JP2016187833A - Continuous casting tundish and continuous casting method using the same - Google Patents

Continuous casting tundish and continuous casting method using the same Download PDF

Info

Publication number
JP2016187833A
JP2016187833A JP2015069943A JP2015069943A JP2016187833A JP 2016187833 A JP2016187833 A JP 2016187833A JP 2015069943 A JP2015069943 A JP 2015069943A JP 2015069943 A JP2015069943 A JP 2015069943A JP 2016187833 A JP2016187833 A JP 2016187833A
Authority
JP
Japan
Prior art keywords
runner
chamber
molten steel
tundish
injection chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2015069943A
Other languages
Japanese (ja)
Other versions
JP6454205B2 (en
Inventor
吉田 仁
Hitoshi Yoshida
仁 吉田
中岡 威博
Takehiro Nakaoka
威博 中岡
酒井 宏明
Hiroaki Sakai
宏明 酒井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kobe Steel Ltd
Original Assignee
Kobe Steel Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kobe Steel Ltd filed Critical Kobe Steel Ltd
Priority to JP2015069943A priority Critical patent/JP6454205B2/en
Publication of JP2016187833A publication Critical patent/JP2016187833A/en
Application granted granted Critical
Publication of JP6454205B2 publication Critical patent/JP6454205B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Continuous Casting (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a tundish that smoothly distributes molten steel.SOLUTION: A tundish 4 provided to a partition dam 15 to have a runner 16 from an injection chamber to a strand chamber 14 with the bottom 11 of the strand chamber 14 located below the lower end of the outlet 17 of the runner 16 to satisfy the following equation. 0.08≤D[m],d≤0.3[m],0.115≤(x+y)≤1[m],0.05≤y/x≤1,0≤y/x≤0.36,x≥0.5,B≤-0.7tanh(3.5A-2.3)+1.1(A=(x/x+y))(x/x+y))(x/x),B=y/x,y=d(1+y/x)-y)(D: equivalent circle diameter of a runner, d: vertical diameter of the runner,x:horizontal length of the runner,y: height of the runner,x: horizontal length of an injection chamber,y: distance between the outlet upper end of the runner and the bottom face of the injection chamber,x: inclination length of the injection chamber,y: inclination height of the injection chamber)SELECTED DRAWING: Figure 1

Description

本発明は、注入室とストランド室とを仕切る仕切堰に、注入室からストランド室へ溶鋼を流通させる湯道(湯道)が設けられた連続鋳造用のタンディッシュ、及びそのタンディッシュを用いた連続鋳造方法に関する。   The present invention uses a tundish for continuous casting in which a runner (runner) for circulating molten steel from the injection chamber to the strand chamber is provided in the partition weir that partitions the injection chamber and the strand chamber, and the tundish. The present invention relates to a continuous casting method.

従来より、連続鋳造設備では、転炉や二次精錬設備等から出鋼された溶鋼を取鍋によってタンディッシュまで搬送し、搬送された取鍋内の溶鋼をタンディッシュへ注入後、このタンディッシュから鋳型へ溶鋼を供給することで、溶鋼を連続的に鋳造している。
連続鋳造を効率よく操業を行うためには、例えばタンディッシュ内において、注入室からストランド室へ溶鋼をスムーズに流通させることが必要となる。
Conventionally, in continuous casting equipment, the molten steel produced from converters, secondary refining equipment, etc. is transported to the tundish using a ladle, and the molten steel in the ladle is poured into the tundish, and then this tundish is used. The molten steel is continuously cast by supplying molten steel to the mold.
In order to efficiently operate continuous casting, for example, it is necessary to smoothly distribute molten steel from the injection chamber to the strand chamber in the tundish.

このようなタンディッシュ内の溶鋼をスムーズに流通させるための手段として、特許文献1、2に開示されているものがある。
特許文献1は、注入室とストランド室とが仕切堰で仕切られ、この注入室とストランド室とを、仕切堰に設けられた湯道(孔)で繋いだタンディッシュが開示されている。
特許文献2は、注入室とストランド室が仕切堰で仕切られ、その仕切堰に設けられた湯道が底部で注入室とストランド室とを繋ぎ、さらに仕切堰に加熱装置を備えているタンディッシュにおいて、仕切堰に設けられた湯道が、ストランド室側に向かって下方を向くことが開示されている。
As means for smoothly circulating such molten steel in the tundish, there are those disclosed in Patent Documents 1 and 2.
Patent Document 1 discloses a tundish in which an injection chamber and a strand chamber are partitioned by a partition weir, and the injection chamber and the strand chamber are connected by a runner (hole) provided in the partition weir.
Patent Document 2 discloses a tundish in which an injection chamber and a strand chamber are partitioned by a partition weir, and a runner provided in the partition weir connects the injection chamber and the strand chamber at the bottom, and further includes a heating device in the partition weir. Is disclosed that the runner provided in the partition weir faces downward toward the strand chamber side.

特開2005−957号公報JP-A-2005-957 特開平5−104212号公報Japanese Patent Laid-Open No. 5-104212

ところで、操業中のタンディッシュにおいては、ストランド室内の溶鋼の湯面上にスラグなどが、浮上している。ストランド室内で浮上したスラグは、溶鋼の保温、酸化防止の役割を果たしているものの、溶鋼中に巻き込まれた場合、製品の品質を低下させることになる。
さて、鍋を交換する連々鋳においては、成分混じりを少なくするために前チャージの溶鋼をできる限り鋳造してから後チャージの溶鋼を注入している。特に、前チャージと後チャージの成分が異なる(異鋼種連々)場合には、成分混じりを極めて少なくして、クロップ(鋳片同士の接続部分で成分が規定値を満たさず、廃棄せざるを得ない部分)を可能なかぎり少なくするために、前チャージの溶鋼が可能な限り少なくなるまで鋳造してから後チャージの溶鋼を注入している。
By the way, in the tundish in operation, slag etc. are floating on the molten steel surface in the strand chamber. The slag that floats in the strand chamber plays a role of keeping the molten steel warm and preventing oxidation, but when it is caught in the molten steel, the quality of the product is lowered.
Now, in continuous casting in which the pan is replaced, in order to reduce the mixing of components, the molten steel of the pre-charge is cast as much as possible before the molten steel of the post-charge is injected. In particular, when the pre-charge and post-charge components are different (dissimilar steel series), the mixing of the components is extremely reduced, and the crop (the component does not meet the specified value at the connection between the slabs and must be discarded) In order to reduce as much as possible, the pre-charged molten steel is poured after casting until the pre-charged molten steel becomes as small as possible.

例えば、特許文献1、2に開示されているようなタンディシュを用いても、溶鋼が注入口を通過して鋳型に装入されるに従って湯面が降下する際に、湯面上のスラグが、注入室側とストランド室とを貫通する孔内を逆流して、注入室内に浸入してしまう虞がある。このように、逆流したスラグが注入室に残存した状態で、後チャージの溶鋼を注入すると、注入室内でスラグが溶鋼に巻き込まれて微細に分散し、介在物性欠陥となってしまうという虞がある。   For example, even when using a tundish as disclosed in Patent Documents 1 and 2, when the molten steel descends as the molten steel passes through the inlet and is inserted into the mold, the slag on the molten metal surface, There is a possibility that the inside of the hole penetrating the injection chamber side and the strand chamber may flow backward and enter the injection chamber. As described above, when the post-charge molten steel is injected in the state where the backflowed slag remains in the injection chamber, the slag is caught in the molten steel in the injection chamber and finely dispersed, resulting in inclusion physical defect. .

そこで、本発明は、上記問題点に鑑み、異鋼種連々時に前チャージにおいて、ストランド室内における溶鋼の湯面を降下させる際に、溶鋼の湯面上のスラグが、湯道を介して注入室に逆流することを抑制するタンディッシュと、そのタンディッシュを用いた連続鋳造方法を提供することを目的とする。   Therefore, in view of the above-mentioned problems, the present invention is directed to lowering the molten steel surface in the strand chamber in the pre-charge when different steel types continuously, so that the slag on the molten steel surface flows into the injection chamber through the runner. It aims at providing the tundish which suppresses backflow, and the continuous casting method using the tundish.

上述の目的を達成するため、本発明においては以下の技術的手段を講じた。
本発明にかかるタンディッシュは、取鍋からの溶鋼が注入される注入室と、前記溶鋼を
鋳型に装入する注入口を有するストランド室と、前記注入室と前記ストランド室とを仕切る仕切堰と、前記仕切堰に設けられ且つ前記注入室から前記ストランド室へ直線状に貫通する湯道と、を備えたタンディッシュであって、前記湯道の出口と繋がる前記ストランド室の底部は、前記湯道の出口下端以下に位置し、且つ、式(1)〜式(7)を満たしている。
In order to achieve the above-described object, the present invention takes the following technical means.
The tundish according to the present invention includes an injection chamber into which molten steel from a ladle is injected, a strand chamber having an injection port for charging the molten steel into a mold, and a partition weir that partitions the injection chamber and the strand chamber. A runner provided in the partition weir and linearly penetrating from the pouring chamber to the strand chamber, wherein the bottom of the strand chamber connected to the outlet of the runner is the hot water It is located below the exit lower end of the road and satisfies the formulas (1) to (7).

0.08≦D (円相当径) [m] ・・・(1)
d1≦0.3 [m] ・・・(2)
0.115≦(x1 2+y1 2)0.5≦1 [m] ・・・(3)
0.05≦y1/x1≦1 [-] ・・・(4)
0≦y3/x3≦0.36 [-] ・・・(5)
x3≧0.5 [m] ・・・(6)
B≦-0.7tanh(3.5A-2.3)+1.1 ・・・(7)
ただし、A=(x1 2/(x1 2+y1 2))2・(x3 2/(x3 2+y3 2))3・(x2/x3)0.4
B=y2/x1、y2=d1(1+y1 2/x1 2)0.5-y1
D:湯道の円相当径
d1:湯道の縦径
x1:湯道の水平方向の長さ
y1:湯道の上下方向の高さ
x2:注入室の水平方向の長さ
y2:湯道の出口上端と注入室底面との上下方向の距離
x3:注入室の傾斜長さ
y3:注入室の傾斜高さ
本発明にかかる連続鋳造方法は、連続鋳造用のタンディッシュを用いて連続鋳造を行うに際し、前記ストランド室側の溶鋼の湯面が前記湯道の上端より上方に位置しているときに、前チャージの溶鋼を注入室に注入することを終了し、式(8)を満たしながら、前記前チャージにおける溶鋼の湯面を、前記湯道の傾斜高さy以下に低下させた後、後チャージの溶鋼における前記注入室への注入を開始する。
0.08 ≦ D (Equivalent circle diameter) [m] (1)
d 1 ≦ 0.3 [m] (2)
0.115 ≦ (x 1 2 + y 1 2 ) 0.5 ≦ 1 [m] (3)
0.05 ≦ y 1 / x 1 ≦ 1 [-] (4)
0 ≦ y 3 / x 3 ≦ 0.36 [-] (5)
x 3 ≧ 0.5 [m] (6)
B ≦ -0.7tanh (3.5A-2.3) +1.1 (7)
However, A = (x 1 2 / (x 1 2 + y 1 2 )) 2・ (x 3 2 / (x 3 2 + y 3 2 )) 3・ (x 2 / x 3 ) 0.4
B = y 2 / x 1 , y 2 = d 1 (1 + y 1 2 / x 1 2 ) 0.5 -y 1
D: Circle equivalent diameter of the runway
d 1 : Length of runner
x 1 : Horizontal length of the runway
y 1 : Vertical height of the runway
x 2: the horizontal length of the injection chamber
y 2 : Vertical distance between the upper end of the runner outlet and the bottom of the injection chamber
x 3: slope length of infusion chamber
y 3 : Inclination height of the injection chamber In the continuous casting method according to the present invention, when continuous casting is performed using a tundish for continuous casting, the molten steel surface on the strand chamber side is above the upper end of the runner. When it is located, the injection of the molten steel of the previous charge into the injection chamber is finished, and while satisfying the equation (8), the molten steel surface of the molten steel in the previous charge is set to the inclined height y 1 of the runner. After lowering below, injection into the injection chamber in the post-charge molten steel is started.

S(US)≦x1 ・・・(8)
ただし、
S(US)=124.5d2b(t/T)0.7(x1 2/(x1 2+y1 2))2(x3 2/(x3 2+y3 2))3(x2/x3)0.4(1-Fr)3
T=98901(d2b)4/3
Fr=UL/(9.8d1)0.5
t=y2/US
Us:溶鋼の湯面降下速度
UL:湯道内の平均溶鋼速度
b:スラグ厚
S(US):湯道内をスラグが逆流する距離
Fr:フルード数
t:湯面がストランド室側の湯道上端に達してから注入室側の湯道下端に達するまでの時間
S (U S ) ≦ x 1 (8)
However,
S (U S ) = 124.5d 2 b (t / T) 0.7 (x 1 2 / (x 1 2 + y 1 2 )) 2 (x 3 2 / (x 3 2 + y 3 2 )) 3 (x 2 / x 3 ) 0.4 (1-Fr) 3
T = 98901 (d 2 b) 4/3
Fr = U L /(9.8d 1 ) 0.5
t = y 2 / U S
U s : Molten steel descent speed
U L : Average molten steel speed in the runway
b: Slag thickness
S (U S ): Distance that slag flows back in the runway
Fr: Fluid number
t: Time from the hot water surface reaching the upper end of the runner on the strand chamber side to the lower end of the runner side on the injection chamber side

本発明によれば、異鋼種連々時に前チャージにおいて、ストランド室内における溶鋼の湯面を降下させる際に、溶鋼の湯面上のスラグが、湯道を介して注入室に逆流することを抑制することができる。   According to the present invention, the slag on the molten steel surface in the strand chamber is prevented from flowing back into the injection chamber through the runner when the molten steel surface in the strand chamber is lowered in the pre-charge at different steel types. be able to.

本発明の連続鋳造用タンディッシュが適用される連続鋳造装置の概念図である。It is a conceptual diagram of the continuous casting apparatus to which the tundish for continuous casting of the present invention is applied. 本発明の連続鋳造用タンディッシュの平面図である。It is a top view of the tundish for continuous casting of the present invention. ストランド室の底部の形状を示す第1図である。It is a 1st figure which shows the shape of the bottom part of a strand chamber. ストランド室の底部の形状を示す第2図である。It is a 2nd figure which shows the shape of the bottom part of a strand chamber. 本発明のタンディッシュに形成された湯道の形状を示した図である。It is the figure which showed the shape of the runner formed in the tundish of this invention. 仕切堰の湯道を直線状にした場合の状態を示した図である。It is the figure which showed the state at the time of making the runner of a partition weir straight. 仕切堰の湯道を途中で屈曲した場合の状態を示した図である。It is the figure which showed the state at the time of bending the runway of a partition weir halfway. 本発明の連続鋳造用タンディッシュの第1例を示す側方断面図である。It is side sectional drawing which shows the 1st example of the tundish for continuous casting of this invention. 本発明の連続鋳造用タンディッシュの第2例を示す側方断面図である。It is side sectional drawing which shows the 2nd example of the tundish for continuous casting of this invention. 本発明の連続鋳造用タンディッシュの第3例を示す側方断面図である。It is side sectional drawing which shows the 3rd example of the tundish for continuous casting of this invention. 本発明のタンディッシュにおける条件を示した図である。It is the figure which showed the conditions in the tundish of this invention. 本発明の連続鋳造用タンディッシュを用いた連続鋳造方法を示した図である。It is the figure which showed the continuous casting method using the tundish for continuous casting of this invention. 水モデルのタンディッシュを示す図である。It is a figure which shows the tundish of a water model. 水モデルの実測値及び計算値の関係を示す図である。It is a figure which shows the relationship between the actual value and calculated value of a water model. スラグが逆流した場合の様子を示す図である。It is a figure which shows a mode when a slag flows backward. スラグの逆流によるクロップ等を示す図である。It is a figure which shows the crop etc. by the backflow of slag. 湯道よりも上方で後チャージの溶鋼を注入した図である。It is the figure which inject | poured the molten steel of the back charge above the runner. 前チャージと後チャージとの混合よるクロップ等を示す図である。It is a figure which shows the crop etc. by mixing of a pre-charge and a post-charge.

以下、図面に示した実施の形態に基づいて本発明を詳細に説明する。
図1は、連続鋳造を行う連続鋳造装置の全体図である。まず、連続鋳造装置の構造について説明する。連続鋳造装置は、例えば、二次精錬処理後の溶鋼を連続的に鋳造する装置である。
図1に示すように、連続鋳造装置1は、取鍋2内の溶鋼3が注入されるタンディッシュ4と、当該タンディッシュ4内の溶鋼3を鋳込む鋳型5と、鋳型5によって形成された鋳片6を支持するサポートロール7を備えている。
Hereinafter, the present invention will be described in detail based on the embodiments shown in the drawings.
FIG. 1 is an overall view of a continuous casting apparatus that performs continuous casting. First, the structure of the continuous casting apparatus will be described. A continuous casting apparatus is an apparatus which casts the molten steel after a secondary refining process continuously, for example.
As shown in FIG. 1, the continuous casting apparatus 1 is formed by a tundish 4 into which the molten steel 3 in the ladle 2 is poured, a mold 5 for casting the molten steel 3 in the tundish 4, and the mold 5. A support roll 7 that supports the slab 6 is provided.

図1,2に示すように、タンディッシュ4は、溶鋼3を鋳型5に装入する注入口10が設けられた底部11と、底部11の周縁から立ち上がる周壁12とを備えている。また、タンディッシュ4は、取鍋2内の溶鋼3を注入する注入室13と、溶鋼3を鋳型5に鋳込むストランド室14とに仕切る仕切堰15を有している。注入室13は、注入口10が設けられていない底部11aと、周壁12と、仕切堰15とで囲まれた部分で構成されている。また、ストランド室14は、注入口10が設けられた底部11bと、周壁12と、仕切堰15とで囲まれた部分で構成されている。図2には、平面視でT字状のタンディッシュ4aと、I型のタンディッシュ4b,4cが示されているが、本発明のタンディッシュ4の平面視の形状は限定されず、図2に示したいずれのタンディッシュ4a、4b、4cでもよいし、その他の形状のタンディッシュであってもよい。また、タンディッシュ4のストランド数についても限定されない。また、連続鋳造装置1で鋳造される鋳片6の形状は、限定されず、スラブ、ブルーム、ビレット等であってもよい。   As shown in FIGS. 1 and 2, the tundish 4 includes a bottom portion 11 provided with an inlet 10 for charging the molten steel 3 into the mold 5, and a peripheral wall 12 rising from the periphery of the bottom portion 11. The tundish 4 has a partition weir 15 that partitions the injection chamber 13 into which the molten steel 3 in the ladle 2 is injected and the strand chamber 14 into which the molten steel 3 is cast into the mold 5. The injection chamber 13 is configured by a portion surrounded by a bottom portion 11 a where the injection port 10 is not provided, a peripheral wall 12, and a partition weir 15. The strand chamber 14 is configured by a portion surrounded by a bottom portion 11 b provided with the inlet 10, a peripheral wall 12, and a partition weir 15. 2 shows a T-shaped tundish 4a and I-type tundishes 4b and 4c in plan view, but the shape of the tundish 4 of the present invention in plan view is not limited, and FIG. Any of the tundishes 4a, 4b, and 4c shown in FIG. Further, the number of strands of the tundish 4 is not limited. Moreover, the shape of the slab 6 cast by the continuous casting apparatus 1 is not limited, and may be a slab, a bloom, a billet, or the like.

