JP2017146898A - Power consumption management device and power consumption management program - Google Patents

Power consumption management device and power consumption management program Download PDF

Info

Publication number
JP2017146898A
JP2017146898A JP2016029893A JP2016029893A JP2017146898A JP 2017146898 A JP2017146898 A JP 2017146898A JP 2016029893 A JP2016029893 A JP 2016029893A JP 2016029893 A JP2016029893 A JP 2016029893A JP 2017146898 A JP2017146898 A JP 2017146898A
Authority
JP
Japan
Prior art keywords
power consumption
request
consumption management
load group
response
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2016029893A
Other languages
Japanese (ja)
Other versions
JP6686510B2 (en
Inventor
潤平 田村
Junpei Tamura
潤平 田村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Electric Industries Ltd
Original Assignee
Sumitomo Electric Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Electric Industries Ltd filed Critical Sumitomo Electric Industries Ltd
Priority to JP2016029893A priority Critical patent/JP6686510B2/en
Publication of JP2017146898A publication Critical patent/JP2017146898A/en
Priority to JP2020053759A priority patent/JP6904450B2/en
Application granted granted Critical
Publication of JP6686510B2 publication Critical patent/JP6686510B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Abstract

PROBLEM TO BE SOLVED: To provide a power consumption management device and a power consumption management program with which it is possible to more reliably satisfy a request concerning power consumption in an environment where there is variation in the duration of time when a request concerning power consumption is made to a plurality of request destinations till when a reply of whether or not to respond to the request is received.SOLUTION: The power consumption management device comprises: a setting unit for setting, for a plurality of load groups classified on the basis of a response time from when a request concerning power consumption is notified to a corresponding terminal device to when a reply of whether or not to respond to the request is acquired, a notification timing differing for each of the load groups as notification timing of the request; and a notification unit for notifying the terminal device of the request in accordance with the notification timing that is set by the setting unit.SELECTED DRAWING: Figure 5

Description

本発明は、電力消費管理装置および電力消費管理プログラムに関し、特に、電力消費に関する要請を通知する電力消費管理装置および電力消費管理プログラムに関する。   The present invention relates to a power consumption management device and a power consumption management program, and more particularly to a power consumption management device and a power consumption management program for notifying a request regarding power consumption.

従来、効果的なデマンドレスポンス(Demand Response:DR)を実現するためのシステムが開発されている。たとえば、特許文献1(特開2014−120028号公報)には、以下のような技術が開示されている。すなわち、管理装置は、利用の際に電力を消費する設備機器の管理を消費電力量の調整要求に基づいて行う管理装置であって、消費電力量の調整要求を受け入れるか否かに関する将来の予定を示す受け入れ可否情報を記憶している記憶部と、前記受け入れ可否情報の変更を示す予定変更情報を受け付ける受付部と、前記設備機器を利用したことに対する対価を示す対価情報を、前記受付部が前記予定変更情報を受け付けた時点から前記受付部が受け付けた前記予定変更情報が示している変更の対象となる予定時点までの間の時間長さに応じた情報となるように生成する対価情報生成部とを備える。   Conventionally, a system for realizing an effective demand response (DR) has been developed. For example, Patent Document 1 (Japanese Patent Application Laid-Open No. 2014-120028) discloses the following technique. In other words, the management device is a management device that performs management of facility equipment that consumes power when used based on a power consumption adjustment request, and whether or not to accept the power consumption adjustment request in the future. A storage unit that stores acceptability information indicating, a receiving unit that receives schedule change information that indicates a change in the acceptability information, and consideration information that indicates consideration for using the facility device. Consideration information generation to generate information corresponding to the time length from the time when the schedule change information is received to the scheduled time to be changed indicated by the schedule change information received by the receiving unit A part.

特開2014−120028号公報JP 2014-120028 A

たとえば、複数の電力需要家にDRを要請した事業者は、当該要請に応じるか否かの各電力需要家からの応答により、どの程度の消費電力量を削減できるかを推測する。そして、事業者は、より大きな電力量を削減する必要があると判断した場合、まだDRを要請していない電力需要家に対して新たにDRの要請を行うことがある。   For example, a business operator who has requested DR to a plurality of power consumers estimates how much power consumption can be reduced based on a response from each power consumer whether or not to respond to the request. Then, when it is determined that it is necessary to reduce a larger amount of power, the business operator may make a new DR request to a power consumer who has not yet requested DR.

ところで、電力需要家は、上述の応答を自動で行う専用端末装置を自己の電力需要施設において導入している場合がある。当該専用端末装置は、たとえば、上記事業者からのDRの要請を受けると、事前に登録された設定に基づいて、即座に上述の応答を行うことが可能である。そして、DRの要請に応じる旨の応答を行った専用端末装置は、自己の電力需要施設における電気機器を自動で制御することにより、自己の電力需要施設における消費電力を削減する。   By the way, a power consumer may have introduced a dedicated terminal device that automatically performs the above-described response in its own power demand facility. For example, when the dedicated terminal device receives a request for DR from the above-mentioned business operator, the dedicated terminal device can immediately make the above-described response based on the settings registered in advance. Then, the dedicated terminal device that has responded to the request of the DR automatically controls the electrical equipment in its own power demand facility, thereby reducing the power consumption in its own power demand facility.

一方、このような専用端末装置を導入していない電力需要家は、上記応答をメールまたはFAX等で行うため、上記事業者がDRの要請を行ってから上記応答を行うまでに時間がかかる場合がある。   On the other hand, since the electric power consumer who has not introduced such a dedicated terminal device performs the response by e-mail or FAX, it takes time until the response is made after the operator requests DR There is.

このように、複数の電力需要家にDRの要請を行ってから、当該要請に応じるか否かの応答がなされるまでの時間にばらつきがある環境において、電力消費に関する要請をより確実に満たす技術が求められる。   As described above, in an environment in which there is a variation in time from when a request for DR is made to a plurality of power consumers until a response is made as to whether or not the request is satisfied, a technology that more reliably satisfies the demand for power consumption. Is required.

本発明は、上述のような課題を解決するためになされたもので、その目的は、電力消費に関する要請を複数の要請先に対して行ってから当該要請に応じるか否かの応答を受けるまでの時間にばらつきがある環境において、電力消費に関する要請をより確実に満たすことが可能な電力消費管理装置および電力消費管理プログラムを提供することである。   The present invention has been made to solve the above-described problems, and its purpose is to make a response regarding whether or not to respond to the request after making a request for power consumption to a plurality of request destinations. It is an object of the present invention to provide a power consumption management device and a power consumption management program that can more reliably meet the demand for power consumption in an environment where the time varies.

(1)上記課題を解決するために、この発明のある局面に係る電力消費管理装置は、電力消費に関する要請を対応の端末装置に通知してから前記要請に応じるか否かに関する応答を取得するまでの応答時間に基づいて分類された複数の負荷グループについて、前記要請の通知タイミングとして各前記負荷グループに異なる通知タイミングを設定する設定部と、前記設定部によって設定された前記通知タイミングに従って前記要請を前記端末装置に通知する通知部とを備える。   (1) In order to solve the above problem, a power consumption management device according to an aspect of the present invention obtains a response regarding whether or not to respond to the request after notifying a corresponding terminal device of the request regarding power consumption. For a plurality of load groups classified based on response time until, a setting unit that sets different notification timings for each load group as the notification timing of the request, and the request according to the notification timing set by the setting unit A notification unit for notifying the terminal device.

(14)上記課題を解決するために、この発明のある局面に係る電力消費管理プログラムは、電力消費管理装置において用いられる電力消費管理プログラムであって、コンピュータを、電力消費に関する要請を対応の端末装置に通知してから前記要請に応じるか否かに関する応答を取得するまでの応答時間に基づいて分類された複数の負荷グループについて、前記要請の通知タイミングとして各前記負荷グループに異なる通知タイミング設定する設定部と、前記設定部によって設定された前記通知タイミングに従って前記要請を前記端末装置に通知する通知部として機能させるためのプログラムである。   (14) In order to solve the above-described problem, a power consumption management program according to an aspect of the present invention is a power consumption management program used in a power consumption management apparatus, and is a terminal that responds to a request related to power consumption. Different notification timings are set for each of the load groups as a notification timing of the request for a plurality of load groups classified based on a response time from when a notification is sent to the device until a response regarding whether to respond to the request is acquired. A program for causing a setting unit to function as a notification unit that notifies the terminal device of the request according to the notification timing set by the setting unit.

本発明は、このような特徴的な処理部を備える電力消費管理装置として実現することができるだけでなく、かかる特徴的な処理をステップとする方法として実現することができる。また、電力消費管理装置の一部または全部を実現する半導体集積回路として実現したり、電力消費管理装置を含むシステムとして実現したりすることができる。   The present invention can be realized not only as a power consumption management apparatus including such a characteristic processing unit, but also as a method using such characteristic processing as a step. Further, it can be realized as a semiconductor integrated circuit that realizes part or all of the power consumption management device, or can be realized as a system including the power consumption management device.

本発明によれば、電力消費に関する要請を複数の要請先に対して行ってから当該要請に応じるか否かの応答を受けるまでの時間にばらつきがある環境において、電力消費に関する要請をより確実に満たすことができる。   According to the present invention, it is possible to more reliably request power consumption in an environment in which there is a variation in the time from when a request for power consumption is made to a plurality of request destinations until a response indicating whether to respond to the request is received. Can be satisfied.

図1は、本発明の実施の形態に係る電力消費管理システムの概要を説明するための図である。FIG. 1 is a diagram for explaining an outline of a power consumption management system according to an embodiment of the present invention. 図2は、本発明の実施の形態に係る電力消費管理システムの構成を示す図である。FIG. 2 is a diagram showing the configuration of the power consumption management system according to the embodiment of the present invention. 図3は、本発明の実施の形態に係る電力消費管理システムにおける負荷グループについて説明するための図である。FIG. 3 is a diagram for explaining a load group in the power consumption management system according to the embodiment of the present invention. 図4は、本発明の実施の形態に係る電力消費管理システムにおける電力消費管理処理のシーケンスを示す図である。FIG. 4 is a diagram showing a sequence of power consumption management processing in the power consumption management system according to the embodiment of the present invention. 図5は、本発明の実施の形態に係る電力消費管理装置の構成を示す図である。FIG. 5 is a diagram showing a configuration of the power consumption management apparatus according to the embodiment of the present invention.

最初に、本発明の実施の形態の内容を列記して説明する。   First, the contents of the embodiment of the present invention will be listed and described.

(1)本発明の実施の形態に係る電力消費管理装置は、電力消費に関する要請を対応の端末装置に通知してから前記要請に応じるか否かに関する応答を取得するまでの応答時間に基づいて分類された複数の負荷グループについて、前記要請の通知タイミングとして各前記負荷グループに異なる通知タイミングを設定する設定部と、前記設定部によって設定された前記通知タイミングに従って前記要請を前記端末装置に通知する通知部とを備える。   (1) The power consumption management device according to the embodiment of the present invention is based on a response time from notification of a request regarding power consumption to a corresponding terminal device until acquisition of a response regarding whether to respond to the request. For a plurality of classified load groups, a setting unit that sets different notification timings for each of the load groups as the notification timing of the request, and notifies the terminal device of the request according to the notification timing set by the setting unit A notification unit.

このような構成により、電力消費に関する要請を行う場合に、対象期間のどの程度前のタイミングで当該要請を行うべきかを負荷グループごとに適切に決定し、決定したタイミングにおいて当該要請を行うことができる。したがって、電力消費に関する要請を複数の要請先に対して行ってから当該要請に応じるか否かの応答を受けるまでの時間にばらつきがある環境において、電力消費に関する要請をより確実に満たすことができる。   With this configuration, when making a request for power consumption, it is possible to appropriately determine for each load group at what timing before the target period the request should be made, and to make the request at the determined timing. it can. Therefore, it is possible to more reliably satisfy the power consumption request in an environment where there is a variation in the time from when a request for power consumption is made to a plurality of request destinations until a response indicating whether or not to respond to the request is received. .

(2)好ましくは、前記電力消費管理装置は、さらに、
前記負荷グループからの前記応答によって推定される内容に基づいて、他の前記負荷グループへの新たな前記要請の内容を決定する要請部を備える。
(2) Preferably, the power consumption management device further includes:
A request unit that determines the content of the new request to the other load group based on the content estimated by the response from the load group.

