JP2012102526A - Installation method, installation structure and attaching metal fitting for falling object prevention fence - Google Patents

Installation method, installation structure and attaching metal fitting for falling object prevention fence Download PDF

Info

Publication number
JP2012102526A
JP2012102526A JP2010251713A JP2010251713A JP2012102526A JP 2012102526 A JP2012102526 A JP 2012102526A JP 2010251713 A JP2010251713 A JP 2010251713A JP 2010251713 A JP2010251713 A JP 2010251713A JP 2012102526 A JP2012102526 A JP 2012102526A
Authority
JP
Japan
Prior art keywords
fence
fence post
road
post
mounting bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2010251713A
Other languages
Japanese (ja)
Other versions
JP5572529B2 (en
Inventor
Akio Michihashi
昭夫 道端
Masayuki Yamura
昌之 矢村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Metal Products Co Ltd
Nikken Fence and Metal Corp
Original Assignee
Nikken Fence and Metal Corp
Nippon Steel and Sumikin Metal Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nikken Fence and Metal Corp, Nippon Steel and Sumikin Metal Products Co Ltd filed Critical Nikken Fence and Metal Corp
Priority to JP2010251713A priority Critical patent/JP5572529B2/en
Publication of JP2012102526A publication Critical patent/JP2012102526A/en
Application granted granted Critical
Publication of JP5572529B2 publication Critical patent/JP5572529B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide an installation method, an installation structure and an attaching metal fitting suitable for installation construction of a falling object prevention fence in a wire mesh structure.SOLUTION: Following a bottom part 50 joined with the lower part of a column 40 for a fence at one side part and extended toward a column 30 of a protective fence 3 bypassing the lower edge of a face bar installation scheduled position, a rising part 51 along the side face of the protective fence column 30 is formed. The rising part 51 is joined to the side face of the protective fence column 30 by bolts 7 to fit the column 40 for the fence, and furring strips 42 are attached to the upper and lower parts of the column 40 for the fence. A face bar 41 is installed along the column 40 for the fence and the furring strips 42, an auxiliary metal fitting 6 is disposed between the part above the rising part 51 of the attaching metal fitting 5 on the side face of the protective fence column 30 and the facing part of the column 40 for the fence thereafter, and the auxiliary metal fitting 6, the protective fence column 30 and the column 40 for the fence are joined by bolts.

Description

この発明は、道路の路側に沿って防護柵が設置され、更に背の高い落下物防止フェンスが二重構造に設置される場合であって、防護柵が新設であるか既設であるかを問わず、金網構造の落下物防止フェンスの設置施工に好適な設置工法及び設置構造並びに取付金具の技術分野に属する。   This invention is a case where a protective fence is installed along the roadside of the road, and a tall fallen object prevention fence is installed in a double structure, regardless of whether the protective fence is newly installed or existing. It belongs to the technical field of installation method and installation structure suitable for installation construction of falling object prevention fence of wire mesh structure, and mounting bracket.

従来、道路に沿って高欄等の防護柵が設置されることは公知、周知であるが、更に背の高い落下物防止フェンスをも併設して、空き缶などが民家や交差道路・鉄道などへ投げ捨てられる被害を防止し、且つ投棄物による思いがけない事故の発生を未然に防ぐ対策が既に実施されている。
例えば下記の特許文献1に記載された高欄用支柱には、道路側の側面にガードレール(ビームパイプ)を支持する半円形状のレール嵌合部を設け、道路とは反対側(歩道側ないし民地側など)の側面にフェンス鉄枠(フェンス用支柱)を支持する突片を設け、同突片を利用してフェンス鉄枠を立て、前記フェンス鉄枠の道路側面に沿って道路長手方向に金網構造の面材を張り付けた構成が開示されている。
また、下記の特許文献2に記載された防護柵は、防護柵用支柱の道路側面へ防護柵本体が架設され、同防護柵用支柱の背面側(歩道側ないし民地側など)に連結片を突設し、同連結片を利用して遮蔽柵(落下物防止フェンス)を支持する遮蔽柵用支柱を取り付け、前記遮蔽柵用支柱の道路方向の両側縁に設けた取り付け枠材の各縦溝へ遮蔽柵(捨て防止フェンスパネル)の縦縁部を差し込み取り付けた構造が開示されている。
Conventionally, it is known and well known that protective fences such as railings are installed along the road, but a tall fallen object prevention fence is also installed, and empty cans are thrown away to private houses, cross roads, railways, etc. Measures have already been implemented to prevent damage that may occur and to prevent unexpected accidents caused by dumped items.
For example, the railing column described in the following Patent Document 1 is provided with a semicircular rail fitting portion that supports a guard rail (beam pipe) on the side surface on the road side, and is on the side opposite to the road (sidewalk side or private side). Protruding pieces that support fence iron frames (fence struts) are provided on the side surfaces of the ground side, etc., and the fence iron frames are erected using the protruding pieces, along the road side surface of the fence iron frames in the longitudinal direction of the road A configuration in which a face member having a wire mesh structure is attached is disclosed.
In addition, the protective fence described in the following Patent Document 2 has a protective fence body built on the side of the road of the protective fence post, and a connecting piece on the back side (sidewalk side or private side) of the protective fence post. , And use the connecting piece to attach shielding fence posts that support the shielding fence (falling object prevention fence), and install each vertical frame of the mounting frame material provided on both side edges of the shielding fence pillar in the road direction. A structure is disclosed in which a vertical edge portion of a shielding fence (discard prevention fence panel) is inserted and attached to a groove.

その他、既往の落下物防止フェンスは、図9A、Bと図10A、Bに例示したように、道路1の路側部に立ち上がらせたコンクリート高欄2の上面に鋼製の高欄支柱30を建て、同高欄支柱30の上端部に道路長手方向に延びる防護パイプ31を支持させて防護柵3を構築している。
更に前記高欄支柱30の道路とは反対側(歩道側ないし民地側など)の側面の上下2箇所に支持金具32を取り付け、この支持金具32へフェンス用支柱40の取付金具49をボルト接合48により結合して同フェンス用支柱40を垂直に立て、前記フェンス用支柱40の道路側面の上下の道路長手方向に胴縁42を取り付けてフェンス下地(骨組み構造)を構築し、前記フェンス用支柱40と胴縁42の道路側面に沿って、金網で成る背の高い面材41を道路長手方向に張り付けた構成である。
In addition, as shown in FIGS. 9A and 9B and FIGS. 10A and 10B, the existing fallen object prevention fence is constructed by installing a steel railing column 30 on the upper surface of the concrete railing 2 raised on the roadside portion of the road 1. The protective fence 3 is constructed by supporting a protective pipe 31 extending in the longitudinal direction of the road at the upper end of the railing column 30.
Further, support brackets 32 are attached to two upper and lower sides on the side opposite to the road of the railing column 30 (such as a sidewalk side or a private side), and a mounting bracket 49 of the fence column 40 is bolted to the support bracket 32. The fence post 40 is vertically set up, and a trunk edge 42 is attached in the longitudinal direction of the road above and below the road side surface of the fence post 40 to construct a fence foundation (frame structure). In addition, along the road side surface of the trunk edge 42, a tall face material 41 made of a wire mesh is attached in the longitudinal direction of the road.

実開昭55−44833号公報Japanese Utility Model Publication No. 55-44833 特開平9−111725号公報JP-A-9-1111725

上記の特許文献1、2に記載された落下物防止フェンス及び図9に示した既往の落下物防止フェンスは、それぞれ目的の機能を果たすことは認められる。
しかし、特許文献1の落下物防止フェンス及び図9に示した既往の落下物防止フェンスはいずれも、フェンス用支柱が道路とは反対の歩道側ないし民地側に立てられ、高欄用支柱へは支持金具などを介してボルト止め等の手段で取り付けておく。その後に面材(金網)を張り付ける手順で設置する構成であるため、面材がフェンス鉄枠(フェンス用支柱)を支持する突片(支持金具)と交差する部位では、同パネル(金網)の該当箇所を予め上下方向へ必要な長さ切断し、また、同金網は道路の長手方向に一定の長さに予め切断しておいて、上方から前記切断箇所を下向きに差し入れて突片を跨らせる手法で設置するほかなかった。そのため面材(金網)の切断、及びその張り付け(又は建て込み)作業が大変面倒で時間がかかり、設置施工の工期が長引き、コスト高になる問題点があった。
It is recognized that the fallen object prevention fences described in Patent Documents 1 and 2 and the existing fallen object prevention fence shown in FIG. 9 each perform the intended function.
However, in both the fallen object prevention fence of Patent Document 1 and the existing fallen object prevention fence shown in FIG. 9, the fence post is set up on the sidewalk side or the private side opposite to the road, It is attached by means such as bolting via a support fitting. Since it is configured to attach the face material (wire mesh) after that, the panel (wire mesh) at the part where the face material intersects with the protruding piece (support metal fitting) that supports the fence iron frame (fence post) The relevant part of the wire is cut in the required length in the vertical direction in advance, and the wire mesh is cut in advance to a certain length in the longitudinal direction of the road, and the cutting part is inserted downward from above to project the projecting piece. There was no other choice but to install it. For this reason, cutting of the face material (wire mesh) and pasting (or erection) of the face material are very troublesome and time consuming, prolonging the installation work period and increasing the cost.

また、特許文献2に記載された落下物防止フェンスの場合も、面材は予め、同面材を支持する遮蔽柵用支柱の間隔寸法に切断して用意し、同面材を一枚ずつ、前記遮蔽柵用支柱に設けた取り付け枠材の縦溝中へ両側縁部を差し込んで取り付ける手法により設置する構造であるため、やはり面材の切断及び加工に時間を要する上に、その張り付け(建て込み)作業が面倒で、多くの手間を要求され、工期が長引き、コスト高になる問題点があった。   Also, in the case of the falling object prevention fence described in Patent Document 2, the face material is prepared by cutting in advance to the interval dimension of the shielding fence support supporting the same surface material, one by one. Since it is a structure that is installed by inserting both side edges into the vertical groove of the mounting frame material provided on the shielding fence post, it takes time to cut and process the face material, and the pasting (building) The work was cumbersome, requiring a lot of labor, prolonging the construction period, and increasing the cost.

