JP2012010470A - Operation planning apparatus for firepower generator - Google Patents

Operation planning apparatus for firepower generator Download PDF

Info

Publication number
JP2012010470A
JP2012010470A JP2010143331A JP2010143331A JP2012010470A JP 2012010470 A JP2012010470 A JP 2012010470A JP 2010143331 A JP2010143331 A JP 2010143331A JP 2010143331 A JP2010143331 A JP 2010143331A JP 2012010470 A JP2012010470 A JP 2012010470A
Authority
JP
Japan
Prior art keywords
day
target time
power
calculation means
time zone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2010143331A
Other languages
Japanese (ja)
Other versions
JP5494282B2 (en
Inventor
Koichi Ito
鉱一 伊藤
Yoko Umeda
陽子 梅田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyo Electric Power Co Holdings Inc
Original Assignee
Tokyo Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyo Electric Power Co Inc filed Critical Tokyo Electric Power Co Inc
Priority to JP2010143331A priority Critical patent/JP5494282B2/en
Publication of JP2012010470A publication Critical patent/JP2012010470A/en
Application granted granted Critical
Publication of JP5494282B2 publication Critical patent/JP5494282B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide an operation planning apparatus for firepower generators capable of optimizing the number of firepower generators to be operated while securing a certain auxiliary capacity for daytime power demand.SOLUTION: Upon input of a date of an operation day and target time zones during daytime, estimated power demand calculating means 13 calculates a power demand estimation at the target time zones on the operation day based on power demand data. Auxiliary capacity calculating means 16 calculates a necessary auxiliary capacity at the target time zones on the operation day based on auxiliary capacity data of firepower generators. Modified auxiliary capacity calculating means 18 calculates a difference between the necessary auxiliary capacity and an available capacity of batteries stored in advance in a memory device 14 as a modified auxiliary capacity. Necessary power generation calculating means 20 calculates a necessary power to be generated at each target time zone on the operation day by adding the power demand estimation and the modified auxiliary capacity. Operation planning calculating means 21 calculates an operation plan of the firepower generators based on a necessary start-up time for each firepower generator calculated by the firepower generator and start-up time calculating means 22.

Description

本発明は、昼間における電力系統の電力需要に対して所定の予備力を確保するように火力発電機の運転計画を立案する火力発電機の運転計画立案装置に関する。   TECHNICAL FIELD The present invention relates to a thermal power generator operation plan planning device for planning a thermal power generator operation plan so as to ensure a predetermined reserve capacity for power demand of a power system in the daytime.

1日の電力系統の電力需要は昼間に最大となり深夜に最低となるが、その昼夜格差は大きい。昼間の最大電力需要においても、安定して電力が供給できるように、1日の電力需要を想定し、一定の予備力を確保できるように火力発電機の運転計画を立案している。この運転計画は週間単位等で作成しているが、特に週明け等の電力需要の急変時への対応が重要である。電力需要に対応するのは揚水発電機を除いては、火力発電機の起動停止による出力変動で対応している。   The daily power demand of the power system is highest during the day and lowest at midnight, but the difference between day and night is large. In order to ensure stable power supply even during daytime maximum power demand, a daily power demand is assumed and a thermal power generator operation plan is established so as to ensure a certain reserve capacity. This operation plan is prepared on a weekly basis, but it is particularly important to respond to sudden changes in power demand such as the beginning of the week. Except for the pumped-storage generator, power demand is handled by fluctuations in output due to the start and stop of the thermal power generator.

火力発電機は停止期間が長いと、その分起動までの期間も長くなる。例えば1日の停止では1日で起動可能であるが、2日の停止では起動に2日〜3日の時間を要するので、1日の電力需要の変動に対応するには、予め火力発電機の運転計画を立案しておくことが必要となる。   If the thermal power generator is stopped for a long time, the period until the start is increased accordingly. For example, a 1-day stop can be started in 1 day, but a 2-day stop requires 2 to 3 days to start. It is necessary to prepare an operation plan.

ここで、深夜の需要が最小となるときの深夜下げ代と昼間の需要が最大となるときの火力予備力とが最適なものとなるように、昼間の電力供給に必要な揚水発電所の発電電力量(揚発容量)を確保し、揚発容量が設備容量限界(揚発容量限界)を超えないように、しかも火力発電機の燃料費用が最も小さくなる条件を満たすように、深夜下げ代と火力予備力とを算出するようにしたものがある。   Here, the power generation of the pumped storage power plant necessary for daytime power supply is optimized so that the midnight reduction allowance when midnight demand is minimum and the thermal power reserve when daytime demand is maximum are optimal. The midnight reduction fee is set so that the amount of electric power (lifting capacity) is secured, the pumping capacity does not exceed the capacity limit (lifting capacity limit), and so that the fuel cost of the thermal power generator is minimized. And firepower reserve are calculated.

