JP2012081948A5 - - Google Patents

Download PDF

Info

Publication number
JP2012081948A5
JP2012081948A5 JP2011180127A JP2011180127A JP2012081948A5 JP 2012081948 A5 JP2012081948 A5 JP 2012081948A5 JP 2011180127 A JP2011180127 A JP 2011180127A JP 2011180127 A JP2011180127 A JP 2011180127A JP 2012081948 A5 JP2012081948 A5 JP 2012081948A5
Authority
JP
Japan
Prior art keywords
electrical system
electrical
analysis
load
configuration data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2011180127A
Other languages
English (en)
Other versions
JP5689768B2 (ja
JP2012081948A (ja
Filing date
Publication date
Priority claimed from US12/968,390 external-priority patent/US8793026B2/en
Application filed filed Critical
Publication of JP2012081948A publication Critical patent/JP2012081948A/ja
Publication of JP2012081948A5 publication Critical patent/JP2012081948A5/ja
Application granted granted Critical
Publication of JP5689768B2 publication Critical patent/JP5689768B2/ja
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Claims (21)

  1. 航空機の電気負荷のライフサイクル管理及び解析システムであって、
    航空機の電気系統構成データ及び電気系統要件を記憶するデータベースモジュールと、
    気系統性能特性を前記電気系統構成データの関数として決定する電気系統解析モジュールであって、前記電気系統構成データは電気系統編成データ、電気系統階層データ、電気系統接続データ、回路データ、及び電気系統構造データを含み、前記電気系統性能特性は負荷分布及び飛行期間中の負荷の解析を含む、前記電気系統解析モジュールと、
    電気系統構成管理モジュールであって、
    前記電気系統構成データに対する、電気コンポーネントの追加及び削除の一つを含む少なくとも一つの変更を管理し、
    前記電気系統性能特性を前記電気系統要件と比較することにより、最な性能を達成する
    電気系統構成管理モジュールと
    を備える電気負荷のライフサイクル管理及び解析システム。
  2. 前記電気系統構成データが、アルゴリズム及び方法論を含んでいる、請求項1に記載の電気負荷のライフサイクル管理及び解析システム。
  3. 前記電気系統構成管理モジュールが、更に、コンプライアンス情報を供給する、請求項1に記載の電気負荷のライフサイクル管理及び解析システム。
  4. 前記電気系統構成管理モジュールが、更に、前記コンプライアンス情報に基づくレポートを生成する、請求項3に記載の電気負荷のライフサイクル管理及び解析システム。
  5. 前記レポートが、設定変更及び電気負荷解析レポートのうちの一つである、請求項4に記載の電気負荷のライフサイクル管理及び解析システム。
  6. 前記設定変更が、業務広報、顧客の変更、及び第三者の変更からなる群のうちの一つから選択される変更を含む、請求項5に記載の電気負荷のライフサイクル管理及び解析システム。
  7. 前記電気系統要件が、前記設定変更に基づく要件を含む、請求項1に記載の電気負荷のライフサイクル管理及び解析システム。
  8. 更に、前記電気系統構成データに従って構成された電気系統のオペレータと通信するインターフェースモジュールを備える、請求項1に記載の電気負荷のライフサイクル管理及び解析システム。
  9. 前記インターフェースモジュールが、更に、前記オペレータに対して少なくとも一つの設定変更を報告する、請求項に記載の電気負荷のライフサイクル管理及び解析システム。
  10. 前記インターフェースモジュールが、更に、前記オペレータから少なくとも一つの設定変更を受け取る、請求項に記載の電気負荷のライフサイクル管理及び解析システム。
  11. 前記インターフェースモジュールが、更に、インターネットのウェブページインターフェースを提供する、請求項に記載の電気負荷のライフサイクル管理及び解析システム。
  12. 航空機の電気負荷のライフサイクル管理及び解析方法であって、
    電気系統編成データ、電気系統階層データ、電気系統接続データ、回路データ、及び電気系統構造データを含む、航空機の電気系統構成データ及び電気系統要件をデータベースに記憶することと、
    前記電気系統構成データから電気コンポーネントの追加及び削除の一つを行うことによって負荷を構成することと、
    前記電気系統構成データに基づいて、負荷分布解析及び飛行期間中の負荷の解析を含む電気系統性能特性を決定することと、
    電気系統性能特性を電気系統要件と比較することによりコンプライアンス情報を供給することと
    を含む方法。
  13. 前記電気系統構成データが、アルゴリズム及び方法論を含む、請求項12に記載の方法。
  14. 前記電気系統構成データに対する少なくとも一つの構成変更を受け取ることと、
    前記電気系統構成データを更新することにより、更新された電気系統構成データを供給することと、
    前記更新された電気系統構成データに基づいて更新後電気系統性能特性を決定することと、
    前記更新後電気系統性能特性を前記電気系統要件と比較することにより、コンプライアンス情報を供給することと
    を更に含む、請求項12に記載の方法。
  15. 更に、前記コンプライアンス情報に基づくレポートを生成することを含む、請求項12に記載の方法。
  16. 前記レポートが、設定変更及びコンプライアンスレポートのうちの一つである、請求項15に記載の方法。
  17. 前記電気系統要件には設定変更に基づく要件が含まれる、請求項12に記載の方法。
  18. 前記電気系統構成データに従って構成された電気系統のオペレータと通信することを更に含む、請求項12に記載の方法。
  19. オペレータと設定変更を通信することを更に含む、請求項18に記載の方法。
  20. 更に、前記電気系統性能特性に基づいて、電気系統の製造及び整備の一方の間に電気系統への負荷を管理することを含む、請求項12に記載の方法。
  21. 請求項1に記載の航空機の電気負荷のライフサイクル管理及び解析システムであって、更に、 前記航空機に関する電気負荷解析を計算するための計算論理を含むコンピュータプログラムを含み、前記計算論理は、非一時的コンピュータ可読媒体に埋め込まれ、且つ顧客によって前記電気系統構成データを含む電気負荷解析データベースにアクセス及び修正するためのマイクロプロセッサによって実行可能であり、前記マイクロプロセッサは電気負荷解析レポートを生成し、及び
    前記計算論理は、
    前記電気負荷解析データベースにアクセスし、
    前記電気負荷解析データベースからの前記電気コンポーネントの追加又は削除を含む、変更承認を伴う負荷の修正を受け取り、
    前記電気系統性能特性を含む前記電気負荷解析を計算する、電気負荷のライフサイクル管理及び解析システム。
JP2011180127A 2010-09-15 2011-08-22 電気負荷管理システム Active JP5689768B2 (ja)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
US88301610A 2010-09-15 2010-09-15
US12/883,016 2010-09-15
US12/968,390 US8793026B2 (en) 2010-09-15 2010-12-15 Electrical load management system
US12/968,390 2010-12-15

