JP2014121880A - Method for producing band - Google Patents

Method for producing band Download PDF

Info

Publication number
JP2014121880A
JP2014121880A JP2014012305A JP2014012305A JP2014121880A JP 2014121880 A JP2014121880 A JP 2014121880A JP 2014012305 A JP2014012305 A JP 2014012305A JP 2014012305 A JP2014012305 A JP 2014012305A JP 2014121880 A JP2014121880 A JP 2014121880A
Authority
JP
Japan
Prior art keywords
sheet material
welding
band
roller
central
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2014012305A
Other languages
Japanese (ja)
Other versions
JP5702870B2 (en
Inventor
Toshinao Arai
利直 新井
Hidekazu Yamazaki
英数 山崎
Toshihiro Matsushita
敏廣 松下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujifilm Corp
Original Assignee
Fujifilm Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujifilm Corp filed Critical Fujifilm Corp
Priority to JP2014012305A priority Critical patent/JP5702870B2/en
Publication of JP2014121880A publication Critical patent/JP2014121880A/en
Application granted granted Critical
Publication of JP5702870B2 publication Critical patent/JP5702870B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)
  • Laser Beam Processing (AREA)
  • Moulding By Coating Moulds (AREA)

Abstract

PROBLEM TO BE SOLVED: To produce a band wider than the conventional one and to produce a long-length film having uniform thickness and optical properties and wider than the conventional one.SOLUTION: A side edge 12e of a central member 12 as a wide sheet material is detected with a position detection means 34, and, based on the detection result, the carrier passage of the central member 12 is controlled with a first roller 26 and a second roller 27. A side member 11 as a narrow sheet member is drawn to the central member 12 with a third roller. The butt position Pc between the side edge 11e of the side member 11 and the side edge 12e of the central member 12 is being above a fourth roller 29. The butted side member 11 and central member 12 are fed to welding equipment 42 in a chamber 52, and the butted parts are welded in a longitudinal direction. A welded band member 13 is coiled by a coiling device 20.

Description

本発明は、溶液製膜の流延支持体に使用され、金属からなるバンドの製造方法に関する。   The present invention relates to a method for producing a band made of metal, which is used for a casting support for solution casting.

液晶ディスプレイ(LCD)の大画面化に伴い、LCDに用いる光学フィルムにも大面積化が要求される。光学フィルムは、長尺に製造されてから、LCDに対応するように所定のサイズにカットされる。したがって、より大きな面積の光学フィルムを製造するためには、長尺の光学フィルムを製造するにあたって、幅がより大きくなるように製造する必要がある。   With the increase in the screen size of a liquid crystal display (LCD), an optical film used for the LCD is also required to have a large area. The optical film is manufactured in a long length and then cut into a predetermined size so as to correspond to the LCD. Therefore, in order to produce an optical film having a larger area, it is necessary to produce a longer optical film so that the width becomes larger.

長尺の光学フィルムの代表的な製造方法としては、連続方式の溶液製膜方法がある。溶液製膜方法は、周知のように、ポリマーが溶剤に溶けているドープを、走行する流延支持体の上に流して流延し、流延により膜状になったドープ、すなわち流延膜を流延支持体から剥がして乾燥することによりフィルムを製造する方法である。   As a typical method for producing a long optical film, there is a continuous solution casting method. As is well known, the solution casting method is known in the art. A dope in which a polymer is dissolved in a solvent is cast on a running casting support and cast into a film, that is, a casting film. Is a method of producing a film by peeling the film from the casting support and drying it.

流延支持体として用いられるものとしては、金属からなるバンドがある。製造することができるフィルムの幅は、このバンドの幅に制約され、より大きな幅のフィルムを製造するには、より大きな幅のバンドが必要となる。しかし、これまで、幅が2m程度までのバンドしか得られていなかった。   A band made of metal is used as a casting support. The width of the film that can be produced is constrained by the width of this band, and a larger width band is required to produce a larger width film. However, until now, only bands with a width of up to about 2 m have been obtained.

そこで、特許文献1では、幅方向の中央部になる中央バンドと、バンドの各側部になる1対の側部バンドとを、長手方向に溶接することにより、幅が2200mmと従来よりも大きなバンドを得ている。   Therefore, in Patent Document 1, by welding a central band that is a central portion in the width direction and a pair of side bands that are each side portion of the band in the longitudinal direction, the width is 2200 mm, which is larger than the conventional one. I'm getting a band.

韓国特許公開公報第2009−0110082号Korean Patent Publication No. 2009-0110082

しかしながら、特許文献1には、側部バンドと中央バンドとの溶接の具体的方法については記載されておらず、得られたバンドは、側部バンドと中央バンドとの溶接部に品質としての問題が残り、溶液製膜の流延支持体として十分なものとはいえない。例えば、このバンドを用いて溶液製膜を実施しても、溶接部上で流延膜が発泡したり、バンドのうち側部バンドから形成された側部領域が反り上がったりして、厚み、特に幅方向での厚みが均一なフィルムを製造することができないという問題がある。厚みが不均一であるフィルムは、光学軸の方向等の光学特性も不均一となってしまう。   However, Patent Document 1 does not describe a specific method for welding the side band and the center band, and the obtained band is a quality problem in the welded portion between the side band and the center band. Is not sufficient as a casting support for solution casting. For example, even if solution casting is performed using this band, the cast film foams on the welded part, or the side region formed from the side band of the band warps, There is a problem that a film having a uniform thickness in the width direction cannot be produced. A film having a non-uniform thickness has non-uniform optical characteristics such as the direction of the optical axis.

そこで、本発明は、従来よりも幅が広いバンドの製造方法を提供することを目的とする。   Therefore, an object of the present invention is to provide a method for manufacturing a band having a width wider than that of the prior art.

上記課題を解決するために、本発明は、溶液製膜の流延支持体として用いられ、金属製のシート材が環状に連結されたバンドの製造方法において、前記バンドの側部となる側部シート材と、この側部シート材よりも幅が広く、前記バンドの幅方向での中央部となる中央部シート材とを搬送しながら、前記側部シート材の一方の側縁と前記中央部シート材の一方の側縁とが接するように突き合わせる突き合わせ工程と、突き合わせた前記側部シート材と前記中央部シート材とを搬送しながら、外部空間と仕切るためのチャンバ内で溶接手段により長手方向で溶接する長手溶接工程と、溶接された前記側部シート材と前記中央部シート材との各先端と各後端とを溶接して環状にする環状溶接工程とを有し、前記溶接手段の下流に配され前記シート材を巻き取る巻取装置により、前記長手方向で溶接する溶接位置における前記シート材と前記側部シート材及び前記中央部シート材との張力を制御するようにしたものである。   In order to solve the above-mentioned problems, the present invention is used as a casting support for solution casting, and in a method for manufacturing a band in which metal sheet materials are connected in a ring shape, a side portion that becomes a side portion of the band While transporting a sheet material and a central sheet material that is wider than the side sheet material and serves as a central portion in the width direction of the band, one side edge of the side sheet material and the central portion The abutting step of abutting so that one side edge of the sheet material is in contact, and the side sheet material and the central sheet material which are abutted are conveyed while being longitudinally welded in a chamber for partitioning from the external space A longitudinal welding process for welding in a direction, and an annular welding process for welding each front end and each rear end of the welded side sheet material and the central sheet material to form an annular shape. Arranged downstream of the sheet By taking up winding device, in which so as to control the tension between the sheet material and the side sheet material and the central portion sheet material in the welding position of welding in the longitudinal direction.

突き合わされた前記側部シート材と前記中央部シート材とが前記溶接手段により溶接される溶接位置の清浄度を、米国連邦規格FED−STD−209Dでのクラス1000以下にすることが好ましい。   It is preferable that the cleanliness of the welding position where the side sheet material and the center sheet material which are butted together are welded by the welding means is class 1000 or less in the US Federal Standard FED-STD-209D.

前記チャンバ内の気体を清浄装置により清浄化するのが好ましい。   The gas in the chamber is preferably cleaned by a cleaning device.

前記長手溶接工程では、前記溶接手段に対向するように配された支持ローラの周面で前記中央部シート材と前記側部シート材とを支持し、この支持ローラ上で溶接することが好ましい。   In the longitudinal welding step, it is preferable that the central sheet material and the side sheet material are supported by a peripheral surface of a support roller disposed so as to face the welding means and welded on the support roller.

前記支持ローラの周面のうち、前記側部シート材の一方の側縁と前記中央部シート材の一方の側縁とが通過する通過領域には、前記中央部シート材及び前記側部シート材よりも熱伝導率が高い素材からなる高熱伝導部が形成されてあることが好ましい。   Of the peripheral surface of the support roller, in the passage region where one side edge of the side sheet material and one side edge of the center sheet material pass, the center sheet material and the side sheet material It is preferable that a high thermal conductivity portion made of a material having a higher thermal conductivity is formed.

前記突き合わせ工程では、前記溶接手段の上流に配され、周方向に回転する回転ローラで前記中央部シート材と前記側部シート材とのいずれか一方を接触搬送し、接触搬送されている前記一方が他方に寄るように前記回転ローラの長手方向の向きを制御することが好ましい。   In the abutting step, one of the central sheet material and the side sheet material is brought into contact with and conveyed by a rotating roller that is arranged upstream of the welding means and rotates in the circumferential direction. It is preferable to control the orientation of the rotating roller in the longitudinal direction so that the distance is closer to the other.

前記突き合わせ工程では、周方向に回転し、一端から他端に向けて径が漸減するように形成され、前記一端が前記中央部シート材の搬送路に向くように前記側部シート材の搬送路に配されたテーパローラにより、前記側部シート材を搬送して前記中央部シート材に寄せることが好ましい。   In the abutting step, the side sheet material conveyance path is formed so as to rotate in the circumferential direction so that the diameter gradually decreases from one end to the other end, and the one end faces the conveyance path for the central sheet material. It is preferable that the side sheet material is conveyed to the center sheet material by a taper roller disposed on the center.

前記突き合わせ工程では、前記中央部シート材の幅方向に変位する把持手段により、前記側部シート材を把持して前記側部シート材を前記中央部シート材に寄せることが好ましい。   In the abutting step, it is preferable that the side sheet material is gripped by the gripping means that is displaced in the width direction of the center sheet material and the side sheet material is brought close to the center sheet material.

前記支持ローラの長手方向に並ぶように前記支持ローラにそれぞれ対向するように1対のベルトを配し、前記1対のベルトの一方で前記支持ローラ上の前記中央部シート材を押圧し、他方で前記支持ローラ上の前記側部シート材を押圧することにより、前記中央部シート材と前記側部シート材との溶接位置における高さを等しくすることが好ましい。   A pair of belts are arranged so as to face the support rollers so as to be aligned in the longitudinal direction of the support rollers, and the center sheet material on the support rollers is pressed by one of the pair of belts, and the other It is preferable that the heights at the welding positions of the center sheet material and the side sheet material are equalized by pressing the side sheet material on the support roller.

前記1対のベルトは、前記中央部シート材及び前記側部シート材よりも熱伝導率が高い素材からなる高熱伝導部が形成されてあることが好ましい。   It is preferable that the pair of belts are formed with a high heat conductive portion made of a material having a higher thermal conductivity than the center sheet material and the side sheet material.

前記溶接手段の上流に配され、前記側部シート材と前記中央部シート材とが互いに接している接触位置を検出する検出手段により、前記支持ローラの長手方向における前記接触位置を検出し、前記側部シート材及び前記中央部シート材の搬送速度と検出した前記接触位置とに基づき、前記溶接手段を前記支持ローラの幅方向に変位させて溶接することが好ましい。   The contact position in the longitudinal direction of the support roller is detected by a detection means that is disposed upstream of the welding means and detects a contact position where the side sheet material and the central sheet material are in contact with each other, It is preferable that welding is performed by displacing the welding means in the width direction of the support roller based on the conveyance speed of the side sheet material and the central sheet material and the detected contact position.

前記長手溶接工程は、前記側部シート材と前記中央部シート材とを連続的に溶接する連続溶接工程と、前記側部シート材と前記中央部シート材とを前記連続溶接工程の前に断続的に溶接する断続溶接工程とを有することが好ましい。   In the longitudinal welding process, the side sheet material and the central sheet material are continuously welded, and the side sheet material and the central sheet material are intermittently connected before the continuous welding process. It is preferable to have an intermittent welding process for performing continuous welding.

溶接された前記側部シート材と前記中央部シート材との溶接部を加熱手段により加熱して、前記溶接部の応力を除去することが好ましい。   It is preferable that the welded portion between the welded side sheet material and the central sheet material is heated by a heating means to remove the stress of the welded portion.

本発明のバンドの製造方法によると、従来よりも幅が広いバンドを製造することができる。   According to the method for manufacturing a band of the present invention, a band having a width wider than that of a conventional band can be manufactured.

本発明のバンドの製造設備の概略側面図である。It is a schematic side view of the manufacturing equipment of the band of the present invention. 図1のバンド製造設備の概略平面図である。It is a schematic plan view of the band manufacturing equipment of FIG. 他の実施態様である溶接ユニットの概略側面図である。It is a schematic side view of the welding unit which is another embodiment. 他の実施態様である溶接ユニットの概略平面図である。It is a schematic plan view of the welding unit which is another embodiment. 図4の(V)−(V)線に沿う一部断面図である。It is a partial cross section figure which follows the (V)-(V) line | wire of FIG. 溶接ビード及びその周辺の説明図である。It is explanatory drawing of a weld bead and its periphery. テーパローラの概略図である。It is the schematic of a taper roller. クリップの概略図である。It is the schematic of a clip. バンドの概略図である。It is the schematic of a band. 溶液製膜設備の概略図である。It is the schematic of solution casting apparatus. バンド及び遮風板、ローラの概略図である。It is the schematic of a band, a windshield, and a roller.

溶液製膜の流延支持体に用いるバンドは、以下のバンド製造設備及び方法により製造することができるが、以下の実施態様は、本発明の一例であり、本発明を限定するものではない。   The band used for the casting support for solution casting can be manufactured by the following band manufacturing equipment and method, but the following embodiment is an example of the present invention and does not limit the present invention.

図1及び図2に示すバンド製造設備10は、流延支持体の各側部になる側部材11と、一方の側部と他方の側部との間の中央部になる中央部材12とから、長尺のバンド部材13を製造する。   The band manufacturing equipment 10 shown in FIGS. 1 and 2 includes a side member 11 that becomes each side portion of the casting support and a central member 12 that becomes a central portion between one side portion and the other side portion. The long band member 13 is manufactured.

側部材11と中央部材12とは、それぞれ金属製のシート材である。側部材11は相対的に幅が狭い幅狭のシート材であり、中央部材12は相対的に幅が広い幅広のシート材である。側部材11及び中央部材12としてはステンレス鋼から形成されたものが好ましい。側部材11と中央部材12とは、互いに同じ素材から形成されることが好ましく、互いに同一の原料及び形成工程を経て形成されることがより好ましい。   The side member 11 and the central member 12 are metal sheet materials, respectively. The side member 11 is a narrow sheet material having a relatively narrow width, and the central member 12 is a wide sheet material having a relatively wide width. The side member 11 and the central member 12 are preferably made of stainless steel. The side member 11 and the central member 12 are preferably formed from the same material, and more preferably formed through the same raw material and forming process.

中央部材12としては、従来の流延支持体として用いられてきたバンドを用いてよい。中央部材12は、側部材11よりも幅が広く、本実施形態における中央部材12の幅は1500mm以上2100mm以下の範囲で一定とされてあり、側部材11の幅は50mm以上500mm以下の範囲で一定とされてある。   As the central member 12, a band that has been used as a conventional casting support may be used. The central member 12 is wider than the side member 11, and the width of the central member 12 in this embodiment is constant in the range of 1500 mm to 2100 mm, and the width of the side member 11 is in the range of 50 mm to 500 mm. It is assumed to be constant.

バンド製造設備10は、送出部16と、突き合わせ部17と、溶接ユニット18と、加熱部19と、巻取装置20とを備える。   The band manufacturing facility 10 includes a delivery unit 16, a butting unit 17, a welding unit 18, a heating unit 19, and a winding device 20.

送出部16は、側部材11を送り出す第1送出装置23と、中央部材12を送り出す第2送出装置24とを有し、側部材11と中央部材12とをそれぞれ独立して突き合わせ部17に送る。第1送出装置23には、ロール状に巻かれた側部材11がセットされ、側部材11を巻き出して突き合わせ部17に送る。第2送出装置24には、ロール状に巻かれた中央部材12がセットされ、中央部材12を巻き出して突き合わせ部17に送る。   The sending unit 16 includes a first sending device 23 that sends out the side member 11 and a second sending device 24 that sends out the central member 12, and sends the side member 11 and the central member 12 to the butting unit 17 independently. . The side member 11 wound in a roll shape is set in the first delivery device 23, and the side member 11 is unwound and sent to the butting portion 17. In the second delivery device 24, the central member 12 wound in a roll shape is set, and the central member 12 is unwound and sent to the butting portion 17.

突き合わせ部17は、側部材11の側縁11eと中央部材12の側縁12eとが互いに接するように、独立して案内されてくる側部材11と中央部材とを突き合わせる。突き合わせ部17は、中央部材12の搬送路に上流側から順に配される第1ローラ26と第2ローラ27、側部材11の搬送路に配される第3ローラ28、側部材11と中央部材12との両方を支持するように搬送路に配される第4ローラ29を有することが好ましい。   The abutting part 17 abuts the side member 11 and the central member that are independently guided so that the side edge 11e of the side member 11 and the side edge 12e of the central member 12 are in contact with each other. The abutting portion 17 includes a first roller 26 and a second roller 27 that are sequentially arranged on the conveyance path of the central member 12 from the upstream side, a third roller 28 that is disposed on the conveyance path of the side member 11, and the side member 11 and the central member. It is preferable to have the 4th roller 29 distribute | arranged to a conveyance path so that both of 12 may be supported.

第4ローラ29は、側部材11の一方の側縁と中央部材12の一方の側縁とが接触を開始する突き合わせ位置Pcにおいて、送られてきた側部材11と中央部材12とを支持する突き合わせ支持ローラである。   The fourth roller 29 is a butt that supports the sent side member 11 and the central member 12 at a butt position Pc where one side edge of the side member 11 and one side edge of the central member 12 start to contact each other. It is a support roller.

第2ローラ27と第3ローラ28とは、第4ローラ29の周面で中央部材12と側部材11とが接触するように中央部材12と側部材11との搬送経路をそれぞれ調整する。   The second roller 27 and the third roller 28 adjust the conveyance paths between the central member 12 and the side member 11 so that the central member 12 and the side member 11 are in contact with each other on the peripheral surface of the fourth roller 29.

第2ローラ27は、中央部材12の搬送経路を調整して、側部材11と溶接されるべき側縁12eの通過経路を、突き合わせ位置Pcに向けて制御する。第2ローラ27には、中央部材12の幅方向Yに変位するためのシフト機構32が備えられる。第2ローラ27と第4ローラ29との間には、中央部材12の各側縁12eのうちの一方の通過位置を検出し、検出した通過位置の信号をコントローラ33に送る位置検出手段34が配される。コントローラ33は、送られてきた通過位置の信号に基づき、幅方向Yにおける第2ローラ27の変位量を求め、変位量の信号をシフト機構32に送る。シフト機構32は、送られてきた変位量の信号に基づき第2ローラ27の傾きや中央部材12の幅方向Yにおける第2ローラ27の位置を変える。このように第2ローラ27の傾きや位置を変えることにより、中央部材12が幅方向Yに変位する。   The 2nd roller 27 adjusts the conveyance path | route of the center member 12, and controls the passage path | route of the side edge 12e which should be welded with the side member 11 toward the abutting position Pc. The second roller 27 is provided with a shift mechanism 32 for displacing in the width direction Y of the central member 12. Between the second roller 27 and the fourth roller 29, there is position detecting means 34 for detecting the passing position of one of the side edges 12e of the central member 12 and sending a signal of the detected passing position to the controller 33. Arranged. The controller 33 obtains the displacement amount of the second roller 27 in the width direction Y based on the sent signal of the passing position, and sends the displacement amount signal to the shift mechanism 32. The shift mechanism 32 changes the inclination of the second roller 27 and the position of the second roller 27 in the width direction Y of the central member 12 based on the sent displacement amount signal. Thus, the central member 12 is displaced in the width direction Y by changing the inclination and position of the second roller 27.

第1ローラ26には、シフト機構37が設けられていることが好ましい。このシフト機構37により、第1ローラ26は、第2ローラ27に向かう中央部材12を一方の部材面から押す。この第1ローラ26の変位量に応じて、第1ローラ26の中央部材12に対する押し圧が変わり、押し圧を調整することにより、第2ローラ27に巻き掛ける中央部材12の巻き掛け中心角を制御することができる。この巻き掛け中心角の制御により、第2ローラ27による中央部材12の幅方向Yでの変位量をより精緻に制御することができる。   The first roller 26 is preferably provided with a shift mechanism 37. By this shift mechanism 37, the first roller 26 pushes the central member 12 toward the second roller 27 from one member surface. Depending on the amount of displacement of the first roller 26, the pressing force of the first roller 26 against the central member 12 changes, and the winding central angle of the central member 12 wound around the second roller 27 is adjusted by adjusting the pressing pressure. Can be controlled. By controlling the winding center angle, the amount of displacement of the central member 12 in the width direction Y by the second roller 27 can be controlled more precisely.

第3ローラ28は、側部材11の搬送経路を調整して、中央部材12と溶接されるべき一方の側縁11eの通過経路を突き合わせ位置Pcに向けて調整する。第3ローラ28には、長手方向の向きを制御するコントローラ38が備えられる。このコントローラ38は、例えば、側部材11と接触している間の接触領域における周方向と中央部材12の搬送方向Xとのなす角θ1が変化するように、第3ローラ28の長手方向を側部材11の部材面に沿って変化させる。   The 3rd roller 28 adjusts the conveyance path of the side member 11, and adjusts the passage path of one side edge 11e which should be welded with the center member 12 toward the abutting position Pc. The third roller 28 is provided with a controller 38 that controls the orientation in the longitudinal direction. For example, the controller 38 moves the longitudinal direction of the third roller 28 to the side so that the angle θ1 formed by the circumferential direction in the contact area while in contact with the side member 11 and the transport direction X of the central member 12 changes. It changes along the member surface of the member 11.

以上のように第1ローラ26〜第3ローラ28により、突き合わせ位置Pcが第4ローラ29上になるように制御することが好ましい。第1ローラ26〜第3ローラ28は、いずれも周方向に回転する駆動ローラであることが好ましい。周方向に回転することにより、第1ローラ26及び第2ローラ27は、中央部材12の搬送手段としても作用し、第3ローラ28は、側部材11の搬送手段としても作用する。第1ローラ26〜第3ローラ28を駆動ローラとすることにより、側部材11と中央部材12との搬送路の制御がより確実になるとともに、側部材11と中央部材12との第1ローラ26〜第3ローラ28上でのスリップを防止して部材面に傷がつくことが防止される。   As described above, the first roller 26 to the third roller 28 are preferably controlled so that the butting position Pc is on the fourth roller 29. The first roller 26 to the third roller 28 are preferably drive rollers that rotate in the circumferential direction. By rotating in the circumferential direction, the first roller 26 and the second roller 27 also function as a transport unit for the central member 12, and the third roller 28 also functions as a transport unit for the side member 11. By using the first roller 26 to the third roller 28 as driving rollers, the control of the conveyance path between the side member 11 and the central member 12 becomes more reliable, and the first roller 26 between the side member 11 and the central member 12 becomes more reliable. The slip on the third roller 28 is prevented and the member surface is prevented from being damaged.

上記態様では、側部材11と中央部材12との両方の搬送経路を制御して、側部材11と中央部材12とが互いに寄るようにしているが、いずれか一方が他方に寄るように、前記一方の搬送経路のみを制御してもよい。また、第1ローラ26及び第2ローラ27に代えて、第3ローラ28を中央部材12の搬送路に配し、第3ローラ28の長手方向の向きを変えることにより中央部材12の搬送経路を制御してもよい。   In the above aspect, the conveyance path of both the side member 11 and the central member 12 is controlled so that the side member 11 and the central member 12 are close to each other. Only one transport path may be controlled. Further, instead of the first roller 26 and the second roller 27, the third roller 28 is arranged in the transport path of the central member 12, and the transport path of the central member 12 is changed by changing the longitudinal direction of the third roller 28. You may control.

突き合わせ位置Pcは、必ずしも第4ローラ29上になる必要はない。例えば、突き合わせ位置Pcは後述の溶接支持ローラ41上になってもよい。突き合わせ位置Pcを溶接支持ローラ41上にする場合には、溶接する溶接位置Pwよりも溶接支持ローラ41の回転方向での上流側が突き合わせ位置Pcになるように、溶接支持ローラ41に対する側部材11と中央部材12との巻き掛け中心角をより大きくするとよい。   The abutting position Pc does not necessarily need to be on the fourth roller 29. For example, the butting position Pc may be on a welding support roller 41 described later. When the abutting position Pc is set on the welding support roller 41, the side member 11 with respect to the welding support roller 41 is arranged such that the upstream side in the rotation direction of the welding support roller 41 becomes the abutting position Pc from the welding position Pw to be welded. It is preferable to increase the winding central angle with the central member 12.

溶接ユニット18は、互いの側縁11e,12eが接触した状態で突き合わせ部17から供給される側部材11と中央部材12とを溶接する。突き合わせ部17から連続的に供給されることにより、側部材11と中央部材12とを長手方向で溶接する長手溶接工程を行うことができる。溶接ユニット18は、溶接装置42を備える。溶接装置42としては、例えば、レーザ溶接装置が挙げられる。レーザ溶接装置としては、例えば、COレーザ溶接装置や、YAGレーザ溶接装置を用いることができる。本実施態様では、COレーザ溶接装置を溶接装置42として用いた場合を説明する。 The welding unit 18 welds the side member 11 and the central member 12 supplied from the butt portion 17 in a state where the side edges 11e and 12e are in contact with each other. By being continuously supplied from the abutting portion 17, a longitudinal welding process of welding the side member 11 and the central member 12 in the longitudinal direction can be performed. The welding unit 18 includes a welding device 42. Examples of the welding device 42 include a laser welding device. As the laser welding apparatus, for example, a CO 2 laser welding apparatus or a YAG laser welding apparatus can be used. In this embodiment, a case where a CO 2 laser welding apparatus is used as the welding apparatus 42 will be described.

溶接装置42は、集光したレーザ光を射出して、照射対象としての側部材11及び中央部材12にレーザ光を照射することにより、側部材11と中央部材12とを溶融して接合する。溶接装置42は、図1に示すように、レーザ発振器43と、このレーザ発振器43から案内されてきたレーザ光を集光して射出する溶接装置本体46と、レーザ光を照射するにあたりCOガスを供給するガス供給部(図示無し)とを備える。COガスは、側部材11と中央部材12との酸化を防止する。なお、図2においては、図の煩雑化を避けるためにレーザ発振器43の図示は略してある。 The welding device 42 emits the condensed laser light and irradiates the side member 11 and the central member 12 as irradiation targets with the laser light, thereby melting and joining the side member 11 and the central member 12. As shown in FIG. 1, the welding apparatus 42 includes a laser oscillator 43, a welding apparatus main body 46 that collects and emits laser light guided from the laser oscillator 43, and CO 2 gas when irradiating the laser light. A gas supply unit (not shown). The CO 2 gas prevents oxidation of the side member 11 and the central member 12. In FIG. 2, the illustration of the laser oscillator 43 is omitted to avoid complication of the drawing.

レーザ溶接装置に代えてTIG溶接(Tungsten Inert Gas welding)装置を用いてもよい。TIG溶接とは、周知のように、アークを熱源とする溶接アーク溶接のひとつであり、シールドガスとしてイナートガス(不活性ガス)を用い、電極にはタングステンあるいはタングステン合金を用いるイナートガスアーク溶接の一種である。TIG溶接よりもレーザ溶接の方がより好ましい。また、TIG溶接とレーザ溶接とを組み合わせたハイブリッド溶接としてもよい。   A TIG welding (Tungsten Inert Gas welding) apparatus may be used instead of the laser welding apparatus. As is well known, TIG welding is one type of welding arc welding that uses an arc as a heat source, and is a type of inert gas arc welding that uses inert gas (inert gas) as a shielding gas and tungsten or a tungsten alloy as an electrode. is there. Laser welding is more preferable than TIG welding. Moreover, it is good also as hybrid welding which combined TIG welding and laser welding.

溶接装置本体46のレーザ光の射出口に対向するように、側部材11と中央部材12との搬送路には側部材11と中央部材12とを周面で支持する溶接支持ローラ41が備えてある。溶接支持ローラ41は、側部材11と中央部材12との幅方向Yに長手方向が一致するように配される。溶接支持ローラ41の周面で支持されている間の側部材11と中央部材12とにレーザ光が照射されるように、溶接支持ローラ41による側部材11と中央部材12との支持位置を設定することが好ましい。すなわち、溶接支持ローラ41上で、溶接をすることが好ましい。これにより、互いに側縁11e,12eが接した状態で側部材11と中央部材12とが安定し、照射すべき箇所にレーザ光を確実に照射することができる。   A welding support roller 41 for supporting the side member 11 and the central member 12 on the circumferential surface is provided in the conveyance path between the side member 11 and the central member 12 so as to face the laser beam exit of the welding apparatus main body 46. is there. The welding support roller 41 is arranged so that the longitudinal direction thereof coincides with the width direction Y of the side member 11 and the central member 12. The support position of the side member 11 and the central member 12 by the welding support roller 41 is set so that the side member 11 and the central member 12 while being supported by the peripheral surface of the welding support roller 41 are irradiated with laser light. It is preferable to do. That is, it is preferable to perform welding on the welding support roller 41. Thereby, the side member 11 and the central member 12 are stabilized in a state in which the side edges 11e and 12e are in contact with each other, and the laser beam can be reliably irradiated to the portion to be irradiated.

溶接装置本体46には、幅方向Yに変位するためのシフト機構50が備えられることが好ましい。溶接装置42の上流には、側部材11の側縁11eと中央部材12の側縁12eとが接している接触位置Ps(図5参照)を検出し、検出した接触位置Ps(図5参照)の信号をコントローラ51に送る位置検出手段47が設けてある。位置検出手段47は、突き合わせ位置Pcから溶接装置42に至る搬送路近傍に配されてあればよい。   The welding apparatus body 46 is preferably provided with a shift mechanism 50 for displacement in the width direction Y. The contact position Ps (see FIG. 5) where the side edge 11e of the side member 11 and the side edge 12e of the central member 12 are in contact is detected upstream of the welding device 42, and the detected contact position Ps (see FIG. 5). Position detecting means 47 for sending the above signal to the controller 51 is provided. The position detecting means 47 only needs to be disposed in the vicinity of the conveyance path from the butting position Pc to the welding device 42.

コントローラ51は、送られてきた接触位置Ps(図5参照)の信号に基づき、幅方向Yにおける溶接装置本体46の変位量を求め、変位量の信号をシフト機構50に送る。コントローラ51は、側部材11と中央部材12との搬送速度の信号が入力されると、溶接装置本体46を変位させるべき変位量の信号とともに変位させるタイミングの信号とをシフト機構50に送る。シフト機構50は、送られてきた変位量及び変位のタイミングの信号に基づき、溶接装置本体46の位置を所定のタイミングで変える。このように溶接装置本体46の位置を幅方向Yで変えることにより、レーザ光の照射位置をより精緻に制御して、より確実に、側部材11と中央部材12とが溶接される。なお、本実施形態における溶接装置42への側部材11と中央部材12との搬送速度は0.15m/分以上20m/分以下の範囲としてある。   The controller 51 obtains the displacement amount of the welding apparatus main body 46 in the width direction Y based on the sent signal of the contact position Ps (see FIG. 5), and sends the displacement amount signal to the shift mechanism 50. When the conveyance speed signal between the side member 11 and the central member 12 is input, the controller 51 sends a displacement timing signal together with a displacement timing signal to the displacement mechanism 50 to the displacement mechanism 50. The shift mechanism 50 changes the position of the welding apparatus main body 46 at a predetermined timing based on the received displacement amount and displacement timing signal. Thus, by changing the position of the welding apparatus main body 46 in the width direction Y, the irradiation position of the laser beam is controlled more precisely, and the side member 11 and the central member 12 are more reliably welded. In addition, the conveyance speed of the side member 11 and the central member 12 to the welding apparatus 42 in this embodiment is set as a range of 0.15 m / min or more and 20 m / min or less.

溶接ユニット18には、図1に示すように、溶接装置本体46と溶接支持ローラ41とを外部空間と仕切るチャンバ52と、気体を清浄化する清浄装置55とを設けることがより好ましい。なお、図2においては、図の煩雑化を避けるためにチャンバ52と清浄装置55との図示は略してある。チャンバ52には、内部気体を外部に出す第1開口(図示無し)と、清浄装置55で清浄化された気体を内部に案内する第2開口(図示無し)とが設けられる。第1開口と第2開口とは、それぞれ清浄装置55に接続する。チャンバ52の内部気体は、第1開口から清浄装置55に案内され、清浄装置55はチャンバ52から案内されてきた気体を清浄化して第2開口を介してチャンバ52に送る。このように、チャンバ52の内部気体は、清浄装置55との間で循環される。   As shown in FIG. 1, the welding unit 18 is more preferably provided with a chamber 52 that partitions the welding device main body 46 and the welding support roller 41 from the external space, and a cleaning device 55 that cleans the gas. In FIG. 2, the illustration of the chamber 52 and the cleaning device 55 is omitted to avoid complication of the drawing. The chamber 52 is provided with a first opening (not shown) for letting out the internal gas to the outside and a second opening (not shown) for guiding the gas cleaned by the cleaning device 55 to the inside. The first opening and the second opening are each connected to the cleaning device 55. The gas inside the chamber 52 is guided to the cleaning device 55 from the first opening, and the cleaning device 55 cleans the gas guided from the chamber 52 and sends it to the chamber 52 through the second opening. In this way, the internal gas of the chamber 52 is circulated with the cleaning device 55.

チャンバ52の内部気体を清浄化しておくことにより、溶接位置Pw及びその周辺が清浄化され、溶接部13wに異物等が混入されてしまうことが防止される。なお、チャンバ52の内部の圧力が、外部空間の圧力よりも高く保持することにより、チャンバ52の内部を清浄化した状態により確実に保持することができる。また、溶接位置Pwを、送出部16、突き合わせ部17、加熱部19、巻取装置20に対して相対的に高い位置にすることにより、これらから異物が案内されることをより防止することができる。   By cleaning the internal gas of the chamber 52, the welding position Pw and its periphery are cleaned, and foreign matter and the like are prevented from being mixed into the welded portion 13w. Note that, by keeping the pressure inside the chamber 52 higher than the pressure in the external space, the inside of the chamber 52 can be reliably held in a clean state. Further, by setting the welding position Pw to a relatively high position with respect to the delivery unit 16, the butting unit 17, the heating unit 19, and the winding device 20, it is possible to further prevent foreign matters from being guided from these positions. it can.

チャンバ52の内部の清浄度は、例えば、米国連邦規格FED−STD−209Dでのクラス1000以下とすることが好ましく、クラス100以下にすることがより好ましい。   The cleanliness inside the chamber 52 is preferably, for example, class 1000 or less, more preferably class 100 or less, according to the US Federal Standard FED-STD-209D.

溶接ユニット18の下流には、加熱部19を設けることが好ましい。加熱部19は、溶接により得られたバンド部材13の溶接部13wを一定の温度範囲になるように加熱するものであれば特に限定されない。溶接部13w及びその周辺には、溶接によるひずみとしての応力が内部に残っていることがあり、溶接部13wを加熱部19により加熱することにより応力を除去することができる。応力を除去することにより、溶液製膜での連続使用において変形してしまうことを防止することがより確実になる。   A heating unit 19 is preferably provided downstream of the welding unit 18. The heating part 19 will not be specifically limited if it heats the welding part 13w of the band member 13 obtained by welding so that it may become a fixed temperature range. Stress as distortion caused by welding may remain inside the welded part 13w and its periphery, and the stress can be removed by heating the welded part 13w by the heating part 19. By removing the stress, it becomes more reliable to prevent deformation during continuous use in solution casting.

加熱部19の加熱による溶接部13wの温度は、応力が除去される温度であれば特に限定されないが、例えばバンド部材13がステンレス鋼からなる場合には、溶接部13wの温度が好ましくは100℃以上200℃以下の範囲、より好ましくは120℃以上180℃以下の範囲となるように、加熱することが好ましい。   The temperature of the welded part 13w due to heating of the heating part 19 is not particularly limited as long as the stress is removed, but when the band member 13 is made of stainless steel, for example, the temperature of the welded part 13w is preferably 100 ° C. Heating is preferably performed in a range of 200 ° C. or lower, more preferably 120 ° C. or higher and 180 ° C. or lower.

加熱部19としては、例えば、送風手段がある。加熱部19としての送風手段は、図1に示すように、一定の温度の気体を吹き出すダクト56と、気体の温度を制御した上でこの気体をダクト56に送り込む送風機57とがある。なお、図2においては、図の煩雑化を避けるためにダクト56と送風機57との図示は略してある。   As the heating unit 19, for example, there is a blowing means. As shown in FIG. 1, the blowing means as the heating unit 19 includes a duct 56 that blows out a gas having a constant temperature, and a blower 57 that sends the gas to the duct 56 after controlling the temperature of the gas. In FIG. 2, the illustration of the duct 56 and the blower 57 is omitted to avoid complication of the drawing.

加熱部19は、バンド部材13の搬送路に関し、図1のように溶接支持ローラ41とは反対側に設けてもよいし、溶接支持ローラ41と同じ側に設けてもよい。   The heating unit 19 may be provided on the opposite side of the welding support roller 41 as shown in FIG. 1 with respect to the conveyance path of the band member 13 or may be provided on the same side as the welding support roller 41.

応力を除去されたバンド部材13は、加熱部19の下流の巻取装置20に送られ、ロール状に巻き取られる。巻取装置20には、バンド部材13を巻き取る巻き芯がセットされ、この巻き芯を周方向に回転させる駆動手段が設けられている。   The band member 13 from which the stress has been removed is sent to the winding device 20 downstream of the heating unit 19 and wound up in a roll shape. In the winding device 20, a winding core for winding the band member 13 is set, and driving means for rotating the winding core in the circumferential direction is provided.

巻取装置20は、溶接位置Pwにおけるバンド部材13と側部材11及び中央部材12との張力を制御する溶接張力制御手段としても作用する。そこで、溶接位置Pwにおけるバンド部材13と側部材11及び中央部材12との張力が一定に保持されるように、巻取装置20のトルクを制御することが好ましい。これにより、溶接部13wの態様が長手方向により均一なバンド部材13を得ることができる。   The winding device 20 also functions as a welding tension control means for controlling the tension between the band member 13, the side member 11, and the central member 12 at the welding position Pw. Therefore, it is preferable to control the torque of the winding device 20 so that the tension between the band member 13, the side member 11, and the central member 12 at the welding position Pw is kept constant. Thereby, the band member 13 with which the aspect of the welding part 13w is more uniform in a longitudinal direction can be obtained.

溶接を開始する場合には、上記巻取装置20を用いて、例えば以下のようにすると好ましい。まず、送出部16から巻取装置20に至る搬送路に側部材11と中央部材12とをセットし、側部材11と中央部材12との各先端を巻取装置20の巻き芯に巻き掛ける。側部材11と中央部材12との巻取を開始する。巻取を開始して、側部材11と中央部材12との搬送の経路を制御して突き合わせ位置Pcを所定位置に保持する。側部材11と中央部材12との突き合わせ位置Pcが一定に保持されるようになった後に、溶接装置42により溶接を開始する。   When starting welding, it is preferable to use the winding device 20 as follows, for example. First, the side member 11 and the central member 12 are set on the conveyance path from the delivery unit 16 to the winding device 20, and the respective ends of the side member 11 and the central member 12 are wound around the winding core of the winding device 20. Winding of the side member 11 and the central member 12 is started. Winding is started, the conveyance path between the side member 11 and the central member 12 is controlled, and the butting position Pc is held at a predetermined position. After the abutting position Pc between the side member 11 and the central member 12 is kept constant, welding is started by the welding device 42.

溶接は、側部材11と中央部材12とバンド部材13とのずれを抑止しながら実施することが好ましい。例えば、溶接ユニット18に代えて、押圧装置を備える図3及び図4に示すような溶接ユニット61を用いてもよい。溶接ユニット61は、図1及び図2に示す溶接ユニット18に、押圧装置62をさらに備えたものであり、シフト機構50、コントローラ51、チャンバ52、清浄装置55を溶接ユニット18と同様に備えるが、図示の煩雑化を避けるため図3及ぶ図4ではこれらの図示を略してある。また、図1及び図2と同じ装置、部材については図1及び図2と同じ符号を付し、説明を略す。なお、溶接ユニット61では、チャンバ52は、押圧装置62と溶接支持ローラ41とを外部空間と仕切るように囲む。   It is preferable to perform welding while suppressing the deviation of the side member 11, the central member 12, and the band member 13. For example, instead of the welding unit 18, a welding unit 61 as shown in FIGS. 3 and 4 provided with a pressing device may be used. The welding unit 61 further includes a pressing device 62 in addition to the welding unit 18 shown in FIGS. 1 and 2, and includes a shift mechanism 50, a controller 51, a chamber 52, and a cleaning device 55 in the same manner as the welding unit 18. In order to avoid complication of illustration, these illustrations are omitted in FIGS. 1 and 2 are denoted by the same reference numerals as those in FIGS. 1 and 2 and description thereof is omitted. In the welding unit 61, the chamber 52 surrounds the pressing device 62 and the welding support roller 41 so as to partition from the external space.

押圧装置62は、溶接位置Pwにおける側部材11と中央部材12とバンド部材13とのずれを抑止するものであり、第1ベルト63及び第2ベルト64とからなる1対のベルトにより、溶接支持ローラ41上の側部材11と中央部材12とバンド部材13とを押さえる。   The pressing device 62 suppresses the displacement of the side member 11, the central member 12, and the band member 13 at the welding position Pw, and is supported by a pair of belts including a first belt 63 and a second belt 64. The side member 11, the central member 12, and the band member 13 on the roller 41 are pressed.

第1ベルト63と第2ベルト64とは、環状に形成された無端のベルトである。第1ベルト63と第2ベルト64とは、第5ローラ67〜第7ローラ69の周面に、第5ローラ67〜第7ローラ69の各長手方向に並ぶように巻き掛けられる。第5ローラ67〜第7ローラ69のうち少なくともいずれかひとつのローラは、周方向に回転する駆動ローラとされる。この駆動ローラの回転によって、第1ベルト63と第2ベルト64とは、互いに平行な搬送路を保持しながら、搬送される。   The first belt 63 and the second belt 64 are endless belts formed in an annular shape. The first belt 63 and the second belt 64 are wound around the circumferential surfaces of the fifth roller 67 to the seventh roller 69 so as to be aligned in the longitudinal directions of the fifth roller 67 to the seventh roller 69. At least one of the fifth roller 67 to the seventh roller 69 is a drive roller that rotates in the circumferential direction. Due to the rotation of the driving roller, the first belt 63 and the second belt 64 are conveyed while maintaining a conveyance path parallel to each other.

第5ローラ67〜第7ローラ69は、各長手方向が溶接支持ローラ41の長手方向に一致するように配される。   The fifth roller 67 to the seventh roller 69 are arranged so that their longitudinal directions coincide with the longitudinal direction of the welding support roller 41.

第5ローラ67〜第7ローラ69は、側部材11と中央部材12との搬送路に関し、第4ローラ29と溶接支持ローラ41とが配されてある側とは反対側の領域に配される。第5ローラ67は、第4ローラ29から溶接支持ローラ41へ向かう側部材11と中央部材12との搬送路に対向するように設けられる。第6ローラ68は、溶接支持ローラ41から加熱部19に向かう側部材11と中央部材12との搬送路に対向するように設けられる。第7ローラ69は、第6ローラ68から第5ローラ67へ向かう第1ベルト63と第2ベルト64との搬送路を決定するように、適宜配される。   The fifth roller 67 to the seventh roller 69 are arranged in a region opposite to the side on which the fourth roller 29 and the welding support roller 41 are arranged with respect to the conveyance path between the side member 11 and the central member 12. . The fifth roller 67 is provided so as to face the conveyance path between the side member 11 and the central member 12 from the fourth roller 29 toward the welding support roller 41. The sixth roller 68 is provided so as to face the conveyance path between the side member 11 and the central member 12 from the welding support roller 41 toward the heating unit 19. The seventh roller 69 is appropriately arranged so as to determine the conveyance path of the first belt 63 and the second belt 64 from the sixth roller 68 to the fifth roller 67.

第5ローラ67と第6ローラ68とは、第5ローラ67から第6ローラ68に向かう第1ベルト63と第2ベルト64とが、溶接支持ローラ41上の側部材11と中央部材12とバンド部材13とを押圧するように搬送されるように配される。例えば、溶接支持ローラ41上の側部材11と中央部材12とを上方から溶接する場合には、第5ローラ67と第6ローラ68とは、これらの各下端が、溶接支持ローラ41の上端よりも低い位置となるように配される。   The fifth roller 67 and the sixth roller 68 are the first belt 63 and the second belt 64 that are directed from the fifth roller 67 to the sixth roller 68, and the side member 11, the central member 12, and the band on the welding support roller 41. It arrange | positions so that it may convey so that the member 13 may be pressed. For example, when the side member 11 and the central member 12 on the welding support roller 41 are welded from above, the lower end of each of the fifth roller 67 and the sixth roller 68 is higher than the upper end of the welding support roller 41. Also, it is arranged to be in a low position.

第5ローラ67と第6ローラ68とは、第1ベルト63の搬送路が側部材11と側部材11から形成されるバンド部材13の側部13sとの搬送路と対向するように、また、第2ベルト64の搬送路が中央部材12と中央部材12から形成されるバンド部材13の中央部13cとの搬送路に対向するように、設けられる。これにより、第1ベルト63は側部材11と側部13eとを、第2ベルト64は中央部材12と中央部13cとを、それぞれ溶接支持ローラ41に押圧する。   The fifth roller 67 and the sixth roller 68 are arranged so that the conveyance path of the first belt 63 faces the conveyance path between the side member 11 and the side portion 13s of the band member 13 formed from the side member 11, and The transport path of the second belt 64 is provided so as to face the transport path between the central member 12 and the central portion 13c of the band member 13 formed from the central member 12. Accordingly, the first belt 63 presses the side member 11 and the side portion 13e, and the second belt 64 presses the center member 12 and the center portion 13c to the welding support roller 41, respectively.

以上のように、第1ベルト63と第2ベルト64とは、それぞれ溶接支持ローラ41にそれぞれ対向して設けられ、溶接位置Pwにおける側部材11と中央部材12との高さが等しくなるように押圧する。側部材11と中央部材12との高さとは、各部材11,12の露出面の高さである。このように高さが等しくなるように側部材11と中央部材12とを押さえ、この状態で溶接を実施することにより、溶接部13wの態様が長手方向でより均一になるとともに、溶接をより確実に行うことができる。   As described above, the first belt 63 and the second belt 64 are provided to face the welding support roller 41, respectively, so that the heights of the side member 11 and the central member 12 at the welding position Pw are equal. Press. The height of the side member 11 and the central member 12 is the height of the exposed surface of each member 11, 12. By pressing the side member 11 and the central member 12 so that the heights are equal to each other and performing welding in this state, the aspect of the welded portion 13w becomes more uniform in the longitudinal direction and welding is more reliably performed. Can be done.

図5及び図6を参照しながら、長手溶接工程についてさらに詳細に説明する。第1ベルト63と第2ベルト64とは、互いに間隔をもって搬送される。第1ベルトと第2ベルト64とは、溶接位置Pwが第1ベルト63と第2ベルト64との隙間を通過するように搬送路が設定される。これにより、側部材11の側縁11eと中央部材12の側縁12eとが接している接触位置Psは、図5に示すように第1ベルト63と第2ベルト64との隙間を通過し、第1ベルト63と第2ベルト64との間で溶接される。なお、図5においては溶接装置本体46の図示を略してある。   The longitudinal welding process will be described in more detail with reference to FIGS. The first belt 63 and the second belt 64 are transported at intervals. The conveyance path is set so that the welding position Pw passes through the gap between the first belt 63 and the second belt 64 between the first belt and the second belt 64. Thereby, the contact position Ps at which the side edge 11e of the side member 11 and the side edge 12e of the central member 12 are in contact with each other passes through the gap between the first belt 63 and the second belt 64, as shown in FIG. Welding is performed between the first belt 63 and the second belt 64. In addition, illustration of the welding apparatus main body 46 is abbreviate | omitted in FIG.

第1ベルト63と第2ベルト64との間隔D1は、6mm以上12mm以下の範囲とすることが好ましい。側部材11と中央部材12との幅方向Yにおける断面において、接触位置Psと第1ベルト63との距離D2、及び、接触位置Psと第2ベルト64との距離D3は、それぞれ3mm以上6mm未満の範囲とすることが好ましい。   The distance D1 between the first belt 63 and the second belt 64 is preferably in the range of 6 mm to 12 mm. In the cross section in the width direction Y between the side member 11 and the central member 12, the distance D2 between the contact position Ps and the first belt 63 and the distance D3 between the contact position Ps and the second belt 64 are 3 mm or more and less than 6 mm, respectively. It is preferable to set it as the range.

押圧装置62に代えて、長手方向が溶接支持ローラ41の長手方向に一致するように、溶接装置本体46の上流と下流とにそれぞれローラ(図示無し)を配してもよい。この場合には、上流の一方のローラで側部材11と中央部材12と押さえ、下流の他方でバンド部材13を押さえることにより、溶接位置Pwにおける側部材11と中央部材12とを押圧することができる。   Instead of the pressing device 62, rollers (not shown) may be arranged upstream and downstream of the welding device main body 46 so that the longitudinal direction coincides with the longitudinal direction of the welding support roller 41. In this case, the side member 11 and the central member 12 at the welding position Pw can be pressed by pressing the side member 11 and the central member 12 with one upstream roller and pressing the band member 13 with the other downstream. it can.

図6に示すように、接触位置Ps及びこの周辺には溶接装置42の熱により溶解されて溶接ビード72が形成される。この溶接ビード72から両側に熱が伝わり、側部材11と中央部材12とのそれぞれに溶接での熱の影響を受ける熱影響領域が生じる。この熱影響領域は、熱影響をうけない他の領域とは異なる性状をただちに示したり、経時的に示すようになったりすることがある。例えば、このように熱影響が幅広く生じたものを流延支持体として用いると、溶液製膜を連続して実施しているうちに変形したり、流延膜が発泡することがある。   As shown in FIG. 6, a weld bead 72 is formed at the contact position Ps and the periphery thereof by melting by the heat of the welding device 42. Heat is transmitted from the weld bead 72 to both sides, and a heat-affected region is generated in each of the side member 11 and the central member 12 that is affected by heat in welding. This heat-affected region may immediately show different properties from other regions that are not affected by heat, or may show over time. For example, when a material having such a wide thermal influence is used as a casting support, the casting film may be deformed or the casting film may be foamed while the solution casting is continuously performed.

