JP2013106507A5 - - Google Patents

Download PDF

Info

Publication number
JP2013106507A5
JP2013106507A5 JP2011251243A JP2011251243A JP2013106507A5 JP 2013106507 A5 JP2013106507 A5 JP 2013106507A5 JP 2011251243 A JP2011251243 A JP 2011251243A JP 2011251243 A JP2011251243 A JP 2011251243A JP 2013106507 A5 JP2013106507 A5 JP 2013106507A5
Authority
JP
Japan
Prior art keywords
power
unit
input
power demand
consumer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2011251243A
Other languages
English (en)
Japanese (ja)
Other versions
JP6019566B2 (ja
JP2013106507A (ja
Filing date
Publication date
Application filed filed Critical
Priority to JP2011251243A priority Critical patent/JP6019566B2/ja
Priority claimed from JP2011251243A external-priority patent/JP6019566B2/ja
Priority to US13/668,891 priority patent/US9588145B2/en
Priority to CN2012104460999A priority patent/CN103123696A/zh
Publication of JP2013106507A publication Critical patent/JP2013106507A/ja
Publication of JP2013106507A5 publication Critical patent/JP2013106507A5/ja
Application granted granted Critical
Publication of JP6019566B2 publication Critical patent/JP6019566B2/ja
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

JP2011251243A 2011-11-17 2011-11-17 電力管理装置および電力管理方法 Active JP6019566B2 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP2011251243A JP6019566B2 (ja) 2011-11-17 2011-11-17 電力管理装置および電力管理方法
US13/668,891 US9588145B2 (en) 2011-11-17 2012-11-05 Electric power management apparatus and electric power management method
CN2012104460999A CN103123696A (zh) 2011-11-17 2012-11-08 电力管理设备和电力管理方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011251243A JP6019566B2 (ja) 2011-11-17 2011-11-17 電力管理装置および電力管理方法

Publications (3)

Publication Number Publication Date
JP2013106507A JP2013106507A (ja) 2013-05-30
JP2013106507A5 true JP2013106507A5 (https=) 2014-12-04
JP6019566B2 JP6019566B2 (ja) 2016-11-02

Family

ID=48426161

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011251243A Active JP6019566B2 (ja) 2011-11-17 2011-11-17 電力管理装置および電力管理方法

Country Status (3)

Country Link
US (1) US9588145B2 (https=)
JP (1) JP6019566B2 (https=)
CN (1) CN103123696A (https=)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9152203B2 (en) 2012-05-31 2015-10-06 At&T Intellectual Property I, Lp Managing power consumption state of electronic devices responsive to predicting future demand
WO2015064267A1 (ja) * 2013-10-31 2015-05-07 日本電気株式会社 情報処理装置、電力需要体、情報処理方法、及びプログラム
WO2016185553A1 (ja) * 2015-05-19 2016-11-24 中国電力株式会社 電気利用契約支援システム、及び電気利用契約支援方法
JP6490234B2 (ja) * 2015-11-27 2019-03-27 三菱電機株式会社 情報収集ユニット、情報処理方法およびプログラム
JP6090499B1 (ja) * 2016-03-31 2017-03-08 中国電力株式会社 電力需要家向けポイントシステム
AU2017253053B2 (en) * 2016-04-22 2021-07-08 Sumitomo Electric Industries, Ltd. Demand monitoring device, demand monitoring method, and demand monitoring program
CN108573545B (zh) * 2018-04-24 2019-10-08 中南大学 一种冰雪环境无人驾驶车辆电源模型预测方法与系统
US11502516B2 (en) * 2019-05-22 2022-11-15 Siemens Ltd., China Power management method and apparatus, computing device, medium, and product
CN113853623A (zh) * 2019-05-29 2021-12-28 西门子股份公司 电力负荷的预测方法、装置及存储介质
EP3979154B1 (en) * 2020-10-05 2026-04-01 ABB Schweiz AG Method for evaluating an energy efficiency of a site
JP7718347B2 (ja) * 2022-08-01 2025-08-05 トヨタ自動車株式会社 サービス適正化システム、サービス適正化方法、及びプログラム