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2015014336A Division JP2015120514A (ja) 2010-09-15 2015-01-28 電気負荷管理システム

Publications (3)

Publication Number Publication Date
JP2012081948A JP2012081948A (ja) 2012-04-26
JP2012081948A5 true JP2012081948A5 (ja) 2014-08-28
JP5689768B2 JP5689768B2 (ja) 2015-03-25

Family

ID=44905393

Family Applications (3)

Application Number Title Priority Date Filing Date
JP2011180127A Active JP5689768B2 (ja) 2010-09-15 2011-08-22 電気負荷管理システム
JP2015014336A Pending JP2015120514A (ja) 2010-09-15 2015-01-28 電気負荷管理システム
JP2016217069A Active JP6570502B2 (ja) 2010-09-15 2016-11-07 電気負荷管理システム

Family Applications After (2)

Application Number Title Priority Date Filing Date
JP2015014336A Pending JP2015120514A (ja) 2010-09-15 2015-01-28 電気負荷管理システム
JP2016217069A Active JP6570502B2 (ja) 2010-09-15 2016-11-07 電気負荷管理システム

Country Status (5)

Country Link
US (2) US8793026B2 (ja)
EP (1) EP2431277A3 (ja)
JP (3) JP5689768B2 (ja)
CN (1) CN102402721B (ja)
AU (1) AU2011204964B2 (ja)

Families Citing this family (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8793026B2 (en) 2010-09-15 2014-07-29 The Boeing Company Electrical load management system
WO2013067061A2 (en) * 2011-10-31 2013-05-10 Siemens Corporation Simulating customer behavior for demand response
FR3001443B1 (fr) * 2013-01-30 2016-05-27 Microturbo Procede et systeme d'alimentation en energie electrique d'un aeronef
US9577432B2 (en) 2013-08-09 2017-02-21 The Boeing Company Advanced energy monitoring and control in a complex system
JP2017507063A (ja) * 2014-02-21 2017-03-16 タレリス・グローバル・エルエルピーTaleris Global LLP 航空機の空調パックの故障を予測するための方法
CN104038546A (zh) * 2014-06-12 2014-09-10 深圳市元征科技股份有限公司 一种车辆检测方法、移动终端和车载终端
JP5967265B2 (ja) * 2014-07-31 2016-08-10 ダイキン工業株式会社 機器制御装置
US9384601B2 (en) * 2014-08-15 2016-07-05 Ppg Industries Ohio, Inc. Aircraft electronic fingerprint and monitoring performance of an aircraft component using the aircraft's electronic fingerprint
US9809321B2 (en) * 2014-10-30 2017-11-07 The Boeing Company Electrical power distribution system with localized distribution conversion units
US10389114B2 (en) 2014-11-25 2019-08-20 The Boeing Company Regulated transformer rectifier unit for aircraft systems
US9762064B2 (en) * 2014-11-25 2017-09-12 The Boeing Company Stable electrical power system with regulated transformer rectifier unit
FR3030147B1 (fr) * 2014-12-11 2018-03-16 Mmt Sa Actionneur avec modules statorique et rotorique enrobes
CN104836278B (zh) * 2015-04-22 2017-06-27 南京航空航天大学 一种多电飞机电气负载启动管理方法
KR101617857B1 (ko) * 2015-10-15 2016-05-03 (주)진상일양행 전력 손실 감소 장치
US10160341B2 (en) * 2016-10-27 2018-12-25 Ford Global Technologies, Llc Electrical system and methods for a vehicle
US20190005826A1 (en) 2017-06-28 2019-01-03 Ge Aviation Systems, Llc Engine load model systems and methods
US10848341B2 (en) 2017-08-02 2020-11-24 Airbus Operations Sas Aircraft comprising a hybrid electrical power distribution and data communication network
FR3069969B1 (fr) * 2017-08-02 2019-08-23 Airbus Operations (S.A.S.) Element modulaire pour un reseau mixte d'un aeronef
EP3565189B1 (fr) * 2017-08-02 2020-06-17 Airbus Operations (S.A.S.) Aéronef comportant un réseau de distribution de puissance électrique
FR3069970A1 (fr) * 2017-08-02 2019-02-08 Airbus Operations (S.A.S.) Aeronef comprenant un reseau mixte de distribution de puissance electrique et de communication de donnees
US10839624B2 (en) * 2018-02-28 2020-11-17 Honeywell International Inc. Systems and methods for associating and presenting aviation checklist data and electronic circuit breaker (ECB) data onboard an aircraft
CN108418208B (zh) * 2018-03-05 2020-07-28 中国商用飞机有限责任公司北京民用飞机技术研究中心 一种基于穷举遍历法的民机多电系统负载管理方法和系统
CN110162432B (zh) * 2019-05-31 2023-04-25 哈尔滨工业大学 一种基于arm的多级容错星载计算机系统
CN110979706B (zh) * 2019-10-11 2022-12-30 中国直升机设计研究所 一种双电压直升机电源系统
DE102019218574A1 (de) 2019-11-29 2021-06-02 Airbus Operations Gmbh Konfigurationsmanagement für avioniknetzwerk und verfahren zum überprüfen der konfiguration eines avioniknetzwerks
CN112561482B (zh) * 2020-12-17 2023-04-07 中国航空工业集团公司成都飞机设计研究所 一种飞机全生命周期管理数据构建方法
FR3122409A1 (fr) * 2021-04-28 2022-11-04 Airbus Operations (S.A.S.) Aéronef comportant un réseau de distribution de puissance électrique.
KR102375013B1 (ko) * 2021-11-01 2022-03-16 한화시스템 주식회사 노후 항공기의 항전장비 개조 장착에 따른 전기부하 해석 최적화 방법

Family Cites Families (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3842249A (en) 1971-10-19 1974-10-15 Westinghouse Electric Corp Electrical system with programmed computer control and manually initiated control means
JPH0696148A (ja) 1992-09-09 1994-04-08 Mitsubishi Electric Corp 電気系統図管理設計支援装置
GB9412287D0 (en) 1994-06-18 1994-08-10 Smiths Industries Plc Power supply systems
US20040095237A1 (en) * 1999-01-09 2004-05-20 Chen Kimball C. Electronic message delivery system utilizable in the monitoring and control of remote equipment and method of same
US6671593B2 (en) 1999-12-01 2003-12-30 Sinex Holding Llc Dynamic aircraft maintenance production system
US6741989B1 (en) 2000-06-07 2004-05-25 Ge Capital Services Structured Finance Group, Inc. Web-based method and system for exchanging information among partners
US6633802B2 (en) 2001-03-06 2003-10-14 Sikorsky Aircraft Corporation Power management under limited power conditions
US6782346B2 (en) * 2001-05-07 2004-08-24 The Boeing Company Aircraft synthesis and systems evaluation method for determining and evaluating electrical power generation and distribution system components
US7210653B2 (en) 2002-10-22 2007-05-01 The Boeing Company Electric-based secondary power system architectures for aircraft
US20050006954A1 (en) 2003-06-30 2005-01-13 The Boeing Company Aircraft secondary electric load controlling system
US20050229838A1 (en) * 2003-07-07 2005-10-20 Lyons Robert J Aircraft secondary electric load controlling system
TW200605430A (en) * 2004-07-20 2006-02-01 Avision Inc Electrical magnetic interference inspecting system
US7702435B2 (en) * 2004-11-05 2010-04-20 Honeywell International Inc. Method and apparatus for system monitoring and maintenance
US7770052B2 (en) 2006-05-18 2010-08-03 The Boeing Company Collaborative web-based airplane level failure effects analysis tool
CN101202469A (zh) * 2007-09-25 2008-06-18 宋振群 基于嵌入式系统的配电变压器远程监测终端
US8237308B2 (en) * 2007-12-12 2012-08-07 The Boeing Company Dynamic electrical load management
US8065126B2 (en) * 2008-07-29 2011-11-22 Mentor Graphics Corporation GUI-facilitated change management for vehicle electrical/electronic architecture design
CN101354408B (zh) * 2008-07-31 2010-08-18 南京能瑞自动化设备有限公司 基于台区集中服务终端的电能采集与运行管理系统及方法
US20100036540A1 (en) * 2008-08-05 2010-02-11 John Lyle Vian Optimizing usage of powered systems
JP2010134630A (ja) * 2008-12-03 2010-06-17 Sony Corp 情報処理装置、分割管理サーバ、情報処理方法、分割管理方法、プログラムおよび情報処理システム
GB2468652B (en) * 2009-03-16 2011-08-31 Ge Aviat Systems Ltd Electrical power distribution
US20100138363A1 (en) * 2009-06-12 2010-06-03 Microsoft Corporation Smart grid price response service for dynamically balancing energy supply and demand
US8793026B2 (en) 2010-09-15 2014-07-29 The Boeing Company Electrical load management system

Similar Documents

Publication Publication Date Title
JP2012081948A5 (ja)
US10320638B1 (en) Method and system for determining workload availability in a multi-tenant environment
Garraghan et al. An analysis of failure-related energy waste in a large-scale cloud environment
US8904209B2 (en) Estimating and managing power consumption of computing devices using power models
US9753749B2 (en) Information handling system configuration parameter history management
Uddin et al. Server consolidation: An approach to make data centers energy efficient and green
Huang et al. Research on architecture and query performance based on distributed graph database Neo4j
JP2013513872A5 (ja)
Procaccianti et al. Green architectural tactics for the cloud
ATE546781T1 (de) Steuerung der betriebsmittelvergabe für backup- operationen
JP2015511345A (ja) 仮定およびスキーマフリー構成管理のための要件メトリクスの反復シミュレーション
Shoukourian et al. Monitoring power data: A first step towards a unified energy efficiency evaluation toolset for HPC data centers
JP2015512091A5 (ja)
Procaccianti et al. A systematic literature review on energy efficiency in cloud software architectures
CN110046071A (zh) 数据库监控方法、装置、计算设备与存储介质
CN103220166B (zh) 服务器集群的license管理方法
WO2012138588A3 (en) Modeling and consuming business policy rules
JP5556418B2 (ja) 電力平準化制御装置、電力平準化制御方法及び電力平準化制御プログラム
Liu et al. Project genome: Wireless sensor network for data center cooling
CN105426177B (zh) 一种建立SaaS应用程序模型的方法及系统
Mahmud et al. Online resource management for data center with energy capping
Deprez et al. Integrating energy and eco-aware requirements engineering in the development of services-based applications on virtual clouds
CN104951312A (zh) 一种基于模型驱动的业务功能定制系统
CN104714813A (zh) 一种基于代理模式的android数据库延迟加载方法
CN104809152B (zh) 一种节约PostgreSQL共享内存的方法及系统