JP2013106507A5 - - Google Patents
Download PDFInfo
- Publication number
- JP2013106507A5 JP2013106507A5 JP2011251243A JP2011251243A JP2013106507A5 JP 2013106507 A5 JP2013106507 A5 JP 2013106507A5 JP 2011251243 A JP2011251243 A JP 2011251243A JP 2011251243 A JP2011251243 A JP 2011251243A JP 2013106507 A5 JP2013106507 A5 JP 2013106507A5
- Authority
- JP
- Japan
- Prior art keywords
- power
- unit
- input
- power demand
- consumer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000007726 management method Methods 0.000 claims 10
- 230000005611 electricity Effects 0.000 claims 1
- 238000005259 measurement Methods 0.000 claims 1
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2011251243A JP6019566B2 (ja) | 2011-11-17 | 2011-11-17 | 電力管理装置および電力管理方法 |
| US13/668,891 US9588145B2 (en) | 2011-11-17 | 2012-11-05 | Electric power management apparatus and electric power management method |
| CN2012104460999A CN103123696A (zh) | 2011-11-17 | 2012-11-08 | 电力管理设备和电力管理方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2011251243A JP6019566B2 (ja) | 2011-11-17 | 2011-11-17 | 電力管理装置および電力管理方法 |
Publications (3)
| Publication Number | Publication Date |
|---|---|
| JP2013106507A JP2013106507A (ja) | 2013-05-30 |
| JP2013106507A5 true JP2013106507A5 (enExample) | 2014-12-04 |
| JP6019566B2 JP6019566B2 (ja) | 2016-11-02 |
Family
ID=48426161
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2011251243A Active JP6019566B2 (ja) | 2011-11-17 | 2011-11-17 | 電力管理装置および電力管理方法 |
Country Status (3)
| Country | Link |
|---|---|
| US (1) | US9588145B2 (enExample) |
| JP (1) | JP6019566B2 (enExample) |
| CN (1) | CN103123696A (enExample) |
Families Citing this family (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9152203B2 (en) * | 2012-05-31 | 2015-10-06 | At&T Intellectual Property I, Lp | Managing power consumption state of electronic devices responsive to predicting future demand |
| WO2015064267A1 (ja) | 2013-10-31 | 2015-05-07 | 日本電気株式会社 | 情報処理装置、電力需要体、情報処理方法、及びプログラム |
| WO2016185553A1 (ja) * | 2015-05-19 | 2016-11-24 | 中国電力株式会社 | 電気利用契約支援システム、及び電気利用契約支援方法 |
| JP6490234B2 (ja) * | 2015-11-27 | 2019-03-27 | 三菱電機株式会社 | 情報収集ユニット、情報処理方法およびプログラム |
| JP6090499B1 (ja) * | 2016-03-31 | 2017-03-08 | 中国電力株式会社 | 電力需要家向けポイントシステム |
| WO2017183337A1 (ja) * | 2016-04-22 | 2017-10-26 | 住友電気工業株式会社 | デマンド監視装置、デマンド監視システム、デマンド監視方法およびデマンド監視プログラム |
| CN108573545B (zh) * | 2018-04-24 | 2019-10-08 | 中南大学 | 一种冰雪环境无人驾驶车辆电源模型预测方法与系统 |
| CN113826294B (zh) * | 2019-05-22 | 2023-08-29 | 西门子(中国)有限公司 | 电力管理方法、装置、计算设备、介质以及产品 |
| CN113853623A (zh) * | 2019-05-29 | 2021-12-28 | 西门子股份公司 | 电力负荷的预测方法、装置及存储介质 |
| EP3979154A1 (en) * | 2020-10-05 | 2022-04-06 | ABB Schweiz AG | Method for evaluating an energy efficiency of a site |
| JP7718347B2 (ja) * | 2022-08-01 | 2025-08-05 | トヨタ自動車株式会社 | サービス適正化システム、サービス適正化方法、及びプログラム |
Family Cites Families (21)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0518995A (ja) * | 1991-07-15 | 1993-01-26 | Tokyo Electric Power Co Inc:The | 電力総需要量予測装置 |
| CN1179212C (zh) * | 1996-10-22 | 2004-12-08 | Abb公司 | 带有电源质量监视和诊断系统的电表 |
| JP3641918B2 (ja) * | 1997-10-09 | 2005-04-27 | 富士電機システムズ株式会社 | 電力需要量予測値補正方法 |
| US6987955B1 (en) * | 2001-04-27 | 2006-01-17 | Bandspeed, Inc. | Approach for managing power for communications channels based on performance |
| US7221712B1 (en) * | 2001-12-12 | 2007-05-22 | Cisco Technology, Inc. | Methods and apparatus for determining transmission power levels |
| ES2538484T3 (es) * | 2003-01-21 | 2015-06-22 | Whirlpool Corporation | Un proceso para gestionar y reducir la demanda de potencia de electrodomésticos y componentes de los mismos, y sistema que utiliza dicho proceso |
| JP3994910B2 (ja) * | 2003-05-08 | 2007-10-24 | 株式会社日立製作所 | 電力売買支援システム |
