JP2010281081A - Method for constructing steel pipe pile - Google Patents

Method for constructing steel pipe pile Download PDF

Info

Publication number
JP2010281081A
JP2010281081A JP2009134343A JP2009134343A JP2010281081A JP 2010281081 A JP2010281081 A JP 2010281081A JP 2009134343 A JP2009134343 A JP 2009134343A JP 2009134343 A JP2009134343 A JP 2009134343A JP 2010281081 A JP2010281081 A JP 2010281081A
Authority
JP
Japan
Prior art keywords
steel pipe
pipe pile
plate
upper structure
mounting member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2009134343A
Other languages
Japanese (ja)
Inventor
Hiroshi Ogawa
ひろし 小川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sansei KK
Original Assignee
Sansei KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sansei KK filed Critical Sansei KK
Priority to JP2009134343A priority Critical patent/JP2010281081A/en
Publication of JP2010281081A publication Critical patent/JP2010281081A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a method for constructing a steel pipe pile, which makes an upper structure mounting member fixed to a head, and which dispenses with the welding of the upper structure mounting member to the steel pipe pile on a construction site. <P>SOLUTION: A plate 21, in which an insertion hole 211 for a bolt is preformed, and the steel pipe pile 11 are prepared (Fig.1(a)); the plate 21 for the upper structure mounting member is welded and fixed to the steel pipe pile 11 in a factory etc. (Fig.1(b)); the steel pipe pile 11 with the plate is carried in to the construction site, and buried in the ground 312 (Fig.1(c)); and the plate 21 and a plate 22, on which a support 12 of an upper structure is mounted, are connected together by means of the bolt 23 and nuts 241 and 242. <P>COPYRIGHT: (C)2011,JPO&INPIT

Description

本願発明は、地盤(地中)に鋼管杭を埋設し、その鋼管杭の頭部にアンテナ、信号機、広告等の支柱や電柱等の上部構造物を設置するときの鋼管杭の施工方法に関する。   The present invention relates to a method for constructing a steel pipe pile when a steel pipe pile is buried in the ground (underground) and an upper structure such as a pole or a power pole such as an antenna, a traffic light, or an advertisement is installed on the head of the steel pipe pile.

上部構造物を設置する鋼管杭を埋設する場合、従来例えば図4の施工方法が行われている。
図4(a),(b1)は、鋼管杭を地盤に埋設した状態の断面図を示す。
まず図4(a)について説明する(例えば特許文献1参照)。
事前に円筒状部材(鋼管)62の一端に円盤状のプレート71を溶接により固着した部材(上部構造物取付部材)を作製する。次に地盤312に鋼管杭61を打設して埋設し、その鋼管杭61の頭部に円筒状部材62の他端を溶接により固着する。即ち鋼管杭61の頭部に上部構造物取付部材を接合する。
上部構造物が例えばアンテナの場合、アンテナの支柱(図示せず)を取付けた円盤状のプレート72を、ボルト73とナット741,742によりプレート71に結合する。即ちプレート72を上部構造物取付部材に結合する。その結合の際、必要に応じてプレート71,72の間にグラウト材75を充填する。
When embedding a steel pipe pile for installing the superstructure, for example, the construction method of FIG. 4 is conventionally performed.
4 (a) and 4 (b1) are sectional views showing a state where a steel pipe pile is embedded in the ground.
First, FIG. 4A will be described (see, for example, Patent Document 1).
A member (upper structure mounting member) in which a disk-like plate 71 is fixed to one end of a cylindrical member (steel pipe) 62 in advance by welding is prepared. Next, the steel pipe pile 61 is cast and embedded in the ground 312, and the other end of the cylindrical member 62 is fixed to the head of the steel pipe pile 61 by welding. That is, the upper structure attaching member is joined to the head of the steel pipe pile 61.
When the superstructure is an antenna, for example, a disk-shaped plate 72 to which an antenna support (not shown) is attached is coupled to the plate 71 by bolts 73 and nuts 741 and 742. That is, the plate 72 is coupled to the upper structure mounting member. During the connection, the grout material 75 is filled between the plates 71 and 72 as necessary.

次に図4(b1)について説明する(例えば特許文献2参照)。
まず鋼管杭61を地盤312に埋設し、その鋼管杭61の頭部外周に、プレート取付金具76を複数個溶接により固着して、プレート71とプレート取付金具76をボルト73とナット741,742によって結合する。即ち図4(b1)の場合、上部構造物取付部材は、プレート取付金具76とプレート71からなる。上部構造物を取付けたプレート(図示せず)は、4(a)と同じように、ボルト73とナット741,742によりプレート71に結合する。
なおプレート取付金具76の側面形状(図4(b1)において左側叉は右側から見た形状)は、図4(b2)のようになる。
Next, FIG. 4B1 will be described (see, for example, Patent Document 2).
First, the steel pipe pile 61 is embedded in the ground 312, and a plurality of plate mounting brackets 76 are fixed to the outer periphery of the head portion of the steel pipe pile 61 by welding, and the plate 71 and the plate mounting bracket 76 are connected by bolts 73 and nuts 741 and 742. Join. That is, in the case of FIG. 4B 1, the upper structure mounting member includes a plate mounting bracket 76 and a plate 71. A plate (not shown) to which the superstructure is attached is coupled to the plate 71 by bolts 73 and nuts 741 and 742, as in 4 (a).
The side surface shape of the plate mounting bracket 76 (the shape viewed from the left side or the right side in FIG. 4 (b1)) is as shown in FIG. 4 (b2).

特開2006−214226号公報JP 2006-214226 A 特開2004−11283号公報JP 2004-11283 A

従来の鋼管杭の施工方法は、鋼管杭11を地盤に埋設し、その埋設した鋼管杭の頭部に上部構造物取付部材を溶接により固着しなければならない。即ち鋼管杭の施工現場において溶接作業が必要になる。施工現場における溶接作業は、難しく危険を伴う場合もあるため、作業効率が悪く施工期間が長くなり、また溶接の品質も十分でない場合がある。
本願発明は、従来の鋼管杭の施工方法の前記問題点に鑑み、鋼管杭の施工を効率的に安全に行うことができ、高品質の溶接が可能な鋼管杭の施工方法を提供することを目的とする。
In the conventional steel pipe pile construction method, the steel pipe pile 11 must be buried in the ground, and the upper structure mounting member must be fixed to the head of the buried steel pipe pile by welding. That is, welding work is required at the construction site of the steel pipe pile. Since the welding work at the construction site may be difficult and dangerous, the work efficiency may be poor and the construction period may be long, and the welding quality may not be sufficient.
In view of the above-described problems of conventional steel pipe pile construction methods, the present invention provides a steel pipe pile construction method capable of efficiently and safely performing steel pipe pile construction and capable of high-quality welding. Objective.

本願発明は、その目的を達成するため、請求項1に記載の鋼管杭の施工方法は、事前に頭部に上部構造物取付部材を固着した鋼管杭を用意し、その鋼管杭を地盤に所定の深さまで埋設し、上部構造物取付部材に上部構造物を結合することを特徴とする。
請求項2に記載の鋼管杭の施工方法は、請求項1に記載の鋼管杭の施工方法において、前記上部構造物取付部材は、プレートであることを特徴とする。
請求項3に記載の鋼管杭の施工方法は、請求項1叉は請求項2に記載の鋼管杭の施工方法において、前記鋼管杭は、先端にスクリュー状の翼を備えていることを特徴とする。
請求項4に記載の鋼管杭の施工方法は、請求項3に記載の鋼管杭の施工方法において、前記鋼管杭は回転して圧入することを特徴とする。
In order to achieve the object of the present invention, the steel pipe pile construction method according to claim 1 prepares a steel pipe pile having an upper structure attaching member fixed to the head in advance, and the steel pipe pile is predetermined on the ground. It is characterized by being embedded to a depth of and joining the upper structure to the upper structure mounting member.
The steel pipe pile construction method according to claim 2 is the steel pipe pile construction method according to claim 1, wherein the upper structure mounting member is a plate.
The construction method of the steel pipe pile according to claim 3 is the construction method of the steel pipe pile according to claim 1 or claim 2, wherein the steel pipe pile is provided with a screw-shaped wing at the tip. To do.
The steel pipe pile construction method according to claim 4 is the steel pipe pile construction method according to claim 3, wherein the steel pipe pile rotates and press-fits.

本願発明は、事前に工場等の設備の整った場所において鋼管杭に上部構造物取付部材を溶接して固着するから、施工現場において鋼管杭に上部構造物取付部材を溶接する必要がない。したがって本願発明は、鋼管杭の施工を容易に安全に効率的に行うことができ、施工期間を短縮できる。また鋼管杭と上部構造物取付部材との接合(溶接)は、設備の整った工場等で行うから、高品質の溶接が可能になる。
本願発明は、翼付鋼管杭を回転して圧入するから、鋼管杭11に上部構造物取付部材を取付けた状態で鋼管杭を円滑に埋設できる。
In the present invention, since the upper structure attaching member is welded and fixed to the steel pipe pile in a well-equipped place such as a factory in advance, it is not necessary to weld the upper structure attaching member to the steel pipe pile at the construction site. Therefore, this invention can perform construction of a steel pipe pile easily, safely and efficiently, and can shorten a construction period. Moreover, since the steel pipe pile and the superstructure attachment member are joined (welded) at a factory equipped with facilities, high-quality welding is possible.
Since this invention rotates and press-fits a winged steel pipe pile, it can embed a steel pipe pile smoothly in the state which attached the upper structure attachment member to the steel pipe pile 11. FIG.

図1は、本願発明の実施例に係る鋼管杭の第1の施工方法を説明する図である。Drawing 1 is a figure explaining the 1st construction method of the steel pipe pile concerning the example of this invention. 図2は、本願発明の実施例に係る鋼管杭の第2の施工方法を説明する図である。Drawing 2 is a figure explaining the 2nd construction method of the steel pipe pile concerning the example of the invention in this application. 図3は、図1、図2の施工方法に用いるプレートの構造と鋼管杭の先端部の構造を示す。FIG. 3 shows the structure of the plate used in the construction method of FIGS. 1 and 2 and the structure of the tip of the steel pipe pile. 図4は、従来の鋼管杭の施工方法を説明する図である。FIG. 4 is a diagram illustrating a conventional steel pipe pile construction method.

図1〜3により本願発明の実施例に係る鋼管杭の施工方法を説明する。
なお図1〜3において、共通の部分は、同じ符号を使用している。
The construction method of the steel pipe pile which concerns on the Example of this invention with FIGS. 1-3 is demonstrated.
1 to 3, common parts use the same reference numerals.

図1により鋼管杭の第1の施工方法の手順を説明する。
まず図1(a)のように、ボルトの挿入孔211を形成したプレート21と埋設する鋼管杭11を用意し、図1(b)のように、工場等において鋼管杭11の頭部にプレート21を溶接により固着してプレート付き鋼管杭11を作製する。そのプレート付き鋼管杭11を施工現場に搬入して、図1(c)のように、鋼管杭11を回転させながら圧入して、或いは打設して地盤312に埋設する。その際プレート21の地盤面311からの距離は、上部構造物の設置条件等を勘案して設定する。次に図1(d)のように、プレート21に、上部構造物の支柱12を取付けたプレート22をボルト23、ナット241,242によって結合する。その際プレート21とプレート22の間にグラウト材を充填してもよい。図1(a)の場合、プレート21は、上部構造物を鋼管杭11に取付ける部材、即ち上部構造物取付部材となる。
The procedure of the 1st construction method of a steel pipe pile is demonstrated with FIG.
First, as shown in FIG. 1 (a), a plate 21 in which a bolt insertion hole 211 is formed and a steel pipe pile 11 to be embedded are prepared. As shown in FIG. 1 (b), a plate is placed on the head of the steel pipe pile 11 in a factory or the like. 21 is fixed by welding, and the steel pipe pile 11 with a plate is produced. The steel pipe pile 11 with the plate is carried into the construction site, and the steel pipe pile 11 is press-fitted while being rotated as shown in FIG. At this time, the distance of the plate 21 from the ground surface 311 is set in consideration of the installation conditions of the upper structure. Next, as shown in FIG. 1 (d), the plate 22 to which the upper structure column 12 is attached is coupled to the plate 21 by bolts 23 and nuts 241 and 242. At that time, a grout material may be filled between the plate 21 and the plate 22. In the case of Fig.1 (a), the plate 21 becomes a member which attaches an upper structure to the steel pipe pile 11, ie, an upper structure attachment member.

次に図2により鋼管杭の第2の施工方法の手順を説明する。
まず図2(a)のように、根伐りして地盤412に基礎構築用の空間313を掘削し、図2(b)のように、図1と同じ構造のプレート付き鋼管杭11を回転させながら圧入して、或いは打設して地盤312に埋設する。次に図2(c)のように、鋼管杭11の上部構造物取付部材用のプレート21にボルト23、ナット241,242を装着し、空間313内にコンクリートの基礎314を構築する。そして図2(d)のように、プレート21と上部構造物の支柱12を取付けたプレート22をボルト23、ナット241,242によって結合する。
Next, the procedure of the 2nd construction method of a steel pipe pile is demonstrated with FIG.
First, as shown in FIG. 2 (a), rooting is performed, and a space 313 for foundation construction is excavated in the ground 412. As shown in FIG. 2 (b), the steel pipe pile 11 having the same structure as FIG. 1 is rotated. Then, it is press-fitted or placed and buried in the ground 312. Next, as shown in FIG. 2C, bolts 23 and nuts 241 and 242 are attached to the plate 21 for the upper structure mounting member of the steel pipe pile 11, and a concrete foundation 314 is constructed in the space 313. Then, as shown in FIG. 2 (d), the plate 22 and the plate 22 to which the support structure 12 of the superstructure is attached are coupled by bolts 23 and nuts 241 and 242.

図1、図2の施工方法は、鋼管杭を地盤に埋設する前に、工場等の設備の整った場所において鋼管杭の頭部に上部構造物取付部材を溶接により固着から、施工現場においてその溶接を行う必要がない。したがって図1、図2の施工方法は、鋼管杭の施工を容易に安全に効率的に行うことができ、施工期間を短縮することができる。また鋼管杭に上部構造物取付部材を溶接する作業は、設備の整った場所において行うから、高品質の溶接が可能になる。   The construction method in FIGS. 1 and 2 is such that, before embedding the steel pipe pile in the ground, the upper structure mounting member is fixed to the head of the steel pipe pile by welding in a well-equipped place such as a factory. There is no need to weld. Therefore, the construction method of FIG. 1 and FIG. 2 can perform construction of a steel pipe pile easily, safely, and efficiently, and can shorten a construction period. Moreover, since the work of welding the superstructure attachment member to the steel pipe pile is performed in a well-equipped place, high-quality welding is possible.

図3は、図1、図2のプレートの構造例と鋼管杭の先端部の構造例を示す。
図3(a1)は、図1、図2のプレート21の例を、図3(a2)は、図1、図2のプレート22の例を示す。プレート21、プレート22は、ボルト23を挿入する長孔211,221を形成してある。孔211,221は、長孔にすることによりプレート21とプレート22の相対的位置関係を調整することができる。なおプレート21,22は、四角形でなく円形であってもよい。
FIG. 3 shows a structural example of the plate of FIGS. 1 and 2 and a structural example of the tip portion of the steel pipe pile.
3A1 shows an example of the plate 21 shown in FIGS. 1 and 2, and FIG. 3A2 shows an example of the plate 22 shown in FIGS. The plates 21 and 22 have long holes 211 and 221 into which the bolts 23 are inserted. By making the holes 211 and 221 into long holes, the relative positional relationship between the plate 21 and the plate 22 can be adjusted. The plates 21 and 22 may be circular instead of square.

図3(b)は、鋼管杭11の先端部にスクリュー状(螺旋状)の2枚の翼111,112を取付けた例である。鋼管杭が先端部に翼111,112を備えている場合には、杭施工機(図示せず)により鋼管杭11の周囲を把持し、鋼管杭11を回転して圧入できるから、鋼管杭11は、上部構造物取付部材を取付けた状態でも円滑に埋設できる。上部構造物取付部材が図1、図2のプレート21の場合には、杭施工機によりそのプレート21を把持して鋼管杭11を回転し圧入することもできる。   FIG. 3B is an example in which two screw-like (spiral) blades 111 and 112 are attached to the tip of the steel pipe pile 11. When the steel pipe pile is provided with the wings 111 and 112 at the tip, the periphery of the steel pipe pile 11 can be gripped by a pile construction machine (not shown), and the steel pipe pile 11 can be rotated and press-fitted. Can be embedded smoothly even when the upper structure mounting member is mounted. When the superstructure attachment member is the plate 21 of FIGS. 1 and 2, the steel pipe pile 11 can be rotated and press-fitted by holding the plate 21 with a pile construction machine.

前記実施例の施工方法は、上部構造物取付部材としてプレート21を用い、そのプレート21を鋼管杭11に直接溶接する例について説明したが、上部構造物取付部材は、図4の従来例と同じ構造のものであってもよい。またその他、従来慣用されている二重管式杭頭構造、基礎に埋設する鉄筋、アンカーボルト等を鋼管杭の頭部に溶接により固着する構造の上部構造物取付部材の場合にも、本願発明を実施することができる。   In the construction method of the above embodiment, the plate 21 is used as the upper structure mounting member and the plate 21 is directly welded to the steel pipe pile 11. However, the upper structure mounting member is the same as the conventional example of FIG. It may be of a structure. In addition, in the case of an upper structure mounting member having a structure in which a conventionally used double pipe pile head structure, a reinforcing bar embedded in a foundation, an anchor bolt, etc. are fixed to the head of a steel pipe pile by welding, the present invention is also applied. Can be implemented.

11 鋼管杭
111,112 翼
12 上部構造物の支柱
21 上部構造物取付部材用のプレート
22 上部構造物の支柱を取付けるプレート
311 地盤面
312 地盤
313 根伐りして形成した空間
314 コンクリートの基礎
DESCRIPTION OF SYMBOLS 11 Steel pipe pile 111,112 Wing | blade 12 Superstructure support | pillar 21 Plate for upper structure attachment member 22 Plate 311 which attaches the support | pillar of an upper structure Ground surface 312 Ground 313 Space 314 formed by root cutting Concrete foundation 314

Claims (4)

事前に頭部に上部構造物取付部材を固着した鋼管杭を用意し、その鋼管杭を地盤に所定の深さまで埋設し、上部構造物取付部材に上部構造物を結合することを特徴とする鋼管杭の施工方法。   A steel pipe pile in which an upper structure mounting member is fixed to the head in advance, the steel pipe pile is buried in the ground to a predetermined depth, and the upper structure is joined to the upper structure mounting member. Pile construction method. 請求項1に記載の鋼管杭の施工方法において、前記上部構造物取付部材は、プレートであることを特徴とする鋼管杭の施工方法。   The steel pipe pile construction method according to claim 1, wherein the upper structure mounting member is a plate. 請求項1叉は請求項2に記載の鋼管杭の施工方法において、前記鋼管杭は、先端にスクリュー状の翼を備えていることを特徴とする鋼管杭の施工方法。   The method for constructing a steel pipe pile according to claim 1 or 2, wherein the steel pipe pile is provided with a screw-shaped wing at the tip. 請求項3に記載の鋼管杭の施工方法において、前記鋼管杭は回転して圧入することを特徴とする鋼管杭の施工方法。   The construction method of the steel pipe pile according to claim 3, wherein the steel pipe pile is rotated and press-fitted.
JP2009134343A 2009-06-03 2009-06-03 Method for constructing steel pipe pile Pending JP2010281081A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009134343A JP2010281081A (en) 2009-06-03 2009-06-03 Method for constructing steel pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009134343A JP2010281081A (en) 2009-06-03 2009-06-03 Method for constructing steel pipe pile

Publications (1)

Publication Number Publication Date
JP2010281081A true JP2010281081A (en) 2010-12-16

Family

ID=43538044

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009134343A Pending JP2010281081A (en) 2009-06-03 2009-06-03 Method for constructing steel pipe pile

Country Status (1)

Country Link
JP (1) JP2010281081A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013060711A (en) * 2011-09-12 2013-04-04 Chiyoda Geotech Co Ltd Foundation structure for solar cell module or solar cell array frame
JP2014077299A (en) * 2012-10-11 2014-05-01 H G Service Kk Foundation pile
JP2014134016A (en) * 2013-01-10 2014-07-24 Sansei:Kk Rotary press-in construction method for steel pipe pile with blade
JP2015110875A (en) * 2013-12-06 2015-06-18 株式会社クロスゲート Foundation pillar

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013060711A (en) * 2011-09-12 2013-04-04 Chiyoda Geotech Co Ltd Foundation structure for solar cell module or solar cell array frame
JP2014077299A (en) * 2012-10-11 2014-05-01 H G Service Kk Foundation pile
JP2014134016A (en) * 2013-01-10 2014-07-24 Sansei:Kk Rotary press-in construction method for steel pipe pile with blade
JP2015110875A (en) * 2013-12-06 2015-06-18 株式会社クロスゲート Foundation pillar

Similar Documents

Publication Publication Date Title
KR101242476B1 (en) Base construct method of building and base construct member of building
JP2009127231A (en) Continuous footing reinforcing structure, its construction method, and reinforcing metal
JP2010281081A (en) Method for constructing steel pipe pile
JP5062570B2 (en) Pile head seismic isolation structure
JP2018062812A (en) Foundation structure, pile head structure of steel-pipe pile, and construction method for foundation structure
JP2011080195A (en) Anchor device and method of installing anchor
JP2010190038A (en) Method for joining prefabricated pile and joint metal for the prefabricated pile
JP6166072B2 (en) Earth retaining structure and earth retaining method
JP6233752B2 (en) Pile head structure
JP5133650B2 (en) Joint structure of column and steel pipe pile
JP2011163009A (en) Subsidence prevention structure of foundation steel pipe
JP2014185504A (en) Junction structure of pile of building with upper structure of the building
JP3800535B2 (en) Pile-column connection structure and method
JP4420697B2 (en) Standing structure of steel pipe columns
JP2017166203A (en) Method and structure for horizontal repair of building
JP2013002047A (en) Steel pipe concrete composite pile
JP2008081985A (en) Pile and pile head anchoring structure
JP6233753B2 (en) Pile head structure and construction method of pile head structure
JP2011252301A (en) Pile and penetration apparatus
JP2009270403A (en) Clutch body for use in burial device for hollow pile
JP2009162029A (en) Retaining wall
JP2007224537A (en) Foundation for steel pipe pole, and foundation method therefor
JP2006291535A (en) Pole reinforcing fitting and fixing method for the reinforcing fitting
JP2010281079A (en) Method for constructing steel pipe pile
JP3126465U (en) Wind pressure lateral rotation prevention structure of prop steel pipe