JP2016098622A - Lower leader attaching/detaching tool for pile driver - Google Patents

Lower leader attaching/detaching tool for pile driver Download PDF

Info

Publication number
JP2016098622A
JP2016098622A JP2014238595A JP2014238595A JP2016098622A JP 2016098622 A JP2016098622 A JP 2016098622A JP 2014238595 A JP2014238595 A JP 2014238595A JP 2014238595 A JP2014238595 A JP 2014238595A JP 2016098622 A JP2016098622 A JP 2016098622A
Authority
JP
Japan
Prior art keywords
support frame
leader
lower leader
attaching
reader
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2014238595A
Other languages
Japanese (ja)
Other versions
JP6472224B2 (en
Inventor
敦史 児玉
Atsushi Kodama
敦史 児玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Sharyo Ltd
Original Assignee
Nippon Sharyo Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Sharyo Ltd filed Critical Nippon Sharyo Ltd
Priority to JP2014238595A priority Critical patent/JP6472224B2/en
Publication of JP2016098622A publication Critical patent/JP2016098622A/en
Application granted granted Critical
Publication of JP6472224B2 publication Critical patent/JP6472224B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a lower leader attaching/detaching tool for a pile driver that enables safe and easy attaching/detaching work for a lower leader without suspending the lower leader by a crane.SOLUTION: A lower leader attaching/detaching tool 41 comprises: a front support frame body 43 comprising a front support member 43a abutting on the front of a guide rail 28 of a second lower leader 20; a rear support frame body 44 comprising a rear support member 44a coupled to a lower part of the support frame body 43 to be raised, and abutting on the back of the guide rail 28 when raised; a first coupling pin 46 coupling the rear support frame body 44 and front support frame body 43 together to maintain the raised state of the rear support frame body 44; a second coupling pin 47 coupling the front support frame body 43 and guide rail 28 together and coupling the front support frame body 43 and guide rail 28 together; and a jack 45 configured to elevate the second lower leader 20 having its front and rear held between the rear support frame body 44 and front support frame body 43.SELECTED DRAWING: Figure 1

Description

本発明は、杭打機の下部リーダ着脱治具に関し、詳しくは、杭打機に設けられているリーダの下端に下部リーダを着脱する際に使用する下部リーダ着脱治具に関する。   The present invention relates to a lower leader attaching / detaching jig of a pile driving machine, and more particularly, to a lower leader attaching / detaching jig used when attaching and detaching a lower leader to a lower end of a leader provided in the pile driving machine.

1台の杭打機で鋼管杭埋設作業と地盤改良作業とを行えるようにした兼用機として、リーダの下端に下部リーダを着脱可能に設け、鋼管杭埋設作業では、リーダに沿って昇降する作業装置のストロークを大きくするために下部リーダを取り付けた状態で工事を行い、地盤改良作業では、ロッドの下端に設ける掘削ヘッドの径を大きくするために下部リーダを取り外した状態で工事を行うようにしたものが知られている。しかし、下部リーダの着脱は、下部リーダをクレーンで吊った状態で下部リーダと上部側のリーダとをフランジ結合しているボルトを着脱しなければならず、作業性が悪く、下部リーダの着脱に長時間を要することがある。さらに、兼用機を輸送する際に、作業装置を下部リーダの部分に保持し、上部側のリーダを後方に倒すようにしたものでは、地盤改良作業で下部リーダを取り外した場合、輸送の前後で下部リーダを着脱する必要が生じることになる。このため、ラックピニオン方式で作業装置を昇降させる兼用機で、下部リーダの前面に設けられているラックを着脱することによって鋼管杭埋設作業の際の作業装置のストロークを大きくするとともに、地盤改良作業を行う際の掘削ヘッドの径を大きくしたものが提案されている(例えば、特許文献1参照)。   As a dual-purpose machine that can perform steel pipe pile embedding work and ground improvement work with a single pile driver, a lower leader is detachably attached to the lower end of the leader. In steel pipe pile embedding work, the work moves up and down along the leader. Work with the lower leader attached to increase the stroke of the equipment, and in ground improvement work, work with the lower leader removed to increase the diameter of the excavation head at the lower end of the rod Is known. However, in order to attach and detach the lower leader, it is necessary to attach and detach the bolt that connects the lower leader and the upper reader with a flange while the lower leader is suspended by a crane. It may take a long time. In addition, when transporting a dual-purpose machine, the work device is held in the lower leader part and the upper leader is tilted backwards. It becomes necessary to attach and detach the lower leader. For this reason, it is a dual-purpose machine that raises and lowers the work device with the rack and pinion method, and by increasing and decreasing the stroke of the work device during the steel pipe pile embedding work by attaching and detaching the rack provided in front of the lower leader, the ground improvement work There has been proposed one in which the diameter of the excavation head at the time of performing is increased (see, for example, Patent Document 1).

特開2006−291643号公報JP 2006-291634 A

しかし、下部リーダ前面のラックを着脱するものでは、掘削ヘッドの径をある程度大きくできるものの、下部リーダを着脱するものに比べて小さな径の掘削ヘッドを使用せざるを得なかった。   However, although the diameter of the excavation head can be increased to some extent by attaching and detaching the rack in front of the lower leader, it has been necessary to use an excavation head having a smaller diameter than that for attaching and detaching the lower leader.

そこで本発明は、下部リーダの着脱作業を安全かつ簡単に行うことができる杭打機の下部リーダ着脱治具を提供することを目的としている。   Therefore, an object of the present invention is to provide a lower leader attaching / detaching jig for a pile driving machine capable of safely and easily attaching and detaching a lower leader.

上記目的を達成するため、本発明の杭打機の下部リーダ着脱治具は、杭打機に設けられたリーダの下端部に下部リーダを着脱する際に使用する下部リーダ着脱治具であって、接地板に鉛直方向に立設されて前記下部リーダの前面に当接する前部支持枠体と、前記下部リーダの後面に当接して前記前部支持枠体との間で前記下部リーダを挟着可能な後部支持枠体とを備えるとともに、前記下部リーダを前記前部支持枠体と前記後部支持枠体とで昇降可能に挟着した状態で、前部支持枠体と後部支持枠体とを連結する着脱可能な第1連結部材と、前部支持枠体又は後部支持枠体と下部リーダとを連結する着脱可能な第2連結部材と、下部リーダを昇降させるジャッキとを備えていることを特徴としている。   In order to achieve the above object, the lower leader attaching / detaching jig of the pile driving machine of the present invention is a lower leader attaching / detaching jig used when attaching and detaching the lower leader to the lower end portion of the leader provided in the pile driving machine. A front support frame that stands vertically on the ground plate and contacts the front surface of the lower reader, and a lower supporter that sandwiches the lower support between the front support frame and the rear surface of the lower reader. A front support frame body, a rear support frame body, and a lower support frame body, wherein the lower leader is sandwiched so as to be movable up and down between the front support frame body and the rear support frame body. A detachable first connecting member that connects the two, a detachable second connecting member that connects the front support frame or the rear support frame and the lower reader, and a jack that raises and lowers the lower reader. It is characterized by.

さらに、本発明の杭打機の下部リーダ着脱治具は、前記後部支持枠体が、該後部支持枠体の下端部が前記前部支持枠体の下部に連結軸で回動可能に連結されて後方に起伏可能に設けられ、後部支持枠体の上端部と前部支持枠体の上端部とに前記第1連結部材の取付部がそれぞれ設けられていることを特徴とし、また、前記前部支持枠体が、前記下部リーダの両側にそれぞれ設けられている一対のガイドレールの前面にそれぞれ当接する一対の前面支持部材を備え、前記後部支持枠体が、前記ガイドレールの後面にそれぞれ当接する一対の後面支持部材を備えるとともに、該一対の後面支持部材は、連結部材で連結されていることを特徴としている。   Further, in the lower leader attaching / detaching jig of the pile driving machine of the present invention, the rear support frame is connected to the lower end of the rear support frame so as to be rotatable to the lower part of the front support frame by a connecting shaft. And a mounting portion for the first connecting member is provided at each of an upper end portion of the rear support frame body and an upper end portion of the front support frame body. The portion support frame includes a pair of front support members that respectively contact the front surfaces of a pair of guide rails provided on both sides of the lower leader, and the rear support frame contacts each of the rear surfaces of the guide rail. A pair of rear surface support members in contact with each other is provided, and the pair of rear surface support members are connected by a connection member.

本発明の杭打機の下部リーダ着脱治具によれば、下部リーダを取り外す際には、作業装置を上部側のリーダに上昇させた状態で、杭打機を走行させて前部支持枠体の後方から下部リーダを前部支持枠体内に挿入し、下部リーダの前面を前部支持枠体に当接させた後、後部支持枠体を下部リーダの後面に当接させ、第1連結部材を取り付けて前面支持部材と後面支持部材とで下部リーダを挟着し、ジャッキによって下部リーダを支持することにより、下部リーダを取り外して下部リーダ着脱治具に保持させることができる。下部リーダの取り付けは、この手順を逆に行えばよい。したがって、下部リーダを着脱する際に下部リーダをクレーンで吊る必要がなく、下部リーダの着脱を安全かつ簡単に行うことができる。また、下部リーダを簡単に取り外せることから、大きな径の掘削ヘッドを容易に使用することができる。   According to the lower leader attaching / detaching jig of the pile driving machine of the present invention, when removing the lower leader, the pile driving machine is run with the working device raised to the upper leader, and the front support frame The lower leader is inserted into the front support frame from behind, the front surface of the lower leader is brought into contact with the front support frame, the rear support frame is brought into contact with the rear surface of the lower reader, and the first connecting member The lower leader is sandwiched between the front support member and the rear support member, and the lower leader is supported by the jack, so that the lower leader can be removed and held by the lower reader attachment / detachment jig. The lower reader may be attached by reversing this procedure. Therefore, it is not necessary to hang the lower leader with a crane when attaching and detaching the lower leader, and the lower leader can be attached and detached safely and easily. Further, since the lower leader can be easily removed, a large-diameter excavation head can be easily used.

