JP2013106507A5 - - Google Patents

Download PDF

Info

Publication number
JP2013106507A5
JP2013106507A5 JP2011251243A JP2011251243A JP2013106507A5 JP 2013106507 A5 JP2013106507 A5 JP 2013106507A5 JP 2011251243 A JP2011251243 A JP 2011251243A JP 2011251243 A JP2011251243 A JP 2011251243A JP 2013106507 A5 JP2013106507 A5 JP 2013106507A5
Authority
JP
Japan
Prior art keywords
power
unit
input
power demand
consumer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2011251243A
Other languages
English (en)
Japanese (ja)
Other versions
JP6019566B2 (ja
JP2013106507A (ja
Filing date
Publication date
Application filed filed Critical
Priority to JP2011251243A priority Critical patent/JP6019566B2/ja
Priority claimed from JP2011251243A external-priority patent/JP6019566B2/ja
Priority to US13/668,891 priority patent/US9588145B2/en
Priority to CN2012104460999A priority patent/CN103123696A/zh
Publication of JP2013106507A publication Critical patent/JP2013106507A/ja
Publication of JP2013106507A5 publication Critical patent/JP2013106507A5/ja
Application granted granted Critical
Publication of JP6019566B2 publication Critical patent/JP6019566B2/ja
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

JP2011251243A 2011-11-17 2011-11-17 電力管理装置および電力管理方法 Active JP6019566B2 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP2011251243A JP6019566B2 (ja) 2011-11-17 2011-11-17 電力管理装置および電力管理方法
US13/668,891 US9588145B2 (en) 2011-11-17 2012-11-05 Electric power management apparatus and electric power management method
CN2012104460999A CN103123696A (zh) 2011-11-17 2012-11-08 电力管理设备和电力管理方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011251243A JP6019566B2 (ja) 2011-11-17 2011-11-17 電力管理装置および電力管理方法

Publications (3)

Publication Number Publication Date
JP2013106507A JP2013106507A (ja) 2013-05-30
JP2013106507A5 true JP2013106507A5 (enExample) 2014-12-04
JP6019566B2 JP6019566B2 (ja) 2016-11-02

Family

ID=48426161

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011251243A Active JP6019566B2 (ja) 2011-11-17 2011-11-17 電力管理装置および電力管理方法

Country Status (3)

Country Link
US (1) US9588145B2 (enExample)
JP (1) JP6019566B2 (enExample)
CN (1) CN103123696A (enExample)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9152203B2 (en) * 2012-05-31 2015-10-06 At&T Intellectual Property I, Lp Managing power consumption state of electronic devices responsive to predicting future demand
WO2015064267A1 (ja) 2013-10-31 2015-05-07 日本電気株式会社 情報処理装置、電力需要体、情報処理方法、及びプログラム
WO2016185553A1 (ja) * 2015-05-19 2016-11-24 中国電力株式会社 電気利用契約支援システム、及び電気利用契約支援方法
JP6490234B2 (ja) * 2015-11-27 2019-03-27 三菱電機株式会社 情報収集ユニット、情報処理方法およびプログラム
JP6090499B1 (ja) * 2016-03-31 2017-03-08 中国電力株式会社 電力需要家向けポイントシステム
WO2017183337A1 (ja) * 2016-04-22 2017-10-26 住友電気工業株式会社 デマンド監視装置、デマンド監視システム、デマンド監視方法およびデマンド監視プログラム
CN108573545B (zh) * 2018-04-24 2019-10-08 中南大学 一种冰雪环境无人驾驶车辆电源模型预测方法与系统
CN113826294B (zh) * 2019-05-22 2023-08-29 西门子(中国)有限公司 电力管理方法、装置、计算设备、介质以及产品
CN113853623A (zh) * 2019-05-29 2021-12-28 西门子股份公司 电力负荷的预测方法、装置及存储介质
EP3979154A1 (en) * 2020-10-05 2022-04-06 ABB Schweiz AG Method for evaluating an energy efficiency of a site
JP7718347B2 (ja) * 2022-08-01 2025-08-05 トヨタ自動車株式会社 サービス適正化システム、サービス適正化方法、及びプログラム

