JP2015154637A - Power supply system and program for the same - Google Patents

Power supply system and program for the same Download PDF

Info

Publication number
JP2015154637A
JP2015154637A JP2014027538A JP2014027538A JP2015154637A JP 2015154637 A JP2015154637 A JP 2015154637A JP 2014027538 A JP2014027538 A JP 2014027538A JP 2014027538 A JP2014027538 A JP 2014027538A JP 2015154637 A JP2015154637 A JP 2015154637A
Authority
JP
Japan
Prior art keywords
smoothing
total demand
time
degree
current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2014027538A
Other languages
Japanese (ja)
Other versions
JP6262011B2 (en
Inventor
郁夫 山田
Ikuo Yamada
郁夫 山田
欣雅 多田
Yoshimasa Tada
欣雅 多田
忠 市川
Tadashi Ichikawa
忠 市川
永田 淳一
Junichi Nagata
淳一 永田
智生 中山
Tomoo Nakayama
智生 中山
真二 谷川
Shinji Tanigawa
真二 谷川
藤井 剛
Takeshi Fujii
剛 藤井
一成 真木
Kazunari Maki
一成 真木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Chugoku Electric Power Co Inc
Original Assignee
Toshiba Corp
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp, Chugoku Electric Power Co Inc filed Critical Toshiba Corp
Priority to JP2014027538A priority Critical patent/JP6262011B2/en
Publication of JP2015154637A publication Critical patent/JP2015154637A/en
Application granted granted Critical
Publication of JP6262011B2 publication Critical patent/JP6262011B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a power supply system and its program capable of suppressing influence of a fringe component by changing its degree of smoothing so as to weaken the degree of smoothing the current total demand in the case that steep change in a long period occurs and strengthen the degree in the case other than the occurrence of the steep change.SOLUTION: A power supply system comprises: a current total demand calculation unit 31 for calculating current total demand 51 from current power generation output of a power generator 10; a smoothing unit 32 for smoothing the current total demand 51 to calculate smoothed current total demand 52; a smoothing degree change unit 33 for changing a smoothing degree of the smoothing unit 32; a prediction total demand curve change unit 34 for calculating a modified prediction total demand curve 54 by modifying a prediction total demand curve so that the prediction total demand curve agrees with the smoothed current total demand 52 at current time; and a power generator control unit 35 for calculating power generator output to maintain power supply/demand balance, from the modified prediction total demand curve 54 and the current power generation output of the power generator 10.

Description

本発明の実施形態は、電力系統に設置される発電機の出力を制御する給電システム及びそのプログラムに関する。   Embodiments described herein relate generally to a power supply system that controls the output of a generator installed in a power system and a program therefor.

電力の需要と供給のバランスを維持するために、電力系統に設置される発電機の出力を制御する給電システムが用いられている。給電システムでは、発電機の現在出力の情報から現在総需要を算定し、現在総需要を基に発電機出力指令値を算定し、発電機へ送信し発電機の出力値を制御している。   In order to maintain a balance between power demand and supply, a power feeding system that controls the output of a generator installed in a power system is used. In the power feeding system, the current total demand is calculated from the information on the current output of the generator, the generator output command value is calculated based on the current total demand, and is transmitted to the generator to control the output value of the generator.

一般に、需要には、数秒から数分の短周期で急峻に変動するフリンジ分と呼ばれる負荷成分が含まれる。発電機出力指令値の算定はこの成分を含む現在総需要に基づいて行われるため、この成分が発電機出力指令値に反映される。すなわち、このフリンジ分と呼ばれる負荷成分は発電機出力指令値のチャタリングやハンチングなどに表面化し、発電機の制御に悪影響を与える。そのため、従来の給電システムでは、現在総需要から短周期変動成分を除去する平滑化を行うことでフリンジ分の影響を除去していた。   Generally, the demand includes a load component called a fringe component that fluctuates sharply in a short cycle of several seconds to several minutes. Since the calculation of the generator output command value is performed based on the current total demand including this component, this component is reflected in the generator output command value. That is, the load component called the fringe component appears on the chattering or hunting of the generator output command value and adversely affects the control of the generator. Therefore, in the conventional power supply system, the influence of the fringe is removed by performing smoothing to remove the short-period fluctuation component from the current total demand.

特開2009―142107号公報JP 2009-142107 A

しかし、需要は、例えば平日の12時〜13時の時間帯など、ある程度長周期(十数分〜数十分)で急峻に変化する場合があり、この際に平滑化を実施すると、急峻な需要の変化に対して発電機の制御が遅れてしまう問題がある。すなわち、図10に示すように、十数分〜数十分で総需要が急峻に変化する場合に平滑化の程度が強いと、変化が緩和するように働く。その後平滑化後の総需要は実際の総需要の変化に追いつくが、発電機出力指令値は平滑化後の総需要に合わせて出力されるため、実際の総需要と異なるものに合わせるので発電機の制御が遅れてしまう。   However, the demand may change sharply to some extent with a long period (ten minutes to several tens of minutes), for example, a time zone from 12:00 to 13:00 on weekdays. There is a problem that the control of the generator is delayed with respect to a change in demand. That is, as shown in FIG. 10, when the total demand changes sharply after a few tens of minutes to several tens of minutes, if the degree of smoothing is strong, the change works. After that, the total demand after smoothing out catches up with the change in the actual total demand, but the generator output command value is output according to the total demand after smoothing, so it matches the actual total demand, so the generator Control will be delayed.

そのため、平滑化の程度を一定にしかできない従来の給電システムでは、現在総需要の長周期の急峻な変化に対して発電機制御に遅れの影響がないように、平滑化の程度を弱める必要があった。しかし、平滑化の程度を弱めた状態で平滑化すると、フリンジ分の影響が大きい系統では、フリンジ分の影響を十分に取り除くことができなかった。   Therefore, in a conventional power supply system that can only keep the degree of smoothing constant, it is necessary to weaken the degree of smoothing so that there is no delay effect on the generator control with respect to the sudden change in the long cycle of the current total demand. there were. However, if smoothing is performed in a state where the degree of smoothing is weakened, the influence of the fringe cannot be sufficiently removed in a system having a large influence of the fringe.

本実施形態に係る給電システムは、上記のような課題を解決するためになされたものであり、長周期の急峻な変化が生ずる場合には現在総需要の平滑化の程度を弱め、それ以外の場合には強めるように変更することで、フリンジ分による影響を抑制できる給電システム及びそのプログラムを提供することを目的とする。   The power supply system according to the present embodiment has been made to solve the above-described problems. When a long-cycle sharp change occurs, the degree of smoothing of the current total demand is weakened. It is an object of the present invention to provide a power feeding system and a program for the power feeding system that can suppress the influence due to the fringe component by changing to be strengthened in some cases.

上記の目的を達成するために、本実施形態の給電システムは、電力系統のある時刻における電力の総需要と、前記電力系統において予測される予想総需要曲線とに基づいて電力の需給バランスを維持するように前記電力系統に設置された発電機を制御する給電システムにおいて、前記電力系統の前記時刻における総需要を算定する総需要算定手段と、算定した前記総需要を平滑化し、平滑化後総需要を算定する平滑化手段と、前記平滑化の程度を変更する平滑化程度変更手段と、前記予想総需要曲線が前記時刻において前記平滑化後総需要と一致するように前記予想総需要曲線を修正し、修正後予想総需要曲線を算定する予想総需要曲線変更手段と、前記修正後予想総需要曲線に基づいて電力需給バランスを維持する発電機出力を算定する発電機制御手段と、を備えたことを特徴とする。   In order to achieve the above object, the power supply system of the present embodiment maintains a power supply-demand balance based on the total power demand at a certain time of the power system and the predicted total demand curve predicted in the power system. In the power supply system for controlling the generator installed in the electric power system, total demand calculating means for calculating the total demand at the time of the electric power system, and smoothing the calculated total demand, A smoothing means for calculating demand; a smoothing degree changing means for changing the degree of smoothing; and the predicted total demand curve so that the predicted total demand curve coincides with the smoothed total demand at the time. A revised forecast total demand curve changing means for calculating a revised forecast total demand curve, and a generator for calculating a generator output that maintains a power supply-demand balance based on the revised forecast total demand curve. A machine control unit, characterized by comprising a.

また、時間帯と平滑化程度との対応関係を記憶した記憶手段を更に備えた前記給電システムに用いられるプログラムも本発明の一態様である。   In addition, a program used in the power supply system further including a storage unit that stores a correspondence relationship between the time zone and the smoothing degree is also an aspect of the present invention.

