JP2011069063A - Bowl base plate - Google Patents

Bowl base plate Download PDF

Info

Publication number
JP2011069063A
JP2011069063A JP2009219123A JP2009219123A JP2011069063A JP 2011069063 A JP2011069063 A JP 2011069063A JP 2009219123 A JP2009219123 A JP 2009219123A JP 2009219123 A JP2009219123 A JP 2009219123A JP 2011069063 A JP2011069063 A JP 2011069063A
Authority
JP
Japan
Prior art keywords
steel
foundation concrete
concrete
base plate
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2009219123A
Other languages
Japanese (ja)
Inventor
Satoshi Katsuyoshi
智 勝吉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2009219123A priority Critical patent/JP2011069063A/en
Publication of JP2011069063A publication Critical patent/JP2011069063A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To reduce costs and stabilize a construction period of steel-frame erection work, by omitting a cumbersome step of molding a reinforcing bar (3) with a length of the order of several tens of centimeters, among steps from work of backfill of foundation concrete (1) to steel structure material assembling work in construction work of a building and a structure of steel construction and steel framed reinforced concrete construction; and to accurately and easily perform operations of marking, the adjustment of a steel column (6), and the injection of a grout material (5) by surely transferring the load of the steel structure material to the foundation concrete (1). <P>SOLUTION: In the placing of the foundation concrete (1), when the leveling of the top surface of the concrete is checked, the steel column (6) equipped with a steel base plate (7) with a domy protrusion (8) is directly installed on the foundation concrete (1). More specifically, after the backfill of the foundation concrete (1), only the operations of the marking of a column core, a wall core, etc., and the re-checking of the level of the top surface of the foundation concrete (1) have only to be performed. Thus, the steps, which include the assembly of the steel structure material and which are not affected by weather, are scheduled; and the cost of the molding of the reinforcing bar (3) with the length of the order of several tens of centimeters becomes unnecessary. <P>COPYRIGHT: (C)2011,JPO&INPIT

Description

本発明は、鉄骨造及び鉄骨鉄筋コンクリート造の建築物工事並びに工作物工事のうち、鉄骨構造材の柱脚下端に取り付ける鋼製ベースプレート下面形状に関するものである。   The present invention relates to a steel base plate bottom surface shape that is attached to the lower end of a column base of a steel structure material among steel works and steel reinforced concrete construction works and work works.

従来、建築物並びに工作物の鉄骨工事に於いて鉄骨構造材を建てる場合、鉄筋、型枠を組み立て、アンカーボルトを設置した後、基礎コンクリートを打設し、コンクリートが凝固するまでに、各基礎の中央部に数十センチ程度の鉄筋(以後まんじゅう筋と称す)を、その4分の3程度の深さに縦に挿入する。
その後、コンクリートの強度が所定の荷重を支持できる値となるまで1週間程度養生し、基礎型枠を解体撤去し埋め戻し作業をした後、基礎コンクリート上面に柱芯を、まんじゅう筋にベースプレート下端高さの基準線をそれぞれ線描(以後墨だしと称す)する。
さらに、図1のように、各鉄骨柱直下の基礎コンクリートの上面上に、無収縮モルタル製のドーム形のレベルモルタル(以後まんじゅうと称す)を成形する仕上げ工事を行い、数日間養生した後、そのまんじゅう上に鋼製ベースプレートの付いた鉄骨柱を立てる。
ベースプレートをアンカーボルトのナットで仮締めした後、鉄骨構造材を組み立て、柱の位置と傾斜を調整後、アンカーボルトのナットを締め付け、基礎コンクリートと柱脚ベースプレートの隙間に無収縮モルタル製の充填材(以後グラウト材と称す)を流し込み固定している。
Conventionally, when building steel structure materials for building and work steel structures, after assembling reinforcing bars and formwork, installing anchor bolts, placing foundation concrete and solidifying each foundation A rebar of about several tens of centimeters (hereinafter referred to as a "manju-muscle") is inserted longitudinally to a depth of about three-quarters of it.
Then, after curing for about one week until the concrete strength reaches a value that can support the specified load, dismantle the foundation formwork and backfill, then post the column core on the upper surface of the foundation concrete and the base plate at the lower end Each of the reference lines is drawn (hereinafter referred to as sumi).
Furthermore, as shown in Fig. 1, after finishing for a few days after finishing a domed level mortar made of non-shrink mortar (hereinafter referred to as “Manju”) on the upper surface of the foundation concrete directly under each steel column, Stand a steel column with a steel base plate on the bun.
After temporarily tightening the base plate with the nut of the anchor bolt, assemble the steel structure material, adjust the position and inclination of the column, tighten the nut of the anchor bolt, and fill the gap between the foundation concrete and the column base plate with non-shrink mortar (Hereinafter referred to as grout material).

