋳片21の位置を導出することを更に実行してもよい。   The tracking control unit 114 derives the position of the conveyance target T using any one of the plurality of sensors 5 and uses the sensor used for derivation of the position among the plurality of sensors 5 according to the movement of the conveyance target T. And switching from the upstream side to the downstream side of the transport path R1. The tracking control unit 114 may further execute deriving the position of the slab 21 using the sensor 9.

ピンチロール制御部115は、制御指令生成部111からの指令に応じた移動速度(以下、「目標移動速度」という。)にて搬送対象物Tを搬送するように複数の搬送ユニットU1を制御する。この制御に際し、ピンチロール制御部115は、トラッキング制御部114により導出された搬送対象物Tの位置に基づいてピンチロール4をアクティブ状態又は非アクティブ状態に切り替えるように切替駆動部6を制御する。ピンチロール制御部115は、目標移動速度に対応する回転速度(目標移動速度に周速が一致する回転速度)にてアクティブなピンチロール4を回転させるように、センサ5の出力に基づいて回転駆動部7を制御する。   The pinch roll control unit 115 controls the plurality of transport units U1 so as to transport the transport target T at a moving speed (hereinafter referred to as “target moving speed”) according to a command from the control command generating unit 111. . In this control, the pinch roll control unit 115 controls the switching drive unit 6 so as to switch the pinch roll 4 to an active state or an inactive state based on the position of the conveyance target T derived by the tracking control unit 114. The pinch roll control unit 115 is driven to rotate based on the output of the sensor 5 so as to rotate the active pinch roll 4 at a rotation speed corresponding to the target movement speed (a rotation speed at which the peripheral speed matches the target movement speed). The unit 7 is controlled.

切断制御部116は、制御指令生成部111からの制御指令に基づいて、搬送テーブル16及びカッター17を制御する。   The cutting control unit 116 controls the transport table 16 and the cutter 17 based on the control command from the control command generating unit 111.

制御装置100は、一つ又は複数の制御用コンピュータにより構成される。例えば制御装置100は、図2に示す回路120を有する。回路120は、一つ又は複数のプロセッサ121と、メモリ122と、ストレージ123と、入出力ポート124と、ドライバ125とを有する。   The control device 100 is configured by one or a plurality of control computers. For example, the control device 100 includes the circuit 120 illustrated in FIG. The circuit 120 includes one or more processors 121, a memory 122, a storage 123, an input / output port 124, and a driver 125.

入出力ポート124は、溶鋼供給部2、センサ5,9,15、切替駆動部6及び切替駆動部10との間で電気信号の入出力を行う。更に入出力ポート124は、複数のドライバ125との間で電気信号の入出力を行う。複数のドライバ125は例えばインバータであり、入出力ポート124からの指令信号に応じた駆動電力を回転駆動部7、ウィンチ12、ダミーバカー13、コンベヤ14、搬送テーブル16及びカッター17に出力する。   The input / output port 124 performs input / output of electrical signals between the molten steel supply unit 2, the sensors 5, 9, 15, the switching drive unit 6, and the switching drive unit 10. Further, the input / output port 124 inputs and outputs electrical signals to and from the plurality of drivers 125. The plurality of drivers 125 are inverters, for example, and output drive power corresponding to a command signal from the input / output port 124 to the rotation drive unit 7, winch 12, dummy backer 13, conveyor 14, transport table 16, and cutter 17.

ストレージ123は、例えば不揮発性の半導体メモリ等、コンピュータによって読み取り可能な記録媒体を有する。記録媒体は、後述の鋳造手順を連続鋳造装置1に実行させるためのプログラムを記録している。   The storage 123 includes a computer-readable recording medium such as a nonvolatile semiconductor memory. The recording medium records a program for causing the continuous casting apparatus 1 to execute a casting procedure described later.

メモリ122は、ストレージ123からロードしたプログラム及びプロセッサ121による演算結果を一時的に記録する。プロセッサ121は、メモリ122と協働して上記プログラムを実行することで、上述した各機能モジュールを構成する。   The memory 122 temporarily records the program loaded from the storage 123 and the calculation result by the processor 121. The processor 121 configures each functional module described above by executing the program in cooperation with the memory 122.

なお、制御装置100のハードウェア構成は、必ずしもプログラムにより各機能モジュールを構成するものに限られない。例えば制御装置100の各機能モジュールは、専用の論理回路又はこれを集積したASIC(Application Specific Integrated Circuit)を含めて構成されていてもよい。   Note that the hardware configuration of the control device 100 is not necessarily limited to the configuration of each functional module by a program. For example, each functional module of the control apparatus 100 may be configured to include a dedicated logic circuit or an ASIC (Application Specific Integrated Circuit) in which the logic circuit is integrated.

2.鋳造制御手順
本実施形態に係る連続鋳造方法は、鋳片の搬送経路に沿って並び、鋳片を搬送する複数のピンチロールの少なくとも回転速度に関する情報をそれぞれ出力する複数の第一センサのうちいずれかを用いて鋳片を含む搬送対象物の位置を導出することと、複数の第一センサのうち上記位置の導出に用いるセンサを搬送対象物の搬送に応じて搬送経路の上流側から下流側に切り替えることと、を含む。以下、この連続鋳造方法の一例として、制御装置100により実行される鋳造制御手順を説明する。
2. Casting control procedure The continuous casting method according to the present embodiment is one of a plurality of first sensors that are arranged along a slab conveying path and each output information on at least rotational speeds of a plurality of pinch rolls that convey the slab. The position of the conveyance object including the slab is derived using the slab, and the sensor used for deriving the position among the plurality of first sensors is determined from the upstream side to the downstream side of the conveyance path according to the conveyance of the conveyance object. Switching to. Hereinafter, a casting control procedure executed by the control device 100 will be described as an example of the continuous casting method.

図3に示すように、制御装置100は、まずステップS01,S02を順に実行する。ステップS01では、制御指令生成部111が、ダミーバ22の挿入準備が完了するのを待機する。ダミーバ22の挿入準備が完了した状態とは、上述のコンベヤ14から鋳型3にダミーバ22を送出可能となった状態を意味する。ステップS02では、制御指令生成部111が、挿入指令の入力を待機する。   As shown in FIG. 3, the control device 100 first executes steps S01 and S02 in order. In step S01, the control command generator 111 waits for the preparation for inserting the dummy bar 22 to be completed. The state where the preparation for inserting the dummy bar 22 is completed means a state where the dummy bar 22 can be sent from the conveyor 14 to the mold 3. In step S02, the control command generator 111 waits for input of an insertion command.

ダミーバ22の挿入指令が入力されると、制御装置100はステップS03を実行する。ステップS03では、制御指令生成部111が、第一鋳造制御を開始するように、制御指令の出力を開始する。以後実行される第一鋳造制御の具体的内容については後述する。   When the instruction to insert dummy bar 22 is input, control device 100 executes step S03. In step S03, the control command generator 111 starts outputting the control command so as to start the first casting control. The specific contents of the first casting control executed thereafter will be described later.

次に、制御装置100はステップS04を実行する。ステップS04では、ダミーバ22の再挿入準備が完了しているか否かを制御指令生成部111が確認する。ダミーバ22の再挿入準備が完了した状態とは、先行する鋳片21から切り離されたダミーバ22をコンベヤ14から鋳型3に送出可能となった状態を意味する。ステップS04において、ダミーバ22の再挿入準備が完了していないと判定した場合、制御装置100は処理をステップS08(後述)に進める。   Next, the control apparatus 100 performs step S04. In step S04, the control command generator 111 confirms whether or not the dummy bar 22 is ready for reinsertion. The state in which the preparation for reinsertion of the dummy bar 22 is completed means a state in which the dummy bar 22 cut off from the preceding slab 21 can be sent from the conveyor 14 to the mold 3. If it is determined in step S04 that preparation for reinsertion of the dummy bar 22 has not been completed, the control device 100 advances the process to step S08 (described later).

ステップS04において、ダミーバ22の再挿入準備が完了していると判定した場合、制御装置100はステップS05を実行する。ステップS05では、制御指令生成部111が、再挿入指令の入力の有無を確認する。ステップS05において、再挿入指令の入力は無いと判定した場合、制御装置100は処理をステップS08(後述)に進める。   If it is determined in step S04 that the dummy bar 22 is ready for reinsertion, the control device 100 executes step S05. In step S05, the control command generation unit 111 checks whether or not a reinsertion command has been input. If it is determined in step S05 that no reinsertion command has been input, control device 100 advances the process to step S08 (described later).

ステップS05において、再挿入指令の入力が有ると判定した場合、制御装置100はステップS06,S07を順に実行する。ステップS06では、制御指令生成部111が、第二鋳造制御を開始するように、制御指令の出力を開始する。第二鋳造制御の具体的内容は、第一鋳造制御と同じである。ステップS07では、制御指令生成部111が、搬送対象物Tの移動速度の調節を開始するように、制御指令の出力を開始する。以後実行される移動速度の調節処理については後述する。   If it is determined in step S05 that a reinsertion command has been input, control device 100 executes steps S06 and S07 in order. In step S06, the control command generator 111 starts outputting the control command so as to start the second casting control. The specific content of the second casting control is the same as that of the first casting control. In step S07, the control command generator 111 starts outputting the control command so as to start adjusting the moving speed of the transport target T. The movement speed adjustment process executed thereafter will be described later.

次に、制御装置100はステップS08を実行する。ステップS08では、実行中であった全ての鋳造制御が完了したか否かを制御指令生成部111が確認する。ステップS08において、実行中の鋳造制御が残っていると判定した場合、制御装置100は処理をステップS04に戻す。以後、制御装置100がステップS04〜S08を繰り返すことにより、連続鋳造が繰り返される。ステップS08において、実行中であった全ての鋳造制御が完了したと判定した場合、制御装置100は処理を終了する。以下、ステップS03,S06で開始される鋳造制御手順及びステップS07で開始される移動速度の調節手順について詳述する。   Next, the control apparatus 100 performs step S08. In step S08, the control command generation unit 111 confirms whether all the casting controls that have been executed have been completed. If it is determined in step S08 that the casting control being executed remains, the control device 100 returns the process to step S04. Thereafter, the control device 100 repeats steps S04 to S08, whereby continuous casting is repeated. If it is determined in step S08 that all casting controls that have been executed have been completed, the control device 100 ends the process. Hereinafter, the casting control procedure started in steps S03 and S06 and the moving speed adjustment procedure started in step S07 will be described in detail.

2.1 鋳造制御手順
(1)概要
図4に示すように、制御装置100は、まずステップS11を実行する。ステップS11では、制御指令生成部111が、ダミーバ22を鋳型3に搬入するための制御指令を生成し、これをダミーバ搬送制御部112及びピンチロール制御部115に出力する。これに応じ、ダミーバ搬送制御部112及びピンチロール制御部115は、ダミーバ22を鋳型3に搬入するように、コンベヤ14及び切替駆動部6をそれぞれ制御する。具体的な処理内容は後述する。
2.1 Casting Control Procedure (1) Overview As shown in FIG. 4, the control device 100 first executes step S11. In step S <b> 11, the control command generation unit 111 generates a control command for carrying the dummy bar 22 into the mold 3 and outputs it to the dummy bar conveyance control unit 112 and the pinch roll control unit 115. In response to this, the dummy bar conveyance control unit 112 and the pinch roll control unit 115 respectively control the conveyor 14 and the switching drive unit 6 so as to carry the dummy bar 22 into the mold 3. Specific processing contents will be described later.

次に、制御装置100はステップS12を実行する。ステップS12では、制御指令生成部111が、挿入モードにてピンチロール4の駆動制御を開始するための制御指令を生成し、これをピンチロール制御部115に出力する。これに応じ、ピンチロール制御部115は、挿入モードでのピンチロール4の駆動制御を開始する。以後実行されるピンチロール4の駆動制御の具体的な処理内容は後述する。   Next, the control apparatus 100 performs step S12. In step S <b> 12, the control command generation unit 111 generates a control command for starting drive control of the pinch roll 4 in the insertion mode, and outputs this to the pinch roll control unit 115. In response to this, the pinch roll control unit 115 starts driving control of the pinch roll 4 in the insertion mode. The specific processing contents of the drive control of the pinch roll 4 that will be executed thereafter will be described later.

次に、制御装置100はステップS13を実行する。ステップS13では、制御指令生成部111が、鋳造開始位置へのダミーバ22の到達を待機する。鋳造開始位置は、例えばダミーバ22のヘッド22b(上流側の端部)が湯面目標位置P0に到達する位置である。ダミーバ22が鋳造開始位置に到達すると、制御装置100はステップS14を実行する。ステップS14では、制御指令生成部111が、ピンチロール4の駆動制御を停止するための制御指令を生成し、これをピンチロール制御部115に出力する。これに応じ、ピンチロール制御部115は、挿入モードでのピンチロール4の駆動制御を停止する。以上でダミーバ22の挿入が完了する。   Next, the control apparatus 100 performs step S13. In step S13, the control command generator 111 waits for the dummy bar 22 to reach the casting start position. The casting start position is, for example, a position at which the head 22b (upstream end portion) of the dummy bar 22 reaches the molten metal surface target position P0. When the dummy bar 22 reaches the casting start position, the control device 100 executes step S14. In step S <b> 14, the control command generation unit 111 generates a control command for stopping the drive control of the pinch roll 4, and outputs this to the pinch roll control unit 115. In response to this, the pinch roll control unit 115 stops the drive control of the pinch roll 4 in the insertion mode. Thus, the insertion of the dummy bar 22 is completed.