| JP2005070959A (ja) * | 2003-08-21 | 2005-03-17 | Hitachi Ltd | 電力需要情報処理システム |
| JP2006174654A (ja) * | 2004-12-17 | 2006-06-29 | Nippon Telegr & Teleph Corp <Ntt> | 分散型エネルギー需給制御方法および設定装置 |
| CN1815497A (zh) * | 2005-01-31 | 2006-08-09 | 宝山钢铁股份有限公司 | 钢铁企业日用电量预测方法 |
| US7797084B2 (en) * | 2005-02-08 | 2010-09-14 | Kazuo Miwa | Building energy management system |
| CA2729846A1 (en) * | 2008-06-10 | 2009-12-17 | Panasonic Electric Works Co., Ltd. | Energy management system and computer program product |
| JP5330812B2 (ja) * | 2008-11-20 | 2013-10-30 | トヨタ自動車株式会社 | ハイブリッド車両 |
| KR20110009072A (ko) * | 2009-05-20 | 2011-01-27 | 미츠비시 쥬고교 가부시키가이샤 | 풍력 발전 장치 및 그 제어 방법 |
| US8190939B2 (en) * | 2009-06-26 | 2012-05-29 | Microsoft Corporation | Reducing power consumption of computing devices by forecasting computing performance needs |
| JP2011055643A (ja) * | 2009-09-02 | 2011-03-17 | Michinori Kawasaki | 電力供給システム |
| EP2473958A1 (en) * | 2009-09-03 | 2012-07-11 | Essence Security International Ltd. | Methods and systems for managing electricity delivery and commerce |
| US8508185B2 (en) * | 2009-11-23 | 2013-08-13 | International Business Machines Corporation | Charging management method and system |
| WO2011127313A1 (en) * | 2010-04-08 | 2011-10-13 | Energyresource Management Corp | Energy-saving measurement, adjustment and monetization system and method |
| TW201223423A (en) * | 2010-11-23 | 2012-06-01 | Inventec Corp | Heat dissipating device and method thereof |
| US20120330472A1 (en) * | 2011-06-21 | 2012-12-27 | General Electric Company | Power consumption prediction systems and methods |
-
2011
- 2011-11-17 JP JP2011251243A patent/JP6019566B2/ja active Active
-
2012
- 2012-11-05 US US13/668,891 patent/US9588145B2/en active Active
- 2012-11-08 CN CN2012104460999A patent/CN103123696A/zh active Pending
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2013106507A5 (enExample) | ||
| JP2013102637A5 (enExample) | ||
| Galvão | Changes in predictive ability with mixed frequency data | |
| WO2013106044A3 (en) | Techniques for utilizing energy usage information | |
| CA2873414A1 (en) | Delivery date determination system and delivery date determination method | |
| PH12013501615A1 (en) | Energy consumption monitoring system, method, and computer program | |
| WO2011100255A3 (en) | Systems and methods for measuring and verifying energy savings in buildings | |
| MX393288B (es) | Sistemas de monitoreo de estado y pronostico de disyuntores. | |
| Soni et al. | Joint pricing and replenishment policies for non-instantaneous deteriorating items with imprecise deterioration free time and credibility constraint | |
| JP2014516446A5 (enExample) | ||
| WO2014059191A3 (en) | Productivity assessment and rewards systems and processes therefor | |
| IN2014CN01565A (enExample) | ||
| JP2013539337A5 (enExample) | ||
| WO2014159196A3 (en) | Predictive maintenance for medical devices | |
| EP2669757A3 (en) | Process monitoring system, device and method | |
| WO2012174348A3 (en) | Systems and methods to assess and optimize energy usage for a facility | |
| MX2015013046A (es) | Sistema y metodo de medicion a demanda de rejilla inteligente autonoma. | |
| DK2369353T3 (da) | Kontaktløs strømmåleindretning og forbrugerenergimålesystem | |
| JP2016109312A5 (enExample) | ||
| JP2011239528A5 (enExample) | ||
| GB201210759D0 (en) | System and method for implementing congestion pricing in a power distribution network | |
| GB201220521D0 (en) | Method of assessing and condition monitoring of fluid conduits and apparatus therefor | |
| WO2014057463A3 (en) | Tube monitor and process measurement and control in or for a reformer | |
| JP2015097059A5 (enExample) | ||
| GB201201593D0 (en) | Evaluating and optimizing a trajectory function |