JP2012026598A - Waste material and subsidiary material charging apparatus of waste melting furnace - Google Patents

Waste material and subsidiary material charging apparatus of waste melting furnace Download PDF

Info

Publication number
JP2012026598A
JP2012026598A JP2010163099A JP2010163099A JP2012026598A JP 2012026598 A JP2012026598 A JP 2012026598A JP 2010163099 A JP2010163099 A JP 2010163099A JP 2010163099 A JP2010163099 A JP 2010163099A JP 2012026598 A JP2012026598 A JP 2012026598A
Authority
JP
Japan
Prior art keywords
waste
intermediate hopper
seal valve
inert gas
furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2010163099A
Other languages
Japanese (ja)
Other versions
JP5626860B2 (en
Inventor
Mitsumasa Todaka
光正 戸高
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Engineering Co Ltd
Original Assignee
Nippon Steel Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Engineering Co Ltd filed Critical Nippon Steel Engineering Co Ltd
Priority to JP2010163099A priority Critical patent/JP5626860B2/en
Publication of JP2012026598A publication Critical patent/JP2012026598A/en
Application granted granted Critical
Publication of JP5626860B2 publication Critical patent/JP5626860B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Gasification And Melting Of Waste (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a waste material and subsidiary material charging apparatus having a simplified structure by integrating a waste material charging apparatus and a subsidiary material charging apparatus of a waste melting furnace and that is capable of preventing blocking caused by adhesion of dust.SOLUTION: The waste material and subsidiary material charging apparatus provided at a furnace top part includes an intermediate hopper 2 for storing waste and subsidiary materials to be charged into the furnace. An upper seal valve 6 that opens and closes during reception of the waste material is provided at an upper end of the intermediate hopper 2. A lower seal valve 7 that opens and closes during insertion of the waste and subsidiary materials into the waste melting furnace is provided at a lower end of the intermediate hopper 2. The intermediate hopper 2 includes a subsidiary material chute 21 communicated therewith so that the subsidiary material can be introduced into the intermediate hopper 2, an upper seal valve 23 provided at an upper end of the subsidiary material chute 21, and an inactive gas blowing pipe 25 connected to the intermediate hopper 2 for introducing inactive gas into the intermediate hopper to replace gas in the intermediate hopper.

Description

本発明は、廃棄物を溶融処理する廃棄物溶融炉へ廃棄物及び副資材を装入するための廃棄物及び副資材装入装置に関する。   The present invention relates to a waste and secondary material charging apparatus for charging waste and secondary materials into a waste melting furnace for melting waste.

一般廃棄物、産業廃棄物等の廃棄物を溶融処理する廃棄物溶融炉の上部には、廃棄物を装入する廃棄物装入装置と、コークスや石灰石等の副資材を装入する副資材装入装置が設けられている。   At the top of the waste melting furnace for melting waste such as general waste and industrial waste, waste charging equipment for charging waste and auxiliary materials for charging auxiliary materials such as coke and limestone A charging device is provided.

廃棄物溶融炉への廃棄物の装入時には、廃棄物溶融炉内で発生した可燃性でかつ人体に有害な成分を含む炉内ガスが炉外へ漏出することを防ぐために、廃棄物溶融炉の廃棄物装入装置は、中間ホッパーの上端部に廃棄物の受入時に開閉する上部シール弁と、下端部に貯留廃棄物の廃棄物溶融炉内への投入時に開閉する、下部シール弁を設けた中間ホッパーを備え、中間ホッパー内に侵入した炉内ガスを不活性ガスパージにより炉内に排出している(特許文献1参照)。   When charging waste into the waste melting furnace, in order to prevent the in-furnace gas generated in the waste melting furnace and containing harmful components to the human body from leaking out of the furnace, This waste charging device is provided with an upper seal valve that opens and closes at the upper end of the intermediate hopper, and a lower seal valve that opens and closes when the stored waste enters the waste melting furnace at the lower end. In addition, an in-furnace gas that has entered the intermediate hopper is discharged into the furnace by an inert gas purge (see Patent Document 1).

コークス、石灰石等の副資材を装入する副資材装入装置においても、廃棄物装入装置と同様に副資材貯留ホッパー内に侵入した炉内ガスを不活性ガスパージにより炉内に排出している。   Even in the auxiliary material charging device for charging auxiliary materials such as coke and limestone, the furnace gas that has entered the auxiliary material storage hopper is discharged into the furnace by inert gas purging as with the waste charging device. .

図2において、廃棄物溶融炉1の炉上部に配置された廃棄物装入装置Aには、廃棄物ピット4から廃棄物クレーン5で搬送された廃棄物29を受け入れる受入ホッパー3が設けられ、受入ホッパー3の下部には溶融炉1内に投入する廃棄物29を一旦貯留する中間ホッパー2が連設される。   In FIG. 2, the waste charging apparatus A disposed in the upper part of the waste melting furnace 1 is provided with a receiving hopper 3 that receives the waste 29 conveyed by the waste crane 5 from the waste pit 4. An intermediate hopper 2 for temporarily storing waste 29 to be introduced into the melting furnace 1 is connected to the lower portion of the receiving hopper 3.

さらに、廃棄物溶融炉1の炉上部には、廃棄物装入装置Aと独立して副資材装入装置Bが設けられている。   Further, an auxiliary material charging device B is provided at the upper part of the waste melting furnace 1 independently of the waste charging device A.

廃棄物溶融炉1は、炉内で発生した可燃性ガスや可燃性ダストを燃焼室8へ導入するために排ガス管9により燃焼室8と接続される。   The waste melting furnace 1 is connected to the combustion chamber 8 by an exhaust gas pipe 9 in order to introduce combustible gas and combustible dust generated in the furnace into the combustion chamber 8.

燃焼室8の燃焼バーナ10の燃焼空気は、廃棄物ピット4の臭気対策上、ごみピット4から吸引される。例えば、廃棄物ピット4内の空気を吸引するために設けられた燃焼空気吹込ダクト11と燃焼空気ファン12により燃焼用空気として供給される。燃焼空気吹込ダクト11には、負圧を調整する絞りダンパー13(図3)が設けられる。   Combustion air from the combustion burner 10 in the combustion chamber 8 is sucked from the waste pit 4 to prevent odor in the waste pit 4. For example, the air is supplied as combustion air by a combustion air blowing duct 11 and a combustion air fan 12 provided for sucking air in the waste pit 4. The combustion air blowing duct 11 is provided with a throttle damper 13 (FIG. 3) for adjusting the negative pressure.

図3において、中間ホッパー2は、上部シール弁6と下部シール弁7を備え、上部シール弁6で受入ホッパー3と仕切られ、下部シール弁7で炉内と仕切られている。廃棄物ピット4から廃棄物クレーン5で搬送された廃棄物は、上部シール弁6を開とし、受け入れホッパー3を経由して中間ホッパー2に一旦貯留された後、上部シール弁6を閉とする。その後、下部シール弁7を開いて炉内に投入される。   In FIG. 3, the intermediate hopper 2 includes an upper seal valve 6 and a lower seal valve 7. The upper seal valve 6 partitions the receiving hopper 3 and the lower seal valve 7 partitions the inside of the furnace. The waste conveyed from the waste pit 4 by the waste crane 5 opens the upper seal valve 6, temporarily stores in the intermediate hopper 2 via the receiving hopper 3, and then closes the upper seal valve 6. . Thereafter, the lower seal valve 7 is opened and charged into the furnace.

中間ホッパー2には、不活性ガス吹込用配管14が接続されるとともに、ごみ装入時、中間ホッパー2内に侵入した炉内ガスを置換するために導入する空気を燃焼空気吹込ダクト11へ排出する空気排気管15が接続されている。中間ホッパー2の空気排気管15の流入口は、廃棄物の流入を防ぐためカバー18で覆われている。不活性ガス吹込用配管14には不活性ガス吹込弁16が設けられ、空気排気管15には空気排気弁17が設けられる。   An inert gas blowing pipe 14 is connected to the intermediate hopper 2, and air introduced to replace the furnace gas that has entered the intermediate hopper 2 is discharged to the combustion air blowing duct 11 when charging the waste. An air exhaust pipe 15 is connected. The inlet of the air exhaust pipe 15 of the intermediate hopper 2 is covered with a cover 18 to prevent the inflow of waste. The inert gas blowing pipe 14 is provided with an inert gas blowing valve 16, and the air exhaust pipe 15 is provided with an air exhaust valve 17.

さらに、中間ホッパー2には、ごみとともに持ち込まれた空気を燃焼空気吹込ダクト11へ導入する空気排気管20が接続されている。不活性ガス吹込用配管14には不活性ガス吹込弁19が設けられ、空気排気管20には空気排気弁20aが設けられる。   Further, the intermediate hopper 2 is connected to an air exhaust pipe 20 for introducing the air brought in with the dust into the combustion air blowing duct 11. The inert gas blowing pipe 14 is provided with an inert gas blowing valve 19, and the air exhaust pipe 20 is provided with an air exhaust valve 20 a.

廃棄物装入装置Aと独立して炉上部に配置されている副資材装入装置Bには、副資材コンベア28より送られてくる副資材30を受け入れる副資材受入ホッパー31の下部に、副資材を貯留する副資材貯留ホッパー22が連設され、さらに副資材貯留ホッパー22の下部に副資材シュート21が連設されている。副資材シュート21は炉上部に接続されて炉内に連通している。   In the auxiliary material charging device B arranged at the upper part of the furnace independently of the waste charging device A, the auxiliary material receiving hopper 31 for receiving the auxiliary material 30 sent from the auxiliary material conveyor 28 is provided under the auxiliary material receiving hopper 31. A secondary material storage hopper 22 for storing the material is continuously provided, and a secondary material chute 21 is continuously provided at a lower portion of the secondary material storage hopper 22. The auxiliary material chute 21 is connected to the upper part of the furnace and communicates with the inside of the furnace.

副資材装入装置Bの副資材貯留ホッパー22は、廃棄物装入装置Aの中間ホッパー2と同様に、上部シール弁23及び下部シール弁24を備え、上部シール弁23で副資材受入ホッパー31と仕切られ、下部シール弁24で炉内と仕切られている。   The auxiliary material storage hopper 22 of the auxiliary material charging device B includes an upper seal valve 23 and a lower seal valve 24 as in the intermediate hopper 2 of the waste charging device A, and the auxiliary material receiving hopper 31 is formed by the upper seal valve 23. And is separated from the inside of the furnace by a lower seal valve 24.

副資材貯留ホッパー22には、不活性ガス吹込弁25aを備えた不活性ガス吹込用配管25、不活性ガス吹込弁26aを備えた不活性ガス吹込用配管26がそれぞれ接続されるとともに、パージにより置換された空気を燃焼空気吹込ダクト11へ導入する、空気排気弁27aを備えた空気排気管27が接続されている。   The auxiliary material storage hopper 22 is connected with an inert gas blowing pipe 25 provided with an inert gas blowing valve 25a and an inert gas blowing pipe 26 provided with an inert gas blowing valve 26a, respectively. An air exhaust pipe 27 having an air exhaust valve 27a for introducing the substituted air into the combustion air blowing duct 11 is connected.

図3によりごみ装入及び副資材装入の手順について説明する。   With reference to FIG. 3, the procedure for charging the waste and charging the auxiliary material will be described.

1.ごみ装入
(1)中間ホッパーへのごみの受入準備
ごみを中間ホッパー2に受け入れる前に、中間ホッパー2のパージとして不活性ガスパージ弁16を開いて不活性ガスを導入し、微開状態7aの下部シール弁7より炉内に排出する。
さらに、中間ホッパー内の可燃性ガス濃度が空気中での可燃域以下となった状態で、下部シール弁7を全閉とし、上部シール弁6を半開とし、空気排気管15の空気排気弁17を開として、上部シール弁6側より空気が導入されて、燃焼空気吹込ダクト11側に案内する流路が形成され、中間ホッパー2内が空気置換され、正常となった後、ごみ装入の準備が完了する。
1. (1) Preparation for receiving waste into the intermediate hopper Before receiving the waste into the intermediate hopper 2, the inert gas purge valve 16 is opened as a purge of the intermediate hopper 2 to introduce inert gas, and the finely opened state 7a The gas is discharged from the lower seal valve 7 into the furnace.
Further, the lower seal valve 7 is fully closed, the upper seal valve 6 is half-opened, and the air exhaust valve 17 of the air exhaust pipe 15 is in a state where the combustible gas concentration in the intermediate hopper is equal to or lower than the combustible region in the air. Is opened, air is introduced from the upper seal valve 6 side, a flow path is formed to guide to the combustion air blowing duct 11 side, the inside of the intermediate hopper 2 is replaced with air, and after normal operation, Preparation is complete.

(2)中間ホッパーへのごみの受入
ごみの受入は上部シール弁6を開にして中間ホッパー2へごみの受入を行い、上部シール弁を閉じる。
(2) Receipt of garbage into the intermediate hopper To accept garbage, the upper seal valve 6 is opened to accept garbage into the intermediate hopper 2, and the upper seal valve is closed.

(3)受入時に随伴して侵入した空気の置換
上部シール弁閉後、ごみとともに持ち込まれた空気(酸素)を不活性ガスで置換するため、不活性ガス吹込用配管14の不活性ガス吹込弁19を開いて中間ホッパー2内に不活性ガスを吹き込んで中間ホッパー内の空気を空気排気弁20aを開いて空気排気管20より排気し、燃焼空気吹込ダクト11に排出する。
(3) Replacement of the air that has entered along with the reception After the upper seal valve is closed, the inert gas blowing valve 14 of the inert gas blowing pipe 14 is used to replace the air (oxygen) brought in with the dust with the inert gas. 19 is opened, an inert gas is blown into the intermediate hopper 2, the air in the intermediate hopper is exhausted from the air exhaust pipe 20 by opening the air exhaust valve 20 a, and discharged to the combustion air blowing duct 11.

(4)ごみの炉内への投入
置換完了後、下部シール弁7を開いてごみ29を溶融炉1内に装入する。
(4) Putting the waste into the furnace After the replacement is completed, the lower seal valve 7 is opened and the waste 29 is charged into the melting furnace 1.

(5)炉内ガスの置換
ごみの炉内装入終了後、装入時に中間ホッパー2内に侵入した炉内ガスを不活性ガスで置換するため、(1)へ戻る。以下、(1)〜(5)を繰り返して副資材の装入と空気及び炉内ガスのパージを行う。
(5) Substitution of furnace gas After completion of entering the furnace interior, the process returns to (1) in order to replace the furnace gas that has entered the intermediate hopper 2 at the time of charging with the inert gas. Thereafter, (1) to (5) are repeated to perform charging of the auxiliary material and purging of air and furnace gas.

2.副資材の装入
(1)副資材貯留ホッパーへの副資材の受入準備
副資材を副資材貯留ホッパー22に受け入れる前に、副資材貯留ホッパー22内のガスのパージとして不活性ガス吹込用配管26を開いて不活性ガスを導入し、下部シール弁24を微開状態にして炉内に排出して、副資材ホッパー22内を不活性ガスで置換し、次のごみ装入の準備が完了する。
2. Loading of secondary material (1) Preparation for receiving secondary material into secondary material storage hopper Before receiving secondary material into secondary material storage hopper 22, pipe 26 for injecting inert gas as a purge of gas in secondary material storage hopper 22 Is opened, the inert gas is introduced, the lower seal valve 24 is slightly opened and discharged into the furnace, the inside of the auxiliary material hopper 22 is replaced with the inert gas, and the preparation for the next waste charging is completed. .

(2)副資材貯留ホッパーへの副資材の受入
副資材コンベア28より送られた副資材は副資材受入ホッパー31から上部シール弁23を開にして副資材貯留ホッパー22へ受け入れた後、上部シール弁23を閉じて貯留する。
(2) Acceptance of subsidiary material to subsidiary material storage hopper The subsidiary material sent from the subsidiary material conveyor 28 is received from the subsidiary material receiving hopper 31 to the subsidiary material storage hopper 22 by opening the upper seal valve 23, and then the upper seal. The valve 23 is closed and stored.

(3)受入時に随伴して侵入した空気の置換
貯留過程で持ち込まれた空気は不活性ガス吹込用配管25より不活性ガスが導入され、空気排気弁27より燃焼空気吹込ダクトに排出される。
(3) Replacement of air that has entered during reception The air brought in during the storage process is introduced with inert gas from the inert gas blowing pipe 25 and is discharged from the air exhaust valve 27 to the combustion air blowing duct.

(4)副資材の炉内への投入
置換完了後、下部シール弁24を開いて副資材30を直接炉内に通じる副資材シュート21より溶融炉1内に装入する。
(4) Inputting the secondary material into the furnace After the replacement is completed, the lower seal valve 24 is opened, and the secondary material 30 is charged into the melting furnace 1 from the secondary material chute 21 that leads directly into the furnace.

(5)炉内ガスの置換
副資材の炉内装入終了後、装入時に副資材貯留ホッパー22内に侵入した炉内ガスを不活性ガスで置換するため、(1)へ戻る。以下、(1)〜(5)を繰り返して副資材の装入と空気及び炉内ガスのパージを行う。
(5) Replacement of Furnace Gas After the completion of loading of the auxiliary material into the furnace interior, the process returns to (1) in order to replace the in-furnace gas that has entered the auxiliary material storage hopper 22 at the time of charging with the inert gas. Thereafter, (1) to (5) are repeated to perform charging of the auxiliary material and purging of air and furnace gas.

特開2007−225196号公報JP 2007-225196 A

前記特許文献1記載の廃棄物装入装置においては、中間ホッパー内のダスト濃度及び湿度が高いために、中間ホッパーからの排気部分(図3のカバー18や空気排気管20の部分)でダストが付着して閉塞し、中間ホッパーの不活性ガス置換が不良となり、運転が中止になるという問題がある。   In the waste charging device described in Patent Document 1, since dust concentration and humidity in the intermediate hopper are high, dust is generated at the exhaust portion (the cover 18 and the air exhaust pipe 20 in FIG. 3) from the intermediate hopper. There is a problem that the adhering and clogging is caused, the inert gas replacement of the intermediate hopper becomes defective, and the operation is stopped.

また、ごみの中間ホッパーの投入前のパージ系と投入後のパージ系が独立して必要であるため、構造が複雑となっている。   In addition, since a purge system before the introduction of the intermediate hopper of the waste and a purge system after the introduction are required independently, the structure is complicated.

さらに、副資材装入装置も廃棄物装入装置と同様のパージ系であるため、前述の廃棄物装入装置と同じく構造が複雑となっている。   Further, since the auxiliary material charging device is a purge system similar to the waste charging device, the structure is complicated as with the above-described waste charging device.

そこで、本発明は、廃棄物溶融炉の廃棄物装入装置と副資材装入装置を一体化した構造にして装置を簡素化するとともに、ダストの付着による閉塞を防止することが可能な、廃棄物溶融炉の廃棄物及び副資材装入装置を提供するものである。   Therefore, the present invention has a structure in which the waste charging device and the auxiliary material charging device of the waste melting furnace are integrated to simplify the device and prevent clogging due to dust adhesion. A waste melting furnace waste and secondary material charging device is provided.

本発明は、廃棄物溶融炉の炉頂部に設けられた、炉内に装入する廃棄物及び副資材を貯留する中間ホッパーを備えた廃棄物及び副資材装入装置において、中間ホッパーの上端部に廃棄物の受入時に開閉する上部シール弁が設けられるとともに、中間ホッパーの下端部に廃棄物及びの廃棄物及び副資材を廃棄物溶融炉内への装入時に開閉する下部シール弁が設けられ、中間ホッパーには、副資材を中間ホッパー内に導入可能に副資材シュートが連通し、副資材シュートの上端部には上部シール弁が設けられ、さらに、中間ホッパーには、中間ホッパー内のガスを置換する不活性ガスを中間ホッパー内に導入する不活性ガス吹込用配管が接続されていることを特徴とする。   The present invention relates to a waste and auxiliary material charging apparatus provided with an intermediate hopper for storing waste and auxiliary materials to be charged in the furnace, provided at the top of the waste melting furnace. In addition, an upper seal valve that opens and closes when receiving waste is provided, and a lower seal valve that opens and closes when the waste and waste and auxiliary materials are charged into the waste melting furnace at the lower end of the intermediate hopper. The intermediate hopper communicates with a secondary material chute so that the secondary material can be introduced into the intermediate hopper, and an upper seal valve is provided at the upper end of the secondary material chute. Further, the intermediate hopper has a gas in the intermediate hopper. An inert gas blowing pipe for introducing an inert gas for replacing the gas into the intermediate hopper is connected.

副資材シュートには、空気排気管の一端が接続されるとともに、空気排気管の他端が燃焼室に接続されている燃焼空気吹込ダクトに接続され、さらに、副資材シュートには、その上部シール弁より中間ホッパー側に不活性ガスを導入する不活性ガス吹込用配管が接続される。   One end of the air exhaust pipe is connected to the secondary material chute, and the other end of the air exhaust pipe is connected to a combustion air blowing duct connected to the combustion chamber. An inert gas blowing pipe for introducing an inert gas to the intermediate hopper side from the valve is connected.

本発明は、副資材を直接炉内投入方式から、副資材シュートにより中間ホッパーへ投入する方式としたことにより、副資材装入装置の副資材投入のための弁は上部シール弁のみでよいので、下部シール弁が不必要となる。また、中間ホッパー及び副資材シュート側のガス置換を同時に行うことができるので、パージラインが簡略化されるとともに、パージラインの弁も大幅に削減される。   The present invention adopts a method in which the auxiliary material is introduced into the intermediate hopper by the auxiliary material chute from the direct charging method in the furnace, so that the valve for supplying the auxiliary material of the auxiliary material charging device may be only the upper seal valve. The lower seal valve is unnecessary. Further, since the gas replacement on the intermediate hopper and the auxiliary material chute side can be performed at the same time, the purge line is simplified and the valves of the purge line are greatly reduced.

さらに、不活性ガスの排気部分が副資材シュートと兼用されているため、従来の排気部分の湿ダストの付着成長は副資材のシュートへの滑降動作で副資材装入毎に洗浄され、目詰まり閉塞が解消できる。   In addition, since the exhaust part of the inert gas is also used as a secondary material chute, the adhesion dust growth of the conventional exhaust part is washed down every time the secondary material is charged by sliding down to the secondary material chute. The blockage can be resolved.

本発明のパージの給排気管機能を有した副資材シュートの設置例を示す。The example of installation of the auxiliary material chute having the purge air supply / exhaust pipe function of the present invention is shown. 従来の不活性ガスのパージ方法及び副資材投入方法を示す全体系統図である。It is the whole system diagram which shows the purge method and the auxiliary material injection | throwing-in method of the conventional inert gas. 図2のパージ方法及び副資材投入方法を示す溶融炉装入部分の例である。It is an example of the melting furnace charging part which shows the purge method and auxiliary material injection method of FIG.

図1において、本実施例においても、図2に示す従来例と同様に、廃棄物溶融炉1の炉上部に配置されている廃棄物装入装置Aには、廃棄物ピットから廃棄物クレーンで搬送された廃棄物を受け入れる受入ホッパー3が設けられ、受入ホッパー3の下部に炉内に装入する廃棄物を一旦貯留する中間ホッパー2が連設される。   In FIG. 1, also in the present embodiment, as in the conventional example shown in FIG. 2, the waste charging device A disposed at the upper part of the waste melting furnace 1 is connected to the waste pit by a waste crane. A receiving hopper 3 for receiving the transported waste is provided, and an intermediate hopper 2 for temporarily storing the waste to be charged into the furnace is provided below the receiving hopper 3.

中間ホッパー2には、その上端部に廃棄物の受入時に開閉する上部シール弁6が設けられるとともに、下端部に貯留廃棄物の廃棄物溶融炉内への投入時に開閉する下部シール弁7が設けられ、上部シール弁6で受入ホッパー3と仕切られ、下部シール弁7で炉内と仕切られている。   The intermediate hopper 2 is provided with an upper seal valve 6 that opens and closes at the upper end when receiving waste, and a lower seal valve 7 that opens and closes when stored waste enters the waste melting furnace at the lower end. The upper seal valve 6 partitions the receiving hopper 3 and the lower seal valve 7 partitions the interior of the furnace.

中間ホッパー2には、ごみ及び副資材の受入時に随伴して侵入した空気を置換する不活性ガスを中間ホッパー2内に導入する不活性ガス導入配管14が接続され、不活性ガス導入配管14には不活性ガス吹込弁19が設けられている。   The intermediate hopper 2 is connected to an inert gas introduction pipe 14 that introduces an inert gas that replaces the air that has entered along with the reception of dust and auxiliary materials into the intermediate hopper 2, and is connected to the inert gas introduction pipe 14. An inert gas blowing valve 19 is provided.

中間ホッパー2には、副資材を中間ホッパー2内に導入するため、副資材装入装置Bの副資材シュート21が接続されて連通している。副資材シュート21の上部には、副資材シュート21の上部を仕切る開閉可能な上部シール弁23が設けられている。   A secondary material chute 21 of the secondary material charging device B is connected to and communicates with the intermediate hopper 2 in order to introduce the secondary material into the intermediate hopper 2. An upper seal valve 23 that is openable and closable for partitioning the upper portion of the auxiliary material chute 21 is provided at the upper portion of the auxiliary material chute 21.

副資材シュート21には、上部シール弁23より中間ホッパー2側に燃焼空気吹込ダクト11に接続される空気排気管20が接続される。空気排気管20には空気排気弁20aが設けられている。   An air exhaust pipe 20 connected to the combustion air blowing duct 11 is connected to the auxiliary material chute 21 on the intermediate hopper 2 side from the upper seal valve 23. The air exhaust pipe 20 is provided with an air exhaust valve 20a.

また、副資材シュート21には、には不活性ガス吹込配管14が接続され、不活性ガス吹込配管14には不活性ガス吹込弁16が設けられている。   Further, an inert gas blowing pipe 14 is connected to the auxiliary material chute 21, and an inert gas blowing valve 16 is provided in the inert gas blowing pipe 14.

さらに、ごみを中間ホッパー2に受け入れる前の中間ホッパー2の炉内ガスのパージとして不活性ガス吹込弁16より不活性ガスを導入し、副資材シュート21を経由して中間ホッパー2に流入し、微開状態7aの下部シール弁7より炉内に排出する。この時、上部シール弁23、上部シール弁6及び空気排気弁20aは全閉としておく。中間ホッパー内の可燃性ガスが一定の濃度以下となった以後、上部シール弁6を半開し、空気排気弁20を開とし、大気圧以下に調整された燃焼空気吹込ダクト11に通じる流路を形成し、空気置換を行う。この時、下部シール弁7及び上部シール弁6は全閉としておく。空気置換を行った後、次のごみの受入準備が完了する。   Furthermore, an inert gas is introduced from the inert gas blowing valve 16 as a purge of the gas in the furnace of the intermediate hopper 2 before receiving the waste into the intermediate hopper 2, and flows into the intermediate hopper 2 via the auxiliary material chute 21, The gas is discharged from the lower seal valve 7 in the slightly opened state 7a into the furnace. At this time, the upper seal valve 23, the upper seal valve 6 and the air exhaust valve 20a are fully closed. After the combustible gas in the intermediate hopper becomes a certain concentration or less, the upper seal valve 6 is opened halfway, the air exhaust valve 20 is opened, and a flow path leading to the combustion air blowing duct 11 adjusted to the atmospheric pressure or less is provided. Form and perform air displacement. At this time, the lower seal valve 7 and the upper seal valve 6 are fully closed. After air replacement, preparation for receiving the next garbage is completed.

ごみの受入は、上部シール弁6を開とし、副資材の受入は上部シール弁23を開いて行う。   The waste is received by opening the upper seal valve 6, and receiving the secondary material by opening the upper seal valve 23.

ごみ及び副資材の受入時に随伴して侵入した空気は、下部シール弁7を開にしてごみ及び副資材を炉内に投入する前に不活性ガスで置換する必要があり、これは不活性ガス吹込弁19を開いて、排気は副資材シュート21を経由して空気排気管20より燃焼空気吹込ダクト11へ排出される。これにより中間ホッパー2及び副資材シュート21側のガス置換を同時に行うことができ、パージに必要な工程、バルブ数がきわめて簡略化される。   It is necessary to replace the air that has entered along with the receipt of the dust and the auxiliary material with an inert gas before opening the lower seal valve 7 and putting the dust and the auxiliary material into the furnace. The blow valve 19 is opened, and the exhaust is discharged from the air exhaust pipe 20 to the combustion air blow duct 11 via the auxiliary material chute 21. Thereby, the gas replacement on the intermediate hopper 2 and the auxiliary material chute 21 side can be performed at the same time, and the process and the number of valves necessary for purging are greatly simplified.

同時に、不活性ガスの排気部分が副資材シュート21と兼用されているため、従来の排気部分の湿ダストの付着成長は副資材のシュートへの滑降動作で洗浄され、目詰まり閉塞が解消できる。   At the same time, since the exhaust part of the inert gas is also used as the secondary material chute 21, the conventional growth and adhesion of wet dust on the exhaust part is cleaned by the sliding action of the secondary material onto the chute, and clogging blockage can be eliminated.

図1によりごみ及び副資材の装入について説明する。   The charging of garbage and auxiliary materials will be described with reference to FIG.

(1)中間ホッパーへのごみ及び副資材の受入準備
ごみ及び副資材を中間ホッパー2に受け入れる前の中間ホッパー2のパージとして、中間ホッパー2の上部シール弁6及び副資材シュート21の上部シール弁23を閉じた状態で、不活性ガス吹込弁16より不活性ガスが導入され、副資材シュート21を経由して中間ホッパー2に流入し、下部シール弁7の微開状態7aにより炉内に排出される。
中間ホッパー内の可燃性ガスが一定の濃度以下となった以後、不活性ガス吹込弁16及び下部シール弁7を閉とし上部シール弁6を半開し、空気配管の20の空気排気弁20aを開にして、絞りダンパー13により大気圧以下に調整された燃焼空気吹込管11に通じる流路を形成し、空気置換を行う。こうしてごみ及び副資材の受入準備が完了する。
(1) Preparation of receiving waste and secondary materials into the intermediate hopper As the purge of the intermediate hopper 2 before receiving the waste and secondary materials into the intermediate hopper 2, the upper seal valve 6 of the intermediate hopper 2 and the upper seal valve of the secondary material chute 21 In the state in which 23 is closed, the inert gas is introduced from the inert gas blowing valve 16, flows into the intermediate hopper 2 through the auxiliary material chute 21, and is discharged into the furnace by the slightly opened state 7 a of the lower seal valve 7. Is done.
After the combustible gas in the intermediate hopper has become below a certain concentration, the inert gas blowing valve 16 and the lower seal valve 7 are closed, the upper seal valve 6 is opened halfway, and the air exhaust valve 20a of the air pipe 20 is opened. Thus, a flow path leading to the combustion air blowing pipe 11 adjusted to the atmospheric pressure or less by the throttle damper 13 is formed, and air replacement is performed. In this way, preparations for receiving waste and secondary materials are completed.

(2)中間ホッパーへのごみ及び副資材の受入
ごみの受入は上部シール弁6を開にし、副資材の受入は上部シール弁23を開にして行う。
(2) Receiving garbage and secondary materials into the intermediate hopper Receiving waste is performed by opening the upper seal valve 6 and receiving secondary materials by opening the upper seal valve 23.

(3)受入時に随伴して侵入した空気の置換
ごみ及び副資材の受入時に随伴して侵入した空気は、下部シール弁7を開にしてごみ及び副資材を炉内投入する前に不活性ガスで置換する必要がある。これは不活性ガス吹込弁19を開いて、排気は副資材シュート21を経由して空気排気管20の空気排気弁20aを開いて燃焼空気吹込管11へ排出される。これにより中間ホッパー2及び副資材シュート側のガス置換を同時に行うことができる。
(3) Replacement of the air that has entered during reception The air that has entered during the reception of waste and secondary materials is inert before the lower seal valve 7 is opened and the waste and secondary materials are put into the furnace. It is necessary to replace with. This opens the inert gas blowing valve 19, and the exhaust is discharged to the combustion air blowing pipe 11 through the secondary material chute 21 by opening the air exhaust valve 20 a of the air exhaust pipe 20. Thereby, the gas replacement on the intermediate hopper 2 and the auxiliary material chute side can be performed simultaneously.

(4)ごみ及び副資材の炉内装入
下部シール弁7を開にしてごみ及び副資材を炉内投入する。
(4) Entering the waste and auxiliary materials into the furnace interior Open the lower seal valve 7 and put the waste and auxiliary materials into the furnace.

(5)炉内ガスの置換
ごみ及び副資材の炉内装入終了後、装入時に中間ホッパー2内に侵入した炉内ガスを不活性ガスで置換して、受入準備をするため、前記(1)に戻る。以上の(1)〜(5)の繰り返しによりごみ及び副資材の装入を行う。
(5) Replacement of furnace gas After the interior of the furnace and interior of garbage and auxiliary materials is completed, the furnace gas that has entered the intermediate hopper 2 at the time of charging is replaced with an inert gas to prepare for reception. Return to). Garbage and auxiliary materials are charged by repeating the above steps (1) to (5).

1:廃棄物溶融炉 2:中間ホッパー
3:受入ホッパー 4:廃棄物ピット
5:廃棄物クレーン 6:上部シール弁
7:下部シール弁 8:燃焼室
7a:下部シール弁微開状態位置 9:排ガス管
10:燃焼バーナ 11:燃焼空気吹込ダクト
12:燃焼空気ファン 13:絞りダンパー
14:不活性ガス吹込用配管 15:空気排気管
16:不活性ガス吹込弁 17:空気排気弁
18:カバー 19:不活性ガス吹込用弁
20:空気排気管 20a:空気排気弁
21:副資材シュート 22:副資材貯留ホッパー
23:上部シール弁 24:下部シール弁
25:不活性ガス吹込用配管 25a:不活性ガス吹込弁
26:不活性ガス吹込用配管 26a:不活性ガス吹込弁
27:空気排気管 27a:空気排気弁
28:副資材搬送コンベア 29:ごみ
30:副資材 31:副資材受入ホッパー
A:廃棄物装入装置 B:副資材装入装置
1: Waste melting furnace 2: Intermediate hopper 3: Receiving hopper 4: Waste pit 5: Waste crane 6: Upper seal valve 7: Lower seal valve 8: Combustion chamber 7a: Lower seal valve slightly open position 9: Exhaust gas tube
10: Combustion burner 11: Combustion air blowing duct 12: Combustion air fan 13: Throttle damper
14: Inert gas blowing pipe 15: Air exhaust pipe
16: Inert gas injection valve 17: Air exhaust valve
18: Cover 19: Valve for inert gas injection 20: Air exhaust pipe 20a: Air exhaust valve 21: Secondary material chute 22: Secondary material storage hopper 23: Upper seal valve 24: Lower seal valve 25: Pipe for inert gas injection 25a: Inert gas blowing valve 26: Pipe for inert gas blowing 26a: Inert gas blowing valve 27: Air exhaust pipe 27a: Air exhaust valve 28: Secondary material transfer conveyor 29: Garbage
30: Sub-material 31: Sub-material receiving hopper A: Waste charging device B: Sub-material charging device

Claims (3)

廃棄物溶融炉の炉頂部に設けられた、炉内に装入する廃棄物及び副資材を貯留する中間ホッパーを備えた廃棄物及び副資材装入装置において、
中間ホッパーの上端部に廃棄物の受入時に開閉する上部シール弁が設けられるとともに、中間ホッパーの下端部に廃棄物及びの廃棄物及び副資材を廃棄物溶融炉内への装入時に開閉する下部シール弁が設けられ、
中間ホッパーには、副資材を中間ホッパー内に導入可能に副資材シュートが連通し、副資材シュートの上端部には上部シール弁が設けられ、
さらに、中間ホッパーには、中間ホッパー内のガスを置換する不活性ガスを中間ホッパー内に導入する不活性ガス吹込用配管が接続されていることを特徴とする廃棄物及び副資材装入装置。
In the waste and secondary material charging device provided with an intermediate hopper for storing waste and secondary materials charged in the furnace, provided at the top of the waste melting furnace,
An upper seal valve that opens and closes when the waste is received is provided at the upper end of the intermediate hopper, and a lower portion that opens and closes at the lower end of the intermediate hopper when the waste and waste and auxiliary materials are charged into the waste melting furnace. A seal valve is provided,
The intermediate hopper communicates with an auxiliary material chute so that the auxiliary material can be introduced into the intermediate hopper, and an upper seal valve is provided at the upper end of the auxiliary material chute.
Furthermore, the waste and auxiliary material charging device, wherein an inert gas blowing pipe for introducing an inert gas for replacing the gas in the intermediate hopper into the intermediate hopper is connected to the intermediate hopper.
副資材シュートに空気排気管の一端が接続されるとともに、空気排気管の他端が燃焼室に接続されている燃焼空気吹込ダクトに接続されていることを特徴とする請求項1に記載の廃棄物及び副資材装入装置。   The disposal according to claim 1, wherein one end of the air exhaust pipe is connected to the auxiliary material chute and the other end of the air exhaust pipe is connected to a combustion air blowing duct connected to the combustion chamber. Material and auxiliary material charging equipment. 副資材シュートには、その上部シール弁より中間ホッパー側に不活性ガスを導入する不活性ガス吹込用配管が接続されていることを特徴とする請求項1又は2に記載の廃棄物及び副資材装入装置。   The waste material and the auxiliary material according to claim 1 or 2, wherein the auxiliary material chute is connected to an inert gas blowing pipe for introducing an inert gas from the upper seal valve to the intermediate hopper side. Charging device.
JP2010163099A 2010-07-20 2010-07-20 Waste melting furnace waste and secondary material charging equipment Active JP5626860B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010163099A JP5626860B2 (en) 2010-07-20 2010-07-20 Waste melting furnace waste and secondary material charging equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010163099A JP5626860B2 (en) 2010-07-20 2010-07-20 Waste melting furnace waste and secondary material charging equipment

Publications (2)

Publication Number Publication Date
JP2012026598A true JP2012026598A (en) 2012-02-09
JP5626860B2 JP5626860B2 (en) 2014-11-19

Family

ID=45779749

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010163099A Active JP5626860B2 (en) 2010-07-20 2010-07-20 Waste melting furnace waste and secondary material charging equipment

Country Status (1)

Country Link
JP (1) JP5626860B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014181843A (en) * 2013-03-19 2014-09-29 Dowa Eco-System Co Ltd Powdery waste supply apparatus, and method for supplying powdery waste
WO2016105117A1 (en) * 2014-12-23 2016-06-30 김상범 Waste cartridge case treatment system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03140409A (en) * 1989-10-27 1991-06-14 Nippon Steel Corp Device for charging auxiliary raw material in pressurizing type converter
JP2000310411A (en) * 1999-04-26 2000-11-07 Nippon Steel Corp Waste charging device of waste processing furnace
JP2007225196A (en) * 2006-02-23 2007-09-06 Nippon Steel Engineering Co Ltd Purging method for intermediate hopper in waste material inserting apparatus of waste melting furnace
JP2008196783A (en) * 2007-02-14 2008-08-28 Nippon Steel Engineering Co Ltd Waste input device and waste input method
JP2010196924A (en) * 2009-02-23 2010-09-09 Nippon Steel Engineering Co Ltd Purge method of intermediate hopper of waste charging device of waste melting furnace, and intermediate hopper of waste charging device of waste melting furnace
JP2010255888A (en) * 2009-04-22 2010-11-11 Nippon Steel Engineering Co Ltd Waste melting treatment method and waste melting treatment device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03140409A (en) * 1989-10-27 1991-06-14 Nippon Steel Corp Device for charging auxiliary raw material in pressurizing type converter
JP2000310411A (en) * 1999-04-26 2000-11-07 Nippon Steel Corp Waste charging device of waste processing furnace
JP2007225196A (en) * 2006-02-23 2007-09-06 Nippon Steel Engineering Co Ltd Purging method for intermediate hopper in waste material inserting apparatus of waste melting furnace
JP2008196783A (en) * 2007-02-14 2008-08-28 Nippon Steel Engineering Co Ltd Waste input device and waste input method
JP2010196924A (en) * 2009-02-23 2010-09-09 Nippon Steel Engineering Co Ltd Purge method of intermediate hopper of waste charging device of waste melting furnace, and intermediate hopper of waste charging device of waste melting furnace
JP2010255888A (en) * 2009-04-22 2010-11-11 Nippon Steel Engineering Co Ltd Waste melting treatment method and waste melting treatment device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014181843A (en) * 2013-03-19 2014-09-29 Dowa Eco-System Co Ltd Powdery waste supply apparatus, and method for supplying powdery waste
WO2016105117A1 (en) * 2014-12-23 2016-06-30 김상범 Waste cartridge case treatment system

Also Published As

Publication number Publication date
JP5626860B2 (en) 2014-11-19

Similar Documents

Publication Publication Date Title
TWI521180B (en) Method for feeding a burden to a blast furnace
JP5626860B2 (en) Waste melting furnace waste and secondary material charging equipment
TW200936221A (en) Bag-filter type small deodorizing and dust collecting apparatus
CN209278504U (en) Double flap valves control elephant trunk blanking sealing device
KR20140038132A (en) Ash discharging apparatus and method of the high pressure dust collector
JP4383417B2 (en) Method for purging intermediate hopper of waste charging equipment of waste melting furnace
CN105600461A (en) Movable powder injection system and process method thereof
KR101557776B1 (en) Method for feeding a burden to a blast furnace
JP5388278B2 (en) Method for purging intermediate hopper of waste charging apparatus of waste melting furnace and intermediate hopper of waste charging apparatus of waste melting furnace
JP2014122090A (en) Transport method of fly ash
CN209260133U (en) A kind of improved precision furnace charging gear
CN102337375A (en) Dry dedusting system for primary flue gas from vanadium extraction converter
JP2008303433A (en) Method for drying and preheating raw material for blast furnace
JP3913684B2 (en) Waste gasification and melting system
CA3161923A1 (en) Blast furnace plant and shutdown process
JP2007045912A (en) Coal charging car of coke oven, method for receiving coal in hermetically sealed state and method for charging coal in hermetically sealed state
WO2022119209A1 (en) Blowing or re-blowing process of blast furnace, and blast furnace equipment for same
JP3277126B2 (en) Furnace top bunker leveling device for bellless blast furnace
CN202359142U (en) Primary smoke dry de-dusting system for vanadium extraction furnace
JP2014505776A (en) Method and apparatus for reducing levitation gas emissions when charging a coal tamped cake into a furnace chamber of a coke oven battery
JP6848913B2 (en) Metal melting equipment with lightweight debris removal equipment
JP2009213973A (en) Bug filter type dust collector
JP2008082630A (en) Waste melting furnace
JP2008156382A (en) Method for pretreatment of high-temperature coal
JP2000074350A (en) Melt treating apparatus for incinerated ash

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20130329

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20131227

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20140107

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20140310

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140902

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140925

R150 Certificate of patent or registration of utility model

Ref document number: 5626860

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250