次に、制御装置100はステップS15を実行する。ステップS15では、制御指令生成部111が、鋳造開始指令の入力を待機する。鋳造開始指令が入力されると、制御装置100はステップS16を実行する。ステップS16では、制御指令生成部111が、溶鋼の供給を開始するための制御指令を生成し、これを溶鋼供給制御部113に出力する。これに応じ、溶鋼供給制御部113は、鋳型3への溶鋼の供給を開始するように溶鋼供給部2を制御する。   Next, the control apparatus 100 performs step S15. In step S15, the control command generator 111 waits for an input of a casting start command. When a casting start command is input, control device 100 executes step S16. In step S <b> 16, the control command generation unit 111 generates a control command for starting the supply of molten steel, and outputs this to the molten steel supply control unit 113. In response to this, the molten steel supply control unit 113 controls the molten steel supply unit 2 to start supplying molten steel to the mold 3.

次に、制御装置100はステップS17を実行する。ステップS17では、制御指令生成部111が、鋳造モードにてピンチロール4の駆動制御を開始するための制御指令を生成し、これをピンチロール制御部115に出力する。これに応じ、ピンチロール制御部115は、鋳造モードでのピンチロール4の駆動制御を開始する。以後実行されるピンチロール4の駆動制御の具体的な処理内容は後述する。   Next, the control apparatus 100 performs step S17. In step S <b> 17, the control command generator 111 generates a control command for starting drive control of the pinch roll 4 in the casting mode, and outputs this to the pinch roll controller 115. In response to this, the pinch roll control unit 115 starts driving control of the pinch roll 4 in the casting mode. The specific processing contents of the drive control of the pinch roll 4 that will be executed thereafter will be described later.

図5に示すように、制御装置100は、次にステップS18を実行する。ステップS18では、制御指令生成部111が、鋳造停止指令の入力の有無を制御装置100が確認する。ステップS18において、鋳造停止指令の入力は無いと判断した場合、制御装置100は処理をステップS23(後述)に進める。   As shown in FIG. 5, the control device 100 next executes step S18. In step S <b> 18, the control command generator 111 confirms whether or not the casting stop command is input by the control device 100. If it is determined in step S18 that no casting stop command has been input, the control device 100 advances the process to step S23 (described later).

ステップS18において、鋳造停止指令の入力が有ると判断した場合、制御装置100はステップS19を実行する。ステップS19では、制御指令生成部111が、溶鋼の供給を停止するための制御指令を生成し、これを溶鋼供給制御部113に出力する。これに応じ、溶鋼供給制御部113は、鋳型3への溶鋼の供給を停止するように溶鋼供給部2を制御する。   If it is determined in step S18 that a casting stop command has been input, the control device 100 executes step S19. In step S <b> 19, the control command generation unit 111 generates a control command for stopping the supply of molten steel, and outputs this to the molten steel supply control unit 113. In response to this, the molten steel supply control unit 113 controls the molten steel supply unit 2 so as to stop the supply of molten steel to the mold 3.

次に、制御装置100はステップS20を実行する。ステップS20では、制御指令生成部111が、ピンチロール4の駆動制御を停止するための制御指令を生成し、これをピンチロール制御部115に出力する。これに応じ、ピンチロール制御部115は、鋳造モードでのピンチロール4の駆動制御を停止する。   Next, the control apparatus 100 performs step S20. In step S <b> 20, the control command generation unit 111 generates a control command for stopping the drive control of the pinch roll 4, and outputs this to the pinch roll control unit 115. In response to this, the pinch roll control unit 115 stops the drive control of the pinch roll 4 in the casting mode.

次に、制御装置100はステップS21を実行する。ステップS21では、制御指令生成部111が、引抜開始指令の入力を待機する。引抜開始指令が入力されると、制御装置100はステップS22を実行する。ステップS22では、制御指令生成部111が、引抜モードにてピンチロール4の駆動制御を開始するための制御指令を生成し、これをピンチロール制御部115に出力する。これに応じ、ピンチロール制御部115は、引抜モードでのピンチロール4の駆動制御を開始する。以後実行されるピンチロール4の駆動制御の具体的な処理内容は後述する。   Next, the control apparatus 100 performs step S21. In step S21, the control command generation unit 111 waits for an input of a drawing start command. When the drawing start command is input, the control device 100 executes Step S22. In step S <b> 22, the control command generation unit 111 generates a control command for starting drive control of the pinch roll 4 in the drawing mode, and outputs this to the pinch roll control unit 115. In response to this, the pinch roll control unit 115 starts driving control of the pinch roll 4 in the drawing mode. The specific processing contents of the drive control of the pinch roll 4 that will be executed thereafter will be described later.

次に、制御装置100はステップS23を実行する。ステップS23では、鋳片21からダミーバ22を切り離す処理(以下、「分離処理」という。)が完了しているか否かを制御指令生成部111が確認する。   Next, the control apparatus 100 performs step S23. In step S <b> 23, the control command generation unit 111 confirms whether or not the process of separating the dummy bar 22 from the slab 21 (hereinafter referred to as “separation process”) has been completed.

ステップS23において分離処理が完了していないと判定した場合、制御装置100はステップS24を実行する。ステップS24では、分離処理が実行中であるか否かを制御指令生成部111が確認する。ステップS24において、分離処理が実行中であると判定した場合、制御装置100は処理をステップS31(後述)に進める。   If it is determined in step S23 that the separation process has not been completed, the control device 100 executes step S24. In step S24, the control command generation unit 111 confirms whether or not the separation process is being executed. If it is determined in step S24 that the separation process is being executed, the control device 100 advances the process to step S31 (described later).

ステップS24において、分離処理が実行中ではないと判定した場合、制御装置100はステップS25を実行する。ステップS25では、ダミーバ22のテール22aが上記所定の切り離し位置(以下、「分離位置」という。)に到達したか否かを制御指令生成部111が確認する。ステップS25において、テール22aが分離位置に到達していないと判定した場合、制御装置100は処理をステップS31(後述)に進める。   If it is determined in step S24 that the separation process is not being executed, the control device 100 executes step S25. In step S25, the control command generator 111 checks whether the tail 22a of the dummy bar 22 has reached the predetermined separation position (hereinafter referred to as “separation position”). If it is determined in step S25 that the tail 22a has not reached the separation position, the control device 100 advances the process to step S31 (described later).

ステップS25において、ダミーバ22のテール22aが分離位置に到達したと判定した場合、制御装置100はステップS26を実行する。ステップS26では、制御指令生成部111が、分離処理を開始するための指令信号を生成し、これをダミーバ搬送制御部112に出力する。これに応じ、ダミーバ搬送制御部112は、鋳片21からダミーバ22を切り離し、鋳型3に再挿入するための位置までダミーバ22を搬送する処理(以下、「分離・搬送処理」という。)を開始するようにダミーバ搬送装置11を制御する。具体的な処理内容は後述する。   If it is determined in step S25 that the tail 22a of the dummy bar 22 has reached the separation position, the control device 100 executes step S26. In step S <b> 26, the control command generator 111 generates a command signal for starting the separation process, and outputs this to the dummy bar transport controller 112. In response to this, the dummy bar conveyance control unit 112 starts a process of separating the dummy bar 22 from the slab 21 and conveying the dummy bar 22 to a position for reinsertion into the mold 3 (hereinafter referred to as “separation / conveying process”). Thus, the dummy bar transport device 11 is controlled. Specific processing contents will be described later.

ステップS23において、分離処理が完了したと判定した場合、制御装置100はステップS27を実行する。ステップS27では、鋳片21を所望の長さに切断する処理(以下、「切断処理」という。)が完了しているか否かを制御指令生成部111が確認する。   If it is determined in step S23 that the separation process has been completed, the control device 100 executes step S27. In step S <b> 27, the control command generation unit 111 confirms whether or not the process of cutting the slab 21 into a desired length (hereinafter referred to as “cutting process”) has been completed.

ステップS27において切断処理が完了していないと判定した場合、制御装置100はステップS28を実行する。ステップS28では、切断処理が実行中であるか否かを制御指令生成部111が確認する。ステップS28において、切断処理が実行中であると判定した場合、制御装置100は処理をステップS31(後述)に進める。   If it is determined in step S27 that the cutting process has not been completed, the control device 100 executes step S28. In step S28, the control command generation unit 111 checks whether or not the cutting process is being executed. If it is determined in step S28 that the cutting process is being executed, the control device 100 advances the process to step S31 (described later).

ステップS28において、切断処理が実行中ではないと判定した場合、制御装置100はステップS29を実行する。ステップS29では、鋳片21の先端21aが切断開始位置に到達したか否かを制御指令生成部111が確認する。ステップS29において、鋳片21の先端21aが切断開始位置に到達していないと判定した場合、制御装置100は処理をステップS31(後述)に進める。   If it is determined in step S28 that the cutting process is not being executed, the control device 100 executes step S29. In step S29, the control command generator 111 checks whether or not the tip 21a of the slab 21 has reached the cutting start position. If it is determined in step S29 that the tip 21a of the slab 21 has not reached the cutting start position, the control device 100 advances the process to step S31 (described later).

ステップS29において、鋳片21の先端21aが切断開始位置に到達したと判定した場合、制御装置100はステップS30を実行する。ステップS30では、制御指令生成部111が、切断処理を開始するための指令信号を生成し、これを切断制御部116に出力する。これに応じ、切断制御部116は、鋳片21を所望の長さで切断する処理を開始するように搬送テーブル16及びカッター17を制御する。   When it determines with the front-end | tip 21a of the slab 21 having reached | attained the cutting start position in step S29, the control apparatus 100 performs step S30. In step S <b> 30, the control command generation unit 111 generates a command signal for starting the cutting process, and outputs this to the cutting control unit 116. In response to this, the cutting control unit 116 controls the transport table 16 and the cutter 17 so as to start a process of cutting the slab 21 with a desired length.

次に、制御装置100はステップS31を実行する。ステップS31では、ピンチロール4の駆動制御が鋳造モード及び引抜モードのいずれで実行されているかを制御指令生成部111が確認する。ステップS31において、ピンチロール4の駆動制御が鋳造モードで実行中であると判定した場合、制御装置100は、処理をステップS18に戻す。ステップS31において、ピンチロール4の駆動制御が引抜モードで実行中であると判定した場合、制御装置100は、処理をステップS23に戻す。以後、ステップS23において分離処理が完了したと判定され、更にステップS27において切断処理が完了したと判定されるまで、鋳造モード又は引抜モードでのピンチロール4の駆動制御が継続される。   Next, the control apparatus 100 performs step S31. In step S31, the control command generator 111 confirms whether the drive control of the pinch roll 4 is executed in the casting mode or the drawing mode. In Step S31, when it is determined that the drive control of the pinch roll 4 is being executed in the casting mode, the control device 100 returns the process to Step S18. If it is determined in step S31 that the drive control of the pinch roll 4 is being executed in the pull-out mode, the control device 100 returns the process to step S23. Thereafter, the drive control of the pinch roll 4 in the casting mode or the drawing mode is continued until it is determined in step S23 that the separation process has been completed, and further in step S27, it is determined that the cutting process has been completed.

ステップS27において、切断処理が完了したと判定した場合、制御装置100は鋳造制御を完了する。   If it is determined in step S27 that the cutting process has been completed, the control device 100 completes the casting control.

(2)ダミーバ搬入手順
続いて、上記ステップS11の具体的な処理内容を説明する。図6に示すように、制御装置100は、まずステップS41を実行する。ステップS41では、ダミーバ搬送制御部112が、鋳型3へのダミーバ22の搬入を開始するようにコンベヤ14を制御する。
(2) Dummy bar carry-in procedure Subsequently, the specific processing content of step S11 will be described. As shown in FIG. 6, the control device 100 first executes step S41. In step S <b> 41, the dummy bar conveyance control unit 112 controls the conveyor 14 so as to start carrying the dummy bar 22 into the mold 3.

次に、制御装置100はステップS42を実行する。ステップS42では、ダミーバ搬送制御部112が、ダミーバ22のテール22a(下流側の端部)が、所定のピンチロール4を通過するのを待機する。すなわちダミーバ搬送制御部112は、所定の搬送ユニットU1における二つのピンチロール4の間をテール22aが通過するのを待機する。所定のピンチロール4及び所定の搬送ユニットU1は、搬送経路R1の最上流に位置するピンチロール4及び搬送ユニットU1であってもよいし、最上流から数個(例えば2〜3個)目のピンチロール4及び搬送ユニットU1であってもよい。なお、ここでの「通過」は、搬送経路R1に沿う方向におけるピンチロール4の中心位置に一致する位置を通過することを意味する。   Next, the control apparatus 100 performs step S42. In step S <b> 42, the dummy bar conveyance control unit 112 waits for the tail 22 a (downstream end) of the dummy bar 22 to pass the predetermined pinch roll 4. That is, the dummy bar conveyance control unit 112 waits for the tail 22a to pass between the two pinch rolls 4 in the predetermined conveyance unit U1. The predetermined pinch roll 4 and the predetermined transport unit U1 may be the pinch roll 4 and the transport unit U1 positioned at the uppermost stream in the transport path R1, or several (for example, two to three) pieces from the uppermost stream. The pinch roll 4 and the conveyance unit U1 may be sufficient. Here, “passing” means passing through a position corresponding to the center position of the pinch roll 4 in the direction along the transport path R1.