このような構成により、先に要請を行った負荷グループからの応答の内容を踏まえて、次に要請を行う負荷グループへの要請内容を決定することができるため、電力消費に関する全体的な要請をより確実に満たすことができる。   With such a configuration, it is possible to determine the content of the request to the load group to be requested next based on the content of the response from the load group that has previously requested. Can be satisfied more reliably.

(3)好ましくは、前記設定部は、前記応答時間の小さい前記負荷グループと比べて、前記応答時間の大きい前記負荷グループに早い前記通知タイミングを設定する。   (3) Preferably, the setting unit sets the notification timing earlier for the load group having a large response time than the load group having a small response time.

このような構成により、応答の遅い負荷グループに早めに要請を行うことができるため、たとえば、要請の対象期間の開始より前により多くの応答を取得することができる。   With such a configuration, it is possible to make a request to a load group having a slow response early, so that, for example, more responses can be acquired before the start of the request target period.

(4)好ましくは、前記設定部は、前記応答時間の大きい前記負荷グループと比べて、前記応答時間の小さい前記負荷グループに遅い前記通知タイミングを設定する。   (4) Preferably, the said setting part sets the said notification timing late | slow to the said load group with the said small response time compared with the said load group with the said large response time.

このような構成により、応答の遅い負荷グループに早めに要請を行うことができるため、たとえば、要請の対象期間の開始より前により多くの応答を取得することができる。   With such a configuration, it is possible to make a request to a load group having a slow response early, so that, for example, more responses can be acquired before the start of the request target period.

(5)好ましくは、前記負荷グループは、前記応答時間および前記要請に応じた実績に基づいて分類される。   (5) Preferably, the load group is classified based on the response time and a record according to the request.

このような構成により、負荷グループをより適切に分類することができる。   With such a configuration, the load group can be classified more appropriately.

(6)好ましくは、前記設定部は、前記実績の高い前記負荷グループと比べて、前記実績の低い負荷グループに早い前記通知タイミングを設定する。   (6) Preferably, the said setting part sets the said notification timing early to the load group with the said low result compared with the said load group with the said high result.

このような構成により、たとえば、要請に応じる可能性が低い負荷グループからの応答の内容を確認した上で、要請に応じる可能性が高い負荷グループへの要請の内容を決定することができるため、電力消費に関する全体的な要請をより確実に満たすことができる。   With such a configuration, for example, after confirming the content of a response from a load group that is unlikely to respond to the request, it is possible to determine the content of the request to the load group that is highly likely to respond to the request. The overall demand for power consumption can be met more reliably.

(7)好ましくは、前記設定部は、前記実績の低い前記負荷グループと比べて、前記実績の高い負荷グループに遅い前記通知タイミングを設定する。   (7) Preferably, the said setting part sets the said notification timing late | slow to the load group with the said high track record compared with the said load group with the said low track record.

このような構成により、たとえば、要請に応じる可能性が低い負荷グループからの応答の内容を確認した上で、要請に応じる可能性が高い負荷グループへの要請の内容を決定することができるため、電力消費に関する全体的な要請をより確実に満たすことができる。   With such a configuration, for example, after confirming the content of a response from a load group that is unlikely to respond to the request, it is possible to determine the content of the request to the load group that is highly likely to respond to the request. The overall demand for power consumption can be met more reliably.

(8)好ましくは、前記負荷グループのメンバーは、電力需要家である。   (8) Preferably, the member of the load group is a power consumer.

このような構成により、電力需要家のグループごとに適切な通知タイミングを設定することができる。   With such a configuration, an appropriate notification timing can be set for each group of power consumers.

(9)好ましくは、前記複数の負荷グループは、前記要請に対して自動で応答する自動応答グループと、前記要請に対して自動で応答しないグループとを含む。   (9) Preferably, the plurality of load groups include an automatic response group that automatically responds to the request and a group that does not automatically respond to the request.

このような構成により、たとえば、要請に対して自動で応答する装置を備える電力需要家と、当該装置を備えない電力需要家とが混在する環境において各電力需要家を適切に分類することができる。   With such a configuration, for example, each power consumer can be appropriately classified in an environment in which a power consumer having a device that automatically responds to a request and a power consumer not having the device are mixed. .

(10)より好ましくは、前記設定部は、前記複数のグループのうち、前記自動応答グループに最も遅い前記通知タイミングを設定する。   (10) More preferably, the setting unit sets the latest notification timing in the automatic response group among the plurality of groups.

このような構成により、たとえば、応答の早い自動応答グループより先に応答の遅い他の負荷グループに要請を行うことができるため、要請の対象期間の開始より前により多くの応答を取得することができる。   With such a configuration, for example, since it is possible to make a request to another load group having a slow response earlier than an automatic response group having a fast response, more responses can be obtained before the start of the target period of the request. it can.

(11)より好ましくは、前記通知部は、前記電力消費に関する全体的な要請と前記自動応答グループ以外の前記負荷グループからの前記応答によって推定される内容との差分に基づく要請を前記自動応答グループに対応する端末装置に通知する。   (11) More preferably, the notification unit sends a request based on a difference between an overall request regarding the power consumption and a content estimated by the response from the load group other than the automatic response group to the automatic response group. To the terminal device corresponding to.

このような構成により、たとえば、要請内容の実施および早い応答を期待しにくいが多数である他の負荷グループによって要請をある程度満たしておき、要請内容の確実な実施および早い応答を期待できるが少数である自動応答グループによって不足分を充足する優れた電力管理を行うことができる。また、自動応答グループへの要請を、全体的な要請を満たすための調整として活用することができる。   With such a configuration, for example, it is difficult to expect the implementation of the requested content and quick response, but a large number of other load groups can satisfy the request to some extent, and the reliable implementation of the requested content and early response can be expected. A certain automatic response group can perform excellent power management to satisfy the shortage. In addition, the request to the automatic response group can be used as an adjustment to satisfy the overall request.

(12)より好ましくは、前記電力消費管理装置は、さらに、前記要請に応じることの対価を算出する対価算出部を備え、前記対価算出部は、他の前記負荷グループと比べて、前記自動応答グループの前記対価を高く算出する。   (12) More preferably, the power consumption management device further includes a price calculation unit that calculates a price for responding to the request, and the price calculation unit compares the automatic response with the other load groups. The consideration of the group is calculated high.

このような構成により、たとえば、要請に対して自動で応答する装置を導入するように、自動応答グループ以外のグループに属する電力需要家を促すことができる。   With such a configuration, for example, it is possible to encourage power consumers belonging to groups other than the automatic response group to introduce a device that automatically responds to a request.

(13)好ましくは、前記電力消費管理装置は、さらに、機器または電力需要家を前記複数の負荷グループのいずれかに分類する分類部を備え、前記分類部は、前記応答時間が得られていない機器または電力需要家を、前記通知タイミングが最も早い前記負荷グループに分類する。   (13) Preferably, the power consumption management device further includes a classification unit that classifies the device or the power consumer into any of the plurality of load groups, and the classification unit does not obtain the response time. A device or a power consumer is classified into the load group with the earliest notification timing.

このような構成により、たとえば、過去に応答時間が得られていない機器または電力需要家からの応答を、要請の対象期間の開始までにより確実に取得することができる。   With such a configuration, for example, a response from a device or a power consumer for which no response time has been obtained in the past can be reliably acquired until the start of the request target period.

(14)本発明の実施の形態に係る電力消費管理プログラムは、電力消費管理装置において用いられる電力消費管理プログラムであって、コンピュータを、電力消費に関する要請を対応の端末装置に通知してから前記要請に応じるか否かに関する応答を取得するまでの応答時間に基づいて分類された複数の負荷グループについて、前記要請の通知タイミングとして各前記負荷グループに異なる通知タイミング設定する設定部と、前記設定部によって設定された前記通知タイミングに従って前記要請を前記端末装置に通知する通知部として機能させるためのプログラムである。   (14) A power consumption management program according to an embodiment of the present invention is a power consumption management program used in a power consumption management device, wherein the computer notifies a corresponding terminal device of a request regarding power consumption and A setting unit configured to set a different notification timing for each load group as the notification timing of the request for a plurality of load groups classified based on response time until obtaining a response regarding whether to respond to the request; and the setting unit Is a program for causing the terminal device to function as a notification unit that notifies the terminal device of the request according to the notification timing set by.

このような構成により、電力消費に関する要請を行う場合に、対象期間のどの程度前のタイミングで当該要請を行うべきかを負荷グループごとに適切に決定し、決定したタイミングにおいて当該要請を行うことができる。したがって、電力消費に関する要請を複数の要請先に対して行ってから当該要請に応じるか否かの応答を受けるまでの時間にばらつきがある環境において、電力消費に関する要請をより確実に満たすことができる。   With this configuration, when making a request for power consumption, it is possible to appropriately determine for each load group at what timing before the target period the request should be made, and to make the request at the determined timing. it can. Therefore, it is possible to more reliably satisfy the power consumption request in an environment where there is a variation in the time from when a request for power consumption is made to a plurality of request destinations until a response indicating whether or not to respond to the request is received. .

以下、本発明の実施の形態について図面を用いて説明する。なお、図中同一または相当部分には同一符号を付してその説明は繰り返さない。また、以下に記載する実施形態の少なくとも一部を任意に組み合わせてもよい。   Hereinafter, embodiments of the present invention will be described with reference to the drawings. In the drawings, the same or corresponding parts are denoted by the same reference numerals and description thereof will not be repeated. Moreover, you may combine arbitrarily at least one part of embodiment described below.

図1は、本発明の実施の形態に係る電力消費管理システムの概要を説明するための図である。   FIG. 1 is a diagram for explaining an outline of a power consumption management system according to an embodiment of the present invention.

小売事業者1は、たとえば、電力の小売り事業者である。小売事業者1は、DRに関して各需要家4を管理する事業者であるアグリゲータ2に対して、DRの要請すなわち電力消費量を抑制することの要請を行う。アグリゲータ2は、小売事業装置11からDRの要請を受けると、自己と契約関係のある電力需要化である各需要家4にDRの要請を行う。   The retailer 1 is, for example, a power retailer. The retailer 1 makes a request for DR, that is, a request for suppressing power consumption, to the aggregator 2 that is a business that manages each customer 4 with respect to DR. When the aggregator 2 receives a request for DR from the retail business apparatus 11, the aggregator 2 makes a request for DR to each customer 4, which is a power demand that has a contractual relationship with itself.

小売事業者1は、各需要家4に削減させるべき消費電力量の総量を指定してアグリゲータ2にDRの要請を行う。以下、小売事業者1が指定する総量を削減指定総量Gとも称する。   The retailer 1 makes a DR request to the aggregator 2 by specifying the total amount of power consumption to be reduced by each consumer 4. Hereinafter, the total amount designated by the retailer 1 is also referred to as a reduction designated total amount G.

小売事業者1からDRの要請を受けたアグリゲータ2は、削減すべき消費電力量を指定して各需要家4にDRの要請を行う。以下、アグリゲータ2が指定する消費電力量を削減指定量Iとも称する。   The aggregator 2 that has received a DR request from the retailer 1 designates the amount of power to be reduced and makes a DR request to each consumer 4. Hereinafter, the power consumption amount designated by the aggregator 2 is also referred to as a reduction designated amount I.

たとえば、アグリゲータ2は、削減指定総量Gを各需要家4に配分することによって、需要家4の各々が削減すべき消費電力量すなわち削減指定量Iを決定する。   For example, the aggregator 2 allocates the reduction designated total amount G to each customer 4 to determine the power consumption amount, that is, the reduction designated amount I that each of the consumers 4 should reduce.

図2は、本発明の実施の形態に係る電力消費管理システムの構成を示す図である。   FIG. 2 is a diagram showing the configuration of the power consumption management system according to the embodiment of the present invention.

図2を参照して、電力消費管理システム101は、小売事業装置11と、電力消費管理装置12と、複数の機器13と、複数の汎用端末装置14と、複数の専用端末装置15とを備える。   With reference to FIG. 2, the power consumption management system 101 includes a retail business device 11, a power consumption management device 12, a plurality of devices 13, a plurality of general-purpose terminal devices 14, and a plurality of dedicated terminal devices 15. .

小売事業装置11は、たとえば、小売事業者1によって運用されるサーバである。電力消費管理装置12は、たとえば、アグリゲータ2によって運用されるサーバである。小売事業装置11は、ネットワーク8を介して、電力消費管理装置12と接続されている。   The retail business apparatus 11 is a server operated by the retail business operator 1, for example. The power consumption management device 12 is a server operated by the aggregator 2, for example. The retail business apparatus 11 is connected to the power consumption management apparatus 12 via the network 8.