Family Cites Families (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0518995A (ja) * 1991-07-15 1993-01-26 Tokyo Electric Power Co Inc:The 電力総需要量予測装置
EP1018022A4 (en) * 1996-10-22 2000-12-06 Abb Power T & D Co ENERGY MEASURING DEVICE COMPRISING DIAGNOSTIC AND ENERGY QUALITY CONTROL SYSTEMS
JP3641918B2 (ja) * 1997-10-09 2005-04-27 富士電機システムズ株式会社 電力需要量予測値補正方法
US6987955B1 (en) * 2001-04-27 2006-01-17 Bandspeed, Inc. Approach for managing power for communications channels based on performance
US7221712B1 (en) * 2001-12-12 2007-05-22 Cisco Technology, Inc. Methods and apparatus for determining transmission power levels
EP1441430B1 (en) * 2003-01-21 2015-05-06 Whirlpool Corporation A process for managing and curtailing power demand of appliances and components thereof, and system using such process
JP3994910B2 (ja) * 2003-05-08 2007-10-24 株式会社日立製作所 電力売買支援システム
JP2005070959A (ja) * 2003-08-21 2005-03-17 Hitachi Ltd 電力需要情報処理システム
JP2006174654A (ja) * 2004-12-17 2006-06-29 Nippon Telegr & Teleph Corp <Ntt> 分散型エネルギー需給制御方法および設定装置
CN1815497A (zh) * 2005-01-31 2006-08-09 宝山钢铁股份有限公司 钢铁企业日用电量预测方法
JP4021471B2 (ja) * 2005-02-08 2007-12-12 和夫 三輪 建物のエネルギー管理システム
US20110172792A1 (en) * 2008-06-10 2011-07-14 Kiyotoshi Shinohara Energy management system and computer program product
JP5330812B2 (ja) * 2008-11-20 2013-10-30 トヨタ自動車株式会社 ハイブリッド車両
KR20110009072A (ko) * 2009-05-20 2011-01-27 미츠비시 쥬고교 가부시키가이샤 풍력 발전 장치 및 그 제어 방법
US8190939B2 (en) * 2009-06-26 2012-05-29 Microsoft Corporation Reducing power consumption of computing devices by forecasting computing performance needs
JP2011055643A (ja) * 2009-09-02 2011-03-17 Michinori Kawasaki 電力供給システム
US20110055036A1 (en) * 2009-09-03 2011-03-03 Meishar Immediate Community Methods and systems for managing electricity delivery and commerce
US8508185B2 (en) * 2009-11-23 2013-08-13 International Business Machines Corporation Charging management method and system
CN105976258B (zh) * 2010-04-08 2019-12-10 能源管理公司 能量节约计量系统和方法
TW201223423A (en) * 2010-11-23 2012-06-01 Inventec Corp Heat dissipating device and method thereof
US20120330472A1 (en) * 2011-06-21 2012-12-27 General Electric Company Power consumption prediction systems and methods

Similar Documents

Publication Publication Date Title
JP2013106507A5 (https=)
JP2013102637A5 (https=)
Galvão Changes in predictive ability with mixed frequency data
WO2010120606A3 (en) System and method of monitoring and optimizing power quality in a network
Soni et al. Joint pricing and replenishment policies for non-instantaneous deteriorating items with imprecise deterioration free time and credibility constraint
CA2873414A1 (en) Delivery date determination system and delivery date determination method
WO2013106044A3 (en) Techniques for utilizing energy usage information
PH12013501615A1 (en) Energy consumption monitoring system, method, and computer program
WO2011100255A3 (en) Systems and methods for measuring and verifying energy savings in buildings
MX393288B (es) Sistemas de monitoreo de estado y pronostico de disyuntores.
GB2508124A (en) Methods and systems to determine a context of a device
MX2013013866A (es) Sistema y metodo para prueba y optimizacion de precios.
JP2014516446A5 (https=)
JP2014180130A5 (https=)
WO2014059191A3 (en) Productivity assessment and rewards systems and processes therefor
WO2012102855A3 (en) Utility electric meter web server
EP2671178A2 (en) Systems and methods for improving the accuracy of appliance level disaggregation in non-intrusive appliance load monitoring techniques
IN2014CN01565A (https=)
JP2013539337A5 (https=)
EP2669757A3 (en) Process monitoring system, device and method
Liu et al. Deterministic approach to the fairest revenue-sharing coefficient in logistics service supply chain under the stochastic demand condition
JP2018081100A5 (https=)
Zarandi et al. A type-2 fuzzy system model for reducing bullwhip effects in supply chains and its application in steel manufacturing
GB201210759D0 (en) System and method for implementing congestion pricing in a power distribution network
Le et al. The role of trading volume in volatility forecasting