JP2014219288A - Notification device for concrete placing time management, and concrete placing time management method - Google Patents

Notification device for concrete placing time management, and concrete placing time management method Download PDF

Info

Publication number
JP2014219288A
JP2014219288A JP2013098775A JP2013098775A JP2014219288A JP 2014219288 A JP2014219288 A JP 2014219288A JP 2013098775 A JP2013098775 A JP 2013098775A JP 2013098775 A JP2013098775 A JP 2013098775A JP 2014219288 A JP2014219288 A JP 2014219288A
Authority
JP
Japan
Prior art keywords
time
concrete
display means
remaining
management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2013098775A
Other languages
Japanese (ja)
Inventor
洋志 牧野
Hiroshi Makino
洋志 牧野
雄 影山
Takeshi Kageyama
雄 影山
根本 浩史
Hiroshi Nemoto
浩史 根本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp filed Critical Shimizu Construction Co Ltd
Priority to JP2013098775A priority Critical patent/JP2014219288A/en
Publication of JP2014219288A publication Critical patent/JP2014219288A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • GPHYSICS
    • G04HOROLOGY
    • G04FTIME-INTERVAL MEASURING
    • G04F3/00Apparatus which can be set and started to measure-off predetermined or adjustably-fixed time intervals with driving mechanisms, e.g. dosimeters with clockwork

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Measurement Of Predetermined Time Intervals (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a notification device for concrete placing time management and a concrete placing time management method allowing a person existing in a concrete installation site to certainly and easily obtain the residual time of the placing time.SOLUTION: The notification device is a device 10 for notifying at least a person existing in a concrete installation site of information related to the management of the concrete placing time. The device 10 includes: time displaying means 12 that is disposed in a place capable of being visually recognized by the person existing in a concrete installation site, and displays the residual time of a predetermined placing time; and notification information displaying means 14 for displaying notification information corresponding to the residual time of the placing time.

Description

本発明は、例えば浄水場や地下鉄の駅等の大規模地下躯体などのコンクリートの打設工事において、コールドジョイントの発生を防止するために、打重ね時間を管理するのに好適なコンクリート打重ね時間管理用報知装置およびこの装置を使用したコンクリートの打ち重ね時間管理方法に関するものである。   The present invention is a concrete overlaying time suitable for managing the stacking time in order to prevent the occurrence of cold joints in concrete construction work such as large-scale underground structures such as water purification plants and subway stations. The present invention relates to a management notification device and a concrete overlaying time management method using this device.

従来、浄水場や地下鉄の駅等の大規模地下躯体などのコンクリート構造物を施工する際において、例えば同日におけるコンクリート打設では複数層に分けてコンクリートを打重ねていき構造物を構築する(例えば、特許文献1を参照)。凝結が進んでいる状態にあるコンクリートに新たなコンクリートを打重ねる場合、適正な時間間隔を過ぎてコンクリートを打設すると、硬化し始めたコンクリートと後から打重ねたコンクリートとが一体化せず、不連続な面が生じるコールドジョイントが発生する場合がある。   Conventionally, when constructing a concrete structure such as a large underground structure such as a water purification plant or a subway station, for example, in the concrete placement on the same day, the structure is constructed by stacking concrete in multiple layers (for example, , See Patent Document 1). When placing new concrete on concrete that has been set, if the concrete is placed after an appropriate time interval, the concrete that has begun to harden and the concrete that has been piled later will not be integrated, Cold joints that produce discontinuous surfaces may occur.

コールドジョイントは構造的な脆弱部となるので、発生を防止するためには、各層毎の打重ね時間間隔を、コールドジョイントが発生しない程度の時間間隔に収めるようにして打設する必要がある。コンクリートを打重ねるまでの適正な打重ね時間間隔は、例えば気温25℃以下の施工条件下では2時間、気温25℃超過の施工条件下では2時間30分として計画されることが多い(例えば、非特許文献1を参照)。したがって、こうした時間間隔を超えて打重ねした場合にはコールドジョイントが発生してしまう可能性が高くなる。   Since a cold joint becomes a structural weak part, in order to prevent generation | occurrence | production, it is necessary to drive | pour so that the stacking time interval for every layer may be set to the time interval which does not generate | occur | produce a cold joint. An appropriate stacking time interval until stacking of concrete is often planned as, for example, 2 hours under construction conditions with a temperature of 25 ° C. or less, and 2 hours 30 minutes under construction conditions with a temperature exceeding 25 ° C. (for example, (Refer nonpatent literature 1). Therefore, there is a high possibility that a cold joint will occur when the time interval is exceeded.

一方、複数回のコンクリートの打継ぎにより施工されるコンクリート構造物の施工管理技術に関して、例えば特許文献2の技術が知られている。この特許文献2は、複数回のコンクリートの打継ぎにより施工されるコンクリート構造物の部位に問題が生じた場合の問題の原因究明するために、その問題が生じた部位の施工情報、その部位に使用したコンクリートの製造情報や品質確認のための試験結果情報などの履歴情報(トレーサビリティ)を容易に把握するようにしたものである。   On the other hand, for example, a technique of Patent Document 2 is known as a construction management technique for a concrete structure constructed by a plurality of times of concrete joining. In this Patent Document 2, in order to investigate the cause of a problem when a problem occurs in a part of a concrete structure constructed by multiple times of concrete joining, the construction information of the part where the problem has occurred, History information (traceability) such as manufacturing information of used concrete and test result information for quality confirmation is easily grasped.

特許第4873412号公報Japanese Patent No. 4873412 特開2010−203110号公報JP 2010-203110 A

「コンクリート標準示方書 施工編<2007年制定>」、土木学会コンクリート委員会コンクリート標準示方書改訂小委員会編、社団法人土木学会発行、2008年4月"Concrete Standard Specification Construction Edition <Established 2007>", Japan Society of Civil Engineers Concrete Committee, Concrete Standard Specification Revision Subcommittee, Published by Japan Society of Civil Engineers, April 2008

上述したように、コールドジョイントの発生を防止するためには、各層毎の打重ね時間間隔を、コールドジョイントが発生しない程度の時間間隔に収めるように打設する必要がある。   As described above, in order to prevent the occurrence of a cold joint, it is necessary to place the overlapping time interval for each layer so as to be within a time interval that does not generate a cold joint.