小売事業者1は、小売事業装置11から電力消費管理装置12へ全体DR要請を送信することにより、アグリゲータ2に対してDRの要請を行う。全体DR要請は、たとえば、DRの対象期間および削減指定総量Gを示す情報である。   The retailer 1 makes a DR request to the aggregator 2 by transmitting an overall DR request from the retail business device 11 to the power consumption management device 12. The overall DR request is, for example, information indicating a DR target period and a reduction designated total amount G.

電力消費管理装置12は、ネットワーク8を介して、汎用端末装置14および専用端末装置15と接続されている。   The power consumption management device 12 is connected to the general-purpose terminal device 14 and the dedicated terminal device 15 via the network 8.

需要家4には、たとえば、専用端末装置15を自己の電力需要施設3に設置している需要家4と、専用端末装置15を自己の電力需要施設3に設置していない需要家4とが存在する。汎用端末装置14は、たとえば、スマートフォンまたはタブレット等の通信端末装置である。専用端末装置15は、たとえば、HEMS(Home Energy Management System)におけるゲートウェイ装置である。   For example, the customer 4 includes a customer 4 who has installed the dedicated terminal device 15 in his own power demanding facility 3 and a customer 4 who has not installed the dedicated terminal device 15 in his own power demanding facility 3. Exists. The general-purpose terminal device 14 is a communication terminal device such as a smartphone or a tablet, for example. The dedicated terminal device 15 is, for example, a gateway device in HEMS (Home Energy Management System).

アグリゲータ2は、電力消費管理装置12から各需要家4に対応する汎用端末装置14または専用端末装置15へ個別DR要請を送信することにより、各需要家4に対してDRの要請を行う。個別DR要請は、たとえば、DRの対象期間および削減指定量Iを示す情報である。   The aggregator 2 makes a DR request to each consumer 4 by transmitting an individual DR request from the power consumption management device 12 to the general-purpose terminal device 14 or the dedicated terminal device 15 corresponding to each consumer 4. The individual DR request is, for example, information indicating a DR target period and a reduction designated amount I.

専用端末装置15を自己の電力需要施設3に設置している需要家4は、電力消費管理装置12からの個別DR要請を専用端末装置15において受信する。専用端末装置15は、自己の電力需要施設3における空調機器または照明機器等の機器13と有線または無線により接続される。専用端末装置15は、個別DR要請を受信すると、たとえば、需要家4によって予め設定された内容に基づいて、当該個別DR要請の内容に従うか否かを示す個別DR応答をたとえば即座に電力消費管理装置12へ自動送信する。以下、DRの要請に従うことを「DRに参加する」とも称する。   The customer 4 who has installed the dedicated terminal device 15 in his own power demand facility 3 receives the individual DR request from the power consumption management device 12 in the dedicated terminal device 15. The dedicated terminal device 15 is connected to a device 13 such as an air conditioner or a lighting device in the power demand facility 3 by wire or wirelessly. When the dedicated terminal device 15 receives the individual DR request, for example, based on the content set in advance by the customer 4, for example, an individual DR response indicating whether or not to comply with the content of the individual DR request is immediately managed for power consumption. Automatically transmitted to the device 12. Hereinafter, following the DR request is also referred to as “participating in DR”.

専用端末装置15は、DRに参加する旨の個別DR応答を送信した場合、個別DR要請の内容に基づいて各機器13を制御することにより、電力需要施設3における消費電力量すなわち需要家4の消費電力量を削減する。   When the dedicated terminal device 15 transmits the individual DR response to participate in the DR, the dedicated terminal device 15 controls each device 13 based on the content of the individual DR request, so that the amount of power consumed in the power demanding facility 3, that is, the customer 4 Reduce power consumption.

専用端末装置15を自己の電力需要施設3に設置していない需要家4は、電力消費管理装置12からの個別DR要請をスマートフォンまたはタブレット等の汎用端末装置14において受信する。需要家4は、たとえば、汎用端末装置14のディスプレイに表示された個別DR要請の内容を確認すると、当該個別DR要請の内容に従うか否かつまりDRに参加するか否かを判断し、判断結果を汎用端末装置14に入力する。   The customer 4 who does not install the dedicated terminal device 15 in his / her power demand facility 3 receives the individual DR request from the power consumption management device 12 in the general-purpose terminal device 14 such as a smartphone or a tablet. For example, when the content of the individual DR request displayed on the display of the general-purpose terminal device 14 is confirmed, the customer 4 determines whether to comply with the content of the individual DR request, that is, whether to participate in the DR, and the determination result Is input to the general-purpose terminal device 14.

汎用端末装置14は、需要家4から入力操作を受けると、DRに参加するか否かを示す個別DR応答を電力消費管理装置12へ送信する。DRに参加する旨の個別DR応答を汎用端末装置14から電力消費管理装置12へ送信した需要家4は、たとえば、DRの対象期間になると、手動で自己の電力需要施設3における各機器13を操作することにより、自己の電力需要施設3における消費電力量を削減する。   When the general-purpose terminal device 14 receives an input operation from the customer 4, the general-purpose terminal device 14 transmits an individual DR response indicating whether or not to participate in DR to the power consumption management device 12. For example, the consumer 4 that has transmitted the individual DR response to participate in the DR from the general-purpose terminal device 14 to the power consumption management device 12 manually sets each device 13 in its own power demanding facility 3 in the DR target period. By operating, the power consumption in the own power demand facility 3 is reduced.

したがって、DRに参加する旨の個別DR応答を専用端末装置15または汎用端末装置14から送信した需要家4は、個別DR要請の示す削減指定量Iと等しい消費電力量を自己の電力需要施設3において削減すると推定される。   Accordingly, the customer 4 who has transmitted the individual DR response indicating that he / she wants to participate in the DR from the dedicated terminal device 15 or the general-purpose terminal device 14 has the same amount of power consumption as the reduction specified amount I indicated by the individual DR request. Is estimated to be reduced.

電力消費管理装置12は、たとえば、個別DR要請を送信してから、当該個別DR要請の送信先から個別DR応答を受信するまでの時間(以下、応答時間とも称する。)、および専用端末装置15の設置の有無に基づいて、当該個別DR要請の送信先に対応する需要家4を複数の負荷グループのいずれかに分類する。   For example, the power consumption management device 12 transmits a dedicated DR request and then receives a dedicated DR response from the transmission destination of the dedicated DR request (hereinafter also referred to as response time), and the dedicated terminal device 15. The customer 4 corresponding to the transmission destination of the individual DR request is classified into one of a plurality of load groups based on the presence / absence of installation.

図3は、本発明の実施の形態に係る電力消費管理システムにおける負荷グループについて説明するための図である。   FIG. 3 is a diagram for explaining a load group in the power consumption management system according to the embodiment of the present invention.

図3を参照して、電力消費管理装置12は、各需要家4を負荷グループA、負荷グループBおよび負荷グループC(自動応答グループ)のいずれかに分類する。   Referring to FIG. 3, power consumption management device 12 classifies each consumer 4 into one of load group A, load group B, and load group C (automatic response group).

負荷グループAは、電力需要施設3において専用端末装置15を備えない需要家4のうち、応答時間が大きい需要家4のグループである。   The load group A is a group of consumers 4 having a long response time among the consumers 4 that do not include the dedicated terminal device 15 in the power demand facility 3.

負荷グループBは、電力需要施設3において専用端末装置15を備えない需要家4のうち、応答時間が小さい需要家4のグループである。   The load group B is a group of consumers 4 having a short response time among the consumers 4 that do not include the dedicated terminal device 15 in the power demand facility 3.

負荷グループCは、電力需要施設3において専用端末装置15を備える需要家4のグループである。専用端末装置15は、個別DR要請を受信すると、たとえば即座に個別DR応答を電力消費管理装置12へ送信する。このため、応答時間は、負荷グループA,B,Cの順番で大きい。   The load group C is a group of consumers 4 including the dedicated terminal device 15 in the power demand facility 3. When receiving the individual DR request, the dedicated terminal device 15 immediately transmits an individual DR response to the power consumption management device 12, for example. For this reason, the response time is large in the order of the load groups A, B, and C.

なお、電力消費管理装置12は、電力需要施設3において専用端末装置15を備えない需要家4を、応答時間に応じて負荷グループAおよび負荷グループBの2つのグループのいずれかに分類する構成であるとしたが、これに限定するものではない。電力消費管理装置12は、電力需要施設3において専用端末装置15を備えない需要家4を、応答時間に応じて設定された3つ以上の負荷グループのうちのいずれかに分類する構成であってもよい。   Note that the power consumption management device 12 is configured to classify the customers 4 that do not have the dedicated terminal device 15 in the power demand facility 3 into one of two groups, load group A and load group B, according to response time. Although there is, it is not limited to this. The power consumption management device 12 is configured to classify the customer 4 that does not include the dedicated terminal device 15 in the power demand facility 3 into one of three or more load groups set according to response time. Also good.

また、電力消費管理装置12は、専用端末装置15の設置の有無に拘わらず、単に応答時間に基づいて、各需要家4を複数の負荷グループのうちのいずれかに分類する構成であってもよい。   Further, the power consumption management device 12 may be configured to classify each customer 4 into one of a plurality of load groups based on response time, regardless of whether or not the dedicated terminal device 15 is installed. Good.

以下、負荷グループAに属する需要家4を需要家4Aとも称し、負荷グループBに属する需要家4を需要家4Bとも称し、負荷グループCに属する需要家4を需要家4Cとも称する。   Hereinafter, the customer 4 belonging to the load group A is also referred to as a customer 4A, the consumer 4 belonging to the load group B is also referred to as a customer 4B, and the consumer 4 belonging to the load group C is also referred to as a customer 4C.

電力消費管理装置12は、上述のように、小売事業装置11から全体DR要請を受信した場合に、各需要家4の汎用端末装置14または専用端末装置15へ個別DR要請を送信する。このとき、電力消費管理装置12は、需要家4の属するグループごとに、異なるタイミングで個別DR要請を送信する。   As described above, the power consumption management device 12 transmits the individual DR request to the general-purpose terminal device 14 or the dedicated terminal device 15 of each consumer 4 when receiving the overall DR request from the retail business device 11. At this time, the power consumption management device 12 transmits individual DR requests at different timings for each group to which the customer 4 belongs.

たとえば、電力消費管理装置12は、各負荷グループへ応答時間の大きい順番に個別DR要請を送信する。具体的には、電力消費管理装置12は、各需要家4Aの汎用端末装置14へ個別DR要請を送信し、その後、各需要家4Bの汎用端末装置14へ個別DR要請を送信し、最後に、各需要家4Cの専用端末装置15へ個別DR要請を送信する。   For example, the power consumption management device 12 transmits individual DR requests to the load groups in order of increasing response time. Specifically, the power consumption management device 12 transmits an individual DR request to the general-purpose terminal device 14 of each consumer 4A, and then transmits an individual DR request to the general-purpose terminal device 14 of each customer 4B. The individual DR request is transmitted to the dedicated terminal device 15 of each customer 4C.

図4は、本発明の実施の形態に係る電力消費管理システムにおける電力消費管理処理のシーケンスを示す図である。   FIG. 4 is a diagram showing a sequence of power consumption management processing in the power consumption management system according to the embodiment of the present invention.

電力消費管理システム101における各装置は、コンピュータを備え、当該コンピュータにおけるCPU等の演算処理部は、以下のシーケンスの各ステップの一部または全部を含むプログラムを図示しないメモリから読み出して実行する。これら複数の装置のプログラムは、それぞれ、外部からインストールすることができる。これら複数の装置のプログラムは、それぞれ、記録媒体に格納された状態で流通する。   Each device in the power consumption management system 101 includes a computer, and an arithmetic processing unit such as a CPU in the computer reads and executes a program including a part or all of each step of the following sequence from a memory (not shown). Each of the programs of the plurality of apparatuses can be installed from the outside. The programs of the plurality of apparatuses are distributed while being stored in a recording medium.

図4を参照して、まず、小売事業者1によって運用される小売事業装置11は、アグリゲータ2によって運用される電力消費管理装置12へ全体DR要請を送信する(ステップS11)。全体DR要請は、上述のように、DRの対象期間および削減指定総量Gを示す。   With reference to FIG. 4, first, the retail business apparatus 11 operated by the retailer 1 transmits an overall DR request to the power consumption management apparatus 12 operated by the aggregator 2 (step S11). The overall DR request indicates the DR target period and the reduction designated total amount G as described above.