特開特開2007−124765号公報Japanese Patent Laid-Open No. 2007-124765

しかし、火力発電機を立ち上げるには、1日〜3日の時間を要するので、1日〜3日前の電力需要の想定を元に火力発電機の運転計画を立案する必要がある。そのため、例えば火力発電機の起動後に需要想定が下方修正された場合、結果的に火力発電機を多めに起動することになるなど、起動する火力発電機の台数を必要最小限に抑えられないこともあり得る。   However, since it takes 1 day to 3 days to start up the thermal power generator, it is necessary to make an operation plan for the thermal power generator based on the assumption of power demand one to three days ago. For this reason, for example, if the demand assumption is revised downward after starting a thermal power generator, the number of thermal power generators to be started cannot be reduced to the minimum necessary. There is also a possibility.

多めに火力発電機を立ち上げた場合には、立ち上げた火力発電機を定格運転した場合には電力が余剰となるので、定格出力よりも低出力で運転することになる。そうすると効率が悪くなり、また、無駄な起動停止が増加することになり、発電原価増の要因となる。   When a large number of thermal power generators are started up, the power is surplus when the thermal power generator that has been started up is rated, so that the power generator is operated at a lower output than the rated output. If it does so, efficiency will worsen and a wasteful start / stop will increase, and will become a factor of a power generation cost increase.

本発明の目的は、昼間の電力需要に対する一定の予備力を確保しながら火力運転台数を最適化できる火力発電機の運転計画立案装置を提供することである。   An object of the present invention is to provide an operation planning device for a thermal power generator capable of optimizing the number of thermal operation units while ensuring a certain reserve capacity for daytime power demand.

請求項1の発明に係る火力発電機の運転計画立案装置は、運用日の日付及び昼間の対象時間帯が入力されると電力系統の電力需要量データに基づいて運用日の対象時間帯の想定電力需要量を算定する想定電力需要量算定手段と、運用日の日付及び昼間の対象時間帯が入力されると電力系統に連系される火力発電機の予備力データに基づいて運用日の対象時間帯の所要予備力を算定する予備力算定手段と、前記運用日の対象時間帯毎に利用可能な蓄電池の容量を予め記憶する記憶装置と、電力系統に連系される火力発電機毎の運転履歴に基づいて前記火力発電機毎に起動所要期間を算定する起動時間算定手段と、前記予備力算定手段で算定された所要予備力と前記記憶装置に予め記憶された利用可能な蓄電池の容量との差分を修正予備力として前記運用日の対象時間帯毎に算定する修正予備力算定手段と、前記想定電力需要量算定手段で算定された想定電力需要量と前記修正予備力算定手段で算定された修正予備力とを加算し前記運用日の対象時間帯毎の所要発電量として算定する所要発電量算定手段と、前記電力系統に連系される火力発電機及び前記起動時間算定手段で算定された前記火力発電機毎の起動所要期間に基づいて前記所要発電量算定手段で算定された前記運用日の対象時間帯毎の所要発電量を満たすように前記火力発電機の運転計画を算定する運転計画算定手段とを備えたことを特徴とする。   The operation plan planning device for a thermal power generator according to the invention of claim 1 assumes the target time zone of the operation day based on the power demand data of the power system when the date of operation date and the target time zone of daytime are input. The target of the operation date based on the reserve power data of the thermal power generator linked to the power system when the expected power demand calculation means for calculating the power demand and the date of operation and the target time zone during the day are input Reserve capacity calculation means for calculating required reserve capacity in time zone, storage device for storing storage battery capacity that can be used for each target time zone on the operation day, and thermal power generator linked to power system Start-up time calculating means for calculating a required start-up period for each thermal power generator based on the operation history, required reserve power calculated by the reserve power calculating means, and available storage battery capacity stored in advance in the storage device As the reserve for correction The corrected reserve capacity calculation means calculated for each target time zone of the operation day, the estimated power demand calculated by the estimated power demand calculation means, and the corrected reserve capacity calculated by the corrected reserve capacity calculation means are added. The required power generation amount calculating means for calculating the required power generation amount for each target time zone on the operation day, the thermal power generator linked to the power system, and the thermal power generator calculated by the start time calculating means Operation plan calculation means for calculating the operation plan of the thermal power generator so as to satisfy the required power generation amount for each target time zone of the operation day calculated by the required power generation amount calculation means based on the startup required period. It is characterized by that.

請求項2の発明に係る火力発電機の運転計画立案装置は、請求項1の発明において、前記利用可能な蓄電池に予め充電する充電量を見直した運転計画を立案する運転計画見直し手段を設けたことを特徴とする。   According to a second aspect of the present invention, there is provided a thermal power generator operation plan planning device according to the first aspect of the present invention, further comprising an operation plan review means for planning an operation plan in which a charge amount to be charged in advance for the usable storage battery is reviewed. It is characterized by that.

請求項3の発明に係る火力発電機の運転計画立案装置は、請求項2の発明において、前記運転計画見直し手段は、運用日の前日または運用日の当日において、前記利用可能な蓄電池に予め充電する充電量を見直した運転計画を立案することを特徴とする。   According to a third aspect of the present invention, there is provided the thermal power generator operation plan planning device according to the second aspect, wherein the operation plan review means pre-charges the usable storage battery on the day before or on the day of the operation. It is characterized by drafting an operation plan in which the amount of charge to be reviewed is reviewed.

請求項1の発明によれば、運用日の対象時間帯毎に利用可能な蓄電池の容量を予め記憶しておき、運用日の対象時間帯毎の電力需要の所要予備力と利用可能な蓄電池の容量との差分を修正予備力として算定し、電力系統に連系される火力発電機が修正予備力を満たすように火力発電機の運転計画を算定するので、利用可能な蓄電池の容量分だけ電力需要の所要予備力が軽減される。従って、必要な予備能力を確保しながら火力発電機の運転台数を適正化でき、全体として運転効率を向上できる。   According to invention of Claim 1, the capacity | capacitance of the storage battery which can be utilized for every object time zone of an operation day is memorize | stored beforehand, and the reserve capacity of the electric power demand for every object time zone of an operation day, and the available storage battery of The difference from the capacity is calculated as the corrected reserve capacity, and the operation plan of the thermal power generator is calculated so that the thermal power generator connected to the power system satisfies the corrected reserve capacity. The reserve capacity required for demand is reduced. Therefore, it is possible to optimize the number of operating thermal power generators while ensuring the necessary reserve capacity, and to improve the operating efficiency as a whole.

請求項2の発明によれば、利用可能な蓄電池に予め充電する充電量を見直しできるので、当初の運転計画通りの火力発電機の運転台数で予備力を確保できる。   According to the second aspect of the present invention, the amount of charge that can be charged in advance to the available storage battery can be reviewed, so that reserve capacity can be secured by the number of thermal power generators operating as originally planned.

請求項3の発明によれば、利用可能な蓄電池への充電は、運用日の前日の夜間または運用日の当日の朝に充電可能であるので、運用日の前日または運用日の当日においても見直しが可能である。   According to the invention of claim 3, since the charge to the available storage battery can be charged at night on the day before the operation day or in the morning on the day of the operation day, it is reviewed on the day before the operation day or on the day of the operation day. Is possible.

本発明の実施形態に係る火力発電機の運転計画立案装置の構成図。The block diagram of the operation plan planning apparatus of the thermal power generator which concerns on embodiment of this invention. ある一日の電力需要量である日負荷曲線の一例を示すグラフ。The graph which shows an example of the daily load curve which is the electric power demand of a certain day. 本発明の他の実施形態に係る火力発電機の運転計画立案装置の構成図。The block diagram of the driving | operation plan planning apparatus of the thermal power generator which concerns on other embodiment of this invention.

以下、本発明の実施形態を説明する。図1は本発明の実施形態に係る火力発電機の運転計画立案装置の構成図である。運転計画立案装置は、電力系統の昼間の需要が最大となるときの予備力を火力発電機の出力で確保する際の火力発電機の運転計画を立案するものであり、例えば、直近の1週間の火力発電機の運転計画を立案するには、入力装置11から直近の1週間の運用日の日付x及び昼間の対象時間帯yを演算制御装置12に入力する。昼間の対象時間帯yは、例えば、電力需要が増大する午前10時から18時までの1時間おきの時間帯である。   Embodiments of the present invention will be described below. FIG. 1 is a configuration diagram of a thermal power generator operation plan planning apparatus according to an embodiment of the present invention. The operation planning apparatus is for planning an operation plan of a thermal power generator when securing reserve power at the time when the daytime demand of the power system is maximized by the output of the thermal power generator. In order to formulate an operation plan for the thermal power generator, the date x on the operation day of the most recent week and the target time zone y in the daytime are input to the arithmetic control device 12 from the input device 11. The daytime target time zone y is, for example, a time zone every other hour from 10:00 am to 18:00 when power demand increases.

演算制御装置12の想定電力需要量算定手段13は、1週間の運用日の日付x及び夜間の対象時間帯yが入力されると、記憶装置14の電力需要量データベース15に予め記憶されている電力需要量データAを読み込み、その電力需要量データAに基づいて、直近の1週間の各運用日における昼間の対象時間帯yの想定電力需要量aを算定する。電力需要量データベース15に予め格納されている電力需要量実績データAは、例えば、過去数年間の電力需要量実績データを基に予め求められたデータである。   The assumed power demand amount calculation means 13 of the arithmetic control device 12 is stored in advance in the power demand amount database 15 of the storage device 14 when the date x of the operation day of one week and the target time zone y at night are input. The power demand amount data A is read, and based on the power demand amount data A, the assumed power demand amount a in the daytime target time zone y on each operation day of the most recent one week is calculated. The power demand amount actual data A stored in advance in the power demand amount database 15 is data obtained in advance based on power demand amount actual data for the past several years, for example.

すなわち、季節や曜日によって夜間の対象時間帯の電力需要量が異なるので、想定電力需要量算定手段13は、過去数年間の電力需要量実績データを基に予め求められた電力需要量データAに基づき、直近の1週間の各運用日における夜間の対象時間帯の想定電力需要量aを算定することになる。   That is, since the power demand in the target time zone at night varies depending on the season and day of the week, the assumed power demand calculation means 13 uses the power demand data A obtained in advance based on the power demand actual data for the past several years. Based on this, the assumed power demand amount a in the target time zone at night on each operation day of the most recent week is calculated.

また、演算制御装置12の予備力算定手段16は、運用日の日付x及び昼間の対象時間帯yが入力されると、記憶装置14の予備力データベース17に予め記憶されている予備力データBを読み込み、その予備力データBに基づいて直近の1週間の各運用日における昼間の対象時間帯yの所要予備力bを算定する。予備力データベース17に予め記憶されている予備力データBは、例えば、起動中の火力発電機の発電余力や起動可能な火力発電機の情報などである。   Further, the reserve capacity calculation means 16 of the arithmetic and control unit 12 receives the reserve capacity data B stored in advance in the reserve capacity database 17 of the storage device 14 when the date x and the daytime target time zone y are input. Based on the reserve capacity data B, the required reserve capacity b in the daytime target time zone y on each operation day of the most recent week is calculated. The reserve power data B stored in advance in the reserve power database 17 is, for example, power generation surplus of the activated thermal power generator, information on the thermal power generator that can be activated, and the like.

次に、修正予備力算定手段18は、予備力算定手段16で算定された各対象時間帯yの所要予備力bを入力すると、記憶装置14の利用可能蓄電池データベース19に予め記憶されている利用可能蓄電池データCを読み込み、該当する日付xの対象時間帯yにおける利用可能な蓄電池の容量cを取り出す。そして、予備力算定手段16で算定された所要予備力bから利用可能な蓄電池の容量cを減算し、その差分を各運用日の昼間の対象時間帯y毎の修正予備力dとして算定する。   Next, when the reserve capacity calculation means 18 inputs the required reserve power b for each target time zone y calculated by the reserve capacity calculation means 16, the use stored in the available storage battery database 19 of the storage device 14 in advance. The possible storage battery data C is read, and the available storage battery capacity c in the target time zone y of the relevant date x is extracted. And the capacity | capacitance c of the storage battery which can be utilized is subtracted from the required reserve b calculated by the reserve calculation means 16, and the difference is calculated as the corrected reserve d for each daytime target time zone y on each operation day.

利用可能蓄電池データベース19に予め記憶されている利用可能蓄電池データCは、昼間において電力系統運用者が自由に充放電制御できる蓄電池の情報であり、例えば、蓄電池を有した需要家との契約により、電力系統運用者が昼間の対象時間帯yにおいて利用できる蓄電池の容量が予め記憶されている。   The available storage battery data C stored in advance in the available storage battery database 19 is information on a storage battery that can be freely charged and discharged by an electric power system operator during the daytime. For example, by a contract with a customer who has a storage battery, The capacity of the storage battery that can be used in the daytime target time zone y by the power system operator is stored in advance.

修正予備力算定手段18で算定された修正予備力dは、所要発電量算定手段20に入力される。所要発電量算定手段20には想定電力需要量算定手段13で算定された想定電力需要量aも入力され、所要発電量算定手段20は想定電力需要量aと修正予備力dとを加算し、運用日の対象時間帯y毎の所要発電量eとして算定し、運転計画算定手段21に出力される。   The corrected reserve d calculated by the corrected reserve calculating unit 18 is input to the required power generation amount calculating unit 20. The required power generation amount calculation means 20 is also input with the assumed power demand amount a calculated by the assumed power demand amount calculation means 13, and the required power generation amount calculation means 20 adds the assumed power demand amount a and the corrected reserve d. The required power generation amount e for each target time zone y on the operation day is calculated and output to the operation plan calculation means 21.

一方、起動時間算定手段22は、記憶装置14の発電機運転履歴データベース23から発電機運転履歴データDを入力し、電力系統に連系される火力発電機毎の発電機運転履歴データDに基づいて、火力発電機毎に起動所要期間fを算定し、運転計画算定手段21に出力する。前述したように、火力発電機は停止期間が長いと、その分起動までの期間も長くなるので、起動時間算定手段22は発電機運転履歴データDに基づいて、火力発電機毎に起動所要期間fを算定する。   On the other hand, the startup time calculation means 22 receives the generator operation history data D from the generator operation history database 23 of the storage device 14 and is based on the generator operation history data D for each thermal power generator linked to the power system. Thus, the startup required period f is calculated for each thermal power generator and output to the operation plan calculation means 21. As described above, if the thermal power generator has a long stoppage period, the period until the start is increased accordingly, so that the start time calculation means 22 is required to start each thermal power generator based on the generator operation history data D. Calculate f.

運転計画算定手段21は、修正予備力算定手段18で算定された修正予備力d及び起動時間算定手段22で算定された火力発電機毎に起動所要期間fに基づいて、系統に連系される火力発電機が各運用日の中の対象時間帯y毎の所要発電量eを満たすように、火力発電機の運転計画を算定する。運転計画算定手段21で算定された運転計画は出力装置24に出力される。   The operation plan calculation means 21 is linked to the system based on the required startup period f for each of the thermal power generators calculated by the corrected reserve capacity d calculated by the corrected reserve capacity calculation means 18 and the startup time calculation means 22. The operation plan of the thermal power generator is calculated so that the thermal power generator satisfies the required power generation amount e for each target time zone y in each operation day. The operation plan calculated by the operation plan calculation means 21 is output to the output device 24.

この算定された運転計画は、利用可能な蓄電池の容量分だけ電力需要の予備力が軽減された運転計画である。従って、火力発電機の運転台数を軽減することができ、全体として電力系統の火力発電機の運転効率を向上できる。   This calculated operation plan is an operation plan in which the reserve power demand is reduced by the capacity of the available storage battery. Therefore, the number of operating thermal power generators can be reduced, and the operating efficiency of the thermal power generators in the power system can be improved as a whole.

図2は、ある一日の電力需要量である日負荷曲線の一例を示すグラフである。図2に示すように、電力需要量S1は夜間は少なく昼間に多くなる。昼間において、特に14時前後に最大需要電力Spとなる。この最大需要電力Spに対して、一定割合の予備力S2が設定される。   FIG. 2 is a graph showing an example of a daily load curve that is the amount of power demand per day. As shown in FIG. 2, the power demand S1 is small at night and increases during the day. In the daytime, the maximum power demand Sp is reached especially around 14:00. A certain percentage of reserve power S2 is set for this maximum demand power Sp.

電力需要量S1は午前7時前後から増大するので、それに対応して火力発電機を順次起動していくことになる。そして、電力需要量S1のうち需要量が大きい午前10時から午後18時の間を予備力確保の対象時間帯yとし、この対象時間帯yにおいて、電力系統運用者が利用できる蓄電池から放電を行い、電力需要量S1の一部を負担する。これにより、予備力S2を保ちつつ火力発電機の運転台数を軽減できる。   Since the electric power demand S1 increases from around 7:00 am, the thermal power generators are sequentially started correspondingly. And between 10 am and 18:00 pm, in which the demand amount is large among the power demand amount S1, is set as a target time zone y for securing reserve power, and in this target time zone y, discharging is performed from a storage battery that can be used by the power system operator Part of the power demand S1 is borne. As a result, the number of operating thermal power generators can be reduced while maintaining the reserve power S2.

図3は、本発明の他の実施形態に係る火力発電機の運転計画立案装置の構成図である。この他の実施形態は、図1に示した実施形態に対し、利用可能な蓄電池に予め充電する運転計画を見直しする運転計画見直し手段25を追加して設けたものである。図1と同一要素には、同一符号を付し重複する説明は省略する。   FIG. 3 is a configuration diagram of a thermal power generator operation plan planning apparatus according to another embodiment of the present invention. In the other embodiment, an operation plan review means 25 for revising an operation plan for charging a usable storage battery in advance is added to the embodiment shown in FIG. The same elements as those in FIG. 1 are denoted by the same reference numerals, and redundant description is omitted.

運転計画は、例えば1週間単位で立案される場合、運用日の直前になって火力発電機のトラブルが発生してしまうと、当初の計画通りに火力発電機を起動できなくなることがある。そのような場合、予備力の確保のために、運転計画見直し手段25により、利用可能な蓄電池に予め充電する充電量の見直しを行う。   For example, when the operation plan is planned on a weekly basis, if a thermal power generator trouble occurs just before the operation day, the thermal power generator may not be started as originally planned. In such a case, in order to ensure reserve capacity, the operation plan review unit 25 reviews the amount of charge that is charged in advance to the available storage battery.

入力装置11から運転計画見直し手段25に対し、計画立案時の状況から変化した状況変化情報gを入力する。状況変化情報gは、例えば、予定していた火力発電機が起動できなくなったことの情報、天気予報の変更情報、前日の実績電力需要量や前日の実績予備力が計画通りでなかったことの情報などである。   Status change information g changed from the situation at the time of planning is input from the input device 11 to the operation plan review means 25. The situation change information g includes, for example, information that the scheduled thermal power generator cannot be started, change information of the weather forecast, actual power demand on the previous day, and actual reserve capacity on the previous day were not as planned. Information.

運転計画見直し手段25は状況変化情報gを入力すると、想定電力需要量算定手段13及び予備力算定手段16を起動し、想定電力需要量算定手段13は状況変化に伴って変化する想定電力需要量を算定し、予備力算定手段16は状況変化に伴って変化する所要予備力を算出する。例えば、想定電力需要量は天気予報の変更情報で変化し、所要予備力は発電機のトラブル情報で変化する。   When the operation plan review unit 25 inputs the status change information g, the operation plan review unit 25 activates the assumed power demand calculation unit 13 and the reserve capacity calculation unit 16, and the assumed power demand calculation unit 13 changes the assumed power demand amount according to the situation change. The reserve capacity calculation means 16 calculates the required reserve capacity that changes with the situation change. For example, the assumed power demand changes with the change information of the weather forecast, and the required reserve capacity changes with the trouble information of the generator.

運転計画見直し手段25は、算定された想定電力需要量や所要予備力に基づいて、減少すると予想される予備力の分だけ、利用可能な蓄電池に予め充電しておく運転計画を算定する。   The operation plan reviewing means 25 calculates an operation plan for precharging the available storage battery by the amount of reserve capacity that is expected to decrease based on the calculated estimated power demand and required reserve capacity.

例えば、状況変化情報gが運用日の前日の夕方に発生した場合には、前日の夕方に運転計画見直し手段25を起動する。そして、運用日当日の予備力が通常の予備力より小さいと算定された場合には、減少すると予想される予備力の分だけ、運用日の前日の夜間に蓄電池に充電するようにする。   For example, when the situation change information g occurs in the evening of the day before the operation day, the operation plan review means 25 is activated in the evening of the previous day. When it is calculated that the reserve capacity on the operation day is smaller than the normal reserve capacity, the storage battery is charged at night on the day before the operation date by the reserve capacity expected to decrease.

また、状況変化情報gが運用日の前日の朝に発生した場合には、当時の朝に運転計画見直し手段25を起動する。そして、運用日当日の予備力が通常の予備力より小さいと算定された場合には、減少すると予想される予備力の分だけ、運用日の当日の午前中(例えば午前10以前)に蓄電池に充電するようにする。   Further, when the status change information g occurs on the morning of the day before the operation day, the operation plan review means 25 is activated on the morning at that time. If it is calculated that the reserve capacity on the day of operation is smaller than the normal reserve capacity, the reserve capacity that is expected to decrease is stored in the storage battery in the morning of the day of operation (for example, before 10 am). Try to charge.

本発明の実施形態によれば、運用日の対象時間帯毎に利用可能な蓄電池の容量を予め記憶しておき、運用日の対象時間帯毎の電力需要の所要予備力と利用可能な蓄電池の容量との差分を修正予備力として算定し、電力系統に連系される火力発電機が修正予備力を満たすように火力発電機の運転計画を算定するので、利用可能な蓄電池の容量分だけ電力需要の所要予備力が軽減される。従って、必要な予備能力を確保しながら火力発電機の運転台数を適正化でき、全体として運転効率を向上できる。   According to the embodiment of the present invention, the capacity of the storage battery that can be used for each target time zone of the operation day is stored in advance, and the required reserve capacity of the power demand for each target time zone of the operation day and the available storage battery The difference from the capacity is calculated as the corrected reserve capacity, and the operation plan of the thermal power generator is calculated so that the thermal power generator connected to the power system satisfies the corrected reserve capacity. The reserve capacity required for demand is reduced. Therefore, it is possible to optimize the number of operating thermal power generators while ensuring the necessary reserve capacity, and to improve the operating efficiency as a whole.

また、運転計画を立案したときから状況変化があったときは、その状況変化に基づき、利用可能な蓄電池に予め充電する充電量を見直し、状況変化により変化した予備力を蓄電池で確保するので、当初の運転計画通りの火力発電機の運転台数で予備力を確保できる。   In addition, when there is a change in the situation since the operation plan was made, based on the change in the situation, review the amount of charge charged in advance to the available storage battery, and reserve capacity that has changed due to the change in situation is secured with the storage battery. Reserve power can be secured by the number of thermal power generators operating as originally planned.

また、利用可能な蓄電池への充電は、運用日の前日の夜間または運用日の当日の朝に充電可能であるので、運用日の前日の夕方または運用日の当日の早朝においても、利用可能な蓄電池に予め充電する充電量の見直しが可能である。   In addition, the available storage battery can be charged at night on the day before the operation day or in the morning on the day of the operation day, so it can also be used in the evening on the day before the operation day or early morning on the day of the operation day. It is possible to review the amount of charge precharged to the storage battery.

11…入力装置、12…演算制御装置、13…想定電力需要量算定手段、14…記憶装置、15…電力需要量データベース、16…予備力算定手段、17…予備力データベース、18…修正予備力算定手段、19…利用可能蓄電池データベース、20…所要発電量算定手段、21…運転計画算定手段、22…起動時間算定手段、23…発電機運転履歴データベース、24…運転計画見直し手段 DESCRIPTION OF SYMBOLS 11 ... Input device, 12 ... Arithmetic controller, 13 ... Assumed electric power demand calculation means, 14 ... Memory | storage device, 15 ... Electric power demand amount database, 16 ... Reserve power calculation means, 17 ... Reserve power database, 18 ... Correction reserve power Calculation means, 19 ... Available storage battery database, 20 ... Required power generation amount calculation means, 21 ... Operation plan calculation means, 22 ... Startup time calculation means, 23 ... Generator operation history database, 24 ... Operation plan review means

Claims (3)

運用日の日付及び昼間の対象時間帯が入力されると電力系統の電力需要量データに基づいて運用日の対象時間帯の想定電力需要量を算定する想定電力需要量算定手段と、
運用日の日付及び昼間の対象時間帯が入力されると電力系統に連系される火力発電機の予備力データに基づいて運用日の対象時間帯の所要予備力を算定する予備力算定手段と、
前記運用日の対象時間帯毎に利用可能な蓄電池の容量を予め記憶する記憶装置と、
電力系統に連系される火力発電機毎の運転履歴に基づいて前記火力発電機毎に起動所要期間を算定する起動時間算定手段と、
前記予備力算定手段で算定された所要予備力と前記記憶装置に予め記憶された利用可能な蓄電池の容量との差分を修正予備力として前記運用日の対象時間帯毎に算定する修正予備力算定手段と、
前記想定電力需要量算定手段で算定された想定電力需要量と前記修正予備力算定手段で算定された修正予備力とを加算し前記運用日の対象時間帯毎の所要発電量として算定する所要発電量算定手段と、
前記電力系統に連系される火力発電機及び前記起動時間算定手段で算定された前記火力発電機毎の起動所要期間に基づいて前記所要発電量算定手段で算定された前記運用日の対象時間帯毎の所要発電量を満たすように前記火力発電機の運転計画を算定する運転計画算定手段とを備えたことを特徴とする火力発電機の運転計画立案装置。
An assumed power demand calculation means for calculating an assumed power demand in the target time zone of the operation day based on the power demand data of the power grid when the date of the operation date and the target time zone in the daytime are input;
Reserve capacity calculation means for calculating the required reserve capacity for the target time zone of the operation day based on the reserve power data of the thermal power generator linked to the power system when the date of the operation day and the target time zone of the daytime are input ,
A storage device that stores in advance the capacity of the storage battery that can be used for each target time zone of the operation day;
Start-up time calculating means for calculating a start-up required period for each thermal power generator based on an operation history for each thermal power generator linked to the power system;
Modified reserve capacity calculation that calculates the difference between the required reserve capacity calculated by the reserve capacity calculation means and the capacity of an available storage battery stored in advance in the storage device as the corrected reserve capacity for each target time zone on the operation day Means,
The required power generation calculated as the required power generation amount for each target time zone on the operation day by adding the estimated power demand amount calculated by the assumed power demand amount calculation means and the corrected reserve capacity calculated by the corrected reserve capacity calculation means Quantity calculation means;
The target time zone calculated by the required power generation amount calculation means based on the required start time for each thermal power generator calculated by the thermal power generator connected to the power system and the start time calculation means An operation plan planning device for a thermal power generator, comprising: an operation plan calculation means for calculating an operation plan of the thermal power generator so as to satisfy a required power generation amount for each.
前記利用可能な蓄電池に予め充電する充電量を見直した運転計画を立案する運転計画見直し手段を設けたことを特徴とする請求項1記載の火力発電機の運転計画立案装置。 The operation plan planning device for a thermal power generator according to claim 1, further comprising an operation plan review means for formulating an operation plan in which a charge amount to be charged in the available storage battery is reviewed in advance. 前記運転計画見直し手段は、運用日の前日または運用日の当日において、前記利用可能な蓄電池に予め充電する充電量を見直した運転計画を立案することを特徴とする請求項2記載の火力発電機の運転計画立案装置。 3. The thermal power generator according to claim 2, wherein the operation plan reviewing unit drafts an operation plan in which a charge amount charged in advance to the available storage battery is reviewed on the day before the operation date or the day of the operation date. Operation planning device.
JP2010143331A 2010-06-24 2010-06-24 Thermal power generator operation planning system Expired - Fee Related JP5494282B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010143331A JP5494282B2 (en) 2010-06-24 2010-06-24 Thermal power generator operation planning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010143331A JP5494282B2 (en) 2010-06-24 2010-06-24 Thermal power generator operation planning system

Publications (2)

Publication Number Publication Date
JP2012010470A true JP2012010470A (en) 2012-01-12
JP5494282B2 JP5494282B2 (en) 2014-05-14

Family

ID=45540365

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010143331A Expired - Fee Related JP5494282B2 (en) 2010-06-24 2010-06-24 Thermal power generator operation planning system

Country Status (1)

Country Link
JP (1) JP5494282B2 (en)

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09252542A (en) * 1996-03-15 1997-09-22 Mitsubishi Electric Corp Method and apparatus for decision of output of generator
JP2001211548A (en) * 2000-01-20 2001-08-03 Hitachi Ltd Method for power-generation planning and device
JP2002084660A (en) * 2000-09-07 2002-03-22 Osaka Gas Co Ltd Control method for generator
JP2003009391A (en) * 2001-06-26 2003-01-10 Chubu Electric Power Co Inc Demand scheduling system of power system and program for executing the system
JP2005102357A (en) * 2003-09-22 2005-04-14 Meidensha Corp Method and device for preparing start/stop plan of generator, recording medium for recording process program thereof
JP2006050730A (en) * 2004-08-03 2006-02-16 Hitachi Ltd Operation plan creating method and apparatus of supply capability
JP2006094652A (en) * 2004-09-24 2006-04-06 Osaka Gas Co Ltd Power generation controlling system and power generating facility with the same
JP2006094649A (en) * 2004-09-24 2006-04-06 Kansai Electric Power Co Inc:The Power generation planning method and power generation planning apparatus using secondary battery
JP2006180673A (en) * 2004-12-24 2006-07-06 Mitsubishi Electric Corp System to prepare operation plan for generator
JP2007166855A (en) * 2005-12-16 2007-06-28 Central Res Inst Of Electric Power Ind Method, device, program for generating generator start/stop plan
JP2007228676A (en) * 2006-02-22 2007-09-06 Hitachi Ltd Apparatus and method for working out power plant operation plan
JP2008154430A (en) * 2006-12-20 2008-07-03 Mitsubishi Electric Corp Supply plan creation system, program, and method
JP2008295175A (en) * 2007-05-23 2008-12-04 Mitsubishi Electric Corp Operation program creating device and method of generator, and program for implementing device and method
JP2009022137A (en) * 2007-07-13 2009-01-29 Tohoku Electric Power Co Inc Automatic generating method of output distribution plan for thermal power generator
JP2009089533A (en) * 2007-10-01 2009-04-23 Panasonic Corp Power generating system and operating method thereof
JP2009240080A (en) * 2008-03-27 2009-10-15 Nippon Telegr & Teleph Corp <Ntt> Device and method for preparing operation plan of energy system

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09252542A (en) * 1996-03-15 1997-09-22 Mitsubishi Electric Corp Method and apparatus for decision of output of generator
JP2001211548A (en) * 2000-01-20 2001-08-03 Hitachi Ltd Method for power-generation planning and device
JP2002084660A (en) * 2000-09-07 2002-03-22 Osaka Gas Co Ltd Control method for generator
JP2003009391A (en) * 2001-06-26 2003-01-10 Chubu Electric Power Co Inc Demand scheduling system of power system and program for executing the system
JP2005102357A (en) * 2003-09-22 2005-04-14 Meidensha Corp Method and device for preparing start/stop plan of generator, recording medium for recording process program thereof
JP2006050730A (en) * 2004-08-03 2006-02-16 Hitachi Ltd Operation plan creating method and apparatus of supply capability
JP2006094652A (en) * 2004-09-24 2006-04-06 Osaka Gas Co Ltd Power generation controlling system and power generating facility with the same
JP2006094649A (en) * 2004-09-24 2006-04-06 Kansai Electric Power Co Inc:The Power generation planning method and power generation planning apparatus using secondary battery
JP2006180673A (en) * 2004-12-24 2006-07-06 Mitsubishi Electric Corp System to prepare operation plan for generator
JP2007166855A (en) * 2005-12-16 2007-06-28 Central Res Inst Of Electric Power Ind Method, device, program for generating generator start/stop plan
JP2007228676A (en) * 2006-02-22 2007-09-06 Hitachi Ltd Apparatus and method for working out power plant operation plan
JP2008154430A (en) * 2006-12-20 2008-07-03 Mitsubishi Electric Corp Supply plan creation system, program, and method
JP2008295175A (en) * 2007-05-23 2008-12-04 Mitsubishi Electric Corp Operation program creating device and method of generator, and program for implementing device and method
JP2009022137A (en) * 2007-07-13 2009-01-29 Tohoku Electric Power Co Inc Automatic generating method of output distribution plan for thermal power generator
JP2009089533A (en) * 2007-10-01 2009-04-23 Panasonic Corp Power generating system and operating method thereof
JP2009240080A (en) * 2008-03-27 2009-10-15 Nippon Telegr & Teleph Corp <Ntt> Device and method for preparing operation plan of energy system

Also Published As

Publication number Publication date
JP5494282B2 (en) 2014-05-14

Similar Documents

Publication Publication Date Title
JP2013143838A (en) Charge/discharge controller
WO2011024769A1 (en) Power system demand control equipment, demand control program and recording medium
CN102149983A (en) Energy supply system
WO2015017201A1 (en) Microgrid energy management system and method for controlling operation of a microgrid
JP5463298B2 (en) Energy supply system
JP2010098793A (en) Power demand and supply system
JP6373476B2 (en) Power management apparatus, power management system, and power management method
JP5895157B2 (en) Charge / discharge control device
JP5948217B2 (en) Fuel cell operation control method and operation control system in an apartment house
CN115714376A (en) System and method for operating a hybrid power system by combining anticipation and real-time optimization
JP6043576B2 (en) Storage battery system and power plant control system
JP2016163488A (en) Device, method and program for power control
US20140306527A1 (en) Method for providing control power with an energy generator and an energy consumer
JP6456153B2 (en) Power control apparatus, charge / discharge control method, and program
JP5494282B2 (en) Thermal power generator operation planning system
RU2656357C1 (en) Electrical load electrical supply system elements (equipment, devices) adaptive control system, connected to two and more electric energy sources (embodiments)
JP5494279B2 (en) Thermal power generator operation planning system
JP2015119575A (en) Energy management system and energy management method
JP2020089200A (en) Device and method for charge/discharge control
Wright et al. The long-term viability of coal for power generation in South Africa
JP7386029B2 (en) power supply system
JP7463885B2 (en) ENERGY MANAGEMENT SYSTEM, ENERGY MANAGEMENT METHOD, AND PROGRAM
JP2022142957A (en) Energy management system
JP7252116B2 (en) Renewable energy power generation system
Habibi Model for impact of storage on spinning reserve requirements and distributed generation

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20130605

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140204

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140217

R150 Certificate of patent or registration of utility model

Ref document number: 5494282

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees