JP2012180035A - System and method of creating train operation diagram - Google Patents

System and method of creating train operation diagram Download PDF

Info

Publication number
JP2012180035A
JP2012180035A JP2011044956A JP2011044956A JP2012180035A JP 2012180035 A JP2012180035 A JP 2012180035A JP 2011044956 A JP2011044956 A JP 2011044956A JP 2011044956 A JP2011044956 A JP 2011044956A JP 2012180035 A JP2012180035 A JP 2012180035A
Authority
JP
Japan
Prior art keywords
information
change
diamond
diagram
input
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2011044956A
Other languages
Japanese (ja)
Other versions
JP5791919B2 (en
Inventor
Shinjiro Ibori
真二郎 井堀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Signal Co Ltd
Original Assignee
Nippon Signal Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Signal Co Ltd filed Critical Nippon Signal Co Ltd
Priority to JP2011044956A priority Critical patent/JP5791919B2/en
Publication of JP2012180035A publication Critical patent/JP2012180035A/en
Application granted granted Critical
Publication of JP5791919B2 publication Critical patent/JP5791919B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

PROBLEM TO BE SOLVED: To provide a system and a method of creating a train operation diagram that can efficiently reduce a workload of changing the train operation diagram.SOLUTION: A train operation diagram creating system 10 includes an input part 1, a recording unit 5, and a train operation diagram creating part 41. The input part 1 is provided for an input operation of basic train operation diagram information 51, change identification information 52, and train operation diagram changed information 53 including execution date information. In the recording unit 5, the train operation diagram changed information 53 is recorded according to the change identification information 52. The train operation diagram creating part 41 reads the train operation diagram changed information 53 out of the recording unit 5 for every change identification information 52, and creates control train operation diagram information 54 in which a change including a targeted date for creating the train operation diagram in the execution date information is reflected to the basic train operation diagram information 51. Because the train operation diagram creating system 10 records the train operation diagram changed information 53 to the recording unit 5 according to the change identification information 52, the train operation diagram changed information 53 inputted for every notification in several times can be managed based on the change identification information 52.

Description

本発明は、列車の運行計画に関わるダイヤ作成装置、及びダイヤ作成方法に関する。   The present invention relates to a diagram creation device and a diagram creation method related to a train operation plan.

ダイヤ作成卓は、列車運行計画に従って日付ごとにダイヤを作成するための装置である。ダイヤ作成卓は、ダイヤ改正ごとに更新される基本ダイヤ情報を基にしてダイヤを作成する。そして、作成されたダイヤは、1日分の制御ダイヤ情報として、LANなどの通信ネットワークを介し、自動進路制御装置、いわゆるPRC装置に送信される。このPRC装置は、制御ダイヤ情報に基づく適切な進路制御を行うように、信号機や転轍機などを制御する連動装置、及びCTC装置に信号を出力する。   The diagram creation table is a device for creating a diagram for each date according to a train operation plan. The diamond creation table creates a diamond based on the basic diamond information that is updated with each diamond revision. The created diagram is transmitted as control diagram information for one day to an automatic route control device, a so-called PRC device, via a communication network such as a LAN. This PRC device outputs a signal to an interlocking device that controls a traffic light, a switch, etc., and a CTC device so as to perform appropriate route control based on control diagram information.

臨時列車の発生などによって列車運行計画に変更が生ずると、運行管理担当の指令員が、配布された運転報や電報(以下、「通達」と呼称する。)に従って、制御ダイヤ情報を項目ごとに変更する作業が必要となる。この作業は、変更対象の運行日(以下、「施工日」と呼称する。)ごとに必要となり、さらに、通達の記載表現とダイヤ作成卓の入力形式が必ずしも一致するわけではないため、施工日や変更対象の項目数が多いときは大変な負担となっている。   When the train operation plan is changed due to the occurrence of a temporary train, etc., the operation manager is in charge of the control schedule information for each item according to the distributed operation report or telegram (hereinafter referred to as “Notification”). Work to change is required. This work is necessary for each operation day to be changed (hereinafter referred to as “construction date”), and further, the written description of the notification and the input format of the diagram creation table do not always match, so the construction date When the number of items to be changed is large, it becomes a heavy burden.

この問題に関連して、例えば特許文献1には、構内運行計画のダイヤ変更に先立ち、本線運行計画のダイヤなどを管理サーバから元データとして取り込んでおくことによって、本線のダイヤ情報の入力作業を省き、その負担を軽減する技術が開示されている。   In relation to this problem, for example, in Patent Document 1, prior to changing the schedule of the on-site operation plan, the main line schedule information input work is taken from the management server as the original data. Techniques for reducing and reducing the burden are disclosed.

しかしながら、このダイヤ変更方法においても、やはり、変更内容の入力作業を施工日ごとに行うこととされているため、効果的な負担の軽減にはなり得ないと考えられる。   However, also in this diamond changing method, it is considered that the input work of the changed content is performed every construction day, so that it cannot be effectively reduced.

このような問題は、列車運行に限って存在するものではなく、運行管理を必要とするバスなどの交通機関に関しても同様に存在する。   Such a problem does not exist only for train operation, but also exists for transportation such as buses that require operation management.

特開2006−199244号公報JP 2006-199244 A

本発明の課題は、ダイヤ変更の作業負担を効果的に軽減し得るダイヤ作成装置、及びダイヤ作成方法を提供することである。   An object of the present invention is to provide a diamond creation device and a diamond creation method that can effectively reduce the work burden of diamond change.

上述した課題を解決するため、本発明に係るダイヤ作成装置は、入力部と、記録部と、ダイヤ作成部とを含む。   In order to solve the above-described problem, a diagram creation apparatus according to the present invention includes an input unit, a recording unit, and a diagram creation unit.

前記入力部は、基本ダイヤ情報と、変更識別情報と、施工日情報を含むダイヤ変更情報との入力操作の用に供される。前記記録部は、前記変更識別情報に対応付けられて前記ダイヤ変更情報が記録されている。   The input unit is used for input operations of basic diagram information, change identification information, and diagram change information including construction date information. The recording unit records the diamond change information in association with the change identification information.