しかも上記特許文献1に係る先行技術の場合は、落下物防止フェンスの設置施工を、道路とは反対の歩道側ないし民地側などに作業スペースを確保すると、作業を行い易い構成になっている反面、いわゆる跨線橋道路とか立体交差道路のように、歩道側ないし民地側などに作業スペースを全く確保できない条件下では、落下物防止フェンスの設置施工が困難で、大変無理な姿勢で、或いは危険を伴う姿勢で作業することを強いられる。そのため落下物防止フェンスの設置作業が難渋し、面倒で多くの手間を要求され、工期が長引き、コスト高になるという問題点が増幅される。   And in the case of the prior art which concerns on the said patent document 1, if work space is ensured on the sidewalk side opposite to a road, or a private side, etc., it will become the structure which is easy to carry out work. On the other hand, under conditions where work space cannot be secured at all, such as overpass roads or three-dimensional crossing roads, it is difficult to install a fallen object prevention fence, and it is very unreasonable or dangerous. Forced to work in a posture that involves. For this reason, the installation work of the fallen object prevention fence is difficult, and it is troublesome and requires a lot of labor, prolonging the construction period and increasing the cost.

したがって、本発明の目的ないし解決課題は、道路の延長方向に沿って高欄等の防護柵が設置され、更に同防護柵の背後側(道路とは反対側)に背の高い落下物防止フェンスが併設される場合に、その落下物防止フェンスの設置施工を、基本的には道路側のみから安全に楽な姿勢で作業を進めることができ、いわゆる跨線橋道路とか立体交差道路のように歩道側ないし民地側に作業スペースを確保できない条件下での設置施工に好都合な落下物防止フェンスの設置工法及び設置構造を提供することである。
本発明の次の目的は、金網による面材をフェンス用支柱へ張り付ける設置作業のために、フェンス用支柱の位置毎に同面材へフェンス用支柱の支持部材を避ける(跨ぐ)切り込みを加工する作業の必要を無くし、更に金網による面材は予め必要な長さ分を巻紙の如く巻いた状態で準備し、フェンス用支柱の位置よりも道路側の作業位置に立つ作業員が道路の延長方向へ順次移動しつつ巻き戻してフェンス用支柱へ張り付ける設置作業を実施することを可能にする、落下物防止フェンスのフェンス用支柱の立て付け方法と、同方法に使用する取付金具を提供することである。
Therefore, the object or solution of the present invention is that a protective fence such as a railing is installed along the extending direction of the road, and a tall fallen object prevention fence is provided behind the protective fence (opposite the road). When installed side by side, the installation of the fallen object prevention fence can be carried out in a safe and easy posture basically from the road side. The object is to provide an installation method and an installation structure for a fall prevention fence that is convenient for installation under a condition where a work space cannot be secured on the private side.
The next object of the present invention is to make a cut to avoid (straddle) the support member of the fence post on the same face material for each position of the fence post for the installation work of attaching the face material by the wire mesh to the fence post. In addition, the face material made of wire mesh is prepared in advance with the necessary length wound like a wrapping paper, and workers standing at the work position on the road side of the fence post position extend the road. A method for setting up a fence post for a fallen object prevention fence and a mounting bracket used for the method are provided, which makes it possible to carry out an installation work of rewinding and sticking to a fence post while sequentially moving in the direction. That is.

上記従来技術の課題を解決するための手段として、請求項1に記載した発明に係る落下物防止フェンスの設置工法は、
道路の路側に沿って延長方向に設置された防護柵3へ、落下物防止フェンス4を取付金具を用いて取り付ける落下物防止フェンスの設置工法であって、
前記取付金具5は、その一側部分をフェンス用支柱40の下方部分と接合され、落下物防止フェンス4の面材設置予定位置の下縁を迂回して前記防護柵3の支柱30に向かって延びる底部50に続いて、前記防護柵支柱30の道路1とは反対側の側面に沿って立ち上がる立ち上がり部51が形成されて成り、前記立ち上がり部51を、防護柵支柱30の道路1とは反対側の側面へボルト7で接合して前記フェンス用支柱40を立て付ける段階と
前記フェンス用支柱40の道路側面の上下に道路延長方向に沿って胴縁42を取り付ける段階と、
前記フェンス用支柱40及び胴縁42の道路側面に沿って面材41を設置する段階と、
しかる後に前記防護柵支柱30の道路1とは反対側の側面の前記取付金具5の立ち上がり部51より上方の部位と、フェンス用支柱40の対面する部位との間に補助金具6を配置し、この補助金具6と防護柵支柱30およびフェンス用支柱40とをボルト接合する段階とから成ることを特徴とする。
請求項2に記載した発明は、請求項1に記載した落下物防止フェンスの設置工法において、
面材41の設置は、道路1の延長方向に施工可能な長さ分を巻紙の如く巻き取って用意し、これを道路1の延長方向へ順次巻き戻しつつ設置する作業を進めて行うことを特徴とする。
As a means for solving the problems of the prior art, the installation method of the falling object prevention fence according to the invention described in claim 1 is:
It is an installation method of a fallen object prevention fence in which a fallen object prevention fence 4 is attached to a protective fence 3 installed in an extending direction along the roadside of the road using a mounting bracket,
One side portion of the mounting bracket 5 is joined to the lower portion of the fence post 40, and detours the lower edge of the face material installation planned position of the falling object prevention fence 4 toward the column 30 of the protective fence 3. Following the extending bottom portion 50, a rising portion 51 is formed that rises along the side surface of the protective fence post 30 opposite to the road 1, and the rising portion 51 is opposite to the road 1 of the protective fence column 30. A step of attaching the fence post 40 by joining with a bolt 7 to the side surface of the side, and a step of attaching a trunk edge 42 along the road extending direction above and below the road side surface of the fence post 40;
Installing a face material 41 along the road side surface of the fence post 40 and the trunk edge 42;
After that, the auxiliary metal fitting 6 is disposed between the part above the rising portion 51 of the mounting bracket 5 on the side opposite to the road 1 of the guard fence post 30 and the part facing the fence post 40, The auxiliary metal fitting 6 is composed of a step of bolting the protective fence post 30 and the fence post 40 to each other.
The invention described in claim 2 is the installation method of the fallen object prevention fence described in claim 1,
The face material 41 is installed by winding up a length that can be constructed in the extension direction of the road 1 like a wrapping paper, and proceeding with the installation work while sequentially rewinding it in the extension direction of the road 1. Features.

請求項3に記載した発明に係るフェンス用支柱の立て付け方法は、
道路1の路側に沿って延長方向に設置された防護柵3の支柱30へ、落下物防止フェンス4のフェンス用支柱40を取付金具4により直立姿勢に取り付けるフェンス用支柱40の立て付け方法であって、
前記取付金具5は、その一側部分を前記フェンス用支柱40の下方部分と接合され、落下物防止フェンス4の面材設置予定位置の下縁を迂回して前記防護柵支柱30に向かって延びる底部50に続いて、前記防護柵支柱30の道路1とは反対側の側面に沿って立ち上がる立ち上がり部51が形成されており、前記立ち上がり部51を防護柵支柱30の道路とは反対側の側面へボルト7で接合して前記フェンス用支柱40を立て付ける段階を経て、落下物防止フェンス4を組み立てる段階へと移行することを特徴とする。
The method for setting up the fence post according to the invention described in claim 3 is:
This is a method of setting up a fence post 40 in which a fence post 40 of a fallen object prevention fence 4 is attached in an upright posture by a mounting bracket 4 to a post 30 of a protective fence 3 installed in an extending direction along the road side of the road 1. And
One side portion of the mounting bracket 5 is joined to the lower portion of the fence post 40 and extends toward the protective fence column 30 by bypassing the lower edge of the face material installation planned position of the fallen object prevention fence 4. Following the bottom portion 50, a rising portion 51 is formed that rises along the side surface of the protective fence column 30 opposite to the road 1, and the rising portion 51 is formed on the side surface opposite to the road of the protective fence column 30. The step moves to the step of assembling the fallen object prevention fence 4 after the step of joining with the heavy bolt 7 and setting the fence support 40.

請求項4に記載した発明に係るフェンス用支柱の取付金具は、
道路1の路側に沿って延長方向に設置された防護柵3の支柱30へ、落下物防止フェンス4のフェンス用支柱40を立て付ける、フェンス用支柱の取付金具であって、
前記取付金具5は、前記フェンス用支柱40の下方部分と接合されるフェンス用支柱取付部52と、前記落下物防止フェンス4の面材設置予定位置の下縁を迂回して前記防護柵支柱30に向かって延びる底部50を備え、
前記底部50に続いて、前記防護柵支柱30の道路1とは反対側の側面に沿って立ち上がる立ち上がり部51を形成された構成であることを特徴とする。
The mounting bracket of the fence post according to the invention described in claim 4 is:
Fence post mounting brackets for setting the fence post 40 of the fall prevention fence 4 to the support post 30 of the protective fence 3 installed in the extending direction along the road side of the road 1,
The mounting bracket 5 circumvents the fence post mounting portion 52 joined to the lower portion of the fence post 40 and the lower edge of the face material installation planned position of the falling object prevention fence 4 so as to bypass the protective fence post 30. A bottom 50 extending toward the
Following the bottom portion 50, a rising portion 51 that rises along the side surface of the protective fence post 30 opposite to the road 1 is formed.

