JP2016118956A5 - - Google Patents
Download PDFInfo
- Publication number
- JP2016118956A5 JP2016118956A5 JP2014258649A JP2014258649A JP2016118956A5 JP 2016118956 A5 JP2016118956 A5 JP 2016118956A5 JP 2014258649 A JP2014258649 A JP 2014258649A JP 2014258649 A JP2014258649 A JP 2014258649A JP 2016118956 A5 JP2016118956 A5 JP 2016118956A5
- Authority
- JP
- Japan
- Prior art keywords
- value
- test
- oil
- construction machine
- management
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 claims 16
- 238000006243 chemical reaction Methods 0.000 claims 11
- 230000005856 abnormality Effects 0.000 claims 9
- 230000001186 cumulative effect Effects 0.000 claims 9
- 238000003745 diagnosis Methods 0.000 claims 8
- 238000011156 evaluation Methods 0.000 claims 8
- 239000000356 contaminant Substances 0.000 claims 3
- 239000002184 metal Substances 0.000 claims 3
- 238000000034 method Methods 0.000 claims 3
- 239000000843 powder Substances 0.000 claims 3
- 230000009466 transformation Effects 0.000 claims 3
- 239000000654 additive Substances 0.000 claims 2
- 230000007423 decrease Effects 0.000 claims 2
- 238000010586 diagram Methods 0.000 claims 2
- 230000001131 transforming effect Effects 0.000 claims 2
- 230000000996 additive effect Effects 0.000 claims 1
- 230000001174 ascending effect Effects 0.000 claims 1
- 239000003795 chemical substances by application Substances 0.000 claims 1
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2014258649A JP6329892B2 (ja) | 2014-12-22 | 2014-12-22 | 建設機械の管理システム |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2014258649A JP6329892B2 (ja) | 2014-12-22 | 2014-12-22 | 建設機械の管理システム |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| JP2016118956A JP2016118956A (ja) | 2016-06-30 |
| JP2016118956A5 true JP2016118956A5 (enExample) | 2017-04-27 |
| JP6329892B2 JP6329892B2 (ja) | 2018-05-23 |
Family
ID=56243065
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2014258649A Active JP6329892B2 (ja) | 2014-12-22 | 2014-12-22 | 建設機械の管理システム |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP6329892B2 (enExample) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP6708033B2 (ja) * | 2016-07-15 | 2020-06-10 | ウシオ電機株式会社 | 重機液相消耗品一次スクリーニング支援システム |
| EP3660507B1 (en) * | 2017-07-28 | 2023-09-27 | Hitachi Construction Machinery Co., Ltd. | Oil diagnosis system |
| JP7218338B2 (ja) * | 2020-09-28 | 2023-02-06 | 横河電機株式会社 | データ処理システム、データ処理方法、および、データ処理プログラム |
| JP7647480B2 (ja) * | 2021-10-01 | 2025-03-18 | 株式会社デンソー | 騒音要因判定装置、及び騒音要因判定方法 |
Family Cites Families (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5227957B2 (ja) * | 2007-08-09 | 2013-07-03 | 日立建機株式会社 | 作業機械の機器診断装置及び機器診断システム |
| JP2012181168A (ja) * | 2011-03-03 | 2012-09-20 | Ntn Corp | 転動装置の状態監視装置および監視方法 |
-
2014
- 2014-12-22 JP JP2014258649A patent/JP6329892B2/ja active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| AU2020203862B2 (en) | Artificial intelligence (ai) based predictions and recommendations for equipment | |
| Oree et al. | A composite metric for assessing flexibility available in conventional generators of power systems | |
| Groth et al. | Bridging the gap between HRA research and HRA practice: A Bayesian network version of SPAR-H | |
| AU2016247051A1 (en) | Resource evaluation for complex task execution | |
| CN109143972B (zh) | 一种基于贝叶斯与故障树的数控机床可靠性评价方法 | |
| US9182758B1 (en) | Computer-implemented system and method for capability zone-based manufacturing quality control | |
| US20150212975A1 (en) | Energy efficiency evaluation support device, non-transitory computer-readable storage medium storing computer program, and method for supporting energy efficiency evaluation | |
| Alinezhad et al. | Sensitivity analysis of SAW technique: The impact of changing the decision making matrix elements on the final ranking of alternatives | |
| CN117254587A (zh) | 配电网的监测方法及其装置、电子设备及存储介质 | |
| JP2015052487A (ja) | 材料強度評価装置 | |
| CN104021281B (zh) | 工程机械的机手操作水平评估系统及评估方法 | |
| CN104102804A (zh) | 一种预测设备器件寿命的方法及装置 | |
| CN121388499B (zh) | 模型训练方法、寿命预测方法和寿命预测装置 | |
| CN116302774B (zh) | 调度任务监控方法、装置、电子设备及可读存储介质 | |
| JP6329892B2 (ja) | 建設機械の管理システム | |
| US9665795B2 (en) | Method and apparatus for identifying root cause of defect using composite defect map | |
| Adhikary et al. | MCDA or MCDM based selection of transmission line conductor: small hydropower project planning and development | |
| CN105894138A (zh) | 一种制造业发货量的最优加权组合预测方法 | |
| Portela et al. | Reliability of repairable systems with Non-Central Gamma frailty | |
| CN116609098B (zh) | 一种磨煤机故障风险预警方法及装置 | |
| Báez et al. | Model of human reliability for manual workers in assembly lines | |
| CN118938031A (zh) | 储能系统运行状态的监测方法、装置及电子设备 | |
| CN104850711A (zh) | 一种机电产品设计标准选择方法 | |
| CN117215205A (zh) | 基于决策树和iss理论的直流系统控制参数分析方法 | |
| JP2020052691A (ja) | 工数分析システム及びそのデータ構造 |