本発明の一形態例を示す下部リーダ着脱治具に下部リーダを保持させた状態を示す側面図である。It is a side view which shows the state which made the lower leader attachment / detachment jig | tool which shows one example of this invention hold | maintain a lower leader. 図1のII−II断面図である。It is II-II sectional drawing of FIG. 同じく下部リーダ着脱治具に下部リーダを保持させた状態を示す正面図である。It is a front view which shows the state which similarly made the lower leader attachment / detachment jig hold | maintain a lower leader. 同じく背面図である。It is a back view similarly. 輸送状態の杭打機を示す要部説明図である。It is principal part explanatory drawing which shows the pile driver of a transport state. 上部リーダを輸送状態から中間位置に起こした状態を示す要部説明図である。It is principal part explanatory drawing which shows the state which raised the upper leader to the intermediate position from the transport state. 上部リーダの下部フランジと連結部材のフランジとを接続した状態の要部説明図である。It is principal part explanatory drawing of the state which connected the lower flange of the upper leader, and the flange of a connection member. 下部リーダに取り付けられたリンクをブラケットから外した状態の要部説明図である。It is principal part explanatory drawing of the state which removed the link attached to the lower leader from the bracket. 作業装置を上部リーダに上昇させた状態の要部説明図である。It is principal part explanatory drawing of the state which raised the working device to the upper leader. 下部リーダを下部リーダ着脱治具に挿入してジャッキを下部リーダに当接させた状態の要部説明図である。It is principal part explanatory drawing of the state which inserted the lower leader in the lower leader attachment / detachment jig, and made the jack contact | abut to the lower leader. 下部リーダと連結部材との間の連結ボルトを取り外して下部リーダを上部リーダから分離した状態の要部説明図である。It is principal part explanatory drawing of the state which removed the connection volt | bolt between a lower leader and a connection member, and isolate | separated the lower leader from the upper leader. 下部リーダを下部リーダ着脱治具に保持させた状態の要部説明図である。It is principal part explanatory drawing of the state which hold | maintained the lower leader to the lower leader attachment / detachment jig. 鋼管杭の施工を行う状態の杭打機の側面図である。It is a side view of the pile driver in the state which constructs a steel pipe pile. 地盤改良機として使用している状態の杭打機の側面図である。It is a side view of the pile driving machine of the state currently used as a ground improvement machine. 輸送状態の杭打機の側面図である。It is a side view of a pile driver in a transportation state.

本形態例に示す杭打機は、鋼管杭施工と地盤改良施工とを切り替えて行うことができる兼用機であって、下部走行体11と、該下部走行体11の上部に旋回可能に設けられた上部旋回体12と、該上部旋回体12の前部に設けられたフロントブラケット12aに起伏可能に設けられたリーダ13と、該リーダ13を上部旋回体12の後部から支持するバックステー14とを備えており、前記リーダ13には、オーガなどの作業装置15がリーダ13に沿って昇降可能に設けられ、リーダ13の頂部には複数のワイヤロープが掛け回されるトップシーブ16が設けられている。   The pile driving machine shown in this embodiment is a dual-purpose machine capable of switching between steel pipe pile construction and ground improvement construction, and is provided on the lower traveling body 11 and the lower traveling body 11 in a turnable manner. An upper swing body 12, a leader 13 that can be raised and lowered on a front bracket 12 a provided at the front of the upper swing body 12, and a backstay 14 that supports the leader 13 from the rear of the upper swing body 12. The leader 13 is provided with a working device 15 such as an auger that can be moved up and down along the leader 13, and a top sheave 16 around which a plurality of wire ropes are wound is provided at the top of the leader 13. ing.

リーダ13は、前記フロントブラケット12aに装着される基本リーダ17と、該基本リーダ17の上部に接続される複数の上部リーダ18と、基本リーダ17の下部に接続される第1下部リーダ19及び第2下部リーダ20とを備えている。各リーダ17,18,19,20は、フランジ17a,18a,19a,20aを突き合わせて複数のボルト21,22,23,24でそれぞれ締結することによって着脱可能に連結されている。また、第2下部リーダ20の後部側面には、リンク部材25の一端が支軸26で回動可能に取り付けられている。このリンク部材25の他端は、両下部リーダ19,20を分離してリーダ13の上部側を後方に倒す際に、連結ピン27によってフロントブラケット12aに着脱可能に取り付けられて両下部リーダ19,20をフロントブラケット12aに連結する。   The reader 13 includes a basic reader 17 attached to the front bracket 12a, a plurality of upper readers 18 connected to the upper portion of the basic reader 17, a first lower reader 19 connected to the lower portion of the basic reader 17, and a first reader 2 lower reader 20. Each reader | leader 17, 18, 19, 20 is connected so that attachment or detachment is possible by making flange 17a, 18a, 19a, 20a face each other and fastening with several volt | bolts 21, 22, 23, 24, respectively. Further, one end of a link member 25 is attached to the rear side surface of the second lower reader 20 so as to be rotatable by a support shaft 26. The other end of the link member 25 is detachably attached to the front bracket 12a by a connecting pin 27 when the lower readers 19 and 20 are separated and the upper side of the reader 13 is tilted backward. 20 is connected to the front bracket 12a.

リーダ13の両側前端部には、作業装置15のガイドギブ15aが摺動可能に係合する左右一対のガイドレール28,28が設けられるとともに、リーダ13の前面中央には、作業装置15に設けられた昇降ピニオンが歯合するラック29がリーダ13の軸線方向略全長に亘って設けられている。   A pair of left and right guide rails 28 and 28 are slidably engaged with the guide gibs 15a of the working device 15 at the front end portions on both sides of the leader 13, and are provided on the working device 15 in the center of the front surface of the leader 13. A rack 29 with which the lifting pinion engages is provided over substantially the entire length in the axial direction of the reader 13.

鋼管杭埋設工事を行う場合は、図13に示すように、リーダ13の下端に第2下部リーダ20を取り付けた状態とし、第2下部リーダ20の下端部に鋼管杭用下部振止30aを配置した状態で、作業装置15に駆動ロッド15bを介して鋼管杭(図示せず)を装着する。   When steel pipe pile embedding work is performed, as shown in FIG. 13, the second lower leader 20 is attached to the lower end of the leader 13, and the lower anchor 30 a for steel pipe piles is disposed at the lower end of the second lower leader 20. In this state, a steel pipe pile (not shown) is attached to the work device 15 via the drive rod 15b.

地盤改良工事を行う場合は、図14に示すように、リーダ13の下端から第2下部リーダ20を取り外した状態で第1下部リーダ19の部分に中空ロッド用下部振止30bを配置するとともに、下端に掘削刃31及び撹拌翼32を有する掘削ヘッド33を装着した中空ロッド34を作業装置15に挿通して保持し、中空ロッド34の上端部にスイベルジョイント35を介してグラウトホース36を接続する。   When performing ground improvement work, as shown in FIG. 14, while disposing the second lower leader 20 from the lower end of the reader 13, the hollow rod lower brace 30b is disposed in the first lower leader 19 part, A hollow rod 34 equipped with a drilling head 33 having a drilling blade 31 and a stirring blade 32 at the lower end is inserted and held in the working device 15, and a grout hose 36 is connected to the upper end of the hollow rod 34 via a swivel joint 35. .

また、杭打機を輸送する場合は、図15に示すように、第2下部リーダ20で作業装置15を支持した状態で、第1下部リーダ19と基本リーダ17とを分離し、基本リーダ17から上の部分を後方に倒伏させた状態とする。   When transporting the pile driver, as shown in FIG. 15, the first lower leader 19 and the basic leader 17 are separated from each other while the work device 15 is supported by the second lower leader 20, and the basic leader 17. The upper part from the top to the bottom is laid back.

工事内容を切り替えるための第2下部リーダ20の着脱や、輸送あるいは上部側リーダの組み替えなどで下部リーダ19,20を着脱する必要が生じた際には、図1乃至図4に示す構造の下部リーダ着脱治具41を使用する。本形態例に示す下部リーダ着脱治具41は、第2下部リーダ20を起立した状態で支持するものであり、接地板42と、該接地板42の幅方向両側から鉛直方向に立設され、前記ガイドレール28,28の前面28a,28aにそれぞれ当接する一対の前面支持部材43a,43aを備えた前部支持枠体43と、下端部が前記前部支持枠体43の下部に回動可能に連結されて後方に起伏可能に設けられ、起立時にガイドレール28,28の後面28b,28bにそれぞれ当接する一対の後面支持部材44a,44aを備えた後部支持枠体44と、接地板42の中央部に配置され、第2下部リーダ20の下面に当接して第2下部リーダ20を昇降させるジャッキ45とを備えている。   When it is necessary to attach or detach the lower leaders 19 and 20 due to the attachment or detachment of the second lower leader 20 for switching the construction contents, transportation or replacement of the upper leader, etc., the lower part of the structure shown in FIGS. A reader attaching / detaching jig 41 is used. The lower leader attaching / detaching jig 41 shown in the present embodiment supports the second lower leader 20 in an upright state, and is erected in the vertical direction from the ground plate 42 and both sides in the width direction of the ground plate 42. A front support frame 43 having a pair of front support members 43a and 43a that abut against the front surfaces 28a and 28a of the guide rails 28 and 28, respectively, and a lower end portion thereof is rotatable to a lower portion of the front support frame 43. And a rear support frame 44 provided with a pair of rear surface support members 44a and 44a that are provided so as to be able to rise and fall rearward and abut against the rear surfaces 28b and 28b of the guide rails 28 and 28, respectively. The jack 45 is disposed at the center and contacts the lower surface of the second lower reader 20 to raise and lower the second lower reader 20.

前部支持枠体43は、ガイドレール28の前面28aの幅寸法より幅広に形成された前記前面支持部材43aと、各前面支持部材43aの後面からガイドレール28の外側面に沿った状態で後方に延出する後部補強板43bと、各前面支持部材43aの前面下部から前方に延出する前部補強板43cとを備えている。   The front support frame 43 is rearward in a state along the outer surface of the guide rail 28 from the rear surface of each front support member 43a, and the front support member 43a formed wider than the width dimension of the front surface 28a of the guide rail 28. A rear reinforcing plate 43b extending forward and a front reinforcing plate 43c extending forward from the lower front surface of each front support member 43a.

後部支持枠体44は、起立時にガイドレール28の後面28bに当接する前記後面支持部材44aと、前記後部補強板43bの内面に沿った状態となる後部補強片44bとからなるアングル材からなるもので、後部補強片44bの下端部が連結軸48を介して前記後部補強板43bの下部に回動可能に連結され、図1及び図2に想像線で示すように水平方向に倒伏した待機位置と、実線で示すように鉛直方向に起立した保持位置とに回動するように形成されている。また、後部補強片44bの上下方向中間部には、左右の後部補強片44b同士を連結して一体に回動させるための連結部材44cが設けられている。また、各後部補強板43bの上端部後部側と、起立した後部補強片44bの上端部とには、後部支持枠体44を起立位置に保持する第1連結部材である第1連結ピン46を挿通して取り付けるための第1連結ピン挿通部43d,44dがそれぞれ設けられており、後部補強板43bの上端部前部側には、ガイドレール28に形成された係止孔28cに、第2下部リーダ20を支持する第2連結部材である第2連結ピン47を挿通するための第2連結ピン挿通部43eが設けられている。第1連結ピン挿通部43dの外側及び第2連結ピン挿通部43eの外側には、第1連結ピン46を支持する第1連結ピン支持筒46a及び第2連結ピン47を支持する第2連結ピン支持筒47aがそれぞれ設けられ、各支持筒46a,47aの外端部には、各連結ピン46,47を抜け止めするベータピン46b,47bがそれぞれ取り付け可能となっている。また、後部補強板43bの上部には、後方が開いたガイド板43fが設けられている。   The rear support frame 44 is made of an angle member composed of the rear support member 44a that contacts the rear surface 28b of the guide rail 28 when standing, and the rear reinforcing piece 44b that is in a state along the inner surface of the rear reinforcing plate 43b. The lower end portion of the rear reinforcing piece 44b is pivotally connected to the lower portion of the rear reinforcing plate 43b via the connecting shaft 48, and as shown in phantom lines in FIGS. And as shown by a solid line, it is formed so as to rotate to a holding position standing upright in the vertical direction. In addition, a connecting member 44c for connecting the left and right rear reinforcing pieces 44b to each other and rotating them integrally is provided at an intermediate portion in the vertical direction of the rear reinforcing piece 44b. Moreover, the 1st connection pin 46 which is a 1st connection member which hold | maintains the rear part support frame body 44 in a standing position is provided in the upper end part rear side of each rear part reinforcement board 43b, and the upper end part of the standing rear part reinforcement piece 44b. First connecting pin insertion portions 43d, 44d for insertion through attachment are provided, respectively, on the front side of the upper end portion of the rear reinforcing plate 43b, a second engagement hole 28c formed in the guide rail 28 is connected to the second. A second connection pin insertion portion 43e for inserting a second connection pin 47, which is a second connection member that supports the lower reader 20, is provided. A first connection pin support tube 46a for supporting the first connection pin 46 and a second connection pin for supporting the second connection pin 47 on the outside of the first connection pin insertion portion 43d and the outside of the second connection pin insertion portion 43e. Support cylinders 47a are provided, and beta pins 46b and 47b for retaining the connection pins 46 and 47 can be attached to the outer ends of the support cylinders 46a and 47a, respectively. In addition, a guide plate 43f whose rear side is open is provided on the upper portion of the rear reinforcing plate 43b.

次に、輸送状態の杭打機を下部リーダ着脱治具41を用いて地盤改良作業を行う仕様にする手順を説明する。まず、輸送状態の杭打機は、図5及び図15に示すように、作業装置15を第2下部リーダ20の下端部まで下降させ、リンク部材25の他端部を連結ピン27によってフロントブラケット12aに連結するとともに、第1下部リーダ19から分離したリーダ13の上部側を、上部旋回体12の上部に沿って後方に倒伏させた状態となっている。   Next, a description will be given of a procedure for setting the pile driver in a transported state to a specification for performing ground improvement work using the lower leader attaching / detaching jig 41. First, as shown in FIGS. 5 and 15, the pile driving machine in the transport state lowers the work device 15 to the lower end portion of the second lower leader 20, and the other end portion of the link member 25 is connected to the front bracket by the connecting pin 27. The upper side of the reader 13 separated from the first lower leader 19 is laid backward along the upper part of the upper swing body 12 while being connected to the first lower leader 19.

この輸送状態から、図6に示すように、リーダ13の上部側を起こしていき、図7に示すように、リーダ13の上部側を鉛直方向に起立させる。この状態で第1下部リーダ19を上部側のリーダにフランジ結合により連結した後、図8に示すように、連結ピン27を差し替えてリンク部材25の他端部を第2下部リーダ20の側面に連結させ、第2下部リーダ20とフロントブラケット12aとの連結を解除する。これにより、作業装置15がガイドレール28に沿って昇降可能な状態になるので、図9に示すように、作業装置15をリーダ13の上部側に上昇させるとともに、リーダ13の全体を後方に傾斜させる。この状態で下部走行体11を操作し、下部リーダ着脱治具41に向けて走行させる。   From this transport state, the upper side of the reader 13 is raised as shown in FIG. 6, and the upper side of the reader 13 is erected in the vertical direction as shown in FIG. In this state, after the first lower leader 19 is connected to the upper leader by flange connection, as shown in FIG. 8, the connecting pin 27 is replaced so that the other end of the link member 25 is connected to the side surface of the second lower leader 20. The second lower leader 20 and the front bracket 12a are disconnected from each other. As a result, the working device 15 can be moved up and down along the guide rail 28. As shown in FIG. 9, the working device 15 is raised to the upper side of the reader 13, and the entire reader 13 is inclined backward. Let In this state, the lower traveling body 11 is operated to travel toward the lower leader attaching / detaching jig 41.

下部リーダ着脱治具41は、第1連結ピン46及び第2連結ピン47を取り外し、後部支持枠体44を水平方向に寝かせた待機状態としておく。そして、図10に示すように、第2下部リーダ20が下部リーダ着脱治具41の後方に配置されるように、下部走行体11を操作するとともに、リーダ13を起立させながら、第2下部リーダ20を下部リーダ着脱治具41の後方から下部リーダ着脱治具41の後部補強板43bの間にガイドレール28を挿入し、ガイドレール28の前面を前面支持部材43aに当接させる。このとき、ガイド板43fによって第2下部リーダ20を容易に所定位置に挿入することができ、多少の位置ズレは、下部リーダ着脱治具41が移動することで解消できる。   The lower leader attaching / detaching jig 41 removes the first connecting pin 46 and the second connecting pin 47, and puts the rear support frame 44 in a standby state in the horizontal direction. Then, as shown in FIG. 10, the second lower leader 20 is operated while operating the lower traveling body 11 and raising the reader 13 so that the second lower leader 20 is arranged behind the lower leader attaching / detaching jig 41. 20 is inserted from the rear of the lower leader attaching / detaching jig 41 between the rear reinforcing plates 43b of the lower leader attaching / detaching jig 41, and the front surface of the guide rail 28 is brought into contact with the front support member 43a. At this time, the second lower leader 20 can be easily inserted into a predetermined position by the guide plate 43f, and a slight misalignment can be eliminated by the movement of the lower leader attaching / detaching jig 41.

後部支持枠体44を起立させて第1連結ピン挿通部43d,44dに第1連結ピン46を挿通し、ベータピン46bで第1連結ピン46を固定することにより、前部支持枠体43と後部支持枠体44との間で第2下部リーダ20を挟着して昇降可能に保持した状態になる。次に、ジャッキ45を伸長させジャッキ45の先端面を第2下部リーダ20の下面に当接させ、第2下部リーダ20をジャッキ45に支持させた状態にする。この状態で、第2下部リーダ20の上端部に設けられたフランジ20aと第1下部リーダ19の下端部に設けられたフランジ19aとを連結している複数のボルト24を取り外す。   The front support frame body 43 and the rear part are formed by raising the rear support frame body 44 and inserting the first connection pin 46 through the first connection pin insertion parts 43d and 44d and fixing the first connection pin 46 with the beta pin 46b. The second lower leader 20 is sandwiched between the support frame body 44 and held so as to be movable up and down. Next, the jack 45 is extended so that the front end surface of the jack 45 is brought into contact with the lower surface of the second lower reader 20 so that the second lower reader 20 is supported by the jack 45. In this state, the plurality of bolts 24 connecting the flange 20a provided at the upper end portion of the second lower reader 20 and the flange 19a provided at the lower end portion of the first lower reader 19 are removed.

次に、図11に示されるように、ジャッキ45を縮めて第2下部リーダ20を下降させ、ガイドレール28の係止孔28cに第2連結ピン挿通部43eから第2連結ピン47を挿通してベータピン47bで固定することにより、第2下部リーダ20が上部側のリーダから分離し、第2下部リーダ20の上下方向が固定されて下部リーダ着脱治具41に保持された状態になる。   Next, as shown in FIG. 11, the jack 45 is contracted to lower the second lower leader 20, and the second connection pin 47 is inserted from the second connection pin insertion portion 43 e into the locking hole 28 c of the guide rail 28. By fixing with the beta pin 47b, the second lower reader 20 is separated from the upper reader, and the vertical direction of the second lower reader 20 is fixed and held in the lower reader attaching / detaching jig 41.

そして、図12に示すように、杭打機を後退させて所定位置に移動させ、掘削ヘッド33を装着した中空ロッド34を作業装置15に取り付けることにより、図14に示す地盤改良工事仕様とすることができる。一方、第2下部リーダ20を保持した下部リーダ着脱治具41は、第2下部リーダ20のフランジ20aにアイボルトなどを取り付けることにより、クレーンで吊り上げて作業の邪魔にならない適宜な場所に保管しておくことができる。また、この手順を逆に行うことにより、第2下部リーダ20を取り付けることができる。   Then, as shown in FIG. 12, the pile driving machine is moved backward to a predetermined position, and the hollow rod 34 equipped with the excavation head 33 is attached to the work device 15 to obtain the ground improvement work specification shown in FIG. be able to. On the other hand, the lower leader attaching / detaching jig 41 holding the second lower leader 20 is stored in an appropriate place where it is lifted by a crane and does not interfere with the work by attaching an eyebolt or the like to the flange 20a of the second lower leader 20. I can leave. Moreover, the 2nd lower reader | leader 20 can be attached by performing this procedure reversely.

このように、下部リーダ着脱治具41を使用することにより、第2下部リーダ20を着脱する際に、第2下部リーダ20をクレーンで吊る必要がなくなるので、第2下部リーダ20の着脱を、低い位置で安全かつ簡単に行うことができる。   In this way, by using the lower leader attaching / detaching jig 41, when the second lower leader 20 is attached / detached, it is not necessary to hang the second lower leader 20 with a crane. It can be done safely and easily in a low position.

なお、後部支持枠体は、前部支持枠体に回動可能に設けることにより、全体を一体に形成することができるが、後部支持枠体を別体として複数の連結部材で前部支持枠体に連結するようにしてもよい。また、本形態例では、下部リーダを、上部の第1下部リーダと下部の第2下部リーダとに分割可能とした例を示したが、一体の下部リーダであってもよい。さらに、ガイドレールの前後を挟持することによって下部リーダの保持を効率よく行うことができるが、前部支持枠体と後部支持枠体とで下部リーダの前後を保持できれば任意の位置を保持することが可能である。また、第2連結部材は、後部支持枠体と下部リーダとを連結するようにしてもよい。   Note that the rear support frame can be formed integrally with the front support frame so as to be rotatable, but the front support frame is composed of a plurality of connecting members separately from the rear support frame. You may make it connect with a body. In this embodiment, the lower reader is divided into an upper first lower reader and a lower second lower reader. However, an integrated lower reader may be used. Furthermore, the lower leader can be efficiently held by sandwiching the front and rear of the guide rail, but if the front and rear of the lower leader can be held by the front support frame and the rear support frame, an arbitrary position can be held. Is possible. Moreover, you may make it a 2nd connection member connect a rear part support frame and a lower leader.

11…下部走行体、12…上部旋回体、12a…フロントブラケット、13…リーダ、14…バックステー、15…作業装置、15a…ガイドギブ、15b…駆動ロッド、16…トップシーブ、17…基本リーダ、17a…フランジ、18…上部リーダ、18a…フランジ、19…第1下部リーダ、19a…フランジ、20…第2下部リーダ、20a…フランジ、21,22,23,24…ボルト、25…リンク部材、26…支軸、27…連結ピン、28…ガイドレール、28a…前面、28b…後面、28c…係止孔、29…ラック、30a…鋼管杭用下部振止、30b…中空ロッド用下部振止、31…掘削刃、32…撹拌翼、33…掘削ヘッド、34…中空ロッド、35…スイベルジョイント、36…グラウトホース、41…下部リーダ着脱治具、42…接地板、43…前部支持枠体、43a…前面支持部材、43b…後部補強板、43c…前部補強板、43d…第1連結ピン挿通部、43e…第2連結ピン挿通部、43f…ガイド板、44…後部支持枠体、44a…後面支持部材、44b…後部補強片、44c…連結部材、44d…第1連結ピン挿通孔、45…ジャッキ、46…第1連結ピン、46a…第1連結ピン支持筒、46b…ベータピン、47…第2連結ピン、47a…第2連結ピン支持筒、47b…ベータピン、48…連結軸 DESCRIPTION OF SYMBOLS 11 ... Lower traveling body, 12 ... Upper turning body, 12a ... Front bracket, 13 ... Leader, 14 ... Back stay, 15 ... Working device, 15a ... Guide give, 15b ... Drive rod, 16 ... Top sheave, 17 ... Basic leader, 17a ... flange, 18 ... upper leader, 18a ... flange, 19 ... first lower leader, 19a ... flange, 20 ... second lower leader, 20a ... flange, 21, 22, 23, 24 ... bolt, 25 ... link member, 26 ... support shaft, 27 ... connecting pin, 28 ... guide rail, 28a ... front surface, 28b ... rear surface, 28c ... locking hole, 29 ... rack, 30a ... lower swinging for steel pipe piles, 30b ... lower swinging for hollow rod 31 ... Excavation blade, 32 ... Stirring blade, 33 ... Excavation head, 34 ... Hollow rod, 35 ... Swivel joint, 36 ... Grout hose, 41 ... Lower leader Demounting jig, 42 ... ground plate, 43 ... front support frame, 43a ... front support member, 43b ... rear reinforcement plate, 43c ... front reinforcement plate, 43d ... first connection pin insertion part, 43e ... second connection Pin insertion part, 43f ... guide plate, 44 ... rear support frame, 44a ... rear surface support member, 44b ... rear reinforcement piece, 44c ... connection member, 44d ... first connection pin insertion hole, 45 ... jack, 46 ... first Connection pin, 46a ... first connection pin support tube, 46b ... beta pin, 47 ... second connection pin, 47a ... second connection pin support tube, 47b ... beta pin, 48 ... connection shaft

Claims (3)

杭打機に設けられたリーダの下端部に下部リーダを着脱する際に使用する下部リーダ着脱治具であって、接地板に鉛直方向に立設されて前記下部リーダの前面に当接する前部支持枠体と、前記下部リーダの後面に当接して前記前部支持枠体との間で前記下部リーダを挟着可能な後部支持枠体とを備えるとともに、前記下部リーダを前記前部支持枠体と前記後部支持枠体とで昇降可能に挟着した状態で、前部支持枠体と後部支持枠体とを連結する着脱可能な第1連結部材と、前部支持枠体又は後部支持枠体と下部リーダとを連結する着脱可能な第2連結部材と、下部リーダを昇降させるジャッキとを備えていることを特徴とする杭打機の下部リーダ着脱治具。   A lower leader attaching / detaching jig used when attaching / detaching a lower leader to / from a lower end portion of a leader provided in a pile driving machine, wherein the front part is erected in a vertical direction on a ground plate and abuts against a front surface of the lower leader A support frame and a rear support frame that can contact the rear surface of the lower reader and sandwich the lower reader between the lower support and the lower reader. A detachable first connecting member that connects the front support frame and the rear support frame in a state in which the body and the rear support frame can be moved up and down, and the front support frame or the rear support frame A lower leader attaching / detaching jig for a pile driving machine, comprising: a second detachable connecting member for connecting the body and the lower leader; and a jack for raising and lowering the lower leader. 前記後部支持枠体は、該後部支持枠体の下端部が前記前部支持枠体の下部に連結軸で回動可能に連結されて後方に起伏可能に設けられ、後部支持枠体の上端部と前部支持枠体の上端部とに前記第1連結部材の取付部がそれぞれ設けられていることを特徴とする請求項1記載の杭打機の下部リーダ着脱治具。   The rear support frame is provided such that a lower end portion of the rear support frame is pivotally connected to a lower portion of the front support frame by a connecting shaft so as to be able to undulate backward, and an upper end of the rear support frame is provided. 2. The lower leader attaching / detaching jig for a pile driving machine according to claim 1, wherein attachment portions for the first connecting member are provided on the upper end portion of the front support frame body. 前記前部支持枠体は、前記下部リーダの両側にそれぞれ設けられている一対のガイドレールの前面にそれぞれ当接する一対の前面支持部材を備え、前記後部支持枠体は、前記ガイドレールの後面にそれぞれ当接する一対の後面支持部材を備えるとともに、該一対の後面支持部材は、連結部材で連結されていることを特徴とする請求項1又は2記載の杭打機の下部リーダ着脱治具。   The front support frame includes a pair of front support members that respectively contact the front surfaces of a pair of guide rails provided on both sides of the lower leader, and the rear support frame is formed on a rear surface of the guide rail. 3. The lower leader attaching / detaching jig for a pile driving machine according to claim 1, wherein the pair of rear supporting members are in contact with each other, and the pair of rear supporting members are connected by a connecting member.
JP2014238595A 2014-11-26 2014-11-26 Pile driver lower leader attachment / detachment jig Active JP6472224B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014238595A JP6472224B2 (en) 2014-11-26 2014-11-26 Pile driver lower leader attachment / detachment jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014238595A JP6472224B2 (en) 2014-11-26 2014-11-26 Pile driver lower leader attachment / detachment jig

Publications (2)

Publication Number Publication Date
JP2016098622A true JP2016098622A (en) 2016-05-30
JP6472224B2 JP6472224B2 (en) 2019-02-20

Family

ID=56076522

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014238595A Active JP6472224B2 (en) 2014-11-26 2014-11-26 Pile driver lower leader attachment / detachment jig

Country Status (1)

Country Link
JP (1) JP6472224B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019039266A (en) * 2017-08-28 2019-03-14 日立建機株式会社 Pile driver and attitude change method of pile driver
JP2019190197A (en) * 2018-04-27 2019-10-31 日本車輌製造株式会社 Method for attaching/detaching work device of pile driver
JP7360321B2 (en) 2019-12-26 2023-10-12 日本車輌製造株式会社 pile driver

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS50105209U (en) * 1974-01-31 1975-08-29
JPS5370703U (en) * 1976-11-17 1978-06-14
JPS59163635U (en) * 1983-04-18 1984-11-01 日立建機株式会社 Leader folding pile driver
JPS6277231U (en) * 1985-10-28 1987-05-18
US20070278013A1 (en) * 2006-06-02 2007-12-06 Rudolf Poeckl Construction device, in particular drilling device
JP2011140799A (en) * 2010-01-07 2011-07-21 Nippon Sharyo Seizo Kaisha Ltd Lower leader attachment/detachment tool and attachment/detachment method for pile driver

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS50105209U (en) * 1974-01-31 1975-08-29
JPS5370703U (en) * 1976-11-17 1978-06-14
JPS59163635U (en) * 1983-04-18 1984-11-01 日立建機株式会社 Leader folding pile driver
JPS6277231U (en) * 1985-10-28 1987-05-18
US20070278013A1 (en) * 2006-06-02 2007-12-06 Rudolf Poeckl Construction device, in particular drilling device
JP2011140799A (en) * 2010-01-07 2011-07-21 Nippon Sharyo Seizo Kaisha Ltd Lower leader attachment/detachment tool and attachment/detachment method for pile driver

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019039266A (en) * 2017-08-28 2019-03-14 日立建機株式会社 Pile driver and attitude change method of pile driver
JP2019190197A (en) * 2018-04-27 2019-10-31 日本車輌製造株式会社 Method for attaching/detaching work device of pile driver
JP7009037B2 (en) 2018-04-27 2022-01-25 日本車輌製造株式会社 How to attach / detach the work equipment of the pile driver
JP7360321B2 (en) 2019-12-26 2023-10-12 日本車輌製造株式会社 pile driver

Also Published As

Publication number Publication date
JP6472224B2 (en) 2019-02-20

Similar Documents

Publication Publication Date Title
CN107191676B (en) Buried pipeline construction method
CN104340886B (en) Supporting leg connects locking device
US10106946B2 (en) Pile upending system
US20140209552A1 (en) Raisable-lowerable member for crane
JP6472224B2 (en) Pile driver lower leader attachment / detachment jig
ITPC20060029A1 (en) PERFORMED HANGING MACHINE
ITUA20163540A1 (en) Tow truck for transporting equipment.
JP5328338B2 (en) Telescopic track frame
JP5442574B2 (en) Work machine
JP2016199345A (en) Boom attaching/detaching device and attaching/detaching method
US20130298796A1 (en) Excavator Adapted for Railroad
JP6234256B2 (en) Construction machinery
JP2017141075A (en) Revolving type work machine and float device used in the same
KR200456465Y1 (en) tongs for excavator
JP5484081B2 (en) Pile driver lower leader attachment / detachment jig and attachment / detachment method
JP6150636B2 (en) Pile driver
JP2017166196A (en) Auger attachment/detachment method for pile driver, and support jig for auger attachment/detachment
JP6351477B2 (en) Attaching and removing the lower reader
CN212004129U (en) Movable belt conveyor wheel replacing support
JP2019203341A (en) Pile driver
JP2015178733A (en) construction machinery
JP6250383B2 (en) Construction machine, boom mounting method, and boom disassembling method
JP6443017B2 (en) Jib attachment / detachment mechanism
CN211078182U (en) Automatic unhooking hanger
CN211058820U (en) Trusteeship device of tunnel pipe gallery fortune frame machine

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20171002

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180621

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180724

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180907

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190122

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190122

R150 Certificate of patent or registration of utility model

Ref document number: 6472224

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150