これに対し、従来のコンクリート打設施工では通常、一人の現場監督者が打重ね時間間隔を手元の腕時計等で確認しながら、一般に広い施工敷地内に点在する大勢の作業者に残り時間や作業内容を報知しつつ作業を指揮する。一方、各作業者はこの現場監督者の残り時間の報知や指示に従いながら打設作業を行うが、施工中の騒音や作業集中のため作業者の全員が打重ね時間の残り時間を確実かつ容易に把握することは困難であった。また、打重ね時間間隔を管理するものが現場監督者一人であると、打設完了時刻の記録を失念したり記録を誤ったりした場合に施工不良を招き易い。このため、従来の施工管理では打重ね時間の管理が曖昧になり易いという問題があった。   On the other hand, in conventional concrete placement work, one site supervisor usually checks the time interval with a wristwatch at hand, etc., while generally remaining time and many workers scattered around a large construction site. Command the work while notifying the work contents. On the other hand, each worker performs the placement work in accordance with the notification and instructions of the remaining time of the field supervisor, but all the workers are surely and easily able to keep the remaining time of the stacking time due to noise and work concentration during construction. It was difficult to figure out. Further, if one person who supervises the stacking time interval is a field supervisor, it is likely to cause a construction failure when the record of the completion time of placement is forgotten or mistaken. For this reason, the conventional construction management has a problem that the management of the stacking time tends to be ambiguous.

また、上記の施工環境下では、工事発注者等の施工管理者側が立会い時などに現場監督者によらずに打重ね時間間隔を直接把握することが難しいという問題があった。   In addition, under the above construction environment, there is a problem that it is difficult to directly grasp the overlapping time interval without relying on the site supervisor when a construction manager such as a construction orderer is present.

本発明は、上記に鑑みてなされたものであって、コンクリート打設現場に居る者が打重ね時間の残り時間を確実かつ容易に把握することができるコンクリート打重ね時間管理用報知装置およびコンクリートの打ち重ね時間管理方法を提供することを目的とする。   The present invention has been made in view of the above, and a concrete laying time management notification device and a concrete laying-out device capable of reliably and easily grasping the remaining time of laying time for a person at a concrete placement site. It is an object to provide a method for managing the time for overwriting.

上記した課題を解決し、目的を達成するために、本発明に係るコンクリート打重ね時間管理用報知装置は、少なくともコンクリートの打設現場に居る者に、前記コンクリートの打重ね時間の管理に関する情報を報知する装置であって、前記コンクリートの打設現場に居る者に視認可能な場所に設けられ、予め定めた前記打重ね時間の残り時間を表示する時間表示手段と、前記打重ね時間の残り時間に対応した報知情報を表示する報知情報表示手段とを備えることを特徴とする。   In order to solve the above-described problems and achieve the object, the concrete overlay time management notification device according to the present invention provides at least information on management of the concrete overlay time to a person at the concrete placement site. A device for informing, provided in a place visible to a person at the concrete placement site, a time display means for displaying a predetermined remaining time of the overlay time, and a remaining time of the overlay time And a notification information display means for displaying notification information corresponding to the above.

また、本発明に係る他のコンクリート打重ね時間管理用報知装置は、上述した発明において、前記時間表示手段は、予め定めた前記打重ね時間からカウントダウン方式で残りの打重ね時間をデジタル表示するものであることを特徴とする。   Further, in the concrete overlaying time management notification device according to the present invention, in the above-described invention, the time display means digitally displays the remaining overlaying time in a countdown manner from the predetermined overlaying time. It is characterized by being.

また、本発明に係る他のコンクリート打重ね時間管理用報知装置は、上述した発明において、前記報知情報表示手段は、前記時間表示手段に近接して放光部を有して設けられ、前記放光部から互いに異なる色を放光可能であり、前記報知情報に対応して予め定めた色の光を、前記放光部から前記打重ね時間の残り時間に対応して放光することを特徴とする。   According to another concrete overlaying time management notification device according to the present invention, in the above-described invention, the notification information display means is provided with a light emitting portion adjacent to the time display means, and Different colors can be emitted from the light part, and light of a predetermined color corresponding to the notification information is emitted from the light emission part corresponding to the remaining time of the overlapping time. And

また、本発明に係る他のコンクリート打重ね時間管理用報知装置は、上述した発明において、光の放射方向を所定の軸線まわりに回動させることができる前記放光部を複数段積層した回転灯からなることを特徴とする。   Further, another concrete overlaying time management alarm device according to the present invention is the above-described invention, in the above-described invention, a rotating lamp in which the light emitting unit capable of rotating the light emission direction around a predetermined axis is stacked in a plurality of stages. It is characterized by comprising.

また、本発明に係る他のコンクリート打重ね時間管理用報知装置は、上述した発明において、前記時間表示手段および前記報知情報表示手段を作動させる作動開始手段をさらに備えることを特徴とする。   In addition, another concrete overlaying time management notifying device according to the present invention is characterized in that, in the above-described invention, further provided is an operation starting means for operating the time display means and the notification information display means.

また、本発明に係るコンクリートの打ち重ね時間管理方法は、上述したコンクリート打重ね時間管理用報知装置を使用したコンクリートの打ち重ね時間管理方法である。   The concrete overlaying time management method according to the present invention is a concrete overlaying time management method using the above-described concrete overlaying time management notification device.

本発明に係るコンクリート打重ね時間管理用報知装置によれば、少なくともコンクリートの打設現場に居る者に、前記コンクリートの打重ね時間の管理に関する情報を報知する装置であって、前記コンクリートの打設現場に居る者に視認可能な場所に設けられ、予め定めた前記打重ね時間の残り時間を表示する時間表示手段と、前記打重ね時間の残り時間に対応した報知情報を表示する報知情報表示手段とを備えるので、例えば現場監督者や作業者だけでなく工事発注者等の施工管理者など、少なくともコンクリート打設現場に居る者が時間表示手段および報知情報表示手段を目視することにより、打重ね時間の残り時間を確実かつ容易に把握することができるという効果を奏する。また、コンクリート打設現場に居る者は打重ね時間の残り時間を容易に共有することができる。   According to the concrete overlaying time management notification device according to the present invention, at least a person at a concrete placement site is notified of information related to the management of the concrete placement time, and the concrete placement time A time display unit that is provided in a place that is visible to a person on the site and displays a remaining time of the predetermined overlapping time, and a notification information display unit that displays notification information corresponding to the remaining time of the overlapping time For example, not only on-site supervisors and workers but also construction managers such as construction orderers, etc., at least those who are at the concrete placement site visually observe the time display means and notification information display means, The remaining time is surely and easily grasped. Moreover, the person who exists in the concrete placement site can easily share the remaining time of the stacking time.

また、本発明に係る他のコンクリート打重ね時間管理用報知装置によれば、前記時間表示手段は、予め定めた前記打重ね時間からカウントダウン方式で残りの打重ね時間をデジタル表示するものであるので、打重ね時間の残り時間が視覚的により認識し易くなり、コンクリート打設現場に居る者は打重ね時間の残り時間をより確実かつ容易に把握することができるという効果を奏する。   Further, according to another concrete overlay time management notification device according to the present invention, the time display means digitally displays the remaining overlay time in a countdown manner from the preset overlay time. The remaining time of the stacking time can be more easily visually recognized, and the person at the concrete placing site can surely and easily grasp the remaining time of the stacking time.

また、本発明に係る他のコンクリート打重ね時間管理用報知装置によれば、前記報知情報表示手段は、前記時間表示手段に近接して放光部を有して設けられ、前記放光部から互いに異なる色を放光可能であり、前記報知情報に対応して予め定めた色の光を、前記放光部から前記打重ね時間の残り時間に対応して放光するので、コンクリート打設現場に居る者は前記打重ね時間の残り時間を視覚的かつ直感的により認識し易いものとなる。このため、コンクリート打設現場に居る者は時間表示手段を目視すれば打重ね時間の残り時間を把握することができると同時に、近接して設けた放光部の異なる発色が直ぐに目に入るので、打重ね時間の残り時間をより直感的に把握することができるという効果を奏する。   Further, according to another concrete overlaying time management notification device according to the present invention, the notification information display means is provided with a light emission part in the vicinity of the time display means, from the light emission part. Since different colors can be emitted and light of a predetermined color corresponding to the notification information is emitted corresponding to the remaining time of the stacking time from the light emitting unit, the concrete placement site The person who is in the position can easily recognize the remaining time of the overlapping time visually and intuitively. For this reason, those who are in the concrete placement site can grasp the remaining time of the stacking time by observing the time display means, and at the same time, different colors of the light emitting part provided in the vicinity can be immediately seen. The remaining time of the stacking time can be grasped more intuitively.

また、本発明に係る他のコンクリート打重ね時間管理用報知装置によれば、光の放射方向を所定の軸線まわりに回動させることができる前記放光部を複数段積層した回転灯からなるので、打重ね時間の残り時間が視覚的かつ直感的により一層認識し易くなる。このため、コンクリート打設現場に居る者は時間表示手段を目視すれば打重ね時間の残り時間を把握することができると同時に、近接して設けた回転灯の光が直ぐに目に入るので、打重ね時間の残り時間をより一層直感的に把握することができるという効果を奏する。   In addition, according to another concrete overlaying time management notification device according to the present invention, it is composed of a rotating lamp in which a plurality of the light-emitting portions capable of rotating the light radiation direction around a predetermined axis are stacked. The remaining time of the overlapping time can be recognized more visually and intuitively. For this reason, a person at the concrete placement site can grasp the remaining time of the stacking time by visually observing the time display means, and at the same time, the light of the rotating lamp provided in the vicinity can be seen immediately. There is an effect that the remaining time of the overlapping time can be grasped more intuitively.

また、本発明に係る他のコンクリート打重ね時間管理用報知装置によれば、前記時間表示手段および前記報知情報表示手段を作動させる作動開始手段をさらに備えるので、例えばコンクリートの1層打設完了時に作動開始手段に入力すれば、時間表示手段および報知情報表示手段は作動を開始して少なくともコンクリート打設現場に居る者に報知する。したがって、打重ね時間の管理が曖昧になるのを防ぐことができる。このため、現場監督者が打設完了時刻の記録を失念したり記録を誤ることによる施工不良の心配がなくなるという効果を奏する。   In addition, according to the other concrete overlaying time management notification device according to the present invention, it further includes an operation start means for operating the time display means and the notification information display means. If input to the operation start means, the time display means and the notification information display means start the operation and notify at least those who are at the concrete placing site. Therefore, it is possible to prevent the management of the overlapping time from becoming ambiguous. For this reason, there is an effect that the on-site supervisor forgets about the record of the completion time of placement and there is no worry about the construction failure due to the wrong record.

また、本発明に係るコンクリートの打ち重ね時間管理方法によれば、上述したコンクリート打重ね時間管理用報知装置を使用したコンクリートの打ち重ね時間管理方法であるので、打重ね時間の管理が曖昧になるのを防ぐことができるという効果を奏する。   In addition, according to the concrete overlay time management method according to the present invention, since the concrete overlay time management method using the above-described concrete overlay time management notification device, the overlay time management becomes ambiguous. There is an effect that can be prevented.

図1は、本発明に係るコンクリート打重ね時間管理用報知装置の実施例を示す概略斜視図である。FIG. 1 is a schematic perspective view showing an embodiment of a concrete overlaying time management notification device according to the present invention. 図2は、本発明に係るコンクリート打重ね時間管理用報知装置の実施例を示す概略ブロック図である。FIG. 2 is a schematic block diagram showing an embodiment of a concrete overlay time management notification device according to the present invention. 図3は、本発明に係るコンクリート打重ね時間管理用報知装置の配置例を示す概略図である。FIG. 3 is a schematic view showing an arrangement example of the concrete overlaying time management notification device according to the present invention. 図4は、本発明に係るコンクリート打重ね時間管理用報知装置による表示例を示す概略図である。FIG. 4 is a schematic view showing a display example by the concrete overlay time management notification device according to the present invention. 図5は、本発明に係るコンクリート打重ね時間管理用報知装置による表示例を示す概略図である。FIG. 5 is a schematic view showing a display example by the concrete overlaying time management notification device according to the present invention. 図6は、本発明に係るコンクリート打重ね時間管理用報知装置による表示例を示す概略図である。FIG. 6 is a schematic view showing an example of display by the concrete overlay time management notification device according to the present invention.

以下に、本発明に係るコンクリート打重ね時間管理用報知装置およびコンクリートの打ち重ね時間管理方法の実施の形態を図面に基づいて詳細に説明する。なお、この実施例によりこの発明が限定されるものではない。   DESCRIPTION OF EMBODIMENTS Embodiments of a concrete overlay time management notification device and a concrete overlay time management method according to the present invention will be described below in detail with reference to the drawings. Note that the present invention is not limited to the embodiments.

図1に示すように、本発明に係るコンクリート打重ね時間管理用報知装置10は、コンクリートの打重ね時間の管理に関する情報を報知する装置であって、予め定めた打重ね時間の残り時間を表示する時間表示手段12と、この打重ね時間の残り時間に対応した報知情報を表示する報知情報表示手段14とを備える。このコンクリート打重ね時間管理用報知装置10は、時間表示手段12および報知情報表示手段14を作動させる押しボタンからなる作動開始手段16をさらに備える。   As shown in FIG. 1, a concrete overlaying time management notification device 10 according to the present invention is a device for notifying information related to concrete overlaying time management, and displays the remaining time of a predetermined overlaying time. And a notification information display means 14 for displaying notification information corresponding to the remaining time of the overlapping time. The concrete overlaying time management notifying device 10 further includes an operation start means 16 including a push button for operating the time display means 12 and the notification information display means 14.

