JP2013158081A - Distributed power management system - Google Patents

Distributed power management system Download PDF

Info

Publication number
JP2013158081A
JP2013158081A JP2012014774A JP2012014774A JP2013158081A JP 2013158081 A JP2013158081 A JP 2013158081A JP 2012014774 A JP2012014774 A JP 2012014774A JP 2012014774 A JP2012014774 A JP 2012014774A JP 2013158081 A JP2013158081 A JP 2013158081A
Authority
JP
Japan
Prior art keywords
power
power management
self
distributed
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2012014774A
Other languages
Japanese (ja)
Other versions
JP5797122B2 (en
Inventor
Masahiro Yoshioka
正博 吉岡
Katsuyuki Suzuki
勝幸 鈴木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP2012014774A priority Critical patent/JP5797122B2/en
Publication of JP2013158081A publication Critical patent/JP2013158081A/en
Application granted granted Critical
Publication of JP5797122B2 publication Critical patent/JP5797122B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/12Energy storage units, uninterruptible power supply [UPS] systems or standby or emergency generators, e.g. in the last power distribution stages

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a distributed power management system that can quickly cope with a configuration change or device abnormality of a power system.SOLUTION: A distributed power management system comprises: a plurality of power subsystems 3 connected to a commercial system; power management devices 2 each of which is provided for each of the power subsystems and controls its power; and data fields 1 which are disposed between power management devices. A part of the plurality of power subsystems includes a self-supporting power source able to supply power independently of the commercial system. In a part of an information frame passing through data fields, a shared data area D1 is set, and the shared data area is formed by self areas with the same format, each self area being for a power management device as a unit. The power management device reads out data described in the plurality of self areas with the same format forming the shared data area, obtains the power state of the whole of the plurality of power subsystems from the obtained data of the plurality of other power management devices and data on the power of the self managing power subsystem, and manages its own power subsystem.

Description

本発明は、工場やその周辺地域の需要家を管理の対象とする電力管理システムに係り、工場やその周辺地域の需要家の電力運用を効率化するための分散型電力管理システムに関する。   The present invention relates to a power management system that manages a customer in a factory and its surrounding area, and relates to a distributed power management system for improving the efficiency of power operation of a customer in a factory and its surrounding area.

これまでの電力系統においては、低炭素化と経済的電力運用の実現を目的とした実証型の技術開発が主流であった。   Until now, proof-type technology development aimed at realizing low-carbon and economical power operation has been the mainstream in power systems.

これに対し近年では、情報通信技術をとりいれたスマートグリッドや、マイクログリッドの研究開発が盛んである。また自然災害等による電力系統故障に対して、工場や自治体でのエネルギー確保における復旧支援機能が求められており、これまでも様々な方法が検討されている。   On the other hand, in recent years, research and development of smart grids and microgrids that incorporate information and communication technologies are thriving. In addition, recovery support functions for securing energy in factories and local governments are required for power system failures due to natural disasters, and various methods have been studied so far.

例えば、制御装置故障に対し、制御情報の伝達を確保する手段の一つとして、自律分散方式がある。自律分散方式では、非特許文献1に示されるように、部分システム(サブシステム)が自律的に稼働しながら、必要に応じて他のサブシステムと協調動作する。この結果、特定の制御装置が故障しても、システム全体の稼働が継続できる。   For example, there is an autonomous decentralized method as one means for ensuring transmission of control information against a control device failure. In the autonomous distributed system, as shown in Non-Patent Document 1, a partial system (subsystem) operates autonomously and cooperates with other subsystems as necessary. As a result, even if a specific control device fails, the operation of the entire system can be continued.

係る自律分散機能は、工場とその周辺地域を対象とする電力系統の運用にも求められる機能であり、特許文献1−3は、これらの一事例を紹介している。   Such an autonomous decentralized function is a function that is also required for operation of a power system for a factory and its surrounding area, and Patent Documents 1-3 introduce one example of these.

電力系統故障では、自家発電設備を活用し、近在する他システムへの電力融通をする。例えば特許文献1では、高圧系統の異常時に、低圧系統の需要家がもつ分散型電源を活用し、電力が余剰する需要家の余剰電力を電力が不足する需要家に供給する。   In the case of a power system failure, private power generation facilities are used to allow power interchange to other nearby systems. For example, in Patent Document 1, when a high-voltage system is abnormal, a distributed power source possessed by a low-voltage system customer is utilized to supply surplus power of a consumer with surplus power to a consumer with insufficient power.

例えば特許文献2では、商用系統が停電しても、蓄電池や太陽光により継続して電力供給を行うよう、検出電圧に応じて蓄電池の制御方式を切り替える。   For example, in Patent Document 2, the storage battery control method is switched in accordance with the detected voltage so that the power is continuously supplied by the storage battery or sunlight even if the commercial system fails.

例えば特許文献3では、負荷平準化と災害時の電力供給に対応するよう、蓄電池の蓄電モードと放電モードを制御し、負荷に供給する。   For example, in Patent Document 3, the storage mode and discharge mode of a storage battery are controlled and supplied to a load so as to correspond to load leveling and power supply during a disaster.

以上のように、工場とその周辺地域を対象とする電力運用において商用系統が故障した場合でも、電力供給を可能とする技術開発が進められている。   As described above, technological development that enables power supply is being promoted even when a commercial system fails in power operation for a factory and its surrounding areas.

特開2008−125290号公報JP 2008-125290 A 特開2011−10412号公報JP 2011-10412 A 特開2000−224769号公報JP 2000-224769 A

三巻達夫、桑原洋:制御用計算機におけるリアルタイム技術:コロナ社(1986)Tatsuo Mimaki, Hiroshi Kuwahara: Real-time technology in control computers: Corona (1986)

工場やその周辺地域を管理対象とする電力管理においては、通常時は、電力会社からの供給電力と事業所内の再生可能エネルギーの活用を行い、災害時は、蓄電池、再生可能エネルギーを用いて一定期間の企業活動を維持する。このためのエネルギー管理機能の実現が求められる。   In power management for factories and surrounding areas, power supply from electric power companies and renewable energy in the office are normally used, and in the event of a disaster, storage batteries and renewable energy are used. Maintain corporate activities for the period. Realization of energy management functions for this purpose is required.

これらの点に関して特許文献1では、高圧系統の異常時に、低圧系統の需要家がもつ分散型電源を活用し、電力が余剰する需要家の余剰電力を電力が不足する需要家に供給するために、低圧系統用の系統管理装置を備えるが、各需要家を集中管理する機能となっている。このため、集中管理するこの系統管理装置が故障した場合は、エネルギー管理機能が失われることになる。   With regard to these points, in Patent Document 1, in order to supply surplus power of a consumer with surplus power to a consumer with insufficient power, by utilizing a distributed power source possessed by a customer of the low voltage system when a high voltage system is abnormal. A system management device for a low-voltage system is provided, but it has a function of centrally managing each consumer. For this reason, when this system management apparatus managed centrally fails, the energy management function is lost.

また特許文献2では、商用系統が停電しても、蓄電池や太陽光により継続して電力供給を行うよう、検出電圧に応じて蓄電池の制御方式を切り替えるための制御機能を提供している。このため、低圧系統下に太陽光発電と蓄電池の設備をもたない場合は、適用できない。   Further, Patent Document 2 provides a control function for switching the storage battery control method in accordance with the detected voltage so that power is continuously supplied by the storage battery or sunlight even if the commercial system fails. For this reason, it is not applicable when solar power generation and storage battery facilities are not provided under the low-voltage system.

また、特許文献3では、負荷平準化と災害時の電力供給に対応するよう、蓄電池の蓄電モードと放電モードを制御し、負荷に供給する構成となっているが、充電には商用系統との接続が必要な構成となっている。このため、災害時の活用ができない。   Moreover, in patent document 3, it is the structure which controls the electrical storage mode and discharge mode of a storage battery, and supplies it to a load so that it may respond to load leveling and the electric power supply at the time of a disaster. The configuration requires connection. For this reason, it cannot be used during a disaster.

以上より、工場やその周辺地域を対象とする電力管理システムとして、解決するべき課題を整理して以下に示す。   Based on the above, the issues to be solved as a power management system for factories and their surrounding areas are summarized below.

工場とその周辺地域を対象とする電力管理システムは、通常時は電力会社からの供給電力と事業所内の再生可能エネルギーの活用を行い、災害時は蓄電池、再生可能エネルギーを用いて一定期間の企業活動を維持することを可能とすることが期待される。このため、第一の課題としては、通常時や災害時など外部環境が変化しても、それに応じて電源供給を継続できるような構成変化を実現することが望ましい。   The power management system for factories and the surrounding area usually uses the power supplied from the power company and the renewable energy in the office, and in the event of a disaster, it uses a storage battery and renewable energy for a certain period of time. It is expected to be possible to maintain activities. For this reason, as a first problem, it is desirable to realize a configuration change that allows power supply to be continued in response to changes in the external environment such as during normal times and disasters.

第二の課題として、工場のような大規模施設において、故障したサブシステム(例えば制御装置)は、健全なサブシステムと速やかに機能補完したい。このためには、電力管理機能を集中管理型ではなく分散型として実現することが望ましい。   As a second problem, in a large-scale facility such as a factory, a failed subsystem (for example, a control device) wants to quickly complement the function of a healthy subsystem. For this purpose, it is desirable to realize the power management function as a distributed type rather than a centralized type.

以上のことから本発明においては、電力系統の構成変化あるいは装置異常に速やかに対応可能な分散型電力管理システムを提供することを目的とする。   In view of the above, an object of the present invention is to provide a distributed power management system capable of quickly responding to changes in the configuration of the power system or device abnormalities.

本発明は、前記課題を解決するため、商用系統に接続された複数の電力サブシステムと、電力サブシステムごとに設けられその電力を制御する電力管理装置と、電力管理装置間に配置されたデータフィールドとを備え、複数の電力サブシステムの少なくとも一部には商用系統から独立して電力供給可能な自立電源を含み、データフィールドに流通する情報フレームの一部には、共有データエリアが設定されており、共有データエリアは電力管理装置を単位とする同一形式の自己エリアで構成されており、電力管理装置は、共有データエリアを構成する複数の同一形式の自己エリアに記述されたデータの読み出しを行い、自己が管理する電力サブシステムの電力のデータを自己に割り当てられた共有データエリアの自己エリアに記述し、データフィールドから得られた複数の他の電力管理装置のデータと自己が管理する電力サブシステムの電力のデータから複数の電力サブシステム全体の電力状況を求めて自己の電力サブシステムを管理することを特徴とする。   In order to solve the above problems, the present invention provides a plurality of power subsystems connected to a commercial system, a power management device provided for each power subsystem and controlling the power, and data arranged between the power management devices. Field, and at least some of the plurality of power subsystems include a stand-alone power source that can supply power independently from the commercial grid, and a shared data area is set in a part of the information frame distributed in the data field The shared data area is composed of self-areas of the same format in units of power management devices, and the power management device reads data described in a plurality of self-areas of the same format constituting the shared data area. And describe the power data of the power subsystem managed by the self in the self area of the shared data area allocated to the self. It is characterized by managing its own power subsystem by determining the power status of the entire power subsystem from the data of other power management devices obtained from the field and the power data of the power subsystem managed by itself. And

また、商用系統から独立して電力供給可能な自立電源として、太陽光発電設備あるいは蓄電設備が配置されていることを特徴とする。   In addition, a solar power generation facility or a power storage facility is arranged as an independent power source that can supply power independently from the commercial system.

また、共有データエリアに記述されるデータには、自立電源の発電容量、電力予測情報、自立電源の運用計画の情報を含むことを特徴とする。   The data described in the shared data area includes the power generation capacity of the independent power source, power prediction information, and information on the operation plan of the independent power source.

また、共有データエリアに記述された自立電源の発電容量、電力予測情報、自立電源の運用計画の情報は、自己の電力サブシステムでの情報と、それぞれの合計値の情報を含むことを特徴とする。   In addition, the power generation capacity of the independent power source, the power prediction information, and the information on the operation plan of the independent power source described in the shared data area include information on the own power subsystem and information on each total value. To do.

また、自立電源が蓄電設備である場合に、この電力管理装置が該当する共有データエリアの自己エリアに記述する自立電源の発電容量は蓄電設備の残量であり、自立電源の運用計画は蓄電設備の状放電計画であることを特徴とする。   In addition, when the self-sustained power source is a power storage facility, the power generation capacity of the self-sustained power source described in the self-area of the corresponding shared data area by this power management device is the remaining capacity of the power storage facility, and the operation plan of the self-sustained power source is the power storage facility It is characterized by being a discharge plan.

また、電力管理装置は、共有データエリアの自己エリアに目標電力と負荷制限可能量の情報を記述しており、商用系統の異常並びに商用系統からの解列を監視しており、商用系統の異常あるいは商用系統からの解列を検出したときに目標電力と負荷制限可能量を変更して運転継続することを特徴とする。   In addition, the power management device describes information on the target power and the load limitable amount in its own area of the shared data area, and monitors for abnormalities in the commercial system and disconnection from the commercial system. Alternatively, when disconnection from a commercial system is detected, the target power and the load limitable amount are changed and the operation is continued.

また、電力管理装置は、電力管理装置自身の異常を監視しており、自己の異常検知により共有データエリアの自己エリアに記述する情報のうち合計計算に使用される情報を出力しないことを特徴とする。   In addition, the power management apparatus monitors an abnormality of the power management apparatus itself, and does not output information used for total calculation among information described in the self area of the shared data area by detecting its own abnormality. To do.

本発明のエネルギー管理方法により、通常時と災害時のような外部環境の変化に適応して電力供給機能を確保することができ、工場の生産のような企業活動が継続できる。また、商用系統が停電した場合でも、自立運転可能な電源を有するサブシステムと他のサブシステムが、協調して電力融通をすることで、広域での電力供給、および生産活動が可能となる。その結果として、工場、地域双方での復旧が進むこととなる。   According to the energy management method of the present invention, the power supply function can be ensured by adapting to changes in the external environment during normal times and disasters, and business activities such as factory production can be continued. In addition, even when a power failure occurs in a commercial system, a sub-system having a power supply capable of independent operation and another sub-system cooperate in power interchange, thereby enabling power supply and production activities in a wide area. As a result, restoration in both the factory and the region will proceed.

本発明の分散型電力管理システムの構成を示す図。The figure which shows the structure of the distributed power management system of this invention. 電力管理装置と電力サブシステムの具体事例を示す図。The figure which shows the specific example of a power management apparatus and a power subsystem. データフィールドに流通するデータ構成を示す図。The figure which shows the data structure which distribute | circulates to a data field. 電力管理装置における蓄電池残量計算の処理フロー図。The processing flowchart of the storage battery remaining charge calculation in an electric power management apparatus. 電力管理装置における一日分電力予測計算の処理フロー図。The processing flow figure of the electric power prediction calculation for one day in an electric power management apparatus. 電力管理装置における一日分充放電計画の処理フロー図。The processing flow figure of the charge / discharge plan for one day in an electric power management apparatus. 状態変化に対応して電力制御を行うための処理フローを示す図。The figure which shows the processing flow for performing electric power control corresponding to a state change. 非常用電源を備えるときの一日分充放電計画処理の処理フロー図。The processing flowchart of a charge / discharge plan process for one day when providing an emergency power supply. 分散電源を有する工場における動作例を示す図。The figure which shows the operation example in the factory which has a distributed power supply. 従来の外部システムとの接続手法の一例を示す図。The figure which shows an example of the connection method with the conventional external system. 本発明による外部システムとの接続手法の一例を示す図。The figure which shows an example of the connection method with the external system by this invention. 図11の電力管理装置2Fの詳細構成を示す図。The figure which shows the detailed structure of the power management apparatus 2F of FIG.