ダミーバ搬送制御部112は、センサ15の出力に基づいてテール22aの現在位置を導出し、当該現在位置が上記所定のピンチロール4を通過するのを待機する。例えばダミーバ搬送制御部112は、センサ15の出力に基づいてコンベヤ14からのダミーバ22の送出長L1を求め、これをステップS41の実行直前のテール22aの位置P1に加算することでテール22aの現在位置P2を導出する(図13の(a)参照)。   The dummy bar conveyance control unit 112 derives the current position of the tail 22 a based on the output of the sensor 15 and waits for the current position to pass the predetermined pinch roll 4. For example, the dummy bar conveyance control unit 112 obtains the transmission length L1 of the dummy bar 22 from the conveyor 14 based on the output of the sensor 15, and adds this to the position P1 of the tail 22a immediately before the execution of step S41, whereby the current of the tail 22a. A position P2 is derived (see FIG. 13A).

なお、ここでの「位置」は、搬送経路R1上における位置を一義的に特定可能であればどのように表されていてもよい。例えば「位置」は、所定の基準箇所を原点とし、搬送経路R1の下流側を正方向とする一次元の座標で表されていてもよい。基準箇所は、搬送経路R1上に位置する限りいかなる箇所であってもよい。例えば基準箇所は、鋳型3内における溶鋼の湯面目標位置P0であってもよい。   The “position” here may be expressed in any way as long as the position on the transport route R1 can be uniquely identified. For example, the “position” may be represented by one-dimensional coordinates with a predetermined reference point as an origin and a downstream side of the transport route R1 as a positive direction. The reference location may be any location as long as it is located on the transport path R1. For example, the reference location may be the molten steel surface target position P 0 in the mold 3.

ステップS42において、上記所定のピンチロール4をテール22aが通過したと判定すると、制御装置100はステップS43を実行する。ステップS43では、コンベヤ14からのダミーバ22の送出を停止するように、ダミーバ搬送制御部112がダミーバ搬送装置11を制御する。   If it is determined in step S42 that the tail 22a has passed the predetermined pinch roll 4, the control device 100 executes step S43. In step S43, the dummy bar conveyance control unit 112 controls the dummy bar conveyance device 11 so as to stop the delivery of the dummy bar 22 from the conveyor 14.

次に、制御装置100はステップS44を実行する。ステップS44では、ダミーバ22のテール22aよりも上流側に位置する全てのピンチロール4をアクティブ状態にするように、これらのピンチロール4にそれぞれ対応する切替駆動部6をピンチロール制御部115が制御する(図13の(b)参照)。   Next, the control apparatus 100 performs step S44. In step S44, the pinch roll control unit 115 controls the switching drive units 6 respectively corresponding to the pinch rolls 4 so as to activate all the pinch rolls 4 located on the upstream side of the tail 22a of the dummy bar 22. (Refer to FIG. 13B).

次に、制御装置100はステップS45を実行する。ステップS45では、ダミーバカー13をウィンチ12側に移動させ、ダミーバ22からコンベヤ14を離すように、ダミーバ搬送制御部112がダミーバ搬送装置11を制御する(図13の(c)参照)。以上でダミーバ22の搬入が完了する。   Next, the control apparatus 100 performs step S45. In step S45, the dummy bar transport control unit 112 controls the dummy bar transport device 11 so as to move the dummy backer 13 toward the winch 12 and separate the conveyor 14 from the dummy bar 22 (see FIG. 13C). This completes the loading of the dummy bar 22.

(3)ロール駆動制御手順
続いて、上記ステップS12,S17,S22において開始されるピンチロール4の駆動制御の具体的な処理内容を説明する。図7に示すように、制御装置100は、まずステップS51を実行する。ステップS51では、ピンチロール4の駆動制御のモード(以下「制御モード」という。)が挿入モードであるか否かをピンチロール制御部115が確認する。
(3) Roll Drive Control Procedure Next, specific processing contents of the drive control of the pinch roll 4 started in steps S12, S17, and S22 will be described. As shown in FIG. 7, the control apparatus 100 first executes step S51. In step S51, the pinch roll control unit 115 checks whether or not the drive control mode of the pinch roll 4 (hereinafter referred to as “control mode”) is the insertion mode.

ステップS51において、制御モードが挿入モードであると判定した場合、制御装置100は、図8に示すようにステップS52を実行する。ステップS52では、センサ5を用いて搬送対象物Tの先端部t1の位置(以下、「第一位置」という。)を導出することをトラッキング制御部114が開始する。トラッキング制御部114は、ステップS52の実行直前における搬送対象物Tの第一位置(センサ15を用いて導出された位置)を基準にして、センサ5を用いて搬送対象物Tの位置を導出する。例えばトラッキング制御部114は、センサ5の出力に基づいてピンチロール4による搬送対象物Tの移動距離L2を求め、これをステップS52の実行直前における搬送対象物Tの先端部t1の位置P3(すなわちテール22aの位置)に加算することで先端部t1の現在位置P4を導出する(図13の(c)参照)。   If it is determined in step S51 that the control mode is the insertion mode, the control device 100 executes step S52 as shown in FIG. In step S <b> 52, the tracking control unit 114 starts to derive the position of the leading end t <b> 1 of the conveyance target T (hereinafter referred to as “first position”) using the sensor 5. The tracking control unit 114 derives the position of the conveyance target T using the sensor 5 with reference to the first position of the conveyance target T immediately before execution of step S52 (the position derived using the sensor 15). . For example, the tracking control unit 114 obtains the movement distance L2 of the conveyance target T by the pinch roll 4 based on the output of the sensor 5, and uses this to determine the position P3 (ie, the front end t1 of the conveyance target T immediately before the execution of Step S52). The current position P4 of the tip end t1 is derived by adding to the position of the tail 22a (see FIG. 13C).

次に、制御装置100はステップS53を実行する。ステップS53では、ピンチロール制御部115が、全てのアクティブなピンチロール4の駆動を開始するように、これらのピンチロール4にそれぞれ対応する回転駆動部7を制御する。   Next, the control apparatus 100 performs step S53. In step S <b> 53, the pinch roll control unit 115 controls the rotation drive units 7 corresponding to these pinch rolls 4 so as to start driving all the active pinch rolls 4.

ステップS53の実行後において、制御装置100は、複数のセンサ5のうち搬送対象物Tの第一位置の導出に用いるセンサを搬送対象物Tの搬送に応じて搬送経路R1の上流側から下流側に切り替える。制御装置100は、センサ5を用いた搬送対象物Tの第一位置の導出結果に異常が生じた際に、当該位置の導出に用いるセンサを当該搬送対象物Tの搬送中のピンチロール4に対応する他のセンサ5に切り替えることを更に実行してもよい。   After execution of step S53, the control device 100 uses a sensor used for deriving the first position of the transport target T among the plurality of sensors 5 from the upstream side to the downstream side of the transport path R1 according to the transport of the transport target T. Switch to. When an abnormality occurs in the derivation result of the first position of the conveyance target T using the sensor 5, the control device 100 applies the sensor used for derivation of the position to the pinch roll 4 that is conveying the conveyance target T. Switching to another corresponding sensor 5 may be further executed.

例えば制御装置100は、まずステップS54を実行する。ステップS54では、アクティブなピンチロール4に対して一つ下流側に位置するピンチロール4(以下、これを「次のピンチロール4」という。)を搬送対象物Tの先端部t1(すなわちテール22a)が通過したか否かをピンチロール制御部115が判定する。ステップS54において、先端部t1が次のピンチロール4を通過していないと判定した場合、制御装置100は処理をステップS57(後述)に進める。   For example, the control device 100 first executes step S54. In step S54, the pinch roll 4 positioned on the downstream side with respect to the active pinch roll 4 (hereinafter referred to as “next pinch roll 4”) is moved to the front end t1 (that is, the tail 22a) of the conveyance target T. ) Has passed or not, the pinch roll control unit 115 determines. If it is determined in step S54 that the tip end t1 has not passed the next pinch roll 4, the control device 100 advances the process to step S57 (described later).

ステップS54において、先端部t1が次のピンチロール4を通過したと判定した場合(図14参照)、制御装置100はステップS55,S56を順に実行する。ステップS55では、上記次のピンチロール4の回転駆動を開始するように、当該ピンチロール4に対応する回転駆動部7を制御し、当該ピンチロール4をアクティブ状態にするように、当該ピンチロール4に対応する切替駆動部6を制御する。   When it is determined in step S54 that the tip end t1 has passed the next pinch roll 4 (see FIG. 14), the control device 100 executes steps S55 and S56 in order. In step S55, the rotation drive unit 7 corresponding to the pinch roll 4 is controlled so as to start the rotation drive of the next pinch roll 4, and the pinch roll 4 is set to be in an active state. The switching drive unit 6 corresponding to is controlled.

ステップS56では、トラッキング制御部114が、複数のセンサ5のうち搬送対象物Tの第一位置の導出に用いるセンサ5を、新たにアクティブ状態となったピンチロール4に対応するセンサ5に切り替える。その後、トラッキング制御部114は、ステップS56における切り替え前のセンサ5を用いて導出した搬送対象物Tの第一位置を基準にして、ステップS56における切り替え後のセンサ5を用いた搬送対象物Tの第一位置の導出を行う。例えばトラッキング制御部114は、切り替え後のセンサ5の出力に基づいてピンチロール4による搬送対象物Tの移動距離L3を求め、切り替え前のセンサ5を用いて導出した先端部t1の位置P5に加算することで、先端部t1の現在位置P6を導出する(図14参照)。   In step S56, the tracking control unit 114 switches the sensor 5 used for derivation of the first position of the conveyance target T among the plurality of sensors 5 to the sensor 5 corresponding to the pinch roll 4 that is newly in the active state. Thereafter, the tracking control unit 114 uses the first position of the conveyance target T derived using the sensor 5 before switching in Step S56 as a reference, and the tracking control unit 114 sets the conveyance target T using the sensor 5 after switching in Step S56. Derivation of the first position is performed. For example, the tracking control unit 114 obtains the movement distance L3 of the conveyance target T by the pinch roll 4 based on the output of the sensor 5 after switching, and adds it to the position P5 of the tip t1 derived using the sensor 5 before switching. As a result, the current position P6 of the tip end portion t1 is derived (see FIG. 14).

次に、制御装置100はステップS57を実行する。ステップS57では、センサ5を用いた位置の導出結果に異常が有るか否かをトラッキング制御部114が判定する。ステップS57において、センサ5を用いた搬送対象物Tの第一位置の導出結果に異常は無いと判定した場合、制御装置100は処理をステップS59(後述)に進める。   Next, the control apparatus 100 performs step S57. In step S57, the tracking control unit 114 determines whether or not there is an abnormality in the position derivation result using the sensor 5. In step S57, when it is determined that there is no abnormality in the derivation result of the first position of the conveyance target T using the sensor 5, the control device 100 advances the process to step S59 (described later).

位置の導出結果に異常が有るか否かを判定する手法に制限は無い。例えば、トラッキング制御部114は、センサ5を用いた位置の導出結果と、前回の導出結果との差が所定の範囲から逸脱している場合(例えば、当該範囲の下限値未満である場合又は当該範囲の上限値を超えている場合)に、位置の導出結果に異常が有ると判定してもよい。所定の範囲は、事前の実験又はシミュレーションにより適宜設定可能である。また、トラッキング制御部114は、搬送ユニットU1の二つのセンサ5を用いて二つの導出結果をそれぞれ得たうえで、これらの差が所定の閾値に比較して大きい場合に、位置の導出結果に異常が有ると判定してもよい。いずれの例においても、所定の閾値は、事前の実験又はシミュレーションにより適宜設定可能である。   There is no limitation on the method for determining whether or not there is an abnormality in the position derivation result. For example, when the difference between the position derivation result using the sensor 5 and the previous derivation result deviates from a predetermined range (for example, when the tracking control unit 114 is less than the lower limit value of the range, When the upper limit value of the range is exceeded, it may be determined that there is an abnormality in the position derivation result. The predetermined range can be appropriately set by a prior experiment or simulation. In addition, the tracking control unit 114 obtains two derivation results using the two sensors 5 of the transport unit U1, and if these differences are larger than a predetermined threshold, It may be determined that there is an abnormality. In any example, the predetermined threshold value can be appropriately set by a prior experiment or simulation.

ステップS57において、センサ5を用いた搬送対象物Tの第一位置の導出結果に異常が有ると判定した場合、制御装置100はステップS58を実行する。ステップS58では、トラッキング制御部114が、搬送対象物Tの第一位置の導出に用いるセンサを当該搬送対象物Tの搬送中のピンチロール4に対応する他のセンサ5に切り替える。例えばトラッキング制御部114は、搬送対象物Tの第一位置の導出に用いるセンサ5を搬送経路R1の下流側から上流側に切り替えてもよい。より具体的に、トラッキング制御部114は、搬送対象物Tの第一位置の導出に用いるセンサ5を、当該センサ5に対応するピンチロール4に対して一つ上流側に位置するピンチロール4に対応するセンサ5に切り替えてもよい。   In Step S57, when it is determined that there is an abnormality in the derivation result of the first position of the conveyance target T using the sensor 5, the control device 100 executes Step S58. In step S58, the tracking control unit 114 switches the sensor used for deriving the first position of the transport target T to another sensor 5 corresponding to the pinch roll 4 that is transporting the transport target T. For example, the tracking control unit 114 may switch the sensor 5 used for deriving the first position of the transport target T from the downstream side to the upstream side of the transport path R1. More specifically, the tracking control unit 114 changes the sensor 5 used for derivation of the first position of the conveyance target T to the pinch roll 4 positioned upstream from the pinch roll 4 corresponding to the sensor 5. You may switch to the corresponding sensor 5.

次に、制御装置100はステップS59を実行する。ステップS59では、ピンチロール4の駆動を停止させるための制御指令(以下、「停止指令」という。)が制御指令生成部111から出力されているか否かをピンチロール制御部115が確認する。   Next, the control apparatus 100 performs step S59. In step S <b> 59, the pinch roll control unit 115 checks whether or not a control command for stopping the driving of the pinch roll 4 (hereinafter referred to as “stop command”) is output from the control command generation unit 111.

ステップS59において、停止指令は出力されていないと判定した場合、制御装置100は処理をステップS54に戻す。以後、停止指令が出力されるまでは、挿入モードでのピンチロール4の駆動制御が継続される。   When determining in step S59 that the stop command has not been output, the control device 100 returns the process to step S54. Thereafter, the drive control of the pinch roll 4 in the insertion mode is continued until a stop command is output.

ステップS59において、停止指令が出力されていると判定した場合、制御装置100はステップS60を実行する。ステップS60では、ピンチロール制御部115が、全てのアクティブなピンチロール4の駆動を停止するように、これらのピンチロール4にそれぞれ対応する回転駆動部7を制御する。以上で挿入モードでのピンチロール4の駆動制御が完了する。以上でダミーバ22の挿入が完了する。   In step S59, when it is determined that the stop command is output, the control device 100 executes step S60. In step S <b> 60, the pinch roll control unit 115 controls the rotation driving units 7 corresponding to these pinch rolls 4 so as to stop the driving of all the active pinch rolls 4. Thus, the drive control of the pinch roll 4 in the insertion mode is completed. Thus, the insertion of the dummy bar 22 is completed.

図7に戻り、ステップS51において制御モードが挿入モードではないと判定した場合、制御装置100はステップS61を実行する。ステップS61では、制御モードが鋳造モードであるか引抜モードであるかをピンチロール制御部115が判定する。   Returning to FIG. 7, when it is determined in step S51 that the control mode is not the insertion mode, the control device 100 executes step S61. In step S61, the pinch roll control unit 115 determines whether the control mode is the casting mode or the drawing mode.

ステップS61において、制御モードが鋳造モードであると判定した場合、制御装置100は、図9に示すようにステップS62を実行する。ステップS62では、ピンチロール制御部115が、全てのアクティブなピンチロール4の駆動を開始するように、これらのピンチロール4にそれぞれ対応する回転駆動部7を制御する。   If it is determined in step S61 that the control mode is the casting mode, the control device 100 executes step S62 as shown in FIG. In step S <b> 62, the pinch roll control unit 115 controls the rotation driving units 7 corresponding to the pinch rolls 4 so as to start driving all the active pinch rolls 4.

ステップS62の実行後において、制御装置100は、複数のセンサ5のうち搬送対象物Tの第一位置の導出に用いるセンサを搬送対象物Tの搬送に応じて搬送経路R1の上流側から下流側に切り替える。制御装置100は、センサ9を用いて鋳片21の位置を導出することを更に実行してもよい。制御装置100は、センサ5,9を用いた搬送対象物Tの第一位置の導出結果に異常が生じた際に、当該位置の導出に用いるセンサを当該搬送対象物Tの搬送中のピンチロール4に対応する他のセンサ5に切り替えることを更に実行してもよい。   After execution of step S62, the control device 100 uses a sensor used for derivation of the first position of the conveyance target T among the plurality of sensors 5 from the upstream side to the downstream side of the conveyance path R1 according to the conveyance of the conveyance target T. Switch to. The control device 100 may further execute deriving the position of the slab 21 using the sensor 9. When an abnormality occurs in the derivation result of the first position of the conveyance target T using the sensors 5 and 9, the control device 100 uses the sensor used for derivation of the position as a pinch roll during conveyance of the conveyance target T. Switching to another sensor 5 corresponding to 4 may be further executed.

例えば制御装置100は、まずステップS63を実行する。ステップS63では、アクティブなピンチロール4に対して一つ下流側に位置するピンチロール4(以下、これを「次のピンチロール4」という。)を搬送対象物Tの先端部t1が通過したか否かをピンチロール制御部115が判定する。   For example, the control device 100 first executes step S63. In step S63, has the tip t1 of the conveyance target T passed through the pinch roll 4 positioned on the downstream side of the active pinch roll 4 (hereinafter referred to as “next pinch roll 4”)? The pinch roll control unit 115 determines whether or not.

ステップS63において、先端部t1が次のピンチロール4を通過したと判定した場合(図15参照)、制御装置100はステップS64,S65を順に実行する。ステップS64では、上記次のピンチロール4の回転駆動を開始するように、当該ピンチロール4に対応する回転駆動部7を制御し、当該ピンチロール4をアクティブ状態にするように、当該ピンチロール4に対応する切替駆動部6を制御する。   In step S63, when it determines with the front-end | tip part t1 having passed the following pinch roll 4 (refer FIG. 15), the control apparatus 100 performs step S64, S65 in order. In step S64, the rotation drive unit 7 corresponding to the pinch roll 4 is controlled so as to start the rotation drive of the next pinch roll 4, and the pinch roll 4 is set to be in an active state. The switching drive unit 6 corresponding to is controlled.

ステップS65では、トラッキング制御部114が、複数のセンサ5のうち搬送対象物Tの第一位置の導出に用いるセンサ5を、新たにアクティブ状態となったピンチロール4に対応するセンサ5に切り替える。その後、トラッキング制御部114は、ステップS65における切り替え前のセンサ5を用いて導出した搬送対象物Tの第一位置を基準にして、ステップS65における切り替え後のセンサ5を用いた搬送対象物Tの第一位置の導出を行う。例えばトラッキング制御部114は、切り替え後のセンサ5の出力に基づいてピンチロール4による搬送対象物Tの移動距離L4を求め、切り替え前のセンサ5を用いて導出した先端部t1の位置P7に加算することで、先端部t1の現在位置P8を導出する(図15参照)。次に、制御装置100は処理をステップS69(後述)に進める。   In step S <b> 65, the tracking control unit 114 switches the sensor 5 used for deriving the first position of the conveyance target T among the plurality of sensors 5 to the sensor 5 corresponding to the pinch roll 4 that is newly in the active state. Thereafter, the tracking control unit 114 uses the first position of the transport target T derived using the sensor 5 before switching in step S65 as a reference, and the tracking control unit 114 sets the transport target T using the sensor 5 after switching in step S65. Derivation of the first position is performed. For example, the tracking control unit 114 obtains the movement distance L4 of the conveyance target T by the pinch roll 4 based on the output of the sensor 5 after switching, and adds it to the position P7 of the tip t1 derived using the sensor 5 before switching. Thus, the current position P8 of the tip end portion t1 is derived (see FIG. 15). Next, control device 100 causes the process to proceed to step S69 (described later).

ステップS63において、先端部t1が次のピンチロール4を通過していないと判定した場合、制御装置100はステップS66を実行する。ステップS66では、先端部t1が測長ロール8を通過したか否かをピンチロール制御部115が確認する。なお、ここでの「通過」は、搬送経路R1に沿う方向における測長ロール8の中心位置に一致する位置を通過することを意味する。ステップS66において、先端部t1が測長ロール8を通過していないと判定した場合、制御装置100は処理をステップS69(後述)に進める。   In step S63, when it determines with the front-end | tip part t1 not passing the next pinch roll 4, the control apparatus 100 performs step S66. In step S <b> 66, the pinch roll control unit 115 checks whether or not the tip end t <b> 1 has passed the length measuring roll 8. Here, “passing” means passing through a position corresponding to the center position of the length measuring roll 8 in the direction along the transport path R1. If it is determined in step S66 that the tip end t1 has not passed the length measuring roll 8, the control device 100 advances the process to step S69 (described later).

ステップS66において、先端部t1が測長ロール8を通過したと判定した場合(図17参照)、制御装置100はステップS67,S68を順に実行する。ステップS67では、測長ロール8をアクティブ状態にするように切替駆動部10を制御する。   If it is determined in step S66 that the tip end t1 has passed the length measuring roll 8 (see FIG. 17), the control device 100 sequentially executes steps S67 and S68. In step S67, the switching drive unit 10 is controlled so that the length measuring roll 8 is activated.

ステップS68では、トラッキング制御部114が、複数のセンサ5のうち搬送対象物Tの第一位置の導出に用いるセンサを測長ロール8に切り替える。その後、トラッキング制御部114は、例えばステップS68における切り替え前のセンサ5を用いて導出した搬送対象物Tの第一位置を基準にして、測長ロール8を用いた搬送対象物Tの第一位置の導出を行う。例えばトラッキング制御部114は、測長ロール8の出力に基づいてピンチロール4による搬送対象物Tの移動距離L5を求め、切り替え前のセンサ5を用いて導出した先端部t1の位置P9に加算することで、先端部t1の現在位置P10を導出する(図17参照)。   In step S <b> 68, the tracking control unit 114 switches the sensor used for deriving the first position of the transport target T among the plurality of sensors 5 to the length measuring roll 8. Thereafter, the tracking control unit 114 uses, for example, the first position of the transport target T using the length measuring roll 8 with reference to the first position of the transport target T derived using the sensor 5 before switching in step S68. Is derived. For example, the tracking control unit 114 obtains a moving distance L5 of the conveyance target T by the pinch roll 4 based on the output of the length measuring roll 8, and adds it to the position P9 of the leading end t1 derived using the sensor 5 before switching. Thus, the current position P10 of the tip end portion t1 is derived (see FIG. 17).

次に、制御装置100はステップS69を実行する。ステップS69では、センサ5,9を用いた位置の導出結果に異常が有るか否かをトラッキング制御部114が判定する。ステップS69において、センサ5,9を用いた搬送対象物Tの第一位置の導出結果に異常は無いと判定した場合、制御装置100は処理をステップS71(後述)に進める。位置の導出結果に異常が有るか否かを判定する手法についてはステップS57と同様である。   Next, the control apparatus 100 performs step S69. In step S69, the tracking control unit 114 determines whether or not there is an abnormality in the position derivation result using the sensors 5 and 9. In step S69, when it is determined that there is no abnormality in the derivation result of the first position of the conveyance target T using the sensors 5 and 9, the control device 100 advances the process to step S71 (described later). The method for determining whether or not there is an abnormality in the position derivation result is the same as in step S57.

ステップS69において、センサ5,9を用いた搬送対象物Tの第一位置の導出結果に異常が有ると判定した場合、制御装置100はステップS70を実行する。ステップS70では、トラッキング制御部114が、搬送対象物Tの第一位置の導出に用いるセンサを当該搬送対象物Tの搬送中のピンチロール4に対応する他のセンサ5に切り替える。例えばトラッキング制御部114は、搬送対象物Tの第一位置の導出に用いるセンサ5を搬送経路R1の下流側から上流側に切り替えてもよい。トラッキング制御部114は、搬送対象物Tの第一位置の導出に用いるセンサを、当該位置の導出に用いていたセンサ5に対応するピンチロール4に対して一つ上流側に位置するピンチロール4に対応するセンサ5に切り替えてもよい。また、トラッキング制御部114は、搬送対象物Tの第一位置の導出に用いるセンサを、当該位置の導出に用いていたセンサ9に対して一つ上流側に位置するピンチロール4に対応するセンサ5に切り替えてもよい。   If it is determined in step S69 that the derivation result of the first position of the conveyance target T using the sensors 5 and 9 is abnormal, the control device 100 executes step S70. In step S <b> 70, the tracking control unit 114 switches the sensor used for deriving the first position of the transport target T to another sensor 5 corresponding to the pinch roll 4 that is transporting the transport target T. For example, the tracking control unit 114 may switch the sensor 5 used for deriving the first position of the transport target T from the downstream side to the upstream side of the transport path R1. The tracking control unit 114 uses a sensor used for deriving the first position of the transport target T as one upstream side of the pinch roll 4 corresponding to the sensor 5 used for deriving the position. You may switch to the sensor 5 corresponding to. In addition, the tracking control unit 114 uses a sensor corresponding to the pinch roll 4 that is located upstream one of the sensors 9 used for deriving the first position of the conveyance target T with respect to the sensor 9 used for deriving the position. You may switch to 5.

次に、制御装置100はステップS71を実行する。ステップS71では、ピンチロール4の駆動を停止させるための制御指令(以下、「停止指令」という。)が制御指令生成部111から出力されているか否かをピンチロール制御部115が確認する。   Next, the control apparatus 100 performs step S71. In step S <b> 71, the pinch roll control unit 115 confirms whether or not a control command for stopping the driving of the pinch roll 4 (hereinafter referred to as “stop command”) is output from the control command generation unit 111.

ステップS71において、停止指令は出力されていないと判定した場合、制御装置100は処理をステップS63に戻す。以後、停止指令が出力されるまでは、鋳造モードでのピンチロール4の駆動制御が継続される。   If it is determined in step S71 that the stop command has not been output, the control device 100 returns the process to step S63. Thereafter, the drive control of the pinch roll 4 in the casting mode is continued until a stop command is output.

ステップS71において、停止指令が出力されていると判定した場合、制御装置100はステップS72を実行する。ステップS72では、ピンチロール制御部115が、全てのアクティブなピンチロール4の駆動を停止するように、これらのピンチロール4にそれぞれ対応する回転駆動部7を制御する。以上で、鋳造モードでのピンチロール4の駆動制御が完了する。   If it is determined in step S71 that a stop command has been output, the control device 100 executes step S72. In step S72, the pinch roll control unit 115 controls the rotation drive units 7 corresponding to the pinch rolls 4 so as to stop the driving of all the active pinch rolls 4, respectively. This completes the drive control of the pinch roll 4 in the casting mode.

上述のステップS61において、制御モードが引抜モードであると判定した場合、制御装置100は、図10に示すようにステップS73を実行する。ステップS73では、センサ5を用いて搬送対象物Tの基端部t2の位置(以下、「第二位置」という。)を導出することをトラッキング制御部114が開始する。トラッキング制御部114は、ステップS73の実行直前における搬送対象物Tの第二位置(例えば湯面目標位置P0)を基準にして、センサ5を用いて搬送対象物Tの第二位置を導出する。例えばトラッキング制御部114は、センサ5の出力に基づいてピンチロール4による搬送対象物Tの移動距離L6を求め、これを湯面目標位置P0に加算することで基端部t2の現在位置P11を導出する(図16参照)。   When it is determined in step S61 described above that the control mode is the drawing mode, the control device 100 executes step S73 as shown in FIG. In step S <b> 73, the tracking control unit 114 starts to derive the position of the base end portion t <b> 2 of the conveyance target T (hereinafter referred to as “second position”) using the sensor 5. The tracking control unit 114 derives the second position of the transport target T using the sensor 5 with reference to the second position of the transport target T (for example, the molten metal surface target position P0) immediately before execution of Step S73. For example, the tracking control unit 114 obtains the movement distance L6 of the conveyance target T by the pinch roll 4 based on the output of the sensor 5, and adds this to the molten metal surface target position P0, thereby obtaining the current position P11 of the base end t2. Derived (see FIG. 16).

次に、制御装置100はステップS74を実行する。ステップS74では、ピンチロール制御部115が、全てのアクティブなピンチロール4の駆動を開始するように、これらのピンチロール4にそれぞれ対応する回転駆動部7を制御する。   Next, the control apparatus 100 performs step S74. In step S <b> 74, the pinch roll control unit 115 controls the rotational drive units 7 corresponding to these pinch rolls 4 so as to start driving all the active pinch rolls 4.

ステップS74の実行後において、制御装置100は、複数のセンサ5のうち搬送対象物Tの第一位置及び第二位置の導出に用いるセンサを搬送対象物Tの搬送に応じて搬送経路R1の上流側から下流側に切り替えてもよい。制御装置100は、センサ9を用いて鋳片21の第一位置を導出することを更に実行してもよい。制御装置100は、センサ5,9を用いた搬送対象物Tの第一位置及び第二位置の導出結果に異常が生じた際に、当該位置の導出に用いるセンサを当該搬送対象物Tの搬送中のピンチロール4に対応する他のセンサ5に切り替えることを更に実行してもよい。   After execution of step S74, the control device 100 uses the sensors used for deriving the first position and the second position of the transport target T among the plurality of sensors 5 in the upstream of the transport path R1 according to the transport of the transport target T. You may switch from the side to the downstream side. The control device 100 may further execute deriving the first position of the slab 21 using the sensor 9. When an abnormality occurs in the derivation result of the first position and the second position of the conveyance target T using the sensors 5 and 9, the control device 100 uses the sensor used for derivation of the position to convey the conveyance target T. You may further perform switching to the other sensor 5 corresponding to the pinch roll 4 inside.

例えば制御装置100は、まずステップS63と同様のステップS75を実行する。ステップS75において、先端部t1が次のピンチロール4を通過したと判定した場合、制御装置100はステップS64,S65と同様のステップS76,S77を順に実行する。次に、制御装置100は処理をステップS81(後述)に進める。ステップS75において、先端部t1が次のピンチロール4を通過していないと判定した場合、制御装置100はステップS66と同様のステップS78を実行する。ステップS78において、先端部t1が測長ロール8を通過していないと判定した場合、制御装置100は処理をステップS81(後述)に進める。ステップS78において、先端部t1が測長ロール8を通過したと判定した場合、制御装置100はステップS67,S68と同様のステップS79,S80を順に実行する。   For example, the control device 100 first executes step S75 similar to step S63. In step S75, when it is determined that the tip portion t1 has passed the next pinch roll 4, the control device 100 sequentially executes steps S76 and S77 similar to steps S64 and S65. Next, control device 100 causes the process to proceed to step S81 (described later). In step S75, when it determines with the front-end | tip part t1 not passing the next pinch roll 4, the control apparatus 100 performs step S78 similar to step S66. If it is determined in step S78 that the tip end t1 has not passed the length measuring roll 8, the control device 100 advances the process to step S81 (described later). When it is determined in step S78 that the tip end t1 has passed the length measuring roll 8, the control device 100 sequentially executes steps S79 and S80 similar to steps S67 and S68.

次に、制御装置100はステップS81を実行する。ステップS81では、全てのアクティブなピンチロール4のうち、搬送経路R1における最も上流側に位置するピンチロール4(以下、「最上流のピンチロール4」という。)に搬送対象物Tの基端部t2(すなわち鋳片21の基端部21b)が接近したか否かをピンチロール制御部115が判定する。ステップS81において、基端部t2が最上流のピンチロール4に接近していないと判定した場合、制御装置100は処理をステップS84(後述)に進める。   Next, the control apparatus 100 performs step S81. In step S <b> 81, the base end portion of the conveyance target T is placed on the pinch roll 4 located on the most upstream side in the conveyance path R <b> 1 (hereinafter referred to as “the most upstream pinch roll 4”) among all the active pinch rolls 4. The pinch roll control unit 115 determines whether t2 (that is, the base end portion 21b of the slab 21) has approached. If it is determined in step S81 that the base end t2 is not approaching the most upstream pinch roll 4, the control device 100 advances the process to step S84 (described later).

ステップS81において、基端部t2が最上流のピンチロール4に接近したと判定した場合(図16参照)、制御装置100はステップS82,S83を順に実行する。ステップS82では、トラッキング制御部114が、複数のセンサ5のうち搬送対象物Tの第二位置の導出に用いるセンサ5を、最上流のピンチロール4に対して一つ下流側のピンチロール4に対応するセンサ5に切り替える。その後、トラッキング制御部114は、ステップS82における切り替え前のセンサ5を用いて導出した搬送対象物Tの第二位置を基準にして、ステップS82における切り替え後のセンサ5を用いた搬送対象物Tの第二位置の導出を行う。例えばトラッキング制御部114は、切り替え後のセンサ5の出力に基づいてピンチロール4による搬送対象物Tの移動距離L7を求め、切り替え前のセンサ5を用いて導出した基端部t2の位置P12に加算することで、基端部t2の現在位置P13を導出する(図16参照)。   If it is determined in step S81 that the base end t2 has approached the most upstream pinch roll 4 (see FIG. 16), the control device 100 executes steps S82 and S83 in order. In step S <b> 82, the tracking control unit 114 sets the sensor 5 used for deriving the second position of the conveyance target T among the plurality of sensors 5 to the pinch roll 4 on the downstream side of the most upstream pinch roll 4. Switch to the corresponding sensor 5. After that, the tracking control unit 114 uses the second position of the conveyance target T derived using the sensor 5 before switching in step S82 as a reference, and the tracking control unit 114 sets the conveyance target T using the sensor 5 after switching in step S82. Derivation of the second position is performed. For example, the tracking control unit 114 obtains the movement distance L7 of the conveyance target T by the pinch roll 4 based on the output of the sensor 5 after switching, and the position P12 of the base end t2 derived using the sensor 5 before switching. By adding, the current position P13 of the base end t2 is derived (see FIG. 16).

ステップS82では、上記最上流のピンチロール4を非アクティブ状態にするように、当該ピンチロール4に対応する切替駆動部6を制御し、当該ピンチロール4の回転駆動を停止するように、当該ピンチロール4に対応する回転駆動部7をピンチロール制御部115が制御する。   In step S82, the switching drive unit 6 corresponding to the pinch roll 4 is controlled so that the most upstream pinch roll 4 is in an inactive state, and the pinch roll 4 is stopped so as to stop rotating. The pinch roll control unit 115 controls the rotation driving unit 7 corresponding to the roll 4.

次に、制御装置100はステップS84を実行する。ステップS84では、センサ5,9を用いた第一位置及び第二位置の導出結果に異常が有るか否かをトラッキング制御部114が判定する。ステップS84において、センサ5,9を用いた搬送対象物Tの第一位置及び第二位置の導出結果に異常は無いと判定した場合、制御装置100は処理をステップS86(後述)に進める。位置の導出結果に異常が有るか否かを判定する手法についてはステップS57と同様である。   Next, the control apparatus 100 performs step S84. In step S84, the tracking control unit 114 determines whether there is an abnormality in the derivation results of the first position and the second position using the sensors 5 and 9. In step S84, when it is determined that there is no abnormality in the derivation result of the first position and the second position of the conveyance target T using the sensors 5 and 9, the control device 100 advances the process to step S86 (described later). The method for determining whether or not there is an abnormality in the position derivation result is the same as in step S57.

ステップS84において、センサ5,9を用いた搬送対象物Tの第一位置あるいは第二位置の導出結果に異常が有ると判定した場合、制御装置100はステップS85を実行する。ステップS85では、トラッキング制御部114が、搬送対象物Tの位置の導出に用いるセンサを当該搬送対象物Tの搬送中のピンチロール4に対応する他のセンサ5に切り替える。   In Step S84, when it is determined that there is an abnormality in the derivation result of the first position or the second position of the conveyance target T using the sensors 5 and 9, the control device 100 executes Step S85. In step S85, the tracking control unit 114 switches the sensor used for deriving the position of the transport target T to another sensor 5 corresponding to the pinch roll 4 that is transporting the transport target T.

例えば、第一位置の導出結果に異常が有ると判定した場合、トラッキング制御部114は、第一位置の導出に用いるセンサ5を搬送経路R1の下流側から上流側に切り替えてもよい。トラッキング制御部114は、搬送対象物Tの第一位置の導出に用いるセンサを、当該位置の導出に用いていたセンサ5に対応するピンチロール4に対して一つ上流側に位置するピンチロール4に対応するセンサ5に切り替えてもよい。また、トラッキング制御部114は、搬送対象物Tの位置の導出に用いるセンサを、当該位置の導出に用いていたセンサ9に対して一つ上流側に位置するピンチロール4に対応するセンサ5に切り替えてもよい。   For example, when it is determined that there is an abnormality in the derivation result of the first position, the tracking control unit 114 may switch the sensor 5 used for derivation of the first position from the downstream side to the upstream side of the transport path R1. The tracking control unit 114 uses a sensor used for deriving the first position of the transport target T as one upstream side of the pinch roll 4 corresponding to the sensor 5 used for deriving the position. You may switch to the sensor 5 corresponding to. In addition, the tracking control unit 114 uses the sensor 5 used for deriving the position of the conveyance target T as the sensor 5 corresponding to the pinch roll 4 positioned upstream from the sensor 9 used for deriving the position. You may switch.

第二位置の導出結果に異常が有ると判定した場合、トラッキング制御部114は、第二位置の導出に用いるセンサ5を搬送経路R1の上流側から下流側に切り替えてもよい。トラッキング制御部114は、搬送対象物Tの第二位置の導出に用いるセンサを、当該位置の導出に用いていたセンサ5に対応するピンチロール4に対して一つ下流側に位置するピンチロール4に対応するセンサ5に切り替えてもよい。   When it is determined that the second position derivation result is abnormal, the tracking control unit 114 may switch the sensor 5 used for derivation of the second position from the upstream side to the downstream side of the transport path R1. The tracking control unit 114 has a sensor used for deriving the second position of the conveyance target T, one pinch roll 4 positioned downstream of the pinch roll 4 corresponding to the sensor 5 used for deriving the position. You may switch to the sensor 5 corresponding to.

次に、制御装置100はステップS86を実行する。ステップS86では、搬送対象物Tを搬送していた全てのピンチロール4の駆動が停止したか否かをピンチロール制御部115が確認する。   Next, the control apparatus 100 performs step S86. In step S86, the pinch roll control unit 115 confirms whether or not driving of all the pinch rolls 4 that have transported the transport target T has been stopped.

ステップS86において、未だ駆動中のピンチロール4が有ると判定した場合、制御装置100は処理をステップS75に戻す。以後、搬送対象物Tを搬送していた全てのピンチロール4の駆動が停止するまで(ピンチロール4による搬送対象物Tの搬送が完了するまで)、引抜モードでのピンチロール4の駆動制御が継続される。   If it is determined in step S86 that there is still the pinch roll 4 being driven, the control device 100 returns the process to step S75. Thereafter, the drive control of the pinch roll 4 in the drawing mode is performed until the driving of all the pinch rolls 4 that have transported the transport target T is stopped (until the transport of the transport target T by the pinch roll 4 is completed). Will continue.

ステップS86において、搬送対象物Tを搬送していた全てのピンチロール4の駆動が停止していると判定した場合、制御装置100は処理を完了する。   If it is determined in step S86 that the driving of all the pinch rolls 4 that have transported the transport target T has been stopped, the control device 100 completes the process.

(4)ダミーバの分離・搬送制御手順
続いて、ステップS26において開始される分離・搬送処理の具体的な処理内容を説明する。図11に示すように、制御装置100は、まずステップS91を実行する。ステップS91では、ウィンチ12によるダミーバ22の引き上げを開始するように、ダミーバ搬送制御部112がダミーバ搬送装置11を制御する(図16参照)。
(4) Dummy Bar Separation / Conveyance Control Procedure Next, specific processing contents of the separation / conveyance processing started in step S26 will be described. As shown in FIG. 11, the control device 100 first executes step S91. In step S91, the dummy bar conveyance control unit 112 controls the dummy bar conveyance device 11 so as to start pulling up the dummy bar 22 by the winch 12 (see FIG. 16).

次に、制御装置100はステップS92を実行する。ステップS92では、ダミーバ22のテール22aがコンベヤ14に到達するのをダミーバ搬送制御部112が待機する。ステップS92において、ダミーバ22のテール22aがコンベヤ14に到達すると、制御装置100はステップS93を実行する。ステップS93では、ウィンチ12によるダミーバ22の引き上げを停止するように、ダミーバ搬送制御部112がダミーバ搬送装置11を制御する。   Next, the control apparatus 100 performs step S92. In step S92, the dummy bar conveyance control unit 112 waits for the tail 22a of the dummy bar 22 to reach the conveyor 14. When the tail 22a of the dummy bar 22 reaches the conveyor 14 in step S92, the control device 100 executes step S93. In step S93, the dummy bar conveyance control unit 112 controls the dummy bar conveyance device 11 so as to stop the pulling of the dummy bar 22 by the winch 12.

次に、制御装置100はステップS94を実行する。ステップS94では、コンベヤ14によりダミーバカー13上にダミーバ22を引き上げるように、ダミーバ搬送制御部112がダミーバ搬送装置11を制御する。   Next, the control apparatus 100 performs step S94. In step S94, the dummy bar conveyance control unit 112 controls the dummy bar conveyance device 11 so that the dummy bar 22 is pulled up on the dummy bagger 13 by the conveyor 14.

次に、制御装置100はステップS95を実行する。ステップS95では、ダミーバ搬送制御部112が、ダミーバカー13によるダミーバ22の搬送を開始するようにダミーバ搬送装置11を制御する。   Next, the control apparatus 100 performs step S95. In step S95, the dummy bar transport control unit 112 controls the dummy bar transport device 11 so as to start transporting the dummy bar 22 by the dummy backer 13.

次に、制御装置100はステップS96を実行する。ステップS96では、ダミーバ22を鋳型3に挿入するための位置(以下、「挿入開始位置」という。)にダミーバカー13が到達するのをダミーバ搬送制御部112が待機する。   Next, the control apparatus 100 performs step S96. In step S96, the dummy bar transport control unit 112 waits for the dummy backer 13 to reach a position for inserting the dummy bar 22 into the mold 3 (hereinafter referred to as “insertion start position”).

ステップS96において、ダミーバカー13が挿入開始位置に到達したと判定すると、制御装置100はステップS97を実行する。ステップS97では、ダミーバカー13によるダミーバ22の搬送を停止するように、ダミーバ搬送制御部112がダミーバ搬送装置11を制御する。以上でダミーバ22の分離・搬送処理が完了する。   If it is determined in step S96 that the dummy backer 13 has reached the insertion start position, the control device 100 executes step S97. In step S97, the dummy bar transport control unit 112 controls the dummy bar transport device 11 so as to stop the transport of the dummy bar 22 by the dummy backer 13. This completes the separation / conveying process of the dummy bar 22.

2.2 移動速度の調節手順
ステップS04〜S07の説明において上述したように、第二鋳造制御は、先行鋳片が有る状況で、次の鋳造が開始される場合に実行される。以下においては、先行鋳片(第一鋳片)を鋳片21Aといい、鋳片21Aに後続する後行鋳片(第二鋳片)を鋳片21Bという(図18参照)。また、鋳片21Aを含む搬送対象物を搬送対象物T1(第一搬送対象物)といい、鋳片21Bを含む搬送対象物を搬送対象物T2(第二搬送対象物)という。更に、搬送対象物T1を搬送するアクティブなピンチロール4をグループG1(第一グループ)のピンチロール4といい、搬送対象物T2を搬送するアクティブなピンチロール4をグループG2(第二グループ)のピンチロール4という。
2.2 Procedure for Adjusting Moving Speed As described above in the explanation of steps S04 to S07, the second casting control is executed when the next casting is started in a situation where there is a preceding slab. Hereinafter, the preceding slab (first slab) is referred to as a slab 21A, and the subsequent slab (second slab) subsequent to the slab 21A is referred to as a slab 21B (see FIG. 18). Moreover, the conveyance target object including the slab 21A is referred to as a conveyance target object T1 (first conveyance target object), and the conveyance target object including the cast piece 21B is referred to as a conveyance target object T2 (second conveyance target object). Furthermore, the active pinch roll 4 that transports the transport target T1 is referred to as a group G1 (first group) pinch roll 4, and the active pinch roll 4 that transports the transport target T2 is the group G2 (second group). It is called pinch roll 4.

制御装置100は、鋳片21Aに対して第一鋳造制御を実行している最中に、第二鋳造制御を開始する。この場合、複数のセンサ5のうちいずれかを用いて搬送対象物Tの位置を導出することは、鋳片21Aを搬送中のグループG1のピンチロール4にそれぞれ対応する複数のセンサ5のうちいずれかを用いて鋳片21Aの位置を導出することと、鋳片21Bを搬送するグループG2のピンチロール4にそれぞれ対応する複数のセンサ5のうちいずれかを用いて鋳片21Bの位置を導出することと、を含む。   The control device 100 starts the second casting control while the first casting control is being performed on the slab 21A. In this case, deriving the position of the conveyance target T using any one of the plurality of sensors 5 means any one of the plurality of sensors 5 corresponding to the pinch rolls 4 of the group G1 that is conveying the slab 21A. Is used to derive the position of the slab 21A, and the position of the slab 21B is derived using any one of the plurality of sensors 5 respectively corresponding to the pinch rolls 4 of the group G2 carrying the slab 21B. Including.

第一鋳造制御及び第二鋳造制御を同時に実行している際に、制御装置100は、搬送対象物T1の先端部t11が通過したピンチロール4をグループG1に加えることと、搬送対象物T2の先端部t21が通過したピンチロール4をグループG2に加えることと、を実行する。   When the first casting control and the second casting control are performed simultaneously, the control device 100 adds the pinch roll 4 through which the leading end t11 of the transport target T1 has passed to the group G1 and the transport target T2. The pinch roll 4 that the tip t21 has passed is added to the group G2.

以下、ステップS07における移動速度の調節処理の具体的な処理内容を説明する。図12に示すように、制御装置100は、まずステップS101を実行する。ステップS101では、搬送対象物T1,T2の間隔L8が第一閾値以下であるか否かを制御指令生成部111が確認する(図18参照)。第一閾値は、搬送対象物T1と搬送対象物T2とを衝突させることなく搬送対象物T2を減速又は停止させられるように適宜設定される。例えば第一閾値は、搬送対象物T2を停止させるのに必要な制動距離等に基づいて設定可能である。ステップS101において、搬送対象物T1,T2の間隔が第一閾値を超えていると判定した場合、制御装置100は処理をステップS109(後述)に進める。   Hereinafter, specific processing contents of the moving speed adjustment processing in step S07 will be described. As shown in FIG. 12, the control device 100 first executes step S101. In step S101, the control command generator 111 checks whether or not the interval L8 between the conveyance objects T1 and T2 is equal to or less than the first threshold (see FIG. 18). The first threshold value is appropriately set so that the transport target T2 can be decelerated or stopped without causing the transport target T1 and the transport target T2 to collide with each other. For example, the first threshold value can be set based on a braking distance or the like necessary for stopping the transport target T2. In step S101, when it determines with the space | interval of conveyance target object T1, T2 exceeding the 1st threshold value, the control apparatus 100 advances a process to step S109 (after-mentioned).

ステップS101において、搬送対象物T1,T2の間隔が第一閾値以下であると判定した場合、制御装置100はステップS102を実行する。ステップS102では、搬送対象物T2の移動速度を減速させるように、制御指令生成部111が搬送対象物T2の目標移動速度を変更する。例えば制御指令生成部111は、グループG2に属するピンチロール4の回転速度の目標値を小さくする。これに応じ、ピンチロール制御部115が、グループG2に属するピンチロール4の回転を減速させるように、これらのピンチロール4にそれぞれ対応する回転駆動部7を制御する。   In step S101, when it determines with the space | interval of conveyance target object T1, T2 being below a 1st threshold value, the control apparatus 100 performs step S102. In step S102, the control command generation unit 111 changes the target movement speed of the conveyance target T2 so as to decelerate the movement speed of the conveyance target T2. For example, the control command generation unit 111 decreases the target value of the rotation speed of the pinch roll 4 belonging to the group G2. In response to this, the pinch roll control unit 115 controls the rotation driving units 7 corresponding to these pinch rolls 4 so as to decelerate the rotation of the pinch rolls 4 belonging to the group G2.

次に、制御装置100はステップS103を実行する。ステップS103では、搬送対象物T1,T2の間隔L8が第二閾値以下であるか否かを制御指令生成部111が確認する。第二閾値は、第一閾値よりも小さい値にであってもよい。   Next, the control apparatus 100 performs step S103. In step S103, the control command generation unit 111 checks whether or not the interval L8 between the conveyance objects T1 and T2 is equal to or smaller than the second threshold value. The second threshold may be a value smaller than the first threshold.

ステップS103において、搬送対象物T1,T2の間隔L8が第二閾値を超えていると判定した場合、制御装置100はステップS104を実行する。ステップS104では、搬送対象物T1,T2の間隔L8が第三閾値以上であるか否かを制御指令生成部111が確認する。第三閾値は、第一閾値よりも大きい値であってもよい。   In step S103, when it determines with the space | interval L8 of conveyance target object T1, T2 exceeding the 2nd threshold value, the control apparatus 100 performs step S104. In step S104, the control command generation unit 111 checks whether or not the interval L8 between the conveyance objects T1 and T2 is equal to or greater than a third threshold value. The third threshold value may be a value larger than the first threshold value.

ステップS104において、搬送対象物T1,T2の間隔L8が第三閾値未満であると判定した場合、制御装置100は処理をステップS103に戻す。以後、搬送対象物T1,T2の間隔L8が第二閾値を超えている限り、搬送対象物T1,T2の間隔L8が第三閾値以上となるまで、減速状態での搬送対象物T2の搬送が継続される。   In step S104, when it determines with the space | interval L8 of conveyance target object T1, T2 being less than a 3rd threshold value, the control apparatus 100 returns a process to step S103. Thereafter, as long as the interval L8 between the conveyance objects T1 and T2 exceeds the second threshold value, the conveyance object T2 in the decelerated state is conveyed until the interval L8 between the conveyance objects T1 and T2 becomes equal to or greater than the third threshold value. Will continue.

ステップS104において、搬送対象物T1,T2の間隔L8が第三閾値以上であると判定した場合、制御装置100はステップS105を実行する。ステップS105では、搬送対象物T2の移動速度を加速させるように、制御指令生成部111が搬送対象物T2の目標移動速度を変更する。例えば制御指令生成部111は、グループG2に属するピンチロール4の回転速度の目標値を大きくし、ステップS102における減速前の値に戻す。これに応じ、ピンチロール制御部115が、グループG2に属するピンチロール4の回転を加速させるように、これらのピンチロール4にそれぞれ対応する回転駆動部7を制御する。次に、制御装置100は処理をステップS109(後述)に進める。   In step S104, when it determines with the space | interval L8 of conveyance target object T1, T2 being more than a 3rd threshold value, the control apparatus 100 performs step S105. In step S105, the control command generator 111 changes the target movement speed of the conveyance target T2 so as to accelerate the movement speed of the conveyance target T2. For example, the control command generator 111 increases the target value of the rotational speed of the pinch roll 4 belonging to the group G2, and returns it to the value before deceleration in step S102. In response to this, the pinch roll control unit 115 controls the rotation driving units 7 respectively corresponding to the pinch rolls 4 so as to accelerate the rotation of the pinch rolls 4 belonging to the group G2. Next, the control device 100 proceeds with the process to step S109 (described later).

ステップS103において、搬送対象物T1,T2の間隔L8が第二閾値以下であると判定した場合、制御装置100はステップS106を実行する。ステップS106では、制御指令生成部111が、搬送対象物T2を停止させるための制御指令を生成し、これをピンチロール制御部115に出力する。これに応じ、ピンチロール制御部115は、グループG2に属するピンチロール4の回転を停止させるように、これらのピンチロール4にそれぞれ対応する回転駆動部7を制御する。   In step S103, when it determines with the space | interval L8 of conveyance target object T1, T2 being below a 2nd threshold value, the control apparatus 100 performs step S106. In step S <b> 106, the control command generation unit 111 generates a control command for stopping the transport target T <b> 2 and outputs the control command to the pinch roll control unit 115. In response to this, the pinch roll control unit 115 controls the rotation driving units 7 respectively corresponding to the pinch rolls 4 so as to stop the rotation of the pinch rolls 4 belonging to the group G2.

次に、制御装置100はステップS107を実行する。ステップS107では、搬送対象物T1,T2の間隔L8が第三閾値以上となるのを制御指令生成部111が待機する。以後、搬送対象物T1,T2の間隔L8が第三閾値以上となるまで、搬送対象物T2が停止状態に保たれる。   Next, the control apparatus 100 performs step S107. In step S107, the control command generator 111 waits for the interval L8 between the conveyance objects T1 and T2 to be equal to or greater than the third threshold value. Thereafter, the conveyance object T2 is kept in a stopped state until the interval L8 between the conveyance objects T1 and T2 becomes equal to or greater than the third threshold value.

ステップS107において、搬送対象物T1,T2の間隔L8が第三閾値以上であると判定した場合、切替駆動部10はステップS108を実行する。ステップS108では、制御指令生成部111が、搬送対象物T2の搬送を再開させるための制御指令を生成し、これをピンチロール制御部115に出力する。これに応じ、ピンチロール制御部115は、グループG2に属するピンチロール4の回転を再開させるように、これらのピンチロール4にそれぞれ対応する回転駆動部7を制御する。なお、制御指令生成部111は、ステップS108の実行後における搬送対象物T2の目標移動速度を、ステップS102の実行前の値に設定してもよい。   If it is determined in step S107 that the interval L8 between the conveyance objects T1 and T2 is greater than or equal to the third threshold value, the switching drive unit 10 executes step S108. In step S <b> 108, the control command generation unit 111 generates a control command for resuming the conveyance of the conveyance target T <b> 2 and outputs this to the pinch roll control unit 115. In response to this, the pinch roll control unit 115 controls the rotation driving units 7 respectively corresponding to the pinch rolls 4 so as to resume the rotation of the pinch rolls 4 belonging to the group G2. Note that the control command generation unit 111 may set the target moving speed of the transport target T2 after execution of step S108 to a value before execution of step S102.

次に、制御装置100はステップS109を実行する。ステップS109では、未だ先行鋳片が存在しているか否か(ピンチロール4による先行鋳片の搬送が継続しているか否か)を制御指令生成部111が確認する。ステップS109において先行鋳片が存在していると判定した場合、制御装置100は処理をステップS101に戻す。以後、先行鋳片が存在する限り、移動速度の調節処理が継続される。ステップS109において、先行鋳片は存在していないと判定した場合、制御装置100は移動速度の調節処理を完了する。   Next, the control device 100 executes Step S109. In step S109, the control command generation unit 111 confirms whether or not the preceding slab still exists (whether or not the conveyance of the preceding slab by the pinch roll 4 is continued). If it is determined in step S109 that a preceding slab is present, the control device 100 returns the process to step S101. Thereafter, as long as the preceding slab exists, the moving speed adjustment process is continued. If it is determined in step S109 that no preceding slab is present, the control device 100 completes the movement speed adjustment process.

3.本実施形態の効果
連続鋳造装置1は、鋳片21の搬送経路R1に沿って並び、鋳片21を搬送する複数のピンチロール4と、複数のピンチロール4の少なくとも回転速度に関する情報をそれぞれ出力する複数のセンサ5と、複数のセンサ5のうちいずれかを用いて鋳片21を含む搬送対象物Tの位置を導出することと、複数のセンサ5のうち位置の導出に用いるセンサを搬送対象物Tの移動に応じて搬送経路R1の上流側から下流側に切り替えることと、を実行するように構成された制御装置100と、を備える。
3. Effect of this embodiment The continuous casting apparatus 1 is arranged along the conveyance path R1 of the slab 21, and outputs a plurality of pinch rolls 4 that convey the slab 21, and information about at least the rotational speed of the plurality of pinch rolls 4, respectively. A plurality of sensors 5 to be used, the position of the conveyance target T including the slab 21 is derived using any one of the plurality of sensors 5, and the sensor used to derive the position among the plurality of sensors 5 is a conveyance target And a control device 100 configured to execute switching from the upstream side to the downstream side of the transport path R1 according to the movement of the object T.

この連続鋳造装置1によれば、複数のピンチロール4にそれぞれ対応する複数のセンサ5が鋳片21の位置のトラッキングに利用される。位置の導出に用いるセンサは、鋳片21の搬送に応じて搬送経路R1の上流側から下流側に切り替えられる。このため、いずれかのピンチロール4が鋳片21に接触している限り鋳片21の位置のトラッキングを継続可能である。従って、より確実に鋳片21の位置をトラッキングできる。   According to the continuous casting apparatus 1, a plurality of sensors 5 respectively corresponding to the plurality of pinch rolls 4 are used for tracking the position of the cast piece 21. The sensor used for deriving the position is switched from the upstream side to the downstream side of the transport path R <b> 1 according to the transport of the slab 21. For this reason, as long as any pinch roll 4 is in contact with the slab 21, the tracking of the position of the slab 21 can be continued. Therefore, the position of the slab 21 can be tracked more reliably.

制御装置100は、複数のセンサ5のうち位置の導出に用いるセンサ5を鋳片21の搬送に応じて搬送経路R1の上流側から下流側に切り替える際に、切り替え前のセンサ5を用いて導出した位置を基準にして、切り替え後のセンサ5を用いた位置の導出を行うように構成されていてもよい。この場合、センサの切り替えに伴う位置の導出結果の急変が抑制される。従って、より確実に鋳片21の位置をトラッキングできる。   The control device 100 derives using the sensor 5 before switching when the sensor 5 used for deriving the position among the plurality of sensors 5 is switched from the upstream side to the downstream side of the transport path R1 according to the transport of the slab 21. The position may be derived using the sensor 5 after switching with reference to the position. In this case, sudden changes in the position derivation result associated with sensor switching are suppressed. Therefore, the position of the slab 21 can be tracked more reliably.

制御装置100は、センサ5を用いた搬送対象物Tの位置の導出結果に異常が生じた際に、当該位置の導出に用いるセンサを、当該搬送対象物Tを搬送中のピンチロール4に対応する他のセンサ5に切り替えることを更に実行するように構成されていてもよい。この場合、センサ5が故障した際にも鋳片21の位置のトラッキングを継続させることができる。   When an abnormality occurs in the result of deriving the position of the conveyance target T using the sensor 5, the control device 100 corresponds to the pinch roll 4 that is conveying the conveyance target T using the sensor used for deriving the position. It may be configured to further execute switching to another sensor 5 to be performed. In this case, the tracking of the position of the slab 21 can be continued even when the sensor 5 fails.

センサ5を用いた搬送対象物Tの位置の導出結果に異常が生じた際に、当該位置の導出に用いるセンサを、当該搬送対象物Tを搬送中のピンチロール4に対応する他のセンサ5に切り替えることは、当該位置の導出に用いるセンサを搬送経路R1の下流側から上流側に切り替えることを含んでもよい。位置の導出結果に異常が生じない限り、位置の導出に用いるセンサは、鋳片21の搬送に応じて搬送経路R1の上流側から下流側に切り替えられる。このため、鋳片の位置の導出に用いているセンサ5の上流側には、当該鋳片を搬送中のピンチロール4に対応する他のセンサ5が存在する(以下、これを「上流側の他のセンサ5」という。)。位置の導出結果に異常が生じた際に、当該位置の導出に用いるセンサを下流側から上流側に切り替えることにより、上流側の他のセンサ5を有効活用し、鋳片21の位置のトラッキングをより確実に継続させることができる。   When an abnormality occurs in the result of deriving the position of the transport target T using the sensor 5, the sensor used for deriving the position is used as another sensor 5 corresponding to the pinch roll 4 that is transporting the transport target T. Switching to may include switching the sensor used for deriving the position from the downstream side to the upstream side of the transport path R1. As long as there is no abnormality in the position derivation result, the sensor used for position derivation is switched from the upstream side to the downstream side of the conveyance path R1 in accordance with the conveyance of the slab 21. Therefore, on the upstream side of the sensor 5 used for deriving the position of the slab, there is another sensor 5 corresponding to the pinch roll 4 that is transporting the slab (hereinafter referred to as “upstream side”). Other sensors 5 ”). When an abnormality occurs in the position derivation result, the sensor used for derivation of the position is switched from the downstream side to the upstream side, so that the other sensors 5 on the upstream side can be effectively used to track the position of the slab 21. It can be continued more reliably.

複数のセンサ5のうちいずれかを用いて位置を導出することは、鋳片21Aを搬送中のグループG1のピンチロール4にそれぞれ対応する複数のセンサ5のうちいずれかを用いて鋳片21Aを含む搬送対象物T1の位置を導出することと、鋳片21Aに後続する鋳片21Bを搬送中のグループG2のピンチロール4にそれぞれ対応する複数のセンサ5のうちいずれかを用いて鋳片21Bを含む搬送対象物T2の位置を導出することと、を含んでもよい。この場合、鋳片21A,21Bの各々にいずれかのピンチロール4が接している限り、鋳片21A,21Bの位置を同時進行でトラッキングできる。従って、鋳片21A,21Bの位置をより確実にトラッキングできるので、鋳片同士の間隔を短縮することができる。   Deriving the position using any one of the plurality of sensors 5 means that the slab 21A is used by using any one of the plurality of sensors 5 corresponding to the pinch rolls 4 of the group G1 that is transporting the slab 21A. The slab 21B is derived using one of a plurality of sensors 5 respectively corresponding to the pinch rolls 4 of the group G2 that is transporting the slab 21B following the slab 21A and deriving the position of the transport target T1 that is included. Deriving the position of the conveyance target T2 including In this case, as long as any pinch roll 4 is in contact with each of the slabs 21A and 21B, the positions of the slabs 21A and 21B can be tracked simultaneously. Therefore, since the positions of the slabs 21A and 21B can be tracked more reliably, the interval between the slabs can be shortened.

例えば制御装置100は、搬送対象物T1と搬送対象物T2との間隔が、搬送経路R1に沿って隣り合うピンチロール4同士の間隔の最小値に対して5倍以下となるように複数のピンチロール4を制御してもよい。更に制御装置100は、搬送対象物T1と搬送対象物T2との間隔が、搬送経路R1に沿って隣り合うピンチロール4同士の間隔の最小値に対して2倍以下となるように複数のピンチロール4を制御してもよい。搬送対象物T1と搬送対象物T2との間隔を短縮することによって、生産効率を高めることができる。   For example, the control apparatus 100 includes a plurality of pinches so that the interval between the conveyance target T1 and the conveyance target T2 is five times or less than the minimum value of the intervals between the pinch rolls 4 adjacent along the conveyance path R1. The roll 4 may be controlled. Furthermore, the control device 100 includes a plurality of pinches so that the interval between the conveyance object T1 and the conveyance object T2 is not more than twice the minimum value of the interval between the pinch rolls 4 adjacent along the conveyance path R1. The roll 4 may be controlled. Production efficiency can be improved by shortening the interval between the conveyance object T1 and the conveyance object T2.

