JP2016017381A - Single pipe fitting seat for beam and other members of steel temporary beam, and work floor construction method using the same - Google Patents

Single pipe fitting seat for beam and other members of steel temporary beam, and work floor construction method using the same Download PDF

Info

Publication number
JP2016017381A
JP2016017381A JP2014142867A JP2014142867A JP2016017381A JP 2016017381 A JP2016017381 A JP 2016017381A JP 2014142867 A JP2014142867 A JP 2014142867A JP 2014142867 A JP2014142867 A JP 2014142867A JP 2016017381 A JP2016017381 A JP 2016017381A
Authority
JP
Japan
Prior art keywords
single pipe
steel
work floor
mounting seat
steel temporary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2014142867A
Other languages
Japanese (ja)
Other versions
JP6327985B2 (en
Inventor
勝治 今田
Katsuji Imada
勝治 今田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nihon Kensetsu Kogyo Co Ltd
Original Assignee
Nihon Kensetsu Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nihon Kensetsu Kogyo Co Ltd filed Critical Nihon Kensetsu Kogyo Co Ltd
Priority to JP2014142867A priority Critical patent/JP6327985B2/en
Publication of JP2016017381A publication Critical patent/JP2016017381A/en
Application granted granted Critical
Publication of JP6327985B2 publication Critical patent/JP6327985B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide an appropriate jig for installing a firm work floor and a work floor construction method using the jig, on a flange of a beam made of an H-steel of an existing building, or on a flange of a steel material spanned on the beam or on a beam part of a steel temporary beam, using only a skill acquired by a worker.SOLUTION: A single pipe fitting seat 1 is for fitting a single pipe for constructing a work floor on a beam and other members of a steel temporary beam, the single pipe fitting seat comprising a short single pipe 2 and two plate materials fixed on both ends of the pipe. The two plate materials have the following members installed: an A protrusion 4 facing downward and having a protrusion 7 for embracing the beam and other members of the steel temporary beam; and a B protrusion 5 facing downward and having a set screw 8 for pressing and fixing the beam and other members of the steel temporary beam on the A protrusion 4. In a method for constructing the work floor, a single pipe 11 for constructing a work floor is fitted on the single pipe fitting seat 1 using a double single-pipe clamp 14, and a scaffold plate 13 is fixed on the single pipe.SELECTED DRAWING: Figure 2

Description

本発明は、鋼製仮設梁のビーム部分やH型鋼のフランジ(以下「鋼製仮設梁のビーム等」と言う)に単管パイプ(以下「単管」と言う)を取り付ける治具、および、それを用いて作業用の床(以下「作業床」と言う)を構築する方法に関するものである。   The present invention includes a jig for attaching a single pipe (hereinafter referred to as “single pipe”) to a beam portion of a steel temporary beam or a flange of an H-shaped steel (hereinafter referred to as “beam of a steel temporary beam or the like”), and The present invention relates to a method for constructing a work floor (hereinafter referred to as “work floor”) using the work.

建設工事に携わる作業員にとって、単管同士を2連の直交単管クランプ、あるいは、2連の自在単管クランプ(以下「2連単管クランプ」と言う)でつなぎ合わせ、そこに足場板を固定して足場を構築することは、まず最初に身につけるべき極めて基本的な技能であり、全員が習熟している技能と言っても過言ではない。   For workers involved in construction work, single pipes are connected with two orthogonal single pipe clamps or two universal single pipe clamps (hereinafter referred to as “two single pipe clamps”), and a scaffolding plate is placed there. Building a scaffold in a fixed manner is a very basic skill that must be acquired first, and it is no exaggeration to say that it is a skill that everyone is familiar with.

一方、建設工事の途中段階や改造工事にあっては、既に建設された建造物のH形鋼で出来た梁を利用して、その梁のフランジに単管を取付け、その単管に足場板を固定して作業床を設けることが、しばしば行われる。作業床は、重量物である資材の保管場所やその搬出入の通路としても利用されるので、建造物の梁にしっかりと荷重をかけられる丈夫な床が望ましいからである。   On the other hand, in the middle of construction work or remodeling work, a single pipe is attached to the flange of the beam using a beam made of H-shaped steel of the already built structure, and the scaffolding plate is attached to the single pipe. It is often done to provide a working floor with a fixed. This is because the work floor is also used as a storage place for heavy materials and a passage for carrying in and out of the work floor. Therefore, it is desirable that the work floor is a strong floor that can apply a load firmly to the beams of the building.

H形鋼の梁に単管を取り付けるためには、特許文献1あるいは特許文献2に記載されているように、鉄骨クランプと単管クランプを組み合わせた治具が種々考えられている。しかし、これらの治具は、作業員全員が習熟している2連単管クランプとはいささか異なるものである。また、一本のボルトの締め付け力だけでH形鋼のフランジ部を把持するものであるから確実性に不安が残る。   In order to attach a single pipe to an H-shaped steel beam, as described in Patent Document 1 or Patent Document 2, various jigs that combine a steel clamp and a single pipe clamp are considered. However, these jigs are slightly different from the dual single tube clamps that all workers are familiar with. Further, since the flange portion of the H-shaped steel is gripped only by the tightening force of one bolt, there remains anxiety about the certainty.