そこで、図5に示すように、溶接支持ローラ41の周面のうち、接触位置Psが通過する通過領域には、側部材11及び中央部材12よりも熱伝導率が高い素材からなる高熱伝導部71が形成されていることが好ましい。これにより、溶接装置42(図3、図4参照)からの熱をよりはやく拡散させることができる。熱をよりはやく溶接支持ローラ41側で拡散させるために、側部材11と中央部材12との熱影響領域73の幅をより小さくしたり熱影響領域73の深さも浅くすることができる。   Therefore, as shown in FIG. 5, in the peripheral region of the welding support roller 41, a high heat conduction portion made of a material having higher heat conductivity than the side member 11 and the central member 12 is in a passage region through which the contact position Ps passes. 71 is preferably formed. Thereby, the heat from the welding apparatus 42 (refer FIG. 3, FIG. 4) can be spread | diffused more quickly. In order to diffuse heat more quickly on the side of the welding support roller 41, the width of the heat affected area 73 between the side member 11 and the central member 12 can be made smaller or the depth of the heat affected area 73 can be made shallower.

高熱伝導部71とされる通過領域の幅D4は26mm以上32mm以下の範囲であることが好ましい。   It is preferable that the width D4 of the passage region used as the high heat conducting portion 71 is in a range of 26 mm or more and 32 mm or less.

さらに、第1ベルト63及び第2ベルト64の両面にも、側部材11及び中央部材12よりも熱伝導率が高い素材からなる高熱伝導部が形成されていることがより好ましい。これにより、熱影響領域73の幅をより小さくしたり、深さをより浅くすることができる。   Furthermore, it is more preferable that high heat conductive portions made of a material having higher thermal conductivity than the side member 11 and the central member 12 are formed on both surfaces of the first belt 63 and the second belt 64. Thereby, the width | variety of the heat affected zone 73 can be made smaller or the depth can be made shallower.

側部材11の側縁11eと中央部材12の側縁12eとは、溶接位置Pwにおいて隙間が0(ゼロ)になるように密着した状態であることが好ましい。そこで、側部材11と中央部材12とは、各側縁11e及び12eを突き合わせたときに隙間が生じないような形状に予め形成されてあることが好ましい。これにより、溶接部に空隙がないバンド部材をより確実に製造することができる。   It is preferable that the side edge 11e of the side member 11 and the side edge 12e of the central member 12 are in close contact with each other so that the gap is 0 (zero) at the welding position Pw. Therefore, it is preferable that the side member 11 and the central member 12 are formed in advance so as not to generate a gap when the side edges 11e and 12e are brought into contact with each other. Thereby, the band member without a space | gap in a welding part can be manufactured more reliably.

上記の長手溶接工程は、側部材11と中央部材12との長手方向に連続して溶接を実施する連続溶接工程のみであってもよいし、これに加えて、断続的に溶接を実施する断続溶接工程を実施してもよい。断続的に溶接すると、溶接装置42に連続的に送られてくる側部材11と中央部材12とは、間欠的に溶接される。このような断続溶接工程は、連続溶接工程の前に実施するとよい。この場合には、断続溶接工程で、まず、側部材11と中央部材12とを仮接合し、その後、連続溶接工程で長手方向全域に亘り接合するとよい。   The above-described longitudinal welding process may be only a continuous welding process in which welding is continuously performed in the longitudinal direction of the side member 11 and the central member 12, and in addition to this, intermittent welding in which welding is intermittently performed. A welding process may be performed. When intermittently welding, the side member 11 and the central member 12 that are continuously sent to the welding device 42 are welded intermittently. Such an intermittent welding process may be performed before the continuous welding process. In this case, in the intermittent welding process, first, the side member 11 and the central member 12 may be temporarily joined, and then joined over the entire longitudinal direction in the continuous welding process.

断続溶接工程で仮接合し、その後連続溶接工程で接合を実施する場合には、突き合わせ部17(図1,図2参照)から溶接ユニット18に側部材11と中央部材12とを案内して断続的に溶接する。なお、側部材11と中央部材12とに、後の流延支持体として用いる際の流延面に対応する表面と、非流延面に対応する裏面とを設定してある場合には、断続溶接工程での溶接は、裏面に対して実施することが好ましい。そこで、裏面が溶接装置本体46(図1参照)に対向して通過するように、側部材11と中央部材12とを搬送する。   When temporary joining is performed in the intermittent welding process, and then joining is performed in the continuous welding process, the side member 11 and the central member 12 are guided to the welding unit 18 from the butting portion 17 (see FIGS. 1 and 2) and intermittent. Welding. In addition, when the side member 11 and the central member 12 are provided with a surface corresponding to a casting surface when used as a subsequent casting support and a back surface corresponding to a non-casting surface, intermittent The welding in the welding process is preferably performed on the back surface. Then, the side member 11 and the central member 12 are conveyed so that a back surface may pass facing the welding apparatus main body 46 (refer FIG. 1).

断続溶接を実施した後に、巻取装置20に案内して巻き取る。なお、巻取前に溶接部に対して加熱部19により加熱してもよい。断続溶接工程を経て巻き取られた側部材11と中央部材12とからなる仮接合部材(図示無し)を、送出装置(図示無し)により巻きだして溶接ユニット18に再び送る。この送り出しは、仮溶接部材の表面が溶接装置本体46(図1参照)に対向して通過するように行う。溶接ユニット18では連続溶接を行い、バンド部材13を得る。なお、この方法に代えて、ふたつの溶接ユニット18を相対的に上流と下流とに並べて配し、上流の一方の溶接ユニット18で断続溶接を実施し、下流の他方の溶接ユニット18で連続溶接を実施してもよい。   After performing intermittent welding, it guides to the winding device 20 and winds up. In addition, you may heat with the heating part 19 with respect to a welding part before winding. A temporary joining member (not shown) made up of the side member 11 and the central member 12 wound through the intermittent welding process is unwound by a feeding device (not shown) and sent to the welding unit 18 again. This feeding is performed so that the surface of the temporary welding member passes facing the welding apparatus main body 46 (see FIG. 1). The welding unit 18 performs continuous welding to obtain the band member 13. In place of this method, the two welding units 18 are arranged side by side relatively upstream and downstream, intermittent welding is performed by one upstream welding unit 18, and continuous welding is performed by the other downstream welding unit 18. May be implemented.

溶接を行うと溶接ビード72は側部材11と中央部材12とよりも盛り上がって形成される場合がある。そこで、以上のように一方の面を長手方向で溶接する第1工程と他方の面を長手方向で溶接する第2工程とを実施する場合において用いる溶接支持ローラ41には、図5に示すように、接触位置Psが通過する通過領域に、溝76が形成されてあることが好ましい。第1工程で盛り上がった溶接ビード72から形成された溶接部が、この溝76を通過するように、側部材11と中央部材12とを搬送して第2工程を実施するとよい。これにより、より平滑で、残留応力がより少ないバンド部材13を得ることができる。したがって、溶液製膜で用いても流延支持体としてのバンドに変形や、性状の変化がより少なく、流延膜が発泡せず、厚みのむらがないフィルムをより確実に製造することができる。   When welding is performed, the weld bead 72 may be formed to be higher than the side member 11 and the central member 12. Therefore, as shown in FIG. 5, the welding support roller 41 used in the case where the first process of welding one surface in the longitudinal direction and the second process of welding the other surface in the longitudinal direction are performed as shown in FIG. In addition, it is preferable that a groove 76 is formed in a passing region through which the contact position Ps passes. It is good to carry out the 2nd process by conveying the side member 11 and the central member 12 so that the welding part formed from the weld bead 72 raised in the 1st process may pass this groove | channel 76. FIG. Thereby, the band member 13 that is smoother and has less residual stress can be obtained. Therefore, even when used in solution casting, it is possible to more reliably produce a film in which the band as a casting support is less deformed and changes in properties, the casting membrane does not foam, and the thickness is not uneven.

溝76の幅D5は、6mm以上12mm以下の範囲であることが好ましく、溝の深さD6は、1mm程度でよい。   The width D5 of the groove 76 is preferably in the range of 6 mm to 12 mm, and the depth D6 of the groove may be about 1 mm.

以上の実施形態では突き合わせ部17における側部材11の搬送経路を調整する手段として第3ローラ28を用いるが、第3ローラ28に代えて、図7に示すようなテーパローラ81を用いてもよい。テーパローラ81は、一端から他端に向けて径dが連続的に漸減するように形成された断面円形のローラである。径dは、一端から他端に向けて一定の割合で連続的に漸減する。径dが大きい一端を中央部材12の搬送路に向け、径dが小さい他端を中央部材12とは反対側に向くように、テーパローラを配する。   In the above embodiment, the third roller 28 is used as means for adjusting the conveyance path of the side member 11 in the abutting portion 17, but instead of the third roller 28, a tapered roller 81 as shown in FIG. 7 may be used. The taper roller 81 is a roller having a circular cross section formed so that the diameter d continuously decreases gradually from one end to the other end. The diameter d gradually decreases gradually from one end to the other end at a constant rate. A taper roller is disposed so that one end with a large diameter d is directed toward the conveyance path of the central member 12 and the other end with a small diameter d is directed to the side opposite to the central member 12.

搬送されている側部材11は、このテーパローラ81に接触することにより、搬送の経路を中央部材12に向かう矢線Aの方向に変え、中央部材12に寄るようになる。これにより、突き合わせ位置Pc(図1、図2参照)に向けて側部材11は確実に搬送される。   The side member 11 being conveyed comes into contact with the taper roller 81, thereby changing the conveyance path to the direction of the arrow A toward the central member 12, and approaching the central member 12. Thereby, the side member 11 is reliably conveyed toward butting position Pc (refer FIG. 1, FIG. 2).

テーパローラ81には、周方向に回転する駆動手段82が備えられていることが好ましい。回転軸は、一端面の中央と他端面の中央とを挿通して形成されてある。駆動手段82で回転するテーパローラ81により側部材11を搬送することにより、側部材はより効果的に中央部材12に寄るようになる。   The taper roller 81 is preferably provided with driving means 82 that rotates in the circumferential direction. The rotating shaft is formed through the center of one end surface and the center of the other end surface. By conveying the side member 11 by the taper roller 81 rotated by the driving means 82, the side member comes closer to the central member 12 more effectively.

第3ローラ28に代えて、図8に示すような把持手段としてのクリップ85を用いてもよい。クリップ85は、コの字状に開いたクリップ本体86と、クリップ本体86の各先端部に設けられた1対の狭持ピン87とを備え、側部材11を狭持して把持する。狭持ピン87は、側部材11を狭持する狭持位置と、狭持位置から退避する退避位置との間で移動自在に設けられる。クリップ85は、移動機構88を備え、把持を開始する把持開始位置と、把持を解除する把持解除位置との間で移動自在とされる。また、クリップ85は、幅方向Yにも移動自在とされる。   Instead of the third roller 28, a clip 85 as gripping means as shown in FIG. 8 may be used. The clip 85 includes a clip body 86 opened in a U-shape and a pair of sandwiching pins 87 provided at the respective distal end portions of the clip body 86, and grips and holds the side member 11. The pinching pin 87 is provided so as to be movable between a pinching position for pinching the side member 11 and a retreating position for retreating from the pinching position. The clip 85 includes a moving mechanism 88 and is movable between a grip start position where gripping is started and a grip release position where gripping is released. The clip 85 is also movable in the width direction Y.

クリップ85は、把持開始位置で狭持ピン87が狭持位置に移動することにより側部材11を把持する。クリップ85は、側部材11を把持した状態で中央部材12に向かう方向Aに寄せつつ、下流へと搬送する。   The clip 85 grips the side member 11 when the pinching pin 87 moves to the pinching position at the gripping start position. The clip 85 is conveyed downstream while approaching the direction A toward the central member 12 with the side member 11 being gripped.

テーパローラ81とクリップ85とは、側部材11を中央部材12へ寄せるために用いる他に、中央部材12を側部材11に寄せるために用いてもよい。この場合には、テーパローラ81、クリップ85で中央部材12を支持あるいは搬送するとよい。   The taper roller 81 and the clip 85 may be used to bring the central member 12 closer to the side member 11 in addition to being used to bring the side member 11 closer to the central member 12. In this case, the central member 12 may be supported or conveyed by the taper roller 81 and the clip 85.

上記の実施形態では、中央部材12に両側部材11を同時に溶接しているが、一方の側部材11を中央部材12に溶接した後に、他方の側部材11を中央部材12に溶接してもよい。   In the above embodiment, the both side members 11 are welded to the central member 12 at the same time. However, after the one side member 11 is welded to the central member 12, the other side member 11 may be welded to the central member 12. .

図9に示すように、流延支持体として用いるバンド91は、環状にされた無端のバンドである。そこで、得られたバンド部材13を、所定の長さにカットし、所定の長さにカットしたバンド部材13の、長手方向における先端と先端とを溶接してバンド91を製造する。なお、あらかじめ所定の長さにカットされた側部材11と中央部材12とからバンド部材を形成した場合には、カットの工程は必ずしも行わなくてよい。   As shown in FIG. 9, a band 91 used as a casting support is an endless band formed into an annular shape. Therefore, the obtained band member 13 is cut to a predetermined length, and the band member 13 cut to a predetermined length is welded at the front end and the front end in the longitudinal direction to manufacture the band 91. In the case where the band member is formed from the side member 11 and the central member 12 that have been cut to a predetermined length in advance, the cutting step is not necessarily performed.

バンド部材13は、幅方向Yと交差する方向でカットすることが好ましい。カットの方向は、幅方向Yとなす角が概ね5°以上15°以下の範囲となるようにカットすることがより好ましい。このようにカットしたバンド部材13の長手方向における先端と先端とを溶接した溶接部91wと、幅方向Yとのなす角θ2は、概ね5°以上15°以下の範囲となる。このように長尺のバンド部材13を環状にする環状溶接工程では、長手溶接工程で用いた溶接装置42を用いてもよいし、公知の他の溶接装置を用いてもよい。   The band member 13 is preferably cut in a direction crossing the width direction Y. More preferably, the cut direction is such that the angle formed with the width direction Y is in the range of approximately 5 ° to 15 °. The angle θ2 formed by the welded portion 91w in which the front end and the front end in the longitudinal direction of the band member 13 thus cut are welded and the width direction Y is approximately in the range of 5 ° to 15 °. As described above, in the annular welding process in which the long band member 13 is annular, the welding apparatus 42 used in the longitudinal welding process may be used, or other known welding apparatuses may be used.

溶接により製造されたバンド91は、側部材11(図1〜図8参照)から形成された側部91sと、中央部材12(図1〜図8参照)から形成された中央部91cとからなる。このように得られるバンド91の幅は、2000mm以上3000mm以下の範囲である。   The band 91 manufactured by welding includes a side portion 91s formed from the side member 11 (see FIGS. 1 to 8) and a center portion 91c formed from the central member 12 (see FIGS. 1 to 8). . The width of the band 91 thus obtained is in the range of 2000 mm to 3000 mm.

得られたバンド91は、表面を研磨して鏡面にした後、溶液製膜設備に用いる。バンド91を用いてフィルムを製造する方法について以下に説明する。ポリマーの種類は特に限定されず、溶液製膜でフィルムにすることができる公知のポリマーを用いてよい。以下の実施形態では、ポリマーとしてセルロースアシレートを用いた場合を例にして説明する。   The obtained band 91 is used for a solution casting apparatus after the surface is polished to a mirror surface. A method for producing a film using the band 91 will be described below. The kind of polymer is not particularly limited, and a known polymer that can be formed into a film by solution casting may be used. In the following embodiments, a case where cellulose acylate is used as a polymer will be described as an example.

図10及び図11に示すように、溶液製膜設備110は、セルロースアシレート111が溶剤112に溶解したドープ113からセルロースアシレートフィルム(以降、単に「フィルム」と称する)116を形成するフィルム形成装置117と、フィルム116の各側部を切除する第1スリッタ118と、フィルム116の各側部を保持手段119で保持しながら乾燥をすすめる第1テンタ120と、フィルム116を複数のローラ156で支持しながら乾燥するローラ乾燥装置124と、フィルム116の各側部を保持手段で保持し、フィルム116に対して幅方向での張力をフィルム116に付与する第2テンタ125と、第2テンタ125の保持手段により保持された各側部の保持跡を切除する第2スリッタ126と、フィルム116を巻き芯に巻いてロール状にする巻取装置127とを、上流側から順に備える。図11においては、図の煩雑化を避けるためダクト141の図示は略してある。なお、本明細書においては、溶剤含有率(単位;%)は乾量基準の値であり、具体的には、溶剤の質量をx、フィルム116の質量をyとするときに、{x/(y−x)}×100で求める値である。   As shown in FIGS. 10 and 11, the solution casting apparatus 110 forms a film for forming a cellulose acylate film (hereinafter, simply referred to as “film”) 116 from a dope 113 in which cellulose acylate 111 is dissolved in a solvent 112. An apparatus 117; a first slitter 118 that cuts out each side of the film 116; a first tenter 120 that advances drying while holding each side of the film 116 with a holding means 119; and a plurality of rollers 156 A roller drying device 124 that dries while supporting, a second tenter 125 that holds each side portion of the film 116 with holding means, and applies a tension in the width direction to the film 116, and a second tenter 125. A second slitter 126 for cutting off the holding marks on the respective sides held by the holding means, and the film 116. Wound on the winding core and a winding device 127 for the roll, in order from the upstream. In FIG. 11, the illustration of the duct 141 is omitted to avoid complication of the drawing. In the present specification, the solvent content (unit:%) is a value based on the dry weight. Specifically, when the mass of the solvent is x and the mass of the film 116 is y, {x / (Y−x)} × 100.

