JP2017133238A JP2016014095A JP2016014095A JP2017133238A JP 2017133238 A JP2017133238 A JP 2017133238A JP 2016014095 A JP2016014095 A JP 2016014095A JP 2016014095 A JP2016014095 A JP 2016014095A JP 2017133238 A JP2017133238 A JP 2017133238A
Authority
JP
Japan
Prior art keywords
concrete
panel body
support
panel
precast concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2016014095A
Other languages
Japanese (ja)
Other versions
JP6100409B1 (en
Inventor
真澄 三瓶
Masumi Sanpei
真澄 三瓶
肇 棚橋
Hajime Tanahashi
棚橋  肇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maruei Concrete Industry Co Ltd
Original Assignee
Maruei Concrete Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maruei Concrete Industry Co Ltd filed Critical Maruei Concrete Industry Co Ltd
Priority to JP2016014095A priority Critical patent/JP6100409B1/en
Application granted granted Critical
Publication of JP6100409B1 publication Critical patent/JP6100409B1/en
Publication of JP2017133238A publication Critical patent/JP2017133238A/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

PROBLEM TO BE SOLVED: To efficiently perform work of arranging a precast concrete panel at the next stage on a precast concrete panel with a space for concrete packing installed, for construction of a concrete wall.SOLUTION: Panel bodies 1 are stacked. In the panel body, a precast concrete panel 2 arranged on a front face of a concrete wall and a precast concrete panel 2 arranged on a rear face are arranged in parallel, and a supporting tool 3 and a receiving tool 4 are extended and attached between the precast concrete panels, and the precast concrete panels on both sides are connected, and the width is the same as that of the concrete wall. In the supporting tool, a supporting pole 11 is provided to project at the upper part of the precast concrete panel, and the receiving tool is provided with a receiving part 12 that abuts on the tip of the supporting pole of the panel body at the lower stage. As the receiving tool is placed on the supporting tool, the panel body is supported while being floated. A projecting length of the supporting pole and a vertical position of the receiving part are decided so that a space between the precast concrete panels of the panel bodies at the upper and lower stages can be a concrete packing space 13.SELECTED DRAWING: Figure 8

Description

本発明は、コンクリート壁を構築する技術に関する。   The present invention relates to a technique for constructing a concrete wall.

コンクリート壁を構築する場合、構築現場の施工能率を高めるため、永久型枠を使用する工法が知られている。この工法では、永久型枠にするコンクリートパネルを工場で製作する。構築現場で、永久型枠のプレキャストコンクリートパネルを対面して配置する。向かい合うプレキャストコンクリートパネルの間の空間、コンクリート中込め空間に生コンクリートを打ち込む。このコンクリートが硬化すると、現場打ちの中込めコンクリートとその両側のプレキャストコンクリートパネルが密着して連結する。両側のプレキャストコンクリートパネルと現場打ち中込めコンクリートが一体化してコンクリート壁が構築される。   In the case of constructing a concrete wall, a construction method using a permanent mold is known in order to increase the construction efficiency at the construction site. In this method, a concrete panel to be made into a permanent form is manufactured at a factory. At the construction site, permanent form precast concrete panels are placed facing each other. Ready-mixed concrete is poured into the space between the precast concrete panels facing each other. When this concrete is hardened, the in-place concrete and the precast concrete panels on both sides of the concrete are in close contact with each other. A concrete wall is constructed by integrating precast concrete panels on both sides and in-situ concrete.

コンクリート壁は、表面側と裏面側でそれぞれ複数枚のプレキャストコンクリートパネルを用いる。プレキャストコンクリートパネルは、方形状にし、複数枚を左右方向に突き合わせて配列する。また、上下方向に突き合わせて配列する。
有害放射線の遮蔽力が求められる原子力関連施設では、鋼板コンクリート壁を用いることがある。鋼板コンクリート壁は、永久型枠を鋼板にする。鋼板は、方形状にし、壁の表面側と裏面側でそれぞれ複数枚を左右方向に突き合わせて溶接する。
The concrete wall uses a plurality of precast concrete panels on the front side and the back side. A precast concrete panel is made into a square shape, and a plurality of sheets are aligned in the left-right direction. Moreover, it arranges | matches up and down.
In nuclear facilities where harmful radiation shielding is required, steel concrete walls may be used. A steel plate concrete wall uses a permanent form as a steel plate. A steel plate is made into a square shape, and a plurality of sheets are butted in the left-right direction on the front surface side and the back surface side of the wall and welded.

特開2012−107381号公報JP 2012-107381 A

[課 題]
上記のようなコンクリート壁においては、表面側でも、裏面側でも、左右に隣り合うプレキャストコンクリートパネルは、左右側面同士が結合していない。接触しているだけである。上下に隣り合うプレキャストコンクリートパネルも、上下側面同士が接触しているだけで結合していない。コンクリート壁は、プレキャストコンクリートパネルの左右側面位置と上下側面位置では、その他の位置よりプレキャストコンクリートパネル分、厚さが薄くなって断面積が少なくなる。その結果、機械的強度や放射線遮蔽力が低くなる。
[Task]
In the concrete wall as described above, the left and right side surfaces of the precast concrete panels adjacent to the left and right sides are not joined to each other on the front side and the back side. They are only touching. The precast concrete panels that are adjacent to each other in the upper and lower sides are not joined because the upper and lower side surfaces are in contact with each other. The concrete wall has a smaller thickness and a smaller cross-sectional area at the left and right lateral positions and the upper and lower lateral positions of the precast concrete panel than the other positions. As a result, mechanical strength and radiation shielding power are lowered.

この解決策として、左右上下に隣り合うプレキャストコンクリートパネルの間に隙間を設けて隙間にコンクリートを詰める方法が考えられる。
プレキャストコンクリートパネルは、左右方向又は上下方向に配列するに当たり、左側面と右側面との間又は上側面と下側面との間に、コンクリートを詰める隙間を設ける。この隙間は、向かい合うプレキャストコンクリートパネルの間のコンクリート中込め空間に連通する。そして、生コンクリートは、コンクリート中込め空間に打ち込むに当たり、プレキャストコンクリートパネルの左右側面間の隙間、上下側面間の隙間にも流入させて充填する。コンクリート中込め空間のみならず隙間にも詰め込む。このコンクリートが硬化すると、現場打ちコンクリートは、プレキャストコンクリートパネルの内面のみならず左右側面、上下側面にも密着して結合する。コンクリート壁は、プレキャストコンクリートパネルの左右側面間の部分、上下側面間の部分で、その他の部分より、現場打ちコンクリートが厚くなって、プレキャストコンクリートパネルがない分、現場打ちコンクリートの断面積が多くなる。機械的強度や放射線遮蔽力が低くならない。
As a solution to this, a method is conceivable in which a gap is provided between precast concrete panels that are adjacent to each other on the left, right, top, and bottom, and concrete is filled in the gap.
When the precast concrete panel is arranged in the left-right direction or the up-down direction, a gap for filling concrete is provided between the left side surface and the right side surface or between the upper side surface and the lower side surface. This gap communicates with the concrete embedding space between the precast concrete panels facing each other. Then, when the ready-mixed concrete is driven into the concrete-filled space, it flows into and fills the gap between the left and right side surfaces of the precast concrete panel and the gap between the upper and lower side surfaces. Packs not only in concrete space but also in gaps. When the concrete is hardened, the cast-in-place concrete is bonded not only to the inner surface of the precast concrete panel but also to the left and right side surfaces and the upper and lower side surfaces. The concrete wall is the part between the left and right sides of the precast concrete panel, the part between the top and bottom sides, and the cast-in-place concrete is thicker than the other parts, and the cross-sectional area of the cast-in-place concrete increases because there is no precast concrete panel . Mechanical strength and radiation shielding power are not lowered.

この解決策を実行するには、プレキャストコンクリートパネルの上に次段のプレキャストコンクリートパネルを、コンクリートを詰め込む隙間を設けて配置する必要がある。プレキャストコンクリートパネルを宙に浮かせて配置する作業を能率良く行う課題がある。   In order to implement this solution, it is necessary to arrange the precast concrete panel in the next stage on the precast concrete panel with a gap for filling the concrete. There is a problem of efficiently performing the work of placing the precast concrete panel in the air.

[着 想]
1)パネル体の積み重ね
コンクリート壁の構築では、工場で製作したパネル体を構築現場で積み重ねることにする。
パネル体は、コンクリート壁の表面に配する表面側のプレキャストコンクリートパネルと裏面に配する裏面側のプレキャストコンクリートパネルを対面して並列し、その間に支え具と受け具を掛け渡して取り付ける。支え具と受け具の取付けで両側のプレキャストコンクリートパネルを連結して結合する。パネル体は、幅をコンクリート壁の厚さと同一にする。
[Idea]
1) Stacking panel bodies When building concrete walls, panel bodies manufactured at the factory are stacked at the construction site.
In the panel body, the precast concrete panel on the front surface side arranged on the surface of the concrete wall and the precast concrete panel on the back surface side arranged on the back surface face each other, and a support member and a receiving tool are installed between them. Connect the precast concrete panels on both sides by attaching the support and the receiver. The panel body has the same width as the concrete wall.

パネル体では、支え具と受け具は、両側のプレキャストコンクリートパネルの連結具の外に、パネル体の積み重ね具にする。
支え具は、支え棒をプレキャストコンクリートパネルの上方又は下方に、即ち、上下方向に突出して設ける。受け具は、下段又は上段のパネル体の支え棒の上端又は下端、即ち、先端に当たる受け部を設ける。支え具と受け具は、一方の上に他方が載ることによってパネル体を浮かせて支える構成にする。支え棒の突出長さと受け部の上下位置は、パネル体を積み重ねたとき、上下段のパネル体のプレキャストコンクリートパネル間の隙間が、コンクリートを詰め込むのに適した幅になるように定める。隙間は、コンクリート詰込み空間にする。隙間の幅は、例えば、4〜6cm位にする。
In the panel body, the support member and the receiving member are stacked on the panel body in addition to the joints of the precast concrete panels on both sides.
The support is provided with a support bar protruding above or below the precast concrete panel, that is, in the vertical direction. The receiving device is provided with a receiving portion that hits the upper end or lower end of the support bar of the lower or upper panel body, that is, the tip. The support member and the support member are configured to float and support the panel body by placing the other on one. The protruding length of the support bar and the vertical position of the receiving portion are determined such that when the panel bodies are stacked, the gap between the precast concrete panels of the upper and lower panel bodies has a width suitable for filling concrete. The gap should be a concrete-filled space. The width of the gap is, for example, about 4 to 6 cm.

構築現場では、下段のパネル体の上に次の上段のパネル体を配置し、下段のパネル体の支え具又は受け具の上に上段のパネル体の受け具又は支え具を載せる。上段のパネル体は、下段のパネル体の上に支え具と受け具で浮かせて支持する。すると、上段のパネル体は、下段のパネル体の上に予め設定した幅の隙間を置いて配置される。上下段のパネル体は、表面側と裏面側でそれぞれ上下のプレキャストコンクリートパネル間に予め設定した幅の隙間、コンクリート詰込み空間が形成される。   At the construction site, the next upper panel body is placed on the lower panel body, and the upper panel body support or support is placed on the lower panel body support or support. The upper panel body is supported by floating on the lower panel body with a supporter and a receiver. Then, the upper panel body is disposed on the lower panel body with a gap having a preset width. In the upper and lower panel bodies, a gap having a preset width and a concrete filling space are formed between the upper and lower precast concrete panels on the front surface side and the back surface side, respectively.

2)パネル体の左右方向の位置決め
パネル体は、下段のパネル体の上に載せる際、左右方向の位置を決める左右位置決め機構を設ける。
支え具と受け具は、一方の上に他方が載ったとき左右方向の相対移動を止める位置決め片を設ける。
支え具の支え棒の先端は、位置決め片を左右に設ける。左右の位置決め片は、その間に受け具の受け部が嵌り込む構成にする。受け具の受け部が左右の位置決め片の間に嵌り込むと左右方向位置が決まる。又は、受け具の受け部は、位置決め片を左右に設ける。左右の位置決め片は、その間に支え具の支え棒の先端が嵌り込む構成にする。支え具の支え棒の先端が左右の位置決め片の間に嵌り込むと左右方向位置が決まる。
2) Positioning of the panel body in the left-right direction When the panel body is placed on the lower panel body, a left-right positioning mechanism for determining the position in the left-right direction is provided.
The supporting member and the receiving member are provided with a positioning piece for stopping the relative movement in the left-right direction when the other is placed on one.
Positioning pieces are provided at the left and right ends of the support rods of the support tools. The left and right positioning pieces are configured so that the receiving portions of the receiving tool are fitted therebetween. When the receiving part of the receiver is fitted between the left and right positioning pieces, the position in the left-right direction is determined. Or the receiving part of a receiving tool provides a positioning piece in right and left. The left and right positioning pieces are configured such that the tips of the support bars of the support members are fitted between them. When the tip of the support rod of the support is fitted between the left and right positioning pieces, the position in the left-right direction is determined.

更に、左右の位置決め片は、逆ハの字形又はハの字形に外開きにする。左右の位置決め片の間に受け具の受け部又は支え具の支え棒先端が入り易くなる。   Further, the left and right positioning pieces are opened outward in a reverse C-shape or C-shape. The receiving portion of the receiving member or the support rod tip of the supporting member easily enters between the left and right positioning pieces.

3)パネル体の前後方向の位置決め
パネル体は、下段のパネル体の上に載せる際、幅方向、前後方向の位置を決める前後位置決め機構を設ける。
支え具の支え棒は、先端側が上段又は下段のパネル体内に進入する長さにする。進入部のある支え棒は、表面側と裏面側に設ける。表面側の支え棒の進入部と裏面側の支え棒の進入部が上段又は下段のパネル体の表面側と裏面側のプレキャストコンクリートパネルの間に嵌り込む構成にする。パネル体は、その表面側と裏面側のプレキャストコンクリートパネルの間に下段のパネル体の表面側と裏面側の支え棒の進入部が嵌り込むと前後方向の位置が決まる。又は、パネル体は、その表面側と裏面側の支え棒の進入部が下段のパネル体の表面側と裏面側のプレキャストコンクリートパネルの間に嵌り込むと前後方向の位置が決まる。
3) Positioning of the panel body in the front-rear direction When the panel body is placed on the lower panel body, a front-rear positioning mechanism that determines the position in the width direction and the front-rear direction is provided.
The support rod of the support tool has such a length that the tip end side enters the upper or lower panel body. Support rods having an entry portion are provided on the front side and the back side. The front-side support bar entry portion and the back-side support rod entry portion are configured to fit between the front-side and back-side precast concrete panels of the upper or lower panel body. The front and rear direction positions of the panel body are determined when the front-side and back-side support bars of the lower panel body are fitted between the front-side and back-side precast concrete panels. Alternatively, the front and back positions of the panel body are determined when the front and back support bars of the panel body are fitted between the front and back side precast concrete panels of the lower panel body.

更に、表面側の支え棒の進入部と裏面側の支え棒の進入部は、先端部の外面をハの字形又は逆ハの字形の斜面にする。先端部を先狭にする。上段又は下段のパネル体内に進入し易くなる。   Further, the front-side support bar entry portion and the back-side support rod entry portion have an outer surface of the tip portion formed into a C-shaped or inverted-C-shaped slope. The tip is tapered. It becomes easy to enter the upper or lower panel body.

4)コンクリート壁の構築
下段のパネル体の上に上段のパネル体を載せる。すると、上段のパネル体は、下段のパネル体の上に予め設定した幅の隙間、コンクリート詰込み空間を置いて配置される。
上下段のパネル体は、表面側と裏面側で、それぞれ、上下のプレキャストコンクリートパネルの外面にコンクリート詰込み空間を跨いて型枠板を取り付ける。型枠板は、コンクリート詰込み空間の外側の開口を閉鎖する。
上段のパネル体は、表面側と裏面側のプレキャストコンクリートパネルの間の中込めコンクリート空間に生コンクリートを打ち込む。生コンクリートは、下段のパネル体の中込コンクリート上面に流下し、上下段のパネル体の表面側と裏面側のコンクリート詰込み空間に充満し、上段のパネル体の中込めコンクリート空間に充満する。
上段のパネル体に現場打ちしたコンクリートは、養生して硬化する。コンクリートの硬化後、型枠板を取り外す。
パネル体を上下段に積み重ねてコンクリート壁を構築する。
4) Construction of concrete wall Place the upper panel on the lower panel. Then, the upper-stage panel body is disposed with a gap having a preset width and a concrete filling space placed on the lower-stage panel body.
The upper and lower panel bodies are respectively attached to the outer surfaces of the upper and lower precast concrete panels across the concrete filling space on the front side and the back side. The formwork plate closes the opening outside the concrete filling space.
The upper panel body drives the ready-mixed concrete into the interstitial concrete space between the front-side and back-side precast concrete panels. The ready-mixed concrete flows down to the upper surface of the embedded concrete in the lower panel body, fills the concrete-filled spaces on the front and back sides of the upper and lower panel bodies, and fills the embedded concrete space in the upper panel body.
The concrete cast on the upper panel body is cured and hardened. After the concrete has hardened, remove the form plate.
A concrete wall is constructed by stacking panels up and down.