前記ダイヤ作成部は、前記変更識別情報ごとに前記ダイヤ変更情報を前記記録部から読み出して、ダイヤ作成対象となる日付が前記施工日情報に含まれる該変更内容を、基本ダイヤ情報に反映させた制御ダイヤ情報を作成する。   The diamond creation unit reads the diamond change information for each change identification information from the recording unit, and reflects the change content including the date to be created in the construction date information in the basic diagram information. Create control diagram information.

本発明に係るダイヤ作成装置は、ダイヤ変更情報を記録部に、変更識別情報に対応付けて記録するから、通達ごとに複数回に分けて入力されたダイヤ変更情報を変更識別情報に基づいて管理することができる。   The diamond creation device according to the present invention records the diamond change information in the recording unit in association with the change identification information, and therefore manages the diamond change information inputted in multiple times for each notification based on the change identification information. can do.

したがって、このダイヤ作成装置によれば、通達を受信したとき、変更識別情報として、例えば当該通達番号を入力することによって、通達番号ごとに変更内容を管理できる。すなわち、ダイヤ作成装置に特定の通達番号を入力して、該当する変更内容を登録、閲覧、または削除することができるため、変更内容の管理が容易となる。   Therefore, according to this diagram creation device, when a notification is received, the change contents can be managed for each notification number, for example, by inputting the notification number as the change identification information. That is, since a specific notification number can be input to the diagram creation device and the corresponding change content can be registered, viewed, or deleted, the change content can be easily managed.

また、ダイヤ作成部は、変更識別情報ごとにダイヤ変更情報を記録部から読み出して、ダイヤ作成対象となる日付が施工日情報に含まれる該変更内容を、基本ダイヤ情報に反映させた制御ダイヤ情報を作成する。   In addition, the diagram creation unit reads the schedule change information from the recording unit for each change identification information, and the control diagram information that reflects the change content in which the date to be created is included in the construction date information in the basic diagram information Create

したがって、本発明に係るダイヤ作成装置は、予め入力されたダイヤ変更情報に基づいて、変更内容が反映された制御ダイヤ情報を、日付ごとに自動的に作成することができる。このため、通達に記載された施工日が複数日であった場合、つまり、施工期間として記載されていた場合、該当する全ての日付において、変更内容が反映された制御ダイヤ情報を、自動的に作成することができる。これにより、指令員が1日ごとに制御ダイヤ情報を項目ごとに変更する作業を省くことができる。   Therefore, the diagram creating apparatus according to the present invention can automatically create the control diagram information reflecting the change contents for each date based on the diagram change information inputted in advance. For this reason, when the construction date described in the notification is more than one day, that is, when it is described as the construction period, the control diagram information reflecting the change contents is automatically reflected on all applicable dates. Can be created. Thereby, the operation | work which a commander changes control diagram information for every item for every day can be omitted.

また、本発明に係るダイヤ作成方法は、基本ダイヤ情報に基づいて日付ごとに制御ダイヤ情報を作成する方法であって、以下のステップを含む。
(1)変更識別情報と、施工日情報を含むダイヤ変更情報との入力を受け付けるステップ
(2)前記変更識別情報に対応付けて前記ダイヤ変更情報を記録するステップ
(3)前記変更識別情報ごとに前記ダイヤ変更情報を前記記録部から読み出して、前記日付が前記施工日情報に含まれる該変更内容を、前記基本ダイヤ情報に反映させて制御ダイヤ情報を作成するステップ
本発明に係るダイヤ変更方法は、上述したダイヤ作成装置と同様の構成を含んでいるため、同様の作用効果を奏する。
The diagram creation method according to the present invention is a method for creating control diagram information for each date based on basic diagram information, and includes the following steps.
(1) Step of receiving input of change identification information and diamond change information including construction date information (2) Step of recording the diamond change information in association with the change identification information (3) For each change identification information A step of reading out the diamond change information from the recording unit, and creating control diamond information by reflecting the change content including the date included in the construction date information in the basic diamond information. Since the same configuration as that of the above-described diamond creation device is included, the same operational effects are achieved.

以上述べたように、本発明によれば、ダイヤ変更の作業負担を効果的に軽減し得るダイヤ作成装置、及びダイヤ作成方法を提供することができる。   As described above, according to the present invention, it is possible to provide a diamond creation device and a diamond creation method that can effectively reduce the workload of changing the diamond.

本発明に係るダイヤ作成装置の機能構成図である。It is a functional block diagram of the diamond production apparatus which concerns on this invention. ダイヤ変更の入力処理のフロー図である。It is a flowchart of the input process of a diamond change. 通達の一例を示す図である。It is a figure which shows an example of notification. 通達の一例を示す図である。It is a figure which shows an example of notification. ダイヤ変更の入力画面の構成例を示す図である。It is a figure which shows the structural example of the input screen of a diagram change. ダイヤ作成処理のフロー図である。It is a flowchart of a diamond creation process.

図1は、本発明に係るダイヤ作成装置の機能構成図である。本発明に係るダイヤ作成装置10は、入力部1と、通信処理部2と、記録部5と、表示部3と、制御部4を含む。ダイヤ作成装置10は、典型的には、パソコンなどの汎用コンピュータ装置にダイヤ作成処理用のソフトウェアを搭載したものであるが、ダイヤ作成の用途に限定された専用コンピュータであってもよい。   FIG. 1 is a functional configuration diagram of a diagram creating apparatus according to the present invention. A diagram creation apparatus 10 according to the present invention includes an input unit 1, a communication processing unit 2, a recording unit 5, a display unit 3, and a control unit 4. The diamond creation apparatus 10 is typically a general-purpose computer device such as a personal computer equipped with diamond creation software, but may be a dedicated computer limited to diamond creation applications.