請求項5に記載した発明は、請求項4に記載したフェンス用支柱の取付金具において、
前記取付金具5のフェンス用支柱取付部53と、フェンス用支柱の下方部分とは、溶接により、又はボルト接合により予め一体的に接合されていることを特徴とする。
The invention described in claim 5 is the mounting bracket for the fence post according to claim 4,
The fence post mounting portion 53 of the mounting bracket 5 and the lower part of the fence post are integrally joined in advance by welding or bolt joining.

請求項1、2に記載した発明に係る落下物防止フェンスの設置工法、及び請求項3に記載した発明に係るフェンス用支柱の立て付け方法によれば、落下物防止フェンス4の設置作業は全て、フェンス用支柱40の位置よりも道路側位置で行えるから、特に跨線橋道路とか立体交差道路のように、歩道側ないし民地側に作業スペースを確保できない条件下での設置施工に好都合であり、安全性の高い工事を楽に短工期に行うことができる。
とりわけ、落下物防止フェンス4の面材41(金網など)をフェンス用支柱40と胴縁42へ設置する(張り付ける)作業に関しては、従来のようにフェンス用支柱40を防護柵支柱30へ支持させた金具を跨ぐ切れ目を加工する作業の必要が一切無く、その分の作業手間を省ける上に、同面材41はフェンス用支柱40へ直接水平方向に当てがう横張り作業ができる。そのため面材41は、予め作業上許容される長さ分を巻紙の如く巻いた状態で準備し、これをフェンス用支柱40よりも道路側の位置へ立つ作業員が道路の延長方向へ順次移動しつつ巻き戻してフェンス用支柱40へ張り付ける設置作業を実施可能である。よって、作業能率は、従来技術に比較して飛躍的に高まり、工期の短縮化とコストの削減に大きな効果が得られる。
また、請求項4、5に記載した発明に係る取付金具5は、防護柵支柱30の下方部分へ予め工場加工として、溶接により、又はボルト接合などの手段で一体的に接合しておけるので、同接合部分の品質の確保が可能であり、現場作業を省略できる。そして、上記したフェンス用支柱の立て付け方法の実施を可能にし、ひいては落下物防止フェンスの設置工法の実施に際して、面材41へ切れ目を入れる加工の必要が無くなり、その分の作業手間を省ける。その上、同面材41はフェンス用支柱40へ直接水平方向に当てがう横張り作業方式で設置でき、作業能率を一層高められ、工期の短縮化を図れる等々の効果を奏する。
According to the installation method of the falling object prevention fence according to the invention described in claims 1 and 2, and the method for setting up the fence post according to the invention described in claim 3, all the installation work of the falling object prevention fence 4 is performed. Since it can be done at the road side position rather than the position of the fence support 40, it is convenient for installation work under conditions where work space cannot be secured on the sidewalk side or private side, especially over the bridge bridge road or three-dimensional intersection road, Highly safe construction can be easily done in a short construction period.
In particular, with respect to the work of installing (pasting) the face material 41 (such as a wire mesh) of the falling object prevention fence 4 on the fence post 40 and the trunk edge 42, the fence post 40 is supported on the protective fence post 30 as in the past. There is no need to work on the cuts straddling the metal fittings, and the work for that amount can be saved. In addition, the same surface material 41 can be applied to the fence support 40 directly in the horizontal direction. Therefore, the face material 41 is prepared in advance in a state where the length allowed for work is wound like a wrapping paper, and an operator standing at a position closer to the road side than the fence post 40 sequentially moves in the road extending direction. However, it is possible to carry out the installation work of rewinding and sticking to the fence support 40. Therefore, the work efficiency is dramatically increased as compared with the prior art, and a great effect can be obtained in shortening the work period and reducing the cost.
In addition, since the mounting bracket 5 according to the invention described in claims 4 and 5 can be integrally joined to the lower portion of the protective fence support 30 in advance by factory processing, by welding or by means such as bolt joining, The quality of the joint portion can be ensured, and field work can be omitted. Then, it is possible to carry out the above-described method for setting up the fence posts, and as a result, when performing the installation method of the falling object prevention fence, it is not necessary to cut the face material 41, thereby saving the work. In addition, the same surface material 41 can be installed by a horizontal working method applied directly to the fence post 40 in the horizontal direction, and the working efficiency can be further improved, and the construction period can be shortened.

Aは本発明により設置した防護柵及び落下物防止フェンスを道路側から見た立面図、Bは前記A図に指示したI−I線矢視の断面図である。A is an elevation view of a protective fence and a fallen object prevention fence installed according to the present invention as viewed from the road side, and B is a cross-sectional view taken along line I-I indicated in FIG. Aは図1Bに指示したII−II線矢視の拡大した断面図、Bは前記A図に指示したII’−II’線矢視方向に見て落下物防止フェンスの設置が完成した構造をフェンス用支柱の下方部分について示した立面図、同Cは取付金具を介して防護柵支柱へフェンス用支柱を立て付けた段階を示した立面図である。A is an enlarged cross-sectional view taken along the line II-II indicated in FIG. 1B, and B is a structure in which the fallen object prevention fence has been installed when viewed in the direction indicated by the arrow II'-II 'indicated in FIG. FIG. 3C is an elevation view showing a lower portion of the fence post, and FIG. 3C is an elevation view showing a stage in which the fence post is placed on the protective fence post via the mounting bracket. A、Bはフェンス用支柱の下方部分へ取付金具を接合した状態を示す平面図と立面図、同Cは取付金具の右側面図である。更に同Dはフェンス用支柱の下方部分へ取付金具を接合した構成がB図とは異なる実施例を示した立面図である。A and B are a plan view and an elevation view showing a state in which the mounting bracket is joined to the lower portion of the fence post, and C is a right side view of the mounting bracket. Furthermore, D is an elevational view showing an embodiment in which the mounting bracket is joined to the lower part of the fence post and the embodiment is different from FIG. Aは本発明の実施例2を上記図2Bと同じ視点で示した立面図、BはA図に指示した楕円b部分の右側面図、CはA、Bに使用した胴縁固定金具の側面図と正面図である。A is an elevation view showing the second embodiment of the present invention from the same viewpoint as FIG. 2B, B is a right side view of an ellipse b indicated in FIG. A, and C is a body edge fixing bracket used for A and B. It is a side view and a front view. A〜Cは上記図4Aに示す実施例2に用いた、防護柵支柱へフェンス用支柱を立て付ける取付金具をフェンス用支柱の下方部分へ接合した状態で示した平面図と立面図、及び右側面図である。Aはフック部材43aを配置した図、B、Cはフック部材43aの配置前の図である。FIGS. 4A and 4B are a plan view and an elevation view showing a state in which the mounting bracket for setting the fence post to the protective fence post is joined to the lower part of the fence post, which is used in the second embodiment shown in FIG. 4A; It is a right view. A is a diagram in which the hook member 43a is arranged, and B and C are diagrams before the hook member 43a is arranged. Aは本発明の実施例3である防護柵及び落下物防止フェンスの設置構造を道路側から見て示した立面図、Bは前記A図に指示したVI−VI線矢視の断面図である。A is an elevation view showing the installation structure of the guard fence and falling object prevention fence according to the third embodiment of the present invention as viewed from the road side, and B is a sectional view taken along the line VI-VI indicated in FIG. is there. Aは図6Bに指示したVII−VII線矢視の断面図、BはA図に指示したVII’−VII’線矢視の立面図、Cは取付金具を介してフェンス用支柱を防護柵支柱へ立て付けた状態を示した立面図である。6A is a cross-sectional view taken along the line VII-VII in FIG. 6B, B is an elevation view taken along the line VII'-VII 'shown in FIG. A, and C is a guard fence for the fence post through the mounting bracket. It is the elevation view which showed the state stood on the support | pillar. A〜Cは上記実施例3に用いた、フェンス用支柱を防護柵支柱へ立て付ける取付金具をフェンス用支柱の下方部分へ接合した状態で示した平面図と立面図、及び右側面図である。A to C are a plan view, an elevation view, and a right side view showing a state in which the mounting bracket for standing the fence post to the guard fence post used in Example 3 is joined to the lower part of the fence post. is there. Aは従来の防護柵及び落下物防止フェンスの設置状態を道路側から見て示す立面図、Bは前記A図に指示したIX−IX線矢視の断面図である。A is an elevation view showing the installation state of a conventional protective fence and falling object prevention fence as viewed from the road side, and B is a cross-sectional view taken along the line IX-IX indicated in FIG. Aは図9Bに指示したX−X線矢視の断面図、Bは前記A図における取付金具部分を示した立面図である。9A is a cross-sectional view taken along line XX in FIG. 9B, and FIG. 9B is an elevation view showing a mounting bracket portion in FIG.

請求項1、2に記載した発明による落下物防止フェンスの設置工法は、道路1の路側に沿って延長方向に設置された防護柵3へ、落下物防止フェンス4を取付金具5を用いて取り付け設置する工法として実施する。
取付金具5は、その一側部分(フェンス用支柱取付部53)をフェンス用支柱40の下方部分と接合し、落下物防止フェンス4の面材設置予定位置の下縁を迂回して前記防護柵3の支柱30に向かって延びる底部50に続いて、前記防護柵支柱30の道路1とは反対側の側面に沿って立ち上がる立ち上がり部51を形成して成り、前記立ち上がり部51を、防護柵支柱30の道路1とは反対側の側面へボルト7で接合して前記フェンス用支柱40を立て付ける段階と、
前記フェンス用支柱40の道路側面の上下に、道路延長方向に沿って胴縁42を取り付ける段階と、
前記フェンス用支柱40及び上下の胴縁42の道路側面に沿って面材41(金網)を設置する(張り付ける)段階と、
しかる後に前記防護柵支柱30の道路1とは反対側の側面の前記取付金具5の立ち上がり部51より上方の部位と、フェンス用支柱40の対面する部位との間へ補助金具6を配置し、この補助金具6と防護柵支柱30およびフェンス用支柱40とをボルト接合する段階とにより実施する。
この場合に、上記面材41の設置作業は、道路1の延長方向へ施工可能な長さ分を予め巻紙の如く巻き取った形に用意し、これを道路の延長方向へ順次巻き戻しつつ設置する作業を進めて行う。
According to the first and second aspects of the present invention, the fallen object prevention fence is installed by attaching the fallen object prevention fence 4 to the protective fence 3 installed in the extending direction along the road side of the road 1 using the mounting bracket 5. Implement as the installation method.
The mounting bracket 5 is joined to the lower portion of the fence post 40 by joining one side portion thereof (fence post mounting portion 53), bypassing the lower edge of the face material installation planned position of the falling object prevention fence 4 and the protective fence. 3 is formed by forming a rising portion 51 that rises along a side surface of the protective fence post 30 opposite to the road 1, and extends from the bottom portion 50 extending toward the column 30. 30 steps of connecting the fence post 40 to the side opposite to the road 1 with bolts 7 and setting the fence post 40;
Attaching the rim 42 along the road extending direction above and below the road side surface of the fence post 40;
Installing (pasting) a face material 41 (metal mesh) along the road side of the fence post 40 and the upper and lower trunk edges 42;
After that, the auxiliary metal fitting 6 is arranged between the part above the rising part 51 of the mounting metal fitting 5 on the side opposite to the road 1 of the guard fence post 30 and the part facing the fence post 40, The auxiliary metal fitting 6, the guard fence post 30 and the fence post 40 are joined by bolting.
In this case, the installation work of the face material 41 is prepared by winding up the length that can be constructed in the extension direction of the road 1 in advance in the form of a wrapping paper, and then rewinding it in the extension direction of the road. Proceed with work to do.

請求項3に記載した発明によるフェンス用支柱の立て付け方法は、道路1の路側に沿って延長方向へ設置された防護柵3の支柱30へ、落下物防止フェンス4のフェンス用支柱40を取付金具5により直立姿勢に取り付ける方法であり、
前記取付金具5は、その一側部分(フェンス用支柱取付部53)を前記フェンス用支柱40の下方部分と接合され、落下物防止フェンス4の面材設置予定位置の下縁を迂回して前記防護柵支柱30に向かって延びる底部50に続いて、前記防護柵支柱30の道路1とは反対側の側面に沿って立ち上がる立ち上がり部51が形成されており、
前記立ち上がり部51を、防護柵支柱30の道路1とは反対側の側面へボルト7で接合して前記フェンス用支柱40を立て付ける段階を経て、面材41を組み立てる段階へと移行する手順で実施する。
According to the third aspect of the present invention, the fence support post 40 is attached to the support pillar 30 of the protective fence 3 installed in the extension direction along the road side of the road 1. It is a method of mounting in an upright position with the bracket 5,
The mounting bracket 5 has one side portion (fence post mounting portion 53) joined to a lower portion of the fence post 40, and bypasses the lower edge of the face material installation planned position of the fallen object prevention fence 4 to bypass the lower end. Following the bottom 50 extending toward the protective fence post 30, a rising portion 51 is formed that rises along the side of the protective fence post 30 opposite to the road 1,
In the procedure which goes to the step of assembling the face material 41 through the step of joining the rising portion 51 to the side surface of the protective fence post 30 opposite to the road 1 with the bolt 7 and standing the fence post 40. carry out.

更に、請求項4に記載した発明によるフェンス用支柱の取付金具5は、道路1の路側に沿って延長方向へ設置された防護柵3の支柱30へ、落下物防止フェンス4のフェンス用支柱40を立て付ける手段に使用するもので、
この取付金具5は、前記フェンス用支柱40の下方部分と接合されるフェンス用支柱取付部53と、
前記落下物防止フェンス4の面材設置予定位置の下縁を迂回して前記防護柵支柱30に向かって延びる底部50を備え、
前記底部50に続いて、防護柵支柱30の道路1とは反対側の側面に沿って立ち上がる立ち上がり部51が形成された構成とする。
この取付金具5のフェンス用支柱取付部53と、フェンス用支柱40の下方部分とは、溶接により、又はボルト接合により予め一体的に接合しておくことができる。
Further, the fence support bracket 5 according to the invention described in claim 4 is attached to the support post 30 of the protection fence 3 installed in the extending direction along the road side of the road 1 and to the support post 40 of the fall prevention fence 4. It is used as a means to set up
The mounting bracket 5 includes a fence post mounting portion 53 joined to a lower portion of the fence post 40, and
A bottom 50 extending around the protective fence post 30 around the lower edge of the face material installation planned position of the falling object prevention fence 4;
Following the bottom portion 50, a rising portion 51 that rises along the side surface of the protective fence post 30 opposite to the road 1 is formed.
The fence post mounting portion 53 of the mounting bracket 5 and the lower portion of the fence post 40 can be integrally joined in advance by welding or bolt joining.

先ず図1A、Bは、本発明による落下物防止フェンスの設置工法により、道路1の路側に沿って延長方向に設置された防護柵3へ、落下物防止フェンス4を取付金具5を用いて取り付けた実施例1を示している。
図1に示した落下物防止フェンス4は、道路1の路側に沿って延長方向に起立させたコンクリート高欄2の上面に、新設であるか、既設であるかの別を問わず、鋼製高欄による防護柵3が先行して設置されていることを前提に、同防護柵3の道路1とは反対側位置に落下物防止フェンス4が取付金具5を用いて設置された構成を示している。
落下物防止フェンス4の面材41には、ひし形金網を用いた例を示している。そして、同面材41は、上下の水平端縁を、フェンス用支柱40の上下へ水平方向に取り付けたアングルによる胴縁42、42へ金網取付け金具を使用して張り付けて設置されているが、その取付け構造の詳細については既に公知、周知に属するので、詳細な図示及び説明は省略する。
因みに、図1に示した防護柵3の構成についても詳しく図示することは省略したが、道路1の長手方向に一定の間隔をあけて立てた防護柵支柱(高欄支柱)30の上端部に、道路延長方向の防護パイプ(ビームパイプ)31を支持させた構成を示しているが、この点の構成も既に公知、周知であるため、詳細な図示と説明は省く。もっとも、防護柵3の構造を前記鋼製高欄による構成に限る意味ではない。防護柵支柱30を後述する構成で落下物防止フェンス4の設置に利用できる限り、その具体的構成の如何は問わない。例えば図6〜図8の実施例が好適に参照されるであろう。
First, FIGS. 1A and 1B show a fallen object prevention fence 4 attached to a protective fence 3 installed in an extending direction along the road side of the road 1 by using a mounting bracket 5 according to the installation method of the fallen object prevention fence according to the present invention. Example 1 is shown.
The fallen object prevention fence 4 shown in FIG. 1 is a steel railing regardless of whether it is newly installed or existing on the upper surface of the concrete railing 2 erected along the road side of the road 1. Assuming that the protective fence 3 is installed in advance, a fallen object prevention fence 4 is installed using a mounting bracket 5 at a position opposite to the road 1 of the protective fence 3. .
An example in which a rhombus wire mesh is used for the face material 41 of the falling object prevention fence 4 is shown. The same surface material 41 is installed by attaching the upper and lower horizontal end edges to the trunk edges 42 and 42 by the angle attached in the horizontal direction to the upper and lower sides of the fence support column 40 using a metal mesh mounting bracket. Since the details of the mounting structure are already known and well known, detailed illustration and description thereof will be omitted.
Incidentally, although detailed illustration of the configuration of the protective fence 3 shown in FIG. 1 is omitted, the upper end of the protective fence column (railing column) 30 standing at a certain interval in the longitudinal direction of the road 1 Although a configuration in which a protection pipe (beam pipe) 31 in the road extending direction is supported is shown, since this configuration is already known and well known, detailed illustration and description are omitted. However, it does not mean that the structure of the protective fence 3 is limited to the structure by the steel railing. As long as the protection fence post 30 can be used for the installation of the fallen object prevention fence 4 in the configuration described later, the specific configuration thereof does not matter. For example, reference will preferably be made to the embodiment of FIGS.

本発明によれば、上記構成の防護柵3が、新設であるか既設であるかの如何を問わず、先行して設置されていることを前提に、落下物防止フェンス4が次のように設置される。
図2Bと図3Bを参照すると明かなように、鋼製の取付金具5は、底部50の一側部分(図の左側部分)がフェンス用支柱取付部53とされ、その上面に、垂直な姿勢としたフェンス用支柱40の下面を突き合わせ、図示例の場合は溶接により一体的に接合した構成とされている。前記底部50は、図2B、Cに示したとおり、後述する面材設置予定位置にある面材41の下縁を迂回して(下縁を潜って)前記防護柵3の支柱30に向かって延びる。そして、前記底部50に続いて、前記防護柵支柱30の道路1とは反対側の側面(図2Bの左側面)に沿って立ち上がる立ち上がり部51を一連に形成して成り、この取付金具5は全体としてL字形に構成されている。更に前記立ち上がり部51には、図3Cに示したように、上方部分の左右に2個(但し、2個の限りではない。)のボルト孔52が設けられている。
上記の取付金具5は、図2のとおり、その底部50の下面がコンクリート高欄2の上面へ接する配置とし、前記立ち上がり部51を防護柵支柱30の道路1とは反対側の側面へ接触させ、前記2個のボルト孔52を利用して防護柵支柱30とボルト7で強固に接合することにより、前記フェンス用支柱40を垂直姿勢に立て付けることができる。
因みに図示したフェンス用支柱40には、長さが1.5m程度の軽量ハット形鋼を使用している。取付金具5には厚さ6mm程度の鋼板を使用しているので、取付金具5の立ち上がり部51を防護柵支柱30の側面へボルト7で強固に接合することにより、フェンス用支柱40は安定な垂直姿勢に立て付けることができる。図2Aは、防護柵支柱30がH形鋼を利用して構成していることを示している。
According to the present invention, on the premise that the guard fence 3 having the above-described configuration is installed in advance, regardless of whether it is a new construction or an existing construction, the falling object prevention fence 4 is as follows. Installed.
2B and 3B, the steel mounting bracket 5 is such that one side portion (the left side portion in the figure) of the bottom portion 50 is a fence post mounting portion 53, and a vertical posture is provided on the upper surface thereof. The bottom surface of the fence support 40 is abutted, and in the illustrated example, it is integrally joined by welding. As shown in FIGS. 2B and 2C, the bottom 50 bypasses the lower edge of the face material 41 at the position where the face material is planned to be described later (submerge the lower edge) toward the column 30 of the protective fence 3. Extend. Then, following the bottom portion 50, a series of rising portions 51 rising along the side surface (the left side surface in FIG. 2B) opposite to the road 1 of the protective fence column 30 is formed. As a whole, it is configured in an L shape. Further, as shown in FIG. 3C, the rising portion 51 is provided with two (but not limited to) two bolt holes 52 on the left and right of the upper portion.
As shown in FIG. 2, the mounting bracket 5 is arranged so that the bottom surface of the bottom portion 50 is in contact with the top surface of the concrete rail 2, the rising portion 51 is brought into contact with the side surface opposite to the road 1 of the protective fence column 30, By using the two bolt holes 52 to firmly join the guard fence post 30 and the bolt 7, the fence post 40 can be set in a vertical posture.
Incidentally, a lightweight hat-shaped steel having a length of about 1.5 m is used for the fence post 40 shown in the figure. Since a steel plate having a thickness of about 6 mm is used for the mounting bracket 5, the fence column 40 is stable by firmly joining the rising portion 51 of the mounting bracket 5 to the side surface of the protective fence column 30 with the bolt 7. Can stand upright. FIG. 2A shows that the guard fence support 30 is configured using H-section steel.

以上に説明し図2Bに示したようにして、道路1の延長方向に並び立つ既設の防護柵支柱30の位置毎に、同取付金具5により防護柵支柱30へフェンス用支柱40を安定な垂直姿勢に立て付けてゆく。因みに、防護柵支柱30およびフェンス用支柱40の道路延長方向の間隔は、通例2m以下とされる。
上記のようにフェンス用支柱40を垂直姿勢に立て付けた後は、既往の施工と同様に、各フェンス用支柱40の上下の位置に、面材41の上下の端縁部を支持させる胴縁(アングル)42、42を取り付け、面材41の張り付け設置の作業に備えたフェンス下地(骨組み構造)を構築する。
胴縁(アングル)42の取付けは、既に公知、周知であるとおり、そして、図2B、Cに一部分を示したように、フェンス用支柱40において胴縁42を取り付けるべき位置に予め打ち起こし加工法で受けフック43が形成され、同受けフック43へ胴縁42のうち、フェンス用支柱40の側面と平行な一辺の先端縁を差し入れて支持させる。そして、同フェンス用支柱40の側面から水平に突き出る他の一辺の先端縁へ掛け止めた金具44を取り付け、長ボルト45を道路1とは反対向きに前記掛け止めた金具44へ貫通させる。更に同長ボルト45は、フェンス用支柱40に予め設けてある水平方向のボルト孔へも通し、同ボルト孔の背後側位置であるフェンス用支柱40の側面へ点付け溶接等で固定したナット46へネジ込み強く締結することで、胴縁42の取り付けが行われている。
因みに、図2Bは、下位の胴縁(アングル)42をフェンス用支柱40へ取り付けた構成を示している。上位の胴縁42も同様な構成でフェンス用支柱40への取り付けが行われる。もっとも、胴縁42の設置を含むフェンス下地(骨組み構造)の組み立てを前記構成に限る意味ではない。
As described above and shown in FIG. 2B, the fence post 40 is stably attached to the guard post 30 by the mounting bracket 5 at each position of the existing guard post 30 arranged in the extending direction of the road 1. I will stand up. Incidentally, the distance in the road extension direction between the protective fence column 30 and the fence column 40 is generally 2 m or less.
After the fence post 40 is set in the vertical posture as described above, the upper and lower end edges of the face member 41 are supported at the upper and lower positions of each fence post 40 in the same manner as in the past construction. (Angle) 42 and 42 are attached, and a fence foundation (frame structure) prepared for the work of attaching and installing the face material 41 is constructed.
As shown in FIGS. 2B and 2C, the attachment of the trunk edge (angle) 42 is performed in advance in a position where the trunk edge 42 is to be attached in the fence post 40 as shown in part in FIGS. 2B and 2C. Thus, a receiving hook 43 is formed, and a tip end edge of one side parallel to the side surface of the fence support 40 is inserted into the receiving hook 43 and supported. Then, a metal fitting 44 hooked to the tip edge of the other side protruding horizontally from the side surface of the fence post 40 is attached, and the long bolt 45 is passed through the metal fitting 44 hooked in the direction opposite to the road 1. Further, the long bolt 45 is also passed through a horizontal bolt hole previously provided in the fence post 40, and is fixed to the side surface of the fence post 40, which is a position behind the bolt hole, by spot welding or the like. The body rim 42 is attached by screwing in and tightening strongly.
Incidentally, FIG. 2B shows a configuration in which the lower trunk edge (angle) 42 is attached to the fence post 40. The upper trunk edge 42 is also attached to the fence post 40 with the same configuration. However, the assembly of the fence foundation (frame structure) including the installation of the trunk edge 42 is not limited to the above configuration.

上記のようにして、フェンス下地(骨組み構造)の構築が完成した後の作業工程として、前記フェンス用支柱40及び胴縁42の道路側面に沿って、面材41(ひし形金網)を張り付ける設置作業を進める。
面材41を上記のフェンス下地へ張り付ける設置作業に関しては、図2B、Cの対比で明かな通り、取付金具5の底部50は、上記のように設置する面材の設置予定位置における面材下縁(下位の胴縁42の位置)の下を迂回する(潜る)ように位置させるので、面材41は、図2Bにおいて防護柵支柱30とフェンス用支柱40の間へ単に差し入れ、そのままフェンス用支柱40の道路側面に向かって水平方向に押し当てる作業法で、楽に張り付け設置の作業を進めることができる。したがって、既往技術のように、面材41が防護柵支柱30とフェンス用支柱40を繋ぐ金具(図9Bの符号32と図10の符号49参照)の位置毎に、同金具を跨ぐように切り込みを入れる加工の必要は全く無い訳で、切り込み作業を一切省ける。
のみならず、面材41(ひし形金網)は、道路1の延長方向に施工可能な長さ分(一工区分)を1単位として、予め巻紙の如く巻き取った状態に用意し、それを上記構成のフェンス下地の上下の胴縁42に沿って道路1の長手方向へ順次回転しつつ巻き戻してゆき、長い帯状に展開して、下部を防護柵支柱30とフェンス用支柱40の間へ差し入れ、フェンス用支柱40及び上下の胴縁42、42の道路側面へ押し付けて止める単純操作により、張り付け作業を能率良く進めることができる。
As described above, as a work process after the construction of the fence foundation (frame structure) is completed, installation is performed such that the face material 41 (diamond wire mesh) is attached along the road side surfaces of the fence posts 40 and the trunk edge 42. Proceed with work.
Regarding the installation work for attaching the face material 41 to the fence base, the bottom 50 of the mounting bracket 5 is the face material at the position where the face material to be installed is installed as described above, as is apparent from the comparison between FIGS. 2B and 2C. The face material 41 is simply inserted between the protective fence post 30 and the fence post 40 in FIG. 2B, and is directly placed in the fence. By the work method of pressing against the road side surface of the support column 40 in the horizontal direction, it is possible to proceed with the installation work easily. Therefore, as in the prior art, the face material 41 is cut so as to straddle the bracket at every position of the bracket (see reference numeral 32 in FIG. 9B and reference numeral 49 in FIG. 10) that connects the protective fence support 30 and the fence support 40. There is no need for machining, so no cutting work is required.
In addition, the face material 41 (diamond wire mesh) is prepared in a state of being wound up in advance like a wrapping paper, with the length (one work division) that can be constructed in the extending direction of the road 1 as one unit. Rotate and rewind along the upper and lower trunk edges 42 of the construction fence base in the longitudinal direction of the road 1, unfold into a long band, and insert the lower part between the protective fence post 30 and the fence post 40. By a simple operation of pressing and stopping the fence post 40 and the upper and lower trunk edges 42, 42 on the road side surface, the pasting work can be efficiently performed.

因みに、上記した如くフェンス用支柱40及び上下の胴縁42、42の道路側面へ押し付けた面材41は、その上下の端縁を編むように道路延長方向へ通したφ4mm程度の横骨線を、上下の胴縁42、42に対して、既に公知、周知の金網押さえ金具を胴縁42へボルト・ナットで締結する手段により止め付けて設置する。面材41の高さ方向の中間位置にも、φ4mm程度の横骨線47を道路延長方向へ編むように通して止め付けることも周知の通りである。   Incidentally, as described above, the fence post 40 and the face material 41 pressed against the road side surfaces of the upper and lower trunk edges 42, 42 have a horizontal bone line of about φ4 mm passed in the road extending direction so as to knit the upper and lower edges. A well-known and well-known wire mesh press fitting is fixed to the upper and lower barrel edges 42, 42 by means of fastening them to the barrel edge 42 with bolts and nuts. It is also well known that the transverse bone line 47 having a diameter of about 4 mm is also passed through the intermediate direction in the height direction of the face material 41 so as to be knitted in the road extending direction.

上記の手順で面材41を上記構成のフェンス下地へ張り付けて止め付けた後の作業工程としては、図2Bに示したとおり、上記防護柵支柱30の道路1とは反対側の側面であって上記取付金具5の立ち上がり部51の上端よりも上方の部位と、フェンス用支柱40の対面する部位との間へ跨る補助金具6を配置する。そして、この補助金具6と防護柵支柱30およびフェンス用支柱40とをそれぞれボルト7’で強固に接合することにより、フェンス用支柱40と面材41は、防護柵支柱30と一体的構造となり、落下物防止フェンス4の設置工事は一段落する。
図示した補助金具6は、下向きのコ字形状とされているが、上記したとおり、フェンス用支柱40を防護柵支柱30と結合して、同フェンス用支柱40の設置状態を十分強固な構成にできる限り、その材質と形状及び構造は限定されない。
また、補助金具6とフェンス用支柱40とを結合するボルト7’をねじ込み締結するナット7aは、フェンス用支柱40の該当位置に予め設けたボルト孔と整合する背後側位置に、フェンス用支柱40へ点付け溶接等で予め固定しておくと、ボルト7’による締結作業が楽で、危険な姿勢をとる必要がなく好都合である。
As shown in FIG. 2B, the work process after the face material 41 is stuck to the fence base having the above structure and fixed by the above procedure is the side surface of the protective fence post 30 opposite to the road 1. The auxiliary metal fitting 6 straddling between the part above the upper end of the rising part 51 of the mounting metal 5 and the part facing the fence post 40 is disposed. Then, by firmly joining the auxiliary metal fitting 6, the guard fence post 30 and the fence pillar 40 with the bolts 7 ', the fence pillar 40 and the face material 41 are integrated with the guard fence pillar 30, The installation work for the fallen object prevention fence 4 is completed.
Although the illustrated auxiliary metal fitting 6 has a downward U-shape, as described above, the fence post 40 is combined with the protective fence post 30 so that the installation state of the fence post 40 is sufficiently strong. As far as possible, the material, shape and structure are not limited.
Further, the nut 7 a for screwing and fastening the bolt 7 ′ for joining the auxiliary metal fitting 6 and the fence post 40 is positioned at the rear side position aligned with the bolt hole provided in advance in the corresponding position of the fence post 40. If it is fixed beforehand by spot welding or the like, it is convenient that the fastening work by the bolt 7 'is easy and it is not necessary to take a dangerous posture.

なお、図3Dは、図3Bと対比して明かなとおり、図3Bでは鋼製の取付金具5における底部50の一側部分(図の左側部分)が一連に水平なフェンス用支柱取付部53とされ、その上面に、垂直な姿勢としたフェンス用支柱40の下面を突き合わせ、溶接により一体的に接合した構成を示している。一方、図3Dは異なる実施例として、取付金具5における底部50の一側部分(図の左側部分)にフェンス用支柱40の道路とは反対側の側面に沿って立ち上がるフェンス用支柱取付部53が形成され、このフェンス用支柱取付部53がフェンス用支柱40とが複数のボルト48とナット49の締結により接合された構成を示している。要するに、フェンス用支柱40とフェンス用支柱取付部53との一体的接合の構造は、適宜に種々実施される一例を示している。   3D, as is clear from FIG. 3B, in FIG. 3B, one side portion (the left side portion in the figure) of the bottom portion 50 of the steel mounting bracket 5 is a series of horizontal fence post attachment portions 53. In addition, a configuration is shown in which the lower surface of the fence post 40 in a vertical posture is abutted on the upper surface and integrally joined by welding. On the other hand, FIG. 3D shows a different embodiment in which a fence post mounting portion 53 that rises along a side surface opposite to the road of the fence post 40 is formed on one side portion (left side portion of the figure) of the bottom 50 of the mounting bracket 5. The fence post support portion 53 is formed and joined to the fence post 40 by fastening a plurality of bolts 48 and nuts 49. In short, the structure of the integral joint between the fence post 40 and the fence post attachment portion 53 is an example of various implementations as appropriate.

次に、図4は、本発明による落下物防止フェンスの設置構造の実施例2を、上記実施例1を示した図2Bと同じ視点で表している。
図4に示した落下物防止フェンスの設置例は、図2B及び図3Bに示した実施例1と対比して見ると明らかなように、取付金具5のフェンス用支柱取付部53が、底部50の左側部分を、上記図3Dとは逆に、フェンス用支柱40の道路側の側面に沿って立ち上がる垂直な屈曲辺に形成され、このフェンス用支柱取付部53がフェンス用支柱40の道路側の側面に沿って溶接でやはり一体的に接合された構成を示している。本実施例2の場合は、取付金具5の底部50の下面と、フェンス用支柱40の下端面とが同一レベルに構成されている。
なお、本実施例の場合、取付金具5における上記フェンス用支柱取付部53の背の高さは、図5Bに示したとおり、上記実施例ではフェンス用支柱40の側壁の一部を打ち起こし加工で形成した受けフック43に代わる手段として、別途用意した図4Cに示すフック部材43aを設置できる背丈に形成されている。
要するに、図4A、Bに示したように、フェンス用支柱40へ取り付ける胴縁42における垂直辺を上記フック部材43aの受けフック43’に指示させ、水平に突き出る他の一辺の先端縁へ掛け止めた金具44を取り付け、長ボルト45を道路1とは反対向きに前記掛け止めた金具44へ貫通させ、更に同前のフック部材43aも貫通させ、ボルト45はフェンス用支柱40に予め設けてある水平方向のボルト孔から、その背後側位置の側面へ点付け溶接等で固定したナット46へネジ込み強く締結することで、胴縁42の取り付けが行われている。
Next, FIG. 4 represents Example 2 of the installation structure of the fallen object prevention fence by this invention from the same viewpoint as FIG. 2B which showed the said Example 1. FIG.
4 clearly shows the installation example of the fallen object prevention fence shown in FIG. 2B and FIG. 3B in comparison with the first embodiment shown in FIGS. 2B and 3B. 3D, the left side portion of the fence is formed on a vertical bent side that rises along the side of the fence post 40 on the road side, and the fence post attachment portion 53 is formed on the road side of the fence post 40 on the road side. The structure also joined integrally by the welding along the side surface is shown. In the case of the second embodiment, the lower surface of the bottom 50 of the mounting bracket 5 and the lower end surface of the fence post 40 are configured at the same level.
In the case of the present embodiment, the height of the fence post mounting portion 53 in the mounting bracket 5 is raised by machining a part of the side wall of the fence post 40 in the embodiment as shown in FIG. 5B. As a means to replace the receiving hook 43 formed in step 1, a hook member 43a shown in FIG.
In short, as shown in FIGS. 4A and 4B, the vertical side of the trunk edge 42 attached to the fence post 40 is instructed to the receiving hook 43 ′ of the hook member 43 a and is latched to the tip edge of the other side protruding horizontally. A long bracket 45 is passed through the bracket 44 that is hooked in the opposite direction to the road 1, and the hook member 43a is also penetrated. The bolt 45 is provided in the fence post 40 in advance. The barrel edge 42 is attached by screwing and tightening from a horizontal bolt hole to a nut 46 fixed to the side surface at the rear side position by spot welding or the like.

したがって、本実施例2の場合も、各フェンス用支柱40の上下の位置に、面材41の上下の端縁部を支持させる胴縁(アングル)42、42を取り付けて、面材41の張り付け作業に備えるフェンス下地(骨組み構造)を構築することは、上記実施例1と同様である。
フェンス用支柱40へ下位の胴縁42を取り付ける構成が、図4Cに示したフック部材43aを使用する点で異なっているにすぎない。
もっとも、上記の構成から明らかなように、取付金具5の垂直辺部53は、フェンス用支柱40の道路側側面へボルト止めによって一体的に接合した構成で実施することも可能である。
Therefore, also in the case of the second embodiment, body edges (angles) 42 and 42 for supporting the upper and lower end edges of the face material 41 are attached to the upper and lower positions of each fence post 40 so that the face material 41 is attached. The construction of a fence foundation (frame structure) prepared for work is the same as in the first embodiment.
The configuration for attaching the lower trunk edge 42 to the fence post 40 is only different in that the hook member 43a shown in FIG. 4C is used.
However, as is apparent from the above configuration, the vertical side portion 53 of the mounting bracket 5 can be implemented by a configuration in which the vertical side portion 53 of the mounting bracket 5 is integrally joined to the side surface of the fence post 40 by bolting.

上記のようにして、フェンス下地(骨組み構造)の構築が完成した後の作業工程として、前記フェンス用支柱40の道路側面に沿って、面材41(ひし形金網)をフェンス下地へ張り付け設置する作業を進めること、そして、上記防護柵支柱30の道路1とは反対側の側面上部と、フェンス用支柱40の対面する部位との間へ跨る補助金具6を配置し、この補助金具6と防護柵支柱30およびフェンス用支柱40とをそれぞれボルト7’で強固に接合して一体的構造とすることにより、落下物防止フェンス4の併設工事が一段落することは、上記実施例1と同じである。   As described above, as a work process after the construction of the fence foundation (frame structure) is completed, the work of attaching the face material 41 (diamond wire mesh) to the fence foundation along the road side surface of the fence post 40 is performed. And the auxiliary metal fitting 6 straddling between the upper part of the side of the protective fence post 30 opposite to the road 1 and the part of the fence post 40 facing the same is arranged. It is the same as the first embodiment that the supporting work for the fallen object prevention fence 4 is completed by firmly joining the support pillar 30 and the fence support pillar 40 with bolts 7 ′ to form an integrated structure.

次に、図6〜図8は、本発明による落下物防止フェンスの設置構造の実施例3を示している。
本実施例3の落下物防止フェンス4は、上記図1に示した実施例1と対比して明らかなとおり、防護柵3の構成をガードレールとした点で異なっている。
即ち、コンクリート高欄2の上面に、防護柵支柱36としての円柱管が道路1の延長方向に一定の間隔をあけて立てられ、この防護柵支柱36の道路側面にビーム35がボルト止めされて防護柵3が構築されている。
Next, FIGS. 6 to 8 show a third embodiment of the installation structure of the falling object prevention fence according to the present invention.
The fallen object prevention fence 4 of the third embodiment is different from the first embodiment shown in FIG. 1 in that the guard fence 3 is configured as a guard rail, as is clear from the first embodiment.
That is, a cylindrical tube as a protective fence post 36 is set up on the upper surface of the concrete railing 2 with a certain interval in the extending direction of the road 1, and the beam 35 is bolted to the side of the road of the protective fence post 36 for protection. The fence 3 is constructed.