次に、電力消費管理装置12は、小売事業装置11から全体DR要請を受信すると、全体DR要請の示す削減指定総量Gを負荷グループA、負荷グループBおよび負荷グループCに分配する。具体的には、削減指定総量Gを達成するために、負荷グループA、負荷グループBおよび負荷グループCの各々が削減すべき電力量の目標値を設定する(ステップS12)。以下、当該電力量の目標値をグループ目標量Tとも称する。   Next, when receiving the overall DR request from the retail business apparatus 11, the power consumption management device 12 distributes the reduction designated total amount G indicated by the overall DR request to the load group A, the load group B, and the load group C. Specifically, in order to achieve the reduction designated total amount G, a target value of the amount of power to be reduced by each of the load group A, the load group B, and the load group C is set (step S12). Hereinafter, the target value of the electric energy is also referred to as a group target amount T.

たとえば、削減指定総量Gが1000kWである場合、電力消費管理装置12は、負荷グループAのグループ目標量Tを削減指定総量Gの50%の500kWhに設定する。また、電力消費管理装置12は、負荷グループBのグループ目標量Tを削減指定総量Gの30%の300kWhに設定する。また、電力消費管理装置12は、負荷グループCのグループ目標量Tを削減指定総量Gの20%の200kWhに設定する。   For example, when the reduction designated total amount G is 1000 kW, the power consumption management apparatus 12 sets the group target amount T of the load group A to 500 kWh, which is 50% of the reduction designated total amount G. Further, the power consumption management device 12 sets the group target amount T of the load group B to 300 kWh, which is 30% of the reduction designated total amount G. Further, the power consumption management device 12 sets the group target amount T of the load group C to 200 kWh, which is 20% of the specified reduction total amount G.

次に、電力消費管理装置12は、設定した負荷グループAのグループ目標量Tに基づいて、各需要家4Aの汎用端末装置14へ送信する個別DR要請の内容を決定する。具体的には、電力消費管理装置12は、負荷グループAのグループ目標量Tを各需要家4Aに分配することによって、各需要家4Aについての削減指定量Iを決定する(ステップS13)。   Next, the power consumption management device 12 determines the content of the individual DR request to be transmitted to the general-purpose terminal device 14 of each consumer 4A based on the set group target amount T of the load group A. Specifically, the power consumption management device 12 determines the specified reduction amount I for each customer 4A by distributing the group target amount T of the load group A to each customer 4A (step S13).

次に、電力消費管理装置12は、決定した削減指定量IおよびDRの対象期間を示す個別DR要請を各需要家4Aの汎用端末装置14へたとえば一括送信する(ステップS14)。なお、電力消費管理装置12は、個別DR要請を全部の需要家4Aの汎用端末装置14へ送信する構成に限らず、一部の需要家4Aの汎用端末装置14へ送信する構成であってもよい。   Next, the power consumption management device 12 transmits, for example, the individual DR request indicating the determined reduction specified amount I and the target period of the DR to the general-purpose terminal device 14 of each consumer 4A, for example (step S14). The power consumption management device 12 is not limited to the configuration that transmits the individual DR request to the general-purpose terminal devices 14 of all the consumers 4A, but may be configured to transmit the individual DR request to the general-purpose terminal devices 14 of some consumers 4A. Good.

次に、需要家4Aの汎用端末装置14は、電力消費管理装置12から個別DR要請を受信して、たとえば、自己のディスプレイに個別DR要請の内容を表示する。需要家4Aは、当該ディスプレイの表示を確認して、自己の汎用端末装置14から電力消費管理装置12へ個別DR応答を送信する(ステップS15)。   Next, the general-purpose terminal device 14 of the consumer 4A receives the individual DR request from the power consumption management device 12, and displays the content of the individual DR request on its own display, for example. The consumer 4A confirms the display on the display and transmits an individual DR response from the general-purpose terminal device 14 to the power consumption management device 12 (step S15).

汎用端末装置14から電力消費管理装置12への個別DR応答の送信は、需要家4が汎用端末装置14を操作した場合に行われるものである。したがって、電力消費管理装置12が各汎用端末装置14から個別DR応答を受信するタイミングにはバラツキがある。電力消費管理装置12は、たとえば、各汎用端末装置14からの個別DR応答を受信しながら、所定時間待機する。   The transmission of the individual DR response from the general-purpose terminal device 14 to the power consumption management device 12 is performed when the consumer 4 operates the general-purpose terminal device 14. Therefore, there is variation in the timing at which the power consumption management device 12 receives the individual DR response from each general-purpose terminal device 14. For example, the power consumption management device 12 waits for a predetermined time while receiving the individual DR response from each general-purpose terminal device 14.

電力消費管理装置12が各需要家4Aの汎用端末装置14からの個別DR応答を受信しながら待機する時間は、たとえば、各需要家4Aの応答時間の統計値に基づいて決定された時間である。   The time that the power consumption management device 12 waits while receiving the individual DR response from the general-purpose terminal device 14 of each consumer 4A is, for example, a time determined based on the statistical value of the response time of each customer 4A. .

次に、電力消費管理装置12は、負荷グループAのグループ目標量Tおよび現時点までに受信した汎用端末装置14からの個別DR応答に基づいて、各需要家4Bについての削減指定量Iを決定する(ステップS16)。   Next, the power consumption management device 12 determines the reduction designation amount I for each customer 4B based on the group target amount T of the load group A and the individual DR response received from the general-purpose terminal device 14 up to the present time. (Step S16).

具体的には、電力消費管理装置12は、以下の式(1)に従って、負荷グループBについての削減指定合計量Ibを設定し、設定した削減指定合計量Ibに基づいて、各需要家4Bについての削減指定量Iを決定する。ただし、Taは負荷グループAのグループ目標量であり、Tbは負荷グループBのグループ目標量である。また、F1は、各需要家4Aからの個別DR応答に基づいて求められた、各需要家4Aによって削減されることが現時点で推定される消費電力量であり、F2は、現時点で個別DR応答を未送信の需要家4Aが削減する消費電力量の予測値である。
Ib=Ta+Tb−(F1+F2) ・・・(1)
Specifically, the power consumption management device 12 sets a reduction designated total amount Ib for the load group B according to the following equation (1), and for each customer 4B based on the set reduction designated total amount Ib. The specified reduction amount I is determined. However, Ta is the group target amount of the load group A, and Tb is the group target amount of the load group B. Further, F1 is the power consumption estimated at the present time to be reduced by each consumer 4A, obtained based on the individual DR response from each consumer 4A, and F2 is the individual DR response at the present time. This is a predicted value of the amount of power consumed by the non-transmitted customer 4A.
Ib = Ta + Tb− (F1 + F2) (1)

たとえば、Ta=500kWhとし、Tb=300kWhとし、F1=400kWhとし、F2=50kWhとすると、Ib=350kWhである。電力消費管理装置12は、削減指定合計量Ibを各需要家4Bに配分することによって、各需要家4Bについての削減指定量Iを決定する。   For example, if Ta = 500 kWh, Tb = 300 kWh, F1 = 400 kWh, and F2 = 50 kWh, then Ib = 350 kWh. The power consumption management device 12 determines the reduction designation amount I for each consumer 4B by allocating the reduction designation total amount Ib to each consumer 4B.

次に、電力消費管理装置12は、決定した削減指定量IおよびDRの対象期間を示す個別DR要請を各需要家4Bの汎用端末装置14へたとえば一括送信する(ステップS17)。   Next, the power consumption management device 12 transmits, for example, the individual DR request indicating the determined reduction specified amount I and the target period of the DR to the general-purpose terminal device 14 of each consumer 4B, for example (step S17).

次に、需要家4Bの汎用端末装置14は、電力消費管理装置12から個別DR要請を受信して、たとえば、自己のディスプレイに個別DR要請の内容を表示する。需要家4Bは、当該ディスプレイの表示を確認して、自己の汎用端末装置14から電力消費管理装置12へ個別DR応答を送信する(ステップS18)。   Next, the general-purpose terminal device 14 of the customer 4B receives the individual DR request from the power consumption management device 12, and displays the content of the individual DR request on its own display, for example. The consumer 4B confirms the display on the display, and transmits an individual DR response from the general-purpose terminal device 14 to the power consumption management device 12 (step S18).

上述のように、電力消費管理装置12が各汎用端末装置14から個別DR応答を受信するタイミングにはバラツキがある。需要家4Aおよび需要家4Bの汎用端末装置14からの個別DR応答を受信しながら、たとえば、DRの対象期間の所定時間前の時刻まで待機する。   As described above, the timing at which the power consumption management device 12 receives the individual DR response from each general-purpose terminal device 14 varies. While receiving the individual DR responses from the general-purpose terminal devices 14 of the customer 4A and the customer 4B, for example, it waits until a predetermined time before the DR target period.

次に、電力消費管理装置12は、各需要家4Aおよび各需要家4Bからの個別DR応答に基づいて求められた、現時点で需要家4Aおよび需要家4Bによって削減されることが推定される消費電力量に基づいて、アグリゲータ2が小売事業者1から要請されたDRに参加するか否かを判断する。たとえば、アグリゲータ2は、当該消費電力量と全体DR要請の示す削減指定総量Gとの差が所定値以内の場合に、DRに参加すると判断する。   Next, the power consumption management device 12 is estimated based on the individual DR responses from each customer 4A and each customer 4B and estimated to be reduced by the customer 4A and the customer 4B at the present time. Based on the amount of electric power, the aggregator 2 determines whether or not to participate in the DR requested by the retailer 1. For example, the aggregator 2 determines to participate in the DR when the difference between the power consumption and the reduction designated total amount G indicated by the overall DR request is within a predetermined value.

次に、電力消費管理装置12は、小売事業者1から要請されたDRに参加するか否かを示す全体DR応答を小売事業装置11へ送信する(ステップS19)。ここでは、電力消費管理装置12は、DRに参加する旨の全体DR応答を小売事業装置11へ送信する。   Next, the power consumption management device 12 transmits an overall DR response indicating whether or not to participate in the DR requested by the retailer 1 to the retailer device 11 (step S19). Here, the power consumption management device 12 transmits an overall DR response to participate in DR to the retail business device 11.

次に、電力消費管理装置12は、たとえば、DRの対象期間の開始直前において、以下の式(2)に基づいて、負荷グループCについての削減指定合計量Icを設定する。ただし、Gは削減指定総量Gであり、F3は、各需要家4Aおよび各需要家4Bからの個別DR応答に基づいて求められた、現時点で需要家4Aおよび需要家4Bによって削減されることが推定される消費電力量である。
Ic=G−F3 ・・・(2)
Next, for example, immediately before the start of the DR target period, the power consumption management apparatus 12 sets the reduction specified total amount Ic for the load group C based on the following equation (2). However, G is the reduction designated total amount G, and F3 may be reduced by the customer 4A and the customer 4B at the present time obtained based on the individual DR response from each customer 4A and each customer 4B. This is the estimated power consumption.
Ic = G−F3 (2)

つまり、削減指定合計量Icは、削減指定総量Gと負荷グループC以外の負荷グループからの個別DR応答によって推定された削減される消費電力量との差分である。   That is, the reduction specified total amount Ic is a difference between the reduction specified total amount G and the reduced power consumption estimated by the individual DR responses from the load groups other than the load group C.

次に、電力消費管理装置12は、削減指定合計量Icを各需要家4Cに配分することによって、各需要家4Cについての削減指定量Iを決定する(ステップS20)。   Next, the power consumption management device 12 determines the reduction designation amount I for each customer 4C by allocating the reduction designation total amount Ic to each consumer 4C (step S20).

次に、電力消費管理装置12は、決定した削減指定量IおよびDRの対象期間を示す個別DR要請を、たとえば、DRの対象期間の開始時刻において各需要家4Cの専用端末装置15へたとえば一括送信する(ステップS21)。   Next, the power consumption management device 12 sends, for example, the individual DR request indicating the determined reduction target amount I and the target period of the DR to the dedicated terminal device 15 of each customer 4C, for example, at the start time of the DR target period. Transmit (step S21).

次に、各需要家4Cの専用端末装置15は、電力消費管理装置12から個別DR要請を受信すると、個別DR応答を電力消費管理装置12へたとえば即座に送信する(ステップS22)。   Next, when receiving the individual DR request from the power consumption management device 12, the dedicated terminal device 15 of each customer 4 </ b> C transmits, for example, an individual DR response to the power consumption management device 12 immediately (step S <b> 22).