第1の実施形態に係る給電システムの全体構成を示すブロック図である。1 is a block diagram illustrating an overall configuration of a power feeding system according to a first embodiment. 時間帯と時定数との対応関係を示す時定数テーブルの図である。It is a figure of the time constant table which shows the correspondence of a time slot | zone and a time constant. 第1の実施形態に係る給電システムの動作を示すフローチャートである。It is a flowchart which shows operation | movement of the electric power feeding system which concerns on 1st Embodiment. 第2の実施形態に係る給電システムの全体構成を示すブロック図である。It is a block diagram which shows the whole structure of the electric power feeding system which concerns on 2nd Embodiment. 時間帯と所定の気象条件との組み合わせと、時定数との対応関係を示す時定数テーブルの図である。It is a figure of the time constant table which shows the correspondence of the combination of a time slot | zone and predetermined weather conditions, and a time constant. 第3の実施形態に係る給電システムの全体構成を示すブロック図である。It is a block diagram which shows the whole structure of the electric power feeding system which concerns on 3rd Embodiment. 第3の実施形態の変形例に係る給電システムの全体構成を示すブロック図である。It is a block diagram which shows the whole structure of the electric power feeding system which concerns on the modification of 3rd Embodiment. 第4の実施形態に係る給電システムの全体構成を示すブロック図である。It is a block diagram which shows the whole structure of the electric power feeding system which concerns on 4th Embodiment. 第4の実施形態に係る給電システムの動作を説明するための図である。It is a figure for demonstrating operation | movement of the electric power feeding system which concerns on 4th Embodiment. 急峻な需要の変化に対する平滑化により総需要の変化を説明するための図である。It is a figure for demonstrating the change of a total demand by smoothing with respect to the change of a steep demand.

[第1の実施形態]
(概略構成)
以下では、図1および図2を参照しつつ、本実施形態の給電システムの全体構成を説明する。図1は、本実施形態の給電システムの全体構成を示すブロック図である。
[First Embodiment]
(Outline configuration)
Below, the whole structure of the electric power feeding system of this embodiment is demonstrated, referring FIG. 1 and FIG. FIG. 1 is a block diagram showing the overall configuration of the power feeding system of the present embodiment.

本実施形態の給電システムは、電力系統に設置されている発電機11、12、…1n(以下、纏めて言う場合には単に発電機10とする)の現在出力情報を受信し、その情報に基づいて算定した現在総需要51と、予め想定された予想総需要曲線とに基づいて電力の需給バランスを維持するように発電機10を制御する。   The power feeding system of the present embodiment receives current output information of generators 11, 12,... 1n (hereinafter simply referred to as generator 10 when collectively referred to) installed in the power system, and includes the information Based on the current total demand 51 calculated based on the predicted total demand curve assumed in advance, the generator 10 is controlled so as to maintain the power supply-demand balance.

本給電システムは、単一のコンピュータ又はネットワーク接続された複数のコンピュータを含み構成されている。本給電システムは、プログラムをHDDやSSD等に記憶しており、RAMに適宜展開し、CPUで処理することにより、発電機10の現在出力情報から現在総需要51の算定や、その現在総需要51の平滑化処理、発電機10への出力指令値の算定等を行う。   The power supply system includes a single computer or a plurality of computers connected via a network. This power supply system stores a program in an HDD, an SSD, etc., is appropriately expanded in a RAM, and processed by the CPU, thereby calculating the current total demand 51 from the current output information of the generator 10 and the current total demand. 51 smoothing processing, calculation of the output command value to the generator 10, etc. are performed.

具体的には、本給電システムは、情報伝送装置30と、現在総需要算定部31と、平滑化部32と、平滑化程度変更部33と、予想総需要曲線修正部34と、発電機制御部35と、を備えている。   Specifically, the power supply system includes an information transmission device 30, a current total demand calculation unit 31, a smoothing unit 32, a smoothing degree changing unit 33, an expected total demand curve correcting unit 34, and a generator control. Part 35.

(詳細構成)
情報伝送装置30は、本給電システムと、電力系統に設置された各発電機11、12、…1nとをつなぐものである。すなわち、情報伝送装置30は、各発電機11、12、…1nの現在出力を受信可能に構成され、また発電機制御部35が算定する発電機出力指令値55を各発電機11、12、…1nに送信可能に構成されている。情報伝送装置30は、メモリを含み構成され、各発電機11、12、…1nから受信した現在出力を発電機現在出力(以下、纏めて言う場合には単に発電機現在出力50という)としてメモリに記憶する。また、情報伝送装置30は、現在総需要算定部31及び発電機制御部35と接続されており、これらに発電機現在出力50を送信する。
(Detailed configuration)
The information transmission device 30 connects the power feeding system and the generators 11, 12,... 1n installed in the power system. That is, the information transmission device 30 is configured to be able to receive the current output of each of the generators 11, 12,... 1 n, and the generator output command value 55 calculated by the generator control unit 35 is set to each of the generators 11, 12, ... configured to transmit to 1n. The information transmission device 30 includes a memory, and the current output received from each of the generators 11, 12,... 1 n is stored as a generator current output (hereinafter simply referred to as a “generator current output 50”). To remember. The information transmission device 30 is connected to the current total demand calculation unit 31 and the generator control unit 35, and transmits the generator current output 50 to them.

現在総需要算定部31は、主にプロセッサを含み構成され、情報伝送装置30から入力されたそれぞれの発電機現在出力50を加算し、現在総需要51を算定する。現在総需要算定部31は、平滑化部32と接続され、算定した現在総需要51を平滑化部32に出力する。   The current total demand calculation unit 31 is configured mainly including a processor, and calculates the current total demand 51 by adding the respective generator current outputs 50 input from the information transmission device 30. The current total demand calculation unit 31 is connected to the smoothing unit 32 and outputs the calculated current total demand 51 to the smoothing unit 32.

平滑化部32は、コンピュータを含み構成されたローパスフィルタであり、現在総需要51を平滑化して平滑化後現在総需要52を算定し、この平滑化後現在総需要52を予想総需要曲線修正部34に出力する。   The smoothing unit 32 is a low-pass filter configured to include a computer, smoothes the current total demand 51 to calculate a current total demand 52 after smoothing, and corrects the current total demand 52 after smoothing to an expected total demand curve correction. To the unit 34.

ローパスフィルタは、デジタルフィルタであり、例えば、抵抗器やコンデンサによるアナログのRC回路をデジタルに変換した1次遅れのデジタルフィルタや、移動平均フィルタを用いることができ、ソフトウェアとしてコンピュータに実装されている。   The low-pass filter is a digital filter. For example, a first-order lag digital filter obtained by converting an analog RC circuit using a resistor or a capacitor into a digital signal or a moving average filter can be used, and is implemented in a computer as software. .

このローパスフィルタは、後述する平滑化程度変更部33により設定された平滑化の程度に基づいて、現在総需要51からこれに含まれるフリンジ分を除去する。すなわち、平滑化とは、現在総需要51の短周期変動成分を除去することをいい、この現在総需要51には、数秒から数分の短周期の変動成分であるフリンジ分が含まれている。   This low-pass filter removes the fringes included in the current total demand 51 based on the smoothing degree set by the smoothing degree changing unit 33 described later. That is, smoothing means removing the short cycle fluctuation component of the current total demand 51, and the current total demand 51 includes a fringe component that is a short cycle fluctuation component of several seconds to several minutes. .

平滑化の程度は、遮断周波数により定められ、遮断周波数は時定数として与えられる。すなわち、遮断周波数は時定数と反比例の関係にあり、本実施形態では時定数により平滑化の程度が定められる。   The degree of smoothing is determined by the cutoff frequency, which is given as a time constant. That is, the cutoff frequency has an inversely proportional relationship with the time constant, and in this embodiment, the degree of smoothing is determined by the time constant.

平滑化程度変更部33は、所定の基準に応じて平滑化部32の平滑化の程度(時定数)を変更する。本実施形態の変更基準は、現在時刻である。すなわち、平滑化程度変更部33は、時計等により現在時刻を検知可能に構成されているとともに、メモリ33aを含み構成されている。このメモリ33aには、図2に示すように、各時間帯に対して時定数τ1〜τ24が定められたテーブルが予め記憶されている。この時定数テーブルには、長周期の急峻な変動をする時間帯においては平滑化の程度を弱める値が予め設定され、それ以外の時間帯(例えば、短周期で変動する時間帯や変動があまりない時間帯など)では平滑化の程度を強める値が予め設定されている。   The smoothing degree changing unit 33 changes the smoothing degree (time constant) of the smoothing unit 32 according to a predetermined standard. The change criterion of this embodiment is the current time. That is, the smoothing degree changing unit 33 is configured to be able to detect the current time using a clock or the like, and includes a memory 33a. As shown in FIG. 2, the memory 33a stores in advance a table in which time constants τ1 to τ24 are determined for each time zone. In this time constant table, values that weaken the degree of smoothing are set in advance in the time period in which the long period is steeply changed, and other time periods (for example, the time period that fluctuates in the short period and the fluctuation are not so much). In a non-elapsed time zone, etc.), a value for increasing the degree of smoothing is set in advance.

なお、各時間帯の時定数は、次のように定めることができる。すなわち、過去の需要実績から一日における需要の変動パターンは時間帯だけでも概ね把握することができるので、そのパターンに基づいて決めた各時間帯の時定数をテーブルとしてメモリ33aに予め設定しておくことができる。   In addition, the time constant of each time slot | zone can be defined as follows. That is, since the fluctuation pattern of the demand in one day can be roughly grasped only from the time zone based on the past demand results, the time constant of each time zone determined based on the pattern is preset in the memory 33a as a table. I can leave.