図3A及び図3Bは、注入室及びストランド室の断面図である。図3Aに示すように、タンディッシュ4の仕切堰15には、注入室13とストランド室14とを連通させる湯道16が形成されている。ストランド室14の底部11bであって、湯道16のストランド室側の出口17と繋がる底部11bを見たとき、当該底部11bの内面は、湯道16の出口17の下端以下に位置している。言い換えれば、湯道16の出口17と繋がるストランド室14の底部11bは、湯道16の出口17の最下端部と同じ高さ、或いは、湯道16の出口17の最下端部よりも低い位置である。 3A and 3B are cross-sectional views of the injection chamber and the strand chamber. As shown in FIG. 3A, the runner 16 that connects the injection chamber 13 and the strand chamber 14 is formed in the partition weir 15 of the tundish 4. A bottom 11b of the strands chamber 14, when viewed bottom 11b 1 connected strands chamber side of the outlet 17 of the runner 16, the inner surface of the bottom portion 11b 1 is positioned below the lower end of the outlet 17 of the runner 16 ing. In other words, the bottom 11 b 1 of the strand chamber 14 connected to the outlet 17 of the runner 16 is the same height as the lowermost end of the outlet 17 of the runner 16 or is lower than the lowermost end of the outlet 17 of the runner 16. Position.

図3Bに示すように、タンディッシュ4の仕切堰15に湯道16を形成した場合であって、湯道16の出口17と繋がる底部11bを見たとき、当該底部11bが、湯道16の出口17の下端よりも上方に位置する場合があるが、本発明のタンディッシュ4では、このような構造のタンディッシュは対象としていない。つまり、ストランド室14の底部11bが湯道16の出口17の最下端部よりも高いのは対象としていない。 As shown in FIG. 3B, when a runner 16 is formed in the partition weir 15 of the tundish 4, when the bottom 11 b 1 connected to the outlet 17 of the runner 16 is viewed, the bottom 11 b 1 is In some cases, the tundish 4 of the present invention is not intended for the tundish 4 of the present invention. That is, the bottom 11b 1 of the strand chamber 14 is not intended to be higher than the lowermost end of the outlet 17 of the runner 16.

図4は、仕切堰15を幅方向で且つ垂直に断面した場合(図2のA−A断面)の断面図である。図4に示すように、仕切堰15に形成する湯道16の個数は、1個、或いは、複数(例えば、2個、3個)であってもよく個数は限定されない。仕切堰15に複数の湯道16を設ける場合は、仕切堰15を正面視した場合に幅方向に並べて配置することが望ましい。また、図4に示すように、断面視の湯道16の形状は、円形であっても、楕円形であっても、四角形であってもよい。   FIG. 4 is a cross-sectional view of the partition weir 15 taken along the width direction and perpendicularly (cross-section AA in FIG. 2). As shown in FIG. 4, the number of runners 16 formed in the partition weir 15 may be one or plural (for example, two, three), and the number is not limited. When providing a plurality of runners 16 in the partition weir 15, it is desirable to arrange them side by side in the width direction when the partition weir 15 is viewed from the front. Moreover, as shown in FIG. 4, the shape of the runner 16 in cross-sectional view may be circular, elliptical, or quadrangular.

図5A及び図5Bは、仕切堰15を奥行方向で且つ垂直に断面した場合(図2のB−B断面)の湯道16の形状を示している。図5Aに示すように、本発明のタンディッシュ4の湯道16は、注入室13からストランド室14へ直線状に貫通する形状であって、図5Bに示すように、途中で屈曲した形状ではない。図5A及び図5Bに示すように、タンディッシュの整備を行う際は、タンディッシュを略90度傾動させた後、湯道16にパイプを挿入して、パイプから酸素等を吹き込むことにより、湯道16に付着した地金等を燃焼熱によって溶融し、地金を除去する。図5Aに示すように、湯道16が直線状である場合には、パイプを問題無く湯道16に挿入することができるが、図5Bに示すように、湯道16が途中で屈曲している場合は、パイプを湯道16の全体に挿入することができない。場合によっては、湯道16及び仕切堰15を溶損させてしまう虞がある。それゆえ、本発明のタンディッシュ4の湯道16は、仕切堰15内を注入室13からストランド室14へ直線的に貫通するものを対象としている。   5A and 5B show the shape of the runner 16 when the partition weir 15 is sectioned in the depth direction and perpendicularly (cross section BB in FIG. 2). As shown in FIG. 5A, the runner 16 of the tundish 4 of the present invention has a shape penetrating linearly from the injection chamber 13 to the strand chamber 14, and as shown in FIG. Absent. As shown in FIGS. 5A and 5B, when the tundish is maintained, the tundish is tilted by approximately 90 degrees, and then a pipe is inserted into the runner 16 and oxygen or the like is blown from the pipe. The metal or the like attached to the road 16 is melted by the combustion heat, and the metal is removed. As shown in FIG. 5A, when the runner 16 is straight, the pipe can be inserted into the runner 16 without any problem. However, as shown in FIG. 5B, the runner 16 is bent halfway. If so, the pipe cannot be inserted into the entire runner 16. In some cases, the runner 16 and the partition weir 15 may be melted. Therefore, the runner 16 of the tundish 4 of the present invention is intended for a linear passage through the partition weir 15 from the injection chamber 13 to the strand chamber 14.

以下、さらに、タンディッシュの構成について詳しく説明する。
湯道の内径(円相当径)Dは、式(1)に示すように、0.08m以上である。
0.08≦D (円相当径) [m] ・・・(1)
湯道の内径が0.08m未満の場合は、鋳造中に湯道16内に介在物等が詰まってしまい鋳造できなくなる可能性がある。なお、上述したように、湯道16は、楕円形や四角形も含むため、式(1)で示したように湯道16の内径は、円に換算したときの円相当径である。
Hereinafter, the structure of the tundish will be described in detail.
The inner diameter (equivalent circle diameter) D of the runner is 0.08 m or more as shown in the equation (1).
0.08 ≦ D (Equivalent circle diameter) [m] (1)
When the inner diameter of the runner is less than 0.08 m, there is a possibility that inclusions and the like are clogged in the runner 16 during casting, making casting impossible. As described above, since the runner 16 also includes an ellipse and a quadrangle, the inner diameter of the runner 16 is an equivalent circle diameter when converted to a circle as shown in the equation (1).

湯道の縦径d1は、式(2)に示すように、0.3m以下である。
d1≦0.3 [m] ・・・(2)
湯道の縦径d1が0.3mを超えている場合、取鍋2のノズルの開口時に当該ノズルから落下した砂等の大部分が湯道16を通ってストランド室14に流入し易くなる。取鍋2の開口時における多量の砂がストランド室14に入ってしまうと、介在物の欠陥になり易い。つまり、湯道の縦径d1を0.3m以下にすることによって、ストランド室14ではなく注入室13側で砂を浮上させることができる。なお、湯道の縦径d1は、図4に示すように、湯道16を垂直に断面した場合の垂直方向の径である。
The longitudinal diameter d 1 of the runner is 0.3 m or less as shown in the equation (2).
d 1 ≦ 0.3 [m] (2)
When the longitudinal diameter d 1 of the runner exceeds 0.3 m, most of sand or the like that has fallen from the nozzle when the nozzle of the ladle 2 is opened easily flows into the strand chamber 14 through the runner 16. . If a large amount of sand enters the strand chamber 14 when the ladle 2 is opened, it tends to cause defects in inclusions. That is, by setting the longitudinal diameter d 1 of the runner to 0.3 m or less, the sand can be floated not on the strand chamber 14 but on the injection chamber 13 side. As shown in FIG. 4, the longitudinal diameter d 1 of the runner is a diameter in the vertical direction when the runner 16 is sectioned vertically.

さて、図6に示すように、注入室13側の湯道16の入口18と、ストランド室14側の湯道16の出口17との水平距離(湯道の水平方向の長さ)を「x1」、湯道16の出口17と湯道16の入口18との高低差(湯道の上下方向の高さ)を「y1」としたとき、湯道16の長さである「(x1 2+y1 2)0.5」は、式(3)を満たしている。
0.115≦(x1 2+y1 2)0.5≦1 [m] ・・・(3)
湯道16の長さ((x1 2+y1 2)0.5)が式(3)の下限値を下回る場合、仕切堰15の厚みが薄すぎて、当該仕切堰15が不安定になる虞がある。湯道16の長さ((x1 2+y1 2)0.5)が式(3)の上限値を上回る場合、湯道16が長すぎるために、鋳造中等に湯道16が詰まる虞がある。特に、湯道の内径(円相当径)Dが小さい場合には、顕著になる。
Now, as shown in FIG. 6, the horizontal distance (the horizontal length of the runner) between the inlet 18 of the runner 16 on the injection chamber 13 side and the outlet 17 of the runner 16 on the strand chamber 14 side is expressed by “x 1 ”, when the height difference between the outlet 17 of the runner 16 and the inlet 18 of the runner 16 (height in the vertical direction of the runner) is“ y 1 ”, the length of the runner 16 is“ (x 1 2 + y 1 2 ) 0.5 ”satisfies the formula (3).
0.115 ≦ (x 1 2 + y 1 2 ) 0.5 ≦ 1 [m] (3)
When the length of the runner 16 ((x 1 2 + y 1 2 ) 0.5 ) is less than the lower limit of the formula (3), the partition weir 15 is too thin and the partition weir 15 may become unstable. There is. When the length of the runner 16 ((x 1 2 + y 1 2 ) 0.5 ) exceeds the upper limit value of the formula (3), the runner 16 is too long, and the runner 16 may be clogged during casting. . In particular, it becomes remarkable when the inner diameter (equivalent circle diameter) D of the runner is small.

また、湯道16の傾きを表す「y1/x1」は、式(4)を満たしている。
0.05≦y1/x1≦1 [-] ・・・(4)
湯道16の傾き(y1/x1)が式(4)の下限値を下回る場合、湯道16が緩やか過ぎて、鋳造終了時に、注入室13や湯道16内の溶鋼3がストランド室14に排出され難い。溶鋼3が注入室13や湯道16に残ってしまうと、歩留が低下するうえに、タンディッシュ4を整備する際に、溶解するための酸素洗浄の負荷が大きくなる。式(4)の下限値を、湯道16の角度に変換すると、3degである。一方、湯道16の傾き(y1/x1)が式(4)の上限値を上回る場合、湯道16を構成する仕切堰15の端部P1(図6参照)が鋭利になり過ぎて、鋭利になった部分が欠損する虞がある。式(4)の上限値を、湯道16の角度に変換すると、45degである。
Further, “y 1 / x 1 ” representing the inclination of the runner 16 satisfies the formula (4).
0.05 ≦ y 1 / x 1 ≦ 1 [-] (4)
When the slope (y 1 / x 1 ) of the runner 16 is below the lower limit of the formula (4), the runner 16 is too gentle, and at the end of casting, the molten steel 3 in the pouring chamber 13 and the runner 16 becomes the strand chamber. 14 is difficult to be discharged. If the molten steel 3 remains in the pouring chamber 13 and the runner 16, the yield decreases, and the load of oxygen cleaning for melting when the tundish 4 is prepared increases. When the lower limit of the equation (4) is converted into the angle of the runner 16, it is 3 deg. On the other hand, when the slope (y 1 / x 1 ) of the runner 16 exceeds the upper limit of the equation (4), the end P1 (see FIG. 6) of the partition weir 15 constituting the runner 16 becomes too sharp. There is a possibility that the sharpened part may be lost. When the upper limit value of the equation (4) is converted into the angle of the runner 16, it is 45 deg.

図6に示すように、注入室13の底部11aを見たとき、当該底部11aは、湯道16
の入口18に繋がり且つ水平である平坦部11aと、平坦部11aに繋がっていて傾斜する傾斜部11aとを有していたとする。この場合、傾斜部11aの開始から終わりまでの高低差(注入室の傾斜高さ)を「y」、傾斜部11aの開始から終わりまでの水平長さ(注入室の傾斜長さ)を「x」としたとき、注入室13の傾斜部11aの傾き(y3/x3)は、式(5)を満たしている。
As shown in FIG. 6, when the bottom 11 a of the injection chamber 13 is viewed, the bottom 11 a
To the flat portion 11a 1 and the horizontal leads to the inlet 18, and it has an inclined portion 11a 2 that is inclined leading to the flat portion 11a 1. In this case, the height difference from the start to the end of the inclined portion 11a 2 (inclination height of the injection chamber) is “y 3 ”, and the horizontal length from the start to the end of the inclined portion 11a 2 (inclination length of the injection chamber) Is “x 3 ”, the inclination (y 3 / x 3 ) of the inclined portion 11 a 2 of the injection chamber 13 satisfies the expression (5).

0≦y3/x3≦0.36 [-] ・・・(5)
傾斜部11aの傾き(y3/x3)が式(5)の下限値を下回る場合、傾斜部11aは下方に傾斜していることになり、鋳造終了時に、注入室13に溶鋼3が残り易くなる。溶鋼3が注入室13に残ってしまうと、歩留が低下する。一方、傾斜部11aの傾き(y3/x3)が式(4)の上限値を上回る場合、傾斜部11aの傾斜が大き過ぎる。そのため、取鍋2から溶鋼3を注入した場合、溶鋼3の仕切堰15に向かう流れが強すぎて、一気に仕切堰15に沿って溶鋼3が上昇して、タンディッシュ4の上端を閉鎖する蓋にまで達する虞がある。タンディッシュ4の上端を閉鎖する蓋に溶鋼3が達した場合は、蓋とタンディッシュ4との隙間から溶鋼3が流れ出る虞がある。式(5)の上限値を、傾斜部11aの角度に変換すると、20degである。
0 ≦ y 3 / x 3 ≦ 0.36 [-] (5)
If the inclination of the inclined portion 11a 2 (y 3 / x 3) is less than the lower limit of the formula (5), the inclined portion 11a 2 will be inclined downwardly, at the time of casting ended, the molten steel injection chamber 13 3 Tends to remain. If the molten steel 3 remains in the injection chamber 13, the yield decreases. On the other hand, when the slope of the inclined portion 11a 2 (y 3 / x 3 ) exceeds the upper limit of the formula (4), is too large inclination of the inclined portion 11a 2. Therefore, when the molten steel 3 is poured from the ladle 2, the flow of the molten steel 3 toward the partition weir 15 is too strong, and the molten steel 3 rises along the partition weir 15 at once, and the lid that closes the upper end of the tundish 4 May reach up to When the molten steel 3 reaches the lid that closes the upper end of the tundish 4, the molten steel 3 may flow out from the gap between the lid and the tundish 4. The upper limit of the formula (5), it is converted into the angle of the inclined portion 11a 2, a 20 deg.

また、注入室の傾斜長さ(x3)は、式(6)を満たしている。
x3≧0.5 [m] ・・・(6)
注入室の傾斜長さ(x3)が下限値を下回る場合、取鍋2のノズルから注入した溶鋼3が平坦部11aと傾斜部11aとの境界に直接当たり易くなり、境界部分が溶損する虞があると共に溶鋼3の流れが不安定になり易い。取鍋2のノズルは、溶鋼3の注入量の調整のために100mm程度芯がズレる可能性があるため、傾斜部11aに直接、溶鋼3を当てるためにも注入室の傾斜長さ(x3)は0.5m以上あることが望ましい。
Further, the inclined length (x 3 ) of the injection chamber satisfies the formula (6).
x 3 ≧ 0.5 [m] (6)
When the inclined length (x 3 ) of the injection chamber is below the lower limit value, the molten steel 3 injected from the nozzle of the ladle 2 is likely to directly contact the boundary between the flat portion 11a 1 and the inclined portion 11a 2 and the boundary portion is melted. The flow of the molten steel 3 tends to become unstable. Nozzle ladle 2, there is a possibility that deviate the 100mm about the core in order to adjust the injection amount of the molten steel 3, directly to the inclined portion 11a 2, the length also of the injection chamber inclined to shed the molten steel 3 is (x 3 ) is preferably 0.5 m or more.

上述した実施形態では、注入室13の底部11が傾斜部11aを有し(y3≧0, x3≧0)且つ平坦部11aを有する(x2≧x3)ことを前提として説明したが、図7に示すように、注入室13の底部11が平坦部11aのみを有し(y3=0、x2=x3)の場合がある。この場合は、式(5)の値は、零となるが、条件を満たしているため、図7の形状も適用可能である。また、式(6)は、x3=x2≧0.5になるため平坦部11aの長さが式(6)を満たせばよい。 In the embodiment described above, the description is made on the assumption that the bottom 11 of the injection chamber 13 has the inclined portion 11a 2 (y 3 ≧ 0, x 3 ≧ 0) and the flat portion 11a 1 (x 2 ≧ x 3 ). However, as shown in FIG. 7, the bottom 11 of the injection chamber 13 may have only the flat portion 11a 1 (y 3 = 0, x 2 = x 3 ). In this case, the value of Expression (5) is zero, but the condition shown in FIG. 7 is applicable because the condition is satisfied. Further, since Expression (6) satisfies x 3 = x 2 ≧ 0.5, the length of the flat portion 11a 1 only needs to satisfy Expression (6).

また、図8に示すように、注入室13の底部11が傾斜部11aのみを有する(y3≧0、x3≧0)場合がある。この場合も、傾斜部11aは、式(5)及び式(6)を満たせばよく、図8の形状も適用可能である。
以下の説明では、図6〜図8に示したタンディッシュ4の全てに適用するとして説明を続ける。図6のタンディッシュの場合は、y3≧0, x2≧x3、図7のタンディッシュの場合は、y3=0、x2=x3, 図8のタンディッシュの場合は、y3≧0,x2=x3を満たすとする。
Moreover, as shown in FIG. 8, the bottom 11 of the injection chamber 13 may have only the inclined portion 11a 2 (y 3 ≧ 0, x 3 ≧ 0). Also in this case, the inclined portion 11a 2 only needs to satisfy the expressions (5) and (6), and the shape of FIG. 8 is also applicable.
In the following description, the description will be continued assuming that it applies to all of the tundish 4 shown in FIGS. In the case of the tundish in FIG. 6, y 3 ≧ 0, x 2 ≧ x 3 , in the case of the tundish in FIG. 7, y 3 = 0, x 2 = x 3 , in the case of the tundish in FIG. Assume that 3 ≧ 0, x 2 = x 3 is satisfied.

さて、前チャージ(前ヒート)での鋳造を終了する場合は、取鍋2のノズルから注入室13への溶鋼3の注入を停止しつつ、タンディッシュ4内の溶鋼3を鋳型5に供給する。即ち、前ヒートでの鋳造を終了する場合は、タンディッシュ4内の溶鋼3の湯面を定常状態から徐々に低下させ、タンディッシュ4内の前チャージの溶鋼3をできるだけ鋳型5に供給する。このとき、注入室13及びストランド室14の湯面は徐々に下降して、湯道16の高さになった場合には、ストランド室14の湯面上のスラグが注入室13へと逆流する虞がある。   When the casting with the pre-charge (pre-heat) is finished, the molten steel 3 in the tundish 4 is supplied to the mold 5 while the injection of the molten steel 3 from the nozzle of the ladle 2 into the pouring chamber 13 is stopped. . That is, when finishing the preheating, the molten steel 3 in the tundish 4 is gradually lowered from the steady state, and the precharged molten steel 3 in the tundish 4 is supplied to the mold 5 as much as possible. At this time, the molten metal surface of the injection chamber 13 and the strand chamber 14 gradually descends, and when the height of the runner 16 is reached, the slag on the molten metal surface of the strand chamber 14 flows back to the injection chamber 13. There is a fear.

そこで、発明者は、湯道16の形状及び注入室13の形状について検証を行い。湯道16の形状及び注入室13の形状を、後述するように指数A及び指数Bに指数化したうえで、これら指数A及び指数Bが式(7)を満たすようにすることによって、ストランド室14の湯面上のスラグが注入室13へと逆流しない形状を見出した。
B≦-0.7tanh(3.5A-2.3)+1.1 ・・・(7)
A=(x1 2/(x1 2+y1 2))2・(x3 2/(x3 2+y3 2))3・(x2/x3)0.4
B=y2/x1、y2=d1(1+y1 2/x1 2)0.5-y1
次に、式(7)で示されたパラメータ、指数A、指数Bについて説明する。
図6に示すように、式(7)の「y2」は、湯道16のストランド室側の出口17と、湯道16の注入室側の入口18との高低差(湯道の上下方向の重なり度合)である。
Therefore, the inventor verified the shape of the runner 16 and the shape of the injection chamber 13. The shape of the runner 16 and the shape of the injection chamber 13 are indexed into an index A and an index B as will be described later, and the index A and the index B satisfy the formula (7). The shape in which the slag on the surface of No. 14 flows back to the injection chamber 13 was found.
B ≦ -0.7tanh (3.5A-2.3) +1.1 (7)
A = (x 1 2 / (x 1 2 + y 1 2 )) 2・ (x 3 2 / (x 3 2 + y 3 2 )) 3・ (x 2 / x 3 ) 0.4
B = y 2 / x 1 , y 2 = d 1 (1 + y 1 2 / x 1 2 ) 0.5 -y 1
Next, the parameters, index A, and index B shown in Expression (7) will be described.
As shown in FIG. 6, “y 2 ” in Expression (7) is the difference in height between the outlet 17 on the strand chamber side of the runner 16 and the inlet 18 on the injection chamber side of the runner 16 (up and down direction of the runner). Degree of overlap).

指数Aは、「湯道と注入室の底部の形状の指数」である。即ち、指数Aにおいて、(x1 2/(x1 2+y1 2))2は、湯道の形状であって傾斜の指数であり、x3 2/(x3 2+y3 2)は、傾斜部11aの傾斜の指数であり、(x2/x3)0.4は、平坦部11aの長さ及び傾斜部11aの長さの指数である。指数Aの数値が小さいほど湯道の形状が急になり、スラグの逆流抑制を図ることができる。 The index A is “the index of the shape of the bottom of the runner and the injection chamber”. That is, in the index A, (x 1 2 / (x 1 2 + y 1 2 )) 2 is the shape of the runner and is an index of inclination, and x 3 2 / (x 3 2 + y 3 2 ) Is an index of inclination of the inclined part 11a 2 , and (x 2 / x 3 ) 0.4 is an index of the length of the flat part 11a 1 and the length of the inclined part 11a 2 . As the value of the index A is smaller, the shape of the runner becomes steeper and the backflow of slag can be suppressed.

また、上述したように、式(7)の「y」は、湯道の上下方向の重なり度合であるが、鋳造終了時に湯面を降下させ、湯面が湯道に到達した場合の状況を考えると、「y」は、「湯面下降時における注入室13とストランド室14とを湯面が繋がる上下距離」と見ることができる。また、指数Bの「x」は、湯道の水平方向の長さであるが、湯面が湯道に到達した場合の状況を考えると、「x」は、湯道内をスラグが注入室13へ向けて流れる距離(スラグ逆流可能距離)と見ることができる。 In addition, as described above, “y 2 ” in Expression (7) is the degree of overlap in the vertical direction of the runner, but the situation when the melt surface is lowered when casting ends and the melt surface reaches the runner In this case, “y 2 ” can be regarded as “the vertical distance at which the molten metal surface connects the injection chamber 13 and the strand chamber 14 when the molten metal surface is lowered”. In addition, “x 1 ” of the index B is the horizontal length of the runner, but considering the situation when the hot water surface reaches the runner, “x 1 ” is injected by slag in the runner It can be seen as the distance flowing toward the chamber 13 (slag backflow possible distance).

つまり、指数Bが小さいほど、スラグが注入室13に到達し難く、指数Aが小さい場合は、指数Bが大きくてもスラグが注入室13に到達し難い。式(7)の範囲は、図9に示す範囲となる。式(7)を満たす場合、スラグが注入室13に入り難く、鋳造停止後、溶鋼3の湯面を下降させた場合に、ストランド室14のスラグが注入室13に逆流することを防止することができる。   That is, the smaller the index B, the harder the slag reaches the injection chamber 13. When the index A is small, the slag does not easily reach the injection chamber 13 even if the index B is large. The range of Expression (7) is the range shown in FIG. When the formula (7) is satisfied, it is difficult for the slag to enter the injection chamber 13, and the slag in the strand chamber 14 is prevented from flowing back into the injection chamber 13 when the molten steel 3 is lowered after the casting is stopped. Can do.

以上、本発明のタンディッシュ4によれば、タンディッシュ4を、式(1)〜式(7)を満たす構造にすることによって、前チャージにおいて、ストランド室14内における溶鋼の湯面を降下させる場合に、溶鋼の湯面上に存在するスラグが、ストランド室14と注入室13とを貫通する湯道を介して注入室13に逆流することを抑制することができる。
さて、上述したタンディッシュ4を異鋼種連々鋳造に用いることによって、前チャージと後チャージの切替時におけるスラグの逆流を防止することができるが、より、下記の方法で連続鋳造することによって、よりスラグの逆流を防止することができる。
As described above, according to the tundish 4 of the present invention, the surface of the molten steel in the strand chamber 14 is lowered in the pre-charge by making the tundish 4 satisfy the formulas (1) to (7). In this case, it is possible to suppress the slag present on the molten steel surface from flowing back into the injection chamber 13 through the runner that penetrates the strand chamber 14 and the injection chamber 13.
Now, by using the above-described tundish 4 for casting different steel types, it is possible to prevent the backflow of the slag at the time of switching between the pre-charge and the post-charge, but more by continuously casting by the following method, Slag backflow can be prevented.

図10を用いて、異鋼種連々鋳造における前チャージと後チャージとの切替について説明する。まず、異鋼種連々鋳造においては、前チャージの溶鋼3と、後チャージの溶鋼3との成分が異なるため、溶鋼3同士が混ざることによる成分変化を防止するため(成分まじりを防止するために、前チャージの溶鋼3を出来る限り少なくしてから後チャージの溶鋼3を注入する。   The switching between the pre-charge and the post-charge in continuous casting of different steel types will be described with reference to FIG. First, in different steel type continuous casting, since the components of the molten steel 3 of the pre-charge and the molten steel 3 of the post-charge are different, in order to prevent the component change due to mixing of the molten steel 3 (in order to prevent component mixing, After the molten steel 3 of the pre-charge is reduced as much as possible, the molten steel 3 of the post-charge is injected.

鋳造をそのまま続ける稀釈鋳造では、前チャージの溶鋼3の注入終了は、図10のS1に示すように、タンディッシュ4内の湯面がストランド室14の湯道16よりも上方で行う。即ち、ストランド室14側の溶鋼の湯面が湯道16の上端より上方に位置しているときに、前チャージの溶鋼を注入室13に注入することを終了する。
図10のS2に示すように、前チャージの溶鋼3の注入終了後も、タンディッシュ4内の溶鋼3は鋳型5に供給するため、湯面は次第に低下し、湯面は湯道16の上端に達する。湯面が湯道16の上端に達すると、ストランド室14側に留まっていた湯面上のスラグが、次第にストランド室14側から注入室13側へ移動する。
In the dilution casting in which the casting is continued as it is, the injection of the precharged molten steel 3 is completed above the runner 16 of the strand chamber 14 as shown in S1 of FIG. That is, when the molten steel surface on the strand chamber 14 side is located above the upper end of the runner 16, the injection of the precharged molten steel into the injection chamber 13 is terminated.
As shown in S <b> 2 of FIG. 10, since the molten steel 3 in the tundish 4 is supplied to the mold 5 even after the injection of the precharged molten steel 3, the molten metal surface gradually decreases, and the molten metal surface is the upper end of the runner 16. To reach. When the molten metal surface reaches the upper end of the runner 16, the slag on the molten metal surface that has remained on the strand chamber 14 side gradually moves from the strand chamber 14 side to the injection chamber 13 side.

ここで、図10に示すように、スラグが湯道16を移動する距離(逆流距離)を「S(US)」としたとき、スラグの逆流距離S(US)が湯道の水平方向の長さx1を超えないようにすればよい。即ち、式(8)を満たしながら、前チャージにおける溶鋼の湯面を、湯道16の傾斜高さy以下に低下させる。つまり、式(a)で求められる逆流距離S(US)が湯道の水平方向の長さx1に到達してしまう前に、湯面を湯道16の傾斜高さy以下まで低下させる。 Here, as shown in FIG. 10, when the distance (back flow distance) by which the slag moves through the runner 16 is “S (U S )”, the back flow distance S (U S ) of the slag is the horizontal direction of the runner. it may be so as not to exceed the length x 1 of the. That is, while satisfying the formula (8), the molten steel surface in the previous charge is lowered to the inclined height y 1 or less of the runner 16. In other words, before the backflow distance S (U S ) calculated by the equation (a) reaches the horizontal length x 1 of the runner, the hot water surface is lowered to the slope height y 1 or less of the runner 16. Let

S(US)≦x1 ・・・(8)
ただし、S(US)=124.5d2b(t/T)0.7(x1 2/(x1 2+y1 2))2(x3 2/(x3 2+y3 2))3(x2/x3)0.4(1-Fr)3 …(a)
T=98901(d2b)4/3,Fr=UL/(9.8d1)0.5,t=y2/USである。
なお、逆流距離S(US)の始点は、スラグが湯道16に入り始める地点であるため、湯道16の出口17の上端である。また、逆流距離S(US)の始点から注入室13側の水平方向を逆流距離S(US)の正としている。また、逆流距離S(US)は、式(a)により求めることができるが、y2>0である場合は式(a)を適用し、y2≦0である場合は、逆流距離S(US)=0とする。
S (U S ) ≦ x 1 (8)
Where S (U S ) = 124.5d 2 b (t / T) 0.7 (x 1 2 / (x 1 2 + y 1 2 )) 2 (x 3 2 / (x 3 2 + y 3 2 )) 3 (x 2 / x 3 ) 0.4 (1-Fr) 3 … (a)
T = 98901 (d 2 b) 4/3 , Fr = U L /(9.8d 1 ) 0.5 , t = y 2 / U S.
The starting point of the backflow distance S (U S ) is the upper end of the outlet 17 of the runner 16 because the slag begins to enter the runner 16. Also the horizontal injection chamber 13 side from the start of the reverse flow distance S (U S) as positive backflow distance S (U S). Further, the backflow distance S (U S ) can be obtained from the formula (a), but when y 2 > 0, the formula (a) is applied, and when y 2 ≦ 0, the back flow distance S (U S ) = 0.

そして、図10のS3に示すように、湯面を湯道16の傾斜高さy以下まで低下させた後は、後チャージの溶鋼を注入室13に注入する。即ち、後チャージの注入を開始する。なお、湯面を湯道16の傾斜高さy以下まで低下させない場合は、注入室13にスラグが逆流する。
鋳造を一端停止する鋳造でも、前チャージの溶鋼3の注入終了は、稀釈鋳造と同じである(図10のS4)。次に、図10のS5に示すように、湯面を湯道16の傾斜高さy以下まで低下させた後は、シーケンスブロックを鋳型に挿入した後(図10のS5)、後チャージの溶鋼を注入室13に注入する(図10のS6)。
さて、上述した式(a)は、水モデルの実験で求めたものである。水モデルの実験による式(a)の導出について説明する。
Then, as shown in S <b> 3 of FIG. 10, after the molten metal surface is lowered to the inclined height y <b> 1 or less of the runner 16, the post-charge molten steel is injected into the injection chamber 13. That is, the post-charge injection is started. Note that the slag flows back into the injection chamber 13 when the hot water surface is not lowered to the inclined height y 1 or less of the runner 16.
Even in the casting where the casting is stopped once, the injection of the precharged molten steel 3 is the same as in the dilution casting (S4 in FIG. 10). Next, as shown in S5 in FIG. 10, after lowering the melt surface to below the inclined height y 1 of the runner 16, (S5 in FIG. 10) after insertion of the sequence block in the mold, the rear charge Molten steel is injected into the injection chamber 13 (S6 in FIG. 10).
Now, the above-described equation (a) is obtained by an experiment of a water model. The derivation of equation (a) from the water model experiment will be described.

水モデル実験では、実機を相似的に1/3にした1/3モデルで実験を行った。水モデルのタンディッシュは、図11に示すT型タンディッシュとした。ストランド数は5ストランドとした。また、水モデルのタンディッシュにおいて、仕切堰15に設けた湯道16は、ストランド室14から注入室13へ向けて延びる直線状とした。湯道16の出口17と繋がるストランド室14の底部11aは、湯道16の出口下端以下に位置させた。   In the water model experiment, the experiment was conducted with a 1/3 model in which the actual machine was similarly reduced to 1/3. The water model tundish was a T-type tundish shown in FIG. The number of strands was 5 strands. Further, in the tundish of the water model, the runner 16 provided in the partition weir 15 has a linear shape extending from the strand chamber 14 toward the injection chamber 13. The bottom part 11 a of the strand chamber 14 connected to the outlet 17 of the runner 16 was positioned below the lower end of the outlet of the runner 16.

図11の1/3モデルのタンディッシュの仕切堰15は、水の流れが分かるように、透明のアクリル樹脂を用いた。水モデルでは、水を溶鋼とし、オイルをスラグとして実験を行った。水及び溶鋼の流体の物性の関係は、表1に示す通りである。また、オイル及びスラグの物性の関係は、表2に示す通りである。   A transparent acrylic resin was used for the partition weir 15 of the 1/3 model tundish of FIG. 11 so that the flow of water could be understood. In the water model, experiments were conducted using water as molten steel and oil as slag. The relationship between physical properties of water and molten steel fluid is as shown in Table 1. The relationship between the physical properties of oil and slag is as shown in Table 2.

水モデルでは、タンディッシュ内に水を満たし、ストランド室14側の水面には、スラグのモデルであるオイルを成層させた。一定の流量で水をストランド室14のノズルから抜き、その様子をタンディッシュ4の上方に設けたビデオカメラで撮像した。ビデオカメラの撮像では、オイルが湯道16を逆流する様子を中心に撮像した。そして、オイルが湯道16の出口17から入口18までに到達する時間を計測した。水モデルの結果は、表3の通りである。   In the water model, the tundish was filled with water, and the slag model oil was stratified on the water surface on the strand chamber 14 side. Water was extracted from the nozzle of the strand chamber 14 at a constant flow rate, and the state was imaged with a video camera provided above the tundish 4. In the imaging of the video camera, the imaging was performed mainly on the state in which oil flows backward through the runner 16. Then, the time for the oil to reach from the outlet 17 to the inlet 18 of the runner 16 was measured. The results of the water model are shown in Table 3.

発明者らは、水モデルの結果に基づき、湯道を通るスラグ(オイル)の移動距離について検証を行った。検証を行うにあたって、高橋らによって導出された式(b)を参考にした。式(b)は、油膜の広がりに対する液体の物性値の影響を考慮した油膜の広がり距離Sに関する実験式である。
S=1.19M(1.25+μLU)0.5(t/T)0.7 ・・・(b)
ただし、 M=5d2b/4(2(σLUUL)/ρU(1-ρUL)g)0.5
T=(8.3ρU(1-ρUL)g(d2b)2LμL)0.5/16(σLUUL)2)2/3
g:重力加速度
t:時間
なお、式(b)は、「高橋照男ら:化学工学論文集、第5巻第5号(1979)pp.526-531)」に記載されている。
The inventors verified the moving distance of the slag (oil) through the runner based on the result of the water model. In conducting the verification, the formula (b) derived by Takahashi et al. Was referred to. Formula (b) is an empirical formula regarding the spread distance S of the oil film in consideration of the influence of the physical property value of the liquid on the spread of the oil film.
S = 1.19M (1.25 + μ L / μ U ) 0.5 (t / T) 0.7 ... (b)
Where M = 5d 2 b / 4 (2 (σ LUUL ) / ρ U (1-ρ U / ρ L ) g) 0.5
T = (8.3ρ U (1-ρ U / ρ L ) g (d 2 b) 2L μ L ) 0.5 / 16 (σ LUUL ) 2 ) 2/3
g: Gravity acceleration
t: Time Note that the formula (b) is described in “Tetsuo Takahashi et al .: Chemical Engineering Papers, Vol. 5, No. 5, (1979) pp. 526-531)”.

上述した式(b)では、タンディッシュの底面の形状の影響、湯道におけるスラグの逆流等の影響が考慮されていない。そこで、式(b)及び水モデルの実験結果を基にして、タンディッシュの底面の形状の影響、湯道におけるスラグの逆流等が考慮された回帰式(c)を導出した。
S(US)=0.2M(1.25+μLU)0.5(t/T)0.7(x1 2/(x1 2+y1 2))2(x3 2/(x3 2+y3 2))3(x2/x3)0.4(1-Fr)3・・・(c)
ただし、 Fr=UL/(9.8d1)0.5
t=y2/US
d1:湯道の縦径
d2:湯道の横径
Us:湯面(水)の降下速度
UL:湯道内の平均溶鋼速度
b:オイル厚(スラグ厚)
そして、式(b)の液体の物性値に実機の値を代入して整理すると、上述した式(a)になる。
In the above-described equation (b), the influence of the shape of the bottom surface of the tundish, the influence of the backflow of slag in the runner, etc. are not taken into consideration. Therefore, based on the equation (b) and the experimental results of the water model, a regression equation (c) was derived in consideration of the influence of the shape of the bottom surface of the tundish, the backflow of slag in the runway, and the like.
S (U S ) = 0.2M (1.25 + μ L / μ U ) 0.5 (t / T) 0.7 (x 1 2 / (x 1 2 + y 1 2 )) 2 (x 3 2 / (x 3 2 + y 3 2 )) 3 (x 2 / x 3 ) 0.4 (1-Fr) 3 ... (c)
However, Fr = U L /(9.8d 1 ) 0.5
t = y 2 / U S
d 1 : Length of runner
d 2 : Horizontal diameter of the runway
U s : Descent speed of hot water (water)
U L : Average molten steel speed in the runway
b: Oil thickness (slag thickness)
Then, when the values of the actual machine are substituted into the physical property values of the liquid of the formula (b) and rearranged, the above formula (a) is obtained.

S(US)=124.5d2b(t/T)0.7(x1 2/(x1 2+y1 2))2(x3 2/(x3 2+y3 2))3(x2/x3)0.4(1-Fr)3 ・・・(a)
ただし、 T=98901(d2b)4/3
Fr=UL/(9.8d1)0.5
t=y2/US
スラグ(オイル)の逆流距離S(US)の実測値と計算値とをまとめると、図12に示すようになった。
S (U S ) = 124.5d 2 b (t / T) 0.7 (x 1 2 / (x 1 2 + y 1 2 )) 2 (x 3 2 / (x 3 2 + y 3 2 )) 3 (x 2 / x 3 ) 0.4 (1-Fr) 3 ... (a)
T = 98901 (d 2 b) 4/3
Fr = U L /(9.8d 1 ) 0.5
t = y 2 / U S
FIG. 12 shows a summary of the measured and calculated values of the slag (oil) backflow distance S (U S ).

図12に示すように、スラグ(オイル)の逆流距離S(US)の実測値と計算値とは相関関係があることを確認できる。したがって、式(8)を満たすように、連続鋳造を行うことによって、異鋼種連々鋳造における前チャージと後チャージとの切替時、即ち、湯面の降下時に注入室13にストランド室14からのスラグが逆流することを防止することができる。 As shown in FIG. 12, it can be confirmed that there is a correlation between the measured value and the calculated value of the backflow distance S (U S ) of the slag (oil). Therefore, by performing continuous casting so as to satisfy the formula (8), the slag from the strand chamber 14 to the pouring chamber 13 is switched at the time of switching between the pre-charge and the post-charge in the continuous casting of different steel types, that is, when the molten metal surface is lowered. Can be prevented from flowing backward.

表4,5は、本発明の連続鋳造用タンディッシュ、及びそのタンディッシュを用いた連続鋳造方法を用いた実施例と、本発明とは異なるタンディッシュ及び連続鋳造方法を用いた比較例とを示している。なお、実施例及び比較例は、水モデルによる結果を実機に換算したものである。この水モデルの実験は、1/3のスケールで行った。また、実施例及び比較例での実施条件は上述した水モデルと同様である。   Tables 4 and 5 show examples of the tundish for continuous casting according to the present invention and examples using the continuous casting method using the tundish, and comparative examples using a tundish and continuous casting method different from the present invention. Show. In addition, an Example and a comparative example convert the result by a water model into a real machine. This water model experiment was performed on a 1/3 scale. Moreover, the implementation conditions in the examples and comparative examples are the same as in the water model described above.

なお、水モデルのタンディッシュにおいて、仕切堰15に設けた湯道16は、ストランド室14から注入室13へ向けて延びる直線状とした。湯道16の出口17と繋がるストランド室14の底部11aは、湯道16の出口下端以下に位置させた。
実施例及び比較例では、スラグ逆流抑制、操業性の2項目について評価を行った。表には評価として、良好「○」、不良「×」を示した。全ての項目について良好である場合は、総合評価の欄に良好を示す「○」を示した。
In the tundish of the water model, the runner 16 provided in the partition weir 15 has a linear shape extending from the strand chamber 14 toward the injection chamber 13. The bottom part 11 a of the strand chamber 14 connected to the outlet 17 of the runner 16 was positioned below the lower end of the outlet of the runner 16.
In Examples and Comparative Examples, evaluation was performed on two items of slag backflow suppression and operability. The table shows good “◯” and bad “×” as evaluation. When all items were satisfactory, “◯” indicating good was indicated in the column for comprehensive evaluation.

図13に示すように、前チャージの鋳造終了後、湯面を降下させた場合にストランド室14のスラグが湯道16を通って注入室13に逆流することがある。この場合には、注入室13に逆流したスラグと後チャージの溶鋼3とが混ざってしまう。即ち、スラグ叩き込みが発生する。スラグ叩き込みが発生した場合、図14に示すように、稀釈連続鋳造であってもシーケンスブロックを挿入する鋳造であっても、前チャージと後チャージとを繋ぐ鋳片では、スラグ系介在物による増加した長いクロップが発生する。   As shown in FIG. 13, the slag in the strand chamber 14 may flow back to the pouring chamber 13 through the runner 16 when the molten metal surface is lowered after the completion of the precharge casting. In this case, the slag flowing back into the injection chamber 13 and the post-charge molten steel 3 are mixed. That is, slag hitting occurs. When slag struck, as shown in FIG. 14, the increase in slag inclusions in the slab that connects the pre-charge and the post-charge, whether it is dilution continuous casting or casting in which a sequence block is inserted Long crops occur.

このように、スラグが注入室13まで逆流してしまった場合は、長いクロップが発生するため、スラグ逆流抑制の評価は不良「×」となる。一方、スラグが湯道16を通過したものの、注入室13内に入らなかった場合は、図14に示すように、稀釈連続鋳造であってもシーケンスブロックを挿入する鋳造であっても、前チャージと後チャージとを繋ぐ鋳片の一部は、成分規格外れクロップが発生するものの、スラグ系介在物によるクロップよりも長さは非常に短い。この場合は、スラグの逆流抑制ができているため、スラグ逆流抑制の評価は良好「〇」となる。操作性の不良とは、湯道の詰まり等が発生する虞があり、耐火物の耐久性が低下すること、取鍋2の砂がストランド室14へ流出することなどを示している。   Thus, when slag has flowed back to the injection chamber 13, a long crop is generated, so the evaluation of slag backflow suppression is poor “x”. On the other hand, when the slag passes through the runner 16 but does not enter the injection chamber 13, the precharge is performed regardless of whether it is dilution continuous casting or casting in which a sequence block is inserted as shown in FIG. A part of the slab connecting the post-charge and the post-charge has a very short length as compared with a crop made of slag inclusions, although a crop out of component specification occurs. In this case, since the backflow suppression of the slag can be performed, the evaluation of the backflow suppression of the slag is good “◯”. Poor operability indicates that there is a risk of clogging of the runner, etc., which means that the durability of the refractory is reduced, and that the sand in the ladle 2 flows out into the strand chamber 14.

なお、図15に示すように、前チャージと後チャージとの切替において、前チャージの湯面を低くせずに、即ち、湯面を湯道に到達させる前に溶鋼を注入した場合、図16に示すように、稀釈連続鋳造であってもシーケンスブロックを挿入する鋳造であっても、前チャージの溶鋼と後チャージの溶鋼とが大量に混ざり成分が規格から外れる長いクロップが発生する。   In addition, as shown in FIG. 15, in the case of switching between the pre-charge and the post-charge, when the molten steel is injected without lowering the molten metal surface of the pre-charge, that is, before the molten metal surface reaches the runner, FIG. As shown in FIG. 4, in both dilution continuous casting and casting in which a sequence block is inserted, a large amount of pre-charged molten steel and post-charged molten steel are mixed and a long crop is generated in which the components deviate from the standard.

実施例では、タンディッシュは、式(1)〜式(7)及び式(8)を全て満たしているため、スラグ逆流抑制及び操作性も良好であった。一方、比較例1では、式(4)の上限値を上回っており、比較例2では、式(2)の上限値を上回っている。また、比較例3では、式(4)の下限値を下回っており、比較例4では、式(1)の下限値を下回っている。比較例5及び7では、式(3)の下限値を下回ると共に上限値を上回っている。比較例6及び7では、式(6)の下限値を下回っている。したがって、比較例1〜7では、操業性が不良であった。   In the examples, since the tundish satisfies all of the expressions (1) to (7) and (8), the slag backflow suppression and operability were also good. On the other hand, in the comparative example 1, it exceeds the upper limit of Formula (4), and in the comparative example 2, it exceeds the upper limit of Formula (2). Moreover, in the comparative example 3, it is below the lower limit of Formula (4), and in the comparative example 4, it is below the lower limit of Formula (1). In Comparative Examples 5 and 7, the value is below the lower limit value of the formula (3) and exceeds the upper limit value. In Comparative Examples 6 and 7, it is below the lower limit value of Equation (6). Therefore, in Comparative Examples 1-7, the operability was poor.

また、比較例8〜11では、式(8)を満たしていないため、スラグ逆流抑制が不良であった。
以上、本発明によれば、タンディッシュの形状や連続鋳造の鋳造方法を適正に設定することにより、操業性を確保しつつ、スラグが逆流して注入室に入ることを抑制することができる。
Moreover, in Comparative Examples 8-11, since the formula (8) was not satisfied, the slag backflow suppression was poor.
As described above, according to the present invention, by appropriately setting the shape of the tundish and the casting method of continuous casting, it is possible to prevent the slag from flowing back into the injection chamber while ensuring operability.

なお、今回開示された実施形態において、明示的に開示されていない事項、例えば、運転条件や操業条件、各種パラメータ、構成物の寸法、重量、体積などは、当業者が通常実施する範囲を逸脱するものではなく、通常の当業者であれば、容易に想定することが可能な事項を採用している。   It should be noted that matters not explicitly disclosed in the embodiment disclosed this time, such as operating conditions and operating conditions, various parameters, dimensions, weights, volumes, and the like of a component, deviate from the range normally practiced by those skilled in the art. However, matters that can be easily assumed by those skilled in the art are employed.

1 連続鋳造装置
2 取鍋
3 溶鋼
4、4a、4b、4c タンディッシュ
5 鋳型
6 鋳片
7 サポートロール
10 注入口
11 底部
11a 注入室側の底部
11a平坦部
11a傾斜部
11b ストランド室側の底部
11b出口と繋がる底部
12 周壁
13 注入室
14 ストランド室
15 仕切堰
16 湯道
17 出口
18 入口
DESCRIPTION OF SYMBOLS 1 Continuous casting apparatus 2 Ladle 3 Molten steel 4, 4a, 4b, 4c Tundish 5 Mold 6 Cast piece 7 Support roll 10 Inlet 11 Bottom part 11a Bottom part 11a on the injection chamber side 1 Flat part 11a 2 Inclined part 11b On the strand room side Bottom portion 11b Bottom portion 12 connected to one outlet 13 Perimeter wall 13 Injection chamber 14 Strand chamber 15 Partition weir 16 Runway 17 Exit 18 Inlet

Claims (2)

取鍋からの溶鋼が注入される注入室と、前記溶鋼を鋳型に装入する注入口を有するストランド室と、前記注入室と前記ストランド室とを仕切る仕切堰と、前記仕切堰に設けられ且つ前記注入室から前記ストランド室へ直線状に貫通する湯道と、を備えたタンディッシュであって、
前記湯道の出口と繋がる前記ストランド室の底部は、前記湯道の出口の下端以下に位置し、且つ、式(1)〜式(7)を満たしていることを特徴とする連続鋳造用のタンディッシュ。
0.08≦D (円相当径) [m] ・・・(1)
d1≦0.3 [m] ・・・(2)
0.115≦(x1 2+y1 2)0.5≦1 [m] ・・・(3)
0.05≦y1/x1≦1 [-] ・・・(4)
0≦y3/x3≦0.36 [-] ・・・(5)
x3≧0.5 [m] ・・・(6)
B≦-0.7tanh(3.5A-2.3)+1.1 ・・・(7)
ただし、A=(x1 2/(x1 2+y1 2))2・(x3 2/(x3 2+y3 2))3・(x2/x3)0.4
B=y2/x1、y2=d1(1+y1 2/x1 2)0.5-y1
D:湯道の円相当径
d1:湯道の縦径
x1:湯道の水平方向の長さ
y1:湯道の上下方向の高さ
x2:注入室の水平方向の長さ
y2:湯道の出口上端と注入室底面との上下方向の距離
x3:注入室の傾斜長さ
y3:注入室の傾斜高さ
An injection chamber into which molten steel from a ladle is injected; a strand chamber having an injection port for charging the molten steel into a mold; a partition weir that partitions the injection chamber and the strand chamber; and the partition weir; A tundish comprising a runner that penetrates linearly from the injection chamber to the strand chamber,
The bottom part of the strand chamber connected to the outlet of the runner is located below the lower end of the outlet of the runner and satisfies the formulas (1) to (7). Tundish.
0.08 ≦ D (Equivalent circle diameter) [m] (1)
d 1 ≦ 0.3 [m] (2)
0.115 ≦ (x 1 2 + y 1 2 ) 0.5 ≦ 1 [m] (3)
0.05 ≦ y 1 / x 1 ≦ 1 [-] (4)
0 ≦ y 3 / x 3 ≦ 0.36 [-] (5)
x 3 ≧ 0.5 [m] (6)
B ≦ -0.7tanh (3.5A-2.3) +1.1 (7)
However, A = (x 1 2 / (x 1 2 + y 1 2 )) 2・ (x 3 2 / (x 3 2 + y 3 2 )) 3・ (x 2 / x 3 ) 0.4
B = y 2 / x 1 , y 2 = d 1 (1 + y 1 2 / x 1 2 ) 0.5 -y 1
D: Circle equivalent diameter of the runway
d 1 : Length of runner
x 1 : Horizontal length of the runway
y 1 : Vertical height of the runway
x 2: the horizontal length of the injection chamber
y 2 : Vertical distance between the upper end of the runner outlet and the bottom of the injection chamber
x 3: slope length of infusion chamber
y 3 : Inclination height of the injection chamber
請求項1に記載された連続鋳造用のタンディッシュを用いて連続鋳造を行うに際し、
前記ストランド室側の溶鋼の湯面が前記湯道の上端より上方に位置しているときに、前チャージの溶鋼を注入室に注入することを終了し、
式(8)を満たしながら、前記前チャージにおける溶鋼の湯面を、前記湯道の傾斜高さy以下に低下させた後、後チャージの溶鋼における前記注入室への注入を開始することを特徴とする連続鋳造方法。
S(US)≦x1 ・・・(8)
ただし、
S(US)=124.5d2b(t/T)0.7(x1 2/(x1 2+y1 2))2(x3 2/(x3 2+y3 2))3(x2/x3)0.4(1-Fr)3
T=98901(d2b)4/3
Fr=UL/(9.8d1)0.5
t=y2/US
Us:溶鋼の湯面降下速度
UL:湯道内の平均溶鋼速度
b:スラグ厚
S(US):湯道内をスラグが逆流する距離
Fr:フルード数
t:湯面がストランド室側の湯道上端に達してから注入室側の湯道下端に達するまでの時間
When performing continuous casting using the tundish for continuous casting according to claim 1,
When the molten steel surface on the strand chamber side is located above the upper end of the runner, the injection of molten steel of the pre-charge into the injection chamber is terminated.
The molten steel surface in the pre-charge is reduced to a slope height y 1 or less of the runner while satisfying the equation (8), and then injection into the injection chamber in the post-charge molten steel is started. A continuous casting method characterized.
S (U S ) ≦ x 1 (8)
However,
S (U S ) = 124.5d 2 b (t / T) 0.7 (x 1 2 / (x 1 2 + y 1 2 )) 2 (x 3 2 / (x 3 2 + y 3 2 )) 3 (x 2 / x 3 ) 0.4 (1-Fr) 3
T = 98901 (d 2 b) 4/3
Fr = U L /(9.8d 1 ) 0.5
t = y 2 / U S
U s : Molten steel descent speed
U L : Average molten steel speed in the runway
b: Slag thickness
S (U S ): Distance that slag flows back in the runway
Fr: Fluid number
t: Time from the hot water surface reaching the upper end of the runner on the strand chamber side to the lower end of the runner side on the injection chamber side
JP2015069943A 2015-03-30 2015-03-30 Tundish for continuous casting and continuous casting method using the tundish Expired - Fee Related JP6454205B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015069943A JP6454205B2 (en) 2015-03-30 2015-03-30 Tundish for continuous casting and continuous casting method using the tundish

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015069943A JP6454205B2 (en) 2015-03-30 2015-03-30 Tundish for continuous casting and continuous casting method using the tundish

Publications (2)

Publication Number Publication Date
JP2016187833A true JP2016187833A (en) 2016-11-04
JP6454205B2 JP6454205B2 (en) 2019-01-16

Family

ID=57239271

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015069943A Expired - Fee Related JP6454205B2 (en) 2015-03-30 2015-03-30 Tundish for continuous casting and continuous casting method using the tundish

Country Status (1)

Country Link
JP (1) JP6454205B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021013942A (en) * 2019-07-11 2021-02-12 日本製鉄株式会社 Continuous casting process
JP2021013944A (en) * 2019-07-11 2021-02-12 日本製鉄株式会社 Continuous casting process
JP2021013943A (en) * 2019-07-11 2021-02-12 日本製鉄株式会社 Continuous casting process

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63180148U (en) * 1987-05-09 1988-11-21
JPH05104212A (en) * 1991-10-16 1993-04-27 Sumitomo Metal Ind Ltd Tundish with molten steel heating device
JPH081289A (en) * 1994-06-21 1996-01-09 Sumitomo Metal Ind Ltd Method for reducing inclusion in molten steel in tundish
JP2007111744A (en) * 2005-10-20 2007-05-10 Nippon Steel Corp Induction-heating type tundish and repairing method therefor
JP2012110946A (en) * 2010-11-26 2012-06-14 Jfe Steel Corp Continuous casting method of steel of high cleanliness

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63180148U (en) * 1987-05-09 1988-11-21
JPH05104212A (en) * 1991-10-16 1993-04-27 Sumitomo Metal Ind Ltd Tundish with molten steel heating device
JPH081289A (en) * 1994-06-21 1996-01-09 Sumitomo Metal Ind Ltd Method for reducing inclusion in molten steel in tundish
JP2007111744A (en) * 2005-10-20 2007-05-10 Nippon Steel Corp Induction-heating type tundish and repairing method therefor
JP2012110946A (en) * 2010-11-26 2012-06-14 Jfe Steel Corp Continuous casting method of steel of high cleanliness

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021013942A (en) * 2019-07-11 2021-02-12 日本製鉄株式会社 Continuous casting process
JP2021013944A (en) * 2019-07-11 2021-02-12 日本製鉄株式会社 Continuous casting process
JP2021013943A (en) * 2019-07-11 2021-02-12 日本製鉄株式会社 Continuous casting process
JP7215361B2 (en) 2019-07-11 2023-01-31 日本製鉄株式会社 Continuous casting method
JP7234837B2 (en) 2019-07-11 2023-03-08 日本製鉄株式会社 Continuous casting method
JP7269480B2 (en) 2019-07-11 2023-05-09 日本製鉄株式会社 Continuous casting method

Also Published As

Publication number Publication date
JP6454205B2 (en) 2019-01-16

Similar Documents

Publication Publication Date Title
US7559353B2 (en) Distributor for use in a method of casting hot metal
JP6454205B2 (en) Tundish for continuous casting and continuous casting method using the tundish
JP4271551B2 (en) Continuous casting equipment for high cleanliness steel by tundish
JP6454206B2 (en) Tundish for continuous casting and continuous casting method using the tundish
JP6701517B2 (en) Tundish for continuous casting, and continuous casting method using the tundish
KR20090123228A (en) Tundish
JP2016190240A (en) Tundish for continuous casting, and method for continuous casting using tundish
JP4725244B2 (en) Ladle for continuous casting and method for producing slab
JP6454204B2 (en) Tundish for continuous casting and continuous casting method using the tundish
JP6491039B2 (en) Bottom pouring method
JP6426045B2 (en) Tundish for continuous casting and continuous casting method using the tundish
JP2018051598A (en) Bottom pouring ingot-making equipment
JP6668568B2 (en) Tundish for continuous casting and continuous casting method using the tundish
JP6668567B2 (en) Tundish for continuous casting and continuous casting method using the tundish
JP5206591B2 (en) Tundish for continuous casting
JP6672549B2 (en) Tundish for continuous casting and continuous casting method using the tundish
JP6904132B2 (en) Tandish for continuous casting
JP2008254028A (en) Tundish for continuous casting
JP6701516B2 (en) Tundish for continuous casting, and continuous casting method using the tundish
JP7172432B2 (en) Partition plate for continuous casting of different steel grades and method for continuous casting of different steel grades
JP7269480B2 (en) Continuous casting method
JP5025312B2 (en) Method of pouring into casting mold for ingot casting to improve the surface of steel ingot by generating swirling flow in runner
JP5053226B2 (en) Tundish for continuous casting
JP5794969B2 (en) Continuous casting method
JP7389335B2 (en) Method for producing thin slabs

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170901

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180725

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180731

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180919

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20181211

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20181214

R150 Certificate of patent or registration of utility model

Ref document number: 6454205

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150