DRに参加する旨の個別DR応答を電力消費管理装置12へ送信した専用端末装置15は、自己の電力需要施設3における機器13を制御することにより、電力需要施設3における消費電力を削減する。   The dedicated terminal device 15 that has transmitted the individual DR response indicating participation in the DR to the power consumption management device 12 reduces the power consumption in the power demand facility 3 by controlling the device 13 in its own power demand facility 3.

DRに参加する旨の個別DR応答を汎用端末装置14から電力消費管理装置12へ送信した需要家4は、上述のように、DRの対象期間になると、手動で自己の電力需要施設3における各機器13を操作することにより、電力需要施設3における消費電力を削減する。   As described above, the customer 4 who has transmitted the individual DR response indicating that he / she participates in the DR from the general-purpose terminal device 14 to the power consumption management device 12 manually enters each period in his / her own power demand facility 3 during the DR target period. By operating the device 13, the power consumption in the power demand facility 3 is reduced.

次に、電力消費管理装置12は、たとえば、DRの対象期間が終了すると、需要家4Aおよび需要家4Bの汎用端末装置14ならびに需要家4Cの専用端末装置15に報告要求を送信する(ステップS23)。報告要求は、DRの対象期間における電力需要施設3の消費電力量についての報告を要求するための情報である。   Next, for example, when the DR target period ends, the power consumption management device 12 transmits a report request to the general-purpose terminal device 14 of the customer 4A and the customer 4B and the dedicated terminal device 15 of the customer 4C (step S23). ). The report request is information for requesting a report on the power consumption amount of the power demand facility 3 in the DR target period.

次に、需要家4Aおよび需要家4Bの汎用端末装置14ならびに需要家4Cの専用端末装置15は、電力消費管理装置12から報告要求を受信すると、たとえば、自己の電力需要施設3において設置された計測装置から電力需要施設3の消費電力量を示す情報を取得する。   Next, when receiving the report request from the power consumption management device 12, the general-purpose terminal device 14 of the customer 4A and the customer 4B and the dedicated terminal device 15 of the customer 4C are installed in the own power demand facility 3, for example. Information indicating the power consumption of the power demand facility 3 is acquired from the measurement device.

そして、需要家4Aおよび需要家4Bの汎用端末装置14ならびに需要家4Cの専用端末装置15は、取得した当該情報に基づいて、DRの対象期間における自己の電力需要施設3の消費電力量を示す報告情報を作成し、作成した報告情報を電力消費管理装置12へ送信する(ステップS24)。   Then, the general-purpose terminal device 14 of the customer 4A and the customer 4B and the dedicated terminal device 15 of the customer 4C indicate the power consumption amount of their own power demanding facility 3 during the DR target period based on the acquired information. Report information is created, and the created report information is transmitted to the power consumption management apparatus 12 (step S24).

次に、電力消費管理装置12は、需要家4Aおよび需要家4Bの汎用端末装置14ならびに需要家4Cの専用端末装置15から報告情報を受信して、受信した各報告情報に基づいて、各需要家4がDRの対象期間において削減した消費電力量を把握する。   Next, the power consumption management device 12 receives report information from the general-purpose terminal device 14 of the customer 4A and the customer 4B and the dedicated terminal device 15 of the customer 4C, and based on each received report information, each demand The house 4 grasps the power consumption reduced in the DR target period.

次に、電力消費管理装置12は、把握した当該消費電力量に基づいて、各需要家4へのインセンティブすなわちDRの要請に応じたことの対価を算出する(ステップS25)。具体的には、たとえば、電力消費管理装置12による個別DR要請の送信タイミングが遅かった負荷グループに属する需要家4ほど高いインセンティブを取得することができるように、各需要家4へのインセンティブを算出する。   Next, the power consumption management device 12 calculates an incentive to each customer 4, that is, a consideration for responding to a DR request, based on the grasped power consumption (step S25). Specifically, for example, the incentive to each customer 4 is calculated so that the higher incentive can be obtained for the customer 4 belonging to the load group whose transmission timing of the individual DR request by the power consumption management device 12 is late. To do.

次に、電力消費管理装置12は、たとえば、需要家4Aおよび需要家4Bの最新の応答時間に基づいて、負荷グループAおよび負荷グループBのメンバーを再構成する(ステップS26)。   Next, the power consumption management device 12 reconfigures the members of the load group A and the load group B based on, for example, the latest response times of the customer 4A and the customer 4B (step S26).

なお、この例では、電力消費管理装置12は、対象期間の終了後に報告要求(ステップS23)を送信する構成であるとしたが、これに限定するものではない。たとえば、電力消費管理装置12は、対象期間の開始タイミングまたは終了タイミングとは無関係に、報告要求を定期的または不定期に送信する構成であってもよい。   In this example, the power consumption management device 12 is configured to transmit a report request (step S23) after the end of the target period. However, the present invention is not limited to this. For example, the power consumption management device 12 may be configured to transmit a report request regularly or irregularly regardless of the start timing or end timing of the target period.

図5は、本発明の実施の形態に係る電力消費管理装置の構成を示す図である。   FIG. 5 is a diagram showing a configuration of the power consumption management apparatus according to the embodiment of the present invention.

図5を参照して、電力消費管理装置12は、取得部31と、処理部32と、通知部33と、設定部34と、要請部35と、分類部36と、記憶部37と、対価算出部38とを備える。なお、電力消費管理装置12は、対価算出部38を備えない構成であってもよい。   Referring to FIG. 5, the power consumption management device 12 includes an acquisition unit 31, a processing unit 32, a notification unit 33, a setting unit 34, a request unit 35, a classification unit 36, a storage unit 37, And a calculation unit 38. The power consumption management device 12 may be configured without the consideration calculation unit 38.

記憶部37は、たとえば、各需要家4の過去のDRへの参加の有無、各需要家4の過去の応答時間、各需要家4の通常時の消費電力量、各需要家4の属する負荷グループ等を記憶している。たとえば、電力消費管理装置12における各ユニットは、記憶部37に記憶された情報を参照して、各種処理を行う。   The storage unit 37 is, for example, whether or not each customer 4 has participated in the past DR, each customer 4's past response time, each customer's 4 normal power consumption, and the load to which each customer 4 belongs. Memorize groups. For example, each unit in the power consumption management device 12 performs various processes with reference to information stored in the storage unit 37.

分類部36は、たとえば、過去にDRが行われた際の需要家4の応答時間に基づいて、各需要家4を負荷グループA、負荷グループBおよび負荷グループCのいずれかに分類する。   The classification unit 36 classifies each customer 4 into one of the load group A, the load group B, and the load group C based on, for example, the response time of the customer 4 when DR has been performed in the past.

具体的には、分類部36は、電力需要施設3において専用端末装置15を備えない需要家4のうち、応答時間が大きい需要家4を負荷グループAに分類する。また、分類部36は、電力需要施設3において専用端末装置15を備えない需要家4のうち、応答時間が小さい需要家4を負荷グループBに分類する。また、分類部36は、電力需要施設3において専用端末装置15を備える需要家4を負荷グループCに分類する。   Specifically, the classification unit 36 classifies the consumers 4 having a long response time into the load group A among the consumers 4 that do not include the dedicated terminal device 15 in the power demand facility 3. Further, the classification unit 36 classifies the consumers 4 having a short response time into the load group B among the consumers 4 that do not include the dedicated terminal device 15 in the power demand facility 3. Further, the classification unit 36 classifies the customer 4 having the dedicated terminal device 15 in the power demand facility 3 into the load group C.

また、分類部36は、たとえば、これまでに応答時間が得られていない需要家4も、負荷グループAつまり個別DR要請の通知タイミングが最も早い負荷グループに分類する。具体的には、分類部36は、たとえば、アグリゲータ2と新たに契約した需要家4は負荷グループAに分類する。   For example, the classification unit 36 also classifies the customer 4 whose response time has not been obtained so far into the load group A, that is, the load group with the earliest notification timing of the individual DR request. Specifically, the classifying unit 36 classifies the customer 4 newly contracted with the aggregator 2 into the load group A, for example.

取得部31は、小売事業装置11から送信された全体DR要請を取得する。処理部32は、取得部31によって取得された全体DR要請の内容を設定部34および要請部35に通知する。   The acquisition unit 31 acquires the entire DR request transmitted from the retail business apparatus 11. The processing unit 32 notifies the setting unit 34 and the request unit 35 of the content of the entire DR request acquired by the acquisition unit 31.

設定部34は、処理部32からの通知に基づいて、各負荷グループに個別DR要請を通知するタイミングである通知タイミングを設定する。   Based on the notification from the processing unit 32, the setting unit 34 sets a notification timing that is a timing for notifying each load group of an individual DR request.

具体的には、設定部34は、複数の負荷グループのそれぞれに異なる通知タイミングを設定する。より具体的には、たとえば、設定部34は、応答時間の大きい負荷グループAと比べて、応答時間の小さい負荷グループBに、負荷グループAよりも遅い通知タイミングを設定する。   Specifically, the setting unit 34 sets different notification timings for each of the plurality of load groups. More specifically, for example, the setting unit 34 sets a notification timing later than that of the load group A in the load group B having a small response time compared to the load group A having a large response time.

すなわち、設定部34は、応答時間の小さい負荷グループBと比べて、応答時間の大きい負荷グループAに、負荷グループBよりも早い通知タイミングを設定する。   That is, the setting unit 34 sets a notification timing earlier than that of the load group B to the load group A having a large response time compared to the load group B having a small response time.

要請部35は、処理部32からの通知に基づいて、各負荷グループのグループ目標量Tを設定する。そして、要請部35は、設定した負荷グループAのグループ目標量Tに基づいて、各需要家4Aの汎用端末装置14へ送信する個別DR要請の内容、具体的には、削減指定量Iを決定する。   The request unit 35 sets a group target amount T for each load group based on the notification from the processing unit 32. Then, the request unit 35 determines the content of the individual DR request to be transmitted to the general-purpose terminal device 14 of each consumer 4A, specifically, the reduction designation amount I based on the set group target amount T of the load group A. To do.

処理部32は、要請部35が決定した削減指定量Iを示す個別DR要請を作成し、作成した個別DR要請を、設定部34が設定した負荷グループAへの通知タイミングにおいて通知部33へ出力する。   The processing unit 32 creates an individual DR request indicating the specified reduction amount I determined by the request unit 35 and outputs the created individual DR request to the notification unit 33 at the notification timing to the load group A set by the setting unit 34. To do.

通知部33は、設定部34が設定した通知タイミングに従って個別DR要請を汎用端末装置14へ通知する。具体的には、処理部32から受けた個別DR要請を需要家4Aの汎用端末装置14に通知する。   The notification unit 33 notifies the general-purpose terminal device 14 of the individual DR request according to the notification timing set by the setting unit 34. Specifically, the individual DR request received from the processing unit 32 is notified to the general-purpose terminal device 14 of the customer 4A.

取得部31は、汎用端末装置14および専用端末装置15から送信された個別DR応答を取得する。処理部32は、取得部31が取得した個別DR応答の内容を要請部35に通知する。   The acquisition unit 31 acquires the individual DR response transmitted from the general-purpose terminal device 14 and the dedicated terminal device 15. The processing unit 32 notifies the request unit 35 of the content of the individual DR response acquired by the acquisition unit 31.

要請部35は、処理部32から通知された需要家4Aからの個別DR応答の内容に基づいて、需要家4Aによって削減される消費電力の現時点における推定値を算出し、算出した推定値に基づいて、削減指定合計量Ibを算出する。具体的には、たとえば、要請部35は、上記式(1)に従って、削減指定合計量Ibを算出する。そして、要請部35は、削減指定合計量Ibを各需要家4Bに配分することによって、各需要家4Bについての削減指定量Iを決定する。   Based on the content of the individual DR response from the consumer 4A notified from the processing unit 32, the request unit 35 calculates an estimated value of power consumption reduced by the consumer 4A at the current time, and based on the calculated estimated value Thus, the reduction designated total amount Ib is calculated. Specifically, for example, the request unit 35 calculates the reduction designated total amount Ib according to the above formula (1). And the request | requirement part 35 determines the reduction designation | designated quantity I about each consumer 4B by allocating the reduction designation | designated total quantity Ib to each consumer 4B.

