JP2015031105A5 - - Google Patents
Download PDFInfo
- Publication number
- JP2015031105A5 JP2015031105A5 JP2013162937A JP2013162937A JP2015031105A5 JP 2015031105 A5 JP2015031105 A5 JP 2015031105A5 JP 2013162937 A JP2013162937 A JP 2013162937A JP 2013162937 A JP2013162937 A JP 2013162937A JP 2015031105 A5 JP2015031105 A5 JP 2015031105A5
- Authority
- JP
- Japan
- Prior art keywords
- main
- stripes
- exposed
- bar
- bars
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 description 4
- 239000000463 material Substances 0.000 description 2
- 210000003205 Muscles Anatomy 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000002093 peripheral Effects 0.000 description 1
- 230000003014 reinforcing Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Description
(1) 擁壁構造Aは、内部に埋設した鉄筋3…の一部が露出筋部3e…として裏面2r…に露出した壁面パネル2…と、所定角度Rmで起立する主縦筋部4v…及び水平に位置する主横筋部4h…により略L形に形成し、主縦筋部4v…を露出筋部3e…に固定した複数の主支持筋4…と、露出筋部3e…及び/又は主縦筋部4v…を支持する複数の補助支持筋6…と、被施工面Cと壁面パネル2…間に充填した中込コンクリート部7と、を少なくとも備えるため、中間支柱等のコンクリートブロック材が全く不要となり、中間支柱やその型枠等の保管や管理も不要となる。これにより、製造時及び施工時の双方を含む全体のコストダウンを図れるとともに、擁壁全体の面方向における連続性(一体性)を容易に確保でき、擁壁全体の施工品質を容易に高めることができる。しかも、施工時に、断面変更等により計画時の設計が変更された場合でも迅速に対応でき、施工遅れ等の不具合も回避できる。 (1) The retaining wall structure A has a wall panel 2 exposed on the back surface 2r as a part of the reinforcing bars 3 embedded in the interior as an exposed bar 3e, and a main vertical bar 4v standing up at a predetermined angle Rm. And a plurality of main supporting muscles 4 formed by fixing the main longitudinal bars 4v to the exposed stripes 3e, and the exposed stripes 3e, and / or. In order to include at least a plurality of auxiliary support bars 6 that support the main longitudinal bars 4v and the interstitial concrete part 7 filled between the work surface C and the wall panel 2, a concrete block material such as an intermediate column is provided. It becomes completely unnecessary, and storage and management of the intermediate strut and its formwork are also unnecessary. As a result, the overall cost, including both manufacturing and construction, can be reduced, and continuity (integration) in the surface direction of the entire retaining wall can be easily secured, and the construction quality of the entire retaining wall can be easily increased. Can do. In addition, even when the design at the time of planning is changed due to a change in cross-section during construction, it is possible to respond quickly and avoid problems such as construction delays.
主支持筋4は、図6に示すように、所定角度Rmで起立する主縦筋部4v及び水平に位置する主横筋部4hにより略L形に形成する。したがって、主支持筋4は、外周面の軸方向一定間隔おきに多数形成したリング状の大径部(凸部)を有する一本の鋼材を折曲して一体形成できる。主支持筋4は、少なくとも壁面パネル2…を支持できることを考慮して、直径30〜40〔mm〕程度に選定することが望ましい。なお、主横筋部4h及び主縦筋部4vの長さは、施工する擁壁Wの規模に応じて選定できる。さらに、主縦筋部4vについては、別途、直線状に形成した延長用縦筋部を用意し、主縦筋部4vに追加連結することにより、主縦筋部4vの上端から上方へ延長できるように構成してもよい。このように、主支持部4…を、所定角度Rmで起立する主縦筋部4v…及び水平に位置する主横筋部4h…により略L形に形成すれば、壁面パネル2…の角度を容易かつ確実に設定できるとともに、壁面パネル2…を確実に支持できる。 As shown in FIG. 6, the main support bar 4 is formed in a substantially L shape by a main vertical bar part 4v standing at a predetermined angle Rm and a main horizontal bar part 4h positioned horizontally. Therefore, the main support bars 4 can be integrally formed by bending a single steel material having a ring-shaped large-diameter portion (convex portion) formed in large numbers at regular intervals in the axial direction of the outer peripheral surface. The main support bars 4 are preferably selected to have a diameter of about 30 to 40 [mm], considering that at least the wall surface panels 2 can be supported. In addition, the length of the main horizontal stripe part 4h and the main vertical stripe part 4v can be selected according to the scale of the retaining wall W to construct. Further, the main vertical streak portion 4v can be extended upward from the upper end of the main vertical streak portion 4v by separately preparing an extension vertical streak portion formed linearly and additionally connecting to the main vertical streak portion 4v. You may comprise as follows. As described above, if the main support portions 4 are formed in a substantially L shape by the main vertical stripes 4v standing up at a predetermined angle Rm and the main horizontal stripes 4h positioned horizontally, the angle of the wall panel 2 is easily set. And it can set reliably and can support wall surface panel 2 ... reliably.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013162937A JP5954835B2 (en) | 2013-08-06 | 2013-08-06 | Retaining wall structure and retaining wall construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013162937A JP5954835B2 (en) | 2013-08-06 | 2013-08-06 | Retaining wall structure and retaining wall construction method |
