JP2014084568A - Concrete placing system and concrete placing method - Google Patents

Concrete placing system and concrete placing method Download PDF

Info

Publication number
JP2014084568A
JP2014084568A JP2012231721A JP2012231721A JP2014084568A JP 2014084568 A JP2014084568 A JP 2014084568A JP 2012231721 A JP2012231721 A JP 2012231721A JP 2012231721 A JP2012231721 A JP 2012231721A JP 2014084568 A JP2014084568 A JP 2014084568A
Authority
JP
Japan
Prior art keywords
concrete
hopper
pump
vertical pipe
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2012231721A
Other languages
Japanese (ja)
Inventor
Takayuki Sasanishi
孝行 笹西
Suminari Kagawa
純成 香川
Hiromasa Takashima
浩政 高島
Kuniya Kido
邦也 木戸
Norifumi Nakahira
憲文 中平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HOKUTO IND CO Ltd
HOKUTO INDUSTRIES CO Ltd
Taisei Corp
Original Assignee
HOKUTO IND CO Ltd
HOKUTO INDUSTRIES CO Ltd
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HOKUTO IND CO Ltd, HOKUTO INDUSTRIES CO Ltd, Taisei Corp filed Critical HOKUTO IND CO Ltd
Priority to JP2012231721A priority Critical patent/JP2014084568A/en
Publication of JP2014084568A publication Critical patent/JP2014084568A/en
Pending legal-status Critical Current

Links

Landscapes

  • Underground Or Underwater Handling Of Building Materials (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a concrete placing system capable of placing high quality concrete even when a conveyance route has vertically long piping.SOLUTION: A concrete placing system to place concrete at a site having a difference in height comprises: a hopper 2 installed on a high place; vertical piping 3 downwardly extended from a discharge port 22 of the hopper 2; a concrete pump 4 connected to a downstream side of the vertical piping; and a discharge pipe 5 enabling the concrete conveyed by the concrete pump 4 to be supplied to a placing position. The hopper has a sensor section to detect a remaining amount of the input concrete. The sensor section transmits a signal to the concrete pump.

Description

本発明は、地上から地中に向けてなど高低差のある場所でコンクリートを打設するためのコンクリート打設システム、及びコンクリート打設方法に関するものである。   The present invention relates to a concrete placement system and a concrete placement method for placing concrete in a place with a height difference such as from the ground to the ground.

立坑や地下タンクなどの地下構造物の底版や側壁を構築するために、通常、地上からコンクリートを搬送させる。ここで、地下構造物が地中の大深度に位置する場合に、縦方向の搬送距離が長距離になるために搬送方法によっては様々な問題が生じることになる。   Concrete is usually transported from the ground in order to construct bottom plates and side walls of underground structures such as shafts and underground tanks. Here, when the underground structure is located at a large depth in the ground, the vertical transport distance becomes long, and thus various problems occur depending on the transport method.

例えばコンクリートを長距離にわたって自由落下させると、落下中や衝突時にコンクリートが骨材と水分とに分離する材料分離を起こすことがある。そして、材料分離が起きると粗骨材が縦配管の底部に溜まりやすくなるため、配管に詰まりが生じてその後のコンクリート打設が継続できなくなる場合がある。そこで、これらの課題を解決するために様々な開発が行われている(特許文献1−3など参照)。   For example, when concrete is dropped freely over a long distance, the material may be separated into aggregate and moisture during the fall or collision. When material separation occurs, coarse aggregate tends to accumulate at the bottom of the vertical pipe, and the pipe may become clogged, making it impossible to continue the subsequent concrete placement. Therefore, various developments have been made to solve these problems (see Patent Documents 1-3).

特許文献1には、縦配管の複数個所にコンクリートの流下速度(落下速度)を調節するためのバルブを設けることで、材料分離の防止と作業効率の確保のバランスを取ることが可能なコンクリート打設装置が開示されている。   Patent Document 1 discloses a concrete beating that can balance the prevention of material separation and the securing of work efficiency by providing valves for adjusting the flow speed (falling speed) of concrete at a plurality of locations in a vertical pipe. An installation device is disclosed.

また、特許文献2には、縦配管の下端に上下方向にスライド可能な外管を装着して外管内での打設とすることで、粘性の高い高流動コンクリートを使用した場合でも材料分離が起きないようにした打設方法が開示されている。   Further, in Patent Document 2, an outer pipe that is slidable in the vertical direction is attached to the lower end of the vertical pipe and is placed in the outer pipe, so that material separation is possible even when high-viscosity concrete with high viscosity is used. A placement method that prevents the occurrence of the problem is disclosed.

一方、特許文献3には、縦配管の途中に分岐管を設けることで、コンクリートを複数の高さから打設できるようにして、100 mを超えるような高低差がある場合でも効率的に実施可能なコンクリート打設方法が開示されている。   On the other hand, in Patent Document 3, a branch pipe is provided in the middle of a vertical pipe so that concrete can be placed from a plurality of heights, and even when there is a height difference exceeding 100 m, it is carried out efficiently. A possible concrete placement method is disclosed.

特開2001−207449号公報JP 2001-207449 A 特開平9−137606号公報JP-A-9-137606 特開2004−100262号公報JP 2004-1000026 A

しかしながら、特許文献1−3の構成では、地上のホッパーから地底の打設箇所までコンクリートを搬送させる力は重力に基づく自由落下によるものであるため、程度の差こそあれ材料分離が生じることになる。材料分離が起きると、上述したように縦配管が詰まったり、コンクリートの品質が低下したりする原因になる。   However, in the configuration of Patent Documents 1-3, since the force for transporting concrete from the ground hopper to the ground placement site is due to free fall based on gravity, material separation occurs to some extent. . When the material separation occurs, as described above, the vertical pipe is clogged and the quality of the concrete is deteriorated.

一方、地上のホッパーの残量が少なくなると、縦配管へのコンクリートの流れ込みが断続的になって、後から投入したコンクリートと先に搬送されたコンクリートとの間に空気が巻き込まれることがある。そして、このようなエアを含んだコンクリートがそのまま打設されると、品質の低いコンクリート構造物になるおそれがある。   On the other hand, when the remaining amount of the hopper on the ground decreases, the flow of the concrete into the vertical pipe becomes intermittent, and air may be caught between the concrete thrown in later and the concrete transported earlier. And when concrete containing such air is poured as it is, there is a possibility that it becomes a low-quality concrete structure.

そこで、本発明は、搬送経路に長い縦配管が介在される場合でも品質の高いコンクリートを打設することが可能なコンクリート打設システム、及びコンクリート打設方法を提供することを目的としている。   Accordingly, an object of the present invention is to provide a concrete placement system and a concrete placement method capable of placing high-quality concrete even when a long vertical pipe is interposed in the transport path.

前記目的を達成するために、本発明のコンクリート打設システムは、高低差のある場所でコンクリートを打設するためのコンクリート打設システムであって、上方に設置されるホッパーと、前記ホッパーの排出口から下方に向けて延びる縦配管と、前記縦配管の下流側に接続されるコンクリートポンプと、前記コンクリートポンプによって搬出されたコンクリートを打設箇所に供給させる吐出管とを備え、前記ホッパーには投入されたコンクリートの残量を検出させるセンサ部が設けられるとともに、前記センサ部から前記コンクリートポンプに信号が送信されることを特徴とする。   In order to achieve the above object, a concrete placement system according to the present invention is a concrete placement system for placing concrete in a place with a height difference, and includes a hopper installed above, and a discharge of the hopper. A vertical pipe extending downward from the outlet; a concrete pump connected to the downstream side of the vertical pipe; and a discharge pipe for supplying the concrete carried out by the concrete pump to a placement site, the hopper A sensor unit for detecting the remaining amount of the input concrete is provided, and a signal is transmitted from the sensor unit to the concrete pump.

ここで、前記センサ部は、前記ホッパー内のコンクリート上面の高さが所定以下になった場合に前記コンクリートポンプを停止させる信号を送信する構成にすることができる。   Here, the sensor unit may be configured to transmit a signal for stopping the concrete pump when the height of the concrete upper surface in the hopper becomes equal to or lower than a predetermined level.

また、本発明のコンクリート打設方法は、上記のコンクリート打設システムを使ったコンクリート打設方法であって、前記コンクリート打設システムを設置する工程と、前記縦配管にセメント系固化材を充満させる工程と、前記ホッパーにコンクリートを投入する工程と、前記コンクリートポンプを稼働させる工程と、前記吐出管を打設箇所に向けてコンクリートを供給する工程とを備えたことを特徴とする。   The concrete placement method of the present invention is a concrete placement method using the above concrete placement system, and the step of installing the concrete placement system and filling the vertical pipe with a cement-based solidifying material. And a step of feeding concrete into the hopper, a step of operating the concrete pump, and a step of supplying the concrete toward the placement site of the discharge pipe.

このように構成された本発明のコンクリート打設システムは、上方のホッパーと下方のコンクリートポンプとが縦配管によって接続されている。また、ホッパーにはセンサ部が設けられており、コンクリートポンプはセンサ部から送信される信号によって制御される構成となっている。   In the concrete placing system of the present invention configured as described above, an upper hopper and a lower concrete pump are connected by a vertical pipe. The hopper is provided with a sensor unit, and the concrete pump is controlled by a signal transmitted from the sensor unit.

このように縦配管の下流側にコンクリートポンプを接続することで、ポンプの吸引力に基づいて縦配管内をコンクリートが連続的に搬送されるようになるので、材料分離を起き難くすることができる。材料分離が起きなければ、コンクリートのワーカビリティや品質が維持できるうえに、縦配管が詰まるリスクも低くなる。   By connecting the concrete pump to the downstream side of the vertical pipe in this way, the concrete is continuously conveyed in the vertical pipe based on the suction force of the pump, so that material separation can be made difficult to occur. . If material separation does not occur, the workability and quality of the concrete can be maintained, and the risk of clogging the vertical piping is reduced.

そして、ホッパーの残量が所定以下になった状態などをセンサ部で検出させ、その検出信号によって自動的にコンクリートポンプが停止するなどの制御がされる構成にしておくことで、空気の巻き込みのない品質の高いコンクリートを打設することができるようになる。   Then, the state where the remaining amount of the hopper becomes below a predetermined value is detected by the sensor unit, and the control is made such that the concrete pump is automatically stopped by the detection signal, so that the entrainment of air is prevented. You will be able to cast high quality concrete.

また、本発明のコンクリート打設方法は、縦配管をモルタルなどのセメント系固化材で充満させた後にホッパーにコンクリートを投入し、コンクリートポンプを稼働させる。   In the concrete placing method of the present invention, the vertical pipe is filled with a cement-based solidifying material such as mortar, and then concrete is poured into the hopper and the concrete pump is operated.

このため、施工当初に投入されたコンクリートであっても縦配管内を自由落下することがなく、材料分離が起きないので、すべてのコンクリートを高い品質で打設することができる。   For this reason, even if it is the concrete thrown in at the beginning of construction, it does not fall freely in the vertical pipe and material separation does not occur, so that all concrete can be placed with high quality.

本発明の実施の形態のコンクリート打設システムの構成を説明するための縦断面図である。It is a longitudinal cross-sectional view for demonstrating the structure of the concrete placement system of embodiment of this invention. コンクリート打設システムの構成を説明するための平面図である。It is a top view for demonstrating the structure of a concrete placement system. ホッパー及びセンサ部の構成を説明する斜視図である。It is a perspective view explaining the structure of a hopper and a sensor part.

以下、本発明の実施の形態について図面を参照して説明する。図1,2は、本実施の形態のコンクリート打設システムの構成を示した説明図である。   Hereinafter, embodiments of the present invention will be described with reference to the drawings. 1 and 2 are explanatory views showing the configuration of the concrete placing system of the present embodiment.

本実施の形態では、図1に示すように、地上Gから鉛直方向に掘り下げられた立坑1に、底版や側壁10などのコンクリート構造物を構築する場合を例に説明を行う。すなわち、側壁10は、図1,2に示すように立坑1の坑壁1aから所定の厚さで円筒状に形成される鉄筋コンクリート構造物である。   In the present embodiment, as shown in FIG. 1, a case where a concrete structure such as a bottom slab or a side wall 10 is constructed in a vertical shaft 1 dug down from the ground G in the vertical direction will be described as an example. That is, the side wall 10 is a reinforced concrete structure formed in a cylindrical shape with a predetermined thickness from the pit wall 1a of the shaft 1 as shown in FIGS.

この側壁10は、立坑1の底版から立ち上げられるので、大深度の立坑1を構築する場合はコンクリートが投入される地上Gと打設箇所との高低差が非常に大きくなる。   Since this side wall 10 is raised from the bottom plate of the vertical shaft 1, when constructing the deep vertical shaft 1, the difference in height between the ground G into which the concrete is poured and the placement site becomes very large.

本実施の形態では、立坑1の内部に下方から上方に向けて逐次、移動させる円板状の移動ステージ11を配置し、その移動ステージ11の上から打設箇所に向けてコンクリートを吐出させる場合について説明する。   In the present embodiment, a disc-shaped moving stage 11 that is sequentially moved from the bottom to the top inside the shaft 1 is disposed, and concrete is discharged from the moving stage 11 toward the placement site. Will be described.

図1に示すように、移動ステージ11の外周縁には、側壁10の内周面となる位置の内側に沿って環状に足場12が設けられる。移動ステージ11は、足場12から坑壁1aに向けて取り付けられた支持材13,・・・によって支持させ、側壁10の立ち上げられた高さに合わせて上昇させる。この移動ステージ11を上げる一工程を、打設リフトという。   As shown in FIG. 1, a scaffold 12 is provided on the outer peripheral edge of the moving stage 11 in a ring shape along the inner side of the position that becomes the inner peripheral surface of the side wall 10. The moving stage 11 is supported by the support members 13 attached from the scaffold 12 toward the pit wall 1a, and is raised in accordance with the raised height of the side wall 10. One process for raising the moving stage 11 is referred to as a driving lift.

本実施の形態のコンクリート打設システムは、地上Gに設置されるホッパー2と、ホッパー2の排出口22から下方に向けて延びる縦配管3と、縦配管3の下流側に接続されるコンクリートポンプ4と、コンクリートポンプ4によって搬出されたコンクリートを打設箇所に供給させる吐出管5とを主に備えている。   The concrete placement system according to the present embodiment includes a hopper 2 installed on the ground G, a vertical pipe 3 extending downward from a discharge port 22 of the hopper 2, and a concrete pump connected to the downstream side of the vertical pipe 3 4 and a discharge pipe 5 for supplying the concrete carried out by the concrete pump 4 to the placement site.

ホッパー2は、図3に示すように上部の投入口21から下部の排出口22に向けて先細る漏斗状に形成される。この投入口21に向けて、コンクリートミキサー車などで運ばれてきたコンクリートを投入する。   The hopper 2 is formed in a funnel shape that tapers from the upper inlet 21 toward the lower outlet 22 as shown in FIG. 3. Concrete that has been transported by a concrete mixer truck or the like is thrown toward the inlet 21.

このホッパー2は下面に排出口22が設けられており、その排出口22の真下に縦配管3が接続される。図1では、ホッパー2の排出口22の位置よりも縦配管3の下方に向けて真っ直ぐに延びる管本体の位置が立坑1の中心側にずれているため、縦配管3の上部3aが少し斜めになっている。   The hopper 2 is provided with a discharge port 22 on the lower surface, and a vertical pipe 3 is connected directly below the discharge port 22. In FIG. 1, the position of the pipe main body that extends straight downward from the position of the vertical pipe 3 relative to the position of the discharge port 22 of the hopper 2 is shifted to the center side of the shaft 1, so the upper part 3 a of the vertical pipe 3 is slightly inclined. It has become.

縦配管3は鋼管などを継ぎ足すことで所望する長さに形成することができる。また、縦配管3には、必要に応じてバルブ31を設ける。図1では、地上Gと移動ステージ11との高低差が、ほぼ縦配管3の長さになっている。   The vertical pipe 3 can be formed to a desired length by adding a steel pipe or the like. The vertical pipe 3 is provided with a valve 31 as necessary. In FIG. 1, the height difference between the ground G and the moving stage 11 is substantially the length of the vertical pipe 3.

縦配管3の下端3bとコンクリートポンプ4との間は、水平配管41によって接続される。この水平配管41も、鋼管などを継ぎ足すことで所望する長さに形成することができる。また、水平配管41にも、必要に応じてバルブ41aを設ける。   A horizontal pipe 41 connects between the lower end 3 b of the vertical pipe 3 and the concrete pump 4. The horizontal pipe 41 can also be formed to a desired length by adding a steel pipe or the like. Further, the horizontal pipe 41 is provided with a valve 41a as necessary.

本実施の形態では、図2に示すように移動ステージ11上で平面視コ字状となるように水平配管41を敷設している。この水平配管41は、コンクリートポンプ4の上流側に配置されたことになる。   In the present embodiment, as shown in FIG. 2, the horizontal pipe 41 is laid on the moving stage 11 so as to have a U shape in plan view. This horizontal pipe 41 is arranged on the upstream side of the concrete pump 4.

移動ステージ11上に設置されるコンクリートポンプ4は、電動モータを動力源とする圧送ポンプである。圧送ポンプは、往復式の油圧ピストンによって上流側から流れ込んだコンクリートを下流側に押し出す構成となっている。   The concrete pump 4 installed on the moving stage 11 is a pressure feed pump using an electric motor as a power source. The pressure feed pump is configured to push the concrete flowing in from the upstream side to the downstream side by a reciprocating hydraulic piston.

コンクリートポンプ4の下流側には、図2に示すように分岐管42が接続される。この分岐管42は、移動ステージ11上に水平方向に向けて敷設されるため、水平配管といえる。   A branch pipe 42 is connected to the downstream side of the concrete pump 4 as shown in FIG. Since this branch pipe 42 is laid in the horizontal direction on the moving stage 11, it can be said that it is a horizontal pipe.

この分岐管42は、コンクリートポンプ4に接続される1本の本管42aが2本の枝管42b,42bに分かれる構成となっている。この2本の枝管42b,42bは、180度異なる方向に向けて延伸される。   The branch pipe 42 is configured such that one main pipe 42a connected to the concrete pump 4 is divided into two branch pipes 42b and 42b. The two branch pipes 42b and 42b are extended in directions different by 180 degrees.

そして、枝管42b,42bのそれぞれの端部には、フレキシブルホースなどの吐出管5,5を接続する。この吐出管5,5の先端は、コンクリートの打設箇所となる側壁10の構築予定位置に配置される。   Then, discharge pipes 5 and 5 such as flexible hoses are connected to the respective ends of the branch pipes 42b and 42b. The distal ends of the discharge pipes 5 and 5 are arranged at a planned construction position of the side wall 10 which is a place where concrete is placed.

本実施形態のホッパー2には、図3に示すように、センサ部としてのレベルセンサ6が取り付けられる。このレベルセンサ6は、ホッパー2に投入されたコンクリートの残量を検出させるための検出装置である。   As shown in FIG. 3, a level sensor 6 as a sensor unit is attached to the hopper 2 of the present embodiment. This level sensor 6 is a detection device for detecting the remaining amount of concrete thrown into the hopper 2.

レベルセンサ6はコンクリートポンプ4の制御部(図示省略)に接続しておき、レベルセンサ6の検出値に基づいてコンクリートポンプ4の稼働を制御させる。以下、レベルセンサ6によってコンクリートポンプ4を制御させる一例について説明する。   The level sensor 6 is connected to a control unit (not shown) of the concrete pump 4 and controls the operation of the concrete pump 4 based on the detection value of the level sensor 6. Hereinafter, an example in which the concrete pump 4 is controlled by the level sensor 6 will be described.

まず、図3に示すように、ホッパー2の上端外周縁から投入口21の略中央に延ばしたアーム61の先に、棒状のレベルセンサ6を取り付けて垂下させる。そして、レベルセンサ6は、電気ケーブルを介してコンクリートポンプ4の制御部に接続させる。   First, as shown in FIG. 3, a rod-shaped level sensor 6 is attached to the tip of an arm 61 extending from the outer periphery of the upper end of the hopper 2 to the approximate center of the insertion port 21 and suspended. And the level sensor 6 is connected to the control part of the concrete pump 4 via an electric cable.

このレベルセンサ6は、ホッパー2に充分にコンクリートが残っているときは、コンクリート上面2aより下方まで先端が挿入されることになって通電状態となる。例えば、この通電状態が稼働信号として電気ケーブルを通ってコンクリートポンプ4に送信され、電動モータを動力源とするコンクリートポンプ4が稼働することになる。   When the concrete remains sufficiently in the hopper 2, the level sensor 6 is energized because the tip is inserted below the concrete upper surface 2a. For example, this energized state is transmitted as an operation signal through the electric cable to the concrete pump 4, and the concrete pump 4 using the electric motor as a power source is operated.

そして、コンクリートポンプ4の稼働によってホッパー2内のコンクリートの搬送が行われると、コンクリート上面2aが徐々に下がっていってレベルセンサ6の先端がコンクリート上面2aから抜け出した状態になる。   When the concrete in the hopper 2 is transported by the operation of the concrete pump 4, the concrete upper surface 2a is gradually lowered and the tip of the level sensor 6 comes out of the concrete upper surface 2a.

このようにコンクリート上面2aが所定高さ以下になってレベルセンサ6が空中に露出すると、通電停止状態になる構成にしておく。この通電停止状態が停止信号として電気ケーブルを通ってコンクリートポンプ4に送信されると、コンクリートポンプ4が停止して、それ以下にはコンクリート上面2aが下がらなくなるようにする。   Thus, when the concrete upper surface 2a becomes below a predetermined height and the level sensor 6 is exposed to the air, the energization is stopped. When this energization stop state is transmitted as a stop signal to the concrete pump 4 through the electric cable, the concrete pump 4 stops, and the concrete upper surface 2a is not lowered below that.

要するに、レベルセンサ6の検出値がトリガーになってコンクリートポンプ4が停止する構成となっていればよい。そして、このようにレベルセンサ6とコンクリートポンプ4とを連動させることによって、縦配管3の上部が空洞になってしまうようなコンクリートポンプ4の吸い込み過ぎを防ぐことができる。   In short, it is sufficient that the concrete pump 4 is stopped by the detection value of the level sensor 6 as a trigger. Then, by linking the level sensor 6 and the concrete pump 4 in this way, it is possible to prevent the concrete pump 4 from being excessively sucked such that the upper part of the vertical pipe 3 becomes hollow.

次に、本実施の形態のコンクリート打設方法について説明する。   Next, the concrete placement method of the present embodiment will be described.

まず、図1,2に示すように、地上Gの立坑1の周縁にホッパー2を設置し、その排出口22に上部3aを接続した縦配管3を下方に向けて延伸させる。縦配管3は、移動ステージ11を上昇させる打設リフト毎に切り離しができるように、単位長さの鋼管(例えば長さ3 mの鋼管)を繋いで延伸させる。   First, as shown in FIGS. 1 and 2, the hopper 2 is installed at the periphery of the shaft 1 on the ground G, and the vertical pipe 3 having the upper portion 3 a connected to the discharge port 22 is extended downward. The vertical pipe 3 is stretched by connecting a steel pipe having a unit length (for example, a steel pipe having a length of 3 m) so that the vertical pipe 3 can be separated for each driving lift that raises the moving stage 11.

そして、移動ステージ11の上方に配置された縦配管3の下端3bには、水平配管41の一端を接続する。水平配管41は、移動ステージ11上のコンクリートポンプ4の位置まで敷設し、コンクリートポンプ4の上流側の接続口(図示省略)に接続する。   Then, one end of the horizontal pipe 41 is connected to the lower end 3 b of the vertical pipe 3 disposed above the moving stage 11. The horizontal pipe 41 is laid to the position of the concrete pump 4 on the moving stage 11 and connected to a connection port (not shown) on the upstream side of the concrete pump 4.

一方、コンクリートポンプ4の下流側の接続口(図示省略)には、分岐管42の本管42aの端部を接続する。また、分岐管42の枝管42b,42bのそれぞれの端部には、吐出管5,5を接続する。この吐出管5,5の先端は、側壁10のコンクリート打設箇所に配置する。   On the other hand, the end of the main pipe 42 a of the branch pipe 42 is connected to a connection port (not shown) on the downstream side of the concrete pump 4. Further, discharge pipes 5 and 5 are connected to respective end portions of the branch pipes 42 b and 42 b of the branch pipe 42. The distal ends of the discharge pipes 5 and 5 are arranged at the concrete placement site on the side wall 10.

このようにしてコンクリート打設システムを設置した後に、ホッパー2の投入口21からモルタルなどのセメント系固化材を流し込む。このセメント系固化材の流し込みは、縦配管3の全長がセメント系固化材によって充満されるまで行う。   After the concrete placement system is thus installed, a cement-based solidifying material such as mortar is poured from the inlet 21 of the hopper 2. The cement-based solidification material is poured until the entire length of the vertical pipe 3 is filled with the cement-based solidification material.

ここで、セメント系固化材は、空洞の縦配管3に流し込まれるため、地上Gから移動ステージ11の深度まで自由落下することになる。しかしながら、粗骨材を含まないモルタルなどであれば、自由落下させても材料分離が起き難い。また、最初に投入するセメント系固化材は、側壁10などのコンクリート構造物とは別の場所に打設するようにすれば、コンクリートの品質に影響を及ぼすことはない。   Here, since the cement-based solidified material is poured into the hollow vertical pipe 3, it falls freely from the ground G to the depth of the moving stage 11. However, if the mortar does not contain coarse aggregate, material separation is unlikely to occur even if it is dropped freely. In addition, if the cement-based solidifying material to be initially introduced is placed in a place different from the concrete structure such as the side wall 10, the quality of the concrete is not affected.

そして、縦配管3をセメント系固化材で充満させた後に、ホッパー2の投入口21にコンクリートを投入する。例えば、スランプ値が15cm程度のコンクリートを投入する。続いて、コンクリートポンプ4を稼働させて、セメント系固化材及びコンクリートを搬送させる。   And after filling the vertical piping 3 with a cement-type solidification material, concrete is thrown into the insertion port 21 of the hopper 2. For example, concrete with a slump value of about 15 cm is thrown. Subsequently, the concrete pump 4 is operated to convey the cement-based solidified material and concrete.

このように予め縦配管3の内空をセメント系固化材で満たしておき、その上からコンクリートを流し込めば、コンクリートが縦配管3の内部を自由落下して材料分離を起こすことがない。   As described above, if the interior of the vertical pipe 3 is filled with a cement-based solidifying material in advance and concrete is poured from above, the concrete will not fall freely in the vertical pipe 3 and cause material separation.

吐出管5からは最初のうちはセメント系固化材が吐出されるので、側壁10の構築箇所とは別の箇所に打設する。そして、コンクリートが吐出管5から排出されるようになった時点で、吐出管5の先端を側壁10のコンクリート打設箇所に誘導する。   Since the cement-based solidified material is discharged from the discharge pipe 5 at the beginning, it is placed at a location different from the construction location of the side wall 10. And when concrete comes to be discharged | emitted from the discharge pipe 5, the front-end | tip of the discharge pipe 5 is guide | induced to the concrete placement location of the side wall 10. FIG.

このようなコンクリート打設は、ホッパー2の投入口21にコンクリートミキサー車から次々とコンクリートが投入されている間は、連続して行われる。しかしながら、コンクリートミキサー車の到着が遅れるなどしてコンクリートの投入が途絶えると、コンクリート上面2aが所定高さ以下まで下がる場合がある。   Such concrete placement is continuously performed while concrete is being poured into the inlet 21 of the hopper 2 one after another from the concrete mixer truck. However, if the concrete is stopped due to a delay in the arrival of the concrete mixer truck, the concrete upper surface 2a may be lowered to a predetermined height or less.

このようなコンクリート上面2aが所定高さ以下まで下がった状態は、レベルセンサ6によって検出され、停止信号となってコンクリートポンプ4に送信される。そして、停止信号を受けたコンクリートポンプ4は停止し、吐出管5からのコンクリートの吐出が止まる。   Such a state that the concrete upper surface 2a is lowered to a predetermined height or less is detected by the level sensor 6 and transmitted to the concrete pump 4 as a stop signal. And the concrete pump 4 which received the stop signal stops, and the discharge of the concrete from the discharge pipe 5 stops.

このようにホッパー2内にコンクリート上面2aが存在する状態が維持されれば、その後にコンクリートが投入されても連続性が保たれて空気を巻き込んでしまうことはない。   Thus, if the state where the concrete upper surface 2a exists in the hopper 2 is maintained, even if concrete is thrown in after that, continuity will be maintained and air will not be caught.

これに対して、例えばコンクリート上面2aが縦配管3の途中まで下がった状態で次のコンクリートを投入すると、縦配管3に残っていたコンクリートと新たに投入されたコンクリートとの間に空気が巻き込まれてエアを含んだコンクリートになるおそれがある。また、縦配管3内の空洞になってしまった距離が長くなると、新たに投入されるコンクリートは、その空洞の長さ分だけ自由落下することになるので、材料分離が起きるおそれがある。   On the other hand, for example, when the next concrete is introduced in a state where the concrete upper surface 2a is lowered to the middle of the vertical pipe 3, air is caught between the concrete remaining in the vertical pipe 3 and the newly added concrete. May result in concrete containing air. In addition, when the distance that has become a cavity in the vertical pipe 3 becomes longer, the newly introduced concrete will fall free for the length of the cavity, so that there is a risk of material separation.

しかしながら本実施の形態のコンクリート打設システムであれば、縦配管3の上部が空洞になるようなコンクリートポンプ4による吸い込み過ぎは、レベルセンサ6によるコンクリート上面2a高さの検出によって防止される。   However, in the concrete placement system of the present embodiment, excessive suction by the concrete pump 4 such that the upper part of the vertical pipe 3 is hollow is prevented by detection of the height of the concrete upper surface 2 a by the level sensor 6.

次に、本実施の形態のコンクリート打設システム、及びこれを使用したコンクリート打設方法の作用について説明する。   Next, the operation of the concrete placement system of the present embodiment and the concrete placement method using the same will be described.

このように構成された本実施の形態のコンクリート打設システムは、地上Gのホッパー2と立坑1の下方の移動ステージ11上に配置されたコンクリートポンプ4とが、縦配管3によって接続されている。   In the concrete placement system of the present embodiment configured as described above, the hopper 2 on the ground G and the concrete pump 4 disposed on the moving stage 11 below the shaft 1 are connected by the vertical pipe 3. .

また、ホッパー2にはレベルセンサ6が設けられており、コンクリートポンプ4はレベルセンサ6によってホッパー2の残量が所定以下になったことが検出されると停止する構成となっている。   Further, the hopper 2 is provided with a level sensor 6, and the concrete pump 4 is configured to stop when the level sensor 6 detects that the remaining amount of the hopper 2 is equal to or less than a predetermined level.

このように縦配管3の下流側にコンクリートポンプ4を接続することで、ポンプの吸引力に基づいて縦配管3内をコンクリートが連続的に搬送されるようになるので、材料分離を起き難くすることができる。例えば、縦配管3の長さが60 mを超えるような大深度へのコンクリート搬送となっても、材料分離を起こすことなく立坑1の底部までコンクリートを搬送することができる。   By connecting the concrete pump 4 to the downstream side of the vertical pipe 3 in this way, the concrete is continuously conveyed in the vertical pipe 3 based on the suction force of the pump, so that material separation is less likely to occur. be able to. For example, even if the length of the vertical pipe 3 exceeds 60 m, the concrete can be conveyed to the bottom of the shaft 1 without causing material separation.

材料分離が起きなければ、コンクリートのワーカビリティや品質が維持できるうえに、縦配管3の底部に粗骨材が溜まって配管が詰まるというような事態にはなり難い。なお、何らかの原因で縦配管3が詰まった場合は、縦配管3のバルブ31を閉じて詰まりを解消する作業を行うことができる。   If material separation does not occur, the workability and quality of the concrete can be maintained, and it is difficult to cause a situation where coarse aggregate accumulates at the bottom of the vertical pipe 3 and the pipe is clogged. If the vertical pipe 3 is clogged for some reason, the valve 31 of the vertical pipe 3 can be closed to eliminate the clogging.

そして、ホッパー2の残量が所定以下になった際に自動的にコンクリートポンプ4が停止するように構成しておくことで、空気の巻き込みのない品質の高いコンクリートを打設することができるようになる。   And, by configuring so that the concrete pump 4 automatically stops when the remaining amount of the hopper 2 falls below a predetermined level, it is possible to place high-quality concrete without air entrainment. become.

また、コンクリートポンプ4の上流側や下流側に水平配管(41,42)を介在させることで、水平方向の広い範囲に打設箇所がある場合でも縦配管3の位置を移動させることなく効率的にコンクリートを供給することができる。   Further, by interposing the horizontal pipes (41, 42) on the upstream side or the downstream side of the concrete pump 4, it is efficient without moving the position of the vertical pipe 3 even when there is a placement place in a wide range in the horizontal direction. Can be supplied with concrete.

このように縦配管3における搬送中に材料分離が起きなければ、コンクリートのワーカビリティが保持されるので、水平配管(41,42)における搬送も詰まりを発生させることなく、効率よく行うことができる。   In this way, if material separation does not occur during conveyance in the vertical pipe 3, the workability of the concrete is maintained, so that conveyance in the horizontal pipe (41, 42) can also be performed efficiently without causing clogging. .

さらに、コンクリートポンプ4の下流側に分岐管42を接続して枝管42b,42bのそれぞれの端部に吐出管5,5を接続するようにすれば、水平方向に離れた複数の箇所に同時にコンクリートを供給することができる。   Furthermore, if the branch pipe 42 is connected to the downstream side of the concrete pump 4 and the discharge pipes 5 and 5 are connected to the respective end portions of the branch pipes 42b and 42b, it is possible to simultaneously connect to a plurality of locations separated in the horizontal direction. Concrete can be supplied.

また、本実施の形態のコンクリート打設方法は、縦配管3をモルタルなどのセメント系固化材で充満させた後にホッパー2にコンクリートを投入し、コンクリートポンプ4を稼働させる。   Further, in the concrete placing method of the present embodiment, the concrete is put into the hopper 2 after the vertical pipe 3 is filled with a cement-based solidifying material such as mortar, and the concrete pump 4 is operated.

このため、施工当初に投入されたコンクリートであっても縦配管3内を自由落下することがなく、材料分離が起きないので、すべてのコンクリートを無駄にすることなく高い品質で打設することができる。   For this reason, even if it is the concrete thrown in at the beginning of construction, since it does not fall freely in the vertical pipe 3 and material separation does not occur, it can be placed with high quality without wasting all the concrete. it can.

以上、図面を参照して、本発明の実施の形態を詳述してきたが、具体的な構成は、この実施の形態に限らず、本発明の要旨を逸脱しない程度の設計的変更は、本発明に含まれる。   The embodiment of the present invention has been described in detail above with reference to the drawings. However, the specific configuration is not limited to this embodiment, and design changes that do not depart from the gist of the present invention are not limited to this embodiment. Included in the invention.

例えば、前記実施の形態では、立坑1の側壁10を構築するためのコンクリート打設について説明したが、これに限定されるものではなく、地下タンクや地下鉄の駅舎などの地下構造物を構築する際のコンクリート打設にも本発明を適用することができる。   For example, in the above-described embodiment, the concrete placement for constructing the side wall 10 of the shaft 1 has been described. However, the present invention is not limited to this, and when constructing an underground structure such as an underground tank or a subway station building. The present invention can also be applied to concrete placement.

また、前記実施の形態では、コンクリートポンプ4の上流側と下流側の両方に水平配管(41,42)を設ける場合について説明したが、これに限定されるものではなく、いずれか一方であってもよいし、両方ともなくてもよい。さらに、コンクリートポンプ4に接続される配管は、水平に延びるものに限定されるものではなく、斜め方向や鉛直方向に延びるものであってもよい。   Moreover, in the said embodiment, although the case where horizontal piping (41, 42) was provided in both the upstream and downstream of the concrete pump 4 was demonstrated, it is not limited to this, It is either one. You may or may not have both. Furthermore, the pipe connected to the concrete pump 4 is not limited to the one that extends horizontally, but may extend in an oblique direction or a vertical direction.

また、前記実施の形態では、センサ部としてレベルセンサ6について説明したが、これに限定されるものではなく、例えばホッパー2全体の重量を計測することによって、その内部のコンクリートの残量を検出させるようなセンサ部であってもよい。   Moreover, although the level sensor 6 was demonstrated as a sensor part in the said embodiment, it is not limited to this, For example, the residual amount of the concrete inside is detected by measuring the weight of the hopper 2 whole. Such a sensor unit may be used.

さらに、前記実施の形態では、セメント系固化材としてのモルタルで縦配管3を充満させた後にコンクリートをホッパー2に投入したが、これに限定されるものではなく、セメント系固化材として最初からコンクリートを投入し、材料分離が起きている可能性のある最初に吐出されるコンクリートを側壁10などのコンクリート構造物の構築に使用しないようにしてもよい。   Furthermore, in the said embodiment, although concrete was thrown into the hopper 2 after filling the vertical pipe 3 with the mortar as a cement-type solidification material, it is not limited to this, Concrete from the beginning as a cement-type solidification material And the first discharged concrete that may have material separation may not be used to construct a concrete structure such as the side wall 10.

2 ホッパー
2a コンクリート上面
22 排出口
3 縦配管
3b 下端
4 コンクリートポンプ
5 吐出管
6 レベルセンサ(センサ部)
2 Hopper 2a Concrete upper surface 22 Discharge port 3 Vertical piping 3b Lower end 4 Concrete pump 5 Discharge pipe 6 Level sensor (sensor part)

Claims (3)

高低差のある場所でコンクリートを打設するためのコンクリート打設システムであって、
上方に設置されるホッパーと、
前記ホッパーの排出口から下方に向けて延びる縦配管と、
前記縦配管の下流側に接続されるコンクリートポンプと、
前記コンクリートポンプによって搬出されたコンクリートを打設箇所に供給させる吐出管とを備え、
前記ホッパーには投入されたコンクリートの残量を検出させるセンサ部が設けられるとともに、前記センサ部から前記コンクリートポンプに信号が送信されることを特徴とするコンクリート打設システム。
A concrete placement system for placing concrete in a place with a height difference,
A hopper installed above;
A vertical pipe extending downward from the discharge port of the hopper;
A concrete pump connected to the downstream side of the vertical pipe;
A discharge pipe for supplying the concrete carried out by the concrete pump to the placement site;
A concrete placement system, wherein the hopper is provided with a sensor part for detecting a remaining amount of the concrete introduced, and a signal is transmitted from the sensor part to the concrete pump.
前記センサ部は、前記ホッパー内のコンクリート上面の高さが所定以下になった場合に前記コンクリートポンプを停止させる信号を送信することを特徴とする請求項1に記載のコンクリート打設システム。   2. The concrete placement system according to claim 1, wherein the sensor unit transmits a signal for stopping the concrete pump when a height of a concrete upper surface in the hopper becomes equal to or lower than a predetermined value. 請求項1又は2に記載のコンクリート打設システムを使ったコンクリート打設方法であって、
前記コンクリート打設システムを設置する工程と、
前記縦配管にセメント系固化材を充満させる工程と、
前記ホッパーにコンクリートを投入する工程と、
前記コンクリートポンプを稼働させる工程と、
前記吐出管を打設箇所に向けてコンクリートを供給する工程とを備えたことを特徴とするコンクリート打設方法。
A concrete placement method using the concrete placement system according to claim 1 or 2,
Installing the concrete placing system;
Filling the vertical pipe with a cement-based solidifying material;
Putting concrete into the hopper;
Operating the concrete pump;
And a step of supplying concrete with the discharge pipe directed toward the placement site.
JP2012231721A 2012-10-19 2012-10-19 Concrete placing system and concrete placing method Pending JP2014084568A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2012231721A JP2014084568A (en) 2012-10-19 2012-10-19 Concrete placing system and concrete placing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2012231721A JP2014084568A (en) 2012-10-19 2012-10-19 Concrete placing system and concrete placing method

Publications (1)

Publication Number Publication Date
JP2014084568A true JP2014084568A (en) 2014-05-12

Family

ID=50787919

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012231721A Pending JP2014084568A (en) 2012-10-19 2012-10-19 Concrete placing system and concrete placing method

Country Status (1)

Country Link
JP (1) JP2014084568A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804082A (en) * 2016-03-23 2016-07-27 宁波高新区永越科技有限公司 Grouting device and method for prefabricated concrete pile hole
CN109610460A (en) * 2018-11-27 2019-04-12 中国电建市政建设集团有限公司 A kind of three-graded concrete quickly puts in storage system and working method
CN113737800A (en) * 2021-10-14 2021-12-03 南通同欧智能装备科技有限公司 Large-volume concrete pouring construction equipment and construction process
CN114293779A (en) * 2021-11-15 2022-04-08 广东天凛高新科技有限公司 Crawler-type intelligence pouring robot

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54115517A (en) * 1978-02-28 1979-09-08 Tobishima Construct Co Ltd Concrete falling transporter of vertical shaft
JPS5682206A (en) * 1979-12-11 1981-07-04 Taisei Corp Flow rate adjusting method in fresh concrete falling transport and its executing device
JPS58125528A (en) * 1982-01-18 1983-07-26 Shimizu Constr Co Ltd Horizontal transpopt device of concrete
JPS61113968A (en) * 1984-11-08 1986-05-31 鉄建建設株式会社 Casting of concrete
JPS63141425U (en) * 1987-03-06 1988-09-19

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54115517A (en) * 1978-02-28 1979-09-08 Tobishima Construct Co Ltd Concrete falling transporter of vertical shaft
JPS5682206A (en) * 1979-12-11 1981-07-04 Taisei Corp Flow rate adjusting method in fresh concrete falling transport and its executing device
JPS58125528A (en) * 1982-01-18 1983-07-26 Shimizu Constr Co Ltd Horizontal transpopt device of concrete
JPS61113968A (en) * 1984-11-08 1986-05-31 鉄建建設株式会社 Casting of concrete
JPS63141425U (en) * 1987-03-06 1988-09-19

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804082A (en) * 2016-03-23 2016-07-27 宁波高新区永越科技有限公司 Grouting device and method for prefabricated concrete pile hole
CN105804082B (en) * 2016-03-23 2018-01-16 宁波鄞州求自建筑科技有限公司 A kind of grouting device and grouting method of precast concrete stake holes
CN109610460A (en) * 2018-11-27 2019-04-12 中国电建市政建设集团有限公司 A kind of three-graded concrete quickly puts in storage system and working method
CN113737800A (en) * 2021-10-14 2021-12-03 南通同欧智能装备科技有限公司 Large-volume concrete pouring construction equipment and construction process
CN114293779A (en) * 2021-11-15 2022-04-08 广东天凛高新科技有限公司 Crawler-type intelligence pouring robot
CN114293779B (en) * 2021-11-15 2023-10-03 广东天凛高新科技有限公司 Crawler-type intelligent pouring robot

Similar Documents

Publication Publication Date Title
RU2668854C2 (en) System and method of delivering oilfield materials
JP2014084568A (en) Concrete placing system and concrete placing method
CN103510702B (en) Steel core concrete column pin type concrete pouring construction method
EP3112585B1 (en) A tunneling machinery and a method of providing a concrete tunnel base
CN108118901B (en) Reverse pumping concrete device for basement and construction method
CN108756890A (en) A kind of sliding mode system being in the milk for vertical shaft concreting and rock mass
JP6240478B2 (en) Concrete placement method
KR100949937B1 (en) Epoxy injection equipment to both direction movement worktable of crack repair-reinforcement for concret structure
CN110485463B (en) Vertical wall pouring construction method and pouring construction device
CN103899091B (en) Long-distance gentle-slope concrete conveying device
CN103953193B (en) Construction method for long-distance gentle-slope concrete conveying
CN211874504U (en) Full-automatic tunnel secondary lining material-distributing grouting system
CN203856209U (en) Long-distance gentle-slope concrete conveying device
CN203403420U (en) Concrete vertical conveying pouring system
CN104389431B (en) A kind of secondary structure casting machine feeding funnel Automatic-dumping mechanism
CN207986107U (en) A kind of dregs elevator
JP2001207449A (en) Equipment for pouring concrete
CN109826650A (en) A kind of single-track tunnel lining trolley automation cloth system and construction method
CN105862868B (en) A kind of apparatus and method quickly put in storage for underground workshop concrete
CN211114865U (en) Shear force wall concrete replacement is with post-cast in water concrete auxiliary device
CN211341766U (en) Vertical formula template device of windowing and pour construction equipment to wall body vertically
CN208734342U (en) A kind of section of jurisdiction stabilisation system for full face rock tunnel boring machine construction
CN207660286U (en) Large-span industrial building device and concrete vertical transport
CN103088826B (en) Concrete vertical conveying pouring system
CN207377137U (en) A kind of floor mortar device for discharging

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20150227

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20151130

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20151215

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20160212

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20160726