本発明の分散型電力管理システムの一実施例を、図を用いて以下に説明する。   An embodiment of the distributed power management system of the present invention will be described below with reference to the drawings.

図1は、本発明の一実施例にかかる分散型電力管理システムの構成を示す図である。   FIG. 1 is a diagram showing a configuration of a distributed power management system according to an embodiment of the present invention.

図1において、データフィールド1は自律分散ネットワークである。データフィールド1には、複数の電力管理装置2が接続されている。電力管理装置2による電力管理対象3は、工場、ビル、家庭などの電力設備であり、この電力設備のことを以下電力サブシステムと呼ぶことにする。図1の例では、6組の電力管理装置2(2A−2F)がデータフィールド1に接続され、6組の電力管理装置2(2A−2F)が夫々の電力サブシステム(3A−3F)の電力を管理している。   In FIG. 1, data field 1 is an autonomous distributed network. A plurality of power management apparatuses 2 are connected to the data field 1. The power management target 3 by the power management apparatus 2 is a power facility such as a factory, a building, or a home, and this power facility is hereinafter referred to as a power subsystem. In the example of FIG. 1, six sets of power management apparatuses 2 (2A-2F) are connected to the data field 1, and six sets of power management apparatuses 2 (2A-2F) are connected to the respective power subsystems (3A-3F). I manage power.

データフィールド1には、各電力管理装置2の出力した情報を含む情報フレームDが流通されている。流通する情報フレームDの一部には、共有データエリアD1が設定されている。   In the data field 1, an information frame D including information output from each power management apparatus 2 is distributed. A shared data area D1 is set in a part of the distributed information frame D.

図2は、電力管理装置2と電力サブシステム3の具体事例を示す図である。図2の電力サブシステム3Aは太陽光発電などの発電設備G1、負荷L1、L2、蓄電設備C1、C2を備えた工場であり、工場内母線B2にこれらの設備を適宜の変圧器T1−T4や、遮断器CBを介して接続している。工場内母線B2は、さらに送受電電力量計W、引き込み母線B1、変圧器T5を経由して商用系統に接続されている。なお、工場内母線B2からさらに降圧用変圧器T1を介して低圧系統に接続されることもある。   FIG. 2 is a diagram illustrating specific examples of the power management apparatus 2 and the power subsystem 3. The electric power subsystem 3A in FIG. 2 is a factory provided with power generation equipment G1, such as solar power generation, loads L1, L2, and power storage equipment C1, C2, and these equipments are connected to an appropriate transformer T1-T4 on the factory bus B2. Or via a circuit breaker CB. The in-plant bus B2 is further connected to a commercial system via a transmission / reception watt-hour meter W, a lead-in bus B1, and a transformer T5. In some cases, the in-plant bus B2 is further connected to a low-voltage system via a step-down transformer T1.

係る設備を備えることにより、電力サブシステム3Aは自己の工場運用のために電力を送受電し、発電し、蓄電している。電力管理装置2Aは自己の工場で使用する電力を、日ごと、週ごと、月ごとなどの電力計画に従って制御し、管理している。なお、他の電力サブシステム3でも電力の送受電、発電、蓄電のための設備の一部又は全てを備えている。さらに、各電力サブシステムは引き込み母線B1などを経由して電力的にも連系されている。   By providing such facilities, the power subsystem 3A transmits and receives power, generates power, and stores power for its own factory operation. The power management apparatus 2A controls and manages the power used in its own factory according to a power plan such as daily, weekly, monthly or the like. The other power subsystem 3 also includes some or all of the facilities for power transmission / reception, power generation, and power storage. Furthermore, each power subsystem is also connected in terms of power via the lead-in bus B1 or the like.

ここで、太陽光発電などの発電設備G1および蓄電設備C1、C2は、商用系統以外の電源であり、独立して電力供給可能な自立電源である。自立電源の活用により、データフィールド1を介して管理制御される電力サブシステム全体としての受電電力を最小化し、通常運転状態での電力過不足を解消し、かつ商用系統から切り離されたときの運転継続を可能とする。このためには自立電源は電力サブシステム内に多く存在し、かつ合計容量が大きいほど上記の各種運用が有効に行える。本発明では、電力サブシステム全体としての電力制御に自立電源を有効活用するためにデータフィールド1を用いている。   Here, the power generation equipment G1 such as solar power generation and the power storage equipment C1 and C2 are power sources other than the commercial system, and are independent power sources that can supply power independently. Utilizing a self-sustained power supply minimizes the received power of the entire power subsystem managed and controlled via data field 1, eliminates excess and deficiency of power in normal operation, and operates when disconnected from the commercial system Allows continuation. For this purpose, many independent power sources exist in the power subsystem, and the above-described various operations can be performed more effectively as the total capacity increases. In the present invention, the data field 1 is used in order to effectively utilize the independent power source for power control as the entire power subsystem.

電力管理装置2は、上記のように自己の工場運用を図ると共に、データフィールド1を介して他の電力管理装置2と連係している。具体的にはデータフィールド1を流通する情報フレームDの共有データエリアD1に記述された情報を入力して他の電力管理装置2の状態を把握する。また共有データエリアD1に設定された自己エリアに自己の工場の状態を示す情報を記述して送出する。   The power management apparatus 2 is intended to operate its own factory as described above, and is linked to other power management apparatuses 2 via the data field 1. Specifically, information described in the shared data area D1 of the information frame D that circulates in the data field 1 is input to grasp the state of the other power management apparatus 2. Also, information indicating the state of the own factory is described and transmitted to the self area set in the shared data area D1.

共有データエリアD1に設定された自己エリアに記述する情報は、商用系統との間の送受電電力量、商用系統との連系情報、発電電力、蓄電電力、電力計画などである。   Information described in the self-area set in the shared data area D1 includes transmission / reception electric energy with the commercial grid, interconnection information with the commercial grid, generated power, stored power, power plan, and the like.

図3に、データフィールド1に流通するデータの具体的な構成を示す。共有データエリアD1内は、電力管理装置2A〜2Fが管理する6つの電力サブシステム3A〜3FのためのサブデータエリアD1A〜D1Fで構成されている。   FIG. 3 shows a specific configuration of data distributed in the data field 1. The shared data area D1 includes sub data areas D1A to D1F for the six power subsystems 3A to 3F managed by the power management apparatuses 2A to 2F.

共有データエリアD1では、電力管理装置2Aの出力情報を格納するサブデータエリアD1Aから、電力管理装置2Fの情報を格納するサブデータエリアD1Fが一元化されている。共有データエリアD1は、電力管理装置2ごとに同一形式で格納される。   In the shared data area D1, a sub data area D1F for storing information on the power management device 2F is unified from a sub data area D1A for storing output information on the power management device 2A. The shared data area D1 is stored in the same format for each power management apparatus 2.

サブデータエリアD1A〜D1Fは、いずれも同じフィールド構成とされるが、この一例をサブデータエリアD1Aで説明する。ここには、この電力管理装置2Aが管理する電力サブシステム3である工場、ビル、家庭などの情報が記述されている。   The sub data areas D1A to D1F all have the same field configuration. An example of this will be described in the sub data area D1A. Here, information on factories, buildings, homes, and the like, which are power subsystems 3 managed by the power management apparatus 2A, is described.