更に、上段のパネル体の現場打ちコンクリートの硬化後、前回と同様に、パネル体の積み重ね施工を行う。即ち、その上に次段のパネル体を載せる。型枠板を取り付ける。生コンクリートを打ち込む。現場打ちコンクリートを硬化する。型枠板を取り外す。
パネル体の積み重ね施工を繰り返して、コンクリート壁を構築する。
Furthermore, after the in-situ concrete of the upper panel body is hardened, the panel body is stacked as before. That is, the next-stage panel body is placed thereon. Install the formwork plate. Drive in ready-mixed concrete. Harden cast-in-place concrete. Remove the formwork plate.
Build a concrete wall by repeatedly stacking panels.

また、コンクリート壁が鉄筋コンクリート壁であるときには、プレキャストコンクリートパネルは鉄筋コンクリートパネルにする。また、現場打ちコンクリートは鉄筋コンクリートにする。即ち、パネル体内に、コンクリート打込み前に、鉄筋を配置する。   When the concrete wall is a reinforced concrete wall, the precast concrete panel is a reinforced concrete panel. The cast-in-place concrete will be reinforced concrete. That is, the reinforcing bars are placed in the panel body before the concrete is placed.

1.コンクリート壁を構築するために構築現場で積み重ねるパネル体であって、
パネル体は、コンクリート壁の表面に配する表面側のプレキャストコンクリートパネルと裏面に配する裏面側のプレキャストコンクリートパネルを対面して並列し、その間に支え具と受け具を掛け渡して取り付け、支え具と受け具の取付けで両側のプレキャストコンクリートパネルを連結して結合し、幅をコンクリート壁の厚さと同一にし、
支え具は、支え棒をプレキャストコンクリートパネルの上方又は下方に突出して設け、
受け具は、下段又は上段のパネル体の支え棒の先端に当たる受け部を設け、
支え具と受け具は、一方の上に他方が載ることによってパネル体を浮かせて支える構成にし、
支え棒の突出長さと受け部の上下位置は、パネル体を積み重ねたとき、上下段のパネル体のプレキャストコンクリートパネル間の隙間が、コンクリートを詰め込むのに適した幅になるように定め、隙間をコンクリート詰込み空間にする構成にしていることを特徴とするコンクリート壁構築用のパネル体。
2.上記1のコンクリート壁構築用のパネル体において、
パネル体は、下段のパネル体の上に載せる際、左右方向の位置を決める左右位置決め機構を設け、
左右位置決め機構では、支え具の支え棒の先端又は受け具の受け部に位置決め片を左右に設け、左右の位置決め片の間に受け具の受け部又は支え具の支え棒の先端が嵌り込んで左右方向位置が決まる構成にしていることを特徴とする。
3.上記2のコンクリート壁構築用のパネル体において、
左右の位置決め片は、逆ハの字形又はハの字形に外開きにしていることを特徴とする。
4.上記1、2又は3のコンクリート壁構築用のパネル体において、
パネル体は、下段のパネル体の上に載せる際、幅方向、前後方向の位置を決める前後位置決め機構を設け、
前後位置決め機構では、支え具の支え棒は先端側が上段又は下段のパネル体内に進入する長さにし、進入部のある支え棒を表面側と裏面側に設け、表面側の支え棒の進入部と裏面側の支え棒の進入部が上段又は下段のパネル体の表面側と裏面側のプレキャストコンクリートパネルの間に嵌り込んで前後方向位置が決まる構成にしていることを特徴とする。
5.上記4のコンクリート壁構築用のパネル体において、
表面側の支え棒の進入部と裏面側の支え棒の進入部は、先端部の外面をハの字形又は逆ハの字形の斜面にし、先端部を先狭にしていることを特徴とする。
6.上記1〜5のいずれかのパネル体を用いるコンクリート壁の構築法であって、
下段のパネル体の上に上段のパネル体を載せて支え具と受け具の一方の上に他方を載せ、上段のパネル体を下段のパネル体の上にコンクリート詰込み空間を置いて配置し、
上下段のパネル体は、表面側と裏面側で、それぞれ、上下のプレキャストコンクリートパネルの外面にコンクリート詰込み空間を跨いて型枠板を取り付け、型枠板でコンクリート詰込み空間の外側の開口を閉鎖し、
上段のパネル体は、表面側と裏面側のプレキャストコンクリートパネルの間の中込めコンクリート空間に生コンクリートを打ち込み、
生コンクリートは、下段のパネル体の中込コンクリート上面に流下させ、上下段のパネル体の表面側と裏面側のコンクリート詰込み空間に充填し、上段のパネル体の中込めコンクリート空間に充填し、
上段のパネル体に現場打ちしたコンクリートは、養生して硬化し、硬化後、型枠板を取り外し、
パネル体を上下段に積み重ねてコンクリート壁を構築することを特徴とするコンクリート壁の構築法。
7.上記6のコンクリート壁の構築法において、
上段のパネル体の現場打ちコンクリートの硬化後、前回と同様に、その上に次段のパネル体を載せ、型枠板を取り付け、生コンクリートを打ち込み、現場打ちコンクリートを硬化し、型枠板を取り外し、
パネル体の積み重ねを繰り返して、コンクリート壁を構築することを特徴とする。
8.上記6又は7のコンクリート壁の構築法において、
プレキャストコンクリートパネルは鉄筋コンクリートパネルにし、
パネル体内に、コンクリート打込み前に、鉄筋を配置し、現場打ちコンクリートは鉄筋コンクリートにすることを特徴とする。
1. A panel body stacked on the construction site to construct a concrete wall,
The panel body has a precast concrete panel on the surface side arranged on the surface of the concrete wall and a precast concrete panel on the back side arranged on the back side facing each other, and a support member and a support member are installed between them. And connecting the precast concrete panels on both sides with the mounting of the receiver, the width is the same as the thickness of the concrete wall,
The support is provided with a support bar protruding above or below the precast concrete panel,
The receiver is provided with a receiving portion that hits the tip of the support bar of the lower or upper panel body,
The support and receiver are configured to float and support the panel body by placing the other on one side,
The protruding length of the support bar and the vertical position of the receiving part are determined so that when the panel bodies are stacked, the gap between the precast concrete panels of the upper and lower panel bodies has a width suitable for filling concrete. A panel body for building a concrete wall, characterized in that it is made into a concrete filling space.
2. In the panel body for building a concrete wall according to 1 above,
The panel body is provided with a left and right positioning mechanism that determines the position in the left and right direction when placed on the lower panel body,
In the left-right positioning mechanism, positioning pieces are provided on the left and right of the tip of the support bar of the support or the receiving part of the support, and the tip of the support of the support or the support bar of the support is fitted between the left and right positioning pieces The configuration is such that the position in the left-right direction is determined.
3. In the panel body for concrete wall construction of 2 above,
The left and right positioning pieces are characterized by being outwardly opened in an inverted C shape or C shape.
4). In the panel body for the construction of the above-mentioned 1, 2, or 3 concrete walls,
When the panel body is placed on the lower panel body, it is provided with a longitudinal positioning mechanism that determines the position in the width direction and the longitudinal direction,
In the front-rear positioning mechanism, the support rod of the support tool has a length that the front end side enters into the upper or lower panel body, and support rods with entry portions are provided on the front side and the back side, and the front side support rod entry portion and The back-side support bar entry portion is fitted between the upper-side or lower-side panel body surface side and the back-side precast concrete panel to determine the position in the front-rear direction.
5. In the panel body for concrete wall construction of 4 above,
The front-side support bar entry part and the back-side support bar entry part are characterized in that the outer surface of the tip part is formed into a C-shaped or reverse-shaped slope and the tip part is tapered.
6). A method for constructing a concrete wall using the panel body according to any one of 1 to 5 above,
Place the upper panel body on the lower panel body, place the other on one of the support and the receiver, place the upper panel body on the lower panel body with a concrete-filled space,
The upper and lower panel bodies are attached to the outer surfaces of the upper and lower precast concrete panels on the front and back sides, respectively, by attaching a formwork plate across the concrete filling space and opening the outside of the concrete filling space with the formwork plate. Closed,
The upper panel body is driven by ready-mixed concrete into the interstitial concrete space between the precast concrete panels on the front and back sides.
The ready-mixed concrete flows down to the upper surface of the inner concrete of the lower panel body, fills the concrete filling space on the front and back sides of the upper and lower panel bodies, fills the inner concrete space of the upper panel body,
The concrete cast in place on the upper panel body is cured and hardened, and after hardening, the form plate is removed,
A concrete wall construction method characterized in that a concrete wall is constructed by stacking panel bodies in upper and lower stages.
7). In the construction method of the concrete wall of 6 above,
After hardening the cast-in-place concrete of the upper panel, place the next-stage panel on it, attach the formwork plate, drive in the ready-mixed concrete, harden the cast-in-place concrete, removal,
A concrete wall is constructed by repeating the stacking of panel bodies.
8). In the construction method of the concrete wall of 6 or 7 above,
Precast concrete panels are reinforced concrete panels,
Reinforcing bars are placed in the panel before placing concrete, and the on-site concrete is reinforced concrete.

