JP2014152538A - Slab curing method - Google Patents

Slab curing method Download PDF

Info

Publication number
JP2014152538A
JP2014152538A JP2013023893A JP2013023893A JP2014152538A JP 2014152538 A JP2014152538 A JP 2014152538A JP 2013023893 A JP2013023893 A JP 2013023893A JP 2013023893 A JP2013023893 A JP 2013023893A JP 2014152538 A JP2014152538 A JP 2014152538A
Authority
JP
Japan
Prior art keywords
slab
curing method
rising
construction
area
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2013023893A
Other languages
Japanese (ja)
Other versions
JP5894547B2 (en
Inventor
Yutaka Saito
豊 齋藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2013023893A priority Critical patent/JP5894547B2/en
Publication of JP2014152538A publication Critical patent/JP2014152538A/en
Application granted granted Critical
Publication of JP5894547B2 publication Critical patent/JP5894547B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a slab curing method capable of reducing construction costs by shortening a construction period.SOLUTION: A slab curing method 1 includes: a step S1 of placing concrete for a slab 10; a step S2 of providing a reference line 20 for skeleton work on a surface of the slab 10; a step S3 of setting an area, which includes a column reinforcement 12 elongated upward from the surface of the slab 10, as a predetermined area A and providing an interception member 13 by surrounding an area, except the predetermined area A, of the surface of the slab 10; and a step S4 of submerging the slab 10 by infilling water into the area surrounded by the interception member 13.

Description

本発明は、スラブ養生方法に関する。詳しくは、コンクリート打設後のスラブの養生方法に関する。   The present invention relates to a slab curing method. In detail, it is related with the curing method of the slab after concrete placement.

従来より、コンクリート打設後のスラブ表面を散水養生を行うことが行われている(特許文献1、2参照)。散水養生とは、コンクリート打設後のスラブに散水して、打設したコンクリート表面が乾燥するのを防止することである。   Conventionally, the surface of a slab after placing concrete is subjected to watering curing (see Patent Documents 1 and 2). Sprinkling curing is to sprinkle the slab after placing concrete and prevent the cast concrete surface from drying.

例えば、特許文献1では、タイマーを設けた養生ホースを用いて、無人で散水養生を実行する。特許文献2では、スラブの周囲に止水処理をして、通水パイプによりスラブのコンクリートを水張養生する。   For example, in patent document 1, watering curing is performed unattended using the curing hose which provided the timer. In Patent Document 2, water stop treatment is performed around the slab, and the concrete of the slab is hydrostatically cured with a water pipe.

特開平11−324327号公報JP-A-11-324327 特開2009−101569号公報JP 2009-101568 A

しかしながら、以上のような散水養生では、スラブが冠水している期間、スラブ上の工事を進めることができず、工期が長期化し、施工コストが増大する、という問題があった。   However, the watering curing as described above has a problem that the construction on the slab cannot be carried out while the slab is flooded, the construction period is prolonged, and the construction cost is increased.

本発明は、工期を短縮して、施工費用を低減できるスラブ養生方法を提供することを目的とする。   An object of this invention is to provide the slab curing method which can shorten a construction period and can reduce construction expense.

請求項1に記載のスラブ養生方法(例えば、後述のスラブ養生方法1)は、スラブ(例えば、後述のスラブ10)のコンクリートを打設する工程(例えば、後述のステップS1)と、当該スラブ表面に躯体工事の基準線(例えば、後述の基準線20)を設ける工程(例えば、後述のステップS2)と、当該スラブの外縁部に沿って堰き止め部材(例えば、後述の堰き止め部材13)を設ける工程(例えば、後述のステップS3)と、前記堰き止め部材で囲まれた領域内に水を張って、前記スラブを冠水させる工程(例えば、後述のステップS4)と、を備えることを特徴とする。   The slab curing method according to claim 1 (for example, slab curing method 1 described later) includes a step of placing concrete of a slab (for example, slab 10 described later) (for example, step S1 described later), and the surface of the slab. A step (for example, step S2 to be described later) for providing a base line for frame construction (for example, step S2 to be described later) and a blocking member (for example, a blocking member 13 to be described later) along the outer edge of the slab. A step of providing (for example, step S3 to be described later) and a step of flooding the slab with water in an area surrounded by the damming member (for example, step S4 to be described later). To do.

