JP2013159945A5 - - Google Patents

Download PDF

Info

Publication number
JP2013159945A5
JP2013159945A5 JP2012022051A JP2012022051A JP2013159945A5 JP 2013159945 A5 JP2013159945 A5 JP 2013159945A5 JP 2012022051 A JP2012022051 A JP 2012022051A JP 2012022051 A JP2012022051 A JP 2012022051A JP 2013159945 A5 JP2013159945 A5 JP 2013159945A5
Authority
JP
Japan
Prior art keywords
view
pile
pile head
steel pipe
fitting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2012022051A
Other languages
Japanese (ja)
Other versions
JP2013159945A (en
Filing date
Publication date
Application filed filed Critical
Priority to JP2012022051A priority Critical patent/JP2013159945A/en
Priority claimed from JP2012022051A external-priority patent/JP2013159945A/en
Publication of JP2013159945A publication Critical patent/JP2013159945A/en
Publication of JP2013159945A5 publication Critical patent/JP2013159945A5/ja
Pending legal-status Critical Current

Links

Description

本発明の接続構造の一実施例を示し、図1(a)は要部の縦断面図、図1(b)は一部省略した平面図である。1 shows an embodiment of the connection structure of the present invention. FIG. 1A is a longitudinal sectional view of an essential part, and FIG. 図1の接続構造における杭頭金具及びこの杭頭金具の裏面に取り付けられるボルト回転止め金具を示す図で、図2(a)は杭頭金具の平面図、図2(b)は杭頭金具の側面図、図2(c)はボルト回転止め金具の平面図、図2(d)はボルト回転止め金具の正面図である。It is a figure which shows the pile head metal fitting in the connection structure of FIG. 1, and the bolt rotation stop metal fitting attached to the back surface of this pile head metal, FIG. 2 (a) is a top view of a pile head metal fitting, FIG. FIG. 2C is a plan view of the bolt rotation stopper, and FIG. 2D is a front view of the bolt rotation stopper. 図1の接続構造における中間金具及び中間金具に取り付けられる偏心座金を示す図で、図3(a)は中間金具の平面図、図3(b)は中間金具の側面図、図3(c)は偏心座金の平面図、図3(d)は偏心座金の面図である。3A and 3B are views showing an intermediate fitting and an eccentric washer attached to the intermediate fitting in the connection structure of FIG. 1, FIG. 3A is a plan view of the intermediate fitting, FIG. 3B is a side view of the intermediate fitting, and FIG. is a plan view of the eccentric washer, FIG. 3 (d) is a cross-sectional view of an eccentric washer. 図3の中間金具上に取り付けられる、上部構造物の脚柱下端に設けられた固定金具を示し、図4(a)は脚柱部分を切断して示す固定金具の平面図、図4(b)は固定金具の一部省略した側面図である。FIG. 4A shows a fixing bracket provided on the lower end of the pedestal of the superstructure attached on the intermediate bracket of FIG. 3, FIG. 4A is a plan view of the fixing bracket shown by cutting the pedestal portion, FIG. ) Is a side view in which a part of the fixing bracket is omitted. 図1の接続構造を示す一部省略した斜視図である。It is the perspective view which abbreviate | omitted partially which shows the connection structure of FIG. 図1の接続構造の施工手順を説明する図で、図6(a)は埋設予定位置(上部構造物の脚柱の軸芯位置)から芯ずれを起こして埋設された鋼管杭を示す平面図、図6(b)は鋼管杭の杭頭空間内にセットされた杭頭金具を芯ずれにあわせて回動調整した状態を示す平面図である。FIG. 6 (a) is a plan view showing a steel pipe pile embedded with a misalignment from the planned embedding position (axial core position of the pedestal of the upper structure). FIG. 6 (b) is a plan view showing a state in which the pile head fitting set in the pile head space of the steel pipe pile is rotated and adjusted in accordance with the misalignment. 図6に示す施工手順の後に引き続き行われる施工手順を説明する図で、図7(a)は図6(b)に示す杭頭金具の調整用長穴に取り付けた接続軸を埋設予定位置(上部構造物の脚柱の軸芯位置)に向けて移動調整した状態を示す平面図、図7(b)は向きを調整する前の中間金具と接続軸との位置関係を示す平面図である。FIG. 7 (a) is a diagram for explaining a construction procedure performed after the construction procedure shown in FIG. 6, and FIG. 7 (a) shows a position where the connecting shaft attached to the adjustment hole of the pile head metal fitting shown in FIG. FIG. 7B is a plan view showing the positional relationship between the intermediate metal fitting and the connecting shaft before the orientation is adjusted. . 図7に示す施工手順の後に引き続き行われる施工手順を説明する図で、図8(a)は向きを調整した後の中間金具と接続軸との位置関係を示す平面図、図8(b)は図6(a)から図8(a)に至るまでの施工手順を示す平面図である。FIG. 8A is a diagram for explaining a construction procedure performed after the construction procedure shown in FIG. 7, and FIG. 8A is a plan view showing the positional relationship between the intermediate metal fitting and the connecting shaft after the orientation is adjusted, and FIG. These are top views which show the construction procedure from Fig.6 (a) to FIG. 8 (a). 図8に示す施工手順の後に引き続き行われる施工手順を説明する図で、図8(a)、(b)に示す、中間金具上に偏心座金を取り付けた状態を示す平面図である。It is a figure explaining the construction procedure performed after the construction procedure shown in FIG. 8, and is a top view which shows the state which attached the eccentric washer on the intermediate metal fitting shown to FIG. 8 (a), (b). 図1に示す本発明の接続構造の実施例で使用する鋼管杭の一例を示す一部省略した側面図である。It is the side view which abbreviate | omitted partially showing an example of the steel pipe pile used in the Example of the connection structure of this invention shown in FIG. 本発明の接続構造を使用して上部構造物としての太陽電池モジュール又は太陽電池アレイ用架台を鋼管杭で支持した状態の説明側面図である。It is a description side view of the state which supported the solar cell module as a superstructure, or the mount for solar cell arrays by the steel pipe pile using the connection structure of this invention. 図11に示す上部構造物としての太陽電池モジュール又は太陽電池アレイ用架台と同架台の接続構造の一部である杭の埋設箇所を示す平面図である。It is a top view which shows the embedding location of the pile which is a part of connection structure of the solar cell module or the solar cell array mount as the upper structure shown in FIG. 11, and the mount.

前記杭頭金具30は、図2(a)、(b)に示すように円板状で、その直径は杭頭24の内径よりも若干小さく設定され、杭頭24内で周方向への移動が円滑に行えるようにしてある。また、前記杭頭金具30は、その軸線方向の寸法である肉厚が強度上必要とされる厚さよりも厚く設定される。埋設後の鋼管杭20の杭頭の高さ(地面から露出する高さ)が予め設定していた寸法よりも低いとき、前記杭頭金具30を杭頭24内から若干露出させて高さの微調整が出来るようにするためである。なお、杭頭の高さが予め設定していた高さよりも高いときは、鋼管杭20を切断することがある。ちなみに、コンクリート杭の場合、このような切断で杭頭の高さ調整をすることは出来ず、鋼管杭20を使用するメリットはここにもある。 As shown in FIGS. 2 (a) and 2 (b), the pile head fitting 30 is disk-shaped, and its diameter is set slightly smaller than the inner diameter of the pile head 24, and moves in the circumferential direction within the pile head 24. Can be done smoothly. In addition, the pile head metal fitting 30 is set such that the thickness in the axial direction is thicker than the thickness required for strength. When the height of the pile head of the steel pipe pile 20 after being buried (height exposed from the ground) is lower than the dimension set in advance, the pile head fitting 30 is slightly exposed from the inside of the pile head 24 and the height is This is to allow fine adjustment. In addition, when the height of a pile head is higher than the height set beforehand, the steel pipe pile 20 may be cut | disconnected. Incidentally, in the case of a concrete pile, the height of the pile head cannot be adjusted by such cutting, and the merit of using the steel pipe pile 20 is also here.