コンクリート壁を構築するに当たり、プレキャストコンクリートパネルの上に次段のプレキャストコンクリートパネルを、コンクリートを詰め込む隙間を設けて配置する作業を能率良く行うことができる。   In constructing the concrete wall, it is possible to efficiently perform the work of arranging the next-stage precast concrete panel on the precast concrete panel with a gap for filling the concrete.

本発明の実施形態におけるコンクリート壁の構築に用いるパネル体の正面図。The front view of the panel body used for construction of the concrete wall in the embodiment of the present invention. 図1のA−A線断面拡大図。FIG. 2 is an enlarged sectional view taken along line AA in FIG. 1. 図1のB−B線断面拡大図。FIG. 3 is an enlarged cross-sectional view taken along line BB in FIG. 1. 図1のC−C線断面拡大図。The CC sectional view enlarged view of FIG. 同パネル体の平面図。The top view of the panel body. 図5のD−D線断面図。The DD sectional view taken on the line of FIG. 同パネル体を積み重ねた状態の正面図。The front view of the state which accumulated the panel body. 図7のE−E線断面図。EE sectional view taken on the line of FIG. 同コンクリート壁の構築時に第1段のパネル体を施工した状態の正面図。The front view of the state which constructed the 1st step panel body at the time of construction of the concrete wall. 図9のF−F線断面拡大図。FIG. 10 is an enlarged sectional view taken along line FF in FIG. 9. 第2段のパネル体を施工した状態の正面図。The front view of the state which constructed the panel body of the 2nd step. 図11のG−G線断面拡大図。FIG. 12 is an enlarged sectional view taken along line GG in FIG. 11. 第3段のパネル体を施工した状態の正面図。The front view of the state which constructed the panel body of the 3rd step. 図13のH−H線断面図。FIG. 14 is a sectional view taken along line HH in FIG. 13. 同コンクリート壁の正面図。The front view of the concrete wall. 図15のI−I線断面図。The II sectional view taken on the line of FIG.

[パネル体の構成]
実施形態のコンクリート壁の構築に用いるパネル体1は、図1〜図6に示すように、構築予定のコンクリート壁の表面に配する表面側のプレキャストコンクリートパネル2と裏面に配する裏面側のプレキャストコンクリートパネル2の2枚を対面して並列し、その間に支え具3と受け具4をそれぞれ掛け渡して取り付けている。支え具3と受け具4の取付けで表面側と裏面側のプレキャストコンクリートパネル2を連結して結合している。両側のプレキャストコンクリートパネル2の間の空間は、コンクリート中込め空間5にしている。パネル体1は、前後方向の寸法、幅を構築予定のコンクリート壁の厚さと同一にしている。
[Configuration of panel body]
As shown in FIGS. 1 to 6, the panel body 1 used for the construction of the concrete wall of the embodiment is a precast concrete panel 2 on the surface side arranged on the surface of the concrete wall to be constructed and a precast on the back side arranged on the back surface. Two pieces of the concrete panel 2 face each other and are juxtaposed, and a support member 3 and a support member 4 are spanned and attached therebetween. The precast concrete panels 2 on the front side and the back side are connected and connected by attaching the support 3 and the support 4. The space between the precast concrete panels 2 on both sides is a concrete-filled space 5. The panel body 1 has the same longitudinal dimension and width as the concrete wall thickness to be constructed.

表面側と裏面側のプレキャストコンクリートパネル2は、横長の長方形状にし、同一の形状寸法にしている。プレキャストコンクリートパネル2は、内面の上下左右の稜線部を面取り面にしている。内部には、図示しないが、鉄筋を埋没している。鉄筋コンクリートパネルにしている。実施例では、パネル体1の縦、横、幅の寸法は100×300×60cmにしている。プレキャストコンクリートパネル2の厚さは10cmにしている。   The precast concrete panels 2 on the front surface side and the back surface side have a horizontally long rectangular shape and have the same shape and size. The precast concrete panel 2 has chamfered upper, lower, left and right ridge lines on the inner surface. Although not shown, a reinforcing bar is buried inside. Reinforced concrete panels are used. In the embodiment, the vertical, horizontal, and width dimensions of the panel body 1 are 100 × 300 × 60 cm. The thickness of the precast concrete panel 2 is 10 cm.

支え具3と受け具4は、両側のプレキャストコンクリートパネル2の連結具の外に、パネル体1の積み重ね具にしている。
支え具3は、パネル体1の上部に配置し、支え棒11をプレキャストコンクリートパネル2の上方に突出して設けている。支え棒11は、表面側と裏面側にそれぞれ設けている。受け具4は、パネル体1の下部に配置し、受け部12を支え棒11の真下位置、下段パネル体の支え棒11の上端に当たる位置に設けている。受け部12は、表面側と裏面側にそれぞれ設けている。上下に配置した支え具3と受け具4は、パネル体1の左部と右部にそれぞれ設けている。パネル体1は、支え具3の支え棒11と受け具4の受け部12をそれぞれ前後左右の4個所に配置している。図7と図8に示すように、下段パネル体の支え具3の上に上段パネル体の受け具4が載ることによって、上段パネル体1を下段パネル体1の上に浮かせて支える構成にしている。
The support 3 and the support 4 are used as a stacking tool for the panel body 1 in addition to the connecting tool for the precast concrete panels 2 on both sides.
The support 3 is arranged on the upper part of the panel body 1 and is provided with a support bar 11 protruding above the precast concrete panel 2. The support rods 11 are provided on the front surface side and the back surface side, respectively. The support 4 is disposed at the lower part of the panel body 1, and the receiving portion 12 is provided at a position directly below the support bar 11 and a position corresponding to the upper end of the support bar 11 of the lower panel body. The receiving part 12 is provided on the front surface side and the back surface side, respectively. The support member 3 and the support member 4 disposed above and below are provided on the left and right parts of the panel body 1, respectively. In the panel body 1, the support bar 11 of the support member 3 and the receiving part 12 of the support member 4 are arranged at four positions on the front, rear, left, and right, respectively. As shown in FIGS. 7 and 8, the upper panel body 1 is floated and supported on the lower panel body 1 by placing the upper panel body support 4 on the lower panel body support 3. Yes.

支え棒11の突出長さと受け部12の上下位置は、パネル体1を積み重ねたとき、上下段のパネル体のプレキャストコンクリートパネル2間の隙間13がコンクリートを詰め込むのに適した幅になるように定めている。隙間13は、コンクリート詰込み空間13にしている。実施例では、隙間、コンクリート詰込み空間13の幅は5cmにしている。プレキャストコンクリートパネル2の厚さの半分にしている。   The protruding length of the support bar 11 and the vertical position of the receiving portion 12 are such that when the panel body 1 is stacked, the gap 13 between the precast concrete panels 2 of the upper and lower panel bodies has a width suitable for filling concrete. It has established. The gap 13 is a concrete filling space 13. In the embodiment, the gap and the width of the concrete filling space 13 are 5 cm. The thickness of the precast concrete panel 2 is half.

パネル体1は、下段のパネル体1の上に載せる際、下段のパネル体1の真上位置に配置する。真上位置に配置し易くするため、パネル体1の左右方向の位置を決める左右位置決め機構と、パネル体1の幅方向、前後方向の位置を決める前後位置決め機構を設けている。   When the panel body 1 is placed on the lower panel body 1, the panel body 1 is disposed at a position directly above the lower panel body 1. In order to facilitate placement at the position directly above, a left / right positioning mechanism that determines the position of the panel body 1 in the left / right direction and a front / rear positioning mechanism that determines the position of the panel body 1 in the width direction and the front / rear direction are provided.

左右位置決め機構は、図1〜図3に示すように、支え具の支え棒11の上端に位置決め片16を左右に設けている。左右の位置決め片16の間に受け具の受け部12が嵌り込むと、受け具4の左右方向位置、パネル体1の左右方向位置が決まる構成にしている。左右の位置決め片16は、逆ハの字形に外開きにしている。左右の位置決め片16の間に受け具の受け部12が入り易くしている。   As shown in FIGS. 1 to 3, the left-right positioning mechanism is provided with positioning pieces 16 on the left and right at the upper end of the support bar 11 of the support. When the receiving part 12 of the receiving member is fitted between the left and right positioning pieces 16, the horizontal position of the receiving member 4 and the horizontal position of the panel body 1 are determined. The left and right positioning pieces 16 are outwardly opened in an inverted C shape. The receiving portion 12 of the receiver is easily inserted between the left and right positioning pieces 16.