一方、落下物防止フェンス4の設置は、図7及び図8を見るとおり、上記実施例1の構成と類似している。即ち、取付金具5の底部50の一側(図中左側)部分がフェンス用支柱取付部53とされ、その上面に、垂直に立てたフェンス用支柱40の下端面が突き合わされ、溶接により一体的に接合されている。また、底部50は、設置予定位置の面材41の下縁を迂回して前記防護柵3の支柱36に向かって延び、続いて図中の右側部分は垂直上向きに屈曲して、前記防護柵支柱36の道路とは反対側の側面に沿って立ち上がる立ち上がり部51として形成されている。
そして、防護柵支柱36の外周へ道路側から抱き付かせたUボルト37の両端を、前記立ち上がり部51の上部に設けた2個のボルト孔52(図8Cを参照)へ通して、ナット38を締結し、取付金具5の固定とフェンス用支柱40の立て付けが行われている。
On the other hand, the installation of the fallen object prevention fence 4 is similar to the configuration of the first embodiment as seen in FIGS. That is, one side (left side in the figure) of the bottom 50 of the mounting bracket 5 is a fence post mounting portion 53, and the lower end surface of the vertically extending fence post 40 is abutted on the upper surface of the mounting bracket 5 and integrated by welding. It is joined to. Further, the bottom 50 bypasses the lower edge of the face material 41 at the planned installation position and extends toward the support column 36 of the protective fence 3, and the right side portion in the drawing is bent upward in the vertical direction. The column 36 is formed as a rising portion 51 that rises along the side surface opposite to the road.
Then, both ends of the U-bolt 37 hung from the road side to the outer periphery of the protective fence post 36 are passed through two bolt holes 52 (see FIG. 8C) provided in the upper portion of the rising portion 51, and the nut 38. Are fastened, and the mounting bracket 5 is fixed and the fence post 40 is erected.

上記のようにして、各防護柵支柱36の位置毎に、フェンス用支柱40の立て付け設置を行った後に、上記実施例1で説明した工程と同様に、各フェンス用支柱40の上下の位置に、面材41の上下の端縁部を支持させる胴縁(アングル)42、42を取り付け、面材41の張り付け設置に備えるフェンス下地(骨組み構造)が構築される。
胴縁(アングル)42の取り付けは、本実施例3の場合も、既に公知、周知であり、図2B、Cに一部を示し説明したように、胴縁42を取り付けるべき該当位置に予め打ち起こし加工で形成された受けフック43へ、胴縁42のうちフェンス用支柱40の側面と平行な一辺の先端縁を差し入れて支持させる。そして、同フェンス用支柱40の側面から水平に突き出る他の一辺の先端縁へ掛け止めた金具44を取り付け、長ボルト45を道路1とは反対側方向に向けて前記掛け止めた金具44へ貫通させ、更にフェンス用支柱40に予め設けてある水平方向のボルト孔へも通し、同ボルト孔の背後側位置であるフェンス用支柱40の側面へ点付け溶接等で固定したナット46へネジ込み強く締結することで、下位の胴縁42の取り付けが行われている。
因みに、図7Cは、下位の胴縁42をフェンス用支柱40へ取り付けただけの途中段階を示している。上位の胴縁42も同様な構成でフェンス用支柱40への取り付けが行われる。もっとも、フェンス下地(骨組み構造)の構築を前記構成に限る意味ではない。
As described above, after setting up the fence posts 40 for each position of each guard fence post 36, the vertical positions of the fence posts 40 are the same as the steps described in the first embodiment. In addition, trunk edges (angles) 42 and 42 for supporting the upper and lower end edges of the face material 41 are attached, and a fence base (frame structure) for constructing the face material 41 for pasting is constructed.
The attachment of the trunk edge (angle) 42 is already known and well known in the case of the third embodiment, and as shown in FIG. 2B and FIG. The front edge of one side parallel to the side surface of the fence post 40 is inserted into the receiving hook 43 formed by raising and supported. Then, a metal fitting 44 that is hooked to the tip edge of the other side that protrudes horizontally from the side surface of the fence post 40 is attached, and the long bolt 45 is passed through the hook 44 that is hooked in the direction opposite to the road 1. Furthermore, it is also passed through a horizontal bolt hole previously provided in the fence post 40, and screwed into a nut 46 fixed by spot welding or the like to the side surface of the fence post 40 that is behind the bolt hole. By fastening, the lower trunk edge 42 is attached.
Incidentally, FIG. 7C shows an intermediate stage in which only the lower trunk edge 42 is attached to the fence post 40. The upper trunk edge 42 is also attached to the fence post 40 with the same configuration. However, the construction of the fence foundation (frame structure) is not limited to the above-described configuration.

上記のようにしてフェンス下地(骨組み構造)の構築が完成した後に、続く作業工程として、前記フェンス用支柱40及び胴縁42の道路側面に沿って、面材41(ひし形金網)を張り付け設置する作業を進めることは上記実施例1と同様である。
また、面材41を上記のフェンス下地へ張り付け設置する作業法に関しても、図7B、Cで明かな通り、取付金具5の底部50は設置された面材41の下縁(下位の胴縁42の位置)よりも下を潜って通る構成になっているので、面材41はその下部を、図7Bに示す防護柵支柱36とフェンス用支柱40との間へ差し入れる操作により、そのままフェンス用支柱40及び胴縁42の道路側面に向かって押し当てることができ、楽に張り付け設置の作業を進めることができる。つまり、既往技術のように、面材41が防護柵支柱36とフェンス用支柱40を繋ぐ金具の位置毎に、同金具を跨ぐ切り込みを入れる加工の必要は全く無い。
勿論、面材41(金網)は、道路1の長手方向に施工可能な長さ分(一工区分)を1単位として、予め巻紙の如く巻き取って用意し、それを上記構成のフェンス下地の上下の胴縁42、42に沿って道路1の長手方向へ順次回転しつつ巻き戻してゆき、長い帯状に展開した後に、やはり防護柵支柱36とフェンス用支柱40の間へ下部を差し入れて、フェンス用支柱40及び上下の胴縁42、42の道路側面へ押し当て止め付ける操作により、張り付け設置の作業を能率良く進めることができる。
After the construction of the fence foundation (frame structure) is completed as described above, as a subsequent work process, a face material 41 (diamond wire mesh) is attached and installed along the road side surface of the fence post 40 and the trunk edge 42. The work is the same as in the first embodiment.
Further, regarding the work method of attaching the face material 41 to the fence base as described above, the bottom 50 of the mounting bracket 5 is the lower edge of the installed face material 41 (lower trunk edge 42 as is apparent from FIGS. 7B and 7C. The face material 41 passes through the lower part of the face material 41 between the protective fence post 36 and the fence post 40 shown in FIG. It can be pressed against the road side surface of the support column 40 and the trunk edge 42, and the work of installation can be facilitated. In other words, unlike the conventional technology, there is no need to cut the straddle straddling the metal fitting at every position of the metal fitting connecting the protective fence post 36 and the fence post 40.
Of course, the face material 41 (metal mesh) is prepared by winding it up in advance like a wrapping paper, with the length (one work division) that can be constructed in the longitudinal direction of the road 1 as one unit, After rotating in the longitudinal direction of the road 1 along the upper and lower trunk edges 42, 42, and unwinding, and expanding into a long strip, the lower part is also inserted between the protective fence post 36 and the fence post 40, By the operation of pressing and stopping the fence post 40 and the upper and lower trunk edges 42, 42 on the road side surface, the work of attaching and setting can be efficiently performed.

面材41の張り付けが終了した後の工程として、前記防護柵支柱36の道路とは反対側の側面の上部と、フェンス用支柱40の対応する部位との間へ補助金具6を配置して跨らせ、防護柵支柱36とはUボルト37とナット38により、フェンス用支柱40とはボルト7’とナット7aにより強く締結して一体的に結合することで、落下物防止フェンス4の設置工程は一段落する。   As a process after the pasting of the face material 41 is completed, the auxiliary metal fitting 6 is disposed between the upper part of the side surface of the protective fence post 36 opposite to the road and the corresponding part of the fence post 40 to straddle. The falling fence prevention fence 4 is installed by strongly fastening the guard fence post 36 with U bolts 37 and nuts 38 and the fence post 40 with bolts 7 'and nuts 7a. Is a paragraph.

以上に本発明を図示した実施例に基づいて説明したが、もとより本発明は各実施例の構成、作用に限定されるものではない。いわゆる当業者が必要に応じて行う設計変更に類する変更、応用の範囲まで含む技術的思想であることを念のため申し添える。   Although the present invention has been described based on the illustrated embodiments, the present invention is not limited to the configurations and functions of the embodiments. I would like to remind you that this is a technical idea that includes the scope of application and changes similar to design changes made by those skilled in the art as necessary.

1 道路
2 コンクリート高欄
3 防護柵
30、36 防護柵支柱
4 落下物防止フェンス
40 フェンス用支柱
41 面材
42 胴縁
5 取付金具
50 底部
51 立ち上がり部
53 フェンス用支柱取付部
6 補助金具
7 ボルト
DESCRIPTION OF SYMBOLS 1 Road 2 Concrete railing 3 Guard fence 30, 36 Guard fence support | pillar 4 Falling object prevention fence 40 Fence support | pillar 41 Face material 42 Trunk edge 5 Mounting bracket 50 Bottom 51 Standing part 53 Fence support | pillar mounting part 6 Auxiliary metal fitting 7 Bolt

Claims (5)

道路の路側に沿って延長方向に設置された防護柵へ、落下物防止フェンスを取付金具を用いて取り付ける落下物防止フェンスの設置工法であって、
前記取付金具は、その一側部分をフェンス用支柱の下方部分と接合され、落下物防止フェンスの面材設置予定位置の下縁を迂回して前記防護柵の支柱に向かって延びる底部に続いて、前記防護柵支柱の道路とは反対側の側面に沿って立ち上がる立ち上がり部が形成されて成り、前記立ち上がり部を、防護柵支柱の道路とは反対側の側面へボルト接合して前記フェンス用支柱を立て付ける段階と
前記フェンス用支柱の道路側面の上下に道路延長方向に沿って胴縁を取り付ける段階と、
前記フェンス用支柱及び胴縁の道路側面に沿って面材を設置する段階と、
しかる後に前記防護柵支柱の道路とは反対側の側面の前記取付金具の立ち上がり部より上方の部位と、フェンス用支柱の対面する部位との間に補助金具を配置し、この補助金具と防護柵支柱およびフェンス用支柱とをボルト接合する段階とから成ることを特徴とする、落下物防止フェンスの設置工法。
Installation method of fallen object prevention fence that attaches fallen object prevention fence using mounting bracket to protective fence installed in the extension direction along the roadside of the road,
The mounting bracket has one side portion joined to the lower portion of the fence post, and continues to the bottom extending around the lower edge of the falling object prevention fence face material installation position and extending toward the guard fence post. A rising portion that rises along a side surface of the protective fence post opposite to the road is formed, and the rising portion is bolted to a side surface of the protective fence post opposite to the road to connect the fence post. And a stage of attaching a trunk edge along the road extending direction above and below the road side surface of the fence post;
Installing a face material along the road side of the fence post and trunk edge;
After that, an auxiliary metal fitting is arranged between a part of the side opposite to the road of the guard fence post above the rising portion of the mounting bracket and a part facing the fence pillar, and the auxiliary metal fitting and the guard fence. An installation method for a fallen object prevention fence, characterized by comprising a step of bolting a support post and a fence support post.
面材の設置は、道路の延長方向に施工可能な長さ分を巻紙の如く巻き取って用意し、これを道路の延長方向へ順次巻き戻しつつ設置する作業を進めて行うことを特徴とする、請求項1に記載した落下物防止フェンスの設置工法。   The installation of the face material is performed by winding up the length that can be constructed in the road extension direction like a wrapping paper, and proceeding with the installation work while sequentially rewinding it in the road extension direction. The installation method of the fallen object prevention fence described in claim 1. 道路の路側に沿って延長方向に設置された防護柵の支柱へ、落下物防止フェンスのフェンス用支柱を取付金具により直立姿勢に取り付けるフェンス用支柱の立て付け方法であって、
前記取付金具は、その一側部分を前記フェンス用支柱の下方部分と接合され、落下物防止フェンスの面材設置予定位置の下縁を迂回して前記防護柵支柱に向かって延びる底部に続いて、前記防護柵支柱の道路とは反対側の側面に沿って立ち上がる立ち上がり部が形成されて成り、前記立ち上がり部を防護柵支柱の道路とは反対側の側面へボルト接合して前記フェンス用支柱を立て付ける段階を経て、落下物防止フェンスを組み立てる段階へと移行することを特徴とする、フェンス用支柱の立て付け方法。
A method for setting up a fence post for attaching a fence post of a fallen object prevention fence to an upright posture by a mounting bracket on a support fence post installed in an extending direction along the road side of the road,
The mounting bracket has one side portion joined to the lower portion of the fence post, and continues to the bottom extending around the lower edge of the fall object prevention fence face material installation position and extending toward the protective fence post. A rising portion rising along a side opposite to the road of the protective fence post is formed, and the rising column is bolted to a side opposite to the road of the protective fence post to attach the fence post. A method for setting up a fence post, wherein the method goes to a stage of assembling a falling object prevention fence through a stage of setting up.
道路の路側に沿って延長方向に設置された防護柵の支柱へ、落下物防止フェンスのフェンス用支柱を立て付ける、フェンス用支柱の取付金具であって、
前記取付金具は、前記フェンス用支柱の下方部分と接合されるフェンス用支柱取付部と、 前記落下物防止フェンスの面材設置予定位置の下縁を迂回して前記防護柵支柱に向かって延びる底部を備え、
前記底部に続いて、前記防護柵支柱の道路とは反対側の側面に沿って立ち上がる立ち上がり部を形成された構成であることを特徴とする、フェンス用支柱の取付金具。
Fence post mounting brackets that stand the fence post of the fallen object prevention fence to the support fence post installed in the extension direction along the road side of the road,
The mounting bracket includes a fence post mounting portion joined to a lower portion of the fence post, and a bottom portion that bypasses a lower edge of the falling material prevention fence face material installation position and extends toward the protection fence post. With
A mounting bracket for a fence post, characterized in that, following the bottom part, a rising part is formed that rises along a side surface opposite to the road of the protective fence post.
前記取付金具のフェンス用支柱取付部と、フェンス用支柱の下方部分とは、溶接により、又はボルト接合により予め一体的に接合されていることを特徴とする、請求項4に記載したフェンス用支柱の取付金具。   5. The fence post according to claim 4, wherein the fence post attachment portion of the mounting bracket and the lower portion of the fence post are integrally joined in advance by welding or bolt joining. Mounting bracket.
JP2010251713A 2010-11-10 2010-11-10 Installation method and structure of fallen object prevention fence and mounting bracket Expired - Fee Related JP5572529B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010251713A JP5572529B2 (en) 2010-11-10 2010-11-10 Installation method and structure of fallen object prevention fence and mounting bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010251713A JP5572529B2 (en) 2010-11-10 2010-11-10 Installation method and structure of fallen object prevention fence and mounting bracket

Publications (2)

Publication Number Publication Date
JP2012102526A true JP2012102526A (en) 2012-05-31
JP5572529B2 JP5572529B2 (en) 2014-08-13

Family

ID=46393228

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010251713A Expired - Fee Related JP5572529B2 (en) 2010-11-10 2010-11-10 Installation method and structure of fallen object prevention fence and mounting bracket

Country Status (1)

Country Link
JP (1) JP5572529B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014132152A (en) * 2012-12-03 2014-07-17 Sekisui Jushi Co Ltd Guard fence and method of assembling the same
JP2020105769A (en) * 2018-12-27 2020-07-09 Jfe建材フェンス株式会社 Method of constructing falling object prevention fence
CN114703761A (en) * 2022-05-09 2022-07-05 保利长大工程有限公司 Protective device for construction of road-crossing cast-in-place box girder and construction method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55178016U (en) * 1979-06-11 1980-12-20
JPS59188513U (en) * 1983-06-01 1984-12-14 株式会社 エフエム鋳鉄 high railing
JPH10168824A (en) * 1996-12-12 1998-06-23 Nippon Light Metal Co Ltd Falling prevention fence

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55178016U (en) * 1979-06-11 1980-12-20
JPS59188513U (en) * 1983-06-01 1984-12-14 株式会社 エフエム鋳鉄 high railing
JPH10168824A (en) * 1996-12-12 1998-06-23 Nippon Light Metal Co Ltd Falling prevention fence

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014132152A (en) * 2012-12-03 2014-07-17 Sekisui Jushi Co Ltd Guard fence and method of assembling the same
JP2020105769A (en) * 2018-12-27 2020-07-09 Jfe建材フェンス株式会社 Method of constructing falling object prevention fence
JP7164429B2 (en) 2018-12-27 2022-11-01 Jfe建材フェンス株式会社 How to build a fence to prevent falling objects
CN114703761A (en) * 2022-05-09 2022-07-05 保利长大工程有限公司 Protective device for construction of road-crossing cast-in-place box girder and construction method thereof

Also Published As

Publication number Publication date
JP5572529B2 (en) 2014-08-13

Similar Documents

Publication Publication Date Title
JP5572529B2 (en) Installation method and structure of fallen object prevention fence and mounting bracket
CN113668772A (en) Method for building space-crossing large-span cantilever truss ground assembly jig frame
JP2010043421A (en) Member for foundation framework of snow fence, foundation of snow fence using the member, and method for constructing the foundation
CN201486120U (en) Detachable steel column connecting construction operation platform
KR100950580B1 (en) Steel guard rail
CN202899600U (en) Construction site limb quick installation and removal protecting device
CN206707318U (en) A kind of construction safety column
CN212248269U (en) SMW worker method stake waist rail support
JP3328626B2 (en) Temporary guardrail parts
KR200445097Y1 (en) Fence intergrated with a post
CN204703542U (en) The assembled passage of a kind of Construction of Steel Structure regularization
CN211201112U (en) Sectional steel tower mounted assembly type construction platform
CN206658039U (en) A kind of lighting proof strip device being easily installed
CN207959911U (en) A kind of builder's jack gusseted
CN206650410U (en) A kind of no-welding lighting proof strip device
CN108483284A (en) A kind of derrick crane base steel plinth suspension installation method
CN213927809U (en) Collision-avoiding foundation pit maintenance device for combined building construction
CN212456562U (en) Assembled lamp bracket
CN214195811U (en) Warning fence for construction site of building engineering
CN213774626U (en) Foundation pit packway support frame fixing tool
CN216076621U (en) Guardrail for construction
CN203452373U (en) Ultrathin steel truss inclined wall formwork structure
CN214885363U (en) Building construction operation platform
CN215289847U (en) Highway construction steel guardrail quick dismounting device
CN219528364U (en) Climbing frame adhesion enhancing device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20130927

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20140324

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20140422

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20140515

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140603

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140630

R150 Certificate of patent or registration of utility model

Ref document number: 5572529

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees