Prior art keywords
installation
floor
opening
building
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2010096602A
Other languages
Japanese (ja)
Other versions
JP5588215B2 (en
Inventor
Kazutoshi Kawarasaki
一利 河原崎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Priority to JP2010096602A priority Critical patent/JP5588215B2/en
Publication of JP2011226142A publication Critical patent/JP2011226142A/en
Application granted granted Critical
Publication of JP5588215B2 publication Critical patent/JP5588215B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Residential Or Office Buildings (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a method of installing a bathroom that is capable of improving installation freedom of a bath unit.SOLUTION: A method of installing a bath unit comprises constructing side joints 14b/24b and floor beams 14c/24c arranged across an opening 40 for bath unit installation formed in a floor FL of a building and installing a bath unit 30 in the opening 40 for bath unit installation that is positioned lower than the floor FL supported by the floor beams 14c/24c. The method includes an opening step in which the opening 40 for bath unit installation is opened in the floor FL, a cutting step in which parts of the side joints 14b/24b that run across the opening 40 for bath unit installation are cut; a panel installation step in which a panel 50 for supporting the bath unit 30 is installed lower than floor FL by being supported by the floor beams 14c/24c; and a bath room installing step in which the bath unit 30 arranged on a floor panel 50 is installed lower than the floor FL in the opening 40 for bath unit installation.

Description

本発明は、住宅、集合住宅などの建物にバスユニットなどの浴室構造体を設置する浴室設置方法に関する。   The present invention relates to a bathroom installation method for installing a bathroom structure such as a bus unit in a building such as a house or an apartment house.

従来、建物に、洗い場と浴槽を備えたバスユニットなどの浴室構造体を設置するにあたり、建物ユニットの床面と浴室構造体の洗い場床面との段差を無くすことが課題となっている。
そこで、バスユニットの設置にあたり、建物ユニットの一般の床部の高さの上段床パネルを設けるとともに、この上段床パネルに開口を設け、この開口に、上段床パネルよりも低い高さに下段床パネルとを設け、この下段床パネルにバスユニットを落とし込んで設置することで、バスユニットを、上段床パネルの上に設置した場合よりも、洗い場床面の高さを低くするようにした技術が知られている(例えば、特許文献1参照)。
2. Description of the Related Art Conventionally, when installing a bathroom structure such as a bath unit equipped with a washing place and a bathtub in a building, it has been a problem to eliminate a step between the floor surface of the building unit and the washing place floor surface of the bathroom structure.
Therefore, when installing the bus unit, an upper floor panel having a general floor height of the building unit is provided, and an opening is provided in the upper floor panel, and the lower floor floor is set at a lower height than the upper floor panel. There is a technology that lowers the height of the washing floor by installing a panel and dropping the bus unit into this lower floor panel and installing the bus unit above the upper floor panel. It is known (see, for example, Patent Document 1).

特許第2728339号公報Japanese Patent No. 2728339

しかしながら、上述の従来技術は、1つの建物ユニットの床の一部に開口を設け、この開口に下段床パネルを設け、この下段床パネルにバスユニットを設置していたため、バスユニット(浴室構造体)の設置位置が1つの建物ユニット内に限られ、設置自由度が低かった。   However, in the above-described conventional technology, an opening is provided in a part of the floor of one building unit, a lower floor panel is provided in the opening, and a bus unit is installed in the lower floor panel. ) Is limited to one building unit, and the degree of freedom of installation is low.

本発明は、上述の課題を解決することを目的とするものであり、浴室構造体の設置自由度を向上させることのできる浴室設置方法を提供することを目的とする。   An object of the present invention is to solve the above-mentioned problems, and an object of the present invention is to provide a bathroom installation method capable of improving the installation flexibility of a bathroom structure.

上記目的を達成するために本発明は、建物の床に設置用開口が開口され、この設置用開口を横断して前記床を支持する高さに配置された根太と、この根太よりも低い位置に配置された小梁とが架設され、浴槽および洗い場を備えた浴室構造体を、前記小梁により前記床よりも低い位置に落とし込んで支持して前記設置用開口に設置する浴室設置方法であって、前記建物の床に、前記設置用開口を開口する開口ステップと、前記根太の前記設置用開口を横断する部分を切断する切断ステップと、前記浴室構造体の支持用の床パネルを、前記小梁に支持させて前記設置用開口に設置するパネル設置ステップと、前記浴室構造体を、前記床パネル上で前記床よりも低い位置で前記設置用開口に設置する浴室設置ステップと、を備えていることを特徴とする浴室設置方法とした。   In order to achieve the above object, the present invention provides an installation opening on a floor of a building, a joist disposed at a height that supports the floor across the installation opening, and a position lower than the joist. Is a bathroom installation method in which a bathroom structure provided with a small beam is installed in a lower position than the floor by the small beam to be supported by the small beam and installed in the installation opening. An opening step for opening the installation opening on the floor of the building, a cutting step for cutting a portion of the joist crossing the installation opening, and a floor panel for supporting the bathroom structure, A panel installation step for supporting the small beam on the installation opening; and a bathroom installation step for installing the bathroom structure in the installation opening at a position lower than the floor on the floor panel. It is characterized by It was bathroom installation method to.

