JP2016172998A - Cylindrical wire mesh cage - Google Patents

Cylindrical wire mesh cage Download PDF

Info

Publication number
JP2016172998A
JP2016172998A JP2015053892A JP2015053892A JP2016172998A JP 2016172998 A JP2016172998 A JP 2016172998A JP 2015053892 A JP2015053892 A JP 2015053892A JP 2015053892 A JP2015053892 A JP 2015053892A JP 2016172998 A JP2016172998 A JP 2016172998A
Authority
JP
Japan
Prior art keywords
cylindrical
filled
semi
wire mesh
wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2015053892A
Other languages
Japanese (ja)
Other versions
JP6272261B2 (en
Inventor
明洋 北村
Akihiro Kitamura
明洋 北村
純一 鍋谷
Junichi Nabeya
純一 鍋谷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Showa Kikai Shoji Co Ltd
Original Assignee
Showa Kikai Shoji Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Showa Kikai Shoji Co Ltd filed Critical Showa Kikai Shoji Co Ltd
Priority to JP2015053892A priority Critical patent/JP6272261B2/en
Priority to TW105108095A priority patent/TW201643302A/en
Publication of JP2016172998A publication Critical patent/JP2016172998A/en
Application granted granted Critical
Publication of JP6272261B2 publication Critical patent/JP6272261B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Revetment (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a cylindrical wire mesh cage that reduces an occupied space when storing or transporting.SOLUTION: A cylindrical wire mesh cage Y comprises a cylindrical wire mesh body 1, circular wire mesh covers 4, 5 and connection coil metallic wires 2, 3. The cylindrical wire mesh body 1 comprises a pair of semi-cylindrical wire mesh bodies 8, 9 formed by dividing the cylinder into two along a central line a of the cylinder. Each of the semi-cylindrical wire mesh bodies 8, 9 configures the cylindrical wire mesh body 1 by placing vertical metallic wires 11A, 11A or 11B, 11B adjacent to each other at both ends in a circumferential direction. Each of the connection coil metallic wires 2, 3 is wound around each of the vertical metallic wires 11A, 11A or 11B, 11B placed adjacent to each other at both ends in the circumferential direction, for connecting the semi-cylindrical metallic mesh bodies 8, 9 to each other.SELECTED DRAWING: Figure 1

Description

本発明は、崩壊した河川護岸及び山間斜面等を復旧するために使用される円筒金網籠に関する。   The present invention relates to a cylindrical wire mesh fence used for restoring a collapsed river revetment and mountain slope.

崩壊した河川護岸等を復旧する技術として、特許文献1は、地盤補強部材を開示する。地盤補強部材は、上部ゲージ、下部ゲージ及びネットを備える。各ゲージは、複数の網目開口を有する円柱状(円筒金網)に形成される。破砕ゴム片を各ゲージに充填して、各ゲージを積載して、ネットにて上部ゲージ開口を閉塞する。   As a technique for restoring a collapsed river revetment, Patent Document 1 discloses a ground reinforcing member. The ground reinforcing member includes an upper gauge, a lower gauge, and a net. Each gauge is formed in a columnar shape (cylindrical wire mesh) having a plurality of mesh openings. Fill each gauge with crushed rubber pieces, load each gauge, and close the upper gauge opening with a net.

特開2007−169925号公報JP 2007-169925 A

しかし、特許文献1では、各ゲージを円柱状(円筒金網)に形成するので、保管又は搬送に多くのスペースを必要とする。   However, in Patent Document 1, since each gauge is formed in a columnar shape (cylindrical wire mesh), a lot of space is required for storage or transportation.

本発明は、保管又は運搬の占有スペースを低減できる円筒金網籠を提供することにある。
本発明は、積載段数に関係なく、勾配αで積載した充填円筒金網籠について、連結コイル金属線の剪断強度を確保できる円筒金網籠を提供することにある。
An object of the present invention is to provide a cylindrical wire mesh cage that can reduce the space occupied by storage or transportation.
It is an object of the present invention to provide a cylindrical wire mesh cage capable of ensuring the shear strength of a connecting coil metal wire for a filled cylindrical wire mesh cage loaded with a gradient α regardless of the number of loading stages.

発明に係る請求項1は、円筒金網本体と、前記円筒金網本体の少なくとも一端開口を閉塞する1又は一対の金網蓋と、複数の連結コイル金属線と、を備え、前記円筒金網本体は、円筒中心線に沿って二分割した一対の半円筒金網体で構成され、前記各半円筒金網体は、円筒中心線方向に線間隔を隔てて並列される複数の半円形金属線と、前記半円筒金網体の円周方向に線間隔を隔てて並列され、前記円筒金網本体の両端開口間にわたって延在される複数の縦金属線と、を有し、前記各金属線の交点にて前記各半円形横金属線及び前記各縦金属線同士を固定し、円周方向両端の前記各縦金属線を隣接して前記円筒金網本体を構成し、前記各連結コイル金属線は、前記円筒金網本体の両端開口間にわたって、前記円周方向各端で隣接する前記各縦金属線に巻付けられ、前記各半円筒体同士を連結することを特徴とする円筒金網籠である。   A first aspect of the present invention includes a cylindrical wire mesh body, one or a pair of wire mesh lids closing at least one end opening of the cylindrical wire mesh body, and a plurality of connecting coil metal wires. The semi-cylindrical metal mesh body is composed of a pair of semi-cylindrical metal mesh bodies divided into two along the center line, and each of the semi-cylindrical metal mesh bodies is arranged in parallel with a line interval in the cylindrical center line direction, and the half cylinder A plurality of vertical metal wires that are arranged in parallel in the circumferential direction of the metal mesh body and that extend between openings at both ends of the cylindrical metal mesh body, and each half of the metal wire at the intersection of the metal wires. A circular horizontal metal wire and the vertical metal wires are fixed to each other, and the cylindrical metal mesh body is configured by adjoining the vertical metal wires at both ends in the circumferential direction, and the connecting coil metal wires are connected to the cylindrical metal mesh body. Each longitudinally adjacent at each end in the circumferential direction across the opening at both ends Wound genus wire, a cylindrical wire mesh cage, characterized by connecting each of said semi-cylindrical bodies.

本発明に係る請求項2は、前記円筒金網本体に中詰材を充填した充填円筒金網本体、前記半円筒金網体に中詰材を充填した充填半円筒金網体、前記充填円筒金網体について、前記各縦金属線を除き、前記各半円形横金属線を水平Beam要素で表現した充填円筒線本体モデル、前記充填半円筒金網体について、前記各縦金属線を除き、前記各半円形横金属線を水平Beam要素で表現した充填半円筒線体モデル、前記充填半円筒金網体について、前記各半円形横金属線を水平Beam要素で表現し、及び前記各縦金属線を鉛直Beam要素で表現した充填半円筒金網体モデル、前記充填円筒金網本体について、前記各縦金属線を除き、前記各半円形横金属線でなる仮想・充填円筒線本体、前記充填半円筒金網体について、前記各縦金属線を除き、前記各半円形横金属線でなる仮想・充填半円筒線体、前記仮想・充填円筒線本体、又は前記充填円筒線本体モデルを積載する水平面、前記水平面に直交する鉛直方向、前記充填半円筒線体の最大鉛直応力σe、前記仮想・充填円筒線本体、又は前記充填円筒線本体モデルの積載段数n、前記仮想・充填半円筒線体の円筒高長L、円筒中心線を前記鉛直方向に向けて、前記仮想・充填円筒線本体、又は前記充填円筒線本体モデルを積載する勾配α、積載段数n=2及び前記勾配αで積載した前記各充填円筒線本体モデルについて、最下段の前記充填半円筒線体モデル、及び最下段の前記充填半円筒線体モデルに積載した領域の充填円孤筒線体モデルでなる、勾配線体モデル群、無限積載段数n=∞及び前記勾配αで積載した前記各仮想・充填円筒線本体について、各段の前記仮想・充填半円筒線体でなる、仮想・勾配線体群、とし、前記勾配線体モデル群について、解析メッシュを構築して、最下段の前記充填半円筒線体モデルの最大鉛直応力σfを解析し、応力係数βを式(1)で求め、前記仮想・勾配線体群について、最下段の前記仮想・充填半円筒線体の最大鉛直応力σgを式(2)から求め、前記最大鉛直応力σg及び前記円筒高長Lから、単位体積重量Wgを求め、前記単位体積重量Wgを作用した前記充填半円筒金網体モデルについて、解析メッシュを構築して、前記水平Beam要素の最大引張荷重Whを解析し、前記最大引張荷重Wh及び前記半円形横金属線の線径面積から、最大引張応力σhを求め、前記各連結コイル金属線の剪段強度τは、τ>最大引張応力σhとすることを特徴とする円筒金網籠である。   Claim 2 according to the present invention relates to a filled cylindrical wire mesh body in which the cylindrical wire mesh body is filled with a filling material, a filled semicylindrical wire mesh body in which the semicylindrical wire mesh body is filled with a filling material, and the filled cylindrical wire mesh body. With respect to the filled cylindrical wire body model in which each semicircular horizontal metal wire is expressed by a horizontal beam element, except for each vertical metal wire, and for each filled semicylindrical wire mesh body, each semicircular horizontal metal is removed except for each vertical metal wire. For a filled semi-cylindrical wire model in which lines are represented by horizontal Beam elements, and for the filled semi-cylindrical wire mesh, each semicircular horizontal metal line is represented by a horizontal Beam element, and each vertical metal line is represented by a vertical Beam element. The filled semi-cylindrical wire mesh model, the filled cylindrical wire mesh body, except for the vertical metal wires, the virtual / filled cylindrical wire body made of the semi-circular horizontal metal wires, and the filled semi-cylindrical wire mesh body Excluding metal wire , A virtual / filling semi-cylindrical wire composed of each semicircular horizontal metal wire, a horizontal plane on which the virtual / filling cylindrical wire main body or the filling cylindrical wire main body model is loaded, a vertical direction perpendicular to the horizontal plane, and the filling semi-cylindrical The maximum vertical stress σe of the wire body, the number n of loading stages of the virtual / filled cylindrical wire body or the filled cylindrical wire body model, the cylinder height L of the virtual / filled semi-cylindrical wire body, and the cylinder center line in the vertical direction For each of the filled cylindrical line main body models loaded with the gradient α, the loading stage number n = 2 and the gradient α loading the virtual / filled cylindrical line main body or the filled cylindrical line main body model, Gradient line model group consisting of a semi-cylindrical line model and a filled circular arc cylinder model of the area loaded on the bottom filled semi-cylindrical line model, loaded with an infinite loading stage number n = ∞ and the gradient α. Each virtual / filling circle For the tube body, a virtual / gradient line group consisting of the virtual / filling semi-cylindrical line bodies at each stage, and an analysis mesh is constructed for the gradient line model group, and the bottom half of the filling half cylinder The maximum vertical stress σf of the linear body model is analyzed, the stress coefficient β is calculated by the equation (1), and the maximum vertical stress σg of the hypothetical / filled semi-cylindrical linear body at the lowest stage is calculated for the virtual / gradient linear body group. From (2), from the maximum vertical stress σg and the cylindrical height L, to determine the unit volume weight Wg, for the filled semi-cylindrical metal mesh model that has worked the unit volume weight Wg, construct an analysis mesh, The maximum tensile load Wh of the horizontal beam element is analyzed, the maximum tensile stress σh is obtained from the maximum tensile load Wh and the wire diameter area of the semicircular horizontal metal wire, and the cutting strength τ of each connecting coil metal wire is , Τ> maximum tensile stress σh It is a cylindrical wire mesh cage characterized by that.

Figure 2016172998
Figure 2016172998

Figure 2016172998
Figure 2016172998

本発明に係る請求項3は、前記円筒金網本体に中詰材を充填した充填円筒金網本体、前記半円筒金網体に中詰材を充填した充填半円筒金網体、前記充填円筒金網本体について、前記各縦金属線を除き、前記各半円形横金属線でなる仮想・充填円筒線本体、前記充填半円筒金網体について、前記各縦金属線を除き、前記各半円形横金属線でなる仮想・充填半円筒線体、前記充填半円筒金網体の仮想・充填半円筒金網体、前記仮想・充填円筒線本体を積載する水平面、前記水平面に直交する鉛直方向、前記仮想・充填円筒線本体の積載段数n、前記仮想・充填半円筒線体の円筒高長L、円筒中心線を前記鉛直方向に向けて、前記仮想・充填円筒線本体を積載する勾配α、無限積載段数n=∞及び前記勾配αで積載した前記各仮想・充填円筒線本体について、各段の前記仮想・充填半円筒線体でなる、仮想・勾配線体群、とし、前記仮想・勾配線体群について、最下段の前記仮想・充填半円筒線体の最大鉛直応力σgを求め、前記最大鉛直応力σg及び前記円筒高長Lから、単位体積重量Wgを求め、前記単位体積重量Wgを作用した前記仮想・充填半円筒金網体について、前記各半円形横金属線の最大引張応力σhを求め、前記各連結コイル金属線の剪断強度τは、τ>最大引張応力σhとすることを特徴とする請求項1に記載の円筒金網籠である。   A third aspect of the present invention relates to a filled cylindrical wire mesh body filled with a filling material in the cylindrical wire mesh body, a filled semicylindrical wire mesh body filled with a filling material into the half cylindrical wire mesh body, and the filled cylindrical wire mesh body. A virtual / filled cylindrical wire main body composed of each semicircular horizontal metal wire, excluding each vertical metal wire, and a virtual metal filled with each semicircular horizontal metal wire except for each vertical metal wire, with respect to the filled semicylindrical wire mesh body. Filling semi-cylindrical wire, virtual filling semi-cylindrical wire mesh body, filling horizontal semi-cylindrical wire mesh, horizontal plane on which the virtual filling / cylindrical cylinder body is loaded, vertical direction perpendicular to the horizontal plane, The loading stage number n, the cylinder height L of the virtual / filling semi-cylindrical line, the gradient α in which the virtual / filling cylindrical line body is loaded with the cylinder center line oriented in the vertical direction, the infinite loading stage number n = ∞ and the above In each virtual / filled cylindrical wire body loaded with a gradient α A virtual / gradient line group consisting of the virtual / filling semi-cylindrical line at each stage, and the maximum vertical stress σg of the virtual / filling semi-cylindrical line at the lowest stage for the virtual / gradient line group. From the maximum vertical stress σg and the cylindrical height L, a unit volume weight Wg is obtained, and the maximum of each semicircular horizontal metal wire is obtained with respect to the virtual / filled semi-cylindrical wire mesh body on which the unit volume weight Wg is applied. 2. The cylindrical wire mesh cage according to claim 1, wherein a tensile stress σh is obtained, and a shear strength τ of each of the connecting coil metal wires satisfies τ> maximum tensile stress σh.

本発明に係る請求項1は、円筒金網籠の円筒金網本体は、一対の半円筒金網体で構成するので、保管又は搬送において、各半円筒金網体を重ねて配置でき、占有スベースを低減できる。   According to the first aspect of the present invention, the cylindrical wire mesh body of the cylindrical wire mesh cage is constituted by a pair of semi-cylindrical wire mesh bodies, so that each half-cylindrical wire mesh body can be arranged in a pile in storage or transport, and the occupied sbase can be reduced. .

本発明に係る請求項2は、3次元解析有限要素法による解析、及び計算にて、仮想・勾配線体群(無限積載段数n=∞及び勾配αで積載)について、最下段の仮想・充填半円筒線体の最大鉛直応力σfを求め、更に単位体積重量Wgを求める。単位体積重量Wgを充填半円筒金網籠体モデルに作用し、単位体積重量Wgの充填半円筒金網体モデルについて、解析メッシュを構築して、水平Beam要素の最大引張荷重Whを解析する。水平Beam要素は、円筒金網本体の半円形横金属線である。水平Beam要素(半円形横金属線)の最大引張荷重Wgは、各連結コイル金属線の剪断方向において、各連結コイル金属線に剪断荷重として作用する。各連結コイル金属線の剪断強度τ(剪断応力)を、τ>最大引張応力σhとすることで、無限積載段数n=∞及び勾配αで充填円筒金網籠を積載しても、各連結コイル金属線は剪断することなく、各半円筒金網体同士の連結を保持できる。
請求項2では、最大鉛直応力σf,σgの解析及び計算は、縦金属線を除き、各半円形横金属線でなる仮想・充填半円筒線体、及び縦金属線を除き、水平Beam要素でなる充填半円筒線体モデルを想定して実行する。これにより、無限積載段数n=∞及び勾配αで積載した充填円筒金網籠に対して、最も危険度の高い条件にて、最大鉛直応力σf,σgを解析及び計算する。
なお、3次元解析有限要素法については、京都大学 木村亮教授,名古屋工業大学教授 張鋒教授により開発された3次元弾塑性有限要素解析コードDGPILE 3Dを元に、本解析ソフトの適用性については、例えば、文献:著作者長野孝一郎、木村亮、鈴木雄吾著「土−水連成弾塑有限要素法による橋梁基礎杭の長期変位予測,土木学会論文集C,Vol.63,No4,pp.1041-1053,2007」、文献:森河由紀弘著「再液状化を含めた地盤液状化メカニズムの解明および種々地盤耐震補強工法の評価への応用,名古屋工業大学学位請求論文,2013」を通じて検証されている。
According to the second aspect of the present invention, in the analysis and calculation by the three-dimensional analysis finite element method, the virtual / filling of the lowermost stage is assumed for the virtual / gradient line body group (loaded with an infinite stacking stage number n = ∞ and the slope α). The maximum vertical stress σf of the semicylindrical wire is obtained, and further the unit volume weight Wg is obtained. The unit volume weight Wg is applied to the filled semi-cylindrical wire mesh frame model, and an analysis mesh is constructed for the filled semi-cylindrical wire mesh model with the unit volume weight Wg to analyze the maximum tensile load Wh of the horizontal beam element. The horizontal beam element is a semicircular horizontal metal wire of a cylindrical wire mesh body. The maximum tensile load Wg of the horizontal beam element (semi-circular horizontal metal wire) acts as a shear load on each connection coil metal wire in the shear direction of each connection coil metal wire. By setting the shear strength τ (shear stress) of each coupled coil metal wire to τ> maximum tensile stress σh, each coupled coil metal can be loaded even when the cylindrical metal mesh cage is loaded with an infinite stacking number n = ∞ and a gradient α. The wire can maintain the connection between the semicylindrical metal mesh bodies without shearing.
In claim 2, the analysis and calculation of the maximum vertical stresses σf and σg are performed by horizontal beam elements except for the vertical metal lines, except for the virtual / filled semi-cylindrical wire body and the vertical metal lines. This is performed assuming a filled semi-cylindrical linear body model. As a result, the maximum vertical stresses σf and σg are analyzed and calculated under the condition with the highest degree of danger for the filled cylindrical mesh net loaded with an infinitely loaded stage number n = ∞ and a gradient α.
Regarding the 3D analysis finite element method, the applicability of this analysis software is based on the 3D elasto-plastic finite element analysis code DGPILE 3D developed by Professor Ryo Kimura, Kyoto University, and Professor Zhang Yun, Nagoya Institute of Technology. For example, literature: authors Koichiro Nagano, Ryo Kimura, Yugo Suzuki, “Long-term displacement prediction of bridge foundation pile by soil-water coupled elastic-plastic finite element method, JSCE C, Vol.63, No4, pp. 1041-1053, 2007 ”, literature: Yukihiro Morikawa,“ Elucidation of ground liquefaction mechanism including reliquefaction and application to evaluation of various ground seismic reinforcement methods, Nagoya Institute of Technology degree request paper, 2013 ” ing.

本発明に係る請求項3は、仮想・勾配線体群(無限積載段数n=∞及び勾配αで積載)について、最下段の仮想・充填半円筒線体の最大鉛直応力σfを求め、更に単位体積重量Wgを求める。単位体積重量Wgを仮想・充填半円筒金網籠体に作用して、各半円形横金属線の最大引張応力σhを求める。半円形横金属線の最大引張荷重Wgは、各連結コイル金属線の剪断方向において、各連結コイル金属線に剪断荷重として作用する。各連結コイル金属線の剪断強度τ(剪断応力)を、τ>最大引張応力σhとすることで、無限積載段数n=∞及び勾配αで充填円筒金網籠を積載しても、各連結コイル金属線は剪断することなく、各半円筒金網体同士の連結を保持できる。
請求項3では、最大鉛直応力σg解析及び計算は、縦金属線を除き、各半円形横金属線でなる仮想・充填半円筒線体を想定して実行する。これにより、無限積載段数n=∞及び勾配αで積載した充填円筒金網籠に対して、最も危険度の高い条件にて、最大鉛直応力σgを解析及び計算する。
According to a third aspect of the present invention, the maximum vertical stress σf of the lowermost virtual / filled semi-cylindrical linear body is obtained for the virtual / gradient line group (infinitely loaded stage number n = ∞ and slope α), The volume weight Wg is obtained. The unit volume weight Wg is applied to the virtual / filled semi-cylindrical wire mesh frame to determine the maximum tensile stress σh of each semi-circular horizontal metal wire. The maximum tensile load Wg of the semicircular horizontal metal wire acts as a shear load on each connecting coil metal wire in the shearing direction of each connecting coil metal wire. By setting the shear strength τ (shear stress) of each coupled coil metal wire to τ> maximum tensile stress σh, each coupled coil metal can be loaded even when the cylindrical metal mesh cage is loaded with an infinite stacking number n = ∞ and a gradient α. The wire can maintain the connection between the semicylindrical metal mesh bodies without shearing.
In claim 3, the analysis and calculation of the maximum vertical stress σg is executed assuming a virtual / filled semi-cylindrical wire body composed of each semi-circular horizontal metal wire except for the vertical metal wire. As a result, the maximum vertical stress σg is analyzed and calculated under the condition with the highest degree of danger for the filled cylindrical wire mesh cage loaded with the infinitely loaded stage number n = ∞ and the gradient α.