記述されるデータは、例えば発電機容量D1A1、蓄電池容量D1A2、蓄電池残量D1A3、負荷制限可能量D1A4、一日分電力予測D1A5、目標電力D1A6、一日分充放電計画D1A7、次1時間充放電出力値D1An−2、次1時間負荷制限出力値D1An−1、系統連系情報D1Anなどである。   The described data includes, for example, generator capacity D1A1, storage battery capacity D1A2, remaining battery capacity D1A3, load limitable amount D1A4, daily power prediction D1A5, target power D1A6, daily charge / discharge plan D1A7, and charging for the next hour. Discharge output value D1An-2, next one hour load limit output value D1An-1, grid interconnection information D1An, and the like.

これらの情報は、いずれも当該電力サブシステム3の情報(自己電力情報)であるが、蓄電池残量D1A3、一日分電力予測D1A5、一日分充放電計画D1A7については総合値を持つのがよい。総合値は、データフィールド1に接続された電力管理装置2により管理制御される電力サブシステム3の合計値である。   These pieces of information are all information (self-power information) of the power subsystem 3, but the storage battery remaining amount D1A3, daily power prediction D1A5, and daily charge / discharge plan D1A7 have comprehensive values. Good. The total value is a total value of the power subsystem 3 that is managed and controlled by the power management apparatus 2 connected to the data field 1.

また、他のサブデータエリアD1B〜D1Fも同じデータエリア配置とされており、各電力管理装置2B〜2Fは自己のサブデータエリアD1B〜D1Fに、自己の管理する電力サブシステム3の情報(自己電力情報)を記載する。   Also, the other sub data areas D1B to D1F have the same data area arrangement, and each power management device 2B to 2F has its own sub data areas D1B to D1F in its own information on the power subsystem 3 (self-managed). Power information).

さらに各電力管理装置2は、他のサブデータエリアD1にアクセスし、ここに記述された他の電力管理装置2による電力サブシステム3の情報(自己電力情報)を読み取ることができる。これにより、データフィールド1に接続された電力管理装置2は、お互いに他の電力管理装置2が管理する電力サブシステム3の情報を知ることができる。つまり、データの共有化が図られている。   Furthermore, each power management apparatus 2 can access the other sub data area D1 and read the information (self power information) of the power subsystem 3 by the other power management apparatus 2 described here. Thereby, the power management apparatuses 2 connected to the data field 1 can know information on the power subsystems 3 managed by the other power management apparatuses 2. That is, data sharing is attempted.

データの共有化のために、各電力管理装置2は、一定周期ごとに電力サブシステム3の各部情報を検出器経由でして入手し、自己に割り当てられたサブデータエリアD1の所定箇所に当該データを記述して送信する。この場合に特に蓄電池残量D1A3、一日分電力予測D1A5、一日分充放電計画D1A7のデータを得るために、電力管理装置2内では図4乃至図6の処理が実施される。なお以下の説明は、電力管理装置2Aの例で説明するが、同時に他の電力管理装置2Aでも同様に実施されている。   In order to share data, each power management apparatus 2 obtains information on each part of the power subsystem 3 via a detector at regular intervals, and applies it to a predetermined location in the subdata area D1 allocated to itself. Describe and send data. In this case, in order to obtain the data of the remaining battery level D1A3, the daily power prediction D1A5, and the daily charge / discharge plan D1A7, the processes of FIGS. The following description will be made with reference to the example of the power management apparatus 2A, but the same applies to other power management apparatuses 2A at the same time.

まず蓄電池残量D1A3について、図4の処理を行う。電力管理装置2Aでは、共有データエリアD1にアクセスして、サブデータエリアD1A〜D1Fの情報を入手している。この状態において処理ステップS10では、サブデータエリアD1A〜D1Fから、各電力サブシステム3が申告している蓄電池容量(D1A2〜D1F2)と蓄電池残量(D1A3〜D1F3)を読み込む。   First, the process of FIG. 4 is performed for the remaining battery level D1A3. The power management apparatus 2A accesses the shared data area D1 and obtains information on the sub data areas D1A to D1F. In this state, in processing step S10, the storage battery capacity (D1A2 to D1F2) and the remaining battery charge (D1A3 to D1F3) declared by each power subsystem 3 are read from the sub data areas D1A to D1F.

処理ステップS11では、自己の電力サブシステム3Aが所有する蓄電設備Cの情報(電流、電圧)から充電状態(SOC:state of charge)の推定値を求める。処理ステップS12では、自己の電力サブシステム3Aが所有する蓄電設備Cについて、充電状態SOCから蓄電池残量を求める。   In process step S11, the estimated value of a state of charge (SOC) is calculated | required from the information (electric current, voltage) of the electrical storage equipment C which own electric power subsystem 3A owns. In process step S12, the storage battery residual amount is calculated | required from charge condition SOC about the electrical storage equipment C which the own electric power subsystem 3A owns.

処理ステップS13では、計算により求めた現時点での自己の蓄電池残量をサブデータエリアD1Aの蓄電池残量D1A3の欄に記述する。また、このときに現時点での自己の蓄電池残量を反映した全体残量も更新する。   In the processing step S13, the current storage battery remaining amount obtained by calculation is described in the storage battery remaining amount D1A3 column of the sub data area D1A. At this time, the total remaining amount reflecting the current remaining amount of the storage battery is also updated.

以上の処理は、データフィールド1に接続された全ての電力管理装置2A〜2Fで実行されており、蓄電池残量と全体残量が最新値に更新されている。このようにして、各電力管理装置2A〜2Fは、蓄電池残量について自己の状況と共に、全体状況を把握している。   The above processing is executed by all the power management apparatuses 2A to 2F connected to the data field 1, and the remaining amount of the storage battery and the entire remaining amount are updated to the latest values. Thus, each power management apparatus 2A-2F grasps | ascertains the whole condition with its own condition about the storage battery remaining amount.

次に一日分電力予測D1A5について、図5の処理を行う。まず処理ステップS20では、電力負荷変動要因を得る。これらは外部機関から入手する気象情報や、予め自己内部に保有する操業計画などである。これらの情報を用いてまず処理ステップS21では、自己の電力サブシステム3Aの負荷Lが消費する当該日の1日分の電力を予測する。   Next, the process of FIG. 5 is performed for the daily power prediction D1A5. First, in processing step S20, a power load fluctuation factor is obtained. These are meteorological information obtained from external organizations and operation plans that are held in advance within the company. Using these pieces of information, first, in processing step S21, the power for one day of the day consumed by the load L of its own power subsystem 3A is predicted.

処理ステップS22では、共有データエリアD1にアクセスして、サブデータエリアD1A〜D1Fの情報から、各電力サブシステム3が申告している電力予測値(D1A5〜D1F5)を読み込み、これを合計する。この場合に自己の電力予測値は処理ステップS21で求めた最新値である。   In the processing step S22, the shared data area D1 is accessed, and the predicted power values (D1A5 to D1F5) declared by the respective power subsystems 3 are read from the information of the sub data areas D1A to D1F and summed up. In this case, the predicted power value is the latest value obtained in the processing step S21.

処理ステップS23では、処理ステップS22で求めた最新の電力予測値と、共有データエリアD1に記述されている電力予測値とを比較する。なお共有データエリアD1に記述されている電力予測値は、自己の最新の電力予測値を反映していない。   In the processing step S23, the latest predicted power value obtained in the processing step S22 is compared with the predicted power value described in the shared data area D1. Note that the predicted power value described in the shared data area D1 does not reflect its latest predicted power value.