請求項2に記載のスラブ養生方法(例えば、後述のスラブ養生方法1)は、スラブ(例えば、後述のスラブ10)のコンクリートを打設する工程(例えば、後述のステップS1)と、当該スラブ表面から上方に延びる立上がり鉄筋(例えば、後述の柱筋12)および立上がり躯体のうち少なくとも一方を含む領域を所定領域(例えば、後述の所定領域A)とし、前記スラブ表面のうち当該所定領域を除いた領域を囲んで堰き止め部材(例えば、後述の堰き止め部材13)を設ける工程(例えば、後述のステップS3)と、前記堰き止め部材で囲まれた領域内に水を張って、前記スラブを冠水させる工程(例えば、後述のステップS4)と、を備えることを特徴とする。   The slab curing method according to claim 2 (for example, slab curing method 1 described later) includes a step of placing concrete of a slab (for example, slab 10 described later) (for example, step S1 described later), and the surface of the slab. A region including at least one of rising reinforcing bars (for example, below-mentioned column reinforcing bars 12) and rising rods extending from the upper side is defined as a predetermined region (for example, predetermined region A described later), and the predetermined region is excluded from the slab surface. A step (for example, step S3 to be described later) for providing a damming member (for example, a damming member 13 to be described later) surrounding the region, and water is applied to the region surrounded by the damming member to flood the slab. And a step (for example, step S4 to be described later).

請求項3に記載のスラブ養生方法は、前記スラブを冠水させた状態で、前記所定領域内の工事を行う工程(例えば、後述のステップS5)をさらに備えることを特徴とする。   The slab curing method according to claim 3 further includes a step (for example, step S5 described later) of performing construction in the predetermined area in a state where the slab is flooded.

所定領域内の工事としては、柱筋や壁筋などの立上がり鉄筋に配筋する工事、立上がり鉄筋に型枠を建て込む工事、立上がり躯体から延びる鉄筋に配筋する工事、立上がり躯体に型枠やプレキャスト部材を建て込む工事などが挙げられる。   The construction within the specified area includes the work to arrange the rising bars such as column bars and wall bars, the construction of the formwork on the rising bars, the construction of the reinforcing bars extending from the rising frame, the formwork and For example, construction of precast members.

この発明によれば、スラブ養生後の作業工程を見据えてスラブ表面に躯体工事の基準線を設け、その後、スラブの外縁部に沿って堰き止め部材を設けて、この堰き止め部材で囲まれた領域内に水を張ってスラブを冠水させる。あるいは、立上がり鉄筋および立上がり躯体のうち少なくとも一方を含む領域を除いた領域を囲んで堰き止め部材を設けて、この堰き止め部材で囲まれた領域内に水を張ってスラブを冠水させる。
よって、スラブのコンクリートを養生しつつ、立上がり鉄筋や立上がり躯体の工事を継続して作業できるので、工期を短縮して、施工費用を低減できる。
According to the present invention, in view of the work process after slab curing, a base line for frame construction is provided on the surface of the slab, and then a dam member is provided along the outer edge of the slab, and is surrounded by the dam member. Fill the area with water to flood the slab. Alternatively, a dam member is provided so as to surround a region excluding a region including at least one of the rising reinforcing bars and the rising frame, and water is filled in the region surrounded by the dam member to flood the slab.
Therefore, since the construction of the rising rebar and the rising frame can be continued while curing the concrete of the slab, the construction period can be shortened and the construction cost can be reduced.

請求項4に記載のスラブ養生方法は、前記所定領域内の工事を行う工程では、前記スラブ表面から上方に延びる立上がり鉄筋、および、前記立上がり躯体から上方に延びる立上がり鉄筋のうち少なくとも一方は、柱筋であり、当該柱筋に機械式継手(例えば、後述の機械式継手16)を用いて鉄筋材(例えば、後述の柱筋14)を接合することを特徴とする。   In the slab curing method according to claim 4, in the step of performing the construction in the predetermined area, at least one of the rising reinforcing bar extending upward from the slab surface and the rising reinforcing bar extending upward from the rising frame is a column. A reinforcing bar material (for example, a column reinforcement 14 described later) is joined to the column reinforcement using a mechanical coupling (for example, a mechanical coupling 16 described below).