すなわち、要請部35は、個別DR要請を通知した負荷グループからの個別DR応答によって推定される内容に基づいて、他の負荷グループへの新たな個別DR要請の内容を決定する。なお、要請部35は、単に負荷グループBのグループ目標量Tを各需要家4Bに配分することによって、各需要家4Bについての削減指定量Iを決定する構成であってもよい。この場合、要請部35は、上記式(1)を用いずに各需要家4Bについての削減指定量Iを決定する。   That is, the request unit 35 determines the content of a new individual DR request to another load group based on the content estimated by the individual DR response from the load group that has notified the individual DR request. In addition, the request | requirement part 35 may be the structure which determines the reduction | decrease designation | designated amount I about each consumer 4B by allocating the group target amount T of the load group B to each consumer 4B. In this case, the request unit 35 determines the specified reduction amount I for each customer 4B without using the above formula (1).

処理部32は、要請部35が決定した各需要家4Bについての削減指定量Iを示す個別DR要請を作成し、作成した個別DR要請を、設定部34が設定した負荷グループBへの通知タイミングにおいて通知部33へ出力する。   The processing unit 32 creates an individual DR request indicating the specified reduction amount I for each customer 4B determined by the request unit 35, and notifies the created individual DR request to the load group B set by the setting unit 34 To the notification unit 33.

要請部35は、処理部32から通知された需要家4Aからの個別DR応答の内容、および需要家4Bからの個別DR応答の内容に基づいて、需要家4Aおよび需要家4Bによって削減される消費電力の現時点における推定値を算出する。   The request unit 35 uses the content of the individual DR response from the customer 4A notified from the processing unit 32 and the content of the individual DR response from the customer 4B to reduce consumption by the customer 4A and the customer 4B. An estimated value of power at the current time is calculated.

処理部32は、要請部35によって算出された推定値に基づいて、アグリゲータ2が小売事業者1から要請されたDRに参加するか否かを判断する。そして、処理部32は、判断結果に基づいて全体DR応答を作成し、作成した全体DR応答を通知部33へ出力する。ここでは、処理部32は、DRに参加する旨の全体DR応答を通知部33へ出力する。通知部33は、処理部32から受けた全体DR応答を小売事業装置11へ通知する。   The processing unit 32 determines whether the aggregator 2 participates in the DR requested by the retailer 1 based on the estimated value calculated by the requesting unit 35. Then, the processing unit 32 creates an overall DR response based on the determination result, and outputs the created overall DR response to the notification unit 33. Here, the processing unit 32 outputs an overall DR response to participate in DR to the notification unit 33. The notification unit 33 notifies the retail business apparatus 11 of the overall DR response received from the processing unit 32.

要請部35は、自己が算出した上記推定値に基づいて、削減指定合計量Icを算出する。具体的には、たとえば、要請部35は、上記式(2)に従って、削減指定合計量Icを算出する。そして、要請部35は、削減指定合計量Icを各需要家4Cに配分することによって、各需要家4Cについての削減指定量Iを決定する。   The request unit 35 calculates the reduction designated total amount Ic based on the estimated value calculated by itself. Specifically, for example, the request unit 35 calculates the reduction designated total amount Ic according to the above equation (2). And the request | requirement part 35 determines the reduction designation | designated quantity I about each consumer 4C by allocating the reduction designation | designated total quantity Ic to each consumer 4C.

なお、要請部35は、単に負荷グループCのグループ目標量Tを各需要家4Cに配分することによって、各需要家4Cについての削減指定量Iを決定する構成であってもよい。この場合、要請部35は、上記式(2)を用いずに各需要家4Cについての削減指定量Iを決定する。   In addition, the request | requirement part 35 may be the structure which determines the reduction | decrease designation | designated amount I about each consumer 4C by allocating the group target amount T of the load group C to each consumer 4C. In this case, the request unit 35 determines the specified reduction amount I for each customer 4C without using the above equation (2).

処理部32は、要請部35が決定した各需要家4Cについての削減指定量Iを示す個別DR要請を作成し、作成した個別DR要請を、設定部34が設定した負荷グループCへの通知タイミングにおいて通知部33へ出力する。   The processing unit 32 creates an individual DR request indicating the specified reduction amount I for each customer 4C determined by the request unit 35, and notifies the created individual DR request to the load group C set by the setting unit 34 To the notification unit 33.

通知部33は、処理部32から受けた個別DR要請を各需要家4の専用端末装置15に通知する。すなわち、通知部33は、削減指定合計量Icに基づいて作成された需要家4Cについての個別DR要請を負荷グループCに対応する専用端末装置15に通知する。   The notification unit 33 notifies the dedicated terminal device 15 of each customer 4 of the individual DR request received from the processing unit 32. That is, the notification unit 33 notifies the dedicated terminal device 15 corresponding to the load group C of the individual DR request for the customer 4C created based on the specified reduction total amount Ic.

取得部31は、各汎用端末装置14および各専用端末装置15から送信された報告情報を取得する。処理部32は、取得部31によって取得された報告情報の内容を対価算出部38に通知する。   The acquisition unit 31 acquires report information transmitted from each general-purpose terminal device 14 and each dedicated terminal device 15. The processing unit 32 notifies the consideration calculation unit 38 of the content of the report information acquired by the acquisition unit 31.

対価算出部38は、通知された報告情報の内容、つまり需要家4がDRの対象期間において削減した消費電力量に基づいて、各需要家4へのインセンティブを算出する。このとき、対価算出部38は、たとえば、負荷グループAへのインセンティブおよび負荷グループBのインセンティブと比べて、負荷グループCへのインセンティブを高く算出する。   The consideration calculation unit 38 calculates an incentive to each customer 4 based on the content of the notified report information, that is, the amount of power consumed by the customer 4 during the DR target period. At this time, the consideration calculation unit 38 calculates the incentive to the load group C higher than the incentive to the load group A and the incentive of the load group B, for example.

なお、本発明の実施の形態に係る電力消費管理システム101では、個別DR要請は、DRの対象期間および削減指定量Iを示す情報である構成としたが、これに限定するものではない。たとえば、個別DR要請は、削減指定量Iの代わりに、削減指定量Iに基づいて作成された他の情報、たとえば、機器13の動作内容を示す情報であってもよい。   In the power consumption management system 101 according to the embodiment of the present invention, the individual DR request is configured to be information indicating the target period of DR and the specified reduction amount I, but is not limited thereto. For example, the individual DR request may be other information created based on the specified reduction amount I instead of the specified reduction amount I, for example, information indicating the operation content of the device 13.

この場合、DRに参加する旨の個別DR応答を汎用端末装置14から送信した需要家4、および当該旨の個別DR応答を送信した専用端末装置15は、DRの対象期間において、自己の電力需要施設3における機器を当該動作内容に従って動作させる。   In this case, the consumer 4 that has transmitted the individual DR response to participate in the DR from the general-purpose terminal device 14 and the dedicated terminal device 15 that has transmitted the individual DR response to that effect have their own power demands in the DR target period. The equipment in the facility 3 is operated according to the operation content.

また、本発明の実施の形態に係る電力消費管理システム101では、電力消費管理装置12は、応答時間の大きい順番すなわち負荷グループA,B,Cの順番で各負荷グループへ個別DR要請を送信したが、これに限定するものではない。たとえば、電力消費管理装置12は、応答時間の小さい順番で各負荷グループへ個別DR要請を送信する構成であってもよい。   In the power consumption management system 101 according to the embodiment of the present invention, the power consumption management apparatus 12 transmits individual DR requests to the load groups in the order of the response time, that is, the load groups A, B, and C. However, the present invention is not limited to this. For example, the power consumption management device 12 may be configured to transmit individual DR requests to each load group in order of increasing response time.

<変形例1>
本発明の実施の形態に係る電力消費管理システム101において、電力消費管理装置12は、応答時間に基づいて、各需要家4を複数の負荷グループのいずれかに分類したが、これに限定するものではない。たとえば、電力消費管理装置12は、DRの要請に応じた実績すなわちDRへの参加実績と、応答時間との両方に基づいて、各需要家4を複数の負荷グループのいずれかに分類する構成であってもよい。
<Modification 1>
In the power consumption management system 101 according to the embodiment of the present invention, the power consumption management device 12 classifies each customer 4 into one of a plurality of load groups based on the response time, but the present invention is limited to this. is not. For example, the power consumption management device 12 is configured to classify each customer 4 into one of a plurality of load groups based on both a track record according to a DR request, that is, a track record of participating in the DR, and a response time. There may be.

具体的には、たとえば、分類部36は、以下の式(3)に従って、評価値Eを算出する。ただし、Lは応答時間であり、PはDRへの参加率であり、aおよびbは重み係数である。
E=a/L+b×P ・・・(3)
Specifically, for example, the classification unit 36 calculates the evaluation value E according to the following formula (3). However, L is a response time, P is a participation rate in DR, and a and b are weighting factors.
E = a / L + b × P (3)

分類部36は、たとえば、評価値Eが小さい需要家4を負荷グループAに分類し、評価値Eが大きい需要家4を負荷グループBに分類する。   For example, the classification unit 36 classifies the customers 4 having a small evaluation value E into the load group A, and classifies the consumers 4 having a large evaluation value E into the load group B.

ここで、たとえば、重み係数bに比べて重み係数aが十分小さい場合、評価値Eは、参加率Pによって支配的に決定される。分類部36は、たとえば、このような場合、参加率Pが低い需要家4を負荷グループAに分類し、参加率Pが高い需要家4を負荷グループBに分類する。   Here, for example, when the weighting factor a is sufficiently smaller than the weighting factor b, the evaluation value E is dominantly determined by the participation rate P. For example, in such a case, the classification unit 36 classifies the consumers 4 with a low participation rate P into the load group A, and classifies the consumers 4 with a high participation rate P into the load group B.

設定部34は、参加率Pが高い負荷グループである負荷グループBと比べて、参加率Pの低い負荷グループである負荷グループAに個別DR要請の早い通知タイミングを設定する。つまり、設定部34は、DRへの参加実績の低い負荷グループと比べて、DRへの参加実績の高いグループに遅い通知タイミングを設定する。   The setting unit 34 sets an earlier notification timing of an individual DR request to the load group A, which is a load group with a low participation rate P, as compared with the load group B, which is a load group with a high participation rate P. That is, the setting unit 34 sets a late notification timing for a group with a high DR participation record as compared to a load group with a low DR participation record.

<変形例2>
本発明の実施の形態に係る電力消費管理システム101では、電力消費管理装置12は、各需要家4を複数の負荷グループのいずれかに分類する構成であるとしたが、これに限定するものではない。たとえば、電力消費管理装置12は、電力消費管理システム101における各機器13を複数の負荷グループのいずれかに分類する構成であってもよい。
<Modification 2>
In the power consumption management system 101 according to the embodiment of the present invention, the power consumption management device 12 is configured to classify each consumer 4 into one of a plurality of load groups. However, the present invention is not limited to this. Absent. For example, the power consumption management device 12 may be configured to classify each device 13 in the power consumption management system 101 into one of a plurality of load groups.

具体的には、たとえば、電力消費管理装置12において、分類部36は、専用端末装置15と接続されていない機器13を負荷グループAまたは負荷グループBのいずれかに分類し、専用端末装置15と接続された機器13を負荷グループCに分類する。分類部36は、1つの電力需要施設3における複数の機器13の各々を異なる負荷グループに分類することも可能である。なお、分類部36は、1つの電力需要施設3における複数の機器13を同じ負荷グループに分類する構成であってもよい。   Specifically, for example, in the power consumption management device 12, the classification unit 36 classifies the device 13 that is not connected to the dedicated terminal device 15 into either the load group A or the load group B, and The connected devices 13 are classified into the load group C. The classification unit 36 can also classify each of the plurality of devices 13 in one power demand facility 3 into different load groups. The classification unit 36 may be configured to classify the plurality of devices 13 in one power demand facility 3 into the same load group.

電力消費管理装置12は、たとえば、まず、負荷グループAに属する各機器13に対応する汎用端末装置14へ個別DR要請を送信する。当該汎用端末装置14に対応する需要家4は、自己の汎用端末装置14のディスプレイを確認し、当該汎用端末装置14から電力消費管理装置12へ個別DR応答を送信する。   For example, the power consumption management device 12 first transmits an individual DR request to the general-purpose terminal device 14 corresponding to each device 13 belonging to the load group A. The consumer 4 corresponding to the general-purpose terminal device 14 confirms the display of the general-purpose terminal device 14 and transmits an individual DR response from the general-purpose terminal device 14 to the power consumption management device 12.

電力消費管理装置12は、その後、負荷グループBに属する各機器13に対応する汎用端末装置14へ個別DR要請を送信する。当該汎用端末装置14に対応する需要家4は、自己の汎用端末装置14のディスプレイを確認し、当該汎用端末装置14から電力消費管理装置12へ個別DR応答を送信する。   Thereafter, the power consumption management device 12 transmits an individual DR request to the general-purpose terminal device 14 corresponding to each device 13 belonging to the load group B. The consumer 4 corresponding to the general-purpose terminal device 14 confirms the display of the general-purpose terminal device 14 and transmits an individual DR response from the general-purpose terminal device 14 to the power consumption management device 12.

電力消費管理装置12は、その後、負荷グループCに属する各機器13に対応する専用端末装置15へ個別DR要請を送信する。専用端末装置15は、たとえば、電力消費管理装置12から機器13への個別DR要請を受信すると、需要家4によって予め登録された設定に基づいて、個別DR応答をたとえば即座に電力消費管理装置12へ送信する。   Thereafter, the power consumption management device 12 transmits an individual DR request to the dedicated terminal device 15 corresponding to each device 13 belonging to the load group C. For example, when the dedicated terminal device 15 receives an individual DR request from the power consumption management device 12 to the device 13, based on the settings registered in advance by the consumer 4, the dedicated terminal device 15 immediately sends an individual DR response, for example, immediately. Send to.

たとえば、分類部36は、過去のDRの際に応答時間が得られていない機器13を、個別DR要請の通知タイミングが最も早い負荷グループ、つまり負荷グループAに分類する。具体的には、分類部36は、たとえば、設置されたばかりの機器13も負荷グループAに分類する。   For example, the classification unit 36 classifies the devices 13 for which the response time has not been obtained in the past DR into the load group with the earliest notification timing of the individual DR request, that is, the load group A. Specifically, the classification unit 36 also classifies the device 13 just installed, for example, into the load group A.

ところで、複数の電力需要家にDRの要請を行ってから、当該要請に応じるか否かの応答がなされるまでの時間にばらつきがある環境において、電力消費に関する要請をより確実に満たす技術が求められる。   By the way, there is a need for a technology that more reliably satisfies the demand for power consumption in an environment where there is a variation in the time from when a DR request is made to a plurality of power consumers until a response indicating whether or not to respond to the request is made. It is done.

これに対して、本発明の実施の形態に係る電力消費管理装置では、設定部34は、電力消費に関する要請を対応の汎用端末装置14または専用端末装置15に通知してから当該要請に応じるか否かに関する応答を取得するまでの応答時間に基づいて分類された複数の負荷グループについて、当該要請の通知タイミングとして各負荷グループに異なる通知タイミングを設定する。通知部33は、設定部34によって設定された通知タイミングに従って当該要請を汎用端末装置14または専用端末装置15に通知する。   On the other hand, in the power consumption management apparatus according to the embodiment of the present invention, the setting unit 34 notifies the corresponding general-purpose terminal device 14 or the dedicated terminal device 15 of a request regarding power consumption and responds to the request. For a plurality of load groups classified based on the response time until obtaining a response regarding whether or not, a different notification timing is set for each load group as the notification timing of the request. The notification unit 33 notifies the general-purpose terminal device 14 or the dedicated terminal device 15 of the request according to the notification timing set by the setting unit 34.

このような構成により、電力消費に関する要請を行う場合に、対象期間のどの程度前のタイミングで当該要請を行うべきかを負荷グループごとに適切に決定し、決定したタイミングにおいて当該要請を行うことができる。   With this configuration, when making a request for power consumption, it is possible to appropriately determine for each load group at what timing before the target period the request should be made, and to make the request at the determined timing. it can.

したがって、本発明の実施の形態に係る電力消費管理装置では、電力消費に関する要請を複数の要請先に対して行ってから当該要請に応じるか否かの応答を受けるまでの時間にばらつきがある環境において、電力消費に関する要請をより確実に満たすことができる。   Therefore, in the power consumption management apparatus according to the embodiment of the present invention, there is a variation in time from when a request regarding power consumption is made to a plurality of request destinations until a response indicating whether or not to respond to the request is received. Therefore, it is possible to satisfy the demand for power consumption more reliably.

また、本発明の実施の形態に係る電力消費管理装置では、要請部35は、負荷グループからの応答によって推定される内容に基づいて、他の負荷グループへの新たな要請の内容を決定する。   In the power consumption management apparatus according to the embodiment of the present invention, the request unit 35 determines the content of a new request to another load group based on the content estimated from the response from the load group.

このような構成により、先に要請を行った負荷グループからの応答の内容を踏まえて、次に要請を行う負荷グループへの要請内容を決定することができるため、電力消費に関する全体的な要請をより確実に満たすことができる。   With such a configuration, it is possible to determine the content of the request to the load group to be requested next based on the content of the response from the load group that has previously requested. Can be satisfied more reliably.

また、本発明の実施の形態に係る電力消費管理装置では、設定部34は、応答時間の小さい負荷グループと比べて、応答時間の大きい負荷グループに早い通知タイミングを設定する。   In the power consumption management device according to the embodiment of the present invention, the setting unit 34 sets an earlier notification timing for a load group with a large response time compared to a load group with a small response time.

このような構成により、応答の遅い負荷グループに早めに要請を行うことができるため、たとえば、要請の対象期間の開始より前により多くの応答を取得することができる。   With such a configuration, it is possible to make a request to a load group having a slow response early, so that, for example, more responses can be acquired before the start of the request target period.

また、本発明の実施の形態に係る電力消費管理装置では、設定部34は、応答時間の大きい負荷グループと比べて、応答時間の小さい負荷グループに遅い通知タイミングを設定する。   In the power consumption management apparatus according to the embodiment of the present invention, the setting unit 34 sets a later notification timing for a load group with a small response time compared to a load group with a large response time.

このような構成により、応答の遅い負荷グループに早めに要請を行うことができるため、たとえば、要請の対象期間の開始より前により多くの応答を取得することができる。   With such a configuration, it is possible to make a request to a load group having a slow response early, so that, for example, more responses can be acquired before the start of the request target period.

また、本発明の実施の形態に係る電力消費管理システムでは、負荷グループは、応答時間および要請に応じた実績に基づいて分類される。   Further, in the power consumption management system according to the embodiment of the present invention, the load group is classified based on the response time and the results according to the request.

このような構成により、負荷グループをより適切に分類することができる。   With such a configuration, the load group can be classified more appropriately.

また、本発明の実施の形態に係る電力消費管理装置では、設定部34は、実績の高い負荷グループと比べて、実績の低い負荷グループに早い通知タイミングを設定する。   Moreover, in the power consumption management apparatus according to the embodiment of the present invention, the setting unit 34 sets an earlier notification timing for a load group with a lower track record than for a load group with a higher track record.

このような構成により、たとえば、要請に応じる可能性が低い負荷グループからの応答の内容を確認した上で、要請に応じる可能性が高い負荷グループへの要請の内容を決定することができるため、電力消費に関する全体的な要請をより確実に満たすことができる。   With such a configuration, for example, after confirming the content of a response from a load group that is unlikely to respond to the request, it is possible to determine the content of the request to the load group that is highly likely to respond to the request. The overall demand for power consumption can be met more reliably.

また、本発明の実施の形態に係る電力消費管理装置では、設定部34は、実績の低い負荷グループと比べて、実績の高い負荷グループに遅い通知タイミングを設定する。   Moreover, in the power consumption management apparatus according to the embodiment of the present invention, the setting unit 34 sets a later notification timing in a load group with a higher track record than in a load group with a lower track record.

このような構成により、たとえば、要請に応じる可能性が低い負荷グループからの応答の内容を確認した上で、要請に応じる可能性が高い負荷グループへの要請の内容を決定することができるため、電力消費に関する全体的な要請をより確実に満たすことができる。   With such a configuration, for example, after confirming the content of a response from a load group that is unlikely to respond to the request, it is possible to determine the content of the request to the load group that is highly likely to respond to the request. The overall demand for power consumption can be met more reliably.

また、本発明の実施の形態に係る電力消費管理システムでは、負荷グループのメンバーは、需要家4である。   In the power consumption management system according to the embodiment of the present invention, the load group member is the customer 4.

このような構成により、需要家4のグループごとに適切な通知タイミングを設定することができる。   With such a configuration, an appropriate notification timing can be set for each group of customers 4.

また、本発明の実施の形態に係る電力消費管理システムでは、複数の負荷グループは、要請に対して自動で応答する負荷グループCと、要請に対して自動で応答しない負荷グループAおよび負荷グループBとを含む。   In the power consumption management system according to the embodiment of the present invention, the plurality of load groups include a load group C that automatically responds to a request, and a load group A and a load group B that do not automatically respond to a request. Including.

このような構成により、たとえば、要請に対して自動で応答する装置を備える需要家4と、当該装置を備えない需要家4とが混在する環境において各需要家4を適切に分類することができる。   With such a configuration, for example, each customer 4 can be appropriately classified in an environment in which a customer 4 including a device that automatically responds to a request and a customer 4 that does not include the device are mixed. .

また、本発明の実施の形態に係る電力消費管理装置では、設定部34は、複数の負荷グループのうち、負荷グループCに最も遅い通知タイミングを設定する。   In the power consumption management device according to the embodiment of the present invention, the setting unit 34 sets the latest notification timing to the load group C among the plurality of load groups.

このような構成により、たとえば、応答の早い負荷グループCより先に応答の遅い他の負荷グループに要請を行うことができるため、要請の対象期間の開始より前により多くの応答を取得することができる。   With such a configuration, for example, since it is possible to make a request to another load group having a slow response before the load group C having a fast response, more responses can be obtained before the start of the target period of the request. it can.

また、本発明の実施の形態に係る電力消費管理装置では、通知部33は、電力消費に関する全体的な要請と負荷グループC以外の負荷グループからの応答によって推定される内容との差分に基づく要請を負荷グループCに対応する専用端末装置15に通知する。   Moreover, in the power consumption management apparatus according to the embodiment of the present invention, the notification unit 33 requests based on the difference between the overall request regarding power consumption and the content estimated by the response from the load group other than the load group C. To the dedicated terminal device 15 corresponding to the load group C.

このような構成により、たとえば、要請の実施および早い応答を期待しにくいが多数である他の負荷グループによって要請をある程度満たしておき、要請の確実な実施および早い応答を期待できるが少数である負荷グループCによって不足分を充足する優れた電力管理を行うことができる。また、負荷グループCへの要請を、全体的な要請を満たすための調整として活用することができる。   With such a configuration, for example, it is difficult to expect a request to be implemented and a quick response, but a large number of other load groups can satisfy the request to some extent, and a reliable implementation of the request and a quick response can be expected, but a few loads. Group C can perform excellent power management to satisfy the shortage. Moreover, the request | requirement to the load group C can be utilized as an adjustment for satisfying the overall request.

また、本発明の実施の形態に係る電力消費管理装置では、対価算出部38は、要請に応じることの対価を算出する。対価算出部38は、他の負荷グループと比べて、負荷グループCの対価を高く算出する。   In the power consumption management apparatus according to the embodiment of the present invention, the consideration calculation unit 38 calculates the consideration for responding to the request. The consideration calculation unit 38 calculates the consideration of the load group C higher than that of other load groups.

このような構成により、たとえば、要請に対して自動で応答する装置を導入するように、負荷グループC以外のグループに属する需要家4を促すことができる。   With such a configuration, for example, the customers 4 belonging to groups other than the load group C can be encouraged to introduce a device that automatically responds to a request.

また、本発明の実施の形態に係る電力消費管理装置では、分類部36は、機器13または需要家4を複数の負荷グループのいずれかに分類する。分類部36は、応答時間が得られていない機器13または需要家4を、通知タイミングが最も早い負荷グループに分類する。   In the power consumption management apparatus according to the embodiment of the present invention, the classification unit 36 classifies the device 13 or the customer 4 into any one of a plurality of load groups. The classification unit 36 classifies the device 13 or the customer 4 for which no response time is obtained into a load group with the earliest notification timing.

このような構成により、たとえば、過去に応答時間が得られていない機器13または需要家4からの応答を、要請の対象期間の開始までにより確実に取得することができる。   With such a configuration, for example, a response from the device 13 or the customer 4 whose response time has not been obtained in the past can be more reliably acquired until the start of the request target period.

上記実施の形態は、すべての点で例示であって制限的なものではないと考えられるべきである。本発明の範囲は、上記説明ではなく特許請求の範囲によって示され、特許請求の範囲と均等の意味および範囲内でのすべての変更が含まれることが意図される。   The above embodiment should be considered as illustrative in all points and not restrictive. The scope of the present invention is defined by the terms of the claims, rather than the description above, and is intended to include any modifications within the scope and meaning equivalent to the terms of the claims.

以上の説明は、以下に付記する特徴を含む。   The above description includes the following features.

[付記1]
電力消費に関する要請を対応の端末装置に通知してから前記要請に応じるか否かに関する応答を取得するまでの応答時間に基づいて分類された複数の負荷グループについて、前記要請の通知タイミングとして各前記負荷グループに異なる通知タイミングを設定する設定部と、
前記設定部によって設定された前記通知タイミングに従って前記要請を前記端末装置に通知する通知部とを備え、
前記要請は、DR(Demand Respons)の要請であり、
前記応答は、前記DRに参加するか否かを示す応答である、電力消費管理装置。
[Appendix 1]
For each of the plurality of load groups classified based on response time from notification of a request regarding power consumption to a corresponding terminal device until acquisition of a response regarding whether to respond to the request, A setting unit for setting different notification timings for load groups;
A notification unit that notifies the terminal device of the request according to the notification timing set by the setting unit;
The request is a DR (Demand Response) request,
The power consumption management apparatus, wherein the response is a response indicating whether to participate in the DR.

1 小売事業者
2 アグリゲータ
3 電力需要施設
4,4A,4B,4C 需要家
8 ネットワーク
11 小売事業装置
12 電力消費管理装置
13 機器
14 汎用端末装置
15 専用端末装置
31 取得部
32 処理部
33 通知部
34 設定部
35 要請部
36 分類部
37 記憶部
38 対価算出部
101 電力消費管理システム
DESCRIPTION OF SYMBOLS 1 Retailer 2 Aggregator 3 Electric power demand facility 4,4A, 4B, 4C Consumer 8 Network 11 Retail business apparatus 12 Power consumption management apparatus 13 Equipment 14 General-purpose terminal apparatus 15 Dedicated terminal apparatus 31 Acquisition part 32 Processing part 33 Notification part 34 Setting unit 35 Request unit 36 Classification unit 37 Storage unit 38 Consideration calculation unit 101 Power consumption management system

Claims (14)

電力消費に関する要請を対応の端末装置に通知してから前記要請に応じるか否かに関する応答を取得するまでの応答時間に基づいて分類された複数の負荷グループについて、前記要請の通知タイミングとして各前記負荷グループに異なる通知タイミングを設定する設定部と、
前記設定部によって設定された前記通知タイミングに従って前記要請を前記端末装置に通知する通知部とを備える、電力消費管理装置。
For each of the plurality of load groups classified based on response time from notification of a request regarding power consumption to a corresponding terminal device until acquisition of a response regarding whether to respond to the request, A setting unit for setting different notification timings for load groups;
A power consumption management device comprising: a notification unit that notifies the terminal device of the request according to the notification timing set by the setting unit.
前記電力消費管理装置は、さらに、
前記負荷グループからの前記応答によって推定される内容に基づいて、他の前記負荷グループへの新たな前記要請の内容を決定する要請部を備える、請求項1に記載の電力消費管理装置。
The power consumption management device further includes:
The power consumption management apparatus according to claim 1, further comprising: a request unit that determines a content of the new request to another load group based on content estimated by the response from the load group.
前記設定部は、前記応答時間の小さい前記負荷グループと比べて、前記応答時間の大きい前記負荷グループに早い前記通知タイミングを設定する、請求項1または請求項2に記載の電力消費管理装置。   The power consumption management apparatus according to claim 1, wherein the setting unit sets the notification timing earlier for the load group having a large response time than the load group having a small response time. 前記設定部は、前記応答時間の大きい前記負荷グループと比べて、前記応答時間の小さい前記負荷グループに遅い前記通知タイミングを設定する、請求項1から請求項3のいずれか1項に記載の電力消費管理装置。   4. The power according to claim 1, wherein the setting unit sets the notification timing that is late for the load group having a small response time compared to the load group having a large response time. 5. Consumption management device. 前記負荷グループは、前記応答時間および前記要請に応じた実績に基づいて分類される、請求項1から請求項4のいずれか1項に記載の電力消費管理装置。   The power consumption management device according to any one of claims 1 to 4, wherein the load group is classified based on the response time and a record according to the request. 前記設定部は、前記実績の高い前記負荷グループと比べて、前記実績の低い負荷グループに早い前記通知タイミングを設定する、請求項5に記載の電力消費管理装置。   The power consumption management apparatus according to claim 5, wherein the setting unit sets the notification timing earlier for a load group with a low result compared to the load group with a high result. 前記設定部は、前記実績の低い前記負荷グループと比べて、前記実績の高い負荷グループに遅い前記通知タイミングを設定する、請求項5または請求項6に記載の電力消費管理装置。   7. The power consumption management device according to claim 5, wherein the setting unit sets the notification timing that is late for the load group having a high track record as compared with the load group having a low track record. 前記負荷グループのメンバーは、電力需要家である、請求項1から請求項7のいずれか1項に記載の電力消費管理装置。   The power consumption management apparatus according to any one of claims 1 to 7, wherein a member of the load group is a power consumer. 前記複数の負荷グループは、前記要請に対して自動で応答する自動応答グループと、前記要請に対して自動で応答しないグループとを含む、請求項1から請求項8のいずれか1項に記載の電力消費管理装置。   9. The load group according to claim 1, wherein the plurality of load groups include an automatic response group that automatically responds to the request and a group that does not automatically respond to the request. Power consumption management device. 前記設定部は、前記複数の負荷グループのうち、前記自動応答グループに最も遅い前記通知タイミングを設定する、請求項9に記載の電力消費管理装置。   The power consumption management device according to claim 9, wherein the setting unit sets the latest notification timing to the automatic response group among the plurality of load groups. 前記通知部は、前記電力消費に関する全体的な要請と前記自動応答グループ以外の前記負荷グループからの前記応答によって推定される内容との差分に基づく要請を前記自動応答グループに対応する端末装置に通知する、請求項10に記載の電力消費管理装置。   The notification unit notifies a terminal device corresponding to the automatic response group of a request based on a difference between an overall request regarding the power consumption and a content estimated by the response from the load group other than the automatic response group. The power consumption management device according to claim 10. 前記電力消費管理装置は、さらに、
前記要請に応じることの対価を算出する対価算出部を備え、
前記対価算出部は、他の前記負荷グループと比べて、前記自動応答グループの前記対価を高く算出する、請求項10または請求項11に記載の電力消費管理装置。
The power consumption management device further includes:
A consideration calculation unit for calculating the consideration for responding to the request;
The power consumption management apparatus according to claim 10 or 11, wherein the consideration calculation unit calculates the consideration of the automatic response group to be higher than that of the other load group.
前記電力消費管理装置は、さらに、
機器または電力需要家を前記複数の負荷グループのいずれかに分類する分類部を備え、
前記分類部は、前記応答時間が得られていない機器または電力需要家を、前記通知タイミングが最も早い前記負荷グループに分類する、請求項1から請求項12のいずれか1項に記載の電力消費管理装置。
The power consumption management device further includes:
A classification unit for classifying a device or a power consumer into one of the plurality of load groups,
The power consumption according to any one of claims 1 to 12, wherein the classifying unit classifies a device or a power consumer for which the response time is not obtained into the load group having the earliest notification timing. Management device.
電力消費管理装置において用いられる電力消費管理プログラムであって、コンピュータを、
電力消費に関する要請を対応の端末装置に通知してから前記要請に応じるか否かに関する応答を取得するまでの応答時間に基づいて分類された複数の負荷グループについて、前記要請の通知タイミングとして各前記負荷グループに異なる通知タイミング設定する設定部と、
前記設定部によって設定された前記通知タイミングに従って前記要請を前記端末装置に通知する通知部として機能させるための、電力消費管理プログラム。
A power consumption management program used in a power consumption management apparatus, comprising:
For each of the plurality of load groups classified based on response time from notification of a request regarding power consumption to a corresponding terminal device until acquisition of a response regarding whether to respond to the request, A setting unit for setting different notification timings for load groups;
The power consumption management program for functioning as a notification part which notifies the said request | requirement to the said terminal device according to the said notification timing set by the said setting part.
JP2016029893A 2016-02-19 2016-02-19 Power consumption management device and power consumption management program Active JP6686510B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2016029893A JP6686510B2 (en) 2016-02-19 2016-02-19 Power consumption management device and power consumption management program
JP2020053759A JP6904450B2 (en) 2016-02-19 2020-03-25 Power consumption management device and power consumption management program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016029893A JP6686510B2 (en) 2016-02-19 2016-02-19 Power consumption management device and power consumption management program

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2020053759A Division JP6904450B2 (en) 2016-02-19 2020-03-25 Power consumption management device and power consumption management program

Publications (2)

Publication Number Publication Date
JP2017146898A true JP2017146898A (en) 2017-08-24
JP6686510B2 JP6686510B2 (en) 2020-04-22

Family

ID=59683198

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016029893A Active JP6686510B2 (en) 2016-02-19 2016-02-19 Power consumption management device and power consumption management program

Country Status (1)

Country Link
JP (1) JP6686510B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020026476A1 (en) * 2018-07-31 2020-02-06 株式会社日立製作所 Database building system and database building method
GB2612982A (en) * 2021-11-17 2023-05-24 Swanbarton Ltd An asset controller for selective operation of assets

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2378483A1 (en) * 2010-04-19 2011-10-19 General Electric Company System and method for scheduling demand response events in a network
JP2017034775A (en) * 2015-07-29 2017-02-09 富士電機株式会社 Power demand guidance system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2378483A1 (en) * 2010-04-19 2011-10-19 General Electric Company System and method for scheduling demand response events in a network
JP2011229374A (en) * 2010-04-19 2011-11-10 General Electric Co <Ge> System and method for scheduling demand response events in network
JP2017034775A (en) * 2015-07-29 2017-02-09 富士電機株式会社 Power demand guidance system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020026476A1 (en) * 2018-07-31 2020-02-06 株式会社日立製作所 Database building system and database building method
GB2612982A (en) * 2021-11-17 2023-05-24 Swanbarton Ltd An asset controller for selective operation of assets

Also Published As

Publication number Publication date
JP6686510B2 (en) 2020-04-22

Similar Documents

Publication Publication Date Title
US9329650B2 (en) Customer-centric demand side management for utilities
KR101345521B1 (en) Controlled restart of electrical service within a utility service area
JP6653153B2 (en) Power demand adjustment plan management device
JP6697080B2 (en) Power management device, power management method, and power management system
JP2011062075A (en) Method and system for demand response in power distribution network
JP6414456B2 (en) Consumer device, power consumption management device, power consumption management system, power consumption management method, and power consumption management program
JPWO2013157030A1 (en) Power monitoring apparatus and power monitoring system
KR101456318B1 (en) Load control method for load contol apparatus
JP6516156B2 (en) Relay management device, storage system
WO2018221330A1 (en) Management method and management device
EP3703221A1 (en) Energy management device, energy management system, and energy management method
US10268171B2 (en) Demand response control result presentation apparatus
US20160161965A1 (en) Open automated demand response (openadr) server
JP2017146898A (en) Power consumption management device and power consumption management program
JPWO2017009909A1 (en) Control device, control system, control method, and program
JP2016015850A (en) Power consumption management device, power consumption management system, power consumption management method and power consumption management program
JP6904450B2 (en) Power consumption management device and power consumption management program
JP6464954B2 (en) Consumer device, power consumption management method, and power consumption management program
JP6332291B2 (en) Power consumption management device and power consumption management program
JP6919347B2 (en) Display processing device, display processing method and display processing program
JP6405996B2 (en) Consumer device, power consumption management device, power consumption management system, power consumption management method, and power consumption management program
JP2016019427A (en) Power managing device and power monitoring control device
WO2017018530A1 (en) Information processing system, information processing method, and program
Narimani et al. Autonomous demand response in heterogeneous smart grid topologies
JP2018207709A (en) Display processor, display processing method and display processing program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180821

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190621

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190806

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200303

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200316

R150 Certificate of patent or registration of utility model

Ref document number: 6686510

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250