本明細書において、平滑化の程度を弱める、若しくは強めるとは、現在時刻が含まれる時間帯の時定数と、その前の時間帯の時定数との関係で決めるものとする。すなわち、現在時刻が含まれる時間帯の時定数が、その前の時間帯の時定数より小さい場合、遮断周波数は大きくなるので「平滑化の程度を弱める」といい、現在時刻が含まれる時間帯の時定数が、その前の時間帯の時定数より大きい場合、遮断周波数は小さくなるので「平滑化の程度を強める」という。   In this specification, reducing or increasing the degree of smoothing is determined by the relationship between the time constant of the time zone including the current time and the time constant of the previous time zone. That is, if the time constant of the time zone that includes the current time is smaller than the time constant of the previous time zone, the cut-off frequency will increase, so it is said to “reduce the degree of smoothing”. The time zone that includes the current time If the time constant of is greater than the time constant of the previous time zone, the cutoff frequency becomes smaller, so “increase the degree of smoothing”.

また、平滑化程度変更部33は、現在時刻がどの時間帯に属するかを判定する時間帯判定部33bを備えている。平滑化程度変更部33は、時間帯判定部33bにより、検知した現在時刻が属する時間帯を判定し、メモリ33aの時定数のテーブルからその時間帯に対応する時定数を得る。   In addition, the smoothing degree changing unit 33 includes a time zone determining unit 33b that determines which time zone the current time belongs to. The smoothing degree changing unit 33 uses the time zone determining unit 33b to determine the time zone to which the detected current time belongs, and obtains a time constant corresponding to the time zone from the table of time constants in the memory 33a.

本実施形態では、平滑化程度変更部33は、時間帯判定部33bが判定した時間帯をその現在時刻に対応させてメモリ33aに順次記憶させておく。これにより、平滑化程度変更部33は、時間帯判定部33bが判定した時間帯が、その直前に判定した時間帯と同一か否かを判定する。同一時間帯である場合には、時定数は同じなので平滑化部32に出力せず、異なる時間帯である場合には、時定数が異なるため、その時定数を平滑化部32に出力する。このように、現在時刻を指標としてこの時刻が含まれる時間帯に対応する時定数を取得し、平滑化部32の平滑化程度を変更させる。   In the present embodiment, the smoothing degree changing unit 33 sequentially stores the time zone determined by the time zone determining unit 33b in the memory 33a in association with the current time. Thereby, the smoothing degree changing unit 33 determines whether or not the time zone determined by the time zone determining unit 33b is the same as the time zone determined immediately before. When the time period is the same, the time constant is the same, so the time constant is not output to the smoothing unit 32. When the time period is different, the time constant is different, and the time constant is output to the smoothing unit 32. As described above, the time constant corresponding to the time zone including this time is obtained using the current time as an index, and the smoothing degree of the smoothing unit 32 is changed.

平滑化程度の変更の一例を示す。平日の11時〜14時の間において、12時〜13時に現在総需要51が急峻に変化し、それ以外であまり変化がない場合、11時〜12時の時間帯では時定数をτ12として平滑化の程度を強め、12時〜13時の時間帯では発電機10の制御の遅れを回避するため時定数をτ13と小さくして平滑化の程度を弱める。13時〜14時の時間帯では時定数をτ14として大きくし、平滑化の程度を強める。なお、時定数τ12とτ13、及び時定数τ13とτ14の大小関係はτ12>τ13、τ13<τ14である。   An example of the change of the smoothing degree is shown. If the current total demand 51 changes sharply between 11:00 and 14:00 on weekdays and between 12:00 and 13:00, and there is not much change other than that, the time constant is set to τ12 in the time zone from 11:00 to 12:00. In order to avoid the delay of control of the generator 10 in the time zone from 12:00 to 13:00, the time constant is reduced to τ13 and the degree of smoothing is weakened. In the time zone from 13:00 to 14:00, the time constant is increased as τ14 and the degree of smoothing is increased. It should be noted that the magnitude relationships of the time constants τ12 and τ13 and the time constants τ13 and τ14 are τ12> τ13 and τ13 <τ14.

時定数のテーブルは、上記では1時間おきの時間帯毎のものとしたが、これに限られず、11時52分〜12時52分のように、各時間帯の始期と終期は任意として良い。また、時間帯の長さも1時間に限らずそれより短くしても長くしても良く、さらに11時52分〜12時30分、12時30分〜14時45分のように、時間帯の長さを異なるようにしても良い。例えば、11時30分〜13時30分、及び14時30分〜16時の時間帯において、時定数は10分とし、これら以外の時間帯では時定数は30分とする。また、ある時間帯の終期とその次の時間帯の始期において、時定数が重複しないようにする。上記の例で示すと、12時ちょうどをτ12とせず、τ13とするとしても良く、その逆にしても良い。   In the above, the table of time constants is for every hour of every hour in the above, but is not limited to this, and the start and end of each time zone may be arbitrary, such as 11: 52-12: 52. . In addition, the length of the time zone is not limited to one hour, and it may be shorter or longer, and it may be longer from 11:52 to 12:30, from 12:30 to 14:45. The length may be different. For example, in the time zone from 11:30 to 13:30 and from 14:30 to 16:00, the time constant is 10 minutes, and in the other time zones, the time constant is 30 minutes. In addition, time constants are prevented from overlapping at the end of a certain time zone and the start of the next time zone. As shown in the above example, twelve o'clock may be set to τ13 instead of τ12, or vice versa.

このように、平滑化程度変更部33は、平滑化部32の時定数を現在時刻に応じた時定数に変更し、平滑化部32は、平滑化程度変更部33により設定された時定数に基づいて平滑化を行う。   As described above, the smoothing degree changing unit 33 changes the time constant of the smoothing unit 32 to a time constant corresponding to the current time, and the smoothing unit 32 changes the time constant set by the smoothing degree changing unit 33. Based on the smoothing.

予想総需要曲線修正部34は、主にプロセッサとメモリを含み構成され、予想しておいた予想総需要53と平滑化後現在総需要52とから予想総需要曲線を修正し、修正後予想総需要曲線54を算定する。算定に用いる予想総需要53は、例えば、予想総需要曲線として給電システム外部から入力されメモリに予め記憶されている。なお、給電システムが予想総需要53を予め算出し、メモリに記憶するようにしても良い。また、予想総需要曲線修正部34は、算定した修正後予想総需要曲線54を発電機制御部35に出力する。   The predicted total demand curve correction unit 34 mainly includes a processor and a memory, and corrects the predicted total demand curve from the predicted total demand 53 that has been predicted and the current total demand 52 that has been smoothed. The demand curve 54 is calculated. The predicted total demand 53 used for the calculation is input from the outside of the power feeding system, for example, as a predicted total demand curve and stored in the memory in advance. The power supply system may calculate the expected total demand 53 in advance and store it in the memory. Further, the predicted total demand curve correction unit 34 outputs the calculated corrected predicted total demand curve 54 to the generator control unit 35.

発電機制御部35は、発電機現在出力50から各発電機11、12、…、1nの出力上下限制約を算定するとともに、修正後予想総需要曲線54から総需要と発電機10の出力合計とを一致させつつ総燃料費が最小となるように発電機出力指令値55を算定する。これらの算定には公知の方法を採用することができる。発電機制御部35は、算定した発電機出力指令値55を、情報伝送装置30を介して発電機10に送信する。   The generator control unit 35 calculates the output upper and lower limit constraints of the generators 11, 12,..., 1n from the generator current output 50, and calculates the total demand and the total output of the generator 10 from the corrected predicted total demand curve 54. And the generator output command value 55 is calculated so that the total fuel cost is minimized. A known method can be adopted for these calculations. The generator control unit 35 transmits the calculated generator output command value 55 to the generator 10 via the information transmission device 30.

(動作)
このような給電システムの動作を以下に説明する。図3は、給電システムの動作を示すフローチャートである。なお、以下の説明では、平滑化部32の初期の平滑化の程度は予め設定されているものとする。また、図3のフローチャートの動作の順序は例示であり、本実施形態の動作は必ずしもこの順序に限定されるものではない。
(Operation)
The operation of such a power feeding system will be described below. FIG. 3 is a flowchart showing the operation of the power feeding system. In the following description, the initial smoothing level of the smoothing unit 32 is set in advance. Further, the order of operations in the flowchart of FIG. 3 is an exemplification, and the operation of the present embodiment is not necessarily limited to this order.

まず、情報伝送装置30は、各発電機11、12、…、1nから現在出力情報を受信し、これを現在総需要算定部31へ送信する(ステップS01)。現在総需要算定部31は、受信した発電機10の現在出力の加算により現在総需要51を算定し(ステップS02)、算定した現在総需要51を平滑化部32に送信する。   First, the information transmission device 30 receives current output information from each of the generators 11, 12,..., 1n, and transmits this to the current total demand calculation unit 31 (step S01). The current total demand calculation unit 31 calculates the current total demand 51 by adding the received current output of the generator 10 (step S02), and transmits the calculated current total demand 51 to the smoothing unit 32.