処理ステップS24では、比較結果に基づき全体の電力予測値を補正する。以上の処理は、データフィールド1に接続された全ての電力管理装置2A〜2Fで実行されており、電力予測値と全体電力予測値が最新値に更新されている。このようにして、各電力管理装置2A〜2Fは、電力予測値について自己の状況と共に、全体状況を把握している。   In process step S24, the whole electric power prediction value is correct | amended based on a comparison result. The above processing is executed in all the power management apparatuses 2A to 2F connected to the data field 1, and the power predicted value and the overall power predicted value are updated to the latest value. In this way, each of the power management apparatuses 2A to 2F grasps the overall status of the predicted power value together with its own status.

また一日分充放電計画D1A7について、図6の処理を行う。電力管理装置2Aでは、共有データエリアD1にアクセスして、サブデータエリアD1A〜D1Fの情報を入手している。この状態において処理ステップS30では、サブデータエリアD1A〜D1Fから、各電力サブシステム3が申告している目標電力(D1A6〜D1F6)と蓄電池容量(D1A2〜D1F2)を読み込む。   Moreover, the process of FIG. 6 is performed about the charge / discharge plan D1A7 for one day. The power management apparatus 2A accesses the shared data area D1 and obtains information on the sub data areas D1A to D1F. In this state, in processing step S30, the target power (D1A6 to D1F6) and the storage battery capacity (D1A2 to D1F2) reported by each power subsystem 3 are read from the sub data areas D1A to D1F.

同様に処理ステップS31では、一日分電力予測(D1A5〜D1F5)を読み込む。   Similarly, in the processing step S31, the daily power prediction (D1A5 to D1F5) is read.

処理ステップS32では、蓄電設備Cを有する電力サブシステム3ごとに、充放電計画を立案する。このために目標電力(D1A6〜D1F6)と蓄電池容量(D1A2〜D1F2)と一日分電力予測(D1A5〜D1F5)が参照される。   In process step S32, a charge / discharge plan is drawn up for each power subsystem 3 having the power storage facility C. For this purpose, reference is made to the target power (D1A6 to D1F6), the storage battery capacity (D1A2 to D1F2), and the daily power prediction (D1A5 to D1F5).

処理ステップS33では、自己の最新の充放電計画を反映した全体計画を自己の一日分充放電計画D1A7に記述し出力する。   In the processing step S33, the entire plan reflecting the latest charge / discharge plan is described and output in the charge / discharge plan D1A7 for one day.

以上の処理により、データフィールド1を介して運用される電力サブシステム3の全体としての電力の過不足を吸収する形での、一日分充放電計画D1A7が得られる。この一日分充放電計画D1A7の更新により得られた結果が、依然として電力の過不足を生じるものである場合には、再度にわたり変更修正されることでよりよい電力供給の体制にできる。   Through the above processing, the daily charge / discharge plan D1A7 is obtained in such a manner as to absorb the excess or deficiency of the power as a whole of the power subsystem 3 operated via the data field 1. If the result obtained by updating the one-day charge / discharge plan D1A7 still causes an excess or deficiency of power, it can be changed and corrected again to make a better power supply system.

以上の処理は、データフィールド1に接続された全ての蓄電設備Cを有する電力管理装置2で実行されており、一日分充放電計画D1A7が最新値に更新されている。このようにして、各電力管理装置2A〜2Fは、一日分充放電計画D1A7について自己の状況と共に、全体状況を把握している。また、この結果が各電力管理装置2での電力制御に反映される。   The above processing is executed by the power management apparatus 2 having all the power storage facilities C connected to the data field 1, and the daily charge / discharge plan D1A7 is updated to the latest value. Thus, each power management apparatus 2A-2F grasps | ascertains the whole condition with its own condition about the charge / discharge plan D1A7 for one day. Further, this result is reflected in the power control in each power management apparatus 2.

図7は、各種の状態変化に対応して適切な電力制御を行うための本発明に係る電力制御処理フローを示している。この制御は、データフィールド1から得られたデータを元に、各電力管理装置2の自立的判断により実行される。   FIG. 7 shows a power control processing flow according to the present invention for performing appropriate power control corresponding to various state changes. This control is executed based on the data obtained from the data field 1 by the independent judgment of each power management apparatus 2.

処理ステップS40では、各電力管理装置2は点検、監視手法を用いて自己の電力管理装置の故障判定を実行する。仮に自己の電力管理装置2Aが故障と判定された場合には、自己が共有データエリアD1に申告している各種合計計算への出力を停止する。   In process step S40, each power management apparatus 2 performs a failure determination of its own power management apparatus using an inspection and monitoring method. If it is determined that the own power management device 2A is out of order, the output to various total calculations that the self-reported to the shared data area D1 is stopped.

具体的には、蓄電池残量D1A3、一日分電力予測D1A5、一日分充放電計画D1A7の各フレームに、自己データを出力することを停止する。この場合、他の電力管理装置2B〜2Fは、これら所量がゼロに変化したことに伴う新たな蓄電池残量、一日分電力予測、一日分充放電計画の合計値に基づいて図4から図6の処理を実行する。これにより新たな運転状態に速やかに移行することができる。   Specifically, the output of the self-data is stopped in each frame of the remaining battery level D1A3, the daily power prediction D1A5, and the daily charge / discharge plan D1A7. In this case, the other power management apparatuses 2B to 2F are based on the total values of the new remaining battery capacity, the daily power prediction, and the daily charge / discharge plan when these quantities change to zero. 6 is executed. Thereby, it can transfer to a new driving | running state rapidly.

なお、電力管理装置2Aの故障により電力サブシステム3Aは商用系統あるいは引き込み母線B1との接続を解列するので、以後の他の電力管理装置2B〜2Fの運用に悪影響を及ぼすことはない。   In addition, since the power subsystem 3A disconnects the connection with the commercial system or the lead-in bus B1 due to the failure of the power management apparatus 2A, the subsequent operations of the other power management apparatuses 2B to 2F are not adversely affected.

故障でない場合には処理ステップS42で通常の処理(図4から図6の合計計算を求める処理)を実行する。   If it is not a failure, a normal process (a process for obtaining the total calculation in FIGS. 4 to 6) is executed in process step S42.

次に商用系統異常発生を処理ステップS43で判断し、異常発生の場合は処理ステップS44を実行し、異常がなければ処理ステップS45で引き続き通常の処理(図4から図6の合計計算を求める処理)を実行する。   Next, the occurrence of an abnormality in the commercial system is determined in processing step S43. If an abnormality has occurred, processing step S44 is executed, and if there is no abnormality, normal processing (processing for obtaining the total calculation in FIGS. 4 to 6) continues in processing step S45. ).

ここで商用系統異常とは、電力動揺の発生、周波数不安定、電圧変動などであり、いずれの場合にも商用系統から安定な電力供給を受けられない状態になっている。このため、商用系統に連系した各電力管理装置2は、異常の状態に応じて自己の目標電力(D1A6〜D1F6)を変更し、あるいは負荷制限可能量(D1A4〜D1F4)を変更する。そのうえで共有データエリアD1に設定された自己エリアに自己の状態(目標電力あるいは負荷制限可能量)を記述して送出する。なおこの場合の変更内容が、電力系統の需給バランスを改善する方向の処理であることは言うまでもない。   Here, the commercial system abnormality is occurrence of power fluctuation, frequency instability, voltage fluctuation, and the like, and in any case, a stable power supply cannot be received from the commercial system. For this reason, each power management apparatus 2 linked to the commercial system changes its own target power (D1A6 to D1F6) or changes the load limitable amount (D1A4 to D1F4) according to the abnormal state. After that, the self state (target power or load limitable amount) is described and transmitted in the self area set in the shared data area D1. In addition, it cannot be overemphasized that the change content in this case is the process of the direction which improves the supply-and-demand balance of an electric power grid | system.