入力部1は、キーボード、及びマウスなどの直接的な入力操作の用に供されるものや、USBメモリなどの汎用記憶媒体を挿入するスロットなどの間接的な入力操作の用に供されるものも含まれる。   The input unit 1 is used for direct input operations such as a keyboard and a mouse, and is used for indirect input operations such as a slot for inserting a general-purpose storage medium such as a USB memory. Is also included.

通信処理部2は、LAN20と接続するためのLANポート、及び通信処理を行なうLSIなどを含んでいる。なお、通信処理部2が処理可能な通信速度は、1Gbps、あるいは100Mbpsでもよい。   The communication processing unit 2 includes a LAN port for connecting to the LAN 20, an LSI that performs communication processing, and the like. The communication speed that can be processed by the communication processing unit 2 may be 1 Gbps or 100 Mbps.

表示部3は、グラフィックボードなどの画像処理回路と、ディスプレイなどの画像表示を行うための装置とから構成される。   The display unit 3 includes an image processing circuit such as a graphic board and an apparatus for performing image display such as a display.

制御部4は、ダイヤ作成部41と、ダイヤ変更取消部43と、表示処理部44と、入出力処理部45とを含む。ダイヤ作成部41は、ダイヤ変更情報53の登録、及び制御ダイヤ情報54の作成処理を行なう。ダイヤ変更取消部43は、ダイヤの変更の取消処理を行なう。表示処理部44は、情報などを表示部3に表示するための処理を行なう。入出力処理部45は、入力部1からの情報の入力処理、通信処理部2との情報の入出力処理、表示部3への情報の出力処理、及び記録部5との情報の入出力処理を行なう。   The control unit 4 includes a diagram creation unit 41, a diagram change cancellation unit 43, a display processing unit 44, and an input / output processing unit 45. The diamond creation unit 41 registers diamond change information 53 and creates control diamond information 54. The diamond change canceling unit 43 performs a diamond change canceling process. The display processing unit 44 performs processing for displaying information and the like on the display unit 3. The input / output processing unit 45 is an information input process from the input unit 1, an information input / output process with the communication processing unit 2, an information output process to the display unit 3, and an information input / output process with the recording unit 5. To do.

制御部4は、CPUなどの演算処理装置やメモリなどから構成されており、入出力処理部45は、バスなどの接続回路40を介して、各部1〜3,5と電気的に接続され、互いに情報の入出力が可能となるように構成されている。上記の処理部41〜45は、演算処理装置を動作させるソフトウェアの処理ルーチンとして構成されており、そのソフトウェアのプログラムはハードディスクなどに記録されている。   The control unit 4 includes an arithmetic processing unit such as a CPU and a memory, and the input / output processing unit 45 is electrically connected to the units 1 to 3 and 5 through a connection circuit 40 such as a bus. Information is input / output to / from each other. The processing units 41 to 45 are configured as software processing routines for operating the arithmetic processing unit, and the software programs are recorded on a hard disk or the like.

記録部5は、ハードディスク、または不揮発性メモリなどから構成され、基本ダイヤ情報51と、複数の変更識別情報52と、複数群のダイヤ変更情報53と、制御ダイヤ情報54とが記録されている。   The recording unit 5 is composed of a hard disk, a nonvolatile memory, or the like, and records basic diagram information 51, a plurality of change identification information 52, a plurality of groups of diagram change information 53, and control diagram information 54.

基本ダイヤ情報51は、ダイヤ作成部41が日付ごとに制御ダイヤ情報54を作成するための基本データであり、ダイヤ改正が行われるごとに更新されるものである。基本ダイヤ情報51は、作業者により、入力部1を介して直接的に入力されて構成されたもの、またはUSBメモリなどの記録媒体により、入力部1を介して間接的に入力されて構成されたもの、あるいはLAN20内の他の装置から通信処理部2を介して入力されて構成されたものである。入力された基本ダイヤ情報51は、入出力処理部45により記録部5に記録される。   The basic diagram information 51 is basic data for the diagram creation unit 41 to create control diagram information 54 for each date, and is updated every time a diagram revision is made. The basic diagram information 51 is configured to be input directly by the operator via the input unit 1 or indirectly input via the input unit 1 by a recording medium such as a USB memory. Or input from another device in the LAN 20 via the communication processing unit 2. The input basic diagram information 51 is recorded in the recording unit 5 by the input / output processing unit 45.

Figure 2012180035
Figure 2012180035

基本ダイヤ情報51は、上記の表1に示されているように、列車ごとの運行管理情報が含まれている。すなわち、基本ダイヤ情報51は、列車の運行の有無、運用の種別、始発、終着、及び各駅の着発時刻などが含まれている。   The basic diagram information 51 includes operation management information for each train as shown in Table 1 above. That is, the basic schedule information 51 includes the presence / absence of train operation, the type of operation, the first and last arrivals, and the arrival and departure times of each station.

変更識別情報52は、上記の通達ごとに設定される識別情報であり、例えば通達番号である。また、ダイヤ変更情報53は、通達ごとに含まれている1以上の変更内容を示すデータであり、識別情報と対応付けられて記録されている。すなわち、変更識別情報52は、通達数の分だけ記録されているダイヤ変更情報53のうち、いずれか1つを識別するためのポインタであり、制御部4がダイヤ変更情報53を処理するための検索キーとなる。   The change identification information 52 is identification information set for each notification, and is, for example, a notification number. The diamond change information 53 is data indicating one or more change contents included in each notification, and is recorded in association with the identification information. That is, the change identification information 52 is a pointer for identifying any one of the diamond change information 53 recorded for the number of notifications, and the control unit 4 is for processing the diamond change information 53. Search key.