前記調整用長穴31は、その長さ方向の寸法が、鋼管杭20の埋設時に予測される水平方向の変位によって生じる施工誤差(鋼管杭20の軸芯と脚柱11の軸芯との間の芯ずれ)のうち、施工杭径に対応した長穴寸法範囲に対応可能な長さに設定されている。実際の施工誤差が前記調整用長穴31の長さ方向の寸法を超える場合、すなわち前記調整用長穴31で対応しきれなかった場合、対応しきれなかった部分(前記調整用長穴31を超える施工誤差範囲)については、同部分に対応可能な寸法に設定された、前記調整用ルーズ穴51で対応するので、何ら支障はない。 The adjustment long hole 31 has a lengthwise dimension that is caused by a horizontal displacement predicted when the steel pipe pile 20 is buried (between the axis of the steel pipe pile 20 and the axis of the pedestal 11). Is set to a length that can correspond to the long hole dimension range corresponding to the construction pile diameter . When the actual construction error exceeds the lengthwise dimension of the adjustment elongated hole 31, that is, when the adjustment elongated hole 31 cannot be fully accommodated, the portion that could not be accommodated (the adjustment elongated hole 31 is changed). For the construction error range exceeding), the adjustment loose hole 51 is set to a dimension that can accommodate the same portion, so there is no problem.

JP2012022051A 2012-02-03 2012-02-03 Connection structure of superstructure and pile Pending JP2013159945A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2012022051A JP2013159945A (en) 2012-02-03 2012-02-03 Connection structure of superstructure and pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2012022051A JP2013159945A (en) 2012-02-03 2012-02-03 Connection structure of superstructure and pile

Publications (2)

Publication Number Publication Date
JP2013159945A JP2013159945A (en) 2013-08-19
JP2013159945A5 true JP2013159945A5 (en) 2015-02-05

Family

ID=49172448

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012022051A Pending JP2013159945A (en) 2012-02-03 2012-02-03 Connection structure of superstructure and pile

Country Status (1)

Country Link
JP (1) JP2013159945A (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015055111A (en) * 2013-09-12 2015-03-23 株式会社藤原設備 Support body for solar battery panel pedestal
JP5966025B2 (en) * 2014-09-30 2016-08-10 株式会社内藤ハウス Joint structure and attachment of pile and building frame
CN104612146B (en) * 2015-03-03 2016-07-06 中淳高科桩业股份有限公司 The end plate manufactured for pretensioned prestressing prefabricated pile and quick connecting method thereof
JP6298498B2 (en) * 2015-11-25 2018-03-20 有限会社三神製作所 Pile puller
JP6096367B1 (en) * 2016-10-20 2017-03-15 大和リース株式会社 Steel pipe pile and steel column joint structure
JP2019056282A (en) * 2017-09-22 2019-04-11 大和ハウス工業株式会社 Leg-shaped part support structure and method for producing the same
KR102348288B1 (en) 2020-03-31 2022-01-10 한국철도기술연구원 The coupling structure and method of the steel and concrete structures

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3647841B2 (en) * 2002-12-02 2005-05-18 東日本旅客鉄道株式会社 Joining structure and joining method of pile and building

Similar Documents

Publication Publication Date Title
JP2013159945A5 (en)
JP2012507650A5 (en)
JP2009013602A (en) Structure and method for joining steel pipe pile and steel column
JP2013159945A (en) Connection structure of superstructure and pile
JP5571446B2 (en) Structure displacement limiter
JP5841851B2 (en) Pile head joint structure assembly jig and pile head joint structure assembly method using the same
JP2015151848A (en) Installation method of foundation pile and installation auxiliary member
KR101421212B1 (en) Basement Structure for power mono rail
JP2013067948A (en) Foundation structure for solar cell module or solar cell array frame
JP5952600B2 (en) Connection structure between superstructure and pile
JP3609083B1 (en) Construction method of building foundation and joint board for building foundation construction
JP2013124444A5 (en)
JP6342713B2 (en) Seismic isolation sliding bearing installation device
JP2011021413A (en) Hold-down hardware
JP5877573B1 (en) Prop fixture
JP5181279B2 (en) Lower foundation structure of seismic isolation members
JP6454591B2 (en) Construction method of seismic isolation foundation
ES2400430A2 (en) Device and method for laying the foundations of a solar collector supporting structure in the ground
JP5544270B2 (en) Seismic isolation device
JP2015132088A (en) Connection member, and structure for connecting foundation pile and support together
JP5841888B2 (en) Column base pin structure
JP3184745U (en) Coupling adjustment fitting between foundation beam and steel pipe pile
JP6384722B2 (en) Pile foundation structure
JP2015017401A (en) Construction method of base isolated building and short column member used in construction method of base isolated building
JP6826510B2 (en) Temporary support member for joining steel beams and joining method of steel beams