この発明によれば、立上がり鉄筋や立上がり躯体から上方に延びる鉄筋に対して、機械式継手を用いて鉄筋材を接合したので、鉄筋材の接合時に圧接継手のように火花が発生しない。よって、スラブ養生の水に火花が落下して養生が不十分になるのを防止できる。   According to the present invention, since the reinforcing bar material is joined to the reinforcing bars that extend upward from the rising reinforcing bars and the rising frame using the mechanical joint, no spark is generated unlike the press-fit joints when the reinforcing bars are joined. Therefore, it is possible to prevent the slab curing from being insufficiently cured due to a spark falling on the water.

本発明によれば、スラブ養生後の作業工程を見据えてスラブ表面に躯体工事の基準線を設け、その後、スラブの外縁部を囲んで堰き止め部材を設けて、この堰き止め部材で囲まれた領域内に水を張ってスラブを冠水させる。あるいは、立上がり鉄筋および立上がり躯体のうち少なくとも一方を含む領域を除いた領域を囲んで堰き止め部材を設けて、この堰き止め部材で囲まれた領域内に水を張ってスラブを冠水させる。よって、スラブのコンクリートを養生しつつ、立上がり鉄筋や立上がり躯体の工事を継続して作業できるので、工期を短縮して、施工費用を低減できる。   According to the present invention, a reference line for frame construction is provided on the surface of the slab in anticipation of the work process after slab curing, and then a dam member is provided around the outer edge of the slab, and is surrounded by the dam member. Fill the area with water to flood the slab. Alternatively, a dam member is provided so as to surround a region excluding a region including at least one of the rising reinforcing bars and the rising frame, and water is filled in the region surrounded by the dam member to flood the slab. Therefore, since the construction of the rising rebar and the rising frame can be continued while curing the concrete of the slab, the construction period can be shortened and the construction cost can be reduced.

本発明の一実施形態に係るスラブ養生方法のフローチャートである。It is a flowchart of the slab curing method which concerns on one Embodiment of this invention. 前記実施形態に係るスラブ養生方法を説明するための斜視図(その1)である。It is a perspective view (the 1) for demonstrating the slab curing method which concerns on the said embodiment. 前記実施形態に係るスラブ養生方法を説明するための斜視図(その2)である。It is a perspective view (the 2) for demonstrating the slab curing method which concerns on the said embodiment. 前記実施形態に係るスラブ養生方法を説明するための斜視図(その3)である。It is a perspective view (the 3) for demonstrating the slab curing method which concerns on the said embodiment. 前記実施形態に係るスラブ養生方法を説明するための斜視図(その4)である。It is a perspective view (the 4) for demonstrating the slab curing method which concerns on the said embodiment.

以下、本発明の一実施形態について、図面を参照しながら説明する。
図1は、本発明の一実施形態に係るスラブ養生方法1のフローチャートである。
Hereinafter, an embodiment of the present invention will be described with reference to the drawings.
FIG. 1 is a flowchart of a slab curing method 1 according to an embodiment of the present invention.

ステップS1では、図2に示すように、スラブ10のコンクリートを打設する。この状態では、スラブ10の表面からは、各柱11の立上がり鉄筋としての柱筋12が上方に突出して延びている。なお、図示しないが、このスラブ10を囲んで工事用の仮設足場が架設されている。   In step S1, concrete of the slab 10 is placed as shown in FIG. In this state, from the surface of the slab 10, the column reinforcing bars 12 as the rising reinforcing bars of the columns 11 protrude and extend upward. Although not shown, a temporary scaffold for construction is installed around the slab 10.

ステップS2では、図3に示すように、スラブ10の表面に躯体工事の基準線20を設定する。具体的には、スラブ表面に基準線としての親墨21を打つとともに、この親墨21に基づいて、型枠を建て込むための基準線である小墨22を打つ。   In step S <b> 2, as shown in FIG. 3, a base line 20 for the frame construction is set on the surface of the slab 10. Specifically, a master ink 21 as a reference line is hit on the surface of the slab, and a small ink 22 which is a reference line for building a formwork is hit based on the master ink 21.

ステップS3では、図3に示すように、スラブ10の表面から上方に延びる柱筋12を囲む領域を所定領域Aとする。そして、スラブ10の表面のうち所定領域Aを除いた領域でかつスラブ10の外縁部に沿って、堰き止め部材13を設置する。具体的には、堰き止め部材13は、スラブ10の表面に釘で固定された板材であり、この板材とスラブ10との間には、図示しない三角シールが打設される。   In step S3, as shown in FIG. 3, a region surrounding the column reinforcement 12 extending upward from the surface of the slab 10 is defined as a predetermined region A. And the dam member 13 is installed in the area | region except the predetermined area | region A among the surfaces of the slab 10, and along the outer edge part of the slab 10. As shown in FIG. Specifically, the damming member 13 is a plate member fixed to the surface of the slab 10 with a nail, and a triangular seal (not shown) is placed between the plate member and the slab 10.

ステップS4では、図4に示すように、堰き止め部材13で囲まれた領域内に水を張って、スラブ10を冠水させる   In step S4, as shown in FIG. 4, the slab 10 is submerged by spreading water in the region surrounded by the blocking member 13.

ステップS5では、図5に示すように、スラブ10を冠水させる一方で、所定領域Aつまり水を張っていない領域内の工事を継続する。
具体的には、鉄筋材としての柱筋14を地組みしておき、この地組みした柱筋14をクレーン15で吊上げて、スラブ10の表面から突出した柱筋12に機械式継手16を用いて接合する。次に、図示しないが、この柱筋12を接合した後、各柱11の柱型枠の建て込みを開始する。
In step S5, as shown in FIG. 5, the slab 10 is flooded, while the construction in the predetermined area A, that is, the area where water is not applied is continued.
Specifically, a column reinforcement 14 as a reinforcing bar material is preliminarily built, and the built-up column reinforcement 14 is lifted by a crane 15, and a mechanical joint 16 is used for the column reinforcement 12 protruding from the surface of the slab 10. And join. Next, although not shown in the figure, after the column bars 12 are joined, the column frame of each column 11 starts to be built.

なお、所定領域A内に立上がり躯体がある場合には、この立上がり躯体から上方に延びる柱筋に機械式継手を用いて鉄筋材を接合してもよいし、さらに、立上がり躯体に型枠やプレキャスト部材を建て込む工事などを行ってもよい。   In addition, when there is a rising frame in the predetermined region A, a reinforcing bar material may be joined to the column bar extending upward from the rising frame using a mechanical joint, and further, a formwork or a precast is attached to the rising frame. You may perform construction to build a member.

ステップS6では、スラブ10のコンクリート養生期間の終了後、堰き止め部材13を撤去する。   In step S6, the dam member 13 is removed after the concrete curing period of the slab 10 ends.

本実施形態によれば、以下のような効果がある。
(1)スラブ養生後の作業工程を見据えてスラブ10の表面に躯体工事の基準線20を設け、その後、スラブ10の表面に堰き止め部材13を設けて、この堰き止め部材13で囲まれた領域に水を張ってスラブ10を冠水させた。よって、スラブ10のコンクリートを養生しつつ、柱筋12の配筋工事や型枠工事を継続して作業できるので、工期を短縮して、施工費用を低減できる。
According to this embodiment, there are the following effects.
(1) With reference to the work process after slab curing, a base line 20 of the frame construction is provided on the surface of the slab 10, and then a dam member 13 is provided on the surface of the slab 10, and is surrounded by the dam member 13. The area was filled with water to flood the slab 10. Therefore, since the concrete construction of the column 12 can be continued while curing the concrete of the slab 10, the construction period can be shortened and the construction cost can be reduced.

(2)柱筋12に対して、機械式継手16を用いて柱筋14を接合したので、柱筋14の接合時に圧接継手のように火花が発生しない。よって、スラブ養生の水に火花が落下して養生が不十分になるのを防止できる。   (2) Since the column rebar 14 is joined to the column rebar 12 using the mechanical joint 16, no spark is generated when the column rebar 14 is joined unlike the press-contact joint. Therefore, it is possible to prevent the slab curing from being insufficiently cured due to a spark falling on the water.

なお、本発明は前記実施形態に限定されるものではなく、本発明の目的を達成できる範囲での変形、改良等は本発明に含まれるものである。
例えば、本実施形態では、ステップS2において、スラブ10の表面に躯体工事の基準線20を設定したが、これに限らず、このステップS2を省略してもよい。このようにしても、上述の(1)と同様の効果がある。
It should be noted that the present invention is not limited to the above-described embodiment, and modifications, improvements, etc. within a scope that can achieve the object of the present invention are included in the present invention.
For example, in this embodiment, the frame construction reference line 20 is set on the surface of the slab 10 in step S2, but this is not a limitation, and step S2 may be omitted. Even if it does in this way, there exists an effect similar to the above-mentioned (1).

A…所定領域
1…スラブ養生方法
10…スラブ
11…柱
12…柱筋(立上がり鉄筋)
13…堰き止め部材
14…柱筋(鉄筋材)
15…クレーン
16…機械式継手
20…基準線
21…親墨
22…小墨
A ... Predetermined area 1 ... Slab curing method 10 ... Slab 11 ... Pillar 12 ... Column reinforcement (rising rebar)
13 ... Damming member 14 ... Column reinforcement (rebar material)
15 ... Crane 16 ... Mechanical joint 20 ... Base line 21 ... Ink ink 22 ... Small ink

Claims (4)

スラブのコンクリートを打設する工程と、
当該スラブ表面に躯体工事の基準線を設ける工程と、
当該スラブ表面の外縁部に沿って堰き止め部材を設ける工程と、
前記堰き止め部材で囲まれた領域内に水を張って、前記スラブを冠水させる工程と、
を備えることを特徴とするスラブ養生方法。
A process of placing slab concrete;
A process of providing a base line for frame construction on the surface of the slab;
Providing a damming member along the outer edge of the slab surface;
Filling the slab with water in an area surrounded by the damming member;
A slab curing method characterized by comprising:
スラブのコンクリートを打設する工程と、
当該スラブ表面から上方に延びる立上がり鉄筋および立上がり躯体のうち少なくとも一方を含む領域を所定領域とし、前記スラブ表面のうち当該所定領域を除いた領域を囲んで堰き止め部材を設ける工程と、
前記堰き止め部材で囲まれた領域内に水を張って、前記スラブを冠水させる工程と、
を備えることを特徴とするスラブ養生方法。
A process of placing slab concrete;
A step including providing a region including at least one of the rising reinforcing bar and the rising frame extending upward from the slab surface as a predetermined region, and providing a damming member surrounding the region excluding the predetermined region of the slab surface;
Filling the slab with water in an area surrounded by the damming member;
A slab curing method characterized by comprising:
前記スラブを冠水させた状態で、前記所定領域内の工事を行う工程をさらに備えることを特徴とする請求項2に記載のスラブ養生方法。   The slab curing method according to claim 2, further comprising a step of performing construction in the predetermined area in a state where the slab is flooded. 前記所定領域内の工事を行う工程では、
前記スラブ表面から上方に延びる立上がり鉄筋、および、前記立上がり躯体から上方に延びる立上がり鉄筋のうち少なくとも一方は、柱筋であり、
当該柱筋に機械式継手を用いて鉄筋材を接合することを特徴とする請求項3に記載のスラブ養生方法。
In the process of performing construction within the predetermined area,
At least one of the rising reinforcing bars extending upward from the slab surface and the rising reinforcing bars extending upward from the rising frame is a column reinforcing bar,
The slab curing method according to claim 3, wherein a reinforcing bar material is joined to the column reinforcement using a mechanical joint.
JP2013023893A 2013-02-08 2013-02-08 Slab curing method Active JP5894547B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013023893A JP5894547B2 (en) 2013-02-08 2013-02-08 Slab curing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013023893A JP5894547B2 (en) 2013-02-08 2013-02-08 Slab curing method