次に、電力サブシステム3が商用系統から解列されたことを処理ステップS46で判断する。解列の場合は処理ステップS47を実行し、解列がなければ処理ステップS49で引き続き通常の処理(図4から図6の合計計算を求める処理)を実行する。   Next, it is determined in processing step S46 that the power subsystem 3 has been disconnected from the commercial system. If it is a sequence, processing step S47 is executed. If there is no sequence, normal processing (processing for obtaining the total calculation in FIGS. 4 to 6) is continued in processing step S49.

解列となった場合各電力サブシステム3は、独立して電力供給可能な自立電源
(太陽光発電などの発電設備G1および蓄電設備C1、C2)の供給可能電力の範囲まで、目標電力あるいは負荷制限可能量を変更する。これらの制限操作は、電力サブシステム3ごとに実行されるが、この結果は電力管理装置2を介してデータ共有がされている。
In the case of disconnection, each power subsystem 3 has the target power or load up to the range of power that can be supplied by independent power sources (power generation equipment G1 such as solar power generation and power storage equipment C1 and C2) that can supply power independently. Change the limit amount. These limiting operations are executed for each power subsystem 3, and the result is data sharing via the power management apparatus 2.

処理ステップS48では、共有化データによる自立運転が実行される。この解列後の安定運転状態においては、電力に余裕のある電力サブシステム3から余裕のない電力サブシステム3に対する電力供給が可能である。このことは、図4から図6の処理により実現される。   In process step S48, the independent operation by shared data is performed. In the stable operation state after the disconnection, power can be supplied from the power subsystem 3 having sufficient power to the power subsystem 3 having no margin. This is realized by the processing shown in FIGS.

なお電力サブシステム3は、解列後の安定運転のために非常用電源を備える場合がある。図8は非常用電源を備えて、解列後に立ち上げた電力サブシステム3における一日分充放電計画処理を示している。この図8は、図6に対応しているので比較しながら説明する。   The power subsystem 3 may be provided with an emergency power supply for stable operation after disconnection. FIG. 8 shows a one-day charge / discharge plan process in the power subsystem 3 provided with an emergency power supply and started up after disconnection. FIG. 8 corresponds to FIG. 6 and will be described with comparison.

ここでも前提としては、電力管理装置2Aでは、共有データエリアD1にアクセスして、サブデータエリアD1A〜D1Fの情報を入手している。この状態において処理ステップS30では、サブデータエリアD1A〜D1Fから、各電力サブシステム3が申告している目標電力(D1A6〜D1F6)と蓄電池容量(D1A2〜D1F2)を読み込む。   As a premise here, the power management apparatus 2A accesses the shared data area D1 and obtains information on the sub data areas D1A to D1F. In this state, in processing step S30, the target power (D1A6 to D1F6) and the storage battery capacity (D1A2 to D1F2) reported by each power subsystem 3 are read from the sub data areas D1A to D1F.

処理ステップS31aでは、一日分電力予測(D1A5〜D1F5)を読み込む。また新たに非常用電源の出力を取り込み、以後の計算に利用する。   In the processing step S31a, the daily power prediction (D1A5 to D1F5) is read. In addition, the output of the emergency power supply is newly taken in and used for the subsequent calculations.

処理ステップS32aでは、蓄電設備Cを有する電力サブシステム3ごとに、充放電計画を立案する。この場合に、蓄電設備Cを有する電力サブシステム3として非常用電源を有する電力サブシステム3も勘案される。この処理のために目標電力(D1A6〜D1F6)と蓄電池容量(D1A2〜D1F2)と一日分電力予測(D1A5〜D1F5)の他に、非常用電源からの供給電力が加味される。   In the processing step S32a, a charge / discharge plan is drawn up for each power subsystem 3 having the power storage facility C. In this case, the power subsystem 3 having an emergency power source is also taken into consideration as the power subsystem 3 having the power storage facility C. For this process, in addition to the target power (D1A6 to D1F6), the storage battery capacity (D1A2 to D1F2), and the daily power prediction (D1A5 to D1F5), the power supplied from the emergency power supply is taken into account.

処理ステップS33では、自己の最新の充放電計画を反映した全体計画を自己の一日分充放電計画D1A7に記述し出力する。これにより、電力供給能力に非常用電源からの供給電力が加味され低後の全体管理に反映される。   In the processing step S33, the entire plan reflecting the latest charge / discharge plan is described and output in the charge / discharge plan D1A7 for one day. As a result, the power supplied from the emergency power supply is added to the power supply capacity, and this is reflected in the overall management after low power.

図9は、エネルギー分散型管理システムを、太陽光発電のような分散電源を有する工場に適用した場合の動作例を示した図である。図4では、横軸に時間、縦軸に発電出力を示している。この図では、分散電源出力(太陽光発電と蓄電池)と非常用電源出力により場内負荷が必要とする電力需要を賄っているものとする。   FIG. 9 is a diagram illustrating an operation example when the energy distributed management system is applied to a factory having a distributed power source such as solar power generation. In FIG. 4, time is plotted on the horizontal axis and power generation output is plotted on the vertical axis. In this figure, it is assumed that the power demand required by the on-site load is covered by the distributed power output (solar power generation and storage battery) and the emergency power output.

図9の上には、本発明の自律分散データフィールド1を適用していない場合を示している。従って、発生電力の合計と負荷が必要とする電力需要間の過不足量は当該工場内で需給バランスを保つ必要がある。このため、工場電力需要に対し、分散電源出力が多い昼間の時間帯は、パワーコンディショナーにより非常用電源出力の出力調整を行い、需給バランスを保つ必要がある。   FIG. 9 shows a case where the autonomous distributed data field 1 of the present invention is not applied. Accordingly, the excess and deficiency between the total generated power and the power demand required by the load needs to maintain a balance between supply and demand within the factory. For this reason, it is necessary to adjust the output of the emergency power output by the power conditioner during the daytime hours when the distributed power output is large with respect to the factory power demand to maintain a balance between supply and demand.

一方、図9の下のグラフは、本発明の自律分散データフィールド1を適用し、他の工場設備との電源融通を可能にした場合の一例を示している。この場合、分散電源出力が電力需要を超えた分に対しては、当該電力管理装置2から、蓄電可能量として共有データエリアに情報送信し、自律分散データフィールド1で、他電力サブシステムである工場に情報発信を行う。蓄電池残量と比較し、充電必要と判断された電力サブシステムに、電力を提供することで、当該工場電源出力を一定に保つことが可能となる。   On the other hand, the lower graph of FIG. 9 shows an example in which the autonomous distributed data field 1 of the present invention is applied to enable power interchange with other factory equipment. In this case, when the distributed power output exceeds the power demand, information is transmitted from the power management apparatus 2 to the shared data area as a chargeable amount, and the autonomous distributed data field 1 is another power subsystem. Disseminate information to the factory. By supplying power to the power subsystem that is determined to be charged as compared with the remaining amount of the storage battery, the factory power output can be kept constant.

次に、本発明の別の実施例である、エネルギー分散型管理システムの、外部システムとの接続手法について説明する。ここで外部システムから得る情報の処理の例としては、図5の1日分電力予測計算の処理ステップS20における、気象状況の取り込み処理がある。   Next, a connection method with an external system of an energy distributed management system which is another embodiment of the present invention will be described. Here, as an example of processing of information obtained from the external system, there is a weather condition capturing process in the processing step S20 of the daily power prediction calculation of FIG.

図10は、従来の外部システムとの接続手法の一例を示す図である。従来例では例えば気象情報提供システム19と、電力管理装置2との間をインターネット接続する。なお、18は気象情報を使用するアプリケーション(例えば1日分電力予測計算プログラム)である。しかるにこの構成では、気象情報提供システム19と各電力管理装置2は各々接続する必要があり、コストがかかる可能性がある。   FIG. 10 is a diagram illustrating an example of a connection method with a conventional external system. In the conventional example, for example, the weather information providing system 19 and the power management apparatus 2 are connected to the Internet. Reference numeral 18 denotes an application (for example, a daily power prediction calculation program) that uses weather information. However, in this configuration, the weather information providing system 19 and each power management apparatus 2 need to be connected to each other, which may be costly.

図11は、本発明による外部システムとの接続手法の一例を示す図である。この場合のエネルギー分散型管理システムでは、自律分散データフィールド1には、気象情報提供システム19の情報DAを含む共有データフレームD1が流通し、各電力管理装置2は各々これを受信して電力需要予測に用いる。   FIG. 11 is a diagram showing an example of a connection method with an external system according to the present invention. In the energy distributed management system in this case, the shared data frame D1 including the information DA of the weather information providing system 19 circulates in the autonomous distributed data field 1, and each power management device 2 receives this and receives the power demand. Used for prediction.

但し、電力管理装置2の中には電力需要予測機能を有しない電力管理装置2がある。このようなケースでは前記共有データエリアが照合できないため、実質的に自律分散データフィールド1に接続できない。   However, the power management apparatus 2 includes a power management apparatus 2 that does not have a power demand prediction function. In such a case, since the shared data area cannot be collated, the autonomous distributed data field 1 cannot be substantially connected.

本発明では係る電力管理装置2(例えば2F)について、ゲートウェイ161を介して自律分散データフィールド1に接続する。これにより自律分散データフィールド1と共有データエリアD1との整合性をもつことで、電力管理装置2Fの接続を可能としている。   In the present invention, the power management apparatus 2 (for example, 2F) is connected to the autonomous distributed data field 1 via the gateway 161. Thus, the power management apparatus 2F can be connected by having the consistency between the autonomous distributed data field 1 and the shared data area D1.

図12は、図11における電力管理装置2Fの詳細を説明する図である。ここで、電力管理装置2は、さらにエネルギー管理サブシステム17Aとエネルギー管理サブシステム17Bを内包するものとし、いずれか一方は、電力需要予測機能をもたない。そのため、従来の方法では、自律分散データフィールド1に接続することはできないが、図12の共通サーバー171を経由することで、気象情報の受信を含めて、間接的に自律分散データフィールドに接続することができる。   FIG. 12 is a diagram for explaining the details of the power management apparatus 2F in FIG. Here, the power management apparatus 2 further includes an energy management subsystem 17A and an energy management subsystem 17B, and either one does not have a power demand prediction function. Therefore, the conventional method cannot connect to the autonomous distributed data field 1, but indirectly connects to the autonomous distributed data field including reception of weather information via the common server 171 in FIG. be able to.

ここで、データDAは、電力管理装置2Fの共通サーバー171がインターネットを経由して気象情報提供システム19から入手する気象情報である。
データDAは、電力管理装置2F内の2つのエネルギー管理サブシステム17Aと17Bに送出される。2つのエネルギー管理サブシステム17Aと17Bからは共有データエリアに提供すべきデータD1Fが共通サーバー171経由で気象情報を使用するアプリケーション18に送られる。
Here, the data DA is weather information that the common server 171 of the power management apparatus 2F obtains from the weather information providing system 19 via the Internet.
The data DA is sent to the two energy management subsystems 17A and 17B in the power management apparatus 2F. Data D1F to be provided to the shared data area is sent from the two energy management subsystems 17A and 17B to the application 18 using the weather information via the common server 171.

以上により、エネルギー分散型管理システムにより、通常時と災害時のような外部環境の変化に適応して電力供給機能を確保することができ、工場の生産のような企業活動が継続できる。   As described above, the energy distributed management system can secure the power supply function in accordance with changes in the external environment such as during normal times and disasters, and business activities such as factory production can be continued.

また、商用系統が停電した場合でも、自立運転可能な電源を有する電力サブシステムと他の電力サブシステムが、協調して電力融通をすることで、広域での電力供給、および生産活動が可能となる。その結果として、工場、地域双方での復旧が進むこととなる。   In addition, even in the event of a power failure in a commercial system, a power subsystem that has a power supply that can operate independently and other power subsystems can coordinate power interchange, enabling power supply and production activities in a wide area. Become. As a result, restoration in both the factory and the region will proceed.

1:データフィールド
2:電力管理装置
3:電力管理対象(電力サブシステム)
B1:引き込み母線
B2:工場内母線
C:蓄電設備
CB:遮断器
D:情報フレーム
D1:共有データエリア
G:発電設備
L:負荷
T:変圧器
W:送受電電力量計
1: Data field 2: Power management device 3: Power management target (power subsystem)
B1: Pull-in bus B2: Factory bus C: Power storage facility CB: Circuit breaker D: Information frame D1: Shared data area G: Power generation facility L: Load T: Transformer W: Transmission / reception watt-hour meter

Claims (7)

商用系統に接続された複数の電力サブシステムと、該電力サブシステムごとに設けられその電力を制御する電力管理装置と、該電力管理装置間に配置されたデータフィールドとを備え、
前記複数の電力サブシステムの少なくとも一部には前記商用系統から独立して電力供給可能な自立電源を含み、
前記データフィールドに流通する情報フレームの一部には、共有データエリアが設定されており、該共有データエリアは前記電力管理装置を単位とする同一形式の自己エリアで構成されており、
前記電力管理装置は、前記共有データエリアを構成する複数の同一形式の自己エリアに記述されたデータの読み出しを行い、自己が管理する電力サブシステムの電力のデータを自己に割り当てられた前記共有データエリアの自己エリアに記述し、前記データフィールドから得られた複数の他の電力管理装置のデータと自己が管理する電力サブシステムの電力のデータから前記複数の電力サブシステム全体の電力状況を求めて自己の電力サブシステムを管理することを特徴とする分散型電力管理システム。
A plurality of power subsystems connected to a commercial system, a power management device provided for each power subsystem for controlling the power, and a data field disposed between the power management devices,
At least a part of the plurality of power subsystems includes an independent power source that can supply power independently from the commercial system,
A shared data area is set in a part of the information frame distributed in the data field, and the shared data area is configured by a self-area of the same format in units of the power management device,
The power management apparatus reads the data described in a plurality of self-areas of the same format constituting the shared data area, and the shared data assigned to the power data of the power subsystem managed by the power management apparatus Describe the power status of the plurality of power subsystems from the data of a plurality of other power management devices obtained from the data field and the power data of the power subsystem managed by the self. A distributed power management system characterized by managing its own power subsystem.
請求項1に記載の分散型電力管理システムにおいて、
前記商用系統から独立して電力供給可能な自立電源として、太陽光発電設備あるいは蓄電設備が配置されていることを特徴とする分散型電力管理システム。
The distributed power management system according to claim 1,
A distributed power management system, wherein a photovoltaic power generation facility or a power storage facility is arranged as a self-sustained power source capable of supplying power independently from the commercial system.
請求項1に記載の分散型電力管理システムにおいて、
前記共有データエリアに記述されるデータには、前記自立電源の発電容量、電力予測情報、前記自立電源の運用計画の情報を含むことを特徴とする分散型電力管理システム。
The distributed power management system according to claim 1,
The distributed power management system characterized in that the data described in the shared data area includes the power generation capacity of the independent power source, power prediction information, and information on the operation plan of the independent power source.
請求項3に記載の分散型電力管理システムにおいて、
前記共有データエリアに記述された前記自立電源の発電容量、電力予測情報、前記自立電源の運用計画の情報は、自己の電力サブシステムでの情報と、それぞれの合計値の情報を含むことを特徴とする分散型電力管理システム。
The distributed power management system according to claim 3,
The power generation capacity of the independent power source, the power prediction information, and the information on the operation plan of the independent power source described in the shared data area include information on its own power subsystem and information on the total value of each. Distributed power management system.
請求項4に記載の分散型電力管理システムにおいて、
前記自立電源が蓄電設備である場合に、この電力管理装置が該当する共有データエリアの自己エリアに記述する前記自立電源の発電容量は蓄電設備の残量であり、前記自立電源の運用計画は蓄電設備の状放電計画であることを特徴とする分散型電力管理システム。
The distributed power management system according to claim 4,
When the self-sustained power source is a power storage facility, the power generation capacity of the self-sustained power source described in the self-area of the corresponding shared data area by the power management device is the remaining capacity of the power storage facility, and the operation plan of the self-sustained power source is A distributed power management system characterized in that it is a facility-like discharge plan.
請求項1に記載の分散型電力管理システムにおいて、
前記電力管理装置は、前記共有データエリアの自己エリアに目標電力と負荷制限可能量の情報を記述しており、前記商用系統の異常並びに商用系統からの解列を監視しており、前記商用系統の異常あるいは商用系統からの解列を検出したときに目標電力と負荷制限可能量を変更して運転継続することを特徴とする分散型電力管理システム。
The distributed power management system according to claim 1,
The power management apparatus describes target power and load limitable amount information in its own area of the shared data area, monitors abnormalities in the commercial system and disconnection from the commercial system, and A distributed power management system characterized by changing the target power and the load limitable amount when a malfunction or disconnection from a commercial system is detected.
請求項1に記載の分散型電力管理システムにおいて、
前記電力管理装置は、電力管理装置自身の異常を監視しており、自己の異常検知により前記共有データエリアの自己エリアに記述する情報のうち合計計算に使用される情報を出力しないことを特徴とする分散型電力管理システム。
The distributed power management system according to claim 1,
The power management device monitors an abnormality of the power management device itself, and does not output information used for total calculation among information described in the self area of the shared data area by detecting its own abnormality. Distributed power management system.
JP2012014774A 2012-01-27 2012-01-27 Distributed power management system Expired - Fee Related JP5797122B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2012014774A JP5797122B2 (en) 2012-01-27 2012-01-27 Distributed power management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2012014774A JP5797122B2 (en) 2012-01-27 2012-01-27 Distributed power management system