まんじゅうを設ける作業は、コンクリート打設時に挿入したまんじゅう筋に基準高を墨だしした後、まんじゅう筋をその高さにガス溶断機で切断し、剥離防止の為設置部分のコンクリート面をケレンし、柱芯等の墨だしを行った後に、無収縮モルタルを現場調合して所定の高さのドーム形に成形する煩雑な作業である。   For the work of installing the steamed bun, after marking the reference height of the steamed muscle inserted at the time of placing the concrete, the steamed muscle is cut to that height with a gas fusing machine, and the concrete surface of the installation part is cleaned to prevent peeling, This is a cumbersome operation of forming a non-shrink mortar and forming it into a dome shape of a predetermined height after inking the pillar core and the like.

まんじゅうは、現場調合の無収縮モルタルで成形する為、作業は雨天等の天候に左右さ
れ易く、凝固までに沈下や破損の恐れもあり養生が不可欠である。
Since manju is molded from on-site non-shrink mortar, the work is easily affected by the weather such as rain, and curing is inevitable because it may sink or break before solidification.

基礎コンクリートに、鉄骨柱荷重を伝えるまんじゅうは、現場調合の無収縮モルタルで成形されるが、その形状と強度は、作業員の熟練度や気温の変化で、非常に不安定である。   The bun that conveys the steel column load to the basic concrete is molded with on-site non-shrink mortar, but its shape and strength are very unstable due to changes in the skill level of workers and changes in temperature.

墨だしは、基礎コンクリートの上面中央部にまんじゅう筋やまんじゅうが在る為、建て方の基準となる柱芯等の墨だし線が柱脚部分で不連続となり、それを基準に行う柱やアンカーボルトの位置測定に正確さを欠く。   Ink soup has a bun and a bun in the center of the upper surface of the foundation concrete, so the inking line such as the pillar core, which is the standard for building, becomes discontinuous at the column base, and the pillars and anchors that are used as a reference Inaccurate bolt position measurement.

まんじゅうのドーム形の凸部が上向きの為、まんじゅうの中央部付近では、半液状化したグラウト材は流れにくく、隙間充填が完全に施工されず空隙が生じやすい。   Since the dome-shaped convex part of the bun is upward, the semi-liquefied grout material hardly flows in the vicinity of the central part of the bun, and the gap filling is not completely applied and a void is likely to be generated.

鉄骨柱脚下端に取り付ける鋼製ベースプレートの下面を、図2のように、一体化した鋼製のドーム形の突起を有する形状にする。   The lower surface of the steel base plate attached to the lower end of the steel column base is formed into a shape having an integrated steel dome-shaped projection as shown in FIG.

基礎コンクリート打設時に、まんじゅう筋を挿入する工程や埋め戻し後基礎上面にまん
じゅうを設ける煩雑な工程を省略でき、天候や作業員の熟練度に左右されず工期も安定し
費用の削減もできる。
When placing concrete foundations, it is possible to omit the process of inserting the buns and the complicated process of installing the buns on the upper surface of the foundation after backfilling.

まんじゅう筋やまんじゅう等の障害物が無い為、構造物の基準となる柱芯の墨だしが、途切れることなく正確にでき以後の作業も容易である。   Since there are no obstacles such as buns or buns, the ink of the pillar core, which is the standard for the structure, can be accurately and without interruption, and the subsequent work is easy.

強度の確定した鉄骨柱脚下端の鋼製ベースプレート下面ドーム形突起が、直接基礎コンクリートに接する為、鉄骨構造材の荷重が、強度の不安定なまんじゅう、まんじゅう筋を介すること無く直接基礎コンクリートに伝わる。   Steel base plate bottom dome-shaped projection at the lower end of steel column base with fixed strength is in direct contact with the foundation concrete, so the load of the steel structure material is directly transmitted to the foundation concrete without going through the unstable strength of the buns and buns .

鉄骨柱の傾斜修正は、現場成形の不完全なドーム形状のまんじゅうと違い、工場成形の鋼製の完全なドーム形の為、柱中心を支点として微妙に調整でき、鉄骨柱の不陸調整も、鉄骨柱を立てた後でも、鉄骨柱をはずすことなく、ナットを緩め、鉄骨柱をジャッキアップしながら薄い鋼板の小片を基礎コンクリートとベースプレートのドーム形の間に差し込むことで可能である。   The steel column tilt correction is different from the incomplete dome-shaped buns that are formed on-site, and because it is a complete dome shape made of steel, it can be finely adjusted with the center of the column as a fulcrum, and the unevenness adjustment of the steel column Even after the steel column has been erected, it is possible to loosen the nut without removing the steel column and to insert a small piece of steel plate between the foundation concrete and the dome shape of the base plate while jacking up the steel column.

グラウト材の注入は、ベースプレートのドーム形が、下向きの形状の為、半液状化したグラウト材はドーム形に沿って流れ易く、したがって基礎コンクリートとベースプレート下の隙間のグラウト材の空隙が発生しにくい。   Since the dome shape of the base plate is downward when the grout material is injected, the semi-liquefied grouting material easily flows along the dome shape, and therefore the gap between the foundation concrete and the gap between the base plate and the grouting material is less likely to occur. .

従来の基礎の上面の仕上りを斜め上から見た姿図。The figure which looked at the finish of the upper surface of the conventional foundation from diagonally above. 本発明のベースプレート下面を斜め下から見た姿図。The figure which looked at the lower surface of the baseplate of this invention from diagonally downward. 従来のベースプレート付き鉄骨柱設置の水平断面図。The horizontal sectional view of the conventional steel column installation with a baseplate. 従来のベースプレート付き柱脚と基礎の接合部分の垂直断面図。The vertical sectional view of the joined part of the conventional column base with a base plate, and a foundation. 本発明のベースプレート付き鉄骨柱設置の水平断面図。The horizontal sectional view of steel pillar installation with a baseplate of the present invention. 本発明のベースプレート付き柱脚と基礎の接合部分の垂直断面図。The vertical sectional view of the joined part of the column base with a base plate and foundation of the present invention.

本発明のうち角形ベースプレートの実施形態を図1〜図6で説明する。
鉄骨柱のレベルと傾斜の調整の為に基礎コンクリート上面に設けるまんじゅうに代えて、同一の役目を果たす、鋼製のドーム形の突起をベースプレート下面に設ける。
各寸法毎に、連続したドーム形の凹部を設けたベースプレートの鋳型に熔解した鉄を流し込み、冷却後取り外し、所定の寸法に裁断する。
An embodiment of a rectangular base plate of the present invention will be described with reference to FIGS.
Instead of the buns on the upper surface of the foundation concrete to adjust the level and inclination of the steel column, steel dome-shaped projections that serve the same function are provided on the lower surface of the base plate.
For each dimension, molten iron is poured into a base plate mold provided with a continuous dome-shaped recess, removed after cooling, and cut into a predetermined dimension.

1 基礎コンクリート
2 アンカーボルト
3 まんじゅう
4 まんじゅう筋
5 グラウト材
6 鉄骨柱
7 ベースプレート
8 ドーム形突起
1 Foundation concrete
2 Anchor bolt
3 Manju
4 Manju muscle
5 Grout wood
6 Steel columns
7 Base plate
8 Dome-shaped protrusion

Claims (1)

鉄骨柱脚を立て基礎コンクリートに接合させる為に、鉄骨柱脚の下端に取り付ける、下
面中央部分に一体化した鋼製のドーム形突起のある、角形並びに円形の、鋼製ベースプレ
ート。
A square and circular steel base plate with a steel dome-shaped projection integrated into the center of the bottom surface, which is attached to the lower end of the steel column base to attach the steel column base to the foundation concrete.
JP2009219123A 2009-09-24 2009-09-24 Bowl base plate Pending JP2011069063A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009219123A JP2011069063A (en) 2009-09-24 2009-09-24 Bowl base plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009219123A JP2011069063A (en) 2009-09-24 2009-09-24 Bowl base plate

Publications (1)

Publication Number Publication Date
JP2011069063A true JP2011069063A (en) 2011-04-07

Family

ID=44014579

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009219123A Pending JP2011069063A (en) 2009-09-24 2009-09-24 Bowl base plate

Country Status (1)

Country Link
JP (1) JP2011069063A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016069863A (en) * 2014-09-29 2016-05-09 大和ハウス工業株式会社 Concrete curing sheet and concrete construction method
CN110258609A (en) * 2019-06-24 2019-09-20 中国建筑第八工程局有限公司 Column foot joint construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016069863A (en) * 2014-09-29 2016-05-09 大和ハウス工業株式会社 Concrete curing sheet and concrete construction method
CN110258609A (en) * 2019-06-24 2019-09-20 中国建筑第八工程局有限公司 Column foot joint construction

Similar Documents

Publication Publication Date Title
CN105220874A (en) The construction method of basement superelevation exterior wall self-supporting single side formwork system
JP2009127231A5 (en)
JP5090220B2 (en) Concrete construction equipment
JP2011069063A (en) Bowl base plate
JP2000008483A (en) Baseplate fixing device
JP6529009B2 (en) Construction method of foundation for building
CN204959798U (en) Basement superelevation outer wall self -supporting unilateral component die body system
KR20100117288A (en) Concrete slab leveler
JP2006322154A (en) Foundation construction method of building
JP2005232866A (en) Cast-in-place hollow core concrete slab structure, cast-in-place hollow core concrete slab and its construction method
JPH02164931A (en) Foundation construction method for building
JP5749620B2 (en) Seismic isolation method for existing buildings
JP2005240426A (en) Erection structure for steel-pipe column
KR20090009128U (en) Basic Fabric for Facilities Supporting
JP3255253B2 (en) Construction method of pillar and its bottom support device
CN113293790A (en) Pre-leveling tower foundation and leveling construction method thereof
JPH02164930A (en) Foundation structure for building
JP2927783B1 (en) Top level adjustment method of reinforced concrete cloth foundation and precast reinforced concrete cloth foundation member
JPH11222928A (en) Steel frame column base part dropping-in construction method
JP2024051233A (en) Retaining wall cap block and installation method thereof
KR100296744B1 (en) Mold installation of cement concrete building using horizontal mold rest and execution method
JP2780861B2 (en) Block structure for foundation construction
JPH07113240A (en) Housing long-strip footing and construction method thereof
KR20010091695A (en) Method for Installing Support Portion of Bridge Beam
JP3052032U (en) Base plate fixing device