時間表示手段12は、7セグメントのLED表示器からなる横長の平板状物であり、予め定めた打重ね時間からカウントダウン方式で残りの打重ね時間を数字でデジタル表示するものである。こうすることで、打重ね時間の残り時間が視覚的により認識し易くなる。   The time display means 12 is a horizontally long flat plate-shaped object composed of a 7-segment LED display, and digitally displays the remaining overlapping time as a number in a countdown manner from a predetermined overlapping time. This makes it easier to visually recognize the remaining time of the overlapping time.

図1の例では、LED表示器に「02:30」と表示されており、残りの打重ね時間が2時間30分であることを示している。このため、コンクリート打設現場に居る者が時間表示手段12を目視すれば、打重ね時間の残り時間を確実かつ容易に把握することができる。したがって、LED表示器にデジタル表示される数字の態様としては、コンクリート打設現場に居る者(例えば数十m離れた位置にいる作業者)から容易に判読可能な程度の大きさ、色、明るさであることが好ましい。   In the example of FIG. 1, “02:30” is displayed on the LED display, indicating that the remaining stacking time is 2 hours 30 minutes. For this reason, if the person who exists in a concrete placement site looks at the time display means 12, he can grasp | ascertain reliably and easily the remaining time of stacking time. Therefore, as the mode of the numbers digitally displayed on the LED display, the size, color, and brightness that can be easily read by those who are at the concrete placement site (for example, workers who are several tens of meters away). It is preferable.

また、図1等では便宜上、LED表示器の背景色を白色、LED点灯部分を黒色とした場合を示しているが、これに限るものではなく、視認性をより高めるために例えば背景色を黒色に、LED点灯部分を赤色やオレンジ色や黄色などの暖色系の色にしてもよく、さらにこれ以外の色の組み合わせを用いてもよい。また、視認性、利便性を高めるため、夜間や昼間など施工時間帯にあった色の組み合わせを採用してもよい。   1 and the like show the case where the background color of the LED display is white and the LED lighting part is black for the sake of convenience, but the present invention is not limited to this. For example, the background color is black to improve the visibility. In addition, the LED lighting portion may be a warm color such as red, orange or yellow, and a combination of other colors may be used. Moreover, in order to improve visibility and convenience, you may employ | adopt the combination of the color suitable for construction time zones, such as nighttime and daytime.

報知情報表示手段14は、時間表示手段12の右横に近接して設けられ、視認性を高めるため、時間表示手段12の高さよりも高い縦長の直方体状に形成してある。この報知情報表示手段14は、光の放射方向を上下方向の軸線まわりに回動させることができる光源を有する放光部24a〜24cを下から順に3段積層した回転灯14aからなり、基部26上に設けられる。各放光部24a〜24cの側方は透明ガラス28a〜28cでそれぞれ覆われている。   The notification information display means 14 is provided close to the right side of the time display means 12 and is formed in a vertically long rectangular parallelepiped shape higher than the height of the time display means 12 in order to improve visibility. The notification information display means 14 includes a rotating lamp 14a in which light emitting portions 24a to 24c each having a light source capable of rotating a light emission direction about an axis in the vertical direction are stacked in three stages in order from the bottom. Provided on top. The side of each light emission part 24a-24c is each covered with transparent glass 28a-28c.

回転灯14aは、各放光部24a〜24cから互いに異なる色を外方に向けて全方位に放光可能であり、所定の報知情報に対応して予め定めた色の光を、この色を方光可能な放光部から打重ね時間の残り時間に対応して放光するものである。図1の例では、回転灯14aは、各放光部24a、24b、24cからそれぞれ青色、黄色、赤色の3色を放光可能な3色式の回転灯として構成している。   The rotating lamp 14a can emit different colors outward from the light emitting sections 24a to 24c in all directions, and emit light of a predetermined color corresponding to predetermined notification information. It emits light corresponding to the remaining time of the stacking time from the light emitting part capable of emitting light. In the example of FIG. 1, the rotating lamp 14a is configured as a three-color rotating lamp capable of emitting three colors of blue, yellow, and red from each of the light emitting sections 24a, 24b, and 24c.

ここで、各色と報知情報の対応関係としては、例えば青色の場合には打重ね時間の残り時間が多いという報知情報を、黄色の場合には打重ね時間の残り時間が中程度あるという報知情報を、赤色の場合には打重ね時間の残り時間が少ないという報知情報を示すようにすることが考えられる。   Here, as a correspondence relationship between each color and the notification information, for example, notification information that the remaining time of the overlapping time is large in the case of blue, and notification information that the remaining time of the overlapping time is medium in the case of yellow. In the case of red, it is conceivable to show notification information that the remaining time of the overlapping time is short.

回転灯14aは、打重ね時間の残り時間が少なくなるに従い、青色、黄色、赤色の順に放光部からの方光の色を段階的に切り替え、残りの打重ね時間を視覚化することから、回転灯14aの周りに居る者がこれを目視すれば、打重ね時間の残り時間が視覚的かつ直感的により一層認識し易くなる。例えば、予め定めた打重ね時間が2時間30分の場合には、残り時間が2時間30分から1時間までを青色、残り時間が1時間から30分までを黄色、残り時間が30分から0分までを赤色にて各放光部より放光するよう設定してもよいし、もちろん、それぞれをこれ以外の時間幅に設定しても構わない。   Since the rotating lamp 14a gradually changes the color of the direction light from the light emitting part in order of blue, yellow and red as the remaining time of the stacking time decreases, the remaining stacking time is visualized. If a person around the revolving light 14a observes this, the remaining time of the overlapping time can be recognized more visually and intuitively. For example, if the predetermined overlap time is 2 hours and 30 minutes, the remaining time is blue for 2 hours 30 minutes to 1 hour, the remaining time is yellow for 1 hour to 30 minutes, and the remaining time is 30 minutes to 0 minutes. May be set to emit light from each light emitting unit in red or, of course, each may be set to a time width other than this.