制御ダイヤ情報54は、ダイヤ作成部41によって基本ダイヤ情報51に、ダイヤ変更情報53を反映させて作成されたデータである。制御ダイヤ情報54は、日付ごとに作成されて、入出力処理部45によって通信処理部2から、LAN20を介して、自動進路制御装置30、いわゆるPRC装置に送信される。PRC装置30は、一日分の制御ダイヤ情報54を保持し、この情報に従って連動装置やCTC装置などを制御する。   The control diagram information 54 is data created by reflecting the diagram change information 53 in the basic diagram information 51 by the diagram creation unit 41. The control diagram information 54 is created for each date, and is transmitted from the communication processing unit 2 to the automatic route control device 30, a so-called PRC device, via the LAN 20 by the input / output processing unit 45. The PRC device 30 holds control diagram information 54 for one day, and controls the interlocking device, the CTC device, and the like according to this information.

次に、ダイヤ作成部41の処理を説明する。ダイヤ作成部41の処理は、ダイヤ変更情報53を作成するための変更内容の入力処理と、基本ダイヤ情報51にダイヤ変更情報53を反映して制御ダイヤ情報54を作成する反映処理とを含んでいる。   Next, the process of the diamond creation unit 41 will be described. The process of the diamond creation unit 41 includes a change content input process for creating the diamond change information 53 and a reflection process for creating the control diamond information 54 by reflecting the diamond change information 53 in the basic diamond information 51. Yes.

前者について、図2は、通達ごとに行われるダイヤ変更の入力処理のフローを示す。   As for the former, FIG. 2 shows a flow of a diamond change input process performed for each notification.

まず、ダイヤ作成部41は、入力部1から変更識別情報52の入力を受け付ける(ステップSt1)。このときの入力形式は、特に限定されるものではなく、表示部3に表示された一般的なコンソール画面から入力するものであってもよいし、表示された候補の中から選択するものであってもよい。   First, the diagram creation unit 41 receives an input of the change identification information 52 from the input unit 1 (step St1). The input format at this time is not particularly limited, and may be input from a general console screen displayed on the display unit 3 or selected from the displayed candidates. May be.

入力時、作業者は、図3と図4に例示されるような通達を参照する。通達には、一般的に管理番号として通達番号520,525が付されている。したがって、この通達番号521,525を変更識別情報52として入力すると、扱いが平易となるため望ましい。   At the time of input, the worker refers to the notification as illustrated in FIG. 3 and FIG. In general, notification numbers 520 and 525 are assigned as management numbers. Therefore, it is desirable to input the notification numbers 521 and 525 as the change identification information 52 because the handling becomes easy.

また、ダイヤ作成部41は、変更識別情報52の入力とともに、通達管理情報として、作成日、通達事由、入力者などの関連事項の入力を受け付けてもよい。もっとも、ダイヤ作成部41は、これらのうち、1以上の項目を変更識別情報52として取り扱ってもよい。つまり、変更識別情報52には、日付、番号、名称のうちの1以上の項目を含むことができる。   Further, the diagram creation unit 41 may receive input of related items such as a creation date, a reason for notification, and an input person as notification management information together with the input of the change identification information 52. However, the diagram creating unit 41 may handle one or more items as the change identification information 52 among them. That is, the change identification information 52 can include one or more items of date, number, and name.

次に、ダイヤ作成部41は、入力部1から、施工日情報を含むダイヤ変更情報53の入力を受け付ける(ステップSt2〜St5)。このときの入力形式は、特に限定されるものではないが、表示部3に、例えば図5に示されるようなカレンダ画面を表示し、これを通じて情報入力する方式を採用すると、入力作業を視覚的に容易に行なえるために望ましい。   Next, the diamond creation part 41 receives the input of the diamond change information 53 including construction date information from the input part 1 (steps St2 to St5). The input format at this time is not particularly limited, but if a calendar screen as shown in FIG. 5, for example, is displayed on the display unit 3 and information is input through this, the input operation is visually confirmed. This is desirable because it can be easily performed.

この入力画面は、ダイヤ変更の施工日を選択するためのカレンダウィンドウ30と、施工日の選択や取消の設定、及び変更項目を選択するための第1選択ウィンドウ35と、さらなる項目を選択するための第2選択ウィンドウ36とを含む。カレンダウィンドウ30は、年月表示欄31と、切替ボタン32と、日付表示欄33とを含む。   This input screen is for selecting a calendar window 30 for selecting a construction date for a diamond change, a setting for selecting or canceling a construction date, a first selection window 35 for selecting a change item, and further items. And a second selection window 36. The calendar window 30 includes a year / month display field 31, a switching button 32, and a date display field 33.

まず、カレンダウィンドウ30から施工日に該当する日付欄33を選択することにより、施工日情報を入力する(ステップSt2)。このカレンダウィンドウ30は、左右の切替ボタン32をマウスクリックすることによって年月表示欄31の年月を順次に切替えることができる。   First, construction date information is input by selecting the date column 33 corresponding to the construction date from the calendar window 30 (step St2). The calendar window 30 can sequentially switch the year and month in the year / month display column 31 by clicking the left and right switching buttons 32 with a mouse.

施工日情報の入力は、図3と図4とに示される通達の施工日521a,522a,526aを参照して行われる。施工日の選択は、マウスクリックなどの操作により日付欄33を選択しておき、次に、第1選択ウィンドウ35において「日付選択」命令を選択入力することによって行われる。第1選択ウィンドウ35は、常時、画面に表示させておいてもよいし、マウスクリックなどの操作により出現するようにしてもよい。   The construction date information is input with reference to the noticed construction dates 521a, 522a and 526a shown in FIGS. The construction date is selected by selecting the date field 33 by an operation such as a mouse click and then selecting and inputting a “date selection” command in the first selection window 35. The first selection window 35 may always be displayed on the screen, or may appear by an operation such as a mouse click.

選択された日付は、符号34で示されるように、着色やハッチングなどによって目立つようにマーキングされる。図5は、図3に示される上段の変更内容521の施工期間521aに従って、2011年2月7日から2011年2月13日が選択されている状態を例示している。   The selected date is marked prominently by coloring or hatching as indicated by reference numeral 34. FIG. 5 illustrates a state in which February 7, 2011 to February 13, 2011 are selected according to the construction period 521a of the change content 521 in the upper stage shown in FIG.