Publications (3)
Publication Number | Publication Date |
---|---|
JP2015031105A JP2015031105A (en) | 2015-02-16 |
JP2015031105A5 true JP2015031105A5 (en) | 2015-05-14 |
JP5954835B2 JP5954835B2 (en) | 2016-07-20 |
Family
ID=52516662
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2013162937A Active JP5954835B2 (en) | 2013-08-06 | 2013-08-06 | Retaining wall structure and retaining wall construction method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP5954835B2 (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6388266B2 (en) * | 2016-04-11 | 2018-09-12 | 松六コンクリート工業株式会社 | Wall construction method |
JP2020012310A (en) * | 2018-07-19 | 2020-01-23 | 松六コンクリート工業株式会社 | Retaining wall construction method and backing layer construction member |
JP2022020018A (en) * | 2020-07-18 | 2022-01-28 | 田中鉄筋工業株式会社 | Built-up retaining wall |
JP7501868B2 (en) | 2020-09-14 | 2024-06-18 | 松六コンクリート工業株式会社 | Retaining wall construction method |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS60173223A (en) * | 1984-02-20 | 1985-09-06 | Chiyoda Tech & Ind Co Ltd | Construction of concrete wall |
JPS61237721A (en) * | 1985-04-15 | 1986-10-23 | Asahi Chem Ind Co Ltd | Construction of retaining wall |
JPS6226448U (en) * | 1985-07-26 | 1987-02-18 | ||
JP2571724B2 (en) * | 1990-08-28 | 1997-01-16 | 東急建設株式会社 | How to build a concrete retaining wall |
JPH07127066A (en) * | 1993-11-05 | 1995-05-16 | Toshiji Murai | Temporary earth retaining construction method and its structural body |
JPH08296241A (en) * | 1995-04-26 | 1996-11-12 | Marutaka Concrete Kogyo Kk | Construction method for establishment of wall surface worked retaining wall, and panel block |
JP3563934B2 (en) * | 1997-09-05 | 2004-09-08 | タカムラ総業株式会社 | Formwork assembling method of self-supporting remaining formwork for concrete retaining wall |
JP3709161B2 (en) * | 2001-11-07 | 2005-10-19 | 広利 増田 | Method for producing a concrete structure using a concrete formwork |
JP4812135B2 (en) * | 2008-06-26 | 2011-11-09 | 和 熊谷 | Tools for laminating reinforced earth retaining walls |
JP5715771B2 (en) * | 2010-06-17 | 2015-05-13 | 晋市 湯田 | Wall surface structure and wall surface construction method |
-
2013
- 2013-08-06 JP JP2013162937A patent/JP5954835B2/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2015031105A5 (en) | ||
CN104060825B (en) | Adjustable general stair template | |
CN102425186B (en) | Foundation bolt stock and manufacture method thereof | |
CN104999557A (en) | Bracket for binding of precast box beam steel bars | |
JP2016003475A5 (en) | ||
CN102182300A (en) | Method for increasing horizontal cross braces and improving and determining bearing capacity of support frame | |
TW201604357A (en) | Reinforced concrete structure | |
JP2016196802A (en) | Spacer and reinforcement setting method | |
AU2011101760A4 (en) | A bar chair | |
CN204139466U (en) | A kind of concrete prefabricated cushion block | |
JP2016125222A (en) | Building foundation | |
CN105155406B (en) | Hollow thin-walled high pier framework cushion cap and bridge | |
CN205894289U (en) | Attach two roof beams of reinforced concrete archaize building of attenuator post shock attenuation node | |
CN106522483A (en) | Supporting tool for controlling flatness of small-gradient sloping roof | |
CN207846863U (en) | Steel rib reinforced concrete structure | |
CN204869214U (en) | A support for precast box girder reinforcement | |
CN214531525U (en) | Stirrup device of steerable floor reinforcing bar protective layer thickness and interval | |
JP2016125221A (en) | Building foundation | |
CN203729502U (en) | Pre-buried positioning frame of concealed bracing main reinforcements | |
TH1801007515A (en) | Floor structure and methods of constructing floor structures | |
JP2015232213A (en) | Lattice hardware, truss and beam structure | |
JP2016020624A (en) | Spacer, spacer manufacturing method, and slab reinforcement placing method | |
RU2392393C1 (en) | Butt joint in monolithic reinforced concrete girderless frame | |
KR20090120869A (en) | Bar chair for concrete structure | |
CN106245853A (en) | A kind of shear force wall reinforcing steel bar Prefabricated Concrete saddle bar |