また、請求項2に記載の発明は、請求項1に記載の浴室設置方法において、前記建物は、複数の建物ユニットを結合させて形成するユニット建物であり、前記設置用開口は、第1建物ユニットと第2建物ユニットとに跨って開口されており、前記根太は、各建物ユニットの外周縁を囲んで設けられた根太であることを特徴とする浴室設置方法とした。
請求項3に記載の発明は、請求項1または請求項2に記載の浴室設置方法において、前記切断ステップと前記パネル設置ステップとの間で、断熱材を前記設置用開口に設置する断熱材設置ステップを備えていることを特徴とする浴室設置方法とした。
請求項4に記載の発明は、請求項1〜請求項3のいずれか1項に記載の浴室設置方法において、前記浴室構造体は、あらかじめ浴槽および洗い場が組み込まれたバスユニットであることを特徴とする浴室設置方法とした。
The invention according to claim 2 is the bathroom installation method according to claim 1, wherein the building is a unit building formed by combining a plurality of building units, and the opening for installation is the first building. It was opened across the unit and the second building unit, and the joist was a joist provided around the outer periphery of each building unit.
According to a third aspect of the present invention, in the bathroom installation method according to the first or second aspect, the heat insulating material is installed in the opening for installation between the cutting step and the panel installing step. It was set as the bathroom installation method characterized by providing the step.
The invention according to claim 4 is the bathroom installation method according to any one of claims 1 to 3, wherein the bathroom structure is a bath unit in which a bathtub and a washing place are incorporated in advance. And the bathroom installation method.

本発明の浴室設置方法では、設置用開口を横断して配置された根太を切断して、設置用開口に浴室構造体を設置し、この浴室構造体は、根太の上面よりも低い位置に配置させた小梁で支持する床パネル上に設置して、床よりも低く落とし込んだ位置に設置するようにした。
したがって、床を支持する根太が存在する位置であっても、浴室構造体を床よりも低い位置に落とし込んで設置することが可能となり、浴室構造体の設置位置が根太で制約されなくなり、浴室構造体の設置自由度が向上する。
In the bathroom installation method of the present invention, the joist placed across the installation opening is cut, and the bathroom structure is installed in the installation opening. The bathroom structure is arranged at a position lower than the upper surface of the joist. It was installed on a floor panel supported by a small beam, and it was installed at a position dropped below the floor.
Therefore, even in the position where the joists that support the floor exist, it is possible to install the bathroom structure by dropping it to a position lower than the floor, and the installation position of the bathroom structure is not restricted by joists. The degree of freedom of body setting is improved.

さらに、請求項2に記載の発明では、ユニット建物において、第1建物ユニットと第2建物ユニットとに跨る設置用開口に浴室構造体を設置するようにしたため、従来のように1つの建物ユニット内のみに浴室構造体を設置するものと比較して、ユニット建物における浴室構造体の設置自由度が向上する。
請求項3に記載の発明では、設置用開口に断熱材を設置するようにしたため、浴室構造体の断熱性を向上できる。
請求項4に記載の発明では、浴室構造体として、あらかじめ浴室および洗い場が組み込まれたバスユニットを用いたため、建築現場で浴室構造体を組み立てるのと比較して、建築現場における作業工数が削減できる。
Furthermore, in the invention according to claim 2, in the unit building, the bathroom structure is installed in the installation opening straddling the first building unit and the second building unit. The degree of freedom of installation of the bathroom structure in the unit building is improved as compared with the case where only the bathroom structure is installed.
In invention of Claim 3, since the heat insulating material was installed in the opening for installation, the heat insulation of a bathroom structure can be improved.
In the invention according to claim 4, since the bathroom unit in which the bathroom and the washing place are incorporated in advance is used as the bathroom structure, it is possible to reduce the work man-hours at the building site compared to assembling the bathroom structure at the building site. .

図1は、本発明の実施の形態1の浴室設置方法における開口ステップを説明する斜視図である。FIG. 1 is a perspective view for explaining an opening step in the bathroom installation method according to Embodiment 1 of the present invention. 図2は、実施の形態1の浴室設置方法における切断ステップを説明する斜視図である。FIG. 2 is a perspective view for explaining a cutting step in the bathroom installation method according to the first embodiment. 図3は、実施の形態1の浴室設置方法における断熱材設置ステップを説明する斜視図である。FIG. 3 is a perspective view illustrating a heat insulating material installation step in the bathroom installation method of the first embodiment. 図4は、実施の形態1の浴室設置方法におけるパネル設置ステップを説明する斜視図である。FIG. 4 is a perspective view for explaining a panel installation step in the bathroom installation method of the first embodiment. 図5は、実施の形態1の浴室設置方法における浴室設置ステップを説明する斜視図である。FIG. 5 is a perspective view for explaining a bathroom installation step in the bathroom installation method of the first embodiment. 図6は、実施の形態1の浴室設置方法における間仕切り建て込みステップを説明する斜視図である。FIG. 6 is a perspective view for explaining a partition building step in the bathroom installation method according to the first embodiment. 図7は、実施の形態1の浴室設置方法に用いた床パネル50を示す平面図である。FIG. 7 is a plan view showing the floor panel 50 used in the bathroom installation method of the first embodiment. 図8は、図5のS8−S8線における切断状態を示す断面図である。FIG. 8 is a cross-sectional view showing a cut state taken along the line S8-S8 in FIG. 図9は、図5のS9−S9線における切断状態を示す断面図である。FIG. 9 is a cross-sectional view showing a cut state taken along line S9-S9 in FIG.

以下、本発明の実施の形態について、添付図面を参照しながら説明する。
図1〜図6は、実施の形態の浴室設置方法をステップ順に示している。
図1は実施の形態の浴室設置方法を実施する建物(図示省略)の一部を示しており、第1建物ユニット10と第2建物ユニット20とを建築現場に設置した状態を示している。
すなわち、図示を省略した建物は、ユニット建物と呼ばれるもので、床パネルおよび壁パネルなどからなる複数の建物ユニットを工場で生産し、この複数の建物を建築現場に輸送し、あらかじめ準備した基礎の上に設置し、各建物ユニットを相互に連結して建物を建築するようにしたものである。
Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings.
1-6 has shown the bathroom installation method of embodiment in order of a step.
FIG. 1 shows a part of a building (not shown) in which the bathroom installation method of the embodiment is implemented, and shows a state in which a first building unit 10 and a second building unit 20 are installed on a building site.
In other words, buildings that are not shown in the figure are called unit buildings, and a plurality of building units consisting of floor panels and wall panels are produced at the factory, and the plurality of buildings are transported to the construction site and prepared in advance. The building is constructed by installing the building units on top of each other and connecting them together.

本実施の形態1では、前述の第1建物ユニット10と第2建物ユニット20とが結合されて建物(図示省略)のコーナ部に1つのサニタリースペースSSが形成される。すなわち、両建物ユニット10,20に立設された壁パネル11,21,22によりサニタリースペースSSの外壁Wが形成され、また、両建物ユニット10,20に設けられた床面材13,23により、サニタリースペースSSの脱衣スペースなどとなる床FLが形成される。なお、図1では、図示を省略するが、両建物ユニット10,20には、サニタリースペースSSを形成する室内壁が設けられている一方で、天井は、建築現場で設置されるもので、工場出荷時には図示のように設置されていない。   In the first embodiment, the first building unit 10 and the second building unit 20 are combined to form one sanitary space SS at the corner of the building (not shown). That is, the outer wall W of the sanitary space SS is formed by the wall panels 11, 21, 22 erected on the building units 10, 20, and the floor materials 13, 23 provided on both the building units 10, 20 are used. A floor FL is formed as an undressing space for the sanitary space SS. In addition, although illustration is abbreviate | omitted in FIG. 1, while both building units 10 and 20 are provided with the indoor wall which forms the sanitary space SS, a ceiling is installed in a construction site, and is a factory. At the time of shipment, it is not installed as shown.

サニタリースペースSSには、浴室構造体としてのバスユニット30が設置される。このバスユニット30は、 図5に示すように、一体成形された防水パンからなる洗い場32と浴槽31とを内部に備え、防水パンの越壁に壁面34を立設させるとともに、この壁面34の上部に天井面35を設けて箱状に形成され、壁面34には洗い場32に出入する出入口を開閉するドア33が設けられた周知のものである。   In the sanitary space SS, a bus unit 30 as a bathroom structure is installed. As shown in FIG. 5, the bath unit 30 includes a wash basin 32 and a bathtub 31 made of an integrally formed waterproof pan, and has a wall surface 34 standing on the wall of the waterproof pan. The ceiling surface 35 is provided on the upper portion and formed into a box shape, and the wall surface 34 is a well-known one provided with a door 33 for opening and closing an entrance to and from the washing place 32.

次に、両建物ユニット10,20について説明する。
図1に示すように、本実施の形態1では、第1建物ユニット10と第2建物ユニット20は、図において矢印Y方向であるユニット長手方向には共通の寸法に形成されているのに対し、図において矢印X方向で示すユニット幅方向の寸法が異なっており第2建物ユニット20は、第1建物ユニット10の1/2程度の寸法に形成されている。すなわち、両建物ユニット10,20を含み建物を構成する建物ユニットは、長手方向および幅方向に連続して結合可能なように所定の規格に基づいて形成されており、基本的には一定の寸法に形成されているが、建物の要求寸法に応じて調整可能なように、基本設定とは異なる寸法が設定されている。本実施の形態1では、第1建物ユニット10が、基本的な寸法のものであり、第2建物ユニット20は、調整用に基本的な寸法とは異なる寸法に形成されている。
Next, both building units 10 and 20 will be described.
As shown in FIG. 1, in the first embodiment, the first building unit 10 and the second building unit 20 are formed to have a common dimension in the unit longitudinal direction, which is the arrow Y direction in the figure. The dimensions in the unit width direction indicated by the arrow X direction in the figure are different, and the second building unit 20 is formed to have a dimension about half that of the first building unit 10. That is, the building unit that includes both the building units 10 and 20 and constitutes the building is formed based on a predetermined standard so as to be continuously connectable in the longitudinal direction and the width direction, and basically has a certain size. However, the dimensions are different from the basic settings so that they can be adjusted according to the required dimensions of the building. In this Embodiment 1, the 1st building unit 10 is a thing of a basic dimension, and the 2nd building unit 20 is formed in the dimension different from a basic dimension for adjustment.

次に、両建物ユニット10,20の床構造について説明する。
各建物ユニット10,20の床FLは、床枠組14,24の上面にパーティクルボードなどの床面材13,23を取り付けて構成されている。
Next, the floor structure of both building units 10 and 20 will be described.
The floor FL of each building unit 10, 20 is configured by attaching floor surface materials 13, 23 such as particle boards to the upper surfaces of the floor frame assemblies 14, 24.

床枠組14,24は、各建物ユニット10,20の外周縁の位置で矩形の枠を形成する木製で縦長の矩形断面形状の端根太14a,24aおよび側根太(根太)14b,24bを備えている。また、床面材13,23が設けられている位置には、図示は省略するが、端根太14a,24aおよび側根太14b,24bと、その上面が同じ高さに配置されて床面材13,23を支持する床根太が設けられている。   The floor frames 14, 24 are provided with end joists 14a, 24a and side joists (joists) 14b, 24b of a wooden and vertically long rectangular cross-sectional shape that form a rectangular frame at the outer peripheral edge of each building unit 10, 20. Yes. Although not shown, the floor coverings 13 and 23 are arranged at the same height as the end joists 14a and 24a and the side joists 14b and 24b. , 23 is provided.

一方、床FLには、バスユニット30(図5参照)を設置するためのバスユニット設置用開口40が工場であらかじめ開口されている。このバスユニット設置用開口40は、第1建物ユニット10の床面材13の角部の一部に形成された第1開口部41と、第2建物ユニット20の床面材23において、第1開口部41に連続して全幅に亘って形成された第2開口部42とにより形成されている。   On the other hand, on the floor FL, a bus unit installation opening 40 for installing the bus unit 30 (see FIG. 5) is previously opened at the factory. The opening 40 for installing the bus unit is the first opening 41 formed in a part of the corner of the floor member 13 of the first building unit 10 and the floor member 23 of the second building unit 20. The second opening 42 is formed continuously over the entire width of the opening 41.

このバスユニット設置用開口40は、その外周を、端根太14a,24aと側根太24bと第1開口枠14d(図9参照)と第2開口枠24d(図8参照)とに囲まれている。
両開口枠14d,24dは、端根太14a,24aおよび側根太14b,24bと素材および寸法が同様のものが用いられており、第1開口枠14dは、図9に示すように、側根太24bに対向して配置され、第2開口枠24dは、図8に示すように、端根太14a,24aに対向して配置されている。
The outer periphery of the bus unit installation opening 40 is surrounded by end joists 14a and 24a, side joists 24b, a first opening frame 14d (see FIG. 9), and a second opening frame 24d (see FIG. 8). .
Both the opening frames 14d and 24d are made of the same material and dimensions as the end joists 14a and 24a and the side joists 14b and 24b. As shown in FIG. 9, the first opening frame 14d has the side joists 24b. As shown in FIG. 8, the second opening frame 24d is disposed to face the end joists 14a and 24a.

バスユニット設置用開口40には、図1に示すように、端根太14a,14a、24a,24aの間に、ユニット長手方向(矢印Y方向)に沿って小梁としての床小梁14c,24cがユニット幅方向に間隔を空けて平行に架設されている。   In the bus unit installation opening 40, as shown in FIG. 1, floor beam beams 14c, 24c as beam beams between the end joists 14a, 14a, 24a, 24a along the unit longitudinal direction (arrow Y direction). Are installed in parallel with a gap in the unit width direction.

床小梁14c,24cは、金属製であり、端根太14a,24a、側根太14b,24b、開口枠14d,24dよりも上下寸法が小さな略正方形筒状に形成されており(図9参照)、その両端に設けられたL字金具(図示省略)を端根太14a,24aおよび開口枠14d,24dにねじ止めして固定されている。また、床小梁14c,24cは、図9に示すように、その下面が端根太14a,24aおよび側根太14b,24bの下面と略一致する高さに配置され、その上面は、端根太14a,24aおよび側根太14b,24bの上面よりも低い位置に配置されている。   The floor beams 14c and 24c are made of metal, and are formed in a substantially square cylindrical shape whose vertical dimension is smaller than the end joists 14a and 24a, the side joists 14b and 24b, and the opening frames 14d and 24d (see FIG. 9). The L-shaped metal fittings (not shown) provided at both ends are fixed to the end joists 14a and 24a and the opening frames 14d and 24d by screws. Further, as shown in FIG. 9, the floor beams 14c and 24c are arranged at a height such that the lower surfaces thereof substantially coincide with the lower surfaces of the end joists 14a and 24a and the side joists 14b and 24b. , 24a and the side joists 14b, 24b are disposed at positions lower than the upper surfaces.

バスユニット設置用開口40には、図4および図7に示す床パネル50が床FLよりも低い位置に落とし込んで設置される。
この床パネル50は、パネル材51とフレーム材52とを備えている。
パネル材51は、長方形の板材において浴槽31の設置位置の下方においてその一辺部分の一部を長方形に切り欠いた浴槽設置用開口51aを備えている。また、この浴槽設置用開口51aの近傍に、排水管(図示省略)が挿通される円形の排水用穴51bが開口されている。
In the bus unit installation opening 40, the floor panel 50 shown in FIGS. 4 and 7 is installed at a position lower than the floor FL.
The floor panel 50 includes a panel material 51 and a frame material 52.
The panel material 51 includes a bathtub installation opening 51a in which a part of one side of the rectangular plate material is cut out into a rectangular shape below the installation position of the bathtub 31. In addition, a circular drainage hole 51b through which a drain pipe (not shown) is inserted is opened near the bathtub installation opening 51a.

フレーム材52は、金属製の四角筒状のもので、ユニット長手方向(矢印Y方向)に沿って配置された2本の横フレーム52a,52bと、ユニット幅方向(矢印X方向に)に沿って配置された合計8本の縦フレーム52c〜52h,52j,52kとを結合して組み付けられており、各フレーム52a〜52h,52j,52kの先端には、端根太14a,24a、側根太14b,24b、開口枠14d,24dにねじ止めするためのL字状の固定金具53が設けられている。なお、固定金具53は、浴槽設置用開口51aの位置で露出されている縦フレーム52d,52eの先端に設けられたもののみ図示し、他のフレームに設けられたものは図示を省略している。   The frame member 52 is a metal rectangular tube, and includes two horizontal frames 52a and 52b arranged along the unit longitudinal direction (arrow Y direction) and the unit width direction (in the arrow X direction). A total of eight vertical frames 52c to 52h, 52j, and 52k are combined and assembled, and end joists 14a and 24a and side joists 14b are attached to the ends of the respective frames 52a to 52h, 52j, and 52k. , 24b, and L-shaped fixing brackets 53 for screwing to the opening frames 14d, 24d. The fixing metal 53 is shown only at the tip of the vertical frames 52d and 52e exposed at the position of the bathtub installation opening 51a, and the one provided at the other frame is not shown. .

フレーム材52は、浴槽31が配置される部分が、洗い場32に配置される部分よりも支持強度が高く形成されている。すなわち、フレーム材52は、洗い場32が配置される位置では、横フレーム52a,52bどうしの間および横フレーム52bと開口枠14dとの間で、それぞれ2本の縦フレーム52g,52hおよび52j,52kが架設されているのに対し、浴槽31が配置される位置である横フレーム52aと側根太24bとの間では、4本の縦フレーム52c〜52fが架設されている。
なお、図7に示すように、浴槽設置用開口51aに沿って配置された横フレーム52aは、他の各フレーム52b〜52h,52j,52kよりも幅広のものが用いられている。また、もう1本の横フレーム52bと、浴槽設置用開口51aに配置された2本の縦フレーム52d,52eおよび横フレーム52a,52bの間に架設された2本の縦フレーム52g,52hは、他の縦フレーム52c,52f,52j,52kよりも幅広のものが用いられている。
The frame material 52 is formed such that the portion where the bathtub 31 is disposed has higher support strength than the portion where the bathtub 31 is disposed. In other words, the frame material 52 has two vertical frames 52g, 52h and 52j, 52k between the horizontal frames 52a and 52b and between the horizontal frame 52b and the opening frame 14d at the position where the washing place 32 is disposed. In contrast, four vertical frames 52c to 52f are installed between the horizontal frame 52a where the bathtub 31 is disposed and the side joists 24b.
As shown in FIG. 7, the horizontal frame 52a arranged along the bathtub installation opening 51a is wider than the other frames 52b to 52h, 52j, 52k. In addition, another vertical frame 52b, two vertical frames 52d and 52e disposed in the bathtub installation opening 51a, and two vertical frames 52g and 52h installed between the horizontal frames 52a and 52b, A frame wider than the other vertical frames 52c, 52f, 52j, and 52k is used.

<浴室設置方法>
次に、本発明の実施の形態の浴室設置方法について順を追って説明する。
(開口ステップ)
開口ステップは、床FLにバスユニット設置用開口40を開口するステップである。本実施の形態1では、あらかじめ、工場において、第1建物ユニット10の床面材13に第1開口部41を形成するとともに、第2建物ユニット20の床面材に第2開口部42を形成しておき、これらの第1建物ユニット10と第2建物ユニット20とを建築現場において結合させることで、両建物ユニット10,20を結合して形成されるサニタリースペースSSの床FLにバスユニット設置用開口40が形成される。
また、本実施の形態1では、工場において、バスユニット設置用開口40に床小梁14c,24cを各建物ユニット10,20に固定しておく。
<Bathroom installation method>
Next, the bathroom installation method according to the embodiment of the present invention will be described in order.
(Opening step)
The opening step is a step of opening the bus unit installation opening 40 in the floor FL. In the first embodiment, the first opening 41 is formed in the floor material 13 of the first building unit 10 and the second opening 42 is formed in the floor material of the second building unit 20 in advance in the factory. The bus unit is installed on the floor FL of the sanitary space SS formed by combining the first building unit 10 and the second building unit 20 at the construction site. Opening 40 is formed.
In the first embodiment, the floor beams 14c and 24c are fixed to the building units 10 and 20 in the bus unit installation opening 40 in the factory.

(ユニット運搬・設置ステップ)
ユニット運搬・設置ステップは、工場で組み立てた両建物ユニット10,20を含む建物ユニットを建築現場まで運び、さらに、建築現場に設けられた図示を省略した基礎に設置するステップである。
(Unit transportation / installation steps)
The unit transportation / installation step is a step of transporting the building unit including both the building units 10 and 20 assembled at the factory to the construction site, and further installing the building unit on a foundation provided on the construction site, not shown.

このユニット運搬・設置ステップにおいて、両建物ユニット10,20は、ユニット外周に沿ってその全周に亘って端根太14a,24aおよび側根太14b,24bが枠状に配置されているため、床FLの剛性が確保されており、運搬時に各根太14a,24a,14b,24bを用いて各建物ユニット10,20の支持を行なっても、各建物ユニット10,20が変形するなどの不具合が生じることが無い。   In this unit transportation / installation step, both building units 10 and 20 are arranged such that the end joists 14a and 24a and the side joists 14b and 24b are arranged in a frame shape along the outer circumference of the unit. The rigidity of the building unit is ensured, and even if the building units 10 and 20 are supported using the joists 14a, 24a, 14b, and 24b during transportation, problems such as deformation of the building units 10 and 20 occur. There is no.

さらに、バスユニット設置用開口40に床小梁14c,24cを設けているため、バスユニット設置用開口40を開口していても、この運搬および基礎への設置時に、バスユニット設置用開口40が変形するのを防止できる。   Furthermore, since the floor beams 14c and 24c are provided in the bus unit installation opening 40, even when the bus unit installation opening 40 is opened, the bus unit installation opening 40 is not provided during transportation and installation on the foundation. Deformation can be prevented.

(切断ステップ)
切断ステップは、両建物ユニット10,20の床枠組14,24の側根太14b,24bのうち、バスユニット設置用開口40に配置されている部分をカットするステップである。
図1は切断ステップの実施前の状態を示しており、バスユニット設置用開口40の位置に側根太14b,24bが存在している。
一方、図2は、この切断ステップを実施後の状態を示しており、バスユニット設置用開口40に配置されている側根太14b,24bが切断され、このバスユニット設置用開口40の位置には、床FLの表面の高さから下方に離れて配置された床小梁14c,24cのみが架設された状態となる。
(Cutting step)
A cutting step is a step which cuts the part arrange | positioned in the opening 40 for bus unit installation among the side joists 14b and 24b of the floor frame assemblies 14 and 24 of both the building units 10 and 20. FIG.
FIG. 1 shows a state before the cutting step is performed, and side joists 14b and 24b exist at the position of the opening 40 for installing the bus unit.
On the other hand, FIG. 2 shows a state after the cutting step is performed. The side joists 14b and 24b arranged in the bus unit installation opening 40 are cut, and the bus unit installation opening 40 is located at the position of the bus unit installation opening 40. Only the floor beams 14c and 24c arranged away from the height of the surface of the floor FL are installed.

(断熱材敷設ステップ)
断熱材敷設ステップは、図3に示すように、バスユニット設置用開口40の全面を覆って断熱材60を敷設するステップであり、断熱材60は図2に示す床小梁14c,24cに支持される。なお、断熱材60としては、グラスウールなどの無機繊維系断熱材や、ポリスチレンフォームなどの発泡プラスチック系断熱材などを用いることができるが、本実施の形態1では、無機繊維系断熱材を用いている。
(Insulation step)
As shown in FIG. 3, the heat insulating material laying step is a step of covering the entire surface of the bus unit installation opening 40 and laying the heat insulating material 60. The heat insulating material 60 is supported by the floor beams 14c and 24c shown in FIG. Is done. In addition, as the heat insulating material 60, an inorganic fiber heat insulating material such as glass wool or a foamed plastic heat insulating material such as polystyrene foam can be used. In the first embodiment, an inorganic fiber heat insulating material is used. Yes.

(パネル設置ステップ)
パネル設置ステップは、バスユニット設置用開口40に、バスユニット30を支持する図4に示す床パネル50を床FLから落とし込んで設置するステップである。
(Panel installation step)
The panel installation step is a step in which the floor panel 50 shown in FIG. 4 that supports the bus unit 30 is dropped into the bus unit installation opening 40 from the floor FL.

このとき、床パネル50は、フレーム材52の下面が断熱材60を圧縮あるいは押し退けて各床小梁14c,24cの上面に当接あるいは近接する高さに配置させた後、各フレーム52a〜52h,52j,52kの先端に設けられた固定金具53を、端根太14a,24a、側根太24bおよび開口枠14d,24dにねじ止めすることで行う。   At this time, after the floor panel 50 is disposed at a height at which the lower surface of the frame material 52 compresses or pushes the heat insulating material 60 to abut or approaches the upper surfaces of the floor beams 14c and 24c, the frames 52a to 52h. , 52j, 52k, by fixing the fixing metal 53 to the end joists 14a, 24a, the side joists 24b and the opening frames 14d, 24d.

したがって、床パネル50は、図5にも示すように、両建物ユニット10,20の床FLよりも低い高さに配置される。   Therefore, the floor panel 50 is arrange | positioned at the height lower than the floor FL of both the building units 10 and 20, as shown also in FIG.

なお、建築現場では、開口ステップからパネル設置ステップまでの間に、壁パネル11と壁パネル21との間の継ぎ目を面材73により覆い隠す作業を実行する。   In the construction site, an operation of covering the joint between the wall panel 11 and the wall panel 21 with the face material 73 is performed between the opening step and the panel installation step.

(バスユニット設置ステップ)
バスユニット設置ステップは、図5に示すように、バスユニット設置用開口40に設置された床パネル50の上に、バスユニット30を床FLから落とし込んで設置するステップである。
このとき、床パネル50は、両建物ユニット10,20の床FLよりも低い位置に設置されているため、バスユニット30も、床FLよりも低い位置に落とし込んで設置される。
(Bus unit installation step)
As shown in FIG. 5, the bus unit installation step is a step in which the bus unit 30 is dropped from the floor FL and installed on the floor panel 50 installed in the bus unit installation opening 40.
At this time, since the floor panel 50 is installed at a position lower than the floor FL of both the building units 10 and 20, the bus unit 30 is also dropped and installed at a position lower than the floor FL.

なお、バスユニット30は、本実施の形態1では、洗い場32の床面を形成する防水パンや浴槽31を工場で既に組み付けたものを用いているが、この組立を建築現場で行うようにしてもよい。   In the first embodiment, the bus unit 30 uses a waterproof pan or a bathtub 31 that already forms the floor surface of the washing place 32 at the factory. Also good.

(間仕切り建て込みステップ)
間仕切り建て込みステップは、図6に示す出入口間仕切71および桁間仕切72を、バスユニット30の壁面34のうちサニタリースペースSSに面した側面を覆って設置するステップである。
以上のステップを経て、バスユニット30の設置が終了する。
(Partition built-in step)
The partition building step is a step of installing the entrance / exit partition 71 and the girder partition 72 shown in FIG. 6 so as to cover the side face of the wall surface 34 of the bus unit 30 facing the sanitary space SS.
Through the above steps, the installation of the bus unit 30 is completed.

以上説明したように、本実施の形態の浴室設置方法にあっては、以下に列挙する効果が得られる。
a)両建物ユニット10,20の設置後に、側根太14b,24bを切断し、この側根太14b,24bよりも低い位置に配置されている床小梁14c,24cにより床パネル50を支持し、この床パネル50によりバスユニット30を床FLよりも低い位置に落とし込んで支持するようにした。
したがって、バスユニット30を、床FLよりも低い位置に落とし込んで設置するのにあたり、側根太14b,24bなどの根太の存在に制約されること無く設置可能となり、バスユニット30の設置自由度が向上する。
As described above, in the bathroom installation method of the present embodiment, the effects listed below can be obtained.
a) After the installation of both building units 10 and 20, the side joists 14b and 24b are cut, and the floor panel 50 is supported by the floor beams 14c and 24c arranged at positions lower than the side joists 14b and 24b. The floor unit 50 supports the bus unit 30 by dropping it to a position lower than the floor FL.
Therefore, when the bus unit 30 is installed at a position lower than the floor FL, the bus unit 30 can be installed without being restricted by the presence of joists such as the side joists 14b and 24b, and the degree of freedom in installing the bus unit 30 is improved. To do.

b)バスユニット設置用開口40を、ユニット建物において、両建物ユニット10,20に跨って形成し、両建物ユニット10,20の外周縁を囲う端根太14a,24aおよび側根太14b,24bのうちの側根太14b,24bを切断するようにした。
したがって、両建物ユニット10,20に跨ってバスユニット30を床FLよりも低く落とし込んで設置可能となり、従来のように、バスユニット30の設置が1つの建物ユニット内に限られていたものと比較して、ユニット建物におけるバスユニット30の設置自由度が向上する。
b) Of the end joists 14a and 24a and the side joists 14b and 24b, the bus unit installation opening 40 is formed across the building units 10 and 20 in the unit building and surrounds the outer peripheral edges of the building units 10 and 20. The side joists 14b and 24b were cut.
Therefore, it becomes possible to install the bus unit 30 by dropping it below the floor FL across both the building units 10 and 20, and compared with the conventional case where the installation of the bus unit 30 is limited to one building unit. Thus, the degree of freedom of installation of the bus unit 30 in the unit building is improved.

c)上記のように、側根太14b,24bの切断は、建築現場で行うため、建築現場までの両建物ユニット10,20の運搬時には、端根太14a,24aおよび側根太14b,24bによる両建物ユニット10,20の剛性を確保して、従来通りの運搬を行うことができる。すなわち、上記b)のように、側根太14b,24bを切断して、バスユニット30を側根太14b,24bが存在する位置に跨って配置するにもかかわらず、ユニット運搬・設置ステップの時点では、両建物ユニット10,20の剛性を確保することができる。   c) Since the side joists 14b and 24b are cut at the construction site as described above, both the buildings by the end joists 14a and 24a and the side joists 14b and 24b are used when transporting the building units 10 and 20 to the construction site. The rigidity of the units 10 and 20 can be ensured and the conventional transportation can be performed. That is, as shown in the above b), the side joists 14b and 24b are cut and the bus unit 30 is arranged across the position where the side joists 14b and 24b exist, but at the time of the unit transportation / installation step. The rigidity of both building units 10 and 20 can be secured.

d)バスユニット設置用開口40において両建物ユニット10,20と床パネル50との間に断熱材60を敷設したため、バスユニット30の熱遮断性を向上できる。   d) Since the heat insulating material 60 is laid between the building units 10 and 20 and the floor panel 50 in the opening 40 for installing the bus unit, the heat shielding property of the bus unit 30 can be improved.

e)工場で組み立てたバスユニット30を、建築現場で両建物ユニット10,20間に設置するようにしたため、浴室構造体を建築現場で組み立てるものと比較して、建築現場における作業時間の短縮を図ることができる。   e) Since the bus unit 30 assembled at the factory is installed between the building units 10 and 20 at the building site, the working time at the building site can be shortened compared with the case where the bathroom structure is assembled at the building site. Can be planned.

以上、本発明の実施の形態について説明したが、本発明はこうした実施の形態に限定されるものではなく、本発明の要旨を逸脱しない範囲内において種々の変形および置換を加えることができる。   As mentioned above, although embodiment of this invention was described, this invention is not limited to such embodiment, A various deformation | transformation and substitution can be added in the range which does not deviate from the summary of this invention.

例えば、実施の形態1では、浴室構造体としてのバスユニットを設置する建物として、ユニット建物を示したが、浴室構造体を設置する建物としては、ユニット建物に限定されることはない。したがって、浴室構造体を設置する設置用開口において切断する根太は、床面材を支持する高さに配置された根太であれば、建物ユニットの側根太14b,24bあるいは端根太14a,24aに限定されない。例えば、いわゆるツーバイフォーと呼ばれる木造枠組壁構法の建物における、床根太を切断するようにしてもよい。   For example, in Embodiment 1, a unit building is shown as a building in which a bus unit as a bathroom structure is installed. However, a building in which a bathroom structure is installed is not limited to a unit building. Therefore, if the joist to be cut at the opening for installing the bathroom structure is a joist arranged at a height that supports the floor material, it is limited to the side joists 14b and 24b or the end joists 14a and 24a of the building unit. Not. For example, floor joists in a so-called two-by-four wooden framed wall construction may be cut.

また、実施の形態1では、小梁として、工場で各建物ユニット10,20に組み付けられた床小梁14c,24cを示したが、この床小梁14c,24cは、建築現場で組み付けるようにしてもよい。   In the first embodiment, the floor beams 14c and 24c assembled to the building units 10 and 20 at the factory are shown as the beams. However, the floor beams 14c and 24c are assembled at the construction site. May be.

また、実施の形態1では、床パネル50と床小梁14c,24cとの間に断熱材60を充填するようにした例を示した。この断熱材60は、寒冷地では有効であるが、非寒冷地の場合などには、断熱材60を設けなくてもよい。   Moreover, in Embodiment 1, the example which filled the heat insulating material 60 between the floor panel 50 and the floor beam 14c, 24c was shown. The heat insulating material 60 is effective in a cold region, but the heat insulating material 60 may not be provided in a non-cold region.

また、実施の形態1では、浴室構造体としてあらかじめ工場で浴槽31や洗い場32が組み立てられたバスユニット30を示したが、浴室構造体としてはこれに限定されるものではなく、建築現場で浴槽や洗い場あるいは防水パンを組み付ける形式の浴室構造体であってもよい。   In the first embodiment, the bath unit 30 in which the bathtub 31 and the washing place 32 are assembled in advance in the factory is shown as the bathroom structure. However, the bathroom structure is not limited to this, and the bathtub is used at the construction site. It may be a bathroom structure of a type in which a washing place or a waterproof pan is assembled.

10 第1建物ユニット
14b 側根太(根太)
14c 床小梁(小梁)
20 第2建物ユニット
24b 側根太(根太)
24c 床小梁(小梁)
30 バスユニット(浴室構造体)
31 浴槽
32 洗い場
40 バスユニット設置用開口
41 第1開口部
42 第2開口部
50 床パネル
60 断熱材
FL 床
10 1st building unit 14b Side joist
14c Floor beam (beam)
20 Second building unit 24b Side joist
24c Floor beam (beam)
30 bath unit (bathroom structure)
31 Bath 32 Washing area 40 Bath unit installation opening 41 First opening 42 Second opening 50 Floor panel 60 Thermal insulation FL Floor

Claims (4)

建物の床に設置用開口が開口され、この設置用開口を横断して前記床を支持する高さに配置された根太と、この根太よりも低い位置に配置された小梁とが架設され、浴槽および洗い場を備えた浴室構造体を、前記小梁により前記床よりも低い位置に落とし込んで支持して前記設置用開口に設置する浴室設置方法であって、
前記建物の床に、前記設置用開口を開口する開口ステップと、
前記根太の前記設置用開口を横断する部分を切断する切断ステップと、
前記浴室構造体の支持用の床パネルを、前記小梁に支持させて前記設置用開口に設置するパネル設置ステップと、
前記浴室構造体を、前記床パネル上で前記床よりも低い位置で前記設置用開口に設置する浴室設置ステップと、
を備えていることを特徴とする浴室設置方法。
An opening for installation is opened on the floor of the building, and a joist arranged at a height that supports the floor across the installation opening and a small beam arranged at a position lower than the joist are installed, A bathroom installation method provided with a bathtub and a washing place, dropped into a position lower than the floor by the small beam and supported and installed in the installation opening,
An opening step for opening the installation opening on the floor of the building;
A cutting step of cutting a portion of the joist crossing the installation opening;
A panel installation step of installing the floor panel for supporting the bathroom structure on the installation opening by supporting the small beam;
A bathroom installation step of installing the bathroom structure in the installation opening at a position lower than the floor on the floor panel;
A bathroom installation method characterized by comprising:
前記建物は、複数の建物ユニットを結合させて形成するユニット建物であり、
前記設置用開口は、第1建物ユニットと第2建物ユニットとに跨って開口されており、
前記根太は、各建物ユニットの外周縁を囲んで設けられた根太であることを特徴とする請求項1に記載の浴室設置方法。
The building is a unit building formed by combining a plurality of building units,
The opening for installation is opened across the first building unit and the second building unit,
The bathroom joist method according to claim 1, wherein the joist is a joist provided around an outer peripheral edge of each building unit.
前記切断ステップと前記パネル設置ステップとの間で、断熱材を前記設置用開口に設置する断熱材設置ステップを備えていることを特徴とする請求項1または請求項2に記載の浴室設置方法。   The bathroom installation method according to claim 1, further comprising a heat insulating material installation step of installing a heat insulating material in the installation opening between the cutting step and the panel installation step. 前記浴室構造体は、あらかじめ浴槽および洗い場が組み込まれたバスユニットであることを特徴とする請求項1〜請求項3のいずれか1項に記載の浴室設置方法。   The bathroom installation method according to any one of claims 1 to 3, wherein the bathroom structure is a bath unit in which a bathtub and a washing place are incorporated in advance.
JP2010096602A 2010-04-20 2010-04-20 Bathroom installation method Active JP5588215B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010096602A JP5588215B2 (en) 2010-04-20 2010-04-20 Bathroom installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010096602A JP5588215B2 (en) 2010-04-20 2010-04-20 Bathroom installation method

Publications (2)

Publication Number Publication Date
JP2011226142A true JP2011226142A (en) 2011-11-10
JP5588215B2 JP5588215B2 (en) 2014-09-10

Family

ID=45041810

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010096602A Active JP5588215B2 (en) 2010-04-20 2010-04-20 Bathroom installation method

Country Status (1)

Country Link
JP (1) JP5588215B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11117397A (en) * 1997-10-08 1999-04-27 Sekisui Chem Co Ltd Building unit
JP2000274097A (en) * 1999-03-25 2000-10-03 Tostem Corp Airtight, heat insulated structure of building
JP2000320000A (en) * 1999-05-14 2000-11-21 Sekisui Chem Co Ltd Unit building
JP2001140379A (en) * 1999-11-16 2001-05-22 Sekisui Chem Co Ltd Sound insulating strucure of bathroom on upper floor

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11117397A (en) * 1997-10-08 1999-04-27 Sekisui Chem Co Ltd Building unit
JP2000274097A (en) * 1999-03-25 2000-10-03 Tostem Corp Airtight, heat insulated structure of building
JP2000320000A (en) * 1999-05-14 2000-11-21 Sekisui Chem Co Ltd Unit building
JP2001140379A (en) * 1999-11-16 2001-05-22 Sekisui Chem Co Ltd Sound insulating strucure of bathroom on upper floor

Also Published As

Publication number Publication date
JP5588215B2 (en) 2014-09-10

Similar Documents

Publication Publication Date Title
JP5411037B2 (en) Insulation structure of reinforced concrete wall structure with steel frame
JP5588215B2 (en) Bathroom installation method
JP4264376B2 (en) Under-floor connection hardware
JP7421399B2 (en) External wall structure
JP6770829B2 (en) Joining structure and joining method of building units and wall panels
JP4702717B2 (en) Partition wall panel
JP7355626B2 (en) Building
JP7331631B2 (en) Basic insulation structure
JP5791416B2 (en) Building floor structure
JP3484232B2 (en) Unit building
JP5947531B2 (en) Building floor structure and flooring installation method
JP2011214320A (en) Waterproof structure of building
JP2023118188A (en) Piping and wiring housing structure
WO2020080192A1 (en) Sanitary unit structure and construction method for same
JP2022145994A (en) Partly tenant-occupied house and method for rebuilding partly tenant-occupied house
JP2024062249A (en) Building
JP2020172770A (en) Floor structure
JP2005016221A (en) Skeleton infill structure
JP6082567B2 (en) Building outer wall structure
JP4664083B2 (en) Fire stop structure in the shaft construction method
JPH1046834A (en) Earthquake-resistant reinforcing structure of existing building
JP2818711B2 (en) Unit and panel combination method
JP2001207547A (en) Unit type building and assembly method therefor
KR20190064816A (en) Exterior insulation construction structure on which window is installed
JP2011084863A (en) Method for reconstructing unit building

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20130107

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20131125

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20131203

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20131225

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140701

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140725

R151 Written notification of patent or utility model registration

Ref document number: 5588215

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250