Publications (2)

Publication Number Publication Date
JP2013158081A true JP2013158081A (en) 2013-08-15
JP5797122B2 JP5797122B2 (en) 2015-10-21

Family

ID=49052780

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012014774A Expired - Fee Related JP5797122B2 (en) 2012-01-27 2012-01-27 Distributed power management system

Country Status (1)

Country Link
JP (1) JP5797122B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104682378A (en) * 2013-11-29 2015-06-03 华为技术有限公司 Microgrid system
WO2015079832A1 (en) * 2013-11-28 2015-06-04 ソフトバンクテレコム株式会社 Management device, management system, and program
JP5753307B1 (en) * 2014-10-20 2015-07-22 ソフトバンクテレコム株式会社 Management device, management system, program, and management method
US10404063B2 (en) 2014-11-25 2019-09-03 Electronics And Telecommunications Research Institute Probabilistic model-based virtual distributed resource management system and method thereof
US10567501B2 (en) 2016-03-29 2020-02-18 Lsis Co., Ltd. Energy management server, energy management system and the method for operating the same

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56116145A (en) * 1980-02-15 1981-09-11 Nec Corp Memory system of loop transmission
JP2006174540A (en) * 2004-12-13 2006-06-29 Takenaka Komuten Co Ltd Autonomous distributed control type electric storage system
WO2008117392A1 (en) * 2007-03-26 2008-10-02 Vpec, Inc. Power system
JP2011101534A (en) * 2009-11-06 2011-05-19 Panasonic Electric Works Co Ltd Electric power interchange system
JP2011167048A (en) * 2010-02-15 2011-08-25 Toshiba Corp Power control system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56116145A (en) * 1980-02-15 1981-09-11 Nec Corp Memory system of loop transmission
JP2006174540A (en) * 2004-12-13 2006-06-29 Takenaka Komuten Co Ltd Autonomous distributed control type electric storage system
WO2008117392A1 (en) * 2007-03-26 2008-10-02 Vpec, Inc. Power system
JP2011101534A (en) * 2009-11-06 2011-05-19 Panasonic Electric Works Co Ltd Electric power interchange system
JP2011167048A (en) * 2010-02-15 2011-08-25 Toshiba Corp Power control system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
笠嶋 広和: "電力情報制御システムにおける高度化対応技術", 日立評論, vol. 第78巻第2号, JPN6015022288, 1 February 1996 (1996-02-01), pages 9 - 14, ISSN: 0003127692 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015079832A1 (en) * 2013-11-28 2015-06-04 ソフトバンクテレコム株式会社 Management device, management system, and program
CN104682378A (en) * 2013-11-29 2015-06-03 华为技术有限公司 Microgrid system
CN104682378B (en) * 2013-11-29 2017-08-18 华为技术有限公司 A kind of micro-grid system
JP5753307B1 (en) * 2014-10-20 2015-07-22 ソフトバンクテレコム株式会社 Management device, management system, program, and management method
US10404063B2 (en) 2014-11-25 2019-09-03 Electronics And Telecommunications Research Institute Probabilistic model-based virtual distributed resource management system and method thereof
US10567501B2 (en) 2016-03-29 2020-02-18 Lsis Co., Ltd. Energy management server, energy management system and the method for operating the same

Also Published As

Publication number Publication date
JP5797122B2 (en) 2015-10-21

Similar Documents

Publication Publication Date Title
US9671807B2 (en) Power grid stabilization system and power grid stabilization method
US10048666B2 (en) System and method for the distributed control and management of a microgrid
Dou et al. MAS-based distributed cooperative control for DC microgrid through switching topology communication network with time-varying delays
US20120245744A1 (en) Networked Power Management and Demand Response
JP5797122B2 (en) Distributed power management system
ES2608723T3 (en) Method and device for the space-time control of the electricity consumption of a telecommunications network depending on the state of the electricity supply system
Krishna et al. Fuzzy logic based smart home energy management system
US10482548B2 (en) Method and apparatus for performing energy management in a power supply grid
JP6693545B2 (en) Power management system, storage battery mounted device, EMS controller and power management server
JP2010279238A (en) Control system for system monitor
US20210344217A1 (en) Datacenter current injection for power management
US20210294406A1 (en) Datacenter power management using current injection
Tuckey et al. Decentralized control of a microgrid
JP2019161706A (en) Power transfer system
JP5917292B2 (en) Power management apparatus, power management system, and power management method
Elgamal et al. An adaptive multiagent control system for autonomous economic operation and resilience assurance in a hybrid-energy islanded microgrid
Saini Trends in Microgrid Technology: A Comprehensive Review.
WO2017146243A1 (en) Power management server, power management system, and power management method
de Souza et al. An offline fuzzy-based decision-making to load shedding in microgrids
Correia et al. Architecture and Control Simulation for Improved System Resiliency of a Building Microgrid
Katiraei et al. Virtual Power Plant Empowerment in the Next Generation of Data Centers: Outlining the challenges
US20240118738A1 (en) Managing power in data centers
Zhang et al. Prospects for and applications to microgrid technology
US20240154428A1 (en) Power control systems and methods including examples of autonomous control of power supplied from multiple sources
WO2021145018A1 (en) Server device, power conversion device, power grid system, and power conversion device management method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20140808

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20150525

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150609

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150707

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20150804

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20150818

R150 Certificate of patent or registration of utility model

Ref document number: 5797122

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees