JP2012005986A - Machine for separating waste material mixed with metal - Google Patents

Machine for separating waste material mixed with metal Download PDF

Info

Publication number
JP2012005986A
JP2012005986A JP2010145861A JP2010145861A JP2012005986A JP 2012005986 A JP2012005986 A JP 2012005986A JP 2010145861 A JP2010145861 A JP 2010145861A JP 2010145861 A JP2010145861 A JP 2010145861A JP 2012005986 A JP2012005986 A JP 2012005986A
Authority
JP
Japan
Prior art keywords
metal
waste material
passage
conveyor
damper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2010145861A
Other languages
Japanese (ja)
Inventor
Hideki Matsumoto
秀樹 松本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kamacho Scale Co Ltd
Original Assignee
Kamacho Scale Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kamacho Scale Co Ltd filed Critical Kamacho Scale Co Ltd
Priority to JP2010145861A priority Critical patent/JP2012005986A/en
Priority to PCT/JP2011/064444 priority patent/WO2012002255A1/en
Publication of JP2012005986A publication Critical patent/JP2012005986A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B03SEPARATION OF SOLID MATERIALS USING LIQUIDS OR USING PNEUMATIC TABLES OR JIGS; MAGNETIC OR ELECTROSTATIC SEPARATION OF SOLID MATERIALS FROM SOLID MATERIALS OR FLUIDS; SEPARATION BY HIGH-VOLTAGE ELECTRIC FIELDS
    • B03BSEPARATING SOLID MATERIALS USING LIQUIDS OR USING PNEUMATIC TABLES OR JIGS
    • B03B9/00General arrangement of separating plant, e.g. flow sheets
    • B03B9/06General arrangement of separating plant, e.g. flow sheets specially adapted for refuse
    • B03B9/061General arrangement of separating plant, e.g. flow sheets specially adapted for refuse the refuse being industrial
    • B03B9/065General arrangement of separating plant, e.g. flow sheets specially adapted for refuse the refuse being industrial the refuse being building rubble
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B07SEPARATING SOLIDS FROM SOLIDS; SORTING
    • B07CPOSTAL SORTING; SORTING INDIVIDUAL ARTICLES, OR BULK MATERIAL FIT TO BE SORTED PIECE-MEAL, e.g. BY PICKING
    • B07C5/00Sorting according to a characteristic or feature of the articles or material being sorted, e.g. by control effected by devices which detect or measure such characteristic or feature; Sorting by manually actuated devices, e.g. switches
    • B07C5/34Sorting according to other particular properties
    • B07C5/344Sorting according to other particular properties according to electric or electromagnetic properties
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/52Mechanical processing of waste for the recovery of materials, e.g. crushing, shredding, separation or disassembly
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/58Construction or demolition [C&D] waste

Abstract

PROBLEM TO BE SOLVED: To solve a problem wherein, when iron scraps are mixed in building waste materials, the iron scraps can be relatively easily removed by a magnetic separator, but, when mixing metal is nonferrous metal, it is difficult to separate waste materials for recycling from the metal (nonferrous metal).SOLUTION: This machine for separating waste materials mixed with metal includes: a conveyor 3 for conveying waste materials mixed with metal; a metal detector 7 for detecting the metal in the waste materials being conveyed on the conveyor 3; a distribution chamber 4 provided, at the bottom thereof, with a passage 41 for waste materials for recycling and a passage 42 for metal; a sorting device 5 equipped with a damper 51 for sorting waste materials falling into the distribution chamber 4; and a controller 8 for operating the sorting device 5 on the basis of a metal detection signal from the metal detector 7. When metal is detected by the metal detector 7, the controller 8 performs control to operate, in accordance with timing of the fall of the detected metal into the distribution chamber 4, the damper 51 on an opening side of the passage for metal and thereafter to restore the damper on an opening side of the passage for waste materials for recycling after a predetermined timer.

Description

本願発明は、金属混入廃材を再利用可能な再生用廃材と異物となる金属とに分別するための金属混入廃材分別機に関するものである。   The present invention relates to a metal-mixed waste material sorting machine for separating a metal-mixed waste material into a reusable recycling material and a metal that becomes a foreign material.

建造物を解体すると、石膏ボードやコンクリート等の建築廃材が多量に発生するが、これらの建築廃材(例えば廃石膏ボード)は、小さく破砕して再生用原料として再利用されることが多い。   When a building is dismantled, a large amount of building waste such as gypsum board and concrete is generated, but these building waste (for example, waste gypsum board) is often crushed and reused as a raw material for recycling.

建築廃材(例えば廃石膏ボード)中には、異物となる金属が塊状の状態で混入していることが多く、塊状の廃石膏ボードを再生用原料として利用し得るまで小さく破砕する際に、塊状の金属が混入しているままであると、その塊状金属が破砕機に噛み込んで該破砕機が破損したり故障の原因になる。   In building waste materials (for example, waste gypsum board), foreign metal is often mixed in a lump state, and when lump-like waste gypsum board can be used as a raw material for recycling, If the metal remains mixed, the massive metal bites into the crusher, causing the crusher to break or cause a failure.

そこで、従来では、解体現場等で発生した金属混入廃材に対して図5に示すような処理を行って、金属混入廃材中から金属を除去する(再生用廃材を得る)ようにしている。   Therefore, conventionally, the metal-mixed waste material generated at the dismantling site or the like is subjected to a process as shown in FIG. 5 to remove the metal from the metal-mixed waste material (to obtain a recycling waste material).

即ち、図5に示すように、大塊状の建築廃材(金属混入廃材A)は、まず破砕機のホッパーに投入して(ステップS1)、該破砕機で所定粒径まで破砕する(ステップS2)。続いて、所定粒径まで破砕した金属混入廃材をコンベアで搬送し(ステップS3)、該コンベア上を搬送される金属混入廃材中の鉄屑Bを磁選機(ベルト式磁選機)で吸着・除去する(ステップ4)ことにより、鉄屑Bを除去した再生用廃材Cを得る。尚、再生用廃材Cは、次の工程においてさらに小さく圧砕されて微小粒径の再生用原料とされる。   That is, as shown in FIG. 5, the massive building waste material (metal-mixed waste material A) is first put into a hopper of a crusher (step S1) and crushed to a predetermined particle size by the crusher (step S2). . Subsequently, the metal-mixed waste material crushed to a predetermined particle size is conveyed by a conveyor (step S3), and the iron scrap B in the metal-mixed waste material conveyed on the conveyor is adsorbed and removed by a magnetic separator (belt type magnetic separator). By doing (step 4), the recycling waste material C from which the iron scrap B is removed is obtained. The recycling waste material C is crushed to a smaller size in the next step to obtain a recycling raw material with a fine particle size.

ところで、金属混入廃材中の鉄屑は、比較的小さいものでは磁選機の磁石により比較的容易に吸着・除去できるが、大塊状(大重量)であると吸着できないことがある。又、混入金属が非鉄金属(アルミニウムや銅やSUS材等)であると、磁選機による除去が行えないので、該金属屑が再生用廃材C中に混入したままとなる。尚、建築廃材に混入している金属としては、例えばドアノブ程度のかなり大きいものがある。   By the way, the iron scrap in the metal-mixed waste can be adsorbed and removed relatively easily by a magnet of a magnetic separator, but may not be adsorbed if it is a large lump (large weight). If the mixed metal is a non-ferrous metal (aluminum, copper, SUS material, etc.), it cannot be removed by a magnetic separator, so that the metal scrap remains mixed in the recycling waste material C. In addition, as a metal mixed in construction waste material, there exists a quite large thing about a door knob, for example.

上記のように、従来の一般的な金属混入廃材分別機では、廃材中に非鉄金属が混入していると、該非鉄金属を除去できず(再生用廃材中に混入したままとなる)、その混入金属が大きい場合には、次の圧砕工程においてその金属塊が圧砕機に噛み込んで、該圧砕機が破損したり故障する原因になるという問題がある。   As described above, in the conventional general metal-mixed waste sorting machine, if non-ferrous metal is mixed in the waste material, the non-ferrous metal cannot be removed (it remains mixed in the recycled waste material). When the mixed metal is large, there is a problem that the metal lump bites into the crusher in the next crushing process, causing the crusher to break or break down.

そこで、本願発明では、金属混入廃材中に混入している金属が鉄屑だけでなく非鉄金属であっても、それらの混入金属(鉄屑及び非鉄金属)を良好に排除できるようにするとともに、金属混入廃材から有用な再生用廃材を効率よく(多量に)分別できるようにした金属混入廃材分別機を提供することを目的としてなされたものである。   Therefore, in the present invention, even if the metal mixed in the metal-mixed waste material is not only iron scrap but also non-ferrous metal, the mixed metal (iron scrap and non-ferrous metal) can be eliminated well, The object of the present invention is to provide a metal-mixed waste material sorting machine that can efficiently (a large amount) separate waste materials for recycling from metal-mixed waste materials.

本願発明は、上記課題を解決するための手段として次の構成を有している。尚、本願発明は、金属混入廃材から金属を除去して有用な再生用廃材を得るための金属混入廃材分別機を対象にしている。   The present invention has the following configuration as means for solving the above problems. The present invention is directed to a metal-mixed waste sorting machine for removing a metal from a metal-mixed waste and obtaining a useful recycling waste.

[本願請求項1の発明]
本願請求項1の発明の金属混入廃材分別機は、金属が混入した金属混入廃材を搬送するコンベアと、コンベア上を搬送される廃材中の金属を検出する金属検出機と、コンベアの終端部から落下する廃材を受容でき且つ底部に再生原料通路と金属通路とを設けた分配室と、分配室内に落下する廃材を再生用原料通路と金属通路に振り分けるダンパー付きの振り分け装置と、金属検出機からの金属検出信号に基いて振り分け装置を作動させるコントローラとを備えている。
[Invention of Claim 1 of the Present Application]
The metal-mixed waste material sorting machine according to the first aspect of the present invention includes a conveyor for transporting a metal-mixed waste material mixed with metal, a metal detector for detecting metal in the scrap material transported on the conveyor, and a terminal portion of the conveyor. From a distribution chamber that can accept falling waste material and provided with a recycled material passage and a metal passage at the bottom, a sorting device with a damper that distributes the waste material falling into the distribution chamber into a recycling raw material passage and a metal passage, and a metal detector And a controller for operating the sorting device based on the metal detection signal.

金属混入廃材を搬送するコンベアとしては、金属を使用していないベルトコンベアが採用される。このコンベアの始端部には、例えば破砕機で粗目に破砕された金属混入廃材が順次投入される。尚、廃材を破砕機で破砕すると、粗目(例えば粒径が50mm以上)のものに混じって小粒状の廃材も発生する。   A belt conveyor that does not use metal is adopted as a conveyor for conveying the metal-mixed waste material. For example, metal-containing waste materials roughly crushed by a crusher are sequentially fed to the start end of the conveyor. Note that when the waste material is crushed by a crusher, small granular waste material is also generated by being mixed with a coarse material (for example, a particle size of 50 mm or more).

コンベア上の金属を検出する金属検出機としては、鉄屑及び非鉄金属の両方を検出し得るものが好適であるが、非鉄金属のみを検出するものであってもよい。尚、非鉄金属のみを検出する金属検出機を使用する場合には、金属混入廃材が搬送されるコンベア上に磁選機(ベルト式)を設けて、該磁選機で混入鉄屑をコンベア上から排除するようにするとよい。   As a metal detector for detecting the metal on the conveyor, one that can detect both iron scrap and non-ferrous metal is suitable, but it may be one that detects only non-ferrous metal. When using a metal detector that detects only non-ferrous metals, a magnetic separator (belt type) is provided on the conveyor where the metal-mixed waste is transported, and the iron separator is removed from the conveyor by the magnetic separator. It is good to do.

分配室内の振り分け装置は、そのダンパーを切換手段(例えばエアシリンダ)で揺動させ得るようにしたものである。尚、この振り分け装置を使用したものでは、ダンパーが切換手段で揺動されることにより、分配室底部にある再生用廃材通路と金属通路とが択一的に開放されるようになっている。   The distribution device in the distribution chamber is configured such that the damper can be swung by switching means (for example, an air cylinder). In the case of using this sorter, the waste material path for recycling and the metal path at the bottom of the distribution chamber are selectively opened by swinging the damper by the switching means.

そして、前記コントローラは、金属検出機が金属非検出状態ではダンパーを再生原料通路開放側に位置させる一方、金属検出機が金属検出したときにその被検出金属が分配室内に落下するタイミングに合わせてダンパーを金属通路開放側に作動させた後、所定タイマー後に再生原料通路開放側に復帰させるように制御するものである。   When the metal detector is in a state where the metal is not detected, the controller positions the damper on the open side of the recycled material passage, and when the metal detector detects the metal, the controller detects the metal falling in the distribution chamber. After the damper is operated to the metal passage opening side, it is controlled to return to the regeneration raw material passage opening side after a predetermined timer.

被検出金属が金属検出機で検出された後、コンベア終端部から分配室内に落下するタイミング(時間)は、コンベア上における金属検出機の設置位置からコンベア終端部までの距離とコンベアの走行スピードとに基いてコントローラで演算することにより把握することができる。尚、実機では、金属検出機が金属検出信号を発してから例えば4秒後にダンパーを金属通路開放側に作動させるようにしている。   After the metal to be detected is detected by the metal detector, the timing (time) of falling from the conveyor end to the distribution chamber is the distance from the metal detector installation position on the conveyor to the conveyor end, the conveyor running speed, This can be grasped by calculating with the controller based on the above. In the actual machine, for example, 4 seconds after the metal detector generates a metal detection signal, the damper is operated to the metal passage opening side.

又、ダンパーを金属通路開放側に作動させた後、該ダンパーを再生用廃材通路開放側に復帰させるタイミング(時間)は、上記被検出金属がダンパー上面に案内されて金属通路の入口に達するまでの、例えば2〜3秒後が適当である。   In addition, after the damper is operated to the metal passage opening side, the timing (time) for returning the damper to the recycling waste material passage opening side is until the detected metal is guided to the upper surface of the damper and reaches the inlet of the metal passage. For example, 2 to 3 seconds later is appropriate.

この請求項1の金属混入廃材分別機は、次のように機能する。   The metal-mixed waste material sorting machine according to claim 1 functions as follows.

コンベアの始端部上には、比較的粗目に破砕された廃材が順次投入され、該廃材がコンベアを順次搬送されるが、その搬送廃材中に金属が混入しているかどうかを金属検出機で常時監視している。尚、コンベア上に磁選機を設けたものでは、搬送廃材中に鉄屑があると、その鉄屑を磁選機の磁石で吸着させて排除できる(非鉄金属は磁選機で排除できない)。   Waste material crushed relatively coarsely is sequentially put on the start end of the conveyor, and the waste material is sequentially transported through the conveyor. Whether or not metal is mixed in the transported waste material is constantly detected by a metal detector. Monitoring. In addition, in the thing which provided the magnetic separator on the conveyor, if there is iron scrap in the conveyance waste material, the iron scrap can be removed by adsorbing with the magnet of the magnetic separator (non-ferrous metal cannot be excluded by the magnetic separator).

そして、金属検出機が金属非検出状態であると、分配室内の振り分け装置のダンパーは、生用廃材通路開放側に位置していて、コンベア終端部から分配室内に落下する金属非混入の廃材をダンパーに案内させながら再生用廃材通路側に送出するようになる。尚、この金属非混入の廃材(再生用廃材となる)は、再生用廃材通路を通って次の圧砕工程に送られ、そこで微細に圧砕されて再生用原料とされる。   When the metal detector is in a metal non-detection state, the damper of the distribution device in the distribution chamber is located on the open side of the raw waste material passage, and removes non-metal-mixed waste material that falls into the distribution chamber from the end of the conveyor. The waste material is sent to the recycling waste material passage side while being guided by the damper. The metal-free waste material (which becomes a waste material for recycling) is sent to the next crushing step through the waste material path for recycling, where it is finely crushed and used as a raw material for recycling.

他方、金属検出機がコンベア上を搬送される廃材中の金属(例えば非鉄金属)を検出すると、該金属検出機からコントローラに金属検出信号が発せられる。すると、コントローラがその金属検出信号を受けて、該コントローラからの指令信号で、被検出金属がコンベア終端部から分配室内に落下するタイミングに合わせてダンパーを金属通路開放側に作動させ(振り分け装置の切換手段を作動させる)、その所定タイマー後に該ダンパーを再生用廃材通路開放側に復帰させる。   On the other hand, when the metal detector detects a metal (for example, non-ferrous metal) in the waste material conveyed on the conveyor, a metal detection signal is issued from the metal detector to the controller. Then, the controller receives the metal detection signal, and in response to the command signal from the controller, operates the damper to the metal passage opening side in accordance with the timing at which the metal to be detected falls from the conveyor end portion into the distribution chamber (of the distribution device). The switching means is operated), and after the predetermined timer, the damper is returned to the recycling waste material passage opening side.

従って、この金属混入廃材分別機では、金属検出機で検出された金属が分配室から金属通路を通って排出(排除)されるので、該金属と再生用廃材とを確実に分別することができる。   Accordingly, in this metal-mixed waste material separator, the metal detected by the metal detector is discharged (excluded) from the distribution chamber through the metal passage, so that the metal and the waste material for recycling can be reliably separated. .

尚、この請求項1の金属混入廃材分別機では、ダンパーが金属通路開放側に位置している間(例えば2〜3秒間)は、被検出金属の前後近傍を搬送される再生用廃材(良品)も金属通路側に送出されるが、ダンパーが金属通路開放側に作動している時間はごく短時間(例えば2〜3秒間)であるので、再生用廃材の金属通路側送出量は比較的少ないものである。   In the metal-mixed waste sorting machine according to claim 1, while the damper is positioned on the side of the metal passage opening (for example, for 2 to 3 seconds), the waste for recycling (non-defective product) conveyed near the front and back of the metal to be detected. ) Is also sent to the metal passage side, but since the damper is operating on the metal passage opening side for a very short time (for example, 2 to 3 seconds), the amount of recycled waste material on the metal passage side is relatively small. There are few things.

[本願請求項2の発明]
本願請求項2の発明は、上記請求項1の金属混入廃材分別機において、分配室の底部にある再生用廃材通路の入口をコンベアの終端部の直下に開口させている一方、振り分け装置のダンパーは、所定大きさ以下の廃材を通過させ得る多数の隙間を有した櫛状又は格子状のものを採用している。
[Invention of claim 2 of the present application]
The invention of claim 2 of the present application is characterized in that, in the metal-mixed waste material separator of claim 1, the inlet of the recycling waste material passage at the bottom of the distribution chamber is opened directly below the terminal end of the conveyor, while the damper of the sorting device Employs a comb-like or lattice-like one having a large number of gaps through which waste materials of a predetermined size or less can pass.

この請求項2の金属混入廃材分別機で使用されるダンパーは、例えば多数本の櫛棒を小間隔(例えば30mm程度の間隔)をもって並置したもの(櫛状ダンパー)を使用できる。そして、この櫛状ダンパーが金属通路開放側に位置している状態では、コンベア終端部から分配室内に落下する金属混入廃材中の上記隙間(例えば30mm)より小さい廃材(再生用廃材と金属屑を含む)の大部分は、該ダンパーの隙間を通って再生用廃材通路側に落下し、該隙間より大きい廃材(再生用廃材と金属屑)のみが櫛状ダンパーの上面に沿って金属通路側に送出されるようになる。   As the damper used in the metal-mixed waste material separator according to the second aspect, for example, a comb in which a large number of comb bars are juxtaposed with a small interval (for example, an interval of about 30 mm) can be used. When this comb-like damper is located on the metal passage opening side, waste materials (recycled waste materials and metal scraps) smaller than the gap (for example, 30 mm) in the metal-mixed waste material falling into the distribution chamber from the end of the conveyor. Most of the waste falls to the recycling waste material passage side through the gap of the damper, and only the waste material (recycling waste material and metal scrap) larger than the clearance passes along the upper surface of the comb damper to the metal passage side. It will be sent out.

従って、ダンパーが金属通路開放側にある状態でも、分配室内に落下する再生用廃材(良品)のうちの小さいものを再生用廃材通路側に送出できるので、不良品として分別される金属屑中に良品である再生用廃材が混入する量を極力少なくできる。   Therefore, even when the damper is on the open side of the metal passage, it is possible to send out a small amount of the reclaimed waste material (good product) falling into the distribution chamber to the recycle waste material passage side. It is possible to reduce as much as possible the amount of good recycled waste.

ところで、この請求項2のものでは、金属検出機で金属を検出しても、ダンパーの隙間より小さい金属屑はその隙間を通って再生用廃材通路側に送出されることになるが、該再生用廃材通路側に送出される金属屑は上記隙間を通った小塊状のものだけであり、このような小塊状金属屑が再生用廃材とともに次の圧砕工程に送られても、該圧砕機が破損したり故障するほどの悪影響は発生しない。   By the way, according to the second aspect, even if the metal is detected by the metal detector, the metal scrap smaller than the gap of the damper is sent to the recycling waste material passage side through the gap. The metal scrap sent to the waste material passage side is only a small lump that passes through the gap, and even if such a small lump metal scrap is sent to the next crushing process together with the waste for recycling, the crusher There will be no adverse effects that may cause damage or failure.

[本願請求項1の発明の効果]
本願請求項1の発明の金属混入廃材分別機は、コンベア上を搬送される廃材中に金属があると、その金属を金属検出機で検出し、その金属検出信号により、被検出金属がコンベア終端部から落下するタイミングに合わせて分配室内のダンパーを金属通路開放側に作動させるようになっている。
[Effect of the invention of claim 1 of the present application]
The metal-mixed waste sorting machine according to the first aspect of the present invention detects the metal with a metal detector when there is metal in the waste material conveyed on the conveyor, and the detected metal is detected by the metal detection signal. The damper in the distribution chamber is operated to the metal passage opening side in accordance with the timing of falling from the section.

従って、この請求項1の金属混入廃材分別機では、廃材中に混入している金属を再生用廃材から確実に分別することができ、しかも被検出金属が非鉄金属であっても確実に分別できるという効果がある。   Therefore, in the metal-mixed waste material separator according to the first aspect, the metal mixed in the waste material can be reliably separated from the waste material for recycling, and even if the metal to be detected is a non-ferrous metal, it can be reliably separated. There is an effect.

尚、このように金属が排除された再生用廃材は、次の工程で小さく圧砕されるが、圧砕機に投入される再生用廃材が金属を排除したものでは、該圧砕機が損傷したり故障しにくくなる。   In addition, the waste material for recycling from which the metal is removed in this way is crushed to a small size in the next step, but if the waste material for recycling put into the crusher excludes the metal, the crusher may be damaged or malfunctioned. It becomes difficult to do.

[本願請求項2の発明の効果]
本願請求項2の発明は、上記請求項1の金属混入廃材分別機において、分配室の底部にある再生用廃材通路の入口をコンベアの終端部の直下に開口させ、且つダンパーとして所定大きさ以下の廃材を通過させ得る多数の隙間を有した櫛状又は格子状のものを採用しているので、ダンパーが金属通路開放側に位置している状態でも、分配室内に落下する金属混入廃材中の上記隙間より小さい廃材(再生用廃材と金属屑を含む)の大部分が、該ダンパーの隙間を通って再生用廃材通路側に落下するようになる。
[Effect of the invention of claim 2 of the present application]
The invention of claim 2 of the present application is the metal-mixed waste material separator according to claim 1, wherein the entrance of the recycling waste material passage at the bottom of the distribution chamber is opened directly below the terminal end of the conveyor and has a predetermined size or less. Since a comb-like or lattice-like one having a large number of gaps through which the waste material can pass is adopted, even in a state where the damper is located on the metal passage open side, the metal mixed waste material falling into the distribution chamber Most of the waste material (including the waste material for recycling and metal waste) smaller than the gap falls to the side of the waste material path for recycling through the gap of the damper.

従って、この請求項2の金属混入廃材分別機では、上記請求項1の効果に加えて、ダンパーが金属通路開放側にある状態でも、分配室内に落下する再生用廃材(良品)のうちの小さいものを再生用廃材通路側に送出できるので、不良品として分別される金属屑中に良品である再生用廃材が混入する量を極力少なくできるという効果がある。   Therefore, in the metal-mixed waste material separator of claim 2, in addition to the effect of claim 1, even if the damper is on the metal passage opening side, the small waste recycling material (good product) falling into the distribution chamber is small. Since the waste can be sent to the recycling waste material passage side, there is an effect that the amount of the good recycling waste mixed into the metal scraps sorted as defective can be reduced as much as possible.

本願実施例の金属混入廃材分別機の概略図である。It is the schematic of the metal mixing waste material sorter of an example of this application. 図1の金属混入廃材分別機における分配室付近の拡大図である。It is an enlarged view of the distribution chamber vicinity in the metal mixing waste material sorter of FIG. 図1の金属混入廃材分別機における振り分け装置部分の拡大斜視図である。It is an expansion perspective view of the distribution apparatus part in the metal mixing waste material sorter of FIG. 図1の金属混入廃材分別機の作動説明図である。It is operation | movement explanatory drawing of the metal mixing waste material sorter of FIG. 従来の一般的な金属混入廃材の分別方法説明図である。It is explanatory drawing of the classification method of the conventional general metal mixing waste material.

以下、図1〜図4を参照して本願実施例の金属混入廃材分別機を説明する。尚、この金属混入廃材分別機で分別するリサイクル廃材の代表例としては、廃石膏ボードが挙げられるが、そのほかに廃コンクリートのリサイクルのための分別にも使用することができる。   Hereinafter, with reference to FIGS. 1-4, the metal mixing waste material sorter of an Example of this application is demonstrated. A typical example of the recycled waste material separated by this metal-mixed waste material sorting machine is a waste gypsum board, but it can also be used for separation for recycling of waste concrete.

図1に示す金属混入廃材分別機は、金属が混入した金属混入廃材を搬送するコンベア3と、コンベア3上を搬送される廃材中の鉄屑を排除する磁選機6と、コンベア3上を搬送される廃材中の金属(特に非鉄金属)を検出する金属検出機7と、コンベア3の終端部3bから落下する廃材を受容でき且つ底部に再生用廃材通路41と金属通路42とを設けた分配室4と、分配室4内に落下する廃材を再生用廃材通路41と金属通路42に振り分けるダンパー51付きの振り分け装置5と、金属検出機7からの金属検出信号に基いて振り分け装置5を作動させるコントローラ8とを基本構成としている。   The metal-mixed waste material sorting machine shown in FIG. 1 transports the conveyor 3 that transports the metal-mixed waste material mixed with metal, the magnetic separator 6 that eliminates iron scraps in the scrap material transported on the conveyor 3, and the conveyor 3 Distributing the metal detector 7 for detecting the metal (especially non-ferrous metal) in the waste material to be collected, the waste material falling from the end portion 3b of the conveyor 3, and the waste material passage 41 for recycling and the metal passage 42 provided at the bottom The chamber 4, the sorting device 5 with the damper 51 for sorting the waste material falling into the distribution chamber 4 into the recycling waste material passage 41 and the metal passage 42, and the sorting device 5 are operated based on the metal detection signal from the metal detector 7. The controller 8 is a basic configuration.

金属混入廃材を搬送するコンベア3としては、金属を使用していないベルトコンベアが採用されている。   A belt conveyor that does not use metal is adopted as the conveyor 3 for transporting the metal-mixed waste material.

この実施例では、コンベア3の始端部3a上に金属混入廃材を投入するのにあたって、解体現場から搬出たれた大塊状の建築廃材(金属混じり)を破砕機1で粗目に破砕し、その粗目に破砕した金属混入廃材を投入コンベア(スクリューコンベア)2からコンベア3の始端部3aに投入するようにしている。従って、この実施例では、大塊状のままの建築廃材を破砕機1のホッパー11に投入することで、粗目に破砕した金属混入廃材を所定量ずつコンベア3の始端部3a上に供給できる。   In this embodiment, when throwing the metal-mixed waste material onto the starting end portion 3a of the conveyor 3, the massive building waste material (mixed with metal) carried out from the dismantling site is roughly crushed by the crusher 1, and the coarse The crushed metal-mixed waste material is fed from the feeding conveyor (screw conveyor) 2 to the starting end portion 3 a of the conveyor 3. Therefore, in this embodiment, by putting the building waste as a large block into the hopper 11 of the crusher 1, the metal-mixed waste material roughly crushed can be supplied onto the start end 3a of the conveyor 3 by a predetermined amount.

この実施例では、コンベア3上に磁選機6を設置しているが、この磁選機6はベルト式のものである。そして、この磁選機6は、コンベア3上を搬送される廃材中に鉄屑があると、該鉄屑を磁気により吸着させてコンベア3上から排除するものである。   In this embodiment, a magnetic separator 6 is installed on the conveyor 3, and this magnetic separator 6 is a belt type. And if this iron separator is in the waste material conveyed on the conveyor 3, this magnetic separator 6 will adsorb this iron scrap by magnetism, and will exclude from the conveyor 3.

金属検出機7は、コンベア3上を搬送される金属混入廃材中の金属を検出するものである。この金属検出機7としては、鉄屑及び非鉄金属の両方を検出し得るものが好適であるが、この実施例のように磁選機6を用いているものでは、非鉄金属のみを検出するものであってもよい。尚、磁選機6を用いたものでも、金属検出機7として、鉄及び非鉄金属を検出し得るものを使用すると、磁選機6で除去できなかった鉄屑も、後述のように再生用廃材から分別できる。   The metal detector 7 detects the metal in the metal mixed waste material conveyed on the conveyor 3. The metal detector 7 is preferably one that can detect both iron scrap and non-ferrous metal. However, in the case of using the magnetic separator 6 as in this embodiment, only non-ferrous metal is detected. There may be. In addition, even if the magnetic separator 6 is used, if the metal detector 7 is capable of detecting iron and non-ferrous metals, iron scraps that could not be removed by the magnetic separator 6 are also recovered from recycling waste as described later. Can be separated.

そして、この金属検出機7は、コンベア3上を搬送されている金属混入廃材中に金属(主として非鉄金属)があると、それを検出してその金属検出信号をコントローラ8に出力するようになっている。   The metal detector 7 detects a metal (mainly non-ferrous metal) in the metal mixed waste conveyed on the conveyor 3 and outputs the metal detection signal to the controller 8. ing.

分配室4は、図2に拡大図示するように、縦向き箱型の容器状であってコンベア3の終端部3bから落下する廃材を受容できるものである。   As shown in an enlarged view in FIG. 2, the distribution chamber 4 is a vertically box-shaped container that can receive waste material falling from the end portion 3 b of the conveyor 3.

分配室4の底部には、図1及び図2において、右半分に再生用廃材Cを送出するための再生用廃材通路41と、左半分に金属Bを送出するための金属通路42とを設けている。尚、図2において、丸で表示した符号Cのものが再生用廃材(例えば石膏屑)であり、四角で表示した符号Bのものが金属屑(主として非鉄金属屑)である。   1 and 2, a recycling waste material passage 41 for sending the recycling waste material C to the right half and a metal passage 42 for sending the metal B to the left half are provided at the bottom of the distribution chamber 4. ing. In FIG. 2, a symbol C indicated by a circle is a waste material for recycling (for example, gypsum waste), and a symbol B indicated by a square is a metal scrap (mainly nonferrous metal scrap).

分配室底部に設けた再生用廃材通路41の入口41aは、コンベア終端部3bの直下に開口させており、後述するダンパー51が無い状態では、コンベア終端部3bから落下する廃材の全量が再生用廃材通路41の入口41a内に落下するようになっている。尚、この実施例では、図2に示すように、再生用廃材通路41の入口41aが金属通路42の入口42aよりやや広い面積を有している。   The inlet 41a of the recycling waste material passage 41 provided at the bottom of the distribution chamber is opened immediately below the conveyor terminal portion 3b. When there is no damper 51 described later, the entire amount of waste material falling from the conveyor terminal portion 3b is used for recycling. It falls into the inlet 41 a of the waste material passage 41. In this embodiment, as shown in FIG. 2, the inlet 41 a of the recycling waste material passage 41 has a slightly larger area than the inlet 42 a of the metal passage 42.

分配室4に設けた振り分け装置5は、分配室4内で左右(コンベア搬送方向の前後)に揺動可能に設置したダンパー51と、該ダンパー51の姿勢を切換える切換手段50とで構成されている。尚、この実施例では、切換手段50としてエアシリンダが使用されており、以下の説明では、この切換手段50をエアシリンダという。   The distribution device 5 provided in the distribution chamber 4 is composed of a damper 51 installed so as to be able to swing left and right (front and rear in the conveyor conveyance direction) in the distribution chamber 4, and a switching means 50 for switching the position of the damper 51. Yes. In this embodiment, an air cylinder is used as the switching means 50. In the following description, this switching means 50 is referred to as an air cylinder.

ダンパー51としては、図3に示すように多数本の櫛棒52,52・・を小間隔(例えば30mm程度の間隔)をもって並置したもの(櫛状ダンパー)を使用をしている。従って、このダンパー51には、各櫛棒52,52間にそれぞれ小間隔(30mm程度の間隔)の隙間53,53・・が設けられている。この各櫛棒52,52間の隙間53は、例えば30mmより小さい小塊状の廃材を通過させるものである。   As the damper 51, as shown in FIG. 3, a comb-shaped damper is used in which a large number of comb bars 52, 52... Are juxtaposed at a small interval (for example, an interval of about 30 mm). Accordingly, the damper 51 is provided with gaps 53, 53,... Between the comb bars 52, 52 with small intervals (intervals of about 30 mm). The gap 53 between the comb bars 52 and 52 allows a small lump-like waste material smaller than 30 mm to pass therethrough, for example.

尚、他の実施例では、ダンパー51に設けられる隙間53,53・・として、櫛状のものに代えて格子状のものにすることができる。   In another embodiment, the gaps 53, 53,... Provided in the damper 51 can be formed in a lattice shape instead of a comb shape.

このダンパー51は、図2に示すように、その下端部の軸51aを分配室4の底部付近の前後方向(図2の奥行き方向)に向けた状態で分配室壁面に枢支することによって取付けられている。又、このダンパー51の軸51aは、図2に示すように、コンベア終端部3bから廃材(C又はB)が落下する位置より、所定長さLだけ金属通路42側に偏位させており、その分、再生用廃材通路41の入口41aの開口幅が大きくなっている。   As shown in FIG. 2, the damper 51 is mounted by pivotally supporting it on the wall surface of the distribution chamber in a state where the shaft 51a at the lower end is directed in the front-rear direction (depth direction in FIG. 2) near the bottom of the distribution chamber 4. It has been. Further, as shown in FIG. 2, the shaft 51a of the damper 51 is displaced to the metal passage 42 side by a predetermined length L from the position where the waste material (C or B) falls from the conveyor terminal portion 3b. Accordingly, the opening width of the inlet 41a of the recycling waste material passage 41 is increased.

そして、この振り分け装置5では、エアシリンダ50の伸縮動作によって、ダンパー51を実線図示する再生用廃材通路開放姿勢と鎖線図示(符号51′)する金属通路開放姿勢とに切換え得るようになっている。   In the distribution device 5, the expansion / contraction operation of the air cylinder 50 can switch the damper 51 between a recycling waste material passage opening posture shown by a solid line and a metal passage opening posture shown by a chain line (reference numeral 51 '). .

コントローラ8は、金属検出機7が金属非検出状態ではダンパー51を実線図示するように再生原料通路41(入口41a)を開放する側に位置させている一方、金属検出機7が金属を検出したときにその被検出金属がコンベア終端部3bから分配室4内に落下するタイミングに合わせてダンパー51を鎖線図示(符号51′)するように金属通路42開放側に作動させた後、所定タイマー後に再生原料通路41開放側に復帰させるように制御するものである。   When the metal detector 7 is in a state where the metal is not detected, the controller 8 positions the damper 51 on the side where the regeneration raw material passage 41 (inlet 41a) is opened as shown by the solid line, while the metal detector 7 detects metal. In some cases, the damper 51 is actuated on the open side of the metal passage 42 as indicated by the chain line (reference numeral 51 ') at the timing when the metal to be detected falls into the distribution chamber 4 from the conveyor terminal portion 3b, and then after a predetermined timer. Control is made so that the recycled material passage 41 is returned to the open side.

上記のように、被検出金属が金属検出機7で検出された後、コンベア終端部3bから分配室4内に落下するタイミング(時間)は、コンベア3上における金属検出機7の設置位置からコンベア終端部3bまでの距離とコンベア3の走行スピードとに基いてコントローラ8で演算することにより把握することができる。尚、実機では、金属検出機7が金属検出信号を発してから例えば4秒後にダンパー51を金属通路開放側に作動させるようにしている。   As described above, after the metal to be detected is detected by the metal detector 7, the timing (time) of falling into the distribution chamber 4 from the conveyor terminal portion 3 b is the conveyor from the installation position of the metal detector 7 on the conveyor 3. This can be grasped by calculating with the controller 8 based on the distance to the end portion 3b and the traveling speed of the conveyor 3. In the actual machine, for example, 4 seconds after the metal detector 7 issues the metal detection signal, the damper 51 is operated to the metal passage opening side.

又、ダンパー51を金属通路42開放側に作動させた後、該ダンパー51を再生用廃材通路41開放側に復帰させるタイミング(時間)は、上記被検出金属(図2の符号B)がダンパー51上面に案内されて金属通路42の入口42aに達するまでの、例えば2〜3秒後が適当である。   Further, after the damper 51 is operated to the opening side of the metal passage 42, the timing (time) for returning the damper 51 to the opening side of the recycling waste material passage 41 is determined by the metal 51 to be detected (reference numeral B in FIG. 2). For example, 2 to 3 seconds after reaching the inlet 42a of the metal passage 42 after being guided by the upper surface is appropriate.

再生用廃材通路41の出口には、該再生用廃材通路41を通って送出された再生用廃材Cを次工程の圧砕工程(圧砕機)に搬送するための搬送コンベア(スクリュコンベア)が設置されている。又、金属通路42の出口には、該金属通路42を通って送出された金属屑Bを貯留するための貯留容器が設置される。   At the outlet of the recycling waste material passage 41, a transport conveyor (screw conveyor) for transporting the recycling waste material C sent through the recycling waste material passage 41 to the crushing process (crusher) of the next process is installed. ing. Further, a storage container for storing the metal scrap B sent through the metal passage 42 is installed at the outlet of the metal passage 42.

この実施例の金属混入廃材分別機の作動方法について、図4を併用して説明する。尚、運転開始時点では、金属検出機7が金属非検出状態であるので、振り分け装置5のダンパー51は図1〜図3に実線図示する再生用廃材通路41を開放する側に位置している。   The operation method of the metal-mixed waste material sorting machine of this embodiment will be described with reference to FIG. In addition, since the metal detector 7 is in a metal non-detection state at the start of operation, the damper 51 of the sorting device 5 is located on the side where the recycling waste material passage 41 shown by a solid line in FIGS. 1 to 3 is opened. .

解体現場から搬出された大塊状の建築廃材(図4の金属混入廃材A)は、図1に示す破砕機1のホッパー11に投入され(S1)、そこで粗目の所定粒径まで破砕される(S2)。そして、破砕機1で粗目に破砕された金属混入廃材は、投入コンベア2によって所定量ずつコンベア3の始端部3a上に供給されて、順次コンベア上を搬送される(S3)。   The massive building waste material (the metal-mixed waste material A in FIG. 4) carried out from the dismantling site is put into the hopper 11 of the crusher 1 shown in FIG. S2). Then, the metal-mixed waste material roughly crushed by the crusher 1 is supplied onto the start end portion 3a of the conveyor 3 by a predetermined amount by the input conveyor 2, and is sequentially conveyed on the conveyor (S3).

コンベア3上では、まず磁選機6で金属混入廃材中の鉄屑を除去する(S4)。即ち、コンベア3上を搬送される廃材中に鉄屑が混入していると、その鉄屑を磁選機6の磁気吸着作用で除去する。尚、廃材中に非鉄金属が含まれていても、この磁選機6では該非鉄金属は除去できない。   On the conveyor 3, first, iron scraps in the metal-mixed waste material are removed by the magnetic separator 6 (S4). That is, if iron scraps are mixed in the waste material conveyed on the conveyor 3, the iron scraps are removed by the magnetic adsorption action of the magnetic separator 6. Even if non-ferrous metal is contained in the waste material, the magnetic separator 6 cannot remove the non-ferrous metal.

金属検出機7の設置位置では、該金属検出機7によりコンベア3上を搬送されている廃材中に金属(非鉄金属)が混入しているか否かを監視している(S5)。そして、該金属検出機7が金属を検出しない状態(S6)では、再生用廃材(良品)のみが搬送されているので、ダンパー51は常態位置(図1〜図3の実線図示位置)のまま維持されていて(S7)、コンベア終端部3bから分配室4内に落下する再生用廃材Cの全量が再生用廃材通路41側に落下する(S8)。そして、その再生用廃材Cは、搬送コンベア9で次工程(圧砕工程)側に搬送される(S9)。尚、圧砕工程側に搬送された再生用廃材Cは、圧砕機で微小粒径まで圧砕されて、再生用原料となる。   At the installation position of the metal detector 7, it is monitored whether or not metal (non-ferrous metal) is mixed in the waste material conveyed on the conveyor 3 by the metal detector 7 (S5). In the state where the metal detector 7 does not detect metal (S6), only the waste material for recycling (non-defective product) is conveyed, so that the damper 51 remains in the normal position (the position indicated by the solid line in FIGS. 1 to 3). The total amount of the recycling waste material C that is maintained (S7) and falls into the distribution chamber 4 from the conveyor terminal portion 3b falls to the recycling waste material passage 41 side (S8). And the waste material C for reproduction | regeneration is conveyed by the next process (crushing process) side with the conveyance conveyor 9 (S9). Incidentally, the recycling waste material C conveyed to the crushing process side is crushed to a fine particle size by a crusher and becomes a recycling raw material.

他方、金属検出機7がコンベア3上を搬送されている廃材中の金属(非鉄金属)を検出すると(S10)、該金属検出機7からの金属検出信号がコントローラ8に発せられ、該コントローラ8から所定タイマー後(被検出金属Bがコンベア終端部3bから落下するタイミングである例えば4秒後)に、振り分け装置5のエアシリンダ50に作動信号が発せられ(ダンパー51が金属通路42開放側に作動する)、その所定タイマー後にエアシリンダ50に対してダンパー51を元に復帰させる信号が発せられる。即ち、被検出金属Bがコンベア終端部3bから落下する時点から該被検出金属Bが金属通路42の入口42aに達するのに必要な時間だけダンパー51が金属通路開放側に作動する(S11)。このとき、コンベア終端部3bから落下する被検出金属Bが、鎖線図示位置にあるダンパー51′の上面に案内されて、金属通路入口42aから金属通路42中に落下し(S12)、該金属通路42の下端から貯留容器10内に貯留される(S13)。   On the other hand, when the metal detector 7 detects the metal (non-ferrous metal) in the waste material being conveyed on the conveyor 3 (S10), a metal detection signal from the metal detector 7 is sent to the controller 8, and the controller 8 After a predetermined timer (for example, 4 seconds after the detection metal B falls from the conveyor terminal portion 3b), an operation signal is issued to the air cylinder 50 of the sorting device 5 (the damper 51 is moved to the metal passage 42 open side). After the predetermined timer, a signal for returning the damper 51 to the original state is issued to the air cylinder 50. That is, the damper 51 is operated toward the metal passage opening side for a time required for the detected metal B to reach the inlet 42a of the metal passage 42 from the time when the detected metal B falls from the conveyor terminal portion 3b (S11). At this time, the detected metal B falling from the conveyor terminal portion 3b is guided to the upper surface of the damper 51 'at the position indicated by the chain line and falls from the metal passage inlet 42a into the metal passage 42 (S12). It is stored in the storage container 10 from the lower end of 42 (S13).

このように、この実施例の金属混入廃材分別機では、廃材中に混入している金属を再生用廃材から確実に分別することができ、しかも被検出金属が非鉄金属であっても確実に分別できる。   In this way, the metal-mixed waste material separator of this embodiment can reliably separate the metal mixed in the waste material from the waste material for recycling, and reliably separates the detected metal even if it is a non-ferrous metal. it can.

又、金属検出機7からの金属検出信号でダンパー51が金属通路42開放側に位置している間(例えば2〜3秒間)は、被検出金属Bの前後近傍を搬送される再生用廃材Cもダンパー51に案内されて金属通路42側に送出されるが、この実施例では、分配室4の底部にある再生用廃材通路41の入口41aをコンベア終端部3bの直下に開口させ、且つダンパー51として所定大きさ以下の廃材を通過させ得る多数の隙間53,53・・を有したものを採用しているので、ダンパー51が金属通路開放側に位置している状態でも、分配室4内に落下する金属混入廃材中の上記隙間53より小さい廃材(再生用廃材と金属屑を含む)の大部分が、該ダンパー51の隙間53を通って再生用廃材通路41側に落下するようになる。   Further, while the damper 51 is positioned on the open side of the metal passage 42 by the metal detection signal from the metal detector 7 (for example, for 2 to 3 seconds), the recycling waste material C transported around the front and back of the metal B to be detected. In this embodiment, the inlet 41a of the recycling waste material passage 41 at the bottom of the distribution chamber 4 is opened directly below the conveyor end portion 3b, and the damper 51 is guided by the damper 51. 51, which has a large number of gaps 53, 53,... Through which waste materials of a predetermined size or less can pass, is adopted in the distribution chamber 4 even when the damper 51 is located on the metal passage opening side. Most of the waste material (including the waste material for recycling and the metal scrap) smaller than the gap 53 in the metal-mixed waste material that falls on the metal falls through the gap 53 of the damper 51 to the side of the waste material passage 41 for recycling. .

従って、ダンパー51が金属通路開放側にある状態(鎖線図示状態)でも、分配室4内に落下する再生用廃材C(良品)のうちの小さいものを再生用廃材通路41側に送出できるので、不良品として分別される金属屑B中に良品である再生用廃材Cが混入する量を極力少なくできる。   Therefore, even in a state where the damper 51 is on the metal passage open side (a state shown in a chain line), a small one of the recycling waste material C (good product) falling into the distribution chamber 4 can be sent to the recycling waste material passage 41 side. It is possible to reduce as much as possible the amount of the recycled waste material C, which is a non-defective product, in the metal scrap B separated as a defective product.

ところで、ダンパー51が金属通路開放側にある状態(鎖線図示状態)で、コンベア終端部3bから落下する金属屑Bがダンパー51の各隙間53より小さい場合(金属屑Bの粒径が30mmより小さいもの)には、その小さい金属屑Bが51の隙間53から再生用廃材通路41側に落下することがあるが、該隙間53を通過する金属屑Bは小塊状(粒径が30mm以下)のものだけであり、このような小塊状金属屑Bが再生用廃材Cとともに次の圧砕工程に送られても、該圧砕機が破損したり故障するほどの悪影響は発生しない。   By the way, in the state where the damper 51 is on the metal path open side (the state shown by the chain line), when the metal scrap B falling from the conveyor terminal portion 3b is smaller than each gap 53 of the damper 51 (the particle size of the metal scrap B is smaller than 30 mm). In this case, the small metal scrap B may fall to the recycling waste material passage 41 side from the gap 53 of the 51, but the metal scrap B passing through the gap 53 is in the form of a small lump (particle size of 30 mm or less). Even if such a small metal scrap B is sent to the next crushing process together with the waste material C for recycling, there is no adverse effect that the crusher breaks or breaks down.

3はコンベア、4は分配室、5は振り分け装置、6は磁選機、7は金属検出機、8はコントローラ、41は再生用廃材通路、41は再生用廃材通路の入口、42は金属通路、42aは金属通路の入口、50はエアシリンダ、51はダンパー、52は櫛棒、53は隙間である。   3 is a conveyor, 4 is a distribution chamber, 5 is a sorting device, 6 is a magnetic separator, 7 is a metal detector, 8 is a controller, 41 is a recycling waste material passage, 41 is an inlet of the recycling waste material passage, 42 is a metal passage, 42a is a metal passage entrance, 50 is an air cylinder, 51 is a damper, 52 is a comb bar, and 53 is a gap.

Claims (2)

金属が混入した金属混入廃材を搬送するコンベア(3)と、該コンベア(3)上を搬送される廃材中の金属を検出する金属検出機(7)と、前記コンベア(3)の終端部から落下する廃材を受容でき且つ底部に再生用廃材通路(41)と金属通路(42)とを設けた分配室(4)と、該分配室(4)内に落下する廃材を前記再生用廃材通路(41)と前記金属通路(42)に振り分けるダンパー(51)付きの振り分け装置(5)と、前記金属検出機(7)からの金属検出信号に基いて前記振り分け装置(5)を作動させるコントローラ(8)とを備えているとともに、
前記コントローラ(8)は、前記金属検出機(7)が金属非検出状態では前記ダンパー(51)を再生原料通路開放側に位置させる一方、前記金属検出機(7)が金属検出したときにその被検出金属が分配室(4)内に落下するタイミングに合わせて前記ダンパー(51)を金属通路開放側に作動させた後、所定タイマー後に再生用廃材通路開放側に復帰させるように制御する、
ことを特徴とする金属混入廃材分別機。
From the conveyor (3) for transporting the metal-mixed waste material mixed with metal, the metal detector (7) for detecting the metal in the waste material transported on the conveyor (3), and the end of the conveyor (3) A distribution chamber (4) capable of receiving the falling waste material and having a recycling waste material passage (41) and a metal passage (42) at the bottom, and the waste material falling into the distribution chamber (4) (41) and a distribution device (5) with a damper (51) for distribution to the metal passage (42), and a controller for operating the distribution device (5) based on a metal detection signal from the metal detector (7) (8)
When the metal detector (7) detects the metal, the controller (8) moves the damper (51) to the regenerative raw material passage open side when the metal detector (7) is not detecting the metal. After the damper (51) is operated to the metal passage opening side in accordance with the timing at which the metal to be detected falls into the distribution chamber (4), control is performed to return to the recycling waste material passage opening side after a predetermined timer.
This is a metal-mixed waste material separator.
請求項1において、
前記分配室(4)の底部にある前記再生用廃材通路(41)の入口(41a)を前記コンベア(3)の終端部の直下に開口させている一方、
前記ダンパー(51)は、所定大きさ以下の廃材を通過させ得る多数の隙間(53)を有した櫛状又は格子状のものを採用している、
ことを特徴とする金属混入廃材分別機。
In claim 1,
While the inlet (41a) of the recycling waste material passage (41) at the bottom of the distribution chamber (4) is opened directly below the terminal end of the conveyor (3),
The damper (51) employs a comb-like or lattice-like one having a large number of gaps (53) through which waste materials having a predetermined size or less can pass.
This is a metal-mixed waste material separator.
JP2010145861A 2010-06-28 2010-06-28 Machine for separating waste material mixed with metal Pending JP2012005986A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2010145861A JP2012005986A (en) 2010-06-28 2010-06-28 Machine for separating waste material mixed with metal
PCT/JP2011/064444 WO2012002255A1 (en) 2010-06-28 2011-06-23 Machine for separating waste materials mixed with metal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010145861A JP2012005986A (en) 2010-06-28 2010-06-28 Machine for separating waste material mixed with metal

Publications (1)

Publication Number Publication Date
JP2012005986A true JP2012005986A (en) 2012-01-12

Family

ID=45401973

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010145861A Pending JP2012005986A (en) 2010-06-28 2010-06-28 Machine for separating waste material mixed with metal

Country Status (2)

Country Link
JP (1) JP2012005986A (en)
WO (1) WO2012002255A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101485533B1 (en) * 2012-08-01 2015-01-26 주식회사 포스코 Red-Hot coke monitoring apparatus and the method thereof
CN108325737A (en) * 2018-02-08 2018-07-27 张玲 Processing unit after construction waste hogging
CN111672577A (en) * 2020-07-17 2020-09-18 江苏中商碳素研究院有限公司 Solid waste treatment device
CN112659361A (en) * 2020-12-17 2021-04-16 江苏日不落再生资源科技有限公司 Dry-mixed mortar preparation method based on construction waste treatment
WO2023032231A1 (en) * 2021-09-02 2023-03-09 株式会社トクヤマ Method for crushing waste gypsum boards, and silo used therefor

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104001677A (en) * 2014-05-06 2014-08-27 中国农业大学 Color selector utilizing electric-control automatic distribution of material
CN104709935A (en) * 2015-03-11 2015-06-17 陈西刚 Device and processing technology of utilizing waste to process gypsum
MX2021000245A (en) * 2018-07-09 2021-03-25 Novelis Inc Systems and methods for sorting material on a conveyor.
CN111732166B (en) * 2020-07-02 2022-06-24 Tcl环保科技股份有限公司 Industrial wastewater treatment equipment
CN112500030A (en) * 2020-12-17 2021-03-16 江苏日不落再生资源科技有限公司 Composite board processing method based on construction waste recovery
CN114345681B (en) * 2021-12-03 2022-10-28 靖江市格利环保科技有限公司 Spiral falling type metal separator for processing granular food

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3293310B2 (en) * 1994-03-18 2002-06-17 株式会社日立製作所 Metal sorting and recovery method and apparatus
JPH09256009A (en) * 1996-03-15 1997-09-30 Kawasaki Steel Corp Device for screening charging material into blast furnace
JPH11197642A (en) * 1998-01-16 1999-07-27 Sanzou Shiken Center:Kk Sorting recovery apparatus for glass and metal mixture waste
JP4436382B2 (en) * 2007-03-23 2010-03-24 メタウォーター株式会社 Crushing system

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101485533B1 (en) * 2012-08-01 2015-01-26 주식회사 포스코 Red-Hot coke monitoring apparatus and the method thereof
CN108325737A (en) * 2018-02-08 2018-07-27 张玲 Processing unit after construction waste hogging
CN108325737B (en) * 2018-02-08 2020-12-15 博兴兴博城建投资集团有限公司 Treatment device for broken waste building wood
CN111672577A (en) * 2020-07-17 2020-09-18 江苏中商碳素研究院有限公司 Solid waste treatment device
CN112659361A (en) * 2020-12-17 2021-04-16 江苏日不落再生资源科技有限公司 Dry-mixed mortar preparation method based on construction waste treatment
WO2023032231A1 (en) * 2021-09-02 2023-03-09 株式会社トクヤマ Method for crushing waste gypsum boards, and silo used therefor

Also Published As

Publication number Publication date
WO2012002255A1 (en) 2012-01-05

Similar Documents

Publication Publication Date Title
WO2012002255A1 (en) Machine for separating waste materials mixed with metal
JP5574876B2 (en) Gypsum waste material recycling equipment
US5333797A (en) Commingled recyclables recovery and recycling process and related apparatuses
US8910794B2 (en) Method for removing metal pieces from gypsum board wastes
US20100282646A1 (en) Method and unit for the separation of non-ferrous metals and stainless steel in bulk material handling
JP3894666B2 (en) Stainless steel sorter
EP2128279B1 (en) Method for separating metal-containing fractions from dry slag and the use of this method for waste incineration slag.
JP2000051830A (en) Method for treating shredder dust
KR20110066119A (en) System and method for sorting dissimilar materials using a dynamic sensor
KR101260026B1 (en) Recycling device of scrap iron waste by using comminution and selection
KR101433461B1 (en) Device for removing scrap in conveyor
KR101768096B1 (en) Apparatus for treating slag
JPH1034123A (en) Improved system for processing ash produced in waste combustion furnace
JP5489652B2 (en) Scrap shredder equipment
JPH08131953A (en) Method for separation of waste and its apparatus
JP2011098297A (en) Device and method of sorting soil, and soil cleaning facilities
US11833525B2 (en) Method and apparatus for separating feed material
JP7469031B2 (en) Sorting device and sorting method
RU117320U1 (en) PLANT FOR PROCESSING DUMPING METALLURGICAL SLAGS
CN101116860A (en) Un-magnetic metal removing device of the material-feeding system and method thereof
JP2004163415A (en) System for screening radioactive waste
US20160024612A1 (en) Method And Device For Obtaining Pure, Additive-Free Scrap Iron From A Mixture Of Comminuted Scrap Metal
JPH05255A (en) Empty can collecting apparatus
JP6896698B2 (en) Sorting device and transport route status determination method
JP3274061B2 (en) Waste treatment facility

Legal Events

Date Code Title Description
RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20111220