第1選択ウィンドウ35は、日付選択に関わる命令を表示する第1表示領域351と、列車選択や追加に関わる命令を表示する第2表示領域352とを有している。第1表示領域351には、「日付選択」命令以外にも、カレンダ30内の全日付33を一括で選択する「全日付選択」命令、選択された日付を取り消すための「日付選択取消」命令、及び選択された日付を一括で取り消すための「全日付選択取消」命令が表示されている。なお、施工日情報の入力操作は、このような命令群によらず、例えば、Ctrlキーなどの特定の制御キーを押した状態において、日付欄33をマウスクリック、あるいはマウスドラッグすることにより行われるようにしてもよい。   The first selection window 35 has a first display area 351 that displays instructions related to date selection and a second display area 352 that displays instructions related to train selection and addition. In the first display area 351, in addition to the “date selection” command, an “all date selection” command for selecting all the dates 33 in the calendar 30 at once, and a “date selection cancellation” command for canceling the selected date. , And a “cancel all date selection” command for canceling the selected dates all at once. The operation date information input operation is performed by, for example, clicking the date column 33 or dragging the mouse while the specific control key such as the Ctrl key is pressed, regardless of the command group. You may do it.

施工日情報の入力受付後、ダイヤ作成部41は、入力部1から、具体的なダイヤ変更内容の入力を受け付ける(ステップSt3)。図3と図4とに示されるように、変更内容521,522,526は、一般的に列車名ごとに記載されている。   After receiving the input of the construction date information, the diagram creating unit 41 receives a specific diagram change content input from the input unit 1 (step St3). As shown in FIGS. 3 and 4, the changed contents 521, 522, and 526 are generally described for each train name.

したがって、変更内容521,522のように、既存列車の運行内容を変更する場合、変更内容の入力は、施工日として選択された全部の日付に共通に存在する列車名を選択することにより行われる。つまり、日付を選択した状態で、第2表示領域352にある「列車選択」命令を選択すると、基本ダイヤ情報51に基づいて、当該日付の全てに共通に存在する列車名の一覧が第2選択ウィンドウ36に表示される。そして、この列車名の中から変更対象の列車を選択し、その列車について運行内容の変更を行う。   Therefore, when the operation content of an existing train is changed as in the case of the change content 521, 522, the input of the change content is performed by selecting a train name that exists in common on all dates selected as construction dates. . That is, when a “train selection” command in the second display area 352 is selected in a state where a date is selected, a list of train names that are common to all the dates is selected based on the basic diagram information 51. It is displayed in the window 36. And the train of change object is selected from this train name, and the operation content is changed about the train.

運行内容の変更入力方式は、特に限定されるものではないが、周知のダイヤ表示画面にて着発時刻などを設定する方式を採用し得る。   The operation content change input method is not particularly limited, but a method of setting the arrival and departure times and the like on a well-known diagram display screen can be adopted.

図3に示されている上段の変更内容521の場合、表1に示された運行内容のうち、「後運用」の項目を「折返」から「なし」に変更することにより設定がなされる。運用の項目としては、他にも「継送」、「分割」、及び「併合」が存在し、これらの候補から選択することにより列車運用の設定がなされる。また、下段の変更内容522については、「運転」の項目を「有」から「無」に変更することにより設定がなされる。   In the case of the change content 521 in the upper row shown in FIG. 3, the setting is made by changing the item “post-operation” from “turnback” to “none” in the operation content shown in Table 1. In addition, there are “transmission”, “division”, and “merging” as operation items, and train operation is set by selecting from these candidates. In addition, the change content 522 in the lower row is set by changing the item “operation” from “present” to “not present”.

一方、図4に示される変更内容526のように、施工日として選択された日付に、新規に列車を追加する場合、変更内容の入力は、第2表示領域352にある「列車追加」命令を選択して行われる。変更内容526のような構内列車の場合、設定項目としては、該当する駅名、運用、発着時刻、発着番線、先行列車名、及び運転の休止/復活が存在する。   On the other hand, when a new train is added to the date selected as the construction date as in the change content 526 shown in FIG. 4, the input of the change content is performed by inputting the “train addition” command in the second display area 352. It is done by selecting. In the case of a local train such as the changed content 526, the setting items include the corresponding station name, operation, departure / arrival time, departure / arrival number, preceding train name, and suspension / restoration of operation.

このように、通達の記載形式に従って容易に変更内容を入力することが可能な方式を採用することによって、ダイヤ変更の入力作業の負荷を大幅に削減することができる。   In this way, by adopting a method that allows the change contents to be easily input in accordance with the notification description format, it is possible to greatly reduce the load of input work for changing the diagram.

再び図2を参照して説明すると、図3に示される通達の場合、上段の変更内容521に含まれる全変更対象項目の入力が完了後(ステップSt4)、今度は、下段の変更内容522の施工日を入力し(ステップSt2)、その全変更対象項目の入力が完了すると(ステップSt4)、ダイヤ作成部41は、入出力処理部45を介して、変更識別情報52とダイヤ変更情報53を記録部5に記録(ステップSt6,St7)する。   Referring back to FIG. 2, in the notification shown in FIG. 3, after the input of all items to be changed included in the upper change content 521 is completed (step St <b> 4), this time, the lower change content 522 is changed. When the construction date is input (step St2) and the input of all the items to be changed is completed (step St4), the diagram creation unit 41 stores the change identification information 52 and the diagram change information 53 via the input / output processing unit 45. Recording is performed in the recording unit 5 (steps St6 and St7).

Figure 2012180035
Figure 2012180035

こうして記録された変更識別情報52とダイヤ変更情報53は、上記の表2のように、互いに対応付けられている。したがって、ダイヤ変更情報53は、変更識別情報52ごとに、つまり通達ごとに、制御ダイヤ情報54へ反映するための登録、その登録解除、閲覧、あるいは抹消することが可能である。   The change identification information 52 and the diamond change information 53 thus recorded are associated with each other as shown in Table 2 above. Therefore, the diamond change information 53 can be registered, reflected, deregistered, viewed, or deleted for each change identification information 52, that is, for each notification.

すなわち、表示処理部44は、入力部1に入力された通達番号520,525を基にして、該当する変更識別情報52に係るダイヤ変更情報53を表示部3に出力する。また、ダイヤ変更取消部43は、入力部1に入力された通達番号520,525を基にして、該当する変更識別情報52に係るダイヤ変更情報を記録部5から抹消する。なお、ダイヤ変更情報53は、現在の日付が最後の施工日を経過した後の一定期間経過後に自動的に抹消されるようにしてもよい。   That is, the display processing unit 44 outputs the diagram change information 53 related to the corresponding change identification information 52 to the display unit 3 based on the notification numbers 520 and 525 input to the input unit 1. Further, the diagram change cancellation unit 43 deletes the schedule change information related to the corresponding change identification information 52 from the recording unit 5 based on the notification numbers 520 and 525 input to the input unit 1. The diagram change information 53 may be automatically deleted after a certain period of time after the current date has passed the last construction date.

次に、基本ダイヤ情報51にダイヤ変更情報53を反映して制御ダイヤ情報54を作成する処理について、図6を参照して説明する。作成処理は、入力部1から対象として指定された日付が入力されたことを契機として実行されてもよいし、あるいは毎日、当日分のダイヤを対象として自動的に実行されてもよい。   Next, a process of creating the control diamond information 54 by reflecting the diamond change information 53 in the basic diamond information 51 will be described with reference to FIG. The creation process may be executed when a date designated as a target is input from the input unit 1 or may be automatically executed on a daily schedule for every day.

まず、ダイヤ作成部41は、入出力処理部45を介して、記録部5から基本ダイヤ情報51を読み出し(ステップSt11)、次に変更識別情報52を読み出す(ステップSt12)。そして、ダイヤ作成部41は、変更識別情報52ごとにダイヤ変更情報53を読み出して(ステップSt13)、該変更内容に係る施工日情報に、ダイヤ作成対象の日付が含まれているかを判定する(ステップSt14)。当該日付が含まれていなければ、1つの変更識別情報52に係る全ての変更内容について反映処理が完了したか否かを判定し(ステップ16)、完了していない場合、他の変更内容に係る施工日情報について同様の判定を行う(ステップSt14)。   First, the diagram creation unit 41 reads the basic diagram information 51 from the recording unit 5 via the input / output processing unit 45 (step St11), and then reads the change identification information 52 (step St12). And the diamond creation part 41 reads the diamond change information 53 for every change identification information 52 (step St13), and determines whether the date of a diamond creation object is contained in the construction date information which concerns on this change content ( Step St14). If the date is not included, it is determined whether or not the reflection process has been completed for all the changes related to one change identification information 52 (step 16). The same determination is made for the construction date information (step St14).

一方、当該日付が含まれていれば、ダイヤ作成部41は該変更内容を基本ダイヤ情報51に反映する(ステップSt15)。具体的には、仮に作成対象日を2011年2月10日とすると、図3に示される上段の変更内容521、及び図4に示される変更内容526は反映されるが、図3に示される下段の変更内容522は反映されないことになる。   On the other hand, if the date is included, the diagram creation unit 41 reflects the changed content in the basic diagram information 51 (step St15). Specifically, if the creation target date is February 10, 2011, the upper change content 521 shown in FIG. 3 and the change content 526 shown in FIG. 4 are reflected, but shown in FIG. The lower change contents 522 are not reflected.

ダイヤ作成部41は、1つの変更識別情報52に係る全ての変更内容について反映処理が完了すると(ステップSt16)、他の変更識別情報52に係る全ての変更内容についても同様に反映処理を行なう(ステップSt13〜St15)。さらに、ダイヤ作成部41は、全ての変更識別情報52に係る変更内容の反映処理が完了すると(ステップSt17)、これにより作成された制御ダイヤ情報54を記録部5に記録する(ステップSt18)。   When the diamond creation unit 41 completes the reflection process for all the change contents related to one change identification information 52 (step St16), the diamond creation unit 41 performs the reflection process for all the change contents related to the other change identification information 52 as well (step 16). Steps St13 to St15). Further, when the reflection process of the change contents related to all the change identification information 52 is completed (step St17), the diagram creation unit 41 records the control diagram information 54 created thereby in the recording unit 5 (step St18).

Figure 2012180035
Figure 2012180035

上記の表3には、このようにして作成された2011年2月7日の制御ダイヤ情報54が例示されている。これを、先に示された表1の基本ダイヤ情報51と比較すれば明らかなように、図3の変更内容521に基づいて、列車名「特急はたち50号」の「後運用」項目が「折返」から「なし」に変更されている。さらに、図3の変更内容522に基づいて、列車名「特急はたち53号」の「運転」項目が「有」から「無」に変更されている。   Table 3 above illustrates the control diagram information 54 created on February 7, 2011 as described above. As is clear from comparison with the basic diagram information 51 shown in Table 1 above, based on the modified content 521 in FIG. It has been changed from “wrapping” to “none”. Further, based on the change content 522 in FIG. 3, the “driving” item of the train name “National Express Hatachi 53” has been changed from “present” to “none”.

Figure 2012180035
Figure 2012180035

また、上記の表4は、2011年2月8日の制御ダイヤ情報54が例示されている。この制御ダイヤ情報54は、図3の変更内容521の反映に加えて、図4の変更内容526に基づいて、列車名「構内列車123号」の運用情報が追加されている。なお、他の日付の制御ダイヤ情報54は、例示されていないが、図3と図4とに示された施工日521a,522a,526aに係る日付について、同様に変更内容521,522,526が反映されているものとする。   Table 4 above illustrates the control diagram information 54 on February 8, 2011. In addition to the reflection of the change contents 521 in FIG. 3, operation information of the train name “local train 123” is added to the control diagram information 54 based on the change contents 526 in FIG. 4. Although the control diagram information 54 of other dates is not illustrated, the changed contents 521, 522, 526 are similarly displayed for the dates related to the construction dates 521a, 522a, 526a shown in FIGS. It shall be reflected.

これまで述べたように、本発明に係るダイヤ作成装置10は、ダイヤ変更情報53を記録部5に、変更識別情報52に対応付けて記録するから、複数回に分けて入力されたダイヤ変更情報53を変更識別情報52に基づいて管理することができる。   As described above, since the diagram creation apparatus 10 according to the present invention records the diagram change information 53 in the recording unit 5 in association with the change identification information 52, the diagram change information input in multiple times. 53 can be managed based on the change identification information 52.

したがって、このダイヤ作成装置10によれば、通達を受信したとき、変更識別情報52として、例えば当該通達番号520,525を入力することによって、通達番号520,525ごとに変更内容521,522,526を管理できる。すなわち、ダイヤ作成装置10に特定の通達番号520,525を入力して、該当する変更内容521,522,526を登録、閲覧、または削除することができるため、変更内容521,522,526の管理が容易となる。   Therefore, according to the diagram creating apparatus 10, when the notification is received, for example, by inputting the notification numbers 520 and 525 as the change identification information 52, the change contents 521, 522 and 526 are provided for each of the notification numbers 520 and 525. Can be managed. That is, since the specific notification numbers 520 and 525 can be input to the diagram creating apparatus 10 and the corresponding change contents 521, 522, and 526 can be registered, viewed, or deleted, the change contents 521, 522, and 526 can be managed. Becomes easy.

また、ダイヤ作成部41は、変更識別情報52ごとにダイヤ変更情報53を記録部5から読み出して、ダイヤ作成対象となる日付が施工日情報に含まれる該変更内容521,522,526を、基本ダイヤ情報51に反映させた制御ダイヤ情報54を作成する。   Further, the diamond creation unit 41 reads the diamond change information 53 for each change identification information 52 from the recording unit 5, and uses the modification contents 521, 522, 526 in which the schedule creation date includes the construction date information. Control diamond information 54 reflected in the diamond information 51 is created.

したがって、本発明に係るダイヤ作成装置10は、予め入力されたダイヤ変更情報53に基づいて、変更内容521,522,526が反映された制御ダイヤ情報54を、日付ごとに自動的に作成することができる。このため、通達に記載された施工日521a,522a,526aが複数日であった場合、つまり、施工期間として記載されていた場合、該当する全ての日付において、変更内容521,522,526が反映された制御ダイヤ情報54を、自動的に作成することができる。これにより、指令員が1日ごとに制御ダイヤ情報を項目ごとに変更する作業を省くことができる。   Therefore, the diagram creating apparatus 10 according to the present invention automatically creates the control diagram information 54 reflecting the change contents 521, 522, and 526 for each date based on the diagram change information 53 inputted in advance. Can do. For this reason, when the construction dates 521a, 522a, and 526a described in the notification are a plurality of days, that is, when the construction dates are described as the construction period, the change contents 521, 522, and 526 are reflected on all the corresponding dates. The control diagram information 54 can be automatically created. Thereby, the operation | work which a commander changes control diagram information for every item for every day can be omitted.

一方、本発明に係るダイヤ変更方法は、上述したダイヤ作成装置10と同様の構成を含んでいるため、同様の作用効果を奏する。   On the other hand, the diamond changing method according to the present invention includes the same configuration as that of the diamond creating apparatus 10 described above, and therefore has the same effect.

上述した実施形態では、列車の運行管理を例に挙げているが、これに限らず、バスなどの他の交通機関の運行管理に関しても、本発明は同様に適用される。   In the above-described embodiment, train operation management is taken as an example. However, the present invention is not limited thereto, and the present invention is similarly applied to operation management of other transportation facilities such as buses.

以上、好ましい実施例を参照して本発明の内容を具体的に説明したが、本発明の基本的技術思想及び教示に基づいて、当業者であれば、種々の変形態様を採り得ることは自明である。   Although the contents of the present invention have been specifically described above with reference to the preferred embodiments, it is obvious that those skilled in the art can take various modifications based on the basic technical idea and teachings of the present invention. It is.

1 入力部
5 記録部
41 ダイヤ作成部
43 ダイヤ変更取消部
10 ダイヤ作成装置
52 変更識別情報
53 ダイヤ変更情報
51 基本ダイヤ情報
54 制御ダイヤ情報
DESCRIPTION OF SYMBOLS 1 Input part 5 Recording part 41 Diamond creation part 43 Diamond change cancellation part 10 Diamond creation apparatus 52 Change identification information 53 Diamond change information 51 Basic diamond information 54 Control diamond information

Claims (5)

入力部と、記録部と、ダイヤ作成部とを含むダイヤ作成装置であって、
前記入力部は、変更識別情報と、施工日情報を含むダイヤ変更情報との入力操作の用に供され、
前記記録部は、前記変更識別情報に対応付けられて前記ダイヤ変更情報が記録されており、
前記ダイヤ作成部は、前記変更識別情報ごとに前記ダイヤ変更情報を前記記録部から読み出して、ダイヤ作成対象となる日付が前記施工日情報に含まれる該変更内容を、基本ダイヤ情報に反映させた制御ダイヤ情報を作成する、
ダイヤ作成装置。
A diagram creation device including an input unit, a recording unit, and a diagram creation unit,
The input unit is used for input operation of change identification information and diamond change information including construction date information,
The recording unit records the diamond change information in association with the change identification information,
The diamond creation unit reads the diamond change information for each change identification information from the recording unit, and reflects the change content including the date to be created in the construction date information in the basic diagram information. Create control diagram information,
Diamond creation device.
請求項1に記載されたダイヤ作成装置であって、
さらにダイヤ変更取消部を含み、
前記ダイヤ変更取消部は、前記入力部に入力された前記変更識別情報と対応する前記ダイヤ変更情報を前記記録部から抹消する、
ダイヤ作成装置。
A diamond creating apparatus according to claim 1,
In addition, the diamond change cancellation part
The diamond change cancellation unit deletes the diamond change information corresponding to the change identification information input to the input unit from the recording unit,
Diamond creation device.
請求項1または2に記載されたダイヤ作成装置であって、
前記変更識別情報には、日付、番号、名称のうちの1以上の項目が含まれる、
ダイヤ作成装置。
The diamond creating device according to claim 1 or 2,
The change identification information includes one or more items of date, number, and name.
Diamond creation device.
基本ダイヤ情報に基づいて日付ごとに制御ダイヤ情報を作成するダイヤ作成方法であって、
変更識別情報と、施工日情報を含むダイヤ変更情報との入力を受け付けるステップと、
前記変更識別情報に対応付けて前記ダイヤ変更情報を記録するステップと、
前記変更識別情報ごとに前記ダイヤ変更情報を前記記録部から読み出して、前記日付が前記施工日情報に含まれる該変更内容を、前記基本ダイヤ情報に反映させて制御ダイヤ情報を作成するステップとを含む、
ダイヤ作成方法。
A diagram creation method for creating control diagram information for each date based on basic diagram information,
A step of receiving input of change identification information and diamond change information including construction date information;
Recording the diagram change information in association with the change identification information;
Reading out the diamond change information from the recording unit for each change identification information, and creating the control diamond information by reflecting the change content including the date included in the construction date information in the basic diamond information; Including,
Diamond creation method.
請求項4に記載されたダイヤ変更方法であって、
前記変更識別情報には、日付、番号、名称のうちの1以上の項目が含まれる、
ダイヤ作成方法。
A diamond changing method according to claim 4,
The change identification information includes one or more items of date, number, and name.
Diamond creation method.
JP2011044956A 2011-03-02 2011-03-02 Diamond creating apparatus and diamond creating method Active JP5791919B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011044956A JP5791919B2 (en) 2011-03-02 2011-03-02 Diamond creating apparatus and diamond creating method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011044956A JP5791919B2 (en) 2011-03-02 2011-03-02 Diamond creating apparatus and diamond creating method

Publications (2)

Publication Number Publication Date
JP2012180035A true JP2012180035A (en) 2012-09-20
JP5791919B2 JP5791919B2 (en) 2015-10-07

Family

ID=47011626

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011044956A Active JP5791919B2 (en) 2011-03-02 2011-03-02 Diamond creating apparatus and diamond creating method

Country Status (1)

Country Link
JP (1) JP5791919B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017213962A (en) * 2016-05-31 2017-12-07 東日本旅客鉄道株式会社 Vehicle operation work assisting device and vehicle operation work assisting system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06127391A (en) * 1992-10-15 1994-05-10 Hitachi Ltd Plan preparation-correction system
JP2003002203A (en) * 2001-06-27 2003-01-08 Railway Technical Res Inst Diagram data editing information on execution train diagram making, storage medium and diagram data editor
JP2005119472A (en) * 2003-10-16 2005-05-12 Hitachi Ltd Information processing device, data management method following change in planning data and program, recording medium
JP2007062554A (en) * 2005-08-31 2007-03-15 Hitachi Ltd Operation diagram cooperating plan producing system and method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06127391A (en) * 1992-10-15 1994-05-10 Hitachi Ltd Plan preparation-correction system
JP2003002203A (en) * 2001-06-27 2003-01-08 Railway Technical Res Inst Diagram data editing information on execution train diagram making, storage medium and diagram data editor
JP2005119472A (en) * 2003-10-16 2005-05-12 Hitachi Ltd Information processing device, data management method following change in planning data and program, recording medium
JP2007062554A (en) * 2005-08-31 2007-03-15 Hitachi Ltd Operation diagram cooperating plan producing system and method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017213962A (en) * 2016-05-31 2017-12-07 東日本旅客鉄道株式会社 Vehicle operation work assisting device and vehicle operation work assisting system

Also Published As

Publication number Publication date
JP5791919B2 (en) 2015-10-07

Similar Documents

Publication Publication Date Title
US20210149662A1 (en) Digital processing systems and methods for automatic updates in collaborative work systems
JP5423444B2 (en) Network system, server device, and groupware program
US8886553B2 (en) Visual workflow process notation and layout
US7721229B2 (en) Displaying overlaid calendars
US8065621B2 (en) System and method for graphical creation, editing and presentation of scenarios
US20150177952A1 (en) Computer Method And Apparatus For Automated Scheduling
JP4719534B2 (en) Operation schedule cooperation plan creation system and method
WO2012032827A1 (en) Production schedule creating method and apparatus therefor
US20090083644A1 (en) Apparatus, method, and program product for managing and displaying schedule
US20130067379A1 (en) Graphical comparison of geographic information system data
US11961051B1 (en) Integrated system for producing procedural data change sets communicated to client devices
EP3961523A1 (en) Managing production pipelines
JP5791919B2 (en) Diamond creating apparatus and diamond creating method
US20180137471A1 (en) Physical location aware calendar system
US20170255605A1 (en) Annotations and Issue Tracking for Graphical Data
US10262051B2 (en) Adjustable graphical display system
US10997564B2 (en) Electronic change planning manager
US10878350B1 (en) Methods and systems for providing a user interface for managing parts production and delivery statuses
US20200333155A1 (en) Client and prospect app
JP5201559B2 (en) Information processing device
US20160267424A1 (en) Managing Employee Information Using an Information Management System
JP2017102694A (en) Gantt chart generation program, gantt chart generation apparatus and gantt charge generation method
JP4645981B2 (en) Operation schedule management device and program
EP3316196A1 (en) Integrated system for producing procedural data change sets communicated to client devices
JP6499044B2 (en) Task management apparatus, task management method, task management program, and user interface providing method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20140221

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20141008

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20141017

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20141030

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20141125

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20141128

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150123

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20150804

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20150805

R150 Certificate of patent or registration of utility model

Ref document number: 5791919

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150