本発明に係る円筒金網籠を示す斜視図である。It is a perspective view which shows the cylindrical metal-mesh cage | basket concerning this invention. 本発明に係る円筒金網籠を示す図であって、(a)は側面図、(b)は図2(a)の拡大図である。It is a figure which shows the cylindrical metal-mesh cage | basket concerning this invention, Comprising: (a) is a side view, (b) is an enlarged view of Fig.2 (a). 本発明に係る円筒金網籠を示す上面図(底面図)である。It is a top view (bottom view) showing a cylindrical wire mesh cage according to the present invention. 本発明に係る円筒金網籠を構成する半円筒金網体、及び連結コイル金属線を示す斜視図である。It is a perspective view which shows the semi-cylindrical metal-mesh body which comprises the cylindrical metal-mesh cage | basket concerning this invention, and a connection coil metal wire. 本発明に係る円筒金網籠において、各半円筒金網体を重ねた状態を示す斜視図である。It is a perspective view which shows the state which piled up each semi-cylindrical metal-mesh body in the cylindrical metal-mesh case concerning this invention. 本発明に係る円筒金網籠において、連結コイル金属線にて半円筒金網体同士を連結し、円筒金網本体に円形金網蓋を固定する状態を示す斜視図である。FIG. 3 is a perspective view showing a state in which the semi-cylindrical metal mesh bodies are connected to each other by a connecting coil metal wire and the circular metal mesh lid is fixed to the cylindrical metal mesh main body in the cylindrical metal mesh cage according to the present invention. 本発明に係る円筒金網籠において、円筒金網本体に中詰材を充填した状態を示す斜視図である。It is a perspective view which shows the state which filled the filling material in the cylindrical metal-mesh main body in the cylindrical metal-mesh cage | basket concerning this invention. 充填円筒金網籠を積載段数n=3及び勾配αで積載した斜視図である。It is the perspective view which loaded the filling cylindrical wire-mesh with the loading stage number n = 3 and the gradient α. 解析及び計算する円筒金網籠Y1について、勾配線体モデル群の最下段の充填半円筒線体モデル、及び2段目の充填円孤筒線体モデルを示す側面図である。It is a side view which shows the lower half filling semi-cylindrical wire model of a gradient wire body model group, and the 2nd filling circle arcuate wire body model about the cylindrical wire netting Y1 to be analyzed and calculated. 図9のA−A矢視図である。It is an AA arrow line view of FIG. 解析及び計算する円筒金網籠Y1について、直上線体モデル群の各段の充填半円筒線体モデルを示す側面図である。It is a side view which shows the filling semi-cylinder linear body model of each step | paragraph of a straight line body model group about the cylindrical wire netting Y1 to analyze and calculate. 図11のB−B矢視図である。It is a BB arrow line view of FIG. 解析及び計算する円筒金網籠Y1の勾配線体モデル群について、3次元解析FEMにより構築される解析メッシュ(解析メッシュモデル)を示す斜視図である。It is a perspective view which shows the analysis mesh (analysis mesh model) constructed | assembled by the three-dimensional analysis FEM about the gradient linear body model group of the cylindrical wire netting Y1 to analyze and calculate. 解析及び計算する円筒金網籠Y1について、3次元解析FENにより構築される解析メッシュ(解析メッシュモデル)を示す図であって、(a)は充填半円筒線体モデルの解析メッシュの斜視図、(b)は直上線体モデル群の解析メッシュの斜視図である。It is a figure which shows the analysis mesh (analysis mesh model) constructed | assembled by the three-dimensional analysis FEN about the cylindrical wire netting Y1 to analyze and calculate, Comprising: (a) is a perspective view of the analysis mesh of a filling semi-cylinder linear body model, ( b) is a perspective view of an analysis mesh of a linear body model group. 解析及び計算する円筒金網籠Y1について、(a)は最大鉛直応力σe,σf,σpの解析結果、(b)は解析メッシュを示すグラフ図である。(A) is the analysis result of maximum vertical stress (sigma) e, (sigma) f, (sigma) p, (b) is a graph figure which shows an analysis mesh about cylindrical metal-mesh fence Y1 to analyze and calculate. 解析及び計算する円筒金網籠Y2について、勾配線体モデル群の最下段の充填半円筒線体モデル、及び2段目の充填円孤筒線体モデルを示す側面図である。It is a side view which shows the lower half filling semi-cylindrical wire model of a gradient wire body model group, and the 2nd filling circle arcuate wire body model about the cylindrical wire netting Y2 to be analyzed and calculated. 図16のC−C矢視図である。It is CC arrow line view of FIG. 解析及び計算する円筒金網籠Y2について、直上線体モデル群の各段の充填半円筒線体モデルを示す側面図である。It is a side view which shows the filling semi-cylinder linear body model of each step | level of a straight line body model group about the cylindrical wire netting Y2 to analyze and calculate. 図18のD−D矢視図である。It is the DD arrow line view of FIG. 解析及び計算する円筒金網籠Y2の勾配線体モデル群について、3次元解析FEMにより構築される解析メッシュ(解析メッシュモデル)を示す斜視図である。It is a perspective view which shows the analysis mesh (analysis mesh model) constructed | assembled by the three-dimensional analysis FEM about the gradient linear body model group of the cylindrical wire netting Y2 to analyze and calculate. 解析及び計算する円筒金網籠Y2について、3次元解析FENにより構築される解析メッシュ(解析メッシュモデル)を示す図であって、(a)は充填半円筒線体モデルの解析メッシュの斜視図、(b)は直上線体モデル群の解析メッシュの斜視図である。It is a figure which shows the analysis mesh (analysis mesh model) constructed | assembled by the three-dimensional analysis FEN about the cylindrical wire netting Y2 to analyze and calculate, Comprising: (a) is a perspective view of the analysis mesh of a filling semi-cylinder linear body model, ( b) is a perspective view of an analysis mesh of a linear body model group. 解析及び計算する円筒金網籠Y2について、(a)は最大鉛直応力σe,σf,σpの解析結果、(b)は解析メッシュを示すグラフ図である。(A) is the analysis result of maximum vertical stress (sigma) e, (sigma) f, (sigma) p, and (b) is a graph which shows an analysis mesh about cylindrical metal-mesh fence Y2 to analyze and calculate. 解析及び計算する円筒金網籠Y1について、無限積載段数n=∞及び勾配αで積載した仮想・充填半円筒線体、及び最大鉛直応力σgを示す模式図である。It is a schematic diagram showing a virtual / filled semi-cylindrical linear body loaded with an infinite stacking stage number n = ∞ and a gradient α, and a maximum vertical stress σg with respect to the cylindrical wire netting Y1 to be analyzed and calculated. 解析及び計算する円筒金網籠Y2について、無限積載段数n=∞及び勾配αで積載した仮想・充填半円筒線体、及び最大鉛直応力σgを示す模式図である。FIG. 6 is a schematic diagram showing a virtual / filled semi-cylindrical line loaded with an infinite stacking stage number n = ∞ and a gradient α, and a maximum vertical stress σg with respect to the cylindrical wire mesh cage Y2 to be analyzed and calculated. 解析及び計算する円筒金網籠Y1について、(a)は最大引張荷重Wgの解析結果を示すグラフ図、(b)は充填半円筒金網体モデルに構築した解析メッシュを示す図である。(A) is a graph which shows the analysis result of the maximum tensile load Wg, (b) is a figure which shows the analysis mesh constructed | assembled to the filling semi-cylindrical wire mesh body model about the cylindrical wire mesh Y1 to analyze and calculate. 解析及び計算する円筒金網籠Y2について、(a)は最大引張荷重Wgの解析結果を示すグラフ図、(b)は充填半円筒金網体モデルに構築した解析メッシュを示す図である。(A) is a graph which shows the analysis result of the maximum tensile load Wg, (b) is a figure which shows the analysis mesh constructed | assembled to the filling semi-cylindrical wire mesh body model about the cylindrical wire mesh Y2 to analyze and calculate. 油圧式万能試験機に供試体を装着した図である。It is the figure which attached the test body to the hydraulic universal testing machine. 引張試験において、最大引張荷重の結果を示すグラフ図である。It is a graph which shows the result of the maximum tensile load in a tension test. 本発明に係る他の実施形態の円筒金網籠YAについて、充填円筒金網籠を積載段数n=3及び勾配αで積載した斜視図である。FIG. 10 is a perspective view of a cylindrical metal mesh cage YA according to another embodiment of the present invention, in which filled cylindrical metal mesh cages are loaded with a loading stage number n = 3 and a gradient α.

本発明に係る円筒金網籠について、図1乃至図29を参照して説明する。   A cylindrical wire mesh rod according to the present invention will be described with reference to FIGS.

図1乃至図4において、円筒金網籠Yは、図1乃至図4に示すように、円筒金網本体1、複数の連結コイル金属線2,3、一対の金網蓋4,5及び複数の固定コイル金属線6,7を備える。
円筒金網籠Yの各寸法は、円筒直径D及び円筒高長Lである。円筒高長Lは、円筒中心線a方向において、各円形金網蓋2,3間の高さとなる。
1 to 4, a cylindrical wire mesh rod Y is formed of a cylindrical wire mesh body 1, a plurality of connecting coil metal wires 2, 3, a pair of wire mesh lids 4, 5 and a plurality of fixed coils, as shown in FIGS. Metal wires 6 and 7 are provided.
Each dimension of the cylindrical wire mesh basket Y is a cylindrical diameter D and a cylindrical height L. The cylinder height L is the height between the circular wire mesh lids 2 and 3 in the direction of the cylinder center line a.

円筒金網本体1は、図1乃至図4に示すように、円筒中心線aに沿って二等分割した一対の半円筒金網体8,9で構成される。   As shown in FIGS. 1 to 4, the cylindrical wire mesh body 1 is composed of a pair of semi-cylindrical wire mesh bodies 8 and 9 that are divided into two equal parts along a cylindrical center line a.

各半円筒金網体8,9は、図1乃至図4に示すように、同一構成(構造)であって、複数の半円形横金属線10,10,…及び複数の縦金属線11,11,…を有する。   As shown in FIGS. 1 to 4, each semicylindrical metal mesh body 8, 9 has the same configuration (structure), and a plurality of semicircular horizontal metal wires 10,... And a plurality of vertical metal wires 11, 11. , ...

各半円形横金属線10,10,…は、図4に示すように、半径R(R=D/2)の半円形に形成される。
各半円形横金属線10,10,…は、円筒中心線a方向に線間隔ATを隔てて並列される。各半円形横金属線10,10,…は、円筒金網本体1の円周方向に延在される。
各半円形横金属線10,10,…は、例えば、亜鉛−10%アルミニウム合金メッキ鉄筋(炭素鋼)で形成される。各半円形金属線10,10,…は、線径dである。各半円形横金属線10,10,…の軸方向の線径面積Aは、A=(d/2)×円周率(π)である。
Each of the semicircular horizontal metal wires 10, 10,... Is formed in a semicircular shape having a radius R (R = D / 2) as shown in FIG.
Each of the semicircular horizontal metal wires 10, 10,... Is arranged in parallel with a line interval AT in the direction of the cylindrical center line a. Each of the semicircular horizontal metal wires 10, 10,... Extends in the circumferential direction of the cylindrical wire net body 1.
Each of the semicircular horizontal metal wires 10, 10,... Is formed of, for example, zinc-10% aluminum alloy plated reinforcing bars (carbon steel). Each semicircular metal wire 10, 10,... Has a wire diameter d. The axial diameter area A of each semicircular horizontal metal wire 10, 10,... Is A = (d / 2) 2 × circumference (π).

各縦金属線11,11,…は、半円形横金属線10(各半円筒金網体8,9)の円周方向に線間隔BTを隔てて並列される。各縦金属線11,11,…は、図1及び図2に示すように、円筒金網本体1の両端開口1A,1B間にわたって延在される。各縦金属線11,11,…は、図1及び図4に示すように、円筒中心線a方向において、各半円筒金網体8,9の両端8A,8B又は9A,9B間にわたって延在され、各半円形横金属線10,10,…と直交して交差する。
各縦金属線11,11,…は、例えば、亜鉛−10%アルミニウム合金メッキ鉄筋(炭素鋼)で形成される。各縦金属線11,11,…は、線直径dである。各縦金属線11,11,…の軸方向の断面積Aは、A=(d/2)×円周率(π)である。
The vertical metal lines 11, 11,... Are arranged in parallel with a line interval BT in the circumferential direction of the semicircular horizontal metal line 10 (each semicylindrical metal mesh body 8, 9). As shown in FIGS. 1 and 2, each vertical metal wire 11, 11,... Extends between both end openings 1 </ b> A, 1 </ b> B of the cylindrical wire net body 1. As shown in FIGS. 1 and 4, each vertical metal wire 11, 11,... Extends between both ends 8 </ b> A, 8 </ b> B or 9 </ b> A, 9 </ b> B of each semi-cylindrical metal mesh body 8, 9 in the direction of the cylindrical center line a. , And intersect with each semicircular horizontal metal wire 10, 10,.
Each of the vertical metal wires 11, 11,... Is formed of, for example, zinc-10% aluminum alloy plated reinforcing bars (carbon steel). Each vertical metal wire 11, 11, ... has a wire diameter d. The cross-sectional area A in the axial direction of each vertical metal wire 11,... Is A = (d / 2) 2 × circumference (π).

各半円筒金網体8,9は、各金属線10,11の交点Bにて、各半円形金属線10,10,…及び各縦金属線11,11,…同士を溶接して固定する。各金属線10,11は、線間隔AT,BT間に複数の網目CTを形成する。
各半円筒金網体8,9は、図1乃至図4に示すように、円周方向両端の縦金属線11A,11A、11B,11Bを隣接して円筒金網本体1を構成する。円周方向一端の各縦金属線11A,11A同士は、各半円筒金網体8,9の両端8A,8B、9A,9B間にわたって隣接される(突合わされる)。円周方向他端の各縦金属線11B,11B同士は、各半円筒金網体8,9の両端8A,8B、9A,9B間にわたって隣接される(突合わされる)。
円周方向両端の各縦金属線11A,11A、11B,11Bを隣接すると、各半円筒金網体8,9は、図1及び図2に示すように、円筒金網本体1を構成する。
Each semi-cylindrical metal mesh body 8, 9 is fixed by welding each semi-circular metal wire 10, 10, ... and each vertical metal wire 11, 11, ... at the intersection B of each metal wire 10, 11. Each metal line 10, 11 forms a plurality of meshes CT between line intervals AT, BT.
As shown in FIGS. 1 to 4, each semicylindrical metal mesh body 8, 9 constitutes a cylindrical metal mesh body 1 with adjacent vertical metal wires 11 </ b> A, 11 </ b> A, 11 </ b> B, 11 </ b> B at both ends in the circumferential direction. The vertical metal wires 11A and 11A at one end in the circumferential direction are adjacent to each other across the ends 8A, 8B, 9A and 9B of the semi-cylindrical metal mesh bodies 8 and 9. The vertical metal wires 11B and 11B at the other end in the circumferential direction are adjacent (abutted) across both ends 8A, 8B, 9A and 9B of the semi-cylindrical metal mesh bodies 8 and 9, respectively.
When the vertical metal wires 11A, 11A, 11B, and 11B at both ends in the circumferential direction are adjacent to each other, the semicylindrical metal mesh bodies 8 and 9 constitute a cylindrical metal mesh body 1 as shown in FIGS.

各連結コイル金属線2,3は、図1乃至図4に示すように、円周方向両端で隣接する各縦金属線11A,11A又は11B,11Bに巻付けられ、各半円筒金網体8,9同士を連結する。各連結コイル金属線2,3は、例えば、鉄線(炭素鋼)で形成される。各連結コイル金属線2,3は、コイル線径dcである。各連結コイル金属線2,3の線径面積Acは、Ac=(dc/2)×円周率(π)である。 As shown in FIGS. 1 to 4, each connecting coil metal wire 2, 3 is wound around each vertical metal wire 11 </ b> A, 11 </ b> A or 11 </ b> B, 11 </ b> B adjacent at both ends in the circumferential direction, 9 is connected. Each connection coil metal wire 2 and 3 is formed with an iron wire (carbon steel), for example. Each of the connecting coil metal wires 2 and 3 has a coil wire diameter dc. The wire diameter area Ac of each of the connecting coil metal wires 2 and 3 is Ac = (dc / 2) 2 × circumference (π).

連結コイル金属線2は、図1に示すように、円筒金網本体1の両端開口1A,1B間にわたって、隣接する各縦金属線11A,11A(円周方向一方端の各縦金属線11A,11A)に巻付けられる。連結コイル金属線2は、円筒金網本体1内外周側から各半円形横金属線10,10,…及び各縦金属線11A,11A間の各網目CTに挿通され、隣接する各縦金属線11A,11Aに巻付けられる。連結コイル金属線2は、各半円筒金網体8,9の各半円形横金属線10,10,…に直交して、各縦金属線11A,11Aに巻付けられる。
連結コイル金属線2は、コイルバネ力(付勢力)にて、円周方向一端で隣接する各縦金属線11A,11Aを締付ける。
As shown in FIG. 1, the connecting coil metal wire 2 extends between the two end openings 1 </ b> A and 1 </ b> B of the cylindrical wire net body 1, adjacent vertical metal wires 11 </ b> A and 11 </ b> A (vertical metal wires 11 </ b> A and 11 </ b> A at one circumferential end. ). The connecting coil metal wire 2 is inserted into the semicircular horizontal metal wires 10, 10,... And the meshes CT between the vertical metal wires 11A, 11A from the inner and outer peripheral sides of the cylindrical metal mesh body 1, and adjacent vertical metal wires 11A. , 11A. The connecting coil metal wire 2 is wound around the vertical metal wires 11A and 11A perpendicularly to the semicircular horizontal metal wires 10, 10,.
The connecting coil metal wire 2 fastens the adjacent vertical metal wires 11A and 11A at one end in the circumferential direction by a coil spring force (biasing force).

連結コイル金属線3は、図1に示すように、円筒金網本体1の両端開口1A,1B間にわたって、隣接する各縦金属線11B,11B(円周方向他方端の各縦金属線11B,11B)に巻付けられる。各連結コイル金属線3は、円筒金網本体1の内外周側から各半円形金属線10,10,…及び各縦金属線11B,11B間の各網目CTに挿通され、隣接する各縦金属線11B,11Bに巻付けられる。連結コイル金属線3は、各半円筒金網体8,9の各半円形横金属線10,10,…に直交して、各縦金属線11B,11Bに巻付けられる。
連結コイル金属線3は、コイルバネ力(付勢力)にて、円周方向他端で隣接する各縦金属線11B,11Bを締付ける。
As shown in FIG. 1, the connecting coil metal wire 3 extends between the two end openings 1 </ b> A and 1 </ b> B of the cylindrical wire mesh body 1 and is adjacent to the vertical metal wires 11 </ b> B and 11 </ b> B. ). The connecting coil metal wires 3 are inserted from the inner and outer peripheral sides of the cylindrical metal mesh body 1 into the semicircular metal wires 10, 10,... And the meshes CT between the vertical metal wires 11B, 11B, and adjacent vertical metal wires. It is wound around 11B and 11B. The connecting coil metal wire 3 is wound around the vertical metal wires 11B and 11B perpendicularly to the semicircular horizontal metal wires 10, 10,.
The connecting coil metal wire 3 fastens the adjacent vertical metal wires 11B and 11B at the other end in the circumferential direction by a coil spring force (biasing force).

各金網蓋4,5は、例えば、円形金網蓋である(以下、「円形金網籠4,5」という)。なお、各金網蓋4,5は、矩形金網蓋(正方形金網蓋、長方形金網蓋)等で構成しても良い。
各円形金網蓋4,5は、図1乃至図4示すように、円筒金網本体1の両端開口1A,1Bを夫々閉塞する。各円形金網蓋4,5は、円筒金網本体1の両端に固定される。
各円形金網蓋4,5は、蓋直径Dである。
各円形金網蓋4,5は、円形金属線15及び円形金網16を有し、円形金属線15は、例えば、亜鉛−10%アルミニウム合金メッキ鉄筋(炭素鋼)で形成される。円形金属線15の寸法は、蓋直径Dである。
円形金網16は、複数の金属線(例えば、亜鉛−10%アルミニウム合金メッキ炭素鋼線)を編込んで構成され、円形金属線15内側に配置される。円形金網16は、円形金属線15の円周方向にわたって、円形金属線15に固定される。
Each of the wire mesh lids 4 and 5 is, for example, a circular wire mesh lid (hereinafter referred to as “circular wire mesh cages 4 and 5”). In addition, you may comprise each metal-mesh cover 4 and 5 with a rectangular metal-mesh cover (square metal-mesh cover, a rectangular metal-mesh cover) etc.
As shown in FIGS. 1 to 4, the circular wire mesh lids 4 and 5 respectively close both end openings 1 </ b> A and 1 </ b> B of the cylindrical wire mesh body 1. The circular wire mesh lids 4 and 5 are fixed to both ends of the cylindrical wire mesh body 1.
Each circular wire mesh lid 4, 5 has a lid diameter D.
Each circular wire mesh lid 4, 5 has a circular metal wire 15 and a circular wire mesh 16, and the circular metal wire 15 is formed of, for example, zinc-10% aluminum alloy plated reinforcing bars (carbon steel). The dimension of the circular metal wire 15 is the lid diameter D.
The circular wire mesh 16 is configured by braiding a plurality of metal wires (for example, zinc-10% aluminum alloy plated carbon steel wire), and is disposed inside the circular metal wire 15. The circular wire mesh 16 is fixed to the circular metal wire 15 over the circumferential direction of the circular metal wire 15.

円形金網蓋4は、図1乃至図3に示すように、円筒金網本体1の一端開口1A(上端開口)を円形金網16にて閉塞する。円形金網蓋4は、円形金属線15を円筒中心線a方向の一端に位置する半円形横金属線10Aに重ねて当接する。円形金網蓋4は、円筒金網本体1の上端開口1Aを閉塞する上蓋(円形金網上蓋)である。   As shown in FIGS. 1 to 3, the circular wire mesh lid 4 closes one end opening 1 </ b> A (upper end opening) of the cylindrical wire mesh body 1 with a circular wire mesh 16. The circular wire mesh lid 4 is brought into contact with the semicircular horizontal metal wire 10A, which is positioned at one end in the direction of the cylindrical center line a, with the circular metal wire 15 overlapped. The circular wire mesh lid 4 is an upper lid (circular wire mesh upper lid) that closes the upper end opening 1 </ b> A of the cylindrical wire mesh body 1.

円形金網蓋5は、図1乃至図3に示すように、円筒金網本体1の他端開口1B(下端開口)を円形金網16にて閉塞する。円形金網蓋5は、円形金属線15を円筒中心線a方向の他端に位置する半円形横金属線10Bに重ねて当接する。円形金網蓋5は、円筒金網本体1の下端開口1Bを閉塞する下蓋(円形金網下蓋)である。   As shown in FIGS. 1 to 3, the circular wire mesh lid 5 closes the other end opening 1 </ b> B (lower end opening) of the cylindrical wire mesh body 1 with a circular wire mesh 16. The circular wire mesh lid 5 overlaps and abuts the circular metal wire 15 on the semicircular horizontal metal wire 10B positioned at the other end in the direction of the cylindrical center line a. The circular wire mesh lid 5 is a lower lid (circular wire mesh lower lid) that closes the lower end opening 1 </ b> B of the cylindrical wire mesh body 1.

各固定コイル金属線6,7は、図1乃至3に示すように、各円形金網蓋4,5を円筒金網本体1の両端の夫々に固定する。各固定コイル金属線6,7は、例えば、鉄線(炭素鋼)で形成される。   As shown in FIGS. 1 to 3, the fixed coil metal wires 6 and 7 fix the circular wire mesh lids 4 and 5 to both ends of the cylindrical wire mesh body 1, respectively. Each fixed coil metal wire 6, 7 is formed of, for example, an iron wire (carbon steel).

固定コイル金属線6は、円形金網蓋4を円筒金網本体1の一端(上端)に固定する。
固定コイル金属線6は、円筒金網本体1の円周方向にわったて、円筒中心線a方向の一端に位置する各半円形金属線10A,10A、及び円形金網蓋4の円形金属線16に巻付けられ、円形金網籠4を円筒金網本体1の一端(上端)に固定する。
固定コイル金属線6は、コイルバネ力(付勢力)にて各半円横金属線10A,10A及び円形金属線15を締付ける。
The fixed coil metal wire 6 fixes the circular wire mesh lid 4 to one end (upper end) of the cylindrical wire mesh body 1.
The fixed coil metal wire 6 extends to the semicircular metal wires 10A and 10A located at one end in the direction of the cylindrical center line a and the circular metal wire 16 of the circular wire mesh lid 4 along the circumferential direction of the cylindrical wire mesh body 1. The circular wire mesh cage 4 is wound and fixed to one end (upper end) of the cylindrical wire mesh body 1.
The fixed coil metal wire 6 fastens the semicircular horizontal metal wires 10A and 10A and the circular metal wire 15 with a coil spring force (biasing force).

固定コイル金属線7は、円形金網蓋5を円筒金網本体1の他端(下端)に固定する。
固定コイル金属線7は、円筒金網本体1の円周方向にわたって、円筒中心線a方向の他端に位置する各半円形横金属線10B,10B、及び円形金網蓋5の円形金属線15に巻付けられ、円形金網蓋5を円筒金網本体1の他端(下端)に固定する。
固定コイル金属線7は、コイルバネ力(付勢力)にて各半円横金属線10B,10B及び円形金属線15を締付ける。
The fixed coil metal wire 7 fixes the circular wire mesh lid 5 to the other end (lower end) of the cylindrical wire mesh body 1.
The fixed coil metal wire 7 is wound around each of the semicircular horizontal metal wires 10B and 10B located at the other end in the direction of the cylindrical center line a and the circular metal wire 15 of the circular wire mesh lid 5 over the circumferential direction of the cylindrical wire mesh body 1. The circular wire mesh lid 5 is fixed to the other end (lower end) of the cylindrical wire mesh body 1.
The fixed coil metal wire 7 fastens the semicircular horizontal metal wires 10B and 10B and the circular metal wire 15 with a coil spring force (biasing force).

このように、本発明に係る円筒金網籠Yは、各連結コイル金属線2,3にて各半円筒金網体8,9同士を連結して、円筒金網本体1を構成する。円筒金網籠Yは、各円形金網蓋4,5にて円筒金網本体1の両端開口1A,1Bして組立てられる。   As described above, the cylindrical wire mesh basket Y according to the present invention forms the cylindrical wire mesh body 1 by connecting the semicylindrical metal mesh bodies 8 and 9 to each other by the connecting coil metal wires 2 and 3. The cylindrical wire mesh basket Y is assembled by opening both ends 1 </ b> A and 1 </ b> B of the cylindrical wire mesh body 1 with the circular wire mesh lids 4 and 5.

本発明に係る円筒金網籠Yでは、図5に示すように、各半円筒金網体8,9を重ねて配置できる。各半円筒金網体8,9は、内周及び外周を重ねて配置する。
これにより、半円筒金網体8,9を重ねて保管及び運搬することで、円筒金網本体で保管及び運搬するのに比して、占有スペースを低減できる。
In the cylindrical wire mesh basket Y according to the present invention, as shown in FIG. Each semi-cylindrical metal mesh body 8, 9 is arranged with the inner periphery and the outer periphery overlapped.
Thereby, by occupying and storing and transporting the semicylindrical metal mesh bodies 8 and 9, the occupied space can be reduced as compared with storing and transporting the cylindrical metal mesh body.

本発明に係る円筒金網籠Yは、崩壊した河川護岸や山間斜面等の復旧に使用される。
復旧現場において、円筒金網籠Yは、図6及び図7に示すように、円筒金網本体1に中詰材Zを充填して、充填円筒金網籠YGとする(中詰材の充填工程)。
河川護岸等の崩壊状態に応じて、図8に示すように、複数の充填円筒金網籠YG,YG,…を積載段数n及び勾配αで積載して、河川護岸等を復旧する(充填円筒金網籠の積載工程)。
The cylindrical wire mesh fence Y according to the present invention is used for restoration of a collapsed river revetment or a mountain slope.
At the restoration site, as shown in FIGS. 6 and 7, the cylindrical wire mesh basket Y fills the cylindrical wire mesh body 1 with the filling material Z to form a filled cylindrical wire mesh bag YG (filling material filling process).
Depending on the collapsed state of river revetment, etc., as shown in FIG. 8, a plurality of filled cylindrical wire meshes YG, YG,...籠 loading process).

<A>中詰材の充填工程
復旧現場において、作業者は、図1乃至図4で説明したと同様、各連結コイル金属線2,3を各半円筒金網籠8,9の各縦金蔵線11A,11A又は11B,11Bに巻付け、各半円筒金網体8,9同士を連結する。
これにより、各半円筒金網籠8,9にて円筒金網体1を構成する(図6参照)。
<A> Filling process of filling material At the recovery site, the operator can connect the connecting coil metal wires 2 and 3 to the vertical metal warehouse wires of the semi-cylindrical metal mesh cages 8 and 9, as described in FIGS. It winds around 11A, 11A or 11B, 11B, and connects each semi-cylindrical metal mesh body 8, 9 to each other.
Thereby, the cylindrical metal mesh body 1 is comprised by each semi-cylindrical metal mesh cage | baskets 8 and 9 (refer FIG. 6).

続いて、作業者は、図1乃至図4で説明したと同様、円筒金網本体1の他端開口1Bを円形金網蓋5にて閉塞し、固定コイル金属線6にて円形金網蓋5を円筒金網本体1に固定する(図6参照)。   Subsequently, the operator closes the other end opening 1 </ b> B of the cylindrical wire mesh body 1 with the circular wire mesh lid 5 and cylindrically attaches the circular wire mesh lid 5 with the fixed coil metal wire 6 as described with reference to FIGS. 1 to 4. It fixes to the metal-mesh main body 1 (refer FIG. 6).

作業者は、バックホウ等の重機を使用して、円形金網蓋5付き円筒金網本体1を反転し、円筒金網本体1の一端開口1A(上端開口)から中詰材Zを円筒金網本体1内に充填する(図7参照)。中詰材Zは、復旧現場にある割栗石等である。   An operator uses a heavy machine such as a backhoe to invert the cylindrical wire mesh body 1 with the circular wire mesh lid 5 and put the filling material Z into the cylindrical wire mesh body 1 from one end opening 1A (upper end opening) of the cylindrical wire mesh body 1. Fill (see FIG. 7). The filling material Z is cracked stone or the like at the restoration site.

続いて、作業者は、図1乃至図4で説明したと同様、中詰材Zを充填した円筒金網本体1の一端開口1A(上端開口)を円形金網蓋4にて閉塞し、固定コイル金属線5にて円形金網蓋4を円筒金網本体1に固定する(図1乃至図3参照)。
これにより、円筒金網籠Yに中詰材Zを充填した充填円筒金網籠YGとする。
河川護岸等の崩壊状態に応じて、複数の充填円筒金網籠YG,YG,…を用意する。
Subsequently, the operator closes one end opening 1A (upper end opening) of the cylindrical wire mesh body 1 filled with the filling material Z with the circular wire mesh lid 4 in the same manner as described with reference to FIGS. A circular wire mesh lid 4 is fixed to the cylindrical wire mesh main body 1 by a line 5 (see FIGS. 1 to 3).
Thereby, it is set as the filling cylindrical gauze net YG filled with the filling material Z in the cylindrical gauze net Y.
A plurality of filled cylindrical wire nettings YG, YG,... Are prepared according to the collapsed state of a river revetment or the like.

<B>充填円筒金網籠YGの積載工程
復旧現場において、複数の充填円筒金網籠YG,YG,…は、図8に示すように、積載段数n(例えば、n=3)にて積載される。
作業者は、バックホウ等の重機を使用して、各充填円筒金網籠YG,YG,…を水平面HG(地面)に積載する。各充填円筒金網籠YG,YG,…は、円筒中心線aを水平面HGに直交する鉛直方向VPに向けて積載する。
各充填円筒金網籠YG,YG,…は、勾配αで積載される。勾配αは、例えば、鉛直方向VPの鉛直長VL、水平方向HHの水平長HL、及び迎角(傾斜角)θ=tan−1(VL/HL)で表される。
<B> Loading Step of Filled Cylindrical Wire Mesh YG At the restoration site, a plurality of filled cylindrical wire meshes YG, YG,... Are loaded with the number of loading stages n (for example, n = 3) as shown in FIG. .
The operator uses a heavy machine such as a backhoe to load each filled cylindrical wire netting YG, YG,... On the horizontal plane HG (ground). Each of the filled cylindrical wire mesh rods YG, YG,... Is loaded with the cylindrical center line a facing in the vertical direction VP orthogonal to the horizontal plane HG.
Each of the filled cylindrical mesh nets YG, YG,... The gradient α is represented by, for example, a vertical length VL in the vertical direction VP, a horizontal length HL in the horizontal direction HH, and an angle of attack (tilt angle) θ = tan −1 (VL / HL).

最下段の充填円筒金網籠YGは、図8に示すように、円筒中心線aを鉛直方向VPに向けて、円形金網蓋5(下蓋)を水平面HG(地面)上に設置する。
最下段以外の充填円筒金網籠YG,YGは、図8に示すように、円筒中心線aを鉛直方向VPに向けて、円形金網蓋5(下蓋)を1段下の充填円筒金網籠YGの円形金網蓋4(上蓋)上に積載する。
As shown in FIG. 8, the lowermost filled cylindrical metal mesh basket YG has a circular metal mesh lid 5 (lower lid) placed on the horizontal plane HG (ground) with the cylindrical center line a directed in the vertical direction VP.
As shown in FIG. 8, the filled cylindrical wire mesh rods YG and YG other than the lowermost row have the circular metal mesh lid 5 (lower lid) one level lower filled cylindrical wire mesh rod YG with the cylindrical center line a directed in the vertical direction VP. On the circular wire mesh lid 4 (upper lid).

各積載段では、河川護岸等の崩壊状態に応じて、複数、例えば4つの充填円筒金網籠YG,YG,…を並設して配置する。   In each loading stage, a plurality of, for example, four filled cylindrical metal mesh fences YG, YG,... Are arranged side by side in accordance with the collapsed state of a river revetment or the like.

このように、河川護岸等の崩壊状態に応じて、複数の充填円筒金網籠YG,YG,…を積載段数n及び勾配αで積載して、河川護岸等を復旧する。   In this way, according to the collapsed state of the river revetment or the like, the plurality of filled cylindrical metal mesh fences YG, YG,... Are loaded with the loading stage number n and the gradient α to restore the river revetment or the like.

図8において、複数の充填円筒金網籠YG,YG,…を積載段数n(例えば、n=3)及び勾配αで積載すると、各充填円筒金網籠YG,YG,…の各自重は、鉛直方向VHの最大鉛直重量として最下段の充填円筒金網籠YGに作用する。
なお、各充填円筒金網籠YGの自重は、各連結コイル金属線2,3、各円形金網蓋4,5、各固定コイル線材6,7、各半円筒金網体8,9及び中詰材Zでなる総重量である。
In FIG. 8, when a plurality of filled cylindrical meshes YG, YG,... Are loaded with a loading stage number n (for example, n = 3) and a gradient α, the respective weights of the filled cylindrical meshes YG, YG,. The maximum vertical weight of VH acts on the lowermost filled cylindrical wire mesh basket YG.
The weight of each filled cylindrical wire mesh basket YG is as follows: each connecting coil metal wire 2, 3, each circular wire mesh lid 4, 5, each fixed coil wire 6, 7, each semi-cylindrical wire mesh 8, 9 and medium filling material Z. Is the total weight of

最下段の充填円筒金網籠YGにおいて、各半円形横金属線10,10,…は、最大鉛直重量による最大引張荷重Whを受ける。
各半円形横金属線10,10,…は、円周方向両端を含む各縦金属線11,11,…に直交して溶接固定され、各連結コイル金属線2,3は、各半円形横金属線10,10,…に直交して円周方向両端で隣接する各縦金属線11A,11A又は11B,11Bに巻付けられる。
これにより、積載段数n及び勾配αで積載した各充填円筒金網籠YG,YG,…について、最下段の充填円筒金網籠YGの各連結コイル金属線2…3は、各半円形横金属線10,10,…の最大引張荷重Whにて剪断方向(円周方向)に引張られ、剪断荷重を受ける。
円筒金網籠Yは、円筒金網本体1を各半円筒金網体8,9で構成して、各連結コイル金属線2,3にて連結するので、特に、各連結コイル金属線2,3の剪断強度τを考慮する必要がある。
このため、本発明に係る円筒金網籠Yは、各連結コイル金属線2,3の剪断強度τ(剪断応力)を、τ>最大引張応力σhとして、積載した各充填円筒金網籠YG,YG,…の自重による剪断を回避する。
なお、最大引張応力σhは、各半円形横金属線10,10,…の最大引張荷重Wh及び線径面積Aから、σh=(Wh/A)となる。
In the lowermost filled cylindrical metal mesh YG, each semicircular horizontal metal wire 10, 10,... Receives a maximum tensile load Wh due to the maximum vertical weight.
Each of the semicircular horizontal metal wires 10, 10,... Is welded and fixed perpendicularly to each of the vertical metal wires 11, 11,... Including both ends in the circumferential direction. It is wound around each vertical metal wire 11A, 11A or 11B, 11B which is orthogonal to the metal wires 10, 10,.
As a result, for each filled cylindrical wire mesh YG, YG,... Loaded with a loading stage number n and a gradient α, each connecting coil metal wire 2 ... 3 of the lowermost filled cylindrical wire mesh YG is connected to each semicircular horizontal metal wire 10. , 10,... Are pulled in the shear direction (circumferential direction) with a maximum tensile load Wh, and receive the shear load.
Since the cylindrical wire netting Y is constituted by the semi-cylindrical wire mesh bodies 8 and 9 and connected by the connecting coil metal wires 2 and 3, in particular, the shearing of the connecting coil metal wires 2 and 3 is performed. It is necessary to consider the intensity τ.
For this reason, the cylindrical wire mesh cage Y according to the present invention is configured so that each of the loaded cylindrical metal mesh cages YG, YG, YG, YG, where the shear strength τ (shear stress) of each connecting coil metal wire 2 and 3 is τ> maximum tensile stress σh. Avoid shear due to its own weight.
The maximum tensile stress σh is σh = (Wh / A) from the maximum tensile load Wh and the wire diameter area A of each semicircular horizontal metal wire 10, 10,.

本発明に係る円筒金網籠Yは、演算処理装置(コンピュータ)を使用して、各半円形横金属線10の最大引張荷重Wh及び最大引張応力σhを解析及び計算して、実際に使用する連結コイル金属線の剪断強度τ(剪断応力)を、τ>最大引張応力σhとする。
以下、演算処理装置(コンピュータ)を使用して実行する、解析及び計算について、説明する。
The cylindrical wire netting Y according to the present invention uses an arithmetic processing unit (computer) to analyze and calculate the maximum tensile load Wh and the maximum tensile stress σh of each semicircular horizontal metal wire 10 and to actually use the connection. The shear strength τ (shear stress) of the coil metal wire is τ> maximum tensile stress σh.
Hereinafter, analysis and calculation performed using the arithmetic processing unit (computer) will be described.

<解析及び計算する円筒金網籠Y1,Y2>
図1乃至図4で説明した円筒金網籠Yについて、解析及び計算する円筒金網籠Y1,Y2の各数値を示す。
<Cylinder wire mesh cage Y1, Y2 to analyze and calculate>
The numerical values of the cylindrical metal mesh cages Y1 and Y2 to be analyzed and calculated for the cylindrical metal mesh cage Y described with reference to FIGS.

(A)円筒金網籠Y1の各数値
■各金属線10,11の線径d=3.2mm
■網目CT(AT×BT)=50mm×50mm
■円筒直径D=600mm(円筒半径R=300mm)
■円筒高長L=600mm
■半円筒金網体8,9の半円形横金属線11の本数Nh1=13本
■半円筒金網体8,9の縦金属線10の本数Nv1=19本
■各金属線10,11のヤング率Es=2.0×10(kN/m
■各金属線10,11のポアソン比νs=0.300
■各金属線10,11の断面積A=8.042×10−6(m
■各金属線10,11の断面2次モーメントI1=5.147×10−12(m
■各金属線10,11の捩りモーメントJ1=1.029×10−11(m
(A) Numerical values of cylindrical wire mesh Y1 ■ Wire diameter d of each metal wire 10, 11 = 3.2 mm
■ Mesh CT (AT x BT) = 50 mm x 50 mm
■ Cylinder diameter D = 600mm (Cylinder radius R = 300mm)
■ Cylinder height L = 600mm
■ Number of semicircular metal wires 11 of semi-cylindrical metal mesh bodies 8, 9 Nh1 = 13 ■ Number of vertical metal wires 10 of semi-cylindrical metal mesh bodies 8, 9 Nv1 = 19 ■ Young's modulus of each metal wire 10,11 Es = 2.0 × 10 8 (kN / m 2 )
■ Poisson's ratio νs = 0.300 of each metal wire 10, 11
■ Cross sectional area A of each metal wire 10, 11 = 8.042 × 10 −6 (m 2 )
■ Sectional moment of inertia I1 = 5.147 × 10 −12 (m 4 ) of each metal wire 10, 11
■ Torsion moment J1 = 1.029 × 10 −11 (m 4 ) of each metal wire 10, 11

(B)円筒金網籠Y2の各数値
■各金属線10,11の線径d=5.0mm
■網目CT(AT×BT)=100mm×100mm
■円筒直径D=955mm(円筒半径R=447.5mm)
■円筒高長L=1000mm
■半円筒金網体8,9の半円形横金属線10の本数Nh2=11本
■半円筒金網体8,9の縦金属線11の本数Nv2=31本
■各金属線10,11のヤング率Es=2.0×10(kN/m
■各金属線10,11のポアソン比νs=0.300
■各金属線10,11の断面積A=19.625×10−6(m
■各金属線10,11の断面2次モーメントI2=3.068×10−11(m
■各金属線10,11の捩りモーメントJ2=6.136×10−11(m
(B) Numerical values of cylindrical wire mesh Y2 ■ Wire diameter d of each metal wire 10, 11 = 5.0 mm
■ Mesh CT (AT x BT) = 100 mm x 100 mm
■ Cylinder diameter D = 955mm (Cylinder radius R = 447.5mm)
■ Cylinder height L = 1000mm
■ Number of semicircular horizontal metal wires 10 of semi-cylindrical metal mesh bodies 8, 9 Nh2 = 11 ■ Number of vertical metal wires 11 of semi-cylindrical metal mesh bodies 8, 9 Nv2 = 31 ■ Young's modulus of each metal wire 10,11 Es = 2.0 × 10 8 (kN / m 2 )
■ Poisson's ratio νs = 0.300 of each metal wire 10, 11
■ Cross-sectional area A of each metal wire 10, 11 = 19.625 × 10 −6 (m 2 )
■ Sectional moment of inertia I2 = 3.068 × 10 −11 (m 4 ) of each metal wire 10, 11
■ Torsion moment J2 of each metal wire 10, 11 = 6.136 × 10 −11 (m 4 )

解析及び計算では、各円筒金網籠Y1,Y2について、各半円形横金属線10,10,…の最大引張荷重Whを解析し、最大引張応力σhを計算する。各円筒金網籠Y1,Y2の解析及び計算は、半円筒金網体8又は9に中詰材Zを充填した充填半円筒金網体RG1,RG2について実行する。   In the analysis and calculation, the maximum tensile load Wh of each semicircular horizontal metal wire 10, 10,... Is analyzed for each cylindrical wire mesh rod Y1, Y2, and the maximum tensile stress σh is calculated. The analysis and calculation of each cylindrical wire mesh basket Y1, Y2 is executed for the filled semi-cylindrical metal mesh bodies RG1, RG2 in which the semi-cylindrical metal mesh body 8 or 9 is filled with the filling material Z.

<中詰材Z(盛土)>
中詰材Zは、盛土を使用し、盛土の各数値を示す。
ヤング率E=2.8×10(kN/m
単位体積重量γ=18(kN/m
ポアソン比ν=0.499
静止土圧係数K=1.0
<Filling material Z (banking)>
Filling material Z uses embankment and shows each numerical value of embankment.
Young's modulus E = 2.8 × 10 4 (kN / m 2 )
Unit volume weight γ = 18 (kN / m 3 )
Poisson's ratio ν = 0.499
Static earth pressure coefficient K = 1.0

<解析及び計算で使用する定義>
解析及び計算で使用する定義を示す。
■各円筒金網籠Y1,Y2の円筒金網本体1に中詰材Zを充填した各充填円筒金網本体YG1,YG2、
■各円筒金網籠Y1,Y2の半円筒金網体8又は9に中詰材Zを充填した充填半円筒金網体RG1,RG2、
■充填円筒金網本体YG1,YG2について、各縦金属線11を除き、各半円形横金属線10でなる仮想・充填円筒線本体YK1,YK2、
■充填半円筒金網体RG1,RG2について、各縦金属線11を除き、各半円形横金属線10でなる仮想・充填半円筒線体RK1,RK2
■各充填半円筒金網体RG1,RG2の仮想・充填半円筒金網体RP1,RP2、
■各充填円筒金網本体YG1,YG2について、各縦金属線11を除き、各半円形横金属線10を水平Beam要素で表現した充填円筒線本体モデルYM1,YM2、
■各充填半円筒金網体RG1,RG2について、各縦金属線11を除き、各半円形横金属線10を水平Beam要素で表現した充填半円筒線体モデルRM1,RM2、
■各充填半円筒金網本RG1,RG2について、各半円形横金属線10を水平Beam要素で表現し、及び各縦金属線11を鉛直Beam要素で表現した充填半円筒金網体モデルRN1,RN2、
■各仮想・充填円筒線本体YK1,YK2、又は各充填円筒線本体モデルYM1,YM2を積載する水平面HG、
■水平面HGに直交する鉛直方向VP、
■各仮想・充填円筒線本体YK1,YK2、又は充填円筒線本体モデルYM1,YM2の積載段数n、
■各仮想・充填半円筒線体RK1,RK2の円筒高長L、
■円筒中心線aを鉛直方向HVに向けて、各仮想・充填円筒線本体YK1,YK2、又は充填円筒線本体モデルYM1,YM2を積載する勾配α、
■積載段数n=2及び勾配αで積載した各充填円筒線本体モデルYM1(又はYM2)について、最下段の充填半円筒線体モデルRM1(又はRM2)、及び最下段の充填半円筒線体モデルRM1(又はRM2)に積載した領域の充填円弧筒線体モデルSM1(又はSM2)でなる、勾配線体モデル群RMG1(又はRMG2)、
■無限積載段数n=∞及び勾配αで積載した各仮想・充填円筒線本体YK1(又はYK2)について、各段の充填半円筒線体RK1,RK2でなる、仮想・勾配線体群RKG1(又はRKG2)、
とする。
なお、充填円筒金網本体YG1,YG2は、各円筒金網籠Y1,Y2の円筒金網体1、及び中詰材Z(円柱の中詰材Z)でなる。
充填半円筒金網体RG1,RG2は、各円筒金網籠Y1,Y2の半円筒金網体8又は9、及び中詰材Z(半円柱の中詰材)でなる。
各充填円筒線体モデルYM1,YM2は、各縦金属線11を除いた各充填円筒線本体YG1,YG2を想定したモデル化したものである。
各充填半円筒線体モデルRM1,RM2は、各縦金属線11を除いた充填半円筒金網体RG1,RG2を想定し、3次元解析FEM(3次元解析有限要素法)により解析メッシュを構築するモデルのである。
各充填半円筒金網体モデルRN1,RN2は、充填半円筒金網体RG1,RG2を想定し、3次元解析FEMにより解析メッシュを構築するモデルのである。
仮想・充填円筒線本体YK1,YK2は、各縦金属線11を除いた充填円筒金網本体YG1,YG2を仮に想定したものである。
各仮想・充填半円筒線体モデルRK1,RK2は、各縦金属線11を除いた充填半円筒金網体RG1,RG2を仮に想定したものである。
各仮想・充填半円筒金網体RP1,RP2は、充填半円筒金網体RG1,RG2を仮に想定したものである。
3次元解析FENでは、中詰材Z(盛土)を弾性Solid要素で表現し、各金属線10,11を弾性Beam要素で表現する。
<Definitions used in analysis and calculation>
Describes definitions used in analysis and calculation.
■ Filled cylindrical wire mesh bodies YG1, YG2, each of which is filled with the filling material Z in the cylindrical wire mesh body 1 of each cylindrical wire mesh bag Y1, Y2.
(1) Filling semi-cylindrical metal mesh bodies RG1, RG2, in which the semi-cylindrical metal mesh bodies 8 or 9 of each cylindrical metal mesh cage Y1, Y2 are filled with the filling material Z,
(1) For the filled cylindrical wire mesh main bodies YG1, YG2, except for the respective vertical metal wires 11, virtual / filled cylindrical wire main bodies YK1, YK2, each of which is composed of each semicircular horizontal metal wire 10,
■ Virtual and filled semi-cylindrical wire bodies RK1, RK2 made up of semi-circular horizontal metal wires 10 except for the respective vertical metal wires 11 with respect to the filled semi-cylindrical metal mesh bodies RG1, RG2.
■ Virtual and filled semi-cylindrical wire meshes RP1, RP2 of each filled semi-cylindrical wire mesh RG1, RG2,
(1) For each filled cylindrical wire mesh body YG1, YG2, except for each vertical metal line 11, each filled circular cylinder body model YM1, YM2, in which each semicircular horizontal metal line 10 is expressed by a horizontal beam element,
(1) For each filled semi-cylindrical wire mesh body RG1, RG2, except for each vertical metal wire 11, filled semi-cylindrical wire models RM1, RM2, in which each semi-circular horizontal metal wire 10 is represented by a horizontal Beam element,
(1) For each filled semi-cylindrical wire net RG1, RG2, filled semi-cylindrical wire mesh models RN1, RN2, each semicircular horizontal metal wire 10 represented by a horizontal Beam element and each vertical metal wire 11 represented by a vertical Beam element,
A horizontal plane HG on which each virtual / filled cylindrical line main body YK1, YK2 or each filled cylindrical line main body model YM1, YM2 is loaded,
■ Vertical direction VP perpendicular to the horizontal plane HG,
■ The number n of loading stages of each virtual / filling cylindrical body YK1, YK2 or the filling cylindrical body model YM1, YM2,
■ Cylinder height L of each virtual / filled semi-cylindrical wire RK1, RK2,
(1) Gradient α for loading each virtual / filled cylindrical line main body YK1, YK2 or filled cylindrical line main body model YM1, YM2 with the cylindrical center line a directed in the vertical direction HV
■ For each filled cylindrical line body model YM1 (or YM2) loaded with a loading stage number n = 2 and a gradient α, the lowermost filled half-cylinder linear model RM1 (or RM2) and the lowermost filled cylindrical cylinder model Gradient line model group RMG1 (or RMG2) consisting of the filled arc cylinder model SM1 (or SM2) of the area loaded on RM1 (or RM2),
(1) For each virtual / filling cylindrical line body YK1 (or YK2) loaded with an infinite number of loading stages n = ∞ and a gradient α, a virtual / gradient line group RKG1 (or a group of filled half-cylindrical lines RK1, RK2) (or RKG2),
And
The filled cylindrical wire net bodies YG1 and YG2 are formed of the cylindrical wire mesh body 1 of each of the cylindrical wire mesh rods Y1 and Y2 and the filling material Z (column filling material Z).
The filled semi-cylindrical metal mesh bodies RG1 and RG2 are made of the semi-cylindrical metal mesh bodies 8 or 9 of the respective cylindrical metal mesh cages Y1 and Y2 and the filling material Z (filling material of a semi-cylindrical column).
Each filled cylindrical wire model YM1, YM2 is modeled assuming each filled cylindrical wire body YG1, YG2 excluding each vertical metal wire 11.
Each filled semi-cylindrical wire model RM1, RM2 assumes a filled semi-cylindrical wire mesh RG1, RG2 excluding each vertical metal wire 11, and constructs an analysis mesh by three-dimensional analysis FEM (three-dimensional analysis finite element method). Of the model.
Each of the filled semi-cylindrical wire mesh models RN1 and RN2 is a model for constructing an analysis mesh by a three-dimensional analysis FEM assuming the filled semi-cylindrical wire meshes RG1 and RG2.
The virtual / filled cylindrical wire bodies YK1 and YK2 are assumed to be filled cylindrical wire mesh bodies YG1 and YG2 excluding the respective vertical metal wires 11.
Each of the virtual / filled semi-cylindrical wire models RK1 and RK2 temporarily assumes the filled semi-cylindrical metal meshes RG1 and RG2 excluding the vertical metal wires 11.
The virtual / filled semi-cylindrical metal mesh bodies RP1, RP2 are assumed to be filled semi-cylindrical metal mesh bodies RG1, RG2.
In the three-dimensional analysis FEN, the filling material Z (filling) is expressed by an elastic Solid element, and each of the metal wires 10 and 11 is expressed by an elastic Beam element.

本発明に係る円筒金網土嚢Xでは、演算処理装置(コンピュータ)を使用して、次の(1),(2),(3)の処理を実行する。   In the cylindrical wire mesh sandbag X according to the present invention, the following processes (1), (2), and (3) are executed using an arithmetic processing unit (computer).

(1)勾配線体モデル群RMG1(又はRMG2)について、最下段の充填半円筒線体モデルRM1(又はRM2)の最大鉛直応力σfを解析して、応力係数βを求める(最大鉛直応力σf及び応力係数βの解析・計算処理)。
最大鉛直応力σfは、演算処理装置(コンピュータ)を使用し、3次元解析FEMにより解析する。
(2)仮想・勾配線体群RKG1(又はRKG2)について、最下段の仮想・充填半円筒線体RK1(又はRK2)の最大鉛直応力σg、及び最大単位体積重量Wgを求める(最大鉛直応力σg及び最大単位体積重量Wgの計算処理)。
(3)仮想・充填半円筒金網体RP1(又はRP2)について、半円形横金属線10の最大引張応力σを求める。即ち、充填半円筒金網体モデルRN1,RN2について、水平Beam要素の最大引張荷重Whを解析し、及び最大引張応力σhを求める(最大引張荷重Wh及び最大引張応力σhの解析・計算処理)。
最大引張荷重Whは、演算処理装置(コンピュータ)を使用して、3次元解析FEMにより解析する。
(1) For the gradient linear body model group RMG1 (or RMG2), the maximum vertical stress σf of the bottom half-cylindrical linear body model RM1 (or RM2) is analyzed to determine the stress coefficient β (maximum vertical stress σf and Analysis and calculation processing of stress coefficient β).
The maximum vertical stress σf is analyzed by a three-dimensional analysis FEM using an arithmetic processing unit (computer).
(2) For the virtual / gradient line group RKG1 (or RKG2), the maximum vertical stress σg and the maximum unit volume weight Wg of the lowest virtual / filled semi-cylindrical linear body RK1 (or RK2) are obtained (maximum vertical stress σg And calculation processing of the maximum unit volume weight Wg).
(3) The maximum tensile stress σ of the semicircular horizontal metal wire 10 is determined for the virtual / filled semicylindrical metal mesh RP1 (or RP2). That is, for the filled semi-cylindrical metal mesh models RN1 and RN2, the maximum tensile load Wh of the horizontal beam element is analyzed and the maximum tensile stress σh is obtained (analysis / calculation processing of the maximum tensile load Wh and the maximum tensile stress σh).
The maximum tensile load Wh is analyzed by a three-dimensional analysis FEM using an arithmetic processing unit (computer).

以下、上記(1),(2),(3)の処理(解析及び計算)について、図9乃至図26を参照して説明する。 Hereinafter, the processing (analysis and calculation) of the above (1), (2), and (3) will be described with reference to FIGS.

<最大鉛直応力σf及び応力係数βの解析・計算処理>
上記(1)の処理について、各円筒金網籠Y1,Y2の解析及び計算を説明する(図9乃至図22参照)。
<Analysis and calculation of maximum vertical stress σf and stress coefficient β>
With respect to the process (1), the analysis and calculation of each cylindrical wire netting Y1, Y2 will be described (see FIGS. 9 to 22).

<A>充填半円筒金網体RG1(円筒金網籠Y1)の解析・計算
i)勾配線体モデル群RMG1について、図9、図10、図13及び図15(b)に示すように、3次元解析FEMにより解析メッシュを構築して、最下段の充填半円筒線体モデルRM1の最大鉛直応力σfを解析する。
ii)充填半円筒線体モデルRM1(積載段数n=1)について、図14(a)及び図15(b)に示すように、3次元解析FEMにより解析メッシュを構築して、充填半円筒線体モデルRM1の最大鉛直応力σeを解析する。
iii)直上線体モデルRMH1について、図11、図12、図14(b)及び図15(b)に示すように、3次元解析FEMにより解析メッシュを構築して、最下段の充填半円筒線体モデルRM1の最大鉛直応力σpを解析する。
<A> Analysis and Calculation of Filled Semi-cylindrical Wire Mesh RG1 (Cylinder Wire Mesh Y1) i) Three-dimensional as shown in FIG. 9, FIG. 10, FIG. 13 and FIG. 15 (b) for gradient linear body model group RMG1 An analysis mesh is constructed by analysis FEM, and the maximum vertical stress σf of the bottom half-filled cylindrical body model RM1 is analyzed.
ii) As shown in FIGS. 14 (a) and 15 (b), an analysis mesh is constructed by a three-dimensional analysis FEM for the filling semi-cylindrical line model RM1 (loading stage number n = 1), and the filling semi-cylindrical line The maximum vertical stress σe of the body model RM1 is analyzed.
iii) For the straight line body model RMH1, as shown in FIGS. 11, 12, 14 (b) and 15 (b), an analysis mesh is constructed by a three-dimensional analysis FEM, and the bottom half cylinder line The maximum vertical stress σp of the body model RM1 is analyzed.

i)勾配線体モデル群RMG1の解析等
勾配線体モデル群RMG1は、図9及び図10に示すように、積載段数n=2及び勾配αで積載した充填円筒線本体モデルYM1,YM1から構成する。最下段(1段目)の充填円筒金網本体モデルYM1は、円筒中心線aを鉛直方向VPに向けて、最下端円形面を水平面HGに設置する。2段目の充填円筒線本体モデルYM1は、円筒中心線aを鉛直方向VPに向けて、最下端円形面をで最下段の充填円筒線本体モデルYM1の最上端円形面に積載する。
積載段数n=2及び勾配αで積載した各充填円筒線本体モデルYM1,YM1について、勾配線体モデル群RMG1は、図9及び図10に示すように、各充填円筒線本体モデルYM1,YM1を各円筒中心線a,aに沿って、鉛直方向VPに二等分割した、一方となる。
勾配線体モデル群RMG1は、最下段の充填半円筒線体モデルRM1及び2段目の充填円孤筒線体モデルSM1でなる(図9及び図10参照)。
円弧筒線体モデルSM1は、図9及び図10に示すように、積載面Sで円孤高長L(L=600mm)を有する。積載面Sは、最下段(1段目)の充填半円筒線体モデルRM1に積載され、各充填円筒線本体モデルYM1,YM1外周及び直線bにて囲まれる領域である。円弧筒線体モデルSM1は、2段目の充填円筒線本体YM1外周の一部を含み、水平Beam要素を有する。
i) Analysis of Gradient Line Model Group RMG1 etc. As shown in FIGS. 9 and 10, the gradient line model group RMG1 is composed of filled cylindrical line body models YM1 and YM1 loaded with a loading stage number n = 2 and a gradient α. To do. The lowermost (first stage) filled cylindrical metal mesh body model YM1 has a cylindrical center line a directed in the vertical direction VP and a lowermost circular surface installed on the horizontal plane HG. The second-stage filled cylindrical body model YM1 is loaded on the uppermost circular surface of the lowermost filled cylindrical body model YM1 with the lowermost circular surface facing the cylindrical center line a in the vertical direction VP.
For each filled cylindrical line body model YM1, YM1 loaded with a loading stage number n = 2 and a gradient α, the gradient line body model group RMG1 replaces each filled cylindrical line body model YM1, YM1 as shown in FIGS. Along each cylindrical center line a, a, one is divided into two equal parts in the vertical direction VP.
The gradient linear body model group RMG1 is composed of a lowermost half-cylindrical linear body model RM1 and a second-stage filled circular arcuate linear body model SM1 (see FIGS. 9 and 10).
As shown in FIGS. 9 and 10, the circular arc tubular body model SM <b> 1 has an arc height L (L = 600 mm) on the loading surface S. The loading surface S is an area that is loaded on the lowermost (first stage) filled semi-cylindrical linear body model RM1 and is surrounded by the outer circumferences of the filled cylindrical body models YM1 and YM1 and the straight line b. The arcuate cylindrical body model SM1 includes a part of the outer periphery of the second-stage filled cylindrical line body YM1, and has a horizontal Beam element.

各段の充填円筒線本体モデルYM1,YM1について、勾配αは、図9及び図10に示すように、円筒金網籠Y1の各網目CTの間隔、解析メッシュの関係から、1:0.3勾配より緩やかな勾配とする。勾配αは、鉛直長VL=600mm、水平長HL=205.21mm、及び迎角(傾斜角)θ=tan−1(600/205.21)であって、1:0.3420勾配とする。また、勾配αは、例えば、鉛直長VL=円筒高長L、水平長HL=0<HL<円筒直径D、及び迎角θ=tan−1[L/(0<HL<D)]で表すこともできる。 For the filled cylindrical line body models YM1 and YM1 at each stage, the gradient α is 1: 0.3 gradient based on the relationship between the meshes CT of the cylindrical metal mesh cage Y1 and the analysis mesh as shown in FIGS. Use a gentler slope. The gradient α has a vertical length VL = 600 mm, a horizontal length HL = 205.21 mm, and an angle of attack (tilt angle) θ = tan −1 (600 / 205.21), which is a 1: 0.3420 gradient. Moreover, the gradient α is expressed by, for example, vertical length VL = cylindrical height L, horizontal length HL = 0 <HL <cylindrical diameter D, and angle of attack θ = tan −1 [L / (0 <HL <D)]. You can also.

勾配線体モデル群RMG1において、2段目の充填円弧筒線体モデルSM1を、最下段(1段目)の充填半円筒線体モデルRM1に積載する積載距離δは、δ=円筒直径D−水平長HL=600mm−205.21mm=394.79mmである。   In the gradient linear body model group RMG1, the loading distance δ for loading the second-stage filled arc tubular linear model SM1 on the lowermost (first-stage) filled semi-cylindrical linear model RM1 is δ = cylinder diameter D− The horizontal length HL = 600 mm−205.21 mm = 394.79 mm.

演算処理装置(コンピュータ)は、円筒金網籠Yの各数値、及び中詰材Zの各数値を用いて、勾配線体モデル群RMG1を構成(モデル化)する。
演算処理装置(コンピュータ)は、図13及び図15(b)に示すように、勾配線体モデル群RMG1について、3次元解析FEMにより解析メッシュを構築して、最下段の充填半円筒線体モデルRM1の最大鉛直応力σfを解析する。3次元解析FEMでは、円筒金網籠Y1の各数値、及び中詰材Zの各数値を用いて、最大鉛直応力σfを解析する。
最大鉛直応力σfは、図9,図10及び図13に示すように、鉛直方向VP(円筒中心線a方向)において、最下段(1段目)の充填半円筒線体モデルRM1の最下端半円面に作用する。
最大鉛直応力σfの解析結果を、図15(a)に示す。
The arithmetic processing unit (computer) configures (models) the gradient linear body model group RMG1 using each numerical value of the cylindrical wire netting Y and each numerical value of the filling material Z.
As shown in FIG. 13 and FIG. 15B, the arithmetic processing unit (computer) constructs an analysis mesh by a three-dimensional analysis FEM for the gradient line model group RMG1, and fills the bottom half-cylindrical line model The maximum vertical stress σf of RM1 is analyzed. In the three-dimensional analysis FEM, the maximum vertical stress σf is analyzed by using the numerical values of the cylindrical wire netting Y1 and the numerical values of the filling material Z.
As shown in FIGS. 9, 10, and 13, the maximum vertical stress σf is the lowermost half of the bottom half (first stage) filled semicylindrical wire model RM1 in the vertical direction VP (in the direction of the cylindrical centerline a). Acts on a circular surface.
The analysis result of the maximum vertical stress σf is shown in FIG.

ii)充填半円筒線体モデルRM1の解析等
演算処理装置(コンピュータ)は、円筒金網籠Y1の各数値、及び中詰材Zの各数値を用いて、充填半円筒線体モデルRM1を構成(モデル化)する。
演算処理装置(コンピュータ)は、図14(a)及び図15(b)に示すように、充填半円筒線体モデルRM1について、3次元解析FEMにより解析メッシュを構築して、充填半円筒線体モデルRM1の最大鉛直応力σeを解析する。3次元解析FEMは、円筒金網籠Y1の各数値、及び中詰材Zの各数値を用いて、最大鉛直応力σeを解析する。
最大鉛直応力σeは、図14(a)に示すように、鉛直方向VP(円筒中心線a方向)において、充填半円筒線体モデルRM1の最下端半円形面に作用する。
最大鉛直応力σeの解析結果を、図15(a)に示す。
ii) Analysis of filled semi-cylindrical wire model RM1 etc. The arithmetic processing unit (computer) constructs a filled semi-cylindrical wire model RM1 by using each numerical value of the cylindrical wire netting Y1 and each numerical value of the filling material Z ( Model).
As shown in FIGS. 14 (a) and 15 (b), the arithmetic processing unit (computer) constructs an analysis mesh by a three-dimensional analysis FEM for the filled semicylindrical line model RM1, and fills the filled semicylindrical line. The maximum vertical stress σe of the model RM1 is analyzed. The three-dimensional analysis FEM analyzes the maximum vertical stress σe by using the numerical values of the cylindrical wire netting Y1 and the numerical values of the filling material Z.
As shown in FIG. 14A, the maximum vertical stress σe acts on the lowermost semicircular surface of the filling semicylindrical linear model RM1 in the vertical direction VP (the direction of the cylindrical center line a).
The analysis result of the maximum vertical stress σe is shown in FIG.

iii)直上線体モデル群RMH1の解析等
直上線体モデル群RMH1は、図11及び図12に示すように、積載段数n=2で積載した充填円筒線本体モデルYM1,YM1から構成する。最下段(1段目)の充填円筒線本体モデルYM1は、円筒中心線aを鉛直方向VPに向けて、最下端円形面を水平面HGに設置する。2段目の充填円筒線本体モデルYM1は、円筒中心線aを鉛直方向VPに向け、及び円筒中心線aを最下段の充填円筒金網籠モデルYM1の円筒中心線aに一致して、最下端円形面を最下段の充填円筒線本体モデルYM1の最上端円形面に積載する。
積載段数n=2で積載した各充填円筒線本体モデルYM1,YM1について、直上線体モデル群RMH1は、図11及び図12に示すように、各段の充填円筒線本体モデルYM1,YM1を各円筒中心線a,aに沿って、鉛直方向VPに二等分割した、一方となる。
直上線体モデル群RMH1は、各段の充填半円筒線体モデルRM1,RM1でなる(図11及び図12参照)。
積載距離δは、δ=600mmとなる。
iii) Analysis of Straight Line Model Model RMH1 etc. As shown in FIGS. 11 and 12, the straight line model group RMH1 is composed of filled cylindrical line main body models YM1, YM1 loaded with the number of loading stages n = 2. The lowermost (first stage) filled cylindrical line body model YM1 has a cylindrical center line a directed in the vertical direction VP and a lowermost circular surface installed on the horizontal plane HG. The second-stage filled cylindrical line body model YM1 has the cylinder center line a in the vertical direction VP, and the cylinder center line a coincides with the cylinder center line a of the lower-stage filled cylindrical wire mesh model YM1, The circular surface is loaded on the uppermost circular surface of the lowermost filled cylindrical line body model YM1.
As shown in FIG. 11 and FIG. 12, the straight line body model group RMH1 for each of the filled cylindrical line main body models YM1 and YM1 loaded with the number of loading stages n = 2 represents the filled cylindrical line main body models YM1 and YM1 of the respective stages. Along the cylindrical center line a, a, it is divided into two equal parts in the vertical direction VP.
The straight line body model group RMH1 is composed of filled semi-cylindrical line body models RM1 and RM1 at each stage (see FIGS. 11 and 12).
The loading distance δ is δ = 600 mm.

演算処理装置(コンピュータ)は、円筒金網籠Y1の各数値、及び中詰材Zの各数値を用いて、直上線体モデル群RMH1を構成(モデル化)する。
演算処理装置(コンピュータ)は、図14(b)及び図15(b)に示すように、直上線体モデル群RMH1について、3次元解析FEMにより解析メッシュを構築して、最下段(1段目)の充填半円筒線体モデルRM1の最大鉛直応力σpを解析する。3次元解析FEMでは、円筒金網籠Y1の各数値、及び中詰材Zの各数値を用いて、最大鉛直応力σpを解析する。
最大鉛直応力σpは、図11、図12及び図14(b)に示すように、鉛直方向HV(円筒中心線a方向)において、最下段(1段目)の充填半円筒線体モデルRM1の最下端半円面に作用する。
最大鉛直応力σpの解析結果を、図15(a)に示す。
The arithmetic processing unit (computer) configures (models) the straight line body model group RMH1 using the numerical values of the cylindrical wire netting Y1 and the numerical values of the filling material Z.
As shown in FIGS. 14 (b) and 15 (b), the arithmetic processing unit (computer) constructs an analysis mesh by the three-dimensional analysis FEM for the straight line body model group RMH1, and sets the lowest level (first level) The maximum vertical stress σp of the filled semicylindrical wire model RM1 is analyzed. In the three-dimensional analysis FEM, the maximum vertical stress σp is analyzed by using the numerical values of the cylindrical wire netting Y1 and the numerical values of the filling material Z.
As shown in FIGS. 11, 12 and 14 (b), the maximum vertical stress σp is the lowest half (first stage) filled semi-cylindrical wire model RM1 in the vertical direction HV (in the direction of the cylindrical center line a). It acts on the lowermost semicircular surface.
The analysis result of the maximum vertical stress σp is shown in FIG.

<解析結果>
図15(a)は、鉛直応力と積載距離δとの関係を示すグラフ図である。
図15(a)において、「○」グラフ線は「直上線体モデルRMH1」の鉛直応力σを示し、「□」グラフ線は「勾配線体モデル群RMG1」の鉛直応力σを示し、「×」グラフ線は「充填半円筒線体モデルRM1」の鉛直応力σを示す。
<Analysis results>
FIG. 15A is a graph showing the relationship between the vertical stress and the loading distance δ.
In FIG. 15A, the “◯” graph line indicates the vertical stress σ of the “straight line model RMH1”, the “□” graph line indicates the vertical stress σ of the “gradient line model group RMG1,” and “× The graph line indicates the vertical stress σ of the “filled semi-cylindrical linear body model RM1”.

図15(a)において、縦軸に「鉛直応力(kPa=kN/m)」を取り、横軸に「積載距離δ」を取る。図15(a)の横軸において、積載距離δは、充填円筒金線本体モデルYM1の円筒中心線aを「0(零)」とし、「−0.3(円筒半径R=300mm)〜0(m)」及び「0〜0.3(m)」を取る。 In FIG. 15A, the vertical axis represents “vertical stress (kPa = kN / m 2 )” and the horizontal axis represents “loading distance δ”. In the horizontal axis of FIG. 15A, the loading distance δ is defined as “−0.3 (cylindrical radius R = 300 mm) ˜0 with the cylindrical center line a of the filled cylindrical gold wire body model YM1 being“ 0 (zero) ”. Take (m) "and" 0-0.3 (m) ".

図15(a)を考察すると、直上線体モデル群RMH1は、最大鉛直応力σp=21.20(kN/mm)を示している(「○」グラフ線参照)。
充填半円筒線体モデルRM1は、最大鉛直応力σe=10.60(kN/m)を示している(「×」グラフ線参照)。
勾配線体モデル群RMG1は、積載距離δ=−0.3(m)の鉛直応力σ=10.60(kN/m)を示し、積載距離δ=−0.3(m)から0.3(m)に向うに連れて、漸次、増加を示している。勾配線体モデル群RMG1は、積載距離δ=0.09479(m)で最大鉛直応力σf=19.25(kN/m)を示している(「□」グラフ線参照)。
Considering FIG. 15A, the straight line body model group RMH1 shows the maximum vertical stress σp = 21.20 (kN / mm 2 ) (see the “◯” graph line).
The filled semicylindrical linear body model RM1 shows the maximum vertical stress σe = 10.60 (kN / m 2 ) (see “×” graph line).
The gradient linear body model group RMG1 shows a vertical stress σ = 10.60 (kN / m 2 ) at a loading distance δ = −0.3 (m), and the loading distance δ = −0.3 (m) to 0.001. As it goes to 3 (m), it gradually increases. The gradient linear body model group RMG1 shows a maximum vertical stress σf = 19.25 (kN / m 2 ) at a loading distance δ = 0.09479 (m) (see the “□” graph line).

勾配線体モデル群RMG1の最大鉛直応力σfは、σf=σe+σe×β=10.60+10.60×0.82=19.25(kN/m)である。最大鉛直応力σfは、最大鉛直荷応力σeの1.82倍となる。
これにより、勾配線体モデル群RMG1について、2段目の充填円弧筒線体モデルSR1から最下段の充填半円筒線体モデルRM1に作用する鉛直応力は、σe×0.82=8.69(kN/m)となる。
The maximum vertical stress σf of the gradient linear body model group RMG1 is σf = σe + σe × β = 10.60-10.60 × 0.82 = 19.25 (kN / m 2 ). The maximum vertical stress σf is 1.82 times the maximum vertical load stress σe.
Thus, the vertical stress acting on the gradient line model group RMG1 from the second-stage filled arc cylindrical line model SR1 to the lowermost filled semi-cylindrical line model RM1 is σe × 0.82 = 8.69 ( kN / m 2 ).

直上線体モデル群RMHの最大鉛直応力σpは、最大鉛直荷応力σeの2.0倍となる。   The maximum vertical stress σp of the straight line body model group RMH is 2.0 times the maximum vertical load stress σe.

勾配線体モデル群RMG1の最下段の充填半円筒線体モデルRM1について、最大鉛直応力σfは、最大鉛直応力σeを超え、最大鉛直応力σp未満となる。   The maximum vertical stress σf exceeds the maximum vertical stress σe and is less than the maximum vertical stress σp for the lowermost filled semicylindrical line model RM1 of the gradient line model group RMG1.

<応力係数βの計算>
応力係数βは、充填半円筒線体モデルRM1の最大鉛直応力σeに対する、各最大鉛直応力σf,σp,σeの増加率である。
応力係数βは、式(1)で計算する。
<Calculation of stress coefficient β>
The stress coefficient β is an increase rate of each maximum vertical stress σf, σp, σe with respect to the maximum vertical stress σe of the filled semicylindrical linear body model RM1.
The stress coefficient β is calculated by equation (1).

Figure 2016172998
Figure 2016172998

勾配線体モデル群RMG1について、応力係数βは、式(1)から、β=(19.25/10.60)−1=0.82となる。
直上線体モデル群RMH1について、応力係数βは、式(1)と同様に、β=(21.20/10.60)−1=1.0となる。
充填半円筒線体モデルRM1について、応力係数βは、式(1)と同様に、β=(10.60/10.60)−1=0となる。
勾配線体モデル群RMG1は、勾配αについて、水平長HL=0であると、直上金網モデル群YMH1と同様なモデルとなり、水平長HL=円筒直径Dであると、充填円筒金網籠モデルYM1と同様なモデルとなる。
これにより、勾配線体モデル群RMG1では、勾配αの水平長HLを0<HL<円筒直径Dとすると、応力係数βは、勾配αに応じて0<β<1の範囲の定数となる。
For the gradient linear body model group RMG1, the stress coefficient β is β = (19.25 / 10.60) −1 = 0.82 from the equation (1).
For the straight line body model group RMH1, the stress coefficient β is β = (21.20 / 10.60) −1 = 1.0 similarly to the equation (1).
For the filled semicylindrical linear body model RM1, the stress coefficient β is β = (10.60 / 10.60) −1 = 0, as in the equation (1).
When the horizontal length HL = 0 for the gradient α, the gradient linear body model group RMG1 becomes a model similar to the directly above metal mesh model group YMH1, and when the horizontal length HL = cylindrical diameter D, the filled cylindrical wire mesh model YM1 Similar model.
Thus, in the gradient line model group RMG1, if the horizontal length HL of the gradient α is 0 <HL <cylinder diameter D, the stress coefficient β is a constant in the range of 0 <β <1 according to the gradient α.

<B>充填半円筒金網体RG2(円筒金網籠Y2)の解析・計算
充填半円筒金網体RG2の計算は、充填半円筒金網体RG1と同様である。
a)勾配線体モデル群RMG2について、図16、図17、図20及び図22(b)に示すように、3次元解析FEMにより解析メッシュを構築して、最下段の充填半円筒線体モデルRM2の最大鉛直応力σfを解析する。
b)充填半円筒線体モデルRM2(積載段数n=1)について、図21(a)及び図22(b)に示すように、3次元解析FEMにより解析メッシュを構築して、充填半円筒線体モデルRM2の最大鉛直応力σeを解析する。
c)直上線体モデルRMH2について、図18、図19、図21(b)及び図22(b)に示すように、3次元解析FEMにより解析メッシュを構築して、最下段の充填半円筒線体モデルRM1の最大鉛直応力σpを解析する。
<B> Analysis and Calculation of Filled Half Cylindrical Wire Mesh RG2 (Cylinder Wire Mesh Y2) The calculation of filled half cylindrical wire mesh RG2 is the same as that of filled half cylindrical wire mesh RG1.
a) For the gradient line model group RMG2, as shown in FIG. 16, FIG. 17, FIG. 20, and FIG. 22 (b), an analysis mesh is constructed by a three-dimensional analysis FEM, and the bottom half-cylindrical line model The maximum vertical stress σf of RM2 is analyzed.
b) As shown in FIGS. 21 (a) and 22 (b), an analysis mesh is constructed by a three-dimensional analysis FEM for the filling semi-cylindrical line model RM2 (loading stage number n = 1), and the filling semi-cylindrical line The maximum vertical stress σe of the body model RM2 is analyzed.
c) As for the straight line body model RMH2, as shown in FIGS. 18, 19, 21 (b) and 22 (b), an analysis mesh is constructed by a three-dimensional analysis FEM, and the lowermost filled semicylindrical line The maximum vertical stress σp of the body model RM1 is analyzed.

a)勾配線体モデル群RMG2の解析等
勾配線体モデル群RMG2は、図16及び図17に示すように、積載段数n=2及び勾配αで積載した充填円筒線本体モデルYM2,YM2から構成する。最下段(1段目)の充填円筒線本体モデルYM2は、円筒中心線aを鉛直方向VPに向けて、最下端円形面を水平面HGに設置する。2段目の充填円筒線本体モデルYM2は、円筒中心線aを鉛直方向VPに向けて、最下端円形面を最下段の充填円筒金網籠モデルYM2の最上端円形面に積載する。
積載段数n=2及び勾配αで積載した各充填円筒線本体モデルYM2,YM2について、勾配線体モデル群RMG2は、図16及び図17に示すように、各充填円筒線本体モデルYM2,YM2を各円筒中心線a,aに沿って、鉛直方向VPに二等分割した、一方となる。
勾配線体モデル群RMG2は、最下段の充填半円筒線体モデルRM2及び2段目の充填円孤筒線体モデルSM2でなる(図16及び図17参照)。
充填円孤筒線体モデルSM2は、図16及び図17に示すように、積載面SSで円孤高長L(L=1000mm)を有する。積載面SSは、最下段(1段目)の充填半円筒線本体モデルRM2に積載され、各充填円筒線本体モデルYM2,YM2外周及び直線cにて囲まれる領域である。充填円弧筒線体モデルSM2は、2段目の充填円筒線本体YM2外周の一部を含み、水平Beam要素を有する。
a) Analysis of Gradient Line Model Group RMG2 etc. As shown in FIGS. 16 and 17, the gradient line model group RMG2 is composed of filled cylindrical body models YM2 and YM2 loaded with a loading stage number n = 2 and a gradient α. To do. The lowermost (first stage) filled cylindrical line main body model YM2 has the lowermost circular surface on the horizontal plane HG with the cylindrical center line a facing the vertical direction VP. The second-stage filled cylindrical body model YM2 is loaded with the lowermost circular surface on the uppermost circular surface of the lowermost filled cylindrical wire mesh model YM2 with the cylindrical center line a directed in the vertical direction VP.
For each filled cylindrical line body model YM2, YM2 loaded with the number of loading stages n = 2 and the gradient α, the gradient line model group RMG2 includes each filled cylindrical line body model YM2, YM2 as shown in FIGS. Along each cylindrical center line a, a, one is divided into two equal parts in the vertical direction VP.
The gradient line model group RMG2 is composed of the lowermost filled semi-cylindrical line model RM2 and the second filled circular and arcuate line model SM2 (see FIGS. 16 and 17).
As shown in FIGS. 16 and 17, the filled circular arc cylinder model SM2 has a circular arc length L (L = 1000 mm) on the loading surface SS. The loading surface SS is an area that is loaded on the lowermost (first stage) filled semi-cylindrical body model RM2 and is surrounded by the outer circumferences of the filled cylindrical line body models YM2 and YM2 and the straight line c. The filled arc tube linear body model SM2 includes a part of the outer periphery of the second-stage filled cylindrical wire body YM2, and has a horizontal Beam element.

勾配線体モデル群RMG2について、勾配αは、1:0.3勾配とする。勾配αは、円鉛直長VL=1000mm、水平長HL=0.3×1000mm=300mm、及び迎角(傾斜角)θ=tan−1(1000/300)である。 For the gradient line model group RMG2, the gradient α is 1: 0.3 gradient. The gradient α has a circular vertical length VL = 1000 mm, a horizontal length HL = 0.3 × 1000 mm = 300 mm, and an angle of attack (tilt angle) θ = tan −1 (1000/300).

勾配線体モデル群RMG2において、2段目の充填円弧筒線体モデルSM2を、最下段の充填半円筒線体モデルRM2上に積載する積載距離δは、δ=955m−300mm=655mmである。   In the gradient linear body model group RMG2, the loading distance δ for loading the second-stage filled circular cylindrical line model SM2 on the lowermost filled semi-cylindrical line model RM2 is δ = 955 m−300 mm = 655 mm.

演算処理装置(コンピュータ)は、円筒金網籠Y2の各数値、及び中詰材Zの各数値を用いて、勾配線体モデル群RMG2を構成(モデル化)する。
演算処理装置(コンピュータ)は、図20及び22(b)に示すように、勾配線体モデル群RMG2について、3次元解析FEMにより解析メッシュを構築して、最下段の充填半円筒線体モデルRM2の最大鉛直応力σfを解析する。3次元解析FEMは、円筒金網籠Y2の各数値、及び中詰材Zの各数値を用いて、最大鉛直応力σfを解析する。なお、解析メッシュは、円筒金網籠Y2の網目CTのAT×BT=100×100(mm)より細かく分割(AT×BT=50×50mm)して、水平Beam要素の配列によって、AT×BT=100×100(mm)を表現した。
最大鉛直応力σfは、図16、図17及び図20に示すように、鉛直方向VP(円筒中心線a方向)において、最下段の充填半円筒線体モデルRM2の最下端半円面に作用する。
最大鉛直応力σfの解析結果を、図22(a)に示す。
The arithmetic processing device (computer) configures (models) the gradient linear body model group RMG2 by using the numerical values of the cylindrical wire netting Y2 and the numerical values of the filling material Z.
As shown in FIGS. 20 and 22 (b), the arithmetic processing unit (computer) constructs an analysis mesh for the gradient line model group RMG2 by the three-dimensional analysis FEM, and fills the bottom half-cylindrical line model RM2 The maximum vertical stress σf is analyzed. The three-dimensional analysis FEM analyzes the maximum vertical stress σf by using the numerical values of the cylindrical wire netting Y2 and the numerical values of the filling material Z. The analysis mesh is finely divided (AT × BT = 50 × 50 mm) from AT × BT = 100 × 100 (mm) of the mesh CT of the cylindrical metal mesh cage Y2, and AT × BT = by the arrangement of horizontal Beam elements. 100 × 100 (mm) was expressed.
As shown in FIGS. 16, 17 and 20, the maximum vertical stress σf acts on the lowermost semicircular surface of the lowermost filled semicylindrical linear body model RM2 in the vertical direction VP (in the direction of the cylindrical center line a). .
An analysis result of the maximum vertical stress σf is shown in FIG.

b)充填半円筒線体モデルRM2の解析等
演算処理装置(コンピュータ)は、円筒金網籠Yの各数値、及び中詰材Zの各数値を用いて、充填半円筒線体RM2を構成(モデル化)する。
演算処理装置(コンピュータ)は、図21(a)及び図22(b)に示すように、充填半円筒線体モデルRM2について、3次元解析FEMにより解析メッシュを構築して、充填半円筒線体モデルRM2の最大鉛直応力σeを解析する。3次元解析FEMは、円筒金網籠Y2の各数値、及び中詰材Zの各数値を用いて、最大鉛直応力σeを解析する。
最大鉛直応力σeは、図21(a)及び図22(b)に示すように、鉛直方向VP(円筒中心線a方向)において、充填半円筒線体モデルRM2の最下端半円面に作用する。
最大鉛直応力σeの解析結果を、図22(a)に示す。
b) Analysis of filled semi-cylindrical wire model RM2, etc. The arithmetic processing unit (computer) constructs the filled semi-cylindrical wire body RM2 using each numerical value of the cylindrical wire netting Y and each numerical value of the filling material Z (model). ).
As shown in FIGS. 21 (a) and 22 (b), the arithmetic processing unit (computer) constructs an analysis mesh by the three-dimensional analysis FEM for the filled semicylindrical line model RM2, and fills the filled semicylindrical line. The maximum vertical stress σe of the model RM2 is analyzed. The three-dimensional analysis FEM analyzes the maximum vertical stress σe by using the numerical values of the cylindrical wire netting Y2 and the numerical values of the filling material Z.
As shown in FIGS. 21 (a) and 22 (b), the maximum vertical stress σe acts on the lowermost semicircular surface of the filled semicylindrical linear model RM2 in the vertical direction VP (the direction of the cylindrical centerline a). .
An analysis result of the maximum vertical stress σe is shown in FIG.

c)直上線体モデル群RMH2の解析等
直上線体モデル群RMH2は、図18及び図19に示すように、積載段数n=2及び勾配αで積載した充填円筒線本体モデルYM2,YM2から構成する。最下段(1段目)の充填円筒線本体モデルYM2は、円筒中心線aを鉛直方向VPに向けて、最下端円形面を水平面HGに設置する。2段目の充填円筒線本体モデルYM2は、円筒中心線aを鉛直方向VPに向け、及び円筒中心線aを最下段の充填円筒線本体モデルYM2の円筒中心線aに一致して、最下端円形面を最下段の充填円筒線本体モデルYM2の最上端円形面に積載する。
積載段数n=2で積載した各充填円筒線本体モデルYM2,YM2について、直上線体モデル群RMH2は、図18及び図19に示すように、各段の充填円筒線本体モデルYM2,YM2を円筒中心線a,aに沿って、鉛直方向VP(円筒中心線a方向)に二等分割した、一方となる。
直上金網モデル群YMH2は、各段の充填半円筒線体モデルRM2,RM2でなる(図18及び図19参照)。
c) Analysis of Straight Line Model Model RMH2 etc. As shown in FIGS. 18 and 19, the straight line model group RMH2 is composed of filled cylindrical line body models YM2 and YM2 loaded with a loading stage number n = 2 and a gradient α. To do. The lowermost (first stage) filled cylindrical line main body model YM2 has the lowermost circular surface on the horizontal plane HG with the cylindrical center line a facing the vertical direction VP. The second-stage filled cylindrical line body model YM2 has a cylinder center line a in the vertical direction VP, and the cylinder center line a coincides with the cylinder center line a of the lowermost filled cylinder line body model YM2, The circular surface is loaded on the uppermost circular surface of the lowermost filled cylindrical line body model YM2.
As shown in FIGS. 18 and 19, for the filled cylindrical body models YM2 and YM2 loaded with the loading stage number n = 2, the straight line body model group RMH2 cylinders the filled cylindrical body models YM2 and YM2 of each stage as shown in FIGS. Along the center lines a and a, the other is divided into two equal parts in the vertical direction VP (the direction of the cylindrical center line a).
The directly above wire mesh model group YMH2 is composed of filled semi-cylindrical linear body models RM2 and RM2 at each stage (see FIGS. 18 and 19).

演算処理装置(コンピュータ)は、円筒金網籠Y2の各数値、及び中詰材Zの各数値を用いて、直上線体モデル群RMH2を構成(モデル化)する。
演算処理装置(コンピュータ)は、図21(b)及び図22(b)に示すように、直上線材モデル群RMH2について、3次元解析FEMにより解析メッシュを構築して、最下段の充填半円筒線体モデルRM2の最大鉛直応力σfを解析する。3次元解析FEMは、円筒金網籠Y2の各数値、及び中詰材Zの各数値を用いて、最大鉛直応力σpを解析する。
最大鉛直応力σpは、図18、図19及び図21(b)に示すように、鉛直方向VP(円筒中心線a方向)において、最下段(1段目)の充填半円筒線体モデルRM2の最下端半円面に作用する。
最大鉛直応力σpの解析結果を、図22(a)に示す。
The arithmetic processing unit (computer) configures (models) the straight line body model group RMH2 using each numerical value of the cylindrical wire netting Y2 and each numerical value of the filling material Z.
As shown in FIGS. 21 (b) and 22 (b), the arithmetic processing unit (computer) constructs an analysis mesh by the three-dimensional analysis FEM for the straight wire model group RMH2 and fills the bottom half-cylindrical line. The maximum vertical stress σf of the body model RM2 is analyzed. The three-dimensional analysis FEM analyzes the maximum vertical stress σp by using the numerical values of the cylindrical wire netting Y2 and the numerical values of the filling material Z.
As shown in FIGS. 18, 19 and 21 (b), the maximum vertical stress σp is the value of the bottom half (first stage) filled semi-cylindrical wire model RM2 in the vertical direction VP (the direction of the cylindrical center line a). It acts on the lowermost semicircular surface.
The analysis result of the maximum vertical stress σp is shown in FIG.

<解析結果>
図22(a)は、各鉛直応力と積載距離δとの関係を示すグラフ図である。
図22(a)において、「○」グラフ線は「直上線体モデル群RMH2」の鉛直応力σを示し、「□」グラフ線は「勾配線体モデル群RMG2」の鉛直応力σを示し、「×」グラフ線は「充填半円筒線体モデルRM2」の鉛直応力σを示す。
<Analysis results>
FIG. 22A is a graph showing the relationship between each vertical stress and the loading distance δ.
In FIG. 22A, the “◯” graph line indicates the vertical stress σ of the “straight line object model group RMH2”, the “□” graph line indicates the vertical stress σ of the “gradient line object model group RMG2,” The “x” graph line indicates the vertical stress σ of the “filled semi-cylindrical linear model RM2”.

図22(a)において、縦軸に「鉛直応力(kPa=kN/m)」を取り、横軸に「積載距離δ」を取る。図22(a)の横軸において、積載距離δは、充填円筒線本体モデルYM2の円筒中心線aを「0(零)」とし、「−0.4775(円筒半径R=477.5mm)〜0(m)」、及び「0〜0.4775(m)」を取る。 In FIG. 22A, “vertical stress (kPa = kN / m 2 )” is taken on the vertical axis, and “loading distance δ” is taken on the horizontal axis. In the horizontal axis of FIG. 22A, the loading distance δ is defined as “−0.4775 (cylinder radius R = 477.5 mm)” with the cylindrical center line a of the filled cylindrical line body model YM2 being “0 (zero)”. 0 (m) "and" 0 to 0.4775 (m) ".

図22(a)を考察すると、直上線体モデル群RMH2は、最大鉛直応力σp=35.04(kN/m)を示している(「○」グラフ線参照)。
充填半円筒線体モデルRM2は、最大鉛直応力σe=17.52(kN/m)を示している(「×」グラフ線参照)。
勾配線体モデル群RMG2は、積載距離δ=−0.4775(m)鉛直応力σ=17.52(kN/mm)を示し、積載距離δ=−0.4775(m)から0.4775(m)に向うに連れて、漸次、増加を示している。勾配線体モデル群RMG2は、積載距離δ=0.1775(m)で最大鉛直応力σf=33.07(kN/m)を示している(「□」グラフ線参照)。
Considering FIG. 22A, the straight line body model group RMH2 shows the maximum vertical stress σp = 35.04 (kN / m 2 ) (see the “◯” graph line).
The filled semi-cylindrical linear body model RM2 indicates the maximum vertical stress σe = 17.52 (kN / m 2 ) (see the “x” graph line).
The gradient line model group RMG2 indicates a loading distance δ = −0.4775 (m) vertical stress σ = 17.52 (kN / mm 2 ), and the loading distance δ = −0.4775 (m) to 0.4775. As it goes to (m), it gradually increases. The gradient linear body model group RMG2 indicates the maximum vertical stress σf = 33.07 (kN / m 2 ) at the loading distance δ = 0.1775 (m) (see the “□” graph line).

勾配線材モデル群RMG1の最大鉛直応力σfは、σf=σe+σe×β=17.52+17.52×0.89=33.07(kN/m)である。最大鉛直応力σfは、最大鉛直荷応力σeの1.89倍となる。
これにより、勾配線体モデル群RMG2について、2段目の充填円弧筒線体モデルSM2から最下段の充填半円筒線体RM2に作用する鉛直応力は、σe×0.89=15.59(kN/m)となる。
The maximum vertical stress σf of the gradient wire model group RMG1 is σf = σe + σe × β = 17.52 + 17.52 × 0.89 = 33.07 (kN / m 2 ). The maximum vertical stress σf is 1.89 times the maximum vertical load stress σe.
As a result, for the gradient line model group RMG2, the vertical stress acting on the lowermost filling semi-cylindrical line RM2 from the second filling arc cylindrical line model SM2 is σe × 0.89 = 15.59 (kN / M 2 ).

直上線体モデル群RMH2の最大鉛直応力σpは、最大鉛直応力σeの2倍となる。   The maximum vertical stress σp of the straight line body model group RMH2 is twice the maximum vertical stress σe.

これにより、勾配線体モデル群RMG2の最下段の充填半円筒線体モデルRM2について、最大鉛直応力σfは、最大鉛直応力σeを超え、最大鉛直応力σp未満となる。   As a result, the maximum vertical stress σf exceeds the maximum vertical stress σe and is less than the maximum vertical stress σp for the lowermost filled semicylindrical line model RM2 of the gradient line model group RMG2.

<応力係数βの計算>
応力係数βは、式(1)で計算する。
勾配線材モデル群YMG2について、式(1)から、応力係数β=(33.70/17.52)−1=0.89となる。
直上線体モデル群RMH2について、式(1)と同様に、応力係数β=(35.04/17.52)−1=1となる。
充填半円筒線体モデルRM2について、式(1)と同様に、応力係数β=(17.52/17、52)−1=0となる。
勾配線体モデル群RMG2は、勾配αについて、水平長HL=0であると、直上線体モデル群RMH1と同様なモデルとなり、水平長HL=円筒直径Dであると、充填半円筒線体モデルRM2と同様なモデルとなる。
これにより、勾配線体モデル群RMG2では、勾配αの水平長HLを0<HL<円筒直径Dとすると、応力係数βは、勾配αに応じて0<β<1の範囲の定数となる。
<Calculation of stress coefficient β>
The stress coefficient β is calculated by equation (1).
For the gradient wire model group YMG2, from the equation (1), the stress coefficient β = (33.70 / 17.52) −1 = 0.89.
For the straight line body model group RMH2, the stress coefficient β = (35.04 / 17.52) −1 = 1 as in the case of the equation (1).
For the filled semi-cylindrical linear body model RM2, the stress coefficient β = (17.52 / 17, 52) −1 = 0 as in the equation (1).
When the horizontal length HL = 0 for the gradient α, the gradient linear body model group RMG2 is a model similar to the straight line body model group RMH1, and when the horizontal length HL = cylindrical diameter D, the filled semi-cylindrical linear body model The model is similar to RM2.
Thus, in the gradient line model group RMG2, if the horizontal length HL of the gradient α is 0 <HL <cylinder diameter D, the stress coefficient β is a constant in the range of 0 <β <1 according to the gradient α.

各円筒金網籠Y1,Y2の解析及び計算から、式(1)は、円筒直径D及び円筒高長Lに関係なく、如何なる円筒直径D及び円筒高長Lの円筒金網籠に適用できる。   From the analysis and calculation of each cylindrical wire netting Y1, Y2, equation (1) can be applied to the cylindrical wire netting of any cylindrical diameter D and cylindrical high length L regardless of the cylindrical diameter D and the cylindrical high length L.

<最大鉛直応力σg及び最大単位体積重量Wgの計算>
上記(2)の処理について、各充填円筒金網籠Y1,Y2の計算を説明する(図23及び図24参照)。
<Calculation of maximum vertical stress σg and maximum unit volume weight Wg>
Regarding the processing of (2) above, calculation of each filled cylindrical wire mesh Y1 and Y2 will be described (see FIGS. 23 and 24).

<A>充填半円筒金網体RG1(円筒金網籠Y1)の計算
仮想・勾配線体群RKG1は、無限積載段数n=∞及び勾配α(1:0.3420勾配)で積載した仮想・充填円筒線本体YK1,YK1,…から構成する。
図23において、無限積載段数n=∞及び勾配α(1:0.3420勾配)で積載した各仮想・充填円筒線本体YK1,YK1,…を想定する。最下段の仮想・充填円筒線本体YK1は、円筒中心線aを鉛直方向VHに向けて、最下端円形面を水平面HGに設置する。最下段以外の仮想・充填円筒線本体YK1,YK1,…は、円筒中心線aを鉛直方向VPに向け、最下端円形面を1段下の仮想・充填円筒線本体YK1の最上端円形面に積載する。
<A> Calculation of Filled Half Cylindrical Wire Mesh RG1 (Cylinder Wire Mesh Y1) Virtual / gradient wire group RKG1 is a virtual / filled cylinder loaded with an infinite stacking stage number n = ∞ and a gradient α (1: 0.3420 gradient). It comprises line main bodies YK1, YK1,.
23, each virtual / filled cylindrical body YK1, YK1,... Loaded with an infinite stacking stage number n = ∞ and a gradient α (1: 0.3420 gradient) is assumed. The lowermost virtual / filling cylindrical line main body YK1 has the cylindrical bottom line on the horizontal plane HG with the cylindrical center line a directed in the vertical direction VH. The virtual / filling cylindrical line bodies YK1, YK1,... Other than the lowermost stage have the cylindrical center line a in the vertical direction VP, and the lowermost circular surface is the uppermost circular surface of the virtual / filling cylindrical line body YK1 one stage lower. To load.

仮想・勾配線体群RKG1は、無限積載段数n=∞及び勾配α(1:0.3420勾配)で積載した仮想・充填円筒線本体YK1,YK1,…について、各段の充填半円筒線体RK1,RK1,…でなる。
仮想・勾配線体群RKG1は、無限積載段数n=∞及び勾配αで積載した仮想・充填円筒線本体YK1,YK1,…を各円筒中心線a,a,…に沿って、鉛直方向VP(円筒中心線a方向)に二等分割した、一方となる。
これにより、仮想・勾配線体群RKG1について、各段の充填半円筒線体RK1,RK1,…は、図23に示すように、無限積載段数n=∞及び勾配αで積載される。
The virtual / gradient line group RKG1 is a filling semi-cylindrical line body at each stage for the virtual / filling cylindrical line bodies YK1, YK1,... Loaded with an infinite number of stages n = ∞ and a gradient α (1: 0.3420 gradient). RK1, RK1,.
The virtual / gradient line group RKG1 includes virtual / filled cylindrical line bodies YK1, YK1,... Loaded with an infinite stacking stage number n = ∞ and a gradient α along the vertical direction VP ( It is divided into two equal parts in the direction of the cylindrical center line a).
As a result, with respect to the virtual / gradient line group RKG1, the filled semi-cylindrical lines RK1, RK1,... At each stage are loaded with an infinite stacking stage number n = ∞ and a gradient α as shown in FIG.

仮想・勾配線体群RKG1について、最下段(1段目)の仮想・充填半円筒線体RK1の最大鉛直応力σgを計算する。最大鉛直応力σgの計算では、上記(1)の処理で解析及び計算した、勾配線体モデル群RMG1の応力係数β=0.82、及び充填半円筒線体モデルRM1の最大鉛直応力σe=10.60(kN/m)を使用する。勾配線体モデル群RMG1の応力係数β=0.82を使用するのは、積載段数n=2及び勾配αから無限積載段数n=∞及び勾配αに拡張するためである。
最大鉛直応力σgは、鉛直方向VP(円筒中心線a方向)において、最下段の仮想・充填半円筒線体RK1の最下端半円形面に作用する。
For the virtual / gradient line group RKG1, the maximum vertical stress σg of the lowermost (first stage) virtual / filled semi-cylindrical linear body RK1 is calculated. In the calculation of the maximum vertical stress σg, the stress coefficient β = 0.82 of the gradient linear body model group RMG1 and the maximum vertical stress σe = 10 of the filled semicylindrical linear body model RM1 analyzed and calculated in the processing of (1) above. .60 (kN / m 2 ) is used. The reason why the stress coefficient β = 0.82 of the gradient line model group RMG1 is used is to extend from the loading stage number n = 2 and the gradient α to the infinite loading stage number n = ∞ and the gradient α.
The maximum vertical stress σg acts on the lowermost semicircular surface of the lowermost virtual / filling semicylindrical wire RK1 in the vertical direction VP (the direction of the cylinder center line a).

図23は、仮想・充填半円筒線体RK1の積載段数n=1,2,3,4,…,∞と、最大鉛直応力σgの関係を示している。
単一の仮想・充填半円筒線体RK1(積載段数n=1)は、最大鉛直応力σg=10.60(kN/m)となる[図23(a)参照]。
積載段数n=2及び勾配αで積載した各仮想・充填半円筒線体RK1,YK1について、最下段の仮想・充填半円筒線体RK1は、最大鉛直応力σg=σe+σe×β=σe×(1+β)=10.60×(1+0、82)=19.29(kN/m)となる[図23(b)参照]。
積載段数n=3及び勾配αで積載した各仮想・充填円筒金網籠YK1,YK1,…について、最下段の仮想・充填円筒金網籠YK1は、最大鉛直応力σg=σe+(σe+σe×β)×β=σe×(1+β+β)=10.60×(1+0.82+0.82)=26.42(kN/m)となる[図23(c)参照]。
積載段数n=4及び勾配αで積載した各仮想・充填半円筒線体RK1,RK1,…について、最下段の仮想・充填半円筒線体RK1は、最大鉛直応力σg=σe×(1+β+β+β)=10.60×(1+0.82+0.82+0.82)=32.26(kN/m)となる[図23(d)参照]。
図21(a)乃至図21(d)から、無限積載段数n=∞及び勾配α(1:0.3420勾配)で積載した仮想・充填半円筒線体RK1,RK1,…について、最下段の充填半円筒線体RK1の最大鉛直応力σfは、σf=σe×(1+β+β+…+βn−1)=10.60×(1+0.82+0.82+…+0.82n−1)=[10.60×(1−0.82)/(1−0.82)=53(kN/m)]となる[図23(e)参照]。なお、n=∞であると、「0.82」は「0(零)」に収束する。
これにより、無限積載段数n=∞及び勾配αで積載した仮想・充填半円筒線体RK1,RK1,…について、最下段の仮想・充填半円筒線体RK1の最大鉛直応力σfは、式(2)となる。
式(2)は、最大鉛直応力σgを、応力係数βで一般化したものである。
FIG. 23 shows the relationship between the stacking stage number n = 1, 2, 3, 4,..., ∞ of the virtual / filled semi-cylindrical linear body RK1 and the maximum vertical stress σg.
The single virtual / filled semi-cylindrical wire RK1 (stacking stage number n = 1) has a maximum vertical stress σg = 10.60 (kN / m 2 ) [see FIG. 23 (a)].
For each virtual / filling semi-cylindrical wire RK1, YK1 loaded with the loading stage number n = 2 and the gradient α, the lowest virtual / filling semi-cylindrical wire RK1 has a maximum vertical stress σg = σe + σe × β = σe × (1 + β ) = 10.60 × (1 + 0, 82) = 19.29 (kN / m 2 ) [see FIG. 23B].
For each virtual / filled cylindrical wire mesh 籠 YK1, YK1,... Loaded with a loading stage number n = 3 and a gradient α, the lowest virtual / filled cylindrical wire mesh 籠 YK1 has a maximum vertical stress σg = σe + (σe + σe × β) × β. = Σe × (1 + β + β 2 ) = 10.60 × (1 + 0.82 + 0.82 2 ) = 26.42 (kN / m 2 ) [see FIG. 23 (c)].
For each virtual / filling semi-cylindrical wire RK1, RK1,... Loaded with a loading stage number n = 4 and a gradient α, the lowest virtual / filling semi-cylindrical wire RK1 has a maximum vertical stress σg = σe × (1 + β + β 2 + β 3 ) = 10.60 × (1 + 0.82 + 0.82 2 +0.82 3 ) = 32.26 (kN / m 2 ) [see FIG. 23 (d)].
From FIG. 21 (a) to FIG. 21 (d), for the hypothetical / filled semi-cylindrical wires RK1, RK1,... Loaded with an infinite stacking stage number n = ∞ and a slope α (1: 0.3420 slope), The maximum vertical stress σf of the filled semicylindrical wire RK1 is σf = σe × (1 + β + β 2 +... + Β n-1 ) = 10.60 × (1 + 0.82 + 0.82 2 +... +0.82 n-1 ) = [ 10.60 × (1−0.82 n ) / (1−0.82) = 53 (kN / m 2 )] [see FIG. 23 (e)]. When n = ∞, “0.82 n ” converges to “0 (zero)”.
As a result, the maximum vertical stress σf of the lowermost virtual / filling semi-cylindrical wire RK1 with respect to the virtual / filling semi-cylindrical wires RK1, RK1,. )
Equation (2) is a generalization of the maximum vertical stress σg with a stress coefficient β.

Figure 2016172998
Figure 2016172998

最大鉛直応力σe=10.60(kN/m)について、式(2)から、各応力係数βと最大鉛直応力σgの関係を考察する。
式(2)において、応力係数β=0.90の最大鉛直応力σgは、σg=10.60/(1−0.9)=106.00(kN/m)となる。
応力係数β=0.7の最大鉛直応力σgは、σg=10.60/(1−0.7)=35.33(kN/m)となる。
応力係数β=0.50の最大鉛直応力σgは、σg=10.60/(1−0.5)=21.20(kN/m)となる。
応力係数β=0.30の最大鉛直応力σgは、σg=10.60/(1−0.3)=15.14(kN/m)となる。
応力係数β=0.10の最大鉛直応力σgは、σg=10.60/(1−0.1)=11.78(kN/m)となる。
このように、応力係数β=0.82以下では、最大鉛直応力σg=53(kN/m)以下となる。応力係数β=0.82以下であると、無限積載段数n=∞の勾配αは、1:0.3420勾配より緩やかになる。
With regard to the maximum vertical stress σe = 10.60 (kN / m 2 ), the relationship between each stress coefficient β and the maximum vertical stress σg will be considered from the equation (2).
In the equation (2), the maximum vertical stress σg with the stress coefficient β = 0.90 is σg = 10.60 / (1-0.9) = 106.00 (kN / m 2 ).
The maximum vertical stress σg with the stress coefficient β = 0.7 is σg = 10.60 / (1-0.7) = 35.33 (kN / m 2 ).
The maximum vertical stress σg with the stress coefficient β = 0.50 is σg = 10.60 / (1-0.5) = 21.10 (kN / m 2 ).
The maximum vertical stress σg with the stress coefficient β = 0.30 is σg = 10.60 / (1-0.3) = 15.14 (kN / m 2 ).
The maximum vertical stress σg with the stress coefficient β = 0.10 is σg = 10.60 / (1-0.1) = 11.78 (kN / m 2 ).
Thus, when the stress coefficient β = 0.82 or less, the maximum vertical stress σg = 53 (kN / m 2 ) or less. When the stress coefficient β = 0.82 or less, the gradient α of the infinite stacking stage number n = ∞ becomes gentler than the 1: 0.3420 gradient.

最大単位体積重量Wgは、Wg=(最大鉛直応力σg/円筒高長L)で求まる。応力係数β=0.82の最大鉛直応力σf=53(kN/m)、及び仮想・充填半円筒線体RK1の円筒高長L=600(mm)=0.6(m)であるので、単位体積重量Wg=53/0.6=88.3(kN/m)となる。 The maximum unit volume weight Wg is obtained by Wg = (maximum vertical stress σg / cylindrical height L). Since the maximum vertical stress σf = 53 (kN / m 2 ) with the stress coefficient β = 0.82 and the cylinder height L = 600 (mm) = 0.6 (m) of the virtual / filled semi-cylindrical wire RK1. Unit volume weight Wg = 53 / 0.6 = 88.3 (kN / m 3 ).

<B>充填半円筒金網体RG2(円筒金網籠Y2)の計算
充填半円筒金網体RG2の計算は、充填半円筒金網体RG1と同様である。
仮想・勾配線体群RKG2は、無限積載段数n=∞及び勾配α(1:0.3勾配)で積載した仮想・充填円筒線本体YK2,YK2,…から構成する。
図24において、無限積載段数n=∞及び勾配α(1:0.3勾配)で積載した各仮想・充填円筒線本体YK2,YK2,…を想定する。最下段(1段目)の仮想・充填円筒線本体YK2は、円筒中心線aを鉛直方向VPに向けて、最下端円形面を水平面HGに設置する。最下段以外の各仮想・充填円筒線本体YK2,YK2,…は、円筒中心線aを鉛直方向VPに向け、最下端円形面を1段下の仮想・充填円筒線本体YK2の最上端円形面に積載する。
<B> Calculation of Filled Half Cylindrical Wire Mesh RG2 (Cylindrical Wire Mesh Y2) The calculation of the filled half cylindrical wire mesh RG2 is the same as that of the filled half cylindrical wire mesh RG1.
The virtual / gradient line group RKG2 is composed of virtual / filled cylindrical line bodies YK2, YK2,... Loaded with an infinite stacking stage number n = ∞ and a gradient α (1: 0.3 gradient).
24, each virtual / filled cylindrical line body YK2, YK2,... Loaded with an infinite stacking stage number n = ∞ and a gradient α (1: 0.3 gradient) is assumed. The lowermost (first stage) virtual / filling cylindrical line main body YK2 has the lowermost circular surface on the horizontal plane HG with the cylindrical center line a facing the vertical direction VP. Each virtual / filling cylindrical line main body YK2, YK2,... Other than the lowermost stage has the uppermost circular surface of the virtual / filling cylindrical line body YK2 one stage lower with the cylindrical center line a directed in the vertical direction VP. To load.

仮想・勾配線体群RKG2について、最下段(1段目)の仮想・充填半円筒線体RK2の最大鉛直応力σfを計算する。最大鉛直応σfの計算は、上記(1)の処理で解析及び計算した、勾配線体モデル群RM2の応力係数β=0.89、及び充填半円筒線体モデルRM2の最大鉛直応力σe=17.52(kN/m)を使用する。最大鉛直応力σgは、鉛直方向HV(円筒中心線a方向)において、最下段(1段目)の仮想・充填半円筒線体RM2の最下端半円形面に作用する。 For the virtual / gradient line group RKG2, the maximum vertical stress σf of the lowermost (first stage) virtual / filled semi-cylindrical linear body RK2 is calculated. For calculating the maximum vertical stress σf, the stress coefficient β = 0.89 of the gradient linear body model group RM2 and the maximum vertical stress σe = 17 of the filled semicylindrical linear body model RM2 analyzed and calculated in the process of (1) above. .52 (kN / m 2 ) is used. The maximum vertical stress σg acts on the lowermost semicircular surface of the lowermost (first stage) virtual / filling semicylindrical wire RM2 in the vertical direction HV (in the direction of the cylinder center line a).

仮想・勾配線体群RKG2は、無限積載段数n=∞及び勾配α(1:0.3勾配)で積載した仮想・充填円筒線本体YK2,YK2,…について、各段の充填半円筒線体RK2,RK2,…でなる。
仮想・勾配線体群RKG2は、無限積載段数n=∞及び勾配αで積載した仮想・充填円筒線本体YK2,YK2,…を各円筒中心線a,a,…に沿って、鉛直方向VP(円筒中心線a方向)に二等分割した、一方となる。
これにより、仮想・勾配線体群RKG2について、各段の充填半円筒線体RK2,RK2,…は、図24に示すように、無限積載段数n=∞及び勾配αで積載される。
The virtual / gradient line group RKG2 is a filling semi-cylindrical line body at each stage with respect to the virtual / filled cylindrical line bodies YK2, YK2,... Loaded with an infinite number of loading stages n = ∞ and a gradient α (1: 0.3 gradient). RK2, RK2,.
The virtual / gradient line group RKG2 includes virtual / filled cylindrical line bodies YK2, YK2,... Loaded with an infinite stacking stage number n = ∞ and a gradient α along the vertical direction VP ( It is divided into two equal parts in the direction of the cylindrical center line a).
As a result, for the virtual / gradient line group RKG2, the filled semi-cylindrical line bodies RK2, RK2,... At each stage are loaded with an infinite stacking stage number n = ∞ and a gradient α as shown in FIG.

図24は、仮想・充填半円筒線体RK2の積載段数n=1,2,3,…,∞と、最大鉛直応力σgの関係を示している。
単一の仮想・充填半円筒線体RK2は、最大鉛直応力σg=σe=17.52(kN/m)となる[図23(a)参照]。
積載段数n=2及び勾配αで積載した仮想・充填半円筒線体RK2,RK2について、最餡段の仮想・充填半円筒線体RK2は、最大鉛直応力σg=σe×(1+β)=33.11(kN/m)となる[図23(b)参照]。
積載段数n=3及び勾配αで積載した仮想・充填半円筒線体RK2,RK2,…について、最餡段の仮想・充填半円筒線体RK2は、最大鉛直応力σg=σe×(1+β+β)=46.99(kN/m)となる[図23(c)参照]。
積載段数n=4及び勾配αで積載した仮想・充填半円筒線体RK2,RK2,…について、最餡段の仮想・充填半円筒線体RK2は、最大鉛直応力σg=σe×(1+β+β+β)=59.34(kN/m)となる[図23(d)参照]。
仮想・勾配線体群RKG2について、最下段(1段目)の仮想、充填半円筒線体RK2の最大鉛直応力σgは、式(2)から、σf=17.52/(1−0.89)=159(kN/m)となる。
FIG. 24 shows the relationship between the stacking stage number n = 1, 2, 3,..., ∞ of the virtual / filled semi-cylindrical wire RK2 and the maximum vertical stress σg.
The single virtual / filled semi-cylindrical wire RK2 has the maximum vertical stress σg = σe = 17.52 (kN / m 2 ) [see FIG. 23 (a)].
Regarding the virtual / filling semi-cylindrical wires RK2 and RK2 loaded with the loading stage number n = 2 and the gradient α, the uppermost virtual / filling semi-cylindrical wire RK2 has a maximum vertical stress σg = σe × (1 + β) = 33. 11 (kN / m 2 ) [see FIG. 23 (b)].
For the virtual / filling semi-cylindrical wires RK2, RK2,... Loaded with the loading stage number n = 3 and the gradient α, the uppermost virtual / filling semi-cylindrical wire RK2 has the maximum vertical stress σg = σe × (1 + β + β 2 ). = 46.99 (kN / m 2 ) [see FIG. 23 (c)].
For virtual / filling semi-cylindrical wires RK2, RK2,... Loaded with a loading stage number n = 4 and a gradient α, the uppermost virtual / filling semi-cylindrical wire RK2 has a maximum vertical stress σg = σe × (1 + β + β 2 + β 3 ) = 59.34 (kN / m 2 ) [see FIG. 23 (d)].
For the virtual / gradient line group RKG2, the maximum vertical stress σg of the lowermost (first stage) virtual, filled semi-cylindrical linear body RK2 is σf = 17.52 / (1−0.89) from Equation (2). ) = 159 (kN / m 2 ).

最大鉛直応力σe=17.52(kN/m)について、式(2)から、各応力係数βと最大鉛直応力σgの関係を考察する。
式(2)において、応力係数β=0.90の最大鉛直応力σgは、σg=17.52/(1−0.9)=175.20(kN/m)となる。
応力係数β=0.8の最大鉛直応力σgは、σg=17.52/(1−0.8)=87.60(kN/m)となる。
応力係数β=0.50の最大鉛直応力σgは、σg=17.52/(1−0.5)=35.40(kN/m)となる。
応力係数β=0.30の最大鉛直応力σgは、σg=17.52/(1−0.3)=25.03(kN/m)となる。
応力係数β=0.10の最大鉛直応力σgは、σg=17.52/(1−0.1)=19.47(kN/m)となる。
このように、応力係数β=0.89以下では、最大鉛直応力σg=159(kN/m)以下となる。応力係数β=0.89以下であると、無限積載段数n=∞の勾配αは、1:0.3勾配より緩やかになる。
Regarding the maximum vertical stress σe = 17.52 (kN / m 2 ), the relationship between each stress coefficient β and the maximum vertical stress σg will be considered from the equation (2).
In the formula (2), the maximum vertical stress σg at the stress coefficient β = 0.90 is σg = 17.52 / (1-0.9) = 175.20 (kN / m 2 ).
The maximum vertical stress σg with the stress coefficient β = 0.8 is σg = 17.52 / (1-0.8) = 87.60 (kN / m 2 ).
The maximum vertical stress σg with the stress coefficient β = 0.50 is σg = 17.52 / (1-0.5) = 35.40 (kN / m 2 ).
The maximum vertical stress σg with the stress coefficient β = 0.30 is σg = 17.52 / (1-0.3) = 25.03 (kN / m 2 ).
The maximum vertical stress σg with the stress coefficient β = 0.10 is σg = 17.52 / (1-0.1) = 19.47 (kN / m 2 ).
Thus, when the stress coefficient β = 0.89 or less, the maximum vertical stress σg = 159 (kN / m 2 ) or less. When the stress coefficient β = 0.89 or less, the gradient α of the infinite stacking stage number n = ∞ becomes gentler than the 1: 0.3 gradient.

単位体積重量Wgは、Wg=(最大鉛直応力σg/円筒高長L)で求まる。応力係数β=0.89の最大鉛直応力σf=159(kN/m)、及び仮想・充填半円筒線体RK2の円筒高長L=1000(mm)=1.0(m)であるので、単位体積重量Wg=159/1.0=159(kN/m)となる。 The unit volume weight Wg is obtained by Wg = (maximum vertical stress σg / cylindrical height L). Since the maximum vertical stress σf = 159 (kN / m 2 ) with the stress coefficient β = 0.89 and the cylinder height L = 1000 (mm) = 1.0 (m) of the virtual / filled semi-cylindrical linear body RK2. Unit volume weight Wg = 159 / 1.0 = 159 (kN / m 3 ).

<最大引張荷重Wh及び最大引張応力σhの解析・計算>
上記(3)の処理について、各円筒金網籠Y1,Y2の解析及び計算を説明する(図25及び図26参照)
<1>充填半円筒金網体RG1(円筒金網籠Y1)の解析等
無限積載段数n=∞及び勾配α(1:0.3420勾配)で積載した各仮想・充填半円筒線体RK1,RK1,…の最下段の仮想・充填半円筒線体RK1について、仮想・充填半円筒金網体RP1を想定する。
単位体積重量Wgを作用した仮想・充填半円筒金網体RP1について、各半円形横金属線10の最大鉛直応力σhを求める。
<Analysis and calculation of maximum tensile load Wh and maximum tensile stress σh>
Regarding the process of (3) above, the analysis and calculation of each cylindrical wire netting Y1, Y2 will be described (see FIGS. 25 and 26).
<1> Analysis of Filled Half Cylindrical Wire Mesh RG1 (Cylinder Wire Mesh Y1), etc. Each virtual and filled semicylindrical wire RK1, RK1, loaded with an infinite loading stage number n = ∞ and a gradient α (1: 0.3420 gradient) The hypothetical / filling semi-cylindrical wire body RK1 is assumed to be the hypothetical / filling semi-cylindrical wire body RP1.
The maximum vertical stress σh of each semicircular horizontal metal wire 10 is determined for the virtual / filled semicylindrical metal mesh RP1 on which the unit volume weight Wg is applied.

演算処理装置(コンピュータ)は、仮想・充填半円筒金網体RP1(又は充填半円筒金網体RG1)について、各半円形横金属線10を水平Beam要素で表現し、及び各縦金属線11を鉛直Beam要素で表現してモデル化した充填半円筒金網体モデルRN1を構成する。
演算処理装置(コンピュータ)は、図25に示すように、鉛直方向VP(円筒中心線a方向)から単位体積重量Wg=88.3(kN/m)を作用した充填半円筒金網体モデルRN1について、3次元解析FEMにより解析メッシュを構築して、水平Beam要素の最大引張荷重Whを解析する。3次元解析FEMでは、図25(b)に示すように、円筒金網籠Y1の各数値及び中詰材Zの各数値を用いて、水平Beam要素(半円形横金属線10)の最大引張荷重Whを解析する。
最大引張荷重Wgの解析は、図25(b)に示すように、円周方向の網目CTの「9番目」及び「10番目」に位置する、水平Beam要素に対して実行する。
引張荷重の解析結果を、図25(a)に示す。
The arithmetic processing unit (computer) expresses each semicircular horizontal metal wire 10 with a horizontal Beam element and a vertical metal wire 11 vertically with respect to the virtual / filled semicylindrical metal mesh RP1 (or filled semicylindrical metal mesh RG1). A filled semi-cylindrical wire mesh model RN1 expressed and modeled by a Beam element is constructed.
As shown in FIG. 25, the arithmetic processing unit (computer) is a filled semi-cylindrical metal mesh model RN1 in which a unit volume weight Wg = 88.3 (kN / m 3 ) is applied from the vertical direction VP (the direction of the cylinder center line a). An analysis mesh is constructed by a three-dimensional analysis FEM, and the maximum tensile load Wh of the horizontal beam element is analyzed. In the three-dimensional analysis FEM, as shown in FIG. 25 (b), the maximum tensile load of the horizontal beam element (semi-circular horizontal metal wire 10) is obtained by using the numerical values of the cylindrical wire netting Y1 and the numerical values of the filling material Z. Analyze Wh.
The analysis of the maximum tensile load Wg is performed with respect to the horizontal beam elements positioned at the “9th” and “10th” of the mesh CT in the circumferential direction, as shown in FIG.
The analysis result of the tensile load is shown in FIG.

図25(a)は、引張荷重(kN)と充填半円筒金網体モデルRN1の円筒高長L=600(mm)=0.6(m)の関係を示すグラフ図である。
図25(a)において、「□」グラフ線は「9番目の水平Beam要素の引張荷重」を示し、「○」グラフ線は「10番目の水平Beam要素の引張荷重」を示す。
図25(a)において、縦軸に「円筒高長L(m)」と取り、横軸に「引張荷重(kN)」を取る。図25(a)の縦軸は、鉛直方向VP(円筒中心線a方向)において、充填半円筒金網体モデルRN1の最上端を「0(零)」とし、最下端を「−0.6(m)」とする。
FIG. 25A is a graph showing the relationship between the tensile load (kN) and the cylindrical height L = 600 (mm) = 0.6 (m) of the filled semicylindrical wire mesh model RN1.
In FIG. 25A, the “□” graph line indicates “the tensile load of the ninth horizontal beam element”, and the “◯” graph line indicates “the tensile load of the tenth horizontal beam element”.
In FIG. 25A, the vertical axis represents “cylindrical height L (m)” and the horizontal axis represents “tensile load (kN)”. In FIG. 25A, the vertical axis indicates the vertical direction VP (cylindrical centerline a direction) where the uppermost end of the filled semicylindrical metal mesh body model RN1 is “0 (zero)” and the lowermost end is “−0.6 ( m) ".

図25(a)を考察すると、「9番目」及び「10番目」の水平Beam要素では、円筒高長L=−0.5(m)で最大引張荷重Wg=0.18(kN)を示している。
最大引張荷重Wh=0.18(kN)=180(N)は、円筒金網籠Y1について、各半円形横金属線10の最大引張荷重となる。円筒金網籠Y1について、最大引張荷重Whは、各連結コイル金属線2,3に剪断荷重として作用する。
Considering FIG. 25 (a), the “9th” and “10th” horizontal beam elements show the maximum tensile load Wg = 0.18 (kN) with the cylindrical height L = −0.5 (m). ing.
The maximum tensile load Wh = 0.18 (kN) = 180 (N) is the maximum tensile load of each semicircular horizontal metal wire 10 with respect to the cylindrical wire netting Y1. For the cylindrical wire mesh rod Y1, the maximum tensile load Wh acts as a shear load on each of the connecting coil metal wires 2 and 3.

最大引張応力σhは、最大引張荷重Wh及び水平Beam要素(半円形横金属線10)の線径面積Aで求める。
最大引張荷重Whは、Wh=0.18(kN)=180(N)、線径面積Aは、A=(d/2)×円周率(π)=(3.2/2)×3.14=8.04(mm)である。
最大引張応力σh=(180/8.04)=22.39(N/mm)となる。
The maximum tensile stress σh is obtained from the maximum tensile load Wh and the wire diameter area A of the horizontal beam element (semi-circular horizontal metal wire 10).
The maximum tensile load Wh is Wh = 0.18 (kN) = 180 (N), and the wire diameter area A is A = (d / 2) 2 × circumference (π) = (3.2 / 2) 2 * 3.14 = 8.04 (mm < 2 >).
The maximum tensile stress σh = (180 / 8.04) = 22.39 (N / mm 2 ).

<2>充填半円筒金網体RG2(円筒金網籠Y2)の解析等
充填半円筒金網体YG2の解析等は、充填半円筒金網体RG2と同様である。
無限積載段数n=∞及び勾配α(1:0.3勾配)で積載した各仮想・充填半円筒線体RK2,RK2,…の最下段の仮想・充填半円筒線体RK2について、仮想・充填半円筒金網体RP2を想定する。
単位体積重量WHh=159(kN)を作用した仮想・充填半円筒金網体PR2について、各半円形横金属線10の最大引張応力σhを求める。
<2> Analysis of Filled Half Cylindrical Wire Mesh RG2 (Cylindrical Wire Mesh Y2) Analysis of Filled Half Cylindrical Wire Mesh YG2 is similar to that of Filled Half Cylindrical Wire Mesh RG2.
Virtual / filling semi-cylindrical wire RK2 at the bottom of each virtual / filling semi-cylindrical wire RK2, RK2,... Loaded with an infinite number of loading stages n = ∞ and gradient α (1: 0.3 gradient). Assume a semi-cylindrical wire mesh RP2.
The maximum tensile stress σh of each semicircular horizontal metal wire 10 is determined for the virtual / filled semicylindrical metal mesh PR2 on which the unit volume weight WHh = 159 (kN) is applied.

演算処理装置(コンピュータ)は、仮想・充填半円筒金網体PR1(又は充填半円筒金網体RG2)について、各半円形横金属線10を水平Beam要素で表現し、及び各縦金属線11を鉛直Beam要素で表現してモデル化した充填半円筒金網体モデルRN2を構成する。
演算処理装置(コンピュータ)は、図26に示すように、鉛直方向VP(円筒中心線a方向)から単位体積重量Wg=159(kN/m)を作用した充填半円筒金網体モデルRN2について、3次元解析FEMにより解析メッシュを構築して、水平Beam要素の最大引張荷重Whを解析する.3次元解析FEMでは、図26(b)に示すように、円筒金網籠Y1の各数値及び中詰材Zの各数値を用いて、水平Beam要素(半円形横金属線10)の最大引張荷重Whを解析する。
最大引張荷重Wgの解析は、図26(b)に示すように、円周方向の網目CTの「15番目」及び「16番目」に位置する、水平Beam要素に対して実行する。
引張荷重の解析結果を、図26(a)に示す。
The arithmetic processing unit (computer) expresses each semicircular horizontal metal wire 10 with a horizontal Beam element and a vertical metal wire 11 vertically with respect to the virtual / filled semicylindrical metal mesh PR1 (or filled semicylindrical metal mesh RG2). A filled semi-cylindrical wire mesh model RN2 expressed and modeled by a Beam element is constructed.
As shown in FIG. 26, the arithmetic processing unit (computer) is configured to fill a semi-cylindrical metal mesh model RN2 in which a unit volume weight Wg = 159 (kN / m 3 ) is applied from the vertical direction VP (the direction of the cylindrical center line a). Analyzing the maximum tensile load Wh of the horizontal beam element by constructing an analysis mesh by 3D analysis FEM. In the three-dimensional analysis FEM, as shown in FIG. 26 (b), the maximum tensile load of the horizontal beam element (semi-circular horizontal metal wire 10) is obtained by using the numerical values of the cylindrical wire netting Y1 and the numerical values of the filling material Z. Analyze Wh.
The analysis of the maximum tensile load Wg is performed on the horizontal beam elements located at the “15th” and “16th” of the mesh CT in the circumferential direction, as shown in FIG.
The analysis result of the tensile load is shown in FIG.

図26(a)は、引張荷重(kN)と充填半円筒金網体モデルRN2の円筒高長L1000(mm)=1.0(m)の関係を示すグラフ図である。
図26(a)において、「□」グラフ線は、「15番目の水平Beam要素の引張荷重」を示し、「○」グラフ線は「16番目の水平Beam要素の引張荷重」を示す。
図26(a)において、縦軸に「円筒高長L(m)」を取り、横軸に「引張荷重(kN)」を取る。図26(a)の縦軸は、鉛直方向VP(円筒中心線a方向)において、充填半円筒金網体モデルRN2の最上端を「0(零)」とし、最下端を「−1(m)」とする。
FIG. 26A is a graph showing the relationship between the tensile load (kN) and the cylindrical height L1000 (mm) = 1.0 (m) of the filled semicylindrical wire mesh model RN2.
In FIG. 26A, the “□” graph line indicates “tensile load of the 15th horizontal beam element”, and the “◯” graph line indicates “tensile load of the 16th horizontal beam element”.
In FIG. 26A, the vertical axis represents “cylindrical height L (m)” and the horizontal axis represents “tensile load (kN)”. In FIG. 26 (a), the vertical axis indicates the vertical end VP (in the direction of the cylinder center line a) with the uppermost end of the filled semicylindrical metal mesh model RN2 being “0 (zero)” and the lowermost end being “−1 (m). "

図26(a)を考察すると、「15番目」及び「16番目」の水平Beam要素では、円筒高長L=−0.6(m)で最大引張荷重Wh=1.5(kN)を示している。
最大引張荷重Wh=1、5(kN)は、円筒金網籠Y2について、各半円形横金属線10の最大引張荷重となる。円筒金網籠Y2について、最大引張荷重Whは、各連結コイル金属線2,3に剪断荷重として作用する。
Considering FIG. 26 (a), the horizontal beam elements “15th” and “16th” indicate the maximum tensile load Wh = 1.5 (kN) with the cylindrical height L = −0.6 (m). ing.
The maximum tensile load Wh = 1, 5 (kN) is the maximum tensile load of each semicircular horizontal metal wire 10 with respect to the cylindrical wire netting Y2. For the cylindrical wire mesh rod Y2, the maximum tensile load Wh acts as a shear load on each of the connecting coil metal wires 2 and 3.

最大引張応力σhは、最大引張荷重Wh及び水平Beam要素(半円形横金蔵線10)の線径面積Aで求める。
最大引張荷重Whは、Wh=1.5(kN)=1500(N)、線径面積A=(5.0/2)×円周率(π)=19.63(mm)である。
最大引張応力σh=(1500/19.63)=76.42(N/mm)となる。
The maximum tensile stress σh is obtained from the maximum tensile load Wh and the wire diameter area A of the horizontal beam element (semi-circular horizontal wire 10).
The maximum tensile load Wh is Wh = 1.5 (kN) = 1500 (N), the wire diameter area A = (5.0 / 2) 2 × circumference (π) = 19.63 (mm 2 ). .
The maximum tensile stress σh = (1500 / 19.63) = 76.42 (N / mm 2 ).

各円筒金網籠Y1,Y2の解析及び計算結果(最大引張荷重Wh及び最大引張応力σh)を「表1」に示す。   Table 1 shows the analysis and calculation results (maximum tensile load Wh and maximum tensile stress σh) of each cylindrical wire netting Y1, Y2.

Figure 2016172998
Figure 2016172998

円筒金網籠Y1について、各連結コイル金属線2,3の剪断強度τ(剪断応力)は、τ>最大引張応力σh=22.39(N/mm)とする。
円筒金網籠Y1について、各連結コイル金属線2,3の線径dc及び材質(例えば、炭素鋼線)を適宜選択して、各連結コイル金属線2,3の剪断強度τは最大引張応力σh=22.39(N/mm)を超えるものとする。
これにより、円筒金網籠Y1に中詰材Zを充填した充填円筒金網籠YG1について、無限積載段数n=∞及び勾配α(1:0.3420勾配)で積載しても、各連結コイル金属線2,3は、剪断することなく、各半円筒金網体8,9同士の連結を保持できる。
なお、円筒金網籠Y1の充填円筒金網籠YG1について、1:0.3420勾配αより緩やかな勾配であると、最大鉛直応力σg(単位体積重量Wg)は、1:0.3420勾配αに比して低い値となることから、各半円形横金属線10の最大引張応力σhは、σh=22.39(N/mm)以下となる。
これにより、円筒金網籠Y1について、剪段強度τ>最大引張応力σh=22.39(N/mm)として、1:0.3420勾配αより緩やかであれば、無限積載段数n=∞で積載しても、各連結コイル金属線2,3は剪断しない。
1:0.3420勾配より緩やかとは、水平長HLの鉛直長VLに対する比について、0.3420を超え、1.0未満となる勾配である。
For the cylindrical wire mesh rod Y1, the shear strength τ (shear stress) of each of the connecting coil metal wires 2 and 3 is τ> maximum tensile stress σh = 22.39 (N / mm 2 ).
For the cylindrical wire mesh rod Y1, the wire diameter dc and the material (for example, carbon steel wire) of each connecting coil metal wire 2, 3 are appropriately selected, and the shear strength τ of each connecting coil metal wire 2, 3 is the maximum tensile stress σh. It shall exceed 22.39 (N / mm 2 ).
As a result, even if the cylindrical metal mesh cage YG1 in which the cylindrical metal mesh cage Y1 is filled with the filling material Z is loaded with an infinite stacking stage number n = ∞ and a gradient α (1: 0.3420 gradient), each connected coil metal wire 2 and 3 can hold | maintain the connection of each semi-cylindrical metal-mesh body 8,9, without shearing.
Note that when the cylindrical metal mesh YG1 of the cylindrical metal mesh Y1 has a gentler gradient than the 1: 0.3420 gradient α, the maximum vertical stress σg (unit volume weight Wg) is compared with the 1: 0.3420 gradient α. Therefore, the maximum tensile stress σh of each semicircular horizontal metal wire 10 is σh = 22.39 (N / mm 2 ) or less.
As a result, for the cylindrical wire netting Y1, if the cutting strength τ> the maximum tensile stress σh = 22.29 (N / mm 2 ), and if it is gentler than the 1: 0.3420 gradient α, the infinite stacking stage number n = ∞. Even when loaded, the connecting coil metal wires 2 and 3 do not shear.
The gentler than the 1: 0.3420 gradient is a gradient that exceeds 0.3420 and less than 1.0 with respect to the ratio of the horizontal length HL to the vertical length VL.

円筒金網籠Y2について、各連結コイル金属線2,3の剪断強度τ(剪断応力)は、τ>最大引張応力σh=76.42(N/mm)とする。
円筒金網籠Y2について、各連結コイル金属線2,3の線径dc及び材質(例えば、炭素鋼線)を適宜選択して、各連結コイル金属線2,3の剪断強度τは最大引張彙応力σh=76.42(N/mm)を超えるものとする。
これにより、円筒金網籠Y2に中詰材Zを充填した充填円筒金網籠YG2について、無限積載段数n=∞及び勾配α(1:0.3勾配)で積載しても、各連結コイル金属線2,3は、剪断することなく、各半円筒金網体8,9同士の連結を保持できる。
なお、円筒金網籠Y2の充填円筒金網籠YG2について、1:0.3勾配αより緩やかな勾配であると、最大鉛直応力σ(単位体積重量Wg)は、1:03勾配αに比して低い値となることから、各半円形横金属線10の最大引張応力σhは、σh=76.42(N/mm)以下となる。
これにより、円筒金網籠Y1について、剪段強度τ>最大引張応力σh=76.42(N/mm)として、1:0.3勾配αより緩やかであれば、無限積載段数n=∞で積載しても、各連結コイル金属線2,3は剪断しない。
1:0.3勾配αより緩やかとは、水平長HLの鉛直長VLに対する比について、0.3を超え、1.0未満となる勾配である。
For the cylindrical wire mesh rod Y2, the shear strength τ (shear stress) of each of the connecting coil metal wires 2 and 3 is τ> maximum tensile stress σh = 76.42 (N / mm 2 ).
For the cylindrical wire mesh rod Y2, the wire diameter dc and the material (for example, carbon steel wire) of each connecting coil metal wire 2, 3 are appropriately selected, and the shear strength τ of each connecting coil metal wire 2, 3 is the maximum tensile stress. It shall exceed σh = 76.42 (N / mm 2 ).
As a result, even when the filled cylindrical wire netting YG2 in which the cylindrical wire mesh Y2 is filled with the filling material Z is loaded with an infinite stacking stage number n = ∞ and a gradient α (1: 0.3 gradient), each connected coil metal wire 2 and 3 can hold | maintain the connection of each semi-cylindrical metal-mesh body 8,9, without shearing.
Note that when the cylindrical metal mesh cage YG2 of the cylindrical metal mesh cage Y2 has a gentler slope than the 1: 0.3 gradient α, the maximum vertical stress σ (unit volume weight Wg) is larger than the 1:03 gradient α. Since it becomes a low value, the maximum tensile stress σh of each semicircular horizontal metal wire 10 is σh = 76.42 (N / mm 2 ) or less.
As a result, for the cylindrical wire netting Y1, if the cutting strength τ> the maximum tensile stress σh = 76.42 (N / mm 2 ), and if it is gentler than the 1: 0.3 gradient α, the infinite stacking stage number n = ∞. Even when loaded, the connecting coil metal wires 2 and 3 do not shear.
The gentler than 1: 0.3 gradient α is a gradient that exceeds 0.3 and less than 1.0 with respect to the ratio of horizontal length HL to vertical length VL.

円筒金網籠Y1は、円筒直径D=600mm、円筒高長L=600mmであって、円筒直径D:円筒高長L=1:1となる。横半円形金属線10の1本当たりの最大引張応力σhは、表1からσh=22.39(N/mm)である。
円筒金網籠Y2は、円筒直径D=955mm、円筒高長L=1000mmであって、円筒直径D:円筒高L=1:1.047となる。横半円形金属線10の1本当たりの最大引張応力σhは、表示1からσh=76.42(N/mm)である。
円筒金網籠Y1の最大引張応力σh=22.39(N/mm)及び円筒直径D=600mmと、円筒金網籠Y2の最大引張応力σh=76.42(N/mm)及び円筒直径D=955mmの関係について、一次関数式は、式(3)で示すことかができる。
σh=0.1522×D−68.93・・・・・・・(3)
The cylindrical wire netting Y1 has a cylinder diameter D = 600 mm and a cylinder height L = 600 mm, and the cylinder diameter D: the cylinder height L = 1: 1. The maximum tensile stress σh per horizontal semicircular metal wire 10 is σh = 22.39 (N / mm 2 ) from Table 1.
The cylindrical wire mesh rod Y2 has a cylindrical diameter D = 955 mm and a cylindrical height L = 1000 mm, and the cylindrical diameter D: cylindrical height L = 1: 1.047. The maximum tensile stress σh per one horizontal semicircular metal wire 10 is σh = 76.42 (N / mm 2 ) from display 1.
Maximum tensile stress .SIGMA.H = 22.39 cylindrical wire mesh cage Y1 (N / mm 2) and a cylindrical diameter D = 600 mm, the maximum tensile stress of the cylindrical wire mesh cage Y2 σh = 76.42 (N / mm 2) and a cylindrical diameter D For the relationship of = 955 mm, the linear function equation can be expressed by equation (3).
σh = 0.1522 × D−68.93 (3)

式(3)は、円筒直径D=600mm〜955mm、及び円筒高長L=600mm〜1000mmの円筒金網籠Yに適用できる。
但し、式(3)の適用条件は、
i)無限積載段数n=∞、及び1:0.3勾配、
ii)円筒直径D=600mm〜955mm、
iii)円筒高長L=600mm〜1000mm
iv)円筒直径D及び円筒高長Lの比は、円筒直径D:円筒高長L=1:1〜1.047、
である。
これにより、円筒金網籠Yについて、式(3)に円筒直径Dを代入することで、各半円形横金属線10の1本当たりの最大引張応力σhを求めることができる。
Equation (3) can be applied to a cylindrical wire mesh rod Y having a cylindrical diameter D = 600 mm to 955 mm and a cylindrical height L = 600 mm to 1000 mm.
However, the application condition of Equation (3) is
i) Infinite loading stage number n = ∞ and 1: 0.3 gradient,
ii) Cylindrical diameter D = 600 mm to 955 mm,
iii) Cylindrical height L = 600 mm to 1000 mm
iv) The ratio of the cylinder diameter D and the cylinder height L is: cylinder diameter D: cylinder height L = 1: 1 to 1.047,
It is.
Thereby, the maximum tensile stress σh per one of the semicircular horizontal metal wires 10 can be obtained by substituting the cylindrical diameter D into the expression (3) for the cylindrical wire netting Y.

次に、連結コイル金属線の引張試験について、実施例1乃至実施例10を示して説明する。   Next, a tensile test of the connecting coil metal wire will be described with reference to Examples 1 to 10.

<引張試験機>
引張試験は、油圧式万能試験機(JTトーシ株式会社、型式:YU200SII、定格:2000kN)を用いて行った。
<Tensile testing machine>
The tensile test was performed using a hydraulic universal testing machine (JT Toshi Co., Ltd., model: YU200SII, rating: 2000 kN).

<供試体>
実施例1乃至実施例10において、供試体は、図27に示すように、一対の金網体101,102、及び連結コイル金属線103でなる。各金属体101,102は、半円筒金網体8,9に相当し、複数の横金属線104,104,…及び複数の縦金属線105,105,…を有する。
各横金属線104,104,…は、線間隔ATを隔てて並列する。各縦金属線105,105,…は、線間隔BTを隔てて並列され、及び各横金属線104,104,…に直交して配置される。各金網体101,102は、各金属線104,105の交点にて、各横金属線104,104,…及び各縦金属線105,105,…同士を溶接して固定する。各横金属線104,104,…及び各縦金属線105,105,…は、各線間隔AT,BTにて、複数の網目CTを形成する。各金網体101,102は、金網体101の縦金属線105と金網体102の105を隣接して配置(突合わせて配置)する。
連結コイル103は、隣接する各縦金属線105A,105Aに巻付けられ、各金属体同士を連結して供試体とする。連結コイル金属線103は、各金網体101,102の内外側から各縦金属線105A,105Aの紙目CTに挿通され、隣接した各縦金属線105A,105Aの軸方向にわたって巻付けられる。
<Specimen>
In Examples 1 to 10, the specimen is composed of a pair of wire nets 101 and 102 and a connecting coil metal wire 103 as shown in FIG. The metal bodies 101 and 102 correspond to the semi-cylindrical metal mesh bodies 8 and 9, and have a plurality of horizontal metal wires 104, 104,... And a plurality of vertical metal wires 105, 105,.
The horizontal metal wires 104, 104,... Are juxtaposed at a line interval AT. The vertical metal lines 105, 105,... Are arranged in parallel with a line interval BT, and are arranged orthogonal to the horizontal metal lines 104, 104,. The metal mesh bodies 101, 102 are fixed by welding the horizontal metal wires 104, 104,... And the vertical metal wires 105, 105,. The horizontal metal lines 104, 104,... And the vertical metal lines 105, 105,... Form a plurality of meshes CT at the line intervals AT, BT. In each of the metal mesh bodies 101 and 102, the vertical metal wire 105 of the metal mesh body 101 and 105 of the metal mesh body 102 are arranged adjacent to each other.
The connecting coil 103 is wound around each of the adjacent vertical metal wires 105A and 105A, and the metal bodies are connected to each other as a specimen. The connecting coil metal wire 103 is inserted from the inner and outer sides of the metal mesh bodies 101 and 102 into the paper CT of the vertical metal wires 105A and 105A, and is wound around the axial direction of the adjacent vertical metal wires 105A and 105A.

<試験条件>
油圧式万能試験機において、図27に示すように、供試体の各金網体101,102をクランプ(把持)して、供試体を油圧式万能試験機に装着する。
油圧式万能試験機では、図27に示すように、連結コイル金属線を間に配置して、各金属体101,102をクランプする。
油圧式万能試験機では、各横金属線104,104,…の軸方向(連結コイル金属線103の剪段方向)に引張荷重を作用する。
<Test conditions>
In the hydraulic universal testing machine, as shown in FIG. 27, the wire mesh bodies 101 and 102 of the specimen are clamped (gripped), and the specimen is mounted on the hydraulic universal testing machine.
In the hydraulic universal testing machine, as shown in FIG. 27, the connecting coil metal wires are arranged between them to clamp the metal bodies 101 and 102.
In the hydraulic universal testing machine, a tensile load is applied in the axial direction of each horizontal metal wire 104, 104,... (Pruning direction of the connecting coil metal wire 103).

<供試体数>
実施例1乃至実施例10において、供試体数は、「5」とする。
<Number of specimens>
In Example 1 to Example 10, the number of specimens is “5”.

<最大引張荷重の測定>
5つの供試体の夫々について、引張試験を実施し、図28に示すように、引張荷重(kN)及び変位(mm)の関係を測定する。図28は、5つの供試体の夫々に対して、荷重(kN)及び変位(mm)を示すグラフ図である。
各供試体において、図28に示すように、最大引張荷重を抽出して、各供試体の平均値を最大引張荷重Wh(kN)とする。
<Measurement of maximum tensile load>
A tensile test is performed on each of the five specimens, and the relationship between the tensile load (kN) and the displacement (mm) is measured as shown in FIG. FIG. 28 is a graph showing the load (kN) and displacement (mm) for each of the five specimens.
In each specimen, as shown in FIG. 28, the maximum tensile load is extracted, and the average value of each specimen is taken as the maximum tensile load Wh (kN).

<実施例1乃至実施例10>
実施例1乃至実施例10の各供試体において、各金属線104,105の線径d、網目の線間隔AT×BT、連結コイル金属線103の線径dc、各金属体102,102の横金属線104の本数Nhは、「表2」に示す。各金属体101,102について、縦金属線105の本数Nvは、Nv=3とする。
各金属線104,105は、亜鉛−アルミニウム合金メッキ鉄線(炭素鋼)を使用する。
連結コイル金属線103は、炭素鋼線を使用する。
各縦金属線105の線長εは、円筒高長Lとする。
<Example 1 to Example 10>
In each specimen of Example 1 to Example 10, the wire diameter d of each of the metal wires 104 and 105, the wire spacing AT × BT, the wire diameter dc of the connecting coil metal wire 103, and the side of each of the metal bodies 102 and 102 The number Nh of the metal wires 104 is shown in “Table 2”. For each metal body 101, 102, the number Nv of vertical metal wires 105 is Nv = 3.
Each metal wire 104, 105 uses a zinc-aluminum alloy plated iron wire (carbon steel).
The connection coil metal wire 103 uses a carbon steel wire.
The length ε of each vertical metal wire 105 is a cylindrical height L.

<試験結果>
実施例1乃至実施例10の試験結果等を、「表2」に示す。
<Test results>
The test results of Examples 1 to 10 are shown in “Table 2”.

Figure 2016172998
Figure 2016172998

「表2」は、実施例1乃至実施例10について、横金属線104の最大引張荷重Wh(kN)、及び連結コイル金属線103の剪断強度τ(kN/mm)を示す。
引張試験において、各横金属線104の最大引張荷重Whは、連結コイル金属線103に対して、剪断方向に最大剪断荷重Wτとして作用する。
連結コイル金属線103の最大剪断荷重Wτは、最大引張荷重Whを横金属線104の本数Nhで除算して求める(Wτ=Wh/Nh)。
実施例1について、最大剪断荷重Wτは、Wτ=7.45/13=0.57(kN)=570(N)となる。
実施例2について、最大剪段荷重Wτは、Wτ=12.63/13=0.97(kN)=970(N)となる。
実施例3について、最大剪断荷重Wτは、Wτ=4.80/9=0.53(kN)=530(N)となる。
実施例4について、最大剪断荷重Wτは、Wτ=20.45/13=1.57(kN)=1570(N)となる。
実施例5について、最大剪断荷重Wτは、Wτ=11.89/9=1.32(kN)=1320(N)となる。
実施例6について、最大剪断荷重Wτは、Wτ=12.89/7=1.84(kN)=1840(N)となる。
実施例7について、最大剪断荷重Wτは、Wτ=31.29/13=2.40(kN)=2400(N)となる。
実施例8について、最大剪断荷重Wτは、Wτ=27.05/9=3、00(kN)=3000(N)となる。
実施例9について、最大剪断荷重Wτは、Wτ=23.11/7=3.30(kN)=3300(N)となる。
実施例10について、最大剪断荷重Wτは、Wτ=36.91/5=7.38(kN)=7380(N)となる。
“Table 2” shows the maximum tensile load Wh (kN) of the horizontal metal wire 104 and the shear strength τ (kN / mm 2 ) of the connecting coil metal wire 103 for Examples 1 to 10.
In the tensile test, the maximum tensile load Wh of each horizontal metal wire 104 acts on the connecting coil metal wire 103 as the maximum shear load Wτ in the shear direction.
The maximum shear load Wτ of the connecting coil metal wire 103 is obtained by dividing the maximum tensile load Wh by the number Nh of the horizontal metal wires 104 (Wτ = Wh / Nh).
For Example 1, the maximum shear load Wτ is Wτ = 7.45 / 13 = 0.57 (kN) = 570 (N).
For Example 2, the maximum pruning load Wτ is Wτ = 12.63 / 13 = 0.97 (kN) = 970 (N).
For Example 3, the maximum shear load Wτ is Wτ = 4.80 / 9 = 0.53 (kN) = 530 (N).
For Example 4, the maximum shear load Wτ is Wτ = 20.45 / 13 = 1.57 (kN) = 1570 (N).
For Example 5, the maximum shear load Wτ is Wτ = 11.89 / 9 = 1.32 (kN) = 1320 (N).
For Example 6, the maximum shear load Wτ is Wτ = 12.89 / 7 = 1.84 (kN) = 1840 (N).
For Example 7, the maximum shear load Wτ is Wτ = 31.29 / 13 = 2.40 (kN) = 2400 (N).
For Example 8, the maximum shear load Wτ is Wτ = 27.05 / 9 = 3,000, 00 (kN) = 3000 (N).
For Example 9, the maximum shear load Wτ is Wτ = 23.11 / 7 = 3.30 (kN) = 3300 (N).
For Example 10, the maximum shear load Wτ is Wτ = 36.91 / 5 = 7.38 (kN) = 7380 (N).

連結コイル金属線103の剪断強度τ(剪断応力)は、最大剪断荷重Wτ/線径面積Acで求める、線径断積Acは、連結コイル金属線103の軸方向に直交する断面積である。
実施例1について、剪断強度τは、τ=570/12.56=45.38(N/mm)となる。
実施例2について、剪断強度τは、τ=970/12.56=77.22(N/mm)となる。
実施例3について、剪断強度τは、τ=530/12.56=42.19(N/mm)となる。
実施例4について、剪断強度τは、τ=1570/19.63=79.97(N/mm)となる。
実施例5について、剪断強度τは、τ=1320/19.63=67.24(N/mm)となる。
実施例6について、剪断強度τは、τ=1840/19.63=93.73(N/mm)となる。
実施例7について、剪断強度τは、τ=2400/28.26=84.92(N/mm)となる。
実施例8について、剪断強度τは、τ=3000/28.26=106.15(N/mm)となる。
実施例9について、剪断強度τは、τ=3300/28.26=116.77(N/mm)となる。
実施例10について、剪断強度τは、τ=7380/50.24=146.89(N/mm)となる。
The shear strength τ (shear stress) of the connection coil metal wire 103 is obtained by the maximum shear load Wτ / wire diameter area Ac. The wire diameter disconnection Ac is a cross-sectional area perpendicular to the axial direction of the connection coil metal wire 103.
For Example 1, the shear strength τ is τ = 570 / 12.56 = 45.38 (N / mm 2 ).
For Example 2, the shear strength τ is τ = 970 / 12.56 = 77.22 (N / mm 2 ).
For Example 3, the shear strength τ is τ = 530 / 12.56 = 42.19 (N / mm 2 ).
For Example 4, the shear strength τ is τ = 1570 / 19.63 = 79.97 (N / mm 2 ).
For Example 5, the shear strength τ is τ = 1320 / 19.63 = 67.24 (N / mm 2 ).
For Example 6, the shear strength τ is τ = 1840 / 19.63 = 93.73 (N / mm 2 ).
For Example 7, the shear strength τ is τ = 2400 / 28.26 = 84.92 (N / mm 2 ).
For Example 8, the shear strength τ is τ = 3000 / 28.26 = 106.15 (N / mm 2 ).
For Example 9, the shear strength τ is τ = 3300 / 28.26 = 116.77 (N / mm 2 ).
For Example 10, the shear strength τ is τ = 7380 / 50.24 = 146.89 (N / mm 2 ).

実施例1は、各金属線104,105の線径d=3.2(mm)、網目の線間隔AT×BT=50×50(mm)、縦金属線104の線長ε=600(mm)及び横金属線104の本数Nh=13(本)であり(「表2」参照)、解析及び計算した円筒金網籠Y1と同様な構成となる。
円筒金網籠Y1について、解析及び計算した最大引張応力σhは、σh=22.39(N/mm)である(「表1」参照)。
実施例1について、連結コイル金属線103の剪断強度τ(剪断応力)は、τ=45.38(N/mm)であり、τ>最大引張応力σh=22.39(N/mm)となる。
これにより、円筒金網籠Y1について、連結コイル金属線2,3は、炭素鋼線の材質、及び線径dc=4.0(mm)とすることで、無限積載段数n=∞及び勾配α(1:0342勾配)で積載しても、各連結コイル金属線2,3は剪断しない。
In Example 1, the wire diameter d of each of the metal wires 104 and 105 is 3.2 (mm), the mesh line interval is AT × BT = 50 × 50 (mm), and the length of the vertical metal wire 104 is ε = 600 (mm). ) And the number of horizontal metal wires 104 (Nh) = 13 (lines) (see “Table 2”), which is the same configuration as the analyzed and calculated cylindrical wire mesh rod Y1.
The maximum tensile stress σh analyzed and calculated for the cylindrical wire netting Y1 is σh = 22.39 (N / mm 2 ) (see “Table 1”).
For Example 1, the shear strength τ (shear stress) of the connecting coil metal wire 103 is τ = 45.38 (N / mm 2 ), and τ> maximum tensile stress σh = 22.39 (N / mm 2 ). It becomes.
Thus, for the cylindrical wire mesh rod Y1, the connecting coil metal wires 2 and 3 are made of carbon steel wire material and wire diameter dc = 4.0 (mm), so that the infinite stacking stage number n = ∞ and the gradient α ( Even when loaded at a gradient of 1: 03342, the connecting coil metal wires 2 and 3 are not sheared.

実施例6は、各金属線104,105の線径d=5.0(mm)、網目の線間隔AT×BT=100×100(mm)、縦金属線104の線長ε=1000(mm)及び横金属線104の本数Nh=7(本)であり(「表2」参照)、解析及び計算した円筒金網籠Y2と同様な構成となる。
円筒金網籠Y2について、解析及び計算した最大引張応力σhは、σh=76.42(N/mm)である(「表1」参照)。
実施例6について、連結コイル金属線103の剪断強度τ(剪断応力)は、τ=93.73(N/mm)であり、τ>最大引張応力σh=76.42(N/mm)となる。
これにより、円筒金網籠Y1について、連結コイル金属線2,3は、炭素鋼線の材質、及び線径dc=5.0(mm)とすることで、無限積載段数n=∞及び勾配α(1:03勾配)で積載しても、各連結コイル金属線2,3は剪断しない。
In Example 6, the wire diameter d of each metal wire 104, 105 = 5.0 (mm), the mesh line spacing AT × BT = 100 × 100 (mm), the length ε = 1000 (mm) of the vertical metal wire 104 ) And the number of horizontal metal wires 104 Nh = 7 (lines) (see “Table 2”), which is the same configuration as the cylindrical wire mesh cage Y2 that has been analyzed and calculated.
The maximum tensile stress σh analyzed and calculated for the cylindrical wire netting Y2 is σh = 76.42 (N / mm 2 ) (see “Table 1”).
For Example 6, the shear strength τ (shear stress) of the connecting coil metal wire 103 is τ = 93.73 (N / mm 2 ), and τ> maximum tensile stress σh = 76.42 (N / mm 2 ). It becomes.
Thus, for the cylindrical wire mesh rod Y1, the connecting coil metal wires 2 and 3 are made of a carbon steel wire material and a wire diameter dc = 5.0 (mm), so that the infinite loading stage number n = ∞ and the gradient α ( Even when loaded with a 1:03 gradient), the connecting coil metal wires 2 and 3 do not shear.

本発明に係る円筒金網籠Yでは、図1乃至図4に示すように、各連結コイル金属線2,3及び各金属線8,9の材質(材料)は、炭素鋼線に限定されず、例えば、ステンレス鋼、アルミニウム合金等を採用できる。   In the cylindrical wire netting Y according to the present invention, as shown in FIG. 1 to FIG. 4, the material (material) of each connecting coil metal wire 2, 3 and each metal wire 8, 9 is not limited to carbon steel wire, For example, stainless steel, aluminum alloy, etc. can be employed.

本発明に係る円筒金網籠Yは、崩壊した河川護岸や山間斜面の復旧に使用される大型円筒金網籠に適している。
大型円筒金網籠として、円筒直径D=400〜1100mm、及び円筒高長L=400〜1100mmのサイズ(寸法)とする。大型円筒金網籠について、円筒高長L及び円筒直径Dに比は、例えばL:D=1:0.9〜1.1×Lとする。
The cylindrical wire mesh fence Y according to the present invention is suitable for a large cylindrical wire mesh fence used for restoration of a collapsed river revetment or mountain slope.
As a large cylindrical wire mesh cage, a size (dimension) of a cylinder diameter D = 400 to 1100 mm and a cylinder height L = 400 to 1100 mm is used. For the large cylindrical wire mesh cage, the ratio of the cylinder height L and the cylinder diameter D is, for example, L: D = 1: 0.9 to 1.1 × L.

本発明に係る他の実施形態として、円筒金網籠YAは、図7に示すように、円筒金網本体1の少なくとも一端開口1B(下端開口)を円形金網蓋5にて閉塞する構成も採用できる。以下、円筒金網籠YAについて、図7及び図29を参照して説明する。
なお、図29において、図1乃至図7と同一符号は、同一部材、同一構成であるので、その詳細な説明は省略する。
As another embodiment according to the present invention, a configuration in which at least one end opening 1B (lower end opening) of the cylindrical metal net body 1 is closed with a circular metal mesh lid 5 can be employed as shown in FIG. Hereinafter, the cylindrical wire netting YA will be described with reference to FIGS.
In FIG. 29, the same reference numerals as those in FIGS. 1 to 7 denote the same members and the same configurations, and thus detailed description thereof will be omitted.

円筒金網籠YAは、図7に示すように、各連結コイル金属線2,3、1の円形金網蓋5、各半円筒金網体8,9及び固定コイル金属線10を備える。
円筒金網籠YAは、図1乃至図4説明したと同様、各連結コイル金属線2,3を隣接する各縦金属線11A,11A又は11B,11Bに巻付け、各半円筒金網体8,9同士を連結する。各半円筒金網体8,9は、各連結コイル金属線2,3にて連結され、円筒金網本体1を構成する。
固定コイル金属線10は、図1乃至図4で説明したと同様、円筒金網本体1の各半円形横金属線10B,10B及び円形金網蓋5の円形金属線15に巻付けられ、円形金網蓋5を円筒金網本体1に固定する。
これにより、円筒金網籠YAは、円筒金網本体1の一端開口1A(上端開口)を開放し、他端開口1B(下端開口)を円形金網蓋5で閉塞してなる(図7参照)。
As shown in FIG. 7, the cylindrical wire mesh basket YA includes a circular wire mesh lid 5 for each of the connecting coil metal wires 2, 3, 1, each semi-cylindrical wire mesh body 8, 9 and a fixed coil metal wire 10.
In the same manner as described in FIGS. 1 to 4, the cylindrical wire mesh YA wraps the connecting coil metal wires 2, 3 around the adjacent vertical metal wires 11 A, 11 A or 11 B, 11 B, and each semi-cylindrical wire mesh 8, 9. Connect them together. The semi-cylindrical metal mesh bodies 8 and 9 are connected by connecting coil metal wires 2 and 3 to constitute a cylindrical metal mesh body 1.
The fixed coil metal wire 10 is wound around the semicircular horizontal metal wires 10B and 10B of the cylindrical metal mesh body 1 and the circular metal wire 15 of the circular metal mesh lid 5 as described with reference to FIGS. 5 is fixed to the cylindrical wire net body 1.
Thereby, the cylindrical wire netting YA opens one end opening 1A (upper end opening) of the cylindrical wire net main body 1 and closes the other end opening 1B (lower end opening) with the circular wire netting lid 5 (see FIG. 7).

<A>中詰材の充填工程
復旧現場において、作業者は、図7に示すように、円筒金網籠YAに中詰材Zを充填する。中詰材Zは、円筒金網本体1の一端開口1A(上端開口)から円筒金網本体1内に充填する。
これにより、円筒金網籠YAに中詰材Zを充填した充填円筒金網籠YGAとする。
河川護岸等の崩壊状態に応じて、複数の充填円筒金網籠YGA,YGA,…を用意する。
<A> Filling process of filling material At the recovery site, the operator fills the filling material Z into the cylindrical wire mesh basket YA as shown in FIG. The filling material Z is filled into the cylindrical wire net body 1 from one end opening 1A (upper end opening) of the cylindrical wire net body 1.
Thereby, it is set as the filling cylindrical metal-mesh YGA which filled the cylindrical metal-mesh YA with the filling material Z.
A plurality of filled cylindrical wire nettings YGA, YGA,... Are prepared according to the collapsed state of a river revetment or the like.

<B>充填円筒金網籠YGAの積載工程
復旧現場において、複数の充填円筒金網籠YGA,YGA,…は、図29に示すように、積載段数n(n=3)にて積載される。
作業者は、バックホウ等の重機を使用して、各充填円筒金網籠YGA,YGA,…を水平面HG(地面)に積載する。各充填円筒金網籠YGA,YGA,…は、円筒中心線aを鉛直方向VPに向けて積載する。
各充填円筒金網籠YGA,YGA,…は、勾配αで積載される。
<B> Loading Step of Filled Cylindrical Wire Mesh YGA At the restoration site, a plurality of filled cylindrical wire meshes YGA, YGA,... Are loaded in the number of loading stages n (n = 3) as shown in FIG.
The worker loads each filled cylindrical wire mesh basket YGA, YGA,... On a horizontal plane HG (ground) using a heavy machine such as a backhoe. Each filled cylindrical wire mesh basket YGA, YGA,... Is loaded with the cylindrical center line a directed in the vertical direction VP.
Each filled cylindrical wire mesh basket YGA, YGA,... Is loaded with a gradient α.

最下段の充填円筒金網籠YGAは、図29に示すように、円筒中心線aを鉛直方向VPに向けて、円筒金網蓋5(下蓋)を水平面HG(地面)上に設置する。
最下段以外の充填円筒金網籠YGA,YGA,…は、図29に示すように、円筒中心線aを鉛直方向VPに向けて、円形金網蓋5(下蓋)を1段下の充填円筒金網籠YGAの一端開口1A(上端)上に積載する。
As shown in FIG. 29, the lowermost filled cylindrical metal mesh basket YGA has the cylindrical metal mesh lid 5 (lower lid) placed on the horizontal plane HG (ground) with the cylindrical center line a directed in the vertical direction VP.
As shown in FIG. 29, the filled cylindrical wire mesh rods YGA, YGA,... Other than the lowermost step have a circular metal mesh lid 5 (lower lid) one level lower filled cylindrical wire mesh with the cylindrical center line a directed in the vertical direction VP.籠 Load on one end opening 1A (upper end) of YGA.

各積載段では、河川護岸等の崩壊状態に応じて、複数、例えば4つの充填円筒金網籠YGA,YGA,…を並設して配置する。   In each loading stage, a plurality of, for example, four filled cylindrical metal mesh fences YGA, YGA,... Are arranged in parallel according to the collapsed state of the river revetment or the like.

このように、河川護岸等の崩壊状態に応じて、複数の充填円筒金網籠YGA,YGA,…を積載段数n及び勾配αで積載して、河川護岸等を復旧する。   In this way, according to the collapsed state of the river revetment or the like, a plurality of filled cylindrical wire mesh fences YGA, YGA,... Are loaded with the loading stage number n and the gradient α to restore the river revetment or the like.

円筒金網籠YAについて、図9乃至図28で説明したと同様、各連結コイル金属線2,3の剪断強度τ(剪段応力)は、τ>最大引張応力σhとする。   For the cylindrical wire mesh YA, as described with reference to FIGS. 9 to 28, the shear strength τ (cutting stress) of each of the connecting coil metal wires 2 and 3 is τ> maximum tensile stress σh.

本発明は、崩壊した河川護岸や山間斜面等を復旧するのに最適である。   The present invention is most suitable for restoring a collapsed river revetment or mountain slope.

Y 円筒金網籠
a 円筒中心線
B 交点
AT 線間隔
BT 線間隔
1 円筒金網本体
1A 一端開口
1B 他端開口
2 連結コイル金属線
3 連結コイル金属線
5 円形金網蓋(金網蓋)
6 円形金網蓋(金網蓋)
8 半円筒金網体
9 半円筒金網体
10 半円形横金属線
11 縦金属線
Y Cylindrical mesh net a Cylindrical center line B Intersection AT Line interval BT Line interval 1 Cylindrical wire mesh body 1A One end opening 1B Other end opening 2 Coupling metal wire 3 Coupling metal wire 5 Circular wire mesh cover (metal mesh cover)
6 Circular wire mesh lid (wire mesh lid)
8 Semi-cylindrical wire mesh 9 Semi-cylindrical wire mesh 10 Semi-circular horizontal metal wire 11 Vertical metal wire

Claims (3)

円筒金網本体と、
前記円筒金網本体の少なくも一端開口を閉塞する1又は一対の金網蓋と、
複数の連結コイル金属線と、を備え、
前記円筒金網本体は、
円筒中心線に沿って二分割した一対の半円筒金網体で構成され、
前記各半円筒金網体は、
円筒中心線方向に線間隔を隔てて並列される複数の半円形横金網線と、
前記半円筒金網体の円周方向に線間隔を隔てて並列され、前記円筒金網本体の両端開口間にわたって延在される複数の縦金属線と、を有し、
前記各金属線の交点にて前記各半円形横金属線及び前記各縦金属線同士を固定し、円周方向両端の前記各縦金属線を隣接して前記円筒金網本体を構成し、
前記各連結コイル金属線は、
前記円筒金網本体の両端開口間にわたって、前記円周方向各端で隣接する前記各縦金属線に巻付けられ、前記各半円筒金網体同士を連結する
ことを特徴とする円筒金網籠。
A cylindrical wire mesh body;
One or a pair of wire mesh lids closing at least one end opening of the cylindrical wire mesh body;
A plurality of connecting coil metal wires,
The cylindrical wire mesh body is
Consists of a pair of semi-cylindrical wire mesh divided into two along the cylindrical center line,
Each semi-cylindrical wire mesh body is
A plurality of semicircular horizontal wire mesh lines arranged in parallel with a line interval in the direction of the center line of the cylinder;
A plurality of vertical metal wires that are arranged in parallel in the circumferential direction of the semi-cylindrical wire mesh body at intervals between the ends of the cylindrical wire mesh body;
Fix each semicircular horizontal metal wire and each vertical metal wire at the intersection of each metal wire, and configure the cylindrical wire net body adjacent to each vertical metal wire at both ends in the circumferential direction,
Each of the connecting coil metal wires is
A cylindrical wire mesh cage that is wound around each of the vertical metal wires adjacent at each end in the circumferential direction across the openings at both ends of the cylindrical wire mesh body to connect the semi-cylindrical wire mesh bodies.
前記円筒金網本体に中詰材を充填した充填円筒金網本体、
前記半円筒金網体に中詰材を充填した充填半円筒金網体、
前記充填円筒金網本体について、前記各縦金属線を除き、前記各半円形横金属線を水平Beam要素で表現した充填円筒線本体モデル、
前記充填半円筒金網体について、前記各縦金属線を除き、前記各半円形横金属線を水平Beam要素で表現した充填半円筒線体モデル、
前記充填半円筒金網体について、前記各半円形横金属線を水平Beam要素を表現し、及び前記各縦金属線を鉛直Beam要素で表現した充填半円筒金網体モデル、
前記充填円筒金網本体について、前記各縦金属線を除き、前記各半円形横金属線でなる仮想・充填円筒線本体、
前記充填半円筒金網体について、前記各縦金属線を除き、前記各半円形横金属線でなる仮想・充填半円筒線体、
前記仮想・充填円筒線本体、又は前記充填円筒線本体モデルを積層する水平面、
前記水平面に直交する鉛直方向、
前記充填半円筒線体の最大鉛直応力σe、
前記仮想・充填円筒線本体、又は前記充填円筒線本体モデルの積載段数n、
前記仮想・充填半円筒線体の円筒高長L、
円筒中心線を前記鉛直方向に向けて、前記仮想・充填円筒線本体、又は前記充填円筒線本体モデルを積載する勾配α、
積載段数n=2及び前記勾配αで積載した前記各充填円筒線本体モデルについて、最下段の前記充填半円筒線体モデル、及び最下段の前記充填半円筒線体モデルに積載した領域の充填円弧筒線体モデルでなる、勾配線体モデル群、
無限積載段数n=∞及び前記勾配αで積載した前記各仮想・充填円筒線本体について、各段の前記仮想・充填半円筒線体でなる、仮想・勾配線体群、
とし、
前記勾配線体モデル群について、解析メッシュを構築して、最下段の前記充填半円筒線体モデルの最大鉛直応力σfを解析し、
応力係数βを式(1)で求め、
前記仮想・勾配線体群について、最下段の前記仮想・充填半円筒線体の最大鉛直応力σgを式(2)で求め、
前記最大鉛直応力σg及び前記円筒高長Lから、単位体積重量Wgを求め、
前記単位体積重量Wgを作用した前記充填半円筒金網体モデルについて、解析メッシュを構築して、前記水平Beam要素の最大引張荷重Whを解析し、
前記最大引張荷重Wh及び前記半円形横金属線の線経面積から、最大引張応力σhを求め、
前記各連結コイル金属線の剪断強度τは、
τ>最大引張応力σh
とする
ことを特徴とする請求項1に記載の円筒金網籠。
Figure 2016172998
Figure 2016172998
Filled cylindrical wire mesh body filled with filling material in the cylindrical wire mesh body,
Filled semi-cylindrical wire mesh body filled with filling material in the semi-cylindrical wire mesh body,
About the filled cylindrical wire mesh body, except for the vertical metal lines, a filled cylindrical line body model in which each semicircular horizontal metal line is expressed by a horizontal Beam element,
About the filled semi-cylindrical wire mesh, a filled semi-cylindrical wire model in which each semi-circular horizontal metal wire is expressed by a horizontal Beam element, excluding each vertical metal wire,
For the filled semi-cylindrical wire mesh, a filled semi-cylindrical wire mesh model in which each semi-circular horizontal metal line is expressed as a horizontal Beam element, and each vertical metal line is expressed as a vertical Beam element,
For the filled cylindrical wire mesh body, except for the vertical metal lines, virtual / filled cylindrical line bodies made of the semicircular horizontal metal lines,
For the filled semi-cylindrical wire mesh, except for the vertical metal wires, virtual / filled semi-cylindrical wire bodies made of the semi-circular horizontal metal wires,
The horizontal plane on which the virtual / filled cylindrical line main body or the filled cylindrical line main body model is laminated,
A vertical direction perpendicular to the horizontal plane,
Maximum vertical stress σe of the filled semicylindrical wire,
Number of loading stages n of the virtual / filled cylindrical wire body or the filled cylindrical wire body model,
Cylindrical height L of the virtual and filled semicylindrical wire,
Gradient α loading the virtual / filled cylindrical line body or the filled cylindrical line body model with the cylindrical center line oriented in the vertical direction,
For each of the filled cylindrical line main body models loaded at the loading stage number n = 2 and the gradient α, the filling arc of the area loaded on the lower filling semi-cylindrical line model and the lower filling semi-cylindrical line model Gradient line model group consisting of cylindrical line models,
A virtual / gradient line group consisting of the virtual / filling semi-cylindrical line bodies of each stage for the virtual / filling cylindrical line bodies loaded with an infinite number of loading stages n = ∞ and the gradient α,
age,
For the gradient linear body model group, an analysis mesh is constructed to analyze the maximum vertical stress σf of the bottom half-cylindrical linear body model,
The stress coefficient β is obtained by equation (1),
About the virtual / gradient line group, the maximum vertical stress σg of the virtual / filled semi-cylindrical linear body at the lowest stage is obtained by the equation (2),
From the maximum vertical stress σg and the cylindrical height L, a unit volume weight Wg is obtained,
For the filled semi-cylindrical wire mesh model on which the unit volume weight Wg is applied, an analysis mesh is constructed, and the maximum tensile load Wh of the horizontal beam element is analyzed,
From the maximum tensile load Wh and the meridian area of the semicircular horizontal metal wire, the maximum tensile stress σh is obtained,
The shear strength τ of each of the connecting coil metal wires is
τ> Maximum tensile stress σh
The cylindrical wire mesh cage according to claim 1, wherein:
Figure 2016172998
Figure 2016172998
前記円筒金網本体に中詰材を充填した充填円筒金網本体、
前記半円筒金網体に中詰材を充填した充填半円筒金網体、
前記充填円筒金網本体について、前記各縦金属線を除き、前記各半円形横金属線でなる仮想・充填円筒線本体、
前記充填半円筒金網体について、前記各縦金属線を除き、前記各半円形横金属線でなる仮想・充填半円筒線体、
前記充填半円筒金網体の仮想・充填半円筒金網体、
前記仮想・充填円筒線本体を積層する水平面、
前記水平面に直交する鉛直方向、
前記仮想・充填円筒線本体の積載段数n、
前記仮想・充填半円筒線体の円筒高長L、
円筒中心線を前記鉛直方向に向けて、前記仮想・充填円筒線本体を積載する勾配α、
無限積載段数n=∞及び前記勾配αで積載した前記各仮想・充填円筒線本体について、各段の前記仮想・充填半円筒線体でなる、仮想・勾配線体群、
とし、
前記仮想・勾配線体群について、最下段の前記仮想・充填半円筒線体の最大鉛直応力σgを求め、
前記最大鉛直応力σg及び前記円筒高長Lから、単位体積重量Wgを求め、
前記単位体積重量Wgを作用した前記仮想・充填半円筒金網体について、前記各半円形横金属線の最大引張応力σhを求め、
前記各連結コイル金属線の剪断強度τは、
τ>最大引張応力σh
とする
ことを特徴とする請求項1に記載の円筒金網籠。
Filled cylindrical wire mesh body filled with filling material in the cylindrical wire mesh body,
Filled semi-cylindrical wire mesh body filled with filling material in the semi-cylindrical wire mesh body,
For the filled cylindrical wire mesh body, except for the vertical metal lines, virtual / filled cylindrical line bodies made of the semicircular horizontal metal lines,
For the filled semi-cylindrical wire mesh, except for the vertical metal wires, virtual / filled semi-cylindrical wire bodies made of the semi-circular horizontal metal wires,
Virtual / filled semi-cylindrical wire mesh of the filled semi-cylindrical wire mesh,
A horizontal plane on which the virtual and filled cylindrical wire bodies are laminated,
A vertical direction perpendicular to the horizontal plane,
The number of loading stages n of the virtual / filled cylindrical wire body,
Cylindrical height L of the virtual and filled semicylindrical wire,
Gradient α for loading the virtual / filled cylindrical wire body with the cylindrical center line oriented in the vertical direction,
A virtual / gradient line group consisting of the virtual / filling semi-cylindrical line bodies of each stage for the virtual / filling cylindrical line bodies loaded with an infinite number of loading stages n = ∞ and the gradient α,
age,
For the virtual / gradient line body group, the maximum vertical stress σg of the virtual / filled semi-cylindrical linear body at the lowest stage is obtained,
From the maximum vertical stress σg and the cylindrical height L, a unit volume weight Wg is obtained,
For the virtual / filled semi-cylindrical wire mesh that has acted on the unit volume weight Wg, the maximum tensile stress σh of each semi-circular horizontal metal wire is obtained,
The shear strength τ of each of the connecting coil metal wires is
τ> Maximum tensile stress σh
The cylindrical wire mesh cage according to claim 1, wherein:
JP2015053892A 2015-03-17 2015-03-17 Cylindrical wire mesh fence Active JP6272261B2 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2015053892A JP6272261B2 (en) 2015-03-17 2015-03-17 Cylindrical wire mesh fence
TW105108095A TW201643302A (en) 2015-03-17 2016-03-16 Cylindrical iron wire cage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015053892A JP6272261B2 (en) 2015-03-17 2015-03-17 Cylindrical wire mesh fence

Publications (2)

Publication Number Publication Date
JP2016172998A true JP2016172998A (en) 2016-09-29
JP6272261B2 JP6272261B2 (en) 2018-01-31

Family

ID=57008064

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015053892A Active JP6272261B2 (en) 2015-03-17 2015-03-17 Cylindrical wire mesh fence

Country Status (2)

Country Link
JP (1) JP6272261B2 (en)
TW (1) TW201643302A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6445106B1 (en) * 2017-07-27 2018-12-26 瀬戸内金網商工株式会社 Cylindrical gabion and method for producing the same
JP2020172826A (en) * 2019-04-12 2020-10-22 三井化学産資株式会社 Structural body
JP6837245B1 (en) * 2019-11-18 2021-03-03 昭和機械商事株式会社 Cylindrical wire mesh frame
CN113297762A (en) * 2021-05-24 2021-08-24 航天晨光股份有限公司 Three-dimensional modeling method of metal net and equivalent model modeling method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1046544A (en) * 1996-07-31 1998-02-17 Shoei Sangyo:Kk Connecting structure of net material mattress cage and mattress cage using it
JPH10159053A (en) * 1996-12-04 1998-06-16 Setouchi Kinmo Shoko Kk Cylindrical stone-filled basket and serial stone-filled baskets
JP2002105922A (en) * 2000-09-29 2002-04-10 Kazuhiko Kitagawa Cylindrical cage body unit and assembling cylindrical cage body and cylindrical cage structural body
JP3171588U (en) * 2011-07-04 2011-11-10 青森昭和産業 株式会社 Jacquard, end junk and junk tie trunk
JP2011252330A (en) * 2010-06-03 2011-12-15 Kyowa-Harmotech Co Ltd Stone-filled gabion
US20130149036A1 (en) * 2010-06-11 2013-06-13 Hesco Baston Limited Barrier assembly for shoreline

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1046544A (en) * 1996-07-31 1998-02-17 Shoei Sangyo:Kk Connecting structure of net material mattress cage and mattress cage using it
JPH10159053A (en) * 1996-12-04 1998-06-16 Setouchi Kinmo Shoko Kk Cylindrical stone-filled basket and serial stone-filled baskets
JP2002105922A (en) * 2000-09-29 2002-04-10 Kazuhiko Kitagawa Cylindrical cage body unit and assembling cylindrical cage body and cylindrical cage structural body
JP2011252330A (en) * 2010-06-03 2011-12-15 Kyowa-Harmotech Co Ltd Stone-filled gabion
US20130149036A1 (en) * 2010-06-11 2013-06-13 Hesco Baston Limited Barrier assembly for shoreline
JP2013528254A (en) * 2010-06-11 2013-07-08 ヘスコ バスティアン リミテッド Coastline barrier assembly
JP3171588U (en) * 2011-07-04 2011-11-10 青森昭和産業 株式会社 Jacquard, end junk and junk tie trunk

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
共和ハーモテック株式会社: "大型ふとんかご(鋼製組立網)の構造計算レポート1・2", 月刊 建設物価, vol. 2005年11月号、2005年12月号, JPN6017024810, 2005, pages 1 - 8, ISSN: 0003590530 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6445106B1 (en) * 2017-07-27 2018-12-26 瀬戸内金網商工株式会社 Cylindrical gabion and method for producing the same
JP2019027265A (en) * 2017-07-27 2019-02-21 瀬戸内金網商工株式会社 Cylindrical gabion and method for manufacturing the same
JP2020172826A (en) * 2019-04-12 2020-10-22 三井化学産資株式会社 Structural body
JP7202247B2 (en) 2019-04-12 2023-01-11 三井化学産資株式会社 Structure
JP6837245B1 (en) * 2019-11-18 2021-03-03 昭和機械商事株式会社 Cylindrical wire mesh frame
JP2021080688A (en) * 2019-11-18 2021-05-27 昭和機械商事株式会社 Cylindrical wire net frame
CN113297762A (en) * 2021-05-24 2021-08-24 航天晨光股份有限公司 Three-dimensional modeling method of metal net and equivalent model modeling method thereof
CN113297762B (en) * 2021-05-24 2023-09-08 航天晨光股份有限公司 Three-dimensional modeling method of metal net sleeve and equivalent model modeling method thereof

Also Published As

Publication number Publication date
TW201643302A (en) 2016-12-16
JP6272261B2 (en) 2018-01-31

Similar Documents

Publication Publication Date Title
JP6272261B2 (en) Cylindrical wire mesh fence
Fakharifar et al. Seismic performance of post-mainshock FRP/steel repaired RC bridge columns subjected to aftershocks
Qasrawi et al. Performance of concrete-filled FRP tubes under field close-in blast loading
McCormick et al. Seismic assessment of concentrically braced steel frames with shape memory alloy braces
De Matteis et al. Experimental tests and optimization rules for steel perforated shear panels
Kanyilmaz et al. Reducing the seismic vulnerability of existing elevated silos by means of base isolation devices
Zhou et al. Behavior of circular tubed-RC column to RC beam connections under axial compression
CN106407552B (en) A kind of design method promoting the anti-collapse ability of RC frame core wall structure
Laterza et al. Modeling of gravity-designed RC sub-assemblages subjected to lateral loads
JP2006161363A (en) Pile design system
Bayraktar et al. Seismic failure behavior of masonry domes under strong ground motions
Ormeño et al. Experimental study of slip-friction connectors for controlling the maximum seismic demand on a liquid storage tank
Tavasoli et al. Shaking table test for assessing the seismic performance of semi-anchored steel water tanks
CN104594174B (en) A kind of CFST Arch Bridge seismic capability evaluation method based on intensity Yu ductility
JP6203671B2 (en) Slope reinforcement, slope structure and slope structure construction method
Avgerinou et al. Full‐scale tests on used steel storage racks
Faga et al. Seismic design of elevated steel tanks with concentrically braced supporting frames
Seker et al. Investigation of channel-encased braces incorporating circular HSS
Aljawhari et al. State-dependent vulnerability of case-study reinforced concrete frames
Yang et al. Seismic analysis of single-layer latticed domes composed of welded round pipes considering low cycle fatigue
CN103512815A (en) Judgment method for dynamic responses of reinforced concrete columns under blast load
Ravi et al. Finite element modeling on behavior of reinforced concrete beam-column joints retrofitted with carbon fiber reinforced polymer sheets
CN106898395B (en) A kind of spent fuel screen work seismic safety analysis method
Haque Seismic performance evaluation and design of a novel piston based self-centering bracing system
Dhakal et al. Bidirectional pseudodynamic tests of bridge piers designed to different standards

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160805

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170627

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20170704

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170825

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20171205

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20171228

R150 Certificate of patent or registration of utility model

Ref document number: 6272261

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250