H形鋼で出来た梁の間隔が広くて、足場板を支える単管を直接掛け渡したのでは強度が不足するときには、そのH形鋼の梁の上に、適切な間隔を空けて別のH形鋼等の鋼材を掛け渡して、その上に単管を並べ、足場板を敷設するのが普通であるが、単管の固定には上述の場合と同じ問題がある。また、追加となる鋼材の重量がかさみ不経済であり、施工性も良くない。   When the gap between the beams made of H-shaped steel is wide and the strength is insufficient when the single pipe that supports the scaffolding plate is directly spanned, another space is provided on the beam of the H-shaped steel with an appropriate interval. It is common to hang a steel material such as an H-shaped steel, arrange a single pipe on it, and lay a scaffolding plate. However, fixing the single pipe has the same problem as described above. Moreover, the weight of the additional steel material is bulky and uneconomical, and the workability is not good.

H形鋼の梁に掛け渡す鋼材に替えて、コンクリート型枠支持梁として使用される鋼製仮設梁(「ペコビーム(登録商標)」などと呼称される)を使用する場合があるが、この鋼製仮設梁のビームに単管を取り付ける治具は市場に見当たらず、取り付ける方法について公開された文献は見当たらない。特許文献3に記載されたチェーンを用いて単管を梁へ固定する治具なら鋼製仮設梁のビームにも適用が可能であろうが、これも、作業員全員が習熟している技能とはいささか異なる。また、チェーンを介するために完全に固定した足場の構築には不向きであるうえに、単管にかかる荷重を上から直接的にビームにかけるものではないので、作業床として確実性に不安が残る。   A steel temporary beam (called “Pecobeam (registered trademark)”) used as a concrete formwork support beam may be used instead of the steel material hung over the H-shaped steel beam. There are no jigs on the market for attaching a single tube to a beam of temporary beams, and there is no published literature on how to attach it. If it is a jig which fixes a single pipe to a beam using the chain described in patent documents 3, it will be applicable also to the beam of a steel temporary beam, but this is also the skill which all the workers have mastered. Yes, it ’s slightly different. In addition, it is not suitable for constructing a scaffold that is completely fixed to pass through the chain, and the load on the single pipe is not directly applied to the beam from above, so there is uncertainty about the certainty as a work floor. .

登録実用新案第3000733号公報Registered Utility Model No. 3000733 特開平11−125002号公報Japanese Patent Laid-Open No. 11-12502 実開平5−24792号公報Japanese Utility Model Publication No. 5-24792

無しNone

そこで本発明が解決しようとする課題は、既に建設された建造物のH形鋼で出来た梁のフランジ、あるいは、その梁に架け渡された鋼材のフランジや鋼製仮設梁のビーム(以下「鋼製仮設梁のビーム等」と言う)の上に、作業員が習熟している技能のみを用いて、しっかりとした作業床を設けるのに適切な治具と、それを用いた作業床を構築する方法を提供することである。   Therefore, the problem to be solved by the present invention is that a flange of a beam made of H-shaped steel of a building already constructed, or a steel flange or a steel temporary beam (hereinafter referred to as “beam”) On top of the beam of steel temporary beams, etc.), using only the skill that the worker is familiar with, a jig suitable for providing a solid work floor and a work floor using it. Is to provide a way to build.

上記課題を解決する本発明は、鋼製仮設梁のビーム部分やH型鋼のフランジ(以下「鋼製仮設梁のビーム等」と言う)に単管パイプ(以下「単管」と言う)を取り付けるための単管取付用座であって、
短い単管と、その両端に固定された2枚の板材を有し、
該2枚の板材それぞれに、該単管取付用座を該鋼製仮設梁のビーム等の上に載置したときに、該鋼製仮設梁のビーム等を抱え込む形の突起を有する下向きのA突出部と、該鋼製仮設梁のビーム等を該A突出部に押しつけて固定する止めねじを有する下向きのB突出部とが設けられた単管取付用座である。
The present invention that solves the above problems attaches a single pipe (hereinafter referred to as “single pipe”) to a beam portion of a steel temporary beam or a flange of an H-shaped steel (hereinafter referred to as “beam of a steel temporary beam”). A single tube mounting seat for
It has a short single pipe and two plates fixed to both ends.
Each of the two plate members has a downward A having a projection that holds the beam of the steel temporary beam when the single tube mounting seat is placed on the beam of the steel temporary beam. A single tube mounting seat provided with a protruding portion and a downward B protruding portion having a set screw for pressing and fixing the beam of the steel temporary beam to the A protruding portion.

本発明は作業床を構築するための単管(以下「作業床構築用単管」と言う)を鋼製仮設梁のビーム等に取り付けるための座であって、その作業床構築用単管を2連単管クランプを用いて固定するための短い単管を有している。その短い単管は、2連単管クランプを用いた固定作業が支障なく行える長さがあればよい。   The present invention is a seat for attaching a single pipe for constructing a work floor (hereinafter referred to as “single pipe for constructing a work floor”) to a beam or the like of a temporary steel beam. It has a short single tube for fixing with a double single tube clamp. The short single pipe should just have the length which can perform the fixing operation | work using a double single pipe clamp without trouble.

短い単管の両端には2枚の板材が溶接等により固定され、その2枚の板材はそれぞれ、鋼製仮設梁のビーム等を抱え込む形の突起を有する下向きのA突出部と、該鋼製仮設梁のビーム等を該A突出部に押しつけて固定する止めねじを有する下向きのB突出部とが設けられている。   Two plate members are fixed to both ends of the short single pipe by welding or the like. Each of the two plate members has a downward A protruding portion having a projection for holding a beam of a steel temporary beam, and the steel plate. A downward B projecting portion having a set screw for pressing and fixing the beam or the like of the temporary beam against the A projecting portion is provided.

言い換えれば、その2枚の板材にはそれぞれ、単管取付用座を鋼製仮設梁のビーム等の上に載置するように下向きコの字型の開口が設けてあり、コの字型の開口の両側を構成する下向きの2本の突出部が、ここで言うA突出部とB突出部である。単管取付用座を鋼製仮設梁のビーム等の上に安定して載置出来るようにするには、両板材のコの字型の開口の上端部は、短い単管の中心からほぼ等距離で、かつ、互いに平行であることが望ましい。   In other words, each of the two plate members is provided with a U-shaped opening facing downward so that the single tube mounting seat is placed on the beam of the steel temporary beam, etc. The two downward projecting portions constituting both sides of the opening are the A projecting portion and the B projecting portion referred to here. In order to allow the single tube mounting seat to be stably placed on the beam of a steel temporary beam, the upper ends of the U-shaped openings of both plates are almost equal from the center of the short single tube. It is desirable that the distances be parallel to each other.

単管取付用座を上方から鋼製仮設梁のビーム等に近づけて、それを跨ぐように載せるためには、コの字型の開口の巾は、鋼製仮設梁のビーム等がA突出部の先端の突起をかわして容易に中にはいるように設定する。A突出部の突起をかわして単管取付用座を鋼製仮設梁のビーム等の上に載置したら、あとはB突出部に設けられた止めねじを使って、単管取付用座を鋼製仮設梁のビーム等にしっかりと固定する。   In order to place the single tube mounting seat close to the beam of the steel temporary beam from above and place it over the beam, the width of the U-shaped opening is such that the beam of the steel temporary beam is the A protrusion Set the tip so that it can be easily inserted inside the tip. After the protrusions of the A protrusions have been displaced and the single tube mounting seats are placed on the beam of a steel temporary beam, the single pipe mounting seats are made of steel using the set screws provided on the B protrusions. Securely fix the beam on the temporary beam.

固定が完了したら、単管取付用座の短い単管に2連単管クランプを用いて作業床構築用単管を取り付ける。すなわち、単管取付用座の短い単管が、作業床構築用単管取付の基点になる。2連単管クランプを用いて作業床構築用単管をこの単管取付用座に取り付ける作業、及び、その後の作業はすべて作業員が習熟している技能のみを用いて行うことができる。   When the fixing is completed, the single pipe for working floor construction is attached to the single pipe having a short single pipe mounting seat by using a double single pipe clamp. That is, a single pipe having a short single pipe mounting seat is a base point for mounting a single pipe for constructing a work floor. The work of attaching the single pipe for constructing the work floor to the single pipe mounting seat using the double single pipe clamp and the subsequent work can be carried out only using the skill that the worker has mastered.

単管取付用座は、鋼製仮設梁のビーム等に上に安定して載置されているので、作業床構築用単管にかけられた荷重は、2連単管クランプを介して上から単管取付用座の短い単管に伝えられ、さらに2枚の板材を通して鋼製仮設梁のビーム等に上から下に向かって伝達される。したがって、その上に保管され、あるいは、その上を搬出入される重量物等の荷重をしっかりと受け止める丈夫な作業床を構築できる。   Since the single tube mounting seat is stably placed on the beam of a steel temporary beam or the like, the load applied to the single tube for constructing the work floor is simply applied from above via a double single tube clamp. It is transmitted to the short single tube of the tube mounting seat, and further transmitted from the top to the bottom through the two plates to the beam of the steel temporary beam. Therefore, it is possible to construct a durable work floor that securely receives a load such as a heavy object that is stored on it or carried in / out.

一本のボルトの締め付け力だけでH形鋼のフランジ部を把持する鉄骨クランプを用いるのとは異なり、たとえ、B突出部に設けられた止めねじが多少ゆるんだとしても、単管取付用座そのものが鋼製仮設梁のビーム等からはずれるおそれが無い。しかも、単管取付用座は水平な鋼製仮設梁のビーム等の上に設置され、作業床から受ける力は基本的に上から下に向かって伝達されるので、単管取付用座の位置がずれることも少なく、作業床構築用単管を取付ける極めて安定した基点となる。   Unlike using steel clamps that hold the H-shaped steel flange with only one bolt tightening force, even if the set screw provided on the B protrusion is somewhat loose, the single tube mounting seat There is no risk that it will come off the steel temporary beam. Moreover, the single tube mounting seat is installed on a horizontal steel temporary beam, etc., and the force received from the work floor is basically transmitted from top to bottom. This is a very stable base point for installing a single pipe for constructing a work floor.

また、上記課題を解決する本発明は、請求項1記載の単管取付用座を鋼製仮設梁のビーム等に固定し、前記短い単管に2連単管クランプを用いて単管を取付け、該取り付けられた単管に足場板を固定して、作業床を構築する方法である。   Further, the present invention for solving the above-mentioned problems is to fix the single pipe mounting seat according to claim 1 to a beam or the like of a steel temporary beam and attach the single pipe to the short single pipe using a double single pipe clamp. In this method, a working floor is constructed by fixing a scaffolding plate to the attached single pipe.

鋼製仮設梁のビーム等に固定された単管取付用座の短い単管を基点として、2連単管クランプを用いて作業床構築用単管を取り付けて固定し、その作業床構築用単管に足場板を固定して作業床を構築する。ここで使われるのは、作業員全員が習熟している単管同士を2連単管クランプでつなぎあわせ、そこに足場板を固定して足場を構築する技能のみである。習熟している技能のみを用いて作業を行えると言うことは、作業の効率と安全性の向上に寄与する。   Using a single tube with a short single tube mounting seat fixed to a beam of steel temporary beams as a base point, a single tube for working floor construction is attached and fixed using a double single tube clamp. The work floor is constructed by fixing the scaffolding plate to the pipe. Only the skill to connect the single pipes that all the workers are familiar with with two single pipe clamps and fix the scaffolding board there to build the scaffolding is used. The fact that work can be performed using only the skill that has been learned contributes to the improvement of work efficiency and safety.

また、上述のように、基点となる短い単管を有する単管取付用座は、極めて高い信頼性を持って鋼製仮設梁のビーム等に固定されているから、この面からも、作業床構築作業は安全に、かつ、効率よく行われ、信頼性の高い丈夫な作業床を作り出すことが出来る。   In addition, as described above, the single tube mounting seat having a short single tube as a base point is fixed to a beam of a steel temporary beam with extremely high reliability. Construction work is done safely and efficiently, creating a reliable and durable work floor.

本発明の鋼製仮設梁のビーム等への単管取付用座を用いることにより、鋼製仮設梁のビーム等の上に、作業員が習熟している技能のみを用いて作業床を構築することができる。そのようにして構築された作業床にかかる荷重は単管取付用座を介して鋼製仮設梁のビーム等へ真上からかかるので、信頼性が高い丈夫な作業床を構築することが出来る。さらに、単管取付用座の鋼製仮設梁のビーム等への固定は、極めて容易であり、かつ、ずれたり、はずれたりすることが無く、極めて高い信頼性を持っているので確実である。   By using the single tube mounting seat to the beam or the like of the steel temporary beam according to the present invention, the work floor is constructed on the beam of the steel temporary beam or the like using only the skill that the worker has mastered. be able to. Since the load applied to the work floor constructed as described above is applied to the beam of the steel temporary beam or the like directly from the single tube mounting seat, a highly reliable and durable work floor can be constructed. Further, the fixing of the single-tube mounting seat to the beam of the steel temporary beam is extremely easy, and it is reliable because it has extremely high reliability without being displaced or detached.

また、本発明の作業床構築方法を用いることにより、単管同士を2連単管クランプでつなぎあわせ、そこに足場板を固定すると言う、作業員全員が習熟している技能のみを使って作業床を構築できるので、作業の効率と安全性の向上に寄与する。また、単管取付用座は、極めて高い信頼性を持って鋼製仮設梁のビーム等に固定されているから、この面からも、作業床構築作業は安全に、かつ、効率よく行われる。   In addition, by using the work floor construction method of the present invention, the single pipes are joined together by two single pipe clamps, and the scaffolding plate is fixed there, using only the skills that all workers are familiar with. Since the floor can be constructed, it contributes to the improvement of work efficiency and safety. In addition, since the single pipe mounting seat is fixed to a beam of a temporary steel beam or the like with extremely high reliability, the work floor construction work can be performed safely and efficiently from this aspect.

本発明の単管取付用座の実施例1の正面図(a)と側面図(b)である。It is the front view (a) and side view (b) of Example 1 of the single tube attachment seat of this invention. その単管取付用座を用いて作業床構築用単管を固定し、その単管に足場板を取り付けた状態を示す斜視図である。It is a perspective view which shows the state which fixed the work floor construction single pipe using the single pipe attachment seat, and attached the scaffolding board to the single pipe. 本発明の単管取付用座の実施例2の側面図である。It is a side view of Example 2 of the single tube mounting seat of the present invention. 本発明の作業床構築方法を示す説明図である。It is explanatory drawing which shows the work floor construction method of this invention.

本発明の実施の形態について図面を参照しながら説明をする。なお、本発明はかかる実施の形態には限定されず、本発明の範囲内でその具体的構造に種々の変更を加えて良いことは言うまでもない。   Embodiments of the present invention will be described with reference to the drawings. The present invention is not limited to such an embodiment, and it goes without saying that various modifications may be made to the specific structure within the scope of the present invention.

図1は本発明の実施例1の単管取付用座1の正面図(a)とその側面図(b)、図2はその単管取付用座1を用いて作業床構築用単管11を鋼製仮設梁のビーム部分12に固定しその作業床構築用単管に足場板13を取り付けた状態を示す斜視図である。   FIG. 1 is a front view (a) and a side view (b) of a single pipe mounting seat 1 according to a first embodiment of the present invention, and FIG. 2 is a single pipe 11 for constructing a work floor using the single pipe mounting seat 1. It is a perspective view which shows the state which fixed to the beam part 12 of steel temporary beams, and attached the scaffold board 13 to the single pipe for work floor construction.