フィルム形成装置117は、周方向に回転する1対のローラ131、132を備える。ローラ131とローラ132との周面には、バンド91が巻き掛けられる。ローラ131,132の少なくともいずれか一方が、駆動手段を有する駆動ローラであればよい。この駆動ローラが周方向に回転することにより、周面に接するバンド91が搬送される。   The film forming apparatus 117 includes a pair of rollers 131 and 132 that rotate in the circumferential direction. A band 91 is wound around the circumferential surfaces of the rollers 131 and 132. At least one of the rollers 131 and 132 may be a driving roller having a driving unit. As the drive roller rotates in the circumferential direction, the band 91 in contact with the circumferential surface is conveyed.

バンド91の上方にはドープ113を流出する流延ダイ133が備えられる。搬送されているバンド91に流延ダイ133からドープ113を連続的に流出することにより、ドープ113はバンド91上で流延されて流延膜136が形成される。流延ダイ133は、一方のローラ131上にあるバンド91の上方に設けてもよいし、一方のローラ131から他方のローラ132に向かうバンド91の上方に設けてもよい。後者の場合には、一方のローラ131と他方のローラ132との間にローラ(図示無し)を配し、このローラによりバンド91を支持してもよい。   A casting die 133 that flows out of the dope 113 is provided above the band 91. By continuously flowing out the dope 113 from the casting die 133 to the band 91 being conveyed, the dope 113 is cast on the band 91 to form a casting film 136. The casting die 133 may be provided above the band 91 on the one roller 131, or may be provided above the band 91 from the one roller 131 toward the other roller 132. In the latter case, a roller (not shown) may be disposed between one roller 131 and the other roller 132, and the band 91 may be supported by this roller.

なお、ダイ31からバンド91に至るドープ113、いわゆるビードに関して、バンド91の走行方向における上流には、減圧チャンバが設けられるが図示は略す。この減圧チャンバは、流出したドープ113の上流側エリアの雰囲気を吸引して前記エリアを減圧する。   Regarding the dope 113 from the die 31 to the band 91, that is, a so-called bead, a decompression chamber is provided upstream in the traveling direction of the band 91, but the illustration is omitted. The decompression chamber sucks the atmosphere in the area upstream of the dope 113 that has flowed out to decompress the area.

流延膜136を、第1テンタ120への搬送が可能な程度にまで固くしてから、溶剤を含む状態でバンド91から剥がす。剥ぎ取りの際には、フィルム116を剥ぎ取り用のローラ(以下、剥取ローラと称する)137で支持し、流延膜136がバンド91から剥がれる剥取位置を一定に保持する。剥取ローラ137は、駆動手段を備え周方向に回転する駆動ローラであってもよい。   The cast film 136 is hardened to such an extent that it can be conveyed to the first tenter 120, and then peeled off from the band 91 in a state containing a solvent. At the time of stripping, the film 116 is supported by a stripping roller (hereinafter referred to as stripping roller) 137, and the stripping position where the casting film 136 is stripped from the band 91 is kept constant. The stripping roller 137 may be a driving roller that includes driving means and rotates in the circumferential direction.

フィルム形成装置117には、バンド91の走行路に沿って上流側から順に、乾燥した気体を流延膜136に向けて送り出す第1ダクト141、第2ダクト142、第3ダクト143の3つのダクトが設けられる。ただし、ダクトの数は3に限定されない。   The film forming apparatus 117 includes three ducts of a first duct 141, a second duct 142, and a third duct 143 that send the dried gas toward the casting film 136 in order from the upstream side along the traveling path of the band 91. Is provided. However, the number of ducts is not limited to three.

第1ダクト〜第3ダクト141〜143には、乾燥した気体を流出する流出口(図示せず)がバンド91の走行路に対向してそれぞれ複数形成される。各流出口は、バンド91の幅方向に延びたスリット形状としてある。しかし、流出口の形状はこれに限定されない。   In the first duct to the third ducts 141 to 143, a plurality of outlets (not shown) through which the dried gas flows out are formed facing the traveling path of the band 91. Each outlet has a slit shape extending in the width direction of the band 91. However, the shape of the outlet is not limited to this.

第1ダクト〜第3ダクト141〜143は、それぞれ送風機(図示せず)に接続し、送風機から供給された気体を流出口から流出する。送風機には、第1ダクト〜第3ダクト141〜143のそれぞれへ供給する気体の温度、湿度、流量を独立して制御する送風コントローラ(図示せず)が接続する。第1ダクト〜第3ダクト141〜143による気体の流出により、流延膜136の乾燥をすすめる。   The first duct to the third ducts 141 to 143 are each connected to a blower (not shown), and the gas supplied from the blower flows out from the outlet. A blower controller (not shown) that independently controls the temperature, humidity, and flow rate of the gas supplied to each of the first duct to the third ducts 141 to 143 is connected to the blower. The casting membrane 136 is dried by the outflow of gas through the first to third ducts 141 to 143.

第1〜第3ダクト141〜143からの気体は、加熱された温風であり、この温風により流延膜136を加熱する。流延膜136の温度は、この温風の温度及び流量の制御と、ローラ131,132の後述の温度制御とにより、調整される。   The gas from the first to third ducts 141 to 143 is heated hot air, and the casting film 136 is heated by this hot air. The temperature of the casting film 136 is adjusted by controlling the temperature and flow rate of the hot air and controlling the temperatures of the rollers 131 and 132 (described later).

ローラ131,132には、周面温度を所定の温度に制御する第1コントローラ(図示せず)及び第2コントローラ(図示せず)がそれぞれ備えられる。   Each of the rollers 131 and 132 includes a first controller (not shown) and a second controller (not shown) that control the peripheral surface temperature to a predetermined temperature.

流延膜136を乾燥するために、本実施形態では、第1〜第3ダクト141〜143を含む乾燥手段を用いる。しかし、乾燥手段はこれに限定されず、流延膜136の性状及びその経時変化に応じて他の乾燥手段を用いてもよい。他の乾燥手段としては、例えば、凝縮器を含む乾燥手段があり、これを第1〜第3ダクト141〜143を含む乾燥手段に代えて、または加えてもよい。   In order to dry the casting membrane 136, in this embodiment, a drying means including the first to third ducts 141 to 143 is used. However, the drying means is not limited to this, and other drying means may be used according to the properties of the casting film 136 and its change with time. As another drying means, for example, there is a drying means including a condenser, which may be replaced with or added to the drying means including the first to third ducts 141 to 143.

第1ダクト141には、流延膜136の側部に対向するように、バンド91の長手方向に延びた一対の遮風板146が起立した姿勢で設けられてある。遮風板146は、バンド91の溶接部91wよりも、バンド91の幅方向の外側に配されてある。遮風板146を、バンドの側部91sに対向するように配することにより、溶接部91wは遮風板146よりもバンド91の幅方向における内側になる。これにより、第1ダクト141からの乾燥気体がバンド91の側部91s上に流れることを遮り、これにより乾燥気体の熱による側部91sの変形が防止される。例えば、側部91sがローラ131,132から浮くように変形することを抑止する。   The first duct 141 is provided with a pair of wind shields 146 extending in the longitudinal direction of the band 91 so as to face the side portion of the casting film 136. The wind shielding plate 146 is arranged on the outer side in the width direction of the band 91 than the welded portion 91 w of the band 91. By arranging the wind shield plate 146 so as to face the side portion 91s of the band, the welded portion 91w is located on the inner side in the width direction of the band 91 than the wind shield plate 146. Accordingly, the dry gas from the first duct 141 is blocked from flowing on the side portion 91s of the band 91, thereby preventing the side portion 91s from being deformed by the heat of the dry gas. For example, the side portion 91 s is prevented from being deformed so as to float from the rollers 131 and 132.

なお、1対の遮風板146は、第2ダクト142と第3ダクト143にも設けられていてよい。   Note that the pair of wind shielding plates 146 may also be provided in the second duct 142 and the third duct 143.

ドープ113がバンド91に接触し始める接触開始位置は、流延膜136が形成し始める位置である。この接触開始位置の上流の側部には、1対のローラ147が配される。1対のローラ147は、それぞれバンドの側部91sに対向し、長手方向がバンド91の幅方向に一致するように配される。また、接触開始位置の下流の側部にも、同様に1対のローラ147が配される。これらのローラ147により側部91sを押圧して、側部91sの浮き上がりをより確実に防止することができる。   The contact start position at which the dope 113 starts to contact the band 91 is a position at which the casting film 136 starts to be formed. A pair of rollers 147 is disposed on the side upstream of the contact start position. The pair of rollers 147 is arranged so as to face the side portion 91 s of the band, and the longitudinal direction thereof coincides with the width direction of the band 91. Similarly, a pair of rollers 147 is arranged on the downstream side of the contact start position. By pressing the side portion 91s with these rollers 147, the side portion 91s can be more reliably prevented from being lifted.

ローラ147は、駆動手段により回転する駆動ローラであることが好ましい。バンド91の搬送速度と同じ速度で周回させることにより、バンド91とローラ147との接触による側部91sの摩擦熱の発生を抑止することができ、側部91sの変形をより確実に防止することができる。   The roller 147 is preferably a driving roller that is rotated by driving means. By rotating at the same speed as the transport speed of the band 91, generation of frictional heat of the side portion 91s due to contact between the band 91 and the roller 147 can be suppressed, and deformation of the side portion 91s can be more reliably prevented. Can do.

本実施形態では、接触位置の上流と下流との両方に1対のローラ147を配してあるが、上流と下流とのいずれか一方でもよい。   In the present embodiment, the pair of rollers 147 are arranged both upstream and downstream of the contact position, but either one of the upstream and downstream may be used.

流延ダイ133のスリット状である流出口133aの長さがバンド91の中央部91cの幅よりも長く、流延膜136が側部91s上にも形成されてよい。溶接部91w及び側部91s上に形成された流延膜136の側部は、第1スリッタ118または第2スリッタ126により切除することができるからである。なお、切除しなくても本発明により製造したバンド91を用いると、溶接部91w及び側部91s上で流延膜136が発泡することが抑止されているので、必ずしも第1スリッタ118または第2スリッタ126により切除しなくてよい。ただし、溶接部91w及び側部91s上で形成された流延膜136の側部は、バンド91から剥ぎ取られた後に、第1テンタ120の上流の第1スリッタ118で切除しておくことが好ましい。   The length of the outlet 133a which is the slit shape of the casting die 133 is longer than the width of the central portion 91c of the band 91, and the casting film 136 may be formed also on the side portion 91s. This is because the side part of the cast film 136 formed on the welded part 91w and the side part 91s can be cut off by the first slitter 118 or the second slitter 126. If the band 91 manufactured according to the present invention is used without being cut, the casting film 136 is prevented from foaming on the welded portion 91w and the side portion 91s. Therefore, the first slitter 118 or the second slitter 118 is not necessarily used. The slitter 126 may not be excised. However, the side part of the cast film 136 formed on the welded part 91w and the side part 91s can be cut off by the first slitter 118 upstream of the first tenter 120 after being peeled off from the band 91. preferable.

フィルム形成装置117と第1テンタ120との間の搬送路には、送風装置(図示無し)を配してもよい。この送風装置からの送風により、フィルム116の乾燥をすすめる。   A blower (not shown) may be disposed on the conveyance path between the film forming apparatus 117 and the first tenter 120. The film 116 is dried by the air blown from the blower.

流延膜136は、剥取ローラ137で剥ぎ取られる。剥ぎ取られた流延膜136、すなわちフィルム116は、第1テンタ120に案内される。第1テンタ120の保持手段119は、クリップとしてある。   The cast film 136 is peeled off by the peeling roller 137. The cast film 136 that has been peeled off, that is, the film 116 is guided to the first tenter 120. The holding means 119 of the first tenter 120 is a clip.

第1テンタ120は、フィルム116を保持手段119で保持して長手方向(以下、方向Aと称する)に搬送しながら、幅方向(以下、方向Bと称する)への張力を付与し、フィルム116の幅を拡げる。第1テンタ120には、上流側から順に、予熱エリア、延伸エリア、及び緩和エリアが形成されてある。なお、緩和エリアは無くてもよい。   The first tenter 120 applies a tension in the width direction (hereinafter referred to as direction B) while holding the film 116 by the holding means 119 and transporting the film 116 in the longitudinal direction (hereinafter referred to as direction A). Increase the width of In the first tenter 120, a preheating area, an extension area, and a relaxation area are formed in this order from the upstream side. There may be no relaxation area.

第1テンタ120は、1対のレール(図示無し)及びチェーン(図示無し)を備える。レールはフィルム116の搬送路の両側に設置され1対のレールは所定の間隔で離間して配される。このレール間隔は、予熱エリアでは一定であり、延伸エリアでは下流に向かうに従って次第に広くなり、緩和エリアでは一定である。なお、緩和エリアのレール間隔は、下流に向かうに従って次第に狭くなるようにしてもよい。   The first tenter 120 includes a pair of rails (not shown) and a chain (not shown). The rails are installed on both sides of the conveyance path of the film 116, and the pair of rails are arranged at a predetermined interval. This rail interval is constant in the preheating area, gradually increases in the extending area as it goes downstream, and is constant in the relaxation area. In addition, you may make it the rail space | interval of a relaxation area become narrow gradually as it goes downstream.

チェーンは、原動スプロケット及び従動スプロケット(図示無し)に掛け渡され、レールに沿って移動自在に取り付けられている。複数の保持手段119は、チェーンに所定の間隔で取り付けられている。原動スプロケットの回転により、保持手段119はレールに沿って循環移動する。   The chain is stretched over a driving sprocket and a driven sprocket (not shown), and is attached so as to be movable along the rail. The plurality of holding means 119 are attached to the chain at a predetermined interval. Due to the rotation of the driving sprocket, the holding means 119 circulates along the rail.

保持手段119は、第1テンタ120の入口近傍で、案内されてきたフィルム116の保持を開始し、出口に向かって移動して、出口近傍で保持を解除する。保持を解除した保持手段119は再び入口近傍に移動して、新たに案内されてきたフィルム116を保持する。   The holding means 119 starts holding the guided film 116 in the vicinity of the inlet of the first tenter 120, moves toward the outlet, and releases the holding in the vicinity of the outlet. The holding means 119 whose release has been released moves again to the vicinity of the entrance, and holds the newly guided film 116.

予熱エリア、延伸エリア、緩和エリアは、ダクト151からの乾燥風の送り出しによって空間として形成されたものであり、明確な境界があるわけではない。ダクト151はフィルム116の搬送路の上方に設けられる。ダクト151は、乾燥風を送り出すスリットを有し、送風機(図示無し)から供給される。送風機は、所定の温度や湿度に調整した乾燥風をダクト151に送る。スリットがフィルム116の搬送路と対向するようにダクト151は配される。各スリットはフィルム116の幅方向に長く伸びた形状であり、搬送方向で互いに所定の間隔をもって形成されている。なお、同様の構造を有するダクトを、フィルム116の搬送路の下方に設けてもよいし、フィルム116の搬送路の上方と下方との両方に設けてもよい。   The preheating area, the stretching area, and the relaxation area are formed as spaces by sending dry air from the duct 151 and do not have a clear boundary. The duct 151 is provided above the conveyance path of the film 116. The duct 151 has a slit for sending dry air, and is supplied from a blower (not shown). The blower sends dry air adjusted to a predetermined temperature and humidity to the duct 151. The duct 151 is arranged so that the slit faces the conveyance path of the film 116. Each slit has a shape extending in the width direction of the film 116 and is formed at a predetermined interval in the transport direction. Note that a duct having a similar structure may be provided below the conveyance path of the film 116, or may be provided both above and below the conveyance path of the film 116.

この第1テンタ120で、フィルムは搬送されながら、ダクト151からの乾燥風により乾燥をすすめられるとともに、保持手段119により幅を所定のタイミングで変えられる。   While the film is being transported by the first tenter 120, drying is promoted by the drying air from the duct 151, and the width can be changed at a predetermined timing by the holding means 119.

延伸エリアにおけるフィルム116の溶剤含有率は、2質量%以上250質量%以下であることが好ましく、2質量%以上100質量%以下であることがより好ましい。延伸処理における延伸率ER1(={(延伸後の幅)/(延伸前の幅)}×100)は、100%より大きく140%以下であることが好ましい。延伸処理におけるフィルム116の温度は、95℃以上150℃以下であることが好ましい。   The solvent content of the film 116 in the stretching area is preferably 2% by mass or more and 250% by mass or less, and more preferably 2% by mass or more and 100% by mass or less. The stretching ratio ER1 (= {(width after stretching) / (width before stretching)} × 100) in the stretching treatment is preferably greater than 100% and 140% or less. The temperature of the film 116 in the stretching process is preferably 95 ° C. or higher and 150 ° C. or lower.

ローラ乾燥装置124の内部の雰囲気は、温度や湿度などが図示しない空調機により調節されている。ローラ乾燥装置124には、多数のローラ156が設けられており、これらにフィルム116が巻き掛けられて搬送される。ローラ乾燥装置124において、フィルム116から溶剤が蒸発する。ローラ乾燥装置124では、溶剤含有率が5質量%以下となるまで、乾燥工程が行うことが好ましい。   The atmosphere inside the roller dryer 124 is adjusted by an air conditioner (not shown) such as temperature and humidity. The roller drying device 124 is provided with a number of rollers 156, and the film 116 is wound around and conveyed. The solvent evaporates from the film 116 in the roller drying device 124. In the roller drying device 124, it is preferable to perform the drying process until the solvent content becomes 5% by mass or less.

なお、ローラ乾燥装置124から出たフィルム116がカールしている場合には、ローラ乾燥装置124と第2テンタ125との間に、カールを矯正してフィルム116を平らにするカール矯正装置(図示無し)を設けてもよい。   When the film 116 coming out of the roller drying device 124 is curled, a curl correcting device (not shown) that corrects the curl and flattens the film 116 between the roller drying device 124 and the second tenter 125. None) may be provided.

第2テンタ125は、フィルム116を延伸する。この延伸により、所望の光学特性を有するフィルム116となる。得られるフィルム116は位相差フィルムとして利用することができる。第2テンタ125は、第1テンタ120と同様の構造を有する。なお、第2テンタ125に設けられるダクト157は、スリット(図示せず)から、所定の温度に加熱された乾燥風を流出し、フィルム116に向かって流れる。   The second tenter 125 stretches the film 116. By this stretching, the film 116 having desired optical properties is obtained. The obtained film 116 can be used as a retardation film. The second tenter 125 has the same structure as the first tenter 120. The duct 157 provided in the second tenter 125 flows from the slit (not shown) out of the drying air heated to a predetermined temperature and flows toward the film 116.

第2テンタ125の保持手段160も第1テンタ120と同様にクリップとしてある。   The holding means 160 of the second tenter 125 is also a clip like the first tenter 120.

第2テンタ125での延伸における延伸率ER2(={(延伸後の幅)/(延伸前の幅)}×100)は、105%より大きく200%以下であることが好ましく、110%以上160%以下であることがより好ましい。延伸開始時におけるフィルム116の溶剤含有率は、5質量%以下であることが好ましく、3質量%以下であることがより好ましい。延伸におけるフィルム116の温度は、100℃以上200℃以下であることが好ましい。   The stretching ratio ER2 (= {(width after stretching) / (width before stretching)} × 100) in stretching in the second tenter 125 is preferably greater than 105% and not greater than 200%, and is not less than 110% and not greater than 160. % Or less is more preferable. The solvent content of the film 116 at the start of stretching is preferably 5% by mass or less, and more preferably 3% by mass or less. The temperature of the film 116 in stretching is preferably 100 ° C. or higher and 200 ° C. or lower.

製造目的とするフィルム116の光学特性によっては、第2テンタ125は用いずともよい。   The second tenter 125 may not be used depending on the optical characteristics of the film 116 to be manufactured.

第2テンタ125の下流の第2スリッタ126は、フィルム116が案内されてくると、第1テンタ120や第2テンタ125の各保持手段119,158による保持跡を含む側部を切除する。側部を切除したフィルム116を巻取装置127に送り、ロール状に巻き取る。   When the film 116 is guided, the second slitter 126 downstream of the second tenter 125 cuts out the side portion including the holding marks by the holding means 119 and 158 of the first tenter 120 and the second tenter 125. The film 116 with the side portions cut off is sent to the winding device 127 and wound into a roll.

第2テンタ125と第2スリッタ126との間に冷却装置(図示無し)を設けて、第2テンタ125からのフィルム116を冷却して降温させてもよい。   A cooling device (not shown) may be provided between the second tenter 125 and the second slitter 126 to cool the film 116 from the second tenter 125 and lower the temperature.

セルロースアシレート111は特に限定されない。セルロースアシレート111のアシル基は1種類だけでも良いし、あるいは2種類以上のアシル基を有していても良い。アシル基が2種以上であるときは、その1つがアセチル基であることが好ましい。セルロースの水酸基をカルボン酸でエステル化している割合、すなわち、アシル基の置換度が下記式(I)〜(III)の全てを満足するものが好ましい。なお、以下の式(I)〜(III)において、A及びBは、アシル基の置換度を表わし、Aはアセチル基の置換度、またBは炭素原子数3〜22のアシル基の置換度である。   The cellulose acylate 111 is not particularly limited. The cellulose acylate 111 may have only one type of acyl group, or may have two or more types of acyl groups. When there are two or more acyl groups, one of them is preferably an acetyl group. The ratio in which the hydroxyl group of cellulose is esterified with carboxylic acid, that is, the substitution degree of the acyl group satisfies all of the following formulas (I) to (III) is preferable. In the following formulas (I) to (III), A and B represent the substitution degree of the acyl group, A is the substitution degree of the acetyl group, and B is the substitution degree of the acyl group having 3 to 22 carbon atoms. It is.

(I) 2.0≦A+B≦3.0
(II) 1.0≦ A ≦3.0
(III) 0 ≦ B ≦2.0
(I) 2.0 ≦ A + B ≦ 3.0
(II) 1.0 ≦ A ≦ 3.0
(III) 0 ≦ B ≦ 2.0

アシル基の全置換度A+Bは、2.20以上2.90以下であることがより好ましく、2.40以上2.88以下であることが特に好ましい。また、炭素原子数3〜22のアシル基の置換度Bは、0.30以上であることがより好ましく、0.5以上であることが特に好ましい。中でも、本発明は、セルロースアシレート111としてセルロースジアセテート(DAC)を用いた場合に特に大きな効果がある。   The total substitution degree A + B of the acyl group is more preferably 2.20 or more and 2.90 or less, and particularly preferably 2.40 or more and 2.88 or less. Further, the substitution degree B of the acyl group having 3 to 22 carbon atoms is more preferably 0.30 or more, and particularly preferably 0.5 or more. Among these, the present invention is particularly effective when cellulose diacetate (DAC) is used as the cellulose acylate 111.

以下に本発明の実施例を説明する。ただし、本発明は、以下の実施例に限定されるものではなく、以下の各実施例は本発明の例として挙げるものである。詳細は実施例1にて説明し、実施例2以下の各実施例、及び本発明に対する比較例については、実施例1と異なる条件のみを示す。   Examples of the present invention will be described below. However, the present invention is not limited to the following examples, and the following examples are given as examples of the present invention. Details will be described in the first embodiment, and only the conditions different from the first embodiment will be shown for each of the second and following embodiments and the comparative example for the present invention.

側部材11と中央部材12とは、SUS316で形成されたものである。側部材11の幅は200mm、中央部材12の幅は2000mmである。側部材11と中央部材12との長さは120m、厚みは1.5mmである。側部材11と中央部材12とは、鏡面とされた表面と、鏡面にはされていない裏面とがある。なお、溶接の前に、側部材11と中央部材12とは、溶剤によりごみや水分を拭き取り、溶接する側縁11e,12eを洗浄した。   The side member 11 and the central member 12 are formed of SUS316. The width of the side member 11 is 200 mm, and the width of the central member 12 is 2000 mm. The side member 11 and the central member 12 have a length of 120 m and a thickness of 1.5 mm. The side member 11 and the central member 12 have a front surface that is a mirror surface and a back surface that is not a mirror surface. In addition, before welding, the side member 11 and the central member 12 wiped off dust and moisture with a solvent, and cleaned the side edges 11e and 12e to be welded.

溶接装置42は、COレーザ溶接装置である。レーザ出力は1kW、溶接装置42へ案内する側部材11と中央部材12との搬送速度は1m/分とした。 The welding device 42 is a CO 2 laser welding device. The laser output was 1 kW, and the conveying speed between the side member 11 and the central member 12 guided to the welding device 42 was 1 m / min.

バンド製造設備10を用いて、まず、裏面から溶接を行った。ただし、本実施例1では、高熱伝導部71を形成していない溶接支持ローラ41を用いた。また、位置検出手段47と加熱部19も用いていない。図3、図4に示す押圧装置62は用いていない。側部材11の表面が第3ローラ28,第4ローラ29に接するように、中央部材12の表面が第1ローラ26,第2ローラ27,第4ローラ29に接するように、第1送出装置23と第2送出装置24とから側部材11と中央部材12とを送り出した。   First, welding was performed from the back surface using the band manufacturing facility 10. However, in the present Example 1, the welding support roller 41 in which the high heat conduction part 71 is not formed was used. Further, the position detecting means 47 and the heating unit 19 are not used. The pressing device 62 shown in FIGS. 3 and 4 is not used. The first delivery device 23 is such that the surface of the side member 11 is in contact with the third roller 28 and the fourth roller 29, and the surface of the central member 12 is in contact with the first roller 26, the second roller 27, and the fourth roller 29. Then, the side member 11 and the central member 12 were sent out from the second delivery device 24.

中央部材12の搬送経路を位置検出手段34と第2ローラ27とにより制御して搬送路を設定した。側部材11と接触している第3ローラ28の接触領域における周方向と中央部材12の搬送方向Xとのなす角θ1は5°とした。この第3ローラ28により、側部材11の搬送経路を、制御して搬送路を決定した。このようにして突き合わせ位置Pcが第4ローラ29上となるようにした。   The conveyance path was set by controlling the conveyance path of the central member 12 by the position detection means 34 and the second roller 27. The angle θ1 formed by the circumferential direction in the contact region of the third roller 28 that is in contact with the side member 11 and the transport direction X of the central member 12 was 5 °. With the third roller 28, the conveyance path of the side member 11 is controlled to determine the conveyance path. In this way, the butting position Pc is set on the fourth roller 29.

第4ローラ29から溶接ユニット18へ、側部材11と中央部材12とを送り、裏面を連続的に溶接した。溶接した側部材11と中央部材12とからなるバンド部材13を一旦巻取装置20に巻き取った。   The side member 11 and the central member 12 were sent from the fourth roller 29 to the welding unit 18, and the back surface was continuously welded. The band member 13 composed of the welded side member 11 and the central member 12 was once wound around the winding device 20.

ロール状にされたバンド部材13を送出装置(図示せず)から再び溶接ユニット18へ送り、表面を連続的に溶接した。表面の溶接で用いた溶接支持ローラ41は溝76の幅D5が8mmのものである。   The roll-shaped band member 13 was sent again from the delivery device (not shown) to the welding unit 18 to continuously weld the surface. The welding support roller 41 used for surface welding has a groove 76 with a width D5 of 8 mm.

長手方向に延びている溶接部13wに関して、幅方向Yでのずれ量(単位;mm)と、厚み方向でのずれ量(単位;mm)とを測定した。厚み方向でのずれ量とはすなわち、溶接部13wでの中央部13cと側部13sでの高さの差である。長さ120mに亘り、幅方向Yでのずれ量は0.3mm以内であり、厚み方向でのずれ量は0.1mm以内であった。   With respect to the welded portion 13w extending in the longitudinal direction, a deviation amount (unit: mm) in the width direction Y and a deviation amount (unit: mm) in the thickness direction were measured. That is, the shift amount in the thickness direction is a difference in height between the central portion 13c and the side portion 13s at the welded portion 13w. Over a length of 120 m, the amount of deviation in the width direction Y was within 0.3 mm, and the amount of deviation in the thickness direction was within 0.1 mm.

目視で認めた溶接ビード72と熱影響領域73との各幅を測定した。溶接ビード72の幅は2mm、熱影響領域73の幅は10mmであった。   The widths of the weld bead 72 and the heat-affected region 73 visually observed were measured. The width of the weld bead 72 was 2 mm, and the width of the heat affected zone 73 was 10 mm.

溶接部13wのうち、幅方向Yでのずれ量が最も大きい箇所を特定し、特定した箇所の断面を検査したところ、溶接不良は確認されなかった。溶接不良とは、接合されずに隙間が生じている状態である。また、直径が40μm以上のピンホールの数は、長手方向1mあたり2個であり、修復可能なレベルであった。   When the location where the deviation | shift amount in the width direction Y was the largest among the welding parts 13w was specified, and the cross section of the specified location was test | inspected, the welding defect was not confirmed. Welding failure is a state in which a gap is generated without being joined. In addition, the number of pinholes having a diameter of 40 μm or more was 2 per 1 m in the longitudinal direction, which was a level that could be repaired.

バンド部材13の先端と後端とを突き合わせて溶接し、環状のバンド91とした。バンド91の表面を研磨処理して、直径2mのローラ131,132に掛け渡し、溶液製膜を実施した。   The front end and the rear end of the band member 13 were butted and welded to form an annular band 91. The surface of the band 91 was polished and passed over rollers 131 and 132 having a diameter of 2 m to carry out solution casting.

[溶液製膜の実験1]
用いたセルロースアシレート111は、セルロースジアセテート(DAC)であり、溶液製膜設備110を用いて溶液製膜によりフィルム116を製造した。このフィルム116はいわゆるLCDのVA(Vertical Alignment)方式用位相差フィルムとして用いるものである。ドープ113がローラ131上のバンド91に接触を開始するように、ドープ113を流延ダイ133から流出した。なお、遮風板146とローラ147と第1スリッタ118とは、使用しなかった。
[Solution casting experiment 1]
The cellulose acylate 111 used was cellulose diacetate (DAC), and the film 116 was produced by solution casting using the solution casting equipment 110. The film 116 is used as a retardation film for a so-called LCD VA (Vertical Alignment) system. The dope 113 flowed out of the casting die 133 so that the dope 113 started to contact the band 91 on the roller 131. The wind shield 146, the roller 147, and the first slitter 118 were not used.

バンド91のテンションは、20ton(=2×10N)とした。製膜を続けても側部91sはローラ131,132上で反りあがることがなく、得られたフィルム116の厚みのむらは許容できるレベルであった。 The tension of the band 91 was 20 ton (= 2 × 10 5 N). Even if the film formation was continued, the side portion 91s did not warp on the rollers 131 and 132, and the uneven thickness of the obtained film 116 was acceptable.

[溶液製膜の実験2]
ローラ131とローラ132との間にバンド91を支持する支持ローラ(図示無し)を配し、この支持ローラ上のバンド91にドープ113が接触を開始するように、流延ダイ133を配し、ドープ113を流延ダイ133から流出した。その他の条件は実験1と同じである。
[Solution casting experiment 2]
A support roller (not shown) that supports the band 91 is disposed between the roller 131 and the roller 132, and a casting die 133 is disposed so that the dope 113 starts to contact the band 91 on the support roller. The dope 113 flowed out of the casting die 133. Other conditions are the same as those in Experiment 1.

製膜を続けた結果、側部91sはローラ131,132上で0.1mm程度反り上がった。バンド91の反りに起して、流延むら、及び減圧チャンバ(図示せず)とバンド91とのクリアランス変化が発生し、フィルム116に段状の厚みむらが確認された。   As a result of continuing the film formation, the side portion 91s warped on the rollers 131 and 132 by about 0.1 mm. Due to the warp of the band 91, casting unevenness and a change in the clearance between the decompression chamber (not shown) and the band 91 occurred, and stepwise thickness unevenness was confirmed in the film 116.

第3ローラ28をテーパローラ81に代えた。テーパローラ81は一端の径dが52mm、他端の径が50mm、一端面から他端面までの長さが550mmのものである。他の溶接方法及び条件は、実施例1と同じである。   The third roller 28 is replaced with a taper roller 81. The tapered roller 81 has a diameter d at one end of 52 mm, a diameter at the other end of 50 mm, and a length from one end surface to the other end surface of 550 mm. Other welding methods and conditions are the same as those in Example 1.

長さ120mに亘り、幅方向Yでのずれ量は0.3mm以内であり、厚み方向でのずれ量は0.1mm以内であった。   Over a length of 120 m, the amount of deviation in the width direction Y was within 0.3 mm, and the amount of deviation in the thickness direction was within 0.1 mm.

溶接ビード72の幅は2mm、熱影響領域73の幅は10mmであった。   The width of the weld bead 72 was 2 mm, and the width of the heat affected zone 73 was 10 mm.

溶接部13wのうち、幅方向Yでのずれ量が最も大きい箇所を特定し、特定した箇所の断面を検査したところ、溶接不良は確認されなかった。直径が40μm以上のピンホールの数は、長手方向1mあたり2個であり、修復可能なレベルであった。   When the location where the deviation | shift amount in the width direction Y was the largest among the welding parts 13w was specified, and the cross section of the specified location was test | inspected, the welding defect was not confirmed. The number of pinholes having a diameter of 40 μm or more was 2 per 1 m in the longitudinal direction, which was a level that could be repaired.

実施例1と同様にして、バンド91を製造して、溶液製膜を実施した。   In the same manner as in Example 1, a band 91 was produced, and solution casting was performed.

実施例1と同様に、溶液製膜の実験1と実験2とを実施した。   In the same manner as in Example 1, Experiments 1 and 2 of solution casting were performed.

実験1では、製膜を続けても側部91sはローラ131,132上で反りあがることがなく、得られたフィルム116の厚みのむらは許容できるレベルであった。   In Experiment 1, the side 91s did not warp on the rollers 131 and 132 even when film formation was continued, and the uneven thickness of the obtained film 116 was acceptable.

実験2では、製膜を続けた結果、側部91sはローラ131,132上で0.1mm程度反り上がった。バンド91の反りに起して、流延むら、及び減圧チャンバ(図示せず)とバンド91とのクリアランス変化が発生し、フィルム116に段状の厚みむらが確認された。   In Experiment 2, as a result of continuing the film formation, the side portion 91s warped on the rollers 131 and 132 by about 0.1 mm. Due to the warp of the band 91, casting unevenness and a change in the clearance between the decompression chamber (not shown) and the band 91 occurred, and stepwise thickness unevenness was confirmed in the film 116.

第3ローラ28に代えてクリップ85を用いた。クリップ85は、中央部材12と同じ速度で走行させた。   Instead of the third roller 28, a clip 85 was used. The clip 85 was run at the same speed as the central member 12.

長さ120mに亘り、幅方向Yでのずれ量は0.3mm以内であり、厚み方向でのずれ量は0.1mm以内であった。   Over a length of 120 m, the amount of deviation in the width direction Y was within 0.3 mm, and the amount of deviation in the thickness direction was within 0.1 mm.

溶接ビード72の幅は2mm、熱影響領域73の幅は10mmであった。   The width of the weld bead 72 was 2 mm, and the width of the heat affected zone 73 was 10 mm.

溶接部13wのうち、幅方向Yでのずれ量が最も大きい箇所を特定し、特定した箇所の断面を検査したところ、溶接不良は確認されなかった。直径が40μm以上のピンホールの数は、長手方向1mあたり2個であり、修復可能なレベルであった。   When the location where the deviation | shift amount in the width direction Y was the largest among the welding parts 13w was specified, and the cross section of the specified location was test | inspected, the welding defect was not confirmed. The number of pinholes having a diameter of 40 μm or more was 2 per 1 m in the longitudinal direction, which was a level that could be repaired.

実施例1と同様にして、バンド91を製造して、溶液製膜を実施した。   In the same manner as in Example 1, a band 91 was produced, and solution casting was performed.

実施例1と同様に、溶液製膜の実験1と実験2とを実施した。   In the same manner as in Example 1, Experiments 1 and 2 of solution casting were performed.

実験1では、製膜を続けても側部91sはローラ131,132上で反りあがることがなく、得られたフィルム116の厚みのむらは許容できるレベルであった。   In Experiment 1, the side 91s did not warp on the rollers 131 and 132 even when film formation was continued, and the uneven thickness of the obtained film 116 was acceptable.

実験2では、製膜を続けた結果、側部91sはローラ131,132上で0.1mm程度反り上がった。バンド91の反りに起して、流延むら、及び減圧チャンバ(図示せず)とバンド91とのクリアランス変化が発生し、フィルム116に段状の厚みむらが確認された。   In Experiment 2, as a result of continuing the film formation, the side portion 91s warped on the rollers 131 and 132 by about 0.1 mm. Due to the warp of the band 91, casting unevenness and a change in the clearance between the decompression chamber (not shown) and the band 91 occurred, and stepwise thickness unevenness was confirmed in the film 116.

図3,図4に示す押圧装置62をさらに用いたこと以外は、実施例1と同様である。第1ベルト63、第2ベルト64とは、SUS304からなり、厚みが1mm、幅が40mmである。第1ベルト63、第2ベルト64との各上流端の位置が突き合わせ位置Pcから3mmの距離となるように、第5ローラ67を配した。   This embodiment is the same as the first embodiment except that the pressing device 62 shown in FIGS. 3 and 4 is further used. The first belt 63 and the second belt 64 are made of SUS304 and have a thickness of 1 mm and a width of 40 mm. The fifth roller 67 is arranged so that the positions of the upstream ends of the first belt 63 and the second belt 64 are 3 mm from the butting position Pc.

長さ120mに亘り、幅方向Yでのずれ量は0.3mm以内であり、厚み方向でのずれ量は0mmであった。   Over a length of 120 m, the amount of deviation in the width direction Y was within 0.3 mm, and the amount of deviation in the thickness direction was 0 mm.

実施例1と同様にして、バンド91を製造して、溶液製膜を実施した。   In the same manner as in Example 1, a band 91 was produced, and solution casting was performed.

実施例1と同様に、溶液製膜の実験1と実験2とを実施した。   In the same manner as in Example 1, Experiments 1 and 2 of solution casting were performed.

実験1では、製膜を続けても側部91sはローラ131,132上で反りあがることがなく、得られたフィルム116の厚みのむらは許容できるレベルであった。   In Experiment 1, the side 91s did not warp on the rollers 131 and 132 even when film formation was continued, and the uneven thickness of the obtained film 116 was acceptable.

実験2では、製膜を続けた結果、側部91sはローラ131,132上で0.1mm程度反り上がった。バンド91の反りに起して、流延むら、及び減圧チャンバ(図示せず)とバンド91とのクリアランス変化が発生し、フィルム116に段状の厚みむらが確認された。   In Experiment 2, as a result of continuing the film formation, the side portion 91s warped on the rollers 131 and 132 by about 0.1 mm. Due to the warp of the band 91, casting unevenness and a change in the clearance between the decompression chamber (not shown) and the band 91 occurred, and stepwise thickness unevenness was confirmed in the film 116.

実施例4で用いた第1ベルト63、第2ベルト64に代えて、銅Cuからなる第1ベルト63と第2ベルト64とを用いた。また、銅Cuからなる高熱伝導部71を備えた溶接支持ローラ41を用いた。これら以外の条件については、実施例4と同じである。   Instead of the first belt 63 and the second belt 64 used in Example 4, a first belt 63 and a second belt 64 made of copper Cu were used. Moreover, the welding support roller 41 provided with the high heat conductive part 71 which consists of copper Cu was used. Other conditions are the same as those in the fourth embodiment.

熱影響領域73の幅は4mmと実施例1に比べて小さくなった。   The width of the heat affected zone 73 was 4 mm, which was smaller than that in Example 1.

実施例1と同様にして、バンド91を製造して、溶液製膜を実施した。   In the same manner as in Example 1, a band 91 was produced, and solution casting was performed.

実施例1と同様に、溶液製膜の実験1と実験2とを実施した。   In the same manner as in Example 1, Experiments 1 and 2 of solution casting were performed.

実験1では、製膜を続けても側部91sはローラ131,132上で反りあがることがなく、得られたフィルム116の厚みのむらは許容できるレベルであった。   In Experiment 1, the side 91s did not warp on the rollers 131 and 132 even when film formation was continued, and the uneven thickness of the obtained film 116 was acceptable.

実験2では、製膜を続けた結果、側部91sはローラ131,132上で0.1mm程度反り上がった。バンド91の反りに起して、流延むら、及び減圧チャンバ(図示せず)とバンド91とのクリアランス変化が発生し、フィルム116に段状の厚みむらが確認された。   In Experiment 2, as a result of continuing the film formation, the side portion 91s warped on the rollers 131 and 132 by about 0.1 mm. Due to the warp of the band 91, casting unevenness and a change in the clearance between the decompression chamber (not shown) and the band 91 occurred, and stepwise thickness unevenness was confirmed in the film 116.

裏面の溶接を連続溶接に代えて断続溶接にし、これにより、裏面から側部材11と中央部材12とを仮接合した。これ以外の条件は実施例1と同じである。   Instead of continuous welding on the back surface, intermittent welding was performed, whereby the side member 11 and the central member 12 were temporarily joined from the back surface. The other conditions are the same as in the first embodiment.

長さ120mに亘り、幅方向Yでのずれ量は0.1mm以内であった。   Over the length of 120 m, the amount of deviation in the width direction Y was within 0.1 mm.

溶接ビード72の幅は2mm、熱影響領域73の幅は10mmであった。   The width of the weld bead 72 was 2 mm, and the width of the heat affected zone 73 was 10 mm.

溶接部13wのうち、幅方向Yでのずれ量が最も大きい箇所を特定し、特定した箇所の断面を検査したところ、溶接不良は確認されなかった。直径が40μm以上のピンホールの数は、長手方向1mあたり2個であり、修復可能なレベルであった。   When the location where the deviation | shift amount in the width direction Y was the largest among the welding parts 13w was specified, and the cross section of the specified location was test | inspected, the welding defect was not confirmed. The number of pinholes having a diameter of 40 μm or more was 2 per 1 m in the longitudinal direction, which was a level that could be repaired.

実施例1と同様にして、バンド91を製造して、溶液製膜を実施した。   In the same manner as in Example 1, a band 91 was produced, and solution casting was performed.

実施例1と同様に、溶液製膜の実験1と実験2とを実施した。   In the same manner as in Example 1, Experiments 1 and 2 of solution casting were performed.

実験1では、製膜を続けても側部91sはローラ131,132上で反りあがることがなく、得られたフィルム116の厚みのむらは許容できるレベルであった。   In Experiment 1, the side 91s did not warp on the rollers 131 and 132 even when film formation was continued, and the uneven thickness of the obtained film 116 was acceptable.

実験2では、製膜を続けた結果、側部91sはローラ131,132上で0.1mm程度反り上がった。バンド91の反りに起して、流延むら、及び減圧チャンバ(図示せず)とバンド91とのクリアランス変化が発生し、フィルム116に段状の厚みむらが確認された。   In Experiment 2, as a result of continuing the film formation, the side portion 91s warped on the rollers 131 and 132 by about 0.1 mm. Due to the warp of the band 91, casting unevenness and a change in the clearance between the decompression chamber (not shown) and the band 91 occurred, and stepwise thickness unevenness was confirmed in the film 116.

位置検出手段47により接触位置Psを検出し、溶接装置本体46の位置を制御しながら、裏面の連続溶接と表面の連続溶接とを実施した。これ以外の条件は実施例1と同じである。   While the contact position Ps was detected by the position detection means 47 and the position of the welding apparatus main body 46 was controlled, the back surface continuous welding and the front surface continuous welding were performed. The other conditions are the same as in the first embodiment.

長さ120mに亘り、幅方向Yでのずれ量は0.1mm以内であった。   Over the length of 120 m, the amount of deviation in the width direction Y was within 0.1 mm.

溶接ビード72の幅は2mm、熱影響領域73の幅は10mmであった。   The width of the weld bead 72 was 2 mm, and the width of the heat affected zone 73 was 10 mm.

溶接部13wのうち、幅方向Yでのずれ量が最も大きい箇所を特定し、特定した箇所の断面を検査したところ、溶接不良は確認されなかった。直径が40μm以上のピンホールの数は、長手方向1mあたり2個であり、修復可能なレベルであった。   When the location where the deviation | shift amount in the width direction Y was the largest among the welding parts 13w was specified, and the cross section of the specified location was test | inspected, the welding defect was not confirmed. The number of pinholes having a diameter of 40 μm or more was 2 per 1 m in the longitudinal direction, which was a level that could be repaired.

実施例1と同様にして、バンド91を製造して、溶液製膜を実施した。   In the same manner as in Example 1, a band 91 was produced, and solution casting was performed.

実施例1と同様に、溶液製膜の実験1と実験2とを実施した。   In the same manner as in Example 1, Experiments 1 and 2 of solution casting were performed.

実験1では、製膜を続けても側部91sはローラ131,132上で反りあがることがなく、得られたフィルム116の厚みのむらは許容できるレベルであった。   In Experiment 1, the side 91s did not warp on the rollers 131 and 132 even when film formation was continued, and the uneven thickness of the obtained film 116 was acceptable.

実験2では、製膜を続けた結果、側部91sはローラ131,132上で0.1mm程度反り上がった。バンド91の反りに起して、流延むら、及び減圧チャンバ(図示せず)とバンド91とのクリアランス変化が発生し、フィルム116に段状の厚みむらが確認された。   In Experiment 2, as a result of continuing the film formation, the side portion 91s warped on the rollers 131 and 132 by about 0.1 mm. Due to the warp of the band 91, casting unevenness and a change in the clearance between the decompression chamber (not shown) and the band 91 occurred, and stepwise thickness unevenness was confirmed in the film 116.

チャンバ52内部を清浄化して、溶接位置Pwにおける清浄度をクラス1000に保持した。これ以外の条件は実施例1と同じである。   The inside of the chamber 52 was cleaned, and the cleanliness at the welding position Pw was maintained at class 1000. The other conditions are the same as in the first embodiment.

直径が40μm以上のピンホールの数は、長手方向1mあたり0.5個であり、修復可能なレベルであった。   The number of pinholes having a diameter of 40 μm or more was 0.5 per 1 m in the longitudinal direction, which was a level that could be repaired.

実施例1と同様にして、バンド91を製造して、溶液製膜を実施した。   In the same manner as in Example 1, a band 91 was produced, and solution casting was performed.

実施例1と同様に、溶液製膜の実験1と実験2とを実施した。   In the same manner as in Example 1, Experiments 1 and 2 of solution casting were performed.

実験1では、製膜を続けても側部91sはローラ131,132上で反りあがることがなく、得られたフィルム116の厚みのむらは許容できるレベルであった。   In Experiment 1, the side 91s did not warp on the rollers 131 and 132 even when film formation was continued, and the uneven thickness of the obtained film 116 was acceptable.

実験2では、製膜を続けた結果、側部91sはローラ131,132上で0.1mm程度反り上がった。バンド91の反りに起して、流延むら、及び減圧チャンバ(図示せず)とバンド91とのクリアランス変化が発生し、フィルム116に段状の厚みむらが確認された。   In Experiment 2, as a result of continuing the film formation, the side portion 91s warped on the rollers 131 and 132 by about 0.1 mm. Due to the warp of the band 91, casting unevenness and a change in the clearance between the decompression chamber (not shown) and the band 91 occurred, and stepwise thickness unevenness was confirmed in the film 116.

加熱部19を用いて、溶接位置Pwの温度を150℃にした以外は、実施例1と同じである。   The same as Example 1 except that the temperature of the welding position Pw was set to 150 ° C. using the heating unit 19.

長さ120mに亘り、幅方向Yでのずれ量は0.3mm以内であり、厚み方向でのずれ量は0.1mm以内であった。   Over a length of 120 m, the amount of deviation in the width direction Y was within 0.3 mm, and the amount of deviation in the thickness direction was within 0.1 mm.

溶接ビード72の幅は2mm、熱影響領域73の幅は10mmであった。   The width of the weld bead 72 was 2 mm, and the width of the heat affected zone 73 was 10 mm.

溶接部13wのうち、幅方向Yでのずれ量が最も大きい箇所を特定し、特定した箇所の断面を検査したところ、溶接不良は確認されなかった。直径が40μm以上のピンホールの数は、長手方向1mあたり2個であり、修復可能なレベルであった。   When the location where the deviation | shift amount in the width direction Y was the largest among the welding parts 13w was specified, and the cross section of the specified location was test | inspected, the welding defect was not confirmed. The number of pinholes having a diameter of 40 μm or more was 2 per 1 m in the longitudinal direction, which was a level that could be repaired.

実施例1と同様にして、バンド91を製造して、溶液製膜を実施した。   In the same manner as in Example 1, a band 91 was produced, and solution casting was performed.

実施例1と同様に、溶液製膜の実験1と実験2とを実施した。   In the same manner as in Example 1, Experiments 1 and 2 of solution casting were performed.

実験1では、製膜を続けても側部91sはローラ131,132上で反りあがることがなく、得られたフィルム116の厚みのむらは許容できるレベルであった。   In Experiment 1, the side 91s did not warp on the rollers 131 and 132 even when film formation was continued, and the uneven thickness of the obtained film 116 was acceptable.

実験2でも、製膜を続けても側部91sはローラ131,132上で反りあがることがなく、得られたフィルム116の厚みのむらは許容できるレベルであった。   Even in Experiment 2, the side 91s did not warp on the rollers 131 and 132 even when film formation was continued, and the unevenness of the thickness of the obtained film 116 was acceptable.

実施例1で得られたバンド91を用いた。ドープ113がバンド91に接触し始める接触開始位置において、溶接部91w近傍で側部91sの浮き上がりが0mmに抑止されるように、接触開始位置の上流と下流との両方にローラ147を配し、ローラ147で側部91sを押さえた。   The band 91 obtained in Example 1 was used. At the contact start position where the dope 113 starts to contact the band 91, rollers 147 are disposed both upstream and downstream of the contact start position so that the lift of the side portion 91s is suppressed to 0 mm in the vicinity of the welded portion 91w. The side portion 91s was pressed by the roller 147.

実験1と実験2との両方で、製膜を続けても側部91sはローラ131,132上で反りあがることがなく、得られたフィルム116の厚みのむらは許容できるレベルであった。   In both Experiment 1 and Experiment 2, the side 91s did not warp on the rollers 131 and 132 even when film formation was continued, and the uneven thickness of the obtained film 116 was acceptable.

第1スリッタ118を設けて、溶接部91wよりも内側の中央部91cで側部を切除した。これ以外は、実施例1と同じである。   The 1st slitter 118 was provided and the side part was excised by the center part 91c inside the welding part 91w. Other than this, the second embodiment is the same as the first embodiment.

幅方向Yにおける光学軸のずれ量が実施例1と比べて0.2°小さくなり良化した。   The amount of deviation of the optical axis in the width direction Y was 0.2 ° smaller than that in Example 1, and improved.

バンド面の垂線方向からバンド91を見たときに遮風板146よりも溶接部91wが内側に入るように、遮風板146の位置を調整して配し、製膜した以外は、実施例1と同じである。   Except for adjusting the position of the wind shield plate 146 and forming a film so that the welded portion 91w enters the inner side of the wind shield plate 146 when the band 91 is viewed from the direction perpendicular to the band surface. Same as 1.

バンド91から流延膜136が剥ぎ取られる剥取位置において、バンド91とフィルム116とのなす角(剥ぎ取り角度)の変動量が実施例1では3°であったのに対し、本実施例ではより小さくなる効果が確認され1°であった。   In the stripping position where the casting film 136 is stripped from the band 91, the amount of change in the angle (stripping angle) between the band 91 and the film 116 was 3 ° in the first embodiment, whereas this embodiment Then, the effect of becoming smaller was confirmed and was 1 °.

[比較例]
第1ローラ26〜第3ローラ28による側部材11と中央部材12との搬送経路の制御を実施せず、突き合わせ位置Pcを一定に保持することをしなかった。その他の条件は実施例1と同じである。
[Comparative example]
The conveyance path between the side member 11 and the central member 12 by the first roller 26 to the third roller 28 was not controlled, and the abutting position Pc was not held constant. Other conditions are the same as those in the first embodiment.

長さ120mに亘り、幅方向Yでのずれ量は1.5mm程度であった。   The shift amount in the width direction Y was about 1.5 mm over a length of 120 m.

溶接部13wのうち、幅方向Yでのずれ量が最も大きい箇所を特定し、特定した箇所の断面を検査したところ、溶接不良が確認された。   When the location where the deviation | shift amount in the width direction Y was the largest among the welding parts 13w was specified and the cross section of the specified location was test | inspected, the welding defect was confirmed.

10 バンド製造設備
11 側部材
12 中央部材
13 バンド部材
17 突き合わせ部
18 溶接ユニット
19 加熱部
26〜29 第1ローラ〜第4ローラ
42 溶接装置
55 清浄装置
62 押圧装置
63,64 第1ベルト,第2ベルト
71 高熱伝導部
DESCRIPTION OF SYMBOLS 10 Band manufacturing equipment 11 Side member 12 Center member 13 Band member 17 Butting | matching part 18 Welding unit 19 Heating part 26-29 1st roller-4th roller 42 Welding device 55 Cleaning device 62 Pressing device 63,64 1st belt, 2nd Belt 71 High heat conduction part

Claims (13)

溶液製膜の流延支持体として用いられ、金属製のシート材が環状に連結されたバンドの製造方法において、
前記バンドの側部となる側部シート材と、この側部シート材よりも幅が広く、前記バンドの幅方向での中央部となる中央部シート材とを搬送しながら、前記側部シート材の一方の側縁と前記中央部シート材の一方の側縁とが接するように突き合わせる突き合わせ工程と、
突き合わせた前記側部シート材と前記中央部シート材とを搬送しながら、チャンバ内で溶接手段により長手方向で溶接する長手溶接工程と、
溶接された前記側部シート材と前記中央部シート材との各先端と各後端とを溶接して環状にする環状溶接工程とを有し、
前記溶接手段の下流に配され前記シート材を巻き取る巻取装置により、前記長手方向で溶接する溶接位置における前記シート材と前記側部シート材及び前記中央部シート材との張力を制御することを特徴とするバンドの製造方法。
In a method for producing a band in which metal sheet materials are connected in a ring shape, as a casting support for solution casting,
While transporting a side sheet material that is a side part of the band and a central sheet material that is wider than the side sheet material and is a central part in the width direction of the band, the side sheet material A butting step of abutting so that one side edge of the center sheet material and one side edge of the central portion sheet material,
A longitudinal welding step of welding in a longitudinal direction by welding means in a chamber while conveying the butted side sheet material and the central sheet material;
An annular welding step that welds each front end and each rear end of the welded side sheet material and the central sheet material into an annular shape,
The tension between the sheet material, the side sheet material, and the central sheet material at a welding position where welding is performed in the longitudinal direction is controlled by a winding device that is arranged downstream of the welding means and winds up the sheet material. A method of manufacturing a band characterized by the above.
突き合わされた前記側部シート材と前記中央部シート材とが前記溶接手段により溶接される溶接位置の清浄度を、米国連邦規格FED−STD−209Dでのクラス1000以下にすることを特徴とする請求項1項記載のバンドの製造方法。   The cleanliness of the welding position where the side sheet material and the center sheet material which are abutted with each other is welded by the welding means is made to be a class 1000 or less in US Federal Standard FED-STD-209D. The manufacturing method of the band of Claim 1. 前記チャンバ内の気体を清浄装置により清浄化することを特徴とする請求項1または2記載のバンドの製造方法。   The method for producing a band according to claim 1 or 2, wherein the gas in the chamber is cleaned by a cleaning device. 前記長手溶接工程では、
前記溶接手段に対向するように配された支持ローラの周面で前記中央部シート材と前記側部シート材とを支持し、この支持ローラ上で溶接することを特徴とする請求項1ないし3いずれか1項記載のバンドの製造方法。
In the longitudinal welding process,
4. The center sheet material and the side sheet material are supported by a peripheral surface of a support roller disposed so as to face the welding means, and are welded on the support roller. The manufacturing method of the band of any one of Claims.
前記支持ローラの周面のうち、前記側部シート材の一方の側縁と前記中央部シート材の一方の側縁とが通過する通過領域には、前記中央部シート材及び前記側部シート材よりも熱伝導率が高い素材からなる高熱伝導部が形成されてあることを特徴とする請求項4記載のバンドの製造方法。   Of the peripheral surface of the support roller, in the passage region where one side edge of the side sheet material and one side edge of the center sheet material pass, the center sheet material and the side sheet material The method for manufacturing a band according to claim 4, wherein a high thermal conductivity portion made of a material having higher thermal conductivity is formed. 前記突き合わせ工程では、
前記溶接手段の上流に配され、周方向に回転する回転ローラで前記中央部シート材と前記側部シート材とのいずれか一方を接触搬送し、接触搬送されている前記一方が他方に寄るように前記回転ローラの長手方向の向きを制御することを特徴とする請求項1ないし5いずれか1項記載のバンドの製造方法。
In the matching step,
One of the central sheet material and the side sheet material is contacted and conveyed by a rotating roller arranged upstream of the welding means and rotating in the circumferential direction, and the one being contacted and conveyed is approaching the other. 6. The method for manufacturing a band according to claim 1, wherein the direction of the rotating roller in the longitudinal direction is controlled.
前記突き合わせ工程では、
周方向に回転し、一端から他端に向けて径が漸減するように形成され、前記一端が前記中央部シート材の搬送路に向くように前記側部シート材の搬送路に配されたテーパローラにより、前記側部シート材を搬送して前記中央部シート材に寄せることを特徴とする請求項1ないし5いずれか1項記載のバンドの製造方法。
In the matching step,
A taper roller that rotates in the circumferential direction and is formed so that the diameter gradually decreases from one end to the other end, and the one end faces the conveyance path of the central sheet material, and is arranged in the conveyance path of the side sheet material The method for manufacturing a band according to any one of claims 1 to 5, wherein the side sheet material is conveyed to the center sheet material.
前記突き合わせ工程では、
前記中央部シート材の幅方向に変位する把持手段により、前記側部シート材を把持して前記側部シート材を前記中央部シート材に寄せることを特徴とする請求項1ないし5いずれか1項記載のバンドの製造方法。
In the matching step,
The gripping means for displacing the central part sheet material in the width direction grips the side part sheet material and brings the side part sheet material to the central part sheet material. The manufacturing method of the band of description.
前記支持ローラの長手方向に並ぶように前記支持ローラにそれぞれ対向するように1対のベルトを配し、
前記1対のベルトの一方で前記支持ローラ上の前記中央部シート材を押圧し、他方で前記支持ローラ上の前記側部シート材を押圧することにより、前記中央部シート材と前記側部シート材との溶接位置における高さを等しくすることを特徴とする請求項4ないし8いずれか1項記載のバンドの製造方法。
A pair of belts are arranged so as to face the support rollers so as to be aligned in the longitudinal direction of the support rollers,
By pressing the central sheet material on the support roller on one side of the pair of belts and pressing the side sheet material on the support roller on the other side, the central sheet material and the side sheet The band manufacturing method according to any one of claims 4 to 8, wherein heights at welding positions with the material are made equal.
前記1対のベルトは、前記中央部シート材及び前記側部シート材よりも熱伝導率が高い素材からなる高熱伝導部が形成されてあることを特徴とする請求項9記載のバンドの製造方法。   The band manufacturing method according to claim 9, wherein the pair of belts are formed with a high thermal conductivity portion made of a material having a higher thermal conductivity than the center sheet material and the side sheet material. . 前記溶接手段の上流に配され、前記側部シート材と前記中央部シート材とが互いに接している接触位置を検出する検出手段により、前記支持ローラの長手方向における前記接触位置を検出し、
前記側部シート材及び前記中央部シート材の搬送速度と検出した前記接触位置とに基づき、前記溶接手段を前記支持ローラの幅方向に変位させて溶接することを特徴とする請求項4ないし10いずれか1項記載のバンドの製造方法。
Detecting the contact position in the longitudinal direction of the support roller by detection means that is arranged upstream of the welding means and detects a contact position where the side sheet material and the central sheet material are in contact with each other,
11. The welding is performed by displacing the welding means in the width direction of the support roller based on the conveyance speed of the side sheet material and the central sheet material and the detected contact position. The manufacturing method of the band of any one of Claims.
前記長手溶接工程は、
前記側部シート材と前記中央部シート材とを連続的に溶接する連続溶接工程と、
前記側部シート材と前記中央部シート材とを前記連続溶接工程の前に断続的に溶接する断続溶接工程とを有することを特徴とする請求項1ないし11いずれか1項記載のバンドの製造方法。
The longitudinal welding process includes
A continuous welding step of continuously welding the side sheet material and the central sheet material;
The band manufacturing method according to any one of claims 1 to 11, further comprising an intermittent welding process of intermittently welding the side sheet material and the central sheet material before the continuous welding process. Method.
溶接された前記側部シート材と前記中央部シート材との溶接部を加熱手段により加熱して、前記溶接部の応力を除去することを特徴とする請求項1ないし12いずれか1項記載のバンドの製造方法。
The welded portion between the welded side sheet material and the central sheet material is heated by a heating means to remove stress in the welded portion. Band manufacturing method.
JP2014012305A 2014-01-27 2014-01-27 Band manufacturing method Active JP5702870B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014012305A JP5702870B2 (en) 2014-01-27 2014-01-27 Band manufacturing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014012305A JP5702870B2 (en) 2014-01-27 2014-01-27 Band manufacturing method

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP2010111175A Division JP5524705B2 (en) 2010-05-13 2010-05-13 Band manufacturing method

Publications (2)

Publication Number Publication Date
JP2014121880A true JP2014121880A (en) 2014-07-03
JP5702870B2 JP5702870B2 (en) 2015-04-15

Family

ID=51402788

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014012305A Active JP5702870B2 (en) 2014-01-27 2014-01-27 Band manufacturing method

Country Status (1)

Country Link
JP (1) JP5702870B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101920555B1 (en) 2016-03-29 2018-11-20 코니카 미놀타 가부시키가이샤 Method for manufacturing endless belt

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0671368A (en) * 1992-07-23 1994-03-15 Hymmen Gmbh Mas & Anlagenbau Method and device for manufacturing endless steel band
JPH07330196A (en) * 1994-06-13 1995-12-19 Nisshin Steel Co Ltd Device and method for cold rolling of metallic strip, and tip transferring truck
JPH0839278A (en) * 1994-07-27 1996-02-13 Sumitomo Metal Ind Ltd Manufacture of laser beam welded tube
JPH10263694A (en) * 1997-03-26 1998-10-06 Kawasaki Steel Corp Method for unwinding band like body coil and device therefor
JPH1158047A (en) * 1997-08-12 1999-03-02 Amada Co Ltd Endless band steel, its welding method and device
JPH11114689A (en) * 1995-05-15 1999-04-27 Elpatronic Ag Device for connecting work
JPH11285874A (en) * 1998-03-31 1999-10-19 Nippon Steel Corp Method and equipment for continuously welding strip steel by laser
JPH11319912A (en) * 1998-05-14 1999-11-24 Nippon Steel Corp Continuous welding method of band steel plate in longitudinal direction and continuous welding equipment
JP2000084695A (en) * 1998-05-13 2000-03-28 Nippon Steel Corp Continuous welding method in longitudinal direction of beltlike steel plate and its welding equipment
JP2000263262A (en) * 1999-03-19 2000-09-26 Nippon Steel Corp Method for joining steel band
JP2000343542A (en) * 1999-06-07 2000-12-12 Nitto Denko Corp Continuous preparation of epoxy resin sheet
JP2002001556A (en) * 2000-06-21 2002-01-08 Nippon Steel Corp Continuous joint device for three or more strips
JP2002263870A (en) * 2001-03-06 2002-09-17 Nippon Steel Corp Equipment for manufacturing butt welded steel sheet or steel strip and method of manufacturing the same
JP2004291090A (en) * 2002-09-26 2004-10-21 Fine Process:Kk Method and equipment of laser roll welding for different kinds of metal
JP2005296991A (en) * 2004-04-09 2005-10-27 Hitachi Metals Ltd End joining structure of sheet metal
JP2011235346A (en) * 2010-05-13 2011-11-24 Fujifilm Corp Method for manufacturing band, and facility, and method of solution film forming

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0671368A (en) * 1992-07-23 1994-03-15 Hymmen Gmbh Mas & Anlagenbau Method and device for manufacturing endless steel band
JPH07330196A (en) * 1994-06-13 1995-12-19 Nisshin Steel Co Ltd Device and method for cold rolling of metallic strip, and tip transferring truck
JPH0839278A (en) * 1994-07-27 1996-02-13 Sumitomo Metal Ind Ltd Manufacture of laser beam welded tube
JPH11114689A (en) * 1995-05-15 1999-04-27 Elpatronic Ag Device for connecting work
JPH10263694A (en) * 1997-03-26 1998-10-06 Kawasaki Steel Corp Method for unwinding band like body coil and device therefor
JPH1158047A (en) * 1997-08-12 1999-03-02 Amada Co Ltd Endless band steel, its welding method and device
JPH11285874A (en) * 1998-03-31 1999-10-19 Nippon Steel Corp Method and equipment for continuously welding strip steel by laser
JP2000084695A (en) * 1998-05-13 2000-03-28 Nippon Steel Corp Continuous welding method in longitudinal direction of beltlike steel plate and its welding equipment
JPH11319912A (en) * 1998-05-14 1999-11-24 Nippon Steel Corp Continuous welding method of band steel plate in longitudinal direction and continuous welding equipment
JP2000263262A (en) * 1999-03-19 2000-09-26 Nippon Steel Corp Method for joining steel band
JP2000343542A (en) * 1999-06-07 2000-12-12 Nitto Denko Corp Continuous preparation of epoxy resin sheet
JP2002001556A (en) * 2000-06-21 2002-01-08 Nippon Steel Corp Continuous joint device for three or more strips
JP2002263870A (en) * 2001-03-06 2002-09-17 Nippon Steel Corp Equipment for manufacturing butt welded steel sheet or steel strip and method of manufacturing the same
JP2004291090A (en) * 2002-09-26 2004-10-21 Fine Process:Kk Method and equipment of laser roll welding for different kinds of metal
JP2005296991A (en) * 2004-04-09 2005-10-27 Hitachi Metals Ltd End joining structure of sheet metal
JP2011235346A (en) * 2010-05-13 2011-11-24 Fujifilm Corp Method for manufacturing band, and facility, and method of solution film forming

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101920555B1 (en) 2016-03-29 2018-11-20 코니카 미놀타 가부시키가이샤 Method for manufacturing endless belt

Also Published As

Publication number Publication date
JP5702870B2 (en) 2015-04-15

Similar Documents

Publication Publication Date Title
JP5524705B2 (en) Band manufacturing method
US11511461B2 (en) Glass film manufacturing method
JP5702870B2 (en) Band manufacturing method
TWI426994B (en) Drying apparatus and solution casting method
TWI428228B (en) Solution casting method and solution casting apparatus
CN105949485B (en) Solution film-making method and apparatus
JP5179614B2 (en) Endless band inspection method and apparatus
KR101317970B1 (en) Solution film forming method and solution film forming facility
TWI610785B (en) Solution casting method
TWI428229B (en) Solution casting method and solution casting apparatus
JP2016185560A (en) Welded pipe manufacturing method and welded pipe manufacturing equipment
JP4942056B2 (en) Solution casting method and casting apparatus
TWI668254B (en) Solution film forming method and device
JP2013252614A (en) Method and equipment for casting solution
JP5568541B2 (en) Solution casting method
JP5426627B2 (en) Casting apparatus, casting film forming method and solution casting method
JP6588364B2 (en) Solution casting apparatus and solution casting method
JP2016083932A (en) Method and device for manufacturing solution membrane

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20141105

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20141202

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20150204

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20150220

R150 Certificate of patent or registration of utility model

Ref document number: 5702870

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250