ここで、平滑化程度変更部33は、現在時刻を検知し、検知した現在時刻が含まれる時間帯を判定する(ステップS03)。次いで、判定した時間帯がその直前に判定した時間帯と同じか否かを判定する(ステップS04)。   Here, the smoothing degree changing unit 33 detects the current time and determines a time zone in which the detected current time is included (step S03). Next, it is determined whether or not the determined time zone is the same as the time zone determined immediately before (step S04).

異なる時間帯である場合は(ステップS04のNO)、現在時刻が含まれる時間帯に対応する時定数に変更する。すなわち、平滑化程度変更部33は、現在時刻が含まれる時間帯に対応する時定数を取得し、平滑化部32へ出力する(ステップS05)。平滑化部32は、その変更された時定数に基づいて現在総需要51を平滑化し、平滑化後現在総需要52を予想総需要曲線修正部34へ出力する(ステップS06)。一方、同一時間帯である場合は(ステップS04のYES)、時定数の変更はなく時定数を維持した状態で、現在総需要51を平滑化し、平滑化後現在総需要52を予想総需要曲線修正部34へ出力する(ステップS06)。   If the time zone is different (NO in step S04), the time constant is changed to a time zone corresponding to the time zone including the current time. That is, the smoothing degree changing unit 33 acquires a time constant corresponding to a time zone including the current time, and outputs the time constant to the smoothing unit 32 (step S05). The smoothing unit 32 smoothes the current total demand 51 based on the changed time constant, and outputs the current total demand 52 after smoothing to the predicted total demand curve correction unit 34 (step S06). On the other hand, if it is the same time zone (YES in step S04), the current total demand 51 is smoothed while the time constant is not changed and the time constant is maintained, and the smoothed current total demand 52 is calculated as the expected total demand curve. It outputs to the correction part 34 (step S06).

予想総需要曲線修正部34は、メモリから予想総需要曲線を取得し(ステップS07)、平滑化後現在総需要52を基に予想総需要曲線を修正し、修正後予想総需要曲線54を算定し、その算定結果を発電機制御部35に出力する(ステップS08)。   The predicted total demand curve correction unit 34 acquires the predicted total demand curve from the memory (step S07), corrects the predicted total demand curve based on the current total demand 52 after smoothing, and calculates the corrected predicted total demand curve 54. Then, the calculation result is output to the generator control unit 35 (step S08).

発電機制御部35は、情報伝送装置30から発電機現在出力50を受信し、この現在出力から発電機10の出力上下限制約を算定する(ステップS09)。さらに、この制約の中で、修正後予想総需要曲線54の総需要と発電機10の出力合計とを一致させつつ総燃料費が最小になるように発電機出力指定値55を算定し(ステップS10)、情報伝送装置30を介して発電機10に送信する(ステップS11)。以上のようにして、本給電システムは、電力の需給バランスを維持するように発電機10を制御する。   The generator control unit 35 receives the generator current output 50 from the information transmission device 30, and calculates the output upper and lower limit constraints of the generator 10 from this current output (step S09). Further, within this constraint, the generator output designated value 55 is calculated so that the total fuel cost is minimized while matching the total demand of the corrected expected total demand curve 54 and the total output of the generator 10 (step) S10), and transmits to the generator 10 via the information transmission device 30 (step S11). As described above, the power supply system controls the generator 10 so as to maintain a power supply / demand balance.

(作用・効果)
(1)本実施形態の給電システムは、特に平滑化部32と、平滑化程度変更部33とを備えており、平滑化の程度を所定の基準に応じて変更可能に構成されている。これにより、長周期の急峻な変動が発生する場合には現在総需要51の平滑化の程度を弱め、それ以外の場合には強めるように切り替えることができる。そのため、フリンジ分の影響が大きい系統であっても、長周期の急峻な変動に対しては、発電機10の制御遅延の影響を少なくしてフリンジ分を除去できるとともに、それ以外の場合に対してはフリンジ分の影響を十分に取り除くことのできる給電システムを得ることができる。
(Action / Effect)
(1) The power feeding system of the present embodiment includes a smoothing unit 32 and a smoothing degree changing unit 33, and is configured to be able to change the degree of smoothing according to a predetermined standard. As a result, when a long-period steep fluctuation occurs, the level of smoothing of the current total demand 51 can be weakened, and in other cases, it can be switched to increase. For this reason, even if the system has a large influence on the fringe, it is possible to remove the fringe by reducing the influence of the control delay of the generator 10 for a long period of steep fluctuations. Thus, it is possible to obtain a power feeding system that can sufficiently eliminate the influence of the fringe.

(2)本実施形態では、対象とする時刻を現在時刻とし、現在総需要算定部31が発電機10の発電機現在出力50に基づいて現在総需要51を算定している。すなわち、供給量である発電機10の発電機現在出力50を需要とみなして総需要を算定している。これにより、電力系統における各需要者の需要量を取得する必要がなくなり、発電機の出力指令値の算定を円滑に行うことができる。 (2) In this embodiment, the target time is the current time, and the current total demand calculation unit 31 calculates the current total demand 51 based on the generator current output 50 of the generator 10. That is, the total demand is calculated by regarding the current output 50 of the generator 10 as the supply amount as demand. Thereby, it is not necessary to acquire the demand amount of each consumer in the power system, and the output command value of the generator can be calculated smoothly.

(3)本実施形態では、平滑化程度変更部33は、現在時刻と平滑化の程度(時定数)とを対応させた時定数テーブルを備えるようにした。この時定数テーブルは、長周期の急峻な変動をする時間帯においては平滑化の程度を弱める値に、それ以外の時間帯では平滑化の程度を強める値に予め設定するようにした。これにより、時刻に応じて平滑化の程度を変更することができる。 (3) In the present embodiment, the smoothing degree changing unit 33 includes a time constant table in which the current time is associated with the smoothing degree (time constant). This time constant table is set in advance to a value that weakens the degree of smoothing in a time zone in which a long-period steep fluctuation occurs, and to a value that increases the degree of smoothing in other time zones. Thereby, the degree of smoothing can be changed according to time.

[第2の実施形態]
(構成)
第2の実施形態について、図4及び図5を用いて説明する。第2の実施形態は、第1の実施形態と基本構成は同じである。第1の実施形態と異なる点のみを説明し、第1の実施形態と同じ部分については同じ符号を付して詳細な説明は省略する。
[Second Embodiment]
(Constitution)
A second embodiment will be described with reference to FIGS. 4 and 5. The basic configuration of the second embodiment is the same as that of the first embodiment. Only the differences from the first embodiment will be described, and the same parts as those in the first embodiment will be denoted by the same reference numerals and detailed description thereof will be omitted.

図4は、第2の実施形態に係る給電システムの全体構成を示すブロック図である。本実施形態の給電システムは、現在時刻や現在の気象データに合う過去の需要変動パターンに合わせて時定数の変更を行うものである。すなわち、本給電システムは、外部から日時、気温、天候等を含む現在の気象データを受信し後述の平滑化程度変更部37に送信する現在気象データ受信部36と、現在時刻や現在の気象データと、予め記録された過去需要実績データベース57から得られる過去の条件における十数分〜数十分程度の周期の需要変動の傾向とに基づいて、時定数を変更する平滑化程度変更部37とを備えている。   FIG. 4 is a block diagram illustrating an overall configuration of a power feeding system according to the second embodiment. The power supply system of the present embodiment changes the time constant according to the past demand fluctuation pattern that matches the current time and current weather data. That is, the present power supply system includes a current weather data receiving unit 36 that receives current weather data including date and time, temperature, weather, and the like from the outside and transmits the current weather data to a smoothing degree changing unit 37 described later, and the current time and current weather data. And a smoothing degree changing unit 37 that changes the time constant based on the trend of demand fluctuations with a period of about ten minutes to several tens of minutes in the past conditions obtained from the past demand record database 57 recorded in advance. It has.

平滑化程度変更部37は、日時、気温、天候等の電力需要に大きく影響を与えるパラメータを加味して時定数を変更するように構成されている。例えば、時定数のテーブルは、日時、気温、天候等の電力需要に大きく影響を与えるパラメータの組み合わせに応じて時定数が一意に定まるように構成されている。時定数は、その組み合わせにおける過去の需要変動パターンにマッチする時定数に予め設定されている。需要が急峻に変化する場合は、時定数の値を小さい値に設定され、ほぼ変化のない場合は、時定数の値を大きい値に設定されている。   The smoothing degree changing unit 37 is configured to change the time constant in consideration of parameters that greatly affect the power demand such as date and time, temperature, and weather. For example, the time constant table is configured such that the time constant is uniquely determined according to a combination of parameters that greatly affect power demand such as date, temperature, and weather. The time constant is preset to a time constant that matches the past demand fluctuation pattern in the combination. When the demand changes sharply, the value of the time constant is set to a small value, and when there is almost no change, the value of the time constant is set to a large value.

以下では、簡単のため、パラメータとして、現在時刻(時間帯)と、需要変動と相関の強い気温を例にして説明する。時定数テーブルには、図5に示すように、各時間帯において、気温毎(例えば、0℃〜40℃の範囲で1℃間隔の気温帯)の時定数が予め設定されている。なお、気温の範囲や気温帯の幅は適宜変更可能である。   In the following, for the sake of simplicity, the current time (time zone) and the temperature having a strong correlation with demand fluctuation will be described as parameters. In the time constant table, as shown in FIG. 5, a time constant for each temperature (for example, a temperature range of 0 ° C. to 40 ° C. at intervals of 1 ° C.) is set in advance. The range of temperature and the width of the temperature range can be changed as appropriate.

例えば、過去の事例において、11時〜12時の時間帯で気温25.5℃ではそれほど需要に急峻な変化はなく時定数がτ1226であった場合に、その後の12時〜13時の時間帯で気温が32.4℃に上昇して需要が急峻に変動(上昇)し、時定数をτ1333(<τ1226)に弱めた事例があったとする。このような場合、時定数テーブルには、11時〜12時の時間帯、気温25℃〜26℃の条件で時定数τ1226が予め設定され、12時〜13時の時間帯、気温32℃〜33℃の条件で時定数τ1333が予め設定されている。   For example, in the past case, when the temperature is 25.5 ° C. in the time zone from 11:00 to 12:00 and the time constant is τ1226 and the time constant is τ1226, the subsequent time zone from 12:00 to 13:00 In this case, the temperature rises to 32.4 ° C., the demand fluctuates (rises) rapidly, and the time constant is weakened to τ1333 (<τ1226). In such a case, in the time constant table, a time constant τ 1226 is preset in the time zone from 11:00 to 12:00 and the temperature is 25 ° C. to 26 ° C., and the time zone from 12:00 to 13:00, the temperature is from 32 ° C. A time constant τ 1333 is set in advance under the condition of 33 ° C.

平滑化程度変更部37は、受信した現在の気象データに含まれる現在の気温が時定数テーブルのどの気温帯に含まれるかを判定する気温帯判定部37cを備えており、第1の実施形態と同様の時間帯判定部37bによる現在時刻の時間帯の判定と気温帯判定部37cによる気温帯の判定を行う。すなわち、判定した時間帯と気温帯に対応する時定数に変更する。   The smoothing degree changing unit 37 includes a temperature zone determination unit 37c that determines in which temperature zone of the time constant table the current temperature included in the received current weather data is included in the first embodiment. The time zone determination unit 37b and the time zone determination by the temperature zone determination unit 37c are performed. That is, the time constant corresponding to the determined time zone and temperature zone is changed.

上記のような時定数テーブルにおいて、現在時刻が11時32分で気温が25.2℃である場合には、時定数をτ1226に設定して平滑化を行い、その後現在時刻が12時15分で気温が32.3℃である場合には、時定数をτ1333に変更し平滑化を行う。   In the time constant table as described above, when the current time is 11:32 and the temperature is 25.2 ° C., the time constant is set to τ1226 and smoothing is performed, and then the current time is 12:15. When the temperature is 32.3 ° C., the time constant is changed to τ 1333 and smoothing is performed.

(作用・効果)
本実施形態に係る給電システムは、複数の気象条件における過去の需要変動パターンに基づく時定数テーブルを有する平滑化程度変更部37を備えるようにした。これにより、現在の複数のパラメータを含む気象条件に合う過去の気象条件における需要変動パターンにマッチした平滑化程度の変更を行うことができる。すなわち、現在時刻のみならず、気温や天候等の需要変動と相関のあるパラメータも加味して時定数を変更するので、第1の実施形態よりも適切にフリンジ分の影響を除去することができる。
(Action / Effect)
The power supply system according to the present embodiment includes a smoothing degree changing unit 37 having a time constant table based on past demand fluctuation patterns in a plurality of weather conditions. Thereby, the change of the smoothing degree matched with the demand fluctuation pattern in the past weather conditions suitable for the weather conditions containing the present several parameter can be performed. That is, since the time constant is changed in consideration of not only the current time but also parameters correlated with demand fluctuations such as temperature and weather, the influence of the fringe can be removed more appropriately than in the first embodiment. .

[第2の実施形態の変形例]
第2の実施形態の平滑化程度変更部37は時定数のテーブルを用いたが、本変形例の平滑化程度変更部は、関数を用いて時定数を算出する。この関数型は、過去の需要実績データに基づいて定められており、時刻や気温等の気象パラメータをパラメータとして含み、メモリにプログラムの一部として記憶されている。平滑化程度変更部は、現在時刻や、取得した現在の気象データの中から気温、天候等の電力需要に大きく影響を与えるパラメータを数値として代入することで、時定数を算出する。
[Modification of Second Embodiment]
Although the smoothing degree changing unit 37 of the second embodiment uses a table of time constants, the smoothing degree changing unit of the present modification calculates a time constant using a function. This function type is determined based on past demand record data, includes weather parameters such as time and temperature as parameters, and is stored in the memory as part of the program. The smoothing degree changing unit calculates a time constant by substituting, as a numerical value, a parameter that greatly affects power demand such as temperature and weather from the current time and acquired current weather data.

なお、時定数を算出するための関数も、時刻と気温を含む所定の気象条件との組み合わせに対する時定数の対応関係に含まれる。   Note that the function for calculating the time constant is also included in the correspondence relationship of the time constant with respect to a combination of time and a predetermined weather condition including temperature.

このように、関数を用いて時定数を算出し平滑化の程度を変更する場合であっても、第2の実施形態と同様の作用効果を得ることができる。   As described above, even when the time constant is calculated using a function and the degree of smoothing is changed, the same effect as that of the second embodiment can be obtained.

[第3の実施形態]
(構成)
第3の実施形態について、図6を用いて説明する。第3の実施形態は、第2の実施形態と基本構成は同じである。第2の実施形態と異なる点のみを説明し、第2の実施形態と同じ部分については同じ符号を付して詳細な説明は省略する。
[Third Embodiment]
(Constitution)
A third embodiment will be described with reference to FIG. The basic configuration of the third embodiment is the same as that of the second embodiment. Only differences from the second embodiment will be described, and the same parts as those of the second embodiment will be denoted by the same reference numerals and detailed description thereof will be omitted.

図6は、第3の実施形態に係る給電システムの全体構成を示すブロック図である。第3の実施形態に係る給電システムは、運用者の平滑化程度変更の修正を受け付ける入力部38を備えている。入力部38は、マウス、キーボード、或いはタッチパネル又はこれらの組み合わせを用いることができる。   FIG. 6 is a block diagram illustrating an overall configuration of a power feeding system according to the third embodiment. The power supply system according to the third embodiment includes an input unit 38 that accepts correction of an operator's smoothing degree change. The input unit 38 can use a mouse, a keyboard, a touch panel, or a combination thereof.

第2の実施形態においては過去の需要変動パターンに合わせた時定数の変更を行っていたが、現在の気象データが過去の気象データと合致する場合でも、現在又は近い将来のイベント(ワールドカップの試合、甲子園の決勝など)等によりその需要変動パターンは異なったものとなる場合もありうる。そのような場合等において、入力部38によりパラメータの入力を受け付け、これを加味して時定数の変更を行う。受け付けるパラメータとしては、気象条件であっても良いし、時定数そのものを調整するものであっても良い。   In the second embodiment, the time constant is changed in accordance with the past demand fluctuation pattern. However, even if the current weather data matches the past weather data, the current or near future event (World Cup The demand fluctuation pattern may differ depending on the game, the Koshien final, etc.). In such a case, parameter input is received by the input unit 38, and the time constant is changed in consideration of the input. The parameter to be accepted may be a weather condition or a parameter that adjusts the time constant itself.

例えば、気象条件の例として気温を挙げると、現在の気温が31.2℃であれば、平滑化程度は31℃〜32℃の気温帯に対応する時定数となるところを、その上(32℃〜33℃)又は下(30℃〜31℃)等の気温帯の時定数とすることが挙げられる。この場合、例えば、入力部38は運用者による気温+α℃の入力を受け付け、その入力情報を気温帯判定部37cに出力する。気温帯判定部37cは現在気象データの31.2℃に+α℃を加味して現在気温を31.2+α℃と認識し、この気温がどの気温帯に含まれるかを判定する。一方、時定数そのものを調整する場合は、現在の時定数の数値をその一割上下に調整する場合が挙げられる。   For example, when the temperature is given as an example of the weather condition, if the current temperature is 31.2 ° C., the smoothing degree becomes a time constant corresponding to the temperature range of 31 ° C. to 32 ° C. (32 It is mentioned to make it the time constant of temperature zones, such as (degreeC-33 degreeC) or lower (30 degreeC-31 degreeC). In this case, for example, the input unit 38 receives an input of air temperature + α ° C. by the operator, and outputs the input information to the temperature zone determination unit 37c. The temperature zone determination unit 37c recognizes the current temperature as 31.2 + α ° C. by adding + α ° C. to 31.2 ° C. of the current weather data, and determines in which temperature zone this temperature is included. On the other hand, when adjusting the time constant itself, the current time constant value may be adjusted up or down by 10%.

(作用・効果)
本実施形態の給電システムでは、これにより、第2の実施形態よりも、さらに適切な時定数の変更を行うことができ、フリンジ分の影響をさらに除去することのできる給電システムを得ることができる。
(Action / Effect)
In the power supply system of the present embodiment, this makes it possible to change the time constant more appropriately than in the second embodiment, and to obtain a power supply system that can further eliminate the influence of the fringe. .

[第3の実施形態の変形例1]
第3の実施形態の変形例1は、第2の実施形態の変形例の平滑化程度変更部を、時定数の変更を入力部38によるパラメータの入力により時定数の関数型を修正するものとするものである。例えば、運用者の知識や経験により現在又は将来のイベント等を加味して、関数型に含まれる重み係数の数値を変更する、関数に入力する気温などの気象パラメータを実際の気温等より高く若しくは低く入力する等により時定数を算出する。
[Modification 1 of the third embodiment]
Modification 1 of the third embodiment is a modification of the smoothing degree change unit of the modification of the second embodiment, in which the time constant is changed and the function type of the time constant is corrected by inputting parameters by the input unit 38. To do. For example, taking into account current or future events based on the operator's knowledge and experience, change the numerical value of the weighting factor included in the function type, or set the weather parameters such as the temperature input to the function higher than the actual temperature, etc. The time constant is calculated by inputting a low value.

これにより、過去の需要実績データに加えて、運用者の知識や経験を反映させることができるので、よりフリンジ分の影響を除去することのできる給電システムを得ることができる。   Thereby, in addition to the past demand performance data, since an operator's knowledge and experience can be reflected, the electric power feeding system which can remove the influence of a fringe more can be obtained.

[第3の実施形態の変形例2]
第3の実施形態の変形例2に係る給電システムは、外部から現在及び将来の気象データを取得可能に構成されている。例えば、図7に示すように、現在の気象データは現在・将来の気象データ58から現在気象データ受信部36によって取得し、将来の気象データ(気象の予測値)は、入力部38が将来の気象データの受信部として機能することで取得する。或いは、情報伝送装置30によって受信して取得しても良い。取得した将来の気象データは平滑化程度変更部41に送信され、平滑化程度の補正に寄与する。すなわち、この変形例は、運用者が直接的に時定数の補正を行うのではなく、外部から現在及び将来の気象データを取得して自動的に時定数の補正を行う。
[Modification 2 of the third embodiment]
The electric power feeding system which concerns on the modification 2 of 3rd Embodiment is comprised so that the present and future weather data can be acquired from the outside. For example, as shown in FIG. 7, the current weather data is acquired from the current / future weather data 58 by the current weather data receiving unit 36, and the future weather data (predicted weather value) is input to the future by the input unit 38. Acquired by functioning as a weather data receiver. Or you may receive and acquire by the information transmission apparatus 30. FIG. The acquired future weather data is transmitted to the smoothing degree changing unit 41 and contributes to correction of the smoothing degree. That is, in this modification, the operator does not directly correct the time constant, but acquires current and future weather data from the outside and automatically corrects the time constant.

具体的に一例を示すと、第3の実施形態の変形例2に係る平滑化程度変更部41は、平滑化部32のローパスフィルタの時定数を下記の式1により算出する。
(式1) T=AX
As a specific example, the smoothing degree changing unit 41 according to the second modification of the third embodiment calculates the time constant of the low-pass filter of the smoothing unit 32 using the following Equation 1.
(Formula 1) T = AX

ここで、Tは時定数(スカラー量)である。Xは時定数の決定因子(ベクトル量)であり、現在及び近い将来の気温、天候等の気象データである。外部から取得した現在及び将来の気象データがこのXに用いられる。Aは時定数算出行列であり、過去需要実績データベース57によりこの行列の各成分の値が決定される。   Here, T is a time constant (scalar amount). X is a determinant (vector quantity) of a time constant, and is meteorological data such as current and near future temperature and weather. Current and future weather data acquired from the outside is used for this X. A is a time constant calculation matrix, and the past demand record database 57 determines the value of each component of this matrix.

式1で算出された時定数Tは、現在の気象データだけでなく将来の気象データも加味されたものであるので、現在の気象データのみから算出される時定数から修正が入ったものとなる。なお、時定数の決定因子Xは、時間と気象データとの組み合わせであるので、式1の関係は、時間帯と所定の気象条件との組み合わせと平滑化程度との対応関係に含まれる。   Since the time constant T calculated by Equation 1 includes not only current weather data but also future weather data, the time constant T is corrected from the time constant calculated only from the current weather data. . Since the determinant X of the time constant is a combination of time and weather data, the relationship of Equation 1 is included in the correspondence between the combination of the time zone and predetermined weather conditions and the degree of smoothing.

以上より、自動的に時定数を修正可能であり、よりフリンジ分の影響を除去することのできる給電システムを得ることができる。   As described above, it is possible to obtain a power feeding system that can automatically correct the time constant and can eliminate the influence of the fringe.

[第4の実施形態]
(構成)
第4の実施形態について、図8及び図9を用いて説明する。第4の実施形態は、第1の実施形態と基本構成は同じである。第1の実施形態と異なる点のみを説明し、第1の実施形態と同じ部分については同じ符号を付して詳細な説明は省略する。
[Fourth Embodiment]
(Constitution)
A fourth embodiment will be described with reference to FIGS. 8 and 9. The basic configuration of the fourth embodiment is the same as that of the first embodiment. Only the differences from the first embodiment will be described, and the same parts as those in the first embodiment will be denoted by the same reference numerals and detailed description thereof will be omitted.

図8は、第4の実施形態に係る給電システムの全体構成を示すブロック図である。第4の実施形態に係る給電システムは、各時刻において修正後予想総需要曲線54と予想総需要曲線とから予想総需要53の誤差を算定する誤差算定部39と、その誤差を積算する誤差積算部40と、を更に備えている。また、平滑化程度変更部33は、誤差積算部40が算定した積算誤差を監視する監視部33cを更に備えている。監視部33cは、誤差積算部40により算定された積算誤差が、予めメモリ33aに記憶されている所定の基準以上であるか否かを判定する。この基準は、電力系統に応じて適宜変更可能である。   FIG. 8 is a block diagram illustrating an overall configuration of a power feeding system according to the fourth embodiment. The power supply system according to the fourth embodiment includes an error calculation unit 39 that calculates an error of the predicted total demand 53 from the corrected predicted total demand curve 54 and the predicted total demand curve at each time, and an error integration that integrates the errors. And a unit 40. Further, the smoothing degree changing unit 33 further includes a monitoring unit 33 c that monitors the integration error calculated by the error integration unit 40. The monitoring unit 33c determines whether or not the integration error calculated by the error integration unit 40 is equal to or greater than a predetermined reference stored in the memory 33a in advance. This standard can be appropriately changed according to the power system.

平滑化程度変更部41は、監視部33cが、積算誤差がメモリ33aに記憶された所定の基準以上であると判定する場合には、平滑化の程度が強すぎると判断して、平滑化の程度を弱めるように平滑化の程度を切り替える。例えば、図9に示すように、長周期の急峻な需要変動が生じる場合、平滑化の程度が強すぎると予想総需要曲線53と修正後予想総需要曲線54との差分面積である誤差Eが溜まっていく。この誤差Eが所定基準以上となると平滑化しすぎていると判断する。この場合、発電機10の制御が遅れる傾向にあるため、平滑化の程度を弱めるように平滑化の程度を切り替える。図9の符号56は、切り替えた後の修正後予想総需要曲線である。なお、積算誤差は、総需要が急峻に上昇するか下降するかによって正の値にも負の値にも両方なり得る。   The smoothing degree changing unit 41 determines that the degree of smoothing is too strong when the monitoring unit 33c determines that the integrated error is equal to or greater than a predetermined reference stored in the memory 33a, and smoothing is performed. The level of smoothing is switched to weaken the level. For example, as shown in FIG. 9, when a long-period steep demand fluctuation occurs, if the degree of smoothing is too strong, an error E that is the difference area between the predicted total demand curve 53 and the corrected predicted total demand curve 54 is Accumulate. When the error E is equal to or greater than a predetermined reference, it is determined that the error E is too smooth. In this case, since the control of the generator 10 tends to be delayed, the degree of smoothing is switched so as to weaken the degree of smoothing. The code | symbol 56 of FIG. 9 is the estimated forecast total demand curve after switching. It should be noted that the integration error can be both a positive value and a negative value depending on whether the total demand rises sharply or falls.

一方、平滑化程度変更部33は、積算誤差が所定の基準未満である場合には、平滑化の程度は変更せず、現在時刻が含まれる時間帯の時定数のままとする。   On the other hand, when the integration error is less than a predetermined reference, the smoothing degree changing unit 33 does not change the smoothing degree and keeps the time constant of the time zone including the current time.

(作用・効果)
本実施形態の給電システムは、誤差算定部39と誤差積算部40と監視部33cとを更に備え、誤差算定部39と誤差積算部40とにより得た積算誤差を監視部33cが監視するようにした。すなわち、積算誤差がメモリ33aに予め記憶された所定の基準以上になると、平滑化の程度が強すぎると判断し、その程度を弱めた平滑化程度に切り替えるようにした。これにより、過去に実績のない需要変動傾向になる場合でも、適切に平滑化の程度を変更させ、誤った状態で平滑化を実行し続けることがなくなる。そのため、よりフリンジ分の影響を適切に除去した給電システムを得ることができる。
(Action / Effect)
The power supply system of the present embodiment further includes an error calculating unit 39, an error integrating unit 40, and a monitoring unit 33c, and the monitoring unit 33c monitors the integrated error obtained by the error calculating unit 39 and the error integrating unit 40. did. That is, when the integrated error is equal to or greater than a predetermined reference stored in advance in the memory 33a, the degree of smoothing is determined to be too strong, and the degree of smoothing is switched to a weakening degree. As a result, even when there is a demand fluctuation trend that has not been recorded in the past, the level of smoothing is appropriately changed, and smoothing is not continued in an incorrect state. Therefore, it is possible to obtain a power feeding system in which the influence of the fringe is appropriately removed.

[その他の実施形態]
本明細書においては、本発明に係る複数の実施形態を説明したが、これらの実施形態は例として提示したものであって、発明の範囲を限定することを意図していない。具体的には、第1乃至第4の実施形態を全て又はいずれかを組み合わせたものも包含される。以上のような実施形態は、その他の様々な形態で実施されることが可能であり、発明の範囲を逸脱しない範囲で、種々の省略や置き換え、変更を行うことができる。これらの実施形態やその変形は、発明の範囲や要旨に含まれると同様に、特許請求の範囲に記載された発明とその均等の範囲に含まれるものである。
[Other Embodiments]
In the present specification, a plurality of embodiments according to the present invention have been described. However, these embodiments are presented as examples and are not intended to limit the scope of the invention. Specifically, a combination of all or any of the first to fourth embodiments is also included. The above embodiments can be implemented in other various forms, and various omissions, replacements, and changes can be made without departing from the scope of the invention. These embodiments and modifications thereof are included in the invention described in the claims and equivalents thereof as well as included in the scope and gist of the invention.

(1)第1乃至第4の実施形態では、情報伝送装置30、平滑化程度変更部33、37、予想総需要曲線修正部34において、発電機現在出力50や、時定数のテーブル、予想総需要53を予め記憶するメモリを含み構成するようにしたが、情報伝送装置30、平滑化程度変更部33、37、予想総需要曲線修正部34とは別にメモリを設けるようにしても良い。 (1) In the first to fourth embodiments, in the information transmission device 30, the smoothing degree changing units 33 and 37, and the predicted total demand curve correcting unit 34, the generator current output 50, the time constant table, the predicted total A memory that stores the demand 53 in advance is included, but a memory may be provided separately from the information transmission device 30, the smoothing degree changing units 33 and 37, and the predicted total demand curve correcting unit 34.

(2)第1乃至第4の実施形態では、平滑化程度変更部33、37自体が時計等により現在時刻を検知するようにしたが、発電機現在出力50が現在時刻と発電機の現在出力と紐付けて含まれるようにして、平滑化程度変更部33、37はこれによって現在時刻を検知するようにしても良い。 (2) In the first to fourth embodiments, the smoothing degree changing units 33 and 37 themselves detect the current time by a clock or the like, but the generator current output 50 is the current time and the current output of the generator. And the smoothing degree changing units 33 and 37 may detect the current time.

(3)第2及び第3の実施形態では、現在気象データ受信部36を備えて外部から現在の気象データを受信するようにしたが、給電システム自体が現在の気象観測を行う構成を備えて現在の気象データを得るようにしても良い。 (3) In the second and third embodiments, the current weather data receiving unit 36 is provided to receive current weather data from the outside. However, the power supply system itself has a configuration for performing current weather observation. You may make it acquire the present weather data.

(4)第4の実施形態では、積算誤差が所定基準以上となった場合には、単に時定数を切り替えるとしたが、誤差が出ないように修正すれば良い。例えば、積算誤差の増加率が減少するように、積算誤差に応じて時定数を変化させるようにしても良い。例えば積算誤差の程度が大きければ時定数の変化幅を大きくし、積算誤差の程度が小さければ、時定数の変化幅を小さくする。 (4) In the fourth embodiment, when the integration error is equal to or greater than the predetermined reference, the time constant is simply switched. However, it may be corrected so as not to cause an error. For example, the time constant may be changed according to the integration error so that the increase rate of the integration error decreases. For example, if the degree of integration error is large, the change width of the time constant is increased, and if the degree of integration error is small, the change width of the time constant is reduced.

(5)第1乃至第4の実施形態の給電システムは、現在時刻における電力の需給バランスを維持するように発電機の出力指令値を算定するものであったが、現在時刻に限らず、任意の時刻における電力の需給バランスを維持するように発電機の出力指令値を算定するようにしても良い。このような給電システム若しくはそのプログラムは、例えば、シミュレータとして用いることができる。すなわち、現在総需要算定部31に代えて総需要算定部とし、これに例えば過去の時刻の発電機出力を与える。この総需要算定部が算出した過去の総需要に対して平滑化を行う際にどの程度の時定数にするとより適切にフリンジ分が除去できるかを調べることができる。 (5) The power supply systems of the first to fourth embodiments calculate the output command value of the generator so as to maintain the power supply-demand balance at the current time. The output command value of the generator may be calculated so as to maintain the supply and demand balance of power at the time of. Such a power supply system or a program thereof can be used as a simulator, for example. That is, instead of the current total demand calculation unit 31, a total demand calculation unit is used, and a generator output at a past time, for example, is given thereto. When smoothing the past total demand calculated by the total demand calculation unit, it is possible to examine how much time constant the fringe component can be removed more appropriately.

10、11、…、1n 発電機
30 情報伝送装置
31 現在総需要算定部
32 平滑化部
33 平滑化程度変更部
33a メモリ
33b 時間帯判定部
33c 監視部
34 予想総需要曲線修正部
35 発電機制御部
36 現在気象データ受信部
37 平滑化程度変更部
37a メモリ
37b 時間帯判定部
37c 気温帯判定部
38 入力部
39 誤差算定部
40 誤差積算部
41 平滑化程度変更部
50 発電機現在出力
51 現在総需要
52 平滑化後現在総需要
53 予想総需要
54 修正後予想総需要曲線
55 発電機出力指令値
56 修正後予想総需要曲線
57 過去需要実績データベース
58 現在・将来の気象データ
E 誤差
10, 11, ..., 1n Generator 30 Information transmission device 31 Current total demand calculation unit 32 Smoothing unit 33 Smoothing degree change unit 33a Memory 33b Time zone determination unit 33c Monitoring unit 34 Expected total demand curve correction unit 35 Generator control Unit 36 Current weather data receiving unit 37 Smoothing level changing unit 37a Memory 37b Time zone determining unit 37c Temperature zone determining unit 38 Input unit 39 Error calculating unit 40 Error integrating unit 41 Smoothing level changing unit 50 Current generator output 51 Current total Demand 52 Current total demand 53 after smoothing 53 Expected total demand 54 Corrected expected total demand curve 55 Generator output command value 56 Corrected expected total demand curve 57 Past demand result database 58 Current / future weather data E Error

Claims (7)

電力系統のある時刻における電力の総需要と、前記電力系統において予測される予想総需要曲線とに基づいて電力の需給バランスを維持するように前記電力系統に設置された発電機を制御する給電システムにおいて、
前記電力系統の前記時刻における総需要を算定する総需要算定手段と、
算定した前記総需要を平滑化し、平滑化後総需要を算定する平滑化手段と、
前記平滑化の程度を変更する平滑化程度変更手段と、
前記予想総需要曲線が前記時刻において前記平滑化後総需要と一致するように前記予想総需要曲線を修正し、修正後予想総需要曲線を算定する予想総需要曲線変更手段と、
前記修正後予想総需要曲線に基づいて電力需給バランスを維持する発電機出力を算定する発電機制御手段と、
を備えたことを特徴とする給電システム。
A power supply system that controls a generator installed in the power system so as to maintain a power supply-demand balance based on the total power demand at a certain time of the power system and an expected total demand curve predicted in the power system In
A total demand calculating means for calculating the total demand at the time of the power system;
A smoothing means for smoothing the calculated total demand and calculating the total demand after smoothing;
Smoothing degree changing means for changing the degree of smoothing;
A forecast total demand curve changing means for correcting the forecast total demand curve so that the forecast total demand curve matches the smoothed total demand at the time, and calculating a revised forecast total demand curve;
A generator control means for calculating a generator output that maintains a power supply-demand balance based on the corrected expected total demand curve;
A power supply system comprising:
前記時刻が現在時刻であり、
前記総需要算定手段は、前記発電機の現在発電出力に基づいて前記総需要を算定することを特徴とする請求項1に記載の給電システム。
The time is the current time,
The power supply system according to claim 1, wherein the total demand calculation unit calculates the total demand based on a current power generation output of the generator.
時間帯と平滑化程度との対応関係が記憶された記憶手段を更に備え、
前記平滑化程度変更手段は、現在時刻が何れの時間帯に含まれるかを判定する時間帯判定部を有し、前記平滑化手段の平滑化程度を、前記記憶手段の対応関係に基づいて、前記時間帯判定部で判定した時間帯に対応する平滑化程度に変更することを特徴とする請求項2に記載の給電システム。
A storage means for storing the correspondence between the time zone and the smoothing degree;
The smoothing degree changing means includes a time zone determination unit that determines in which time zone the current time is included, and the smoothing degree of the smoothing means is determined based on the correspondence relationship of the storage means, The power supply system according to claim 2, wherein the power supply system is changed to a smoothing degree corresponding to the time zone determined by the time zone determination unit.
前記記憶手段の前記対応関係は、時間帯と所定の気象条件との組み合わせと、平滑化程度との対応関係であり、
前記平滑化程度変更手段は、前記平滑化手段の平滑化程度を、現在時刻を含む時間帯と現在の前記所定の気象条件との組み合わせに対応する平滑化程度に変更することを特徴とする請求項3に記載の給電システム。
The correspondence relationship of the storage means is a correspondence relationship between a combination of a time zone and a predetermined weather condition, and a smoothing degree,
The smoothing degree changing means changes the smoothing degree of the smoothing means to a smoothing degree corresponding to a combination of a time zone including a current time and the current predetermined weather condition. Item 4. The power feeding system according to Item 3.
前記平滑化程度の変更に対し修正するための入力を受け付ける入力手段を更に備え、
前記平滑化程度変更手段は、前記入力手段が受け付けた入力情報を加味して前記平滑化手段の平滑化程度を変更することを特徴とする請求項4に記載の給電システム。
An input means for receiving an input for correcting the change in the smoothing degree;
The power supply system according to claim 4, wherein the smoothing degree changing unit changes the smoothing degree of the smoothing unit in consideration of input information received by the input unit.
各時刻において、前記修正後予想総需要曲線と前記予想総需要曲線とから予想総需要の誤差を算定する誤差算定手段と、
前記誤差を積算する誤差積算手段と、を更に備え、
前記誤差積算手段の算定結果が所定基準以上の場合に、現在時刻が含まれる時間帯の前記平滑化程度変更手段の平滑化程度からその程度を弱めた平滑化程度に変更することを特徴とする請求項1〜請求項5の何れかに記載の給電システム。
At each time, an error calculating means for calculating an error of the predicted total demand from the corrected predicted total demand curve and the predicted total demand curve;
Error accumulating means for accumulating the error, and
When the calculation result of the error integrating means is equal to or greater than a predetermined reference, the smoothing degree of the time zone including the current time is changed from the smoothing degree of the smoothing degree changing means to a smoothing degree that weakens the degree. The electric power feeding system in any one of Claims 1-5.
電力系統のある時刻における電力の総需要と、前記電力系統において予測される予想総需要曲線とに基づいて電力の需給バランスを維持するように前記電力系統に設置された発電機を制御する給電システムに用いられるプログラムにおいて、
前記給電システムは、時間帯と平滑化程度との対応関係が記憶された記憶手段を備え、
コンピュータに、
前記電力系統の前記時刻における総需要を算定する総需要算定機能と、
算定した前記総需要を平滑化し、平滑化後総需要を算定する平滑化機能と、
前記平滑化程度を変更する平滑化程度変更機能と、
前記予想総需要曲線が前記時刻において前記平滑化後総需要と一致するように前記予想総需要曲線を修正し、修正後予想総需要曲線を算定する予想総需要曲線変更機能と、
前記修正後予想総需要曲線に基づいて電力需給バランスを維持する発電機出力を算定する発電機制御機能と、
を実現させるための給電システムのプログラム。
A power supply system that controls a generator installed in the power system so as to maintain a power supply-demand balance based on the total power demand at a certain time of the power system and an expected total demand curve predicted in the power system In the program used for
The power supply system includes storage means in which a correspondence relationship between a time zone and a smoothing degree is stored,
On the computer,
A total demand calculation function for calculating the total demand at the time of the power system;
A smoothing function for smoothing the calculated total demand and calculating the total demand after smoothing;
A smoothing degree changing function for changing the smoothing degree;
A forecast total demand curve changing function for correcting the forecast total demand curve so that the forecast total demand curve matches the smoothed total demand at the time, and calculating a revised forecast total demand curve;
A generator control function for calculating a generator output that maintains a power supply-demand balance based on the corrected expected total demand curve; and
Power supply system program to realize
JP2014027538A 2014-02-17 2014-02-17 Power supply system and program thereof Active JP6262011B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014027538A JP6262011B2 (en) 2014-02-17 2014-02-17 Power supply system and program thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014027538A JP6262011B2 (en) 2014-02-17 2014-02-17 Power supply system and program thereof

Publications (2)

Publication Number Publication Date
JP2015154637A true JP2015154637A (en) 2015-08-24
JP6262011B2 JP6262011B2 (en) 2018-01-17

Family

ID=53896366

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014027538A Active JP6262011B2 (en) 2014-02-17 2014-02-17 Power supply system and program thereof

Country Status (1)

Country Link
JP (1) JP6262011B2 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004112910A (en) * 2002-09-18 2004-04-08 Hitachi Ltd Method and device for monitoring transmission end power
US20070038335A1 (en) * 2005-07-22 2007-02-15 Mcintyre Timothy J Real Power Regulation for the Utility Power Grid Via Responsive Loads
JP2010063322A (en) * 2008-09-05 2010-03-18 Toshiba Corp Apparatus, method, and program for controlling supply and demand for power system
JP2011259667A (en) * 2010-06-11 2011-12-22 Chugoku Electric Power Co Inc:The Power supply system control method, and power supply system
JP2012244828A (en) * 2011-05-23 2012-12-10 Hitachi Ltd Independent operation type power supply system
JP2013162563A (en) * 2012-02-02 2013-08-19 Mitsubishi Electric Corp Power demand/supply control device and power demand/supply control method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004112910A (en) * 2002-09-18 2004-04-08 Hitachi Ltd Method and device for monitoring transmission end power
US20070038335A1 (en) * 2005-07-22 2007-02-15 Mcintyre Timothy J Real Power Regulation for the Utility Power Grid Via Responsive Loads
JP2010063322A (en) * 2008-09-05 2010-03-18 Toshiba Corp Apparatus, method, and program for controlling supply and demand for power system
JP2011259667A (en) * 2010-06-11 2011-12-22 Chugoku Electric Power Co Inc:The Power supply system control method, and power supply system
JP2012244828A (en) * 2011-05-23 2012-12-10 Hitachi Ltd Independent operation type power supply system
JP2013162563A (en) * 2012-02-02 2013-08-19 Mitsubishi Electric Corp Power demand/supply control device and power demand/supply control method

Also Published As

Publication number Publication date
JP6262011B2 (en) 2018-01-17

Similar Documents

Publication Publication Date Title
CN109426892A (en) System and method for the distribution load forecast in power grid
JP6587522B2 (en) Voltage / reactive power control device, method, and voltage / reactive power control system
JP2019028565A (en) Failure prediction method, failure prediction apparatus and failure prediction program
RU2016133331A (en) METHOD AND DEVICE FOR MANAGING INTELLECTUAL DEVICE
JP2018085834A (en) System stabilizer
EP2410654A2 (en) Grid frequency rate limiting system
CN114151373A (en) Server fan rotating speed regulating method, system, terminal and storage medium
WO2018110082A1 (en) Power system status estimation device and status estimation method
US20230147470A1 (en) Failure prediction system
JP6262011B2 (en) Power supply system and program thereof
JP2015108976A (en) Part ordering assist system and part ordering assist method
JP5787365B2 (en) Power control apparatus, power control system, power control method, and program
KR101433724B1 (en) Method measuring of healthy indicia of plant reflected status of sub-component and storage media thereof
JP7181464B2 (en) Power estimation program, power estimation device and power estimation method
CN108133429B (en) Method, equipment and device for acquiring generating capacity of power generation equipment
JP6645951B2 (en) Power system stabilization system
US11320794B2 (en) Systems and methods for high rate-of-change-of-frequency ride-through in electric power systems
JP5857228B2 (en) Frequency control method and frequency control system
CN113661457B (en) Device for determining operating condition of plant, control system for plant, method for determining operating condition, and recording medium
US20130297283A1 (en) Information processing device, information processing method, and program
JP2015194805A (en) Prediction program, prediction device, and prediction method
US20200333170A1 (en) Missing value imputation device, missing value imputation method, and missing value imputation program
JP6756680B2 (en) Information processing equipment, information processing methods, and information processing programs
CN113036716A (en) Generator winding fault protection method and device
CN113901294A (en) Information processing method and device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170127

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20171110

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20171114

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20171213

R150 Certificate of patent or registration of utility model

Ref document number: 6262011

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350