実施例1の単管取付用座1は、2連単管クランプ14を用いて作業床構築用単管11を固定する短い単管2と、その短い単管の両端に溶接等により固定された2枚の板材3から成っており、その2枚の板材はそれぞれ、鋼製仮設梁のビーム部分12を抱え込む形の突起7を有する下向きのA突出部4と、その鋼製仮設梁のビーム部分をA突出部に押しつけて固定する止めねじ8を有する下向きのB突出部5とが設けられている。   The single tube mounting seat 1 according to the first embodiment is fixed to the short single tube 2 for fixing the work floor construction single tube 11 using a double single tube clamp 14 and to both ends of the short single tube by welding or the like. The two plate members 3 each have a downward A protrusion 4 having a projection 7 shaped to hold a beam portion 12 of a steel temporary beam, and a beam portion of the steel temporary beam. And a downward B projecting portion 5 having a set screw 8 that presses the A projecting portion against the A projecting portion.

図1(b)からわかるように、2枚の板材にはそれぞれ、単管取付用座1を鋼製仮設梁のビーム部分12の上に載置出来るように下向きコの字型の開口6が設けてあり、コの字型の開口6の両側を構成する下向きの2本の突出部が、ここで言うA突出部とB突出部である。   As can be seen from FIG. 1B, each of the two plates has a downward U-shaped opening 6 so that the single tube mounting seat 1 can be placed on the beam portion 12 of the steel temporary beam. The two downward projecting portions provided and constituting both sides of the U-shaped opening 6 are the A projecting portion and the B projecting portion referred to here.

単管取付用座1を上方から鋼製仮設梁のビーム部分12に近づけて、それを跨ぐように載せるためには、コの字型の開口6の巾は、鋼製仮設梁のビーム部分12がA突出部4の先端の突起7をかわして容易に中にはいるように設定する。A突出部の突起7をかわして単管取付用座1を鋼製仮設梁のビーム部分12の上に載置したら、あとはB突出部に設けられた止めねじ8を使って、単管取付用座1を鋼製仮設梁のビーム部分12にしっかりと固定する。   In order to place the single tube mounting seat 1 close to the beam portion 12 of the steel temporary beam from above and to straddle it, the width of the U-shaped opening 6 is set to be equal to the beam portion 12 of the steel temporary beam. Is set so that the projection 7 at the tip of the A protrusion 4 can be easily inserted. After the projection 7 of the A projecting portion is displaced and the single tube mounting seat 1 is placed on the beam portion 12 of the temporary steel beam, the single tube mounting is performed using the set screw 8 provided on the B projecting portion. The seat 1 is firmly fixed to the beam portion 12 of the temporary steel beam.

固定が完了したら、短い単管2に2連単管クランプ14を用いて作業床構築用単管11を取り付ける。すなわち、単管取付用座の短い単管2が、作業床構築用単管取付の基点になる。あとは、作業床構築用単管11に足場板13を固定すればよい。   When the fixing is completed, the work floor construction single pipe 11 is attached to the short single pipe 2 using the double single pipe clamp 14. That is, the single pipe 2 having a short single pipe mounting seat is a base point for mounting the single pipe for constructing the work floor. After that, the scaffolding plate 13 may be fixed to the work floor construction single pipe 11.

基点となる短い単管2に2連単管クランプ14を用いて作業床構築用単管11を取り付ける作業は、まさに作業員誰でもが習熟している技能である。その作業床構築用の単管に足場板13を固定する作業もまた、作業員誰もが習熟している技能である。すなわち、作業員が習熟している技能のみを用いて作業床を構築することができる。   The work of attaching the single pipe 11 for constructing the work floor to the short single pipe 2 serving as the base point by using the double single pipe clamp 14 is a skill that every worker is familiar with. The work of fixing the scaffolding plate 13 to the single pipe for constructing the work floor is also a skill that all workers are familiar with. In other words, the work floor can be constructed using only the skills that the worker has mastered.

なお、図2では、作業床構築用単管11に足場板13を固定するに当たって番線15を用いて固縛しているが、公開実用新案平1−163642号公報に記載されている「足場板固定金具」等の治具を用いても良い。いずれにせよ、作業員が習熟している方法をとることが肝要である。   In FIG. 2, the scaffolding plate 13 is secured to the single pipe 11 for constructing the work floor by using the wire 15, but the “scaffolding plate” described in the published utility model No. 1-163642 is disclosed. A jig such as a “fixing bracket” may be used. In any case, it is important to adopt a method that workers are familiar with.

また、図1と図2は、鋼製仮設梁の外ビームのビーム部分に単管取付用座1を取り付けた様子を示している。鋼製仮設梁は、図4に示すように外ビーム16と内ビーム18を組み合わせた構造になっており、仮設するスパンに合わせて全体の長さを調節できるように外ビームのビーム部分17に内ビームのビーム部分19がはめ込まれてスライドできる構造になっている。したがって、外ビームのビーム部分17と内ビームのビーム部分19では、後者が前者に比べてやや小さい寸法となるが、それぞれの寸法の合わせて単管取付用座を制作しても良いし、外ビームのビーム部分用に制作した単管取付用座の止めねじ8を締め込んで、内ビームのビーム部分19に対応しても良い。   1 and 2 show a state in which the single tube mounting seat 1 is attached to the beam portion of the outer beam of the steel temporary beam. The steel temporary beam has a structure in which the outer beam 16 and the inner beam 18 are combined as shown in FIG. 4, and the entire beam length 17 can be adjusted in accordance with the temporary span. The beam portion 19 of the inner beam is fitted and slidable. Therefore, in the beam portion 17 of the outer beam and the beam portion 19 of the inner beam, the latter has a slightly smaller size than the former. The set screw 8 for the single tube mounting seat produced for the beam portion of the beam may be tightened to correspond to the beam portion 19 of the inner beam.

図3は、本発明の実施例2の単管取付用座1aの側面図である。実施例1と同じ機能を有し、ほぼ同じ形態を有する構成要素には、理解を容易にするために同じ名称と同じ付番を使用して説明する。     FIG. 3 is a side view of the single tube mounting seat 1a according to the second embodiment of the present invention. Components having the same functions as those of the first embodiment and having almost the same form will be described using the same names and the same numbers for easy understanding.

この単管取付用座1aは、H型鋼20のフランジ21上に載置するためのものであり、その主要な構成は実施例1の単管取付用座1と変わらない。作業床構築用の単管を固定する短い単管2と、その短い単管の両端に溶接等により固定された2枚の板材3から成っており、その2枚の板材はそれぞれ、H型鋼20のフランジ21を抱え込む形の突起7を有する下向きのA突出部4と、そのフランジ21をA突出部に押しつけて固定する止めねじ8を有する下向きのB突出部5とが設けられている。単管取付用座1aの正面図は、図1(a)とほぼ変わらないので省略した。   This single pipe mounting seat 1a is for mounting on the flange 21 of the H-shaped steel 20, and its main configuration is the same as the single pipe mounting seat 1 of the first embodiment. It consists of a short single pipe 2 for fixing a single pipe for constructing a work floor, and two plate members 3 fixed to both ends of the short single pipe by welding or the like. Each of the two plate members is an H-shaped steel 20. A downward A protrusion 4 having a projection 7 that holds the flange 21 and a downward B protrusion 5 having a set screw 8 that presses and fixes the flange 21 against the A protrusion are provided. The front view of the single tube mounting seat 1a is omitted because it is almost the same as FIG. 1 (a).

この単管取付用座1aは、既に建設された建造物のH形鋼で出来た梁のフランジ、あるいは、その梁の上に架け渡された鋼材のフランジに用いられるので、A突出部4とB突出部5で形成される下向きコの字型の開口6の寸法は、設置対象となるH型鋼のフランジ21の寸法に対応して決定される。ほぼ寸法が固定されている鋼製仮設梁のビーム部分に比べ、H形鋼のフランジの寸法は多種類に及ぶので、使用対象となるH形鋼の寸法に合わせて単管取付用座1aの寸法も多種類になろう。   The single pipe mounting seat 1a is used for a flange of a beam made of H-shaped steel of a building that has already been constructed, or a flange of a steel material spanned over the beam. The dimension of the downward U-shaped opening 6 formed by the B protrusion 5 is determined in accordance with the dimension of the flange 21 of the H-shaped steel to be installed. Compared to the beam part of a steel temporary beam, the dimensions of which are almost fixed, the H-shaped flange has a wide variety of flange dimensions, so the single pipe mounting seat 1a can be adapted to the dimensions of the H-shaped steel to be used. There will be many different dimensions.

図4は、本発明の作業床構築方法を示す説明図である。このケースでは、柱24、梁25、26、27等からなる既設の建造物があって、その梁25とその手前側に梁25に並行して走る梁(図示されていない)の間の空間に作業床を設けようとしている。   FIG. 4 is an explanatory diagram showing the work floor construction method of the present invention. In this case, there is an existing building composed of columns 24, beams 25, 26, 27, etc., and the space between the beam 25 and a beam (not shown) that runs parallel to the beam 25 on the near side. Is trying to provide a work floor.

しかし、梁25とそれに並行して走る梁との間隔が広く、その間に単管を掛け渡したのでは作業床にかかる荷重を支えきれないので、本実施例では梁25に平行して鋼製仮設梁28を設置している。必要とされる作業床の広さに応じて、1本だけでなく、数本の鋼製仮設梁を平行して設けても良い。   However, the distance between the beam 25 and the beam running in parallel with the beam 25 is wide, and if a single pipe is spanned between them, the load applied to the work floor cannot be supported. Temporary beams 28 are installed. Depending on the required working floor area, not only one but several steel temporary beams may be provided in parallel.

鋼製仮設梁28は、外ビーム16のビーム部分17に内ビーム18のビーム部分19がはめ込まれてスライドできる構造になっており、掛け渡される梁間のスパンに合わせてその長さを調節し、端部に設けられた爪部16aにより、しっかりと梁27に固定できる。なお、内ビーム18の端部(図示されていない)にも、外ビームと同様な爪部が設けられており、図4の右方向に梁27と平行して走る梁(図示されていない)にその爪部によってしっかりと固定される。   The steel temporary beam 28 has a structure in which the beam portion 19 of the inner beam 18 is fitted to the beam portion 17 of the outer beam 16 and is slidable. The length of the steel temporary beam 28 is adjusted according to the span between the spanned beams. The claw portion 16a provided at the end can firmly fix the beam 27. A claw similar to the outer beam is also provided at the end (not shown) of the inner beam 18, and a beam (not shown) that runs parallel to the beam 27 in the right direction of FIG. It is firmly fixed by the nail part.

足場板13の長さを考えて作業床構築用単管11の配置を決め、それを固定する位置に単管取付用座を配置する。鋼製仮設梁28の上には実施例1の単管取付用座1を、H形鋼の梁25の上には実施例2の単管取付用座1aを配置し、それぞれのB突出部の止めねじを使って、しっかりと固定する。   Considering the length of the scaffold plate 13, the arrangement of the work floor construction single pipe 11 is determined, and the single pipe mounting seat is arranged at a position where it is fixed. The single-tube mounting seat 1 of the first embodiment is disposed on the steel temporary beam 28, and the single-tube mounting seat 1a of the second embodiment is disposed on the H-shaped steel beam 25. Use the setscrews to secure them firmly.

これらの単管取付用座1、1aに、2連単管クランプを用いて作業床構築用単管11を取付け、その上に足場板13を並べ、番線15などの固定手段で作業床構築用単管11と足場板13を固定すれば、しっかりとした作業床が構築できる。   A single pipe 11 for working floor construction is attached to these single pipe mounting seats 1, 1 a using a double single pipe clamp, a scaffolding plate 13 is arranged on the single pipe 11, and work floor construction is performed by fixing means such as a wire 15. If the single tube 11 and the scaffolding plate 13 are fixed, a solid work floor can be constructed.

ここで使われるのは、作業員全員が習熟している単管同士を2連単管クランプでつなぎあわせ、そこに足場板を固定して足場を構築する技能のみである。習熟している技能のみを用いて作業を行えると言うことは、作業の効率と安全性の向上に寄与する。   Only the skill to connect the single pipes that all the workers are familiar with with two single pipe clamps and fix the scaffolding board there to build the scaffolding is used. The fact that work can be performed using only the skill that has been learned contributes to the improvement of work efficiency and safety.

また、単管取付用座1、1aは、極めて高い信頼性を持って鋼製仮設梁のビーム等に固定されているから、この面からも、作業床構築作業は安全に、かつ、効率よく行われ、信頼性の高い丈夫な作業床を作り出すことが出来る。   In addition, since the single tube mounting seats 1 and 1a are fixed to a beam of a steel temporary beam with extremely high reliability, the work floor construction work can be performed safely and efficiently from this aspect. It is possible to create a reliable and durable work floor.

1、1a 単管取付用座
2 単管取付用座の短い単管
3 同 2枚の板材
4 同 A突出部
5 同 B突出部
6 同 下向きコの字形開口
7 A突出部の突起
8 B突出部の止めねじ
11 作業床構築用単管
12 鋼製仮設梁のビーム
13 足場板
14 2連単管クランプ
15 番線
16 鋼製仮設梁の外ビーム
17 外ビームのビーム部分
18 鋼製仮設梁の内ビーム
19 内ビームのビーム部分
24 既設建造物の柱
25、26、27 既設建造物の梁
28 鋼製仮設梁
1, 1a Single tube mounting seat 2 Single tube short single tube mounting plate 3 Same 2 sheets 4 Same A protrusion 5 Same B protrusion 6 Same Downward U-shaped opening 7 A Protrusion protrusion 8 B protrusion Set screw 11 Single pipe for work floor construction 12 Beam of steel temporary beam 13 Scaffold plate 14 Duplex single pipe clamp 15 Wire 16 Outer beam of steel temporary beam
17 Beam portion of outer beam 18 Inner beam of steel temporary beam 19 Beam portion of inner beam 24 Pillars 25, 26, 27 of existing building Beam 28 of existing building Steel temporary beam

Claims (2)

鋼製仮設梁のビーム部分やH型鋼のフランジ(以下「鋼製仮設梁のビーム等」と言う)に単管パイプ(以下「単管」と言う)を取り付けるための単管取付用座であって、
短い単管と、その両端に固定された2枚の板材を有し、
該2枚の板材それぞれに、該単管取付用座を該鋼製仮設梁のビーム等の上に載置したときに、該鋼製仮設梁のビーム等を抱え込む形の突起を有する下向きのA突出部と、該鋼製仮設梁のビーム等を該A突出部に押しつけて固定する止めねじを有する下向きのB突出部とが設けられた単管取付用座。
This is a single pipe mounting seat for attaching a single pipe (hereinafter referred to as “single pipe”) to a beam part of a steel temporary beam or a flange of an H-shaped steel (hereinafter referred to as “beam of a steel temporary beam”). And
It has a short single pipe and two plates fixed to both ends.
Each of the two plate members has a downward A having a projection that holds the beam of the steel temporary beam when the single tube mounting seat is placed on the beam of the steel temporary beam. A single-tube mounting seat provided with a projecting portion and a downward B projecting portion having a set screw for pressing and fixing the beam of the steel temporary beam against the A projecting portion.
請求項1記載の単管取付用座を鋼製仮設梁のビーム等に固定し、前記短い単管に2連の直交単管クランプ、あるいは、自在単管クランプ(以下「2連単管クランプ」と言う)を用いて単管を取付け、該取り付けられた単管に足場板を固定して、作業用の床(以下「作業床」と言う)を構築する方法。   The single tube mounting seat according to claim 1 is fixed to a beam or the like of a temporary steel beam, and two short single tube clamps or a universal single tube clamp (hereinafter referred to as “double single tube clamp”) is attached to the short single tube. A single pipe is attached to the attached single pipe, and a scaffolding plate is fixed to the attached single pipe to construct a work floor (hereinafter referred to as “work floor”).
JP2014142867A 2014-07-11 2014-07-11 Single tube mounting seat for temporary steel beam, etc. and work floor construction method using the same Active JP6327985B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014142867A JP6327985B2 (en) 2014-07-11 2014-07-11 Single tube mounting seat for temporary steel beam, etc. and work floor construction method using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014142867A JP6327985B2 (en) 2014-07-11 2014-07-11 Single tube mounting seat for temporary steel beam, etc. and work floor construction method using the same

Publications (2)

Publication Number Publication Date
JP2016017381A true JP2016017381A (en) 2016-02-01
JP6327985B2 JP6327985B2 (en) 2018-05-23

Family

ID=55232805

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014142867A Active JP6327985B2 (en) 2014-07-11 2014-07-11 Single tube mounting seat for temporary steel beam, etc. and work floor construction method using the same

Country Status (1)

Country Link
JP (1) JP6327985B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7029920B2 (en) 2017-10-06 2022-03-04 株式会社日立産機システム Transformer

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4727029U (en) * 1971-04-07 1972-11-27
JPS5123323U (en) * 1974-08-08 1976-02-20
JPS51139600U (en) * 1975-04-30 1976-11-10
JPS53639U (en) * 1976-06-22 1978-01-06
JPS62638U (en) * 1985-06-18 1987-01-06
JPS6290469A (en) * 1985-10-15 1987-04-24 佐藤工業株式会社 Bridge stand hanging method and jig
US6173809B1 (en) * 1998-03-25 2001-01-16 Mc Enterprises International, Inc. Safety stanchions
JP2002295005A (en) * 2001-03-29 2002-10-09 Soken Sangyo Kk Steel framed suspended scaffold exchanging method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4727029U (en) * 1971-04-07 1972-11-27
JPS5123323U (en) * 1974-08-08 1976-02-20
JPS51139600U (en) * 1975-04-30 1976-11-10
JPS53639U (en) * 1976-06-22 1978-01-06
JPS62638U (en) * 1985-06-18 1987-01-06
JPS6290469A (en) * 1985-10-15 1987-04-24 佐藤工業株式会社 Bridge stand hanging method and jig
US6173809B1 (en) * 1998-03-25 2001-01-16 Mc Enterprises International, Inc. Safety stanchions
JP2002295005A (en) * 2001-03-29 2002-10-09 Soken Sangyo Kk Steel framed suspended scaffold exchanging method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7029920B2 (en) 2017-10-06 2022-03-04 株式会社日立産機システム Transformer

Also Published As

Publication number Publication date
JP6327985B2 (en) 2018-05-23

Similar Documents

Publication Publication Date Title
US20170260810A1 (en) Scaffold accessories
JP2016056639A (en) Wall-tie installation structure
CN111247299A (en) Suspension safety system
JP6327985B2 (en) Single tube mounting seat for temporary steel beam, etc. and work floor construction method using the same
JP2018062853A (en) Ceiling substrate structure
JP6207317B2 (en) Ceiling structure
JP2020165232A (en) Anchor member and installation method
JP2010019055A (en) Clamping mechanism
JP5334707B2 (en) Reinforcement method of beams in wooden buildings
JP6174483B2 (en) Hanging unit jig, manufacturing method of hanging unit jig, hanging method, center jig and end jig
JP2007132099A (en) Base metal fixture for scaffold
JP3204834U (en) Mounting structure of master strut for column beam
WO2013015693A1 (en) Method for installation of a pipe based system, and a pipe based system particularly suitable for the method
JP6150872B2 (en) Seat mounting device for temporary buildings
KR100909361B1 (en) Pipe supporting structure
JP2011106126A (en) Working scaffold with supplementary panel
KR101454643B1 (en) scaffold pipe with connector
JP2009079620A (en) Joint
KR20180009062A (en) Shore and building scaffolds combined horizontal support bars
JP6109219B2 (en) Temporary scaffold
JP7409780B2 (en) Hanging equipment for hanging scaffolds and hanging scaffolding
JP6165420B2 (en) Seismic reinforcement structure and method using compression braces
JP6068852B2 (en) Collapse prevention jig
JP2017227096A (en) Slide mechanism to move pipe or scaffold board used for assembling scaffold around structure forward
JP5269147B2 (en) Scaffolding plate support device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170426

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180228

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180410

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180417

R150 Certificate of patent or registration of utility model

Ref document number: 6327985

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250