制御装置100は、搬送対象物T1の先端部t11が通過したピンチロール4をグループG1に加えることと、搬送対象物T2の先端部t21が通過したピンチロール4をグループG2に加えることと、を更に実行するように構成されていてもよい。この場合、鋳片21A,21Bのそれぞれの位置をより確実にトラッキングできる。   The control device 100 adds the pinch roll 4 through which the leading end t11 of the transport target T1 has passed to the group G1, and adds the pinch roll 4 through which the leading end t21 of the transport target T2 has passed to the group G2. Further, it may be configured to execute. In this case, the positions of the cast slabs 21A and 21B can be tracked more reliably.

連続鋳造装置1は、搬送対象物Tに接しているときに、当該搬送対象物Tの移動に応じて回転する測長ロール8と、測長ロール8の少なくとも回転速度に関する情報を出力するセンサ9と、を更に備えてもよく、制御装置100は、センサ9を用いて搬送対象物Tの位置を導出することを更に実行するように構成されていてもよい。この場合、位置の導出に特化したセンサを併用することで、鋳片21の位置をより高い信頼性でトラッキングできる。   When the continuous casting apparatus 1 is in contact with the conveyance target T, the length measurement roll 8 that rotates in accordance with the movement of the conveyance target T and a sensor 9 that outputs information on at least the rotation speed of the length measurement roll 8. And the control device 100 may be configured to further execute deriving the position of the transport target T using the sensor 9. In this case, the position of the slab 21 can be tracked with higher reliability by using a sensor specialized for position derivation.

以上、実施形態について説明したが、本発明は必ずしも上述した実施形態に限定されるものではなく、その要旨を逸脱しない範囲で様々な変更が可能である。   Although the embodiment has been described above, the present invention is not necessarily limited to the above-described embodiment, and various modifications can be made without departing from the scope of the invention.

1…連続鋳造装置、4…ピンチロール、5…センサ(第一センサ)、100…制御装置、R1…搬送経路、21…鋳片、21A…鋳片(第一鋳片)、21B…鋳片(第二鋳片)、8…測長ロール、9…センサ(第二センサ)、T…搬送対象物、T1…搬送対象物(第一搬送対象物)、T2…搬送対象物(第二搬送対象物)、G1…グループ(第一グループ)、G2…グループ(第二グループ)。   DESCRIPTION OF SYMBOLS 1 ... Continuous casting apparatus, 4 ... Pinch roll, 5 ... Sensor (1st sensor), 100 ... Control apparatus, R1 ... Conveyance path, 21 ... Slab, 21A ... Slab (first slab), 21B ... Slab (Second cast), 8 ... length measuring roll, 9 ... sensor (second sensor), T ... transport object, T1 ... transport object (first transport object), T2 ... transport object (second transport) Object), G1... Group (first group), G2... Group (second group).

Claims (9)

鋳片の搬送経路に沿って並び、前記鋳片を搬送する複数のピンチロールと、
前記複数のピンチロールの少なくとも回転速度に関する情報をそれぞれ出力する複数の第一センサと、
前記複数の第一センサのうちいずれかを用いて前記鋳片を含む搬送対象物の位置を導出することと、前記複数の第一センサのうち前記位置の導出に用いるセンサを前記搬送対象物の移動に応じて前記搬送経路の上流側から下流側に切り替えることと、を実行するように構成された制御装置と、を備える連続鋳造装置。
A plurality of pinch rolls arranged along the slab conveying path and conveying the slab,
A plurality of first sensors that respectively output at least rotational speed information of the plurality of pinch rolls;
Deriving the position of the conveyance object including the slab using any one of the plurality of first sensors, and using the sensor used for deriving the position among the plurality of first sensors of the conveyance object. A continuous casting apparatus comprising: a control device configured to perform switching from the upstream side to the downstream side of the conveyance path according to movement.
前記制御装置は、前記複数の第一センサのうち前記位置の導出に用いるセンサを前記搬送対象物の搬送に応じて前記搬送経路の上流側から下流側に切り替える際に、切り替え前の前記第一センサを用いて導出した前記位置を基準にして、切り替え後の前記第一センサを用いた前記位置の導出を行うように構成されている、請求項1記載の連続鋳造装置。   When the control device switches a sensor used for deriving the position among the plurality of first sensors from the upstream side to the downstream side of the transport path according to transport of the transport target, the first before switching The continuous casting apparatus according to claim 1, wherein the position is derived using the first sensor after switching with the position derived using a sensor as a reference. 前記制御装置は、前記第一センサを用いた前記搬送対象物の前記位置の導出結果に異常が生じた際に、当該位置の導出に用いるセンサを、当該搬送対象物を搬送中の前記ピンチロールに対応する他の前記第一センサに切り替えることを更に実行するように構成されている、請求項1又は2記載の連続鋳造装置。   When an abnormality occurs in the derivation result of the position of the conveyance object using the first sensor, the control device uses the sensor used for deriving the position as the pinch roll that is conveying the conveyance object. The continuous casting apparatus according to claim 1, wherein the continuous casting apparatus is further configured to further switch to the other first sensor corresponding to the first sensor. 前記第一センサを用いた前記搬送対象物の前記位置の導出結果に異常が生じた際に、当該位置の導出に用いるセンサを、当該搬送対象物を搬送中の前記ピンチロールに対応する他の前記第一センサに切り替えることは、当該位置の導出に用いるセンサを前記搬送経路の下流側から上流側に切り替えることを含む、請求項3記載の連続鋳造装置。   When an abnormality occurs in the derivation result of the position of the conveyance object using the first sensor, a sensor used for derivation of the position is replaced with another sensor corresponding to the pinch roll that is conveying the conveyance object. The continuous casting apparatus according to claim 3, wherein switching to the first sensor includes switching a sensor used for deriving the position from a downstream side to an upstream side of the conveyance path. 前記複数の第一センサのうちいずれかを用いて前記位置を導出することは、第一鋳片を搬送中の第一グループの前記ピンチロールにそれぞれ対応する複数の前記第一センサのうちいずれかを用いて前記第一鋳片を含む第一搬送対象物の位置を導出することと、前記第一鋳片に後続する第二鋳片を搬送中の第二グループの前記ピンチロールにそれぞれ対応する複数の前記第一センサのうちいずれかを用いて前記第二鋳片を含む第二搬送対象物の位置を導出することと、を含む、請求項1〜4のいずれか一項記載の連続鋳造装置。   Deriving the position using any one of the plurality of first sensors is any one of the plurality of first sensors respectively corresponding to the pinch rolls of the first group that is transporting the first slab. And deriving the position of the first conveyance object including the first slab, and corresponding to the second group of the pinch rolls that are conveying the second slab following the first slab. The continuous casting according to any one of claims 1 to 4, further comprising: deriving a position of a second conveyance object including the second cast piece using any one of the plurality of first sensors. apparatus. 前記制御装置は、前記第一搬送対象物の先端部が通過した前記ピンチロールを前記第一グループに加えることと、前記第二搬送対象物の先端部が通過した前記ピンチロールを前記第二グループに加えることと、を更に実行するように構成されている、請求項5記載の連続鋳造装置。   The control device adds the pinch roll through which the tip of the first transport object has passed to the first group, and adds the pinch roll through which the tip of the second transport object has passed to the second group. The continuous casting apparatus according to claim 5, wherein the continuous casting apparatus is further configured to further perform the following. 前記搬送対象物に接しているときに、当該搬送対象物の移動に応じて回転する測長ロールと、
前記測長ロールの少なくとも回転速度に関する情報を出力する第二センサと、を更に備え、
前記制御装置は、前記第二センサを用いて前記搬送対象物の位置を導出することを更に実行するように構成されている、請求項1〜6のいずれか一項記載の連続鋳造装置。
A measuring roll that rotates in accordance with the movement of the transport object when in contact with the transport object;
A second sensor that outputs information on at least the rotation speed of the length measuring roll, and
The continuous casting apparatus according to any one of claims 1 to 6, wherein the control device is configured to further execute deriving a position of the conveyance object using the second sensor.
鋳片の搬送経路に沿って並び、前記鋳片を搬送する複数のピンチロールと、
前記複数のピンチロールの少なくとも回転速度に関する情報をそれぞれ出力する複数の第一センサと、
少なくとも第一鋳片を含む第一搬送対象物と、前記第一搬送対象物に後続し、少なくとも第二鋳片を含む第二搬送対象物とを同時に搬送し、前記第一搬送対象物と前記第二搬送対象物との間隔が、前記搬送経路に沿って隣り合う前記ピンチロール同士の間隔の最小値に対して5倍以下となるように前記複数のピンチロールを制御する制御装置と、を備える連続鋳造装置。
A plurality of pinch rolls arranged along the slab conveying path and conveying the slab,
A plurality of first sensors that respectively output at least rotational speed information of the plurality of pinch rolls;
The first conveyance object including at least the first slab and the second conveyance object including at least the second slab following the first conveyance object are simultaneously conveyed, and the first conveyance object and the A control device that controls the plurality of pinch rolls such that an interval between the second conveyance objects is 5 times or less with respect to a minimum value of an interval between the pinch rolls adjacent to each other along the conveyance path; A continuous casting apparatus.
鋳片の搬送経路に沿って並び、前記鋳片を搬送する複数のピンチロールの少なくとも回転速度に関する情報をそれぞれ出力する複数の第一センサのうちいずれかを用いて前記鋳片を含む搬送対象物の位置を導出することと、
前記複数の第一センサのうち前記位置の導出に用いるセンサを前記搬送対象物の搬送に応じて前記搬送経路の上流側から下流側に切り替えることと、を含む連続鋳造方法。
A conveyance object including the slab using any one of a plurality of first sensors that are arranged along a conveyance path of the slab and each output information on at least rotational speeds of a plurality of pinch rolls that convey the slab. Deriving the position of
A continuous casting method comprising: switching a sensor used for deriving the position among the plurality of first sensors from an upstream side to a downstream side of the transport path according to transport of the transport target.
JP2016120661A 2016-06-17 2016-06-17 Continuous casting apparatus and continuous casting method Active JP6202145B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016120661A JP6202145B1 (en) 2016-06-17 2016-06-17 Continuous casting apparatus and continuous casting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016120661A JP6202145B1 (en) 2016-06-17 2016-06-17 Continuous casting apparatus and continuous casting method

Publications (2)

Publication Number Publication Date
JP6202145B1 JP6202145B1 (en) 2017-09-27
JP2017221966A true JP2017221966A (en) 2017-12-21

Family

ID=59969313

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016120661A Active JP6202145B1 (en) 2016-06-17 2016-06-17 Continuous casting apparatus and continuous casting method

Country Status (1)

Country Link
JP (1) JP6202145B1 (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5311127A (en) * 1976-07-19 1978-02-01 Sumitomo Heavy Industries Method of measuring drawing speed or total length of continuously cast piece in continuous casting machine
JPS5813869U (en) * 1981-07-17 1983-01-28 神鋼電機株式会社 Casting length measuring device in continuous casting equipment
JPS60118363A (en) * 1983-11-30 1985-06-25 Sumitomo Metal Ind Ltd Method for controlling cutting of continuous casting billet
JPS626749A (en) * 1985-07-02 1987-01-13 Sumitomo Metal Ind Ltd Method and installation for continuous casting
JPS62161446A (en) * 1986-01-08 1987-07-17 Toshiba Corp Dummy bar detach control device
JPH0677791B2 (en) * 1987-10-09 1994-10-05 住友金属工業株式会社 Operating method of continuous casting equipment

Also Published As

Publication number Publication date
JP6202145B1 (en) 2017-09-27

Similar Documents

Publication Publication Date Title
US7681712B2 (en) Alignment conveyor apparatus
JP6025334B2 (en) Plywood patching device
US11986903B2 (en) Laser processing machine and control method therefor
JP6583341B2 (en) Packaging machine, control device for packaging machine, control method, and program
JP6017528B2 (en) Laser processing equipment with interference avoidance function at nozzle approach
US9724776B2 (en) Wire electrical discharge machine which corrects machining path in corner portion
JP2007144535A (en) Apparatus for controlling cutting operation of flying shear
JP5994610B2 (en) Conveying apparatus and image forming apparatus
JP5994611B2 (en) Conveying apparatus and image forming apparatus
JP6202145B1 (en) Continuous casting apparatus and continuous casting method
JP6381301B2 (en) Recording apparatus, sheet conveying method, and program
JP6059163B2 (en) Image forming apparatus
JP5100369B2 (en) Cutting machine and sheet material feeding cutting method
JP6249583B2 (en) Operation control device and operation control method for press line
JP2004291231A (en) Continuous-cycle shearing machine for moving welded tube
KR101648074B1 (en) Laser cutting apparatus
JPH11277328A (en) Cutting method of strip steel product and cutting device
JP5660717B2 (en) Corrugated sheet manufacturing equipment
JP5203833B2 (en) Control method of conveying speed of rolled material in rolling equipment
JP2020163726A (en) Recording device, method for controlling recording device, and program
JP2016060567A (en) Sheet material discharge device
KR102687104B1 (en) Conveyor control system and method during casting
JP2012166406A (en) Image recording apparatus, and method of controlling the same
JP5077043B2 (en) Transport device
JP2017159412A (en) Crop shear cutting control method and crop shear cutting control device

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170720

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170801

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170814

R150 Certificate of patent or registration of utility model

Ref document number: 6202145

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150