Family Cites Families (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0518995A (ja) * 1991-07-15 1993-01-26 Tokyo Electric Power Co Inc:The 電力総需要量予測装置
CN1179212C (zh) * 1996-10-22 2004-12-08 Abb公司 带有电源质量监视和诊断系统的电表
JP3641918B2 (ja) * 1997-10-09 2005-04-27 富士電機システムズ株式会社 電力需要量予測値補正方法
US6987955B1 (en) * 2001-04-27 2006-01-17 Bandspeed, Inc. Approach for managing power for communications channels based on performance
US7221712B1 (en) * 2001-12-12 2007-05-22 Cisco Technology, Inc. Methods and apparatus for determining transmission power levels
ES2538484T3 (es) * 2003-01-21 2015-06-22 Whirlpool Corporation Un proceso para gestionar y reducir la demanda de potencia de electrodomésticos y componentes de los mismos, y sistema que utiliza dicho proceso
JP3994910B2 (ja) * 2003-05-08 2007-10-24 株式会社日立製作所 電力売買支援システム
JP2005070959A (ja) * 2003-08-21 2005-03-17 Hitachi Ltd 電力需要情報処理システム
JP2006174654A (ja) * 2004-12-17 2006-06-29 Nippon Telegr & Teleph Corp <Ntt> 分散型エネルギー需給制御方法および設定装置
CN1815497A (zh) * 2005-01-31 2006-08-09 宝山钢铁股份有限公司 钢铁企业日用电量预测方法
US7797084B2 (en) * 2005-02-08 2010-09-14 Kazuo Miwa Building energy management system
CA2729846A1 (en) * 2008-06-10 2009-12-17 Panasonic Electric Works Co., Ltd. Energy management system and computer program product
JP5330812B2 (ja) * 2008-11-20 2013-10-30 トヨタ自動車株式会社 ハイブリッド車両
KR20110009072A (ko) * 2009-05-20 2011-01-27 미츠비시 쥬고교 가부시키가이샤 풍력 발전 장치 및 그 제어 방법
US8190939B2 (en) * 2009-06-26 2012-05-29 Microsoft Corporation Reducing power consumption of computing devices by forecasting computing performance needs
JP2011055643A (ja) * 2009-09-02 2011-03-17 Michinori Kawasaki 電力供給システム
EP2473958A1 (en) * 2009-09-03 2012-07-11 Essence Security International Ltd. Methods and systems for managing electricity delivery and commerce
US8508185B2 (en) * 2009-11-23 2013-08-13 International Business Machines Corporation Charging management method and system
WO2011127313A1 (en) * 2010-04-08 2011-10-13 Energyresource Management Corp Energy-saving measurement, adjustment and monetization system and method
TW201223423A (en) * 2010-11-23 2012-06-01 Inventec Corp Heat dissipating device and method thereof
US20120330472A1 (en) * 2011-06-21 2012-12-27 General Electric Company Power consumption prediction systems and methods

Similar Documents

Publication Publication Date Title
JP2013106507A5 (enExample)
JP2013102637A5 (enExample)
Galvão Changes in predictive ability with mixed frequency data
WO2013106044A3 (en) Techniques for utilizing energy usage information
CA2873414A1 (en) Delivery date determination system and delivery date determination method
PH12013501615A1 (en) Energy consumption monitoring system, method, and computer program
WO2011100255A3 (en) Systems and methods for measuring and verifying energy savings in buildings
MX393288B (es) Sistemas de monitoreo de estado y pronostico de disyuntores.
Soni et al. Joint pricing and replenishment policies for non-instantaneous deteriorating items with imprecise deterioration free time and credibility constraint
JP2014516446A5 (enExample)
WO2014059191A3 (en) Productivity assessment and rewards systems and processes therefor
IN2014CN01565A (enExample)
JP2013539337A5 (enExample)
WO2014159196A3 (en) Predictive maintenance for medical devices
EP2669757A3 (en) Process monitoring system, device and method
WO2012174348A3 (en) Systems and methods to assess and optimize energy usage for a facility
MX2015013046A (es) Sistema y metodo de medicion a demanda de rejilla inteligente autonoma.
DK2369353T3 (da) Kontaktløs strømmåleindretning og forbrugerenergimålesystem
JP2016109312A5 (enExample)
JP2011239528A5 (enExample)
GB201210759D0 (en) System and method for implementing congestion pricing in a power distribution network
GB201220521D0 (en) Method of assessing and condition monitoring of fluid conduits and apparatus therefor
WO2014057463A3 (en) Tube monitor and process measurement and control in or for a reformer
JP2015097059A5 (enExample)
GB201201593D0 (en) Evaluating and optimizing a trajectory function