Publications (2)

Publication Number Publication Date
JP2014152538A true JP2014152538A (en) 2014-08-25
JP5894547B2 JP5894547B2 (en) 2016-03-30

Family

ID=51574673

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013023893A Active JP5894547B2 (en) 2013-02-08 2013-02-08 Slab curing method

Country Status (1)

Country Link
JP (1) JP5894547B2 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06307085A (en) * 1993-04-23 1994-11-01 Taisei Corp Execution method for jointing part of successively placed concrete of very high strength structure
JPH07197658A (en) * 1993-12-30 1995-08-01 Takenaka Komuten Co Ltd Curing method of concrete floor
JP2003064875A (en) * 2001-08-23 2003-03-05 Maeda Corp Assembling method for column reinforcement and beam reinforcement
JP2006316579A (en) * 2005-05-16 2006-11-24 Taisei Corp Foundation structure
JP2012219472A (en) * 2011-04-06 2012-11-12 Taisei Corp Construction method for column-beam frame

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06307085A (en) * 1993-04-23 1994-11-01 Taisei Corp Execution method for jointing part of successively placed concrete of very high strength structure
JPH07197658A (en) * 1993-12-30 1995-08-01 Takenaka Komuten Co Ltd Curing method of concrete floor
JP2003064875A (en) * 2001-08-23 2003-03-05 Maeda Corp Assembling method for column reinforcement and beam reinforcement
JP2006316579A (en) * 2005-05-16 2006-11-24 Taisei Corp Foundation structure
JP2012219472A (en) * 2011-04-06 2012-11-12 Taisei Corp Construction method for column-beam frame

Also Published As

Publication number Publication date
JP5894547B2 (en) 2016-03-30

Similar Documents

Publication Publication Date Title
CN103195087B (en) Mould support method of foundation pit basement haunch shearing wall
CN104989102A (en) Improved concrete wall and column construction method
CN105275097A (en) A post-cast strip water-stop steel plate and demolition-free template net installing method
WO2015184476A1 (en) Precast concrete falsework bubbledeck element and process of manufacturing thereof
CN104295003A (en) Structural column construction method
CN103938649B (en) A kind of construction method on high-rise building cavity basis
CN106149878B (en) Concrete frame structure prefabricated post and the connection structure and method at beam slab node
CN107905424A (en) Full prefabricated band splicing groove unidirectional harden structure, making and assembly method
CN103696437A (en) Construction method for cutting latticed column
CN204112712U (en) A kind of side root haunch cast-in-place wall model sheetinstallat device
JP5894547B2 (en) Slab curing method
CN105715042B (en) Tool-type building drop panel assembly and its construction method
CN108612121A (en) A kind of formwork structure and its construction method of the pile framing of large area shallow waters
CN108775086A (en) The additional assembled integral beam-column node structure and construction method for being closed connection reinforcing bar
CN103821149A (en) Large-scale deep foundation pit slope remaining soil digging and pit-in-pit concrete post casting construction method
CN206941628U (en) A kind of construction site enclosing prefabricated foundation
CN208830582U (en) A kind of secondary structure PCization construction masonry
CN207032321U (en) Rubber water-proof band model at a kind of raft plate level seam
JP6069259B2 (en) Method for manufacturing reinforced concrete
CN105421789A (en) Floor slab rib supporting horse stool capable of being used repeatedly
CN206309016U (en) A kind of post-cast strip side form and waterproof construction
CN104963509B (en) Brick formwork aseismatic structural column method of construction integrated with collar tie beam
CN205476517U (en) But reuse&#39;s floor lid muscle supports split heads
CN208137275U (en) One kind exempting from template iron net concrete casting beam, column
CN103397741A (en) Construction method for steel reinforced concrete beam

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20151015

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20151223

A975 Report on accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A971005

Effective date: 20160127

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20160201

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20160202

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20160223

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20160226

R150 Certificate of patent or registration of utility model

Ref document number: 5894547

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150