前後位置決め機構は、図7と図8に示すように、支え具の表面側と裏面側の支え棒11を、その上端側が上段のパネル体1内に進入する長さにしている。表面側と裏面側の支え棒11の進入部が上段のパネル体の表面側と裏面側のプレキャストコンクリートパネル2の間に嵌り込むと、パネル体1の前後方向位置が決まる構成にしている。支え具の表面側と裏面側の支え棒11の進入部は、図2と図3に示すように、上端部の外面をハの字形の斜面17にしている。上端部を先狭にしている。上段のパネル体1内に進入し易くしている。   As shown in FIGS. 7 and 8, the front-rear positioning mechanism is configured such that the support bars 11 on the front surface side and the back surface side of the support member have such a length that the upper end side enters into the upper panel body 1. When the front-side and back-side support bars 11 are fitted between the front-side and back-side precast concrete panels 2 of the upper panel body, the front-rear direction position of the panel body 1 is determined. As shown in FIG. 2 and FIG. 3, the front part and the back part of the support bar 11 in which the support member 11 has an upper surface formed with a C-shaped slope 17. The upper end is tapered. It is easy to enter the upper panel body 1.

支え具3は、図1〜図3に示すように、概略H形状の金具にし、主材料のみぞ形鋼をH形状に溶接している。表面側と裏面側の支え棒11は、それぞれ、みぞ形鋼にし、みぞ形鋼の上端に平鋼を水平に溶接している。表面側と裏面側の支え棒11のみぞ形鋼は、それぞれ、下部を表面側と裏面側のプレキャストコンクリートパネル2の内面にボルト21で固定している。表面側と裏面側のプレキャストコンクリートパネル2は、それぞれ、内面にボルト21用のネジ穴をインサートによって設けている。表面側と裏面側の支え棒11は、それぞれ、外面を表面側と裏面側のプレキャストコンクリートパネル2の内面と同一面内に配置している。左右の位置決め片16は、支え棒11のみぞ形鋼の上端の左右に平鋼を逆ハの字形に外開きに溶接している。   As shown in FIGS. 1 to 3, the support 3 is a substantially H-shaped metal fitting, and the main material groove steel is welded to the H shape. The support bars 11 on the front surface side and the back surface side are each formed into a grooved steel, and a flat steel is horizontally welded to the upper end of the grooved steel. The lower surface of the front and back side support rods 11 is fixed to the inner surface of the precast concrete panel 2 on the front side and the back side with bolts 21. Each of the precast concrete panels 2 on the front side and the back side is provided with screw holes for bolts 21 on the inner surface by inserts. The support bars 11 on the front surface side and the back surface side are arranged with their outer surfaces in the same plane as the inner surfaces of the precast concrete panels 2 on the front surface side and the back surface side, respectively. The left and right positioning pieces 16 are formed by welding flat steel to the left and right of the upper end of the grooved steel of the support bar 11 so as to open outward in a reverse C shape.

受け具4は、図1〜図3に示すように、棒形状の金具にし、主材料をみぞ形鋼にしている。表面側と裏面側の受け部12は、それぞれ、受け具4のみぞ形鋼の表面側と裏面側の端部にしている。受け具4のみぞ形鋼は、両端にそれぞれ平鋼を溶接している。両端の平鋼は、それぞれ、表面側と裏面側のプレキャストコンクリートパネル2の内面にボルト22で固定している。表面側と裏面側のプレキャストコンクリートパネル2は、それぞれ、内面にボルト22用のネジ穴をインサートによって設けている。
なお、表面側と裏面側のプレキャストコンクリートパネル2の間には、受け具4と同様な棒形状の金具を補強連結材26として取り付けている。また、間隔保持材のセパレータ27を取り付けている。
As shown in FIGS. 1 to 3, the support 4 is a rod-shaped metal fitting, and the main material is a grooved steel. The front surface side and the back surface side receiving portions 12 are provided at the end portions on the front surface side and the back surface side of the grooved steel 4 respectively. Flat steel is welded to both ends of the receiving steel 4 grooved steel. The flat steel bars at both ends are fixed to the inner surfaces of the precast concrete panels 2 on the front surface side and the back surface side by bolts 22 respectively. Each of the precast concrete panels 2 on the front surface side and the back surface side is provided with screw holes for bolts 22 on the inner surfaces by inserts.
In addition, a bar-shaped metal fitting similar to the support 4 is attached as a reinforcing connecting member 26 between the precast concrete panels 2 on the front surface side and the back surface side. In addition, a separator 27 of a spacing member is attached.

[パネル体の使用法、コンクリート壁の構築法]
パネル体1は、工場で製作する。そして、コンクリート壁の構築現場に運搬する。
コンクリート壁の構築位置には、図9と図10に示すように、構築面31上に第1段のパネル体1を施工する。
構築面31上には、パネル体の支え具の支え棒11の突出部に相当する支え台32を支え棒11と同様に前後左右に配置する。第1段のパネル体1は、支え台32の上方に保持して下降する。第1段のパネル体1内には、前後左右の支え台32の進入部を進入させる。第1段のパネル体1は、受け具の各受け部12をそれぞれ支え台32の上に載せる。すると、第1段のパネル体1は、構築面31上に予め設定した幅の隙間13を置いて配置される。第1段のパネル体1は、表面側と裏面側で、それぞれ、プレキャストコンクリートパネル2と構築面31との間に横長のコンクリート詰込み空間13が形成される。表面側と裏面側の横長のコンクリート詰込み空間13は、第1段のパネル体のコンクリート中込め空間5に連通する。
[Usage of panel body, construction method of concrete wall]
The panel body 1 is manufactured at a factory. And it transports to the construction site of a concrete wall.
As shown in FIGS. 9 and 10, the first-stage panel body 1 is constructed on the construction surface 31 at the construction position of the concrete wall.
On the construction surface 31, the support bases 32 corresponding to the protruding portions of the support bars 11 of the panel body support tools are arranged in the front, rear, left and right like the support bars 11. The first-stage panel body 1 descends while being held above the support base 32. In the first-stage panel body 1, the front and rear left and right support bases 32 are inserted. The first-stage panel body 1 places each receiving portion 12 of the receiving device on a support base 32. Then, the first-stage panel body 1 is arranged on the construction surface 31 with a gap 13 having a preset width. In the first-stage panel body 1, a horizontally long concrete filling space 13 is formed between the precast concrete panel 2 and the construction surface 31 on the front surface side and the back surface side, respectively. The horizontally long concrete filling space 13 on the front surface side and the back surface side communicates with the concrete embedding space 5 of the first-stage panel body.

構築面31上に配置した第1段のパネル体1の左側又は右側には、次の第1段パネル体1を同様に配置する。左右の第1段パネル体1の間には、予め設定した幅の隙間33を設ける。左右の第1段パネル体1は、表面側と裏面側で、それぞれ、左右のプレキャストコンクリートパネル2の間に縦長のコンクリート詰込み空間33が形成される。表面側と裏面側の縦長のコンクリート詰込み空間33は、第1段のパネル体のコンクリート中込め空間5に連通する。   On the left or right side of the first-stage panel body 1 arranged on the construction surface 31, the next first-stage panel body 1 is similarly arranged. A gap 33 having a preset width is provided between the left and right first-stage panel bodies 1. In the left and right first-stage panel bodies 1, a vertically long concrete filling space 33 is formed between the left and right precast concrete panels 2 on the front surface side and the back surface side, respectively. The vertically long concrete filling space 33 on the front surface side and the back surface side communicates with the concrete embedding space 5 of the first-stage panel body.

第1段のパネル体の配置後、左右の第1段パネル体1は、表面側と裏面側で、それぞれ、左右のプレキャストコンクリートパネル2の外面に縦長のコンクリート詰込み空間33を跨いて縦長の型枠板34をボルト35で取り付ける。表面側と裏面側のプレキャストコンクリートパネル2は、それぞれ、外面にボルト35用のネジ穴をインサートによって設けている。縦長の型枠板34は、縦長のコンクリート詰込み空間33の外側の開口を閉鎖する。   After the placement of the first-stage panel body, the left and right first-stage panel bodies 1 are vertically elongated across the vertically long concrete filling space 33 on the outer surfaces of the left and right precast concrete panels 2 on the front surface side and the back surface side, respectively. The formwork plate 34 is attached with bolts 35. The front-side and back-side precast concrete panels 2 are each provided with screw holes for bolts 35 on the outer surfaces by inserts. The vertically long formwork plate 34 closes the opening outside the vertically long concrete filling space 33.

また、第1段のパネル体1は、表面側と裏面側で、それぞれ、プレキャストコンクリートパネル2の外面に横長のコンクリート詰込み空間13の外側の開口を塞いて横長の型枠板36をボルト37で取り付ける。表面側と裏面側のプレキャストコンクリートパネル2は、それぞれ、外面にボルト37用のネジ穴をインサートによって設けている。   Moreover, the panel body 1 of the 1st step | paragraph is obstruct | occluded the laterally long formwork board 36 with the volt | bolt 37 by closing the opening of the outer side of the horizontally long concrete filling space 13 in the outer surface of the precast concrete panel 2, respectively. Attach with. Each of the precast concrete panels 2 on the front side and the back side is provided with screw holes for bolts 37 on the outer surfaces by inserts.

第1段のパネル体の左右の縦長のコンクリート詰込み空間33と下側の横長のコンクリート詰込み空間13の外側開口を閉鎖した後、第1段のパネル体1は、その上側からコンクリート中込め空間5に生コンクリートを打ち込む。生コンクリートは、構築面31に流下し、表面側と裏面側の横長の型枠板36の間の空間とコンクリート中込め空間5及び表面側と裏面側の縦長の型枠板34の間の空間に充満する。表面側と裏面側の横長のコンクリート詰込み空間13には、生コンクリートが詰め込まれる。また、表面側と裏面側の縦長のコンクリート詰込み空間33には、生コンクリートが詰め込まれる。生コンクリートの打込み高さは、第1段のパネル体のプレキャストコンクリートパネル2上側面より少し低くする。なお、第1段のパネル体1内には、図示しないが、コンクリート打込み前に、鉄筋を配置する。
第1段の現場打ちコンクリート38は、養生して硬化する。現場打ちコンクリート38の硬化後、縦長と横長の型枠板34、36は取り外す。
After closing the outer openings of the left and right vertically long concrete filling spaces 33 and the lower horizontally long concrete filling space 13 of the first stage panel body, the first stage panel body 1 is inserted into the concrete from the upper side. Put concrete in space 5. The ready-mixed concrete flows down to the construction surface 31, and the space between the horizontally long formwork plate 36 on the front surface side and the back surface side, the space 5 in the concrete, and the space between the vertically long formwork plate 34 on the front surface side and the back surface side. To charge. Ready-mixed concrete is filled in the horizontally long concrete filling space 13 on the front surface side and the back surface side. In addition, ready-mixed concrete is packed in the vertically long concrete filling space 33 on the front side and the back side. The height of the ready-mixed concrete is slightly lower than the upper side of the precast concrete panel 2 of the first-stage panel body. Although not shown in the drawing, the reinforcing bars are arranged in the first-stage panel body 1 before placing concrete.
The first-stage cast-in-place concrete 38 is cured and hardened. After the cast-in-place concrete 38 is hardened, the longitudinal and lateral formwork plates 34 and 36 are removed.

第1段のパネル体の施工後、図11と図12に示すように、第1段のパネル体1の上に第2段のパネル体1を施工する。
第2段のパネル体1は、第1段のパネル体1の上方に保持して下降する。第2段のパネル体1内には、第1段のパネル体1の上に突出した前後左右の支え具の支え棒11の進入部を進入させる。第2段のパネル体の受け具の前後左右の受け部12をそれぞれ第1段のパネル体の支え具の支え棒11の上に載せる。すると、第2段のパネル体1は、第1段のパネル体1の真上位置に予め設定した幅の隙間13を置いて配置される。第1段と第2段のパネル体1は、表面側と裏面側で、それぞれ、上下のプレキャストコンクリートパネル2の間に横長のコンクリート詰込み空間13が形成される。表面側と裏面側の横長のコンクリート詰込み空間13は、第2段のパネル体のコンクリート中込め空間5に連通する。
After the construction of the first-stage panel body, the second-stage panel body 1 is constructed on the first-stage panel body 1 as shown in FIGS.
The second stage panel body 1 is lowered while being held above the first stage panel body 1. In the second-stage panel body 1, an entrance portion of the support bar 11 of the front, rear, left and right support members protruding above the first-stage panel body 1 is entered. The front, rear, left, and right receiving portions 12 of the second-stage panel body support are respectively placed on the support rods 11 of the first-stage panel body support. Then, the second-stage panel body 1 is arranged with a gap 13 having a preset width at a position directly above the first-stage panel body 1. In the first-stage and second-stage panel bodies 1, a horizontally-long concrete filling space 13 is formed between the upper and lower precast concrete panels 2 on the front surface side and the back surface side, respectively. The horizontally long concrete filling space 13 on the front surface side and the back surface side communicates with the concrete embedding space 5 of the second-stage panel body.

第1段のパネル体1の上に配置した第2段のパネル体1の左側又は右側には、次の第2段パネル体1を同様に配置する。左右の第2段パネル体1の間には、予め設定した幅の隙間33が形成される。左右の第2段パネル体1は、表面側と裏面側で、それぞれ、左右のプレキャストコンクリートパネル2の間に縦長のコンクリート詰込み空間33が形成される。表面側と裏面側の縦長のコンクリート詰込み空間33は、第2段のパネル体のコンクリート中込め空間5に連通する。   On the left or right side of the second-stage panel body 1 disposed on the first-stage panel body 1, the next second-stage panel body 1 is similarly disposed. A gap 33 having a preset width is formed between the left and right second-stage panel bodies 1. In the left and right second-stage panel bodies 1, a vertically long concrete filling space 33 is formed between the left and right precast concrete panels 2 on the front surface side and the back surface side, respectively. The vertically long concrete filling space 33 on the front surface side and the back surface side communicates with the concrete filling space 5 of the second-stage panel body.

第2段のパネル体の配置後、第2段の左右のパネル体1は、表面側と裏面側で、それぞれ、左右のプレキャストコンクリートパネルの外面に縦長のコンクリート詰込み空間33を跨いて縦長の型枠板34をボルト35で取り付ける。縦長の型枠板34は、縦長のコンクリート詰込み空間33の外側の開口を閉鎖する。   After the arrangement of the second-stage panel body, the left and right panel bodies 1 of the second stage are vertically long and straddle the vertically long concrete filling space 33 on the outer surfaces of the left and right precast concrete panels, respectively. The formwork plate 34 is attached with bolts 35. The vertically long formwork plate 34 closes the opening outside the vertically long concrete filling space 33.

また、第1段と第2段のパネル体1は、表面側と裏面側で、それぞれ、上下のプレキャストコンクリートパネル2の外面に横長のコンクリート詰込み空間13を跨いて横長の型枠板36をボルト37で取り付ける。横長の型枠板36は、横長のコンクリート詰込み空間13の外側の開口を閉鎖する。   Moreover, the panel body 1 of the 1st step and the 2nd step has a horizontally long form plate 36 across the horizontally long concrete filling space 13 on the outer surface of the upper and lower precast concrete panels 2 on the front side and the back side, respectively. Install with bolts 37. The horizontally long formwork plate 36 closes the opening outside the horizontally long concrete filling space 13.

第2段のパネル体1の左右の縦長のコンクリート詰込み空間33と下側の横長のコンクリート詰込み空間13の外側開口を閉鎖した後、第2段のパネル体1は、その上側からコンクリート中込め空間5に生コンクリートを打ち込む。生コンクリートは、第1段の現場打ちコンクリート38の上面に流下し、第1段の現場打ちコンクリート38の上側部分の空間、表面側と裏面側の横長の型枠板36の間の空間と第2段のパネル体1のコンクリート中込め空間5及び表面側と裏面側の縦長の型枠板34の間の空間に充満する。表面側と裏面側の横長のコンクリート詰込み空間13には、生コンクリートが詰め込まれる。また、表面側と裏面側の縦長のコンクリート詰込み空間33には、生コンクリートが詰め込まれる。生コンクリートの打込み高さは、第2段のパネル体のプレキャストコンクリートパネル2上側面より少し低くする。なお、第2段のパネル体内には、図示しないが、コンクリート打込み前に、鉄筋を配置する。
第2段の現場打ちコンクリート38は、養生して硬化する。現場打ちコンクリート38の硬化後、縦長と横長の型枠板34、36を取り外す。
After closing the outer openings of the left and right vertically long concrete filling spaces 33 and the lower horizontally long concrete filling space 13 of the second stage panel body 1, the second stage panel body 1 is placed in the concrete from above. Put concrete into the storage space 5. The ready-mixed concrete flows down to the upper surface of the first-stage cast-in-place concrete 38, the space in the upper part of the first-stage cast-in-place concrete 38, the space between the front and back side long formwork plates 36, and the first. The concrete embedding space 5 of the two-stage panel body 1 and the space between the vertically long formwork plate 34 on the front surface side and the back surface side are filled. Ready-mixed concrete is filled in the horizontally long concrete filling space 13 on the front surface side and the back surface side. In addition, ready-mixed concrete is packed in the vertically long concrete filling space 33 on the front side and the back side. The height of the ready-mixed concrete is slightly lower than the upper side of the precast concrete panel 2 of the second-stage panel body. Although not shown in the figure, the reinforcing bars are placed in the second-stage panel body before placing the concrete.
The second-stage cast-in-place concrete 38 is cured and hardened. After the cast-in-place concrete 38 is hardened, the longitudinal and lateral formwork plates 34 and 36 are removed.

第2段のパネル体の施工後、図13と図14に示すように、第2段のパネル体1の上に第3段のパネル体1を施工する。
第3段のパネル体1は、第2段の前回と同様に、第2段のパネル体1の上に載せる。縦長と横長の型枠板34、36を取り付ける。鉄筋を配置する。生コンクリートを打ち込む。現場打ちコンクリート38を養生して硬化する。縦長と横長の型枠板34、36を取り外す。
After the construction of the second stage panel body, the third stage panel body 1 is constructed on the second stage panel body 1 as shown in FIGS. 13 and 14.
The third-stage panel body 1 is placed on the second-stage panel body 1 in the same manner as the second-stage previous panel. Vertically and horizontally long formwork plates 34 and 36 are attached. Place the rebar. Drive in ready-mixed concrete. The cast-in-place concrete 38 is cured and cured. Remove the vertically and horizontally long formwork plates 34 and 36.

パネル体1の積み重ね施工を繰り返して、鉄筋コンクリート壁41を構築する。鉄筋コンクリート壁41は、図15と図16に示すように、表面側と裏面側のプレキャストコンクリートパネル2と現場打ちコンクリート38が密着して結合し、下段と上段の現場打ちコンクリート38が密着して結合している。また、表面側と裏面側で、それぞれ、左右のプレキャストコンクリートパネル2の左右側面の間の部分、縦長のコンクリート詰込み空間33であった部分と、上下のプレキャストコンクリートパネル2の上下側面の間の部分、横長のコンクリート詰込み空間13であった部分には、現場打ちコンクリート38が詰め込まれている。現場打ちコンクリート38は、プレキャストコンクリートパネル2のない部分で、プレキャストコンクリートパネル2のある部分より、プレキャストコンクリートパネル2の厚さ分、厚くなっている。鉄筋コンクリート壁41は、プレキャストコンクリートパネル2のない部分の断面積がプレキャストコンクリートパネル2のある部分と同一になっている。   The reinforced concrete wall 41 is constructed by repeating the stacking construction of the panel body 1. As shown in FIGS. 15 and 16, the reinforced concrete wall 41 has the precast concrete panel 2 on the front side and the back side and the cast-in-place concrete 38 in close contact with each other, and the lower and upper cast-in-place concrete 38 in close contact with each other. doing. In addition, on the front side and the back side, respectively, the portion between the left and right side surfaces of the left and right precast concrete panels 2, the portion that was the vertically long concrete filling space 33, and the upper and lower side surfaces of the upper and lower precast concrete panels 2. The portion that was the horizontally long concrete filling space 13 is filled with cast-in-place concrete 38. The cast-in-place concrete 38 is thicker by the thickness of the precast concrete panel 2 than the portion where the precast concrete panel 2 is present, in a portion where the precast concrete panel 2 is not present. In the reinforced concrete wall 41, the cross-sectional area of the portion without the precast concrete panel 2 is the same as the portion with the precast concrete panel 2.

[変形例]
本発明は、上記の実施形態に限定されない。次のような変形が例示される。
1.上記の実施形態において、パネル体1は、支え具3を受け具4の上側に配置して支え具の支え棒11をプレキャストコンクリートパネル2の上方に突出しているが、支え具3を受け具4の下側に配置して支え具の支え棒11をプレキャストコンクリートパネル2の下方に突出する。
2.上記の実施形態において、
左右位置決め機構は、左右の位置決め片16を支え具の支え棒11の上端に設けているが、受け具の受け部12に設ける。
3.上記の実施形態において、コンクリート壁41は、鉄筋コンクリート壁にしているが、無筋のコンクリート壁にする。
4.上記の実施形態において、パネル体1の積み重ね施工を繰り返し、パネル体を3段以上の多数段に積み重ねてコンクリート壁を構築するが、パネル体を2段に積み重ねてコンクリート壁を構築する。
[Modification]
The present invention is not limited to the above embodiment. The following modifications are exemplified.
1. In the above-described embodiment, the panel body 1 is disposed above the support 3 and the support bar 11 of the support protrudes above the precast concrete panel 2. The support bar 11 of the support member is arranged below the precast concrete panel 2 by being arranged on the lower side.
2. In the above embodiment,
In the left and right positioning mechanism, the left and right positioning pieces 16 are provided at the upper end of the support bar 11 of the support, but are provided at the receiving portion 12 of the support.
3. In the above embodiment, the concrete wall 41 is a reinforced concrete wall, but is an unreinforced concrete wall.
4). In the above embodiment, the panel body 1 is repeatedly stacked, and the panel bodies are stacked in multiple stages of three or more to construct a concrete wall, but the panel bodies are stacked in two stages to construct a concrete wall.

本発明は、原子力関連施設の壁、建物の壁、防潮堤、津波を防ぐ壁、強風を防ぐ壁に利用することができる。   INDUSTRIAL APPLICABILITY The present invention can be used for a wall of a nuclear facility, a wall of a building, a seawall, a wall for preventing a tsunami, and a wall for preventing a strong wind.

1 パネル体
2 表面側と裏面側のプレキャストコンクリートパネル
3 支え具
4 受け具
5 コンクリート中込め空間
11 支え具の支え棒
12 受け具の受け部
13 隙間、横長のコンクリート詰込み空間
16 位置決め片
17 斜面
21 支え具固定用のボルト
22 受け具固定用のボルト
26 補強連結材
27 間隔保持材のセパレータ
31 構築面31
32 支え台
33 隙間、縦長のコンクリート詰込み空間
34 縦長の型枠板
35 縦長型枠板固定用のボルト
36 横長の型枠板
37 横長型枠板固定用のボルト
38 現場打ちコンクリート
41 鉄筋コンクリート壁
DESCRIPTION OF SYMBOLS 1 Panel body 2 Precast concrete panel 3 on the surface side and back side 3 Supporting tool 4 Receiving tool 5 Concrete insertion space 11 Supporting tool support bar 12 Receiving tool receiving part 13 Clearance, horizontally long concrete filling space 16 Positioning piece 17 Slope 21 Bolts for fixing a support member 22 Bolts for fixing a support member 26 Reinforcing connecting material 27 Separator 31 for spacing member 31 Construction surface 31
32 Supporting base 33 Gap, vertically long concrete filling space 34 Vertically shaped form plate 35 Bolts for fixing the vertically long form plate 36 Horizontally formed form plate 37 Bolts for fixing the horizontally long form plate 38 On-site concrete 41 Reinforced concrete wall

Claims (8)

コンクリート壁を構築するために積み重ねるパネル体であって、
パネル体は、コンクリート壁の表面に配する表面側のプレキャストコンクリートパネルと裏面に配する裏面側のプレキャストコンクリートパネルを対面して並列し、その間に支え具と受け具を掛け渡して取り付け、支え具と受け具の取付けで両側のプレキャストコンクリートパネルを連結して結合し、幅をコンクリート壁の厚さと同一にし、
支え具は、支え棒をプレキャストコンクリートパネルの上方又は下方に突出して設け、
受け具は、下段又は上段のパネル体の支え棒の先端に当たる受け部を設け、
支え具と受け具は、一方の上に他方が載ることによってパネル体を浮かせて支える構成にし、
支え棒の突出長さと受け部の上下位置は、パネル体を積み重ねたとき、上下段のパネル体のプレキャストコンクリートパネル間の隙間が、コンクリートを詰め込むのに適した幅になるように定め、隙間をコンクリート詰込み空間にする構成にしていることを特徴とするコンクリート壁構築用のパネル体。
A panel body stacked to build a concrete wall,
The panel body has a precast concrete panel on the surface side arranged on the surface of the concrete wall and a precast concrete panel on the back side arranged on the back side facing each other, and a support member and a support member are installed between them. And connecting the precast concrete panels on both sides with the mounting of the receiver, the width is the same as the thickness of the concrete wall,
The support is provided with a support bar protruding above or below the precast concrete panel,
The receiver is provided with a receiving portion that hits the tip of the support bar of the lower or upper panel body,
The support and receiver are configured to float and support the panel body by placing the other on one side,
The protruding length of the support bar and the vertical position of the receiving part are determined so that when the panel bodies are stacked, the gap between the precast concrete panels of the upper and lower panel bodies has a width suitable for filling concrete. A panel body for building a concrete wall, characterized in that it is made into a concrete filling space.
パネル体は、下段のパネル体の上に載せる際、左右方向の位置を決める左右位置決め機構を設け、
左右位置決め機構では、支え具の支え棒の先端又は受け具の受け部に位置決め片を左右に設け、左右の位置決め片の間に受け具の受け部又は支え具の支え棒の先端が嵌り込んで左右方向位置が決まる構成にしていることを特徴とする請求項1に記載のコンクリート壁構築用のパネル体。
The panel body is provided with a left and right positioning mechanism that determines the position in the left and right direction when placed on the lower panel body,
In the left-right positioning mechanism, positioning pieces are provided on the left and right of the tip of the support bar of the support or the receiving part of the support, and the tip of the support of the support or the support bar of the support is fitted between the left and right positioning pieces. The panel body for building a concrete wall according to claim 1, wherein the right and left direction position is determined.
左右の位置決め片は、逆ハの字形又はハの字形に外開きにしていることを特徴とする請求項2に記載のコンクリート壁構築用のパネル体。   The panel body for building a concrete wall according to claim 2, wherein the left and right positioning pieces are outwardly opened in an inverted C shape or C shape. パネル体は、下段のパネル体の上に載せる際、幅方向、前後方向の位置を決める前後位置決め機構を設け、
前後位置決め機構では、支え具の支え棒は先端側が上段又は下段のパネル体内に進入する長さにし、進入部のある支え棒を表面側と裏面側に設け、表面側の支え棒の進入部と裏面側の支え棒の進入部が上段又は下段のパネル体の表面側と裏面側のプレキャストコンクリートパネルの間に嵌り込んで前後方向位置が決まる構成にしていることを特徴とする請求項1、2又は3に記載のコンクリート壁構築用のパネル体。
When the panel body is placed on the lower panel body, it is provided with a longitudinal positioning mechanism that determines the position in the width direction and the longitudinal direction,
In the front-rear positioning mechanism, the support rod of the support tool has a length that the front end side enters into the upper or lower panel body, and support rods with entry portions are provided on the front side and the back side, and the front side support rod entry portion and The front-rear direction position is determined by fitting the back-side support bar intrusion portion between the front-side and back-side precast concrete panels of the upper or lower panel body. Or the panel body for concrete wall construction of 3.
表面側の支え棒の進入部と裏面側の支え棒の進入部は、先端部の外面をハの字形又は逆ハの字形の斜面にし、先端部を先狭にしていることを特徴とする請求項4に記載のコンクリート壁構築用のパネル体。   The front-side support bar entry portion and the back-side support rod entry portion are characterized in that the outer surface of the front end portion is a C-shaped or reverse C-shaped slope, and the front end portion is tapered. Item 5. A panel body for constructing a concrete wall according to Item 4. 請求項1〜5のいずれかに記載のパネル体を用いるコンクリート壁の構築法であって、
下段のパネル体の上に上段のパネル体を載せて支え具と受け具の一方の上に他方を載せ、上段のパネル体を下段のパネル体の上にコンクリート詰込み空間を置いて配置し、
上下段のパネル体は、表面側と裏面側で、それぞれ、上下のプレキャストコンクリートパネルの外面にコンクリート詰込み空間を跨いて型枠板を取り付け、型枠板でコンクリート詰込み空間の外側の開口を閉鎖し、
上段のパネル体は、表面側と裏面側のプレキャストコンクリートパネルの間の中込めコンクリート空間に生コンクリートを打ち込み、
生コンクリートは、下段のパネル体の中込コンクリート上面に流下させ、上下段のパネル体の表面側と裏面側のコンクリート詰込み空間に充填し、上段のパネル体の中込めコンクリート空間に充填し、
上段のパネル体に現場打ちしたコンクリートは、養生して硬化し、硬化後、型枠板を取り外し、
パネル体を上下段に積み重ねてコンクリート壁を構築することを特徴とするコンクリート壁の構築法。
A method for constructing a concrete wall using the panel body according to claim 1,
Place the upper panel body on the lower panel body, place the other on one of the support and the receiver, place the upper panel body on the lower panel body with a concrete-filled space,
The upper and lower panel bodies are attached to the outer surfaces of the upper and lower precast concrete panels on the front and back sides, respectively, by attaching a formwork plate across the concrete filling space and opening the outside of the concrete filling space with the formwork plate. Closed,
The upper panel body is driven by ready-mixed concrete into the interstitial concrete space between the precast concrete panels on the front and back sides.
The ready-mixed concrete flows down to the upper surface of the inner concrete of the lower panel body, fills the concrete filling space on the front and back sides of the upper and lower panel bodies, fills the inner concrete space of the upper panel body,
The concrete cast in place on the upper panel body is cured and hardened, and after hardening, the form plate is removed,
A concrete wall construction method characterized in that a concrete wall is constructed by stacking panel bodies in upper and lower stages.
上段のパネル体の現場打ちコンクリートの硬化後、前回と同様に、その上に次段のパネル体を載せ、型枠板を取り付け、生コンクリートを打ち込み、現場打ちコンクリートを硬化し、型枠板を取り外し、
パネル体の積み重ねを繰り返して、コンクリート壁を構築することを特徴とする請求項6に記載のコンクリート壁の構築法。
After hardening the cast-in-place concrete of the upper panel, place the next-stage panel on it, attach the formwork plate, drive in the ready-mixed concrete, harden the cast-in-place concrete, removal,
The method for constructing a concrete wall according to claim 6, wherein the concrete wall is constructed by repeating the stacking of the panel bodies.
プレキャストコンクリートパネルは鉄筋コンクリートパネルにし、
パネル体内に、コンクリート打込み前に、鉄筋を配置し、現場打ちコンクリートは鉄筋コンクリートにすることを特徴とする請求項6又は7に記載のコンクリート壁の構築法。
Precast concrete panels are reinforced concrete panels,
The method for constructing a concrete wall according to claim 6 or 7, wherein a reinforcing bar is arranged in the panel body before the concrete is placed, and the in-situ concrete is made of reinforced concrete.
JP2016014095A 2016-01-28 2016-01-28 Concrete wall construction Active JP6100409B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016014095A JP6100409B1 (en) 2016-01-28 2016-01-28 Concrete wall construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016014095A JP6100409B1 (en) 2016-01-28 2016-01-28 Concrete wall construction

Publications (2)

Publication Number Publication Date
JP6100409B1 JP6100409B1 (en) 2017-03-22
JP2017133238A true JP2017133238A (en) 2017-08-03

Family

ID=58363202

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016014095A Active JP6100409B1 (en) 2016-01-28 2016-01-28 Concrete wall construction

Country Status (1)

Country Link
JP (1) JP6100409B1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5744046A (en) * 1980-08-28 1982-03-12 Yamashita Jiyouji Erection of concrete wall
JPS58153842A (en) * 1982-03-10 1983-09-13 山下 譲二 Connector for constructing concrete wall
JPS59118948A (en) * 1982-12-24 1984-07-09 株式会社 岸ブロツク製作所 Production of plate member using assembled concrete block
JP2005188108A (en) * 2003-12-25 2005-07-14 Toshiyuki Tokida Separator and mold of mold material

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5744046A (en) * 1980-08-28 1982-03-12 Yamashita Jiyouji Erection of concrete wall
JPS58153842A (en) * 1982-03-10 1983-09-13 山下 譲二 Connector for constructing concrete wall
JPS59118948A (en) * 1982-12-24 1984-07-09 株式会社 岸ブロツク製作所 Production of plate member using assembled concrete block
JP2005188108A (en) * 2003-12-25 2005-07-14 Toshiyuki Tokida Separator and mold of mold material

Also Published As

Publication number Publication date
JP6100409B1 (en) 2017-03-22

Similar Documents

Publication Publication Date Title
JP2013159929A (en) Building foundation construction method and raised block for use in the same
JP2001295298A (en) Foundation for columnar structure and its work execution method
KR20150075437A (en) Joint structure of remodeling modular unit for seismic retrofitting and joint method of using it
JP2017096061A (en) Construction method of reinforced concrete beam, spacer-cum-permanent mold, and reinforced concrete beam
KR20150114299A (en) Apparatus for manufacturing and assembling reinforcing steel bar net and construction method of foundation reinforcement using the same
JP6100409B1 (en) Concrete wall construction
JP2016186166A (en) Concrete mold panel, concrete mold panel unit, concrete building frame structure, and concrete mold construction method
JP2007177492A (en) Pier reinforcing method
JP2011032684A (en) Lining structure and lining method
JP6543077B2 (en) Construction method of structure
JP2009046829A (en) Aseismatic reinforcing wall
JP5749620B2 (en) Seismic isolation method for existing buildings
JP6193843B2 (en) Wall structure
CN113417478A (en) Prefabricated post guiding device that takes one's place
JP2021004451A (en) Mold frame structure for installation type foundation, installation type foundation using the same and installation method thereof
JP7382557B1 (en) Inverted U-shaped disposable formwork for the rising foundation of a building
JP6261333B2 (en) Seismic reinforcement method
KR101389123B1 (en) Pile type protecting wall
JP2014114680A (en) Base-isolated building structure
JP6348631B1 (en) Embankment construction
JP5601505B2 (en) Damping beam consisting of precast formwork and construction method of damping beam
JP2001342639A (en) Buried form
JP2018044286A (en) Steel plate concrete structure, and construction method for the same
KR101650312B1 (en) Concrete retaining wall and method for manufacturing the same
JP4365820B2 (en) Pier reinforcement unit and bridge reinforcement structure

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170207

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170222

R150 Certificate of patent or registration of utility model

Ref document number: 6100409

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250