作動開始手段16は、時間表示手段12および報知情報表示手段14を作動させる押しボタンにより構成され、時間表示手段12の筐体の上部に出没自在に設けてある。例えばコンクリートの1層打設完了時にこの押しボタンを押下すれば、時間表示手段12および報知情報表示手段14は作動を開始し、時間表示手段12のLED表示器には予め定めた打重ね時間の残り時間が表示され、報知情報表示手段14の回転灯14aからは残り時間に対応した色の放光部から光が放光される。なお、時間の経過とともに時間表示手段12に表示される残り時間は減少していき、この残り時間の減少に応じて報知情報表示手段14の回転灯14から放光される色が例えば青色、黄色、赤色と段階的に変化していくことになる。   The operation start means 16 is constituted by a push button for operating the time display means 12 and the notification information display means 14, and is provided at the top of the casing of the time display means 12 so as to be able to appear and disappear. For example, when the push button is pressed when the concrete one-layer placement is completed, the time display means 12 and the notification information display means 14 start operation, and the LED display of the time display means 12 has a predetermined overlay time. The remaining time is displayed, and light is emitted from the rotating light 14a of the notification information display means 14 from the light emitting portion of the color corresponding to the remaining time. Note that the remaining time displayed on the time display unit 12 decreases with the passage of time, and the color emitted from the rotating lamp 14 of the notification information display unit 14 according to the decrease in the remaining time is, for example, blue or yellow It will change in red and step by step.

次に、本発明のコンクリート打重ね時間管理用報知装置10のブロック構成について説明する。   Next, the block configuration of the concrete overlay time management notification device 10 of the present invention will be described.

図2は、本発明のコンクリート打重ね時間管理用報知装置10の概略ブロック図を示したものである。この図2に示すように、コンクリート打重ね時間管理用報知装置10は、上述した時間表示手段12と、報知情報表示手段14と、作動開始手段16のほかに、時間を計測するための計時手段18と、打重ね時間を設定するための打重ね時間設定手段20と、これらの手段を制御するCPUを有する制御手段22とをさらに備える。計時手段18、制御手段22は時間表示手段12の筐体内部あるいは報知情報表示手段14の基部26などに設けられる。   FIG. 2 is a schematic block diagram of the concrete overlay time management notification device 10 of the present invention. As shown in FIG. 2, the concrete overlaying time management notification device 10 includes a time measuring means for measuring time in addition to the time display means 12, the notification information display means 14, and the operation start means 16 described above. 18, a stacking time setting unit 20 for setting a stacking time, and a control unit 22 having a CPU for controlling these units. The time measuring means 18 and the control means 22 are provided inside the casing of the time display means 12 or the base 26 of the notification information display means 14.

打重ね時間設定手段20は、数値入力用のテンキーや押しボタン等で構成され、時間表示手段12または報知情報表示手段14の筐体に設けることができる。また、このようにする代わりに、ワイヤレスリモコン等にテンキーや押しボタンを設けるとともに、時間表示手段12または報知情報表示手段14の筐体側にリモコン受信手段を設け、遠方操作により打重ね時間を設定可能としてもよい。   The overlapping time setting means 20 is constituted by a numeric keypad for inputting numerical values, a push button or the like, and can be provided on the casing of the time display means 12 or the notification information display means 14. Also, instead of doing this, a wireless remote control or the like is provided with a numeric keypad or push button, and a remote control receiving means is provided on the casing side of the time display means 12 or the notification information display means 14 so that the overlap time can be set by a remote operation. It is good.

上記の構成において、操作者から打重ね時間設定手段20を通じて打重ね時間が設定されると、制御手段22は作動開始手段16からの入力を待つ状態となる。操作者から作動開始手段16の押しボタンが押下されると、制御手段22は、計時手段18による計測時間に基づいて、設定された打重ね時間からカウントダウン方式で打重ね時間の残り時間を演算し、演算した残り時間を時間表示手段12にリアルタイムで表示させる処理を行う。一方、制御手段22は、演算した残り時間に連動して、予め定めた報知情報を報知情報表示手段14に表示させる処理を行う。このような処理により、時間表示手段12、報知情報表示手段14に残り時間、報知情報を表示させることが可能である。   In the above configuration, when the overlay time is set through the overlay time setting means 20 by the operator, the control means 22 waits for an input from the operation start means 16. When the push button of the operation start means 16 is pressed by the operator, the control means 22 calculates the remaining time of the overlapping time by the countdown method from the set overlapping time based on the time measured by the time measuring means 18. The calculated remaining time is displayed on the time display means 12 in real time. On the other hand, the control unit 22 performs a process of displaying predetermined notification information on the notification information display unit 14 in conjunction with the calculated remaining time. By such processing, the remaining time and the notification information can be displayed on the time display unit 12 and the notification information display unit 14.

図3は、本発明のコンクリート打重ね時間管理用報知装置10を配置したコンクリートの打設現場Aの一例を示したものである。図3に示すように、このコンクリートの打設現場Aは、H形鋼からなる鉄骨1、2と格子状に組まれた鉄筋3とからなる施工敷地を有している。本発明のコンクリート打重ね時間管理用報知装置10は、鉄骨1上に載置された部材4上の長手方向に間隔をあけた3箇所(場所B)に配置してあり、それぞれ時間表示手段12の表示面側が手前側を向くような態様で配置される。   FIG. 3 shows an example of a concrete placement site A where the concrete overlaying time management notification device 10 of the present invention is arranged. As shown in FIG. 3, the concrete placement site A has a construction site composed of steel frames 1 and 2 made of H-shaped steel and reinforcing bars 3 assembled in a lattice shape. The concrete overlaying time management notification device 10 of the present invention is arranged at three locations (location B) spaced in the longitudinal direction on the member 4 placed on the steel frame 1, and each of the time display means 12. Are arranged in such a manner that the display surface side faces the front side.

このように、コンクリート打重ね時間管理用報知装置10は、コンクリートの打設現場Aに居る者に視認可能な場所Bに設けられるので、例えば現場監督者や作業者だけでなく工事発注者等の施工管理者など、少なくともコンクリートの打設現場Aに居る者は時間表示手段12および報知情報表示手段14を目視することで、これらに表示された残りの打重ね時間を確実かつ容易に把握することができ、さらに、打重ね時間の残り時間を共有することができる。   In this way, the concrete overlaying time management notification device 10 is provided in the place B that is visible to the person at the concrete placement site A. A person who is at least at the concrete placement site A, such as a construction manager, can view the remaining display time displayed on the time display means 12 and the notification information display means 14 surely and easily. In addition, the remaining time of the stacking time can be shared.

特に、時間表示手段12を目視すれば打重ね時間の残り時間を把握することができると同時に、近接して設けた報知情報表示手段14の回転灯の青色、黄色、赤色のいずれかに発色された光が直ぐに目に入るので、打重ね時間の残り時間をより一層直感的に把握することができる。また、本発明によれば、全作業者が目視により残りの打重ね時間を容易に確認できるため、打重ね時間の管理が曖昧になるのを防ぎ、打重ね時間の管理を従来の方法に比べてより確実にすることができる。このため、現場監督者が打設完了時刻の記録を失念したり記録を誤ることによる施工不良の心配もなくなる。   In particular, if the time display means 12 is visually checked, the remaining time of the overlaying time can be grasped, and at the same time, the rotating light of the notification information display means 14 provided in the vicinity is colored in blue, yellow or red. Since the light immediately enters the eye, it is possible to more intuitively grasp the remaining time of the stacking time. In addition, according to the present invention, since all workers can easily confirm the remaining stacking time by visual observation, the management of the stacking time is prevented from becoming ambiguous, and the management of the stacking time is compared with the conventional method. Can be more reliable. For this reason, the on-site supervisor forgets the record of the completion time of placement and there is no fear of construction failure due to incorrect recording.

次に、本発明のコンクリート打重ね時間管理用報知装置10による表示例について図4〜図6を参照しながら説明する。なお、以下の例では、予め定めた打重ね時間が2時間30分の場合について説明する。また、打重ね時間の残り時間が2時間30分から1時間までを青色、残り時間が1時間から30分までを黄色、残り時間が30分から0分までを赤色で放光されるものとする。   Next, display examples by the concrete overlay time management notification device 10 of the present invention will be described with reference to FIGS. In the following example, a case where a predetermined overlapping time is 2 hours 30 minutes will be described. Further, the remaining time of the stacking time is emitted in blue from 2 hours 30 minutes to 1 hour, yellow in the remaining time from 1 hour to 30 minutes, and red in the remaining time from 30 minutes to 0 minutes.

図4に示すように、時間表示手段12には残り時間を表す「01:30」が表示され、報知情報表示手段14の回転灯14aからは最下段の放光部24aにより青色の光が放たれている。したがって、打重ね時間の残り時間が1時間30分であり、残り時間は未だ十分多いことがわかる。   As shown in FIG. 4, “01:30” representing the remaining time is displayed on the time display unit 12, and blue light is emitted from the rotating light 14 a of the notification information display unit 14 by the lowermost light emitting unit 24 a. I'm leaning. Therefore, it can be seen that the remaining time of the stacking time is 1 hour 30 minutes, and the remaining time is still sufficiently long.

図5に示すように、時間表示手段12には残り時間を表す「00:45」が表示され、報知情報表示手段14の回転灯14aからは中段の放光部24bにより黄色の光が放たれている。したがって、打重ね時間の残り時間が45分であり、残り時間は中程度あるものの十分でないことがわかる。   As shown in FIG. 5, “00:45” representing the remaining time is displayed on the time display unit 12, and yellow light is emitted from the rotating lamp 14 a of the notification information display unit 14 by the middle light emitting unit 24 b. ing. Therefore, it can be seen that the remaining time of the stacking time is 45 minutes and the remaining time is moderate but not sufficient.

図6に示すように、時間表示手段12には残り時間を表す「00:10」が表示され、報知情報表示手段14の回転灯14aからは最上段の放光部24cにより赤色の光が放たれている。したがって、打重ね時間の残り時間が10分であり、残り時間はほとんどないことがわかる。   As shown in FIG. 6, “00:10” representing the remaining time is displayed on the time display unit 12, and red light is emitted from the rotating lamp 14 a of the notification information display unit 14 by the uppermost light emitting unit 24 c. I'm leaning. Therefore, it can be seen that the remaining time of the stacking time is 10 minutes and there is almost no remaining time.

なお、上記の実施の形態において、報知情報表示手段14を上下方向に3段積層した3色の回転灯にて構成する場合について説明したが、施工条件や現場条件などにあわせて構成を適宜変更してもよい。例えば、回転灯の積層数を3段に限らず、1段、2段、4段以上の複数段積層してなるもので構成し、複数色の回転灯を実現するようにしてもよい。また、上下方向に複数段積層する代わりに、左右方向あるいは前後方向に複数段積層して回転灯を実現してもよい。また、回転灯とせずに単なる照明灯を用いてもよいし、あるいは、単に光を点滅させる点滅灯を用いてもよい。   In the above embodiment, the case where the notification information display means 14 is configured by three-color rotating lamps that are stacked in three stages in the vertical direction has been described. However, the configuration is appropriately changed according to construction conditions, site conditions, and the like. May be. For example, the number of rotating lamps is not limited to three, but may be configured by stacking a plurality of stages of one stage, two stages, four stages or more to realize a multi-color rotating lamp. Further, instead of stacking a plurality of stages in the vertical direction, a rotating lamp may be realized by stacking a plurality of stages in the left-right direction or the front-rear direction. Further, a simple illumination lamp may be used instead of a rotating lamp, or a blinking lamp that simply blinks light may be used.

また、上記の実施の形態において、報知情報表示手段14を時間表示手段12の右横に近接して設けた場合について説明したが、これに限るものではなく、時間表示手段12の左横に近接配置してもよいし、上部あるいは下部に近接配置してもよく、さらに、報知情報表示手段14を時間表示手段12から間を離して配置してもよい。いずれにせよ、時間表示手段12および報知情報表示手段14は、コンクリート打設現場に居る者から確実かつ容易に目視できるような位置に配置することが望ましい。また、報知情報表示手段14を時間表示手段12の筐体に一体化させたり、時間表示手段12のLED表示器内に組み入れた構成を採用してもよい。   Further, in the above embodiment, the case where the notification information display unit 14 is provided close to the right side of the time display unit 12 has been described. However, the present invention is not limited to this, and is close to the left side of the time display unit 12. It may be arranged close to the upper part or the lower part, and the notification information display means 14 may be arranged away from the time display means 12. In any case, it is desirable to arrange the time display means 12 and the notification information display means 14 at positions where they can be surely and easily viewed from a person at the concrete placement site. Further, the notification information display unit 14 may be integrated with the casing of the time display unit 12 or may be incorporated into the LED display of the time display unit 12.

また、上記の実施の形態において、作動開始手段16を時間表示手段12の筐体の上部に出没自在に設けた押しボタンにより構成した場合について説明したが、これに限るものではなく、例えば作動開始手段16をシーソー型、レバー型、スライド型のスイッチで構成してもよい。また、作動開始手段16を時間表示手段12の筐体の上部に設ける代わりに、筐体の前後左右など他の部位や、報知情報表示手段14に設けてもよく、さらに、時間表示手段12および報知情報表示手段14とは別体に設けてもよい。また、作動開始手段16をワイヤレスリモコンや携帯端末などで遠隔操作が可能なようにしてもよい。   Further, in the above-described embodiment, the case where the operation start means 16 is configured by a push button that can be freely moved in and out of the time display means 12 has been described. However, the present invention is not limited to this. The means 16 may be a seesaw type, lever type, or slide type switch. Further, instead of providing the operation start means 16 at the upper part of the casing of the time display means 12, it may be provided in other parts such as front, rear, left and right of the casing, or in the notification information display means 14, and the time display means 12 and It may be provided separately from the notification information display means 14. Further, the operation starting means 16 may be remotely controlled by a wireless remote controller or a portable terminal.

以上説明したように、本発明に係るコンクリート打重ね時間管理用報知装置によれば、少なくともコンクリートの打設現場に居る者に、前記コンクリートの打重ね時間の管理に関する情報を報知する装置であって、前記コンクリートの打設現場に居る者に視認可能な場所に設けられ、予め定めた前記打重ね時間の残り時間を表示する時間表示手段と、前記打重ね時間の残り時間に対応した報知情報を表示する報知情報表示手段とを備えるので、例えば現場監督者や作業者だけでなく工事発注者等の施工管理者など、少なくともコンクリート打設現場に居る者が時間表示手段および報知情報表示手段を目視することにより、打重ね時間の残り時間を確実かつ容易に把握することができる。また、コンクリート打設現場に居る者は打重ね時間の残り時間を容易に共有することができる。   As described above, according to the concrete overlay time management notification device according to the present invention, it is a device for notifying at least a person at a concrete placement site of information regarding management of the concrete overlay time. , Provided in a place that is visible to a person at the concrete placement site, and a time display means for displaying the predetermined remaining time of the overlay time, and notification information corresponding to the remaining time of the overlay time For example, not only on-site supervisors and workers but also construction managers such as construction orderers, at least those who are at the concrete placement site visually check the time display means and the notification information display means. By doing so, the remaining time of the stacking time can be grasped reliably and easily. Moreover, the person who exists in the concrete placement site can easily share the remaining time of the stacking time.

また、本発明に係る他のコンクリート打重ね時間管理用報知装置によれば、前記時間表示手段は、予め定めた前記打重ね時間からカウントダウン方式で残りの打重ね時間をデジタル表示するものであるので、打重ね時間の残り時間が視覚的により認識し易くなり、コンクリート打設現場に居る者は打重ね時間の残り時間をより確実かつ容易に把握することができる。   Further, according to another concrete overlay time management notification device according to the present invention, the time display means digitally displays the remaining overlay time in a countdown manner from the preset overlay time. The remaining time of the stacking time is more easily visually recognized, and the person at the concrete placing site can more reliably and easily grasp the remaining time of the stacking time.

また、本発明に係る他のコンクリート打重ね時間管理用報知装置によれば、前記報知情報表示手段は、前記時間表示手段に近接して放光部を有して設けられ、前記放光部から互いに異なる色を放光可能であり、前記報知情報に対応して予め定めた色の光を、前記放光部から前記打重ね時間の残り時間に対応して放光するので、コンクリート打設現場に居る者は前記打重ね時間の残り時間を視覚的かつ直感的により認識し易いものとなる。このため、コンクリート打設現場に居る者は時間表示手段を目視すれば打重ね時間の残り時間を把握することができると同時に、近接して設けた放光部の異なる発色が直ぐに目に入るので、打重ね時間の残り時間をより直感的に把握することができる。   Further, according to another concrete overlaying time management notification device according to the present invention, the notification information display means is provided with a light emission part in the vicinity of the time display means, from the light emission part. Since different colors can be emitted and light of a predetermined color corresponding to the notification information is emitted corresponding to the remaining time of the stacking time from the light emitting unit, the concrete placement site The person who is in the position can easily recognize the remaining time of the overlapping time visually and intuitively. For this reason, those who are in the concrete placement site can grasp the remaining time of the stacking time by observing the time display means, and at the same time, different colors of the light emitting part provided in the vicinity can be immediately seen. It is possible to more intuitively grasp the remaining time of the stacking time.

また、本発明に係る他のコンクリート打重ね時間管理用報知装置によれば、光の放射方向を所定の軸線まわりに回動させることができる前記放光部を複数段積層した回転灯からなるので、打重ね時間の残り時間が視覚的かつ直感的により一層認識し易くなる。このため、コンクリート打設現場に居る者は時間表示手段を目視すれば打重ね時間の残り時間を把握することができると同時に、近接して設けた回転灯の光が直ぐに目に入るので、打重ね時間の残り時間をより一層直感的に把握することができる。   In addition, according to another concrete overlaying time management notification device according to the present invention, it is composed of a rotating lamp in which a plurality of the light-emitting portions capable of rotating the light radiation direction around a predetermined axis are stacked. The remaining time of the overlapping time can be recognized more visually and intuitively. For this reason, a person at the concrete placement site can grasp the remaining time of the stacking time by visually observing the time display means, and at the same time, the light of the rotating lamp provided in the vicinity can be seen immediately. The remaining time of the overlapping time can be grasped more intuitively.

また、本発明に係る他のコンクリート打重ね時間管理用報知装置によれば、前記時間表示手段および前記報知情報表示手段を作動させる作動開始手段をさらに備えるので、例えばコンクリートの1層打設完了時に作動開始手段に入力すれば、時間表示手段および報知情報表示手段は作動を開始して少なくともコンクリート打設現場に居る者に報知する。したがって、打重ね時間の管理が曖昧になるのを防ぐことができる。このため、現場監督者が打設完了時刻の記録を失念したり記録を誤ることによる施工不良の心配がなくなる。   In addition, according to the other concrete overlaying time management notification device according to the present invention, it further includes an operation start means for operating the time display means and the notification information display means. If input to the operation start means, the time display means and the notification information display means start the operation and notify at least those who are at the concrete placing site. Therefore, it is possible to prevent the management of the overlapping time from becoming ambiguous. For this reason, the on-site supervisor forgets about the record of the completion time of placement and there is no worry of construction failure due to incorrect recording.

また、本発明に係るコンクリートの打ち重ね時間管理方法によれば、上述したコンクリート打重ね時間管理用報知装置を使用したコンクリートの打ち重ね時間管理方法であるので、打重ね時間の管理が曖昧になるのを防ぐことができる。   In addition, according to the concrete overlay time management method according to the present invention, since the concrete overlay time management method using the above-described concrete overlay time management notification device, the overlay time management becomes ambiguous. Can be prevented.

以上のように、本発明に係るコンクリート打重ね時間管理用報知装置およびコンクリートの打ち重ね時間管理方法は、浄水場や地下鉄の駅等の大規模地下躯体などのコンクリートの打設工事において、コールドジョイントの発生を防止するために、打重ね時間を管理するのに有用であり、特に、少なくともコンクリート打設現場に居る者が打重ね時間の残り時間を確実かつ容易に把握するのに適している。   As described above, the concrete overlay time management notification device and the concrete overlay time management method according to the present invention are a cold joint in concrete placement work such as a large-scale underground building such as a water purification plant or a subway station. It is useful for managing the stacking time in order to prevent the occurrence of this, and is particularly suitable for at least a person at the concrete placing site to surely and easily grasp the remaining time of the stacking time.

10 コンクリート打重ね時間管理用報知装置
12 時間表示手段
14 報知情報表示手段
14a 回転灯
16 作動開始手段
18 計時手段
20 打重ね時間設定手段
22 制御手段
24a、24b、24c 放光部
26 基部
28a,28b,28c 透明ガラス
DESCRIPTION OF SYMBOLS 10 Concrete overlaying time management notification device 12 Time display means 14 Notification information display means 14a Rotating lamp 16 Operation start means 18 Timekeeping means 20 Stacking time setting means 22 Control means 24a, 24b, 24c Light emitting part 26 Base parts 28a, 28b 28c Clear glass

Claims (6)

少なくともコンクリートの打設現場に居る者に、前記コンクリートの打重ね時間の管理に関する情報を報知する装置であって、
前記コンクリートの打設現場に居る者に視認可能な場所に設けられ、予め定めた前記打重ね時間の残り時間を表示する時間表示手段と、前記打重ね時間の残り時間に対応した報知情報を表示する報知情報表示手段とを備えることを特徴とするコンクリート打重ね時間管理用報知装置。
An apparatus for informing at least a person at a concrete placement site of information related to the management of the concrete stacking time,
Provided in a place that is visible to a person at the concrete placement site, and displays time display means for displaying a predetermined remaining time of the overlay time, and notification information corresponding to the remaining time of the overlay time. An information device for concrete laying time management comprising: information information display means for performing.
前記時間表示手段は、予め定めた前記打重ね時間からカウントダウン方式で残りの打重ね時間をデジタル表示するものであることを特徴とする請求項1に記載のコンクリート打重ね時間管理用報知装置。   2. The concrete overlay time management notification device according to claim 1, wherein the time display means digitally displays the remaining overlay time in a countdown manner from the preset overlay time. 前記報知情報表示手段は、前記時間表示手段に近接して放光部を有して設けられ、前記放光部から互いに異なる色を放光可能であり、前記報知情報に対応して予め定めた色の光を、前記放光部から前記打重ね時間の残り時間に対応して放光することを特徴とする請求項1または2に記載のコンクリート打重ね時間管理用報知装置。   The notification information display means is provided with a light emission part in proximity to the time display means, and can emit different colors from the light emission part, and is determined in advance corresponding to the notification information. 3. The concrete overlaying time management notification device according to claim 1 or 2, wherein light of a color is emitted from the light emitting unit corresponding to the remaining time of the overlaying time. 光の放射方向を所定の軸線まわりに回動させることができる前記放光部を複数段積層した回転灯からなることを特徴とする請求項3に記載のコンクリート打重ね時間管理用報知装置。   4. The concrete overlay time management notification device according to claim 3, comprising a rotating lamp in which a plurality of the light-emitting portions capable of rotating a light emission direction about a predetermined axis are stacked. 前記時間表示手段および前記報知情報表示手段を作動させる作動開始手段をさらに備えることを特徴とする請求項1〜4のいずれか一つに記載のコンクリート打重ね時間管理用報知装置。   The concrete overlaying time management notification device according to any one of claims 1 to 4, further comprising an operation start unit that operates the time display unit and the notification information display unit. 請求項1〜5のいずれか一つに記載のコンクリート打重ね時間管理用報知装置を使用したコンクリートの打ち重ね時間管理方法。   A concrete overlaying time management method using the concrete overlaying time management notification device according to any one of claims 1 to 5.
JP2013098775A 2013-05-08 2013-05-08 Notification device for concrete placing time management, and concrete placing time management method Pending JP2014219288A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013098775A JP2014219288A (en) 2013-05-08 2013-05-08 Notification device for concrete placing time management, and concrete placing time management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013098775A JP2014219288A (en) 2013-05-08 2013-05-08 Notification device for concrete placing time management, and concrete placing time management method

Publications (1)

Publication Number Publication Date
JP2014219288A true JP2014219288A (en) 2014-11-20

Family

ID=51937871

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013098775A Pending JP2014219288A (en) 2013-05-08 2013-05-08 Notification device for concrete placing time management, and concrete placing time management method

Country Status (1)

Country Link
JP (1) JP2014219288A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016058593A (en) * 2014-09-11 2016-04-21 富士機械製造株式会社 Operation panel combining display

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5338379A (en) * 1976-09-20 1978-04-08 Seiko Epson Corp Clock for conference
JPS62198606U (en) * 1986-06-06 1987-12-17
JP2012229529A (en) * 2011-04-25 2012-11-22 Toda Constr Co Ltd Time management system for concrete placement and the time management method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5338379A (en) * 1976-09-20 1978-04-08 Seiko Epson Corp Clock for conference
JPS62198606U (en) * 1986-06-06 1987-12-17
JP2012229529A (en) * 2011-04-25 2012-11-22 Toda Constr Co Ltd Time management system for concrete placement and the time management method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016058593A (en) * 2014-09-11 2016-04-21 富士機械製造株式会社 Operation panel combining display

Similar Documents

Publication Publication Date Title
JP5406090B2 (en) Concrete placement management system
US20150056583A1 (en) Underground mining training simulator
JP2014114638A (en) Time interval control system for concrete placement in layers
US20200097874A1 (en) Method and System for Managing and/or Monitoring a Project or a Process
CN108171795A (en) A kind of display methods of pipe gallery, device and virtual reality device
CN115631604A (en) Near-potential operation voltage level identification and safety distance early warning system and method
JP2014219288A (en) Notification device for concrete placing time management, and concrete placing time management method
KR20140132602A (en) Apparatus for managing tower crane remotely
Biotto et al. Adapted use of andon in a horizontal residential construction project
WO2018078773A1 (en) Signal indicator lamp system and signal indicator lamp therefor
CN204883348U (en) Cement produced with dry method production line safety monitoring system
CN103103998A (en) Intelligent bulldozing method capable of controlling level foundation elevation randomly and automatically
JP5357798B2 (en) Building status display system
KR100865472B1 (en) System for unified managing of illumination establishment
JP2005141094A (en) Display device
WO2022121910A1 (en) Factory server embedded in distributed control system and secure network structure thereof
CN102546262B (en) A kind of regulator control system
JP6630065B2 (en) Schedule management system and schedule management method
Cheung et al. Applying virtual reality to improve the construction logistics of high-rise modular integrated construction
JP3196401U (en) Emergency disaster warning system
KR101987914B1 (en) Live wire using System and Truck for reflecting the changes in task for non-interrupting live wire simultaneously
JP7390457B1 (en) Lighting control/condition monitoring system
JP6161579B2 (en) Display control system and control center using the same
JP2018104933A (en) Construction management device for civil engineering construction work
JP2019143697A (en) Opening display of electric valve drive unit

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20151118

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20160908

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20161025

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02